Connecting structures and building roofs Download PDF

Info

Publication number
JP7533539B2
JP7533539B2 JP2022130184A JP2022130184A JP7533539B2 JP 7533539 B2 JP7533539 B2 JP 7533539B2 JP 2022130184 A JP2022130184 A JP 2022130184A JP 2022130184 A JP2022130184 A JP 2022130184A JP 7533539 B2 JP7533539 B2 JP 7533539B2
Authority
JP
Japan
Prior art keywords
frame member
gradient beam
gradient
connection
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022130184A
Other languages
Japanese (ja)
Other versions
JP2024027408A (en
Inventor
亮介 佐藤
和己 土方
誠 中谷
靖曜 高橋
大輝 福元
翔太郎 熊澤
桃 江南
朋子 大石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP2022130184A priority Critical patent/JP7533539B2/en
Priority to US19/103,663 priority patent/US20260062916A1/en
Priority to PCT/JP2023/029523 priority patent/WO2024038858A1/en
Priority to AU2023327428A priority patent/AU2023327428A1/en
Priority to GB2502363.1A priority patent/GB2638878A/en
Publication of JP2024027408A publication Critical patent/JP2024027408A/en
Application granted granted Critical
Publication of JP7533539B2 publication Critical patent/JP7533539B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/02Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
    • E04B7/04Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs supported by horizontal beams or the equivalent resting on the walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/02Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
    • E04B7/022Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of a plurality of parallel similar trusses or portal frames
    • E04B7/024Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of a plurality of parallel similar trusses or portal frames the trusses or frames supporting load-bearing purlins, e.g. braced purlins
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/02Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
    • E04B7/04Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs supported by horizontal beams or the equivalent resting on the walls
    • E04B7/045Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs supported by horizontal beams or the equivalent resting on the walls with connectors made of sheet metal for connecting the roof structure to the supporting wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

本開示は、接続構造および建築物の屋根に関する。 This disclosure relates to a connection structure and a roof for a building.

屋根の一例として次の屋根が知られている。屋根は、2個の骨組部材と、2個の骨組部材に掛けられる勾配梁と、2個の骨組部材に掛けられる垂木とを備える。骨組部材は、例えば、勾配梁が掛けられる梁または柱である。一例では、勾配梁は、金具によって骨組部材に接続される(例えば、特許文献1)。特許文献1に記載の勾配梁の接続構造(以下、従来の接続構造)では、勾配梁の下面が骨組部材の上面よりも下に位置するように勾配梁と骨組部材とが接続される。 The following roof is known as an example of a roof. The roof comprises two frame members, a gradient beam hung on the two frame members, and rafters hung on the two frame members. The frame members are, for example, beams or columns on which the gradient beam is hung. In one example, the gradient beam is connected to the frame members by metal fittings (for example, Patent Document 1). In the gradient beam connection structure described in Patent Document 1 (hereinafter, the conventional connection structure), the gradient beam and the frame members are connected so that the bottom surface of the gradient beam is located below the top surface of the frame members.

特開2004-52464号公報JP 2004-52464 A

ところで、屋根において垂木は骨組部材の上に掛けられる。このため、特許文献1に記載の従来の接続構造によって勾配梁が骨組部材に接続される場合、勾配梁は垂木の下に位置する。このようなことから、屋根をスリム化することは難しい。 However, in a roof, the rafters are hung above the frame members. Therefore, when the gradient beams are connected to the frame members using the conventional connection structure described in Patent Document 1, the gradient beams are located below the rafters. This makes it difficult to slim down the roof.

(1)上記課題を解決する接続構造は、第1勾配梁の下端と第1骨組部材とを接続する第1接続構造を含み、前記第1接続構造は、前記第1勾配梁の前記下端の第1端面に接触する第1金具を備え、前記第1金具によって、前記第1勾配梁の下面が前記第1骨組部材の上面よりも上に位置するように前記第1勾配梁と前記第1骨組部材とが接続される。 (1) A connection structure that solves the above problem includes a first connection structure that connects the lower end of a first gradient beam and a first frame member, the first connection structure having a first metal fitting that contacts a first end face of the lower end of the first gradient beam, and the first metal fitting connects the first gradient beam and the first frame member such that the lower surface of the first gradient beam is positioned above the upper surface of the first frame member.

この構成によれば、第1勾配梁の下面が第1骨組部材の上面よりも上に位置するため、第1勾配梁を従来の接続構造の勾配梁よりも高い位置に配置できる。第1勾配梁の位置が高くなることによって屋根の厚みを薄くできる。このように、屋根をスリム化できる。 With this configuration, the bottom surface of the first gradient beam is located above the top surface of the first frame member, so the first gradient beam can be positioned higher than gradient beams in conventional connection structures. By positioning the first gradient beam higher, the thickness of the roof can be made thinner. In this way, the roof can be made slimmer.

(2)上記(1)に記載の接続構造において、前記第1金具は、前記第1端面に接触する第1接続面と、前記第1骨組部材の上面に接触し、前記第1接続面に垂直に交わる第2接続面と、を含む。この構成によれば、第1金具が第1勾配梁および第1骨組部材に接触できるため、第1金具によって第1勾配梁と第1骨組部材とを確実に接続できる。 (2) In the connection structure described in (1) above, the first metal fitting includes a first connection surface that contacts the first end surface, and a second connection surface that contacts the upper surface of the first frame member and perpendicularly intersects with the first connection surface. With this configuration, the first metal fitting can contact the first gradient beam and the first frame member, so that the first gradient beam and the first frame member can be reliably connected by the first metal fitting.

(3)上記(2)に記載の接続構造において、前記第1接続面に、前記第1端面に形成されるスリットに挿入される第1接続部が形成される。この構成によれば、第1接続部がスリットに挿入されることによって第1金具に対する第1勾配梁の移動が規制されるため、第1勾配梁と第1骨組部材とを正確な位置関係で接続できる。 (3) In the connection structure described in (2) above, a first connection portion is formed on the first connection surface to be inserted into a slit formed in the first end surface. With this configuration, the first connection portion is inserted into the slit to restrict movement of the first gradient beam relative to the first fitting, so that the first gradient beam and the first frame member can be connected in an accurate positional relationship.

(4)上記(2)または(3)に記載の接続構造において、前記第2接続面に、前記第1骨組部材の上面に形成される挿通孔に挿入される第2接続部が形成される。この構成によれば、第2接続部が挿通孔に挿入されることによって第1骨組部材に対する第1金具の移動が規制されるため、第1勾配梁と第1骨組部材とを正確な位置関係で接続できる。 (4) In the connection structure described in (2) or (3) above, a second connection part is formed on the second connection surface to be inserted into a through hole formed in the upper surface of the first frame member. With this configuration, the second connection part is inserted into the through hole to restrict movement of the first metal fitting relative to the first frame member, so that the first gradient beam and the first frame member can be connected in an accurate positional relationship.

(5)上記(1)から(4)のいずれか1つに記載の接続構造において、前記第1勾配梁の上端と、前記第1骨組部材と平行に配置される第2骨組部材と、を接続する第2接続構造をさらに含み、前記第2接続構造は、前記第1勾配梁の前記上端の第2端面に接触する第2金具を備え、前記第2端面は、前記第1端面とは反対側の端面であって、前記第2接続構造は、前記第2金具によって、前記第2端面の少なくとも一部が、前記第2骨組部材の上面よりも上に位置するように前記第1勾配梁と前記第2骨組部材とが接続される構造を含む。この構成によれば、第1接続構造および第2接続構造によって、第1勾配梁の上端から下端まで、第1勾配梁を従来の接続構造の勾配梁よりも高い位置に配置できるため、屋根がスリム化される。 (5) The connection structure described in any one of (1) to (4) above further includes a second connection structure that connects the upper end of the first gradient beam and a second frame member arranged parallel to the first frame member, and the second connection structure includes a second metal fitting that contacts a second end face of the upper end of the first gradient beam, the second end face being an end face opposite to the first end face, and the second connection structure includes a structure in which the first gradient beam and the second frame member are connected by the second metal fitting so that at least a part of the second end face is located above the upper surface of the second frame member. According to this configuration, the first connection structure and the second connection structure allow the first gradient beam to be positioned higher from the upper end to the lower end of the first gradient beam than the gradient beam of a conventional connection structure, thereby slimming down the roof.

(6)建築物の屋根であって、上記(1)から(5)のいずれか一項に記載の接続構造を備える。この構成によれば、第1勾配梁を従来の接続構造の勾配梁よりも高い位置に配置できるため、屋根がスリム化される。 (6) A roof of a building, comprising the connection structure described in any one of (1) to (5) above. With this configuration, the first gradient beam can be positioned higher than the gradient beam of a conventional connection structure, thereby slimming down the roof.

(7)上記課題を解決する建築物の屋根は、建築物の屋根であって、第1骨組部材と、前記第1骨組部材と平行に配置される第2骨組部材と、前記第1骨組部材および前記第2骨組部材に接続される第1勾配梁と、前記第1勾配梁と平行に配置される垂木と、を備え、前記第1勾配梁は、前記第1勾配梁の上面が前記垂木の下面よりも上に位置するように前記第1骨組部材および前記第2骨組部材に接続される。 (7) A roof of a building that solves the above problem is a roof of a building that includes a first frame member, a second frame member arranged parallel to the first frame member, a first gradient beam connected to the first frame member and the second frame member, and a rafter arranged parallel to the first gradient beam, and the first gradient beam is connected to the first frame member and the second frame member such that the upper surface of the first gradient beam is located above the lower surface of the rafter.

この構成によれば、第1勾配梁の上面が垂木の下面よりも上に位置するように第1勾配梁が配置されるため、第1骨組部材に沿う方向から第1勾配梁および垂木を見た場合に、垂木の少なくとも一部が第1勾配梁と重なる。したがって、第1勾配梁および垂木による屋根の厚みを薄くできるため、屋根がスリム化される。 According to this configuration, the first gradient beam is positioned so that the upper surface of the first gradient beam is located above the lower surface of the rafter, so that when the first gradient beam and the rafter are viewed from a direction along the first frame member, at least a portion of the rafter overlaps with the first gradient beam. Therefore, the thickness of the roof due to the first gradient beam and the rafters can be reduced, resulting in a slimmer roof.

(8)上記(7)に記載の建築物の屋根であって、前記第1勾配梁は、前記第1勾配梁の上面が、前記垂木の上面と同じ高さに位置するように、前記第1骨組部材および前記第2骨組部材に接続される。 (8) The roof of the building described in (7) above, wherein the first gradient beam is connected to the first frame member and the second frame member so that the upper surface of the first gradient beam is located at the same height as the upper surface of the rafter.

この構成によれば、第1勾配梁の上下方向における寸法が垂木の上下方向における寸法よりも大きい場合、第1骨組部材に沿う方向から見て、垂木の上下方向における全部が第1勾配梁と重なる。したがって、屋根の構成がさらにスリム化される。また、この構成によれば、第1勾配梁および垂木に野地板を取り付けできるため、屋根の剛性が向上する。 With this configuration, if the vertical dimension of the first gradient beam is greater than the vertical dimension of the rafter, the entire vertical dimension of the rafter overlaps with the first gradient beam when viewed from the direction along the first frame member. This further slims down the roof structure. Also, with this configuration, sheathing can be attached to the first gradient beam and the rafter, improving the rigidity of the roof.

(9)上記(7)または(8)に記載の建築物の屋根であって、前記第1勾配梁に平行に配置される第2勾配梁をさらに備え、前記第2勾配梁は、前記第2勾配梁の上面が前記垂木の上面よりも下に位置するように前記第1骨組部材および前記第2骨組部材に接続される。この構成によれば、屋根が、第1勾配梁とは異なるように配置される第2勾配梁を含むことによって、スリム化できる部分とスリム化しない部分とを設けることができる。 (9) The roof of the building described in (7) or (8) above further includes a second gradient beam arranged parallel to the first gradient beam, and the second gradient beam is connected to the first frame member and the second frame member so that the upper surface of the second gradient beam is located below the upper surface of the rafters. With this configuration, the roof can have parts that can be slimmed down and parts that cannot be slimmed down by including a second gradient beam that is arranged differently from the first gradient beam.

(10)上記(9)に記載の建築物の屋根であって、前記第2勾配梁に交差するように配置され、かつ、前記第2勾配梁に支持されるけらば部材をさらに備える。この構成によれば、けらば部材を第2勾配梁によって支持できる。けらば部材が第2勾配梁に支持される構造によって、けらばを大きくできる。 (10) The roof of the building described in (9) above further comprises a gable member arranged to intersect with the second gradient beam and supported by the second gradient beam. With this configuration, the gable member can be supported by the second gradient beam. The structure in which the gable member is supported by the second gradient beam allows the gable to be made larger.

本開示の接続構造および建築物は、屋根をスリム化できる。 The connection structure and building disclosed herein can slim down the roof.

第1実施形態の建築物の斜視図である。FIG. 2 is a perspective view of the building according to the first embodiment. 図1の建築物の屋根骨格の斜視図である。FIG. 2 is a perspective view of the roof framework of the building of FIG. 1 . 図2の屋根骨格の平面図である。FIG. 3 is a plan view of the roof framework of FIG. 2 . 図3の4-4線に沿う屋根骨格の断面図である。4 is a cross-sectional view of the roof framework taken along line 4-4 in FIG. 3. 第1実施形態の接続構造の側面図である。FIG. 2 is a side view of the connection structure according to the first embodiment. 第1実施形態の接続構造の平面図である。FIG. 2 is a plan view of the connection structure according to the first embodiment. 第1金具の斜視図である。FIG. 第2金具の斜視図である。FIG. 第2実施形態の建築物の屋根骨格の斜視図である。FIG. 11 is an oblique view of the roof framework of a building according to the second embodiment. 従来の建築物の屋根骨格の斜視図である。FIG. 1 is a perspective view of a conventional roof framework of a building. 図10の11-11線に沿う屋根骨格の断面図である。A cross-sectional view of the roof framework taken along line 11-11 in Figure 10.

<第1実施形態>
図1から図8、図10、および図11を参照して、第1実施形態に係る接続構造20および建築物2の屋根1を説明する。
First Embodiment
A connection structure 20 and a roof 1 of a building 2 according to a first embodiment will be described with reference to FIGS. 1 to 8, 10, and 11. FIG.

<建築物>
図1を参照して、屋根1を備える建築物2を説明する。
図1に示されるように、屋根1は、建築物2の屋根1である。建築物2は、ピロティ空間PSを有するピロティ3を備える。ピロティ空間PSは、屋根1の下に設けられる。ピロティ空間PSは、建築物2の室外に設けられる。ピロティ空間PSは、平面視において、第1柱4A、第2柱4B、第3柱4C、および第4柱4Dによって囲まれる空間を含む。平面視において、第3柱4Cと第4柱4Dとは、第3柱4Cと第4柱4Dとを結ぶ線が第1柱4Aと第2柱4Bとを結ぶ線に平行となるように配置される。ピロティ3は、ベランダ、テラス、バルコニー、玄関ポーチとして構成されてもよい。ピロティ3の用途は、これらの例に限定されない。
<Buildings>
With reference to FIG. 1, a building 2 having a roof 1 is described.
As shown in FIG. 1, the roof 1 is the roof 1 of the building 2. The building 2 includes a pilotis 3 having a pilotis space PS. The pilotis space PS is provided under the roof 1. The pilotis space PS is provided outside the building 2. In a plan view, the pilotis space PS includes a space surrounded by a first column 4A, a second column 4B, a third column 4C, and a fourth column 4D. In a plan view, the third column 4C and the fourth column 4D are arranged so that a line connecting the third column 4C and the fourth column 4D is parallel to a line connecting the first column 4A and the second column 4B. The pilotis 3 may be configured as a veranda, a terrace, a balcony, or an entrance porch. The use of the pilotis 3 is not limited to these examples.

<屋根>
図2、図3、および図5を参照して、建築物2の屋根1の構成を説明する。
図2および図3に示されるように、屋根1は、第1骨組部材5と、第2骨組部材6と、第1勾配梁7と、垂木8と、を備える。第1骨組部材5、第2骨組部材6、第1勾配梁7および垂木8は、例えば、木材によって構成される。本実施形態では、第1骨組部材5は、第3柱4Cと第4柱4Dとを連結する水平梁である。第2骨組部材6は、第1骨組部材5よりも高い位置に配置される。第2骨組部材6は、第1骨組部材5と平行に配置される。本実施形態では、第2骨組部材6は、第1柱4Aと第2柱4Bを連結する水平梁である。
<Roof>
The configuration of the roof 1 of the building 2 will be described with reference to Figures 2, 3 and 5.
As shown in Figures 2 and 3, the roof 1 includes a first frame member 5, a second frame member 6, a first gradient beam 7, and a rafter 8. The first frame member 5, the second frame member 6, the first gradient beam 7, and the rafter 8 are made of, for example, wood. In this embodiment, the first frame member 5 is a horizontal beam that connects the third column 4C and the fourth column 4D. The second frame member 6 is disposed at a higher position than the first frame member 5. The second frame member 6 is disposed parallel to the first frame member 5. In this embodiment, the second frame member 6 is a horizontal beam that connects the first column 4A and the second column 4B.

屋根1は、傾斜するように建築物2に設けられる。第1骨組部材5は、屋根1の傾斜に関して下側に配置される。第2骨組部材6は、屋根1の傾斜に関して上側に配置される。図1のように屋根1が切妻屋根構造を有する場合、第2骨組部材6は、建築物2の棟木2Aに対応してもよい。屋根1が下屋として構成される場合、第2骨組部材6は、屋根1と建築物2の外壁との接続箇所に配置される梁に対応してもよい。 The roof 1 is provided on the building 2 so as to be inclined. The first frame member 5 is disposed on the lower side of the inclination of the roof 1. The second frame member 6 is disposed on the upper side of the inclination of the roof 1. If the roof 1 has a gable roof structure as shown in FIG. 1, the second frame member 6 may correspond to the ridgepole 2A of the building 2. If the roof 1 is configured as a shed, the second frame member 6 may correspond to a beam disposed at the connection point between the roof 1 and the exterior wall of the building 2.

第1勾配梁7は、第1骨組部材5および第2骨組部材6に接続される。第1勾配梁7は、第1方向D1から見て、第1骨組部材5から第2骨組部材6にかけて斜め上に延びるように配置される。第1方向D1は、第1骨組部材5に沿う方向である。垂木8は、第1勾配梁7と平行に配置される。垂木8は、第1方向D1から見て、第1骨組部材5および第2骨組部材6の少なくとも1つに掛けられるように配置される。 The first gradient beam 7 is connected to the first frame member 5 and the second frame member 6. The first gradient beam 7 is arranged so as to extend diagonally upward from the first frame member 5 to the second frame member 6 when viewed from the first direction D1. The first direction D1 is a direction along the first frame member 5. The rafter 8 is arranged parallel to the first gradient beam 7. The rafter 8 is arranged so as to be hung on at least one of the first frame member 5 and the second frame member 6 when viewed from the first direction D1.

図5に示されるように、第1勾配梁7は、第1端面9および第2端面10を含む。第1端面9は、第1勾配梁7が第1骨組部材5に接続された場合に、下側に位置する端面である。第1端面9は、第1勾配梁7が第1骨組部材5に接続された場合において、横方向DHを向く面である。横方向DHは、第1方向D1および上下方向に直交する方向である。第1端面9は、第1勾配梁7が第1骨組部材5に接続された場合に、第1骨組部材5の側面に面さない。第2端面10は、第1勾配梁7が第2骨組部材6に接続された場合に、上側に位置する端面である。第2端面10は、第1端面9とは反対側の端面である。第2端面10は、第1勾配梁7が第2骨組部材6に接続された場合において、第1端面9と反対方向を向く面である。第2端面10の一部は、第1勾配梁7が第2骨組部材6に接続された場合に、第2骨組部材6に面する。 5, the first gradient beam 7 includes a first end face 9 and a second end face 10. The first end face 9 is an end face located on the lower side when the first gradient beam 7 is connected to the first frame member 5. The first end face 9 is a face facing the horizontal direction DH when the first gradient beam 7 is connected to the first frame member 5. The horizontal direction DH is a direction perpendicular to the first direction D1 and the up-down direction. The first end face 9 does not face the side of the first frame member 5 when the first gradient beam 7 is connected to the first frame member 5. The second end face 10 is an end face located on the upper side when the first gradient beam 7 is connected to the second frame member 6. The second end face 10 is an end face opposite to the first end face 9. The second end face 10 is a face facing the opposite direction to the first end face 9 when the first gradient beam 7 is connected to the second frame member 6. A portion of the second end surface 10 faces the second frame member 6 when the first gradient beam 7 is connected to the second frame member 6.

図2に示されるように、屋根1は、第1繋ぎ梁11を備える。第1繋ぎ梁11は、例えば、木材によって構成される。第1繋ぎ梁11は、第1繋ぎ梁11の上面が第1勾配梁7の上面7Aと面一となり、かつ、第1繋ぎ梁11の下面が第1勾配梁7の下面7Bと面一となるように、第1勾配梁7の側面に接続される。第1繋ぎ梁11によって、屋根1の構成の自由度が向上する。第1繋ぎ梁11は、省略されてもよい。 As shown in FIG. 2, the roof 1 includes a first connecting beam 11. The first connecting beam 11 is made of, for example, wood. The first connecting beam 11 is connected to the side of the first gradient beam 7 so that the upper surface of the first connecting beam 11 is flush with the upper surface 7A of the first gradient beam 7 and the lower surface of the first connecting beam 11 is flush with the lower surface 7B of the first gradient beam 7. The first connecting beam 11 increases the degree of freedom in the configuration of the roof 1. The first connecting beam 11 may be omitted.

一例では、垂木8は、第1垂木8Aと第2垂木8Bとを含む。第1垂木8Aは、第1骨組部材5および第2骨組部材6に掛けられるように配置される。第2垂木8Bは、第2骨組部材6に掛けられず、第1骨組部材5および第1繋ぎ梁11に掛けられるように配置される。第2垂木8Bは、第1骨組部材5に掛けられず、第2骨組部材6に掛けられるように配置されてもよい。 In one example, the rafters 8 include a first rafter 8A and a second rafter 8B. The first rafter 8A is arranged so that it can be hung on the first frame member 5 and the second frame member 6. The second rafter 8B is arranged so that it can be hung on the first frame member 5 and the first tie beam 11 without being hung on the second frame member 6. The second rafter 8B may be arranged so that it can be hung on the second frame member 6 without being hung on the first frame member 5.

図5に示されるように、屋根1は、野地板12と天井部材13とを備える。野地板12は、第1勾配梁7の上面7Aおよび垂木8の上面8Cに取り付けられる。野地板12の上面には、屋根材が取り付けられる。天井部材13は、第1基準線R1に沿うように第1勾配梁7の下に配置され、屋根1の下面を形成する。第1基準線R1は、第1勾配梁7の下面7Bに応じて設定される。天井部材13が第1勾配梁7に取り付けられることによって、ピロティ空間PSの天井が構成される。天井部材13は、例えば、化粧板を含む。 As shown in FIG. 5, the roof 1 comprises a sheathing board 12 and a ceiling member 13. The sheathing board 12 is attached to the upper surface 7A of the first gradient beam 7 and the upper surface 8C of the rafters 8. A roofing material is attached to the upper surface of the sheathing board 12. The ceiling member 13 is placed below the first gradient beam 7 along the first reference line R1 and forms the underside of the roof 1. The first reference line R1 is set according to the underside 7B of the first gradient beam 7. The ceiling member 13 is attached to the first gradient beam 7 to form the ceiling of the piloti space PS. The ceiling member 13 includes, for example, a decorative panel.

図4は、図3の4-4線における断面図を示す。第1勾配梁7は、第1勾配梁7の上面7Aが垂木8の下面8Dよりも上に位置するように第1骨組部材5および第2骨組部材6に接続される。本実施形態では、第1勾配梁7は、第1勾配梁7の上面7Aが、垂木8の上面8Cと同じ高さに位置するように、第1骨組部材5および第2骨組部材6に接続される。図4の断面図のように、第1勾配梁7の断面の上辺と垂木8の断面の上辺とが、仮想線Rに一致する。仮想線Rは、野地板12が配置される線である。図4に示されるように、第1勾配梁7の上下方向における寸法L1は、垂木8の上下方向における寸法L2よりも大きい。 Figure 4 shows a cross-sectional view taken along line 4-4 in Figure 3. The first gradient beam 7 is connected to the first frame member 5 and the second frame member 6 so that the upper surface 7A of the first gradient beam 7 is located above the lower surface 8D of the rafter 8. In this embodiment, the first gradient beam 7 is connected to the first frame member 5 and the second frame member 6 so that the upper surface 7A of the first gradient beam 7 is located at the same height as the upper surface 8C of the rafter 8. As shown in the cross-sectional view of Figure 4, the upper edge of the cross section of the first gradient beam 7 and the upper edge of the cross section of the rafter 8 coincide with the imaginary line R. The imaginary line R is the line along which the sheathing board 12 is arranged. As shown in Figure 4, the dimension L1 of the first gradient beam 7 in the vertical direction is greater than the dimension L2 of the rafter 8 in the vertical direction.

図4に示されるように、第1勾配梁7の第1方向D1における寸法L3は、垂木8の第1方向D1における寸法L4よりも大きい。本実施形態では、第1方向D1における野地板12の端縁が第1勾配梁7に配置される。このように配置によれば、第1勾配梁7の寸法L3が垂木8の寸法L4よりも大きいことから、野地板12の端縁を垂木8に配置する場合よりも、第1方向D1における野地板12の寸法誤差が吸収され易くなる。具体的には、野地板12は、第1方向D1における野地板12の端縁が第1勾配梁7の上に位置するように配置される。この場合、野地板12の端縁が第1勾配梁7の上に位置するように配置されたときの重なりの面積を、野地板12の端縁が垂木8の上に位置するように配置されたときの重なりの面積よりも大きくできる。野地板12の端縁が第1勾配梁7の上に位置するように配置されたときの重なりの面積は、ビスを打つための面積として大きいことが好ましい。このため、第1勾配梁7に野地板12の端縁を配置することによって、野地板12にビスを打つための面積が確保され易い。 As shown in FIG. 4, the dimension L3 of the first gradient beam 7 in the first direction D1 is larger than the dimension L4 of the rafter 8 in the first direction D1. In this embodiment, the edge of the sheathing board 12 in the first direction D1 is arranged on the first gradient beam 7. According to this arrangement, since the dimension L3 of the first gradient beam 7 is larger than the dimension L4 of the rafter 8, the dimensional error of the sheathing board 12 in the first direction D1 is more easily absorbed than when the edge of the sheathing board 12 is arranged on the rafter 8. Specifically, the sheathing board 12 is arranged so that the edge of the sheathing board 12 in the first direction D1 is located on the first gradient beam 7. In this case, the overlap area when the edge of the sheathing board 12 is arranged to be located on the first gradient beam 7 can be made larger than the overlap area when the edge of the sheathing board 12 is arranged to be located on the rafter 8. It is preferable that the overlap area when the edge of the sheathing board 12 is arranged to be located on the first gradient beam 7 is large as an area for driving screws. Therefore, by placing the edge of the sheathing board 12 on the first gradient beam 7, it is easy to ensure an area for driving screws into the sheathing board 12.

本実施形態の建築物2の屋根1の作用を説明する。
図10および図11は、従来の接続構造によって勾配梁62が取り付けられた屋根60の屋根骨格を示す。従来の屋根60では、勾配梁62の下端の端面は骨組部材63の側面に接続される。垂木64は、骨組部材63の上に載るように配置される。このため、勾配梁62の下端において、勾配梁62の下面が骨組部材63の上面よりも下に位置し、かつ、勾配梁62の上面が垂木64の下面と同じ高さに位置する。このように、従来の屋根60では、上下方向において垂木64と勾配梁62との位置が大きくずれている。このため、従来の構造では、第4方向D4から見た屋根60の厚みを、勾配梁62の上下方向における寸法L5と垂木64の上下方向における寸法L6との和よりも小さくすることが出来ない。第4方向D4は、図2の第1方向D1に対応する方向である。
The function of the roof 1 of the building 2 of this embodiment will be described.
10 and 11 show the roof framework of a roof 60 to which a slope beam 62 is attached by a conventional connection structure. In the conventional roof 60, the end face of the lower end of the slope beam 62 is connected to the side of the frame member 63. The rafters 64 are arranged to rest on the frame member 63. Therefore, at the lower end of the slope beam 62, the lower surface of the slope beam 62 is located below the upper surface of the frame member 63, and the upper surface of the slope beam 62 is located at the same height as the lower surface of the rafters 64. In this way, in the conventional roof 60, the positions of the rafters 64 and the slope beams 62 are significantly misaligned in the vertical direction. For this reason, in the conventional structure, the thickness of the roof 60 as viewed from the fourth direction D4 cannot be made smaller than the sum of the dimension L5 of the slope beam 62 in the vertical direction and the dimension L6 of the rafters 64 in the vertical direction. The fourth direction D4 corresponds to the first direction D1 in FIG. 2.

本実施形態の屋根1では、第1勾配梁7は、第1勾配梁7の下端において第1勾配梁7の下面7Bが第1骨組部材5の上面5Aよりも上に位置するように、第1骨組部材5に接続される。これによって、第1勾配梁7の上面7Aが垂木8の下面8Dよりも上に位置する。このため、第1方向D1から見て、垂木8の少なくとも一部が第1勾配梁7と重なる。したがって、この構成によれば、垂木8において、上下方向に第1勾配梁7と重なっている分だけ、従来の屋根60よりも、屋根60の厚みを薄くできる。さらに、第1勾配梁7の上面7Aは垂木8の上面8Cと同じ高さに位置してもよい。この場合、第1方向D1から見て、垂木8の上下方向における全部が第1勾配梁7と重なる。したがって、この構成によれば、垂木8の寸法L2の分だけ、従来の屋根60よりも屋根1の厚みを薄くできる。 In the roof 1 of this embodiment, the first gradient beam 7 is connected to the first frame member 5 so that the lower surface 7B of the first gradient beam 7 is located above the upper surface 5A of the first frame member 5 at the lower end of the first gradient beam 7. As a result, the upper surface 7A of the first gradient beam 7 is located above the lower surface 8D of the rafter 8. Therefore, as viewed from the first direction D1, at least a part of the rafter 8 overlaps with the first gradient beam 7. Therefore, according to this configuration, the thickness of the roof 60 can be made thinner than that of the conventional roof 60 by the amount of the rafter 8 that overlaps with the first gradient beam 7 in the vertical direction. Furthermore, the upper surface 7A of the first gradient beam 7 may be located at the same height as the upper surface 8C of the rafter 8. In this case, as viewed from the first direction D1, the entire rafter 8 in the vertical direction overlaps with the first gradient beam 7. Therefore, according to this configuration, the thickness of the roof 1 can be made thinner than that of the conventional roof 60 by the amount of the dimension L2 of the rafter 8.

従来の屋根60では、野地板が垂木64のみに取り付けられる。勾配梁62の上面が垂木64の下面と同じ高さに位置するため、従来の屋根60では、勾配梁62に野地板を取り付けることができない構造になっている。これに対して、本実施形態の屋根1は、第1勾配梁7の上面7Aが垂木8の上面8Cと同じ高さに位置するため、第1勾配梁7および垂木8に野地板12を取り付けできる。屋根骨格である第1勾配梁7に野地板12を取り付けできるため、屋根1の剛性が向上する。 In a conventional roof 60, the sheathing boards are attached only to the rafters 64. Because the upper surfaces of the slope beams 62 are located at the same height as the lower surfaces of the rafters 64, the conventional roof 60 is structured in such a way that the sheathing boards cannot be attached to the slope beams 62. In contrast, in the roof 1 of this embodiment, the upper surfaces 7A of the first slope beams 7 are located at the same height as the upper surfaces 8C of the rafters 8, so the sheathing boards 12 can be attached to the first slope beams 7 and the rafters 8. Because the sheathing boards 12 can be attached to the first slope beams 7, which are the roof skeleton, the rigidity of the roof 1 is improved.

<接続構造>
図4から図6を参照して、第1勾配梁7の接続構造20を説明する。接続構造20は、第1勾配梁7の下端と第1骨組部材5とを接続する第1接続構造22を含む。
<Connection structure>
4 to 6, the connection structure 20 of the first gradient beam 7 will be described. The connection structure 20 includes a first connection structure 22 that connects the lower end of the first gradient beam 7 and the first frame member 5.

図5および図6に示されるように、屋根1において、接続構造20によって、第1勾配梁7は、第1骨組部材5および第2骨組部材6に対して上にオフセットされる。第1勾配梁7が上にオフセットされることによって、第1方向D1から見て、第1勾配梁7は、第2基準線R2が第1勾配梁7の上面7Aと下面7Bとの間に位置するように配置される。第2基準線R2は、第1骨組部材5および第2骨組部材6に垂木8を掛けた場合に、第1方向D1から見て、垂木8の下面8Dに沿う線である。図10に示されるような従来の屋根60では、第1方向D1に対応する方向から見て、勾配梁62の上面が第2基準線R2に対応する線に一致する。 5 and 6, in the roof 1, the first gradient beam 7 is offset upward relative to the first frame member 5 and the second frame member 6 by the connection structure 20. By offsetting the first gradient beam 7 upward, the first gradient beam 7 is positioned so that the second reference line R2 is located between the upper surface 7A and the lower surface 7B of the first gradient beam 7 when viewed from the first direction D1. The second reference line R2 is a line along the lower surface 8D of the rafter 8 when the rafter 8 is hung on the first frame member 5 and the second frame member 6 when viewed from the first direction D1. In the conventional roof 60 as shown in FIG. 10, when viewed from the direction corresponding to the first direction D1, the upper surface of the gradient beam 62 coincides with the line corresponding to the second reference line R2.

第1接続構造22は、第1金具21を備える。第1接続構造22は、第1金具21によって第1勾配梁7の下端と第1骨組部材5とが接続される構造を含む。第1金具21は、第1勾配梁7の下端の第1端面9に接触する部分を有する。第1金具21は、第1勾配梁7の下端の第1端面9を支持する。第1接続構造22によって、第1勾配梁7の下面7Bが第1骨組部材5の上面5Aよりも上に位置するように、第1勾配梁7が第1骨組部材5に接続される。第1方向D1から見て、第1勾配梁7の下面7Bは、所定間隔を空けて第1骨組部材5の上面5Aから離隔する。本実施形態では、第1接続構造22によって、第1端面9が第1骨組部材5に対向しないように、第1勾配梁7と第1骨組部材5とが接続される。 The first connection structure 22 includes a first metal fitting 21. The first connection structure 22 includes a structure in which the lower end of the first gradient beam 7 and the first frame member 5 are connected by the first metal fitting 21. The first metal fitting 21 has a portion that contacts the first end surface 9 of the lower end of the first gradient beam 7. The first metal fitting 21 supports the first end surface 9 of the lower end of the first gradient beam 7. The first connection structure 22 connects the first gradient beam 7 to the first frame member 5 so that the lower surface 7B of the first gradient beam 7 is located above the upper surface 5A of the first frame member 5. When viewed from the first direction D1, the lower surface 7B of the first gradient beam 7 is separated from the upper surface 5A of the first frame member 5 by a predetermined distance. In this embodiment, the first connection structure 22 connects the first gradient beam 7 and the first frame member 5 so that the first end surface 9 does not face the first frame member 5.

接続構造20は、第1勾配梁7の上端と第2骨組部材6とを接続する第2接続構造24をさらに含む。接続構造20は、第2金具23を備える。第2接続構造24は、第2金具23によって第1勾配梁7と第2骨組部材6とが接続される構造を含む。第2金具23は、第1勾配梁7の上端の第2端面10に接触する部分を有する。第2金具23は、第1勾配梁7の上端の第2端面10を支持する。第2接続構造24によって、第1方向D1から見て、第2端面10の少なくとも一部が第2骨組部材6の上面6Aよりも上に位置するように、第1勾配梁7が第2骨組部材6に接続される。本実施形態では、第2接続構造24によって、第1方向D1から見て第2端面10の下側部分が、第2骨組部材6の側面に対向するように、第1勾配梁7と第2骨組部材6とが接続される。 The connection structure 20 further includes a second connection structure 24 that connects the upper end of the first gradient beam 7 and the second frame member 6. The connection structure 20 includes a second metal fitting 23. The second connection structure 24 includes a structure in which the first gradient beam 7 and the second frame member 6 are connected by the second metal fitting 23. The second metal fitting 23 has a portion that contacts the second end face 10 at the upper end of the first gradient beam 7. The second metal fitting 23 supports the second end face 10 at the upper end of the first gradient beam 7. The first gradient beam 7 is connected to the second frame member 6 by the second connection structure 24 so that at least a portion of the second end face 10 is located above the upper surface 6A of the second frame member 6 when viewed from the first direction D1. In this embodiment, the first gradient beam 7 and the second frame member 6 are connected by the second connection structure 24 so that the lower portion of the second end face 10 faces the side surface of the second frame member 6 when viewed from the first direction D1.

本実施形態の接続構造20の作用を説明する。
本実施形態の屋根1では、第1勾配梁7の下端において、第1接続構造22によって第1勾配梁7の下面7Bが第1骨組部材5の上面5Aよりも上に位置する。このため、第1勾配梁7の下端は、従来の接続構造の勾配梁62の下端よりも高い位置に配置される。また、第1接続構造22および第2接続構造24によれば、第1勾配梁7が、第1勾配梁7の下端から上端にわたって、従来の接続構造の勾配梁62よりも高い位置に配置される。したがって、天井部材13を、より高い位置に配置できるため、従来の屋根60よりも屋根1の厚みを薄くできる。
The operation of the connection structure 20 of this embodiment will be described.
In the roof 1 of this embodiment, at the lower end of the first gradient beam 7, the lower surface 7B of the first gradient beam 7 is located above the upper surface 5A of the first frame member 5 by the first connection structure 22. Therefore, the lower end of the first gradient beam 7 is located at a higher position than the lower end of the gradient beam 62 of the conventional connection structure. Also, according to the first connection structure 22 and the second connection structure 24, the first gradient beam 7 is located at a higher position than the gradient beam 62 of the conventional connection structure from the lower end to the upper end of the first gradient beam 7. Therefore, the ceiling member 13 can be located at a higher position, so that the thickness of the roof 1 can be made thinner than that of the conventional roof 60.

<第1金具>
図5から図8を参照して、第1接続構造22を実現するための第1金具21を説明する。第1金具21は、第1勾配梁7の下面7Bが第1骨組部材5の上面5Aよりも上に位置するように第1勾配梁7と第1骨組部材5とを接続する。
<First metal fitting>
5 to 8, a first metal fitting 21 for realizing the first connection structure 22 will be described. The first metal fitting 21 connects the first gradient beam 7 and the first frame member 5 such that the lower surface 7B of the first gradient beam 7 is located above the upper surface 5A of the first frame member 5.

図7に示されるように、第1金具21は、第1接続面25と、第2接続面26と、を含む。第1接続面25は、第1勾配梁7の下端の第1端面9に接触するように構成される。第2接続面26は、第1骨組部材5の上面5Aに接触するように構成される。第2接続面26は、第1接続面25に垂直に交わる。第2接続面26は、第1接続面25の下端において第1接続面25に垂直に交わる。第1接続面25および第2接続面26は、連続的に形成される。 As shown in FIG. 7, the first fitting 21 includes a first connection surface 25 and a second connection surface 26. The first connection surface 25 is configured to contact the first end surface 9 at the lower end of the first gradient beam 7. The second connection surface 26 is configured to contact the upper surface 5A of the first frame member 5. The second connection surface 26 intersects perpendicularly with the first connection surface 25. The second connection surface 26 intersects perpendicularly with the first connection surface 25 at the lower end of the first connection surface 25. The first connection surface 25 and the second connection surface 26 are formed continuously.

図5に示されるように、第1金具21は、第1本体部27を含む。第1本体部27は、鉄、ステンレス鋼等によって構成される。第1本体部27は、第1接続面25が形成される第1部分27Aと、第2接続面26が形成される第2部分27Bとを含む。第1部分27Aは板状部材である。第2部分27Bは板状部材である。第1部分27Aおよび第2部分27Bは、1枚の板状部材を折り曲げて形成されてもよいし、2枚の板状部材を溶接によって接合して形成されてもよい。 As shown in FIG. 5, the first metal fitting 21 includes a first body portion 27. The first body portion 27 is made of iron, stainless steel, or the like. The first body portion 27 includes a first portion 27A where the first connection surface 25 is formed, and a second portion 27B where the second connection surface 26 is formed. The first portion 27A is a plate-shaped member. The second portion 27B is a plate-shaped member. The first portion 27A and the second portion 27B may be formed by bending a single plate-shaped member, or may be formed by joining two plate-shaped members by welding.

図7に示されるように、第1金具21は、第1支持部28Aと第2支持部28Bとを含む。第1支持部28Aおよび第2支持部28Bは、第1部分27Aが第2部分27Bに対して垂直に配置されるように第1部分27Aを支持する。第1支持部28Aおよび第2支持部28Bは、第2方向D2に並ぶように配置される。第2方向D2は、第1接続面25および第2接続面26に平行な方向である。第1金具21が第1勾配梁7と第1骨組部材5とを接続する状態において、第2方向D2は、第1方向D1に一致する。第1支持部28Aおよび第2支持部28Bは、鉄、ステンレス鋼等によって構成され、溶接等によって第1本体部27に接合される。 7, the first metal fitting 21 includes a first support portion 28A and a second support portion 28B. The first support portion 28A and the second support portion 28B support the first portion 27A so that the first portion 27A is disposed perpendicular to the second portion 27B. The first support portion 28A and the second support portion 28B are disposed so as to be aligned in the second direction D2. The second direction D2 is a direction parallel to the first connection surface 25 and the second connection surface 26. When the first metal fitting 21 connects the first gradient beam 7 and the first frame member 5, the second direction D2 coincides with the first direction D1. The first support portion 28A and the second support portion 28B are made of iron, stainless steel, or the like, and are joined to the first body portion 27 by welding or the like.

図6に示されるように、第1金具21は第1接続部29をさらに含む。第1接続部29は第1接続面25に形成される。第1接続部29は、第1勾配梁7の下端の第1端面9に形成されるスリット9Aに挿入される。第1接続部29がスリット9Aに挿入されることによって、第1金具21に対する第1方向D1への第1勾配梁7の移動が規制される。図7に示すように、第1接続部29は、ボルトおよびナットによって取り外し可能に、第1部分27Aに取り付けられる。第1接続部29が第1部分27Aから取り外し可能なため、第1勾配梁7の寸法に応じて、第1接続部29の大きさおよび形状を選択できる。第1接続部29は、第1部分27Aと一体に形成されてもよい。 6, the first fitting 21 further includes a first connection portion 29. The first connection portion 29 is formed on the first connection surface 25. The first connection portion 29 is inserted into a slit 9A formed on the first end surface 9 at the lower end of the first gradient beam 7. By inserting the first connection portion 29 into the slit 9A, the movement of the first gradient beam 7 in the first direction D1 relative to the first fitting 21 is restricted. As shown in FIG. 7, the first connection portion 29 is removably attached to the first portion 27A by a bolt and a nut. Since the first connection portion 29 is detachable from the first portion 27A, the size and shape of the first connection portion 29 can be selected according to the dimensions of the first gradient beam 7. The first connection portion 29 may be formed integrally with the first portion 27A.

第1接続部29は、第1接続部分29Aと第2接続部分29Bとを含む。第1接続部分29Aおよび第2接続部分29Bは、第1勾配梁7と第1骨組部材5とが接続された状態において、厚さ方向が第2方向D2に一致する板状部材によって構成される。第1接続部分29Aおよび第2接続部分29Bは、第2方向D2に隙間をあけて並ぶように配置される。第1接続部分29Aおよび第2接続部分29Bは、第1勾配梁7と第1骨組部材5とが接続された状態において、第1接続面25から第1勾配梁7に沿って斜め上に延びるように形成される。第1接続部29は、第1金具21に対する第1骨組部材5に平行な方向への第1勾配梁7の移動を規制できれば、第1接続部分29Aおよび第2接続部分29Bに加えて、または、これらに代えて他の部材を含んでもよい。他の部材の例として軸部材が挙げられる。 The first connection portion 29 includes a first connection portion 29A and a second connection portion 29B. The first connection portion 29A and the second connection portion 29B are formed of plate-like members whose thickness direction coincides with the second direction D2 when the first gradient beam 7 and the first frame member 5 are connected. The first connection portion 29A and the second connection portion 29B are arranged so as to be aligned with a gap in the second direction D2. The first connection portion 29A and the second connection portion 29B are formed so as to extend obliquely upward from the first connection surface 25 along the first gradient beam 7 when the first gradient beam 7 and the first frame member 5 are connected. The first connection portion 29 may include other members in addition to or instead of the first connection portion 29A and the second connection portion 29B, as long as the first connection portion 29 can restrict the movement of the first gradient beam 7 in a direction parallel to the first frame member 5 relative to the first fitting 21. An example of the other members is an axis member.

第1接続部29は、第1貫通孔30を含む。第1貫通孔30は、第1接続部分29Aおよび第2接続部分29Bに形成される。第1貫通孔30は、第1接続部29が第1勾配梁7の下端のスリット9Aに挿入された状態において、第1支持ピン30Aが挿通されるように構成される。第1支持ピン30Aは、例えばドリフトピンである。第1接続部29がスリット9Aに挿入された状態において、第1支持ピン30Aが第1貫通孔30に挿通することによって、第1接続部29が第1勾配梁7に強固に取り付けられる。また、第1支持ピン30Aが第1勾配梁7の貫通孔および第1接続部29の第1貫通孔30に挿通することによって、第1金具21に対する上下方向への第1勾配梁7の移動が規制される。 The first connection portion 29 includes a first through hole 30. The first through hole 30 is formed in the first connection portion 29A and the second connection portion 29B. The first through hole 30 is configured so that the first support pin 30A is inserted when the first connection portion 29 is inserted into the slit 9A at the lower end of the first gradient beam 7. The first support pin 30A is, for example, a drift pin. When the first connection portion 29 is inserted into the slit 9A, the first support pin 30A is inserted into the first through hole 30, so that the first connection portion 29 is firmly attached to the first gradient beam 7. In addition, the first support pin 30A is inserted into the through hole of the first gradient beam 7 and the first through hole 30 of the first connection portion 29, so that the movement of the first gradient beam 7 in the vertical direction relative to the first fitting 21 is restricted.

第1金具21は第2接続部31をさらに含む。第2接続部31は第2接続面26に形成される。第2接続部31は、第1骨組部材5の上面5Aに形成される挿通孔5Bに挿入される。第2接続部31は、第1軸部31Aを含む。第1軸部31Aが挿通孔5Bに挿入されることによって、第1金具21の第1骨組部材5に対する水平な方向の移動が規制される。第2接続部31は、ボルトによって取り外し可能に、第2部分27Bに取り付けられてもよい。第2接続部31は、第2部分27Bと一体に形成されてもよい。 The first fitting 21 further includes a second connection portion 31. The second connection portion 31 is formed on the second connection surface 26. The second connection portion 31 is inserted into a through hole 5B formed in the upper surface 5A of the first frame member 5. The second connection portion 31 includes a first shaft portion 31A. By inserting the first shaft portion 31A into the through hole 5B, horizontal movement of the first fitting 21 relative to the first frame member 5 is restricted. The second connection portion 31 may be removably attached to the second portion 27B by a bolt. The second connection portion 31 may be formed integrally with the second portion 27B.

第2接続部31は、第2貫通孔32を含む。第2貫通孔32は、第1軸部31Aに形成される。第2貫通孔32は、第2接続部31が第1骨組部材5の挿通孔5Bに挿入された状態において、第2支持ピン32Aが挿通可能に構成される。第2支持ピン32Aは、例えばドリフトピンである。第2接続部31が第1骨組部材5の挿通孔5Bに挿入された状態において、第2支持ピン32Aが第1骨組部材5の貫通孔および第2接続部31の第2貫通孔32に挿通することによって、第2接続部31が第1骨組部材5に強固に取り付けられる。第2支持ピン32Aが、第1骨組部材5に形成される貫通孔および第2接続部31の第2貫通孔32を貫通することによって、第1骨組部材5に対する第1金具21の上下方向の移動が規制される。 The second connection portion 31 includes a second through hole 32. The second through hole 32 is formed in the first shaft portion 31A. The second through hole 32 is configured so that the second support pin 32A can be inserted when the second connection portion 31 is inserted into the insertion hole 5B of the first frame member 5. The second support pin 32A is, for example, a drift pin. When the second connection portion 31 is inserted into the insertion hole 5B of the first frame member 5, the second support pin 32A is inserted into the through hole of the first frame member 5 and the second through hole 32 of the second connection portion 31, so that the second connection portion 31 is firmly attached to the first frame member 5. The second support pin 32A penetrates the through hole formed in the first frame member 5 and the second through hole 32 of the second connection portion 31, so that the vertical movement of the first metal fitting 21 relative to the first frame member 5 is restricted.

本実施形態の第1金具21の作用を説明する。
第1金具21が第1骨組部材5の上面5Aに配置され、かつ、第1勾配梁7の第1端面9に接続されることによって、第1勾配梁7と第1骨組部材5とが接続される。第1接続面25は、第2接続面26から上に延びる。このため、第1金具21が第1勾配梁7と第1骨組部材5とを接続した状態において、第1接続面25は、第1骨組部材5の上面5Aから上に延びるように配置される。したがって、第1接続面25に第1勾配梁7の第1端面9が取り付けられることによって、第1勾配梁7が第1骨組部材5に対して上にオフセットされる。
The function of the first metal fitting 21 of this embodiment will be described.
The first metal fitting 21 is disposed on the upper surface 5A of the first frame member 5 and is connected to the first end surface 9 of the first gradient beam 7, thereby connecting the first gradient beam 7 and the first frame member 5. The first connection surface 25 extends upward from the second connection surface 26. Therefore, when the first metal fitting 21 connects the first gradient beam 7 and the first frame member 5, the first connection surface 25 is disposed so as to extend upward from the upper surface 5A of the first frame member 5. Therefore, by attaching the first end surface 9 of the first gradient beam 7 to the first connection surface 25, the first gradient beam 7 is offset upward with respect to the first frame member 5.

図6に示されるように、第1金具21は、上下方向において第1勾配梁7が第1骨組部材5と重ならないように第1勾配梁7と第1骨組部材5と接続できる。第1金具21が無ければ、第1勾配梁7を第1骨組部材5に対して上にオフセット接続するためには、上下方向において第1勾配梁7が第1骨組部材5と重なるように長手方向に第1勾配梁7を延長する必要がある。これに対して、第1金具21によれば、第1金具21によって第1勾配梁7を第1骨組部材5に対して上にオフセット接続することができるため、第1勾配梁7を延長する必要がない。要するに、第1金具21によって、従来の屋根60の勾配梁62をそのまま使用して第1接続構造22を構成できる。 As shown in FIG. 6, the first fitting 21 can connect the first gradient beam 7 to the first frame member 5 so that the first gradient beam 7 does not overlap the first frame member 5 in the vertical direction. Without the first fitting 21, in order to offset the first gradient beam 7 upwardly to the first frame member 5, it is necessary to extend the first gradient beam 7 in the longitudinal direction so that the first gradient beam 7 overlaps the first frame member 5 in the vertical direction. In contrast, with the first fitting 21, the first gradient beam 7 can be offset upwardly to the first frame member 5 by the first fitting 21, so there is no need to extend the first gradient beam 7. In short, the first fitting 21 allows the first connection structure 22 to be constructed using the gradient beam 62 of the conventional roof 60 as is.

<第2金具>
図5から図8を参照して、第2接続構造24を実現するための第2金具23を説明する。第2金具23は、第2端面10の少なくとも一部が、第2骨組部材6の上面6Aよりも上に位置するように第1勾配梁7と第2骨組部材6とを接続する。
<Second metal fitting>
5 to 8, the second metal fitting 23 for realizing the second connection structure 24 will be described. The second metal fitting 23 connects the first gradient beam 7 and the second frame member 6 such that at least a portion of the second end face 10 is located above the upper surface 6A of the second frame member 6.

図8に示されるように、第2金具23は、第3接続面33と第4接続面34とを含む。第3接続面33は、第1勾配梁7の上端の第2端面10に接触するように構成される。第4接続面34は、第2骨組部材6の上面6Aに接触するように構成される。第4接続面34は、第3接続面33に垂直に交わる。第4接続面34は、第3接続面33の下端において第3接続面33に垂直に交わる。第3接続面33および第4接続面34は、連続的に形成される。 As shown in FIG. 8, the second fitting 23 includes a third connection surface 33 and a fourth connection surface 34. The third connection surface 33 is configured to contact the second end surface 10 at the upper end of the first gradient beam 7. The fourth connection surface 34 is configured to contact the upper surface 6A of the second frame member 6. The fourth connection surface 34 intersects perpendicularly with the third connection surface 33. The fourth connection surface 34 intersects perpendicularly with the third connection surface 33 at the lower end of the third connection surface 33. The third connection surface 33 and the fourth connection surface 34 are formed continuously.

図5に示されるように、第2金具23は、第2本体部35を含む。第2本体部35は、鉄、ステンレス鋼等によって構成される。第2本体部35は、第3接続面33が形成される第3部分35Aと、第4接続面34が形成される第4部分35Bとを含む。第3部分35Aは板状部材である。第4部分35Bは板状部材である。第3部分35Aおよび第4部分35Bは、一枚の板状部材を折り曲げて形成されてもよいし、2枚の板状部材を溶接によって接合して形成されてもよい。 As shown in FIG. 5, the second metal fitting 23 includes a second body portion 35. The second body portion 35 is made of iron, stainless steel, or the like. The second body portion 35 includes a third portion 35A where the third connection surface 33 is formed, and a fourth portion 35B where the fourth connection surface 34 is formed. The third portion 35A is a plate-shaped member. The fourth portion 35B is a plate-shaped member. The third portion 35A and the fourth portion 35B may be formed by bending a single plate-shaped member, or may be formed by joining two plate-shaped members by welding.

図8に示されるように、第2金具23は、第3支持部36Aと第4支持部36Bとを含む。第3支持部36Aおよび第4支持部36Bは、第3部分35Aが第4部分35Bに対して垂直に配置されるように第3部分35Aを支持する。第3支持部36Aおよび第4支持部36Bは、第3方向D3に並ぶように配置される。第3方向D3は、第3接続面33および第4接続面34に平行な方向である。第2金具23が第1勾配梁7と第2骨組部材6とを接続する状態において、第3方向D3は、第1方向D1に一致する。第3支持部36Aおよび第4支持部36Bは、鉄、ステンレス鋼等によって構成され、溶接等によって第2本体部35に接合される。 8, the second metal fitting 23 includes a third support portion 36A and a fourth support portion 36B. The third support portion 36A and the fourth support portion 36B support the third portion 35A so that the third portion 35A is disposed perpendicular to the fourth portion 35B. The third support portion 36A and the fourth support portion 36B are disposed so as to be aligned in the third direction D3. The third direction D3 is a direction parallel to the third connection surface 33 and the fourth connection surface 34. When the second metal fitting 23 connects the first gradient beam 7 and the second frame member 6, the third direction D3 coincides with the first direction D1. The third support portion 36A and the fourth support portion 36B are made of iron, stainless steel, or the like, and are joined to the second body portion 35 by welding or the like.

図5および図6に示されるように、第2金具23は第3接続部37をさらに含む。第3接続部37は第3接続面33に形成される。第3接続部37は、第1勾配梁7の上端の第2端面10に形成されるスリット10Aに挿入される。第3接続部37がスリット10Aに挿入されることによって、第2金具23に対する第1方向D1への第1勾配梁7の移動が規制される。第3接続部37は、ボルトおよびナットによって取り外し可能に、第3部分35Aに取り付けられる。第3接続部37が第3部分35Aから取り外し可能なため、第1勾配梁7の寸法に応じて、第3接続部37の大きさおよび形状を選択できる。第3接続部37は、第3部分35Aと一体に形成されてもよい。 5 and 6, the second fitting 23 further includes a third connection portion 37. The third connection portion 37 is formed on the third connection surface 33. The third connection portion 37 is inserted into a slit 10A formed on the second end surface 10 at the upper end of the first gradient beam 7. By inserting the third connection portion 37 into the slit 10A, the movement of the first gradient beam 7 in the first direction D1 relative to the second fitting 23 is restricted. The third connection portion 37 is removably attached to the third portion 35A by a bolt and a nut. Since the third connection portion 37 is detachable from the third portion 35A, the size and shape of the third connection portion 37 can be selected according to the dimensions of the first gradient beam 7. The third connection portion 37 may be formed integrally with the third portion 35A.

第3接続部37は、第3接続部分37Aと第4接続部分37Bとを含む。第3接続部分37Aおよび第4接続部分37Bは、第1勾配梁7と第2骨組部材6とが接続された状態において、厚さ方向が第3方向D3に一致する板状部材によって構成される。第3接続部分37Aおよび第4接続部分37Bは、第3方向D3に隙間をあけて並ぶように配置される。第3接続部分37Aおよび第4接続部分37Bは、第1勾配梁7と第2骨組部材6とが接続された状態において、第3接続面33から第1勾配梁7に沿って斜め下に延びるように形成される。第3接続部37は、第2金具23に対する第2骨組部材6に平行な方向への第1勾配梁7の移動を規制できれば、第3接続部分37Aおよび第4接続部分37Bに加えて、または、これらに代えて他の部材を含んでもよい。他の部材の例として軸部材が挙げられる。 The third connection portion 37 includes a third connection portion 37A and a fourth connection portion 37B. The third connection portion 37A and the fourth connection portion 37B are formed of plate-like members whose thickness direction coincides with the third direction D3 when the first gradient beam 7 and the second frame member 6 are connected. The third connection portion 37A and the fourth connection portion 37B are arranged so as to be aligned with a gap in the third direction D3. The third connection portion 37A and the fourth connection portion 37B are formed so as to extend obliquely downward along the first gradient beam 7 from the third connection surface 33 when the first gradient beam 7 and the second frame member 6 are connected. The third connection portion 37 may include other members in addition to or instead of the third connection portion 37A and the fourth connection portion 37B, as long as the third connection portion 37 can restrict the movement of the first gradient beam 7 in a direction parallel to the second frame member 6 relative to the second fitting 23. An example of the other members is an axis member.

第3接続部37は、第3貫通孔38を含む。第3貫通孔38は、第3接続部分37Aおよび第4接続部分37Bに形成される。第3貫通孔38は、第3接続部37が第1勾配梁7の上端のスリット10Aに挿入された状態において、第3支持ピン38Aが挿通されるように構成される。第3支持ピン38Aは、例えばドリフトピンである。第3接続部37がスリット10Aに挿入された状態において、第3支持ピン38Aが第3貫通孔38に挿通することによって、第3接続部37が第1勾配梁7に強固に取り付けられる。また、第3支持ピン38Aが、第1勾配梁7の貫通孔および第3接続部37の第3貫通孔38に挿通することによって、第2金具23に対する上下方向への第1勾配梁7の移動が規制される。 The third connection portion 37 includes a third through hole 38. The third through hole 38 is formed in the third connection portion 37A and the fourth connection portion 37B. The third through hole 38 is configured so that the third support pin 38A is inserted when the third connection portion 37 is inserted into the slit 10A at the upper end of the first gradient beam 7. The third support pin 38A is, for example, a drift pin. When the third connection portion 37 is inserted into the slit 10A, the third support pin 38A is inserted into the third through hole 38, so that the third connection portion 37 is firmly attached to the first gradient beam 7. In addition, the third support pin 38A is inserted into the through hole of the first gradient beam 7 and the third through hole 38 of the third connection portion 37, so that the movement of the first gradient beam 7 in the vertical direction relative to the second metal fitting 23 is restricted.

第2金具23は第4接続部39をさらに含む。第4接続部39は第4接続面34に形成される。第4接続部39は、第2骨組部材6の上面6Aに形成される挿通孔6Bに挿入される。第4接続部39は、第2軸部39Aを含む。第2軸部39Aが挿通孔6Bに挿入されることによって、第2骨組部材6に対する水平な方向への第2金具23の移動が規制される。第4接続部39は、ボルトによって取り外し可能に、第4部分35Bに取り付けられてもよい。第4接続部39は、第4部分35Bと一体に形成されてもよい。 The second fitting 23 further includes a fourth connection portion 39. The fourth connection portion 39 is formed on the fourth connection surface 34. The fourth connection portion 39 is inserted into a through hole 6B formed in the upper surface 6A of the second frame member 6. The fourth connection portion 39 includes a second shaft portion 39A. The second shaft portion 39A is inserted into the through hole 6B, thereby restricting movement of the second fitting 23 in a horizontal direction relative to the second frame member 6. The fourth connection portion 39 may be removably attached to the fourth portion 35B by a bolt. The fourth connection portion 39 may be formed integrally with the fourth portion 35B.

第4接続部39は、第4貫通孔40を含む。第4貫通孔40は、第2軸部39Aに形成される。第4貫通孔40は、第4接続部39が第2骨組部材6の挿通孔6Bに挿入された状態において、第4支持ピン40Aが挿通可能に構成される。第4支持ピン40Aは、例えばドリフトピンである。第4接続部39が第2骨組部材6の挿通孔6Bに挿入された状態において、第4支持ピン40Aが第2骨組部材6の貫通孔および第4接続部39の第4貫通孔40を貫通することによって、第4接続部39が第2骨組部材6に強固に取り付けられる。第4支持ピン40Aが、第2骨組部材6に形成される貫通孔および第4接続部39の第4貫通孔40を貫通することによって、第2骨組部材6に対する上下方向への第2金具23の移動が規制される。 The fourth connection portion 39 includes a fourth through hole 40. The fourth through hole 40 is formed in the second shaft portion 39A. The fourth through hole 40 is configured so that the fourth support pin 40A can be inserted when the fourth connection portion 39 is inserted into the insertion hole 6B of the second frame member 6. The fourth support pin 40A is, for example, a drift pin. When the fourth connection portion 39 is inserted into the insertion hole 6B of the second frame member 6, the fourth support pin 40A penetrates the through hole of the second frame member 6 and the fourth through hole 40 of the fourth connection portion 39, so that the fourth connection portion 39 is firmly attached to the second frame member 6. The fourth support pin 40A penetrates the through hole formed in the second frame member 6 and the fourth through hole 40 of the fourth connection portion 39, so that the movement of the second metal fitting 23 in the vertical direction relative to the second frame member 6 is restricted.

図7および図8に示されるように、第2接続部31は、複数の第2貫通孔32を含む。第4接続部39は、複数の第4貫通孔40を含む。複数の第4貫通孔40のピッチは、複数の第2貫通孔32のピッチと等しい。 As shown in Figures 7 and 8, the second connection portion 31 includes a plurality of second through holes 32. The fourth connection portion 39 includes a plurality of fourth through holes 40. The pitch of the plurality of fourth through holes 40 is equal to the pitch of the plurality of second through holes 32.

本実施形態の第2金具23の作用を説明する。
第2金具23が第2骨組部材6の上面6Aに配置され、かつ、第1勾配梁7の第2端面10に接続されることによって、第1勾配梁7と第2骨組部材6とが接続される。第3接続面33は、第4接続面34から上に延びる。このため、第2金具23が第1勾配梁7と第2骨組部材6とを接続した状態において、第3接続面33は、第2骨組部材6の上面6Aから上に延びるように配置される。したがって、第3接続面33に第1勾配梁7の第2端面10が取り付けられることによって、第1勾配梁7が第2骨組部材6に対して上にオフセットされる。
The function of the second metal fitting 23 of this embodiment will be described.
The second metal fitting 23 is disposed on the upper surface 6A of the second frame member 6 and is connected to the second end surface 10 of the first gradient beam 7, thereby connecting the first gradient beam 7 and the second frame member 6. The third connection surface 33 extends upward from the fourth connection surface 34. Therefore, when the second metal fitting 23 connects the first gradient beam 7 and the second frame member 6, the third connection surface 33 is disposed so as to extend upward from the upper surface 6A of the second frame member 6. Therefore, by attaching the second end surface 10 of the first gradient beam 7 to the third connection surface 33, the first gradient beam 7 is offset upward with respect to the second frame member 6.

図6に示されるように、第2金具23は、上下方向において第1勾配梁7が第2骨組部材6と重ならないように第1勾配梁7と第2骨組部材6と接続できる。第2金具23が無ければ、第1勾配梁7を第2骨組部材6に対して上にオフセット接続するためには、上下方向において第1勾配梁7が第2骨組部材6と重なるように、長手方向に第1勾配梁7を延長する必要がある。これに対して、第2金具23によれば、第2金具23によって第1勾配梁7を第2骨組部材6に対して上にオフセット接続することができるため、第1勾配梁7を延長する必要がない。要するに、第2金具23によって、従来の屋根60の勾配梁62をそのまま使用して、第2接続構造24を構成できる。 As shown in FIG. 6, the second metal fitting 23 can connect the first gradient beam 7 to the second frame member 6 so that the first gradient beam 7 does not overlap the second frame member 6 in the vertical direction. Without the second metal fitting 23, in order to offset the first gradient beam 7 upwardly to the second frame member 6, it is necessary to extend the first gradient beam 7 in the longitudinal direction so that the first gradient beam 7 overlaps the second frame member 6 in the vertical direction. In contrast, with the second metal fitting 23, the first gradient beam 7 can be offset upwardly to the second frame member 6 by the second metal fitting 23, so there is no need to extend the first gradient beam 7. In short, the second metal fitting 23 allows the second connection structure 24 to be constructed using the gradient beam 62 of the conventional roof 60 as is.

本実施形態の効果を説明する。
(1-1)接続構造20は、第1勾配梁7の下端と第1骨組部材5とを接続する第1接続構造22を含む。第1接続構造22は、第1勾配梁7の下端の第1端面9に接触する第1金具21を備える。第1接続構造22は、第1金具21によって、第1勾配梁7の下面7Bが第1骨組部材5の上面5Aよりも上に位置するように第1勾配梁7と第1骨組部材5とが接続される構造を含む。
The effects of this embodiment will be described.
(1-1) The connection structure 20 includes a first connection structure 22 that connects the lower end of the first gradient beam 7 and the first frame member 5. The first connection structure 22 includes a first metal fitting 21 that contacts a first end face 9 of the lower end of the first gradient beam 7. The first connection structure 22 includes a structure in which the first metal fitting 21 connects the first gradient beam 7 and the first frame member 5 such that the lower surface 7B of the first gradient beam 7 is located above the upper surface 5A of the first frame member 5.

この構成によれば、第1勾配梁7の下面7Bが第1骨組部材5の上面5Aよりも上に位置するため、第1勾配梁7を従来の接続構造の勾配梁62よりも高い位置に配置できる。第1勾配梁7の位置が高くなるため、第1方向D1から見て第1勾配梁7が垂木8に重なる。これにより、第1勾配梁7の下面7Bと垂木8の下面8Dとの段差が、従来の屋根60の勾配梁62の下面と垂木64の下面との段差よりも小さくなる。このため、屋根1の厚みを薄くできるため、屋根1をスリム化できる。したがって、従来の屋根60よりも天井の意匠性を向上できる。 With this configuration, the underside 7B of the first gradient beam 7 is located above the upper side 5A of the first frame member 5, so the first gradient beam 7 can be positioned higher than the gradient beam 62 of a conventional connection structure. Because the position of the first gradient beam 7 is higher, the first gradient beam 7 overlaps the rafter 8 when viewed from the first direction D1. As a result, the step between the underside 7B of the first gradient beam 7 and the underside 8D of the rafter 8 is smaller than the step between the underside of the gradient beam 62 of the conventional roof 60 and the underside of the rafter 64. This allows the thickness of the roof 1 to be made thinner, making the roof 1 slimmer. This improves the design of the ceiling compared to the conventional roof 60.

(1-2)第1金具21は、第1勾配梁7の第1端面9に接触する第1接続面25と、第1骨組部材5の上面5Aに接触し、第1接続面25に垂直に交わる第2接続面26と、を含む。この構成によれば、第1金具21が第1勾配梁7および第1骨組部材5に接触するため、第1金具21によって第1勾配梁7と第1骨組部材5とを確実に接続できる。 (1-2) The first fitting 21 includes a first connection surface 25 that contacts the first end surface 9 of the first gradient beam 7, and a second connection surface 26 that contacts the upper surface 5A of the first frame member 5 and perpendicularly intersects with the first connection surface 25. With this configuration, the first fitting 21 contacts the first gradient beam 7 and the first frame member 5, so that the first gradient beam 7 and the first frame member 5 can be reliably connected by the first fitting 21.

(1-3)第1接続面25に、第1勾配梁7の第1端面9に形成されるスリット9Aに挿入される第1接続部29が形成される。この構成によれば、第1接続部29がスリット9Aに挿入されることによって第1金具21に対する第1勾配梁7の移動が規制されるため、第1勾配梁7と第1骨組部材5とを、正確な位置関係で接続できる。 (1-3) A first connection portion 29 is formed on the first connection surface 25 to be inserted into a slit 9A formed in the first end surface 9 of the first gradient beam 7. With this configuration, the first connection portion 29 is inserted into the slit 9A to restrict movement of the first gradient beam 7 relative to the first fitting 21, so that the first gradient beam 7 and the first frame member 5 can be connected in an accurate positional relationship.

(1-4)第2接続面26には、第1骨組部材5の上面5Aに形成される挿通孔5Bに挿入される第2接続部31が形成される。この構成によれば、第2接続部31が挿通孔5Bに挿入されることによって第1骨組部材5に対する第1金具21の移動が規制されるため、第1勾配梁7と第1骨組部材5とを、正確な位置関係で接続できる。 (1-4) The second connection surface 26 is formed with a second connection portion 31 that is inserted into a through hole 5B formed in the upper surface 5A of the first frame member 5. With this configuration, the second connection portion 31 is inserted into the through hole 5B to restrict movement of the first metal fitting 21 relative to the first frame member 5, so that the first gradient beam 7 and the first frame member 5 can be connected in an accurate positional relationship.

(1-5)接続構造20は、第1勾配梁7の上端と第2骨組部材6とを接続する第2接続構造24をさらに含む。第2接続構造24は、第1勾配梁7の上端の第2端面10に接触する第2金具23を備える。第2金具23によって、第2端面10の少なくとも一部が、第1骨組部材5と平行に配置される第2骨組部材6の上面6Aよりも上に位置するように第1勾配梁7と第2骨組部材6とが接続される。 (1-5) The connection structure 20 further includes a second connection structure 24 that connects the upper end of the first gradient beam 7 and the second frame member 6. The second connection structure 24 includes a second metal fitting 23 that contacts the second end face 10 of the upper end of the first gradient beam 7. The second metal fitting 23 connects the first gradient beam 7 and the second frame member 6 such that at least a portion of the second end face 10 is located above the upper surface 6A of the second frame member 6 that is arranged parallel to the first frame member 5.

この構成によれば、第1接続構造22および第2接続構造24によって、第1勾配梁7の上端から下端まで、第1勾配梁7を従来の接続構造の勾配梁62よりも高い位置に配置できるため、屋根1の構成がスリム化される。 According to this configuration, the first connection structure 22 and the second connection structure 24 allow the first gradient beam 7 to be positioned higher from its upper end to its lower end than the gradient beam 62 of a conventional connection structure, thereby slimming down the structure of the roof 1.

(1-6)建築物2の屋根1であって、接続構造20を備える。この構成によれば、第1勾配梁7が従来の接続構造の勾配梁62よりも高い位置に配置されるため、屋根1の構成がスリム化される。また、従来の屋根60よりも、天井部材13を高い位置に配置できるため、従来の屋根60よりも天井の意匠性を向上できる。 (1-6) A roof 1 of a building 2, comprising a connection structure 20. With this configuration, the first gradient beam 7 is positioned higher than the gradient beam 62 of a conventional connection structure, thereby slimming down the structure of the roof 1. In addition, the ceiling member 13 can be positioned higher than in a conventional roof 60, thereby improving the design of the ceiling compared to the conventional roof 60.

(1-7)建築物2の屋根1であって、第1骨組部材5と、第1骨組部材5と平行に配置される第2骨組部材6と、第1骨組部材5および第2骨組部材6に接続される第1勾配梁7と、第1勾配梁7と平行に配置される垂木8と、を備える。第1勾配梁7は、第1勾配梁7の上面7Aが垂木8の下面8Dよりも上に位置するように第1骨組部材5および第2骨組部材6に接続される。 (1-7) A roof 1 of a building 2, comprising a first frame member 5, a second frame member 6 arranged parallel to the first frame member 5, a first gradient beam 7 connected to the first frame member 5 and the second frame member 6, and a rafter 8 arranged parallel to the first gradient beam 7. The first gradient beam 7 is connected to the first frame member 5 and the second frame member 6 such that the upper surface 7A of the first gradient beam 7 is located above the lower surface 8D of the rafter 8.

この構成によれば、第1勾配梁7の上面7Aが垂木8の下面8Dよりも上に位置するように第1勾配梁7が配置されるため、第1骨組部材5に沿う第1方向D1から第1勾配梁7および垂木8を見た場合に、垂木8の少なくとも一部が第1勾配梁7と重なる。したがって、第1勾配梁7および垂木8による屋根1の厚みを薄くできる。これによって、屋根1の構成がスリム化される。 According to this configuration, the first gradient beam 7 is positioned so that the upper surface 7A of the first gradient beam 7 is located above the lower surface 8D of the rafter 8, so that when the first gradient beam 7 and the rafter 8 are viewed from the first direction D1 along the first frame member 5, at least a portion of the rafter 8 overlaps with the first gradient beam 7. Therefore, the thickness of the roof 1 due to the first gradient beam 7 and the rafter 8 can be reduced. This allows the configuration of the roof 1 to be slimmed down.

(1-8)第1勾配梁7は、第1勾配梁7の上面7Aが、垂木8の上面8Cと同じ高さに位置するように、第1骨組部材5および第2骨組部材6に接続される。この構成によれば、第1勾配梁7の上下方向における寸法L1が垂木8の上下方向における寸法L2よりも大きい場合、第1骨組部材5に沿う第1方向D1から見て、垂木8の上下方向における全部が第1勾配梁7と重なる。したがって、第1勾配梁7の寸法と垂木8の寸法とによる屋根1の厚みを薄くできる。このため、屋根1の構成がスリム化される。 (1-8) The first gradient beam 7 is connected to the first frame member 5 and the second frame member 6 so that the upper surface 7A of the first gradient beam 7 is located at the same height as the upper surface 8C of the rafter 8. With this configuration, when the vertical dimension L1 of the first gradient beam 7 is greater than the vertical dimension L2 of the rafter 8, the entire vertical dimension of the rafter 8 overlaps with the first gradient beam 7 when viewed from the first direction D1 along the first frame member 5. Therefore, the thickness of the roof 1, which is determined by the dimensions of the first gradient beam 7 and the rafter 8, can be made thinner. This allows the configuration of the roof 1 to be slimmer.

また、この構成によれば、第1勾配梁7および垂木8に野地板12を取り付けできる。野地板12が第1勾配梁7に取り付けられることによって、屋根1の剛性が向上する。屋根1の剛性が向上することによって、建築物2の剛性を向上するための構成を従来の建築物61よりも少なくできるため、建築物2の構成の自由度が向上する。建築物2の剛性を向上するための構成は、例えば、耐力壁、火打等である。 In addition, with this configuration, the sheathing boards 12 can be attached to the first gradient beams 7 and the rafters 8. By attaching the sheathing boards 12 to the first gradient beams 7, the rigidity of the roof 1 is improved. By improving the rigidity of the roof 1, the amount of structure for improving the rigidity of the building 2 can be reduced compared to the conventional building 61, and the degree of freedom in the structure of the building 2 is increased. Examples of structures for improving the rigidity of the building 2 include load-bearing walls, firestops, etc.

<第2実施形態>
図9を参照して、第2実施形態に係る建築物2の屋根1を説明する。本実施形態の建築物2の屋根1において第1実施形態と共通する構成については、第1実施形態と同一の符号を付し、重複する説明を省略する。
Second Embodiment
The roof 1 of the building 2 according to the second embodiment will be described with reference to Fig. 9. The same reference numerals as in the first embodiment are used for the components of the roof 1 of the building 2 of the second embodiment that are common to the first embodiment, and duplicated descriptions will be omitted.

<屋根>
屋根1は、第1勾配梁7に平行に配置される第2勾配梁50をさらに備える。第2勾配梁50は、例えば、木材によって構成される。第2勾配梁50の寸法は、第1勾配梁7の寸法と等しい。第2勾配梁50の寸法は、第1勾配梁7の寸法と異なっていてもよい。第2勾配梁50は、第2勾配梁50の上面50Aが第1勾配梁7の上面7Aよりも下に位置するように配置される。第2勾配梁50は、第1方向D1から見て、第2勾配梁50の上側部分が第1勾配梁7に重なるように第1骨組部材5および第2骨組部材6に接続される。
<Roof>
The roof 1 further includes a second gradient beam 50 arranged parallel to the first gradient beam 7. The second gradient beam 50 is made of, for example, wood. The dimensions of the second gradient beam 50 are equal to those of the first gradient beam 7. The dimensions of the second gradient beam 50 may be different from those of the first gradient beam 7. The second gradient beam 50 is arranged such that the upper surface 50A of the second gradient beam 50 is located below the upper surface 7A of the first gradient beam 7. The second gradient beam 50 is connected to the first frame member 5 and the second frame member 6 such that the upper portion of the second gradient beam 50 overlaps the first gradient beam 7 when viewed from the first direction D1.

第2勾配梁50は、第2勾配梁50の下端の端面が第1骨組部材5の側面に接触するように、第1骨組部材5に接続される。第2勾配梁50は、第2勾配梁50の上端の端面が第2骨組部材6の側面に接触するように、第2骨組部材6に接続される。第2勾配梁50は、第2勾配梁50の上面50Aが垂木8の上面8Cよりも下に位置するように第1骨組部材5および第2骨組部材6に接続される。第2勾配梁50は、第1方向D1から見て、第2勾配梁50の上面50Aが第2基準線R2に一致するように配置される。 The second gradient beam 50 is connected to the first frame member 5 so that the end face of the lower end of the second gradient beam 50 contacts the side of the first frame member 5. The second gradient beam 50 is connected to the second frame member 6 so that the end face of the upper end of the second gradient beam 50 contacts the side of the second frame member 6. The second gradient beam 50 is connected to the first frame member 5 and the second frame member 6 so that the upper surface 50A of the second gradient beam 50 is located below the upper surface 8C of the rafter 8. The second gradient beam 50 is positioned so that the upper surface 50A of the second gradient beam 50 coincides with the second reference line R2 when viewed from the first direction D1.

屋根1は、第2繋ぎ梁51と追加垂木52とを備える。第2繋ぎ梁51および追加垂木52は、例えば、木材によって構成される。第2繋ぎ梁51の第1端は、第2繋ぎ梁51の上面が第2勾配梁50の上面50Aと面一となるように、第2勾配梁50の側面に接続される。第2繋ぎ梁51の第2端は、第2繋ぎ梁51の上面が第1勾配梁7の上面7Aよりも下に位置するように、第1勾配梁7の下に配置される勾配梁に接続される。第1勾配梁7の下に配置される勾配梁は、例えば従来の接続構造の勾配梁である。追加垂木52は、屋根1を上側から見て、第1方向D1において第1勾配梁7と第2勾配梁50との間に配置される。追加垂木52は、追加垂木52の上面が垂木8の上面8Cと面一となるように、配置される。追加垂木52は、第1骨組部材5、第2骨組部材6および第2繋ぎ梁51に、ビス等によって取り付けられる。 The roof 1 includes a second connecting beam 51 and an additional rafter 52. The second connecting beam 51 and the additional rafter 52 are made of, for example, wood. The first end of the second connecting beam 51 is connected to the side of the second gradient beam 50 so that the upper surface of the second connecting beam 51 is flush with the upper surface 50A of the second gradient beam 50. The second end of the second connecting beam 51 is connected to a gradient beam arranged below the first gradient beam 7 so that the upper surface of the second connecting beam 51 is located below the upper surface 7A of the first gradient beam 7. The gradient beam arranged below the first gradient beam 7 is, for example, a gradient beam of a conventional connection structure. The additional rafter 52 is arranged between the first gradient beam 7 and the second gradient beam 50 in the first direction D1 when viewing the roof 1 from above. The additional rafter 52 is arranged so that the upper surface of the additional rafter 52 is flush with the upper surface 8C of the rafter 8. The additional rafter 52 is attached to the first frame member 5, the second frame member 6, and the second connecting beam 51 with screws or the like.

屋根1は、第2勾配梁50に交差するように配置されるけらば部材53をさらに備える。けらば部材53は、第2勾配梁50に支持される。けらば部材53は、第2勾配梁50の上に配置される。けらば部材53は、例えば、木材によって構成される。けらば部材53は、建築物2のけらば54を構成する。けらば部材53は、例えば、一端が追加垂木52に接続される持ち出し梁53Aを含む。けらば部材53は、けらば部材53の下面が第1勾配梁7の下面7Bと同じ高さに位置するように追加垂木52に接続される。けらば部材53は、けらば部材53の上面が追加垂木52の上面と面一となるように追加垂木52に接続される。 The roof 1 further includes a gable member 53 arranged to intersect with the second gradient beam 50. The gable member 53 is supported by the second gradient beam 50. The gable member 53 is arranged on the second gradient beam 50. The gable member 53 is made of, for example, wood. The gable member 53 constitutes the gable 54 of the building 2. The gable member 53 includes, for example, a corbel beam 53A whose one end is connected to the additional rafter 52. The gable member 53 is connected to the additional rafter 52 so that the lower surface of the gable member 53 is located at the same height as the lower surface 7B of the first gradient beam 7. The gable member 53 is connected to the additional rafter 52 so that the upper surface of the gable member 53 is flush with the upper surface of the additional rafter 52.

本実施形態の屋根1の作用を説明する。
本実施形態の建築物2は、第1勾配梁7に加えて、第2勾配梁50をさらに備える。けらば部材53を第2勾配梁50によって支持できるため、けらば54を大きく構成できる。第2勾配梁50によって、第1勾配梁7によるスリムな天井と、第2勾配梁50による大きなけらば54とを有する建築物2を構成できる。
The function of the roof 1 of this embodiment will be described.
The building 2 of this embodiment further includes a second gradient beam 50 in addition to the first gradient beam 7. Since the gable member 53 can be supported by the second gradient beam 50, the gable 54 can be configured to be large. The second gradient beam 50 allows the building 2 to have a slim ceiling provided by the first gradient beam 7 and a large gable 54 provided by the second gradient beam 50.

本実施形態の効果を説明する。
(2-1)第1勾配梁7に平行に配置される第2勾配梁50をさらに備える。第2勾配梁50は、第2勾配梁50の上面50Aが垂木8の上面8Cよりも下に位置するように第1骨組部材5および第2骨組部材6に接続される。
The effects of this embodiment will be described.
(2-1) Further provided is a second gradient beam 50 arranged parallel to the first gradient beam 7. The second gradient beam 50 is connected to the first frame member 5 and the second frame member 6 such that the upper surface 50A of the second gradient beam 50 is located lower than the upper surface 8C of the rafter 8.

この構成によれば、屋根1が、第1勾配梁7とは異なるように配置される第2勾配梁50を含むことによって、スリム化できる部分とスリム化しない部分とを設けることができる。また、屋根1が、第1勾配梁7とは異なるように配置される第2勾配梁50を含むため、屋根1の構成の自由度が向上する。例えば、従来の屋根60において、勾配梁62に代えてまたは加えて、第1勾配梁7を追加できる。この場合、第1勾配梁7の部分では、第2勾配梁50が配置されていないため、屋根1の構成をスリム化できる。また、野地板12を第1勾配梁7に取り付けることによって、従来の屋根60よりも剛性を向上できる。 According to this configuration, the roof 1 includes the second gradient beam 50 that is arranged differently from the first gradient beam 7, so that it is possible to provide some parts that can be slimmed down and some parts that cannot be slimmed down. In addition, because the roof 1 includes the second gradient beam 50 that is arranged differently from the first gradient beam 7, the degree of freedom of the configuration of the roof 1 is improved. For example, in a conventional roof 60, the first gradient beam 7 can be added in place of or in addition to the gradient beam 62. In this case, since the second gradient beam 50 is not arranged in the part of the first gradient beam 7, the configuration of the roof 1 can be slimmed down. In addition, by attaching the sheathing board 12 to the first gradient beam 7, the rigidity can be improved compared to the conventional roof 60.

(2-2)第2勾配梁50に交差するけらば部材53をさらに備える。けらば部材53は、第2勾配梁50によって支持される。この構成によれば、けらば部材53を第2勾配梁50によって支持できるため、けらば54を大きくできる。また、けらば54を大きく構成できるため、屋根1の意匠性を向上できる。 (2-2) Further provided is a gable member 53 that intersects with the second gradient beam 50. The gable member 53 is supported by the second gradient beam 50. With this configuration, the gable member 53 can be supported by the second gradient beam 50, so the gable 54 can be made large. In addition, because the gable 54 can be made large, the design of the roof 1 can be improved.

<変形例>
上記各実施形態は、接続構造20および建築物2の屋根1が取り得る形態の例示であり、その形態を制限することを意図していない。接続構造20および建築物2の屋根1は、上記各実施形態に例示された形態とは異なる形態を取り得る。その例は、各実施形態の構成の一部を置換、変更、省略した形態、または、各実施形態に新たな構成を付加した形態である。以下に各実施形態の変形例を示す。
<Modification>
The above-described embodiments are examples of possible forms of the connection structure 20 and the roof 1 of the building 2, and are not intended to limit the forms. The connection structure 20 and the roof 1 of the building 2 may take forms different from those exemplified in the above-described embodiments. Examples of such forms include forms in which part of the configuration of each embodiment is replaced, modified, or omitted, or forms in which a new configuration is added to each embodiment. Modified examples of each embodiment are shown below.

(1)接続構造20を備える屋根1は、ピロティ3の上に配置される屋根でなくてもよい。接続構造20を備える屋根1は、例えば、建築物2の室内の上に配置される屋根であってもよい。 (1) The roof 1 having the connection structure 20 does not have to be a roof placed above the pilotis 3. The roof 1 having the connection structure 20 may be, for example, a roof placed above the interior of the building 2.

(2)柱が、第1骨組部材5でもよい。柱は、第3柱4Cまたは第4柱4Dを含む。要するに、第1接続構造22は、第1金具21によって、第1勾配梁7の下面7Bが柱の上面よりも上に位置するように第1勾配梁7と柱とが接続される構造を有してもよい。 (2) The pillar may be the first frame member 5. The pillar may include the third pillar 4C or the fourth pillar 4D. In short, the first connection structure 22 may have a structure in which the first metal fitting 21 connects the first gradient beam 7 and the pillar such that the lower surface 7B of the first gradient beam 7 is located above the upper surface of the pillar.

(3)第1勾配梁7は、第1勾配梁7の上面7Aが垂木8の上面8Cよりも下に位置するように、第1骨組部材5および第2骨組部材6に接続されてもよい。この場合であっても、第1勾配梁7の上面7Aが垂木8の下面8Dよりも上に位置していれば、第1勾配梁7の下面7Bが高い位置に配置されるため、屋根1の構成を、従来の屋根60よりもスリム化できる。 (3) The first gradient beam 7 may be connected to the first frame member 5 and the second frame member 6 so that the upper surface 7A of the first gradient beam 7 is located lower than the upper surface 8C of the rafter 8. Even in this case, if the upper surface 7A of the first gradient beam 7 is located higher than the lower surface 8D of the rafter 8, the lower surface 7B of the first gradient beam 7 is positioned higher, so that the structure of the roof 1 can be slimmer than that of the conventional roof 60.

(4)第1勾配梁7は、第1勾配梁7の下面7Bが垂木8の下面8Dと同じ高さになるように配置されてもよい。この場合であっても、第1勾配梁7の下面7Bが高い位置に配置されるため、屋根1の構成を、従来の屋根60よりもスリム化できる。 (4) The first gradient beam 7 may be positioned so that the lower surface 7B of the first gradient beam 7 is at the same height as the lower surface 8D of the rafter 8. Even in this case, the lower surface 7B of the first gradient beam 7 is positioned at a higher position, so the structure of the roof 1 can be made slimmer than that of the conventional roof 60.

(5)第1金具21は、第1接続面25および第2接続面26を有していれば、その形状は限定されない。第1金具21は、例えば、第1接続面25および第2接続面26を有する立方体、直方体等として形成されてもよい。 (5) The shape of the first metal fitting 21 is not limited as long as it has the first connection surface 25 and the second connection surface 26. The first metal fitting 21 may be formed, for example, as a cube, rectangular parallelepiped, or the like having the first connection surface 25 and the second connection surface 26.

(6)第2金具23は、第3接続面33および第4接続面34を有していれば、その形状は限定されない。第2金具23は、例えば、第3接続面33および第4接続面34を有する立方体、直方体等として形成されてもよい。 (6) The shape of the second metal fitting 23 is not limited as long as it has the third connection surface 33 and the fourth connection surface 34. The second metal fitting 23 may be formed, for example, as a cube, rectangular parallelepiped, or the like, having the third connection surface 33 and the fourth connection surface 34.

(7)第2接続構造24によって、平面視において第1勾配梁7が第2骨組部材6と重なるように、第1勾配梁7と第2骨組部材6とが接続されてもよい。この場合、第2接続構造24によって、第1勾配梁7の下面7Bが第2骨組部材6の上面6Aよりも上に位置するように、第1勾配梁7が第2骨組部材6に接続されてもよい。 (7) The first gradient beam 7 and the second frame member 6 may be connected by the second connection structure 24 so that the first gradient beam 7 overlaps the second frame member 6 in a plan view. In this case, the first gradient beam 7 may be connected by the second connection structure 24 to the second frame member 6 so that the lower surface 7B of the first gradient beam 7 is located above the upper surface 6A of the second frame member 6.

本明細書には以下の技術が開示される。
[付記1]
第1勾配梁の下端と第1骨組部材とを接続する第1接続構造を含み、前記第1接続構造は、前記第1勾配梁の前記下端の第1端面に接触する第1金具を備え、前記第1金具によって、前記第1勾配梁の下面が前記第1骨組部材の上面よりも上に位置するように前記第1勾配梁と前記第1骨組部材とが接続される接続構造。
The present specification discloses the following techniques.
[Appendix 1]
A connection structure including a first connection structure connecting a lower end of a first gradient beam and a first frame member, the first connection structure comprising a first metal fitting contacting a first end face of the lower end of the first gradient beam, the first metal fitting connecting the first gradient beam and the first frame member such that the lower surface of the first gradient beam is positioned above the upper surface of the first frame member.

[付記2]
前記第1金具は、前記第1端面に接触する第1接続面と、前記第1骨組部材の上面に接触し、前記第1接続面に垂直に交わる第2接続面と、を含む付記1に記載の接続構造。
[Appendix 2]
2. The connection structure described in Appendix 1, wherein the first fitting includes a first connection surface that contacts the first end surface, and a second connection surface that contacts an upper surface of the first frame member and intersects with the first connection surface perpendicularly.

[付記3]
前記第1接続面に、前記第1端面に形成されるスリットに挿入される第1接続部が形成される付記2に記載の接続構造。
[Appendix 3]
3. The connection structure according to claim 2, wherein the first connection surface is formed with a first connection portion to be inserted into a slit formed in the first end surface.

[付記4]
前記第2接続面に、前記第1骨組部材の上面に形成される挿通孔に挿入される第2接続部が形成される付記2または3に記載の接続構造。
[Appendix 4]
4. The connection structure according to claim 2 or 3, wherein a second connection portion is formed on the second connection surface to be inserted into an insertion hole formed in the upper surface of the first frame member.

[付記5]
前記第1勾配梁の上端と、前記第1骨組部材と平行に配置される第2骨組部材と、を接続する第2接続構造をさらに含み、前記第2接続構造は、前記第1勾配梁の前記上端の第2端面に接触する第2金具を備え、前記第2端面は、前記第1端面とは反対側の端面であって、前記第2接続構造は、前記第2金具によって、前記第2端面の少なくとも一部が、前記第2骨組部材の上面よりも上に位置するように前記第1勾配梁と前記第2骨組部材とが接続される構造を含む付記1から4のいずれか一項に記載の接続構造。
[Appendix 5]
A connection structure as described in any one of Appendix 1 to 4, further comprising a second connection structure connecting an upper end of the first gradient beam and a second frame member arranged parallel to the first frame member, the second connection structure comprising a second metal fitting contacting a second end face of the upper end of the first gradient beam, the second end face being an end face opposite to the first end face, and the second connection structure comprising a structure in which the first gradient beam and the second frame member are connected by the second metal fitting so that at least a portion of the second end face is positioned above the upper surface of the second frame member.

[付記6]
建築物の屋根であって、付記1から5のいずれか一項に記載の接続構造を備える屋根。
[Appendix 6]
A roof of a building, comprising a connection structure according to any one of appendices 1 to 5.

[付記7]
建築物の屋根であって、第1骨組部材と、前記第1骨組部材と平行に配置される第2骨組部材と、前記第1骨組部材および前記第2骨組部材に接続される第1勾配梁と、前記第1勾配梁と平行に配置される垂木と、を備え、前記第1勾配梁は、前記第1勾配梁の上面が前記垂木の下面よりも上に位置するように前記第1骨組部材および前記第2骨組部材に接続される屋根。
[Appendix 7]
A roof of a building comprising: a first frame member; a second frame member arranged parallel to the first frame member; a first gradient beam connected to the first frame member and the second frame member; and a rafter arranged parallel to the first gradient beam, wherein the first gradient beam is connected to the first frame member and the second frame member such that an upper surface of the first gradient beam is located above a lower surface of the rafter.

[付記8]
前記第1勾配梁は、前記第1勾配梁の上面が、前記垂木の上面と同じ高さに位置するように、前記第1骨組部材および前記第2骨組部材に接続される付記7に記載の屋根。
[Appendix 8]
The roof of claim 7, wherein the first gradient beam is connected to the first frame member and the second frame member so that the upper surface of the first gradient beam is located at the same height as the upper surface of the rafter.

[付記9]
前記第1勾配梁に平行に配置される第2勾配梁をさらに備え、前記第2勾配梁は、前記第2勾配梁の上面が前記垂木の上面よりも下に位置するように前記第1骨組部材および前記第2骨組部材に接続される付記7または8に記載の屋根。
[Appendix 9]
9. The roof of claim 7 or 8, further comprising a second gradient beam arranged parallel to the first gradient beam, the second gradient beam being connected to the first frame member and the second frame member such that an upper surface of the second gradient beam is located below an upper surface of the rafters.

[付記10]
前記第2勾配梁に交差するように配置され、かつ、前記第2勾配梁に支持されるけらば部材をさらに備える付記9に記載の屋根。
[Appendix 10]
The roof of claim 9, further comprising a gable member arranged to intersect with the second slope beam and supported by the second slope beam.

1…屋根、2…建築物、5…第1骨組部材、6…第2骨組部材、7…第1勾配梁、8…垂木、9…第1端面、9A…スリット、10…第2端面、10A…スリット、20…接続構造、21…第1金具、22…第1接続構造、23…第2金具、24…第2接続構造、25…第1接続面、26…第2接続面、29…第1接続部、31…第2接続部、50…第2勾配梁、53…けらば部材。 1...roof, 2...building, 5...first frame member, 6...second frame member, 7...first slope beam, 8...rafter, 9...first end face, 9A...slit, 10...second end face, 10A...slit, 20...connection structure, 21...first metal fitting, 22...first connection structure, 23...second metal fitting, 24...second connection structure, 25...first connection surface, 26...second connection surface, 29...first connection part, 31...second connection part, 50...second slope beam, 53...gable member.

Claims (10)

第1勾配梁の下端と第1骨組部材とを接続する第1接続構造を含み、
前記第1接続構造は、前記第1勾配梁の前記下端の第1端面に接触する第1金具を備え、
前記第1金具によって、前記第1勾配梁の下面が前記第1骨組部材の上面よりも上に位置するように前記第1勾配梁と前記第1骨組部材とが接続され、
前記第1金具は、
前記第1端面に接触する第1接続面と、
前記第1骨組部材の上面に接触し、前記第1接続面に垂直に交わる第2接続面と、を含む
接続構造。
a first connection structure that connects a lower end of the first gradient beam and the first frame member;
The first connection structure includes a first metal fitting that contacts a first end surface of the lower end of the first gradient beam,
The first gradient beam and the first frame member are connected by the first metal fitting so that the lower surface of the first gradient beam is located above the upper surface of the first frame member ,
The first fitting is
a first connection surface in contact with the first end surface;
a second connection surface that contacts the upper surface of the first frame member and perpendicularly intersects with the first connection surface.
Connection structure.
前記第1接続面に、前記第1端面に形成されるスリットに挿入される第1接続部が形成される
請求項1に記載の接続構造。
A first connection portion is formed on the first connection surface to be inserted into a slit formed in the first end surface.
The connection structure according to claim 1 .
前記第2接続面に、前記第1骨組部材の上面に形成される挿通孔に挿入される第2接続部が形成される
請求項1に記載の接続構造。
A second connection portion is formed on the second connection surface to be inserted into an insertion hole formed in the upper surface of the first frame member.
The connection structure according to claim 1 .
前記第1勾配梁の上端と、前記第1骨組部材と平行に配置される第2骨組部材と、を接続する第2接続構造をさらに含み、
前記第2接続構造は、前記第1勾配梁の前記上端の第2端面に接触する第2金具を備え、
前記第2端面は、前記第1端面とは反対側の端面であって、
前記第2接続構造は、前記第2金具によって、前記第2端面の少なくとも一部が前記第2骨組部材の上面よりも上に位置するように、前記第1勾配梁と前記第2骨組部材とが接続される構造を含む
請求項1に記載の接続構造。
Further comprising a second connection structure connecting an upper end of the first gradient beam and a second frame member arranged parallel to the first frame member;
The second connection structure includes a second metal fitting that contacts a second end surface of the upper end of the first gradient beam,
The second end surface is an end surface opposite to the first end surface,
The connection structure according to claim 1, wherein the second connection structure includes a structure in which the first gradient beam and the second frame member are connected by the second metal fitting so that at least a portion of the second end face is positioned above an upper surface of the second frame member.
建築物の屋根であって、
請求項1から4のいずれか一項に記載の接続構造を備える
屋根。
A roof of a building,
A roof comprising the connection structure according to any one of claims 1 to 4 .
建築物の屋根であって、
第1骨組部材と、
前記第1骨組部材と平行に配置される第2骨組部材と、
前記第1骨組部材および前記第2骨組部材に接続される第1勾配梁と、
前記第1勾配梁と平行に配置される垂木と、を備え、
前記第1勾配梁の下端と前記第1骨組部材とを接続する接続構造を含み、
前記接続構造は、請求項1に記載の接続構造を含み、
前記第1勾配梁は、前記第1勾配梁の上面が前記垂木の下面よりも上に位置するように前記第1骨組部材および前記第2骨組部材に接続される
屋根。
A roof of a building,
A first frame member; and
a second frame member disposed parallel to the first frame member;
a first gradient beam connected to the first frame member and the second frame member;
A rafter disposed parallel to the first gradient beam;
a connection structure that connects a lower end of the first gradient beam and the first frame member;
The connection structure includes the connection structure according to claim 1 ,
the first gradient beam is connected to the first frame member and the second frame member such that an upper surface of the first gradient beam is located above a lower surface of the rafters.
前記第1勾配梁は、前記第1勾配梁の上面が、前記垂木の上面と同じ高さに位置するように、前記第1骨組部材および前記第2骨組部材に接続される
請求項6に記載の屋根。
The first gradient beam is connected to the first frame member and the second frame member such that the upper surface of the first gradient beam is located at the same height as the upper surface of the rafter.
7. The roof of claim 6 .
前記第1勾配梁に平行に配置される第2勾配梁をさらに備え、
前記第2勾配梁は、
前記第2勾配梁の上面が前記垂木の上面よりも下に位置するように前記第1骨組部材および前記第2骨組部材に接続される
請求項6または7に記載の屋根。
Further comprising a second gradient beam arranged parallel to the first gradient beam;
The second gradient beam is
The second gradient beam is connected to the first frame member and the second frame member such that the upper surface of the second gradient beam is located below the upper surface of the rafter.
A roof according to claim 6 or 7 .
前記第2勾配梁に交差するように配置され、かつ、前記第2勾配梁に支持されるけらば部材をさらに備える
請求項8に記載の屋根。
The second slope beam is disposed so as to intersect with the second slope beam, and the second slope beam is supported by the gable member.
9. The roof of claim 8 .
建築物の屋根であって、
第1骨組部材と、
前記第1骨組部材と平行に配置される第2骨組部材と、
前記第1骨組部材および前記第2骨組部材に接続される第1勾配梁と、
前記第1勾配梁と平行に配置される垂木と、
前記第1勾配梁に平行に配置される第2勾配梁と、
前記第2勾配梁に交差するように配置され、かつ、前記第2勾配梁に支持されるけらば部材と、を備え、
前記第1勾配梁は、前記第1勾配梁の上面が前記垂木の下面よりも上に位置するように前記第1骨組部材および前記第2骨組部材に接続され、
前記第2勾配梁は、前記第2勾配梁の上面が前記垂木の上面よりも下に位置するように前記第1骨組部材および前記第2骨組部材に接続され、
前記けらば部材は、前記けらば部材の上面が前記垂木の上面と面一に位置するように、配置される、
屋根。
A roof of a building,
A first frame member; and
a second frame member disposed parallel to the first frame member;
a first gradient beam connected to the first frame member and the second frame member;
A rafter arranged parallel to the first gradient beam ;
A second gradient beam arranged parallel to the first gradient beam;
A gable member is disposed so as to intersect with the second gradient beam and is supported by the second gradient beam,
The first gradient beam is connected to the first frame member and the second frame member such that an upper surface of the first gradient beam is located above a lower surface of the rafter;
The second gradient beam is connected to the first frame member and the second frame member such that an upper surface of the second gradient beam is located below an upper surface of the rafter;
The gable member is arranged so that the upper surface of the gable member is flush with the upper surface of the rafter.
roof.
JP2022130184A 2022-08-17 2022-08-17 Connecting structures and building roofs Active JP7533539B2 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2022130184A JP7533539B2 (en) 2022-08-17 2022-08-17 Connecting structures and building roofs
US19/103,663 US20260062916A1 (en) 2022-08-17 2023-08-15 Connection structure and roof of building
PCT/JP2023/029523 WO2024038858A1 (en) 2022-08-17 2023-08-15 Connection structure and roof of building
AU2023327428A AU2023327428A1 (en) 2022-08-17 2023-08-15 Connection structure and roof of building
GB2502363.1A GB2638878A (en) 2022-08-17 2023-08-15 Connection structure and roof of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022130184A JP7533539B2 (en) 2022-08-17 2022-08-17 Connecting structures and building roofs

Publications (2)

Publication Number Publication Date
JP2024027408A JP2024027408A (en) 2024-03-01
JP7533539B2 true JP7533539B2 (en) 2024-08-14

Family

ID=89941734

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022130184A Active JP7533539B2 (en) 2022-08-17 2022-08-17 Connecting structures and building roofs

Country Status (5)

Country Link
US (1) US20260062916A1 (en)
JP (1) JP7533539B2 (en)
AU (1) AU2023327428A1 (en)
GB (1) GB2638878A (en)
WO (1) WO2024038858A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001248258A (en) 1999-12-28 2001-09-14 Nippon Steel Corp Rafter joints in steel and wooden houses
JP2004218324A (en) 2003-01-16 2004-08-05 Sekisui House Ltd Roof structure and roof panel
JP2006241753A (en) 2005-03-01 2006-09-14 Grand Form:Kk Fastener
JP2016108890A (en) 2014-12-09 2016-06-20 株式会社エヌ・シー・エヌ Roof structure
JP2019065640A (en) 2017-10-04 2019-04-25 積水ハウス株式会社 Jig tool and laminated beam structure and construction method of laminated beam structure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2812488B2 (en) * 1989-05-18 1998-10-22 旭化成工業株式会社 How to attach a gradient beam
JP2902505B2 (en) * 1991-07-05 1999-06-07 旭化成工業株式会社 Roof base panel
JPH0518032A (en) * 1991-07-05 1993-01-26 Asahi Chem Ind Co Ltd Pent-roof construction for roof
JP2514578B2 (en) * 1993-06-25 1996-07-10 大和ハウス工業株式会社 Mansard roof hut structure and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001248258A (en) 1999-12-28 2001-09-14 Nippon Steel Corp Rafter joints in steel and wooden houses
JP2004218324A (en) 2003-01-16 2004-08-05 Sekisui House Ltd Roof structure and roof panel
JP2006241753A (en) 2005-03-01 2006-09-14 Grand Form:Kk Fastener
JP2016108890A (en) 2014-12-09 2016-06-20 株式会社エヌ・シー・エヌ Roof structure
JP2019065640A (en) 2017-10-04 2019-04-25 積水ハウス株式会社 Jig tool and laminated beam structure and construction method of laminated beam structure

Also Published As

Publication number Publication date
GB202502363D0 (en) 2025-04-02
JP2024027408A (en) 2024-03-01
WO2024038858A1 (en) 2024-02-22
US20260062916A1 (en) 2026-03-05
AU2023327428A1 (en) 2025-02-20
GB2638878A (en) 2025-09-03

Similar Documents

Publication Publication Date Title
JP7533539B2 (en) Connecting structures and building roofs
JP5142574B2 (en) Wooden building
JP7739980B2 (en) Fixtures and Buildings
JP7533540B2 (en) Connecting structures and building roofs
JP7711742B2 (en) Roof structure and building
JP4394310B2 (en) Roof structure of unit house
JP3735213B2 (en) Roof structure
JP7782609B1 (en) Building walls and structures
JP7747543B2 (en) balcony
JP7299797B2 (en) modular building
JP3887233B2 (en) Unit building
JP4507987B2 (en) Stiffening structure of sloped roof construction surface
JP7198672B2 (en) Bent beam and roof truss structure
JP2001107502A (en) Garret structure of unit building
JP5271783B2 (en) Connecting hardware and roof mounting structure
JPS61204450A (en) Floor panel
JP3936981B2 (en) Support structure of floor board in wooden building
JP2024124241A (en) Wooden pillar and beam joint structure
JP6581354B2 (en) building
JP3509252B2 (en) Balconi Handrail Base Frame
JPS594082Y2 (en) Structure of beams, external walls, and roof connections
JPH02272143A (en) Framework constructing mechanism in ridge section
JPH0351441A (en) Floor structure for industrialized housing
JPH0544493B2 (en)
JPH09125585A (en) Roof for unit type building

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230417

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240130

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240315

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240702

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240715

R150 Certificate of patent or registration of utility model

Ref document number: 7533539

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150