Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7539438B2 - Switchgear Monitoring System - Google Patents
[go: Go Back, main page]

JP7539438B2 - Switchgear Monitoring System - Google Patents

Switchgear Monitoring System Download PDF

Info

Publication number
JP7539438B2
JP7539438B2 JP2022128614A JP2022128614A JP7539438B2 JP 7539438 B2 JP7539438 B2 JP 7539438B2 JP 2022128614 A JP2022128614 A JP 2022128614A JP 2022128614 A JP2022128614 A JP 2022128614A JP 7539438 B2 JP7539438 B2 JP 7539438B2
Authority
JP
Japan
Prior art keywords
time
current value
abnormal
monitoring
switching device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022128614A
Other languages
Japanese (ja)
Other versions
JP2024025282A (en
Inventor
比呂志 山田
保則 伊藤
貴之 金森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chubu Electric Power Co Inc
Original Assignee
Chubu Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chubu Electric Power Co Inc filed Critical Chubu Electric Power Co Inc
Priority to JP2022128614A priority Critical patent/JP7539438B2/en
Publication of JP2024025282A publication Critical patent/JP2024025282A/en
Application granted granted Critical
Publication of JP7539438B2 publication Critical patent/JP7539438B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Description

本発明は、変電所等に設けられている開閉装置を監視する開閉装置監視システムに関する。 The present invention relates to a switchgear monitoring system that monitors switchgear installed in substations, etc.

変電所等に設けられている、遮断器や断路器等の、回線を接続あるいは切り離す複数の開閉装置を監視する開閉装置監視システム(開閉装置監視装置)が知られている。開閉装置監視システムは、例えば、特許文献1(特開2010-178475号公報)に開示されている。
特許文献1に開示されている開閉装置監視システムは、操作電流波形検出装置と制御電流波形検出装置を有している。操作電流波形検出装置は、各開閉装置を構成する操作装置に接続された操作電源から供給される操作電流の波形を検出する。制御電流波形検出装置は、各開閉装置を構成する制御装置に接続された制御電源から供給される制御電流の波形を検出する。そして、操作電流の波形あるいは制御電流の波形と、定常電流、各開閉装置の動作時間および動作内容等に基づいて、各開閉装置が異常であるか否かを判別している。
There is known a switchgear monitoring system (switchgear monitoring device) that monitors a plurality of switchgears, such as circuit breakers and disconnectors, that connect or disconnect lines and are provided in a substation, etc. The switchgear monitoring system is disclosed in, for example, Patent Document 1 (JP 2010-178475 A).
The switchgear monitoring system disclosed in Patent Document 1 has an operation current waveform detection device and a control current waveform detection device. The operation current waveform detection device detects the waveform of the operation current supplied from an operation power supply connected to an operation device constituting each switchgear. The control current waveform detection device detects the waveform of the control current supplied from a control power supply connected to a control device constituting each switchgear. Then, based on the waveform of the operation current or the waveform of the control current, the steady-state current, the operation time and operation content of each switchgear, etc., it is determined whether or not each switchgear is abnormal.

特開2010-178475号公報JP 2010-178475 A

特許文献1に開示されている開閉装置監視システムは、各開閉装置の操作装置に接続されている操作電源から供給される操作電流の波形を検出する操作電流波形検出装置と、各開閉装置の制御装置に接続されている制御電源から供給される制御電流の波形を検出する制御電流波形検出装置を設けている、これにより、操作電流波形検出装置および制御電流波形検出装置を各操作装置および各制御装置に設ける必要がないため、開閉装置監視システムを安価に構成することができる。
しかしながら、特許文献1に開示されている開閉装置監視システムは、操作電流波形あるいは制御電流波形から定常電流を差し引くために、定常電流を判別する必要がある。定常電流は変化するため、定常電流を判別する処理は処理負担が大きい。
本発明は、このような点に鑑みて創案されたものであり、安価に構成しながら、少ない処理負担で開閉装置の動作異常を判別することができる開閉装置監視システムを提供することを目的とする。
The switchinggear monitoring system disclosed in Patent Document 1 is provided with an operation current waveform detection device that detects the waveform of the operation current supplied from an operation power supply connected to the operation device of each switchinggear, and a control current waveform detection device that detects the waveform of the control current supplied from a control power supply connected to the control device of each switchinggear.As a result, there is no need to provide an operation current waveform detection device and a control current waveform detection device in each operating device and each control device, and therefore the switchinggear monitoring system can be constructed at low cost.
However, the switching gear monitoring system disclosed in Patent Document 1 needs to determine the steady-state current in order to subtract the steady-state current from the operation current waveform or the control current waveform. Since the steady-state current changes, the process of determining the steady-state current imposes a large processing load.
The present invention has been devised in consideration of the above points, and aims to provide a switching gear monitoring system that can determine operational abnormalities in a switching gear with a low processing burden while being inexpensive to configure.

本発明の開閉装置監視システムを用いて監視する複数の開閉装置は、開閉器と、操作装置と、制御装置と、を有している。操作装置は、開閉器の投入あるいは引き外しを行う。制御装置は、投入あるいは引き外しが指示された場合に、操作装置を制御する。
複数の開閉装置の操作装置は、専用の操作電源に並列に接続されている。また、複数の開閉装置の制御装置は、専用の制御電源に並列に接続されている。
第1発明の開閉装置監視システムは、監視装置と記憶装置を備えている。
記憶装置は、異常動作判別情報データベース、動作履歴データベース、監視電流情報データベースを有している。
監視装置は、異常動作判別手段を有している。
記憶装置は、異常動作判別情報データベース、動作履歴データベース、監視電流情報データベースを有している。
異常動作判別情報データベースには、開閉装置の投入動作時および引き外し動作時のうちの少なくとも一方の動作時における異常動作を判別するための異常動作判別情報が、開閉装置を示す開閉装置識別情報と動作内容に対応して記憶される。
動作履歴データベースには、開閉装置の投入動作あるいは引き外し動作に関連する事象が発生した時刻を示す事象発生時刻と、当該開閉装置を示す開閉装置識別情報と、当該投入動作あるいは引き外し動作を示す動作内容と、を含む動作履歴が記憶される。
監視電流情報データベースには、監視電流の監視電流値と当該監視電流値を検出した時刻tを含む監視電流情報が記憶される。監視電流には、操作電源から供給される操作電流Ipおよび制御電源から供給される制御電流Icのうちの少なくとも一方の電流が含まれる。監視電流の監視電流値には、操作電流Ipの操作電流値Ip(t)および制御電流Icの制御電流値Ic(t)のうちの少なくとも一方が含まれる。
監視装置は、異常動作判別手段を有している。
異常動作判別手段は、以下の処理を実行する。
監視電流情報データベースに記憶されている監視電流情報に基づいて、監視電流が流れ始めた動作開始時刻tsと、監視電流の流れが停止した動作終了時刻teを判別する。
動作履歴データベースに記憶されている動作履歴に基づいて、判別した動作開始時刻tsに動作を開始した開閉装置を示す開閉装置識別情報と動作内容を判別する。
判別した開閉装置識別情報と動作内容に対応する異常動作判別情報を、異常動作判別情報データベースから読み出す。
判別した動作終了時刻teと動作開始時刻tsの間の動作時間S(=te-ts)および動作時間S内の監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]のうちの少なくとも一方と、異常動作判別情報データベースから読み出した異常動作判別情報に基づいて、判別した開閉装置識別情報で示される開閉装置の異常動作を判別する。
本発明では、各開閉装置の操作装置が、専用の操作電源に並列に接続されているとともに、各開閉装置の制御装置が、専用の制御電源に並列に接続されている。これにより、特許文献1に開示されている、定常電流を判別する処理を必要とすることなく、操作電源から供給された操作電流の操作電流値あるいは制御電源から供給された制御電流の制御電流値に基づいて、操作電流あるいは制御電流が流れ始めた動作開始時刻tsと操作電流あるいは制御電流の流れが停止した動作終了時刻teを判別することができる。
第1発明の開閉装置監視システムを用いることにより、安価に構成しながら、少ない処理負担で、開閉装置の異常動作を判別することができる。
第2発明の開閉装置監視システムは、監視装置と記憶装置を備えている。
記憶装置は、第1発明の記憶装置と同様の、異常動作判別情報データベース、動作履歴データベース、監視電流情報データベースを有している。
監視装置は、異常動作判別手段を有している。
異常動作判別手段は、以下の処理を実行する。
動作履歴データベースから読み出した動作履歴に含まれている事象発生時刻に基づいて、監視電流情報データベースからの監視電流値の抽出を開始する抽出開始時刻taを決定する。
監視電流情報データベースから抽出した監視電流値に基づいて、監視電流が流れ始めた動作開始時刻tsと、監視電流の流れが停止した動作終了時刻teを判別する。
読み出した動作履歴に含まれている開閉装置識別情報と動作内容に対応する異常動作判別情報を、異常動作判別情報データベースから読み出す。
判別した動作終了時刻teと動作開始時刻tsの間の動作時間S(=te-ts)および動作時間S内の監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]のうちの少なくとも一方と、異常動作判別情報データベースから読み出した異常動作判別情報に基づいて、読み出した動作履歴に含まれている開閉装置識別情報で示される開閉装置の異常動作を判別する。
第2発明の開閉装置監視システムを用いることにより、第1発明の開閉装置監視システムと同様に、安価に構成しながら、少ない処理負担で開閉装置の異常動作を判別することができる。
第1発明および第2発明の異なる形態では、操作電源から供給される操作電流の操作電流値[Ip(t)]を検出する操作電流値検出装置と、制御電源から供給される制御電流の制御電流値[Ic(t)]を検出する制御電流値検出装置が設けられている。
そして、監視装置は、監視電流値処理手段を有している。
監視電流値処理手段は、操作電流値検出装置で検出された操作電流値[Ip(t)]および制御電流値検出装置で検出された制御電流値[Ic(t)]のうちの少なくとも一方の電流値と、検出した時刻tと、を含む監視電流情報を監視電流情報データベースに記憶させる処理を実行する。
本形態では、監視電流情報データベースを容易に作成することができる。
第1発明および第2発明の異なる形態では、監視装置は、動作履歴管理手段を有している。
動作履歴管理手段は、複数の開閉装置の制御装置に投入あるいは引き出しが指示された時刻および複数の開閉装置の開閉器の投入動作あるいは引き外し動作が行われたことを検出した時刻のうちの一方の時刻を事象発生時刻として含む動作履歴を、動作履歴データベースに記憶させる処理を実行する。
本形態では、動作履歴データベースを容易に作成することができる。
第1発明および第2発明の異なる形態では、異常動作判別手段は、監視電流値が[0]([略0]を含む)より大きくなった時刻を動作開始時刻tsとして判別する。また、異常動作判別手段は、動作開始時刻ts後に、監視電流値が[0]([略0]を含む)となった時刻を動作終了時刻teとして判別する。
本形態では、動作開始時刻tsおよび動作終了時刻teを容易に判別することができる。
第1発明および第2発明の異なる形態では、異常動作判別手段は、動作開始時刻tsと動作終了時刻teとの間の動作時間S(=te-ts)と、異常動作判別情報に含まれている第1設定時間との比較結果に基づいて、開閉装置の異常動作を判別する。例えば、動作時間Sが第1設定時間を超えた場合に、開閉装置が異常であることを判別する。
本形態では、動作時間に基づいて開閉装置の異常を判別することができる。
第1発明および第2発明の異なる形態では、異常動作判別手段は、動作時間Sと第1設定時間との比較結果と、動作時間Sのうち、動作開始時刻tsから除外時間を除いた期間における監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]と、異常動作判別情報に含まれている設定電流値との比較結果に基づいて、開閉装置の異常動作を判別する。例えば、動作時間Sが第1設定時間を超えた場合あるいは監視電流値が設定電流値を超えた場合に、開閉装置が異常であることを判別する。除外時間としては、例えば、動作開始時に突入電流が流れる期間が設定される。
本形態では、動作時間および監視電流値に基づいて開閉装置の異常を判別することができる。
第1発明および第2発明の異なる形態では、第1設定時間は、周囲温度に応じて変更される。
本形態では、開閉装置の異常を、周囲温度に応じて適切に判別することができる。
第1発明および第2発明の異なる形態では、異常動作判別手段は、監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]が減少を開始する変曲点から設定傾斜角度で線を引き、線上の、監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]が[0]([略0]を含む)となる基準時刻hを判別する。そして、基準時刻hに対する動作終了時刻teの遅れ時間N(=te-h)と、異常動作判別情報に含まれている第2設定時間との比較結果に基づいて、開閉装置の異常動作を判別する。例えば、遅れ時間Nが第2設定時間を超えた場合に、開閉装置が異常であることを判別する。
本形態では、第1相~第3相開閉装置により構成される開閉装置の異常動作(三相不揃い)を簡単に判別することができる。
The switching gear monitoring system of the present invention monitors a plurality of switching gears, each of which includes a switch, an operating device, and a control device. The operating device closes or trips the switch. The control device controls the operating device when a command to close or trip the switch is received.
The operating devices of the multiple switchgears are connected in parallel to a dedicated operating power supply, and the control devices of the multiple switchgears are connected in parallel to a dedicated control power supply.
The switching gear monitoring system of the first aspect of the present invention includes a monitoring device and a storage device.
The storage device has an abnormal operation determination information database, an operation history database, and a monitored current information database.
The monitoring device includes an abnormal operation determination means.
The storage device has an abnormal operation determination information database, an operation history database, and a monitored current information database.
The abnormal operation discrimination information database stores abnormal operation discrimination information for discriminating abnormal operation during at least one of the closing operation and the tripping operation of the opening/closing device, in correspondence with the opening/closing device identification information indicating the opening/closing device and the operation content.
The operation history database stores operation history including an event occurrence time indicating the time when an event related to the closing operation or tripping operation of the switching device occurred, switching device identification information indicating the switching device, and operation content indicating the closing operation or tripping operation.
The monitored current information database stores monitored current information including a monitored current value of the monitored current and a time t at which the monitored current value was detected. The monitored current includes at least one of an operating current Ip supplied from an operating power source and a control current Ic supplied from a control power source. The monitored current value of the monitored current includes at least one of an operating current value Ip(t) of the operating current Ip and a control current value Ic(t) of the control current Ic.
The monitoring device includes an abnormal operation determination means.
The abnormal operation determination means executes the following process.
Based on the monitoring current information stored in the monitoring current information database, the operation start time ts when the monitoring current starts to flow and the operation end time te when the monitoring current stops to flow are determined.
Based on the operation history stored in the operation history database, the switching device identification information indicating the switching device that started operation at the determined operation start time ts and the operation content are determined.
Abnormal operation discrimination information corresponding to the determined opening/closing device identification information and operation content is read out from the abnormal operation discrimination information database.
An abnormal operation of the opening/closing device indicated by the determined opening/closing device identification information is determined based on at least one of the operation time S (=te-ts) between the determined operation end time te and operation start time ts and the monitored current value [operation current value Ip(t), control current value Ic(t)] within the operation time S, and the abnormal operation determination information read out from the abnormal operation determination information database.
In the present invention, the operating device of each switchgear is connected in parallel to a dedicated operating power source, and the control device of each switchgear is connected in parallel to a dedicated control power source. This makes it possible to determine the operation start time ts at which the operating current or the control current starts to flow and the operation end time te at which the flow of the operating current or the control current stops, based on the operating current value of the operating current supplied from the operating power source or the control current value of the control current supplied from the control power source, without requiring the process of determining a steady-state current as disclosed in Patent Document 1.
By using the switchgear monitoring system of the first aspect of the invention, it is possible to determine abnormal operation of the switchgear with a low processing load while being constructed at low cost.
The switching gear monitoring system of the second invention includes a monitoring device and a storage device.
The storage device has an abnormal operation determination information database, an operation history database, and a monitored current information database, similar to the storage device of the first invention.
The monitoring device includes an abnormal operation determination means.
The abnormal operation determination means executes the following process.
Based on the event occurrence time included in the operation history read from the operation history database, an extraction start time ta at which extraction of a monitoring current value from the monitoring current information database is started is determined.
Based on the monitoring current value extracted from the monitoring current information database, the operation start time ts when the monitoring current starts to flow and the operation end time te when the monitoring current stops to flow are determined.
Abnormal operation determination information corresponding to the switching device identification information and operation details included in the read operation history is read from the abnormal operation determination information database.
An abnormal operation of the switching device indicated by the switching device identification information included in the read operation history is determined based on at least one of the operation time S (=te-ts) between the determined operation end time te and operation start time ts and the monitored current value [operation current value Ip(t), control current value Ic(t)] within the operation time S, and the abnormal operation determination information read from the abnormal operation determination information database.
By using the switchgear monitoring system of the second invention, like the switchgear monitoring system of the first invention, it is possible to determine abnormal operation of the switchgear with a low processing load while being constructed at low cost.
In different forms of the first and second inventions, an operation current value detection device is provided that detects an operation current value [Ip(t)] of an operation current supplied from an operation power source, and a control current value detection device that detects a control current value [Ic(t)] of a control current supplied from a control power source.
The monitoring device further includes a monitored current value processing means.
The monitored current value processing means executes a process of storing monitored current information including at least one of the current values of the operation current value [Ip(t)] detected by the operation current value detection device and the control current value [Ic(t)] detected by the control current value detection device, and the time t of detection, in a monitored current information database.
In this embodiment, the monitored current information database can be easily created.
In a different aspect of the first and second aspects of the invention, the monitoring device has an operation history management means.
The operation history management means executes a process of storing in an operation history database an operation history including, as an event occurrence time, one of the times when the control devices of the multiple switching devices were instructed to close or pull out and the time when it was detected that the closing operation or pull-out operation of the switches of the multiple switching devices was performed.
In this embodiment, the operation history database can be easily created.
In the different forms of the first and second inventions, the abnormal operation determination means determines the time when the monitored current value becomes greater than [0] (including [approximately 0]) as the operation start time ts. Also, the abnormal operation determination means determines the time when the monitored current value becomes [0] (including [approximately 0]) after the operation start time ts as the operation end time te.
In this embodiment, the operation start time ts and the operation end time te can be easily determined.
In a different embodiment of the first and second inventions, the abnormal operation determination means determines an abnormal operation of the opening and closing device based on a comparison result between an operation time S (=te-ts) between an operation start time ts and an operation end time te and a first set time included in the abnormal operation determination information. For example, when the operation time S exceeds the first set time, it is determined that the opening and closing device is abnormal.
In this embodiment, an abnormality in the switching device can be determined based on the operation time.
In different embodiments of the first and second inventions, the abnormal operation determination means determines an abnormal operation of the switching device based on a comparison result between the operation time S and the first set time, and a comparison result between the monitored current value [operation current value Ip(t), control current value Ic(t)] during the operation time S from the operation start time ts excluding the exclusion time, and the set current value included in the abnormal operation determination information. For example, when the operation time S exceeds the first set time or the monitored current value exceeds the set current value, it determines that the switching device is abnormal. As the exclusion time, for example, a period during which an inrush current flows at the start of operation is set.
In this embodiment, an abnormality in the switching device can be determined based on the operation time and the monitored current value.
In a different embodiment of the first and second aspects of the invention, the first set time is changed in response to the ambient temperature.
In this embodiment, an abnormality in the switching device can be appropriately determined according to the ambient temperature.
In a different embodiment of the first and second inventions, the abnormal operation determination means draws a line at a set inclination angle from an inflection point where the monitored current value [operation current value Ip(t), control current value Ic(t)] starts to decrease, and determines a reference time h on the line where the monitored current value [operation current value Ip(t), control current value Ic(t)] becomes [0] (including [approximately 0]). Then, the abnormal operation of the opening/closing device is determined based on a comparison result between a delay time N (= te - h) of the operation end time te relative to the reference time h and a second set time included in the abnormal operation determination information. For example, it is determined that the opening/closing device is abnormal when the delay time N exceeds the second set time.
In this embodiment, abnormal operation (three-phase mismatch) of a switchgear constituted by first-phase to third-phase switchgears can be easily determined.

第1発明あるいは第2発明の開閉装置監視システムを用いることにより、安価に構成しながら、少ない処理負担で開閉装置の異常を判別することができる。 By using the switching gear monitoring system of the first or second invention, it is possible to determine abnormalities in the switching gear with a low processing load while maintaining a low cost configuration.

一実施形態の開閉装置監視システムの概略構成を示す図である。1 is a diagram showing a schematic configuration of a switching gear monitoring system according to an embodiment; 開閉装置を構成する制御装置と操作装置の一例の概略構成を示す図である。FIG. 2 is a diagram showing a schematic configuration of an example of a control device and an operating device that configure the opening and closing device. 異常動作判別情報データベースの一例を示す図である。FIG. 4 is a diagram illustrating an example of an abnormal operation determination information database. 動作履歴データベース、制御電流情報データベース、操作電流情報データベースの一例を示す図である。5A to 5C are diagrams illustrating examples of an operation history database, a control current information database, and an operation current information database. 投入動作時における制御電流値に基づいて開閉装置の異常動作を判別する方法の一例を示す図である。FIG. 11 is a diagram showing an example of a method for determining an abnormal operation of a switching device based on a control current value during a closing operation. 引き外し動作時における制御電流値に基づいて開閉装置の異常動作を判別する方法の一例を説明する図である。10A and 10B are diagrams illustrating an example of a method for determining an abnormal operation of a switching device based on a control current value during a tripping operation. 投入動作時における操作電流値に基づいて開閉装置の異常動作を判別する方法の一例を説明する図である。10A and 10B are diagrams illustrating an example of a method for determining an abnormal operation of a switching device based on an operation current value during a closing operation. 投入動作時における操作電流値に基づいて開閉装置の異常動作を判別する方法の一例を説明する図である。10A and 10B are diagrams illustrating an example of a method for determining an abnormal operation of a switching device based on an operation current value during a closing operation. 第1相~第3相開閉装置を有する開閉装置を構成する制御装置の概略構成を示す図である。FIG. 2 is a diagram showing a schematic configuration of a control device constituting a switching device having first to third phase switching devices. 第1相~第3相開閉装置の動作時間が相違する場合における、第1相~第3相開閉装置の制御装置を流れる制御電流の制御電流値の変化状態の一例を示す図である。11 is a diagram showing an example of a change in the control current value of the control current flowing through the control device of the first-phase to third-phase switching devices when the operation times of the first-phase to third-phase switching devices are different. FIG. 第1相~第3相開閉装置の動作時間が相違する場合における、制御電流値Ic(t)の変化状態の一例を示す図である。FIG. 11 is a diagram showing an example of a change state of the control current value Ic(t) when the operation times of the first-phase to third-phase switching devices are different. 制御電流値Ic(t)の変化状態に基づいて、第1相~第3相開閉装置の動作不揃い(三相不揃い)を判別する方法の一例を説明する図である。FIG. 13 is a diagram for explaining an example of a method for determining operational mismatch (three-phase mismatch) of the first to third phase switching devices based on a change state of the control current value Ic(t). 異常状態を判別するための設定時間が、周囲温度に応じて変化する状態の一例を示す図である。FIG. 11 is a diagram showing an example of a state in which a set time for determining an abnormal state changes depending on an ambient temperature. 監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]の変化状態に基づいて開閉装置の異常動作を判別する方法の一実施形態を示すフローチャートである。1 is a flowchart showing an embodiment of a method for determining an abnormal operation of a switching device based on a change state of monitored current values [operation current value Ip(t), control current value Ic(t)]. 図14に示されているステップA1の処理(動作開始時刻tsと動作終了時刻teの判別処理)の一例を示すフローチャートである。15 is a flowchart showing an example of the process (processing for determining an operation start time ts and an operation end time te) of step A1 shown in FIG. 14. 図14に示されているステップA4の処理(異常動作判別処理)の一例を示すフローチャートである。15 is a flowchart showing an example of the process (abnormal operation determination process) of step A4 shown in FIG. 14. 監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]の変化状態に基づいて開閉装置の異常動作を判別する方法の異なる実施形態を示すフローチャートである。10 is a flowchart showing another embodiment of a method for determining an abnormal operation of a switching device based on a change in the monitored current values [operation current value Ip(t), control current value Ic(t)]. 図17に示されているステップF3の処理(動作開始時刻tsと動作終了時刻teの判別処理)の一例を示すフローチャートである。18 is a flowchart showing an example of the process of step F3 shown in FIG. 17 (processing for determining the operation start time ts and the operation end time te).

以下に、本発明の開閉装置監視システム(開閉装置監視装置)の実施形態を、図面を参照して説明する。
図1に、一実施形態の開閉装置監視システム100の概略構成が示されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of a switchgear monitoring system (switchgear monitoring device) of the present invention will be described with reference to the drawings.
FIG. 1 shows a schematic configuration of a switching gear monitoring system 100 according to an embodiment.

先ず、開閉装置10の概略構成を説明する。
開閉装置10は、開閉器20、操作装置30、制御装置40を有している。
開閉器20は、回線を接続および遮断する機能を備えており、遮断器や断路器等が含まれる。開閉器20は、例えば、固定接点と、可動接点と、駆動機構を有する。駆動機構は、可動接点を固定接点に接触させ(「投入」あるいは「閉極」と呼ばれる)、あるいは、可動接点を固定接点から引き離す(「引き外し」あるいは「開極」と呼ばれる)。駆動機構としては、公知の種々の駆動機構が用いられる。
操作装置30は、開閉器20を操作する。例えば、可動接点が固定接点に接触するように駆動機構を操作し、あるいは、可動接点が固定接点から引き離されるように駆動機構を操作する。操作装置30としては、公知の操作装置が用いられる。例えば、油圧を利用して駆動機構を操作する操作装置、電動機の駆動力を利用して駆動機構を操作する操作装置、ばねの蓄勢力を利用して駆動機構を操作する操作装置、電磁コイルの電磁力を利用して駆動機構を操作する操作装置等が用いられる。
制御装置40は、操作装置30を制御する。例えば、制御装置40は、投入が指示されると、開閉器20の可動接点が固定接点に接触するように操作装置30を制御する。あるいは、引き外しが指示されると、開閉器20の可動接点が固定接点から引き離されるように操作装置30を制御する。開閉装置10の投入は、遠方監視制御装置60(後述する)から指示され、あるいは、操作員の手動操作によって指示される。また、開閉装置10の引き外しは、遠方監視制御装置60から指示され、あるいは、操作員の手動操作によって指示され、あるいは、過電流や過電圧等の異常が発生した時に動作する継電連動装置(図示省略)から指示される。
First, a schematic configuration of the opening and closing device 10 will be described.
The opening and closing device 10 includes a switch 20 , an operating device 30 , and a control device 40 .
The switch 20 has a function of connecting and disconnecting a line, and includes a circuit breaker, a disconnecting switch, and the like. The switch 20 has, for example, a fixed contact, a movable contact, and a drive mechanism. The drive mechanism brings the movable contact into contact with the fixed contact (called "closing" or "closing"), or separates the movable contact from the fixed contact (called "removing" or "opening"). As the drive mechanism, various known drive mechanisms are used.
The operating device 30 operates the switch 20. For example, the operating device 30 operates the drive mechanism so that the movable contact comes into contact with the fixed contact, or operates the drive mechanism so that the movable contact is separated from the fixed contact. A known operating device is used as the operating device 30. For example, an operating device that operates the drive mechanism using hydraulic pressure, an operating device that operates the drive mechanism using the driving force of an electric motor, an operating device that operates the drive mechanism using the stored force of a spring, an operating device that operates the drive mechanism using the electromagnetic force of an electromagnetic coil, etc. are used.
The control device 40 controls the operating device 30. For example, when an instruction to close is given, the control device 40 controls the operating device 30 so that the movable contact of the switch 20 comes into contact with the fixed contact. Alternatively, when an instruction to trip is given, the control device 40 controls the operating device 30 so that the movable contact of the switch 20 is separated from the fixed contact. The closing of the switchgear 10 is instructed by a remote monitoring and control device 60 (described later), or by manual operation by an operator. The tripping of the switchgear 10 is instructed by the remote monitoring and control device 60, or by manual operation by an operator, or by a relay interlocking device (not shown) that operates when an abnormality such as an overcurrent or overvoltage occurs.

本実施形態の開閉装置監視システム100は、開閉装置グループを構成しているn個の複数の開閉装置10(1)~10(n)を監視する。なお、開閉装置グループを構成する開閉装置の数nは適宜設定可能である。また、例えば、変電所等に設けられている複数の開閉装置10を1つの開閉装置グループにまとめてもよく、複数の開閉装置グループに分けることもできる。
開閉装置10(1)~10(n)は、開閉器20(1)~20(n)、操作装置30(1)~30(n)、制御装置40(1)~40(n)を有している。
The switchgear monitoring system 100 of this embodiment monitors a plurality of n switchgears 10(1) to 10(n) constituting a switchgear group. The number n of switchgears constituting a switchgear group can be set appropriately. For example, a plurality of switchgears 10 provided in a substation or the like may be grouped together into one switchgear group, or may be divided into a plurality of switchgear groups.
The switching devices 10(1) to 10(n) include switches 20(1) to 20(n), operating devices 30(1) to 30(n), and control devices 40(1) to 40(n).

開閉装置10(1)の一例が、図2に示されている。なお、図2には、開閉装置10(1)を構成する操作装置30(1)と制御装置40(1)のみが示されている。
制御装置40(1)は、投入コイル41、投入スイッチ42、43、引き外しコイル44、引き外しスイッチ45、46、47、リミットスイッチ48を有している。
リミットスイッチ48は、開閉器20(1)の可動接点の位置を検出する位置検出スイッチであり、接点48aと48bを有している。リミットスイッチ48は、開閉器20(1)の可動接点が固定接点から引き離されている状態(引き外し状態)において、接点48bが閉じ、接点48aが開く。また、リミットスイッチ48は、開閉器20(1)の可動接点が固定接点に接触している状態(投入状態)において、接点48bが開き、接点48aが閉じる。
リミットスイッチ48の接点48bが閉じている状態において、投入スイッチ42あるいは43が閉じられると、投入コイル41が励磁される。投入スイッチ42は、遠方監視制御装置60から投入動作が指示された場合に閉じる。投入スイッチ43は、作業員等が手動で操作することによって閉じる。
投入コイル41が励磁されると、補助接点41aが閉じ、投入スイッチ42、43を迂回する自己保持回路が形成される。また、投入コイル41が励磁されると、操作装置30(1)に設けられている補助接点32Aと32Bが閉じる。
リミットスイッチ48の接点48aが閉じている状態において、引き外しスイッチ45、46あるいは47が閉じられると、引き外しコイル44が励磁される。引き外しスイッチ45は、遠方監視制御装置60から引き外しが指示された場合に閉じる。引き外しスイッチ46は、作業員等が手動で操作することによって閉じる。引き外しスイッチ47は、保護継電装置から引き外しが指示された場合に閉じる。
引き外しコイル44が励磁されると、補助接点44aが閉じ、引き外しスイッチ45、46、47を迂回する自己保持回路が形成される。また、引き外しコイル44が励磁されると、操作装置30(1)に設けられている補助接点33Aと33Bが閉じる。
An example of an opening and closing device 10(1) is shown in Fig. 2. Note that Fig. 2 shows only an operating device 30(1) and a control device 40(1) that constitute the opening and closing device 10(1).
The control device 40 ( 1 ) has a closing coil 41 , closing switches 42 and 43 , a tripping coil 44 , tripping switches 45 , 46 , and 47 , and a limit switch 48 .
The limit switch 48 is a position detection switch that detects the position of the movable contact of the switchgear 20(1), and has contacts 48a and 48b. When the movable contact of the switchgear 20(1) is pulled away from the fixed contact (tripped state), the contact 48b closes and the contact 48a opens. When the movable contact of the switchgear 20(1) is in contact with the fixed contact (closed state), the contact 48b opens and the contact 48a closes.
When the contact 48b of the limit switch 48 is closed, the closing coil 41 is excited when the closing switch 42 or 43 is closed. The closing switch 42 is closed when a closing operation is instructed by the remote monitoring and control device 60. The closing switch 43 is closed by manual operation by an operator or the like.
When the closing coil 41 is excited, the auxiliary contact 41a closes, forming a self-holding circuit that bypasses the closing switches 42 and 43. In addition, when the closing coil 41 is excited, the auxiliary contacts 32A and 32B provided in the operating device 30(1) close.
When the contact 48a of the limit switch 48 is closed, the tripping coil 44 is excited when the tripping switch 45, 46 or 47 is closed. The tripping switch 45 closes when a tripping command is received from the remote monitoring and control device 60. The tripping switch 46 is closed by manual operation by an operator or the like. The tripping switch 47 closes when a tripping command is received from a protective relay.
When the tripping coil 44 is excited, the auxiliary contact 44a closes, forming a self-holding circuit that bypasses the tripping switches 45, 46, and 47. When the tripping coil 44 is excited, the auxiliary contacts 33A and 33B provided in the operating device 30(1) close.

操作装置30(1)は、電動機31、補助接点32A、32B、33A、33Bを有している。
制御装置40(1)の投入コイル41が励磁されると、補助接点32Aと32Bが閉じて、電動機31に補助接点32A側から補助接点32B側に電流が流れる。この時、電動機31は、第1回転方向に回転する。これにより、開閉器20(1)の駆動機構が駆動され、開閉器20(1)の可動接点が固定接点に接触する。開閉器20(1)の可動接点が固定接点に接触すると(投入が完了すると)、リミットスイッチ48が動作し、接点48bが開くとともに、接点48aが閉じる。これにより、投入コイル41の励磁が解除され、補助接点32Aと32Bが開くことによって電動機31への電流の供給が停止される。なお、この時、開閉器20(1)は、可動接点が固定接点に接触した状態に保持される。
一方、制御装置40(1)の引き外しコイル44が励磁されると、補助接点33Aと33Bが閉じて、電動機31に補助接点33A側から補助接点33B側に電流が流れる。この時、電動機31は、第1回転方向と逆方向の第2回転方向に回転する。これにより、開閉器20(1)の駆動機構が駆動され、開閉器20(1)の可動接点が固定接点から引き外される。開閉器20(1)の可動接点が固定接点から引き外されると(引き外しが完了すると)、リミットスイッチ48が動作し、接点48aが開くとともに、接点48bが閉じる。これにより、引き外しコイル44の励磁が解除され、補助接点33Aと33Bが開くことによって電動機31への電流の供給が停止される。なお、この時、開閉器20(1)は、可動接点が固定接点から引き外された状態に保持される。
操作装置30の構成は、図2に示されている構成に限定されず、開閉器20の、可動接点を駆動する駆動機構に応じて変更される。制御装置40の構成も、操作装置30の構成に応じて変更される。
The operating device 30(1) has an electric motor 31 and auxiliary contacts 32A, 32B, 33A, and 33B.
When the closing coil 41 of the control device 40(1) is excited, the auxiliary contacts 32A and 32B are closed, and current flows from the auxiliary contact 32A side to the auxiliary contact 32B side of the electric motor 31. At this time, the electric motor 31 rotates in the first rotation direction. This drives the drive mechanism of the switch 20(1), and the movable contact of the switch 20(1) comes into contact with the fixed contact. When the movable contact of the switch 20(1) comes into contact with the fixed contact (closing is completed), the limit switch 48 operates, and the contact 48b opens and the contact 48a closes. This releases the excitation of the closing coil 41, and the auxiliary contacts 32A and 32B open, thereby stopping the supply of current to the electric motor 31. At this time, the switch 20(1) is held in a state in which the movable contact is in contact with the fixed contact.
On the other hand, when the tripping coil 44 of the control device 40(1) is excited, the auxiliary contacts 33A and 33B are closed, and current flows from the auxiliary contact 33A side to the auxiliary contact 33B side of the electric motor 31. At this time, the electric motor 31 rotates in a second rotation direction opposite to the first rotation direction. This drives the drive mechanism of the switch 20(1), and the movable contact of the switch 20(1) is separated from the fixed contact. When the movable contact of the switch 20(1) is separated from the fixed contact (when the tripping is completed), the limit switch 48 operates, and the contact 48a opens and the contact 48b closes. This releases the excitation of the tripping coil 44, and the auxiliary contacts 33A and 33B open, thereby stopping the supply of current to the electric motor 31. At this time, the switch 20(1) is held in a state in which the movable contact is separated from the fixed contact.
2 and may be changed depending on the drive mechanism that drives the movable contact of the switch 20. The configuration of the control device 40 may also be changed depending on the configuration of the operating device 30.

開閉装置グループを構成する開閉装置10(1)~10(n)の操作装置30(1)~30(n)および制御装置40(1)~40(n)に電流を供給する電源装置50が設けられている。
電源装置50は、操作電流Ipのみを供給する操作電源51と、制御電流Icのみを供給する制御電源52と、他の設備に電流を供給する設備電源53を有している。操作電源51は、操作電流Ipを供給する専用の電源として構成され、制御電源52は、制御電流Icのみを供給する専用の電源として構成されている。操作電源51と制御電源52は、単独の電源であってもよいし、他の電源から分岐した電源であってもよい。
操作装置30(1)~30(n)は、操作電源51に並列に接続されている。すなわち、操作装置30(1)~30(n)には、専用の操作電源51から、操作電流Ip(1)~Ip(n)が供給される。
制御装置40(1)~40(n)は、制御電源52に並列に接続されている。すなわち、制御装置40(1)~40(n)には、専用の制御電源52から、制御電流Ic(1)~Ic(n)が供給される。
A power supply device 50 is provided to supply current to the operating devices 30(1) to 30(n) and control devices 40(1) to 40(n) of the switching devices 10(1) to 10(n) that constitute the switching device group.
The power supply device 50 has an operation power supply 51 that supplies only the operation current Ip, a control power supply 52 that supplies only the control current Ic, and an equipment power supply 53 that supplies current to other equipment. The operation power supply 51 is configured as a power supply dedicated to supplying the operation current Ip, and the control power supply 52 is configured as a power supply dedicated to supplying only the control current Ic. The operation power supply 51 and the control power supply 52 may be independent power supplies or may be power supplies branched off from other power supplies.
The operating devices 30(1) to 30(n) are connected in parallel to an operating power supply 51. That is, operating currents Ip(1) to Ip(n) are supplied to the operating devices 30(1) to 30(n) from a dedicated operating power supply 51.
The control devices 40(1) to 40(n) are connected in parallel to a control power supply 52. That is, the control devices 40(1) to 40(n) are supplied with control currents Ic(1) to Ic(n) from a dedicated control power supply 52.

また、操作電流値検出装置121と制御電流値検出装置122が設けられている。
操作電流値検出装置121は、操作電源51から供給される操作電流Ipの、各時点tにおける操作電流値Ip(t)を検出する。すなわち、操作電流値検出装置121は、操作装置30(1)~30(n)のいずれかに操作電流Ip1~Ipnが流れた場合に、操作電流値Ip(t)を検出する。
制御電流値検出装置122は、制御電源52から供給される制御電流Icの、各時点tにおける制御電流値Ic(t)を検出する。すなわち、制御電流値検出装置122は、制御装置40(1)~40(n)のいずれかに制御電流Ic1~Icnが流れた場合に、制御電流値Ic(t)を検出する。
操作電流値検出装置121および制御電流値検出装置122としては、公知の種々の構成の電流値検出装置を用いることができる。
In addition, an operation current value detector 121 and a control current value detector 122 are provided.
The operation current value detection device 121 detects the operation current value Ip(t) at each time point t of the operation current Ip supplied from the operation power supply 51. That is, the operation current value detection device 121 detects the operation current value Ip(t) when the operation current Ip1 to Ipn flows through any of the operation devices 30(1) to 30(n).
The control current value detection device 122 detects the control current value Ic(t) at each time point t of the control current Ic supplied from the control power supply 52. That is, the control current value detection device 122 detects the control current value Ic(t) when the control current Ic1 to Icn flows through any of the control devices 40(1) to 40(n).
As the operation current value detector 121 and the control current value detector 122, current value detectors having various known configurations can be used.

遠方監視制御装置60は、開閉装置10(1)~10(n)が設けられている変電所等から離れた位置に設置されている遠方監視制御所等に設けられる。
遠方監視制御装置60は、遠方監視制御所の操作員の操作によってまたは予め定められた時刻に、開閉装置10(1)~10(n)の制御装置40(1)~40(n)に投入あるいは引き外しを指示する。
なお、開閉装置10(1)~10(n)の動作(投入動作、引き外し動作)が重ならないように、各開閉装置10(1)~10(n)に投入あるいは引き外しが指示される。
また、遠方監視制御装置60は、開閉装置10(1)~10(n)の開閉器20(1)~20(n)の投入動作あるいは引き外し動作が行われたことを監視する。例えば、遠方監視制御装置60は、開閉器20(1)~20(n)の可動接点の位置を検出するリミットスイッチ48(1)~48(n)から出力される(送信される)信号(位置検出信号)が入力される(受信する)ことによって、開閉器20(1)~20(n)の投入動作あるいは引き外し動作が行われたことを検出する。
遠方監視制御装置60は、開閉器20(1)~20(n)の投入動作あるいは引き外し動作に関連する事象が発生した時刻を示す事象発生時刻、事象が発生した開閉装置を示す開閉装置識別情報、投入動作あるいは引き外し動作を示す動作内容を、後述する、監視装置110の動作履歴管理手段112に出力(送信)する。
The remote monitoring and control device 60 is provided in a remote monitoring and control station or the like that is installed at a location away from a substation or the like in which the switchgears 10(1) to 10(n) are installed.
The remote monitoring and control device 60 instructs the control devices 40(1) to 40(n) of the switching devices 10(1) to 10(n) to make or take off the switches, by operation of an operator at the remote monitoring and control station or at a predetermined time.
In addition, the switching devices 10(1) to 10(n) are instructed to make or break the connections so that their operations (closing operations, tripping operations) do not overlap.
The remote monitoring and control device 60 also monitors whether the switches 20(1) to 20(n) of the switching devices 10(1) to 10(n) have been closed or tripped. For example, the remote monitoring and control device 60 detects whether the switches 20(1) to 20(n) have been closed or tripped by receiving as input (receiving) a signal (position detection signal) output (transmitted) from the limit switches 48(1) to 48(n) that detect the positions of the movable contacts of the switches 20(1) to 20(n).
The remote monitoring and control device 60 outputs (transmits) to the operation history management means 112 of the monitoring device 110 described later, the event occurrence time indicating the time when an event related to the closing operation or tripping operation of the switches 20(1) to 20(n) occurred, the switchgear identification information indicating the switchgear in which the event occurred, and the operation content indicating the closing operation or tripping operation.

「開閉装置の投入動作あるいは引き外し動作に関連する事象」は、開閉装置10(1)~10(n)の動作(投入動作、引き外し動作)に関連して発生するイベント(出来事)を意味する。
「開閉装置の動作(投入動作あるいは引き外し動作)に関連する事象」としては、例えば、以下の事象を用いることができる。
遠方監視制御装置60が、開閉装置10(1)~10(n)の制御装置40(1)~40(n)に動作(投入動作、引き外し動作)を指示したことを「事象」として用いることできる。例えば、遠方監視制御装置60から制御装置40(1)~40(n)に投入信号あるいは引き外し信号を出力(送信)したことを「事象」として用いる。この場合、動作(投入動作、引き外し動作)を指示した時刻tx、動作(投入動作、引き外し動作)が指示された開閉装置10(1)~10(n)を示す開閉装置識別情報および指示した動作(投入動作、引き外し動作)を示す動作内容が、それぞれ事象発生時刻、開閉装置識別情報および動作内容に対応する。
ここで、「遠方監視制御装置60から制御装置40(1)~40(n)に投入信号あるいは引き外し信号を出力(送信)した事象」には、「制御装置40(1)~40(n)が、遠方監視制御装置60から出力(送信)された投入信号あるいは引き外し信号が入力(受信)された事象」が含まれる。
An "event related to the closing or tripping operation of the switchgear" refers to an event (occurrence) that occurs in relation to the operation (closing operation, tripping operation) of the switchgear 10(1) to 10(n).
As the "event related to the operation of the switching device (closing operation or tripping operation)", for example, the following events can be used.
An "event" can be used when the remote monitoring control device 60 instructs the control devices 40(1) to 40(n) of the switching devices 10(1) to 10(n) to perform an operation (closing operation, tripping operation). For example, an "event" can be used when the remote monitoring control device 60 outputs (transmits) a closing signal or a tripping signal to the control devices 40(1) to 40(n). In this case, the time tx at which the operation (closing operation, tripping operation) is instructed, the switching device identification information indicating the switching device 10(1) to 10(n) to which the operation (closing operation, tripping operation) is instructed, and the operation content indicating the instructed operation (closing operation, tripping operation) correspond to the event occurrence time, the switching device identification information, and the operation content, respectively.
Here, "an event in which the remote monitoring control device 60 outputs (transmits) an on signal or a trip signal to the control devices 40(1) to 40(n)" includes "an event in which the control devices 40(1) to 40(n) input (receive) an on signal or a trip signal output (transmitted) from the remote monitoring control device 60."

また、遠方監視制御装置60が、開閉装置10(1)~10(n)の開閉器20(1)~20(n)の動作(投入動作、引き外し動作)を検出したことを「事象」として用いることができる。例えば、遠方監視制御装置60が、開閉器20(1)~20(n)の可動接点の位置(例えば、可動接点が固定接点に接触した位置、可動接点が固定接点から引き離された位置)を検出するリミットスイッチから出力(送信)される位置検出信号が入力(受信)されたことを「事象」として用いる。この場合、リミットスイッチから出力(送信)された位置検出信号が遠方監視制御装置60に入力(受信)された時刻ty、リミットスイッチが設けられている開閉器20(1)~20(n)を有する開閉装置10(1)~10(n)を示す開閉装置識別情報およびリミットスイッチからの位置検出信号の内容が、それぞれ事象発生時刻、開閉装置識別情報および動作内容に対応する。
ここで、「リミットスイッチから出力(送信)された位置検出信号が遠方監視制御装置60に入力(受信)された事象」には、「リミットスイッチから遠方監視制御装置60に位置検出信号が出力(送信)された事象」が含まれる。
また、後述する動作履歴管理手段112が、開閉装置10(1)~10(n)の開閉器20(1)~20(n)の動作(投入動作、引き外し動作)を検出したことを「事象」として用いることができる。例えば、動作履歴管理手段112が、開閉器20(1)~20(n)の可動接点の位置を検出するリミットスイッチから出力(送信)される位置検出信号が入力(受信)されたことを検出したことを「事象」として用いる。この場合、リミットスイッチから出力(送信)された位置検出信号が入力(受信)されたことを動作履歴管理手段112が検出した時刻ty、リミットスイッチが設けられている開閉器20(1)~20(n)を有する開閉装置10(1)~10(n)を示す開閉装置識別情報およびリミットスイッチからの位置検出信号の内容が、それぞれ事象発生時刻、開閉装置識別情報および動作内容に対応する。
ここで、「リミットスイッチから出力(送信)された位置検出信号が入力(受信)されたことを動作履歴管理手段112が検出する事象」には、「リミットスイッチから動作履歴管理手段112(監視装置110)に位置検出信号が出力(送信)された事象」が含まれる。
In addition, the fact that the remote monitoring control device 60 has detected the operation (closing operation, tripping operation) of the switches 20(1) to 20(n) of the switching devices 10(1) to 10(n) can be used as an "event." For example, the fact that the remote monitoring control device 60 has input (received) a position detection signal output (transmitted) from a limit switch that detects the position of the movable contact of the switch 20(1) to 20(n) (for example, the position where the movable contact is in contact with the fixed contact, the position where the movable contact is separated from the fixed contact) is used as an "event." In this case, the time ty at which the position detection signal output (transmitted) from the limit switch is input (received) to the remote monitoring control device 60, the switching device identification information indicating the switching devices 10(1) to 10(n) having the switches 20(1) to 20(n) to which the limit switch is provided, and the content of the position detection signal from the limit switch correspond to the event occurrence time, the switching device identification information, and the content of the operation, respectively.
Here, "an event in which a position detection signal output (transmitted) from a limit switch is input (received) to the remote monitoring control device 60" includes "an event in which a position detection signal is output (transmitted) from the limit switch to the remote monitoring control device 60."
In addition, the detection of the operation (closing operation, tripping operation) of the switches 20(1) to 20(n) of the switching devices 10(1) to 10(n) by the operation history management means 112 described later can be used as an "event." For example, the detection of the input (reception) of a position detection signal output (transmitted) from a limit switch that detects the position of the movable contact of the switch 20(1) to 20(n) by the operation history management means 112 is used as an "event." In this case, the time ty at which the operation history management means 112 detects that the position detection signal output (transmitted) from the limit switch has been input (received), the switching device identification information indicating the switching devices 10(1) to 10(n) having the switches 20(1) to 20(n) to which the limit switch is provided, and the content of the position detection signal from the limit switch correspond to the event occurrence time, the switching device identification information, and the operation content, respectively.
Here, "an event in which the operation history management means 112 detects that a position detection signal output (transmitted) from a limit switch has been input (received)" includes "an event in which a position detection signal is output (transmitted) from the limit switch to the operation history management means 112 (monitoring device 110)."

次に、本実施形態の開閉装置監視システム100の構成を説明する。
開閉装置監視システム100は、監視装置110、監視電流値検出装置120、記憶装置130、表示装置140、入力装置150を有している。
本実施形態では、監視電流値として、操作電流値Ipと制御電流Icのうちの少なくとも一方が用いられる。このため、監視電流値検出装置120は、操作電流値検出装置121と制御電流値検出装置122を有している。
Next, the configuration of the switching gear monitoring system 100 of this embodiment will be described.
The switching gear monitoring system 100 includes a monitoring device 110 , a monitoring current value detection device 120 , a storage device 130 , a display device 140 , and an input device 150 .
In this embodiment, at least one of the operation current value Ip and the control current value Ic is used as the monitored current value. For this reason, the monitored current value detection device 120 includes an operation current value detection device 121 and a control current value detection device 122.

監視装置110は、CPU等の処理装置により構成され、監視電流値処理手段111、動作履歴管理手段112、異常動作判別手段113を有している。
監視電流値処理手段111は、監視電流値検出装置120で検出された、各時刻tにおける監視電流値と検出した時刻tを含む監視電流を、記憶装置130の監視電流情報データベース133に記憶する処理を実行する。
具体的には、操作電流値検出装置121で検出された、各時刻tにおける操作電流値Ip(t)と検出した時刻tを含む操作電流情報を、記憶装置130の監視電流情報データベース133を構成する操作電流情報データベース134に記憶する処理を実行する。また、制御電流値検出装置122で検出された、各時刻tにおける制御電流値Ic(t)と検出した時刻tを含む制御電流情報を、記憶装置130の監視電流情報データベース133を構成する制御電流情報データベース135に記憶する処理を実行する。時刻(t)としては、例えば、操作電流値Ip(t)や制御電流値Ic(t)を所定時間間隔(サンプリング周期)で読み取る(入力する)場合には、所定時間間隔毎の時刻が用いられる。
動作履歴管理手段112は、事象発生時刻、開閉装置識別情報および動作内容を含む動作履歴を、記憶装置130の動作履歴データベース132に記憶する処理を実行する。事象発生時刻としては、例えば、遠方監視制御装置60から制御装置40(1)~40(n)に投入あるいは引き外しが指示された時刻txが用いられる。また、事象発生時刻としては、開閉器20(1)~20(n)が動作したことを遠方監視制御装置60が検出した時刻tyあるいは開閉器20(1)~20(n)が動作したことを動作履歴管理手段112が検出した時刻tyが用いられる。
遠方監視制御装置60から制御装置30(1)~30(n)に投入あるいは引き外しが指示された時刻txあるいは開閉器20(1)~20(n)が動作したことを遠方監視制御装置60が検出した時刻tyと、開閉装置識別情報および動作内容は、例えば、遠方監視制御装置60から入力される。また、開閉器20(1)~20(n)が動作したことを動作履歴管理手段112が検出した時刻tyと、開閉装置識別情報および動作内容は、例えば、開閉器20(1)~20(n)の可動接点の位置を検出するリミットスイッチから出力(送信)された位置検出信号が入力(受信)されたことを動作履歴管理手段112が検出することによって判別する。
異常動作判別手段113は、詳しくは後述するが、異常動作判別情報データベース131に記憶されている異常動作判別情報、動作履歴データベース132に記憶されている動作履歴、監視電流情報データベース133に記憶されている監視電流値(操作電流情報データベース134に記憶されている操作電流値、制御電流情報データベース135に記憶されている制御電流値)に基づいて、開閉装置10(1)~10(n)の異常動作を判別する処理を実行する。
The monitoring device 110 is configured with a processing device such as a CPU, and has a monitored current value processing means 111 , an operation history management means 112 , and an abnormal operation determination means 113 .
The monitored current value processing means 111 executes a process of storing the monitored current, including the monitored current value at each time t and the detection time t, detected by the monitored current value detection device 120, in a monitored current information database 133 of the storage device 130.
Specifically, a process is executed to store operation current information including the operation current value Ip(t) at each time t detected by the operation current value detection device 121 and the detection time t in an operation current information database 134 constituting a monitoring current information database 133 of the storage device 130. Also, a process is executed to store control current information including the control current value Ic(t) at each time t detected by the control current value detection device 122 and the detection time t in a control current information database 135 constituting a monitoring current information database 133 of the storage device 130. For example, when the operation current value Ip(t) or the control current value Ic(t) is read (input) at a predetermined time interval (sampling period), a time at each predetermined time interval is used as the time (t).
The operation history management means 112 executes a process of storing an operation history including an event occurrence time, switching device identification information, and operation details in an operation history database 132 of the storage device 130. For example, the time tx at which the remote monitoring control device 60 issues an instruction to close or trip the control devices 40(1) to 40(n) is used as the event occurrence time. In addition, the time ty at which the remote monitoring control device 60 detects that the switches 20(1) to 20(n) have operated, or the time ty at which the operation history management means 112 detects that the switches 20(1) to 20(n) have operated is used as the event occurrence time.
The time tx when the remote monitoring control device 60 issues an instruction to the control devices 30(1) to 30(n) to make a connection or tripping, or the time ty when the remote monitoring control device 60 detects that the switches 20(1) to 20(n) have operated, the switchgear identification information, and the operation details are, for example, input from the remote monitoring control device 60. In addition, the time ty when the operation history management means 112 detects that the switches 20(1) to 20(n) have operated, the switchgear identification information, and the operation details are determined, for example, by the operation history management means 112 detecting that a position detection signal output (transmitted) from a limit switch that detects the position of the movable contact of the switches 20(1) to 20(n) has been input (received).
The abnormal operation discrimination means 113, which will be described in detail later, executes a process of discriminating abnormal operation of the opening and closing devices 10(1) to 10(n) based on the abnormal operation discrimination information stored in the abnormal operation discrimination information database 131, the operation history stored in the operation history database 132, and the monitored current values stored in the monitored current information database 133 (the operation current values stored in the operation current information database 134 and the control current values stored in the control current information database 135).

監視電流値処理手段111、動作履歴管理手段112および異常動作判別手段113は、同じ処理装置により構成してもよいし、異なる処理装置により構成してもよい。
また、監視電流値処理手段111、動作履歴管理手段112および異常動作判別手段113を異なる処理装置で構成する場合、近くに配置してもよいし、離れた箇所に配置してもよい。本実施形態では、監視電流値処理手段111は、変電所等に配置されている処理装置により構成され、動作履歴管理手段112と異常動作判別手段113は、遠方監視制御所等に配置されている処理装置により構成されている。
動作履歴管理手段112による動作履歴管理処理は、監視電流値処理手段111あるいは異常動作判別手段113により実行するように構成することもできる。
なお、予め用意された動作履歴データベース132および監視電流情報データベース133(操作電流情報データベース134、制御電流情報データベース)を用いる場合には、操作電流値検出装置121、制御電流値検出装置122、監視電流値処理手段111、動作履歴管理手段112を省略することができる。
The monitored current value processing means 111, the operation history management means 112 and the abnormal operation determination means 113 may be configured by the same processing device, or may be configured by different processing devices.
Furthermore, when the monitored current value processing means 111, the operation history management means 112, and the abnormal operation determination means 113 are configured by different processing devices, they may be located nearby or at distant locations. In this embodiment, the monitored current value processing means 111 is configured by a processing device located in a substation or the like, and the operation history management means 112 and the abnormal operation determination means 113 are configured by processing devices located in a remote monitoring and control station or the like.
The operation history management process by the operation history management means 112 can also be configured to be executed by the monitored current value processing means 111 or the abnormal operation determination means 113.
In addition, when using a pre-prepared operation history database 132 and monitoring current information database 133 (operation current information database 134, control current information database), the operation current value detection device 121, the control current value detection device 122, the monitoring current value processing means 111, and the operation history management means 112 can be omitted.

記憶装置130は、公知の記憶装置により構成され、異常動作判別情報データベース131、動作履歴データベース132、監視電流情報データベース133を有している。
異常動作判別情報データベース131には、開閉装置10(1)~10(n)の投入動作時あるいは引き外し動作時における監視電流値情報に基づいて、開閉装置10(1)~10(n)の異常動作を判別するための異常動作判別情報が記憶される。監視電流情報は、時刻tにおける監視電流値と検出した時刻tを含んでいる。本実施形態では、時刻tにおける監視電流値として、時刻tにおける制御電流値Ic(t)および操作電流値Ip(t)のうちの少なくとも一方が用いられている。
異常動作判別情報データベース141の一例が、図3に示されている。図3に示されている異常動作判別情報データベースには、開閉装置を示す開閉装置識別情報、動作内容(投入動作、引き外し動作)、異常動作を判別する電流種別(制御電流、操作電流)、異常動作判別情報が記憶されている。すなわち、投入動作時あるいは引き外し動作時における制御電流値Ic(t)あるいは操作電流値Ip(t)に基づいて異常動作を判別するための異常動作判別情報が、開閉装置識別情報および動作内容に対応させて記憶される。
なお、異常動作判別情報データベース131に、制御電流値Ic(t)に対する異常動作判別情報および操作電流値Ip(t)に対する異常動作判別情報の両方を記憶させる必要はなく、一方のみでもよい。また、制御電流値Ic(t)や操作電流値Ip(t)により開閉装置の異常動作を判別するのが困難な場合には、制御電流値Ic(t)や操作電流値Ip(t)に対する異常動作判別情報は省略される。
The storage device 130 is configured using a known storage device, and has an abnormal operation determination information database 131 , an operation history database 132 , and a monitored current information database 133 .
The abnormal operation determination information database 131 stores abnormal operation determination information for determining abnormal operation of the switching devices 10(1) to 10(n) based on monitoring current value information during the closing operation or tripping operation of the switching devices 10(1) to 10(n). The monitoring current information includes the monitoring current value at time t and the detection time t. In this embodiment, at least one of the control current value Ic(t) and the operation current value Ip(t) at time t is used as the monitoring current value at time t.
An example of the abnormal operation determination information database 141 is shown in Fig. 3. The abnormal operation determination information database shown in Fig. 3 stores switching device identification information indicating a switching device, operation details (closing operation, tripping operation), current type for determining abnormal operation (control current, operation current), and abnormal operation determination information. That is, abnormal operation determination information for determining abnormal operation based on the control current value Ic(t) or operation current value Ip(t) during the closing operation or tripping operation is stored in association with the switching device identification information and the operation details.
It is not necessary to store both the abnormal operation discrimination information for the control current value Ic(t) and the abnormal operation discrimination information for the operation current value Ip(t) in the abnormal operation discrimination information database 131; only one of them may be stored. Furthermore, when it is difficult to discriminate an abnormal operation of the switching device from the control current value Ic(t) or the operation current value Ip(t), the abnormal operation discrimination information for the control current value Ic(t) or the operation current value Ip(t) is omitted.

動作履歴データベース132には、開閉装置10(1)~10(n)の投入動作あるいは引き外し動作に関連する事象が発生した時刻を示す事象発生時刻(tx、ty)、開閉装置を示す開閉装置識別情報および動作内容を含む動作履歴が記憶される。動作履歴データベース132の一例が、図4に示されている。
監視電流情報データベース133には、時刻tにおける監視電流値と時刻tを含む監視電流情報が記憶される。本実施形態では、監視電流として、操作電流Ipと制御電流Icのうちの少なくとも一方の電流が用いられている。すなわち、監視電流情報データベース133は、操作電流情報データベース134と制御電流情報データベース135を有している。
操作電流情報データベース134には、操作電流値検出装置121で検出された、時刻tにおける操作電流値Ip(t)と時刻tを含む操作電流情報が記憶される。
制御電流情報データベース135には、制御電流値検出装置122で検出された、時刻tにおける制御電流値Ic(t)と時刻tを含む制御電流情報が記憶される。
操作電流情報データベース134と制御電流情報データベース135の一例が、図4に示されている。
The operation history database 132 stores an operation history including an event occurrence time (tx, ty) indicating the time when an event related to the closing operation or tripping operation of the switching devices 10(1) to 10(n) occurred, switching device identification information indicating the switching device, and the operation content. An example of the operation history database 132 is shown in FIG. 4.
The monitoring current information database 133 stores monitoring current information including a monitoring current value at time t and time t. In this embodiment, at least one of the operation current Ip and the control current Ic is used as the monitoring current. That is, the monitoring current information database 133 has an operation current information database 134 and a control current information database 135.
The operation current information database 134 stores operation current information including the operation current value Ip(t) at time t detected by the operation current value detection device 121 and time t.
The control current information database 135 stores control current information including the control current value Ic(t) at time t detected by the control current value detection device 122 and the time t.
An example of the operation current information database 134 and the control current information database 135 is shown in FIG.

表示装置140としては、公知の種々の構成の表示装置を用いることができる。表示装置140には、監視装置110の異常動作判別手段113で実行した異常動作判別処理の結果等を表示可能である。なお、異常動作判別処理の結果等を出力する出力装置としては、印刷装置等を用いることもできる。
入力装置150としては、公知の種々の構成の入力装置を用いることができる。入力装置150を介して、種々の情報を入力することが可能である。
Display devices of various known configurations can be used as the display device 140. The display device 140 can display the results of the abnormal operation determination process executed by the abnormal operation determination means 113 of the monitoring device 110. Note that a printing device or the like can also be used as an output device that outputs the results of the abnormal operation determination process.
Any known input device having any of various configurations can be used as the input device 150. Various information can be input via the input device 150.

監視装置110、記憶装置130、表示装置140、入力装置150は、近接して配置することもできるし、離れた場所に配置することもできる。
例えば、パソコン等の処理装置を、監視装置110の異常動作判別手段113の処理機能を実行可能に構成する。そして、パソコンを、通信回線を介して記憶装置130に接続することにより、あるいは、記憶装置130に記憶されている情報が書き込まれたUSBメモリ等をパソコンに接続することにより、開閉装置10(1)~10(n)の異常判別処理を実行することもできる。
The monitoring device 110, the storage device 130, the display device 140, and the input device 150 may be located in close proximity to each other or at separate locations.
For example, a processing device such as a personal computer is configured to be capable of executing the processing function of the abnormal operation determination means 113 of the monitoring device 110. Then, by connecting the personal computer to the storage device 130 via a communication line, or by connecting a USB memory or the like in which the information stored in the storage device 130 is written to the personal computer, the abnormality determination process for the opening and closing devices 10(1) to 10(n) can also be executed.

次に、開閉装置10(1)~10(n)の異常動作を判別する方法の実施例を説明する。
先ず、監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]に基づいて、開閉装置10(1)~10(n)の動作時間を判別する方法を説明する。
前述したように、操作電源51は、開閉装置10(1)~10(n)の操作装置30(1)~30(n)に操作電流Ip(1)~Ip(n)のみを供給する専用の電源装置として設けられている。
このため、操作装置30(1)~30(n)が動作していない(投入あるいは引き外しが指示されていない)場合には、操作電源51から操作電流Ipが供給されない。すなわち、操作電流値Ip(t)は、[0]である。
一方、操作装置30(1)~30(n)のうちのいずれか一つが動作する場合には、当該操作装置が動作を開始してから終了するまでの間、操作電源51から当該操作装置に操作電流が供給される。すなわち、当該操作装置の動作時間Sの間、操作電流値Ip(t)は、[0]より大きくなる。
このため、操作電流値Ip(t)が[0]より大きくなった時刻tsと、その後、[0]となった時刻teを判別することによって、操作電流値Ip(t)が[0]より大きい時間、すなわち、動作時間S(S=te-ts)を判別することができる。
この場合、操作電流値Ip(t)が[0]より大きい時間(動作時間)Sと、操作装置(操作装置を有する開閉装置)および動作内等との対応関係を判別する必要がある。
Next, an embodiment of a method for determining whether the switching devices 10(1) to 10(n) are operating abnormally will be described.
First, a method for determining the operation time of the switching devices 10(1) to 10(n) based on the monitored current values [operation current value Ip(t), control current value Ic(t)] will be described.
As described above, the operation power supply 51 is provided as a dedicated power supply device that supplies only the operation currents Ip(1) to Ip(n) to the operation devices 30(1) to 30(n) of the switching devices 10(1) to 10(n).
Therefore, when the operating devices 30(1) to 30(n) are not operating (when no command to turn on or off has been issued), the operating current Ip is not supplied from the operating power supply 51. In other words, the operating current value Ip(t) is [0].
On the other hand, when any one of the operating devices 30(1) to 30(n) is operating, an operating current is supplied to the operating device from the operating power supply 51 during the period from when the operating device starts to when the operating device ends. That is, during the operating time S of the operating device, the operating current value Ip(t) becomes greater than [0].
Therefore, by determining the time ts when the operating current value Ip(t) becomes greater than [0] and the time te when it subsequently becomes [0], it is possible to determine the time when the operating current value Ip(t) is greater than [0], i.e., the operating time S (S = te - ts).
In this case, it is necessary to determine the correspondence between the time (operation time) S during which the operating current value Ip(t) is greater than [0] and the operating device (opening/closing device having the operating device), the operation time, etc.

また、制御電源52は、開閉装置10(1)~10(n)の制御装置40(1)~40(n)に制御電流Ic(1)~Ic(n)のみを供給する専用の電源装置として設けられている。
このため、前述した、操作電流値Ip(t)に基づいて開閉装置10(1)~10(n)の動作時間Sを判別する方法と同様の方法を用いて、制御電流値Ic(t)に基づいて開閉装置10(1)~10(n)の動作時間Sを判別することができる。
すなわち、制御電流値Ic(t)が[0]より大きくなった時刻tsと、その後、[0]となった時刻teを判別することによって、制御電流値Ic(t)が[0]より大きい時間を動作時間S(S=te-ts)として判別することができる。
この場合も、制御電流値Ic(t)が[0]より大きい時間(動作時間)Sと、制御装置(制御装置を有する開閉装置)および動作内容との対応関係を判別する必要がある。
Further, the control power supply 52 is provided as a dedicated power supply device that supplies only the control currents Ic(1) to Ic(n) to the control devices 40(1) to 40(n) of the switching devices 10(1) to 10(n).
For this reason, the operation time S of the switching devices 10(1) to 10(n) can be determined based on the control current value Ic(t) using a method similar to the method for determining the operation time S of the switching devices 10(1) to 10(n) based on the operation current value Ip(t) described above.
In other words, by determining the time ts when the control current value Ic(t) becomes greater than [0] and the time te when it subsequently becomes [0], the time when the control current value Ic(t) is greater than [0] can be determined as the operating time S (S = te - ts).
In this case as well, it is necessary to determine the correspondence between the time (operation time) S during which the control current value Ic(t) is greater than [0], the control device (the switching device having the control device), and the operation content.

監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]に基づいて判別した動作時間Sと開閉装置および動作内容との対応関係は、動作履歴に基づいて判別することができる。
監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]に基づいて判別した動作時間Sと開閉装置および動作内容との対応関係を動作履歴に基づいて判別する方法として、第1の判別方法と第2の判別方法を用いることができる。
第1の判別方法では、監視電流情報データベース133から監視電流値[Ip(t)、Ic(t)]を読み出す。そして、読み出した監視電流値[Ip(t)、Ic(t)]が[0]より大きくなった時刻(動作開始時刻ts)と、その後に[0]となった時刻(動作終了時刻te]を判別する。さらに、動作履歴データベースに記憶されている動作履歴の中から、判別した動作開始時刻tsと動作終了時刻teに近い事象発生時刻(tx、ty)を含む動作履歴を判別(選択)する。この場合、判別した動作時間S(=te-ts)と開閉装置および動作内容との対応関係は、判別(選択)した動作履歴に含まれている開閉装置識別情報および動作内容に基づいて判別することができる。
第2の判別方法では、動作履歴データベース132から動作履歴を読み出す。そして、読み出した動作履歴に含まれている事象発生時刻(tx、ty)に基づいて、監視電流情報データベース133からの、監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]の抽出を開始する抽出開始時刻taを決定する。さらに、抽出開始時刻taから抽出した監視電流値[Ip(t)、Ic(t)]が[0]より大きくなった時刻(動作開始時刻ts)と、その後に[0]となった時刻(動作終了時刻te)を判別する。この場合、判別した動作時間S(=te-ts)と開閉装置および動作内容との対応関係は、読み出した動作履歴に含まれている開閉装置識別情報と動作内容に基づいて判別することができる。
The correspondence between the operation time S determined based on the monitored current values [operation current value Ip(t), control current value Ic(t)] and the switching device and operation content can be determined based on the operation history.
The first and second discrimination methods can be used as methods for discriminating the correspondence between the operation time S determined based on the monitored current value [operation current value Ip(t), control current value Ic(t)] and the opening/closing device and operation content based on the operation history.
In the first determination method, the monitored current values [Ip(t), Ic(t)] are read from the monitored current information database 133. Then, the time (operation start time ts) when the read monitored current values [Ip(t), Ic(t)] become greater than [0] and the time (operation end time te) when they become [0] after that are determined. Furthermore, from among the operation histories stored in the operation history database, an operation history including an event occurrence time (tx, ty) close to the determined operation start time ts and operation end time te is determined (selected). In this case, the correspondence relationship between the determined operation time S (=te-ts) and the switching device and operation content can be determined based on the switching device identification information and operation content included in the determined (selected) operation history.
In the second determination method, the operation history is read from the operation history database 132. Then, based on the event occurrence time (tx, ty) included in the read operation history, an extraction start time ta is determined at which extraction of the monitored current value [operation current value Ip(t), control current value Ic(t)] from the monitored current information database 133 is started. Furthermore, the time (operation start time ts) at which the monitored current value [Ip(t), Ic(t)] extracted from the extraction start time ta becomes greater than [0] and the time (operation end time te) at which it subsequently becomes [0] are determined. In this case, the correspondence between the determined operation time S (=te-ts) and the switching device and operation content can be determined based on the switching device identification information and operation content included in the read operation history.

第1の判別方法を、図5を参照して具体的に説明する。図5は、開閉装置10(1)の投入動作時における異常動作を、制御電流値Ic(t)に基づいて判別する方法の一例を示したものである。開閉装置10(1)の投入動作時における制御電流値Ic(t)に対応する異常動作判別情報は、図3に示されている。
異常動作判別手段113は、以下の処理を実行する。
制御電流情報データベース135から、制御電流値Ic(t)を順次抽出する。
抽出した制御電流値Ic(t)が閾値I0を超えた時刻を初期時刻tiとする。閾値I0は、[0]より大きい値が設定される。
初期時刻tiに基づいて、抽出開始時刻taを決定する。
図5に実線で示されている制御電流Ic11に対しては、初期時刻ti11から第1指定時間T1前の時刻を抽出開始時刻ta11(=ti11-T1)として決定する。
制御電流情報データベース135に記憶されている制御電流値Ic(t)を、抽出開始時刻ta11から順に抽出する。
抽出した制御電流値Ic(t)が[0]を超えた時刻を、動作開始時刻tsとして判別する。
ここで、制御電流値Ic(t)が[0]を超えた時刻を判別するのは難しい。このため、制御電流値Ic(t)が、[0]より少し大きい値を超えた時刻を、制御電流値Ic(t)が[0]を超えた時刻として判別する方法を用いることもできる。すなわち、制御電流値Ic(t)が[略0]を超えた時刻を、動作開始時刻tsとして判別する。
次に、動作開始時刻ts後に、制御電流値Ic(t)が[0]となった時刻を、動作終了時刻teとして判別する。
ここで、制御電流値Ic(t)が[0]となった時刻を判別するのは難しい。このため、制御電流値Ic(t)が、[0]より少し大きい値となった時刻を、制御電流値Ic(t)が[0]となった時刻として判別する方法を用いることもできる。すなわち、制御電流値Ic(t)が[略0]となった時刻を、動作終了時刻teとして判別する。
そして、動作開始時刻tsと動作終了時刻teの間の時間を、動作時間S(=te-ts)として判別する。
図5に実線で示されている制御電流Ic11に対しては、動作開始時刻ts11と動作終了時刻te11の間の動作時間S11(=te11-ts11)を判別する。
動作履歴データベース132に記憶されている動作履歴の中から、動作開始時刻ts11と動作終了時刻te11に近い事象発生時刻(tx、ty)を含んでいる動作履歴を選択する。
そして、選択した動作履歴に基づいて、判別した動作時間Sと開閉装置および動作内容との対応関係を判別する。図5に示されている例では、判別した動作時間Sは、選択した動作履歴に含まれている開閉装置識別情報で示される開閉装置(図5に示されている例では、開閉装置10(1))の、選択した動作履歴に含まれている動作内容(図5に示されている例では、投入動作)に対応する動作時間であることを判別することができる。
The first discrimination method will be specifically described with reference to Fig. 5. Fig. 5 shows an example of a method for discriminating an abnormal operation during a closing operation of the switchgear 10(1) based on the control current value Ic(t). The abnormal operation discrimination information corresponding to the control current value Ic(t) during a closing operation of the switchgear 10(1) is shown in Fig. 3.
The abnormal operation determination means 113 executes the following process.
The control current values Ic(t) are extracted in sequence from the control current information database 135 .
The time when the extracted control current value Ic(t) exceeds the threshold value I0 is set as the initial time ti. The threshold value I0 is set to a value greater than [0].
Based on the initial time ti, the extraction start time ta is determined.
For the control current Ic11 indicated by a solid line in FIG. 5, the time preceding the initial time ti11 by the first designated time T1 is determined as the extraction start time ta11 (=ti11-T1).
The control current values Ic(t) stored in the control current information database 135 are extracted in order from the extraction start time ta11.
The time when the extracted control current value Ic(t) exceeds [0] is determined as the operation start time ts.
Here, it is difficult to determine the time when the control current value Ic(t) exceeds [0]. For this reason, a method can be used in which the time when the control current value Ic(t) exceeds a value slightly larger than [0] is determined as the time when the control current value Ic(t) exceeds [0]. In other words, the time when the control current value Ic(t) exceeds [approximately 0] is determined as the operation start time ts.
Next, the time when the control current value Ic(t) becomes [0] after the operation start time ts is determined as the operation end time te.
Here, it is difficult to determine the time when the control current value Ic(t) becomes [0]. For this reason, a method can be used in which the time when the control current value Ic(t) becomes a value slightly larger than [0] is determined as the time when the control current value Ic(t) becomes [0]. In other words, the time when the control current value Ic(t) becomes [almost 0] is determined as the operation end time te.
Then, the time between the motion start time ts and the motion end time te is determined as motion time S (=te-ts).
For the control current Ic11 shown by the solid line in FIG. 5, the operation time S11 (=te11-ts11) between the operation start time ts11 and the operation end time te11 is determined.
Among the operation histories stored in the operation history database 132, an operation history including an event occurrence time (tx, ty) close to the operation start time ts11 and the operation end time te11 is selected.
Then, based on the selected operation history, a correspondence relationship between the determined operation time S and the opening/closing device and the operation content is determined. In the example shown in Fig. 5, it can be determined that the determined operation time S is an operation time corresponding to the operation content (in the example shown in Fig. 5, the closing operation) included in the selected operation history of the opening/closing device (in the example shown in Fig. 5, the opening/closing device 10(1)) indicated by the opening/closing device identification information included in the selected operation history.

なお、図5に示されている第2指定時間T2は、抽出時間である。抽出開始時刻taから制御電流値Ic(t)の抽出を開始した後、第2指定時間T2が経過して抽出終了時刻tb(=ta+T2)に達した場合には、図5に示されている制御電流値Ic(t)に基づいて動作開始時刻tsおよび動作終了時刻teを判別する処理を中止する。図5に示されている例では、抽出開始時刻ta11から第2指定時間T2が経過した時刻が、抽出終了時刻tb11として設定される。
ここで、開閉装置10(1)~10(n)の、通常の投入動作時間は、大きな差がない。このため、第1指定時間T1を適切な値に設定することにより、制御電流値Ic(t)が閾値I0を超えた初期時刻tiから第1指定時間T1前の抽出開始時刻ta(=ti-T1)から制御電流値Ic(t)の抽出を開始した場合でも、開閉装置10(1)~10(n)の投入動作時の異常動作を判別可能な動作時間Sを判別することができる。
投入動作時における、制御電流値Ic(t)に対する第2指定時間T2についても、同様に適切な値に設定することができる。
The second designated time T2 shown in Fig. 5 is the extraction time. After the extraction of the control current value Ic(t) is started from the extraction start time ta, when the second designated time T2 has elapsed and the extraction end time tb (=ta+T2) is reached, the process of determining the operation start time ts and the operation end time te based on the control current value Ic(t) shown in Fig. 5 is stopped. In the example shown in Fig. 5, the time when the second designated time T2 has elapsed from the extraction start time ta11 is set as the extraction end time tb11.
Here, there is no significant difference in the normal closing operation times of the switching devices 10(1) to 10(n). Therefore, by setting the first specified time T1 to an appropriate value, it is possible to determine the operation time S during which abnormal operation can be identified during the closing operation of the switching devices 10(1) to 10(n), even if extraction of the control current value Ic(t) is started from the extraction start time ta (=ti-T1) that is the first specified time T1 before the initial time ti at which the control current value Ic(t) exceeded the threshold value I0.
The second specified time T2 for the control current value Ic(t) during the closing operation can also be set to an appropriate value in the same manner.

第1の判別方法を、図6を参照して説明する。図6は、開閉装置10(1)の引き外し動作時における異常動作を、制御電流値Ic(t)に基づいて判別する方法の一例を示したものである。開閉装置10(1)の引き外し動作時における制御電流値Ic(t)に対応する異常動作判別情報は、図3に示されている。
異常動作判別手段113は、図5に示されている開閉装置10(1)の投入動作時と同様に、以下の処理を実行する。
制御電流情報データベース135から抽出した制御電流値Ic(t)が閾値I0を超えた時刻を初期時刻tiとする。
初期時刻tiに基づいて、抽出開始時刻taを決定する。
図6に実線で示されている制御電流Ic21に対しては、初期時刻ti21から第1指定時間T1前の時刻を、抽出開始時刻ta21(=ti21-T1)として決定する。
制御電流情報データベース135に記憶されている制御電流値Ic(t)を、抽出開始時刻taから順に抽出する。
抽出した制御電流値Ic(t)が[0]([略0]を含む)を超えた時刻を、動作開始時刻tsとして判別する。また、動作開始時刻ts後に、制御電流値Ic(t)が[0]([略0]を含む)となった時刻を、動作終了時刻teとして判別する。
そして、動作開始時刻tsと動作終了時刻teの間の時間を、動作時間S(=te-ts)として判別する。
図6に実線で示されている制御電流Ic21に対しては、動作開始時刻ts21と動作終了時刻te21の間の動作時間S21(=te21-ts21)を判別する。
動作履歴データベース132に記憶されている動作履歴の中から、動作開始時刻ts21と動作終了時刻te21に近い事象発生時刻(tx、ty)を含んでいる動作履歴を選択する。
そして、選択した動作履歴に基づいて、判別した動作時間Sと開閉装置および動作内容との対応関係を判別する。図6に示されている例では、判別した動作期間Sは、選択した動作履歴に含まれている開閉装置識別情報で示される開閉装置(図6に示されている例では、開閉装置10(1))の、選択した動作履歴に含まれている動作内容(図6に示されている例では、引き外し動作)に対応する動作時間であることを判別することができる。
The first determination method will be described with reference to Fig. 6. Fig. 6 shows an example of a method for determining an abnormal operation during a tripping operation of the switching device 10(1) based on the control current value Ic(t). The abnormal operation determination information corresponding to the control current value Ic(t) during a tripping operation of the switching device 10(1) is shown in Fig. 3.
The abnormal operation determination means 113 executes the following process in the same manner as during the closing operation of the opening/closing device 10(1) shown in FIG.
The time when the control current value Ic(t) extracted from the control current information database 135 exceeds the threshold value I0 is defined as the initial time ti.
Based on the initial time ti, the extraction start time ta is determined.
For the control current Ic21 indicated by a solid line in FIG. 6, the time preceding the initial time ti21 by the first designated time T1 is determined as the extraction start time ta21 (=ti21-T1).
The control current values Ic(t) stored in the control current information database 135 are extracted in order from the extraction start time ta.
The time when the extracted control current value Ic(t) exceeds [0] (including [approximately 0]) is determined as the operation start time ts. In addition, the time when the control current value Ic(t) becomes [0] (including [approximately 0]) after the operation start time ts is determined as the operation end time te.
Then, the time between the motion start time ts and the motion end time te is determined as motion time S (=te-ts).
For the control current Ic21 shown by the solid line in FIG. 6, the operation time S21 (=te21-ts21) between the operation start time ts21 and the operation end time te21 is determined.
Among the operation histories stored in the operation history database 132, an operation history including an event occurrence time (tx, ty) close to the operation start time ts21 and the operation end time te21 is selected.
Then, based on the selected operation history, a correspondence relationship between the determined operation time S and the opening/closing device and the operation content is determined. In the example shown in Fig. 6, it can be determined that the determined operation period S is an operation time corresponding to the operation content (tripping operation in the example shown in Fig. 6) included in the selected operation history of the opening/closing device (opening/closing device 10(1) in the example shown in Fig. 6) indicated by the opening/closing device identification information included in the selected operation history.

第1の判別方法を、図7を参照して説明する。図7は、開閉装置10(2)の投入動作時における異常動作を、操作電流値Ip(t)に基づいて判別する方法の一例を示したものである。開閉装置10(2)の投入動作時における操作電流値Ip(t)に対応する異常動作判別情報は、図3に示されている。
異常動作判別手段113は、図5に示されている開閉装置10(1)の投入動作時と同様に、以下の処理を実行する。
操作電流情報データベース134から抽出した操作電流値Ip(t)が閾値I0を超えた時刻を初期時刻tiとする。
初期時刻tiに基づいて、抽出開始時刻taを決定する。
図7に実線で示されている操作電流Ip31に対しては、初期時刻ti31から第1指定時間T1前の時刻を、抽出開始時刻ta31(=ti31-T1)として決定する。
操作電流情報データベース134に記憶されている操作電流値Ip(t)を、抽出開始時刻taから順に抽出する。
抽出した操作電流値Ip(t)が[0]([略0]を含む)を超えた時刻を、動作開始時刻tsとして判別する。また、動作開始時刻ts後に、操作電流値Ip(t)が[0]([略0]を含む)となった時刻を、動作終了時刻teとして判別する。
そして、動作開始時刻tsと動作終了時刻teの間の時間を、動作時間S(=te-ts)として判別する。
図7に実線で示されている操作電流Ip31に対しては、動作開始時刻ts31と動作終了時刻te31の間の動作時間S31(=te31-ts31)を判別する。
動作履歴データベース132に記憶されている動作履歴の中から、動作開始時刻tsと動作終了時刻teに近い事象発生時刻(tx、ty)を含んでいる動作履歴を選択する。
そして、選択した動作履歴に基づいて、判別した動作時間Sと開閉装置および動作内容との対応関係を判別する。図7に示されている例では、判別した動作期間Sは、選択した動作履歴に含まれている開閉装置識別情報で示される開閉装置(図7に示されている例では、開閉装置10(2))の、選択した動作履歴に含まれている動作内容(図7に示されている例では、投入動作)に対応する動作時間であることを判別することができる。
The first determination method will be described with reference to Fig. 7. Fig. 7 shows an example of a method for determining an abnormal operation during a closing operation of the switching device 10(2) based on the operation current value Ip(t). The abnormal operation determination information corresponding to the operation current value Ip(t) during a closing operation of the switching device 10(2) is shown in Fig. 3.
The abnormal operation determination means 113 executes the following process in the same manner as during the closing operation of the opening/closing device 10(1) shown in FIG.
The time when the operation current value Ip(t) extracted from the operation current information database 134 exceeds the threshold value I0 is defined as the initial time ti.
Based on the initial time ti, the extraction start time ta is determined.
For the operating current Ip31 indicated by a solid line in FIG. 7, the time preceding the initial time ti31 by the first designated time T1 is determined as the extraction start time ta31 (=ti31-T1).
The operation current values Ip(t) stored in the operation current information database 134 are extracted in order from the extraction start time ta.
The time when the extracted operation current value Ip(t) exceeds [0] (including [approximately 0]) is determined as the operation start time ts. In addition, the time when the operation current value Ip(t) becomes [0] (including [approximately 0]) after the operation start time ts is determined as the operation end time te.
Then, the time between the motion start time ts and the motion end time te is determined as motion time S (=te-ts).
For the operating current Ip31 shown by the solid line in FIG. 7, the operation time S31 (=te31-ts31) between the operation start time ts31 and the operation end time te31 is determined.
From among the operation histories stored in the operation history database 132, an operation history including an event occurrence time (tx, ty) close to the operation start time ts and the operation end time te is selected.
Then, based on the selected operation history, the correspondence relationship between the determined operation time S and the opening/closing device and the operation content is determined. In the example shown in Fig. 7, it can be determined that the determined operation period S is an operation time corresponding to the operation content (in the example shown in Fig. 7, the closing operation) included in the selected operation history of the opening/closing device (in the example shown in Fig. 7, the opening/closing device 10(2)) indicated by the opening/closing device identification information included in the selected operation history.

第1の判別方法を、図8を参照して説明する。図8は、開閉装置10(3)の投入動作時における異常動作を、操作電流値Ip(t)に基づいて判別する方法の一例を示したものである。開閉装置10(3)の投入動作時における操作電流値Ip(t)に対応する異常動作判別情報は、図3に示されている。
異常動作判別手段113は、図5に示されている開閉装置10(1)の投入動作時と同様に、以下の処理を実行する。
操作電流情報データベース134から抽出した操作電流値Ip(t)が閾値I0を超えた時刻を初期時刻tiとする。
初期時刻tiに基づいて、抽出開始時刻taを決定する。
図8に実線で示されている操作電流Ipに対しては、初期時刻ti41から第1指定時間T1前の時刻を抽出開始時刻ta41(=ti41-T3)として決定する。
操作電流情報データベース134に記憶されている操作電流値Ip(t)を、抽出開始時刻taから順に抽出する。
抽出した操作電流値Ip(t)が[0]([略0]を含む)を超えた時刻を、動作開始時刻tsとして判別する。また、動作開始時刻ts後に、制御電流値Ic(t)が[0]([略0]を含む)となった時刻を、動作終了時刻teとして判別する。
そして、動作開始時刻tsと動作終了時刻teの間の時間を、動作時間S(=te-ts)として判別する。
図8に実線で示されている操作電流Ip41に対しては、動作開始時刻ts41と動作終了時刻te41の間の動作時間S41(=te41-ts41)を判別する。
動作履歴データベース132に記憶されている動作履歴の中から、動作開始時刻ts41と動作終了時刻te41に近い事象発生時刻(tx、ty)を含んでいる動作履歴を選択する。
そして、選択した動作履歴に基づいて、判別した動作時間Sと開閉装置および動作内容との対応関係を判別する。図8に示されている例では、判別した動作期間Sは、選択した動作履歴に含まれている開閉装置識別情報で示される開閉装置(図8に示されている例では、開閉装置10(3))の、選択した動作履歴に含まれている動作内容(図8に示されている例では、投入動作)に対応する動作時間であることを判別することができる。
The first determination method will be described with reference to Fig. 8. Fig. 8 shows an example of a method for determining an abnormal operation during a closing operation of the switching device 10 (3) based on the operation current value Ip(t). The abnormal operation determination information corresponding to the operation current value Ip(t) during a closing operation of the switching device 10 (3) is shown in Fig. 3.
The abnormal operation determination means 113 executes the following process in the same manner as during the closing operation of the opening/closing device 10(1) shown in FIG.
The time when the operation current value Ip(t) extracted from the operation current information database 134 exceeds the threshold value I0 is defined as the initial time ti.
Based on the initial time ti, the extraction start time ta is determined.
For the operating current Ip shown by the solid line in FIG. 8, the time before the first designated time T1 from the initial time ti41 is determined as the extraction start time ta41 (=ti41-T3).
The operation current values Ip(t) stored in the operation current information database 134 are extracted in order from the extraction start time ta.
The time when the extracted operation current value Ip(t) exceeds [0] (including [approximately 0]) is determined as the operation start time ts. In addition, the time when the control current value Ic(t) becomes [0] (including [approximately 0]) after the operation start time ts is determined as the operation end time te.
Then, the time between the motion start time ts and the motion end time te is determined as motion time S (=te-ts).
For the operation current Ip41 shown by the solid line in FIG. 8, the operation time S41 (=te41-ts41) between the operation start time ts41 and the operation end time te41 is determined.
Among the operation histories stored in the operation history database 132, an operation history including an event occurrence time (tx, ty) close to the operation start time ts41 and the operation end time te41 is selected.
Then, based on the selected operation history, the correspondence relationship between the determined operation time S and the opening/closing device and the operation content is determined. In the example shown in Fig. 8, it can be determined that the determined operation period S is an operation time corresponding to the operation content (in the example shown in Fig. 8, the closing operation) included in the selected operation history of the opening/closing device (in the example shown in Fig. 8, the opening/closing device 10(3)) indicated by the opening/closing device identification information included in the selected operation history.

なお、以上で説明した第1の判別方法では、監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]が閾値I0を超えた初期時刻tiを判別したが、初期時刻tiの判別処理を省略することもできる。
この場合、監視電流情報データベース133(操作電流情報データベース134、制御電流情報データベース135)に記憶されている監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]を、任意の時刻から順に抽出する。そして、抽出した監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]が[0]([略0]を含む)を超えた時刻を動作開始時刻tsとして判別し、その後、[0]([略0]を含む)になった時刻を動作終了時刻teとして判別する処理を実行する。
In the first discrimination method described above, the initial time ti at which the monitored current value [operation current value Ip(t), control current value Ic(t)] exceeded the threshold value I0 was discriminated, but the discrimination process of the initial time ti can also be omitted.
In this case, the monitoring current values [operation current value Ip(t), control current value Ic(t)] stored in the monitoring current information database 133 (operation current information database 134, control current information database 135) are extracted in order from an arbitrary time. Then, the time when the extracted monitoring current value [operation current value Ip(t), control current value Ic(t)] exceeds [0] (including [approximately 0]) is determined as the operation start time ts, and the time when it becomes [0] (including [approximately 0]) is then determined as the operation end time te.

次に、第2の判別方法を、図5を参照して説明する。
異常動作判別手段113は、以下の処理を実行する。
動作履歴データベース132から動作履歴を読み出す。
読み出した動作履歴に含まれている事象発生時刻(tx、ty)に基づいて、制御電流情報データベース135からの、制御電流値Ic(t)の抽出を開始する抽出開始時刻taを決定する。
例えば、事象発生時刻として、遠方監視制御装置60から制御装置40(1)に投入動作が指示された時刻txが記憶されている場合には、時刻txから第3指定時間T3前の時刻を抽出開始時刻ta(=tx-T3)として決定する。
図5に実線で示されている制御電流Ic11に対しては、事象発生時刻tx11から第3指定時間T3前の時刻を、抽出開始時刻ta11(=tx11-T3)として決定する。
また、事象発生時刻として、開閉器20(1)の投入動作が行われた時刻tyが記憶されている場合には、時刻tyから第4指定時間T4前の時刻を、抽出開始時刻ta(=ty-T4)を決定する。
図5に実線で示されている制御電流Ic11に対しては、事象発生時刻ty11から第4指定時間T4前の時刻を、抽出開始時刻ta11(=ty11-T4)として決定する。
開閉器20(1)の投入動作が行われた時刻tyは、前述したように、遠方監視制御装置60あるいは動作履歴管理手段142で検出することができる。
Next, the second determination method will be described with reference to FIG.
The abnormal operation determination means 113 executes the following process.
The operation history is read from the operation history database 132 .
Based on the event occurrence time (tx, ty) included in the read operation history, an extraction start time ta for starting extraction of the control current value Ic(t) from the control current information database 135 is determined.
For example, if the time tx at which the remote monitoring control device 60 instructs the control device 40 (1) to perform an input operation is stored as the time of event occurrence, the time before the third specified time T3 from the time tx is determined to be the extraction start time ta (= tx - T3).
For the control current Ic11 indicated by a solid line in FIG. 5, the time before the event occurrence time tx11 and the third designated time T3 is determined as the extraction start time ta11 (=tx11-T3).
Furthermore, in the case where the time ty at which the switch 20(1) was closed is stored as the event occurrence time, the time before the fourth designated time T4 from the time ty is determined as the extraction start time ta (=ty-T4).
For the control current Ic11 indicated by a solid line in FIG. 5, the time preceding the event occurrence time ty11 by the fourth specified time T4 is determined as the extraction start time ta11 (=ty11-T4).
The time ty at which the closing operation of the switch 20(1) is performed can be detected by the remote monitoring and control device 60 or the operation history management means 142, as described above.

制御電流情報データベース135に記憶されている制御電流値Ic(t)を、抽出開始時刻taから順に抽出する。
抽出した制御電流値Ic(t)が[0]([略0]を含む)を超えた時刻を、動作開始時刻tsとして判別する。
次に、動作開始時刻ts後に、制御電流値Ic(t)が[0]([略0]を含む)となった時刻を、動作終了時刻teとして判別する。
そして、動作開始時刻tsと動作終了時刻teの間の時間を、動作時間S(=te-ts)として判別する。
図5に実線で示されている制御電流Ic11に対しては、動作開始時刻ts11、動作終了時刻te11、動作時間S(=te11-ts11)を判別する。
さらに、動作履歴データベース132から読み出した動作履歴に基づいて、判別した動作時間Sと開閉装置および動作内容との対応関係を判別する。
この場合、判別した動作時間Sは、読み出した動作履歴に含まれている開閉装置識別情報で示される開閉装置(図5に示されている例では、開閉装置10(1))の、読み出した動作履歴に含まれている動作内容(図5に示されている例では、投入動作)に対応する動作時間であることを判別することができる。
The control current values Ic(t) stored in the control current information database 135 are extracted in order from the extraction start time ta.
The time when the extracted control current value Ic(t) exceeds [0] (including [approximately 0]) is determined as the operation start time ts.
Next, the time when the control current value Ic(t) becomes [0] (including [approximately 0]) after the operation start time ts is determined as the operation end time te.
Then, the time between the motion start time ts and the motion end time te is determined as motion time S (=te-ts).
For the control current Ic11 shown by the solid line in FIG. 5, the operation start time ts11, the operation end time te11, and the operation time S (=te11-ts11) are determined.
Furthermore, based on the operation history read from the operation history database 132, the correspondence relationship between the determined operation time S and the opening/closing device and the operation content is determined.
In this case, it can be determined that the determined operation time S is the operation time corresponding to the operation content (in the example shown in Figure 5, the closing operation) included in the read-out operation history of the opening/closing device (in the example shown in Figure 5, opening/closing device 10(1)) indicated by the opening/closing device identification information included in the read-out operation history.

なお、開閉装置10(1)~10(n)の、通常の投入動作時間は、大きな差はない。このため、第3指定時間T3を適切に設定することにより、事象発生時刻txに基づいて決定した抽出開始時刻taから制御電流値Ic(t)の抽出を開始した場合でも、開閉装置10(1)~10(n)の投入動作時の異常動作を判別可能な動作時間Sを判別することができる。
一方、事象発生時刻tyは、開閉器20(1)~20(n)によって変化する。このため、事象発生時刻tyに基づいて決定した抽出開始時刻taから制御電流値Ic(t)の抽出を開始する場合には、第4指定時間T4を開閉装置10(1)~10(n)に応じて設定するのが好ましい。
第2の判別方法では、事象発生時刻(tx、ty)を判別するために、動作履歴データベース132から動作履歴を読み出す。このため、読み出した動作履歴に含まれている開閉装置識別情報に対応して第4指定時間T4を設定することができる。
なお、開閉装置10(1)~10(n)の引き外し動作時における第3設定時間T3、第4指定時間T4についても同様である。
Note that there is no significant difference in the normal closing operation times of the switching devices 10(1) to 10(n). Therefore, by appropriately setting the third specified time T3, it is possible to determine the operation time S during which abnormal operation can be identified during the closing operation of the switching devices 10(1) to 10(n), even if extraction of the control current value Ic(t) is started from the extraction start time ta determined based on the event occurrence time tx.
On the other hand, the event occurrence time ty varies depending on the switchgear 20(1) to 20(n). For this reason, when starting extraction of the control current value Ic(t) from the extraction start time ta determined based on the event occurrence time ty, it is preferable to set the fourth specified time T4 depending on the switchgear 10(1) to 10(n).
In the second determination method, in order to determine the event occurrence time (tx, ty), the operation history is read from the operation history database 132. Therefore, the fourth specified time T4 can be set in accordance with the opening/closing device identification information included in the read operation history.
The same applies to the third set time T3 and the fourth specified time T4 during the tripping operation of the switching devices 10(1) to 10(n).

第2の判別方法を、図6を参照して説明する。
異常動作判別手段113は、図5に示されている開閉装置10(1)の投入動作時と同様に、以下の処理を実行する。
動作履歴データベース132から動作履歴を読み出す。
読み出した動作履歴に含まれている事象発生時刻(tx、ty)に基づいて、抽出開始時刻taを決定する。
図6に示されている例では、読み出した動作履歴に含まれている事象発生時刻tx21から第3指定時間T3前の時刻を、抽出開始時刻ta21(=tx21-T3)を決定する。あるいは、読み出した動作履歴に含まれている事象発生時刻ty21から第4指定時間T4前の時刻を、抽出開始時刻ta21(=ty21-T4)を決定する。
制御電流情報データベース135に記憶されている制御電流値Ic(t)を、抽出開始時刻taから順に抽出する。抽出した制御電流値Ic(t)が[0]([略0]を含む)を超えた時刻を、動作開始時刻tsとして判別する。また、動作開始時刻ts後に、制御電流値Ic(t)が[0]([略0]を含む)となった時刻を、動作終了時刻teとして判別する。
そして、動作開始時刻tsと動作終了時刻teの間の時間を、動作時間S(=te-ts)として判別する。
図6に実線で示されている制御電流Ic21に対しては、動作開始時刻ts21、動作終了時刻te21、動作時間S21(=te21-ts21)を判別する。
さらに、動作履歴データベース132から読み出した動作履歴に基づいて、判別した動作時間Sと開閉装置および動作内容との対応関係を判別する。
この場合、判別した動作時間Sは、読み出した動作履歴に含まれている開閉装置識別情報で示される開閉装置(図6に示されている例では、開閉装置10(1))の、読み出した動作履歴に含まれている動作内容(図6に示されている例では、引き外し動作)に対応する動作時間であることを判別することができる。
The second determination method will be described with reference to FIG.
The abnormal operation determination means 113 executes the following process in the same manner as during the closing operation of the opening/closing device 10(1) shown in FIG.
The operation history is read from the operation history database 132 .
The extraction start time ta is determined based on the event occurrence time (tx, ty) included in the read operation history.
6, the time that is the third designated time T3 before the event occurrence time tx21 included in the read operation history is determined as the extraction start time ta21 (=tx21-T3). Alternatively, the time that is the fourth designated time T4 before the event occurrence time ty21 included in the read operation history is determined as the extraction start time ta21 (=ty21-T4).
The control current values Ic(t) stored in the control current information database 135 are extracted in order starting from the extraction start time ta. The time at which the extracted control current value Ic(t) exceeds [0] (including [approximately 0]) is determined as the operation start time ts. In addition, the time at which the control current value Ic(t) becomes [0] (including [approximately 0]) after the operation start time ts is determined as the operation end time te.
Then, the time between the motion start time ts and the motion end time te is determined as motion time S (=te-ts).
For the control current Ic21 shown by the solid line in FIG. 6, the operation start time ts21, the operation end time te21, and the operation time S21 (=te21-ts21) are determined.
Furthermore, based on the operation history read out from the operation history database 132, the correspondence relationship between the determined operation time S and the opening/closing device and the operation content is determined.
In this case, it can be determined that the determined operation time S is the operation time corresponding to the operation content (in the example shown in Figure 6, the tripping operation) included in the read operation history of the opening/closing device (in the example shown in Figure 6, opening/closing device 10 (1)) indicated by the opening/closing device identification information included in the read operation history.

第2の判別方法を、図7を参照して説明する。
異常動作判別手段113は、図5に示されている開閉装置10(1)の投入動作時と同様に、以下の処理を実行する。
動作履歴データベース132から動作履歴を読み出す。
読み出した動作履歴に含まれている事象発生時刻(tx、ty)に基づいて、抽出開始時刻taを決定する。
図7に実線で示されている制御電流Ic31に対しては、読み出した動作履歴に含まれている事象発生時刻tx31から第3指定時間T3前の時刻を、抽出開始時刻ta31(=tx31-T3)を決定する。あるいは、読み出した動作履歴に含まれている事象発生時刻ty31から第4指定時間T4前の時刻を、抽出開始時刻ta31(=ty31-T4)を決定する。
制御電流情報データベース135に記憶されている制御電流値Ic(t)を、抽出開始時刻taから順に抽出する。抽出した制御電流値Ic(t)が[0]([略0]を含む)を超えた時刻を、動作開始時刻tsとして判別する。また、動作開始時刻ts後に、制御電流値Ic(t)が[0]([略0]を含む)となった時刻を、動作終了時刻teとして判別する。
そして、動作開始時刻tsと動作終了時刻teの間の時間を、動作時間S(=te-ts)として判別する。
図7に実線で示されている制御電流Ic31に対しては、動作開始時刻ts31、動作終了時刻te31、動作時間S31(=te31-ts31)を判別する。
さらに、動作履歴データベース132から読み出した動作履歴に基づいて、判別した動作時間Sと開閉装置および動作内容との対応関係を判別する。
この場合、判別した動作時間Sは、読み出した動作履歴に含まれている開閉装置識別情報で示される開閉装置(図7に示されている例では、開閉装置10(2))の、読み出した動作履歴に含まれている動作内容(図7に示されている例では、投入動作)に対応する動作時間であることを判別することができる。
The second determination method will be described with reference to FIG.
The abnormal operation determination means 113 executes the following process in the same manner as during the closing operation of the opening/closing device 10(1) shown in FIG.
The operation history is read from the operation history database 132 .
The extraction start time ta is determined based on the event occurrence time (tx, ty) included in the read operation history.
7, the time before the third designated time T3 from the event occurrence time tx31 included in the read operation history is determined as the extraction start time ta31 (=tx31-T3). Alternatively, the time before the fourth designated time T4 from the event occurrence time ty31 included in the read operation history is determined as the extraction start time ta31 (=ty31-T4).
The control current values Ic(t) stored in the control current information database 135 are extracted in order starting from the extraction start time ta. The time at which the extracted control current value Ic(t) exceeds [0] (including [approximately 0]) is determined as the operation start time ts. In addition, the time at which the control current value Ic(t) becomes [0] (including [approximately 0]) after the operation start time ts is determined as the operation end time te.
Then, the time between the motion start time ts and the motion end time te is determined as motion time S (=te-ts).
For the control current Ic31 shown by the solid line in FIG. 7, the operation start time ts31, the operation end time te31, and the operation time S31 (=te31-ts31) are determined.
Furthermore, based on the operation history read out from the operation history database 132, the correspondence relationship between the determined operation time S and the opening/closing device and the operation content is determined.
In this case, it can be determined that the determined operation time S is the operation time corresponding to the operation content (in the example shown in Figure 7, the closing operation) included in the read-out operation history of the opening/closing device (in the example shown in Figure 7, opening/closing device 10 (2)) indicated by the opening/closing device identification information included in the read-out operation history.

第2の判別方法を、図8を参照して説明する。
異常動作判別手段113は、図5に示されている開閉装置10(1)の投入動作時と同様に、以下の処理を実行する。
動作履歴データベース132から動作履歴を読み出す。
読み出した動作履歴に含まれている事象発生時刻(tx、ty)に基づいて、抽出開始時刻taを決定する。
図8に実線で示されている制御電流Ic41に対しては、読み出した動作履歴に含まれている事象発生時刻tx41から第3指定時間T3前の時刻を、抽出開始時刻ta41(=tx41-T3)を決定する。あるいは、読み出した動作履歴に含まれている事象発生時刻ty41から第4指定時間T4前の時刻を、抽出開始時刻ta41(=ty41-T4)を決定する。
制御電流情報データベース135に記憶されている制御電流値Ic(t)を、抽出開始時刻taから順に抽出する。抽出した制御電流値Ic(t)が[0]([略0]を含む)を超えた時刻を、動作開始時刻tsとして判別する。また、動作開始時刻ts後に、制御電流値Ic(t)が[0]([略0]を含む)となった時刻を、動作終了時刻teとして判別する。
図8に実線で示されている制御電流Ic41に対しては、動作開始時刻ts41、動作終了時刻te41、動作時間S41(=te41-ts41)を判別する。
さらに、動作履歴データベース132から読み出した動作履歴に基づいて、判別した動作時間Sと開閉装置および動作内容との対応関係を判別する。
この場合、判別した動作時間Sは、読み出した動作履歴に含まれている開閉装置識別情報で示される開閉装置(図8に示されている例では、開閉装置10(3))の、読み出した動作履歴に含まれている動作内容(図8に示されている例では、投入動作)に対応する動作時間であることを判別することができる。
The second determination method will be described with reference to FIG.
The abnormal operation determination means 113 executes the following process in the same manner as during the closing operation of the opening/closing device 10(1) shown in FIG.
The operation history is read from the operation history database 132 .
The extraction start time ta is determined based on the event occurrence time (tx, ty) included in the read operation history.
8, the time before the third designated time T3 from the event occurrence time tx41 included in the read operation history is determined as the extraction start time ta41 (=tx41-T3). Alternatively, the time before the fourth designated time T4 from the event occurrence time ty41 included in the read operation history is determined as the extraction start time ta41 (=ty41-T4).
The control current values Ic(t) stored in the control current information database 135 are extracted in order starting from the extraction start time ta. The time at which the extracted control current value Ic(t) exceeds [0] (including [approximately 0]) is determined as the operation start time ts. In addition, the time at which the control current value Ic(t) becomes [0] (including [approximately 0]) after the operation start time ts is determined as the operation end time te.
For the control current Ic41 shown by the solid line in FIG. 8, the operation start time ts41, the operation end time te41, and the operation time S41 (=te41-ts41) are determined.
Furthermore, based on the operation history read out from the operation history database 132, the correspondence relationship between the determined operation time S and the opening/closing device and the operation content is determined.
In this case, it can be determined that the determined operation time S is the operation time corresponding to the operation content (in the example shown in Figure 8, the closing operation) included in the read-out operation history of the opening/closing device (in the example shown in Figure 8, opening/closing device 10 (3)) indicated by the opening/closing device identification information included in the read-out operation history.

次に、異常動作判別情報データベース131に記憶されている異常動作判別情報に基づいて、開閉装置の動作が異常であるか否かを判別する処理について説明する。
先ず、図5に示されている例について説明する。
開閉装置10(1)、投入動作および制御電流に対応する異常動作判別情報には、図3に示されているように、動作時間Sに対する第1設定時間R11が含まれている。
異常動作判別手段113は、前述した方法で判別した動作時間Sと第1設定時間R11との比較結果に基づいて、開閉装置10(1)の投入動作が異常であるか否かを判別する。
具体的には、動作時間Sが、第1設定時間R11以下である場合には、開閉装置10(1)の投入動作は正常であることを判別する。一方、動作時間Sが、第1設定時間R11を超えている場合には、開閉装置10(1)の投入動作は異常であることを判別する。
図5に実線で示されている制御電流Ic11は、動作時間S11(=te11-ts11)が第1設定時間R11より小さい。このため、開閉装置10(1)の投入動作は正常であることを判別する。
一方、図5に破線で示されている制御電流Ic12は、動作時間S12(=te12-ts11)が第1設定時間R11より大きい。このため、開閉装置10(1)の投入動作は異常であることを判別する。
Next, a process of determining whether or not the operation of the opening and closing device is abnormal based on the abnormal operation determination information stored in the abnormal operation determination information database 131 will be described.
First, the example shown in FIG. 5 will be described.
The abnormal operation determination information corresponding to the switching device 10(1), the closing operation, and the control current includes a first set time R11 for the operation time S, as shown in FIG.
The abnormal operation determination means 113 determines whether or not the closing operation of the opening/closing device 10(1) is abnormal based on the result of comparing the operation time S determined by the above-mentioned method with the first set time R11.
Specifically, if the operation time S is equal to or less than the first set time R11, it is determined that the closing operation of the opening/closing device 10(1) is normal. On the other hand, if the operation time S exceeds the first set time R11, it is determined that the closing operation of the opening/closing device 10(1) is abnormal.
5, the operation time S11 (=te11-ts11) of the control current Ic11 is shorter than the first set time R11. Therefore, it is determined that the closing operation of the switching device 10(1) is normal.
On the other hand, the control current Ic12 indicated by the dashed line in Fig. 5 has an operation time S12 (=te12-ts11) that is greater than the first set time R11. For this reason, it is determined that the closing operation of the switching device 10(1) is abnormal.

次に、図6に示されている例について説明する。
開閉装置10(1)、引き外し動作および制御電流に対応する異常動作判別情報には、図3に示されているように、動作時間Sに対する第1設定時間R21が含まれている。
異常動作判別手段113は、前述した方法で判別した動作時間Sと第1設定時間R21との比較結果に基づいて、開閉装置10(1)の引き外し動作が異常であるか否かを判別する。
具体的には、動作時間Sが、第1設定時間R21以下である場合には、開閉装置10(1)の引き外し動作は正常であることを判別する。一方、動作時間Sが、第1設定時間R21を超えている場合には、開閉装置10(1)の引き外し動作は異常であることを判別する。
図6に実線で示されている制御電流Ic21は、動作時間S21(=te21-ts21)が第1設定時間R21より小さい。このため、開閉装置10(1)の引き外し動作は正常であることを判別する。
一方、図6に破線で示されている制御電流Ic22は、動作時間S22(=te22-ts22)が第1設定時間R21より大きい。このため、開閉装置10(1)の引き外し動作は異常であることを判別する。
Next, the example shown in FIG. 6 will be described.
The abnormal operation determination information corresponding to the switching device 10(1), the tripping operation, and the control current includes a first set time R21 for the operation time S, as shown in FIG.
The abnormal operation determination means 113 determines whether or not the tripping operation of the opening/closing device 10(1) is abnormal based on the result of comparing the operation time S determined by the above-mentioned method with the first set time R21.
Specifically, if the operation time S is equal to or less than the first set time R21, it is determined that the tripping operation of the opening/closing device 10(1) is normal. On the other hand, if the operation time S exceeds the first set time R21, it is determined that the tripping operation of the opening/closing device 10(1) is abnormal.
6, the operation time S21 (=te21-ts21) of the control current Ic21 is smaller than the first set time R21. Therefore, it is determined that the tripping operation of the switching device 10(1) is normal.
6, the operation time S22 (=te22-ts22) is longer than the first set time R21. Therefore, it is determined that the tripping operation of the switching device 10(1) is abnormal.

次に、図7に示されている例について説明する。
開閉装置10(2)、投入動作および操作電流に対応する異常動作判別情報には、図3に示されているように、動作時間Sに対する第1設定時間R31と、操作電流値Ip(t)に対する設定電流値J31が含まれている。
異常動作判別手段113は、前述した方法で判別した動作時間Sと第1設定時間R31との比較結果に基づいて、開閉装置10(2)の投入動作が異常であるか否かを判別する。また、異常動作判別手段113は、操作電流情報データベース134に記憶されている、動作時間S内の操作電流値Ip(t)と設定電流値J31との比較結果に基づいて、開閉装置10(2)の投入動作が異常であるか否かを判別する。
なお、動作時間Sの初期に、突入電流によって、操作電流値Ip(t)が急増することがある。この突入電流を検出すると、誤判別するおそれがある。このため、動作時間Sのうち、突入電流が流れる除外時間T0を除いた期間内の操作電流値Ip(t)と設定電流値J31とを比較する。
具体的には、動作時間Sが第1設定時間R21以下であり、且つ、動作時間Sのうち、除外時間T0を除いた期間内の操作電流値Ip(t)が設定電流値J31を超えていない場合には、開閉装置10(2)の投入動作は正常であることを判別する。一方、動作時間Sが第1設定時間R21を超えている場合、あるいは、動作時間Sのうち、除外時間T0を除いた期間内の操作電流値Ip(t)が設定電流値J31を超えている場合には、開閉装置10(2)の投入動作は異常であることを判別する。
図7に実線で示されている操作電流Ip31は、動作時間S31(=te31-ts31)が第1設定時間R31より小さい。また、動作期間Sのうち、除外時間T0を除いた期間内の操作電流値Ip(t)は、設定電流値J31より小さい。このため、開閉装置10(2)の投入動作は正常であることを判別する。
一方、図7に破線で示されている操作電流Ip32は、動作時間S32(=te32-ts32)が第1設定時間R31より大きい。このため、開閉装置10(2)の投入動作は異常であることを判別する。また、動作時間Sのうち、除外時間T0を除いた期間内の操作電流値Ip(t)が設定電流値J31を超えている。このため、この点においても、開閉装置10(2)の投入動作は異常であることを判別する。
Next, the example shown in FIG. 7 will be described.
The abnormal operation determination information corresponding to the opening and closing operation of the opening and closing device 10(2) includes a first set time R31 for the operation time S and a set current value J31 for the operation current value Ip(t), as shown in FIG. 3.
The abnormal operation determination means 113 determines whether or not the closing operation of the switching device 10(2) is abnormal based on the result of comparing the operation time S determined by the above-mentioned method with the first set time R31. The abnormal operation determination means 113 also determines whether or not the closing operation of the switching device 10(2) is abnormal based on the result of comparing the operation current value Ip(t) within the operation time S stored in the operation current information database 134 with the set current value J31.
In addition, at the beginning of the operation time S, the operation current value Ip(t) may suddenly increase due to an inrush current. If this inrush current is detected, there is a risk of misjudgment. For this reason, the operation current value Ip(t) during the period of the operation time S excluding the exclusion time T0 during which the inrush current flows is compared with the set current value J31.
Specifically, if the operation time S is equal to or shorter than the first set time R21 and the operation current value Ip(t) during the operation time S excluding the exclusion time T0 does not exceed the set current value J31, it is determined that the closing operation of the switching device 10(2) is normal. On the other hand, if the operation time S exceeds the first set time R21 or if the operation current value Ip(t) during the operation time S excluding the exclusion time T0 exceeds the set current value J31, it is determined that the closing operation of the switching device 10(2) is abnormal.
7, the operation current Ip31 shown by the solid line has an operation time S31 (=te31-ts31) that is smaller than the first set time R31. Also, the operation current value Ip(t) during the operation period S excluding the exclusion time T0 is smaller than the set current value J31. For this reason, it is determined that the closing operation of the switching device 10(2) is normal.
On the other hand, the operation current Ip32 shown by the dashed line in Fig. 7 has an operation time S32 (=te32-ts32) that is greater than the first set time R31. For this reason, it is determined that the closing operation of the switching device 10(2) is abnormal. In addition, the operation current value Ip(t) during the period of operation time S excluding the exclusion time T0 exceeds the set current value J31. For this reason, it is also determined that the closing operation of the switching device 10(2) is abnormal.

次に、図8に示されている例について説明する。
開閉装置10(3)、投入動作および操作電流に対応する異常動作判別情報には、図3に示されているように、動作時間Sに対する第1設定時間R41が含まれている。
異常動作判別手段113は、前述した方法で判別した動作時間Sと第1設定時間R41との比較結果に基づいて、開閉装置10(3)の投入動作が異常であるか否かを判別する。
具体的には、動作時間Sが、第1設定時間R41以下である場合には、開閉装置10(3)の投入動作は正常であることを判別する。一方、動作時間Sが、第1設定時間R41を超えている場合には、開閉装置10(3)の投入動作は異常であることを判別する。
図8に実線で示されている操作電流Ip41は、動作時間S41(=te41-ts41)が第1設定時間R41より小さい。このため、開閉装置10(3)の投入動作は正常であることを判別する。
一方、図8に破線で示されている操作電流Ip42は、動作時間S42(=te42-ts42)が第1設定時間R41より大きい。このため、開閉装置10(3)の投入動作は異常であることを判別する。
なお、操作電流Ipが、図8に示されているように流れる場合には、突入電流が流れる期間は、開閉装置10(3)の投入動作が異常であるか否かを判別する処理に影響しない。
Next, the example shown in FIG. 8 will be described.
The abnormal operation determination information corresponding to the opening and closing operation and the operating current of the switching device 10 ( 3 ) includes a first set time R 41 for the operation time S, as shown in FIG. 3 .
The abnormal operation determination means 113 determines whether or not the closing operation of the opening/closing device 10 (3) is abnormal based on the result of comparing the operation time S determined by the above-mentioned method with the first set time R41.
Specifically, if the operation time S is equal to or less than the first set time R41, it is determined that the closing operation of the opening/closing device 10(3) is normal. On the other hand, if the operation time S exceeds the first set time R41, it is determined that the closing operation of the opening/closing device 10(3) is abnormal.
8, the operation time S41 (=te41-ts41) is shorter than the first set time R41. Therefore, it is determined that the closing operation of the switching device 10(3) is normal.
8, the operation time S42 (=te42-ts42) is greater than the first set time R41. Therefore, it is determined that the closing operation of the opening and closing device 10(3) is abnormal.
When the operating current Ip flows as shown in FIG. 8, the period during which the inrush current flows does not affect the process of determining whether the closing operation of the switching device 10 (3) is abnormal.

次に、開閉装置10が、第1相~第3相に設けられている第1相~第3相開閉装置により構成される場合について、図9を参照して説明する。
第1相開閉装置(図示省略)の第1相制御装置40(1)[A]、第2相開閉装置(図示省略)の第2相制御装置40(1)[B]、第3相開閉装置(図示省略)の第3相制御装置40(1)[C]は、専用の制御電源52に並列に接続されている。
第1相制御装置40(1)[A]~第3相制御装置40(1)[C]は、前述した制御装置と構成および動作が同じである。
すなわち、第1相~第3相投入コイル41[A]~41[C]、第1相~第3相投入スイッチ42[A]~42[C]、43[A]~43[C]、第1相~第3相補助接点41a[A]~41a[C]、第1相~第3相引き外しコイル44[A]~44[C]、第1相~第3相引き外しスイッチ45[A]~45[C]、46[A]~46[C]、47[A]~47[C]、第1相~第3相補助接点44a[A]~44a[C]、第1相~第3相リミットスイッチ48[A]~48[C]を有している。
Next, a case where the switching device 10 is configured by first to third phase switching devices provided for the first to third phases will be described with reference to FIG.
A first-phase control device 40(1)[A] of the first-phase switching device (not shown), a second-phase control device 40(1)[B] of the second-phase switching device (not shown), and a third-phase control device 40(1)[C] of the third-phase switching device (not shown) are connected in parallel to a dedicated control power source 52.
The first phase control device 40(1)[A] to the third phase control device 40(1)[C] have the same configuration and operation as the control devices described above.
That is, it has first-phase to third-phase making coils 41[A] to 41[C], first-phase to third-phase making switches 42[A] to 42[C], 43[A] to 43[C], first-phase to third-phase auxiliary contacts 41a[A] to 41a[C], first-phase to third-phase release coils 44[A] to 44[C], first-phase to third-phase release switches 45[A] to 45[C], 46[A] to 46[C], 47[A] to 47[C], first-phase to third-phase auxiliary contacts 44a[A] to 44a[C], and first-phase to third-phase limit switches 48[A] to 48[C].

このような、第1相~第3相開閉装置を有している場合、投入動作時あるいは引き外し動作時に、各相の開閉装置の動作時間が相違すると(「三相不揃い」と呼ばれる)、不具合が発生するおそれがある。例えば、進み電流開閉時の回復電圧値が大きくなるおそれがある。
三相不揃いを判別する方法としては、第1相制御電流値検出装置122(1)[A]~第3相制御電流値検出装置122(1)[C](図9に一点鎖線で示されている)を設けることが考えられる。
この場合、図10(a)~(c)に示されているように、第1相制御装置40(1)[A]~第3相制御装置40(1)[C]に供給される第1相制御電流Ic(1)[A]~第3相制御電流Ic(1)[C]の、動作期間S(1)[A]~S(1)[C]内における第1相制御電流値Ic(1)[A](t)~第3相制御電流値Ic(1)[C](t)を検出することができる。
そして、図10(d)に示されているように、第1相制御電流Ic(1)[A]の、動作時間S(1)[A]内における第1相制御電流値Ic(1)[A](t)、第2相制御電流Ic(1)[B]の、動作時間S(1)[B]内における第2相制御電流値Ic(1)[B](t)、第3相制御電流Ic(1)[C]の、動作時間S(1)[C]内における第3相制御電流値Ic(1)[C](t)を重ね合わせる。
第1相制御電流Ic(1)[A]~第3相制御電流Ic(1)[C]の動作時間S(1)[A]~S(1)[C]が相違していると、第1相制御電流値Ic(1)[A](t)~第3相制御電流値Ic(1)[C](t)が一致しない。これにより、三相不揃いを判別することができる、
しかしながら、この方法を用いて三相不揃いを判別するには、第1相制御電流値検出装置122(1)[A]~第3相制御電流値検出装置122(1)[C]を設ける必要がある。
In the case of having such first to third phase switching devices, if the operation times of the switching devices for each phase differ during closing or tripping (called "three-phase mismatch"), problems may occur. For example, the recovery voltage value may increase when switching a leading current.
As a method for determining whether or not the three phases are misaligned, it is possible to provide a first-phase control current value detection device 122(1)[A] through a third-phase control current value detection device 122(1)[C] (shown by dashed lines in FIG. 9).
In this case, as shown in Figures 10(a) to 10(c), it is possible to detect the first-phase control current value Ic(1)[A](t) through the third-phase control current value Ic(1)[C](t) within the operation periods S(1)[A] to S(1)[C] of the first-phase control current Ic(1)[A] through the third-phase control current Ic(1)[C] supplied to the first-phase control device 40(1)[A] through the third-phase control device 40(1)[C].
Then, as shown in FIG. 10( d ), the first phase control current value Ic(1)[A] (t) of the first phase control current Ic(1)[A] within the operation time S(1)[A], the second phase control current value Ic(1)[B] (t) of the second phase control current Ic(1)[B] within the operation time S(1)[B], and the third phase control current value Ic(1)[C] (t) of the third phase control current Ic(1)[C] within the operation time S(1)[C] are superimposed.
If the operation times S(1)[A] to S(1)[C] of the first-phase control current Ic(1)[A] to third-phase control current Ic(1)[C] are different, the first-phase control current value Ic(1)[A](t) to third-phase control current value Ic(1)[C](t) will not match. This makes it possible to determine whether the three phases are misaligned.
However, in order to determine whether or not there is a three-phase misalignment using this method, it is necessary to provide a first-phase control current value detection device 122(1)[A] through a third-phase control current value detection device 122(1)[C].

そこで、簡単に三相不揃いを判別することができる技術について検討した結果、制御電源52から供給される制御電流Icの制御電流値Ic(t)のみを検出することで三相不揃いを判別することができることが判明した。
すなわち、第1相開閉装置~第3相開閉装置を有する開閉装置を用いた場合、開閉装置の動作時間内における、制御電流Icの制御電流値Ic(t)は、図11に示されている状態となる。なお、開閉装置の動作時間は、第1相開閉装置~第3相開閉装置のいずかが動作を開始した時刻から、すべてが動作を終了した時刻までの時間である。
図11において、制御電流値Ic(t)は、動作終了時刻teの前に、変曲点Kから減少を開始する。なお、変曲点Kは、開閉器の可動接点の位置を検出するリミットスイッチ等により検出することができる。
変曲点Kから、予め設定されている設定傾斜角度で線Gを引く。線G上において、制御電流値Ic(t)が[0]([略0]を含む)となる時刻を、基準時刻hとする。
ここで、三相不揃いが発生していない場合には、開閉装置の動作終了時刻teは、基準時刻hと一致(あるいは略一致)する。一方、三相不揃いが発生している場合には、基準時刻hと動作終了時刻teが一致しない。
すなわち、動作終了時刻teと線G上の基準時刻hとの間の時間Nは、基準時刻hに対する動作終了時刻teの遅れ時間であり、第1相制御装置40(1)[A]~第3相制御装置40(1)[C]の不揃いの程度を示す。
したがって、遅れ時間Nと第2設定時間Mとに基づいて、開閉装置の異常動作(三相不揃い)を判別することができる。
Therefore, after examining a technology that can easily determine whether or not three-phase misalignment occurs, it was found that whether or not three-phase misalignment occurs can be determined by detecting only the control current value Ic(t) of the control current Ic supplied from the control power supply 52.
That is, when a switching device having first-phase to third-phase switching devices is used, the control current value Ic(t) of the control current Ic during the operation time of the switching device is as shown in Fig. 11. The operation time of the switching device is the time from when any of the first-phase to third-phase switching devices starts operation to when all of them finish operation.
11 , the control current value Ic(t) starts decreasing from an inflection point K before the operation end time te. The inflection point K can be detected by a limit switch or the like that detects the position of the movable contact of the switch.
A line G is drawn at a preset inclination angle from the inflection point K. The time on the line G at which the control current value Ic(t) becomes [0] (including [approximately 0]) is defined as a reference time h.
Here, when no three-phase misalignment occurs, the operation end time te of the switching device coincides (or approximately coincides) with the reference time h. On the other hand, when three-phase misalignment occurs, the reference time h and the operation end time te do not coincide.
In other words, the time N between the operation end time te and the reference time h on line G is the delay time of the operation end time te with respect to the reference time h, and indicates the degree of misalignment of the first phase control device 40(1)[A] to the third phase control device 40(1)[C].
Therefore, based on the delay time N and the second set time M, it is possible to determine whether or not the switching device is operating abnormally (three-phase mismatch).

図12に、開閉装置10(4)の投入動作時における異常動作(三相不揃い)を、制御電流値Ic(t)に基づいて判別する方法の一例が示されている。
図5~図8で説明した方法と同様の方法を用いて、動作開始時刻tsと動作終了時刻teを判別する。また、判別した動作開始時刻tsあるいは動作終了時刻teと動作履歴に基づいて、動作時間S(=te-ts)が、開閉装置10(4)の投入動作時における動作時間であることを判別する。
図3に示されている異常動作判別情報データベース131には、開閉装置10(4)の投入動作時における、制御電流値Ic(t)に対する異常動作判別情報として第2設定時間M51が記憶されている。
次に、変曲点Kから、設定傾斜角度rで線Gを引く。そして、線G上において、制御電流値Ic(t)が[0]([略0]を含む)となる基準時刻hを判別する、
次に、線G上の基準時刻hと動作終了時刻teの間の遅れ時間N(=te-h)を判別する。そして、判別した遅れ時間Nと、異常動作判別情報に含まれている第2設定時間M51とに基づいて、開閉装置10(4)の投入動作時における異常動作(三相不揃い)を判別する。
具体的には、遅れ時間Nが第2設定時間M51以下である場合には、開閉装置10(4)が正常である(異常な三相不揃いは発生していない)ことを判別する。
一方、遅れ時間Nが第2設定時間M51を超えている場合には、開閉装置10(4)が異常である(異常な三相不揃いが発生している)ことを判別する。
FIG. 12 shows an example of a method for determining an abnormal operation (three-phase mismatch) during a closing operation of the switchgear 10 (4) based on the control current value Ic(t).
The operation start time ts and the operation end time te are determined using a method similar to that described in Figures 5 to 8. In addition, based on the determined operation start time ts or operation end time te and the operation history, it is determined that the operation time S (= te - ts) is the operation time during the closing operation of the opening and closing device 10 (4).
The abnormal operation determination information database 131 shown in FIG. 3 stores a second set time M51 as abnormal operation determination information for the control current value Ic(t) during the closing operation of the switching device 10(4).
Next, a line G is drawn from the inflection point K at a set tilt angle r. Then, on the line G, a reference time h at which the control current value Ic(t) becomes [0] (including [approximately 0]) is determined.
Next, the delay time N (=te-h) between the reference time h and the operation end time te on the line G is determined. Then, based on the determined delay time N and the second set time M51 included in the abnormal operation determination information, an abnormal operation (three-phase misalignment) during the closing operation of the switching device 10(4) is determined.
Specifically, if the delay time N is equal to or less than the second set time M51, it is determined that the switching device 10(4) is normal (no abnormal three-phase misalignment has occurred).
On the other hand, if the delay time N exceeds the second set time M51, it is determined that the switching device 10(4) is abnormal (abnormal three-phase misalignment has occurred).

図12に示されている実線は、設計時に設定された制御電流Ic50を示している。設計時には、変曲点K50から設定傾斜角度rで引いた線G50上の基準時刻h50で、制御電流値Ic(t)が[0]([略0]を含む)となる。そして、動作終了時刻te50が基準時刻h50と一致するように設計されている。
一点鎖線で示されている制御電流Ic51では、変曲点K51から設定傾斜角度rで引いた線G51上の基準時刻h51で、制御電流値Ic(t)が[0]([略0]を含む)となる。この場合、動作終了時刻te51と基準時刻h51の間の遅れ時間N51は、第2設定時間M51以下である。このため、開閉装置10(4)が正常である(異常な三相不揃いは発生していない)ことを判別する。
一方、二点鎖線で示されている制御電流Ic52では、変曲点K52から設定傾斜角度rで引いた線G52上の基準時刻h52で、制御電流値Ic(t)が[0]([略0]を含む)となる。この場合、動作終了時刻te52と基準時刻h52の間の遅れ時間N52は、第2設定時間M51を超えている。このため、開閉装置10(4)が異常である(異常な三相不揃い発生している)ことを判別する。
なお、図12に示されている例において、動作時間S(=te-ts)と第1設定時間Rとの比較結果に基づいて開閉装置10(4)の異常動作を判別する手法も用いることができる。
12 indicates the control current Ic50 set at the time of design. At the time of design, the control current value Ic(t) becomes [0] (including [approximately 0]) at a reference time h50 on a line G50 drawn from an inflection point K50 at a set tilt angle r. The design is such that the operation end time te50 coincides with the reference time h50.
For the control current Ic51 shown by the dashed line, the control current value Ic(t) becomes [0] (including [approximately 0]) at a reference time h51 on a line G51 drawn from an inflection point K51 at a set tilt angle r. In this case, the delay time N51 between the operation end time te51 and the reference time h51 is less than or equal to the second set time M51. For this reason, it is determined that the switching device 10(4) is normal (no abnormal three-phase misalignment has occurred).
On the other hand, for the control current Ic52 indicated by the two-dot chain line, the control current value Ic(t) becomes [0] (including [approximately 0]) at the reference time h52 on the line G52 drawn from the inflection point K52 at the set tilt angle r. In this case, the delay time N52 between the operation end time te52 and the reference time h52 exceeds the second set time M51. For this reason, it is determined that the switching device 10(4) is abnormal (an abnormal three-phase misalignment is occurring).
In the example shown in FIG. 12, a method can also be used to determine abnormal operation of the opening and closing device 10(4) based on the results of comparing the operation time S (=te-ts) with the first set time R.

以上では、動作時間Sに対する第1設定時間Rが一定である場合について説明した、
一方、周囲温度が変化すると、開閉器20(1)~20(n)の動作時間が変化する。このため、開閉装置の異常動作を判別するための、動作時間Sに対する第1設定時間Rを周囲温度に応じ変更するのが好ましい。
図13に、第1設定時間Rを周囲温度に応じて変更した一例が示されている。図13では、周囲温度が高くなるにしたがって第1設定時間Rが短くなり、周囲温度が低くなるにしたがって第1設定時間Rが長くなるように修正されている。
第1設定時間Rを周囲温度に応じて修正する態様は、開閉器20(1)~20(n)の構造等に応じて設定される。
なお、第2設定時間Mについても、周囲温度に応じて変更することができる。
In the above, the case where the first set time R with respect to the operation time S is constant has been described.
On the other hand, when the ambient temperature changes, the operation time of the switches 20(1) to 20(n) changes. For this reason, it is preferable to change the first set time R for the operation time S for determining whether the switching device is operating abnormally in response to the ambient temperature.
An example in which the first set time R is changed according to the ambient temperature is shown in Fig. 13. In Fig. 13, the first set time R is modified so that it becomes shorter as the ambient temperature increases and becomes longer as the ambient temperature decreases.
The manner in which the first set time R is corrected in response to the ambient temperature is set in accordance with the structure of the switches 20(1) to 20(n), etc.
The second set time M can also be changed according to the ambient temperature.

次に、本実施形態における、監視装置110による、開閉装置10(1)~10(n)の異常動作を判別する処理を説明する。
図14は、開閉装置10(1)~10(n)の異常動作判別処理の一実施形態の概略を説明するフローチャートである。
図14に示されている異常動作判別処理では、判別した動作時間Sと開閉装置および動作内容との対応関係を判別する方法として、前述した第1の判別方法を用いている。すなわち、監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]に基づいて判別した動作時間Sと開閉装置および動作内容との対応関係を、動作履歴データベース132に記憶されている動作履歴を参照して判別している。
Next, a process of determining whether the switching devices 10(1) to 10(n) are operating abnormally by the monitoring device 110 in this embodiment will be described.
FIG. 14 is a flowchart outlining an embodiment of the abnormal operation determination process for the opening and closing devices 10(1) to 10(n).
14, the first determination method described above is used as a method for determining the correspondence between the determined operation time S and the switching device and operation content. That is, the correspondence between the operation time S determined based on the monitored current value [operation current value Ip(t), control current value Ic(t)] and the switching device and operation content is determined by referring to the operation history stored in the operation history database 132.

図14に示されている処理は、定められた時刻、操作員により指示された時刻等の適宜の時刻に開始される。
ステップA1では、監視電流情報データベース133(操作電流情報データベース134、制御電流情報データベース135)に記憶されている監視電流情報(操作電流情報、制御電流情報)に基づいて、監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]が[0]([略0]を含む)より大きくなった時刻を動作開始時刻tsとして判別する。また、動作開始時刻ts後に、監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]が[0]([略0]を含む)となった時刻を動作終了時刻teとして判別する。
ステップA2では、ステップA1で判別した動作開始時刻tsと動作終了時刻teの間の動作時間S(=te-ts)に動作した開閉装置を示す開閉装置識別情報と動作内容を判別する。具体的には、動作履歴データベース132に記憶されている動作履歴の中から、ステップA1で判別した動作開始時刻tsあるいは動作終了時刻teに近い事象発生時刻(tx、ty)を含んでいる動作履歴を選択する。そして、選択した動作履歴に含まれている開閉装置識別情報で示される開閉装置の、選択した動作履歴に含まれている動作内容であることを判別する。
ステップA3では、ステップA2で判別した開閉装置識別情報と動作内容に対応する異常動作判別情報を、異常動作判別情報データベース131から読み出す。
ステップA4では、監視電流情報データベース133(操作電流情報データベース134、制御電流情報データベース135)に記憶されている監視電流情報(操作電流情報、制御電流情報)と、ステップA3で読み出した異常動作判別情報に基づいて、ステップA2で判別した開閉装置識別情報で示される開閉装置の異常動作を判別する。
なお、ステップA4では、例えば、動作時間Sと異常動作判別情報に基づいて、あるいは、監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]と異常動作判別情報に基づいて、あるいは、動作時間Sおよび監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]と異常動作判別情報に基づいて開閉装置の異常動作を判別することができる。すなわち、ステップA4では、動作時間Sおよび監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]のうちの少なくとも一方と異常動作判別情報に基づいて開閉装置の異常動作を判別することができる。
ステップA5では、動作開始時刻tsと動作終了時刻teの組み合わせを全て判別したか否かを判別する。動作開始時刻tsと動作終了時刻teの組み合わせを全て判別していない場合には、ステップA1に戻る。動作開始時刻tsと動作終了時刻teの組み合わせを全て判別した場合には、処理を終了する。
The process shown in FIG. 14 is started at an appropriate time, such as a predetermined time or a time instructed by an operator.
In step A1, the time when the monitored current value [operation current value Ip(t), control current value Ic(t)] becomes greater than [0] (including [approximately 0]) is determined as the operation start time ts based on the monitored current information (operation current information, control current information) stored in the monitored current information database 133 (operation current information database 134, control current information database 135). In addition, the time when the monitored current value [operation current value Ip(t), control current value Ic(t)] becomes [0] (including [approximately 0]) after the operation start time ts is determined as the operation end time te.
In step A2, the switching device identification information and operation details indicating the switching device that operated during the operation time S (=te-ts) between the operation start time ts and the operation end time te determined in step A1 are determined. Specifically, an operation history including an event occurrence time (tx, ty) close to the operation start time ts or the operation end time te determined in step A1 is selected from the operation histories stored in the operation history database 132. Then, it is determined that the operation details are included in the selected operation history of the switching device indicated by the switching device identification information included in the selected operation history.
In step A3, abnormal operation determination information corresponding to the opening/closing device identification information and operation content determined in step A2 is read from the abnormal operation determination information database 131.
In step A4, based on the monitoring current information (operation current information, control current information) stored in the monitoring current information database 133 (operation current information database 134, control current information database 135) and the abnormal operation determination information read out in step A3, the abnormal operation of the switching device indicated by the switching device identification information determined in step A2 is determined.
In step A4, for example, abnormal operation of the switching device can be determined based on the operation time S and the abnormal operation discrimination information, or based on the monitored current value [operation current value Ip(t), control current value Ic(t)] and the abnormal operation discrimination information, or based on the operation time S and the monitored current value [operation current value Ip(t), control current value Ic(t)] and the abnormal operation discrimination information. That is, in step A4, abnormal operation of the switching device can be determined based on at least one of the operation time S and the monitored current value [operation current value Ip(t), control current value Ic(t)] and the abnormal operation discrimination information.
In step A5, it is determined whether or not all combinations of the operation start time ts and the operation end time te have been determined. If all combinations of the operation start time ts and the operation end time te have not been determined, the process returns to step A1. If all combinations of the operation start time ts and the operation end time te have been determined, the process ends.

次に、図14に示されているステップA1の処理の一例を、図15に示されているフローチャートを用いて説明する。
図15には、制御電流値Ic(t)を用いて動作時間Sを判別する処理が示されている。
なお、図15に示されている処理は、操作電流値Ip(t)を用いて動作時間Sを判別する処理に用いることができる。
Next, an example of the process of step A1 shown in FIG. 14 will be described with reference to the flowchart shown in FIG.
FIG. 15 shows a process for determining the operating time S using the control current value Ic(t).
The process shown in FIG. 15 can be used to determine the operation time S using the operation current value Ip(t).

ステップb1では、時刻tを、任意の時刻tnに設定する。
ステップb2では、制御電流値Ic(t)が閾値I0より大きくなったか否かを判別する。制御電流値Ic(t)が閾値I0より大きくなっていない場合には、ステップb3に進む。制御電流値Ic(t)が閾値I0より大きくなった場合には、ステップb4に進む。
ステップb3では、時刻tに[1]を加えてステップb2に戻る。なお、例えば、監視電流情報データベース133(操作電流情報データベースベース134、制御電流情報データベース135)に、所定時間間隔で読み取った(入力された)監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]が記憶されている場合には、「時刻tに[1]を加える」処理は、「所定時間後の時刻を指定する処理を意味する。
ステップb4では、制御電流値Ic(t)が閾値I0に達した時刻tを初期時刻tiに設定する。
ステップb5では、ステップb4で設定した初期時刻tiより第1指定時間T1前の時刻を、抽出開始時刻ta(=ti-T1)として設定する。
ステップb6では、時刻tを抽出開始時刻taに設定する。
ステップb7では、抽出開始時刻taから第2指定時間T2が経過したか否かを判別する。第2指定時間T2は、予め指定されている抽出時間である。抽出開始時刻taから第2指定時間T2が経過していない場合には、ステップb8に進む。抽出開始時刻taから第2指定時間T2が経過した場合には、ステップb8以降の処理(動作開始時刻ts、動作終了時刻teの判別処理)を中止して、次の処理に進む。例えば、図14に示されているステップA5に進み、動作開始時刻tsと動作終了時刻teの組み合わせを全て判別したか否かを判別する。動作開始時刻tsと動作終了時刻teの組み合わせを全て判別していない場合には、同様の処置を繰り返す。
ステップb8では、制御電流値Ic(t)が[0]([略0]を含む)より大きくなったか否かを判別する。制御電流値Ic(t)が[0]より大きくなっていない場合には、ステップb9に進む。制御電流値Ic(t)が[0]より大きくなった場合には、ステップb10に進む。
ステップb9では、時刻tに[1]を加えてステップb7に戻る。
ステップb10では、制御電流値Ic(t)が[0]より大きくなった時刻tを動作開始時刻tsとして判別する。
ステップb11では、時刻tに[1]を加えてステップb12に進む。
ステップb12では、制御電流値Ic(t)が[0]([略0]を含む)になったか否かを判別する。制御電流値Ic(t)が[0]になっていない場合には、ステップb11に戻る。制御電流値Ic(t)が[0]になった場合には、ステップb13に進む。
ステップb13では、制御電流値Ic(t)が[0]になった時刻tを動作終了時刻teとして判別する。
ステップb14では、動作開始時刻tsと動作終了時刻teの間の動作時間S(=te-ts)を判別する。
ステップb15では、動作時間Sが、第5指定時間T5以下であるか否かを判別する。第5指定時間T5は、動作時間Sが通常の動作時間より短い時間に設定される。動作時間Sが第5指定時間T5以下である場合には、ステップb16に進む。動作時間Sが第5指定時間T5より大きい場合には、次の処理に進む。
ステップb16では、ステップb10で判別した動作開始時刻tsとステップb13で判別した動作終了時刻teを破棄して、次の処理を実行する。
ステップb15とステップb16は、動作時間Sの誤判別を防止する処理である。例えば、判別した動作時間Sが、開閉器20(1)~20(n)の通常の動作時間より短い場合には、ノイズ等に基づいて動作時間を誤判別したものと判断する。ステップb15とステップb16は、省略することもできる。
なお、ステップb9の後に、ステップb5と同様のステップを設けることもできる。さらに、ステップb9は省略することもできる。この場合、制御電流値Ic(t)の抽出が終了するまで、動作開始時刻tsと動作終了時刻teを判別する処理が続行される。
In step b1, the time t is set to an arbitrary time tn.
In step b2, it is determined whether the control current value Ic(t) is greater than the threshold value I0. If the control current value Ic(t) is not greater than the threshold value I0, the process proceeds to step b3. If the control current value Ic(t) is greater than the threshold value I0, the process proceeds to step b4.
In step b3, [1] is added to the time t, and the process returns to step b2. Note that, for example, in the case where the monitored current values [operation current value Ip(t), control current value Ic(t)] read (input) at a predetermined time interval are stored in the monitored current information database 133 (operation current information database 134, control current information database 135), the process of "adding [1] to time t" means the process of "designating a time after a predetermined time period."
In step b4, the time t at which the control current value Ic(t) reaches the threshold value I0 is set as an initial time ti.
In step b5, the time that is the first designated time T1 before the initial time ti that was set in step b4 is set as the extraction start time ta (=ti-T1).
In step b6, the time t is set to the extraction start time ta.
In step b7, it is determined whether or not the second designated time T2 has elapsed since the extraction start time ta. The second designated time T2 is a pre-designated extraction time. If the second designated time T2 has not elapsed since the extraction start time ta, the process proceeds to step b8. If the second designated time T2 has elapsed since the extraction start time ta, the process from step b8 onwards (processing for determining the operation start time ts and the operation end time te) is stopped, and the process proceeds to the next process. For example, the process proceeds to step A5 shown in FIG. 14, where it is determined whether or not all combinations of the operation start time ts and the operation end time te have been determined. If all combinations of the operation start time ts and the operation end time te have not been determined, the same process is repeated.
In step b8, it is determined whether the control current value Ic(t) is greater than [0] (including [approximately 0]). If the control current value Ic(t) is not greater than [0], the process proceeds to step b9. If the control current value Ic(t) is greater than [0], the process proceeds to step b10.
In step b9, the time t is incremented by [1] and the process returns to step b7.
In step b10, the time t when the control current value Ic(t) becomes greater than [0] is determined as the operation start time ts.
In step b11, the time t is incremented by [1] and the process proceeds to step b12.
In step b12, it is determined whether the control current value Ic(t) has become [0] (including [approximately 0]). If the control current value Ic(t) has not become [0], the process returns to step b11. If the control current value Ic(t) has become [0], the process proceeds to step b13.
In step b13, the time t when the control current value Ic(t) becomes [0] is determined as the operation end time te.
In step b14, the operation time S (=te-ts) between the operation start time ts and the operation end time te is determined.
In step b15, it is determined whether the operation time S is equal to or shorter than a fifth designated time T5. The fifth designated time T5 is set to a time shorter than the normal operation time of the operation time S. If the operation time S is equal to or shorter than the fifth designated time T5, the process proceeds to step b16. If the operation time S is greater than the fifth designated time T5, the process proceeds to the next process.
In step b16, the operation start time ts determined in step b10 and the operation end time te determined in step b13 are discarded, and the next process is executed.
Steps b15 and b16 are processes for preventing erroneous determination of the operation time S. For example, if the determined operation time S is shorter than the normal operation time of the switches 20(1) to 20(n), it is determined that the operation time has been erroneously determined based on noise or the like. Steps b15 and b16 may be omitted.
Note that step b9 may be followed by a step similar to step b5. Furthermore, step b9 may be omitted. In this case, the process of determining the operation start time ts and the operation end time te continues until extraction of the control current value Ic(t) is completed.

図14に示されているステップA4における、異常動作判別情報に基づいて開閉装置の異常動作を判別する処理の第1例を図16(a)に示す。
ステップc1では、動作時間Sが、異常動作判別情報に含まれている第1設定時間R以下であるか否かを判別する。動作時間Sが第1設定時間R以下である場合には、ステップc2に進む。動作時間Sが第1設定時間Rより大きい場合には、ステップc3に進む。
ステップc2では、開閉装置は正常であることを判別する。
ステップc3では、開閉装置は異常であることを判別する。
FIG. 16(a) shows a first example of the process of determining whether an abnormal operation of the opening and closing device is occurring based on the abnormal operation determination information in step A4 shown in FIG.
In step c1, it is determined whether the operation time S is equal to or shorter than the first set time R included in the abnormal operation determination information. If the operation time S is equal to or shorter than the first set time R, the process proceeds to step c2. If the operation time S is longer than the first set time R, the process proceeds to step c3.
In step c2, it is determined that the switching device is normal.
In step c3, it is determined that the switching device is abnormal.

図14に示されているステップA4における、異常動作判別情報に基づいて開閉装置の異常動作を判別する処理の第2例を図16(b)に示す。
ステップd1では、動作時間Sが、異常動作判別情報に含まれている第1設定時間R以下であるか否かを判別する。動作時間Sが第1設定時間R以下である場合には、ステップd2に進む。動作時間Sが第1設定時間Rより大きい場合には、ステップd4に進む。
ステップd2では、動作時間Sのうち、動作開始時刻tsから除外時間T0を除いた期間の制御電流値Ic(t)が、異常動作判別情報に含まれている設定電流値J以下であるか否かを判別する。制御電流値Ic(t)が設定電流値J以下である場合には、ステップd3に進む。制御電流値Ic(t)が設定電流値Jより大きい場合には、ステップd4に進む。
ステップd3では、開閉装置は正常であることを判別する。
ステップd4では、開閉装置は異常であることを判別する。
FIG. 16(b) shows a second example of the process of determining whether an abnormal operation of the opening and closing device is occurring based on the abnormal operation determination information in step A4 shown in FIG.
In step d1, it is determined whether the operation time S is equal to or shorter than the first set time R included in the abnormal operation determination information. If the operation time S is equal to or shorter than the first set time R, the process proceeds to step d2. If the operation time S is longer than the first set time R, the process proceeds to step d4.
In step d2, it is determined whether the control current value Ic(t) during the operation time S, which is the period from the operation start time ts excluding the exclusion time T0, is equal to or less than the set current value J included in the abnormal operation determination information. If the control current value Ic(t) is equal to or less than the set current value J, the process proceeds to step d3. If the control current value Ic(t) is greater than the set current value J, the process proceeds to step d4.
In step d3, it is determined that the switching device is normal.
In step d4, it is determined that the switching device is abnormal.

図14に示されているステップA4における、異常動作判別情報に基づいて開閉装置の異常動作を判別する処理の第3例を図16(c)に示す。
ステップe1では、制御電流値Ic(t)の変曲点Kから設定傾斜角度rで線Gを引く。そして、線G上の、制御電流値Ic(t)が[0]([略0]を含む)である基準時刻hを判別する。
ステップe2では、基準時刻hに対する動作終了時刻teの遅れ時間N(=te-h)を判別する。
ステップe3では、遅れ時間Nが、異常動作判別情報に含まれている第2設定時間M以下であるか否かを判別する。遅れ時間Nが第2設定時間M以下である場合には、ステップe4に進む。遅れ時間Nが第2設定時間Mより大きい場合には、ステップe5に進む。
ステップe4では、開閉装置は正常であることを判別する。
ステップe5では、開閉装置は異常であることを判別する。
FIG. 16(c) shows a third example of the process of determining whether an abnormal operation of the opening and closing device is occurring based on the abnormal operation determination information in step A4 shown in FIG.
In step e1, a line G is drawn at a set inclination angle r from an inflection point K of the control current value Ic(t). Then, a reference time h on the line G where the control current value Ic(t) is [0] (including [approximately 0]) is determined.
In step e2, the delay time N (=te-h) of the operation end time te relative to the reference time h is determined.
In step e3, it is determined whether the delay time N is equal to or less than the second set time M included in the abnormal operation determination information. If the delay time N is equal to or less than the second set time M, the process proceeds to step e4. If the delay time N is greater than the second set time M, the process proceeds to step e5.
In step e4, it is determined that the switching device is normal.
In step e5, it is determined that the switching device is abnormal.

次に、開閉装置10(1)~10(n)の異常動作判別処理の他の実施形態の概略を、図17に示されているフローチャートにより説明する。
図17に示されている異常動作判別処理では、判別した動作時間Sと開閉装置および動作内容との対応関係を判別する方法として、前述した第2の判別方法を用いている。すなわち、動作履歴データベース132から読み出した動作履歴に含まれている開閉装置識別情報と動作内容に基づいて、動作時間Sと開閉装置および動作内容との対応関係を判別している。
Next, an outline of another embodiment of the abnormal operation determination process for the opening and closing devices 10(1) to 10(n) will be described with reference to the flowchart shown in FIG.
17 uses the above-mentioned second determination method as a method for determining the correspondence relationship between the determined operation time S and the opening/closing device and operation content. That is, the correspondence relationship between the operation time S and the opening/closing device and operation content is determined based on the opening/closing device identification information and operation content included in the operation history read from the operation history database 132.

図17に示されている処理は、定められた時刻、操作員により指示された時刻等の適宜の時刻に開始される。
ステップF1では、動作履歴データベース132から、動作履歴(事象発生時刻、開閉装置識別情報、動作内容)を読み出す。
ステップF2では、ステップF1で読み出した動作履歴に含まれている事象発生時刻(tx、ty)に基づいて、監視電流情報データベース133からの、監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]の抽出を開始する抽出開始時刻taを決定する。
例えば、読み出した動作履歴に、遠方監視制御装置60から開閉装置10の制御装置40に投入あるいは引き外しが指示された時刻txが事象発生時刻として含まれている場合には、時刻txから第3指定時間T3前の時刻(=tx-T3)が抽出開始時刻taとして決定される。
また、読み出した動作履歴に、開閉装置10の開閉器20の投入動作あるいは引き外し動作が行われたことを検出した時刻tyが事象発生時刻として含まれている場合には、時刻tyから第4指定時間T4前の時刻(=ty-T4)が抽出開始時刻taとして決定される。
ステップF3では、監視電流情報データベース133(操作電流情報データベース134、制御電流情報データベース135)に記憶されている監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]を、ステップF2で決定された抽出開始時刻taから順に抽出する。そして、抽出した監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]が[0]([略0]を含む)より大きくなった時刻を動作開始時刻tsとして判別する。また、動作開始時刻ts後に、監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]が[0]([略0]を含む)になった時刻を動作終了時刻teとして判別する。動作開始時刻tsと動作終了時刻teの間の時間を動作時間S(=te-ts)として判別する。
The process shown in FIG. 17 is started at an appropriate time, such as a predetermined time or a time instructed by an operator.
In step F1, the operation history (event occurrence time, switching device identification information, operation details) is read from the operation history database 132.
In step F2, based on the event occurrence time (tx, ty) included in the operation history read in step F1, an extraction start time ta at which to start extracting the monitored current values [operation current value Ip(t), control current value Ic(t)] from the monitored current information database 133 is determined.
For example, if the read operation history includes the time tx when the remote monitoring control device 60 instructs the control device 40 of the switching device 10 to close or trip as the event occurrence time, the time before the third specified time T3 from the time tx (= tx - T3) is determined to be the extraction start time ta.
In addition, if the read operation history includes the time ty at which it is detected that the switch 20 of the switching device 10 has been closed or tripped as the event occurrence time, the time before the fourth specified time T4 from the time ty (= ty - T4) is determined to be the extraction start time ta.
In step F3, the monitoring current values [operation current value Ip(t), control current value Ic(t)] stored in the monitoring current information database 133 (operation current information database 134, control current information database 135) are extracted in order from the extraction start time ta determined in step F2. Then, the time when the extracted monitoring current values [operation current value Ip(t), control current value Ic(t)] become larger than [0] (including [approximately 0]) is determined as the operation start time ts. In addition, the time when the monitoring current values [operation current value Ip(t), control current value Ic(t)] become [0] (including [approximately 0]) after the operation start time ts is determined as the operation end time te. The time between the operation start time ts and the operation end time te is determined as the operation time S (= te - ts).

ステップF4では、ステップF1で読み出した動作履歴に含まれている開閉装置識別情報と動作内容に対応する異常動作判別情報を、異常動作判別情報データベース131から読み出す。
ステップF5では、監視電流情報データベース133(操作電流情報データベース134、制御電流情報データベース135)に記憶されている監視電流情報(操作電流情報、制御電流情報)と、ステップF4で読み出した異常動作判別情報に基づいて、ステップF1で読み出した動作履歴に含まれている開閉装置識別情報で示される開閉装置の異常動作を判別する。
ステップF5は、図14に示されているステップA4と同様の処理を行うことができる。すなわち、ステップF5では、動作時間Sおよび監視電流値[操作電流値Ip(t)、制御電流値Ic(t)]のうちの少なくとも一方と異常動作判別情報に基づいて開閉装置の異常動作を判別することができる。
ステップF6では、動作履歴データベース132に記憶されている動作履歴を全て読み出したか否かを判断する。読み出していない動作履歴が存在する場合には、ステップF1に戻る。全ての動作履歴を読み出した場合には、処理を終了する。
In step F4, abnormal operation determination information corresponding to the opening/closing device identification information and operation details included in the operation history read in step F1 is read from the abnormal operation determination information database 131.
In step F5, based on the monitoring current information (operation current information, control current information) stored in the monitoring current information database 133 (operation current information database 134, control current information database 135) and the abnormal operation discrimination information read out in step F4, an abnormal operation of the switching device indicated by the switching device identification information included in the operation history read out in step F1 is discriminated.
Step F5 can perform the same process as step A4 shown in Fig. 14. That is, in step F5, it is possible to determine an abnormal operation of the switching device based on at least one of the operation time S and the monitored current value [operation current value Ip(t), control current value Ic(t)] and the abnormal operation determination information.
In step F6, it is determined whether or not all operation histories stored in the operation history database 132 have been read. If there is operation history that has not been read, the process returns to step F1. If all operation histories have been read, the process ends.

次に、図17に示されているステップF3の処理の一例を、図18に示されているフローチャートを用いて説明する。
図18には、制御電流値Ic(t)を用いて動作時間Sを判別する処理が示されている。
なお、図18に示されている処理は、操作電流値Ip(t)を用いて動作時間Sを判別する処理に用いることができる。
Next, an example of the process of step F3 shown in FIG. 17 will be described with reference to the flowchart shown in FIG.
FIG. 18 shows a process for determining the operating time S using the control current value Ic(t).
The process shown in FIG. 18 can be used to determine the operation time S using the operation current value Ip(t).

ステップg1では、時刻tを、図17のステップF2で決定した抽出開始時刻taに設定する。
ステップg2では、抽出開始時刻taから第2指定時間T2が経過したか否かを判別する。抽出開始時刻taから第2指定時間T2が経過していない場合には、ステップg3に進む。抽出開始時刻taから第2指定時間T2が経過した場合には、ステップb3以降の処理(動作開始時刻ts、動作終了時刻teの判別処理)を中止して、次の処理に進む。
ステップg3では、制御電流値Ic(t)が[0]([略0]を含む)より大きくなったか否かを判別する。制御電流値Ic(t)が[0]より大きくなっていない場合には、ステップg4に進む。制御電流値Ic(t)が[0]より大きくなった場合には、ステップg5に進む。
ステップg4では、時刻tに[1]を加えてステップg1に戻る。
ステップg5では、制御電流値Ic(t)が[0]より大きくなった時刻tを動作開始時刻tsとして判別する。
ステップg6では、時刻tに[1]を加えてステップg7に進む。
ステップg7では、制御電流値Ic(t)が[0]([略0]を含む)になったか否かを判別する。制御電流値Ic(t)が[0]になっていない場合には、ステップg6に戻る。制御電流値Ic(t)が[0]になった場合には、ステップg8に進む。
ステップg8では、制御電流値Ic(t)が[0]になった時刻tを動作終了時刻teとして判別する。
ステップg9では、動作開始時刻tsと動作終了時刻teの間の動作時間S(=te-ts)を判別する。
ステップg10では、動作時間Sが、第5指定時間T5以下であるか否かを判別する。第5指定時間T5は、動作時間Sが通常の動作時間より短い時間に設定される。動作時間Sが第5指定時間T5以下である場合には、ステップg11に進む。動作時間Sが第5指定時間T5より大きい場合には、次の処理に進む。
ステップg11では、ステップg5で判別した動作開始時刻tsとステップg8で判別した動作終了時刻teを破棄して、次の処理を実行する。
ステップg10とステップg11は、動作時間Sの誤判別を防止する処理である。ステップg10とステップg11は、省略することもできる。
なお、ステップg6の後に、ステップg2と同様のステップを設けることもできる。さらに、ステップg2は省略することもできる。
In step g1, the time t is set to the extraction start time ta determined in step F2 of FIG.
In step g2, it is determined whether the second designated time T2 has elapsed since the extraction start time ta. If the second designated time T2 has not elapsed since the extraction start time ta, the process proceeds to step g3. If the second designated time T2 has elapsed since the extraction start time ta, the process from step b3 onwards (the process of determining the operation start time ts and the operation end time te) is stopped, and the process proceeds to the next step.
In step g3, it is determined whether the control current value Ic(t) is greater than [0] (including [approximately 0]). If the control current value Ic(t) is not greater than [0], the process proceeds to step g4. If the control current value Ic(t) is greater than [0], the process proceeds to step g5.
In step g4, the time t is incremented by [1] and the process returns to step g1.
In step g5, the time t when the control current value Ic(t) becomes greater than [0] is determined as the operation start time ts.
In step g6, the time t is incremented by [1] and the process proceeds to step g7.
In step g7, it is determined whether the control current value Ic(t) has become [0] (including [approximately 0]). If the control current value Ic(t) has not become [0], the process returns to step g6. If the control current value Ic(t) has become [0], the process proceeds to step g8.
In step g8, the time t when the control current value Ic(t) becomes [0] is determined as the operation end time te.
In step g9, the operation time S (=te-ts) between the operation start time ts and the operation end time te is determined.
In step g10, it is determined whether the operation time S is equal to or shorter than a fifth designated time T5. The fifth designated time T5 is set to a time shorter than the normal operation time of the operation time S. If the operation time S is equal to or shorter than the fifth designated time T5, the process proceeds to step g11. If the operation time S is greater than the fifth designated time T5, the process proceeds to the next process.
In step g11, the operation start time ts determined in step g5 and the operation end time te determined in step g8 are discarded, and the next process is executed.
Steps g10 and g11 are processes for preventing erroneous determination of the operation time S. Steps g10 and g11 may be omitted.
It should be noted that step g6 may be followed by a step similar to step g2. Furthermore, step g2 may be omitted.

本発明は、以下のように構成することもできる。
(態様1)
開閉器と、前記開閉器の投入あるいは引き外しを行う操作装置と、投入あるいは引き外しが指示された場合に、前記操作装置を制御する制御装置と、を有する複数の開閉装置を監視する開閉装置監視システムであって、
前記複数の開閉装置の前記操作装置は、専用の操作電源に並列に接続されているとともに、前記複数の開閉装置の前記制御装置は、専用の制御電源に並列に接続されており、
監視装置と、記憶装置と、を備え、
前記記憶装置は、異常動作判別情報データベースと、動作履歴データベースと、監視電流情報データベースと、を有し、
前記異常動作判別情報データベースには、開閉装置の投入動作時および引き外し動作時のうちの少なくとも一方の動作時における異常動作を判別するための異常動作判別情報が、開閉装置を示す開閉装置識別情報と動作内容に対応して記憶され、
前記動作履歴データベースには、開閉装置の投入動作あるいは引き外し動作に関連する事象が発生した時刻を示す事象発生時刻と、当該開閉装置を示す開閉装置識別情報と、当該投入動作あるいは引き外し動作を示す動作内容と、を含む動作履歴が記憶され、
前記監視電流情報データベースには、監視電流の監視電流値と当該監視電流値を検出した時刻tを含む監視電流情報が記憶され、前記監視電流の監視電流値には、前記操作電源から供給された操作電流Ipの操作電流値Ip(t)および前記制御電源から供給された制御電流Icの制御電流値Ic(t)のうちの少なくとも一方の電流値が含まれ、
前記監視装置は、異常動作判別手段を有し、
前記異常動作判別手段は、
前記監視電流情報データベースに記憶されている監視電流情報に基づいて、監視電流が流れ始めた動作開始時刻tsと、監視電流の流れが停止した動作終了時刻teを判別し、
前記動作履歴データベースに記憶されている動作履歴に基づいて、前記判別した動作開始時刻tsに動作を開始した開閉装置を示す開閉装置識別情報と動作内容を判別し、
前記判別した開閉装置識別情報と動作内容に対応する異常動作判別情報を前記異常動作判別情報データベースから読み出し、
前記判別した動作開始時刻tsと動作終了時刻teの間の動作時間Sおよび前記監視電流情報データベースに記憶されている、前記動作時間S内の監視電流値のうちの少なくとも一方と、前記異常動作判別情報データベースから読み出した異常動作判別情報に基づいて、前記判別した開閉装置識別情報で示される開閉装置の異常動作を判別する、
ことを特徴とする開閉装置監視システム。
(態様2)
開閉器と、前記開閉器の投入あるいは引き外しを行う操作装置と、投入あるいは引き出しが指示された場合に、前記操作装置を制御する制御装置と、を有する複数の開閉装置を監視する開閉装置監視システムであって、
前記複数の開閉装置の前記操作装置は、専用の操作電源に並列に接続されているとともに、前記複数の開閉装置の前記制御装置は、専用の制御電源に並列に接続されており、
監視装置と、記憶装置と、を備え、
前記記憶装置は、異常動作判別情報データベースと、動作履歴データベースと、監視電流情報データベースと、を有し、
前記異常動作判別情報データベースには、開閉装置の投入動作時および引き外し動作時のうちの少なくとも一方の動作時における異常動作を判別するための異常動作判別情報が、開閉装置を示す開閉装置識別情報と動作内容に対応して記憶され、
前記動作履歴データベースには、開閉装置の投入動作あるいは引き外し動作に関連する事象が発生した時刻を示す事象発生時刻と、当該開閉装置を示す開閉装置識別情報と、当該投入動作あるいは引き外し動作を示す動作内容と、を含む動作履歴が記憶され、
前記監視電流情報データベースには、監視電流の監視電流値と当該監視電流値を検出した時刻tを含む監視電流情報が記憶され、前記監視電流の監視電流値には、前記操作電源から供給された操作電流Ipの操作電流値Ip(t)および前記制御電源から供給された制御電流Icの制御電流値Ic(t)のうちの少なくとも一方の電流値が含まれ、
前記監視装置は、異常動作判別手段を有し、
前記異常動作判別手段は、
前記動作履歴データベースから読み出した動作履歴に含まれている事象発生時刻に基づいて、前記監視電流情報データベースからの監視電流値の抽出を開始する抽出開始時刻taを決定し、
前記監視電流情報データベースから抽出した監視電流値に基づいて、監視電流が流れ始めた動作開始時刻tsと、監視電流の流れが停止した動作終了時刻teを判別し、
前記読み出した動作履歴に含まれている開閉装置識別情報と動作内容に対応する異常動作判別情報を前記異常動作判別情報データベースから読み出し、
前記判別した動作開始時刻tsと動作終了時刻teの間の動作時間Sおよび前記監視電流情報データベースに記憶されている、当該動作時間S内の監視電流値のうちの少なくとも一方と、前記異常動作判別情報データベースから読み出した異常動作判別情報に基づいて、前記読み出した動作履歴に含まれている開閉装置識別情報で示される開閉装置の異常動作を判別する、
ことを特徴とする開閉装置監視システム。
(態様3)
態様1または2の開閉装置監視システムであって、
前記操作電源から供給される操作電流の操作電流値を検出する操作電流値検出装置と、前記制御電源から供給される制御電流の制御電流値を検出する制御電流値検出装置が設けられており、
前記監視装置は、監視電流値処理手段を有し、
前記監視電流値処理手段は、前記操作電流値検出装置で検出された操作電流値および前記制御電流値検出装置で検出された制御電流値のうちの少なくとも一方の電流値と、検出した時刻tを含む監視電流情報を前記監視電流情報データベースに記憶させる処理を実行することを特徴とする開閉装置監視システム。
(態様4)
態様1~3のうちのいずれかの開閉装置監視システムであって、
前記監視装置は、動作履歴管理手段を有し、
前記動作履歴管理手段は、前記複数の開閉装置の前記制御装置に投入あるいは引き出しが指示された時刻および前記複数の開閉装置の前記開閉器の投入動作あるいは引き外し動作が行われたことを検出した時刻のうちの一方の時刻を前記事象発生時刻として含む動作履歴を、前記動作履歴データベースに記憶させる処理を実行することを特徴とする開閉装置監視システム。
(態様5)
態様4の開閉装置監視システムであって、
前記複数の開閉装置の前記制御装置に投入あるいは引き出しを指示するとともに、前記複数の開閉装置の前記開閉器の投入動作あるいは引き外し動作が行われたことを監視する遠方監視制御装置が設けられており、
前記動作履歴管理手段は、前記遠方監視制御装置から前記複数の開閉装置の前記制御装置に投入あるいは引き外しが指示された時刻および前記複数の開閉装置の前記開閉器の投入動作あるいは引き外し動作が行われたことを前記遠方監視制御装置あるいは前記動作履歴管理手段が検出した時刻のうち一方の時刻を前記事象発生時刻として含む動作履歴を前記動作履歴データベースに記憶させる処理を実行することを特徴とする開閉装置監視システム。
(態様6)
態様1~5のうちのいずれかの開閉装置監視システムであって、
前記異常動作判別手段は、監視電流値が[0]より大きくなった時刻を前記動作開始時刻tsとして判別し、その後、監視電流値が[0]となった時刻を前記動作終了時刻teとして判別することを特徴とする開閉装置監視システム。
(態様7)
態様1~6のうちのいずれかの開閉装置監視システムであって、
前記異常動作判別手段は、前記動作開始時刻tsと前記動作終了時刻teとの間の動作時間Sと、前記異常動作判別情報に含まれている第1設定時間との比較結果に基づいて、前記開閉装置の異常動作を判別することを特徴とする開閉装置監視システム。
(態様8)
態様1~7のうちのいずれかの開閉装置監視システムであって、
前記異常動作判別手段は、前記動作時間Sのうち、前記動作開始時刻tsから除外時間を除いた期間における監視電流値と前記異常動作判別情報に含まれている設定電流値との比較結果に基づいて、前記開閉装置の異常動作を判別することを特徴とする開閉装置監視システム。
(態様9)
態様7の開閉装置監視システムであって、
前記第1設定時間は、周囲温度に応じて変更されることを特徴とする開閉装置監視システム。
(態様10)
態様1~6のうちのいずれかの開閉装置監視システムであって、
前記異常動作判別手段は、監視電流値が減少を開始する変曲点から設定傾斜角度で引いた線上の、監視電流値が[0]となる基準時刻hと前記動作終了時刻teの間の遅れ時間Nと、前記異常動作判別情報に含まれている第2設定時間との比較結果に基づいて、前記開閉装置の異常動作を判別することを特徴とする開閉装置監視システム。
The present invention can also be configured as follows.
(Aspect 1)
A switchgear monitoring system for monitoring a plurality of switchgears, the switchgears including an operating device for closing or tripping the switchgears, and a control device for controlling the operating device when a command to close or trip the switchgear is received,
The operation devices of the plurality of switchgears are connected in parallel to a dedicated operation power supply, and the control devices of the plurality of switchgears are connected in parallel to a dedicated control power supply,
A monitoring device and a storage device,
The storage device includes an abnormal operation determination information database, an operation history database, and a monitored current information database,
The abnormal operation discrimination information database stores abnormal operation discrimination information for discriminating abnormal operation during at least one of a closing operation and a tripping operation of the switching device, in association with switching device identification information indicating the switching device and the operation content,
The operation history database stores an operation history including an event occurrence time indicating a time when an event related to a closing operation or a tripping operation of a switching device occurred, switching device identification information indicating the switching device, and an operation content indicating the closing operation or the tripping operation,
The monitored current information database stores monitored current information including a monitored current value of a monitored current and a time t at which the monitored current value was detected, and the monitored current value of the monitored current includes at least one of an operation current value Ip(t) of an operation current Ip supplied from the operation power source and a control current value Ic(t) of a control current Ic supplied from the control power source,
The monitoring device has an abnormal operation determination means,
The abnormal operation determination means
determining an operation start time ts at which the flow of the monitoring current begins and an operation end time te at which the flow of the monitoring current stops based on the monitoring current information stored in the monitoring current information database;
determining switching device identification information indicating a switching device that started operation at the determined operation start time ts and a content of the operation based on the operation history stored in the operation history database;
reading out abnormal operation determination information corresponding to the determined opening/closing device identification information and operation content from the abnormal operation determination information database;
determining an abnormal operation of the switching device indicated by the determined switching device identification information based on at least one of an operation time S between the determined operation start time ts and operation end time te and a monitored current value within the operation time S stored in the monitored current information database, and abnormal operation determination information read out from the abnormal operation determination information database;
A switching gear monitoring system comprising:
(Aspect 2)
A switchgear monitoring system for monitoring a plurality of switchgears, the switchgears including an operating device for closing or tripping the switchgears, and a control device for controlling the operating device when a command to close or pull out the switchgear is received,
The operation devices of the plurality of switchgears are connected in parallel to a dedicated operation power supply, and the control devices of the plurality of switchgears are connected in parallel to a dedicated control power supply,
A monitoring device and a storage device,
The storage device includes an abnormal operation determination information database, an operation history database, and a monitored current information database,
The abnormal operation discrimination information database stores abnormal operation discrimination information for discriminating abnormal operation during at least one of a closing operation and a tripping operation of the switching device, in association with switching device identification information indicating the switching device and the operation content,
The operation history database stores an operation history including an event occurrence time indicating a time when an event related to a closing operation or a tripping operation of a switching device occurred, switching device identification information indicating the switching device, and an operation content indicating the closing operation or the tripping operation,
The monitored current information database stores monitored current information including a monitored current value of a monitored current and a time t at which the monitored current value was detected, and the monitored current value of the monitored current includes at least one of an operation current value Ip(t) of an operation current Ip supplied from the operation power source and a control current value Ic(t) of a control current Ic supplied from the control power source,
The monitoring device has an abnormal operation determination means,
The abnormal operation determination means
determining an extraction start time ta for starting extraction of a monitoring current value from the monitoring current information database based on an event occurrence time included in the operation history read from the operation history database;
Based on the monitoring current value extracted from the monitoring current information database, an operation start time ts at which the monitoring current starts to flow and an operation end time te at which the monitoring current stops to flow are determined;
reading out, from the abnormal operation discrimination information database, abnormal operation discrimination information corresponding to the opening/closing device identification information and the operation content included in the read operation history;
determining an abnormal operation of the switching device indicated by the switching device identification information included in the read operation history, based on at least one of the operation time S between the determined operation start time ts and operation end time te and the monitored current value within the operation time S stored in the monitored current information database, and abnormal operation determination information read from the abnormal operation determination information database;
A switching gear monitoring system comprising:
(Aspect 3)
The switching gear monitoring system according to aspect 1 or 2,
an operation current value detection device for detecting an operation current value of an operation current supplied from the operation power source, and a control current value detection device for detecting a control current value of a control current supplied from the control power source,
The monitoring device has a monitored current value processing means,
The switching gear monitoring system is characterized in that the monitoring current value processing means executes a process of storing monitoring current information including at least one of the current values of the operation current value detected by the operation current value detection device and the control current value detected by the control current value detection device, and the detection time t, in the monitoring current information database.
(Aspect 4)
A switching gear monitoring system according to any one of aspects 1 to 3,
The monitoring device has an operation history management means,
The switching gear monitoring system is characterized in that the operation history management means executes a process of storing in the operation history database an operation history including, as the event occurrence time, one of the times when a closing or pulling operation was instructed to the control devices of the multiple switching gears and the time when it was detected that the closing operation or the pulling operation of the switches of the multiple switching gears was performed.
(Aspect 5)
A switching device monitoring system according to aspect 4,
a remote monitoring and control device is provided for instructing the control devices of the plurality of switchgears to make or remove a switch and for monitoring that the switchgears have been made to make or remove a switch,
The operation history management means of this switching gear monitoring system is characterized in that it executes a process of storing in the operation history database an operation history including, as the event occurrence time, one of the times when the remote monitoring control device instructs the control devices of the multiple switching gears to make or take off the switches and when the remote monitoring control device or the operation history management means detects that the closing operation or tripping operation of the switches of the multiple switching gears has been performed.
(Aspect 6)
A switching gear monitoring system according to any one of aspects 1 to 5,
a switching gear monitoring system, characterized in that the abnormal operation determination means determines the time when the monitored current value becomes greater than [0] as the operation start time ts, and then determines the time when the monitored current value becomes [0] as the operation end time te.
(Aspect 7)
A switching gear monitoring system according to any one of aspects 1 to 6,
The abnormal operation discrimination means discriminates abnormal operation of the switching device based on a comparison result between an operation time S between the operation start time ts and the operation end time te and a first set time included in the abnormal operation discrimination information.
(Aspect 8)
A switching gear monitoring system according to any one of aspects 1 to 7,
a switching gear monitoring system characterized in that the abnormal operation determination means determines an abnormal operation of the switching gear based on a comparison result between a monitored current value during the operation time S, the monitored current value being a period from the operation start time ts excluding an exclusion time, and a set current value included in the abnormal operation determination information.
(Aspect 9)
The switching device monitoring system of aspect 7,
A switching device monitoring system, characterized in that the first set time is changed in response to an ambient temperature.
(Aspect 10)
A switching gear monitoring system according to any one of aspects 1 to 6,
the abnormal operation determination means determines abnormal operation of the switching gear based on a comparison result between a delay time N between a reference time h at which the monitor current value becomes [0] and the operation end time te on a line drawn at a set inclination angle from the inflection point at which the monitor current value begins to decrease, and a second set time included in the abnormal operation determination information.

本発明の構成は、実施形態で説明した構成に限定されず、種々の変更、追加、削除が可能である。
実施形態では、操作電流値検出装置、制御電流値検出装置、監視電流値処理手段、動作履歴管理手段、異常動作判別手段を備える開閉装置監視システムについて説明したが、監視電流情報(操作電流情報、制御電流情報)が記憶されている監視電流情報データベースが用意される場合には、制御電流値検出装置、監視電流値検出装置および監視電流値処理手段を省略することができ、また、動作履歴が記憶されている動作履歴データベースが用意される場合には、動作履歴管理手段を省略することができる。
監視電流値処理手段における監視電流値処理手法、動作履歴管理手段における動作履歴管理手法、異常動作判別手段における異常動作判別手法は、図15~図18に示されている手法に限定されない。
第1指定時間T1~第4指定時間T4は、各開閉装置に対して共通の値に設定してもよいし、開閉装置に対応して異なる値に設定してもよい。
実施形態で説明した各構成は、単独で用いることもできるし、適宜選択した複数を組み合わせて用いることもできる。
The configuration of the present invention is not limited to the configurations described in the embodiments, and various modifications, additions, and deletions are possible.
In the embodiments, a switching gear monitoring system has been described that includes an operation current value detection device, a control current value detection device, a monitoring current value processing means, an operation history management means, and an abnormal operation discrimination means. However, if a monitoring current information database in which monitoring current information (operation current information, control current information) is stored is prepared, the control current value detection device, the monitoring current value detection device, and the monitoring current value processing means can be omitted, and if an operation history database in which operation history is stored is prepared, the operation history management means can be omitted.
The monitoring current value processing method in the monitoring current value processing means, the operation history management method in the operation history management means, and the abnormal operation discrimination method in the abnormal operation discrimination means are not limited to the methods shown in FIGS.
The first to fourth designated times T1 to T4 may be set to common values for each opening/closing device, or may be set to different values corresponding to each opening/closing device.
Each of the configurations described in the embodiments can be used alone or in combination with an appropriately selected plurality of configurations.

10、10(1)~10(n) 開閉装置
20、20(1)~20(n) 開閉器
30、30(1)~30(n) 操作装置
31 電動機
40、40(1)~40(n)、40(1)A、40(1)B、40(1)C 制御装置
41、41(A)、41(B)、41(C) 投入コイル
32A、32B、41a、41a(A)、41a(B)、41a(C) 補助接点
42、42(A)、42(B)、42(C) 投入スイッチ(遠方)
43、43(A)、43(B)、43(C) 投入スイッチ(手動)
44、44(A)、44(B)、44(C) 引き外しコイル
33A、33B、44a、44a(A)、44a(B)、44a(C) 補助接点
45、45(A)、45(B)、45(C) 引き外しスイッチ(遠方)
46、46(A)、46(B)、46(C) 引き外しスイッチ(手動)
47、47(A)、47(B)、47(C) 引き外しスイッチ(保護)
48、48(A)、48(B)、48(C) リミットスイッチ
48a、48a(A)、48a(B)、48a(C)、48b、48b(A)、48b(B)、48b(C) 接点
50 電源装置
51 操作電源
52 制御電源
53 設備電源
60 遠方監視制御装置
100 開閉装置監視システム(開閉装置監視装置)
110 監視装置
111 監視電流値処理手段
112 動作履歴管理手段
113 異常動作判別手段
120 監視電流値検出装置
121 操作電流値検出装置
122 制御電流値検出装置
130 記憶装置
131 異常動作判別情報データベース
132 動作履歴データベース
133 監視電流情報データベース
134 操作電流情報データベース
135 制御電流情報データベース
140 表示装置
150 入力装置
10, 10(1) to 10(n) Switching device 20, 20(1) to 20(n) Switch 30, 30(1) to 30(n) Operating device 31 Motor 40, 40(1) to 40(n), 40(1)A, 40(1)B, 40(1)C Control device 41, 41(A), 41(B), 41(C) Making coil 32A, 32B, 41a, 41a(A), 41a(B), 41a(C) Auxiliary contact 42, 42(A), 42(B), 42(C) Making switch (remote)
43, 43(A), 43(B), 43(C) Turn-on switch (manual)
44, 44(A), 44(B), 44(C) Tripping coils 33A, 33B, 44a, 44a(A), 44a(B), 44a(C) Auxiliary contacts 45, 45(A), 45(B), 45(C) Tripping switch (remote)
46, 46(A), 46(B), 46(C) Pull-out switch (manual)
47, 47(A), 47(B), 47(C) Trip switch (protection)
48, 48(A), 48(B), 48(C) Limit switches 48a, 48a(A), 48a(B), 48a(C), 48b, 48b(A), 48b(B), 48b(C) Contacts 50 Power supply device 51 Operation power supply 52 Control power supply 53 Facility power supply 60 Remote monitoring and control device 100 Switchgear monitoring system (switchgear monitoring device)
110 Monitoring device 111 Monitored current value processing means 112 Operation history management means 113 Abnormal operation determination means 120 Monitored current value detection device 121 Operation current value detection device 122 Control current value detection device 130 Storage device 131 Abnormal operation determination information database 132 Operation history database 133 Monitored current information database 134 Operation current information database 135 Control current information database 140 Display device 150 Input device

Claims (9)

開閉器と、前記開閉器の投入あるいは引き外しを行う操作装置と、投入あるいは引き外しが指示された場合に、前記操作装置を制御する制御装置と、を有する複数の開閉装置を監視する開閉装置監視システムであって、
前記複数の開閉装置の前記操作装置は、専用の操作電源に並列に接続されているとともに、前記複数の開閉装置の前記制御装置は、専用の制御電源に並列に接続されており、
監視装置と、記憶装置と、を備え、
前記記憶装置は、異常動作判別情報データベースと、動作履歴データベースと、監視電流情報データベースと、を有し、
前記異常動作判別情報データベースには、開閉装置の投入動作時および引き外し動作時のうちの少なくとも一方の動作時における異常動作を判別するための異常動作判別情報が、開閉装置を示す開閉装置識別情報と動作内容に対応して記憶され、
前記動作履歴データベースには、開閉装置の投入動作あるいは引き外し動作に関連する事象が発生した時刻を示す事象発生時刻と、当該開閉装置を示す開閉装置識別情報と、当該投入動作あるいは引き外し動作を示す動作内容と、を含む動作履歴が記憶され、
前記監視電流情報データベースには、監視電流の監視電流値と当該監視電流値を検出した時刻tを含む監視電流情報が記憶され、前記監視電流の監視電流値には、前記操作電源から供給された操作電流Ipの操作電流値Ip(t)および前記制御電源から供給された制御電流Icの制御電流値Ic(t)のうちの少なくとも一方の電流値が含まれ、
前記監視装置は、異常動作判別手段を有し、
前記異常動作判別手段は、
前記監視電流情報データベースに記憶されている監視電流情報に基づいて、監視電流が流れ始めた動作開始時刻tsと、監視電流の流れが停止した動作終了時刻teを判別し、
前記動作履歴データベースに記憶されている動作履歴に基づいて、前記判別した動作開始時刻tsに動作を開始した開閉装置を示す開閉装置識別情報と動作内容を判別し、
前記判別した開閉装置識別情報と動作内容に対応する異常動作判別情報を前記異常動作判別情報データベースから読み出し、
前記判別した動作開始時刻tsと動作終了時刻teの間の動作時間Sおよび前記監視電流情報データベースに記憶されている、前記動作時間S内の監視電流値のうちの少なくとも一方と、前記異常動作判別情報データベースから読み出した異常動作判別情報に基づいて、前記判別した開閉装置識別情報で示される開閉装置の異常動作を判別する、
ことを特徴とする開閉装置監視システム。
A switchgear monitoring system for monitoring a plurality of switchgears, the switchgears including an operating device for closing or tripping the switchgears, and a control device for controlling the operating device when a command to close or trip the switchgear is received,
The operation devices of the plurality of switchgears are connected in parallel to a dedicated operation power supply, and the control devices of the plurality of switchgears are connected in parallel to a dedicated control power supply,
A monitoring device and a storage device,
The storage device includes an abnormal operation determination information database, an operation history database, and a monitored current information database,
The abnormal operation discrimination information database stores abnormal operation discrimination information for discriminating abnormal operation during at least one of a closing operation and a tripping operation of the switching device, in association with switching device identification information indicating the switching device and the operation content,
The operation history database stores an operation history including an event occurrence time indicating a time when an event related to a closing operation or a tripping operation of a switching device occurred, switching device identification information indicating the switching device, and an operation content indicating the closing operation or the tripping operation,
The monitored current information database stores monitored current information including a monitored current value of a monitored current and a time t at which the monitored current value was detected, and the monitored current value of the monitored current includes at least one of an operation current value Ip(t) of an operation current Ip supplied from the operation power source and a control current value Ic(t) of a control current Ic supplied from the control power source,
The monitoring device has an abnormal operation determination means,
The abnormal operation determination means
determining an operation start time ts at which the flow of the monitoring current begins and an operation end time te at which the flow of the monitoring current stops based on the monitoring current information stored in the monitoring current information database;
determining switching device identification information indicating a switching device that started operation at the determined operation start time ts and a content of the operation based on the operation history stored in the operation history database;
reading out abnormal operation determination information corresponding to the determined opening/closing device identification information and operation content from the abnormal operation determination information database;
determining an abnormal operation of the switching device indicated by the determined switching device identification information based on at least one of an operation time S between the determined operation start time ts and operation end time te and a monitored current value within the operation time S stored in the monitored current information database, and abnormal operation determination information read out from the abnormal operation determination information database;
A switching gear monitoring system comprising:
開閉器と、前記開閉器の投入あるいは引き外しを行う操作装置と、投入あるいは引き外しが指示された場合に、前記操作装置を制御する制御装置と、を有する複数の開閉装置を監視する開閉装置監視システムであって、
前記複数の開閉装置の前記操作装置は、専用の操作電源に並列に接続されているとともに、前記複数の開閉装置の前記制御装置は、専用の制御電源に並列に接続されており、
監視装置と、記憶装置と、を備え、
前記記憶装置は、異常動作判別情報データベースと、動作履歴データベースと、監視電流情報データベースと、を有し、
前記異常動作判別情報データベースには、開閉装置の投入動作時および引き外し動作時のうちの少なくとも一方の動作時における異常動作を判別するための異常動作判別情報が、開閉装置を示す開閉装置識別情報と動作内容に対応して記憶され、
前記動作履歴データベースには、開閉装置の投入動作あるいは引き外し動作に関連する事象が発生した時刻を示す事象発生時刻と、当該開閉装置を示す開閉装置識別情報と、当該投入動作あるいは引き外し動作を示す動作内容と、を含む動作履歴が記憶され、
前記監視電流情報データベースには、監視電流の監視電流値と当該監視電流値を検出した時刻tを含む監視電流情報が記憶され、前記監視電流の監視電流値には、前記操作電源から供給された操作電流Ipの操作電流値Ip(t)および前記制御電源から供給された制御電流Icの制御電流値Ic(t)のうちの少なくとも一方の電流値が含まれ、
前記監視装置は、異常動作判別手段を有し、
前記異常動作判別手段は、
前記動作履歴データベースから読み出した動作履歴に含まれている事象発生時刻に基づいて、前記監視電流情報データベースからの監視電流値の抽出を開始する抽出開始時刻taを決定し、
前記監視電流情報データベースから抽出した監視電流値に基づいて、監視電流が流れ始めた動作開始時刻tsと、監視電流の流れが停止した動作終了時刻teを判別し、
前記読み出した動作履歴に含まれている開閉装置識別情報と動作内容に対応する異常動作判別情報を前記異常動作判別情報データベースから読み出し、
前記判別した動作開始時刻tsと動作終了時刻teの間の動作時間Sおよび前記監視電流情報データベースに記憶されている、当該動作時間S内の監視電流値のうちの少なくとも一方と、前記異常動作判別情報データベースから読み出した異常動作判別情報に基づいて、前記読み出した動作履歴に含まれている開閉装置識別情報で示される開閉装置の異常動作を判別する、
ことを特徴とする開閉装置監視システム。
A switchgear monitoring system for monitoring a plurality of switchgears, the switchgears including an operating device for closing or tripping the switchgears, and a control device for controlling the operating device when a command to close or trip the switchgear is received,
The operation devices of the plurality of switchgears are connected in parallel to a dedicated operation power supply, and the control devices of the plurality of switchgears are connected in parallel to a dedicated control power supply,
A monitoring device and a storage device,
The storage device includes an abnormal operation determination information database, an operation history database, and a monitored current information database,
The abnormal operation discrimination information database stores abnormal operation discrimination information for discriminating abnormal operation during at least one of a closing operation and a tripping operation of the switching device, in association with switching device identification information indicating the switching device and the operation content,
The operation history database stores an operation history including an event occurrence time indicating a time when an event related to a closing operation or a tripping operation of a switching device occurred, switching device identification information indicating the switching device, and an operation content indicating the closing operation or the tripping operation,
The monitored current information database stores monitored current information including a monitored current value of a monitored current and a time t at which the monitored current value was detected, and the monitored current value of the monitored current includes at least one of an operation current value Ip(t) of an operation current Ip supplied from the operation power source and a control current value Ic(t) of a control current Ic supplied from the control power source,
The monitoring device has an abnormal operation determination means,
The abnormal operation determination means
determining an extraction start time ta for starting extraction of a monitoring current value from the monitoring current information database based on an event occurrence time included in the operation history read from the operation history database;
Based on the monitoring current value extracted from the monitoring current information database, an operation start time ts at which the monitoring current started to flow and an operation end time te at which the monitoring current stopped to flow are determined;
reading out, from the abnormal operation discrimination information database, abnormal operation discrimination information corresponding to the opening/closing device identification information and the operation content included in the read operation history;
determining an abnormal operation of the switching device indicated by the switching device identification information included in the read operation history, based on at least one of the operation time S between the determined operation start time ts and operation end time te and the monitored current value within the operation time S stored in the monitored current information database, and abnormal operation determination information read from the abnormal operation determination information database;
A switching gear monitoring system comprising:
請求項1または2に記載の開閉装置監視システムであって、
前記操作電源から供給される操作電流の操作電流値を検出する操作電流値検出装置と、前記制御電源から供給される制御電流の制御電流値を検出する制御電流値検出装置が設けられており、
前記監視装置は、監視電流値処理手段を有し、
前記監視電流値処理手段は、前記操作電流値検出装置で検出された操作電流値および前記制御電流値検出装置で検出された制御電流値のうちの少なくとも一方の電流値と検出した時刻tを含む監視電流情報を前記監視電流情報データベースに記憶させる処理を実行することを特徴とする開閉装置監視システム。
The switching device monitoring system according to claim 1 or 2,
an operation current value detection device for detecting an operation current value of an operation current supplied from the operation power source, and a control current value detection device for detecting a control current value of a control current supplied from the control power source,
The monitoring device has a monitored current value processing means,
The switching gear monitoring system is characterized in that the monitoring current value processing means executes a process of storing monitoring current information including at least one of the operation current value detected by the operation current value detection device and the control current value detected by the control current value detection device and the detection time t in the monitoring current information database.
請求項1または2に記載の開閉装置監視システムであって、
前記監視装置は、動作履歴管理手段を有し、
前記動作履歴管理手段は、前記複数の開閉装置の前記制御装置に投入あるいは引き出しが指示された時刻および前記複数の開閉装置の前記開閉器の投入動作あるいは引き外し動作が行われたことを検出した時刻のうちの一方の時刻を前記事象発生時刻として含む動作履歴を、前記動作履歴データベースに記憶させる処理を実行することを特徴とする開閉装置監視システム。
The switching device monitoring system according to claim 1 or 2,
The monitoring device has an operation history management means,
The switching gear monitoring system is characterized in that the operation history management means executes a process of storing in the operation history database an operation history including, as the event occurrence time, one of the times when a closing or pulling operation was instructed to the control devices of the multiple switching gears and the time when it was detected that the closing operation or the pulling operation of the switches of the multiple switching gears was performed.
請求項1または2に記載の開閉装置監視システムであって、
前記異常動作判別手段は、監視電流値が[0]より大きくなった時刻を前記動作開始時刻tsとして判別し、その後、監視電流値が[0]となった時刻を前記動作終了時刻teとして判別することを特徴とする開閉装置監視システム。
The switching device monitoring system according to claim 1 or 2,
The abnormal operation determination means determines the time when the monitored current value becomes greater than [0] as the operation start time ts, and then determines the time when the monitored current value becomes [0] as the operation end time te.
請求項1または2に記載の開閉装置監視システムであって、
前記異常動作判別手段は、前記動作開始時刻tsと前記動作終了時刻teとの間の動作時間Sと、前記異常動作判別情報に含まれている第1設定時間との比較結果に基づいて、前記開閉装置の異常動作を判別することを特徴とする開閉装置監視システム。
The switching device monitoring system according to claim 1 or 2,
The abnormal operation discrimination means discriminates abnormal operation of the switching device based on a comparison result between an operation time S between the operation start time ts and the operation end time te and a first set time included in the abnormal operation discrimination information.
請求項6に記載の開閉装置監視システムであって、
前記異常動作判別手段は、さらに、前記動作時間Sのうち、前記動作開始時刻tsから除外時間を除いた期間における監視電流値と前記異常動作判別情報に含まれている設定電流値との比較結果に基づいて、前記開閉装置の異常動作を判別することを特徴とする開閉装置監視システム。
The switching device monitoring system according to claim 6,
The abnormal operation determination means further determines an abnormal operation of the switching device based on a comparison result between a monitored current value during the operation time S, the monitored current value being a period from the operation start time ts excluding an exclusion time, and a set current value included in the abnormal operation determination information.
請求項6に記載の開閉装置監視システムであって、
前記第1設定時間は、周囲温度に応じて変更されることを特徴とする開閉装置監視システム。
The switching device monitoring system according to claim 6,
A switching device monitoring system, characterized in that the first set time is changed in response to an ambient temperature.
請求項1または2に記載の開閉装置監視システムであって、
前記異常動作判別手段は、監視電流値が減少を開始する変曲点から設定傾斜角度で引いた線上の、監視電流値が[0]となる基準時刻hと前記動作終了時刻teの間の遅れ時間Nと、前記異常動作判別情報に含まれている第2設定時間との比較結果に基づいて、前記開閉装置の異常動作を判別することを特徴とする開閉装置監視システム。
The switching device monitoring system according to claim 1 or 2,
a switching gear monitoring system characterized in that the abnormal operation determination means determines abnormal operation of the switching gear based on a comparison result between a delay time N between a reference time h at which the monitor current value becomes [0] and the operation end time te on a line drawn at a set inclination angle from the inflection point at which the monitor current value begins to decrease, and a second set time included in the abnormal operation determination information.
JP2022128614A 2022-08-12 2022-08-12 Switchgear Monitoring System Active JP7539438B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022128614A JP7539438B2 (en) 2022-08-12 2022-08-12 Switchgear Monitoring System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022128614A JP7539438B2 (en) 2022-08-12 2022-08-12 Switchgear Monitoring System

Publications (2)

Publication Number Publication Date
JP2024025282A JP2024025282A (en) 2024-02-26
JP7539438B2 true JP7539438B2 (en) 2024-08-23

Family

ID=90011120

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022128614A Active JP7539438B2 (en) 2022-08-12 2022-08-12 Switchgear Monitoring System

Country Status (1)

Country Link
JP (1) JP7539438B2 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002049418A (en) 2000-05-23 2002-02-15 Toshiba Corp Device monitoring system and method
JP2005301438A (en) 2004-04-07 2005-10-27 Hitachi Ltd Distributed monitoring and control system
JP2007156744A (en) 2005-12-02 2007-06-21 Hitachi Ltd Distributed monitoring and control system
JP2010178475A (en) 2009-01-28 2010-08-12 Chugoku Electric Power Co Inc:The Method and system for collectively and remotely monitoring switch
JP2012050210A (en) 2010-08-25 2012-03-08 Chugoku Electric Power Co Inc:The Supporting system and method for power failure restoration
JP2018073114A (en) 2016-10-28 2018-05-10 株式会社東芝 Information management device, and information management system
JP2019046399A (en) 2017-09-07 2019-03-22 株式会社日立製作所 Operation result management device and switch abnormality detection system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002049418A (en) 2000-05-23 2002-02-15 Toshiba Corp Device monitoring system and method
JP2005301438A (en) 2004-04-07 2005-10-27 Hitachi Ltd Distributed monitoring and control system
JP2007156744A (en) 2005-12-02 2007-06-21 Hitachi Ltd Distributed monitoring and control system
JP2010178475A (en) 2009-01-28 2010-08-12 Chugoku Electric Power Co Inc:The Method and system for collectively and remotely monitoring switch
JP2012050210A (en) 2010-08-25 2012-03-08 Chugoku Electric Power Co Inc:The Supporting system and method for power failure restoration
JP2018073114A (en) 2016-10-28 2018-05-10 株式会社東芝 Information management device, and information management system
JP2019046399A (en) 2017-09-07 2019-03-22 株式会社日立製作所 Operation result management device and switch abnormality detection system

Also Published As

Publication number Publication date
JP2024025282A (en) 2024-02-26

Similar Documents

Publication Publication Date Title
US10630069B2 (en) Solid-state circuit interrupter and arc inhibitor
US7075767B2 (en) Fault current limiting system and method
JP5866390B2 (en) Control circuit for power circuit switch
EP3896811B1 (en) Contactor control device and power supply system
EP2541572A1 (en) Method and apparatus for monitoring of a tap changer
JP2010233322A (en) Device and method for switch batch-monitoring, and program
JP7539438B2 (en) Switchgear Monitoring System
US9678130B2 (en) Earth leakage circuit breaker
EP1318587B1 (en) Apparatus and method for servicing a distribution bus
EP1919053B1 (en) State monitoring device for circuit breaker
US9831656B2 (en) Circuit interruption apparatus providing automatic reduced arc mode and methods of operating the same
US7301743B2 (en) Device and a method for advanced protection from short circuit current
JP6698414B2 (en) Power transmission line protection system
JPH1080057A (en) Power distribution automation system
RU2634710C1 (en) Method of accelerated breaker fail protection and device for its implementation
KR101970006B1 (en) Apparatus and Method for preventing malfunction of Circuit Breaker in Metal-Clad and Metal enclosed Swithgear
KR20170096369A (en) Fault current limiter with circuit breaker
Rozine et al. Protective device problems and solutions
CN108475917A (en) The overvoltage protection of variable-ratio electricity generation system
JPH05252646A (en) Detecting device for deterioration of insulation
CN119695807A (en) Anti-misclosing method and control system for automatic switch of distribution network line
CN112582996A (en) Power distribution network protection method and device and storage medium
CN118573053A (en) Flexible starting control circuit and control method of variable frequency controller
JPS6242448B2 (en)
JP2000166084A (en) Power distribution system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240417

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20240417

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240723

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240813

R150 Certificate of patent or registration of utility model

Ref document number: 7539438

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150