JP7535429B2 - Foundation structure, steel segment used in foundation structure, and construction method for foundation structure - Google Patents
[go: Go Back, main page]

JP7535429B2 - Foundation structure, steel segment used in foundation structure, and construction method for foundation structure - Google Patents

Foundation structure, steel segment used in foundation structure, and construction method for foundation structure Download PDF

Info

Publication number
JP7535429B2
JP7535429B2 JP2020173155A JP2020173155A JP7535429B2 JP 7535429 B2 JP7535429 B2 JP 7535429B2 JP 2020173155 A JP2020173155 A JP 2020173155A JP 2020173155 A JP2020173155 A JP 2020173155A JP 7535429 B2 JP7535429 B2 JP 7535429B2
Authority
JP
Japan
Prior art keywords
main
segment
foundation structure
steel
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020173155A
Other languages
Japanese (ja)
Other versions
JP2021076002A (en
Inventor
雄登 大場
馨 松岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
JFE Metal Products and Engineering Inc
Original Assignee
JFE Steel Corp
JFE Metal Products and Engineering Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp, JFE Metal Products and Engineering Inc filed Critical JFE Steel Corp
Publication of JP2021076002A publication Critical patent/JP2021076002A/en
Application granted granted Critical
Publication of JP7535429B2 publication Critical patent/JP7535429B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Description

本発明は、基礎構造物、基礎構造物に用いられる鋼製セグメント及び基礎構造物の施工方法に関する。 The present invention relates to a foundation structure, a steel segment used in the foundation structure, and a construction method for the foundation structure.

複数の鋼製のセグメントを用いて立坑など鉛直方向の埋設構造物を構築するセグメントの圧入工法が知られている。この工法においては、セグメントを沈設地点で周方向に連結して、リング体を組み立てて、圧入装置によってリング体を地中に圧入する。リング体の圧入後、リング体内部を掘削して排土し、その上にセグメントリングを増設するといった作業工程を所定の深度まで繰り返し、立坑、橋脚補強の土留め壁等の埋設構造物を地中に構築するものである(例えば、特許文献1参照)。 A segment press-in method is known in which multiple steel segments are used to construct buried vertical structures such as shafts. In this method, the segments are connected circumferentially at the sinking point, a ring body is assembled, and the ring body is pressed into the ground using a press-in device. After the ring body is pressed in, the inside of the ring body is excavated and soil is removed, and additional segment rings are added on top of it. This work process is repeated to a specified depth to construct buried structures such as shafts and retaining walls for reinforcing bridge piers in the ground (see, for example, Patent Document 1).

上記工法により構築された埋設構造物の底部は、基礎構造物として利用することができる。底部は、セグメントリングにより構成された埋設物構造物の内側に、地上又は内部で組み立てた鉄筋籠を設置し、鉄筋籠を含めてコンクリートを打設することにより構築される。鉄筋籠は、鉛直方向に延びて、周方向に所定の間隔をあけて設けられた複数の主筋と、複数の主筋を周方向に連結する複数の帯筋と、を有する。複数の帯筋は、鉛直方向に所定の間隔をあけて設けられている。 The bottom of a buried structure constructed by the above-mentioned method can be used as a foundation structure. The bottom is constructed by placing a reinforcing bar cage assembled above ground or inside the structure inside the buried structure composed of segment rings, and pouring concrete including the reinforcing bar cage. The reinforcing bar cage has a number of main bars extending vertically and arranged at a predetermined interval in the circumferential direction, and a number of tie bars connecting the main bars in the circumferential direction. The tie bars are arranged at a predetermined interval in the vertical direction.

特開2017-214722号公報JP 2017-214722 A

ところで、従来の埋設構造物の底部を基礎構造部として利用する場合、基礎として有効とみなされる部分は、コンクリート部分を含めて中心軸線からセグメントリングの内径の部分までである。鉄筋籠の径方向外側にある埋設構造物は、多量の鋼材を用いたセグメントにより構築されているにもかかわらず、基礎の有効径には含まれない。そのため、基礎構造部の完成後であっても基礎構造部としては扱われず、経済性の観点から改善の余地がある。 When using the bottom of a conventional buried structure as a foundation structure, the part considered effective as a foundation is from the central axis to the inner diameter of the segment ring, including the concrete part. The buried structure located radially outside the reinforcing bar cage is not included in the effective diameter of the foundation, even though it is constructed from segments using a large amount of steel. Therefore, even after the foundation structure is completed, it is not treated as a foundation structure, and there is room for improvement from an economic standpoint.

そこで本発明は、上記課題に鑑みてなされたものであり、鋼製セグメントを用いて基礎構造物を構築する場合の基礎構造物の有効断面としてみなすことができる部分を拡大する技術を提供することを目的とする。 The present invention was made in consideration of the above problems, and aims to provide a technology that expands the portion that can be considered as the effective cross section of a foundation structure when the foundation structure is constructed using steel segments.

上記課題を解決するために、本発明に係る基礎構造物は、複数の鋼製セグメントを長手方向及び短手方向に連結した筒状のセグメント構造体と、前記セグメント構造体の内側に設けられた中詰部と、前記セグメント構造体の軸線に沿って延びかつ前記軸線周りの周方向に所定の間隔をあけて配置され、前記セグメント構造体及び前記中詰部と一体化した複数の主筋と、を備えることを特徴とする。 In order to solve the above problems, the foundation structure according to the present invention is characterized by comprising a cylindrical segment structure in which multiple steel segments are connected in the longitudinal and lateral directions, a filler section provided inside the segment structure, and multiple main reinforcements that extend along the axis of the segment structure, are arranged at predetermined intervals in the circumferential direction around the axis, and are integrated with the segment structure and the filler section.

また、前記鋼製セグメントは、前記セグメント構造体の壁面を形成するプレートと、前記周方向に延びる前記プレートの縁に沿って立設された主桁と、を備え、前記主桁は、前記主筋を係止する係止部を有していてもよい。 The steel segment may also include a plate forming the wall surface of the segment structure and a main girder erected along the edge of the plate extending in the circumferential direction, and the main girder may have an engagement portion for engaging the main reinforcement.

また、前記鋼製セグメントとで前記主筋を挟んで当該主筋を支持する支持部を備えていてもよい。 The steel segment may also include a support section that supports the main reinforcement by sandwiching the main reinforcement between the steel segment.

また、前記支持部は、前記主筋を受容する受容部を有していてもよい。 The support portion may also have a receiving portion that receives the main reinforcement.

また、前記支持部は、前記鋼製セグメントに連結されていてもよい。 The support portion may also be connected to the steel segment.

また、前記主桁には、前記プレート及び前記主桁により画定された空間に前記中詰部を
充填する際に空気を抜く孔が形成されていてもよい。
The main girder may also be formed with a hole for venting air when filling the filled portion into the space defined by the plate and the main girder.

また、前記鋼製セグメントは、前記主桁間を延在し、前記周方向に所定の間隔をあけて設けられた複数の補剛材を有し、前記孔は、前記プレートと前記補剛材とがなす隅角部に対応する前記主桁の位置に形成されていてもよい。 The steel segment may also have a plurality of stiffeners extending between the main girders and spaced at predetermined intervals in the circumferential direction, and the holes may be formed at positions on the main girders that correspond to the corners formed by the plates and the stiffeners.

さらに、上記課題をするために、本発明に係る基礎構造物は、埋設方向に延びる軸線に沿って延在する筒状のセグメント構造体と、前記軸線に沿って延びかつ前記軸線周りの周方向に所定の間隔をあけて配置され、前記前記セグメント構造体と係合する複数の主筋と、を備え、前記セグメント構造体は、前記埋設方向及び前記周方向に連続的に連結され壁面を形成する複数の鋼製セグメントにより形成されており、前記鋼製セグメントは、前記セグメント構造体の外壁を形成する外側ピースと、前記セグメント構造体の内壁を形成する内側ピースと、を有し、前記外側ピースと前記内側ピースとの間に中詰部が設けられており、前記主筋、前記鋼製セグメント及び前記中詰部は互いに一体化していることを特徴とする。 Furthermore, in order to achieve the above object, the foundation structure according to the present invention comprises a cylindrical segment structure extending along an axis extending in the embedment direction, and a plurality of main reinforcements extending along the axis and arranged at predetermined intervals in the circumferential direction around the axis, engaging with the segment structure, the segment structure being formed of a plurality of steel segments continuously connected in the embedment direction and the circumferential direction to form a wall surface, the steel segments having an outer piece forming the outer wall of the segment structure and an inner piece forming the inner wall of the segment structure, a filler section being provided between the outer piece and the inner piece, and the main reinforcements, the steel segments, and the filler section being integrated with each other.

また、前記外側ピースは、外壁面を形成するプレートと、前記周方向に延在する前記プレートの縁に沿って立設された主桁と、を有し、前記内側ピースは、内壁面を形成するプレートと、前記周方向に延在する前記プレートの縁に沿って立設された主桁と、を有し、前記外側ピース及び前記内側ピースの少なくとも一方の前記主桁は、前記主筋を係止する係止部を有していてもよい。 The outer piece may have a plate forming an outer wall surface and a main girder erected along the edge of the plate extending in the circumferential direction, and the inner piece may have a plate forming an inner wall surface and a main girder erected along the edge of the plate extending in the circumferential direction, and the main girder of at least one of the outer piece and the inner piece may have an engagement portion that engages the main reinforcement.

また、前記鋼製セグメントは、前記外側ピースと前記内側ピースとを連結する連結ピースを有していてもよい。 The steel segment may also have a connecting piece that connects the outer piece and the inner piece.

さらに、上記課題を解決するために、本発明に係る基礎構造物に用いられる鋼製セグメントは、埋設方向に延びる軸線に沿って延在する筒状のセグメント構造体と、前記セグメント構造体の内側に設けられた中詰部と、前記軸線に沿って延びかつ前記軸線周りの周方向に所定の間隔をあけて配置され、前記セグメント構造体及び前記中詰部と一体化した複数の主筋と、を有する基礎構造物に用いられる鋼製セグメントであって、前記基礎構造物の外壁面を形成するプレートと、前記周方向に延在する前記プレートの縁に沿って立設された主桁と、を備え、前記主桁は、前記主筋を係止する係止部を有することを特徴とする。 Furthermore, in order to solve the above problems, the steel segment used in the foundation structure according to the present invention is a steel segment used in a foundation structure having a cylindrical segment structure extending along an axis extending in the embedment direction, a filler section provided inside the segment structure, and a plurality of main reinforcements extending along the axis and arranged at predetermined intervals in the circumferential direction around the axis, and integrated with the segment structure and the filler section, characterized in that the steel segment is provided with a plate forming the outer wall surface of the foundation structure, and a main girder erected along the edge of the plate extending in the circumferential direction, and the main girder has an engagement section for engaging the main reinforcements.

さらに、上記課題を解決するために、本発明に係る基礎構造物に用いられる鋼製セグメントは、埋設方向に延びる軸線に沿って延在する筒状のセグメント構造体と、前記軸線に沿って延びかつ前記軸線周りの周方向に所定の間隔をあけて配置され、前記セグメント構造体と係合する複数の主筋と、中詰部と、を有する前記基礎構造物に用いられる鋼製セグメントであって、外壁を形成する外側ピースと、前記外側ピースに連結され、前記基礎構造物の内壁を形成する内側ピースと、を備え、前記外側ピースは、前記基礎構造物の外壁面を形成するプレートと、前記周方向に延在する前記プレートの縁に沿って立設された主桁と、を有し、前記内側ピースは、前記基礎構造物の内壁面を形成するプレートと、前記周方向に延在する前記プレートの縁に沿って立設された主桁と、を有し、前記外側ピース及び前記内側ピースの少なくとも一方の前記主桁は、前記主筋を係止する係止部を有し、前記中詰部は、前記外側ピースと前記内側ピースとの間に設けられていることを特徴とする。 Furthermore, in order to solve the above problem, the steel segment used in the foundation structure according to the present invention has a cylindrical segment structure extending along an axis extending in the embedding direction, a plurality of main reinforcements extending along the axis and arranged at a predetermined interval in the circumferential direction around the axis, engaging with the segment structure, and a filler section, and is characterized in that it comprises an outer piece forming an outer wall, and an inner piece connected to the outer piece and forming the inner wall of the foundation structure, the outer piece having a plate forming the outer wall surface of the foundation structure and a main girder erected along the edge of the plate extending in the circumferential direction, the inner piece having a plate forming the inner wall surface of the foundation structure and a main girder erected along the edge of the plate extending in the circumferential direction, the main girder of at least one of the outer piece and the inner piece has an engagement section for engaging the main reinforcement, and the filler section is provided between the outer piece and the inner piece.

さらに、上記課題を解決するために、本発明に係る基礎構造物の施工方法は、複数の鋼製セグメントを長手方向及び短手方向に連結してセグメント構造体を構築する工程と、前記セグメント構造体の軸線方向に沿って主筋を構築する工程と、前記セグメント構造体の内側に中詰材を打設して前記セグメント構造体及び前記主筋と一体化する工程と、を有することを特徴とする。 Furthermore, in order to solve the above problems, the construction method for foundation structures according to the present invention is characterized by having a step of constructing a segment structure by connecting multiple steel segments in the longitudinal and lateral directions, a step of constructing main reinforcement along the axial direction of the segment structure, and a step of pouring filler material inside the segment structure to integrate it with the segment structure and the main reinforcement.

本発明により、鋼製セグメントを用いて基礎構造物を構築する場合の有効断面としてみなすことができる部分を拡大することができる。 This invention makes it possible to expand the area that can be considered as the effective cross section when constructing a foundation structure using steel segments.

本発明に係る基礎構造物を基礎とした橋脚及び床版を示す概略図である。FIG. 2 is a schematic diagram showing a bridge pier and deck based on the foundation structure according to the present invention. 基礎構造物の平面図である。FIG. 鋼製セグメントの平面図である。FIG. 鋼製セグメントを内側から見た正面図である。FIG. 4 is a front view of the steel segment as seen from the inside. 鋼製セグメントの斜視図である。FIG. 連結機構の構成を説明する斜視図である。FIG. 4 is a perspective view illustrating a configuration of a connecting mechanism. 基礎構造物の構成を説明する部分断面図である。FIG. 2 is a partial cross-sectional view illustrating a configuration of a foundation structure. セグメント構造体を構築した後の基礎構造物を構築する施工方法を説明する図である。13A and 13B are diagrams illustrating a construction method for constructing a foundation structure after constructing a segment structure. 従来の基礎構造物の有効断面と、基礎構造物の有効断面とを比較する図である。FIG. 1 is a diagram comparing the effective cross section of a conventional foundation structure with the effective cross section of a foundation structure. 第2の実施の形態における基礎構造物の部分断面斜視図である。FIG. 11 is a partial cross-sectional perspective view of a substructure according to a second embodiment. 第3の実施の形態における鋼製セグメントの平面図である。FIG. 13 is a plan view of a steel segment according to a third embodiment. 第3の実施の形態におけるセグメント構造体を構築した後の基礎構造物を構築する施工方法を説明する図である。13A to 13C are diagrams illustrating a construction method for constructing a foundation structure after constructing a segment structure in the third embodiment. 第4の実施の形態における鋼製セグメントと支持部との関係を示す図である。FIG. 13 is a diagram showing the relationship between the steel segments and the support portion in the fourth embodiment. 第4の実施の形態における支持部の平面図である。FIG. 13 is a plan view of a support portion according to the fourth embodiment. 第4の実施の形態におけるセグメント構造体を構築した後の基礎構造物を構築する施工方法を説明する図である。13A to 13C are diagrams illustrating a construction method for constructing a foundation structure after constructing a segment structure in the fourth embodiment. 第4の実施の形態における基礎構造物の平面図である。FIG. 13 is a plan view of a substructure in a fourth embodiment. 変形例に係る鋼製セグメントの斜視図である。FIG. 11 is a perspective view of a steel segment according to a modified example. 変形例に係る鋼製セグメントを上下に重ねた状態を示す概略図である。FIG. 11 is a schematic diagram showing a state in which steel segments according to a modified example are stacked one on top of the other.

以下に、本発明の実施の形態について、図面を参照しながら説明する。
本発明に係る基礎構造物は、地上の建築物の基礎となるものであり、例えば、橋脚の基礎(土台)となる。基礎構造物は、鉄筋コンクリート構造物として地盤に埋設される。なお、本発明に係る基礎構造物が基礎として適用される建築物は、橋脚に限られず、高層ビルや集合住宅であってもよく、特に限定されない。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
The foundation structure according to the present invention is a foundation for a building on the ground, for example, a foundation (base) for a bridge pier. The foundation structure is buried in the ground as a reinforced concrete structure. Note that the building for which the foundation structure according to the present invention is applied as a foundation is not limited to a bridge pier, and may be a high-rise building or an apartment building, and is not particularly limited.

1.第1の実施の形態
図1は、本発明の第1の実施の形態に係る基礎構造物1を基礎とした橋脚100及び床版110を示す概略図である。橋脚100に支持されている床版110は、例えば、自動車、電車等の車両が走行し、車両の荷重が直接かかる部分である。なお、以下では、説明の便宜上、基礎構造物1の中心線を軸線xとする。軸線xに沿って基礎構造物1が埋設される方向を埋設方向Aとし、軸線x周りの方向を周方向Cとする。
1. First embodiment Fig. 1 is a schematic diagram showing a pier 100 and a deck 110 based on a foundation 1 according to a first embodiment of the present invention. The deck 110 supported by the pier 100 is a portion on which vehicles such as automobiles and trains run and on which the load of the vehicles is directly applied. For convenience of explanation, the center line of the foundation 1 will be referred to as the axis x in the following description. The direction in which the foundation 1 is embedded along the axis x will be referred to as the embedding direction A, and the direction around the axis x will be referred to as the circumferential direction C.

<基礎構造物>
基礎構造物1は、橋脚100の下側に構築されている。基礎構造物1は、例えば、円柱状に形成されている。基礎構造物1は、筒状に形成されたセグメント構造体10と、中詰部20と、主筋30と、を備える。
<Foundation structure>
The foundation 1 is constructed below the pier 100. The foundation 1 is formed, for example, in a cylindrical shape. The foundation 1 includes a segment structure 10 formed in a cylindrical shape, a filler portion 20, and main reinforcement bars 30.

[セグメント構造体]
セグメント構造体10は、埋設方向Aに沿って延びる軸線xに沿って延在する。セグメント構造体10は、埋設方向A及び周方向Cに連続的に連結され、基礎構造物1を構築する際の土留壁を形成すると共に、中詰部20を構築する際のコンクリート型枠を形成する複数の鋼製セグメント40により形成されている。
[Segment structure]
The segment structure 10 extends along an axis x that extends along an embedding direction A. The segment structure 10 is formed of a plurality of steel segments 40 that are continuously connected in the embedding direction A and the circumferential direction C and form an earth retaining wall when constructing the foundation structure 1, and also form a concrete formwork when constructing the filled portion 20.

図2は、基礎構造物1の平面図である。基礎構造物1のセグメント構造体10は、軸線xに沿って埋設方向Aに連結された複数のリング体(環状体)11を有する。すなわち、セグメント構造体10の軸線xに沿った方向は、埋設方向Aと一致する。基礎構造物1においてリング体11は、互いに周方向Cに環状に連結された複数の鋼製セグメント40を有しており、基礎構造物1の帯筋を代替する帯筋代替部として機能する。すなわち、リング体11は、埋設方向Aに複数連結されることで基礎構造物1を構成すると共に、各リング体11に本来設けられる帯筋の代わりとなる。したがって、帯筋を代替するリング体11は、主筋30に交差する方向(埋設方向Aに直交する基礎構造物1の横断面方向)に沿って配置されている。軸線xに沿って上下方向(埋設方向A)に隣接するリング体11において、上方のリング体11の各鋼製セグメント40と下方のリング体11の各鋼製セグメント40とは、周方向Cにおける端部がそれぞれ周方向Cにずらされて千鳥状に配置されている。周方向Cに連結する鋼製セグメント40の数は、構築する基礎構造物1の大きさ(外径)に基づいて適宜変更される。 2 is a plan view of the substructure 1. The segment structure 10 of the substructure 1 has a plurality of ring bodies (annular bodies) 11 connected in the embedding direction A along the axis x. That is, the direction along the axis x of the segment structure 10 coincides with the embedding direction A. In the substructure 1, the ring bodies 11 have a plurality of steel segments 40 connected to each other in an annular shape in the circumferential direction C, and function as tie bar substitutes that substitute for the tie bars of the substructure 1. That is, the ring bodies 11 constitute the substructure 1 by being connected in the embedding direction A in multiple numbers, and also substitute for the tie bars originally provided in each ring body 11. Therefore, the ring bodies 11 that substitute for the tie bars are arranged along a direction that intersects with the main reinforcement 30 (the cross-sectional direction of the substructure 1 that is perpendicular to the embedding direction A). In the ring bodies 11 adjacent to each other in the vertical direction (embedding direction A) along the axis x, the steel segments 40 of the upper ring body 11 and the steel segments 40 of the lower ring body 11 are arranged in a staggered pattern with their ends in the circumferential direction C shifted in the circumferential direction C. The number of steel segments 40 connected in the circumferential direction C is changed appropriately based on the size (outer diameter) of the foundation structure 1 to be constructed.

図3は、リング体11を構成する鋼製セグメント40の平面図である。図4は、鋼製セグメント40を内側から見た正面図である。図5は、鋼製セグメント40の斜視図である。図6は、連結機構の構成を説明する斜視図である。帯筋を代替するリング体11は、複数の鋼製セグメント40と、連結機構50と、を備える。 Figure 3 is a plan view of the steel segments 40 that make up the ring body 11. Figure 4 is a front view of the steel segments 40 as seen from the inside. Figure 5 is a perspective view of the steel segments 40. Figure 6 is a perspective view explaining the configuration of the connecting mechanism. The ring body 11, which replaces the hoops, comprises multiple steel segments 40 and a connecting mechanism 50.

(鋼製セグメント)
鋼製セグメント40は、鋼材により形成されている。鋼製セグメント40は、プレート41と、主桁42と、継手部43と、リブ(補剛材)44と、を有する。鋼製セグメント40において、プレート41、主桁42及び継手部43により、中詰部20を形成するコンクリートを充填する充填空間Sが画定されている。なお、主桁42、継手部43、リブ44は、いずれもプレート41に溶接によって接合されていてもよいし、一部がプレート41と一体に形成されていてもよい。
(Steel segments)
The steel segment 40 is formed of steel material. The steel segment 40 has a plate 41, a main girder 42, a joint portion 43, and a rib (stiffener) 44. In the steel segment 40, a filling space S into which concrete that forms the core portion 20 is filled is defined by the plate 41, the main girder 42, and the joint portion 43. Note that the main girder 42, the joint portion 43, and the rib 44 may all be joined to the plate 41 by welding, or a portion of each of them may be formed integrally with the plate 41.

プレート41は、基礎構造物1、具体的にはセグメント構造体10の外壁面を形成する。プレート41は、平面視矩形状に形成されている。プレート41は、円弧状に湾曲して形成されている。なお、プレート41の曲率は、構築する基礎構造物1の大きさに基づいて決定される。 The plate 41 forms the outer wall surface of the substructure 1, specifically the segment structure 10. The plate 41 is formed in a rectangular shape when viewed from above. The plate 41 is formed to be curved in an arc. The curvature of the plate 41 is determined based on the size of the substructure 1 to be constructed.

主桁42は、周方向Cに沿って延びるプレート41の2つの端縁(短手方向端縁)にそれぞれ立設されている。主桁42は、プレート41に沿って湾曲して形成されている。主桁42は、プレート41に対して略直角を成しており、プレート41の内面に立設されている。主桁42は、リング体11が上下方向に重ねられた場合、上下方向のリング体11の鋼製セグメント40を向く。一の主桁42は、地上側に位置する縁に設けられている。他の主桁42は、地中側に位置する縁に設けられている。 The main girders 42 are erected on two edges (short edges) of the plate 41 extending along the circumferential direction C. The main girders 42 are curved along the plate 41. The main girders 42 are approximately perpendicular to the plate 41 and erected on the inner surface of the plate 41. When the ring bodies 11 are stacked in the vertical direction, the main girders 42 face the steel segments 40 of the ring bodies 11 in the vertical direction. One main girder 42 is provided on the edge located on the aboveground side. The other main girder 42 is provided on the edge located underground.

各主桁42には、複数の孔42a,42b,42cが形成されている。
孔42aは、上下に隣接する他の鋼製セグメント40と連結するためのボルト等の連結具(図示せず)が挿通される連結用の孔である。孔42aは、例えば、円形状に形成されており、主桁42の厚さ方向(軸線xに沿った方向)に貫通している。孔42aは、連結具の横断面よりも若干大きな径を有するように形成されている(連結具の最外径+3~6mm程度)が、打設されるコンクリートが通過可能な大きさに形成する必要はない。もちろん、コンクリートに含まれる骨材が孔42aと連結具との間の隙間を通過できるような大きさとなるように孔42aを形成してもよい。なお、孔42aは、円形状に限らず、楕円状、長円状、矩形状に形成してもよく、その形状及び大きさは主桁42の設計強度を満たす範囲内で自由に変更可能である。
孔42aは、プレート41と主桁42との連結側に設けられている。孔42aは、主桁42の周方向Cにおける一端から他端に亘って、その延び方向において所定の間隔をあけて設けられている。軸線xに対向する各主桁42の孔42aは、互いに同軸となるように設けられている。
Each main girder 42 has a plurality of holes 42a, 42b, and 42c formed therein.
The hole 42a is a connecting hole through which a connecting tool (not shown) such as a bolt for connecting to other steel segments 40 adjacent above and below is inserted. The hole 42a is formed, for example, in a circular shape and penetrates the main girder 42 in the thickness direction (direction along the axis x). The hole 42a is formed to have a diameter slightly larger than the cross section of the connecting tool (approximately the outermost diameter of the connecting tool + 3 to 6 mm), but it is not necessary to form it in a size that allows the concrete to be poured to pass through. Of course, the hole 42a may be formed to have a size that allows the aggregate contained in the concrete to pass through the gap between the hole 42a and the connecting tool. The hole 42a is not limited to a circular shape, and may be formed in an elliptical, oval, or rectangular shape, and the shape and size of the hole 42a can be freely changed within a range that satisfies the design strength of the main girder 42.
The holes 42a are provided on the connection side between the plate 41 and the main girder 42. The holes 42a are provided at predetermined intervals in the extension direction of the main girder 42 from one end to the other end in the circumferential direction C. The holes 42a of each main girder 42 facing the axis x are provided so as to be coaxial with each other.

孔42bは、コンクリートを充填する際に充填空間Sから空気を抜く空気抜き用の孔であると共にコンクリートを流動させる孔である。孔42bは、例えば、円形状に形成されており、主桁42の厚さ方向(軸線xに沿った方向)に貫通している。孔42bは、空気だけでなく、コンクリートに含まれる骨材が通過できる大きさとなるように形成されている。なお、孔42bは、円形状に限らず、楕円状、長円状、矩形状に形成してもよく、その形状及び大きさは主桁42の設計強度を満たす範囲内で自由に変更可能である。具体的には、孔42bは、コンクリートの流入性の観点から、最小径はコンクリートに含まれる細骨材の最大サイズである10mmよりも大きく、最大径は主桁42の強度への影響の観点から主桁幅の1/3以下とすることが好ましい。
孔42bは、プレート41と主桁42との連結側に設けられている。孔42a及び孔42bは、軸線xを中心とした同じ仮想円上に形成されている。孔42bは、主桁42の周方向Cにおける一端から他端に亘って、リブ44の両近傍で孔42aと孔42aとの間に形成されている。すなわち、孔42bは、主桁42におけるリブ44との連結位置近傍に形成されている。さらに、孔42bは、主桁42の周方向Cにおける両端部近傍に形成されている。より具体的には、一部の孔42bは、主桁42における継手部43との連結位置と第2の継手部52(後述する)との連結位置とに挟まれた位置に形成されている。軸線xに対向する主桁42における孔42bは、互いに同軸上に設けられている。
The hole 42b is an air vent hole for venting air from the filling space S when filling the concrete, and also a hole for flowing the concrete. The hole 42b is formed, for example, in a circular shape and penetrates the main girder 42 in the thickness direction (direction along the axis x). The hole 42b is formed to have a size that allows not only air but also aggregate contained in the concrete to pass through. The hole 42b is not limited to a circular shape, and may be formed in an elliptical, oval, or rectangular shape, and the shape and size can be freely changed within a range that satisfies the design strength of the main girder 42. Specifically, from the viewpoint of the inflowability of concrete, it is preferable that the minimum diameter of the hole 42b is larger than 10 mm, which is the maximum size of fine aggregate contained in concrete, and the maximum diameter is 1/3 or less of the main girder width from the viewpoint of the influence on the strength of the main girder 42.
The hole 42b is provided on the connecting side between the plate 41 and the main girder 42. The holes 42a and 42b are formed on the same imaginary circle centered on the axis x. The holes 42b are formed between the holes 42a and 42a in the vicinity of both sides of the rib 44, from one end to the other end in the circumferential direction C of the main girder 42. That is, the holes 42b are formed in the vicinity of the connecting position of the main girder 42 with the rib 44. Furthermore, the holes 42b are formed in the vicinity of both ends in the circumferential direction C of the main girder 42. More specifically, some of the holes 42b are formed at a position sandwiched between the connecting position of the main girder 42 with the joint portion 43 and the connecting position of the second joint portion 52 (described later). The holes 42b in the main girder 42 facing the axis x are provided coaxially with each other.

孔42cは、複数の主筋30がそれぞれ挿通される複数の主筋用の孔であり、主筋30を係止する係止部として機能する。孔42cは、例えば、円形状に形成されており、主桁42の厚さ方向(軸線xに沿った方向)に貫通している。孔42cは、主筋の横断面よりも若干大きな径を有するように形成されている。具体的には、孔42cの最小径は、施工性の観点から、主筋30の最外径(公称直径+両側のリブ高さ)+片側1mm(余裕しろ)以上とすることが好ましく、孔42cの最大径は、主筋配置位置の精度の観点から、主筋30の最外径+片側10mm(かぶりの許容誤差±10mm、鉄筋の中心間隔の組み立て施工許容誤差は±20mm)とすることが好ましい。なお、主筋30をD19(公称径19.1mm)で長さ1300mmとし、孔42cを最小径の25.1mmとして(最大リブ高さ片側2mm、片側余裕しろ1mm)、実大の主桁42間の最大距離となる1200mmまでの範囲内で挿入試験を行ったところ、問題なく挿入できることを確認した。
ただし、孔42cは、打設されるコンクリートが通過可能な大きさに形成する必要はない。もちろん、コンクリートに含まれる骨材が孔42cと主筋との間の隙間を通過できるような大きさとなるように孔42cを形成してもよい。なお、孔42cは、円形状に限らず、楕円状、長円状、矩形状に形成してもよく、その形状及び大きさは主桁42の設計強度を満たす範囲内で自由に変更可能である。
孔42cは、孔42a及び孔42bが形成されている側とは反対の側、つまり、軸線xの側(プレート41との連結部とは反対側)の主桁42の縁部に設けられている。孔42cは、主桁42の周方向Cにおける一端から他端に亘って、所定の間隔をあけて設けられている。軸線xに対向する主桁42における孔42cは、互いに同軸上に設けられている。孔42cと孔42a及び孔42bとは、軸線xを中心とした互いに異なる仮想円上に形成されている。
The holes 42c are holes for a plurality of main reinforcements through which the plurality of main reinforcements 30 are inserted, and function as locking portions for locking the main reinforcements 30. The holes 42c are formed, for example, in a circular shape and penetrate the main girder 42 in the thickness direction (direction along the axis x). The holes 42c are formed to have a diameter slightly larger than the cross section of the main reinforcements. Specifically, from the viewpoint of workability, the minimum diameter of the holes 42c is preferably the outermost diameter of the main reinforcements 30 (nominal diameter + rib height on both sides) + 1 mm (margin) or more on one side, and the maximum diameter of the holes 42c is preferably the outermost diameter of the main reinforcements 30 + 10 mm on one side (allowable error of cover ±10 mm, allowable error of assembly work for the center spacing of the reinforcing bars ±20 mm) from the viewpoint of accuracy of the main reinforcement arrangement position. In addition, the main reinforcement 30 was set to D19 (nominal diameter 19.1 mm) and 1,300 mm in length, and the hole 42c was set to the minimum diameter of 25.1 mm (maximum rib height on one side 2 mm, margin on one side 1 mm). Insertion tests were conducted within a range of up to 1,200 mm, which is the maximum distance between the actual-size main girders 42, and it was confirmed that insertion could be performed without any problems.
However, the holes 42c do not need to be formed to a size that allows the concrete to pass through. Of course, the holes 42c may be formed to a size that allows the aggregate contained in the concrete to pass through the gap between the holes 42c and the main reinforcement. The holes 42c are not limited to a circular shape, and may be formed to an elliptical, oval, or rectangular shape, and the shape and size can be freely changed within a range that satisfies the design strength of the main girder 42.
The holes 42c are provided on the side opposite to the side where the holes 42a and 42b are formed, i.e., on the edge of the main girder 42 on the axis x side (opposite the connection portion with the plate 41). The holes 42c are provided at predetermined intervals from one end to the other end in the circumferential direction C of the main girder 42. The holes 42c in the main girder 42 facing the axis x are provided coaxially with each other. The holes 42c and the holes 42a and 42b are formed on different imaginary circles centered on the axis x.

継手部43は、周方向Cにおけるプレート41の各端部において軸線xに沿って延びる端縁(長手方向端縁)に設けられている。継手部43は、周方向Cにおける主桁42の端部において主桁42間を軸線xに沿って延びる。継手部43は、周方向Cにおいて隣接する他の鋼製セグメント40の継手部43と接触すると共に連結される。
継手部43は、プレート41から軸線xに向かって延びるようにプレート41の内面に立設されている。軸線xに沿って延びる継手部43の一端はプレート41に連結されており、他端は主桁42の内側の縁の手前まで延びている。軸線xに向かって延びる継手部43の縁は、それぞれ主桁42に連結されている。
継手部43には、軸線xに沿って所定の間隔をあけて、連結部51(図2参照)を挿通する複数の孔43aが軸線xに沿って二列に形成されている。
The joint portions 43 are provided on edges (longitudinal edges) extending along the axis x at each end of the plate 41 in the circumferential direction C. The joint portions 43 extend along the axis x between the main girders 42 at the ends of the main girders 42 in the circumferential direction C. The joint portions 43 come into contact with and are connected to the joint portions 43 of other steel segments 40 adjacent in the circumferential direction C.
The joint portion 43 is erected on the inner surface of the plate 41 so as to extend from the plate 41 toward the axis x. One end of the joint portion 43 extending along the axis x is connected to the plate 41, and the other end extends to just before the inner edge of the main girder 42. The edges of the joint portion 43 extending toward the axis x are each connected to the main girder 42.
The joint portion 43 has a plurality of holes 43a formed in two rows along the axis x at predetermined intervals, through which the connecting portions 51 (see FIG. 2) are inserted.

リブ44は、プレート41の内面において、軸線xに沿って2つの主桁42間を延びるように複数設けられている。リブ44は、鋼製セグメント40の周方向Cにおける各端部に設けられた継手部43の間で所定の間隔をあけて設けられている。リブ44は、プレート41から軸線xに向かって延びるように立設されている。軸線xに沿って延びるリブ44の一端は、プレート41に連結されており、他端は、主桁42の内側の縁の手前まで延びている。軸線xに向かって延びるリブ44の縁は、それぞれ主桁42に連結されている。
主桁42において各リブ44の周方向Cにおける両側にはそれぞれ孔42bが形成されている。孔42bは、リブ44とプレート41とにより形成される角部付近に形成されている。周方向Cにおいて最も外側にある孔42bは、継手部43と第2の継手部52(後述する)との間に形成されている。
A plurality of ribs 44 are provided on the inner surface of the plate 41 so as to extend between the two main girders 42 along the axis x. The ribs 44 are provided at predetermined intervals between the joint portions 43 provided at each end of the steel segment 40 in the circumferential direction C. The ribs 44 are erected so as to extend from the plate 41 toward the axis x. One end of the rib 44 extending along the axis x is connected to the plate 41, and the other end extends to just before the inner edge of the main girder 42. The edges of the rib 44 extending toward the axis x are each connected to the main girders 42.
In the main girder 42, holes 42b are formed on both sides of each rib 44 in the circumferential direction C. The holes 42b are formed near corners formed by the ribs 44 and the plates 41. The hole 42b located on the outermost side in the circumferential direction C is formed between the joint portion 43 and a second joint portion 52 (described later).

(連結機構)
図6に示すように、連結機構50は、連結部51と、第2の継手部52と、継手リブ53と、充填部54と、を備える。
連結部51は、継手部43及び第2の継手部52に挿通され、周方向(長手方向)に隣接する鋼製セグメント40同士を連結する。連結部51は、例えば、ボルト51aとナット51bにより構成されている。連結部51は、継手部43に形成された孔43aと第2の継手部52に形成された孔52aに挿通される。
第2の継手部52は、鋼製セグメント40の周方向Cにおける両端部近傍において、各継手部43に対して周方向Cに所定の間隔をあけて、継手部43と互いに平行に設けられている。第2の継手部52は、プレート41の内面に設けられており、当該内面から軸線xに向かって延びるように立設されている。軸線xに沿って延びる第2の継手部52の一端は、プレート41に連結されており、他端は、主桁42の内側の縁の手前まで延びている。軸線xに向かって延びる第2の継手部52の両端縁は、それぞれ主桁42に連結されている。
(Connecting mechanism)
As shown in FIG. 6 , the connecting mechanism 50 includes a connecting portion 51 , a second joint portion 52 , a joint rib 53 , and a filling portion 54 .
The connecting portion 51 is inserted through the joint portion 43 and the second joint portion 52, and connects the steel segments 40 adjacent in the circumferential direction (longitudinal direction) to each other. The connecting portion 51 is composed of, for example, a bolt 51a and a nut 51b. The connecting portion 51 is inserted through a hole 43a formed in the joint portion 43 and a hole 52a formed in the second joint portion 52.
The second joint portions 52 are provided in the vicinity of both ends in the circumferential direction C of the steel segment 40, at a predetermined interval in the circumferential direction C from each joint portion 43, and parallel to each other. The second joint portions 52 are provided on the inner surface of the plate 41 and stand so as to extend from the inner surface toward the axis x. One end of the second joint portion 52 extending along the axis x is connected to the plate 41, and the other end extends to just before the inner edge of the main girder 42. Both end edges of the second joint portion 52 extending toward the axis x are each connected to the main girder 42.

第2の継手部52には、軸線xに沿って所定の間隔をあけて、連結部51のボルト51aを挿通する複数の孔52aが形成されている。孔52aは、例えば、6つ形成されており、鋼製セグメント40の短手方向(埋設方向A)に沿って並んだ3つの孔52aが、鋼製セグメント40の厚さ方向に沿って二列にわたって形成されている。継手部43の孔43aと、第2の継手部52の孔52aとは、周方向Cにおいて互い
に対向した位置に設けられている。したがって、双方の孔43a,52aに挿通されるボルト51aも6つ設けられ、これらの6つのボルト51aとナット51bによって隣接する鋼製セグメント40が連結されている。
In the second joint portion 52, a plurality of holes 52a through which the bolts 51a of the connecting portion 51 are inserted are formed at predetermined intervals along the axis x. For example, six holes 52a are formed, and three holes 52a aligned along the short direction (embedding direction A) of the steel segment 40 are formed in two rows along the thickness direction of the steel segment 40. The hole 43a of the joint portion 43 and the hole 52a of the second joint portion 52 are provided at positions facing each other in the circumferential direction C. Therefore, six bolts 51a are also provided to be inserted into both holes 43a, 52a, and adjacent steel segments 40 are connected by these six bolts 51a and nuts 51b.

周方向Cに隣接する鋼製セグメント40を連結する場合、計4枚の継手部43,52の孔43a,52aのそれぞれに連結部51のボルト51aが挿通され、第2の継手部52の外側からボルト51aのそれぞれの端部にナット51bを螺合させる。このとき、ナット51bが各第2の継手部52に当接している。これにより、鋼製セグメント40は、周方向Cにおいて互いに連結される。
なお、頭部を有するボルト51aを用いる場合には、ボルト51aの頭部が一方の第2の継手部52に当接し、ナット51bが他方の第2の継手部52に当接すると共に、ボルト51aに螺合される。これにより、鋼製セグメント40は、周方向Cにおいて互いに連結される。
When connecting adjacent steel segments 40 in the circumferential direction C, the bolts 51a of the connecting portion 51 are inserted into the holes 43a, 52a of the four joint portions 43, 52, respectively, and nuts 51b are screwed onto the ends of the bolts 51a from the outside of the second joint portions 52. At this time, the nuts 51b are in contact with the second joint portions 52. In this way, the steel segments 40 are connected to each other in the circumferential direction C.
When the bolt 51a having a head is used, the head of the bolt 51a abuts against one of the second joint parts 52, and the nut 51b abuts against the other second joint part 52 and is screwed onto the bolt 51a. In this way, the steel segments 40 are connected to each other in the circumferential direction C.

継手リブ53は、周方向Cにおいて隣り合う継手部43と第2の継手部52との間に設けられている。継手リブ53は、軸線xに交差するように主桁42に対して平行に設けられている。各継手リブ53は、軸線xに沿って所定の間隔をあけて互いに平行に設けられている。より具体的には、各継手リブ53は、連結部51の各ボルト51a間において、ボルト51aの軸方向に沿って設けられている。各継手リブ53は、プレート41の内面に設けられており、当該内面から軸線xに向かって延びるように立設されている。各継手リブ53は、軸線xに交差する方向における一端が継手部43に連結され、他端が第2の継手部52に連結されている。
これにより、各継手リブ53は、継手部43と第2の継手部52とによって囲まれた空間V内を仕切っている。
The joint rib 53 is provided between the joint portion 43 and the second joint portion 52 adjacent to each other in the circumferential direction C. The joint rib 53 is provided parallel to the main girder 42 so as to intersect with the axis x. The joint ribs 53 are provided parallel to each other at a predetermined interval along the axis x. More specifically, the joint ribs 53 are provided between the bolts 51a of the connecting portion 51 along the axial direction of the bolts 51a. The joint ribs 53 are provided on the inner surface of the plate 41 and stand so as to extend from the inner surface toward the axis x. One end of each joint rib 53 in a direction intersecting the axis x is connected to the joint portion 43, and the other end is connected to the second joint portion 52.
As a result, each joint rib 53 divides the space V surrounded by the joint portion 43 and the second joint portion 52 .

充填部54は、プレート41、主桁42、継手部43、第2の継手部52によって囲まれた空間V内に設けられ、連結部51のボルト51aと一体化される。具体的に、充填部54は、コンクリートであり、空間V内に打設されて固化することにより、鋼製セグメント40及び連結機構50と一体化される。ここで、空間Vは継手リブ53によって仕切られており、空間Vは、複数の空間に分割されている。充填部54は、中詰部20を構築する際に打設されるコンクリートが空間V内に充填されることで形成される。 The filling section 54 is provided in the space V surrounded by the plate 41, the main girder 42, the joint section 43, and the second joint section 52, and is integrated with the bolt 51a of the connecting section 51. Specifically, the filling section 54 is made of concrete, and is integrated with the steel segment 40 and the connecting mechanism 50 by being poured into the space V and solidifying. Here, the space V is partitioned by the joint ribs 53, and the space V is divided into multiple spaces. The filling section 54 is formed by filling the space V with concrete poured when constructing the infill section 20.

ここで、隣接する孔43a,52aの間隔は、これらの孔43a,52aに挿通されるボルト51aのピッチ間隔が設計上帯筋として必要なピッチ間隔以下となるように形成する位置が決められる。具体的には、一般的な基礎構造物、言い換えると、セグメント構造体10が基礎構造物の一部として用いることができない場合において、基礎構造物の大きさや必要強度に基づいて設計された、主筋に巻き付けられる帯筋のピッチ間隔以下となるようにボルト51aの間隔も決められる。例えば、設計された帯筋のピッチ間隔が150mmである場合には、鋼製セグメント40を連結するボルト51aの中心間の間隔も150mm以下とする。
また、鋼製セグメント40の高さあたりにおけるボルト51aの断面積の総和が、当該高さあたりにおける帯筋の断面積の総和以上となるように、各ボルト51aの径、数量が選択される。例えば、帯筋の所定長さあたりにおけるD41(断面積1340mm)の帯筋の断面積の総和が5360mmである場合、M33(有効断面積694mm)の規格のボルト51aを用いる場合には、少なくとも8本以上のボルト51aを用いて鋼製セグメント40を連結する必要がある。
Here, the positions of the adjacent holes 43a, 52a are determined so that the pitch of the bolts 51a inserted through these holes 43a, 52a is equal to or smaller than the pitch required for the hoops in design. Specifically, in a general foundation, in other words, in a case where the segment structure 10 cannot be used as part of a foundation, the spacing of the bolts 51a is also determined so as to be equal to or smaller than the pitch of the hoops wound around the main reinforcement, which is designed based on the size and required strength of the foundation. For example, if the designed pitch of the hoops is 150 mm, the spacing between the centers of the bolts 51a connecting the steel segments 40 is also set to be equal to or smaller than 150 mm.
The diameter and the number of bolts 51a are selected so that the sum of the cross-sectional areas of the bolts 51a per height of the steel segment 40 is equal to or greater than the sum of the cross-sectional areas of the hoops per height. For example, when the sum of the cross-sectional areas of the D41 (cross-sectional area 1340 mm2 ) hoops per given length is 5360 mm2 , if bolts 51a conforming to the M33 (effective cross-sectional area 694 mm2 ) standard are used, it is necessary to connect the steel segments 40 using at least eight bolts 51a.

また、ボルト51aの強度(材料の降伏応力)が帯筋の強度(降伏応力)以上となるようにボルト51aの材質が選択される。例えば、帯筋にD41(降伏応力345N/mm)を用いる場合、M33(降伏応力480N/mm)の規格のボルト51aを用いる場合には、強度上も問題ないといえる。
ボルト51aは、M33よりも大きな規格のボルトを用いてボルト51aの使用本数を減らすことも可能であるが、ボルト51aが大きくなると締め付ける際に必要なトルクも大きくなるため、作業性が低下する。そこで、図6に示すように、セグメントの厚さ方向にボルト51aを複数配置する構造が好ましい。これにより、ボルト51aの締結作業の手間と、必要な締め付けトルクのバランスを考慮してボルト51aの大きさ、使用本数を決定することが可能となる。
なお、継手部43以外の部分では、プレート41と主桁42の断面積の和及び強度が設計上の帯筋の断面積の和及び強度以上となるように厚さや材質が決定される。
In addition, the material of the bolts 51a is selected so that the strength of the bolts 51a (yield stress of the material) is equal to or greater than the strength of the hoops (yield stress). For example, when using D41 (yield stress 345 N/ mm2 ) for the hoops, if the bolts 51a comply with the M33 (yield stress 480 N/ mm2 ) standard, there is no problem in terms of strength.
It is possible to reduce the number of bolts 51a used by using bolts with a larger standard than M33, but as the bolts 51a become larger, the torque required to tighten them also increases, reducing workability. Therefore, a structure in which multiple bolts 51a are arranged in the thickness direction of the segment, as shown in Figure 6, is preferable. This makes it possible to determine the size and number of bolts 51a to be used by taking into consideration the balance between the effort required to tighten the bolts 51a and the required tightening torque.
In addition, in parts other than the joint part 43, the thickness and material are determined so that the sum of the cross-sectional areas and strength of the plate 41 and the main girder 42 are greater than or equal to the sum of the cross-sectional areas and strength of the designed tie reinforcement.

[主筋]
主筋30は、例えば、鋼材により形成された鉄筋である。主筋30は、軸線xを中心とした所定の仮想円上に設けられている。主筋30は、埋設方向Aに沿って延び、周方向Cに所定の間隔をあけて設けられている。なお、セグメント構造体10において同じ箇所に設けられている主筋30は、軸線xに沿って延びる1本の鉄筋であってもよく、また、所定の長さを有する複数の鉄筋により形成されていてもよい。主筋30は、少なくともセグメント構造体10の地上側の上端から地中側の他端にわたって延びている。主筋30は、各鋼製セグメント40における孔42cに軸線xに沿って挿通されている。主筋30は、セグメント構造体10の内側に打設された中詰部20が固化することにより、鋼製セグメント40と一体に形成されている。
[Main reinforcement]
The main reinforcement 30 is, for example, a reinforcing bar made of steel. The main reinforcement 30 is provided on a predetermined imaginary circle centered on the axis x. The main reinforcement 30 extends along the embedding direction A and is provided at a predetermined interval in the circumferential direction C. The main reinforcement 30 provided at the same location in the segment structure 10 may be a single reinforcing bar extending along the axis x, or may be formed of a plurality of reinforcing bars having a predetermined length. The main reinforcement 30 extends at least from the upper end of the segment structure 10 on the aboveground side to the other end on the underground side. The main reinforcement 30 is inserted through the hole 42c in each steel segment 40 along the axis x. The main reinforcement 30 is formed integrally with the steel segment 40 by solidifying the filler portion 20 cast inside the segment structure 10.

[中詰部]
中詰部20は、リング体11を高さ方向に連結して形成された円筒状のセグメント構造体10の内側に設けられている。基礎構造物1において、鋼製セグメント40の内側は、中詰部20によって埋められており、鋼製セグメント40と一体に形成されている。
[Middle packing section]
The filler portion 20 is provided inside the cylindrical segment structure 10 formed by connecting the ring bodies 11 in the height direction. In the foundation structure 1, the inside of the steel segments 40 is filled with the filler portion 20 and is formed integrally with the steel segments 40.

<基礎構造物の構築方法>
次に、基礎構造物1の構築方法について説明する。基礎構造物1を構築する箇所に、例えば、油圧ジャッキ等によって構成された沈設装置(図示せず)を据え付ける。沈設装置は、環状の基礎構造物1の周方向Cにおいて複数箇所に設けられる。
<Method of constructing foundation structure>
Next, a description will be given of a method for constructing the foundation 1. An installation device (not shown) constituted by, for example, a hydraulic jack or the like is installed at a location where the foundation 1 is to be constructed. The installation devices are provided at a plurality of locations in the circumferential direction C of the annular foundation 1.

次いで、沈設装置の内側において鋼製セグメント40を周方向C(長手方向)に連結して環状のリング体11を形成する。リング体11を形成する際には、ボルト51aを継手部43及び第2の継手部52に挿通し、ナット51bにて締結する。さらに、リング体11の上で別のリング体11を形成して両者を連結する。この別のリング体11の上にさらに別のリング体11を形成して両者を連結する。リング体11の内側の地盤をクラムシェル(図示せず)により掘削する。リング体11を地中へ沈設するために必要な深さの掘削が終わると、掘削を止め、沈設装置によってリング体11の上面を地中に向けて押圧して、リング体11を地中に圧入する。 Then, inside the sinking device, the steel segments 40 are connected in the circumferential direction C (longitudinal direction) to form the annular ring body 11. When forming the ring body 11, the bolt 51a is inserted through the joint portion 43 and the second joint portion 52, and fastened with the nut 51b. Furthermore, another ring body 11 is formed on the ring body 11 to connect the two. Another ring body 11 is formed on this other ring body 11 to connect the two. The ground inside the ring body 11 is excavated using a clamshell (not shown). When the excavation is completed to the depth required to sink the ring body 11 into the ground, the excavation is stopped, and the sinking device is used to press the top surface of the ring body 11 toward the ground, pressing the ring body 11 into the ground.

次いで、沈設したリング体11の上側でさらに複数の別のリング体11を組み立てる。リング体11の内側の地盤をクラムシェルにより必要な深さだけ掘削し、リング体11を沈設装置によって地中に向けて押圧し、リング体11を地中に沈設する。この作業を所定の深さまで繰り返す。これにより、複数のリング体11が地中において軸線xに沿って連結された筒状のセグメント構造体10が構築される。上下に隣接するリング体11は、鋼製セグメント40の継手部43の位置が互いに周方向Cにずれて、鋼製セグメント40が千鳥状に配置されている。 Next, multiple other ring bodies 11 are assembled on top of the sunk ring body 11. The ground inside the ring body 11 is excavated to the required depth using a clamshell, and the ring body 11 is pressed into the ground using a sinking device to sink the ring body 11 into the ground. This process is repeated to the specified depth. In this way, a cylindrical segment structure 10 is constructed in which multiple ring bodies 11 are connected in the ground along the axis x. The joints 43 of the steel segments 40 of the vertically adjacent ring bodies 11 are offset from each other in the circumferential direction C, and the steel segments 40 are arranged in a staggered pattern.

次いで、セグメント構造体10の内側に満たされている地下水を水中ポンプ(図示せず)によって外部に排出する。次いで、地上側のリング体11における各鋼製セグメント40に、軸線xに沿って主筋30を挿入する。高さ方向に亘って圧入によりリング体11を地中に押し込む工法は、軸線xに沿った高さ方向における精度に極めて優れており、上下に重ねられたリング体11における鋼製セグメント40の孔42c同士の整合性は極めて高い。なお、主筋30は、所定の長さの鉄筋を複数本、セグメント構造体10の最上部のリング体11の同じ孔42cから挿入し、適宜、途中で連結してもよい。 Next, the groundwater filling the inside of the segment structure 10 is discharged to the outside by an underwater pump (not shown). Next, the main reinforcement 30 is inserted along the axis x into each steel segment 40 of the ring body 11 on the aboveground side. The method of forcing the ring body 11 into the ground by pressing it in the height direction is extremely accurate in the height direction along the axis x, and the holes 42c of the steel segments 40 of the ring bodies 11 stacked one on top of the other are highly consistent. Note that the main reinforcement 30 may be multiple reinforcing bars of a specified length inserted through the same holes 42c of the uppermost ring body 11 of the segment structure 10 and connected along the way as appropriate.

図7は、基礎構造物1の構成を説明する部分断面図である。図7において基礎構造物1は、左半分から右半分に移るに連れて完成度が高くなるように描画している。セグメント構造体10を設計上の高さにまで構築した後、図8(a)に示すように、周方向Cにおいて所定の本数の主筋30(鉄筋)を同じ孔42cに挿通する(図7の右側参照)。セグメント構造体10の高さに1本の主筋30で足りない場合には、複数本の主筋30を挿通して端部同士を溶接等により連結する。 Figure 7 is a partial cross-sectional view explaining the configuration of the foundation structure 1. In Figure 7, the foundation structure 1 is drawn so that the degree of completion increases from the left half to the right half. After the segment structure 10 is constructed to the designed height, as shown in Figure 8 (a), a predetermined number of main reinforcements 30 (reinforcing bars) are inserted into the same holes 42c in the circumferential direction C (see the right side of Figure 7). If one main reinforcement 30 is insufficient for the height of the segment structure 10, multiple main reinforcements 30 are inserted and the ends are connected by welding or the like.

全周に亘って、主筋30を設置した後、図8(b)に示すように、セグメント構造体10の内側に中詰部20を構成するコンクリートを段階的に打設する。打設されたコンクリートは、プレート41に向かって広がっていく。徐々に打設されていくコンクリートは、地上に向かって嵩を増していく。コンクリートは、孔42bから充填空間S内の空気を押し出ながら充填空間Sを埋めていく。そのため、基礎構造物1中に空気溜まりが形成されることを確実に防ぐことができる。
また、コンクリートは、セグメント構造体10の内側に開口しているプレート41、主桁42、継手部43、第2の継手部52によって囲まれた空間V内にも流れ込むので、コンクリートが固化した後は、充填部54として、連結部51のボルト51aと一体化される。これにより、隣接する鋼製セグメント40同士の連結が強固になる。
After the main reinforcement bars 30 have been installed around the entire periphery, concrete that will form the filled portion 20 is poured in stages inside the segment structure 10, as shown in Fig. 8(b). The poured concrete spreads toward the plate 41. The concrete that is gradually poured increases in volume toward the ground. The concrete fills the filled space S while pushing out the air in the filled space S through the holes 42b. This makes it possible to reliably prevent air pockets from forming in the foundation structure 1.
The concrete also flows into the space V surrounded by the plate 41, the main girder 42, the joint 43, and the second joint 52, which are open to the inside of the segment structure 10, and after the concrete hardens, it is integrated with the bolt 51a of the connecting portion 51 as the filling portion 54. This strengthens the connection between adjacent steel segments 40.

図8(c)に示すように、孔42cへの主筋30の挿通、コンクリートの打設を繰り返し、コンクリートをセグメント構造体10の上端にまで打設して中詰部20を形成する。これにより、主筋30及び鋼製セグメント40は、中詰部20を介して互いに一体化され、基礎構造物1が構築される。このとき、主筋30は、基礎構造物1(鉄筋コンクリート構造物)の主筋としての機能を発揮し、鋼製セグメント40が連結機構50によって連結されたリング体11は、基礎構造物1(鉄筋コンクリート構造物)の帯筋としての機能を発揮する。 As shown in FIG. 8(c), the main reinforcement 30 is inserted into the hole 42c and concrete is poured repeatedly until the concrete reaches the top end of the segment structure 10, forming the infilled section 20. As a result, the main reinforcement 30 and the steel segment 40 are integrated with each other via the infilled section 20, and the foundation structure 1 is constructed. At this time, the main reinforcement 30 functions as the main reinforcement of the foundation structure 1 (reinforced concrete structure), and the ring body 11 to which the steel segment 40 is connected by the connecting mechanism 50 functions as a tie bar of the foundation structure 1 (reinforced concrete structure).

鋼製セグメント40を圧入して基礎構造物1を構築する方法は、例えば、高架道路における橋脚100を補修等する場合に極めて適している。高架道路下では高さ方向の空間が制限されている。リング体11を構築して地中に圧入していく工法では、高さ方向における空間制限を受けることが小さい。なお、主筋30は、複数段のリング体11を地中に沈設する毎に挿通するようにしてもよい。 The method of constructing the foundation structure 1 by pressing in the steel segments 40 is extremely suitable, for example, when repairing the bridge piers 100 of an elevated road. The space in the vertical direction is limited under an elevated road. The method of constructing the ring body 11 and pressing it into the ground is less subject to spatial restrictions in the vertical direction. The main reinforcement 30 may be inserted each time multiple stages of the ring body 11 are sunk into the ground.

以上のような、基礎構造物1によれば、主筋30は鋼製セグメント40と直接的に係合し、かつ中詰部20を介して一体化されることにより、従来、基礎構造物として利用することができていなかったセグメント構造体10を基礎構造物の一部として利用することができる。
また、リング体11は、鋼製セグメント40を連結機構50にて連結しているので、鋼製セグメント40が連結されたリング体11を鉄筋コンクリート構造物の帯筋に代替して用いることができ、セグメント構造体10の継手部分の強度を大幅に高めることができる。これにより、従来は継手の強度が十分ではないために、基礎の一部として用いることができなかったセグメント構造体10を基礎構造物の一部として用いることができる。
また、鋼製セグメント40の連結が帯筋代替部の設置となるので、主筋に帯筋を設けるという手間のかかる工程を省くことができ、基礎構造物1の構築にかかる時間を短縮できる。
According to the foundation structure 1 as described above, the main reinforcement bars 30 are directly engaged with the steel segments 40 and are integrated via the filled portions 20, so that the segment structure 10, which could not be used as a foundation structure in the past, can be used as part of the foundation structure.
In addition, because the steel segments 40 are connected to the ring body 11 by the connecting mechanism 50, the ring body 11 to which the steel segments 40 are connected can be used in place of the hoops of a reinforced concrete structure, and the strength of the joints of the segment structure 10 can be significantly increased. This allows the segment structure 10, which could not be used as part of a foundation because the joint strength was not sufficient in the past, to be used as part of a foundation structure.
Furthermore, since the connection of the steel segments 40 constitutes the installation of alternative hoop reinforcement sections, the time-consuming process of providing hoop reinforcement to the main reinforcement can be omitted, and the time required to construct the foundation structure 1 can be shortened.

また、連結機構50は、引張力を受けた際の変形量が小さいほど、拘束力が高まり、帯筋としての機能を発揮する。ここで、コンクリートは、プレート41、主桁42、継手部43、第2の継手部52の各部材によって囲まれた空間Vに充填される。この空間Vに充填されたコンクリートは、各部材の拘束により変形が抑制されることとなり、高い強度を発現する。一方で、空間Vに充填されたコンクリートの剛性により、連結機構50の変形量を最小限に抑制することができる。すなわち、コンクリートによって形成される充填部54が連結機構50と一体になることで、引張力が作用した際の連結機構50の変形量を最小限に抑制できる。
また、連結機構50に空間Vを形成してコンクリートを充填し、当該コンクリートを拘束することで、鋼製セグメント40の連結強度を高めることができる。
In addition, the smaller the deformation amount of the connecting mechanism 50 when subjected to a tensile force, the higher the restraining force, and the greater the function of the hoop reinforcement. Here, concrete is filled into the space V surrounded by the members of the plate 41, the main girder 42, the joint portion 43, and the second joint portion 52. The concrete filled into this space V is restrained from deformation by the restraint of each member, and exhibits high strength. On the other hand, the rigidity of the concrete filled into the space V can minimize the deformation amount of the connecting mechanism 50. In other words, the filling portion 54 formed by the concrete is integrated with the connecting mechanism 50, and the deformation amount of the connecting mechanism 50 when a tensile force is applied can be minimized.
In addition, by forming a space V in the connecting mechanism 50 and filling it with concrete, and then restraining the concrete, the connecting strength of the steel segments 40 can be increased.

また、基礎構造物1においては、従来の鉄筋を交差させて帯筋を設ける構造に比べて強度がより高まる。また、鋼製セグメント40を用いることにより、従来のように主筋30に対して帯筋を軸線に沿って所定の間隔をあけて組み付ける必要がなくなり、基礎構造物1の構築に要する作業時間を大幅に減じることができる。 The foundation structure 1 also has greater strength than a conventional structure in which reinforcing bars are crossed to provide tie bars. Furthermore, by using the steel segments 40, it is no longer necessary to attach tie bars to the main reinforcement bars 30 at a specified interval along the axis, as was the case in the past, and the work time required to construct the foundation structure 1 can be significantly reduced.

基礎構造物1により、有効断面をリング体11の外径にまで拡大することができる。図9は、従来の基礎構造物の有効断面と、基礎構造物1の有効断面とを比較する図である。従来の基礎構造物200においては、環状に連結されたセグメント210の内側に配筋構造220が配置されていた。配筋構造220は、軸線xに沿って延びかつ周方向に所定の間隔を互いにあけて配置された複数の主筋221と、全主筋221を囲みかつ軸線xに沿って所定の間隔をあけて組み付けられた帯筋222とを有する。セグメント210と配筋構造220とは直接的に係合しておらず、基礎の有効径rにセグメント210まで含むことができなかった。そのため、セグメント210の部分を基礎の有効断面としてみなすことができなかった。つまり、従来の基礎構造物200において有効断面は、配筋構造220までしか考慮することができない。
同じ直径(断面)の基礎構造物を構築しようとした場合、従来の基礎構造物200は、セグメント210の分だけ外径が大きくなっており、基礎構造物200としてみなされない部分における材料(セグメント、コンクリート)コストが極めて嵩んでいた。
The foundation 1 allows the effective cross section to be expanded to the outer diameter of the ring body 11. FIG. 9 is a diagram comparing the effective cross section of a conventional foundation with that of the foundation 1. In the conventional foundation 200, a reinforcement structure 220 is arranged inside the segments 210 connected in an annular shape. The reinforcement structure 220 has a plurality of main reinforcements 221 extending along the axis x and arranged at a predetermined interval from each other in the circumferential direction, and hoops 222 surrounding all the main reinforcements 221 and assembled at a predetermined interval along the axis x. The segments 210 and the reinforcement structure 220 are not directly engaged with each other, and the effective diameter r of the foundation cannot include the segments 210. Therefore, the portion of the segments 210 cannot be considered as the effective cross section of the foundation. In other words, in the conventional foundation 200, the effective cross section can only be considered up to the reinforcement structure 220.
When attempting to construct a foundation of the same diameter (cross-section), the outer diameter of the conventional foundation 200 is larger by the amount of the segments 210, and the cost of materials (segments, concrete) for the parts not considered as the foundation 200 was extremely high.

これに対して、基礎構造物1によれば、鋼製セグメント40によるリング体11の外径まで基礎の有効径Rとして考慮することができる。そのため、例えば、従来の基礎構造物200と同じ大きさの有効断面を確保する場合、配筋構造220と同じ直径のセグメント構造体10を形成すればよく(r=R)、基礎構造物1を構築する場合の材料、施工面積を従来の基礎構造物200に比べて小さくすることができる。 In contrast, with the foundation structure 1, the outer diameter of the ring body 11 made of the steel segments 40 can be considered as the effective diameter R of the foundation. Therefore, for example, to ensure an effective cross-section of the same size as that of the conventional foundation structure 200, it is sufficient to form a segment structure 10 with the same diameter as the reinforcement structure 220 (r = R), and the materials and construction area required to construct the foundation structure 1 can be made smaller than those of the conventional foundation structure 200.

また、基礎構造物1においては、鋼製セグメント40の主桁42及び継手部43も帯筋として考慮することができるので、基礎構造物1全体は、極めて強度の高い基礎として利用することができる。
また、鋼製セグメント40及び連結機構50で本来設けられる帯筋を代替することができるので、基礎構造物1としての強度を下げずに、鋼材の使用量を大幅に削減することができる。
Furthermore, in the foundation 1, the main girders 42 and joints 43 of the steel segments 40 can also be considered as hoops, so that the entire foundation 1 can be used as a foundation with extremely high strength.
Furthermore, since the steel segments 40 and the connecting mechanisms 50 can replace the tie bars that are normally provided, the amount of steel used can be significantly reduced without reducing the strength of the foundation structure 1.

また、孔42cは、プレート41から所定の間隔だけ内側の位置で主桁42に確保している。一般的に基礎構造物において主筋の位置は目視で確認することができないため、主筋かぶりを、余裕をもって大きく確保することになる。これに対して、主桁42に主筋30が挿通される孔42cが形成されているので、主筋30の位置は設計上、一義的に決定することができる。そのため、主筋かぶりを小さくすることができ、例えば、同じ建築物に対する基礎構造物であっても、一般的な基礎構造物の直径よりも小さい直径の基礎構造物を構築することができる。また、主筋30を孔42cに挿通することにより、位置合わせの信頼性を向上させることができる。 In addition, the hole 42c is secured in the main girder 42 at a position a predetermined distance inward from the plate 41. In general, since the position of the main reinforcement cannot be visually confirmed in a foundation structure, a large amount of main reinforcement cover is secured with a margin. In contrast, since the hole 42c through which the main reinforcement 30 is inserted is formed in the main girder 42, the position of the main reinforcement 30 can be uniquely determined in the design. This allows the main reinforcement cover to be small, and for example, a foundation structure with a smaller diameter than that of a general foundation structure can be constructed, even for the same building. Furthermore, by inserting the main reinforcement 30 into the hole 42c, the reliability of alignment can be improved.

また、主桁42には孔42bが形成されている。従来、プレートとリブとにより形成される角部付近に空気溜まりが形成される傾向があった。空気溜まりにより鋼製セグメント40における充填空間Sがコンクリートにより完全に充填されていない。プレート41とリブ44とがなす角部に対応する主桁42の位置に孔42bが形成されているので、コンクリート打設時にプレート41の側に押しやられた空気は、孔42bを通じて確実に鋼製セグメント40の外側に排出される。これにより、鋼製セグメント40全体を基礎の有効断面として考慮することができる。 In addition, holes 42b are formed in the main girder 42. Conventionally, air pockets tended to form near the corners formed by the plates and ribs. Due to the air pockets, the filling space S in the steel segment 40 was not completely filled with concrete. Since holes 42b are formed in the main girder 42 at the positions corresponding to the corners formed by the plates 41 and ribs 44, air pushed toward the plate 41 during concrete pouring is reliably discharged to the outside of the steel segment 40 through the holes 42b. This allows the entire steel segment 40 to be considered as the effective cross section of the foundation.

また、連結機構50においては、中詰部20の形成のために打設したコンクリートを空間Vに導くことで鋼製セグメント40の連結を強固にすることができるので、空間Vに予め充填材を充填しておくことは必要ない。 In addition, in the connection mechanism 50, the connection between the steel segments 40 can be strengthened by directing the concrete poured to form the filled section 20 into the space V, so there is no need to fill the space V with a filler material in advance.

2.第2の実施の形態
次に、基礎構造物の第2の実施の形態について説明する。図10は、基礎構造物1Aの部分断面斜視図である。基礎構造物1Aは、筒状のセグメント構造体10Aと、複数の主筋30Aと、を備える。セグメント構造体10Aは、埋設方向Aに延びる軸線xに沿って延在する。主筋30Aは、軸線xに沿って延びかつ軸線x周りの周方向Cに所定の間隔をあけて配置され、セグメント構造体10Aと係合する。セグメント構造体10Aは、埋設方向A及び周方向Cに連続的に連結され壁面を形成する複数の鋼製セグメント40Aにより形成されている。製セグメント40Aは、セグメント構造体10Aの外壁を形成する外側ピース60と、セグメント構造体10Aの内壁を形成する内側ピース65と、を有する。外側ピース60と内側ピース65との間に中詰部80が設けられている。主筋30A、鋼製セグメント40A及び中詰部80は互いに一体化している。以下、基礎構造物1Aの構成について具体的に説明する。
2. Second embodiment Next, a second embodiment of the foundation structure will be described. FIG. 10 is a partial cross-sectional perspective view of the foundation structure 1A. The foundation structure 1A includes a cylindrical segment structure 10A and a plurality of main reinforcements 30A. The segment structure 10A extends along an axis x extending in the embedding direction A. The main reinforcements 30A extend along the axis x and are arranged at predetermined intervals in the circumferential direction C around the axis x, and engage with the segment structure 10A. The segment structure 10A is formed of a plurality of steel segments 40A that are continuously connected in the embedding direction A and the circumferential direction C to form a wall surface. The steel segments 40A have an outer piece 60 that forms the outer wall of the segment structure 10A, and an inner piece 65 that forms the inner wall of the segment structure 10A. A filler portion 80 is provided between the outer piece 60 and the inner piece 65. The main reinforcements 30A, the steel segments 40A, and the filler portion 80 are integrated with each other. The configuration of the substructure 1A will be specifically described below.

基礎構造物1Aは、セグメント構造体10Aと、中詰部80と、主筋30Aと、を備える。セグメント構造体10Aは、複数の鋼製セグメント40Aを周方向Cに連結した、帯筋を代替する帯筋代替部として機能する複数のリング体(一部のみ示す)11Aを有する。鋼製セグメント40Aは、外側ピース60と、内側ピース65と、連結ピース70と、を有する。外側ピース60は、基礎構造物1Aの外壁を形成する。内側ピース65は、基礎構造物1Aの内壁を形成する。連結ピース70は、外側ピース60と内側ピース65とを互いに連結する。 The foundation structure 1A comprises a segment structure 10A, a filler section 80, and main reinforcement 30A. The segment structure 10A has a number of ring bodies (only some of which are shown) 11A that connect a number of steel segments 40A in the circumferential direction C and function as hoop replacement sections that replace the hoop reinforcement. The steel segments 40A have an outer piece 60, an inner piece 65, and a connecting piece 70. The outer piece 60 forms the outer wall of the foundation structure 1A. The inner piece 65 forms the inner wall of the foundation structure 1A. The connecting piece 70 connects the outer piece 60 and the inner piece 65 to each other.

外側ピース60は、プレート61と、主桁62と、継手部63と、リブ(補剛材)64と、を有する。外側ピース60において、プレート61及び主桁62により、後述する中詰部80を形成するコンクリートを充填する際に充填空間S1が画定されている。プレート61は、基礎構造物1Aの外壁面を形成する。 The outer piece 60 has a plate 61, a main girder 62, a joint section 63, and a rib (stiffener) 64. In the outer piece 60, the plate 61 and the main girder 62 define a filling space S1 when filling with concrete that forms the filled section 80 described below. The plate 61 forms the outer wall surface of the foundation structure 1A.

主桁62は、周方向Cに延在するプレート61の縁に沿って立設されている。各主桁62には、複数の孔62a、孔62b及び孔62cが形成されている。孔62a、孔62b及び孔62cは、鋼製セグメント40Aの孔62a、孔62b及び孔62cと同じ構成及び機能を有する。なお、主桁62、継手部63及びリブ64は、鋼製セグメント40Aの主桁62、継手部63及びリブ64と同じ構成である。 The main girders 62 are erected along the edge of the plate 61 extending in the circumferential direction C. Each main girder 62 has a plurality of holes 62a, 62b, and 62c formed therein. The holes 62a, 62b, and 62c have the same structure and function as the holes 62a, 62b, and 62c of the steel segment 40A. The main girders 62, joint parts 63, and ribs 64 have the same structure as the main girders 62, joint parts 63, and ribs 64 of the steel segment 40A.

内側ピース65は、プレート66と、主桁67と、継手部68と、図面には見られないリブ(補剛材)と、を有する。内側ピース65において、プレート66及び主桁67により、中詰部80を形成するコンクリートを充填する際に充填空間(図示せず)が画定されている。プレート66は、基礎構造物1Aの内壁面を形成する。内側ピース65においてプレート66は、外側ピース60とは反対側の主桁67の縁に沿って設けられている。 The inner piece 65 has a plate 66, a main girder 67, a joint 68, and a rib (stiffener) not shown in the drawing. In the inner piece 65, the plate 66 and the main girder 67 define a filling space (not shown) when filling with concrete that forms the infill section 80. The plate 66 forms the inner wall surface of the foundation structure 1A. In the inner piece 65, the plate 66 is provided along the edge of the main girder 67 on the opposite side to the outer piece 60.

主桁67は、周方向Cに延在するプレート66の縁に沿って立設されている。各主桁67には、複数の孔67a、孔67b及び孔67cが形成されている。孔67a、孔67b及び孔67cは、鋼製セグメント40Aの孔67a、孔62b及び孔62cと同じ構成及び機能を有する。なお、主桁67、継手部68及びリブは、鋼製セグメント40の主桁42、継手部43及びリブ44と同じ構成である。 The main girders 67 are erected along the edge of the plate 66 extending in the circumferential direction C. Each main girder 67 has a plurality of holes 67a, 67b, and 67c formed therein. The holes 67a, 67b, and 67c have the same structure and function as the holes 67a, 62b, and 62c of the steel segment 40A. The main girders 67, joint parts 68, and ribs have the same structure as the main girders 42, joint parts 43, and ribs 44 of the steel segment 40.

周方向Cにおける鋼製セグメント40A同士は、連結機構(図示せず)により連結される。基礎構造物1Aにおける連結機構の構成は、基礎構造物1における連結機構50の構成と同じである。 The steel segments 40A in the circumferential direction C are connected to each other by a connecting mechanism (not shown). The configuration of the connecting mechanism in the foundation structure 1A is the same as the configuration of the connecting mechanism 50 in the foundation structure 1.

連結ピース70は、鋼製セグメント40Aのせん断強度を高める。連結ピース70は、外側ピース60と内側ピース65との間に複数設けられている。連結ピース70は、中詰部80と接合することで、外側ピース60及び内側ピース65との一体性を高める。 The connecting pieces 70 increase the shear strength of the steel segments 40A. Multiple connecting pieces 70 are provided between the outer piece 60 and the inner piece 65. The connecting pieces 70 are joined to the filling portion 80 to increase the unity between the outer piece 60 and the inner piece 65.

連結ピース70は、鋼製の棒材により形成されている。連結ピース70は、周方向Cに
おいて外側ピース60及び内側ピース65の両端部の間で外側ピース60及び内側ピース65を連結する。連結ピース70は、外側ピース60のリブ64及び内側ピース65のリブに架け渡されている。連結ピース70は、軸線xに沿った鋼製セグメント40Aの高さ方向において外側ピース60のリブ64及び内側ピース65のリブの上側端部と下側端部とにそれぞれ固定されている。
The connecting piece 70 is formed of a steel bar. The connecting piece 70 connects the outer piece 60 and the inner piece 65 between both ends of the outer piece 60 and the inner piece 65 in the circumferential direction C. The connecting piece 70 is bridged over the rib 64 of the outer piece 60 and the rib of the inner piece 65. The connecting piece 70 is fixed to the upper end and the lower end of the rib 64 of the outer piece 60 and the rib of the inner piece 65, respectively, in the height direction of the steel segment 40A along the axis x.

中詰部80は、外側ピース60と内側ピース65との間に設けられている。 The filling section 80 is provided between the outer piece 60 and the inner piece 65.

鋼製セグメント40Aにより基礎構造物1Aを構築する方法について説明する。基礎構造物1Aを構築する方法は、基礎構造物1を構築する方法とほぼ同じである。 The method for constructing the foundation structure 1A using steel segments 40A will be described. The method for constructing the foundation structure 1A is almost the same as the method for constructing the foundation structure 1.

鋼製セグメント40Aを周方向Cに連結して環状のリング体11Aを形成する。複数のリング体11Aを高さ方向に積み重ねて連結した後、リング体11Aの内側の地盤をクラムシェル(図示せず)により掘削する。リング体11Aを地中へ沈設するために必要な深さの掘削が終わると、掘削を止め、沈設装置によってリング体11Aの上面を地中に向けて押圧して、リング体11Aを地中に圧入する。 The steel segments 40A are connected in the circumferential direction C to form an annular ring body 11A. After stacking and connecting multiple ring bodies 11A in the vertical direction, the ground inside the ring body 11A is excavated using a clamshell (not shown). When the excavation is completed to the depth required to sink the ring body 11A into the ground, the excavation is stopped and the upper surface of the ring body 11A is pressed into the ground by the sinking device, pressing the ring body 11A into the ground.

この作業をセグメント構造体10Aの設計上の高さまで繰り返した後、セグメント構造体10Aの内側に満たされている地下水を水中ポンプ(図示せず)によっての外部に排出する。その後、周方向Cにおいて所定の本数の主筋30A(鉄筋)を同じ孔62cに挿通する(図10参照)。 This process is repeated until the segment structure 10A reaches its designed height, and then the groundwater filling the inside of the segment structure 10A is discharged to the outside using a submersible pump (not shown). After that, a predetermined number of main reinforcements 30A (reinforcing bars) are inserted into the same holes 62c in the circumferential direction C (see Figure 10).

全周に亘って、主筋30Aを設置した後、セグメント構造体10Aの外側ピース60と内側ピース65との間にコンクリートを打設する。打設されたコンクリートは、外側ピース60と内側ピース65との間を広がっていく。これにより、複数のリング体11Aが地中において軸線xに沿って連結された基礎構造物1Aが構築される。基礎構造物1Aは、内側ピース65の内側が空洞となる円筒状の構造物である。 After the main reinforcement 30A is installed around the entire circumference, concrete is poured between the outer piece 60 and the inner piece 65 of the segment structure 10A. The poured concrete spreads between the outer piece 60 and the inner piece 65. This creates a foundation structure 1A in which multiple ring bodies 11A are connected underground along the axis x. The foundation structure 1A is a cylindrical structure with a hollow inside the inner piece 65.

また、コンクリートの打設は段階的に行われてもよい。具体的には、所定の高さに重ねられた複数のリング体11Aを地中へ圧入した後に、圧入したリング体11Aにおいて外側ピース60及び内側ピース65それぞれの孔62c,67cに主筋30を挿通する。主筋30の挿通後、外側ピース60と内側ピース65との間にコンクリートを充填する。コンクリートの固化後、沈設したリング体11Aの上側でさらに複数の別のリング体11Aを組み立てる。リング体11Aの内側の地盤をクラムシェルにより必要な深さだけ掘削し、リング体11Aを沈設装置によって地中に向けて押圧し、リング体11Aを地中にさらに沈設する。 The concrete may also be poured in stages. Specifically, after multiple ring bodies 11A stacked to a predetermined height are pressed into the ground, the main reinforcement 30 is inserted into the holes 62c, 67c of the outer piece 60 and the inner piece 65 of the pressed-in ring body 11A. After the main reinforcement 30 is inserted, concrete is filled between the outer piece 60 and the inner piece 65. After the concrete has solidified, multiple other ring bodies 11A are assembled on top of the sunken ring body 11A. The ground inside the ring body 11A is excavated to the required depth using a clamshell, and the ring body 11A is pressed into the ground using a sinking device, and the ring body 11A is further sunken into the ground.

沈設後、主筋30を鋼製セグメント40Aに挿入し、主筋30の下端と、先に地中に埋設されていた鋼製セグメント40Aに挿入されている主筋30の上端とを連結する。次いで、外側ピース60と内側ピース65との間にコンクリートを充填する。この作業を所定の深さまで繰り返す。これにより、複数のリング体11Aが地中において軸線xに沿って連結された基礎構造物1Aが構築される。 After sinking, the main reinforcement 30 is inserted into the steel segment 40A, and the lower end of the main reinforcement 30 is connected to the upper end of the main reinforcement 30 inserted into the steel segment 40A that was previously buried in the ground. Next, concrete is filled between the outer piece 60 and the inner piece 65. This process is repeated to a specified depth. This completes the construction of the foundation structure 1A in which multiple ring bodies 11A are connected in the ground along the axis x.

以上のような、基礎構造物1Aによれば、上記実施の形態に係る基礎構造物1と同様の効果を奏する上に、主筋30は鋼製セグメント40Aと直接的に係合し、かつ中詰部80を介して一体化されることにより、従来、基礎構造物として利用することができていなかった鋼製のセグメント部分を基礎構造物の一部として利用することができる。 The foundation structure 1A described above provides the same effects as the foundation structure 1 according to the above embodiment, and the main reinforcement 30 directly engages with the steel segments 40A and is integrated via the filled section 80, allowing the steel segment portions that could not previously be used as part of the foundation to be used as part of the foundation.

鋼製セグメント40Aは、外側ピース60及び内側ピース65を有する構成となっているので大断面の基礎構造物1Aの施工に適している。鋼製セグメント40Aの外側ピース
60及び内側ピース65は、連結ピース70を介して互いに連結され、かつ、主筋30と鋼製セグメント40Aとは互いに係合している。したがって、多くの鋼材が基礎構造物1Aにおいて使用されており、基礎構造物1Aとしてより強度が高められている。
The steel segment 40A is suitable for construction of a large cross-section foundation 1A because it has an outer piece 60 and an inner piece 65. The outer piece 60 and the inner piece 65 of the steel segment 40A are connected to each other via a connecting piece 70, and the main reinforcement 30 and the steel segment 40A are engaged with each other. Therefore, a large amount of steel material is used in the foundation 1A, and the strength of the foundation 1A is increased.

3.第3の実施の形態
次に、基礎構造物の第3の実施の形態について説明する。第3の実施の形態における基礎構造物1Bが第1の実施の形態における基礎構造物1と異なる点は、主筋30を係止する主桁42の孔42cをなくして、切欠部に主筋30を係止する点であるため、以下では主桁について説明し、他の構成要素については、同一符号を付して説明を省略する。図11は、第3の実施の形態における鋼製セグメントの平面図である。
3. Third embodiment Next, a third embodiment of the foundation will be described. A foundation 1B in the third embodiment differs from the foundation 1 in the first embodiment in that the holes 42c in the main girders 42 for engaging the main reinforcements 30 are eliminated, and the main reinforcements 30 are engaged in the cutouts. Therefore, the following description will focus on the main girders, and the other components will be given the same reference numerals and will not be described. Figure 11 is a plan view of a steel segment in the third embodiment.

図11に示すように、鋼製セグメント40Bの主桁42Bは、第1の実施の形態における主桁42よりも幅が短く形成されている。具体的には、主桁42Bは、継手部43の幅と同じ幅に形成されており、継手部43よりも内側に張り出していない。
主桁42Bの周方向(長手方向)Cに沿った内側(長さが短い方)の縁部には、所定の間隔で切り欠かれた切欠部42Bcが形成されており、主筋30を係止する係止部として機能する。切欠部42Bcは、例えば、主筋30の配置間隔をあけて主桁42Bに形成されている。切欠部42Bcは、例えば、半円形状に形成されており、用いられる主筋30の半分程度が嵌り込むような大きさに形成されている。したがって、主筋30は、主桁42Bに挿通されることはなく、単に主筋30の一部が嵌め込まれるだけである。
11 , the main girder 42B of the steel segment 40B is formed to have a width shorter than that of the main girder 42 in the first embodiment. Specifically, the main girder 42B is formed to have the same width as the joint portion 43 and does not protrude inward beyond the joint portion 43.
The inner (shorter) edge of the main girder 42B along the circumferential direction (longitudinal direction) C has cutouts 42Bc cut out at predetermined intervals, which function as locking sections for locking the main reinforcements 30. The cutouts 42Bc are formed in the main girder 42B, for example, at intervals equal to the arrangement intervals of the main reinforcements 30. The cutouts 42Bc are formed, for example, in a semicircular shape, and are formed to a size such that about half of the main reinforcements 30 to be used can be fitted into them. Therefore, the main reinforcements 30 are not inserted into the main girder 42B, but only a portion of the main reinforcements 30 is fitted into them.

基礎構造物1Bを構築する際には、セグメント構造体10を設計上の高さにまで構築した後、図12(a)に示すように、周方向Cにおいて所定の本数の主筋30(鉄筋)を切欠部42Bcに嵌め込み、クリップや溶接等の手法により、主筋30を主桁42Bに固定する。セグメント構造体10の高さに1本の主筋30で足りない場合には、複数本の主筋30を切欠部42Bcに嵌め込んで端部同士を溶接等により連結する。 When constructing the foundation structure 1B, after constructing the segment structure 10 to the design height, a predetermined number of main reinforcements 30 (reinforcing bars) are fitted into the cutouts 42Bc in the circumferential direction C as shown in FIG. 12(a), and the main reinforcements 30 are fixed to the main girder 42B by a method such as clips or welding. If one main reinforcement 30 is insufficient for the height of the segment structure 10, multiple main reinforcements 30 are fitted into the cutouts 42Bc and the ends are connected together by welding or the like.

全周に亘って、主筋30を設置した後、図12(b)に示すように、セグメント構造体10の内側に中詰部20を構成するコンクリートを段階的に打設する。打設されたコンクリートは、孔42bから充填空間S内の空気を押し出ながら充填空間Sを埋めていく。
また、コンクリートは、空間V内にも流れ込むので、コンクリートが固化した後は、充填部54として、連結部51のボルト51aと一体化される。これにより、隣接する鋼製セグメント40B同士の連結が強固になる。
After the main reinforcement 30 has been installed around the entire periphery, as shown in Fig. 12(b), concrete that constitutes the filled portion 20 is poured stepwise inside the segment structure 10. The poured concrete fills the filling space S while pushing out the air in the filling space S through the holes 42b.
In addition, the concrete also flows into the space V, and after the concrete hardens, it is integrated with the bolts 51a of the connecting portions 51 as the filled portions 54. This strengthens the connection between the adjacent steel segments 40B.

図12(c)に示すように、切欠部42Bcへの主筋30の嵌め込み及び固定、コンクリートの打設を繰り返し、コンクリートをセグメント構造体10の上端にまで打設して中詰部20を形成する。これにより、主筋30及び鋼製セグメント40は、中詰部20を介して互いに一体化され、基礎構造物1Bが構築される。このとき、主筋30は、基礎構造物1B(鉄筋コンクリート構造物)の主筋としての機能を発揮し、鋼製セグメント40が連結機構50によって連結されたリング体11は、基礎構造物1B(鉄筋コンクリート構造物)の帯筋としての機能を発揮する。 As shown in FIG. 12(c), the main reinforcement 30 is inserted and fixed into the cutout 42Bc, and concrete is poured repeatedly until the concrete reaches the top of the segment structure 10 to form the infilled section 20. As a result, the main reinforcement 30 and the steel segment 40 are integrated with each other via the infilled section 20, and the foundation structure 1B is constructed. At this time, the main reinforcement 30 functions as the main reinforcement of the foundation structure 1B (reinforced concrete structure), and the ring body 11 to which the steel segment 40 is connected by the connecting mechanism 50 functions as a tie bar of the foundation structure 1B (reinforced concrete structure).

以上のような、基礎構造物1Bによれば、主筋30を配置する際には、主筋30の一部を切欠部42Bcに嵌め込んでクリップ等で留めるという簡単な作業で済むことになるため、第1の実施の形態のように、主筋30を主桁42の孔42cに順次挿通するという手間のかかる作業を省略することができ、作業効率を大幅に改善することができる。これにより、第1の実施の形態における基礎構造物1よりも施工期間を短縮することができる。また、コンクリートを充填する段階で主筋30の位置は固定されるので、主筋30を切欠部42Bcに嵌め込むだけでも主筋30の位置合わせの信頼性を向上させることができる。 As described above, with the foundation structure 1B, when placing the main reinforcement 30, it is a simple task of fitting a part of the main reinforcement 30 into the cutout 42Bc and fastening it with a clip or the like. This eliminates the time-consuming task of sequentially inserting the main reinforcement 30 into the holes 42c of the main girder 42 as in the first embodiment, and significantly improves work efficiency. This makes it possible to shorten the construction period compared to the foundation structure 1 in the first embodiment. In addition, since the position of the main reinforcement 30 is fixed at the stage of filling the concrete, the reliability of the alignment of the main reinforcement 30 can be improved simply by fitting the main reinforcement 30 into the cutout 42Bc.

4.第4の実施の形態
次に、基礎構造物の第4の実施の形態について説明する。第4の実施の形態における基礎構造物1Cが第3の実施の形態における基礎構造物1Bと異なる点は、主桁42Bの切欠部42Bcをなくして、鋼製セグメントとは別個の支持部によって主筋30を固定する点であるため、以下では相違点について説明し、他の構成要素については、同一符号を付して説明を省略する。図13は、第4の実施の形態における鋼製セグメントと支持部との関係を示す図である。図14は、第4の実施の形態における支持部の平面図である。
4. Fourth embodiment Next, a fourth embodiment of the foundation will be described. A foundation 1C in the fourth embodiment differs from the foundation 1B in the third embodiment in that the notch 42Bc in the main girder 42B is eliminated and the main reinforcement 30 is fixed by a support part separate from the steel segment. Therefore, the following will describe the difference, and other components will be given the same reference numerals and will not be described. Figure 13 is a diagram showing the relationship between the steel segments and the support parts in the fourth embodiment. Figure 14 is a plan view of the support parts in the fourth embodiment.

図13に示すように、主桁42Cは、第3の実施の形態における主桁42Bと同様に、第1の実施の形態における主桁42よりも幅が短く形成されている。具体的には、主桁42Cは、継手部43の幅と同じ幅に形成されており、継手部43よりも内側に張り出していない。主桁42Cには、主筋30を係止する孔や切欠部は形成されておらず、隣接する鋼製セグメントとの連結に用いられる連結用の孔42aと空気を抜く孔42bが形成されている。 As shown in FIG. 13, the main girder 42C, like the main girder 42B in the third embodiment, is formed with a width shorter than the main girder 42 in the first embodiment. Specifically, the main girder 42C is formed with the same width as the joint part 43 and does not protrude inward beyond the joint part 43. The main girder 42C does not have holes or notches for engaging the main reinforcement 30, but has a connection hole 42a used to connect to adjacent steel segments and an air vent hole 42b.

基礎構造物1Cは、鋼製セグメント40Cとで主筋30を挟んで当該主筋30を支持する支持部90を備える。支持部90は、主桁42Cの周方向Cに沿った内側の縁部に沿うように湾曲した板材から形成されている。支持部90は、主桁42Cの内側に配置され、鋼製セグメント40Cの主桁42Cに締結具(例えば、ボルト、ナット)を用いて連結される。なお、支持部90は、主桁42Cに限らず、プレート41、継手部43、リブ44等に連結されていてもよい。 The foundation structure 1C includes a support section 90 that supports the main reinforcement 30 by sandwiching the main reinforcement 30 between the steel segment 40C and the support section 90. The support section 90 is formed from a curved plate material that fits along the inner edge of the main girder 42C in the circumferential direction C. The support section 90 is disposed inside the main girder 42C and is connected to the main girder 42C of the steel segment 40C using fasteners (e.g., bolts and nuts). Note that the support section 90 is not limited to being connected to the main girder 42C, and may also be connected to the plate 41, the joint section 43, the rib 44, etc.

図14に示すように、支持部90は、鋼製セグメント40Cとで主筋30を挟んで当該主筋30を支持するものであり、本体部91と、受容部92と、連結部93と、を有する。
本体部91は、主桁42Cの周方向Cに沿うように、主桁42Cとほぼ同じ曲率を有するように形成されており、周方向C(長手方向)に沿った長さは一つの鋼製セグメント40Cの主桁42Cとほぼ同じ長さに形成されている。
受容部92は、主筋30を受容して係止する切欠部であり、本体部91の周方向(長手方向)Cに沿った外側(長さが長い膨出側)の縁部に所定の間隔で形成されている。受容部92は、例えば、主筋30の配置間隔をあけて本体部91に形成されている。受容部92は、例えば、半円形状に形成されており、用いられる主筋30の半分程度が嵌り込むような大きさに形成されている。したがって、主筋30は、支持部90に挿通されることはなく、単に主筋30の一部が嵌め込まれ、主筋30はクリップや溶接等により支持部90に固定される。
連結部93は、本体部91に設けられており、本体部91の周方向(長手方向)Cに沿った外側(長さが長い膨出側)に向けて突出して延びるように形成されている。連結部93の先端部には、締結具を挿通する孔が形成されており、締結具を連結部93の孔と主桁42Cの孔に挿通して締結することで支持部90を主桁42Cに連結することができる。本体部91の一端部には、隣接する支持部90と連結するための連結部93aが設けられている。なお、連結部93,93aは、本体部91に一体に形成されていてもよいし、本体部91とは別個の部材から形成されていてもよい。
As shown in FIG. 14 , the support portion 90 supports the main reinforcement 30 by sandwiching the main reinforcement 30 between the steel segment 40</b>C and the support portion 90 , and has a main body portion 91 , a receiving portion 92 , and a connecting portion 93 .
The main body 91 is formed to have approximately the same curvature as the main girder 42C so as to follow the circumferential direction C of the main girder 42C, and its length along the circumferential direction C (longitudinal direction) is formed to be approximately the same length as the main girder 42C of one steel segment 40C.
The receiving portions 92 are cutouts that receive and lock the main reinforcements 30, and are formed at predetermined intervals on the outer (longer bulging side) edge of the main body portion 91 along the circumferential direction (longitudinal direction) C. The receiving portions 92 are formed in the main body portion 91, for example, at intervals equal to the arrangement intervals of the main reinforcements 30. The receiving portions 92 are formed, for example, in a semicircular shape, and are formed in a size such that about half of the main reinforcements 30 to be used can be fitted into them. Therefore, the main reinforcements 30 are not inserted into the support portion 90, but rather a part of the main reinforcements 30 is simply fitted into them, and the main reinforcements 30 are fixed to the support portion 90 by clips, welding, or the like.
The connecting portion 93 is provided on the main body portion 91, and is formed so as to protrude and extend toward the outside (the bulging side having the longer length) along the circumferential direction (longitudinal direction) C of the main body portion 91. A hole through which a fastener is inserted is formed at the tip of the connecting portion 93, and the fastener can be inserted through the hole of the connecting portion 93 and the hole of the main girder 42C and fastened to connect the support portion 90 to the main girder 42C. A connecting portion 93a for connecting to the adjacent support portion 90 is provided at one end of the main body portion 91. The connecting portions 93, 93a may be formed integrally with the main body portion 91, or may be formed from a member separate from the main body portion 91.

基礎構造物1Cを構築する際には、セグメント構造体10を設計上の高さにまで構築した後、図15(a)に示すように、複数の主筋30が取り付けられた支持部90を鋼製セグメント40Cの主桁42Cに締結具を用いて連結する。ここで、支持部90の各受容部92には、予め工場等で主筋30を取り付けておくことが好ましい。受容部92に主筋30を取り付ける際には、主筋30を受容部92に嵌め込み、クリップや溶接等の手法により、主筋30を支持部90に固定する。支持部90は、主筋30の両端部において取り付けることが好ましいが、主筋30の長さに応じて3カ所以上に支持部90を取り付けてもよい。なお、支持部90に主筋30を取り付けず、単に、主桁42Cと支持部90とで主筋30を挟み込んで支持するようにしてもよい。 When constructing the foundation structure 1C, after constructing the segment structure 10 to the design height, as shown in FIG. 15(a), the support part 90 to which the multiple main reinforcements 30 are attached is connected to the main girder 42C of the steel segment 40C using fasteners. Here, it is preferable to attach the main reinforcements 30 to each receiving part 92 of the support part 90 in advance at a factory or the like. When attaching the main reinforcements 30 to the receiving parts 92, the main reinforcements 30 are fitted into the receiving parts 92 and fixed to the support part 90 by a method such as a clip or welding. It is preferable to attach the support part 90 to both ends of the main reinforcements 30, but the support part 90 may be attached to three or more places depending on the length of the main reinforcements 30. It is also possible to simply sandwich the main reinforcements 30 between the main girder 42C and the support part 90 without attaching the main reinforcements 30 to the support part 90.

全周に亘って、主筋30を設置した後、図15(b)に示すように、セグメント構造体10の内側に中詰部20を構成するコンクリートを段階的に打設する。打設されたコンクリートは、孔42bから充填空間S内の空気を押し出ながら充填空間Sを埋めていく。
また、コンクリートは、空間V内にも流れ込むので、コンクリートが固化した後は、充填部54として、連結部51のボルト51aと一体化される。これにより、隣接する鋼製セグメント40C同士の連結が強固になる。
After the main reinforcement 30 has been installed around the entire periphery, as shown in Fig. 15(b), concrete that constitutes the filled portion 20 is poured stepwise inside the segment structure 10. The poured concrete fills the filling space S while pushing out the air in the filling space S through the holes 42b.
In addition, the concrete also flows into the space V, and after the concrete hardens, it is integrated with the bolts 51a of the connecting portions 51 as the filled portions 54. This strengthens the connection between the adjacent steel segments 40C.

図15(c)に示すように、主筋30が取り付けられた支持部90の主桁42Cへの連結、コンクリートの打設を繰り返し、コンクリートをセグメント構造体10の上端にまで打設して中詰部20を形成する。これにより、主筋30及び鋼製セグメント40Cは、中詰部20を介して互いに一体化され、図16に示すような基礎構造物1Cが構築される。このとき、主筋30は、基礎構造物1C(鉄筋コンクリート構造物)の主筋としての機能を発揮し、鋼製セグメント40Cが連結機構50によって連結されたリング体11は、基礎構造物1C(鉄筋コンクリート構造物)の帯筋としての機能を発揮する。 As shown in FIG. 15(c), the support section 90 to which the main reinforcement 30 is attached is connected to the main girder 42C, and concrete is poured repeatedly until the concrete reaches the top end of the segment structure 10 to form the infill section 20. As a result, the main reinforcement 30 and the steel segment 40C are integrated with each other via the infill section 20, and the foundation structure 1C as shown in FIG. 16 is constructed. At this time, the main reinforcement 30 functions as the main reinforcement of the foundation structure 1C (reinforced concrete structure), and the ring body 11 to which the steel segment 40C is connected by the connecting mechanism 50 functions as a tie bar of the foundation structure 1C (reinforced concrete structure).

以上のような、基礎構造物1Cによれば、主筋30を配置する際には、予め支持部90に複数の主筋30を取り付けておき、支持部90を主桁42Cにクリップ等で留めるという簡単な作業で一度に複数の主筋30を主桁42Cに沿って配置することができるので、第1の実施の形態のように、主筋30を主桁42の孔42cに順次挿通するという手間のかかる作業を省略することができ、作業効率を大幅に改善することができる。これにより、第1の実施の形態における基礎構造物1よりも施工期間を短縮することができる。また、第3の実施の形態における基礎構造物1Bのように、主筋30を一本ずつ切欠部42Bcに嵌め込んで固定する必要もないので、第3の実施の形態における基礎構造物1Bよりも施工期間を短縮することができる。
また、主桁42C等の鋼製セグメント40C自体を加工する必要がないので、後施工に対応することができるようになり、施工中に設計変更があった場合でも、支持部90の受容部92の数や大きさを変更することにより、配置する主筋30の数や大きさを柔軟に変更することができる。
また、支持部90に複数の受容部92を形成しておくことで、支持部90に複数の主筋30を取り付けてユニット化することができ、当該ユニットを主桁42Cに連結することで一度に多くの主筋30を配置することができ、作業効率を大幅に改善することができる。
According to the foundation 1C as described above, when arranging the main reinforcements 30, a plurality of main reinforcements 30 can be arranged along the main girders 42C at once by a simple operation of attaching the plurality of main reinforcements 30 to the support parts 90 in advance and fastening the support parts 90 to the main girders 42C with clips or the like. This eliminates the need for a time-consuming operation of sequentially inserting the main reinforcements 30 into the holes 42c of the main girders 42 as in the first embodiment, and significantly improves the work efficiency. This allows the construction period to be shorter than that of the foundation 1 in the first embodiment. In addition, there is no need to fit and fix the main reinforcements 30 one by one into the notches 42Bc as in the foundation 1B in the third embodiment, so that the construction period can be shorter than that of the foundation 1B in the third embodiment.
Furthermore, since there is no need to process the steel segments 40C such as the main girders 42C themselves, it is possible to accommodate post-construction. Even if there are design changes during construction, the number and size of the main reinforcements 30 to be placed can be flexibly changed by changing the number and size of the receiving portions 92 of the support portions 90.
Furthermore, by forming multiple receiving portions 92 in the support portion 90, multiple main reinforcements 30 can be attached to the support portion 90 to form a unit, and by connecting the unit to the main girder 42C, many main reinforcements 30 can be placed at once, thereby greatly improving work efficiency.

以上、本発明の好適な実施の形態及び他の実施の形態について説明したが、本発明は上記の実施の形態及び他の実施の形態に限定されるものではなく、本発明の概念及び特許請求の範囲に含まれるあらゆる態様を含む。また、上述した課題及び効果の少なくとも一部を奏するように、上記実施の形態及び他の実施の形態の各構成を適宜選択的に組み合わせてもよい。また、例えば、上記実施の形態及び他の実施の形態における各構成要素の形状、材料、配置、サイズ等は、本発明の具体的使用態様によって適宜変更され得る。図17は、変形例に係る鋼製セグメント40Dの斜視図である。 Although the preferred embodiment and other embodiments of the present invention have been described above, the present invention is not limited to the above-mentioned embodiment and other embodiments, and includes all aspects included in the concept of the present invention and the scope of the claims. In addition, the configurations of the above-mentioned embodiment and other embodiments may be appropriately and selectively combined so as to achieve at least a part of the above-mentioned problems and effects. In addition, for example, the shape, material, arrangement, size, etc. of each component in the above-mentioned embodiment and other embodiments may be appropriately changed depending on the specific usage mode of the present invention. Figure 17 is a perspective view of a steel segment 40D relating to a modified example.

鋼製セグメント40Dは、プレート41Dと、主桁42Dと、継手部43Dと、リブ(補剛材)44Dと、第2の継手部52Dとを有する。鋼製セグメント40Dにおいて一対の主桁42Dのうち一(下側)の主桁42Dは、継手部43D及び第2の継手部52Dとの連結箇所を除いて、プレート41Dに向かって凹に形成された凹部45Dを有する。鋼製セグメント40Dにおいて主筋30が挿通される孔42Dcは、上側の主桁42Dにおいては周方向Cに沿って形成されているが、下側の主桁42Dにおいては周方向Cにおける端部にのみ形成されている。 The steel segment 40D has a plate 41D, a main girder 42D, a joint 43D, a rib (stiffener) 44D, and a second joint 52D. In the steel segment 40D, one (lower) of the pair of main girders 42D has a recess 45D recessed toward the plate 41D, except for the connection points with the joint 43D and the second joint 52D. In the steel segment 40D, the holes 42Dc through which the main reinforcement 30 is inserted are formed along the circumferential direction C in the upper main girder 42D, but are formed only at the ends in the circumferential direction C in the lower main girder 42D.

図18は、変形例に係る鋼製セグメント40Dを上下に重ねた状態を示す概略図である。鋼製セグメント40Dを用いてリング体を形成した場合、一方のリング体上に重ねられる他方のリング体は、それぞれの鋼製セグメント40Dの上側の主桁42Dにおいてのみ主筋30が挿通されている。下側の主桁42Dの凹部45Dの位置には、下側のリング体における鋼製セグメント40Dの上側の主桁42Dが位置している。鋼製セグメント40Dにより、鋼製セグメント40と同様の効果を奏しつつ、使用する鋼材の量を大幅に減じることができる。また、主筋30を挿通する孔42Dcの数を減らすことができるので、作業効率を向上させることができる。なお、鋼製セグメント40Dを、基礎構造物1Aに適用することもできる。 Figure 18 is a schematic diagram showing a state where steel segments 40D according to a modified example are stacked one on top of the other. When a ring body is formed using steel segments 40D, the main reinforcement 30 is inserted only in the upper main girder 42D of one ring body stacked on top of the other ring body of each steel segment 40D. The upper main girder 42D of the steel segment 40D in the lower ring body is located at the position of the recess 45D of the lower main girder 42D. The steel segment 40D can achieve the same effect as the steel segment 40, while significantly reducing the amount of steel material used. In addition, the number of holes 42Dc through which the main reinforcement 30 is inserted can be reduced, improving work efficiency. The steel segment 40D can also be applied to the foundation structure 1A.

上記の実施の形態において、鋼製セグメント40の主桁42に設けられている孔42cは、一の仮想円上に設けられていたが、主桁42に一の仮想円とは異なる径の他の仮想円を想定しさらに孔42cを設けてもよい。この場合、主筋30は、軸線xを中心として二重に設けられている。 In the above embodiment, the holes 42c in the main girder 42 of the steel segment 40 are provided on one imaginary circle, but the main girder 42 may be provided with another imaginary circle with a different diameter from the one imaginary circle. In this case, the main reinforcement 30 is provided in double with the axis x as the center.

また、他の実施の形態に係る鋼製セグメント40Aにおいて、主筋30Aは、外側ピース60及び内側ピース65のそれぞれに挿通されているが、外側ピース60又は内側ピース65に挿通されていてもよい。 In addition, in the steel segment 40A according to another embodiment, the main reinforcement 30A is inserted through each of the outer piece 60 and the inner piece 65, but may be inserted through either the outer piece 60 or the inner piece 65.

また、鋼製セグメント40,40Aの主桁42,62,67自体に主筋30が予め取り付けられていてもよい。高さ方向において隣接する鋼製セグメント40,40Aにおけるこれらの主筋30は、高さ方向において互いに連結する際に互いに接合すればよい。 The main reinforcements 30 may also be attached in advance to the main girders 42, 62, 67 of the steel segments 40, 40A themselves. The main reinforcements 30 of the steel segments 40, 40A adjacent in the height direction may be joined together when they are connected to each other in the height direction.

また、第4の実施の形態における支持部90を、第3の実施の形態において切欠部42Bcに嵌め込まれた主筋30の押さえとして用いてもよい。 The support portion 90 in the fourth embodiment may also be used to hold down the main reinforcement 30 fitted into the notch portion 42Bc in the third embodiment.

1 基礎構造物
10 セグメント構造体
11 リング体(帯筋代替部)
20 中詰部
30 主筋
40 鋼製セグメント
41 プレート
42 主桁
42c 孔(主筋がそれぞれ挿通される孔)
43 継手部
44 リブ(補剛材)
50 連結機構
51 連結部
52 第2の継手部
53 継手リブ
54 充填部
1A 基礎構造物
10A セグメント構造体
11A リング体(帯筋代替部)
30A 主筋
40A 鋼製セグメント
60 外側ピース
61 プレート
62 主桁
62c 孔
65 内側ピース
66 プレート
67 主桁
67c 孔
70 連結ピース
80 中詰部
1B 基礎構造物
40B 鋼製セグメント
42B 主桁
42Bc 切欠部
1C 基礎構造物
40C 鋼製セグメント
42C 主桁
90 支持部
91 本体部
92 受容部
93,93a 連結部
A 埋設方向
C 周方向
S,S1 充填空間(空間)
x 軸線
1 Foundation structure 10 Segment structure 11 Ring body (replacement for tie bar)
20 Filling section 30 Main reinforcement 40 Steel segment 41 Plate 42 Main girder 42c Hole (hole through which each main reinforcement is inserted)
43 Joint portion 44 Rib (stiffener)
50 Connection mechanism 51 Connection portion 52 Second joint portion 53 Joint rib 54 Filling portion 1A Foundation structure 10A Segment structure 11A Ring body (replacement for tie bar)
30A Main reinforcement 40A Steel segment 60 Outer piece 61 Plate 62 Main girder 62c Hole 65 Inner piece 66 Plate 67 Main girder 67c Hole 70 Connecting piece 80 Filled portion 1B Foundation structure 40B Steel segment 42B Main girder 42Bc Cutout portion 1C Foundation structure 40C Steel segment 42C Main girder 90 Support portion 91 Main body portion 92 Receptacle portion 93, 93a Connecting portion A Buried direction C Circumferential direction S, S1 Filling space (space)
x-axis

Claims (18)

複数の鋼製セグメントを長手方向及び短手方向に連結した筒状のセグメント構造体と、
前記セグメント構造体の内側に設けられた中詰部と、
前記セグメント構造体の軸線に沿って延びかつ前記軸線周りの周方向に所定の間隔をあけて配置され、前記セグメント構造体及び前記中詰部と一体化した複数の主筋と、を備え、
前記鋼製セグメントは、
前記セグメント構造体の壁面を形成するプレートと、
前記周方向に延びる前記プレートの縁に沿って立設された主桁と、を備え、
前記主桁は、前記主筋を係止する係止部を有し、
前記係止部は、前記プレートと前記主桁との連結部とは反対側における前記主桁の縁部に設けられていることを特徴とする基礎構造物。
A cylindrical segment structure in which a plurality of steel segments are connected in a longitudinal direction and a transverse direction;
a filler portion provided inside the segment structure;
A plurality of main reinforcements extending along the axis of the segment structure and arranged at predetermined intervals in the circumferential direction around the axis, and integrated with the segment structure and the fill portion ,
The steel segment is
A plate forming a wall surface of the segment structure;
A main girder erected along an edge of the plate extending in the circumferential direction,
The main girder has an engagement portion that engages the main reinforcement,
A foundation structure, characterized in that the engaging portion is provided on the edge of the main girder on the opposite side to the connection portion between the plate and the main girder .
前記係止部は、前記主筋が挿通される孔であることを特徴とする請求項1に記載の基礎構造物。The foundation structure according to claim 1 , wherein the engaging portion is a hole through which the main reinforcement is inserted. 前記係止部は、前記主桁の前記周方向に沿った内側の縁部に形成され、所定の間隔で切り欠かれた切欠部であり、The locking portion is a notch portion that is formed on an inner edge portion of the main girder along the circumferential direction and is cut out at a predetermined interval,
前記切欠部に前記主筋の一部が嵌め込まれていることを特徴とする請求項1に記載の基礎構造物。The foundation structure according to claim 1, wherein a part of the main reinforcement is fitted into the notch.
前記切欠部は、半円形状に形成されていることを特徴とする請求項3に記載の基礎構造物。The substructure according to claim 3 , wherein the cutout portion is formed in a semicircular shape. 複数の鋼製セグメントを長手方向及び短手方向に連結した筒状のセグメント構造体と、
前記セグメント構造体の内側に設けられた中詰部と、
前記セグメント構造体の軸線に沿って延びかつ前記軸線周りの周方向に所定の間隔をあけて配置され、前記セグメント構造体及び前記中詰部と一体化した複数の主筋と、を備え、
前記鋼製セグメントとで前記主筋を挟んで当該主筋を支持する支持部を備えることを特徴とする基礎構造物。
A cylindrical segment structure in which a plurality of steel segments are connected in a longitudinal direction and a transverse direction;
a filler portion provided inside the segment structure;
A plurality of main reinforcements extending along the axis of the segment structure and arranged at predetermined intervals in the circumferential direction around the axis, and integrated with the segment structure and the fill portion,
A foundation structure comprising a support section that supports the main reinforcement by sandwiching the main reinforcement between the steel segment and the support section.
前記支持部は、前記主筋を受容する受容部を有することを特徴とする請求項に記載の基礎構造物。 The foundation structure according to claim 5 , wherein the support portion has a receiving portion for receiving the main reinforcement. 前記支持部は、前記鋼製セグメントに連結されることを特徴とする請求項又はに記載の基礎構造物。 7. The foundation structure according to claim 5 or 6 , wherein the supporting portion is connected to the steel segment. 前記鋼製セグメントは、The steel segment is
前記セグメント構造体の壁面を形成するプレートと、A plate forming a wall surface of the segment structure;
前記周方向に延びる前記プレートの縁に沿って立設された主桁と、を備え、A main girder erected along an edge of the plate extending in the circumferential direction,
前記主筋は、前記主桁と前記支持部とで挟まれて支持されることを特徴とする請求項5から7までのいずれか一項に記載の基礎構造物。8. The foundation structure according to claim 5, wherein the main reinforcement is supported by being sandwiched between the main girder and the support portion.
前記主桁には、前記プレート及び前記主桁により画定された空間に前記中詰部を充填する際に空気を抜く孔が形成されていることを特徴とする請求項1又は8に記載の基礎構造物。 9. The foundation structure according to claim 1, wherein the main girder is formed with a hole for venting air when the filled portion is filled into the space defined by the plate and the main girder. 前記孔は、前記プレートと前記主桁との連結側に設けられていることを特徴とする請求項9に記載の基礎構造物。The foundation structure according to claim 9 , wherein the holes are provided on a connection side between the plate and the main girder. 前記鋼製セグメントは、前記主桁間を延在し、前記周方向に所定の間隔をあけて設けられた複数の補剛材を有し、
前記孔は、前記プレートと前記補剛材とがなす隅角部に対応する前記主桁の位置に形成されていることを特徴とする請求項9又は10に記載の基礎構造物。
The steel segment extends between the main girders and has a plurality of stiffeners provided at predetermined intervals in the circumferential direction,
11. The foundation structure according to claim 9 , wherein the holes are formed in the main girders at positions corresponding to corners formed by the plates and the stiffeners.
埋設方向に延びる軸線に沿って延在する筒状のセグメント構造体と、
前記軸線に沿って延びかつ前記軸線周りの周方向に所定の間隔をあけて配置され、前記セグメント構造体と係合する複数の主筋と、を備え、
前記セグメント構造体は、前記埋設方向及び前記周方向に連続的に連結され壁面を形成する複数の鋼製セグメントにより形成されており、
前記鋼製セグメントは、前記セグメント構造体の外壁を形成する外側ピースと、前記セグメント構造体の内壁を形成する内側ピースと、を有し、
前記外側ピースと前記内側ピースとの間に中詰部が設けられており、
前記主筋、前記鋼製セグメント及び前記中詰部は互いに一体化しており、
前記外側ピースは、外壁面を形成するプレートと、前記周方向に延在する前記プレートの縁に沿って立設された主桁と、を有し、
前記内側ピースは、内壁面を形成するプレートと、前記周方向に延在する前記プレートの縁に沿って立設された主桁と、を有し、
前記外側ピース及び前記内側ピースの少なくとも一方の前記主桁は、前記主筋を係止する係止部を有することを特徴とする基礎構造物。
A cylindrical segment structure extending along an axis extending in the embedding direction;
A plurality of main reinforcements extending along the axis and arranged at predetermined intervals in a circumferential direction around the axis , and engaging with the segment structure;
The segment structure is formed of a plurality of steel segments that are continuously connected in the embedding direction and the circumferential direction to form a wall surface,
The steel segment has an outer piece forming an outer wall of the segment structure and an inner piece forming an inner wall of the segment structure,
A filling portion is provided between the outer piece and the inner piece,
The main reinforcement, the steel segment, and the filled portion are integrated with each other ,
The outer piece has a plate forming an outer wall surface and a main girder erected along an edge of the plate extending in the circumferential direction,
The inner piece has a plate forming an inner wall surface and a main girder erected along an edge of the plate extending in the circumferential direction,
A foundation structure, characterized in that the main girder of at least one of the outer piece and the inner piece has an anchoring portion that anchors the main reinforcement .
前記鋼製セグメントは、前記外側ピースと前記内側ピースとを連結する連結ピースを有することを特徴とする請求項12に記載の基礎構造物。 The foundation structure according to claim 12 , wherein the steel segment has a connecting piece connecting the outer piece and the inner piece. 埋設方向に延びる軸線に沿って延在する筒状のセグメント構造体と、前記セグメント構造体の内側に設けられた中詰部と、前記軸線に沿って延びかつ前記軸線周りの周方向に所定の間隔をあけて配置され、前記セグメント構造体及び前記中詰部と一体化した複数の主筋と、を有する基礎構造物に用いられる鋼製セグメントであって、
前記基礎構造物の外壁面を形成するプレートと、
前記周方向に延在する前記プレートの縁に沿って立設された主桁と、を備え、
前記主桁は、前記主筋を係止する係止部を有し、
前記係止部は、前記プレートと前記主桁との連結部とは反対側における前記主桁の縁部に設けられていることを特徴とする基礎構造物に用いられる鋼製セグメント。
A steel segment for use in a foundation structure, the steel segment having a cylindrical segment structure extending along an axis extending in an embedding direction, a filler section provided inside the segment structure, and a plurality of main reinforcements extending along the axis, arranged at predetermined intervals in a circumferential direction around the axis, and integrated with the segment structure and the filler section,
A plate forming an outer wall surface of the foundation structure;
A main girder erected along an edge of the plate extending in the circumferential direction,
The main girder has an engagement portion that engages the main reinforcement,
A steel segment used in a foundation structure, characterized in that the engaging portion is provided on the edge of the main girder on the opposite side to the connection portion between the plate and the main girder .
埋設方向に延びる軸線に沿って延在する筒状のセグメント構造体と、前記軸線に沿って延びかつ前記軸線周りの周方向に所定の間隔をあけて配置され、前記セグメント構造体と係合する複数の主筋と、中詰部と、を有する基礎構造物に用いられる鋼製セグメントであって、
外壁を形成する外側ピースと、
前記外側ピースに連結され、前記基礎構造物の内壁を形成する内側ピースと、を備え、
前記外側ピースは、前記基礎構造物の外壁面を形成するプレートと、前記周方向に延在する前記プレートの縁に沿って立設された主桁と、を有し、
前記内側ピースは、前記基礎構造物の内壁面を形成するプレートと、前記周方向に延在する前記プレートの縁に沿って立設された主桁と、を有し、
前記外側ピース及び前記内側ピースの少なくとも一方の前記主桁は、前記主筋を係止する係止部を有し、
前記中詰部は、前記外側ピースと前記内側ピースとの間に設けられていることを特徴とする基礎構造物に用いられる鋼製セグメント。
A steel segment for use in a foundation structure, the steel segment having a cylindrical segment structure extending along an axis extending in an embedding direction, a plurality of main reinforcements extending along the axis and arranged at predetermined intervals in a circumferential direction around the axis and engaging with the segment structure, and a fill portion,
an outer piece forming an outer wall;
an inner piece connected to the outer piece and forming an inner wall of the substructure;
the outer piece has a plate forming an outer wall surface of the foundation structure and a main girder erected along an edge of the plate extending in the circumferential direction,
the inner piece includes a plate forming an inner wall surface of the foundation structure and a main girder erected along an edge of the plate extending in the circumferential direction,
At least one of the main girders of the outer piece and the inner piece has a locking portion that locks the main reinforcement,
13. A steel segment for use in a foundation structure, wherein the filler portion is provided between the outer piece and the inner piece.
請求項1に記載の基礎構造物の施工方法であって、
複数の鋼製セグメントを長手方向及び短手方向に連結してセグメント構造体を構築する工程と、
前記係止部に前記主筋を係止し、前記セグメント構造体の軸線方向に沿って前記主筋を係止する工程と、
前記セグメント構造体の内側に中詰材を打設して前記セグメント構造体及び前記主筋と一体化する工程と、
を有することを特徴とする基礎構造物の施工方法。
A construction method for a foundation structure according to claim 1,
A step of connecting a plurality of steel segments in a longitudinal direction and a transverse direction to construct a segment structure;
a step of fastening the main reinforcement to the fastening portion and fastening the main reinforcement along the axial direction of the segment structure;
A step of pouring a filler into the inside of the segment structure to integrate it with the segment structure and the main reinforcement;
A foundation structure construction method comprising the steps of:
請求項5に記載の基礎構造物の施工方法であって、The construction method for a foundation structure according to claim 5,
複数の鋼製セグメントを長手方向及び短手方向に連結してセグメント構造体を構築する工程と、A step of connecting a plurality of steel segments in a longitudinal direction and a transverse direction to construct a segment structure;
前記鋼製セグメントと前記支持部とで前記主筋を挟んで支持し、前記セグメント構造体の軸線方向に沿って前記主筋を係止する工程と、a step of supporting the main reinforcement by sandwiching it between the steel segment and the support portion and locking the main reinforcement along the axial direction of the segment structure;
前記セグメント構造体の内側に中詰材を打設して前記セグメント構造体及び前記主筋と一体化する工程と、A step of pouring a filler into the inside of the segment structure to integrate it with the segment structure and the main reinforcement;
を有することを特徴とする基礎構造物の施工方法。A foundation structure construction method comprising the steps of:
請求項12に記載の基礎構造物の施工方法であって、A construction method for a foundation structure according to claim 12, comprising the steps of:
複数の鋼製セグメントを長手方向及び短手方向に連結してセグメント構造体を構築する工程と、A step of connecting a plurality of steel segments in a longitudinal direction and a transverse direction to construct a segment structure;
前記セグメント構造体の軸線方向に沿って前記係止部に主筋を係止する工程と、A step of fastening a main reinforcement to the fastening portion along an axial direction of the segment structure;
前記外側ピースと前記内側ピースとの間に中詰材を打設して前記セグメント構造体及び前記主筋と一体化する工程と、A step of placing a filler between the outer piece and the inner piece to integrate the filler with the segment structure and the main reinforcement;
を有することを特徴とする基礎構造物の施工方法。A foundation structure construction method comprising the steps of:
JP2020173155A 2019-10-31 2020-10-14 Foundation structure, steel segment used in foundation structure, and construction method for foundation structure Active JP7535429B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019199343 2019-10-31
JP2019199343 2019-10-31

Publications (2)

Publication Number Publication Date
JP2021076002A JP2021076002A (en) 2021-05-20
JP7535429B2 true JP7535429B2 (en) 2024-08-16

Family

ID=75899128

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020173155A Active JP7535429B2 (en) 2019-10-31 2020-10-14 Foundation structure, steel segment used in foundation structure, and construction method for foundation structure

Country Status (1)

Country Link
JP (1) JP7535429B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7309237B2 (en) * 2022-09-30 2023-07-18 島工業Hd株式会社 Liner plate and method for connecting liner plate

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006249784A (en) 2005-03-10 2006-09-21 Taisei Corp Base structure of base-isolated building and its construction method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10331568A (en) * 1997-06-03 1998-12-15 Nippon Kokan Light Steel Kk Steel segment piece for casting concrete in hollow interior and method of constructing a submerged body using the steel segment piece
JP3930149B2 (en) * 1998-06-09 2007-06-13 株式会社加藤建設 Segment piece and underground structure construction method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006249784A (en) 2005-03-10 2006-09-21 Taisei Corp Base structure of base-isolated building and its construction method

Also Published As

Publication number Publication date
JP2021076002A (en) 2021-05-20

Similar Documents

Publication Publication Date Title
US6536181B1 (en) Composite retaining wall and construction method for underground structure
CN110205918B (en) Assembled bridge pile splicing structure and connecting method thereof
JP7103962B2 (en) Earth retaining structure and earth retaining method
CN101939492B (en) Precast temporary facility structure and construction method for the same
JP4691690B2 (en) Joint structure and joining method of pedestal
JP6924682B2 (en) Pile head seismic isolation structure and its construction method
JP2023174870A (en) road structure
JP6924683B2 (en) Pile head seismic isolation structure and its construction method
JP6430271B2 (en) Footing-integrated foundation pile structure and construction method of footing-integrated foundation pile
KR101587062B1 (en) Steel composite underground earth retaining wall structure and it&#39;s construction method
JP7535429B2 (en) Foundation structure, steel segment used in foundation structure, and construction method for foundation structure
KR100679301B1 (en) Head reinforcement structure of steel pipe pile
KR100629437B1 (en) Guide casing structure for pillar construction and pillar construction method using the same
JP3728653B2 (en) Bonding structure between flat slab and concrete-filled steel pipe column and flat slab construction method
KR101618719B1 (en) Top-down underground construction method using the connecting structure of the CFT column
JP4912030B2 (en) Junction structure between pier and pile
KR200201561Y1 (en) Head reinforcement structure of steel pipe pile
JPH1018424A (en) Root wrapping reinforcing structure of column base of steel post or the like
KR20050073776A (en) Assembly pile for method of ground improvement
KR200381589Y1 (en) A pile head reinforcement structure of precastconcrete pile
JP7138146B2 (en) Foundation structure, annular body, connecting mechanism of steel segments, and construction method of foundation structure
KR102482690B1 (en) Bridge foundation construction method using formwork integrated PC panels
JPH108422A (en) Reinforcement structure of bridge pier
JP4452170B2 (en) Construction method of shaft
JP3622100B2 (en) How to reinforce existing beams

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20201110

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230706

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240214

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240227

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240425

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240729

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240805

R150 Certificate of patent or registration of utility model

Ref document number: 7535429

Country of ref document: JP