JP7529254B2 - Support device for above-ground structure and construction method thereof - Google Patents
[go: Go Back, main page]

JP7529254B2 - Support device for above-ground structure and construction method thereof - Google Patents

Support device for above-ground structure and construction method thereof Download PDF

Info

Publication number
JP7529254B2
JP7529254B2 JP2020167929A JP2020167929A JP7529254B2 JP 7529254 B2 JP7529254 B2 JP 7529254B2 JP 2020167929 A JP2020167929 A JP 2020167929A JP 2020167929 A JP2020167929 A JP 2020167929A JP 7529254 B2 JP7529254 B2 JP 7529254B2
Authority
JP
Japan
Prior art keywords
cylindrical portion
cylindrical
leg
peripheral surface
support device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020167929A
Other languages
Japanese (ja)
Other versions
JP2021063424A (en
Inventor
貴大 黒川
悟史 烏山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hinode Ltd
Original Assignee
Hinode Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hinode Ltd filed Critical Hinode Ltd
Publication of JP2021063424A publication Critical patent/JP2021063424A/en
Application granted granted Critical
Publication of JP7529254B2 publication Critical patent/JP7529254B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Description

本発明は、地上構造物の脚部を地中に設置した状態で支持する支持装置およびその施工方法に関する。 The present invention relates to a support device that supports the legs of an above-ground structure while it is installed underground, and a construction method thereof.

道路標識や防護柵などの地上構造物の脚部を地中に設置した状態で支持する支持装置として、例えば、特許文献1には、筒状の接合部に、地上構造物の脚部(柱脚)を挿入しコンクリートを充填してなる杭基礎が開示されている。 As an example of a support device that supports the legs of above-ground structures such as road signs and guardrails while they are installed underground, Patent Document 1 discloses a pile foundation in which the legs (column bases) of the above-ground structure are inserted into a cylindrical joint and filled with concrete.

しかし、この特許文献1の杭基礎では、地上構造物の脚部(柱脚)が充填コンクリートを介して杭基礎(筒状の接合部)に一体的に接合しているため、地上構造物の損傷などにより交換を行う場合、筒状の接合部の内部に充填されたコンクリートを斫る必要があるが、コンクリートは、接合部の内周面と脚部とにはさまれた狭い空間に充填されており、コンクリートが拘束された状態になっていることから、破砕装置を用いてもコンクリートが割れにくく、さらに、大きく割れた状態では接合部の内部から外への取り出しが困難なため、コンクリートをかなり細かな状態まで破砕する必要がある。よって、交換作業は非常に困難で時間とコストを要する。 However, in the pile foundation of Patent Document 1, the legs (column bases) of the above-ground structure are integrally joined to the pile foundation (cylindrical joint) via filled concrete. Therefore, when replacing the above-ground structure due to damage, etc., it is necessary to chip away the concrete filled inside the cylindrical joint. However, since the concrete is filled in the narrow space between the inner surface of the joint and the legs and is in a constrained state, it is difficult to break the concrete even with a crushing device. Furthermore, if the concrete is in a large cracked state, it is difficult to remove it from inside the joint, so the concrete must be crushed into very small pieces. Therefore, the replacement work is very difficult and time-consuming and costly.

特許第5449124号公報Patent No. 5449124

本発明が解決しようとする課題は、地上構造物の損傷などにより交換を行う場合、容易に交換可能な支持装置およびその施工方法を提供することにある。 The problem that this invention aims to solve is to provide a support device and a construction method that can be easily replaced when replacement is required due to damage to above-ground structures.

本発明の一態様は、地上構造物の脚部を地中に設置した状態で支持する支持装置であって、脚部を支持する支持ユニットを含み、支持ユニットは、脚部を挿入可能な大きさに開口が限定された筒状部と、筒状部に脚部が挿入された状態で、筒状部の上端まで充填される非固着性の粒体と、筒状部の上端より上方に配置される第1の硬化層とを有する。 One aspect of the present invention is a support device that supports the legs of an above-ground structure while it is installed underground, and includes a support unit that supports the legs, and the support unit has a cylindrical portion with an opening limited in size to allow the legs to be inserted, non-adhesive granules that are filled up to the top end of the cylindrical portion when the legs are inserted into the cylindrical portion, and a first hardened layer that is positioned above the top end of the cylindrical portion.

このように、筒状部に脚部が挿入された状態で、筒状部の上端まで非固着性の粒体が充填されているから、地上構造物が破損して交換を行う場合には、筒状部の上端より上方に配置される第1の硬化層を破砕装置を用いて除去することで、脚部を筒状部から容易に引き抜くことができる。また、第1の硬化層よりも下方が健全な場合に再利用が可能となる。
また、非固着性の粒体が筒状部の上端まで充填され、第1の硬化層が筒状部の上端より上方に配置されることにより、脚部を側面から覆って位置決めして確実かつ強固に保持される。
なお、筒状部の上端より上方に配置される第1の硬化層は、筒状部の上端まで充填されている非固着性の粒体を覆う蓋の機能を発揮する。
In this way, since the cylindrical part is filled with non-adhesive granules up to the top end with the legs inserted in the cylindrical part, when the above-ground structure is damaged and needs to be replaced, the legs can be easily pulled out of the cylindrical part by removing the first hardened layer located above the top end of the cylindrical part using a crushing device. Also, if the part below the first hardened layer is sound, it can be reused.
In addition, the non-adhesive granules are filled up to the top end of the cylindrical portion, and the first hardened layer is positioned above the top end of the cylindrical portion, covering the sides of the legs, positioning them and holding them securely and firmly.
The first hardened layer disposed above the upper end of the cylindrical portion functions as a lid that covers the non-adhesive granules that have been filled up to the upper end of the cylindrical portion.

この支持装置において、支持ユニットは、脚部の下端と筒状部の下端との間に配置される第2の硬化層を含むことができる。このように第2の硬化層を含むことで、脚部の高さ調整を容易に行うことができる。また、この第2の硬化層は、脚部が中空の場合、その中空内に非固着性の粒体が流入しないように脚部の下端を塞ぐ蓋の機能を発揮する。 In this support device, the support unit can include a second hardened layer disposed between the lower end of the leg and the lower end of the tubular portion. By including the second hardened layer in this manner, the height of the leg can be easily adjusted. In addition, when the leg is hollow, this second hardened layer functions as a lid that closes the lower end of the leg to prevent non-adhesive particles from flowing into the hollow space.

また、この支持装置において、支持ユニットは、筒状部の下端に設けられる底部と、底部に直接または間接的に取り付けられる杭部とを含むことができる。このように底部と杭部とを含むことで、杭部と支持ユニットとを底部を介して連結できる。 In addition, in this support device, the support unit can include a bottom portion provided at the lower end of the tubular portion, and a pile portion attached directly or indirectly to the bottom portion. By including the bottom portion and the pile portion in this manner, the pile portion and the support unit can be connected via the bottom portion.

また、この支持装置は、筒状部を挿入可能な大きさに開口が限定された筒状ブロックと、筒状ブロックに筒状部が挿入された状態で、筒状ブロックの上端まで充填される非固着性の粒体と、筒状ブロックの上端より上方に配置される第3の硬化層をさらに含むことができる。このように、筒状ブロックに筒状部が挿入された状態で、筒状ブロックの上端まで非固着性の粒体が充填されているから、筒状部が破損するなどして支持ユニットの交換が必要となった場合には、筒状部の上端より上方に配置される第1の硬化層および筒状ブロックの上端より上方に配置される第3の硬化層を破砕装置を用いて除去することで、筒状部を含む支持ユニット全体を筒状ブロックから容易に引き抜くことができる。 This support device can further include a cylindrical block with an opening limited to a size that allows the cylindrical portion to be inserted, non-adhesive granules filled to the upper end of the cylindrical block when the cylindrical portion is inserted into the cylindrical block, and a third hardened layer arranged above the upper end of the cylindrical block. In this way, when the cylindrical portion is inserted into the cylindrical block, the non-adhesive granules are filled to the upper end of the cylindrical block. Therefore, when the cylindrical portion is damaged and replacement of the support unit becomes necessary, the entire support unit including the cylindrical portion can be easily pulled out from the cylindrical block by removing the first hardened layer arranged above the upper end of the cylindrical portion and the third hardened layer arranged above the upper end of the cylindrical block using a crushing device.

また、本発明の他の態様である支持装置の施工方法は、地上構造物の脚部を地中に設置した状態で支持する支持装置の施工方法であって、支持装置は、脚部を支持する支持ユニットを含み、支持ユニットは筒状部を含み、当該施工方法は、筒状部に脚部を挿入することと、筒状部の上端まで非固着性の粒体を充填することと、筒状部の上端より上方に第1の硬化層を配置すること、を有する。
これにより地上構造物が破損して交換を行う場合には、筒状部の上端より上方に配置される第1の硬化層を破砕装置を用いて除去することで、脚部を筒状部から容易に引き抜くことができ、第1の硬化層より下方が健全な場合に再利用が可能となる。
Another aspect of the present invention is a construction method for a support device that supports the legs of an above-ground structure while installed underground, wherein the support device includes a support unit that supports the legs, the support unit including a cylindrical portion, and the construction method includes inserting the legs into the cylindrical portion, filling non-adhesive granules up to an upper end of the cylindrical portion, and arranging a first hardened layer above the upper end of the cylindrical portion.
As a result, if the above-ground structure is damaged and needs to be replaced, the first hardened layer located above the upper end of the tubular section can be removed using a crushing device, allowing the legs to be easily pulled out of the tubular section, and if the area below the first hardened layer is sound, it can be reused.

また、この支持装置の施工方法は、筒状部に脚部を挿入することの前に、脚部の下端と筒状部の下端との間に第2の硬化層を配置することを含むことができる。これにより、脚部の高さ調整を容易に行うことができ、また、脚部が中空の場合、その中空内に非固着性の粒体が流入しないように脚部の下端を塞ぐ蓋の機能を発揮する。 The construction method of this support device can also include disposing a second hardened layer between the lower end of the leg and the lower end of the tubular section before inserting the leg into the tubular section. This allows the height of the leg to be easily adjusted, and also acts as a lid to close the lower end of the leg to prevent non-adhesive particles from entering the hollow space if the leg is hollow.

また、この支持装置の施工方法は、筒状ブロックを設置することと、筒状ブロックに筒状部が挿入された状態で、筒状ブロックの上端まで非固着性の粒体を充填することと、筒状ブロックの上端より上方に第3の硬化層を配置することを含むことができる。これにより、筒状部が破損するなどして支持ユニットの交換が必要となった場合には、筒状部の上端より上方に配置される第1の硬化層および筒状ブロックの上端より上方に配置される第3の硬化層を破砕装置を用いて除去することで、筒状部を含む支持ユニット全体を筒状ブロックから容易に引き抜くことができる。 The construction method of this support device can include installing a cylindrical block, filling the cylindrical block with non-adhesive granules up to the top end with the cylindrical portion inserted into the cylindrical block, and arranging a third hardened layer above the top end of the cylindrical block. In this way, when it becomes necessary to replace the support unit due to damage to the cylindrical portion, the first hardened layer arranged above the top end of the cylindrical portion and the third hardened layer arranged above the top end of the cylindrical block can be removed using a crushing device, making it possible to easily pull out the entire support unit including the cylindrical portion from the cylindrical block.

本発明によれば、地上構造物の損傷などにより交換を行う場合、容易に交換可能な支持装置およびその施工方法が提供される。 The present invention provides a support device and a construction method that can be easily replaced when replacement is required due to damage to an above-ground structure.

本発明の一実施形態である地上構造物の支持装置の使用状態を示す縦断面図。1 is a vertical cross-sectional view showing a state in which a support device for a ground structure according to one embodiment of the present invention is used. 本発明の他の実施形態である地上構造物の支持装置の使用状態を示し、(a)は縦断面図、(b)は(a)のA-A断面図。5A and 5B show a state in which a support device for a ground structure according to another embodiment of the present invention is in use, where (a) is a longitudinal sectional view and (b) is a sectional view taken along the line A-A of (a).

図1に、本発明の一実施形態である地上構造物の支持装置10Aの使用状態を示している。
この支持装置10Aは、地上構造物である円筒状の車止めボラード20の脚部21を地中に設置した状態で支持するもので、脚部21を支持する支持ユニット12を含む。なお、車止めボラード20の上端にはキャップ22が装着されている。
支持ユニット12は、脚部21を挿入可能な大きさに開口12a-1が限定された円筒状の筒状部12aと、この筒状部12aに脚部21が挿入された状態で、筒状部12aの上端まで充填される非固着性の粒体である砂12bと、筒状部12aの上端より上方に配置される第1の硬化層である第1のモルタル層12cとを有する。
FIG. 1 shows a state in which a support device 10A for a ground structure according to one embodiment of the present invention is used.
This support device 10A supports the legs 21 of a cylindrical car stop bollard 20, which is an above-ground structure, in a state in which the leg 21 is installed underground, and includes a support unit 12 that supports the legs 21. A cap 22 is attached to the upper end of the car stop bollard 20.
The support unit 12 has a cylindrical tubular portion 12a having an opening 12a-1 limited in size so that the leg portion 21 can be inserted, sand 12b which is a non-adhesive granular material that is filled up to the upper end of the tubular portion 12a when the leg portion 21 is inserted into the tubular portion 12a, and a first mortar layer 12c which is a first hardened layer that is positioned above the upper end of the tubular portion 12a.

このように本実施形態では、筒状部12aに脚部21が挿入された状態で、筒状部12aの上端まで砂12bが充填されているから、車止めボラード20が破損して交換を行う場合には、筒状部12aの上端より上方に配置されている第1のモルタル層12cをコンクリートブレーカー等の破砕装置を用いて除去することで、脚部21を筒状部12aから容易に引き抜くことができる。これにより、第1のモルタル層12cより下方が健全な場合に再利用が可能となる。
また、脚部21を挿入可能な大きさに開口12a-1が限定された筒状部12aに脚部21が挿入された状態で、筒状部12aの上端まで砂12bが充填されて、第1の硬化層である第1のモルタル層12cが筒状部の上端より上方に配置されることにより、脚部21を側面から覆って位置決めして確実かつ強固に保持される。
なお、筒状部12aの上端より上方に配置される第1のモルタル層12cは、筒状部12aの上端まで充填されている砂12bを覆う蓋の機能を発揮する。
In this embodiment, since sand 12b is filled up to the upper end of cylindrical portion 12a with leg 21 inserted in cylindrical portion 12a, when bollard 20 is damaged and needs to be replaced, leg 21 can be easily pulled out from cylindrical portion 12a by removing first mortar layer 12c located above the upper end of cylindrical portion 12a with a crushing device such as a concrete breaker. This makes it possible to reuse the portion below first mortar layer 12c if it is sound.
In addition, with the leg 21 inserted into the tubular portion 12a, whose opening 12a-1 is limited to a size that allows the leg 21 to be inserted, sand 12b is filled up to the upper end of the tubular portion 12a, and the first mortar layer 12c, which is the first hardened layer, is positioned above the upper end of the tubular portion, thereby covering the leg 21 from the side, positioning it and holding it securely and firmly.
The first mortar layer 12c disposed above the upper end of the cylindrical portion 12a functions as a lid that covers the sand 12b that has been filled up to the upper end of the cylindrical portion 12a.

本実施形態において支持ユニット12には、脚部21の下端と筒状部12aの下端との間に、第2の硬化層である第2のモルタル層12dを配置している。
このように第2のモルタル層12dを配置することで、脚部21の高さ調整を容易に行うことができる。また、この第2のモルタル層12dは、脚部21が中空の場合、その中空内に砂12bが流入しないように脚部21の下端を塞ぐ蓋の機能を発揮する。
なお、本実施形態では第2のモルタル層12dを配置したが、必ず配置しなければならないものではなく、省略してもよい。省略する際には、脚部21が中空の場合には脚部21の下端を蓋等の別の手段で塞ぎ、脚部21の高さ調整が必要な場合には別の手段により行えばよい。
In this embodiment, the support unit 12 has a second mortar layer 12d, which is a second hardened layer, disposed between the lower end of the leg portion 21 and the lower end of the cylindrical portion 12a.
By disposing the second mortar layer 12d in this manner, it is possible to easily adjust the height of the leg 21. Furthermore, when the leg 21 is hollow, the second mortar layer 12d functions as a lid that closes the lower end of the leg 21 to prevent the sand 12b from flowing into the hollow space.
In this embodiment, the second mortar layer 12d is disposed, but it is not essential and may be omitted. When omitting it, if the leg 21 is hollow, the lower end of the leg 21 may be covered with another means such as a lid, and if the height of the leg 21 needs to be adjusted, it may be adjusted by another means.

本実施形態において支持ユニット12は、筒状部12aの下端に設けられる底部12eと、底部12eに直接または間接的に取り付けられる杭部11とを含む。このように底部12eと杭部11とを含むことで、杭部11と支持ユニット12とを底部12eを介して連結できる。
また、本実施形態において、杭部11は、中間部11aと螺旋状の先端部11bとを有しており、筒状部12a、底部12e、中間部11aおよび先端部11bは、鋳鉄で一体成型されている。
In this embodiment, the support unit 12 includes a bottom portion 12e provided at the lower end of the cylindrical portion 12a, and a pile portion 11 directly or indirectly attached to the bottom portion 12e. By including the bottom portion 12e and the pile portion 11 in this manner, the pile portion 11 and the support unit 12 can be connected via the bottom portion 12e.
In this embodiment, the pile portion 11 has an intermediate portion 11a and a spiral tip portion 11b, and the cylindrical portion 12a, the bottom portion 12e, the intermediate portion 11a and the tip portion 11b are integrally molded from cast iron.

なお、本実施形態の支持装置10Aは、筒状部の下端に設けられる底部12eと底部12eに直接または間接的に取り付けられる杭部11とを含んでいるが、支持装置10Aは本実施形態で説明するものには限定されず、例えば杭頭から杭先端までが連続した鋼管の杭のように、杭部11を有さないものも含まれる。また、筒状部12a、底部12e、中間部11aおよび先端部11bについても、本実施形態で説明するものには限定されず、例えば鋳鉄製ではなく鋼製でもよく、先端部11bが公知の杭先端部の形状を有するものでもよく、中間部11aを省略して先端部11bが底部12eに直接取り付けられてもよく、各部が一体成型ではなく別体で成型されたものを接合したものであってもよい。 The support device 10A of this embodiment includes a bottom 12e provided at the lower end of the tubular portion and a pile portion 11 directly or indirectly attached to the bottom 12e, but the support device 10A is not limited to the one described in this embodiment, and may also include one that does not have a pile portion 11, such as a steel pipe pile that is continuous from the pile head to the pile tip. The tubular portion 12a, bottom 12e, middle portion 11a, and tip portion 11b are also not limited to the one described in this embodiment, and may be made of steel instead of cast iron, the tip portion 11b may have a known shape of a pile tip portion, the middle portion 11a may be omitted and the tip portion 11b may be directly attached to the bottom 12e, or each part may be molded separately rather than integrally and joined together.

また、本実施形態において筒状部12aは円筒状であるが、筒状部12aは円筒状には限定されず、例えば角筒状でもよい。同様に、脚部21は中空で円筒状には限定されず、中実や角柱状でもよい。 In addition, in this embodiment, the tubular portion 12a is cylindrical, but the tubular portion 12a is not limited to a cylindrical shape and may be, for example, a rectangular tube. Similarly, the leg portion 21 is not limited to a hollow cylindrical shape and may be solid or rectangular.

また、本実施形態において筒状部12aの開口12a-1は脚部21を挿入可能な大きさに限定しているが、その具体的な大きさは技術常識の範囲内で適宜決定する。
筒状部12aの内周面と脚部21の外周面との間の隙間が小さすぎる場合、防護柵のように複数の脚部を有する地上構造物を地中に設置する際に、脚部の間隔と支持装置の間隔とのズレを許容することができず、支持装置を正確に設置する必要があり多大な労力を要する。一方、筒状部12aの内周面と脚部21の外周面との間の隙間が大きすぎる場合、地上構造物が傾くなどの不具合が生じる。
以上のことから、例えば、開口12a-1の大きさは、筒状部12aの内周面と脚部21の外周面との間の隙間の大きさが、コンクリートブレーカー等の破砕装置の先端工具を挿入できないほどに小さくすることが好ましい。より具体的には、筒状部12aの内周面と脚部21の外周面との間の隙間の大きさが5~20mm程度となるようにすることが好ましい。ちなみに、本実施形態において開口12a-1の直径(筒状部12aの内径)は140mm、脚部21の外径は114mmであり、筒状部12aの内周面と脚部21の外周面との間の隙間は13mmであり、隙間の大きさが10~15mm程度となるようにすることがなお好ましい。
In this embodiment, the opening 12a-1 of the cylindrical portion 12a is limited in size to allow the leg portion 21 to be inserted therein, but the specific size can be appropriately determined within the scope of common technical knowledge.
If the gap between the inner peripheral surface of the cylindrical portion 12a and the outer peripheral surface of the leg 21 is too small, when installing an above-ground structure having multiple legs such as a guard fence underground, a discrepancy between the spacing between the legs and the spacing between the support devices cannot be tolerated, and the support devices must be installed accurately, which requires a great deal of effort. On the other hand, if the gap between the inner peripheral surface of the cylindrical portion 12a and the outer peripheral surface of the leg 21 is too large, problems such as the above-ground structure tilting will occur.
From the above, for example, it is preferable that the size of the opening 12a-1 is small enough that the size of the gap between the inner peripheral surface of the cylindrical portion 12a and the outer peripheral surface of the leg portion 21 cannot insert a tip tool of a crushing device such as a concrete breaker. More specifically, it is preferable that the size of the gap between the inner peripheral surface of the cylindrical portion 12a and the outer peripheral surface of the leg portion 21 is about 5 to 20 mm. Incidentally, in this embodiment, the diameter of the opening 12a-1 (the inner diameter of the cylindrical portion 12a) is 140 mm, the outer diameter of the leg portion 21 is 114 mm, the gap between the inner peripheral surface of the cylindrical portion 12a and the outer peripheral surface of the leg portion 21 is 13 mm, and it is more preferable that the size of the gap is about 10 to 15 mm.

筒状部12aの上端まで充填される砂12bは、固着されることなく充填されるから、破砕装置を使用しなくても、脚部21を筒状部12aから容易に引き抜くことができる。したがって、筒状部12aの内周面と脚部21の外周面との間の隙間の大きさが、コンクリートブレーカー等の破砕装置の先端工具を挿入できないほどに小さくても、脚部21を筒状部12aから容易に引き抜くことができる。
なお、上述のとおり、筒状部12aの上端より上方に配置される第1のモルタル層12cは、脚部12aを筒状部12aから引き抜くときには除去する必要があるが、その除去はコンクリートブレーカー等の破砕装置を用いて容易に行うことができる。
Since the sand 12b filled to the upper end of the cylindrical portion 12a is filled without being stuck, the legs 21 can be easily pulled out from the cylindrical portion 12a without using a crushing device. Therefore, even if the size of the gap between the inner peripheral surface of the cylindrical portion 12a and the outer peripheral surface of the legs 21 is so small that the tip tool of a crushing device such as a concrete breaker cannot be inserted, the legs 21 can be easily pulled out from the cylindrical portion 12a.
As mentioned above, the first mortar layer 12c located above the upper end of the tubular portion 12a needs to be removed when pulling the leg portion 12a out of the tubular portion 12a, but this can be easily removed using a crushing device such as a concrete breaker.

本実施形態では第1のモルタル層12cを路面(GL面)と同じ高さまで配置しているが、それに限定されず、例えば、第1のモルタル層12cを路面(GL面)より少し低い高さまで配置した後、その上方に埋戻しの土砂やアスファルト舗装31を配置してもよい。 In this embodiment, the first mortar layer 12c is placed to the same height as the road surface (GL surface), but this is not limited to this. For example, the first mortar layer 12c may be placed to a height slightly lower than the road surface (GL surface), and then backfill soil and asphalt pavement 31 may be placed above it.

本実施形態では非固着性の粒体として砂を用いたが、非固着性の粒体は砂には限定されず、例えば、砂利、砕石、土砂、鉄粒、セラミックス粒等の他の非固着性の粒体を単独で、または砂と併用で用いることもできる。 In this embodiment, sand is used as the non-adhesive granules, but the non-adhesive granules are not limited to sand, and other non-adhesive granules such as gravel, crushed stone, soil, iron particles, ceramic particles, etc. can also be used alone or in combination with sand.

本実施形態において第1および第2の硬化層はモルタル層12c,12dであるが、第1および第2の硬化層はモルタル層には限定されず、例えばコンクリート層でもよい。なお、後述のとおり、第2の硬化層は、硬練りモルタルが硬化したモルタル層であることが好ましい。 In this embodiment, the first and second hardened layers are mortar layers 12c and 12d, but the first and second hardened layers are not limited to mortar layers and may be, for example, concrete layers. As described below, it is preferable that the second hardened layer is a mortar layer formed by hardening dry mortar.

次に、支持装置10Aの施工方法について説明する。
この施工方法は、脚部21の下端と筒状部12aの下端との間に第2の硬化層である第2のモルタル層12dを配置することと、筒状部12aに脚部21を挿入することと、筒状部12aの上端まで非固着性の粒体である砂12bを充填することと、筒状部12aの上端より上方に第1の硬化層である第1のモルタル層12cを配置することとを有する。より具体的に説明すると以下のとおりである。
Next, a method for installing the support device 10A will be described.
This construction method includes arranging a second mortar layer 12d, which is a second hardened layer, between the lower end of the leg 21 and the lower end of the cylindrical portion 12a, inserting the leg 21 into the cylindrical portion 12a, filling the cylindrical portion 12a with sand 12b, which is a non-adhesive granular material, up to the upper end of the cylindrical portion 12a, and arranging a first mortar layer 12c, which is a first hardened layer, above the upper end of the cylindrical portion 12a. A more specific explanation is as follows.

まず、図1に示すように、アスファルト舗装31および路盤32のある地盤30において、アスファルト舗装31を例えば□300mmで除去し、路面(GL面)から例えば□300×h350mmの先行掘削を行い、杭部11を杭打機により地中に埋設する。 First, as shown in FIG. 1, in the ground 30 containing the asphalt pavement 31 and the roadbed 32, the asphalt pavement 31 is removed by, for example, 300 mm square, and preliminary excavation is performed from the road surface (GL surface) to, for example, 300 mm square x 350 mm high, and the pile portion 11 is buried in the ground using a pile driver.

次に、筒状部12aの下端(底部12e)から+100mm程度の位置まで、第2のモルタル層12dとなる硬練りモルタルを充填し、脚部21の下端を硬練りモルタルに10mm程度貫入させて地上構造物の高さ調整を行う。すなわち、本実施形態では脚部12aの下端と筒状部12aの下端との間に第2のモルタル層12dを配置し、その後、筒状部12aに脚部21を挿入する。 Next, the second mortar layer 12d is filled with dry mortar up to a position about +100 mm from the lower end (bottom 12e) of the cylindrical portion 12a, and the lower end of the leg 21 is inserted about 10 mm into the dry mortar to adjust the height of the above-ground structure. That is, in this embodiment, the second mortar layer 12d is placed between the lower end of the leg 12a and the lower end of the cylindrical portion 12a, and then the leg 21 is inserted into the cylindrical portion 12a.

硬練りモルタルが硬化したのち、筒状部12aと脚部21の隙間に砂12bを筒状部12aの上端まで充填する。 After the dry mortar has hardened, sand 12b is filled into the gap between the cylindrical portion 12a and the leg portion 21 up to the top end of the cylindrical portion 12a.

次に、先行掘削範囲(□300×h350mm)にモルタルを充填し、金コテで表面仕上げを行う。このようにして、筒状部12aの上端より上方に第1の硬化層である第1のモルタル層12cを配置する。このように本実施形態では、先行掘削範囲(□300×h350mm)にモルタルを充填することで筒状部12aの上端より上方に第1の硬化層である第1のモルタル層12cを配置されるから、第1のモルタル層12cは筒状部12aの周囲に配置される周囲モルタル層12fと一体化しているが、図1では第1のモルタル層12cと周囲モルタル層12fとを仮想的に破線によって区別している。なお、第1のモルタル層12cと周囲モルタル層12fとを別々に配置(施工)してもよい。
また、本実施形態では先行掘削範囲(□300×h350mm)にモルタルを充填、すなわち第1のモルタル層12cを路面(GL面)と同じ高さまで配置しているが、それに限定されず、例えば、路面(GL面)より少し低い高さまでモルタルを充填した後、その上方に埋戻しの土砂やアスファルト舗装31を配置してもよい。
Next, fill the preliminary excavation range (□300×h350 mm) with mortar and finish the surface with a metal trowel. In this way, the first mortar layer 12c, which is the first hardened layer, is placed above the upper end of the cylindrical portion 12a. In this embodiment, the first mortar layer 12c, which is the first hardened layer, is placed above the upper end of the cylindrical portion 12a by filling the preliminary excavation range (□300×h350 mm) with mortar, so that the first mortar layer 12c is integrated with the surrounding mortar layer 12f placed around the cylindrical portion 12a, but in FIG. 1, the first mortar layer 12c and the surrounding mortar layer 12f are virtually distinguished by dashed lines. The first mortar layer 12c and the surrounding mortar layer 12f may be placed (constructed) separately.
In addition, in this embodiment, mortar is filled in the preliminary excavation range (□300×h350 mm), i.e., the first mortar layer 12c is placed up to the same height as the road surface (GL surface), but this is not limited to this. For example, mortar may be filled up to a height slightly lower than the road surface (GL surface), and then backfill soil and asphalt pavement 31 may be placed above it.

再施工は、車止めボラード20周辺を筒状部12aの上端までコンクリートブレーカー等の破砕装置を用いて除去し、脚部21を筒状部12aから引き抜く。その後、筒状部12a内部の砂12bを一旦取り除き、再度硬練りモルタルを充填し新規の車止めボラード20の脚部21を筒状部12aに挿入する。続いて、前回施工と同様に筒状部12aと脚部21の隙間に砂12bを筒状部12aの上端まで充填し、その後、筒状部12aの上端より上方に第1の硬化層である第1のモルタル層12cを配置する。なお、車止めボラード20周辺をコンクリートブレーカー等の破砕装置を用いて除去した時に、周囲モルタル層12fの上方を一緒に除去した場合は、第1のモルタル層12cを配置する際に、除去した周囲モルタル層12fの上方にもモルタル層を配置する。 In the re-construction, the area around the car stop bollard 20 is removed up to the top of the cylindrical portion 12a using a crushing device such as a concrete breaker, and the legs 21 are pulled out from the cylindrical portion 12a. After that, the sand 12b inside the cylindrical portion 12a is temporarily removed, and the hard mortar is filled again, and the legs 21 of the new car stop bollard 20 are inserted into the cylindrical portion 12a. Next, as in the previous construction, the gap between the cylindrical portion 12a and the legs 21 is filled with sand 12b up to the top of the cylindrical portion 12a, and then the first mortar layer 12c, which is the first hardened layer, is placed above the top of the cylindrical portion 12a. Note that when the area around the car stop bollard 20 is removed using a crushing device such as a concrete breaker, if the upper part of the surrounding mortar layer 12f is also removed, a mortar layer is also placed above the removed surrounding mortar layer 12f when the first mortar layer 12c is placed.

以上の施工方法では、筒状部12aに脚部21を挿入することの後に、筒状部12aの上端まで非固着性の粒体である砂12bを充填することを実施したが、筒状部12aの上端まで非固着性の粒体である砂12bを充填することの後に、筒状部12aに脚部21を挿入することを実施してもよい。この場合、充填された砂12bに脚部21を貫入するようにして筒状部12aに挿入すればよい。 In the above construction method, the legs 21 are inserted into the cylindrical portion 12a, and then the cylindrical portion 12a is filled with sand 12b, which is a non-adhesive granular material, up to the top end. However, the legs 21 may be inserted into the cylindrical portion 12a after filling the cylindrical portion 12a with sand 12b, which is a non-adhesive granular material, up to the top end. In this case, the legs 21 may be inserted into the cylindrical portion 12a so as to penetrate the filled sand 12b.

以上の施工方法では、筒状部12aに脚部21を挿入することの前に、脚部21の下端と筒状部12aの下端との間に第2の硬化層である第2のモルタル層12dを配置することを実施したが、この第2のモルタル層12dを配置することは省略可能である。この場合、脚部21が中空の場合には脚部21の下端を蓋等の別の手段で塞ぎ、脚部21の高さ調整は別の手段により行えばよい。
また、第2のモルタル層12dを形成するために硬練りモルタルを用いたが、通常のモルタルを用いることもできる。ただし、施工性を考慮すると硬練りモルタルを用いることが好ましい。
In the above construction method, the second mortar layer 12d, which is a second hardened layer, is placed between the lower end of the leg 21 and the lower end of the cylindrical portion 12a before the leg 21 is inserted into the cylindrical portion 12a, but the placement of the second mortar layer 12d can be omitted. In this case, if the leg 21 is hollow, the lower end of the leg 21 can be closed with another means such as a lid, and the height of the leg 21 can be adjusted by another means.
Although the dry mortar was used to form the second mortar layer 12d, ordinary mortar may also be used, although the dry mortar is preferably used in terms of workability.

次に、本発明の他の実施形態について説明する。図2に、本発明の他の実施形態である地上構造物の支持装置10Bの使用状態を示している。
この支持装置10Bは、先に説明した図1の支持装置10Aの構成に加え、筒状部12aを挿入可能な大きさに開口13aが限定された筒状ブロック13と、この筒状ブロック13に筒状部12aが挿入された状態で、筒状ブロック13の上端まで充填される非固着性の粒体である砂14と、筒状ブロックの上端より上方に配置される第3の硬化層である第3のモルタル層15をさらに含むものである。そこで、図2の支持装置10Bにおいて図1の支持装置10Aと同じ構成には同じ符号を付し、その説明を省略する。
Next, another embodiment of the present invention will be described. Fig. 2 shows a support device 10B for a ground structure according to another embodiment of the present invention in use.
In addition to the configuration of the support device 10A in Fig. 1 described above, this support device 10B further includes a cylindrical block 13 with an opening 13a limited in size to allow the cylindrical portion 12a to be inserted, sand 14, which is a non-adhesive granular material, filled up to the upper end of the cylindrical block 13 with the cylindrical portion 12a inserted into the cylindrical block 13, and a third mortar layer 15, which is a third hardened layer, disposed above the upper end of the cylindrical block. Therefore, in the support device 10B in Fig. 2, the same components as those in the support device 10A in Fig. 1 are denoted by the same reference numerals, and their description will be omitted.

このように本実施形態では、筒状ブロック13に筒状部12aが挿入された状態で、筒状ブロック13の上端まで砂14が充填されているから、筒状部12aが破損するなどして支持ユニット12の交換が必要となった場合には、筒状部12aの上端より上方に配置される第1のモルタル層12cおよび筒状ブロック13の上端より上方に配置される第3のモルタル層15をコンクリートブレーカー等の破砕装置を用いて除去することで、筒状部12aを含む支持ユニット12全体を筒状ブロック13から容易に引き抜くことができる。
なお、筒状ブロック13の上端より上方に配置される第3のモルタル層15は、筒状ブロック13の上端まで充填されている砂14を覆う蓋の機能を発揮する。
In this embodiment, with the cylindrical portion 12a inserted into the cylindrical block 13, sand 14 is filled up to the upper end of the cylindrical block 13. Therefore, if the support unit 12 needs to be replaced due to damage to the cylindrical portion 12a, the entire support unit 12 including the cylindrical portion 12a can be easily pulled out from the cylindrical block 13 by removing the first mortar layer 12c located above the upper end of the cylindrical portion 12a and the third mortar layer 15 located above the upper end of the cylindrical block 13 using a crushing device such as a concrete breaker.
The third mortar layer 15 disposed above the upper end of the cylindrical block 13 functions as a lid that covers the sand 14 that has been filled up to the upper end of the cylindrical block 13 .

本実施形態において筒状ブロック13は、コンクリート製の四角形状のブロック本体に円形状の開口13aを設けたもので、この開口13aの大きさを、筒状部12aを挿入可能な大きさに限定しているが、その具体的な大きさは技術常識の範囲内で適宜決定する。
筒状ブロック13の内周面と筒状部12aの外周面との間の隙間が小さすぎる場合、筒状部12aを筒状ブロック13の開口13aに挿入し難くなる。一方、筒状ブロック13の内周面と筒状部12aの外周面との間の隙間が大きすぎる場合、筒状部12aが傾きやすくなるなどの不具合が生じる。
以上のことから、例えば、開口13aの大きさは、筒状ブロック13の内周面と筒状部12aの外周面との間の隙間の大きさが、コンクリートブレーカー等の破砕装置の先端工具を挿入できないほどに小さくすることが好ましい。より具体的には、筒状ブロック13の内周面と筒状部12aの外周面との間の隙間の大きさが5~20mm程度となるようにすることが好ましい。ちなみに、本実施形態において開口13aの直径は180mm、筒状部12aの外径は156mmであり、筒状ブロック13の内周面と筒状部12aの外周面との間の隙間は12mmであり、隙間の大きさが10~15mm程度となるようにすることがなお好ましい。
In this embodiment, the cylindrical block 13 has a square concrete block body with a circular opening 13a. The size of this opening 13a is limited to a size that allows the cylindrical portion 12a to be inserted, but the specific size can be determined appropriately within the bounds of common technical knowledge.
If the gap between the inner peripheral surface of the cylindrical block 13 and the outer peripheral surface of the cylindrical portion 12a is too small, it becomes difficult to insert the cylindrical portion 12a into the opening 13a of the cylindrical block 13. On the other hand, if the gap between the inner peripheral surface of the cylindrical block 13 and the outer peripheral surface of the cylindrical portion 12a is too large, problems such as the cylindrical portion 12a being easily tilted occur.
From the above, for example, it is preferable that the size of the opening 13a is small enough that the size of the gap between the inner peripheral surface of the cylindrical block 13 and the outer peripheral surface of the cylindrical portion 12a cannot insert a tip tool of a crushing device such as a concrete breaker. More specifically, it is preferable that the size of the gap between the inner peripheral surface of the cylindrical block 13 and the outer peripheral surface of the cylindrical portion 12a is about 5 to 20 mm. Incidentally, in this embodiment, the diameter of the opening 13a is 180 mm, the outer diameter of the cylindrical portion 12a is 156 mm, and the gap between the inner peripheral surface of the cylindrical block 13 and the outer peripheral surface of the cylindrical portion 12a is 12 mm, and it is even more preferable that the size of the gap is about 10 to 15 mm.

筒状ブロック13の上端まで充填される砂14は、固着されることなく充填されるから、破砕装置を使用しなくても、筒状部12aを筒状ブロック13から容易に引き抜くことができる。したがって、筒状ブロック13の内周面と筒状部12aの外周面との間の隙間の大きさが、コンクリートブレーカー等の破砕装置の先端工具を挿入できないほどに小さくても、筒状部12aを筒状ブロック13から容易に引き抜くことができる。
なお、上述のとおり、筒状ブロックの上端より上方に配置される第3のモルタル層15は、筒状部12aを筒状ブロック13から引き抜くときには除去する必要があるが、その除去はコンクリートブレーカー等の破砕装置を用いて容易に行うことができる。
Since the sand 14 filled up to the upper end of the cylindrical block 13 is filled without being stuck, the cylindrical portion 12a can be easily pulled out from the cylindrical block 13 without using a crushing device. Therefore, even if the size of the gap between the inner peripheral surface of the cylindrical block 13 and the outer peripheral surface of the cylindrical portion 12a is so small that the tip tool of a crushing device such as a concrete breaker cannot be inserted, the cylindrical portion 12a can be easily pulled out from the cylindrical block 13.
As mentioned above, the third mortar layer 15 located above the upper end of the cylindrical block needs to be removed when pulling out the cylindrical portion 12a from the cylindrical block 13, but this can be easily removed using a crushing device such as a concrete breaker.

本実施形態において筒状ブロック13は四角形状であるが、筒状ブロック13は四角形状には限定されず、例えば円形状、楕円形状、台形状または多角形状でもよい。同様に、開口13aも円形状には限定されず、四角形状や多角形状でもよい。さらに、筒状ブロック13の材質もコンクリート製には限定されず、レジンコンクリート製や鋳鉄製でもよい。
また、本実施形態では非固着性の粒体として砂を用いたが、非固着性の粒体は砂には限定されず、例えば、砂利、砕石、土砂、鉄粒、セラミックス粒等の他の非固着性の粒体を単独で、または砂と併用で用いることもできる。
また、本実施形態において第3の硬化層はモルタル層15であるが、第3の硬化層はモルタル層には限定されず、例えばコンクリート層でもよい。
In this embodiment, the cylindrical block 13 is rectangular, but the cylindrical block 13 is not limited to a rectangular shape and may be, for example, a circular, elliptical, trapezoidal, or polygonal shape. Similarly, the opening 13a is not limited to a circular shape and may be a rectangular or polygonal shape. Furthermore, the material of the cylindrical block 13 is not limited to concrete and may be resin concrete or cast iron.
In addition, although sand is used as the non-adhesive granules in this embodiment, the non-adhesive granules are not limited to sand, and other non-adhesive granules such as gravel, crushed stone, soil, iron particles, ceramic particles, etc. can also be used alone or in combination with sand.
In addition, in this embodiment, the third hardened layer is the mortar layer 15, but the third hardened layer is not limited to a mortar layer and may be, for example, a concrete layer.

また、本実施形態では、筒状ブロック13の上端と筒状部12aの上端とを同じ高さとしているが、筒状ブロック13の上端を筒状部12aの上端より高くしてもよいし、逆に低くしてもよい。 In addition, in this embodiment, the upper end of the cylindrical block 13 and the upper end of the cylindrical portion 12a are at the same height, but the upper end of the cylindrical block 13 may be higher than the upper end of the cylindrical portion 12a, or may be lower.

次に、支持装置10Bの施工方法について説明する。
この支持装置10Bの施工方法は、先に説明した図1の支持装置10Aの施工方法に加えて、筒状ブロック13を設置することと、筒状ブロック13に筒状部12aが挿入された状態で、筒状ブロック13の上端まで非固着性の粒体である砂14を充填することと、筒状ブロック13の上端より上方に第3の硬化層である第3のモルタル層15を配置することを含む。より具体的に説明すると以下のとおりである。
Next, a method for installing the support device 10B will be described.
1, the construction method of this support device 10B includes, in addition to the construction method of the support device 10A described above, setting up a cylindrical block 13, filling the cylindrical block 13 with sand 14, which is a non-adhesive granular material, up to the upper end with the cylindrical portion 12a inserted in the cylindrical block 13, and arranging a third mortar layer 15, which is a third hardened layer, above the upper end of the cylindrical block 13. A more specific explanation is as follows.

まず、図2に示すように、アスファルト舗装31および路盤32のある地盤30において、アスファルト舗装31を例えば□300mmで除去し、路面(GL面)から例えば□300×h350mmの先行掘削を行い、筒状部12aを含む杭部11を杭打機により地中に埋設する。 First, as shown in FIG. 2, in the ground 30 containing the asphalt pavement 31 and the roadbed 32, the asphalt pavement 31 is removed by, for example, 300 mm square, and preliminary excavation is performed from the road surface (GL surface) by, for example, 300 mm square x 350 mm high, and the pile portion 11 including the tubular portion 12a is buried in the ground using a pile driver.

次に、先行掘削を行った底面部に、第4のモルタル層(硬化層)16となる硬練りモルタルを10mm程度打設し、その上から筒状ブロック13の開口13aに筒状部12aが挿入された状態となるように筒状ブロック13を設置する。
硬練りモルタルが硬化したのち、筒状ブロック13と筒状部12aとの隙間に砂14を筒状ブロック13の上端まで充填する。
Next, about 10 mm of hard-mixed mortar which will become the fourth mortar layer (hardened layer) 16 is poured into the bottom portion where the preliminary excavation was performed, and then the cylindrical block 13 is placed on top of that so that the cylindrical portion 12a is inserted into the opening 13a of the cylindrical block 13.
After the dry mortar has hardened, sand 14 is filled into the gap between the cylindrical block 13 and the cylindrical portion 12 a up to the upper end of the cylindrical block 13 .

次に、筒状部12aの下端(底部12e)から+100mm程度の位置まで、第2のモルタル層12dとなる硬練りモルタルを充填し、脚部21の下端を硬練りモルタルに10mm程度貫入させて地上構造物の高さ調整を行う。すなわち、本実施形態では脚部21の下端と筒状部12aの下端との間に第2のモルタル層12dを配置し、その後、筒状部12aに脚部21を挿入する。 Next, the second mortar layer 12d is filled with dry mortar up to a position about +100 mm from the lower end (bottom 12e) of the cylindrical portion 12a, and the lower end of the leg 21 is inserted about 10 mm into the dry mortar to adjust the height of the above-ground structure. That is, in this embodiment, the second mortar layer 12d is placed between the lower end of the leg 21 and the lower end of the cylindrical portion 12a, and then the leg 21 is inserted into the cylindrical portion 12a.

第2のモルタル層12dが硬化したのち、筒状部12aと脚部21の隙間に砂12bを筒状部12aの上端まで充填する。 After the second mortar layer 12d has hardened, sand 12b is filled into the gap between the cylindrical portion 12a and the leg portion 21 up to the top end of the cylindrical portion 12a.

次に、先行掘削範囲(□300×h350mm)にモルタルを充填し、金コテで表面仕上げを行う。このようにして、筒状部12aの上端より上方に第1の硬化層である第1のモルタル層12cおよび筒状ブロック13の上端より上方に第3の硬化層である第3のモルタル層15を配置する。このように本実施形態では、先行掘削範囲(□300×h350mm)にモルタルを充填することで筒状部12aの上端より上方に第1の硬化層である第1のモルタル層12cおよび筒状ブロック13の上端より上方に第3の硬化層である第3のモルタル層15を配置されるから、第1のモルタル層12cおよび第3のモルタル層15は筒状ブロック13の周囲に配置される周囲モルタル層17と一体化しているが、図2では第1のモルタル層12c、第3のモルタル層15および周囲モルタル層17を仮想的に破線によって区別している。なお、第1のモルタル層12c、第3のモルタル層15および周囲モルタル層17を別々に配置(施工)してもよい。
また、本実施形態では先行掘削範囲(□300×h350mm)にモルタルを充填、すなわち第1のモルタル層12cおよび第3のモルタル層15を路面(GL面)と同じ高さまで配置しているが、それに限定されず、例えば、路面(GL面)より少し低い高さまでモルタルを充填した後、その上方に埋戻しの土砂やアスファルト舗装31を配置してもよい。
Next, fill the preliminary excavation range (□300×h350 mm) with mortar and finish the surface with a metal trowel. In this way, the first mortar layer 12c, which is the first hardened layer, is disposed above the upper end of the cylindrical portion 12a, and the third mortar layer 15, which is the third hardened layer, is disposed above the upper end of the cylindrical block 13. In this embodiment, the first mortar layer 12c, which is the first hardened layer, is disposed above the upper end of the cylindrical portion 12a, and the third mortar layer 15, which is the third hardened layer, is disposed above the upper end of the cylindrical block 13 by filling the preliminary excavation range (□300×h350 mm) with mortar, so that the first mortar layer 12c and the third mortar layer 15 are integrated with the surrounding mortar layer 17 disposed around the cylindrical block 13, but in FIG. 2, the first mortar layer 12c, the third mortar layer 15, and the surrounding mortar layer 17 are virtually distinguished by dashed lines. The first mortar layer 12c, the third mortar layer 15 and the surrounding mortar layer 17 may be disposed (constructed) separately.
In addition, in this embodiment, the preliminary excavation range (□300×h350 mm) is filled with mortar, i.e., the first mortar layer 12c and the third mortar layer 15 are placed up to the same height as the road surface (GL surface), but this is not limited to this. For example, mortar may be filled up to a height slightly lower than the road surface (GL surface), and then backfill soil and asphalt pavement 31 may be placed above it.

再施工は、地上構造物である車止めボラード20のみを交換する場合、筒状部12aの上端より上方に配置されている第1のモルタル層12cをコンクリートブレーカー等の破砕装置を用いて除去し、脚部21を筒状部12aから引き抜く。その後、筒状部12a内部の砂12bを一旦取り除き、再度硬練りモルタルを充填し新規の車止めボラード20の脚部21を筒状部12aに挿入する。続いて、前回施工と同様に筒状部12aと脚部21の隙間に砂12bを筒状部12aの上端まで充填し、その後、筒状部12aの上端より上方に第1の硬化層である第1のモルタル層12cを配置する。 When re-construction is to replace only the vehicle stop bollard 20, which is an above-ground structure, the first mortar layer 12c located above the top end of the cylindrical portion 12a is removed using a crushing device such as a concrete breaker, and the legs 21 are pulled out from the cylindrical portion 12a. The sand 12b inside the cylindrical portion 12a is then temporarily removed, and hard-mixed mortar is again filled in, and the legs 21 of the new vehicle stop bollard 20 are inserted into the cylindrical portion 12a. Next, as in the previous construction, the gap between the cylindrical portion 12a and the legs 21 is filled with sand 12b up to the top end of the cylindrical portion 12a, and then the first mortar layer 12c, which is the first hardened layer, is placed above the top end of the cylindrical portion 12a.

一方、筒状部12aを含む支持ユニット12全体を交換する場合、筒状部12aの上端より上方に配置される第1のモルタル層12cおよび筒状ブロック13の上端より上方に配置される第3のモルタル層15をコンクリートブレーカー等の破砕装置を用いて除去し、筒状部12aを筒状ブロック13から引き抜く。その後、筒状ブロック13内部の砂14を一旦取り除き、新規の支持ユニット12の筒状部12aを筒状ブロック13に挿入する。続いて、前回施工と同様に筒状ブロック13と筒状部12aとの隙間に砂14を筒状ブロック13の上端まで充填する。その後、筒状部12aの上端より上方に第1の硬化層である第1のモルタル層12cおよび筒状ブロック13の上端より上方に第3の硬化層である第3のモルタル層15を配置する。なお、第1のモルタル層12cや第3のモルタル層15をコンクリートブレーカー等の破砕装置を用いて除去した時に、周囲モルタル層17の上方を一緒に除去した場合は、第1のモルタル層12cや第3のモルタル層15を配置する際に、除去した周囲モルタル層17の上方にもモルタル層を配置する。 On the other hand, when replacing the entire support unit 12 including the cylindrical portion 12a, the first mortar layer 12c arranged above the upper end of the cylindrical portion 12a and the third mortar layer 15 arranged above the upper end of the cylindrical block 13 are removed using a crushing device such as a concrete breaker, and the cylindrical portion 12a is pulled out from the cylindrical block 13. After that, the sand 14 inside the cylindrical block 13 is temporarily removed, and the cylindrical portion 12a of the new support unit 12 is inserted into the cylindrical block 13. Next, as in the previous construction, the sand 14 is filled up to the upper end of the cylindrical block 13 in the gap between the cylindrical block 13 and the cylindrical portion 12a. Then, the first mortar layer 12c, which is the first hardened layer, is arranged above the upper end of the cylindrical portion 12a, and the third mortar layer 15, which is the third hardened layer, is arranged above the upper end of the cylindrical block 13. In addition, if the upper part of the surrounding mortar layer 17 is also removed when the first mortar layer 12c and the third mortar layer 15 are removed using a crushing device such as a concrete breaker, a mortar layer is also placed above the removed surrounding mortar layer 17 when placing the first mortar layer 12c and the third mortar layer 15.

以上の施工方法では、杭部11を含む支持ユニット12の筒状部12aを設置することの後に、筒状ブロック13を設置することを実施したが、筒状ブロック13を設置することの後に、杭部11を含む支持ユニット12の筒状部12aを設置することを実施してもよい。 In the above construction method, the cylindrical portion 12a of the support unit 12 including the pile portion 11 is installed, and then the cylindrical block 13 is installed. However, the cylindrical portion 12a of the support unit 12 including the pile portion 11 may be installed after the cylindrical block 13 is installed.

10A,10B 支持装置
11 杭部
11a 中間部
11b 先端部
12 支持ユニット
12a 筒状部
12a-1 開口
12b 砂(非固着性の粒体)
12c 第1のモルタル層(第1の硬化層)
12d 第2のモルタル層(第2の硬化層)
12e 底部
12f 周囲モルタル層
13 筒状ブロック
13a 開口
14 砂(非固着性の粒体)
15 第3のモルタル層(第3の硬化層)
16 第4のモルタル層(第4の硬化層)
17 周囲モルタル層
20 車止めボラード(地上構造物)
21 脚部
22 キャップ
30 地盤
31 アスファルト舗装
32 路盤
10A, 10B Support device 11 Pile portion 11a Middle portion 11b Tip portion 12 Support unit 12a Cylindrical portion 12a-1 Opening 12b Sand (non-adhesive granules)
12c First mortar layer (first hardened layer)
12d Second mortar layer (second hardened layer)
12e Bottom 12f Surrounding mortar layer 13 Cylindrical block 13a Opening 14 Sand (non-adherent granules)
15 Third mortar layer (third hardened layer)
16 Fourth mortar layer (fourth hardened layer)
17 Surrounding mortar layer 20 Vehicle stop bollard (ground structure)
21 Foot 22 Cap 30 Ground 31 Asphalt pavement 32 Roadbed

Claims (6)

地上構造物の脚部を地中に設置した状態で支持する支持装置であって、
前記脚部を支持する支持ユニットを含み、
前記支持ユニットは、
前記脚部を挿入可能な大きさに開口が限定された筒状部と、
前記筒状部の下端に設けられる底部と、
前記底部に直接または間接的に取り付けられる杭部と、
前記筒状部に前記脚部が挿入された状態で、前記筒状部の内周面と前記脚部の外周面との間の隙間に対して、前記筒状部の前記内周面の上端位置まで充填される非固着性の粒体と、
前記上端位置まで充填された前記粒体より上方に配置される第1の硬化層と、
前記筒状部の下端位置を基準としてそれより上方に形成された掘削空間の少なくとも一部に対して配置される周囲硬化層とを有する支持装置。
A support device that supports legs of a ground structure while the legs are installed underground,
a support unit for supporting the leg;
The support unit includes:
A cylindrical portion having an opening limited in size to allow the leg portion to be inserted therein;
A bottom portion provided at a lower end of the cylindrical portion;
A stake portion attached directly or indirectly to the bottom portion;
With the leg portion inserted into the cylindrical portion, non-adhesive granules are filled into a gap between an inner peripheral surface of the cylindrical portion and an outer peripheral surface of the leg portion up to an upper end position of the inner peripheral surface of the cylindrical portion;
a first hardened layer disposed above the granules filled to the upper end position;
a supporting device having a peripheral hardened layer that is positioned relative to at least a portion of an excavated space formed above the lower end position of the cylindrical portion.
地上構造物の脚部を地中に設置した状態で支持する支持装置であって、
前記脚部を支持する支持ユニットを含み、
前記支持ユニットは、
前記脚部を挿入可能な大きさに開口が限定された筒状部と、
前記筒状部に前記脚部が挿入された状態で、前記筒状部の内周面と前記脚部の外周面との間の隙間に対して、前記筒状部の前記内周面の上端位置まで充填される非固着性の第1の粒体と、
前記上端位置まで充填された前記第1の粒体より上方に配置される第1の硬化層とを有し、
当該支持装置は、前記筒状部を挿入可能な大きさに開口が限定された筒状ブロックと、
前記筒状ブロックに前記筒状部が挿入された状態で、前記筒状ブロックの内周面と前記筒状部の外周面との間の隙間に対して、前記筒状ブロックの前記内周面の上端位置まで充填される非固着性の第2の粒体と、
前記上端位置まで充填された前記第2の粒体より上方に配置される第3の硬化層とをさらに含む、支持装置。
A support device that supports legs of a ground structure while the legs are installed underground,
a support unit for supporting the leg;
The support unit includes:
A cylindrical portion having an opening limited in size to allow the leg portion to be inserted therein;
a first non-adhesive granule that fills a gap between an inner peripheral surface of the cylindrical portion and an outer peripheral surface of the leg portion up to an upper end position of the inner peripheral surface of the cylindrical portion when the leg portion is inserted into the cylindrical portion;
a first hardened layer disposed above the first granules filled to the upper end position;
The support device includes a cylindrical block having an opening limited in size to allow the cylindrical portion to be inserted therein;
a second non-adhesive granule that is filled into a gap between an inner peripheral surface of the cylindrical block and an outer peripheral surface of the cylindrical portion up to an upper end position of the inner peripheral surface of the cylindrical block when the cylindrical portion is inserted into the cylindrical block;
and a third hardening layer disposed above the second granules filled to the upper end position.
前記支持ユニットは、前記脚部の下端と前記筒状部の下端との間に配置される第2の硬化層を含む、請求項1または請求項2に記載の支持装置。 The support device according to claim 1 or 2, wherein the support unit includes a second stiffening layer disposed between the lower end of the leg portion and the lower end of the tubular portion. 地上構造物の脚部を地中に設置した状態で支持する支持装置の施工方法であって、
前記支持装置は、前記脚部を支持する支持ユニットを含み、前記支持ユニットは筒状部と、前記筒状部の下端に設けられる底部と、前記底部に直接または間接的に取り付けられる杭部とを含み、
当該施工方法は、前記杭部を前記地中に埋設することと、
前記筒状部に前記脚部を挿入することと、
前記筒状部の内周面と前記脚部の外周面との間の隙間に対して、前記筒状部の前記内周面の上端位置まで非固着性の粒体を充填することと、
前記上端位置まで充填された前記粒体より上方に第1の硬化層を配置することと、
前記筒状部の下端位置を基準としてそれより上方に形成された掘削空間の少なくとも一部に対して周囲硬化層を配置することとを有する支持装置の施工方法。
A construction method for a support device that supports a leg of a ground structure while the leg is installed underground, comprising the steps of:
The support device includes a support unit that supports the leg portion, and the support unit includes a cylindrical portion , a bottom portion provided at a lower end of the cylindrical portion, and a stake portion directly or indirectly attached to the bottom portion ,
The construction method includes burying the pile portion in the ground;
Inserting the leg portion into the tubular portion;
filling a gap between an inner peripheral surface of the cylindrical portion and an outer peripheral surface of the leg portion with non-adhesive granules up to an upper end position of the inner peripheral surface of the cylindrical portion;
disposing a first hardened layer above the granules filled to the upper end position;
A construction method for a support device, comprising: placing a peripheral hardening layer on at least a portion of an excavated space formed above the lower end position of the cylindrical portion as a reference.
地上構造物の脚部を地中に設置した状態で支持する支持装置の施工方法であって、
前記支持装置は、前記脚部を支持する支持ユニットを含み、前記支持ユニットは筒状部を含み、前記支持装置は、前記筒状部を挿入可能な筒状ブロックをさらに含み、
当該施工方法は、前記筒状ブロックに前記筒状部が挿入された状態となるように、前記筒状部および前記筒状ブロックを設置することと、
前記筒状ブロックの内周面と前記筒状部の外周面との間の隙間に対して、前記筒状ブロックの前記内周面の上端位置まで非固着性の第2の粒体を充填することと、
前記筒状部に前記脚部を挿入することと、
前記筒状部の内周面と前記脚部の外周面との間の隙間に対して、前記筒状部の前記内周面の上端位置まで非固着性の第1の粒体を充填することと、
前記上端位置まで充填された前記第1の粒体より上方に第1の硬化層を配置するとともに、前記上端位置まで充填された前記第2の粒体より上方に第3の硬化層を配置することとを含む、支持装置の施工方法。
A construction method for a support device that supports a leg of a ground structure while the leg is installed underground, comprising the steps of:
The support device includes a support unit that supports the leg portion, the support unit includes a cylindrical portion, and the support device further includes a cylindrical block into which the cylindrical portion can be inserted,
The construction method includes: installing the cylindrical portion and the cylindrical block so that the cylindrical portion is inserted into the cylindrical block;
filling a gap between an inner peripheral surface of the cylindrical block and an outer peripheral surface of the cylindrical portion with non-adhesive second granules up to an upper end position of the inner peripheral surface of the cylindrical block;
Inserting the leg portion into the tubular portion;
filling a gap between an inner peripheral surface of the cylindrical portion and an outer peripheral surface of the leg portion with non-adhesive first granules up to an upper end position of the inner peripheral surface of the cylindrical portion;
A method for constructing a support device, comprising: placing a first hardened layer above the first granules that have been filled to the upper end position; and placing a third hardened layer above the second granules that have been filled to the upper end position.
当該施工方法は、前記筒状部に前記脚部を挿入することの前に、前記脚部の下端と前記筒状部の下端との間に第2の硬化層を配置することを含む、請求項または請求項に記載の支持装置の施工方法。 The method of constructing a support device as described in claim 4 or claim 5, further comprising disposing a second hardening layer between the lower end of the leg and the lower end of the tubular portion before inserting the leg into the tubular portion.
JP2020167929A 2019-10-10 2020-10-02 Support device for above-ground structure and construction method thereof Active JP7529254B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019187097 2019-10-10
JP2019187097 2019-10-10

Publications (2)

Publication Number Publication Date
JP2021063424A JP2021063424A (en) 2021-04-22
JP7529254B2 true JP7529254B2 (en) 2024-08-06

Family

ID=75487778

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020167929A Active JP7529254B2 (en) 2019-10-10 2020-10-02 Support device for above-ground structure and construction method thereof

Country Status (1)

Country Link
JP (1) JP7529254B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7672569B1 (en) * 2024-12-10 2025-05-07 原田 好也 Installation structure of driftwood capture body and driftwood capture work

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003171943A (en) 2001-12-03 2003-06-20 Nkk Corp Joint structure of pillar and steel pipe pile and joining method
JP2003328354A (en) 2002-05-08 2003-11-19 Tsuneo Goto Post and foundation for post
JP2011036602A (en) 2009-08-18 2011-02-24 Mtic Co Ltd Fall-down-type-pole support device and fall-down type pole with the support device
JP2012052383A (en) 2010-09-02 2012-03-15 Jfe Civil Engineering & Construction Corp Construction method of steel pipe support
JP2015212507A (en) 2014-04-15 2015-11-26 国立大学法人豊橋技術科学大学 Substructure of long object and construction method for substructure of long object

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS523488B2 (en) * 1972-11-20 1977-01-28
JPS61125555U (en) * 1985-01-23 1986-08-07
JPH0651978B2 (en) * 1987-11-11 1994-07-06 東京電力株式会社 Utility pole self-supporting foundation and its burying method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003171943A (en) 2001-12-03 2003-06-20 Nkk Corp Joint structure of pillar and steel pipe pile and joining method
JP2003328354A (en) 2002-05-08 2003-11-19 Tsuneo Goto Post and foundation for post
JP2011036602A (en) 2009-08-18 2011-02-24 Mtic Co Ltd Fall-down-type-pole support device and fall-down type pole with the support device
JP2012052383A (en) 2010-09-02 2012-03-15 Jfe Civil Engineering & Construction Corp Construction method of steel pipe support
JP2015212507A (en) 2014-04-15 2015-11-26 国立大学法人豊橋技術科学大学 Substructure of long object and construction method for substructure of long object

Also Published As

Publication number Publication date
JP2021063424A (en) 2021-04-22

Similar Documents

Publication Publication Date Title
KR100869815B1 (en) Expanding device for bearing capacity of tip of buried pile and construction method of buried pile
KR101096620B1 (en) Emergency crack repair method on concrete road
JP6543176B2 (en) Building method
JP2011163009A (en) Subsidence prevention structure of foundation steel pipe
RU2266370C2 (en) Method for manhole chimney and cover replacement
JP7529254B2 (en) Support device for above-ground structure and construction method thereof
JP2000345502A (en) Boundary junction structure and method of widening road boundary
JP6340044B2 (en) Overhang trail construction body and construction method of overhang trail using these
JP4827203B2 (en) Road widening structure
CN114809238B (en) Municipal road inspection well and construction method thereof
KR100966639B1 (en) Manhole repair method
JP4611113B2 (en) Integrated construction method of pile and column
JP2009046942A (en) Foundation block for retaining wall
CN112663431B (en) Concrete pavement fracture subsidence section treatment structure and construction method
KR100436896B1 (en) Construction method for back-fill area of abutment
JP2023079393A (en) Structural repair method and structure.
KR101117400B1 (en) Constructing method for back-filling of structures
KR101455202B1 (en) Construction method of an underground structure using lower member installed temporary system
KR200194046Y1 (en) A back filling structure for the paving road
JP4680676B2 (en) Three-dimensional intersection construction method using backfilling material and construction material of fluidized soil
JP7265451B2 (en) Floating prevention method for underground buried objects
KR101333843B1 (en) Constructing device of install mount for street facility
JP2008231756A (en) Subsidence prevention device for strut for supporting guard rail and method of constructing the strut
JP5926140B2 (en) Casting concrete pile construction method
JP2019108677A (en) Drain pile and liquefaction countermeasures method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230608

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240131

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240206

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240405

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240604

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240607

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240625

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240718

R150 Certificate of patent or registration of utility model

Ref document number: 7529254

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150