Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7523971B2 - Surveillance equipment - Google Patents
[go: Go Back, main page]

JP7523971B2 - Surveillance equipment - Google Patents

Surveillance equipment Download PDF

Info

Publication number
JP7523971B2
JP7523971B2 JP2020114409A JP2020114409A JP7523971B2 JP 7523971 B2 JP7523971 B2 JP 7523971B2 JP 2020114409 A JP2020114409 A JP 2020114409A JP 2020114409 A JP2020114409 A JP 2020114409A JP 7523971 B2 JP7523971 B2 JP 7523971B2
Authority
JP
Japan
Prior art keywords
load
temperature
output
response
monitoring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020114409A
Other languages
Japanese (ja)
Other versions
JP2022012532A (en
Inventor
真吾 井出
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Infrastructure Systems and Solutions Corp
Original Assignee
Toshiba Corp
Toshiba Infrastructure Systems and Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba Infrastructure Systems and Solutions Corp filed Critical Toshiba Corp
Priority to JP2020114409A priority Critical patent/JP7523971B2/en
Publication of JP2022012532A publication Critical patent/JP2022012532A/en
Application granted granted Critical
Publication of JP7523971B2 publication Critical patent/JP7523971B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Temperature Or Quantity Of Heat (AREA)
  • Emergency Alarm Devices (AREA)

Description

本発明の実施形態は、監視装置に関する。 An embodiment of the present invention relates to a monitoring device.

従来、高圧受変電設備の盤内において、発熱を管理する目的で、示温材が貼付されることがある。盤内の発熱は、例えば、主回路導体やその接続部で、負荷増大に伴う過電流などを原因としている。示温材は、所定の温度で変色するよう構成されており、主に目視での変色確認によって、管理者が発熱を認識可能とするものである。 Conventionally, temperature-indicating materials are sometimes attached inside panels of high-voltage substation equipment for the purpose of managing heat generation. Heat generation inside the panel is caused, for example, by overcurrent caused by increased load in the main circuit conductors and their connections. The temperature-indicating materials are configured to change color at a specified temperature, allowing managers to recognize heat generation mainly by visually checking the color change.

特開平9-015064号公報Japanese Patent Application Publication No. 9-015064

しかしながら、高圧受変電設備の稼働中に盤を開放することは危険であるため、稼働中の発熱管理が困難になっている。 However, it is dangerous to open the panels of high-voltage substation equipment while it is in operation, making it difficult to manage heat generation during operation.

また、負荷増大のために高温度化したのであれば負荷率を下げることが対応策となるが、高温度化の原因が必ずしも負荷増大ではないため、温度監視のみにて負荷の程度を推量るのでは、不正確な推量となる場合がある。 Also, if the temperature rises due to an increase in load, the countermeasure is to reduce the load rate. However, since the cause of a high temperature is not necessarily an increase in load, estimating the level of load based only on temperature monitoring may be inaccurate.

そこで、本発明は、上述の事情に鑑みてなされたものであって、発熱および負荷の管理や対策を安全に実施可能な監視装置を提供することを課題とする。 Therefore, the present invention was made in consideration of the above circumstances, and aims to provide a monitoring device that can safely manage and take measures against heat generation and load.

実施形態の実施形態の監視装置は、温度変化検知部と、負荷状況出力部と、対応実施部と、を備える。温度変化検知部は、1以上の負荷回路へ電力を供給する給電路における測温対象位置の温度が所定値を上回ったことを検知可能な情報を出力する。負荷状況出力部は、前記給電路にかかる負荷が当該負荷の高さが異なる複数の段階のいずれに該当するか検知可能な情報を出力する。対応実施部は、前記温度変化検知部の出力および前記負荷状況出力部の出力に応じて、前記段階に対応付けて定められた対応策を実施する。 The monitoring device of the embodiment includes a temperature change detection unit, a load status output unit, and a response implementation unit. The temperature change detection unit outputs information capable of detecting that a temperature at a temperature measurement target position in a power supply line that supplies power to one or more load circuits has exceeded a predetermined value. The load status output unit outputs information capable of detecting which of a plurality of stages of different load levels a load on the power supply line corresponds to. The response implementation unit implements a response measure defined in association with the stage according to the output of the temperature change detection unit and the output of the load status output unit.

図1は、第1の実施形態における高圧受変電設備10の単線結線図である。FIG. 1 is a single-line diagram of a high-voltage substation facility 10 according to the first embodiment. 図2は、高圧受変電設備10に続く設備21,22の単線結線図である。FIG. 2 is a single-line diagram of facilities 21 and 22 connected to the high-voltage substation facility 10. 図3は、高圧受変電設備10の側面図である。FIG. 3 is a side view of the high-voltage substation equipment 10. As shown in FIG. 図4は、監視装置500の構成を示すブロック図である。FIG. 4 is a block diagram showing the configuration of the monitoring device 500. 図5は、監視装置500の動作フローを示す図である。FIG. 5 is a diagram showing an operation flow of the monitoring device 500. 図6は、第2の実施形態における高圧受変電設備10の側面図である。FIG. 6 is a side view of the high-voltage substation equipment 10 according to the second embodiment. 図7は、示温材501の色変化の例を示す図である。FIG. 7 is a diagram showing an example of the color change of the temperature indicating material 501. As shown in FIG. 図8は、第2の実施形態における監視装置500の動作フローを示す図である。FIG. 8 is a diagram showing an operation flow of the monitoring device 500 in the second embodiment.

(第1の実施形態)
以下、添付の図面を用いて、第1の実施形態について説明する。図1は、本実施形態における高圧受変電設備10の単線結線図である。図2は、高圧受変電設備10に続く設備21,22の単線結線図である。図3は、高圧受変電設備10の側面図である。ここで、図1が示す範囲は、図3に対応する部分であって、いわゆる配電盤に相当する。図2が示す範囲は、いわゆる分電盤に相当する部分であって、図3が示す設備とは別の盤である。なお、図1の図中横方向は、図3の図中奥行方向に相当する。
First Embodiment
Hereinafter, a first embodiment will be described with reference to the accompanying drawings. Fig. 1 is a single-line wiring diagram of a high-voltage substation equipment 10 in this embodiment. Fig. 2 is a single-line wiring diagram of equipment 21, 22 following the high-voltage substation equipment 10. Fig. 3 is a side view of the high-voltage substation equipment 10. Here, the range shown in Fig. 1 is the portion corresponding to Fig. 3, which corresponds to a so-called switchboard. The range shown in Fig. 2 is the portion corresponding to a so-called distribution board, which is a board different from the equipment shown in Fig. 3. The horizontal direction in Fig. 1 corresponds to the depth direction in Fig. 3.

図1に示す高圧受変電設備10は、母線101と、導線102,103,104との接続部分およびその周辺部を、筐体300(図3参照)に収納している。電力は、導線102から母線101へ供給され、母線101から導線103,104へ分配される。導線102には、遮断器105が設けられている。導線103には、遮断器106および変流器107が設けられている。導線103は、接続部108によって外線ケーブル109に接続される。ここで、接続部108の付近には、温度に応じた値を出力する温度センサが設けられている。外線ケーブル109には、零相変圧器110が設けられている。 The high-voltage substation equipment 10 shown in FIG. 1 houses the connection portion between the bus bar 101 and the conductors 102, 103, and 104 and the surrounding area in a housing 300 (see FIG. 3). Power is supplied from the conductor 102 to the bus bar 101, and distributed from the bus bar 101 to the conductors 103 and 104. The conductor 102 is provided with a circuit breaker 105. The conductor 103 is provided with a circuit breaker 106 and a current transformer 107. The conductor 103 is connected to an external cable 109 by a connection part 108. Here, a temperature sensor that outputs a value according to temperature is provided near the connection part 108. The external cable 109 is provided with a zero-phase transformer 110.

導線104には、導線103と同様に、遮断器116や、変流器117が設けられている。また、導線104は、接続部118によって外線ケーブル119に接続される。外線ケーブル119には、零相変圧器120が設けられている。 Similar to conductor 103, conductor 104 is provided with a circuit breaker 116 and a current transformer 117. Conductor 104 is also connected to an external cable 119 by a connection part 118. External cable 119 is provided with a zero-phase transformer 120.

筐体300は、図3に示すように、上記各部を収納している。筐体300は、屋根301、外壁302、隔壁303などで構成されている。隔壁303は、筐体内部を、稼働中の開放が禁止された第1の領域と、開放可能な第2の領域とに分ける。図1に示す各部は、第1の領域に収納されている。第2の領域は、外壁302に設けられた扉によって開閉可能であって、制御部304,305は、遮断器106,116の制御などを行う。なお、高圧受変電設備10は、第1の領域に、結露を防止するヒータ306を備えている。 As shown in FIG. 3, the housing 300 houses the above-mentioned components. The housing 300 is composed of a roof 301, an outer wall 302, a partition wall 303, and the like. The partition wall 303 divides the inside of the housing into a first area that is prohibited from being opened during operation, and a second area that can be opened. The components shown in FIG. 1 are housed in the first area. The second area can be opened and closed by a door provided on the outer wall 302, and the control units 304 and 305 control the circuit breakers 106 and 116, etc. The high-voltage substation equipment 10 is equipped with a heater 306 in the first area to prevent condensation.

設備21は、図2に示すように、導線201、導線201を外線ケーブル109に接続する接続部202、変圧器203、電圧計204、電流計205、および電力計206を備えている。 As shown in FIG. 2, the equipment 21 includes a conductor 201, a connection part 202 that connects the conductor 201 to the external cable 109, a transformer 203, a voltmeter 204, an ammeter 205, and a power meter 206.

設備22は、導線201から複数の負荷回路に電力を分配する部分であって、図2に示すように、配線用遮断器211~214および端子221~224を備えている。配線用遮断器211~214は、導線201から端子221~224へ電力を供給する経路に設けられている。端子221~224は、各種負荷回路に接続されている。 The equipment 22 distributes power from the conductor 201 to multiple load circuits, and as shown in FIG. 2, includes circuit breakers 211-214 and terminals 221-224. The circuit breakers 211-214 are provided on a path that supplies power from the conductor 201 to the terminals 221-224. The terminals 221-224 are connected to various load circuits.

ここで、各種負荷回路は、その重要度が異なる。重要度は、給電が絶たれた場合の影響の大小に応じて設定され、影響が大きいものは、重要度が高いとされる。例えば工場であれば、機械設備の重要度を高くし、照明などの重要度を低くする等が考えられる。本実施形態では、以下の説明の便宜上、端子221に接続される負荷回路の重要度が高く、他の端子222~224に接続される負荷回路の重要度が低いものとする。 Here, the various load circuits have different levels of importance. The level of importance is set according to the impact of a power cut, with the greater the impact being considered to be of high importance. For example, in a factory, the importance of machinery and equipment could be high and the importance of lighting, etc. low. In this embodiment, for the sake of convenience in the following explanation, it is assumed that the load circuit connected to terminal 221 has high importance and the load circuits connected to the other terminals 222 to 224 have low importance.

各負荷回路の重要度の高低は、優先順位の高低に対応する。高圧受変電設備10の負荷率が高くなり過ぎた場合、優先順位が低い負荷回路への電力供給は、優先順位が高い負荷回路への電力供給よりも先に、遮断対象とされる。優先順位が高い負荷回路への電力供給は、高圧受変電設備10の負荷率が高くなり過ぎた場合にも、可能な限り維持される。 The importance of each load circuit corresponds to its priority. If the load factor of the high-voltage substation equipment 10 becomes too high, the power supply to a load circuit with a low priority is cut off before the power supply to a load circuit with a high priority. The power supply to a load circuit with a high priority is maintained as much as possible, even if the load factor of the high-voltage substation equipment 10 becomes too high.

図4は、本実施形態の監視装置500の構成を示すブロック図である。実施形態にかかる監視装置500は、高圧受変電設備10内の温度や負荷率の状況を監視するように構成されている。監視装置500は、温度変化検知部511、負荷状況出力部521、および対応実施部531,532を備えている。 Figure 4 is a block diagram showing the configuration of the monitoring device 500 of this embodiment. The monitoring device 500 according to this embodiment is configured to monitor the temperature and load factor status within the high-voltage receiving and transforming equipment 10. The monitoring device 500 includes a temperature change detection unit 511, a load status output unit 521, and response implementation units 531 and 532.

温度変化検知部511は、負荷回路へ電力を供給する給電路における測温対象位置の温度が所定値を上回ったことを検知可能な情報を出力する。より具体的には、温度変化検知部511は、接続部108の付近の温度センサの出力値が、所定の温度を上回ったことを示した場合に、変化を検知した旨を示す情報を出力する(後述する図5の(1)に対応)。 The temperature change detection unit 511 outputs information that can detect that the temperature at the temperature measurement position in the power supply path that supplies power to the load circuit has exceeded a predetermined value. More specifically, when the output value of the temperature sensor near the connection part 108 indicates that it has exceeded a predetermined temperature, the temperature change detection unit 511 outputs information indicating that a change has been detected (corresponding to (1) in Figure 5 described later).

負荷状況出力部521は、負荷回路へ電力を供給する給電路にかかる負荷の状況が、緊急性の程度が異なる複数の段階のいずれに該当するか検知可能な情報を出力する。より具体的には、負荷状況出力部521は、電圧計204、電流計205、および電力計206の出力を用いて算出される負荷率が所定の閾値を上回ったことを示した場合に、負荷率が高い旨を示す情報を出力する(後述する図5の(2)に対応)。 The load status output unit 521 outputs information that can detect which of multiple stages of different degrees of urgency the load status on the power supply line that supplies power to the load circuit falls into. More specifically, when the load status output unit 521 indicates that the load rate calculated using the outputs of the voltmeter 204, ammeter 205, and wattmeter 206 exceeds a predetermined threshold, it outputs information indicating that the load rate is high (corresponding to (2) in Figure 5 described later).

対応実施部531,532は、温度変化検知部511の出力および負荷状況出力部521の出力に応じて、緊急性の程度に応じた対応策を実施する。対応策は、上記段階に対応付けて定められている。より具体的には、対応実施部531は、上記対応策として、配線用遮断器211~214による電力供給の遮断の実施を制御する(後述する図5の(4)に対応)。また、対応実施部532は、上記対応策として、管理者向けの情報を発報する(後述する図5の(3)に対応)。当該情報の発報は、例えば、監視装置500に接続された情報処理端末装置が備えるモニタにテキストや画像で表示するのでもよいし、或いは、スピーカで音声を発するのでもよい。 The countermeasures implementation units 531 and 532 implement countermeasures according to the level of urgency, depending on the output of the temperature change detection unit 511 and the load status output unit 521. The countermeasures are determined in correspondence with the above stages. More specifically, the countermeasure implementation unit 531 controls the execution of the cutoff of the power supply by the molded-case circuit breakers 211 to 214 as the countermeasure (corresponding to (4) in FIG. 5, which will be described later). In addition, the countermeasure implementation unit 532 issues information for the administrator as the countermeasure (corresponding to (3) in FIG. 5, which will be described later). The information may be issued, for example, by displaying text or images on a monitor equipped in an information processing terminal device connected to the monitoring device 500, or by issuing audio through a speaker.

このような構成により、監視装置500は、発熱管理および負荷率管理を行う。図5は、監視装置500の動作フローを示す図である。まず、温度変化検知部511が、接続部108の付近の温度センサの出力値から、測温対象位置の温度が所定値を上回ったことを検知すると、その旨を示す情報(1)を出力する。また、電圧計204、電流計205、および電力計206の出力を用いて算出される負荷率が、所定の閾値を上回ると、負荷状況出力部521が、負荷率が高い旨を示す情報(2)を出力する。 With this configuration, the monitoring device 500 performs heat generation management and load rate management. Figure 5 is a diagram showing the operation flow of the monitoring device 500. First, when the temperature change detection unit 511 detects from the output value of the temperature sensor near the connection unit 108 that the temperature at the temperature measurement target position has exceeded a predetermined value, it outputs information (1) indicating that. Furthermore, when the load rate calculated using the outputs of the voltmeter 204, ammeter 205, and wattmeter 206 exceeds a predetermined threshold, the load status output unit 521 outputs information (2) indicating that the load rate is high.

情報(1)と情報(2)とがAND入力されると、対応実施部532が、管理者向けの情報(3)を発報する。また、対応実施部531が、配線用遮断器211~214による電力供給の遮断すなわちトリップ(4)を行う。 When information (1) and information (2) are ANDed, the response execution unit 532 issues information (3) for the administrator. In addition, the response execution unit 531 cuts off the power supply by the molded-case circuit breakers 211 to 214, i.e., trips (4).

ここで、図2に示すように各種負荷回路に重要度の高低が対応付けられている場合、対応実施部531は、重要度に対応した優先順位に基づき、重要度が低く優先順位が低い負荷回路への電力供給は、重要度が高く優先順位が高い負荷回路への電力供給よりも先に遮断対象とする。これにより、対応実施部531は、重要度が高く優先順位が高い負荷回路への電力供給を維持する。 When various load circuits are associated with high and low levels of importance as shown in FIG. 2, the response execution unit 531, based on the priority order corresponding to the importance, targets the power supply to a load circuit with low importance and low priority to be cut off before the power supply to a load circuit with high importance and high priority. In this way, the response execution unit 531 maintains the power supply to the load circuit with high importance and high priority.

さらにここで、重要度に応じて負荷回路の取り扱いを区別する場合の、具体的な数値の例を示す。例えば、負荷率が80%を上回った場合には、重要度が低い負荷回路のいくつかへの電力供給を遮断する。このときのトリップ対象をどの負荷回路とするかの選択方法の例としては、重要度が低いもののうち最も高負荷のものを選ぶ、或いは、重要度が最も低く設定されたものを選ぶなど、いくつか考えられる。また、負荷率が90%を上回った場合には、配線用遮断器212~214を作動させて、重要度の低い負荷回路が接続された端子222~224の全てへの電力供給を遮断する。そして、負荷率が95%を上回った場合には、全ての配線用遮断器211~214を作動させ、全ての負荷回路への電力供給を遮断する。 Here, we will show concrete numerical examples of how to handle load circuits according to their importance. For example, if the load rate exceeds 80%, the power supply to some of the less important load circuits is cut off. There are several possible methods for selecting which load circuit to trip at this time, such as selecting the least important one with the highest load, or selecting the one with the lowest importance. If the load rate exceeds 90%, the circuit breakers 212 to 214 are activated to cut off the power supply to all of the terminals 222 to 224 to which the less important load circuits are connected. If the load rate exceeds 95%, all circuit breakers 211 to 214 are activated to cut off the power supply to all of the load circuits.

図5の説明に戻る。次に、温度変化検知部511が、測温対象位置の温度が所定値を上回ったことを検知しその旨を示す情報(5)を出力し、負荷状況出力部521が、負荷率が低い旨を示す情報(6)を出力した場合、対応実施部532は、管理者向けの情報(7)を発報する。当該情報(7)は、盤内の異常(発熱等)を管理者に知らせるための情報である。この場合には、負荷率が高くないことから、負荷率以外の原因で発熱していると考えられる。このため、この場合には、配線用遮断器211~214のトリップ(4)の実施は管理者に委ね、自動で直ちに実施とはしない。 Returning to the explanation of FIG. 5, next, when the temperature change detection unit 511 detects that the temperature at the temperature measurement location has exceeded a predetermined value and outputs information (5) indicating that, and the load status output unit 521 outputs information (6) indicating that the load rate is low, the response execution unit 532 issues information (7) for the administrator. This information (7) is information for informing the administrator of an abnormality (heat generation, etc.) within the panel. In this case, since the load rate is not high, it is considered that the heat is being generated due to a cause other than the load rate. For this reason, in this case, the implementation of tripping (4) of the molded-case circuit breakers 211-214 is left to the administrator, and is not implemented automatically and immediately.

以上、本実施形態によれば、高圧受変電設備10を開放しなくとも、盤内の温度および負荷の状況を監視し、緊急性の段階に応じてトリップや異常の発報を行うことができる。このため、本実施形態によれば、発熱および負荷の管理や対策を、安全に実施することができる。 As described above, according to this embodiment, it is possible to monitor the temperature and load status inside the panel without opening the high-voltage substation equipment 10, and to issue trips or abnormality alerts depending on the level of urgency. Therefore, according to this embodiment, heat generation and load management and countermeasures can be implemented safely.

また、本実施形態によれば、負荷率が高い場合には、重要度が低い負荷回路からトリップすることで、重要度が高い負荷回路への給電を維持するので、トリップによる影響を低く抑えることができる。 In addition, according to this embodiment, when the load factor is high, the power supply to the load circuit of high importance is maintained by tripping the load circuit of low importance first, so that the impact of tripping can be kept low.

また、本実施形態によれば、負荷率が低くても発熱があれば異常を示す情報(7)発報するので、過負荷以外の原因の発熱をも拾い上げ、対応することができる。 In addition, according to this embodiment, even if the load factor is low, if heat is generated, information (7) indicating an abnormality is issued, so heat generated due to causes other than overload can also be identified and dealt with.

(第2の実施形態)
次に、図6~図8を用いて、第2の実施形態について説明する。第2の実施形態は、第1の実施形態の変形例であるので、第1の実施形態で説明した部分と同じ部分については同じ符号を用い、詳細な説明を省略する。
Second Embodiment
Next, a second embodiment will be described with reference to Figures 6 to 8. Since the second embodiment is a modified example of the first embodiment, the same parts as those described in the first embodiment are designated by the same reference numerals, and detailed description thereof will be omitted.

図6は、第2の実施形態における高圧受変電設備10の側面図である。本実施形態の監視装置500は、温度センサに代えて、示温材501とカメラ502とを用いる。図7は、示温材501の色変化の例を示す図である。示温材501は、例えば3つの示温エレメント503~505を備える。各示温エレメント503~505は、各々異なる温度に応じて変色する。当該変色により、示温材501の貼付位置の温度が判定可能となる。 Figure 6 is a side view of the high-voltage substation equipment 10 in the second embodiment. The monitoring device 500 of this embodiment uses a temperature indicator 501 and a camera 502 instead of a temperature sensor. Figure 7 is a diagram showing an example of the color change of the temperature indicator 501. The temperature indicator 501 includes, for example, three temperature indicator elements 503-505. Each of the temperature indicator elements 503-505 changes color in response to a different temperature. This color change makes it possible to determine the temperature at the position where the temperature indicator 501 is attached.

図8は、第2の実施形態における監視装置500の動作フローを示す図である。本実施形態の監視装置500は、温度変化検知部551、負荷状況出力部521、対応実施部531,532、および動体検知部552を備えている。負荷状況出力部521および対応実施部531,532は、第1の実施形態と同様である。
温度変化検知部551は、測温対象位置(接続部108の付近)に貼付された示温材501の色変化を、カメラ502で監視することで、温度変化の検知を行う。
動体検知部552は、カメラ502が出力する画像を用いて、監視領域内における動体(小動物など)の存在を検知する。
本実施形態において、対応実施部532は、温度変化検知部551の出力が、測温対象位置の温度が所定値を下回っていることを示し、且つ、負荷状況出力部521の出力が、緊急性の程度が低い段階に該当することを示す場合に、対応策として、異常を知らせる管理者向けの情報の発報を実施する。つまり、対応実施部532は、負荷率が高くなく(6)、カメラ502が小動物などの動体をとらえた(8)場合に、異常発生を発報する(7)。
8 is a diagram showing an operation flow of the monitoring device 500 in the second embodiment. The monitoring device 500 in this embodiment includes a temperature change detection unit 551, a load status output unit 521, response implementation units 531 and 532, and a moving object detection unit 552. The load status output unit 521 and the response implementation units 531 and 532 are similar to those in the first embodiment.
The temperature change detection unit 551 detects a temperature change by monitoring, with a camera 502, a color change of a temperature indicating material 501 attached to the temperature measurement target position (near the connection portion 108).
The moving object detection unit 552 detects the presence of a moving object (such as a small animal) within the monitoring area using the image output by the camera 502 .
In this embodiment, when the output of the temperature change detection unit 551 indicates that the temperature at the temperature measurement target position is below a predetermined value and the output of the load status output unit 521 indicates that the level of urgency is low, the response execution unit 532 issues information to the manager notifying the manager of the occurrence of an abnormality as a response measure. In other words, when the load rate is not high (6) and the camera 502 captures a moving object such as a small animal (8), the response execution unit 532 issues a report of the occurrence of an abnormality (7).

このように、本実施形態によれば、第1の実施形態と同様の効果に加え、カメラ502を利用することで、小動物などの動体が盤内に侵入するなどの異常の検知および発報を、行うことができる。 In this way, according to this embodiment, in addition to the same effects as the first embodiment, by using the camera 502, it is possible to detect and issue an alarm when an abnormality occurs, such as a small animal or other moving object entering the board.

なお、上記第1および第2の実施形態の監視装置500が備える各部(温度変化検知部511,551、負荷状況出力部521、対応実施部531,532、および動体検知部552)は、コンピュータのハードウェアとソフトウェアとが協働して実現する機能モジュールであってもよいし、或いは、専用のハードウェア(回路)であってもよい。 Note that each unit (temperature change detection unit 511, 551, load status output unit 521, response implementation unit 531, 532, and moving object detection unit 552) of the monitoring device 500 of the first and second embodiments may be a functional module realized by cooperation between computer hardware and software, or may be dedicated hardware (circuitry).

また、上記各部が機能モジュールである場合、監視装置500は、プロセッサ、メモリ、および通信インターフェースなどといったハードウェアを備えたコンピュータとして構成される。また、そのプログラムは、プログラムは、インストール可能な形式又は実行可能な形式のファイルでCD-ROM、フレキシブルディスク(FD)、CD-R、DVD(Digital Versatile Disk)等のコンピュータで読み取り可能な記録媒体に記録されて提供され得る。 When each of the above-mentioned units is a functional module, the monitoring device 500 is configured as a computer equipped with hardware such as a processor, memory, and a communication interface. The program may be provided by being recorded in an installable or executable file format on a computer-readable recording medium such as a CD-ROM, a flexible disk (FD), a CD-R, or a DVD (Digital Versatile Disk).

また、当該プログラムを、インターネット等のネットワークに接続されたコンピュータ上に格納し、ネットワーク経由でダウンロードさせることにより提供するように構成してもよい。また、当該プログラムをインターネット等のネットワーク経由で提供または配布するように構成してもよい。また、当該プログラムを、ROM等に予め組み込んで提供するように構成してもよい。 The program may also be configured to be stored on a computer connected to a network such as the Internet and provided by downloading it via the network. The program may also be configured to be provided or distributed via a network such as the Internet. The program may also be configured to be provided by being pre-installed in a ROM or the like.

本発明の実施形態を説明したが、この実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。この新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。また、この実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。 Although an embodiment of the present invention has been described, this embodiment is presented as an example and is not intended to limit the scope of the invention. This new embodiment can be embodied in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. Furthermore, this embodiment and its modifications are included within the scope and gist of the invention, and are included in the scope of the invention and its equivalents described in the claims.

10 …高圧受変電設備
101…母線、102~104…導線(給電路)
105,106,116…遮断器
107,117…変流器
108,118…接続部
109,119…外線ケーブル
110,120…零相変圧器
201…導線(給電路)
202…接続部、203…変圧器
204…電圧計、205…電流計、206…電力計
21 …設備、211~214…配線用遮断器
22 …設備、221~224…端子
300…筐体、301…屋根、302…外壁、303…隔壁
304…制御部、306…ヒータ
500…監視装置
501…示温材、502…カメラ、503~505…示温エレメント
511…温度変化検知部、521…負荷状況出力部、531,532…対応実施部
551…温度変化検知部、552…動体検知部
10... High voltage substation equipment 101... Busbar, 102-104... Conductor (power supply line)
105, 106, 116... Circuit breakers 107, 117... Current transformers 108, 118... Connections 109, 119... External cables 110, 120... Zero-phase transformer 201... Conductor (power supply line)
202...Connection section, 203...Transformer 204...Voltmeter, 205...Ammeter, 206...Power meter 21...Equipment, 211-214...Circuit breaker 22...Equipment, 221-224...Terminal 300...Housing, 301...Roof, 302...Exterior wall, 303...Partition wall 304...Control section, 306...Heater 500...Monitoring device 501...Temperature indicator, 502...Camera, 503-505...Temperature indicator element 511...Temperature change detection section, 521...Load status output section, 531, 532...Response implementation section 551...Temperature change detection section, 552...Motion detection section

Claims (6)

1以上の負荷回路へ電力を供給する給電路における測温対象位置の温度が所定値を上回ったことを検知可能な情報を出力する温度変化検知部と、
前記給電路にかかる負荷が当該負荷の高さが異なる複数の段階のいずれに該当するか検知可能な情報を出力する負荷状況出力部と、
前記温度変化検知部の出力および前記負荷状況出力部の出力に応じて、前記段階に対応付けて定められた対応策を実施する対応実施部と、
を備える監視装置。
a temperature change detection unit that outputs information capable of detecting that a temperature at a temperature measurement target position in a power supply path that supplies power to one or more load circuits has exceeded a predetermined value;
a load status output unit that outputs information that can detect which of a plurality of stages of different load levels the load on the power supply line corresponds to;
a countermeasure execution unit that executes a countermeasure determined in correspondence with the stage in response to an output from the temperature change detection unit and an output from the load status output unit;
A monitoring device comprising:
前記対応実施部は、前記負荷回路への電力供給の遮断と管理者向けの情報の発報とを含む複数の前記対応策から、前記段階に対応付けて定められた1または複数の前記対応策を実施する
請求項1に記載の監視装置。
The monitoring device of claim 1 , wherein the response implementation unit implements one or more of the response measures determined in correspondence with the stage from a plurality of response measures including cutting off the power supply to the load circuit and issuing information for an administrator.
前記給電路は、優先順位が定められた複数の前記負荷回路へ電力を供給し、
前記対応実施部は、前記優先順位が最も高い前記負荷回路以外への電力供給の遮断を前記対応策とする
請求項2に記載の監視装置。
the power supply path supplies power to the plurality of load circuits in a priority order;
The monitoring device according to claim 2 , wherein the countermeasure execution unit takes as the countermeasure a cutoff of power supply to the load circuit other than the load circuit having the highest priority.
前記対応実施部は、前記温度変化検知部の出力が、前記測温対象位置の温度が所定値を上回っていることを示し、且つ、前記負荷状況出力部の出力が、前記負荷が高い段階に該当することを示す場合に、前記対応策として、前記負荷回路への電力供給の遮断と管理者向けの情報の発報とを実施する
請求項1~3のいずれか1項に記載の監視装置。
A monitoring device as described in any one of claims 1 to 3, wherein the response implementation unit, when the output of the temperature change detection unit indicates that the temperature at the temperature measurement location exceeds a predetermined value and the output of the load status output unit indicates that the load is at a high stage, implements the response measure of cutting off the power supply to the load circuit and issuing information for an administrator.
前記対応実施部は、前記温度変化検知部の出力が、前記測温対象位置の温度が所定値を上回っていることを示し、且つ、前記負荷状況出力部の出力が、前記負荷が低い段階に該当することを示す場合に、前記対応策として、異常を知らせる管理者向けの情報の発報を実施する
請求項1~4のいずれか1項に記載の監視装置。
A monitoring device as described in any one of claims 1 to 4, wherein the response implementation unit issues information to an administrator to notify them of an abnormality as the response measure when the output of the temperature change detection unit indicates that the temperature at the temperature measurement location exceeds a predetermined value and the output of the load status output unit indicates that the load is at a low stage.
監視領域内における動体の存在を検知する動体検知部をさらに備え、
前記対応実施部は、前記温度変化検知部の出力が、前記測温対象位置の温度が所定値を下回っていることを示し、且つ、前記負荷状況出力部の出力が、前記負荷が低い段階に該当することを示し、さらに、前記動体検知部が動体の存在を検知した場合に、前記対応策として、異常を知らせる管理者向けの情報の発報を実施する
請求項1~5のいずれか1項に記載の監視装置。
A moving object detection unit is further provided for detecting the presence of a moving object within the monitoring area,
The monitoring device of any one of claims 1 to 5, wherein the response implementation unit, when the output of the temperature change detection unit indicates that the temperature at the temperature measurement location is below a predetermined value and the output of the load status output unit indicates that the load is at a low stage, and further, when the moving object detection unit detects the presence of a moving object, issues information to an administrator to notify them of an abnormality as the response measure.
JP2020114409A 2020-07-01 2020-07-01 Surveillance equipment Active JP7523971B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020114409A JP7523971B2 (en) 2020-07-01 2020-07-01 Surveillance equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020114409A JP7523971B2 (en) 2020-07-01 2020-07-01 Surveillance equipment

Publications (2)

Publication Number Publication Date
JP2022012532A JP2022012532A (en) 2022-01-17
JP7523971B2 true JP7523971B2 (en) 2024-07-29

Family

ID=80148742

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020114409A Active JP7523971B2 (en) 2020-07-01 2020-07-01 Surveillance equipment

Country Status (1)

Country Link
JP (1) JP7523971B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003023729A (en) 2001-05-02 2003-01-24 Kazuo Miwa Power saving control device and energy saving system
JP2003029214A (en) 2001-07-19 2003-01-29 Fukui Megane Kogyo Kk Spectacle parts of structure integrated with brow endpiece and hinge
US20080088991A1 (en) 2006-10-13 2008-04-17 Elms Robert T Circuit interrupter including a shunt wire current sensor and a processor having a thermal overload predictive function
JP2010262858A (en) 2009-05-08 2010-11-18 Kawamura Electric Inc Circuit breaker for low-voltage power contract
JP2011250661A (en) 2010-05-31 2011-12-08 Mitsubishi Electric Corp Switchgear
JP2016031893A (en) 2014-07-30 2016-03-07 株式会社コエックス Automatic recovery breaker

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003023729A (en) 2001-05-02 2003-01-24 Kazuo Miwa Power saving control device and energy saving system
JP2003029214A (en) 2001-07-19 2003-01-29 Fukui Megane Kogyo Kk Spectacle parts of structure integrated with brow endpiece and hinge
US20080088991A1 (en) 2006-10-13 2008-04-17 Elms Robert T Circuit interrupter including a shunt wire current sensor and a processor having a thermal overload predictive function
JP2010262858A (en) 2009-05-08 2010-11-18 Kawamura Electric Inc Circuit breaker for low-voltage power contract
JP2011250661A (en) 2010-05-31 2011-12-08 Mitsubishi Electric Corp Switchgear
JP2016031893A (en) 2014-07-30 2016-03-07 株式会社コエックス Automatic recovery breaker

Also Published As

Publication number Publication date
JP2022012532A (en) 2022-01-17

Similar Documents

Publication Publication Date Title
KR101039313B1 (en) Prefabricated power distribution unit for monitoring
KR100809910B1 (en) Digital distribution board
US10732223B2 (en) Circuit breaker health monitoring
EP2577697B1 (en) Arc flash detection apparatus and electrical system including the same
JP6732278B1 (en) Digital electric safety control system
KR100681801B1 (en) Digital distribution board
US9324527B2 (en) Arc monitor
KR101723217B1 (en) A self-diagnosis module for diagnosing whether or not the operation is correct within the power distribution panel itself and for alarming if the operation is inaccurate, and a switchboard
KR20100138248A (en) Electrical safety monitoring system that manages the status of distribution panels and switchboards installed by region
JP7522599B2 (en) Distribution board management method, distribution board, program, and distribution board management system
KR20180003978A (en) A self-diagnosis module for diagnosing whether or not the operation is correct within the power distribution panel itself and for alarming if the operation is inaccurate, and a switchboard
KR102859387B1 (en) Digital protection relays and digital protection relay monitoring systems
JP7523971B2 (en) Surveillance equipment
KR101069637B1 (en) Overcurrent protection method and device
JP6509029B2 (en) Distribution board
US20090257156A1 (en) Method of setting a ground fault trip function for a trip unit and a trip unit having a defined trip function for ground fault protection
KR102128744B1 (en) Apparatus for power monitoring of electric power equipment
JPWO2021095280A1 (en) Digital Electric Safety Control System
KR20200025057A (en) Switchboard with overheat monitoring device for fire prevention
KR20190110199A (en) System for detecting corrosion in switchboard panel
KR102157076B1 (en) Electric Fire Prevention Smart Controller for Cattle Shed
JP2021100355A (en) Leakage detection system, automatic maintenance and inspection system, and leakage detection method
US20150233974A1 (en) Meter or display device for calculation and display of arc flash incident energy
US10103535B2 (en) Electrical protective arrangement for an electrical installation, and associated method
KR20230073088A (en) Smart switchboard providing fire prevention alarm system based on multiple temperature sensor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230601

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240319

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240326

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240521

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240618

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240717

R150 Certificate of patent or registration of utility model

Ref document number: 7523971

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350