Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7523364B2 - Operation status management system - Google Patents
[go: Go Back, main page]

JP7523364B2 - Operation status management system - Google Patents

Operation status management system Download PDF

Info

Publication number
JP7523364B2
JP7523364B2 JP2021004067A JP2021004067A JP7523364B2 JP 7523364 B2 JP7523364 B2 JP 7523364B2 JP 2021004067 A JP2021004067 A JP 2021004067A JP 2021004067 A JP2021004067 A JP 2021004067A JP 7523364 B2 JP7523364 B2 JP 7523364B2
Authority
JP
Japan
Prior art keywords
power
operation status
management system
power outage
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021004067A
Other languages
Japanese (ja)
Other versions
JP2021114897A (en
Inventor
進二郎 福山
裕也 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Publication of JP2021114897A publication Critical patent/JP2021114897A/en
Application granted granted Critical
Publication of JP7523364B2 publication Critical patent/JP7523364B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • Y04S20/244Home appliances the home appliances being or involving heating ventilating and air conditioning [HVAC] units

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、稼働状況管理システムに関する。 The present invention relates to an operation status management system.

家庭で使用する電気の節約や、電気の効率的な利用を行わせるものとしてHEMS(Home Energy Management System)が知られている。HEMSは、空調、冷暖房といった設備機器が消費する電気などのエネルギー量や、太陽光パネルなどによる発電機器などの使用状態をモニターしたり、自動制御したりすることを目的としたシステムである。 The Home Energy Management System (HEMS) is known as a system that helps save electricity used at home and use it efficiently. HEMS is a system that aims to monitor and automatically control the amount of energy, such as electricity, consumed by equipment such as air conditioners and heating and cooling, and the usage status of power generation equipment such as solar panels.

特許文献1には、HEMSコントローラを備えたエネルギー管理システムが記載されている。このエネルギー管理システムは、電力消費量が増大して電力量が逼迫した状況になる場合や一時的に発電量が増大して電力の供給が過剰になる場合に、電力会社が集中管理システムに対して消費電力量の調整要求を送るものである。また、集中管理システムは、通信ネットワークを介して電力会社および各家庭に設置したHEMSコントローラと接続されており、電力会社からの要求に応じて各家庭に設置したHEMSコントローラを介して家庭内の機器を制御するようになっている。
さらに、上述の特許文献1とは別に、災害時に、電力供給を安定して行うことが提案されている(例えば、特許文献2参照)。
Patent Literature 1 describes an energy management system equipped with a HEMS controller. In this energy management system, when power consumption increases and the power supply becomes tight, or when power generation temporarily increases and the power supply becomes excessive, a power company sends a request for adjusting the power consumption to a centralized management system. The centralized management system is connected to the power company and the HEMS controllers installed in each home via a communication network, and controls household appliances via the HEMS controller installed in each home in response to a request from the power company.
Furthermore, apart from the above-mentioned Patent Document 1, a method for stably supplying power in the event of a disaster has been proposed (see, for example, Patent Document 2).

特開2014-120030号公報JP 2014-120030 A 特開2008-245454号公報JP 2008-245454 A

近年、暴風雨、水害などの自然災害により住宅の被害が多く生じており、また、自然災害時に、停電が発生する場合がある。 In recent years, natural disasters such as storms and floods have caused a lot of damage to homes, and power outages can occur during natural disasters.

特許文献2に記載の発明のように、停電しないように電力供給を行うことは一つの解決方法ではあるが、全住宅に対して、確実に電力供給を行うのは困難であるし、電力設備機器類が破損、水没した場合は、電力供給も困難になる。 One solution is to supply power to prevent power outages, as in the invention described in Patent Document 2, but it is difficult to reliably supply power to all homes, and if power equipment is damaged or submerged in water, it becomes difficult to supply power.

このように、災害発生時には、停電中や停電の復旧後に、電力機器が正常に稼働しない場合があり、住人が電力機器の異常に気付かない場合、その異常状態のままで放置されるおそれがある。 In this way, when a disaster occurs, power equipment may not operate normally during a power outage or after the power is restored, and if residents do not notice an abnormality in the power equipment, it may be left in that abnormal state.

したがって、災害発生時に住宅の電力機器の稼働状況に異常が生じた場合、早急かつ正確な被害状況の把握と、被害状況に応じた早期の対応が望まれる。 Therefore, if an abnormality occurs in the operation of residential power equipment during a disaster, it is desirable to quickly and accurately grasp the extent of the damage and take early action according to the damage.

本開示は、上記課題に着目してなされたもので、住宅の電力関連機器の稼働状況に不具合が生じた場合に、早期に状況を把握可能とする稼働状況管理システムの提供を目的とするものである。 This disclosure was made with a focus on the above-mentioned problem, and aims to provide an operation status management system that makes it possible to grasp the situation early when a malfunction occurs in the operation status of power-related equipment in a home.

上記目的を達成するために、本開示の稼働状況管理システムは、少なくとも蓄電池と太陽光発電装置との一方を含む電力機器と、前記電力機器の動作状態を示すデータを受け取るコントローラと、を備えた複数の住宅の前記コントローラと通信可能に接続され、前記コントローラから前記動作状態を示すデータを受け取り記録するサーバを備える。 To achieve the above objective, the operation status management system of the present disclosure includes a server that is communicatively connected to the controllers of multiple homes that are equipped with electric power equipment including at least one of a storage battery and a solar power generation device, and a controller that receives data indicating the operating status of the electric power equipment, and receives and records data indicating the operating status from the controller.

そして、前記サーバは、前記コントローラから受け取る前記動作状態を示すデータに基づいて停電状態を判定する停電判定部と、前記動作状態を示すデータに基づいて、前記電力機器の停電中の稼働状況と停電復旧後の稼働状況との少なくとも一方を分析する稼働分析部と、前記分析の結果を表示部に表示させる表示処理部と、を備える。 The server includes a power outage determination unit that determines a power outage state based on the data indicating the operating state received from the controller, an operation analysis unit that analyzes at least one of the operating status of the power equipment during the power outage and the operating status after the power is restored based on the data indicating the operating state, and a display processing unit that displays the results of the analysis on a display unit.

本開示の稼働状況管理システムは、停電判定部と稼働分析部とにより、停電の復旧後に停電状態の判定と、電力機器の稼働状況の分析とを行うため、住宅の電力関連機器の稼働状況に不具合が生じた場合に、早期に状況を把握可能である。 The operation status management system disclosed herein uses a power outage determination unit and an operation analysis unit to determine the power outage state and analyze the operation status of power equipment after the power is restored, making it possible to grasp the situation early if a problem occurs in the operation status of power-related equipment in a home.

実施の形態の稼働状況管理システムの全体概要を表した全体図である。1 is an overall view showing an overview of an operational status management system according to an embodiment; 実施の形態の稼働状況管理システムによる処理の流れを示すシーケンス図である。1 is a sequence diagram showing a flow of processing by an operational status management system according to an embodiment. FIG. 実施の形態の稼働状況管理システムの停電判定処理の流れを示すフローチャートである。1 is a flowchart showing a flow of a power outage determination process in an operation status management system according to an embodiment. 実施の形態の稼働状況管理システムによる停電判定結果の表示におけるラベルと詳細との関係の説明図である。11 is an explanatory diagram of the relationship between labels and details in the display of a power outage determination result by the operation status management system of the embodiment. FIG. 実施の形態の稼働状況管理システムによる稼働状況分析の概要の説明図である。FIG. 2 is an explanatory diagram of an overview of an operational status analysis performed by the operational status management system according to the embodiment. 実施の形態の稼働状況管理システムによる、停電状況と、蓄電池の稼働状況分析結果と、それに対する対応の表示内容との関係の説明図である。1 is an explanatory diagram of the relationship between a power outage situation, an analysis result of the operational status of a storage battery, and the display content of the response thereto, according to an embodiment of the operational status management system. 実施の形態の稼働状況管理システムによる、停電状況と、太陽光発電装置蓄電池の稼働状況分析結果と、それに対する対応の表示内容との関係の説明図である。1 is an explanatory diagram of the relationship between a power outage situation, an analysis result of the operational status of a storage battery of a photovoltaic power generation device, and the display content of the corresponding response, according to an embodiment of the operational status management system. 実施の形態の稼働状況管理システムによる、非常用コンセント接続データ、太陽光発電装置発電時間内データ、履歴記憶タイミングデータと、それに対応する稼働判別(分析結果)との関係の説明図である。1 is an explanatory diagram of the relationship between emergency outlet connection data, data within the power generation time of a photovoltaic power generation device, history storage timing data, and corresponding operation determination (analysis result) according to an embodiment of the operation status management system. FIG. 実施の形態の変形例の稼働状況管理システムによる、停電判定処理の流れの主要部を示すフローチャートである。13 is a flowchart showing a main part of a flow of a power outage determination process by an operation status management system according to a modified example of an embodiment.

以下、本開示の稼働状況管理システムの実施形態について説明する。
図1は、実施の形態の稼働状況管理システムの概要を表した説明図である。
この稼働状況管理システムは、いわゆるHEMSを構成する住宅100のコントローラ110と通信ネットワークNEを介して通信可能な第1管理部200と、この第1管理部200と通信可能な第2管理部300とを有したシステムである。
Hereinafter, an embodiment of the operation status management system of the present disclosure will be described.
FIG. 1 is an explanatory diagram showing an overview of an operational status management system according to an embodiment.
This operational status management system is a system having a first management unit 200 that can communicate with a controller 110 of a home 100 that constitutes a so-called HEMS via a communication network NE, and a second management unit 300 that can communicate with this first management unit 200.

なお、コントローラ110と通信ネットワークNEとの間には、情報分電盤120が介在されている。この情報分電盤120は、住宅内外の通信機能を集約するとともに、電力計測機能を有し、住宅100における電力の供給や消費状態を監視する。また、また、図1では住宅100として、1邸のみ示しているが、第1管理部200は、複数の住宅100のコントローラ110と接続されている。 In addition, an information distribution board 120 is interposed between the controller 110 and the communication network NE. This information distribution board 120 aggregates communication functions inside and outside the house, and has a power measurement function to monitor the power supply and consumption status in the house 100. Also, although only one house is shown as the house 100 in FIG. 1, the first management unit 200 is connected to the controllers 110 of multiple houses 100.

住宅100には、電力機器として、太陽光発電装置130、蓄電池140、パワーコンディショナ150を備える。なお、パワーコンディショナ150は、電気自動車EVに搭載された蓄電池(図示省略)の充電、放電を制御する。また、住宅100には、電力を消費する電力消費装置として、空調装置160や給湯装置170が設けられている。なお、電気自動車EVは、充放電可能な蓄電池を搭載した車両を指すもので、ハイブリッド車を含む。 The house 100 is equipped with a solar power generation device 130, a storage battery 140, and a power conditioner 150 as power equipment. The power conditioner 150 controls the charging and discharging of a storage battery (not shown) installed in the electric vehicle EV. The house 100 is also equipped with an air conditioner 160 and a hot water heater 170 as power consumption devices that consume power. The electric vehicle EV refers to a vehicle equipped with a rechargeable storage battery, and includes hybrid vehicles.

コントローラ110は、太陽光発電装置130、蓄電池140、パワーコンディショナ150、空調装置160、給湯装置170の作動状態を監視し、これらの作動状態を示すデータを24時間計測する(図2参照)。 The controller 110 monitors the operating status of the solar power generation system 130, the storage battery 140, the power conditioner 150, the air conditioning system 160, and the hot water supply system 170, and measures data indicating these operating statuses 24 hours a day (see Figure 2).

第1管理部200は、NAVIサーバ(第1のサーバ)210と第1データベース220とを備える。 The first management unit 200 includes a NAVI server (first server) 210 and a first database 220.

NAVIサーバ210は、コントローラ110による電力機器や電力消費装置の制御を管理する。そこで、図2に示すように、毎日、所定の時刻(本実施の形態1では、0:00~10:30の間)にコントローラ110からデータを収集し、第1データベース220に記録する。 The NAVI server 210 manages the control of power equipment and power consumption devices by the controller 110. As shown in FIG. 2, data is collected from the controller 110 at a specified time each day (between 0:00 and 10:30 in the first embodiment) and recorded in the first database 220.

この第1管理部200は、NAVIサーバ210により、取得したデータに基づいて、各住宅100における住環境を快適に保つための制御を継続的に実行する。この住環境を快適に保つための制御として、例えば、翌日の天気予報情報と、各住宅100の住人により入力スケジュールとに基づいて、空調装置160や給湯装置170の運転計画を作成し、運転計画に基づいてこれらの自動運転を行う制御を行う。また、電力消費状態を監視し、より良い電力消費状態をアドバイスする制御を行うこともできる。 The first management unit 200 continuously executes control to keep the living environment in each house 100 comfortable based on data acquired by the NAVI server 210. As part of the control to keep the living environment comfortable, for example, an operation plan for the air conditioner 160 and hot water heater 170 is created based on the weather forecast information for the next day and the schedule input by the resident of each house 100, and control is performed to automatically operate these devices based on the operation plan. It is also possible to monitor the power consumption status and perform control to provide advice on better power consumption status.

このように、上記の第1管理部200は、住宅100の電力機器の制御に関する管理を行うもので、例えば、住宅メーカなどが継続的に管理する。また、第1管理部200は、第1の管理者の第1担当者AD1が、いわゆるパーソナルコンピュータなどの情報端末230を用いてアクセスして、入出力が可能となっている。 In this way, the first management unit 200 manages the control of the power equipment of the house 100, and is continuously managed by, for example, a house manufacturer. In addition, the first management unit 200 can be accessed by the first person in charge AD1 of the first manager using an information terminal 230 such as a personal computer to input and output data.

第2管理部300は、住宅100の電力機器のメンテナンス、つまり、故障が発生した場合に、住宅100に出向いて修理を行ったり、住人に対して、最適な対応方法を、通信ネットワークNEを介して行ったりする第2の管理者が管理する。 The second management unit 300 is managed by a second administrator who performs maintenance on the power equipment in the house 100, i.e., in the event of a breakdown, visits the house 100 to make repairs and provides the residents with the most appropriate response method via the communication network NE.

第2管理部300は、SIFT集計サーバ(第2のサーバ)310、第2データベース320、SIFT公開サーバ(第2のサーバ)330を備える。SIFT集計サーバ310は、NAVIサーバ210から、毎日、所定の時刻(本実施の形態では、NAVIサーバ210が、コントローラ110からデータを受け取る時刻よりも遅い時刻(例えば、10:40))に、当日、各住宅100のコントローラ110から収集したデータを受信し、第2データベース320の通常時データベース321に記録する。 The second management unit 300 includes a SIFT aggregation server (second server) 310, a second database 320, and a SIFT public server (second server) 330. The SIFT aggregation server 310 receives data collected from the controller 110 of each residence 100 on the day from the NAVI server 210 at a predetermined time every day (in this embodiment, a time later than the time the NAVI server 210 receives data from the controller 110 (e.g., 10:40)), and records the data in the normal time database 321 of the second database 320.

なお、第2データベース320は、災害調査時に、分析結果を保存するための災害時分析結果データベース322を備える。 The second database 320 also includes a disaster analysis results database 322 for storing analysis results during disaster investigations.

SIFT公開サーバ330は、第2データベース320のデータを閲覧する際に使用する。第2担当者AD2は、パーソナルコンピュータなどの情報端末340により通常時データベース321および災害時分析結果データベース322のデータを、閲覧することができる。 The SIFT public server 330 is used to view the data in the second database 320. The second person in charge AD2 can view the data in the normal database 321 and the disaster analysis result database 322 using an information terminal 340 such as a personal computer.

例えば、第2担当者AD2は、情報端末340を用いて図2に示すように、必要なデータを抽出する要求を出力し、通常時データベース321から必要なデータを抽出することができる。また、第2担当者AD2は、情報端末340を用いて必要な測定データをダウンロードしたい場合、測定データの抽出要求を出力し、通常時データベース321から必要な測定データを抽出してダウンロードすることができる。 For example, the second person in charge AD2 can use the information terminal 340 to output a request to extract necessary data as shown in FIG. 2, and extract the necessary data from the normal time database 321. Also, when the second person in charge AD2 wants to download necessary measurement data using the information terminal 340, he or she can output a request to extract the measurement data, and extract and download the necessary measurement data from the normal time database 321.

さらに、第2担当者AD2は、災害発生時に、情報端末340を用いて後述する稼働状況分析処理を実行することを要求(リクエスト)することができる(図2参照)。 Furthermore, in the event of a disaster, the second person in charge AD2 can use the information terminal 340 to request that the operation status analysis process described below be executed (see Figure 2).

(災害時調査の説明)
第2担当者AD2は、第2管理部300を用いて、災害発生時に、顧客の住宅100の
災害調査として、電力機器類の稼働状況を分析することができる。
(Explanation of disaster investigation)
The second person in charge AD2 can use the second management unit 300 to analyze the operating status of electric appliances as part of a disaster investigation of the customer's house 100 in the event of a disaster.

以下に、この災害時調査を行う際の、第2担当者AD2の操作と、この操作に応じた第2管理部300における処理について説明する。 The following describes the operations performed by the second person in charge AD2 when conducting this disaster investigation, and the processing performed by the second management unit 300 in response to these operations.

災害が発生した場合、第2担当者AD2は、情報端末340から、SIFT公開サーバ330に接続し、災害調査開始要求を行う。 When a disaster occurs, the second person in charge AD2 connects to the SIFT public server 330 from the information terminal 340 and requests the start of a disaster investigation.

SIFT公開サーバ330は、災害調査開始要求に対し、第2データベース320に保存したデータに基づいて、稼働状況分析を行う。なお、稼働状況分析の詳細については、後述する。そして、稼働状況分析結果を、情報端末340の表示画面に表示する。 In response to a disaster investigation start request, the SIFT public server 330 performs an operation status analysis based on the data stored in the second database 320. Details of the operation status analysis will be described later. The operation status analysis results are then displayed on the display screen of the information terminal 340.

また、稼働状況分析結果は、第2データベース320の災害時分析結果データベース322に保存する。そして、この稼働状況分析の初回は、第2担当者AD2の災害調査開始要求により実行するが、その後は、毎日、NAVIサーバ210からの情報更新時刻を経過した後の所定の時刻である分析更新時刻に、毎日実行し、その最新の分析結果を、第2データベース320に保存する。なお、分析更新時刻は、NAVIサーバ210からデータを受信する時刻(例えば、10:40)よりも遅い時刻(例えば、11:00)である。 The operation status analysis results are stored in the disaster analysis results database 322 of the second database 320. The first operation status analysis is performed in response to a disaster investigation start request from the second person in charge AD2, but thereafter, it is performed every day at the analysis update time, which is a predetermined time after the information update time from the NAVI server 210, and the latest analysis results are stored in the second database 320. The analysis update time is a time (e.g., 11:00) later than the time (e.g., 10:40) when data is received from the NAVI server 210.

したがって、第2担当者AD2は、分析更新時刻の経過後のタイミングで、最新の稼働状況分析結果を確認し、対応することが可能である。 Therefore, the second person in charge AD2 can check the latest operational status analysis results and take action after the analysis update time has passed.

(稼働状況分析処理の説明)
次に、第2管理部300における稼働状況分析処理について説明する。
<停電判定>
まず、この稼働状況分析処理において、停電の判定を行う処理の流れを図3のフローチャートに基づいて説明する。すなわち、停電時には、HEMSのコントローラ110からデータを受信することができない。そして、停電が復旧してから、停電中のデータを含むデータの取得を再開する。
(Explanation of operation status analysis process)
Next, the operational status analysis process in the second management unit 300 will be described.
<Power outage determination>
First, the flow of the process of determining a power outage in the operation status analysis process will be described with reference to the flowchart in Fig. 3. That is, during a power outage, data cannot be received from the HEMS controller 110. Then, after the power outage is restored, acquisition of data including data during the power outage is resumed.

そこで、第2管理部300は、停電中、停電復旧後のデータの受信状態に基づいて停電状態を判定する。 Therefore, the second management unit 300 determines the power outage state based on the data reception status during and after the power outage is restored.

最初のステップS101では、災害発生当日であるか否かを判定する。ここで、災害発生当日であるか否かの判定は、第2担当者AD2による災害時稼働状況分析要求が実行された当日(初日)であるか否かにより判定する。そして、災害発生当日(肯定)の場合は、ステップS102に進んで、「停電状況不明」と判定する。つまり、コントローラ110からNAVIサーバ210へは1日遅れでデータが送られるため、災害発生当日には、災害状況を示すデータが得られず判定を行うことができないことから、「停電状況不明」と判定する。 In the first step S101, it is determined whether or not it is the day the disaster occurred. Here, the determination of whether or not it is the day the disaster occurred is made based on whether or not it is the day (first day) when the second person in charge AD2 executed the request for disaster operation status analysis. Then, if it is the day the disaster occurred (yes), the process proceeds to step S102 and it is determined that the "power outage status is unknown." In other words, because data is sent from the controller 110 to the NAVI server 210 with a one-day delay, on the day the disaster occurred, data indicating the disaster status is not available and a determination cannot be made, so it is determined that the "power outage status is unknown."

一方、災害時稼働状況分析要求が実行された災害発生当日の翌日以降は、ステップS101において、否定判定され、ステップS103に進む。そして、ステップS103では、前日に「停電状況不明」と判定されたかを尋ね、否定の場合はステップS104に進む。また、前日に「停電状況不明」と判定した(肯定の)場合、その判定が初回の場合はステップS105に進み、2回目以降の場合はステップS109に進む。 On the other hand, from the day after the disaster occurred on which the disaster operation status analysis request was executed, a negative judgment is made in step S101, and the process proceeds to step S103. Then, in step S103, it is asked whether the "power outage status unknown" was judged on the previous day, and if it is negative, the process proceeds to step S104. Also, if it was judged that the "power outage status unknown" on the previous day (positive), if this judgment is the first time, the process proceeds to step S105, and if it is the second time or later, the process proceeds to step S109.

前日に「停電状況不明」と判定されていない場合に進むステップS104では、前日と同じ判定結果を維持し、表示する。 In step S104, which is reached if the power outage status was not determined to be "unknown" on the previous day, the same determination result as on the previous day is maintained and displayed.

前日に「停電状況不明」と判定され、それが初回判定の場合に進むステップS105では、「設備見守り検知」の状態であるか否か判定し、検知あり(肯定)の場合は、ステップS106に進み、検知なし(否定)の場合は、ステップS107に進む。なお、「設備見守り検知」とは、コントローラ110、電力機器、情報分電盤120のいずれかと通信不良の場合に、「設備見守り検知」と判定する。 In step S105, which is reached if the "power outage status is unknown" was determined the previous day and this is the first determination, it is determined whether or not the state is "equipment monitoring detected." If there is detection (yes), the process proceeds to step S106, and if there is no detection (no), the process proceeds to step S107. Note that "equipment monitoring detected" is determined when there is a communication failure with either the controller 110, the power equipment, or the information distribution board 120.

「設備見守り検知」を検知状態の場合に進むステップS106では、「停電判定不可」と判定する。つまり、この場合は、災害発生以前から、何らかのデータが欠損している状態であり、正確な停電判定を行うことができないため、「停電判定不可」と判定する。 In step S106, which is performed when "equipment monitoring detection" is in a detection state, it is determined that "power outage determination is impossible." In other words, in this case, some data was missing even before the disaster occurred, and an accurate power outage determination cannot be made, so it is determined that "power outage determination is impossible."

一方、「設備見守り検知」がなされていない場合に進むステップS107では、災害前日の所定時刻(この場合、前日の終了時点の近傍が好ましく、本実施の形態では、23時とする)のデータに基づいて電力状態を確認する。この電力状態の確認は、買電、売電、住宅内電力消費(自家消費)、蓄電池140の充放電のデータを確認する。この確認は、全てのデータが、「0」または「欠損」している場合、非正常としてステップS108に進み、それ以外は、正常と判定してステップS109に進む。 On the other hand, in step S107, which is reached when "equipment monitoring detection" has not been performed, the power status is checked based on data from a specified time on the day before the disaster (in this case, it is preferable to be close to the end of the previous day, which is 11pm in this embodiment). This power status check checks data on power purchases, power sales, power consumption within the home (self-consumption), and charging/discharging of the storage battery 140. If all data is "0" or "missing", this check proceeds to step S108 as an abnormality, otherwise it is determined to be normal and proceeds to step S109.

そして、ステップS107において非正常と判定した場合に進むステップS108では、「停電判定不可」と判定する。すなわち、災害の発生前にデータが欠損している場合には、正確な判定を行うことができないため、このように「停電判定不可」と判定する。 Then, in step S108, which is reached if step S107 determines that the system is abnormal, it determines that "power outage determination is not possible." In other words, if data is missing before the disaster occurs, it is not possible to make an accurate determination, and so it is determined that "power outage determination is not possible."

ステップS107において全データが正常と判定した場合に進むステップS109では、最新日のデータの欠損の有無を判定し、欠損が生じている場合はステップS110に進み、欠損が無い場合にはステップS111に進む。 If it is determined in step S107 that all data is normal, the process proceeds to step S109, which determines whether or not there is any data loss for the most recent day. If there is any data loss, the process proceeds to step S110, and if there is no data loss, the process proceeds to step S111.

最新日のデータが欠損している場合に進むステップS110では、「停電状態不明」と判定する。つまり、この場合、「最新日」のデータの記録が来ていないことから、通信状態が未復旧であるため、「停電状態不明」として経過観察を行う。 In step S110, which is performed if the most recent data is missing, the power outage status is determined to be unknown. In other words, in this case, since no data has been recorded for the most recent day, the communication status has not been restored, and the power outage status is deemed to be unknown and the system is monitored.

最新日のデータに欠損が無い場合に進むステップS111では、停電中の買電、売電、住宅内電力消費(自家消費)、蓄電池140の充放電のデータを確認する。そして、全種類の全データの種別が1時間でも「0のみ」、「欠損のみ」「0と欠損の混在」がある場合、ステップS112に進んで、「停電あり、復旧済」と判定する。なお、この場合、さらに、「停電の種類」を記録する。ここで、「停電の種類」とは、「0のみ」「欠損のみ」「0の時間と欠損の時間が混在」の3種類とする。 In step S111, which is reached if there are no missing data for the most recent day, data on power purchases and sales during the power outage, power consumption within the home (self-consumption), and charging and discharging of the storage battery 140 are checked. Then, if all types of data for all types include "0 only", "missing only", or "mix of 0 and missing data" even for one hour, the process proceeds to step S112, where it is determined that "power outage occurred and recovery has been completed". In this case, the "type of power outage" is also recorded. Here, there are three types of "type of power outage", namely "0 only", "missing only", and "mix of times of 0 and times of missing data".

一方、全種類の全データの種別が「0のみ」、「欠損のみ」「0と欠損の混在」のいずれも無い場合は、ステップS113に進んで「停電なし」と判定する。このステップS111の判定は、「最新日に連携されたデータ」のみを対象とする。つまり、通信未復旧の場合、過去のデータが更新されることもあるが、「最新日に連携されたデータ」を対象とすることにより、正確な判定を行うことができる。 On the other hand, if none of the types of all data of all types are "0 only", "missing only", or "mix of 0 and missing", the process proceeds to step S113 and determines that there is "no power outage". This determination in step S111 targets only the "data linked on the most recent day". In other words, if communication has not been restored, past data may be updated, but by targeting the "data linked on the most recent day", an accurate determination can be made.

以上説明した停電判定結果のラベリングと、詳細との関係を図4に示す。すなわち、災害時調査結果の1つの停電状況として、各住宅100の停電状況として、このラベリングとその詳細を、情報端末340の画面に示す。 Figure 4 shows the relationship between the labeling of the power outage determination results described above and the details. That is, as one power outage situation in the disaster investigation results, this labeling and its details are displayed on the screen of the information terminal 340 as the power outage situation of each residence 100.

ラベリングとしてS112の処理に基づいて「停電あり、復旧済み」を付与した場合は、詳細として、「災害発生日から現在までに、電力量が異常である期間があり」と表示する。また、停電復旧後には、停電が発生していた期間の開始日および終了日を表示する。
ラベリングとしてS113の処理に基づいて「停電なし」を付与した場合は、詳細として、「災害発生日から現在まで、電力量が正常」と表示する。
ラベリングとしてS110の処理に基づいて「停電状況不明(通信復旧後に更新)」を付与した場合は、詳細として、「停電継続中か、または、宅内~NAVIまでの通信経路に異常あり」と表示する。
ラベリングとしてS106の処理に基づいて「停電判定不可(災害以前から見守り検知あり)」を付与した場合は、詳細として「災害以前からHEMS通信不良/蓄電池停止が発生している」と表示する。
In the case where "Power outage, restored" is added as the label based on the process of S112, the details are displayed as "There was a period of abnormal power amount from the disaster occurrence date to the present." In addition, after the power outage is restored, the start date and end date of the period during which the power outage occurred are displayed.
If "no power outage" is added as the labeling based on the processing of S113, the details displayed are "the amount of power has been normal from the day the disaster occurred to the present."
If the labeling is given as "Power outage status unknown (to be updated after communication is restored)" based on the processing of S110, the details will be displayed as "Power outage is continuing or there is an abnormality in the communication path from the home to the NAVI."
If the labeling is given as "Power outage cannot be determined (monitoring detected before the disaster)" based on the processing of S106, the details will be displayed as "HEMS communication failure/storage battery stoppage has occurred since before the disaster."

ラベリングとしてS108の処理に基づいて「停電判定不可(災害発生前にデータ欠損)」を付与した場合は、詳細として「災害前日23:00に異常あり」と表示する。 If the labeling is given as "Power outage determination impossible (data missing before the disaster occurred)" based on the processing of S108, the details will be displayed as "Abnormality occurred at 23:00 the day before the disaster."

<稼働状況分析>
以下に、電力機器の稼働状況分析の詳細について、図5に基づいて説明する。
<Operation status analysis>
The analysis of the operation status of the power equipment will be described in detail below with reference to FIG.

まず、蓄電池140の、最新の稼働状況分析、つまり、停電復旧後に正常に稼働しているか否かの分析について説明する。
この場合、日別のデータに基づいて、充電量が0よりも大、または、放電量が0よりも大であれば、稼働状況が正常(〇)と分析する。一方、充電量が0かつ放電量が0の場合、稼働状況が異常(×)と分析する。また、蓄電池140に関するデータが欠損している場合は、稼働状況が不明と分析する。なお、情報端末340には、正常、異常の分析結果に加え、充電量および放電量の値を表示する。
First, an analysis of the latest operating status of the storage battery 140, that is, an analysis of whether or not the storage battery 140 is operating normally after recovery from a power outage, will be described.
In this case, if the charge amount is greater than 0 or the discharge amount is greater than 0 based on the daily data, the operating status is analyzed as normal (◯). On the other hand, if the charge amount is 0 and the discharge amount is 0, the operating status is analyzed as abnormal (×). Furthermore, if data related to the storage battery 140 is missing, the operating status is analyzed as unknown. In addition to the analysis result of normality or abnormality, the information terminal 340 displays the values of the charge amount and discharge amount.

次に、復旧後の太陽光発電装置(PV)130の最新の稼働状況の分析について説明する。
この場合、日別のデータに基づいて、発電量が0よりも大きければ、稼働状況が正常(〇)と分析する。一方、発電量が0の場合は、稼働状況が異常(×)と分析する。また、データが欠損していれば、稼働状況が不明と分析する。なお、情報端末340には、正常、異常の分析結果に加え、発電量の値を表示する。
Next, an analysis of the latest operational status of the photovoltaic power generation device (PV) 130 after recovery will be described.
In this case, if the amount of power generation is greater than 0 based on the daily data, the operating status is analyzed as normal (◯). On the other hand, if the amount of power generation is 0, the operating status is analyzed as abnormal (×). Also, if there is missing data, the operating status is analyzed as unknown. The information terminal 340 displays the value of the amount of power generation in addition to the analysis result of normality or abnormality.

次に、復旧後の電気自動車によるパワーコンディショナ150の稼働状況の分析について説明する。
この場合、住宅100にパワーコンディショナ150が設置されている場合と、設置されていない場合とで、分析および表示が異なる。
Next, an analysis of the operating status of the power conditioner 150 in the electric vehicle after recovery will be described.
In this case, the analysis and display will differ depending on whether or not the power conditioner 150 is installed in the house 100 .

パワーコンディショナ150が設置されている場合、日別のデータに基づいて、パワーコンディショナ150を介した充電量または放電量が0よりも大であれば、稼働状況が正常(〇)と分析する。また、これ以外は、稼働状況が不明と分析する。なお、情報端末340には、正常、異常の分析結果に加え、電気自動車EVへの充電量および放電量の値を表示する。
一方、パワーコンディショナ150が設置されていない場合、分析を行うことなく単に、「・」と表示する。
When the power conditioner 150 is installed, if the amount of charge or discharge via the power conditioner 150 is greater than 0 based on the daily data, the operating status is analyzed as normal (◯). Otherwise, the operating status is analyzed as unknown. In addition to the analysis result of normality or abnormality, the information terminal 340 displays the values of the amount of charge and discharge to the electric vehicle EV.
On the other hand, if the power conditioner 150 is not installed, then no analysis is performed and simply "." is displayed.

次に、停電中の蓄電池140の稼働状況の分析について説明する。
この場合、停電中の運転モードにより自立運転が行われている場合は、正常と分析する。なお、自立運転モードは、住人が、手動によりモードの切り替えを行って実行される。
Next, analysis of the operating status of the storage battery 140 during a power outage will be described.
In this case, if the system is operating in an autonomous mode during a power outage, the system is analyzed as being normal. Note that the autonomous mode is executed by manually switching the mode by the resident.

一方、自立運転が行われていない場合は、時間別のデータに基づいて、1時間でも、充電または放電が行われている場合には、正常と分析し、それ以外の場合は、異常と分析する。なお、情報端末340には、「運転モードで判断」「充放電量で判断」を表示する。 On the other hand, if independent operation is not being performed, and charging or discharging has occurred for even one hour based on the hourly data, it is analyzed as normal, and otherwise it is analyzed as abnormal. The information terminal 340 will display "Judgement based on operation mode" and "Judgement based on charge/discharge amount."

また、情報端末340には、充電期間の表示を行うもので、この充電期間は、データが欠損していた期間、もしくは、全データの値が「0」であった期間とする。 In addition, the information terminal 340 displays the charging period, which is the period during which data is missing or the period during which all data values are "0".

(対応の表示例)
第2管理部300は、上述した分析結果の表示に加えて、情報端末340の画面に対応方法を表示するのが好ましい。
(Example of correspondence display)
In addition to displaying the above-mentioned analysis results, the second management unit 300 preferably displays a response method on the screen of the information terminal 340 .

図6は、停電状況と、蓄電池140の稼働状態(最新の蓄電池稼働状況と、停電中の蓄電池稼働状況)とに応じた対応方法の表示例を示す図である。 Figure 6 shows an example of a display of a response method according to the power outage situation and the operating status of the storage battery 140 (the latest storage battery operating status and the storage battery operating status during the power outage).

停電が生じ、復旧済の場合に、最新の蓄電池稼働状況が正常であれば、停電中の蓄電池稼働状況が正常、異常、不明のいずれの場合も、「対処不要」とする。 If a power outage occurs and has since been restored, and the latest battery operation status is normal, no action is required regardless of whether the battery operation status during the power outage was normal, abnormal, or unknown.

次に、停電が生じ、復旧済の場合に、最新の蓄電池稼働状況が異常で、停電中の蓄電池稼働状況が正常の場合、対応方法として、「現時点で蓄電池が異常です。お客様に問い合わせください。」と表示する。 Next, if a power outage occurs and has since been restored, and the latest battery operation status is abnormal but the battery operation status during the power outage was normal, the following message will be displayed as a response: "The battery is currently abnormal. Please contact the customer."

停電が生じ、復旧済の場合に、最新の蓄電池稼働状況および停電中の蓄電池稼働状況が異常の場合、対応方法として、「停電時、現時点ともに蓄電池が異常です。お客様に問い合わせください。」と表示する。 If a power outage occurs and has since been restored, and the most recent battery operation status and the battery operation status during the power outage are abnormal, the following message will be displayed as a response: "The battery is abnormal both at the time of the power outage and at the current time. Please contact the customer."

停電が生じ、復旧済の場合に、最新の蓄電池稼働状況が異常で、停電中の蓄電池稼働状況が不明の場合、対応方法として、「停電時、現時点ともに蓄電池が異常です。お客様に問い合わせください。」と表示する。 If a power outage occurs and has since been restored, and the latest battery operation status is abnormal, and the battery operation status during the power outage is unknown, the following message will be displayed as a response: "The battery is abnormal both at the time of the power outage and at the current time. Please contact the customer."

停電が生じ、復旧済の場合に、最新の蓄電池稼働状況が不明である場合、停電中の蓄電池稼働状況が正常、異常、不明のいずれの場合も、対応方法として、「HEMS異常の可能性があります。お客様に問い合わせください。」と表示する。 If a power outage occurs and has since been restored, and the latest battery operation status is unknown, and the battery operation status during the power outage is normal, abnormal, or unknown, the message "There may be an abnormality in the HEMS. Please contact the customer" will be displayed as a response.

また、停電が生じていない場合は、「対処不要」と表示する。さらに、停電状況不明の場合は、「通信復旧まで経過観察」と表示し、停電分析不可の場合は、「災害時稼働管理対象外」と表示する。 If no power outage has occurred, "No action required" will be displayed. Furthermore, if the power outage situation is unknown, "Continue monitoring until communication is restored" will be displayed, and if power outage analysis is not possible, "Not subject to disaster operation management" will be displayed.

次に、図7に基づいて、停電状況と太陽光発電装置130の稼働状態とに応じた対応方法の表示について説明する。 Next, based on FIG. 7, we will explain how to display the response method according to the power outage situation and the operating status of the solar power generation device 130.

停電が生じ、復旧済の場合に、太陽光発電装置稼働状況が正常であれば、「正常に動作しているため、対処不要です。」と表示する。 If a power outage occurs and has since been restored, and the solar power generation equipment is operating normally, the message "No action is required as it is operating normally" will be displayed.

停電が生じ、復旧済の場合に、太陽光発電装置稼働状況が異常であれば、「現時点で、太陽光発電装置(PV)が異常または発電時間外です。お客様に問い合わせください。」と表示する。 If a power outage occurs and has since been restored, and the solar power generation equipment is not operating normally, the message "At this time, the solar power generation equipment (PV) is abnormal or outside of power generation hours. Please contact the customer." will be displayed.

停電が生じ、復旧済の場合に、太陽光発電装置稼働状況が不明であれば、「HEMSに異常が発生している可能性があります。お客様に問い合わせください。」と表示する。 If a power outage occurs and has since been restored, and the operating status of the solar power generation equipment is unknown, the message "There may be an abnormality in the HEMS. Please contact the customer." will be displayed.

また、停電が生じていない場合は、「対処不要」と表示する。さらに、停電状況不明の場合は、「通信復旧まで経過観察」と表示し、停電判定不可の場合は、「災害時稼働管理対象外」と表示する。 If there is no power outage, "No action required" will be displayed. Furthermore, if the power outage status is unknown, "Monitor until communication is restored" will be displayed, and if it is not possible to determine whether there is a power outage, "Not subject to disaster operation management" will be displayed.

また、停電が発生していない場合は、「対処不要」と表示する。 If no power outage has occurred, the message "No action required" will be displayed.

なお、非常用コンセント接続データ、太陽光発電装置発電時間内データ、履歴記憶タイミングデータと、それに対応する稼働判別(分析結果)との関係を図8に一覧表示する。ここで、非常用コンセントとは、蓄電池140に設けられ、停電時に、蓄電池140および太陽光発電装置130の電力を使用可能なコンセントである。 The relationship between the emergency outlet connection data, the photovoltaic power generation time data, the history storage timing data, and the corresponding operation determination (analysis result) is shown in a list in FIG. 8. Here, the emergency outlet is an outlet that is provided in the storage battery 140 and can use the power of the storage battery 140 and the photovoltaic power generation device 130 during a power outage.

以下に、実施の形態の効果を列挙する。
(1)実施の形態の稼働状況管理システムは、NAVIサーバ210、SIFT集計サーバ310、SIFT公開サーバ330のサーバを備える。NAVIサーバ210は、蓄電池140、太陽光発電装置130、パワーコンディショナ150を含む電力機器と、電力機器の動作状態を示すデータを住宅100内で受け取るコントローラ110と、を備えた複数の住宅100のコントローラ110と通信可能に接続され、コントローラ110から動作状態を示すデータを受け取り記録する。
The effects of the embodiment are listed below.
(1) The operation status management system according to the embodiment includes a NAVI server 210, a SIFT aggregation server 310, and a SIFT disclosure server 330. The NAVI server 210 is communicatively connected to the controllers 110 of a plurality of homes 100, each of which includes power equipment including a storage battery 140, a solar power generation device 130, and a power conditioner 150, and a controller 110 that receives data indicating the operation status of the power equipment within the home 100, and receives and records data indicating the operation status from the controller 110.

SIFT公開サーバ330は、コントローラ110から受け取る動作状態を示すデータに基づいて図3に示す停電状態を判定する停電判定部と、動作状態を示すデータに基づいて、電力機器の停電中の稼働状況と停電復旧後の稼働状況とを分析する稼働分析部と、分析の結果を情報端末340の画面に表示させる表示処理部と、を備える。 The SIFT public server 330 includes a power outage determination unit that determines the power outage state shown in FIG. 3 based on data indicating the operating state received from the controller 110, an operation analysis unit that analyzes the operating status of the power equipment during the power outage and the operating status after the power is restored based on the data indicating the operating state, and a display processing unit that displays the results of the analysis on the screen of the information terminal 340.

したがって、停電復旧後に、蓄電池140、太陽光発電装置130、パワーコンディショナ150などの電力機器の、停電中や復旧後の稼働状態を早期に知ることができる。よって、電力機器が異常な状態で放置されることを防止できる。また、これにより、蓄電池140や太陽光発電装置130による経済効果の損失を抑えることができる。 Therefore, after the power outage is restored, the operating status of power equipment such as the storage battery 140, the solar power generation device 130, and the power conditioner 150 during the power outage and after the power outage is restored can be known at an early stage. This makes it possible to prevent the power equipment from being left in an abnormal state. This also makes it possible to suppress the loss of economic benefits due to the storage battery 140 and the solar power generation device 130.

(2)実施の形態の稼働状況管理システムは、SIFT公開サーバ330の停電判定部による判定と、稼働分析部による分析は、情報端末340から、災害調査開始要求があった場合に実行を開始する。
したがって、災害の発生によりデータが送られて来ない状況であっても、早期に、確実に実行を開始することが可能である。
(2) In the embodiment of the operation status management system, the determination by the power outage determination unit of the SIFT public server 330 and the analysis by the operation analysis unit begin execution when a request to start a disaster investigation is received from the information terminal 340.
Therefore, even in a situation where data is not being sent due to the occurrence of a disaster, it is possible to start execution early and reliably.

(3)実施の形態の稼働状況管理システムは、SIFT公開サーバ330の停電判定部による判定と、稼働分析部による分析は、災害調査開始要求があった後は、定期的に自動的に実行する。
したがって、災害発生時に、迅速に調査を開始した後は、自動的に停電判定および稼働状況の分析を行うことにより、毎回、調査開始要求を必要とするとものと比較して、第2担当者AD2の手間を省いて、使い勝手に優れる。特に、本実施の形態1では、停電判定および稼働状況分析を行うタイミングを、NAVIサーバ210からデータを受信した直後としているため、データを受け取って遅滞なく、判定、分析を行って、早期の対応が可能である。
(3) In the embodiment of the operation status management system, the determination by the power outage determination unit of the SIFT public server 330 and the analysis by the operation analysis unit are automatically performed periodically after a request to start a disaster investigation is received.
Therefore, when a disaster occurs, after the investigation is started quickly, the power outage determination and the analysis of the operation status are automatically performed, which is easier to use than the case where an investigation start request is required every time. In particular, in the first embodiment, the timing for the power outage determination and the analysis of the operation status is immediately after receiving data from the NAVI server 210, so that the data can be received and the determination and analysis can be performed without delay, allowing for early response.

(4)実施の形態の稼働状況管理システムは、SIFT公開サーバ330の図3の処理を行う停電判定部は、災害調査開始要求が行われた災害発生日を基準とし、コントローラ110から動作状態を示すデータが送られてこない期間は、停電継続中もしくは、通信経路に異常ありと分析する。さらに、コントローラ110から動作状態を示すデータが送られてこない期間後に、データが送られてきた場合、データが送られて来ない期間のデータの値が0もしくは欠損していた場合は、停電発生後に、復旧済みと判定する。そして、コントローラ110から動作状態を示すデータが途絶えない場合は、停電なしと判定する。 したがって、停電復旧後に送られてきたデータに基づいて、停電期間や停電状態を正確に判定することができる。 (4) In the embodiment of the operation status management system, the power outage determination unit that performs the processing of FIG. 3 of the SIFT public server 330 uses the disaster occurrence date when a disaster investigation start request is made as a reference, and analyzes that a period during which data indicating the operation status is not sent from the controller 110 is a continuing power outage or that there is an abnormality in the communication path. Furthermore, if data indicating the operation status is sent from the controller 110 after a period during which no data is sent, and if the value of the data during the period during which no data is sent is 0 or missing, it is determined that recovery has been completed after the power outage occurred. Then, if the data indicating the operation status from the controller 110 is not interrupted, it is determined that there is no power outage. Therefore, the power outage duration and power outage status can be accurately determined based on the data sent after the power outage is restored.

(5)実施の形態の稼働状況管理システムは、SIFT公開サーバ330の稼働分析部は、復旧後の蓄電池140の稼働状況を、復旧後に取得した蓄電池140の動作状態を示すデータに基づいて分析し、この分析では、充電量、放電量が0よりも大きい場合は、蓄電池140が正常と分析し、充電量および放電量が0の場合、蓄電池140が異常と分析し、蓄電池140の動作状態を示すデータが欠損している場合は、不明と分析する。
したがって、復旧後に取得した蓄電池140の動作状態を示すデータに基づいて、復旧後の蓄電池140の稼働状態を、正確に分析することができる。
(5) In an embodiment of the operation status management system, the operation analysis unit of the SIFT public server 330 analyzes the operation status of the storage battery 140 after recovery based on data indicating the operating status of the storage battery 140 obtained after recovery. In this analysis, if the charge amount and discharge amount are greater than 0, it is analyzed that the storage battery 140 is normal. If the charge amount and discharge amount are 0, it is analyzed that the storage battery 140 is abnormal. If data indicating the operating status of the storage battery 140 is missing, it is analyzed that the operating status is unknown.
Therefore, the operating state of the storage battery 140 after recovery can be accurately analyzed based on the data indicating the operating state of the storage battery 140 obtained after recovery.

(6)実施の形態の稼働状況管理システムは、SIFT公開サーバ330の稼働分析部は、復旧後の太陽光発電装置130の稼働状況を、復旧後に取得した太陽光発電装置130の動作状態を示すデータに基づいて分析する。そして、この分析では、発電量が0よりも大きい場合は、太陽光発電装置130が正常と分析し、発電量が0の場合は、太陽光発電装置130が異常と分析し、太陽光発電装置130の動作状態を示すデータが欠損している場合は、不明と分析する。
したがって、復旧後に取得した太陽光発電装置130の動作状態を示すデータに基づいて、復旧後の太陽光発電装置130の稼働状態を、正確に分析することができる。
(6) In the operation status management system according to the embodiment, the operation analysis unit of the SIFT public server 330 analyzes the operation status of the photovoltaic power generation device 130 after recovery based on data indicating the operation status of the photovoltaic power generation device 130 acquired after recovery. In this analysis, if the amount of power generation is greater than 0, the photovoltaic power generation device 130 is analyzed as normal, if the amount of power generation is 0, the photovoltaic power generation device 130 is analyzed as abnormal, and if data indicating the operation status of the photovoltaic power generation device 130 is missing, the operation status is analyzed as unknown.
Therefore, the operating state of the photovoltaic power generation device 130 after recovery can be accurately analyzed based on the data indicating the operating state of the photovoltaic power generation device 130 acquired after recovery.

(7)実施の形態の稼働状況管理システムは、SIFT公開サーバ330の稼働分析部は、復旧後のパワーコンディショナ150の稼働状況を、復旧後に取得したパワーコンディショナ150の動作状態を示すデータに基づいて分析する。そして、稼働分析部は、復旧後に、パワーコンディショナ150の動作状態を示すデータに基づいて、電気自動車EVへの充電量または電気自動車EVからの放電量が0よりも大きい場合は、パワーコンディショナ150が正常と分析し、それ以外は不明と分析する。
したがって、復旧後に取得したパワーコンディショナ150の動作状態を示すデータに基づいて、復旧後のパワーコンディショナ150の稼働状態を、正確に分析することができる。
(7) In the operation status management system according to the embodiment, the operation analysis unit of the SIFT public server 330 analyzes the operation status of the power conditioner 150 after recovery based on data indicating the operation state of the power conditioner 150 acquired after recovery. Then, based on the data indicating the operation state of the power conditioner 150 after recovery, the operation analysis unit analyzes that the power conditioner 150 is normal if the amount of charge to the electric vehicle EV or the amount of discharge from the electric vehicle EV is greater than 0, and analyzes that the power conditioner 150 is unknown otherwise.
Therefore, the operating state of the power conditioner 150 after recovery can be accurately analyzed based on the data indicating the operating state of the power conditioner 150 acquired after recovery.

(8)実施の形態の稼働状況管理システムは、SIFT公開サーバ330の稼働分析部は、停電期間中の蓄電池140の稼働状況を、復旧後に取得した蓄電池140の動作状態を示すデータに基づいて分析する。そして、この分析では、停電期間中に、電力系統から切り離した自立運転が実行されていれば、正常と分析し、自立運転が実行されていない場合、充電量または放電量が0よりも大きい場合は、蓄電池140が正常と分析し、それ以外は、異常と分析する。
したがって、復旧後に取得した蓄電池140の動作状態を示すデータに基づいて、停電中の蓄電池140の稼働状態を、正確に分析することができる。
(8) In the operation status management system according to the embodiment, the operation analysis unit of the SIFT public server 330 analyzes the operation status of the storage battery 140 during a power outage based on data indicating the operating state of the storage battery 140 acquired after recovery. In this analysis, if the storage battery 140 is operating independently in an isolated manner from the power grid during the power outage, the analysis is made to be normal, and if the storage battery 140 is not operating independently and the charge amount or discharge amount is greater than 0, the analysis is made to be abnormal otherwise.
Therefore, the operating status of the storage battery 140 during a power outage can be accurately analyzed based on the data indicating the operating status of the storage battery 140 obtained after recovery.

(9)実施の形態の稼働状況管理システムは、第1のサーバとしてのNAVIサーバ210と、第2のサーバとしてのSIFT集計サーバ310と、第3のサーバとしてのSIFT公開サーバ330とを備える。そして、NAVIサーバ210は、コントローラ110と通信可能に接続され、コントローラ110から電力機器の動作状態を示すデータを毎日定期的(0:00~10:30)に取得し第1の記録部としての第1データベース220に記録する。SIFT集計サーバ310は、NAVIサーバ210から電力機器の動作状態を示すデータを定期的(10:40)に取得し第2の記録部としての第2データベース320に記録する。SIFT公開サーバ330は、所定の災害調査開始要求があった場合に、停電判定部による判定と、前記稼働分析部による分析を行う。
したがって、SIFT公開サーバ330により、迅速にデータを収集して災害調査を行うことができる。また、SIFT公開サーバ330が抽出、判定、分析を行っている間も、第2のサーバであるSIFT集計サーバ310を、第2担当者AD2とは異なる使用者が使用することができる。
(9) The operation status management system of the embodiment includes a NAVI server 210 as a first server, a SIFT aggregation server 310 as a second server, and a SIFT public server 330 as a third server. The NAVI server 210 is communicably connected to the controller 110, and acquires data indicating the operation status of the power equipment from the controller 110 periodically (0:00 to 10:30) every day and records the data in the first database 220 as a first recording unit. The SIFT aggregation server 310 acquires data indicating the operation status of the power equipment from the NAVI server 210 periodically (10:40) and records the data in the second database 320 as a second recording unit. When a predetermined disaster investigation start request is received, the SIFT public server 330 performs a determination by the power outage determination unit and an analysis by the operation analysis unit.
Therefore, data can be collected quickly to conduct a disaster investigation by the SIFT public server 330. Also, while the SIFT public server 330 is performing extraction, determination, and analysis, the second server, the SIFT aggregation server 310, can be used by a user other than the second person in charge AD2.

すなわち、各サーバ210、310、330の管理者や、使用者が異なる場合、災害が起きてから、第2担当者AD2が、NAVIサーバ210からSIFT集計サーバ310にデータを取得し、これを用いて抽出、判定、分析を行おうとした場合に、他に使用者が存在すると、これらの処理に時間を要する場合がある。それに対し、SIFT集計サーバ310と独立して、SIFT公開サーバ330により処理を行うことにより、迅速な処理が可能となる。また、上記(3)のように、これらの処理を自動で行う場合、より効果的である。 In other words, if the servers 210, 310, and 330 have different administrators or users, when a disaster occurs and the second person in charge AD2 retrieves data from the NAVI server 210 to the SIFT compilation server 310 and uses the data to perform extraction, judgment, and analysis, these processes may take time if there are other users. In contrast, by performing the processes using the SIFT public server 330 independently of the SIFT compilation server 310, rapid processing is possible. Also, it is more effective to perform these processes automatically, as in (3) above.

(実施の形態の変形例)
次に、上記の実施の形態の変形例について説明する。 なお、この変形例の説明では、上述の実施の形態との相違点のみ説明する。
(Modification of the embodiment)
Next, a modification of the above embodiment will be described, in which only the differences from the above embodiment will be described.

この実施の形態の変形例は、図3のフローチャートにおけるステップS109に続く停電の判定の処理の変形例(図9のS111b)であり、停電発生の判定において値が0であるデータとして、買電電力値、売電電力値を用いた例である。 This modified embodiment is a modified example of the process for determining whether a power outage has occurred that follows step S109 in the flowchart of FIG. 3 (S111b in FIG. 9), and is an example in which the purchased power value and the sold power value are used as data whose value is 0 when determining whether a power outage has occurred.

具体的には、図9のステップS111bにおいて、ステップS112に進む条件は、データが送られて来ない期間のデータが欠損していたか、もしくは前記データのうち買電電力値と売電電力値とが共に0であったかした場合としている。 Specifically, in step S111b of FIG. 9, the condition for proceeding to step S112 is that data is missing for a period in which no data is sent, or that the purchased power value and the sold power value of the data are both zero.

すなわち、この変形例では、SIFT公開サーバ330の停電判定部は、災害調査開始要求が行われた災害発生日を基準とし、コントローラ110から動作状態を示すデータが送られてこない期間は、停電継続中もしくは、通信経路に異常ありと判定する(S110)。さらに、コントローラ110から動作状態を示すデータが送られてこない期間後に、データが送られてきた場合に、データが送られて来ない期間のデータが欠損していたか、もしくはデータのうち買電電力値と売電電力値とが共に0であったかした場合は、停電発生後に、復旧済みと判定する(S111bからS112の処理)。そして、コントローラ110から動作状態を示すデータが途絶えない場合は、停電なしと判定する(S111bからS113の処理)。 That is, in this modified example, the power outage determination unit of the SIFT public server 330 uses the disaster occurrence date when the disaster investigation start request was made as a reference and determines that the power outage is continuing or that there is an abnormality in the communication path during the period during which data indicating the operating status is not sent from the controller 110 (S110). Furthermore, if data indicating the operating status is sent from the controller 110 after the period during which no data is sent, and if data is missing during the period during which no data is sent or if both the purchased power value and the sold power value of the data are 0, it determines that recovery has been completed after the power outage (processing from S111b to S112). Then, if the data indicating the operating status from the controller 110 is not interrupted, it determines that there is no power outage (processing from S111b to S113).

したがって、この変形例にあっても、停電復旧後にコントローラ110から送られてきたデータに基づいて、停電期間や停電状態を正確に判定することができる。 Therefore, even in this modified example, the duration and state of the power outage can be accurately determined based on the data sent from the controller 110 after the power outage is restored.

以上、図面を参照して本発明の実施の形態を説明したが、具体的な構成はこの実施の形態に限らず、本発明の要旨を逸脱しない程度の設計変更事項は本発明に含まれるものである。 The above describes an embodiment of the present invention with reference to the drawings, but the specific configuration is not limited to this embodiment, and design changes that do not deviate from the gist of the present invention are included in the present invention.

例えば、実施の形態では、電力機器として、蓄電池、太陽光発電装置、パワーコンディショナを備えた住宅を示したが、これに限定されず、少なくとも、蓄電池と太陽光発電装置との一方が含まれていればよい。 For example, in the embodiment, a house equipped with a storage battery, a solar power generation device, and a power conditioner is shown as power equipment, but this is not limited thereto, and it is sufficient if at least one of a storage battery and a solar power generation device is included.

また、実施の形態では、サーバとして、NAVIサーバ、SHIFT集計サーバ、SHIFT公開サーバの3つのサーバを備えたものを示したが、これに限定されず、これらを1または2に合体させたサーバを用いてもよい。 In addition, in the embodiment, three servers are shown: a NAVI server, a SHIFT aggregation server, and a SHIFT public server. However, this is not limited to this, and a server that combines these into one or two may also be used.

また、実施の形態では、電力機器の停電中の稼働状況と停電復旧後の稼働状況との両方を分析するものを示したが、これに限定されず、少なくとも一方、好ましくは、復旧後の稼働状況を分析できればよい。 In addition, in the embodiment, the operation status of the power equipment during a power outage and the operation status after the power outage is restored are analyzed, but this is not limited to this, and it is sufficient if at least one of the operation statuses, preferably the operation status after recovery, can be analyzed.

また、実施の形態では、停電判定部による判定と稼働分析部による分析は、初回のみ災害調査開始要求があった場合に実行を開始し、その後は、定期的に自動で行うものを示したが、これに限定されず、その都度、手動により判定、分析の実行を要求してもよい。また、NAVIサーバからのデータ収集の時刻や、判定、分析を行う時刻も任意に設定してよいものであり、実施の形態で示した時刻に限定されるものではない。 In addition, in the embodiment, the determination by the power outage determination unit and the analysis by the operation analysis unit are performed only the first time a request to start a disaster investigation is made, and are then performed automatically periodically. However, this is not limited to this, and the determination and analysis may be requested manually each time. In addition, the time for collecting data from the NAVI server and the time for performing the determination and analysis may be set arbitrarily, and are not limited to the times shown in the embodiment.

100 住宅
110 コントローラ
130 太陽光発電装置(電力機器)
140 蓄電池(電力機器)
150 パワーコンディショナ(電力機器)
200 第1管理部
210 NAVIサーバ(第1のサーバ)
220 第1データベース(第1の記録部)
300 第2管理部
310 SIFT集計サーバ(第2のサーバ)
320 第2データベース(第2の記録部)
321 通常時データベース
322 災害時分析結果データベース
330 SIFT公開サーバ(第3のサーバ)
340 情報端末(表示部)
NE 通信ネットワーク
100 House 110 Controller 130 Photovoltaic power generation device (electric power device)
140 Storage batteries (power equipment)
150 Power conditioner (electrical equipment)
200 First Management Unit 210 NAVI Server (First Server)
220 First database (first recording unit)
300 Second management unit 310 SIFT aggregation server (second server)
320 Second database (second recording unit)
321 Normal time database 322 Disaster time analysis result database 330 SIFT public server (third server)
340 Information terminal (display unit)
NE Communication Network

Claims (10)

少なくとも蓄電池と太陽光発電装置との一方を含む電力機器と、前記電力機器の動作状態を示すデータを受け取るコントローラと、を備えた複数の住宅の前記コントローラと通信可能に接続され、前記コントローラから前記動作状態を示すデータを受け取り記録するサーバを備え、
前記サーバは、
前記コントローラから受け取る前記動作状態を示すデータに基づいて停電状態を判定する停電判定部と、
前記動作状態を示すデータに基づいて、前記電力機器の停電中の稼働状況と停電復旧後の稼働状況との少なくとも一方を分析する稼働分析部と、
前記分析の結果を表示部に表示させる表示処理部と、
を備える稼働状況管理システム。
a server connected to a plurality of controllers of a plurality of homes so as to be communicatively connected thereto, the controllers including electric power equipment including at least one of a storage battery and a solar power generation device, and a server receiving and recording the data indicating the operating state of the electric power equipment from the controllers;
The server,
A power outage determination unit that determines a power outage state based on data indicating the operation state received from the controller;
an operation analysis unit that analyzes at least one of an operation status of the power equipment during a power outage and an operation status after the power outage is restored based on the data indicating the operation state;
a display processing unit that displays the results of the analysis on a display unit;
An operation status management system equipped with
請求項1に記載の稼働状況管理システムにおいて、
前記停電判定部は、
所定の災害調査開始要求が行われた災害発生日を基準とし、
前記コントローラから前記動作状態を示すデータが送られてこない期間は、停電継続中もしくは、通信経路に異常ありと判定し、
前記コントローラから前記動作状態を示すデータが送られてこない期間後に、前記データが送られてきた場合、前記データが送られて来ない期間の前記データの値が0もしくは欠損していた場合は、停電発生後に、復旧済みと判定し、
前記コントローラから前記動作状態を示すデータが途絶えない場合は、停電なしと判定する稼働状況管理システム。
In the operation status management system according to claim 1,
The power outage determination unit is
Based on the date of occurrence of the disaster when the specified disaster investigation start request was made,
A period during which the data indicating the operating state is not transmitted from the controller is determined to be a period during which a power outage continues or an abnormality exists in the communication path;
When the data indicating the operating state is transmitted from the controller after a period in which the data is not transmitted, if the value of the data during the period in which the data is not transmitted is 0 or missing, it is determined that the power has been restored after the power outage has occurred;
An operation status management system that determines that there is no power outage if data indicating the operating status from the controller is not interrupted.
請求項1に記載の稼働状況管理システムにおいて、
前記停電判定部は、
所定の災害調査開始要求が行われた災害発生日を基準とし、
前記コントローラから前記動作状態を示すデータが送られてこない期間は、停電継続中もしくは、通信経路に異常ありと判定し、
前記コントローラから前記動作状態を示すデータが送られてこない期間後に、前記データが送られてきた場合、前記データが送られて来ない期間の前記データが欠損していたか、もしくは前記データのうち買電電力値と売電電力値とがともに0であったかした場合は、停電発生後に、復旧済みと判定し、
前記コントローラから前記動作状態を示すデータが途絶えない場合は、停電なしと判定する稼働状況管理システム。
In the operation status management system according to claim 1,
The power outage determination unit is
Based on the date of occurrence of the disaster when the specified disaster investigation start request was made,
A period during which the data indicating the operating state is not transmitted from the controller is determined to be a period during which a power outage continues or an abnormality exists in the communication path;
If the data indicating the operating state is sent from the controller after a period in which the data is not sent, if the data is missing during the period in which the data is not sent, or if the power purchase value and the power sale value of the data are both 0, it is determined that the power has been restored after a power outage has occurred;
An operation status management system that determines that there is no power outage if data indicating the operating status from the controller is not interrupted.
請求項1~請求項3のいずれか1項に記載の稼働状況管理システムにおいて、
前記電力機器に前記蓄電池が含まれ、
前記稼働分析部は、前記復旧後の前記蓄電池の稼働状況を、前記復旧後に取得した前記蓄電池の動作状態を示すデータに基づいて分析し、
この分析では、充電量、放電量が0よりも大きい場合は、前記蓄電池が正常と分析し、充電量および放電量が0の場合、前記蓄電池が異常と分析し、前記蓄電池の動作状態を示すデータが欠損している場合は、不明と分析する稼働状況管理システム。
In the operation status management system according to any one of claims 1 to 3,
the power device includes the storage battery;
The operation analysis unit analyzes an operation status of the storage battery after the recovery based on data indicating an operating state of the storage battery obtained after the recovery,
In this analysis, if the charge amount or discharge amount is greater than zero, the operation status management system analyzes that the storage battery is normal, if the charge amount or discharge amount is zero, the operation status management system analyzes that the storage battery is abnormal, and if data indicating the operating status of the storage battery is missing, the operation status management system analyzes that the operating status is unknown.
請求項1~請求項4のいずれか1項に記載の稼働状況管理システムにおいて、
前記電力機器に、前記太陽光発電装置が含まれ、
前記稼働分析部は、前記復旧後の前記太陽光発電装置の稼働状況を、前記復旧後に取得した前記太陽光発電装置の動作状態を示すデータに基づいて分析し、
この分析では、発電量が0よりも大きい場合は、前記太陽光発電装置が正常と分析し、発電量が0の場合は、前記太陽光発電装置が異常と分析し、前記太陽光発電装置の動作状態を示すデータが欠損している場合は、不明と分析する稼働状況管理システム。
In the operation status management system according to any one of claims 1 to 4,
the electric power equipment includes the solar power generation device,
The operation analysis unit analyzes an operation status of the photovoltaic power generation device after the restoration based on data indicating an operating state of the photovoltaic power generation device acquired after the restoration,
In this analysis, if the amount of power generated is greater than zero, the solar power generation system is analyzed as being normal, if the amount of power generated is zero, the solar power generation system is analyzed as being abnormal, and if data indicating the operating status of the solar power generation system is missing, the operating status is analyzed as being unknown.
請求項1~請求項5のいずれか1項に記載の稼働状況管理システムにおいて、
前記電力機器に、電気自動車の蓄電池から充放電を行うパワーコンディショナが含まれ、
前記稼働分析部は、前記復旧後の前記パワーコンディショナの稼働状況を、前記復旧後に取得した前記パワーコンディショナの動作状態を示すデータに基づいて分析し、
前記稼働分析部は、前記復旧後に、前記パワーコンディショナの動作状態を示すデータに基づいて、電気自動車への充電量または電気自動車からの放電量が0よりも大きい場合は、前記パワーコンディショナが正常と分析し、それ以外は不明と分析する稼働状況管理システム。
In the operation status management system according to any one of claims 1 to 5,
The electric power equipment includes a power conditioner that charges and discharges from a storage battery of an electric vehicle,
The operation analysis unit analyzes an operation status of the power conditioner after the recovery based on data indicating an operating state of the power conditioner acquired after the recovery,
The operation analysis unit analyzes, based on data indicating the operating status of the power conditioner after the recovery, that the power conditioner is normal if the amount of charge to the electric vehicle or the amount of discharge from the electric vehicle is greater than zero, and analyzes the power conditioner as unknown in other cases.
請求項1~請求項6のいずれか1項に記載の稼働状況管理システムにおいて、
前記電力機器に前記蓄電池が含まれ、
前記稼働分析部は、前記停電の期間中の前記蓄電池の稼働状況を、前記復旧後に取得した前記蓄電池の動作状態を示すデータに基づいて分析し、
この分析では、前記停電の期間中に、電力系統から切り離した自立運転が実行されていれば、正常と分析し、前記自立運転が実行されていない場合、充電量または放電量が0よりも大きい場合は、前記蓄電池が正常と分析し、それ以外は、異常と分析する稼働状況管理システム。
In the operation status management system according to any one of claims 1 to 6,
the power device includes the storage battery;
The operation analysis unit analyzes an operation status of the storage battery during the power outage based on data indicating an operating state of the storage battery obtained after the recovery,
In this analysis, if independent operation, isolated from the power grid, is performed during the power outage, the operation status management system analyzes the battery as normal; if independent operation is not performed and the charge or discharge amount is greater than zero, the operation status management system analyzes the battery as normal; otherwise, the operation status management system analyzes the battery as abnormal.
請求項1~請求項7のいずれか1項に記載の稼働状況管理システムにおいて、
前記サーバは、
前記コントローラと通信可能に接続され、前記コントローラから前記電力機器の動作状態を示すデータを毎日定期的に取得し第1の記録部に記録する第1のサーバと、
前記第1のサーバから前記電力機器の動作状態を示すデータを定期的に取得し第2の記録部に記録する第2のサーバと、
所定の災害調査開始要求があった場合に、前記停電判定部による判定と、前記稼働分析部による分析を行う第3のサーバと、を備える稼働状況管理システム。
In the operation status management system according to any one of claims 1 to 7,
The server,
a first server that is communicatively connected to the controller and that periodically acquires data indicating an operating state of the electric power device from the controller every day and records the data in a first recording unit;
a second server that periodically acquires data indicating an operation state of the electric power device from the first server and records the data in a second recording unit;
An operation status management system comprising: a third server that performs a determination by the power outage determination unit and an analysis by the operation analysis unit when a specified disaster investigation start request is received.
請求項1~請求項8のいずれか1項に記載の稼働状況管理システムにおいて、
前記停電判定部による判定と、前記稼働分析部による分析は、所定の災害調査開始要求があった場合に実行を開始する稼働状況管理システム。
In the operation status management system according to any one of claims 1 to 8,
In this operation status management system, the determination by the power outage determination unit and the analysis by the operation analysis unit are started when a specified disaster investigation start request is received.
請求項9に記載の稼働状況管理システムにおいて、
前記停電判定部による判定と、前記稼働分析部による分析は、前記災害調査開始要求があった後は、定期的に自動的に実行する稼働状況管理システム。
In the operation status management system according to claim 9,
An operation status management system in which the determination by the power outage determination unit and the analysis by the operation analysis unit are automatically performed periodically after the request to start the disaster investigation is received.
JP2021004067A 2020-01-16 2021-01-14 Operation status management system Active JP7523364B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020005082 2020-01-16
JP2020005082 2020-01-16

Publications (2)

Publication Number Publication Date
JP2021114897A JP2021114897A (en) 2021-08-05
JP7523364B2 true JP7523364B2 (en) 2024-07-26

Family

ID=77077299

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021004067A Active JP7523364B2 (en) 2020-01-16 2021-01-14 Operation status management system

Country Status (1)

Country Link
JP (1) JP7523364B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7679245B2 (en) 2021-07-12 2025-05-19 三菱造船株式会社 Corrosion management system, estimation method and program

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005185028A (en) 2003-12-22 2005-07-07 Tm T & D Kk Monitoring system of low-voltage power distribution system
JP2012115061A (en) 2010-11-25 2012-06-14 Toyota Motor Corp Power storage system
WO2016113823A1 (en) 2015-01-13 2016-07-21 パナソニックIpマネジメント株式会社 Photovoltaic facility monitoring device, photovoltaic facility monitoring system, and photovoltaic facility monitoring method
JP2018133867A (en) 2017-02-14 2018-08-23 積水化学工業株式会社 Power control system and power control method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005185028A (en) 2003-12-22 2005-07-07 Tm T & D Kk Monitoring system of low-voltage power distribution system
JP2012115061A (en) 2010-11-25 2012-06-14 Toyota Motor Corp Power storage system
WO2016113823A1 (en) 2015-01-13 2016-07-21 パナソニックIpマネジメント株式会社 Photovoltaic facility monitoring device, photovoltaic facility monitoring system, and photovoltaic facility monitoring method
JP2018133867A (en) 2017-02-14 2018-08-23 積水化学工業株式会社 Power control system and power control method

Also Published As

Publication number Publication date
JP2021114897A (en) 2021-08-05

Similar Documents

Publication Publication Date Title
JP3138257B2 (en) Method and apparatus for providing network infrastructure information to network control center
KR102373347B1 (en) Energy storage system and operating method with integrated environmental monitoring and control device
JP5619148B2 (en) Power management system, power management method, and section controller
JP7249155B2 (en) Storage battery management device and storage battery management method
US9441625B2 (en) System and method for pump component controlling and testing
US20120271471A1 (en) Network system and method of controlling network system
US20120022709A1 (en) Energy delivery control systems and methods
CN105359369A (en) Energy management device and its associated method
JP4802046B2 (en) Building power monitoring system
KR101882466B1 (en) Apparatus and method for controlling of battery energy storage system
JP2020020654A (en) Capacity estimating system, capacity estimating method, communication device, and computer program
JPWO2020162461A1 (en) Power control system and power control method
JP5989436B2 (en) Energy management system, energy management apparatus, control method, and program
JP7549571B2 (en) Power storage control system and power storage control method
JP2016173689A (en) Energy management system
JP7523364B2 (en) Operation status management system
JP4992991B2 (en) SOLAR CELL CONTROL DEVICE, SOLAR CELL MANAGEMENT DEVICE, POWER SYSTEM, SOLAR CELL CONTROL DEVICE CONTROL METHOD, AND SOLAR CELL MANAGEMENT METHOD
JP6901345B2 (en) Power control system storage battery deterioration diagnosis method
US20160118798A1 (en) Power control device, power control method, and power control system
US20200348363A1 (en) System and methods for fault detection
JP6769889B2 (en) Power control system and power control method
JP2009079935A (en) Fault diagnosis method for received power measurement system in distributed power supply
JP2018185581A (en) Equipment abnormality management system
WO2026061138A1 (en) Ups configuration method and apparatus, and energy storage system
JP2010110047A (en) Monitor for uninterruptible power supply unit

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231012

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240618

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240619

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240716

R150 Certificate of patent or registration of utility model

Ref document number: 7523364

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150