Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7540928B2 - Power management device, power management system, and power management method - Google Patents
[go: Go Back, main page]

JP7540928B2 - Power management device, power management system, and power management method - Google Patents

Power management device, power management system, and power management method Download PDF

Info

Publication number
JP7540928B2
JP7540928B2 JP2020162289A JP2020162289A JP7540928B2 JP 7540928 B2 JP7540928 B2 JP 7540928B2 JP 2020162289 A JP2020162289 A JP 2020162289A JP 2020162289 A JP2020162289 A JP 2020162289A JP 7540928 B2 JP7540928 B2 JP 7540928B2
Authority
JP
Japan
Prior art keywords
storage battery
power
power management
value
target range
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020162289A
Other languages
Japanese (ja)
Other versions
JP2022054977A (en
Inventor
真史 合川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyocera Corp
Original Assignee
Kyocera Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyocera Corp filed Critical Kyocera Corp
Priority to JP2020162289A priority Critical patent/JP7540928B2/en
Publication of JP2022054977A publication Critical patent/JP2022054977A/en
Application granted granted Critical
Publication of JP7540928B2 publication Critical patent/JP7540928B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本開示は、電力管理装置、電力管理システム、及び電力管理方法に関するものである。 This disclosure relates to a power management device, a power management system, and a power management method.

近年、災害情報に応じて、需要家毎に設けられる電力管理装置によって、需要家に設けられる負荷や需要家に設けられる分散電源などを制御する技術が知られている。例えば特許文献1には、警報情報を取得し、用途に応じて蓄電池に準備される電力量を変更することが記載されている。 In recent years, a technology has been known in which a power management device installed at each consumer controls the loads and distributed power sources installed at the consumer in response to disaster information. For example, Patent Document 1 describes obtaining warning information and changing the amount of power stored in the storage battery depending on the application.

特開2014-220975号公報JP 2014-220975 A

警報が発令された地域では、蓄電装置を備える需要家であれば停電に備えて充電量を増加させることが考えられる。一方、電力管理装置は、系統安定化のために、通常時において電力の需要量と供給量との調整を行うインバランス制御を行っている。そのため、インバランス制御下においては、急な災害に備えて充電量を確保することが困難なため、災害情報を取得した場合における蓄電装置の制御について改善の余地がある。 In areas where an alert has been issued, consumers equipped with energy storage devices may consider increasing the amount of charge in preparation for a power outage. Meanwhile, power management devices perform imbalance control to adjust the amount of power demand and supply during normal times in order to stabilize the grid. As a result, under imbalance control, it is difficult to ensure a sufficient amount of charge in preparation for a sudden disaster, and there is room for improvement in the control of energy storage devices when disaster information is acquired.

第1の観点による電力管理装置は、所定時間以内における系統からの電力購入計画値に対する電力購入実績値の差分であるインバランスが目標範囲値以内となるように、前記蓄電池の充放電を制御する電力管理装置であって、前記蓄電池の動作状態を制御する制御部と、災害情報及び前記蓄電池の蓄電量を取得可能な通信部と、を有する。前記制御部は、通常モード時において、前記目標範囲値が通常基準値となるように、前記蓄電池の動作状態を制御し、前記災害情報及び前記蓄電量に基づいて、前記目標範囲値を設定する。 The power management device according to a first aspect is a power management device that controls the charging and discharging of the storage battery so that an imbalance, which is the difference between a planned value for power purchase from a grid and an actual value for power purchase within a predetermined time period, falls within a target range value, and has a control unit that controls the operating state of the storage battery, and a communication unit that can acquire disaster information and the amount of stored power in the storage battery. In a normal mode, the control unit controls the operating state of the storage battery so that the target range value becomes a normal reference value, and sets the target range value based on the disaster information and the amount of stored power.

第2の観点による電力管理システムは、蓄電池と、所定時間以内における系統からの電力購入計画値に対する電力購入実績値の差分であるインバランスが目標範囲値以内となるように、前記蓄電池の充放電を制御する電力管理装置と、を備える。前記電力管理装置は、前記蓄電池の動作状態を制御する制御部と、災害情報及び前記蓄電池の蓄電量を取得可能な通信部と、を有する。前記制御部は、通常モード時において、前記目標範囲値が通常基準値となるように、前記蓄電池の動作状態を制御し、前記災害情報及び前記蓄電量に基づいて、前記目標範囲値を設定する。 The power management system according to the second aspect includes a storage battery, and a power management device that controls charging and discharging of the storage battery so that an imbalance, which is the difference between a planned value for power purchase from a grid and an actual value for power purchase within a predetermined time period, falls within a target range value. The power management device has a control unit that controls the operating state of the storage battery, and a communication unit that can acquire disaster information and the amount of stored power in the storage battery. The control unit controls the operating state of the storage battery in a normal mode so that the target range value becomes a normal reference value, and sets the target range value based on the disaster information and the amount of stored power.

第3の観点による電力管理方法は、所定時間以内における系統からの電力購入計画値に対する電力購入実績値の差分であるインバランスが目標範囲値以内となるように、前記蓄電池の充放電を制御する。前記電力管理方法は、通常モード時において、所定時間以内における、前記目標範囲値が通常基準値となるように、前記蓄電池の動作状態を制御するステップと、災害情報及び前記蓄電池の蓄電量を取得するステップと、前記災害情報及び前記蓄電量に基づいて、前記目標範囲値を設定するステップと、を含む。 The power management method according to the third aspect controls charging and discharging of the storage battery so that an imbalance, which is the difference between a planned value for power purchase from the grid and an actual value for power purchase within a predetermined time period, falls within a target range value. The power management method includes the steps of controlling the operating state of the storage battery in a normal mode so that the target range value within a predetermined time period becomes a normal reference value, acquiring disaster information and the amount of stored power in the storage battery, and setting the target range value based on the disaster information and the amount of stored power.

本発明の実施形態に係る電力管理装置、電力管理システム、及び電力管理方法によれば、インバランスの目標範囲値及び蓄電池の蓄電量に従って蓄電池の充電を行うことができ
るため、系統の安定化を考慮しつつ、災害に備えた充電量を確保することが可能になる。
According to the power management device, power management system, and power management method of the embodiments of the present invention, the storage battery can be charged according to the target range value of the imbalance and the amount of electricity stored in the storage battery, making it possible to ensure a charging amount in preparation for a disaster while taking into account the stabilization of the system.

一実施形態に係る電力管理システムの構成を示す図である。1 is a diagram illustrating a configuration of a power management system according to an embodiment. 一実施形態に係る電力管理装置の動作例を示す図である。FIG. 4 is a diagram illustrating an example of the operation of a power management device according to an embodiment. 一実施形態に係る電力管理装置の動作例を示す図である。FIG. 4 is a diagram illustrating an example of the operation of a power management device according to an embodiment.

以下、一実施形態に係る電力管理装置、電力管理システム、及び電力管理方法について、図面を参照して説明する。 The following describes a power management device, a power management system, and a power management method according to one embodiment, with reference to the drawings.

図1は、一実施形態に係る電力管理システム1の構成例を示す図である。 Figure 1 is a diagram showing an example of the configuration of a power management system 1 according to one embodiment.

図1に示すように、電力管理システム1は、電力管理装置100と蓄電池200を有する。また、電力管理システム1は、外部サーバ20と電力メータ300を有してもよい。また、電力管理システム1は、その他種々の機器を有してもよい。機器とは、例えば、電力を出力する分散電源及び電力を消費する負荷のうち少なくとも1つを含んでよい。なお、機器の数は単一であってもよいし、複数であってもよい。 As shown in FIG. 1, the power management system 1 has a power management device 100 and a storage battery 200. The power management system 1 may also have an external server 20 and a power meter 300. The power management system 1 may also have various other devices. The devices may include, for example, at least one of a distributed power source that outputs power and a load that consumes power. The number of devices may be one or more.

図1において、実線は電力線を、破線は通信線を示している。 In Figure 1, solid lines indicate power lines and dashed lines indicate communication lines.

電力管理装置100及び蓄電池200は、ネットワーク30に接続されている。ネットワーク30は、LAN(Local Area Network)、WAN(Wide Area Network)、及びイ
ンターネットのうち少なくとも1つを含む。
The power management device 100 and the storage battery 200 are connected to a network 30. The network 30 includes at least one of a local area network (LAN), a wide area network (WAN), and the Internet.

電力管理装置100は、所定の地域内における電力を制御するAEMS(Area Energy Management System)を構成する。所定の地域とは例えば、市町村単位であってもよいし
、予め定められた区画であってもよく、物理的に離れた2以上の区画を含んでいればよい。
The power management device 100 constitutes an area energy management system (AEMS) that controls power within a predetermined area. The predetermined area may be, for example, a city, town, or village, or may be a predetermined section, and may include two or more sections that are physically separated from each other.

電力管理装置100は、電力管理システム1が有する種々の機器の電力状態や運転状態を管理若しくは制御してもよい。 The power management device 100 may manage or control the power status and operating status of various devices included in the power management system 1.

蓄電池200は、例えば、リチウムイオン電池またはニッケル水素電池、鉛蓄電池などである。蓄電池200は、充電された電力を放電することにより、電力を負荷に供給可能である。また、蓄電池200は、系統10などから供給された電力を充電可能である。 The storage battery 200 is, for example, a lithium ion battery, a nickel metal hydride battery, a lead storage battery, or the like. The storage battery 200 can supply power to a load by discharging the charged power. The storage battery 200 can also be charged with power supplied from the grid 10, etc.

蓄電池200は、電力管理装置100から送信される制御指示に従い、充放電可能である。 The storage battery 200 can be charged and discharged according to control instructions sent from the power management device 100.

本実施形態では、電力管理装置100は、所定時間以内における系統10からの電力購入計画値に対する電力購入実績値の差分が、目標範囲値以内となるように、蓄電池200の充放電を制御するものとして説明する。 In this embodiment, the power management device 100 is described as controlling the charging and discharging of the storage battery 200 so that the difference between the planned value for purchasing power from the grid 10 and the actual value for purchasing power within a specified time period is within a target range value.

外部サーバ20は、ネットワーク30に接続されており、政府等機関及び民間等機関のうち少なくとも一つ以上の情報源から災害情報及び気象情報を取得及び蓄積可能である。また、外部サーバ20は、電力広域機関から、電力管理システム1が管轄する地域の電力購入計画を取得及び蓄積可能である。 The external server 20 is connected to the network 30 and can acquire and store disaster information and weather information from at least one of the information sources, such as government agencies and private agencies. The external server 20 can also acquire and store power purchase plans for the area under the jurisdiction of the power management system 1 from the Agency for Cross-regional Transmission Operators.

電力メータ300は、電力管理システム1が管轄する地域における系統10からの電力
購入実績値を取得する。また、電力メータ300は、電力管理システム1が管轄する地域における系統10からの需要家毎の電力購入実績値を取得してもよい。なお本実施形態では、電力メータ300は、系統10と蓄電池200との間の電力線に設けられている電流センサとして説明するが、電力購入実績値を取得可能な機器であれば、電力メータ300に限られない。
The power meter 300 acquires an actual power purchase value from the grid 10 in an area under the jurisdiction of the power management system 1. The power meter 300 may also acquire an actual power purchase value for each consumer from the grid 10 in an area under the jurisdiction of the power management system 1. Note that in this embodiment, the power meter 300 is described as a current sensor provided on a power line between the grid 10 and the storage battery 200, but is not limited to the power meter 300 as long as it is a device capable of acquiring an actual power purchase value.

なお、本実施形態では、電力管理システム1は、分散電源として、蓄電池200を有するものとして説明するが、これに限られない。電力管理システム1は、蓄電池200に加え、その他の分散電源を設けてもよい。分散電源として、太陽電池及び燃料電池のうち少なくとも1つを含んでもよい。分散電源は、異なる種類の電源の組み合わせであってもよい。 In this embodiment, the power management system 1 is described as having a storage battery 200 as a distributed power source, but is not limited to this. The power management system 1 may be provided with other distributed power sources in addition to the storage battery 200. The distributed power sources may include at least one of a solar cell and a fuel cell. The distributed power sources may be a combination of different types of power sources.

太陽電池は、シリコン系多結晶太陽電池、シリコン系単結晶太陽電池、又はCIGS等薄膜系太陽電池等、光電変換可能なものであればその種類は制限されない。一実施形態において、太陽電池は、電力を供給するために太陽光発電を行う機能を有するものであれば、任意の電源を採用してよい。 The type of solar cell is not limited as long as it is capable of photoelectric conversion, such as a silicon-based polycrystalline solar cell, a silicon-based single crystal solar cell, or a thin-film solar cell such as CIGS. In one embodiment, the solar cell may be any power source as long as it has the function of generating solar power to supply electricity.

燃料電池は、例えば、水素を用いて空気中の酸素との化学反応により直流の電力を発電するセルと、その他補機類とを備えてよい。燃料電池は、例えば、固体酸化物型燃料電池(Solid Oxide Fuel Cell:SOFC)、固体高分子形燃料電池(Polymer Electrolyte Fuel Cell:PEFC)、リン酸形燃料電池(Phosphoric Acid Fuel Cell:PAFC)、
又は溶融炭酸塩形燃料電池(Molten Carbonate Fuel Cell:MCFC)などのような燃料電池のセルスタックを含んで構成してもよい。
The fuel cell may include, for example, a cell that generates direct current electricity by chemically reacting hydrogen with oxygen in the air, and other auxiliary devices. Examples of the fuel cell include a solid oxide fuel cell (SOFC), a polymer electrolyte fuel cell (PEFC), a phosphoric acid fuel cell (PAFC),
Alternatively, the fuel cell may be configured to include a cell stack of a fuel cell such as a molten carbonate fuel cell (MCFC).

次に、一実施形態に係る電力管理装置100について説明する。 Next, we will explain the power management device 100 according to one embodiment.

図1に示すように、電力管理装置100は、制御部110と、通信部120と、を有する。また、電力管理装置100は、記憶部130を有してもよい。また、電力管理装置100は、蓄電池200から供給される電力により稼働してもよいし、電力管理システム1の備えるその他の電力供給手段により稼働してもよいし、電力管理システム1の管轄外である電力供給手段により稼働してもよい。 As shown in FIG. 1, the power management device 100 has a control unit 110 and a communication unit 120. The power management device 100 may also have a memory unit 130. The power management device 100 may operate using power supplied from the storage battery 200, may operate using other power supply means provided in the power management system 1, or may operate using power supply means outside the jurisdiction of the power management system 1.

記憶部130は、制御部110が実行する情報処理に用いる各種情報を記憶してよい。記憶部130は、地域に設けられている分散電源の種類、負荷の種類、負荷の消費電力を記憶していてもよい。記憶部130は、HDD(Hard Disk Drive)又はSSD(Solid State Drive)等の補助記憶装置を含む。制御部110は、記憶部130に情報を記憶させたり、記憶部130に記憶された情報を更新してよい。 The memory unit 130 may store various information used in the information processing executed by the control unit 110. The memory unit 130 may store the types of distributed power sources provided in the area, the types of loads, and the power consumption of the loads. The memory unit 130 includes an auxiliary storage device such as a hard disk drive (HDD) or a solid state drive (SSD). The control unit 110 may store information in the memory unit 130 or update the information stored in the memory unit 130.

制御部110は、電力管理装置100の各機能をはじめとして電力管理システム1の全体を制御するプロセッサである。制御部110は、蓄電池200の動作状態を制御する。動作状態とは、蓄電池200の時間当たりの充放電量の制御のように、所定のプログラムに従って蓄電池200が制御されるあらゆる状態であってもよいし、プログラムに基づかず直接制御される状態であってもよい。なお、状態をモードと称してもよい。なお、制御部110が蓄電池200の動作状態を制御するとは、通信部120が蓄電池200に対して、蓄電池200の動作状態を制御する制御信号を送信するように、制御部110が通信部120を制御することであってもよい。 The control unit 110 is a processor that controls the entire power management system 1, including each function of the power management device 100. The control unit 110 controls the operating state of the storage battery 200. The operating state may be any state in which the storage battery 200 is controlled according to a predetermined program, such as control of the amount of charge and discharge per hour of the storage battery 200, or may be a state in which the storage battery 200 is directly controlled without being based on a program. The state may be referred to as a mode. The control unit 110 controlling the operating state of the storage battery 200 may mean that the control unit 110 controls the communication unit 120 so that the communication unit 120 transmits a control signal to the storage battery 200 to control the operating state of the storage battery 200.

通信部120は、無線通信をはじめとする各種の通信機能を有する通信インタフェースである。通信部120は、例えば、LTE(Long Term Evolution)などの種々の通信方
式により通信を実現する。また、通信部120は、通信部120の機能を有していてもよ
い。通信部120は、例えば、ITU-T(International Telecommunication Union Telecommunication Standardization Sector)において通信方式が標準化されたモデムを含んでよい。通信部120は、WiFi(Wireless Fidelity)またはBluetooth
(登録商標)などの種々の方式により無線通信を実現してよい。通信部120は、電波を送受信するためのアンテナおよび適当なRF(Radio Frequency)部などを含めて構成し
てよい。通信部120は、無線通信を行うための既知の技術により構成することができるため、より詳細なハードウェアの説明は省略する。
The communication unit 120 is a communication interface having various communication functions including wireless communication. The communication unit 120 realizes communication by various communication methods such as LTE (Long Term Evolution). The communication unit 120 may also have the functions of the communication unit 120. The communication unit 120 may include, for example, a modem whose communication method is standardized by the International Telecommunication Union Telecommunication Standardization Sector (ITU-T). ...
(registered trademark), the wireless communication may be realized by various methods. The communication unit 120 may be configured to include an antenna for transmitting and receiving radio waves and an appropriate RF (Radio Frequency) unit. The communication unit 120 may be configured by known technology for performing wireless communication, and therefore a detailed description of the hardware will be omitted.

通信部120は、ネットワーク30を介して、蓄電池200と通信する。また、通信部120は、外部サーバ20と通信してもよい。また、通信部120は、電力メータ300から、電力購入実績値を、ネットワーク30を介して取得してもよいし、ネットワーク30を介さずに取得してもよい。また、通信部120は、電力メータ300から所定の時間間隔で電力購入実績値を取得してもよい。また、通信部120は、ある時刻における瞬時値としての電力購入実績値を取得してもよいし、所定の時間内における積算値としての電力購入実績値を取得してもよい。 The communication unit 120 communicates with the storage battery 200 via the network 30. The communication unit 120 may also communicate with the external server 20. The communication unit 120 may also acquire the actual power purchase value from the power meter 300 via the network 30 or without via the network 30. The communication unit 120 may also acquire the actual power purchase value from the power meter 300 at a predetermined time interval. The communication unit 120 may also acquire the actual power purchase value as an instantaneous value at a certain time, or may acquire the actual power purchase value as an integrated value within a predetermined time.

また、通信部120は、災害情報を取得してもよい。本実施形態において、災害情報は、災害が必ず発生するというものに限らず、将来、例えば、現在時刻から所定時間(以下、災害予報時間とも称する)以内に、災害が発生する蓋然性がある旨の情報を含むものであるとして説明する。よって、災害情報は、現在時刻から災害予報時間以内に災害の発生が予測される旨の情報を含む災害情報を含んでもよい。また、災害情報は、現在時刻から少なくとも災害予報時間以内の間においては災害が発生しない旨の情報を含んでもよい。また、災害情報は、災害の終了に関する情報を含んでもよい。災害とは、例えば、地震、台風、大雨、大雪等、様々なものが挙げられるが、これらに限られない。災害の終了に関する情報とは、災害が終了した旨の情報であってもよいし、災害の終了が予測される旨の情報であってもよい。 The communication unit 120 may also acquire disaster information. In this embodiment, the disaster information is not limited to information indicating that a disaster will definitely occur, but is described as including information indicating that a disaster is likely to occur in the future, for example, within a predetermined time from the current time (hereinafter also referred to as the disaster forecast time). Therefore, the disaster information may include disaster information including information indicating that a disaster is predicted to occur within the disaster forecast time from the current time. The disaster information may also include information indicating that a disaster will not occur at least within the disaster forecast time from the current time. The disaster information may also include information regarding the end of the disaster. Examples of disasters include, but are not limited to, various disasters such as earthquakes, typhoons, heavy rain, and heavy snow. The information regarding the end of the disaster may be information indicating that the disaster has ended, or information indicating that the end of the disaster is predicted.

なお、災害予報時間は、例えば、数時間オーダーや数分オーダーの時間を表してもよい。 Note that the disaster forecast time may represent, for example, a time on the order of a few hours or minutes.

また、通信部120は、停電情報を取得してもよい。停電情報は停電が発生した旨の情報である。なお、停電情報は、電力管理システム1が管轄する地域に対する停電に限らず、電力管理システム1が管轄する地域に隣接する地域における停電に関する情報であってもよい。 The communication unit 120 may also acquire power outage information. The power outage information is information that a power outage has occurred. Note that the power outage information is not limited to information about a power outage in the area under the jurisdiction of the power management system 1, but may also be information about a power outage in an area adjacent to the area under the jurisdiction of the power management system 1.

なお、本実施形態において、災害情報と停電情報は因果関係のある関連した情報であってもよく、独立した異なる情報であってもよい。つまり、通信部120は、災害情報を取得した場合に、関連する停電情報を取得してもよい。また、通信部120は、災害情報を取得した場合であっても、停電情報を取得しなくてもよい。例えば、災害の予報はあるが、実際には災害が発生せずに停電にもならなかった場合等である。また、通信部120は、災害情報を取得しない場合であっても、停電情報を取得してもよい。例えば、将来の災害の予報が困難で、災害が突発的に発生し得る場合等である。 In this embodiment, the disaster information and the power outage information may be related information that has a causal relationship, or may be different and independent pieces of information. In other words, when the communication unit 120 acquires disaster information, it may acquire related power outage information. Furthermore, even when the communication unit 120 acquires disaster information, it is not necessary to acquire power outage information. For example, this may be the case when a disaster is forecast, but the disaster does not actually occur and there is no power outage. Furthermore, even when the communication unit 120 does not acquire disaster information, it may acquire power outage information. For example, this may be the case when it is difficult to forecast future disasters and disasters may occur suddenly.

また、通信部120は、ネットワーク30を介して、蓄電池200の蓄電量及び充電速度のうち少なくともいずれか1つを含む情報を取得してよい。蓄電量の値は、SOC(State Of Charge)で表されてもよいし、SOH(State Of Health)で表されてもよい。充電速度の値は、C-Rate(Capacity Rate)あるいは蓄電池200の出力を用いて表されてもよい。 The communication unit 120 may also acquire information including at least one of the amount of stored power and the charging speed of the storage battery 200 via the network 30. The value of the amount of stored power may be expressed as SOC (State Of Charge) or SOH (State Of Health). The value of the charging speed may be expressed using C-Rate (Capacity Rate) or the output of the storage battery 200.

制御部110は、通信部120が取得した災害情報及び蓄電池200の蓄電量に基づい
て、蓄電池200の動作状態を制御する。なお、蓄電池200の動作状態の制御には電力状態の制御が含まれていてもよい。蓄電池200の電力状態の制御とは、例えば、電力を出力(放電)させる制御、電力を充電させる制御である。
The control unit 110 controls the operation state of the storage battery 200 based on the disaster information acquired by the communication unit 120 and the amount of power stored in the storage battery 200. The control of the operation state of the storage battery 200 may include control of the power state. The control of the power state of the storage battery 200 is, for example, control to output (discharge) power and control to charge power.

制御部110は、所定時間以内における、系統10からの電力購入計画値に対する電力購入実績値の差分(以下、インバランスとも称する)が、予め定められたインバランスを許容する割合(以下、目標範囲値とも称する)以内になるように制御してよい。言い換えれば、制御部110は、所定時間以内における系統10からの電力購入計画値に対する電力購入実績値の差分であるインバランスが、目標範囲値以内となるように、蓄電池200の動作状態を制御してもよい(以下、インバランス制御とも称する)。例えば、所定時間以内における、電力購入実績値が、電力購入計画値の103%の値である場合、目標範囲値は、+3%であるとされる。つまり、この場合、所定時間以内における電力購入実績値の値は、電力購入計画値よりも、電力購入計画値の3%分大きい値となる。このように、目標範囲値は1つの値として決められてもよいし、+2~3%のように幅を許容する値として定められてもよい。また、例えば、所定時間以内における、電力購入実績値が、電力購入計画値の97%の値である場合、目標範囲値は、-3%であるとされる。つまり、この場合、所定時間以内における電力購入実績値の値は、電力購入計画値よりも、電力購入計画値の3%分小さい値となる。このように、目標範囲値は1つの値として決められてもよいし、-2~3%のように幅を許容する値として定められてもよい。また、目標範囲値は±3%のように正負の値で幅をとってもよい。 The control unit 110 may control the difference between the actual power purchase value and the power purchase plan value from the grid 10 within a predetermined time (hereinafter also referred to as imbalance) so that it is within a predetermined imbalance tolerance ratio (hereinafter also referred to as target range value). In other words, the control unit 110 may control the operating state of the storage battery 200 so that the imbalance, which is the difference between the actual power purchase value and the power purchase plan value from the grid 10 within a predetermined time, is within the target range value (hereinafter also referred to as imbalance control). For example, if the actual power purchase value within a predetermined time is 103% of the power purchase plan value, the target range value is +3%. In other words, in this case, the actual power purchase value within a predetermined time is 3% larger than the power purchase plan value. In this way, the target range value may be determined as one value, or may be determined as a value that allows a range, such as +2 to 3%. Also, for example, if the actual power purchase value within a specified time is 97% of the planned power purchase value, the target range value is set to -3%. In other words, in this case, the actual power purchase value within a specified time will be 3% smaller than the planned power purchase value. In this way, the target range value may be determined as a single value, or may be determined as a value that allows for a range, such as -2 to 3%. The target range value may also take a range of positive and negative values, such as ±3%.

インバランス制御による需要家に対する経済的な影響について説明する。エリアを管理する需要家は、電力購入計画時に、電力購入量を計画し、当該電力購入量に対しては所定の単価で電力を購入する。使用不足が生じており差分が-3%を下回っているとき、需要家は電力供給者(例えば、一般電気事業者、PPS(Power Producer and Supplier)等
)に第1の単価(例えば0円)で発電電力を売却可能である。また、使用不足が生じており差分が-3~0%のとき、需要家は第1の単価よりも高い第2の単価(例えば7.83円/kWh)で発電電力を売却可能である。したがって、計画した電力購入量に対して実際の使用量の過剰分が所定の範囲である場合、需要家に経済的なメリットが付与される。
The economic impact of imbalance control on consumers will be described. A consumer who manages an area plans the amount of power to be purchased at the time of power purchase planning, and purchases power at a predetermined unit price for the amount of power purchased. When a usage shortage occurs and the difference is below -3%, the consumer can sell the generated power to a power supplier (for example, a general electric utility, a PPS (Power Producer and Supplier), etc.) at a first unit price (for example, 0 yen). When a usage shortage occurs and the difference is -3 to 0%, the consumer can sell the generated power at a second unit price (for example, 7.83 yen/kWh) higher than the first unit price. Therefore, when the excess of the actual usage amount relative to the planned power purchase amount is within a predetermined range, an economic benefit is given to the consumer.

また、使用超過が生じており差分が0~3%のとき、需要家は第2の単価よりも高い第3の単価(例えば11.66円/kWh)で電力供給者から発電電力を購入しなければならず、差分が3%を上回るとき、需要家は第3の単価よりも高い第4の単価(例えば32.42~40.69円/kWh)で発電電力を購入しなければならない。したがって、計画した電力購入量に対して実際の電力購入量の不足分が大きくなる程、需要家に経済的なペナルティが付与される。 Furthermore, when overuse occurs and the difference is between 0 and 3%, the consumer must purchase the generated electricity from the electricity supplier at a third unit price (e.g., 11.66 yen/kWh) higher than the second unit price, and when the difference exceeds 3%, the consumer must purchase the generated electricity at a fourth unit price (e.g., 32.42 to 40.69 yen/kWh) higher than the third unit price. Therefore, the greater the shortfall in the actual amount of electricity purchased compared to the planned amount of electricity purchase, the greater the economic penalty imposed on the consumer.

インバランスの平準化は、電力購入計画で定めた電力購入量(電力購入計画値)と実際に需要家が消費する電力使用量(電力購入実績値)との差分を、蓄電池200に吸収させることによって実行される。例えば、制御部110は、電力購入計画値に対して電力購入実績値が多いときに蓄電池200に放電させて電力不足を補い、電力購入計画値に対して電力購入実績値が少ないときに蓄電池200に充電させて電力過剰分を消費することによって、インバランスを解消する。 The imbalance is leveled out by having the storage battery 200 absorb the difference between the amount of power purchased set in the power purchase plan (power purchase plan value) and the amount of power actually consumed by the consumer (actual power purchase value). For example, the control unit 110 compensates for the power shortage by discharging the storage battery 200 when the actual power purchase value is higher than the power purchase plan value, and eliminates the imbalance by having the storage battery 200 charge the storage battery 200 to consume the excess power when the actual power purchase value is lower than the power purchase plan value.

なお、インバランスは、同一時刻における、系統10からの電力購入計画値に対する電力購入実績値の瞬時値の差分であってもよい。また、インバランスにおける所定時間は、例えば、数秒オーダーや数分オーダーの時間を表してもよく、この場合、インバランスは、同一の所定時間以内における、系統10からの電力購入計画の積算値に対する電力購入実績値の積算値の差分であってもよい。 The imbalance may be the difference between the instantaneous value of the actual power purchase value and the planned value of the power purchase from the grid 10 at the same time. The specified time period for the imbalance may represent, for example, a time period on the order of a few seconds or a few minutes. In this case, the imbalance may be the difference between the integrated value of the actual power purchase value and the integrated value of the power purchase plan from the grid 10 within the same specified time period.

目標範囲値が正の値である場合には、電力購入計画と比べて、電力購入を促す、つまり、系統10から蓄電池200への電力の充電を促す制御に相当するため、目標範囲値の値が、0%の場合に比べて、蓄電池200が充電されやすくなる。つまり、目標範囲値が正の値である場合の制御は、蓄電池200の放電を抑制する制御であると言える。 When the target range value is a positive value, it corresponds to a control that encourages power purchases compared to the power purchase plan, that is, that encourages charging of power from the grid 10 to the storage battery 200, so the storage battery 200 is more likely to be charged compared to when the target range value is 0%. In other words, the control when the target range value is a positive value can be said to be a control that suppresses discharging of the storage battery 200.

一方、目標範囲値が負の値である場合には、電力購入計画と比べて、電力購入を抑制する、つまり、系統10から蓄電池200への電力の充電を抑制する制御に相当するため、目標範囲値が、0%の場合に比べて、蓄電池200が放電しやすくなる。つまり、目標範囲値の値が負の値である場合の制御は、蓄電池200の充電を抑制する制御であると言える。 On the other hand, when the target range value is a negative value, it corresponds to a control that suppresses power purchases compared to the power purchase plan, that is, suppresses charging of power from the grid 10 to the storage battery 200, so the storage battery 200 is more likely to discharge than when the target range value is 0%. In other words, the control when the target range value is a negative value can be said to be a control that suppresses charging of the storage battery 200.

このように、制御部110は、目標範囲値を、-∞%~+∞%の範囲で設定可能である。また、目標範囲値は災害の種類及び蓄電池200の蓄電量に応じてもよいし、応じなくてもよい、また、目標範囲値は、災害の種類及び蓄電池200の蓄電量に応じて、一時的に設定されるものであってもよい。 In this way, the control unit 110 can set the target range value in the range of -∞% to +∞%. Furthermore, the target range value may or may not depend on the type of disaster and the amount of power stored in the storage battery 200, and the target range value may be temporarily set depending on the type of disaster and the amount of power stored in the storage battery 200.

また、制御部110は、通常モード時において、目標範囲値を通常基準値となるように、蓄電池200の動作状態を制御してもよい。通常基準値とは、例えば、目標範囲値が0%である状態を指すが、これに限られない。例えば、通常基準値は、+1%であってもよい。また、制御部110は、災害情報及び蓄電池200の蓄電量に基づいて、目標範囲値を設定してもよい。これにより、制御部110は、災害が発生した場合であっても、蓄電池200の蓄電量に基づいてインバランスを考慮した蓄電池200の制御をすることができる。よって、蓄電池200の蓄電量に応じて、インバランスが生じる程度を適宜考慮しつつ、災害による停電発生に備えて、蓄電池200に充電することができる。 The control unit 110 may also control the operating state of the storage battery 200 in the normal mode so that the target range value becomes the normal reference value. The normal reference value refers to, for example, a state in which the target range value is 0%, but is not limited to this. For example, the normal reference value may be +1%. The control unit 110 may also set the target range value based on disaster information and the amount of stored power in the storage battery 200. This allows the control unit 110 to control the storage battery 200 while taking into account the imbalance based on the amount of stored power in the storage battery 200, even if a disaster occurs. Therefore, the storage battery 200 can be charged in preparation for a power outage caused by a disaster, while appropriately considering the degree of imbalance according to the amount of stored power in the storage battery 200.

制御部110は、通信部120が、現在時刻から災害予報時間以内に災害の発生が予測される旨の情報を含む災害情報を取得した場合、蓄電池200の動作状態を、通常モード時よりも蓄電池200の放電を抑制する停電準備モードに設定してもよい。停電準備モードは、蓄電池200の動作状態として、インバランス制御を実行しながら、停電に備えるモードであってよい。このように、蓄電池200の動作モードとして、将来の停電に備えるのみならず、インバランス制御を実行しつつも停電に備える旨のモードを予め設定することで、制御部110は、災害が発生した場合であっても、災害発生時までに蓄えられた蓄電池200の電力を用いて、防災電源として使うことができる。また、停電準備モードは、通常モード時よりも蓄電池200の放電を抑制するモードであるため、放電により失われる蓄電池200の蓄電量をより低減できる。その結果、本実施形態では、災害による停電発生に備えて、より効率的に蓄電池200の充電をすることができる。 When the communication unit 120 acquires disaster information including information indicating that a disaster is predicted to occur within a disaster forecast time from the current time, the control unit 110 may set the operation state of the storage battery 200 to a power outage preparation mode that suppresses the discharge of the storage battery 200 more than in the normal mode. The power outage preparation mode may be a mode in which the operation state of the storage battery 200 prepares for a power outage while executing imbalance control. In this way, by setting in advance a mode for preparing for a power outage while executing imbalance control as the operation mode of the storage battery 200, not only for preparing for a future power outage but also for preparing for a power outage, the control unit 110 can use the power of the storage battery 200 stored up until the time of the disaster as a disaster power source even in the event of a disaster. In addition, since the power outage preparation mode is a mode that suppresses the discharge of the storage battery 200 more than in the normal mode, the amount of storage battery 200 lost due to discharge can be further reduced. As a result, in this embodiment, the storage battery 200 can be charged more efficiently in preparation for a power outage caused by a disaster.

制御部110は、蓄電池200の蓄電量が所定の閾値を下回る場合に、目標範囲値を通常基準値よりも大きい値として設定してもよい。例えば、通常モード時において、目標範囲値が通常基準値として0%に設定されている場合に、通信部120が、災害予報時間以内に災害が発生する情報及び蓄電池200の蓄電量を取得し、蓄電池200の蓄電量が少ない場合には、目標範囲値を3%といった値に設定することができる。これにより、単位時間内での電力供給が電力需要よりも多くなる頻度が多くなり、蓄電池200に供給可能な電力量を増やすことが可能になる。その結果、本実施形態では、より効率的に蓄電池200の充電をすることができる。 When the amount of stored power in the storage battery 200 falls below a predetermined threshold, the control unit 110 may set the target range value to a value greater than the normal reference value. For example, in normal mode, when the target range value is set to 0% as the normal reference value, the communication unit 120 acquires information on the occurrence of a disaster within the disaster forecast time and the amount of stored power in the storage battery 200, and when the amount of stored power in the storage battery 200 is low, the target range value can be set to a value such as 3%. This increases the frequency with which the power supply within a unit time exceeds the power demand, making it possible to increase the amount of power that can be supplied to the storage battery 200. As a result, in this embodiment, the storage battery 200 can be charged more efficiently.

制御部110は、現在時刻から災害予報時間以内に蓄電池200の蓄電量が所定の蓄電量を超えるように目標範囲値を設定してもよい。例えば、現在時刻から3時間以内に満充電まで充電する場合は、目標範囲値を3%に設定し、現在時刻から1時間以内に満充電まで充電する場合は、目標範囲値を5%に設定してもよい。このように、蓄電池200を所
定時間までに充電する時間が短いほど、目標範囲値が大きい値となるように設定することで、蓄電池200に供給可能な電力量をより増やすことが可能になり、短時間に効率的に充電することができる。
The control unit 110 may set the target range value so that the amount of stored power in the storage battery 200 exceeds a predetermined amount of stored power within the disaster forecast time from the current time. For example, if the storage battery 200 is to be fully charged within three hours from the current time, the target range value may be set to 3%, and if the storage battery 200 is to be fully charged within one hour from the current time, the target range value may be set to 5%. In this way, by setting the target range value to a larger value as the time to charge the storage battery 200 up to the predetermined time becomes shorter, it becomes possible to further increase the amount of power that can be supplied to the storage battery 200, and to efficiently charge the storage battery 200 in a short time.

制御部110は、蓄電池200の蓄電量及び蓄電池200の充電速度に基づいて目標範囲値を設定してもよい。蓄電池200の充電速度は、単位時間当たりの充電の速度を表している。一般に蓄電池の充電速度は、使用期間、劣化状態等によって異なる値となる。このような各蓄電池固有の充電速度に基づいて、制御部110が、目標範囲値を設定することで、より災害による停電発生に備えて、蓄電池200に充電することができる。本実施形態において、蓄電池200の充電速度は、記憶部130が記憶していてもよい。 The control unit 110 may set a target range value based on the amount of stored power in the storage battery 200 and the charging speed of the storage battery 200. The charging speed of the storage battery 200 represents the charging speed per unit time. In general, the charging speed of a storage battery varies depending on the period of use, the state of deterioration, etc. By the control unit 110 setting a target range value based on such a charging speed specific to each storage battery, the storage battery 200 can be charged in preparation for a power outage caused by a disaster. In this embodiment, the charging speed of the storage battery 200 may be stored in the memory unit 130.

例えば、3時間以内に満充電まで充電する場合、通信部120が、記憶部130から蓄電池200の充電速度を取得し、制御部110は、その充電速度の値に基づいて、3時間以内に蓄電池200の蓄電量を満充電にするには、現在時刻から何時間後に、目標範囲値を大きくするかを判断してよい。 For example, when charging to full charge within three hours, the communication unit 120 obtains the charging speed of the storage battery 200 from the memory unit 130, and the control unit 110 may determine, based on the value of the charging speed, how many hours from the current time to increase the target range value in order to fully charge the amount of stored electricity in the storage battery 200 within three hours.

また、制御部110は、所定時間ごとに段階的に目標範囲値を大きくしてもよい。これにより、停電発生が予想される時刻に近づくに連れて、蓄電池200が充電されやすくなるため、より災害による停電発生に備えて、より効率的に蓄電池200の充電をすることができる。 The control unit 110 may also increase the target range value stepwise at predetermined time intervals. This makes it easier for the storage battery 200 to be charged as the time of the predicted power outage approaches, allowing the storage battery 200 to be charged more efficiently in preparation for a power outage caused by a disaster.

また、制御部110は、蓄電池200の蓄電量が所定の閾値を上回る場合に、目標範囲値を通常基準値に設定してもよい。これにより、停電に備えて所定の充電量を確保しつつ、インバランスの発生を低減させることができる。 In addition, the control unit 110 may set the target range value to the normal reference value when the amount of charge stored in the storage battery 200 exceeds a predetermined threshold. This makes it possible to reduce the occurrence of imbalance while ensuring a predetermined amount of charge in preparation for a power outage.

制御部110は、通信部120が停電情報を取得した場合に、蓄電池200の動作状態を系統10から解列された自立運転に切替えてもよい。これにより、停電により系統10から電力が供給されない場合においても、蓄電池200から負荷に電力を供給することができる。 When the communication unit 120 acquires power outage information, the control unit 110 may switch the operating state of the storage battery 200 to independent operation in which the storage battery 200 is disconnected from the grid 10. This allows the storage battery 200 to supply power to the load even when power is not supplied from the grid 10 due to a power outage.

なお、自立運転時においては、蓄電池200は系統10から解列しているため、インバランス制御は行われずに、蓄電池200は、負荷の消費電力に追従する負荷追従モードで動作することになる。 Note that during independent operation, the storage battery 200 is disconnected from the grid 10, so imbalance control is not performed and the storage battery 200 operates in a load following mode that follows the power consumption of the load.

また、通信部120が停電情報を取得しない場合には、制御部110は、蓄電池200の動作状態を停電準備モードとして維持してよい。 In addition, if the communication unit 120 does not acquire power outage information, the control unit 110 may maintain the operating state of the storage battery 200 in the power outage preparation mode.

制御部110は、通信部120が、災害が終了した旨の情報を含む災害情報を取得した場合、蓄電池200の動作状態を通常モードに設定してもよい。これにより、制御部110は、今後災害が発生しないと判断できるため、経済性の高い通常モードに再設定し、コストメリットが得られる。なお、制御部110は、蓄電池200が負荷追従モードである場合、停電準備モードである場合のいずれにおいても、通信部120が、災害が終了した旨の情報を含む災害情報を取得した場合には、蓄電池200の動作状態を通常モードに設定してよい。 When the communication unit 120 acquires disaster information including information that the disaster has ended, the control unit 110 may set the operating state of the storage battery 200 to the normal mode. This allows the control unit 110 to determine that no future disasters will occur, and therefore resets the operating state to the more economical normal mode, thereby achieving cost benefits. Note that the control unit 110 may set the operating state of the storage battery 200 to the normal mode when the communication unit 120 acquires disaster information including information that the disaster has ended, regardless of whether the storage battery 200 is in the load following mode or the power outage preparation mode.

なお、本実施形態では、インバランスにおける所定時間は、災害予報時間よりも短いものとして、言い換えれば、災害予報時間は、インバランスにおける所定時間よりも長いものとして説明したが、実施形態はこれに限られない。災害予報時間は、インバランスにおける所定時間よりも短くてもよい。災害予報時間が、インバランスにおける所定時間よりも短い場合とは、例えば、災害が突発的に発生し得る場合である。この場合には、通信部
120が災害情報を取得しなくてもよい。
In the present embodiment, the predetermined time for imbalance is described as being shorter than the disaster forecast time, in other words, the disaster forecast time is described as being longer than the predetermined time for imbalance, but the embodiment is not limited to this. The disaster forecast time may be shorter than the predetermined time for imbalance. A case in which the disaster forecast time is shorter than the predetermined time for imbalance is, for example, a case in which a disaster may occur suddenly. In this case, the communication unit 120 does not need to acquire disaster information.

次に、電力管理システム1の電力管理方法における動作例についてフローチャートを用いて説明する。 Next, an example of the operation of the power management method of the power management system 1 will be explained using a flowchart.

図2に示すように、ステップS310において、電力管理装置100は、蓄電池200から蓄電池200の蓄電量を取得する。この取得は、所定時間間隔に行われてもよいし、継続して行われてもよい。なお、蓄電池200の動作状態は通常モードであるものとして説明する。 As shown in FIG. 2, in step S310, the power management device 100 acquires the amount of stored power in the storage battery 200 from the storage battery 200. This acquisition may be performed at a predetermined time interval or may be performed continuously. Note that the following description will be given assuming that the operating state of the storage battery 200 is in normal mode.

ステップS320において、電力管理装置100は、災害が発生する蓋然性がある旨の災害情報を取得したか否かを判定する。電力管理装置100は、災害が発生する蓋然性がある旨の災害情報を取得したと判定した場合(S320:Yes)、ステップS330に進む。なお、電力管理装置100は、災害情報を取得していないと判定した場合、あるいは、災害が発生する蓋然性がある旨の災害情報を取得していないと判定した場合(S320:No)、ステップS340に進む。 In step S320, the power management device 100 determines whether or not disaster information indicating that a disaster is likely to occur has been acquired. If the power management device 100 determines that disaster information indicating that a disaster is likely to occur has been acquired (S320: Yes), the process proceeds to step S330. Note that if the power management device 100 determines that disaster information has not been acquired, or that disaster information indicating that a disaster is likely to occur has not been acquired (S320: No), the process proceeds to step S340.

ステップS330において、電力管理装置100は、蓄電池200の動作状態を停電準備モードに設定し、ステップS340に進む。 In step S330, the power management device 100 sets the operating state of the storage battery 200 to power outage preparation mode and proceeds to step S340.

ステップS340において、電力管理装置100は、停電情報を取得したか否かを判定する。電力管理装置100は、停電情報を取得したと判定した場合(S340:Yes)、ステップS340に進む。なお、電力管理装置100は、停電情報を取得していないと判定した場合(S340:No)、ステップS350に進む。 In step S340, the power management device 100 determines whether or not power outage information has been acquired. If the power management device 100 determines that power outage information has been acquired (S340: Yes), the process proceeds to step S340. If the power management device 100 determines that power outage information has not been acquired (S340: No), the process proceeds to step S350.

ステップS350において、電力管理装置100は、蓄電池200の動作状態を系統10から解列された自立運転に切替え、ステップS370に進む。 In step S350, the power management device 100 switches the operating state of the storage battery 200 to independent operation in which the storage battery 200 is disconnected from the grid 10, and proceeds to step S370.

ステップS360において、電力管理装置100は、災害予報時間を経過したか否かを判定する。電力管理装置100は、災害予報時間を経過したと判定した場合(S360:Yes)、ステップS380に進む。なお、電力管理装置100は、災害予報時間を経過していないと判定した場合(S360:No)、ステップS340に再度戻る。 In step S360, the power management device 100 determines whether the disaster forecast time has passed. If the power management device 100 determines that the disaster forecast time has passed (S360: Yes), the power management device 100 proceeds to step S380. If the power management device 100 determines that the disaster forecast time has not passed (S360: No), the power management device 100 returns to step S340.

ステップS370において、電力管理装置100は、災害の終了に関する情報を取得したか否かを判定する。なお、電力管理装置100は、災害の終了に関する情報を含む災害情報を取得したか否かを判定してもよい。電力管理装置100は、災害の終了に関する情報を取得したと判定した場合(S370:Yes)、ステップS380に進む。なお、電力管理装置100は、災害の終了に関する情報を取得していないと判定した場合(S370:No)、ステップS370に再度戻る。 In step S370, the power management device 100 determines whether or not information regarding the end of the disaster has been acquired. The power management device 100 may also determine whether or not disaster information including information regarding the end of the disaster has been acquired. If the power management device 100 determines that information regarding the end of the disaster has been acquired (S370: Yes), the power management device 100 proceeds to step S380. If the power management device 100 determines that information regarding the end of the disaster has not been acquired (S370: No), the power management device 100 returns to step S370.

ステップS380において、電力管理装置100は、蓄電池200の動作状態を通常モードに設定し、終了する。具体的には、電力管理装置100は、蓄電池200の動作状態を停電準備モード若しくは自立運転から、通常モードに切替える。なお、ステップS380では、蓄電池200の動作状態を通常モードに設定するとしているが、電力管理装置100は、外部サーバ20から災害情報及び停電情報のいずれも取得しない場合には、蓄電池200の動作状態を通常モードとして維持しているものとする。 In step S380, the power management device 100 sets the operating state of the storage battery 200 to normal mode and ends the process. Specifically, the power management device 100 switches the operating state of the storage battery 200 from power outage preparation mode or independent operation to normal mode. Note that, although the operating state of the storage battery 200 is set to normal mode in step S380, if the power management device 100 does not acquire either disaster information or power outage information from the external server 20, it is assumed that the operating state of the storage battery 200 is maintained in normal mode.

次に、電力管理装置100の停電準備モード設定(ステップS330)の動作例について説明する。 Next, an example of the operation of setting the power outage preparation mode of the power management device 100 (step S330) will be described.

図3に示すように、ステップS331において、電力管理装置100は、蓄電池200の蓄電量の値が所定の蓄電量未満であるか判定する。電力管理装置100は、蓄電量の値が所定の蓄電量未満であると判定した場合(S331:Yes)、ステップS332に進む。なお、電力管理装置100は、蓄電量の値が所定の蓄電量未満ではないと判定した場合、(S331:No)、ステップS333に進む。 As shown in FIG. 3, in step S331, the power management device 100 determines whether the value of the stored power amount of the storage battery 200 is less than a predetermined stored power amount. If the power management device 100 determines that the value of the stored power amount is less than the predetermined stored power amount (S331: Yes), the power management device 100 proceeds to step S332. Note that if the power management device 100 determines that the value of the stored power amount is not less than the predetermined stored power amount (S331: No), the power management device 100 proceeds to step S333.

ステップS332において、電力管理装置100は、蓄電池200に送信する制御命令を生成する。具体的には、電力管理装置100は、蓄電池200の目標範囲値を通常基準値よりも大きい値として設定し、設定された目標範囲値に従って蓄電池200の動作状態を制御するように、蓄電池200を制御する。 In step S332, the power management device 100 generates a control command to be transmitted to the storage battery 200. Specifically, the power management device 100 sets a target range value for the storage battery 200 to a value greater than the normal reference value, and controls the storage battery 200 to control the operating state of the storage battery 200 according to the set target range value.

ステップS333において、電力管理装置100は、蓄電池200に送信する制御命令を生成する。具体的には、制御部110は、蓄電池200の目標範囲値を通常基準値として設定し、設定された目標範囲値に従って蓄電池200の動作状態を制御するように、蓄電池200を制御する。 In step S333, the power management device 100 generates a control command to be transmitted to the storage battery 200. Specifically, the control unit 110 sets the target range value of the storage battery 200 as a normal reference value, and controls the storage battery 200 to control the operating state of the storage battery 200 according to the set target range value.

つまり、本実施形態における電力管理装置100の電力管理方法は、所定時間以内における系統10からの電力購入計画値に対する電力購入実績値の差分であるインバランスが目標範囲値以内となるように、蓄電池200の充放電を制御する電力管理方法であってよい。 In other words, the power management method of the power management device 100 in this embodiment may be a power management method that controls the charging and discharging of the storage battery 200 so that the imbalance, which is the difference between the planned value for power purchase from the grid 10 and the actual value for power purchase within a specified time period, falls within a target range value.

また、本実施形態における電力管理装置100の電力管理方法は、通常モード時において、電力購入計画値に対する電力購入実績値の差分である目標範囲値が通常基準値となるように、蓄電池200の動作状態を制御するステップを有してもよい。 The power management method of the power management device 100 in this embodiment may also include a step of controlling the operating state of the storage battery 200 in normal mode so that the target range value, which is the difference between the power purchase plan value and the actual power purchase value, becomes the normal reference value.

また、本実施形態における電力管理装置100の電力管理方法は、災害情報及び蓄電池200の蓄電量を取得するステップと、災害情報及び蓄電池200の蓄電量に基づいて、目標範囲値を設定するステップと、を含んでもよい。これにより、電力管理装置100の電力管理方法は、災害が発生した場合であっても、蓄電池200の蓄電量に基づいてインバランスを考慮した蓄電池200の制御をすることができる。 The power management method of the power management device 100 in this embodiment may also include a step of acquiring disaster information and the amount of stored power in the storage battery 200, and a step of setting a target range value based on the disaster information and the amount of stored power in the storage battery 200. As a result, the power management method of the power management device 100 can control the storage battery 200 taking into account the imbalance based on the amount of stored power in the storage battery 200, even when a disaster occurs.

各ステップで設定した目標範囲値は、記憶部130が記憶してもよい。記憶部130が記憶した目標範囲値は、制御部110が目標範囲値を設定する際に参照してもよい。例えば、前回の停電準備モードにおいて、目標範囲値を+3%と設定していた場合、+3%という値を参照して目標範囲値を設定してもよい。 The target range value set in each step may be stored by the memory unit 130. The target range value stored by the memory unit 130 may be referenced by the control unit 110 when setting the target range value. For example, if the target range value was set to +3% in the previous power outage preparation mode, the target range value may be set by referring to the value of +3%.

本発明を諸図面や実施例に基づき説明してきたが、当業者であれば本開示に基づき種々の変形や修正を行うことが容易であることに注意されたい。従って、これらの変形や修正は本発明の範囲に含まれることに留意されたい。例えば、各構成部、各ステップ等に含まれる機能等は論理的に矛盾しないように再配置可能であり、複数の構成部やステップ等を1つに組み合わせたり、或いは分割したりすることが可能である。また、本発明について装置を中心に説明してきたが、本発明は装置が備えるプロセッサにより実行される方法、プログラム、又はプログラムを記憶した記憶媒体としても実現し得るものであり、本発明の範囲にはこれらも包含されるものと理解されたい。また、この場合、記憶媒体には、ハードディスク装置、光ディスク、CD-ROM、CD-R、メモリカード、ROM等を用いることができる。 Although the present invention has been described based on the drawings and examples, it should be noted that those skilled in the art can easily make various modifications and corrections based on the present disclosure. Therefore, it should be noted that these modifications and corrections are included in the scope of the present invention. For example, the functions included in each component, each step, etc. can be rearranged so as not to cause logical contradictions, and multiple components, steps, etc. can be combined into one or divided. In addition, while the present invention has been described mainly with respect to an apparatus, the present invention can also be realized as a method, a program, or a storage medium storing a program executed by a processor provided in the apparatus, and it should be understood that these are also included in the scope of the present invention. In this case, the storage medium can be a hard disk drive, an optical disk, a CD-ROM, a CD-R, a memory card, a ROM, etc.

2015年9月の国連サミットにおいて採択された17の国際目標として、「持続可能な開発目標(Sustainable Development Goals:SDGs)」がある。一実施形態に係る
電力管理装置、電力管理システム、及び電力管理方法は、このSDGsの17の目標のう
ち、例えば「7.エネルギーをみんなに そしてクリーンに」、「9.産業と技術革新の基盤をつくろう」、及び「11.「住み続けられるまちづくりを」の目標などの達成に貢献し得る。
The "Sustainable Development Goals (SDGs)" are 17 international goals adopted at the United Nations Summit in September 2015. A power management device, a power management system, and a power management method according to an embodiment can contribute to the achievement of the 17 SDGs, for example, goals "7. Affordable and clean energy for all,""9. Build resilient infrastructure, promote industry, innovation and infrastructure," and "11. Make cities and towns sustainable."

1 電力管理システム
10 系統
20 外部サーバ
30 ネットワーク
100 電力管理装置
110 制御部
120 通信部
130 記憶部
200 蓄電池
300 電力メータ
Reference Signs List 1 Power management system 10 System 20 External server 30 Network 100 Power management device 110 Control unit 120 Communication unit 130 Storage unit 200 Storage battery 300 Power meter

Claims (10)

所定時間以内における系統からの電力購入計画値に対する電力購入実績値の差分であるインバランスが目標範囲値以内となるように、電池の充放電を制御する電力管理装置であって、
前記蓄電池の動作状態を制御する制御部と、
災害情報及び前記蓄電池の蓄電量を取得可能な通信部と、を有し、
前記制御部は、通常モード時において、前記目標範囲値が通常基準値となるように、前記蓄電池の動作状態を制御し、
前記災害情報及び前記蓄電量に基づいて、前記目標範囲値を設定する、電力管理装置。
A power management device that controls charging and discharging of a storage battery so that an imbalance, which is a difference between a planned value for purchasing power from a grid and an actual value for purchasing power within a predetermined time period, falls within a target range value,
A control unit that controls an operating state of the storage battery;
A communication unit capable of acquiring disaster information and a storage amount of the storage battery,
the control unit controls an operating state of the storage battery in a normal mode so that the target range value becomes a normal reference value;
A power management device that sets the target range value based on the disaster information and the stored power amount.
請求項1に記載の電力管理装置において、
前記制御部は、前記通信部が、現在時刻から災害予報時間以内に災害の発生が予測される旨の情報を含む前記災害情報を取得した場合に、前記蓄電池の動作状態を前記通常モード時よりも前記蓄電池の放電を抑制する停電準備モードに設定する、電力管理装置。
2. The power management apparatus of claim 1,
The control unit of the power management device sets the operating state of the storage battery to a power outage preparation mode that suppresses discharge of the storage battery more than in the normal mode when the communication unit acquires disaster information including information that a disaster is predicted to occur within a disaster forecast time from the current time.
請求項2に記載の電力管理装置において、
前記制御部は、前記蓄電量が所定の閾値を下回る場合に、前記目標範囲値を、前記通常基準値よりも大きい値として設定する、電力管理装置。
3. The power management device of claim 2,
The control unit sets the target range value to a value greater than the normal reference value when the stored power amount falls below a predetermined threshold.
請求項3に記載の電力管理装置において、
前記制御部は、前記現在時刻から災害予報時間以内に前記蓄電量が所定の蓄電量を超えるように、前記目標範囲値を設定する、電力管理装置。
4. The power management device of claim 3,
The control unit sets the target range value so that the stored power amount exceeds a predetermined stored power amount within a disaster forecast time from the current time.
請求項1から4のいずれか一項に記載の電力管理装置において、
前記通信部は、さらに前記蓄電の充電速度を取得し、
前記制御部は、前記蓄電量及び前記蓄電池の充電速度に基づいて、前記目標範囲値を設定する、電力管理装置。
5. The power management device according to claim 1,
The communication unit further acquires a charging speed of the storage battery ,
The control unit sets the target range value based on the amount of stored power and a charging rate of the storage battery.
請求項3又は4に記載の電力管理装置において、
前記制御部は、前記蓄電量が前記所定の閾値を上回る場合に、前記目標範囲値を、前記通常基準値として設定する、電力管理装置。
5. The power management device according to claim 3 ,
The control unit sets the target range value as the normal reference value when the stored power amount exceeds the predetermined threshold.
請求項1から6のいずれか一項に記載の電力管理装置において、
前記制御部は、前記通信部が停電情報を取得した場合に、前記蓄電池の動作状態を前記系統から解列された自立運転に切替える、電力管理装置。
7. The power management device according to claim 1,
The control unit switches the operation state of the storage battery to an independent operation in which the storage battery is disconnected from the grid when the communication unit acquires power outage information.
請求項1から7のいずれか一項に記載の電力管理装置において、
前記制御部は、前記通信部が、災害の終了に関する情報を含む災害情報を取得した場合に、前記蓄電池の動作状態を前記通常モードに設定する、電力管理装置。
8. The power management device according to claim 1,
The control unit sets the operating state of the storage battery to the normal mode when the communication unit acquires disaster information including information regarding the end of the disaster.
蓄電池と、所定時間以内における系統からの電力購入計画値に対する電力購入実績値の差分であるインバランスが目標範囲値以内となるように、前記蓄電池の充放電を制御する電力管理装置と、を備える電力管理システムであって、
前記電力管理装置は、
前記蓄電池の動作状態を制御する制御部と、
災害情報及び前記蓄電池の蓄電量を取得可能な通信部と、を備え、
前記制御部は、通常モード時において、前記目標範囲値が通常基準値となるように、前記蓄電池の動作状態を制御し、
前記災害情報及び前記蓄電量に基づいて、前記目標範囲値を設定する、電力管理システム。
A power management system including a storage battery and a power management device that controls charging and discharging of the storage battery so that an imbalance, which is a difference between a planned value for purchasing power from a grid and an actual value for purchasing power within a predetermined time period, falls within a target range value,
The power management device includes:
A control unit that controls an operating state of the storage battery;
A communication unit capable of acquiring disaster information and a stored power amount of the storage battery,
the control unit controls an operating state of the storage battery in a normal mode so that the target range value becomes a normal reference value;
The power management system sets the target range value based on the disaster information and the stored power amount.
所定時間以内における系統からの電力購入計画値に対する電力購入実績値の差分であるインバランスが目標範囲値以内となるように、電池の充放電を制御する電力管理方法であって、
通常モード時において、前記目標範囲値が通常基準値となるように、前記蓄電池の動作状態を制御するステップと、
災害情報及び前記蓄電池の蓄電量を取得するステップと、
前記災害情報及び前記蓄電量に基づいて、前記目標範囲値を設定するステップと、を含む、電力管理方法。
A power management method for controlling charging and discharging of a storage battery so that an imbalance, which is a difference between a planned value for purchasing power from a grid and an actual value for purchasing power within a predetermined time period, falls within a target range value,
controlling an operating state of the storage battery in a normal mode so that the target range value becomes a normal reference value;
Acquiring disaster information and a stored power amount of the storage battery;
setting the target range value based on the disaster information and the stored power amount.
JP2020162289A 2020-09-28 2020-09-28 Power management device, power management system, and power management method Active JP7540928B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020162289A JP7540928B2 (en) 2020-09-28 2020-09-28 Power management device, power management system, and power management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020162289A JP7540928B2 (en) 2020-09-28 2020-09-28 Power management device, power management system, and power management method

Publications (2)

Publication Number Publication Date
JP2022054977A JP2022054977A (en) 2022-04-07
JP7540928B2 true JP7540928B2 (en) 2024-08-27

Family

ID=80998159

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020162289A Active JP7540928B2 (en) 2020-09-28 2020-09-28 Power management device, power management system, and power management method

Country Status (1)

Country Link
JP (1) JP7540928B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013027136A (en) 2011-07-20 2013-02-04 Seiko Electric Co Ltd Stored power control apparatus, stored power control method and program
WO2016084392A1 (en) 2014-11-27 2016-06-02 京セラ株式会社 Power control device, power control method and power control system
JP2018057231A (en) 2016-09-30 2018-04-05 大和ハウス工業株式会社 Power supply system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013027136A (en) 2011-07-20 2013-02-04 Seiko Electric Co Ltd Stored power control apparatus, stored power control method and program
WO2016084392A1 (en) 2014-11-27 2016-06-02 京セラ株式会社 Power control device, power control method and power control system
JP2018057231A (en) 2016-09-30 2018-04-05 大和ハウス工業株式会社 Power supply system

Also Published As

Publication number Publication date
JP2022054977A (en) 2022-04-07

Similar Documents

Publication Publication Date Title
JP5590033B2 (en) Energy system
Divya et al. Battery energy storage technology for power systems—An overview
JP5537478B2 (en) Composite battery energy management system and method
US8866443B2 (en) Lead acid storage battery and lead acid storage battery system for natural energy utilization system
JP7254737B2 (en) POWER CONTROL DEVICE, POWER CONTROL SYSTEM, POWER CONTROL METHOD, AND PROGRAM
US20120249152A1 (en) Charging/discharging determination apparatus and computer-readable non-transitory medium storing charging/discharging determination program
JP5165042B2 (en) System power stabilization system, system power stabilization method, and charger / discharger
JP2013192401A (en) Power demand control apparatus
CN115378015B (en) Operation control method, system, equipment and medium of micro-grid
KR20170000238A (en) High capacity battery system for frequency regulation of electrical power system, method for managing thereof
WO2011105555A1 (en) Charging system, and control method and program therefor
KR101985853B1 (en) User selection operation mode system of ess connected renewable energy
CN111903027A (en) Power information management system, power information management method, program, power information management server, communication terminal, and power system
JP7540928B2 (en) Power management device, power management system, and power management method
JP7823384B2 (en) Charging/discharging system and method for controlling the charging/discharging system
CN114977232A (en) An energy storage control method, device and microgrid
JP6108665B2 (en) Energy saving system
KR102084678B1 (en) method for discharging schedule control of solar connected type ESS
KR20190130859A (en) ESS equipped with PCS with integrated PMS and Operation method
JP6971158B2 (en) Power management equipment and programs
JP2016012983A (en) Power storage facility monitoring system and method
JP7303692B2 (en) POWER MANAGEMENT SYSTEM, POWER MANAGEMENT METHOD, POWER MANAGEMENT APPARATUS, AND PROGRAM
JP7208095B2 (en) Server device and control method
WO2021111967A1 (en) Power network and power network changing method
Noussan Economics of electricity battery storage

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20210820

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230517

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240131

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240206

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240403

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240723

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240815

R150 Certificate of patent or registration of utility model

Ref document number: 7540928

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150