Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7528656B2 - End formwork fixing device - Google Patents
[go: Go Back, main page]

JP7528656B2 - End formwork fixing device - Google Patents

End formwork fixing device Download PDF

Info

Publication number
JP7528656B2
JP7528656B2 JP2020150501A JP2020150501A JP7528656B2 JP 7528656 B2 JP7528656 B2 JP 7528656B2 JP 2020150501 A JP2020150501 A JP 2020150501A JP 2020150501 A JP2020150501 A JP 2020150501A JP 7528656 B2 JP7528656 B2 JP 7528656B2
Authority
JP
Japan
Prior art keywords
gable
formwork
fixing
burr
supported
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020150501A
Other languages
Japanese (ja)
Other versions
JP2022045030A (en
Inventor
秀明 西浦
聡 外山
拓也 鈴木
雅信 阪口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2020150501A priority Critical patent/JP7528656B2/en
Publication of JP2022045030A publication Critical patent/JP2022045030A/en
Application granted granted Critical
Publication of JP7528656B2 publication Critical patent/JP7528656B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、覆工コンクリートセントルにおける妻型枠固定装置に関する。 The present invention relates to a gable formwork fixing device for a concrete lining center.

山岳トンネルの覆工コンクリートの施工では、「セントル」と呼ばれる半円筒形の移動式型枠を使用し、トンネルの内周面にコンクリートを打設している(例えば、特許文献1、2参照)。コンクリートの打設に際し、施工継目となる「セントル」の端部には、「妻型枠」と呼ばれる輻20cm程度の木製の板を打ち止め型枠として用い、地山と「セントル」の間の開口部を塞ぐように設置していた。 When constructing mountain tunnel lining concrete, a semi-cylindrical movable formwork called a "center" is used to pour concrete into the inner surface of the tunnel (see, for example, Patent Documents 1 and 2). When pouring the concrete, a wooden board with a spoke of about 20 cm called a "gable formwork" is used as a stop formwork at the end of the "center," which forms the construction joint, and is installed to close the opening between the ground and the "center."

特許文献1では、覆工コンクリートの厚みに応じた形状の妻型枠を、セントルの妻面に固定されている棒状の支持部材で支持する技術が提案されている。また、特許文献2では、トンネル覆工用のセントルの妻側を塞ぐ妻型枠を、セントルの円周方向に分割し、セントルに対し内周側と外周側とに揺動自在にヒンジ結合する技術が提案されている。 Patent Document 1 proposes a technique in which an end formwork shaped according to the thickness of the lining concrete is supported by a rod-shaped support member fixed to the end face of the center tunnel. In addition, Patent Document 2 proposes a technique in which the end formwork that covers the end side of the center tunnel for tunnel lining is divided in the circumferential direction of the center tunnel, and hinged to the inner and outer sides of the center tunnel so that it can swing freely.

特開2001-248397号公報JP 2001-248397 A 特開2011-184869号公報JP 2011-184869 A

しかしながら、棒状の支持部材やヒンジ結合での妻型枠の支持は、コンクリートの打設圧に対する強度を十分に確保できないたため、実際には、端太角等を用いた通し材を覆工コンクリートの周方向に配置し、通し材を妻型枠固定用ばり(パイプサポートや端太角)で固定していた。 However, supporting the gable formwork with rod-shaped support members or hinge connections did not provide sufficient strength against the concrete pouring pressure, so in practice, through members using thickened corners or the like were placed around the periphery of the lining concrete and secured in place with beams for fixing the gable formwork (pipe supports or thickened corners).

通し材及び妻型枠固定用ばりは、覆工コンクリートを打設するごとに、妻型枠が動いたり外れたりしないように妻型枠固定用ばりを堅固に設置し、打設後に撤去している。通し材は、妻型枠に釘等で固定しないので、通し材と妻型枠固定用ばりの設置及び撤去作業は、セントルの足場上で行うが、側壁部などの場所によっては足場から身を乗り出しての作業となる。また、妻型枠固定用ばりの設置間隔は、作業員の勘(熟練度)による部分が大きく、不足するとコンクリート打設中に妻型枠が外れたり動いたりして不具合が生じる。さらに、打設ごとに周長20m程度の妻型枠を固定しなければならないので、多くの時間と手間を要していた。これらのことから、通し材及び妻型枠固定用ばりの設置及び撤去作業は、墜落・落下の恐れのある危険で熟練を有する煩雑な作業であった。 The through bars and gable formwork fixing beams are firmly installed each time the lining concrete is poured to prevent the gable formwork from moving or coming off, and are removed after pouring. Because the through bars are not fixed to the gable formwork with nails or other fasteners, the installation and removal of the through bars and gable formwork fixing beams is carried out on the center scaffolding, but in some places, such as on the side walls, the work requires workers to lean over the scaffolding. In addition, the installation interval for the gable formwork fixing beams depends largely on the worker's intuition (level of skill), and if the interval is insufficient, the gable formwork will come off or move during concrete pouring, causing problems. Furthermore, since the gable formwork, which has a circumference of about 20 m, must be fixed each time concrete is poured, it takes a lot of time and effort. For these reasons, the installation and removal of the through bars and gable formwork fixing beams is dangerous, involves falling, and is a complicated task that requires skill.

本発明は、妻型枠へ当接させる通し材及び妻型枠固定用ばりの設置及び撤去を簡単に行うことができる妻型枠固定装置を提供することにある。 The present invention aims to provide a gable formwork fixing device that allows for easy installation and removal of through members and gable formwork fixing beams that are abutted against the gable formwork.

本発明の妻型枠固定装置は、トンネルの内周面とセントルの型枠との間の打設空間における妻面に並設された複数の妻型枠を固定する妻型枠固定装置であって、複数の前記妻型枠に当接する通し材と、開放端に前記通し材が支持されていると共に、基端が前記セントルの前記妻面側から張り出したばり受け鋼材に支持された妻型枠固定用ばりを具備し、前記妻型枠固定用ばりは、伸縮機構を備えていることを特徴とする。
さらに、本発明の妻型枠固定装置において、前記通し材は、2本以上の前記妻型枠固定用ばりにかけ渡されて支持されていても良い。
さらに、本発明の妻型枠固定装置において、前記妻型枠固定用ばりは、前記通し材及び前記ばり受け鋼材に、前記型枠の周長の法線方向に回動可能にそれぞれ支持されていても良い。
さらに、本発明の妻型枠固定装置において、前記妻型枠固定用ばりは、前記型枠の周面よりも内周側で前記ばり受け鋼材によって支持されていても良い。
さらに、本発明の妻型枠固定装置において、前記妻型枠固定用ばりの開放端と、前記ばり受け鋼材における前記妻型枠固定用ばりの基端よりも前記妻面側の位置との間に介在する、伸縮機構を備えた高さ調整部材を具備しても良い。
The gable formwork fixing device of the present invention is a gable formwork fixing device that fixes multiple gable formworks arranged side by side on the gable face in the pouring space between the inner surface of a tunnel and the formwork of a center tunnel, and is characterized in that it is equipped with a through member that abuts the multiple gable formworks, and a gable formwork fixing beam whose open end supports the through member and whose base end is supported by a burr-receiving steel material that protrudes from the gable face side of the center tunnel, and the gable formwork fixing beam is equipped with an extension and contraction mechanism .
Furthermore, in the end form fixing device of the present invention, the through member may be supported by being stretched across two or more of the end form fixing beams.
Furthermore, in the gable form fixing device of the present invention, the gable form fixing burrs may be supported by the through member and the burr receiving steel member, respectively, so as to be rotatable in the normal direction to the perimeter of the form.
Furthermore, in the end form fixing device of the present invention, the end form fixing burrs may be supported by the burr receiving steel material on the inner peripheral side relative to the peripheral surface of the form.
Furthermore, the gable formwork fixing device of the present invention may be provided with a height adjustment member equipped with an expansion and contraction mechanism interposed between the open end of the gable formwork fixing beam and a position on the burr-receiving steel material closer to the gable face than the base end of the gable formwork fixing beam.

本発明によれば、通し材と妻型枠固定用ばりとを一体としてセントルに支持されているため、妻型枠の設置後に、伸縮機構を伸長させることで、通し材及び妻型枠固定用ばりを妻型枠に対して簡単に設置できると共に、打設完了後は、伸縮機構を収縮させることで、通し材及び妻型枠固定用ばりを妻型枠から簡単に撤去できるという効果を奏する。 According to the present invention, the through member and the gable form fixing beam are supported by the center as a single unit. After the gable form is installed, the through member and the gable form fixing beam can be easily installed on the gable form by extending the telescopic mechanism. After pouring is completed, the through member and the gable form fixing beam can be easily removed from the gable form by contracting the telescopic mechanism.

本発明に係る妻型枠固定装置が設置されたセントルの構成を示す図である。A diagram showing the configuration of a center in which the end formwork fixing device of the present invention is installed. 図1に示すセントルを切羽側から見た図である。FIG. 2 is a view of the center shown in FIG. 1 as seen from the face side. 本発明に係る妻型枠固定装置の構成を示す図である。FIG. 2 is a diagram showing the configuration of a gable formwork fixing device according to the present invention. 図3に示す妻型枠固定用ばりの構成を示す側面図である。FIG. 4 is a side view showing the configuration of the end formwork fixing beam shown in FIG. 3 . 図3に示す妻型枠固定用ばりの折り畳んだ状態を示す側面図である。FIG. 4 is a side view showing the gable formwork fixing beam shown in FIG. 3 in a folded state.

次に、本発明を実施するための形態(以下、単に「実施形態」という)を、図面を参照して具体的に説明する。 Next, a form for implementing the present invention (hereinafter simply referred to as "embodiment") will be specifically described with reference to the drawings.

本実施形態の妻型枠固定装置1は、図1を参照すると、コンクリートの吹き付け等によっては一次支保されたトンネルの内周面に沿ったアーチ型の型枠21を有するセントル2に設置され、トンネルの内周面とセントル2(型枠21)との間に形成される覆工コンクリートの打設空間(以下、単に打設空間Cと称す)の妻面を塞ぐ妻型枠を支持する。 Referring to FIG. 1, the end form fixing device 1 of this embodiment is installed on a center 2 having an arch-shaped form 21 that follows the inner periphery of a tunnel that is primarily supported by spraying concrete, etc., and supports the end form that closes the end face of the casting space for the lining concrete (hereinafter simply referred to as casting space C) that is formed between the inner periphery of the tunnel and the center 2 (form 21).

セントル2は、トンネル軸方向(覆工コンクリートの施工方向)に沿ってそれぞれ敷設されたレール3上をそれぞれ走行可能である。覆工コンクリートが坑口側から切羽側に向かって施工される場合、複数個の妻型枠固定装置1は、セントル2の切羽側に、型枠21の周長に沿って、複数個が設置されている。 The center tunnels 2 can run on rails 3 that are laid along the tunnel axis (the direction in which the lining concrete is constructed). When the lining concrete is constructed from the tunnel mouth toward the face, multiple end formwork fixing devices 1 are installed on the face side of the center tunnel 2 along the perimeter of the formwork 21.

型枠21は、トンネルの内周面に沿うように、トンネル幅方向の断面形状が略半円弧状の鋼製部材である。型枠21は、図2に示すように、複数のジャッキ22を介して移動架台23によって支持されている。そして、型枠21とトンネルの内周面との間が、打設空間Cとなる。 The formwork 21 is a steel member with a cross-sectional shape in the tunnel width direction that is roughly semicircular so as to fit along the inner circumferential surface of the tunnel. As shown in FIG. 2, the formwork 21 is supported by a movable platform 23 via multiple jacks 22. The space between the formwork 21 and the inner circumferential surface of the tunnel becomes the casting space C.

移動架台23は、H型鋼や溝型鋼等で構成され、前後に配置された複数の門型フレーム24と、複数の門型フレーム24を連結する図示しない複数の縦梁部材とを備えている。門型フレーム24の下端部には、レール3上を走行するための車輪25が備えられている。門型フレーム24の内側の空間断面は、ズリ等を搬送する坑道として機能する。 The mobile platform 23 is made of H-shaped steel, channel steel, etc., and is equipped with multiple portal frames 24 arranged at the front and rear, and multiple vertical beam members (not shown) that connect the multiple portal frames 24. The lower end of the portal frames 24 is equipped with wheels 25 for running on the rails 3. The spatial cross section inside the portal frames 24 functions as a tunnel for transporting waste, etc.

セントル2(型枠21)は、型枠21の周長に沿って所定の間隔で妻面側から切羽方向に張り出した複数の第1ばり受け鋼材26を備え、隣接する第1ばり受け鋼材26の間にそれぞれ妻型枠固定装置1が設置されている。 The center 2 (formwork 21) has a number of first burr support steel members 26 that protrude from the end face side toward the face at predetermined intervals along the perimeter of the formwork 21, and end formwork fixing devices 1 are installed between adjacent first burr support steel members 26.

妻型枠固定装置1は、図3及び図4を参照すると、打設空間Cの妻面に並設された複数の妻型枠4に当接してコンクリートの打設圧を支持する装置であり、通し材11と、2本の第1妻型枠固定用ばり12と、第2妻型枠固定用ばり13と、高さ調整部材14とで構成される。なお、図3に示す符号27は、型枠21の坑口側端部から内周に向けて延設された型枠妻面21aと間隔を空けて架け渡されたアングル材である。アングル材27は、妻型枠4の脱落を防止する脱落防止部材として機能すると共に、アングル材27と妻型枠4との間にキャンバー(くさび)5を打ち込むことで、妻型枠4を固定する固定部材として機能する。また、図4において、(a)は第1妻型枠固定用ばり12及び高さ調整部材14の側面図であり、(b)は第2妻型枠固定用ばり13の側面図である。 Referring to Figs. 3 and 4, the gable form fixing device 1 is a device that supports the concrete pouring pressure by contacting multiple gable formworks 4 arranged side by side on the gable surface of the casting space C, and is composed of a through member 11, two first gable formwork fixing beams 12, a second gable formwork fixing beam 13, and a height adjustment member 14. The reference numeral 27 shown in Fig. 3 is an angle member that is spaced apart from the formwork gable surface 21a that is extended from the tunnel mouth end of the formwork 21 toward the inner circumference. The angle member 27 functions as a fall prevention member that prevents the gable formwork 4 from falling off, and also functions as a fixing member that fixes the gable formwork 4 by driving a camber (wedge) 5 between the angle member 27 and the gable formwork 4. Also, in Fig. 4, (a) is a side view of the first gable formwork fixing beam 12 and the height adjustment member 14, and (b) is a side view of the second gable formwork fixing beam 13.

通し材11は、角パイプ、端太角、H鋼等で棒状の仮設材で構成され、打設空間Cの妻面に並設された複数の妻型枠4に当接する当接部として機能する。通し材11の両端部付近には、一対のブラケット31がそれぞれ取付けられ、それぞれのブラケット31には、第1妻型枠固定用ばり12の一端が、通し材11と平行な連結ピン41を介して回動可能にそれぞれ支持されている。また、通し材11の中央部付近には、ブラケット32が取り付けられ、ブラケット32には、第2妻型枠固定用ばり13の一端が、通し材11と平行な連結ピン42を介して回動可能に支持されている。 The through member 11 is made of rod-shaped temporary materials such as square pipes, thick-end squares, and H-shaped steel, and functions as an abutment part that abuts against multiple end forms 4 arranged side by side on the end face of the casting space C. A pair of brackets 31 is attached near both ends of the through member 11, and one end of the first end form fixing beam 12 is rotatably supported by each bracket 31 via a connecting pin 41 parallel to the through member 11. In addition, a bracket 32 is attached near the center of the through member 11, and one end of the second end form fixing beam 13 is rotatably supported by the bracket 32 via a connecting pin 42 parallel to the through member 11.

複数の第1ばり受け鋼材26には、型枠21の周長に沿った形状の第2ばり受け鋼材26aが打設空間Cの妻面と間隔を空けてかけ渡されて固着されている。そして、第2ばり受け鋼材26aには、2本の第1妻型枠固定用ばり12と第2妻型枠固定用ばり13とを支持するための3個のブラケット33が、通し材11の一対のブラケット31及びブラケット32と同じ間隔で取り付けられている。3個のブラケット33には、第1妻型枠固定用ばり12の他端と第2妻型枠固定用ばり13の他端とが、通し材11と平行な連結ピン43を介して回動可能にそれぞれ支持されている。これにより、第1妻型枠固定用ばり12と第2妻型枠固定用ばり13は、第2ばり受け鋼材26aに支持された他端を基端とすると共に、通し材11に支持された一端を解放端として、型枠21の周長の法線方向に回動可能に設置される。 Second burr support steel materials 26a, which are shaped to follow the perimeter of the formwork 21, are fixed to the multiple first burr support steel materials 26, with a gap between them and the end face of the casting space C. Three brackets 33 for supporting the two first end formwork fixing burrs 12 and the second end formwork fixing burrs 13 are attached to the second burr support steel materials 26a at the same intervals as the pair of brackets 31 and 32 of the through member 11. The other ends of the first end formwork fixing burrs 12 and the second end formwork fixing burrs 13 are rotatably supported by the three brackets 33 via connecting pins 43 parallel to the through member 11. As a result, the first end formwork fixing burr 12 and the second end formwork fixing burr 13 are installed so that they can rotate in the normal direction to the circumference of the formwork 21, with the other end supported by the second burr support steel material 26a as the base end and one end supported by the through material 11 as the open end.

第1妻型枠固定用ばり12及び第2妻型枠固定用ばり13は、長さ調整する伸縮機構を備えた棒状部材であり、例えば、仮設材であるパイプサポートを用いることができる。これにより、第1妻型枠固定用ばり12及び第2妻型枠固定用ばり13の伸縮機構によって長さを調整し、通し材11を打設空間Cの妻面に並設された複数の妻型枠4に当接させることで、コンクリートの打設圧を第2ばり受け鋼材26a(第1ばり受け鋼材26)によって支持できる。そして、コンクリートの打設後は、第1妻型枠固定用ばり12及び第2妻型枠固定用ばり13の伸縮機構を縮める(緩める)ことで、妻型枠4を簡単に取り外すことができる。 The first end form fixing burrs 12 and the second end form fixing burrs 13 are rod-shaped members equipped with an expansion mechanism for adjusting the length, and for example, pipe supports, which are temporary materials, can be used. As a result, the length can be adjusted by the expansion mechanism of the first end form fixing burrs 12 and the second end form fixing burrs 13, and the through member 11 can be abutted against multiple end formworks 4 arranged side by side on the end surface of the casting space C, so that the concrete pouring pressure can be supported by the second burr support steel material 26a (first burr support steel material 26). After pouring the concrete, the end formworks 4 can be easily removed by contracting (loosening) the expansion mechanism of the first end form fixing burrs 12 and the second end form fixing burrs 13.

なお、第1妻型枠固定用ばり12及び第2妻型枠固定用ばり13の伸縮機構として、油圧や電動で伸縮するシリンダー等を用いても良い。 In addition, a hydraulic or electrically operated cylinder may be used as the extension mechanism for the first end form fixing beam 12 and the second end form fixing beam 13.

第1妻型枠固定用ばり12及び第2妻型枠固定用ばり13の両端は、通し材11及び第2ばり受け鋼材26aにそれぞれ回動可能に支持されているため、巻厚の大小にも対応可能である。なお、通し材11の長さや第1妻型枠固定用ばり12及び第2妻型枠固定用ばり13の本数は、コンクリートの打設圧を考慮して適宜設定し、セントル2に事前に装備する。 The ends of the first end form fixing beam 12 and the second end form fixing beam 13 are rotatably supported by the through material 11 and the second beam support steel material 26a, respectively, so they can accommodate a variety of winding thicknesses. The length of the through material 11 and the number of the first end form fixing beam 12 and the second end form fixing beam 13 are set appropriately taking into account the pouring pressure of the concrete, and are equipped in advance on the center 2.

第1妻型枠固定用ばり12の解放端近傍には、ブラケット34が取り付けられ、ブラケット34には、高さ調整部材14の一端が、通し材11と平行な連結ピン44を介して回動可能にそれぞれ支持されている。 A bracket 34 is attached near the open end of the first end formwork fixing beam 12, and one end of the height adjustment member 14 is rotatably supported on the bracket 34 via a connecting pin 44 that is parallel to the through member 11.

複数の第1ばり受け鋼材26には、高さ調整部材14の他端が支持されるブラケット35が取り付けられた取付鋼材26bが、第2ばり受け鋼材26aよりも型枠妻面21a側に固着されている。ブラケット35には、高さ調整部材14の他端が、通し材11と平行な連結ピン45を介して回動可能に支持されている。なお、取付鋼材26bは、隣接して設置される妻型枠固定装置1用のブラケット35も取り付けられている。 The mounting steel 26b, to which a bracket 35 for supporting the other end of the height adjustment member 14 is attached, is fixed to the first burr support steel 26, closer to the formwork end face 21a side than the second burr support steel 26a. The other end of the height adjustment member 14 is rotatably supported by the bracket 35 via a connecting pin 45 that is parallel to the through member 11. The mounting steel 26b also has a bracket 35 attached for the end formwork fixing device 1 that is installed adjacently.

高さ調整部材14が、伸縮機構を有する棒状部材であり、例えば、パイプサポートを用いることができる。高さ調整部材14の伸縮機構は、油圧や電動で伸縮可能にしても良い。高さ調整部材14は、第1妻型枠固定用ばり12の解放端近傍と、第1ばり受け鋼材26における第2ばり受け鋼材26aに支持された基端よりも型枠妻面21a側の位置との間に介在している。これにより、高さ調整部材14を伸縮させることで、通し材11が支持された第1妻型枠固定用ばり12の解放端の高さを簡単に調整することができ、通し材11が妻型枠4に当接する位置を簡単に調整することができる。また、高さ調整部材14は、第1妻型枠固定用ばり12によるコンクリートの打設圧に対する支持力を補強する機能も有している。 The height adjustment member 14 is a rod-shaped member having an extension mechanism, and for example, a pipe support can be used. The extension mechanism of the height adjustment member 14 may be hydraulically or electrically extendable. The height adjustment member 14 is interposed between the vicinity of the open end of the first gable formwork fixing beam 12 and a position on the formwork gable face 21a side of the base end supported by the second burr support steel material 26a of the first burr support steel material 26. As a result, by extending and retracting the height adjustment member 14, the height of the open end of the first gable formwork fixing beam 12 on which the through member 11 is supported can be easily adjusted, and the position where the through member 11 abuts against the gable formwork 4 can be easily adjusted. In addition, the height adjustment member 14 also has the function of reinforcing the support force of the first gable formwork fixing beam 12 against the concrete pouring pressure.

また、高さ調整部材14によって通し材11(第1妻型枠固定用ばり12の解放端)をトンネルの内周面の抵触しない高さに調整しておくことで、鉄筋が組立済みの鉄筋区間以外では、そのままの状態で掘削断面内を通過できる。そして、鉄筋区間では、高さ調整部材14を短くして倒すことで鉄筋内空側を通過させることが可能になる。 In addition, by using the height adjustment member 14 to adjust the through material 11 (the free end of the first gable formwork fixing beam 12) to a height that does not interfere with the inner periphery of the tunnel, it can pass through the excavation cross section in its current state except in the reinforced bar section where the rebar has already been assembled. In the reinforced bar section, the height adjustment member 14 can be shortened and tilted down to allow passage through the hollow side inside the rebar.

なお、第1妻型枠固定用ばり12を支持する第1ばり受け鋼材26は、型枠21の周面よりも内周側に配置されている。従って、連結ピン45を取り外して、ブラケット35(第1ばり受け鋼材26)による高さ調整部材14の支持を解消することで、図5に示すように、妻型枠固定装置1を型枠21の周面よりも内周側に折り畳むことができる。これにより、鉄筋内空側を回避することができる。なお、連結ピン44を取り外して、ブラケット34(第1妻型枠固定用ばり12)による高さ調整部材14の支持を解消しても同様の効果を得ることができる。 The first burr support steel 26 that supports the first gable form fixing burr 12 is positioned on the inner side of the peripheral surface of the formwork 21. Therefore, by removing the connecting pin 45 and eliminating the support of the height adjustment member 14 by the bracket 35 (first burr support steel 26), the gable form fixing device 1 can be folded on the inner side of the peripheral surface of the formwork 21 as shown in FIG. 5. This makes it possible to avoid the hollow side of the reinforcing bar. The same effect can be obtained by removing the connecting pin 44 and eliminating the support of the height adjustment member 14 by the bracket 34 (first gable form fixing burr 12).

以上説明したように、本実施形態は、トンネルの内周面とセントル2の型枠21との間の打設空間Cにおける妻面に並設された複数の妻型枠4に通し材11を当接させてコンクリートの打設圧を支持する妻型枠固定装置1であって、通し材11に開放端が支持されていると共に、基端がセントル2の型枠妻面21a側から張り出した第1ばり受け鋼材26に支持された第1妻型枠固定用ばり12を具備し、第1妻型枠固定用ばり12は、伸縮機構を備えている。
この構成により、通し材11と第1妻型枠固定用ばり12とを一体としてセントル2に支持されているため、妻型枠4の設置後に、伸縮機構を伸長させることで、通し材11及び第1妻型枠固定用ばり12を妻型枠4に対して簡単に設置できる。すなわち、第1妻型枠固定用ばり12の長さを微調整するだけなので、一人でも簡単に作業が行え、誰が作業を行っても、妻型枠4が外れたり動いたりという不具合を防止できる。そして、打設完了後は、伸縮機構を収縮させることで、通し材11及び第1妻型枠固定用ばり12を妻型枠4から簡単に撤去できる。これにより、通し材11及び第1妻型枠固定用ばり12は、コンクリートの打設ごとにセントル2への設置及び撤去を行う必要がなくなり、妻型枠4の固定作業が迅速かつ簡単に行える。
As described above, this embodiment is a gable formwork fixing device 1 that supports the pouring pressure of concrete by abutting a through member 11 against multiple gable formworks 4 arranged side by side on the gable face in the pouring space C between the inner surface of the tunnel and the formwork 21 of the center telescopic 2, and is equipped with a first gable formwork fixing beam 12 whose open end is supported by the through member 11 and whose base end is supported by a first beam support steel material 26 protruding from the gable face 21a side of the formwork of the center telescopic 2, and the first gable formwork fixing beam 12 is equipped with an extension mechanism.
With this configuration, the through member 11 and the first gable form fixing beam 12 are supported by the center 2 as a unit, so that after the gable form 4 is installed, the through member 11 and the first gable form fixing beam 12 can be easily installed on the gable form 4 by extending the telescopic mechanism. In other words, since the length of the first gable form fixing beam 12 only needs to be finely adjusted, the work can be easily performed by one person, and the problem of the gable form 4 coming off or moving can be prevented regardless of who is performing the work. After the concrete pouring is completed, the through member 11 and the first gable form fixing beam 12 can be easily removed from the gable form 4 by contracting the telescopic mechanism. As a result, the through member 11 and the first gable form fixing beam 12 do not need to be installed and removed from the center 2 every time concrete is poured, and the fixing work of the gable form 4 can be performed quickly and easily.

さらに、本実施形態において、通し材11は、2本以上の第1妻型枠固定用ばり12(第2妻型枠固定用ばり13)にかけ渡されて支持されている。
この構成により、通し材11を安定して支持することができる。
Furthermore, in this embodiment, the through material 11 is supported by being stretched across two or more first end form fixing beams 12 (second end form fixing beams 13).
This configuration allows the through material 11 to be stably supported.

さらに、本実施形態において、第1妻型枠固定用ばり12は、通し材11及び第1ばり受け鋼材26に、型枠21の周長の法線方向に回動可能にそれぞれ支持されている。
この構成により、巻厚により周方向の設置位置も容易に調整することができる。
Furthermore, in this embodiment, the first end form fixing burr 12 is supported by the through material 11 and the first burr receiving steel material 26 so as to be rotatable in the normal direction to the perimeter of the form 21 .
With this configuration, the circumferential installation position can be easily adjusted according to the winding thickness.

さらに、本実施形態において、第1妻型枠固定用ばり12は、型枠21の周面よりも内周側で第1ばり受け鋼材26によって支持されている。
この構成により、妻型枠固定装置1を型枠21の周面よりも内周側に折り畳むことができ、組立済みの鉄筋内空側を通過できる。
Furthermore, in this embodiment, the first end form fixing burr 12 is supported by a first burr support steel material 26 on the inner circumferential side relative to the peripheral surface of the form 21 .
With this configuration, the end formwork fixing device 1 can be folded inward from the peripheral surface of the formwork 21, and can pass through the hollow side inside the assembled reinforcing bar.

さらに、本実施形態において、第1妻型枠固定用ばり12の開放端と、第1ばり受け鋼材26における第1妻型枠固定用ばり12の基端よりも型枠妻面21a側の位置との間に介在する、伸縮機構を備えた高さ調整部材14を備えている。
この構成により、高さ調整部材14を伸縮させることで、通し材11が支持された第1妻型枠固定用ばり12の解放端の高さを簡単に調整することができ、通し材11が妻型枠4に当接する位置を簡単に調整することができる。また、第1妻型枠固定用ばり12によるコンクリートの打設圧に対する支持力を補強することができる。
Furthermore, in this embodiment, a height adjustment member 14 equipped with an expansion and contraction mechanism is provided, which is interposed between the open end of the first end formwork fixing beam 12 and a position on the first beam support steel 26 that is closer to the formwork end face 21a than the base end of the first end formwork fixing beam 12.
With this configuration, by expanding or contracting the height adjustment member 14, the height of the open end of the first gable form fixing beam 12 on which the through member 11 is supported can be easily adjusted, and the position at which the through member 11 abuts against the gable form 4 can be easily adjusted. In addition, the support force of the first gable form fixing beam 12 against the pouring pressure of concrete can be reinforced.

以上、実施形態をもとに本発明を説明した。この実施形態は例示であり、それらの各構成要素の組み合わせ等にいろいろな変形例が可能なこと、またそうした変形例も本発明の範囲にあることは当業者に理解されるところである。 The present invention has been described above based on an embodiment. This embodiment is merely an example, and it will be understood by those skilled in the art that various modifications are possible in terms of the combination of each component, and that such modifications are also within the scope of the present invention.

1 妻型枠固定装置
2 セントル
3 レール
4 妻型枠
5 キャンバー
11 通し材
12 第1妻型枠固定用ばり
13 第2妻型枠固定用ばり
14 高さ調整部材
21 型枠
21a 型枠妻面
22 ジャッキ
23 移動架台
24 門型フレーム
25 車輪
26 第1ばり受け鋼材
26a 第2ばり受け鋼材
26b 取付鋼材
27 アングル材
31、32、33、34、35 ブラケット
41、42、43、44、45 連結ピン
C 打設空間
1 Gable form fixing device 2 Center 3 Rail 4 Gable form 5 Camber 11 Through member 12 First gable form fixing burr 13 Second gable form fixing burr 14 Height adjustment member 21 Form 21a Form end surface 22 Jack 23 Mobile stand 24 Gate frame 25 Wheel 26 First burr support steel material 26a Second burr support steel material 26b Mounting steel material 27 Angle material 31, 32, 33, 34, 35 Bracket 41, 42, 43, 44, 45 Connecting pin C Casting space

Claims (5)

トンネルの内周面とセントルの型枠との間の打設空間における妻面に並設された複数の妻型枠を固定する妻型枠固定装置であって、
複数の前記妻型枠に当接する通し材と、
開放端に前記通し材が支持されていると共に、基端が前記セントルの前記妻面側から張り出したばり受け鋼材に支持された妻型枠固定用ばりを具備し、
前記妻型枠固定用ばりは、伸縮機構を備えていることを特徴とする妻型枠固定装置。
A gable form fixing device that fixes a plurality of gable formworks arranged side by side on a gable surface in a casting space between an inner circumferential surface of a tunnel and a center formwork,
A through member abutting against a plurality of the gable forms;
The through member is supported at an open end , and a burr for fixing the end formwork is provided, the burr being supported at a base end by a burr receiving steel material protruding from the end face side of the center,
The end formwork fixing device is characterized in that the end formwork fixing beam is equipped with an extension mechanism.
前記通し材は、2本以上の前記妻型枠固定用ばりにかけ渡されて支持されていることを特徴とする請求項1記載の妻型枠固定装置。 The end formwork fixing device according to claim 1, characterized in that the through member is supported by being stretched across two or more of the end formwork fixing beams. 前記妻型枠固定用ばりは、前記通し材及び前記ばり受け鋼材に、前記型枠の周長の法線方向に回動可能にそれぞれ支持されていることを特徴とする請求項1又は2記載の妻型枠固定装置。 The end form fixing device according to claim 1 or 2, characterized in that the end form fixing burrs are supported by the through material and the burr receiving steel material so as to be rotatable in the normal direction to the perimeter of the form. 前記妻型枠固定用ばりは、前記型枠の周面よりも内周側で前記ばり受け鋼材によって支持されていることを特徴とする請求項3記載の妻型枠固定装置。 The end formwork fixing device according to claim 3, characterized in that the end formwork fixing burrs are supported by the burr support steel material on the inner side of the peripheral surface of the formwork. 前記妻型枠固定用ばりの開放端と、前記ばり受け鋼材における前記妻型枠固定用ばりの基端よりも前記妻面側の位置との間に介在する、伸縮機構を備えた高さ調整部材を具備することを特徴とする請求項1乃至4のいずれかに記載の妻型枠固定装置。 The gable formwork fixing device according to any one of claims 1 to 4, characterized in that it is provided with a height adjustment member with an expansion mechanism interposed between the open end of the gable formwork fixing beam and a position on the gable face side of the base end of the gable formwork fixing beam on the burr receiving steel material.
JP2020150501A 2020-09-08 2020-09-08 End formwork fixing device Active JP7528656B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020150501A JP7528656B2 (en) 2020-09-08 2020-09-08 End formwork fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020150501A JP7528656B2 (en) 2020-09-08 2020-09-08 End formwork fixing device

Publications (2)

Publication Number Publication Date
JP2022045030A JP2022045030A (en) 2022-03-18
JP7528656B2 true JP7528656B2 (en) 2024-08-06

Family

ID=80682043

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020150501A Active JP7528656B2 (en) 2020-09-08 2020-09-08 End formwork fixing device

Country Status (1)

Country Link
JP (1) JP7528656B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7845938B2 (en) * 2022-07-13 2026-04-14 株式会社大林組 End formwork fixing device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000257391A (en) 1999-03-10 2000-09-19 Kajima Corp Concrete casting equipment
JP2010018975A (en) 2008-07-09 2010-01-28 Nippon Steel & Sumikin Metal Products Co Ltd Form timbering and horizontal force processing member for form timbering
JP2011184869A (en) 2010-03-05 2011-09-22 Nishimatsu Constr Co Ltd Centering gable side form apparatus
JP2019183578A (en) 2018-04-17 2019-10-24 株式会社大林組 Lining concrete construction system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03230910A (en) * 1990-02-06 1991-10-14 P S Concrete Co Ltd Side frame-moving device of long concrete member
JP3127329B2 (en) * 1993-01-12 2001-01-22 飛島建設株式会社 Secondary lining concrete placing equipment and its construction method
JPH09207111A (en) * 1996-02-05 1997-08-12 De-P Kensetsu Kogyo Kk Formwork for concrete members
JP3024945B2 (en) * 1997-01-27 2000-03-27 株式会社福田組 Wife formwork device for placing concrete in tunnel lining
JP3150657B2 (en) * 1998-02-27 2001-03-26 佐賀工業株式会社 Tunnel lining method and concrete casting device used for it
ES2442040B1 (en) * 2011-01-04 2014-12-10 Peri, S.A. WINDING TO CONCRETE THE INTERNAL TUNNEL COATING.

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000257391A (en) 1999-03-10 2000-09-19 Kajima Corp Concrete casting equipment
JP2010018975A (en) 2008-07-09 2010-01-28 Nippon Steel & Sumikin Metal Products Co Ltd Form timbering and horizontal force processing member for form timbering
JP2011184869A (en) 2010-03-05 2011-09-22 Nishimatsu Constr Co Ltd Centering gable side form apparatus
JP2019183578A (en) 2018-04-17 2019-10-24 株式会社大林組 Lining concrete construction system

Also Published As

Publication number Publication date
JP2022045030A (en) 2022-03-18

Similar Documents

Publication Publication Date Title
JP4917094B2 (en) Rail-guided climbing system
JP5767558B2 (en) Mobile formwork apparatus and lining concrete construction method
US8550213B2 (en) Scaffold element, arrangement and method of use
US3504879A (en) Column shore bracket
JP6130706B2 (en) Mobile formwork apparatus and lining concrete construction method
JP7210895B2 (en) Lining concrete construction system
US20100175205A1 (en) Scaffold Arrangement and Method for Repairing the Edge Structure of a Concrete Bridge
JP2018105029A (en) Movable type form device
JP6664699B2 (en) Mountain retaining method and support system
JP7528656B2 (en) End formwork fixing device
JP2006028881A (en) Self-propelled PC slab erection machine and PC slab erection method
JP5484983B2 (en) Method for assembling and dismantling bridge moving work device
JP6468612B2 (en) Method for assembling formwork support for tunnel lining concrete molding
JP4329535B2 (en) Mobile work vehicle for overhanging slabs
JP2000087316A (en) Method and device for construction of floor slab
JP3543288B2 (en) Slide center device
KR20120057363A (en) Ladder apparatus for working on a tunnel type structure
JP7139256B2 (en) Mobile work equipment, construction method of arch bridge
KR102095480B1 (en) Foldable support for strut
JP7481554B2 (en) Tunnel repair method and repair equipment
JPH0455118Y2 (en)
GB2539371A (en) Railway shuttering apparatus
JP7845938B2 (en) End formwork fixing device
KR100816493B1 (en) Slip foam for vertical tunnel concrete wall forming and concrete concrete wall construction method
JP2987068B2 (en) Pillar formwork device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230804

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240226

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240402

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240530

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240625

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240708

R150 Certificate of patent or registration of utility model

Ref document number: 7528656

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150