Planning device, planning method, and planning program Download PDF

Info

Publication number
JP7541395B2
JP7541395B2 JP2023013840A JP2023013840A JP7541395B2 JP 7541395 B2 JP7541395 B2 JP 7541395B2 JP 2023013840 A JP2023013840 A JP 2023013840A JP 2023013840 A JP2023013840 A JP 2023013840A JP 7541395 B2 JP7541395 B2 JP 7541395B2
Authority
JP
Japan
Prior art keywords
plan
disaster prevention
information
items
target facility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2023013840A
Other languages
Japanese (ja)
Other versions
JP2024109187A (en
Inventor
勝輝 小森
Original Assignee
日本消防・防災デザイン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本消防・防災デザイン株式会社 filed Critical 日本消防・防災デザイン株式会社
Priority to JP2023013840A priority Critical patent/JP7541395B2/en
Publication of JP2024109187A publication Critical patent/JP2024109187A/en
Application granted granted Critical
Publication of JP7541395B2 publication Critical patent/JP7541395B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Medical Treatment And Welfare Office Work (AREA)

Description

本発明は、防災に係る計画作成装置、計画作成方法及び防計画作成プログラムに関する。 The present invention relates to a disaster prevention plan creation device, a plan creation method, and a disaster prevention plan creation program.

特許文献1には、災害時および防災活動における避難計画を、シミュレーションを使って策定する技術が記載されている。詳細に説明すると、災害シナリオにおける最小空間の空間モデルの状態、人員の位置データから、及び、避難行動モデルに基づいて、エリアの内部に滞在する人員の避難挙動をシミュレーションする。 Patent Document 1 describes a technology that uses simulation to formulate evacuation plans during disasters and disaster prevention activities. In more detail, the evacuation behavior of people staying within an area is simulated based on the state of a spatial model of the minimum space in a disaster scenario, personnel position data, and an evacuation behavior model.

特開2022-126365号公報JP 2022-126365 A

ところで、例えば老人ホームや介護施設などは、在籍する地域の地域防災計画に則った防災計画を準備し、それを各省庁などに提出しなければならない。しかしながら、特許文献1で作成することのできる避難計画は、これらの施設に対して法的に提出が義務づけられているような防災計画としては不十分である。このように、例えば老人ホームや介護施設などに必要な防災計画を作成することは、難しかった。 Meanwhile, for example, nursing homes and care facilities must prepare disaster prevention plans that conform to the local disaster prevention plans for the areas in which they are located and submit them to the relevant government ministries and agencies. However, the evacuation plans that can be created using Patent Document 1 are insufficient as disaster prevention plans that these facilities are legally required to submit. As such, it has been difficult to create the disaster prevention plans required for nursing homes and care facilities, for example.

そこで本発明は、例えば老人ホームや介護施設などに必要な防災計画を作成することができる防災計画作成装置、防災計画作成方法及び防災計画作成プログラムを提供することを目的とする。 The present invention aims to provide a disaster prevention plan creation device, a disaster prevention plan creation method, and a disaster prevention plan creation program that can create disaster prevention plans necessary for, for example, nursing homes and care facilities.

本発明の計画作成装置は、対象施設に係る施設情報の入力を受ける入力部と、前記対象施設の属する地域の地域防災計画の少なくとも一部に関する地域防災計画情報が記憶される記憶部と、前記地域防災計画に基づいた情報の項目である大項目ごとに作成された小項目であって、職員および利用者の詳細情報を含む小項目に基づいて、職員配置および備蓄品の大項目において各係や各備蓄品の理論値を算出し、算出した理論値に基づいて前記対象施設の防災に係る計画書を作成する制御部と、を備える。 The plan creation device of the present invention comprises an input unit that receives input of facility information related to a target facility, a memory unit that stores regional disaster prevention plan information related to at least a part of the regional disaster prevention plan for the area to which the target facility belongs, and a control unit that calculates theoretical values for each department and each stockpile item in the major items of staff deployment and stockpiles based on sub-items created for each major item, which is an item of information based on the regional disaster prevention plan, the sub-items including detailed information on staff and users, and creates a disaster prevention plan for the target facility based on the calculated theoretical values .

本発明の計画作成方法は、対象施設に係る施設情報の入力を受けるステップと、前記対象施設の属する地域の地域防災計画に基づいた情報の項目である大項目ごとに作成された小項目であって、職員および利用者の詳細情報を含む小項目に基づいて、職員配置および備蓄品の大項目において各係や各備蓄品の理論値を算出し、算出した理論値に基づいて前記対象施設の防災に係る計画書を作成するステップを、コンピュータによって実行する The plan creation method of the present invention is carried out by a computer, comprising the steps of receiving input of facility information relating to a target facility, calculating theoretical values for each department and each stockpile item under the major items of staff deployment and stockpiles based on sub-items created for each major item, which is an information item based on the regional disaster prevention plan for the area to which the target facility belongs, the sub-items including detailed information on staff and users, and creating a disaster prevention plan for the target facility based on the calculated theoretical values .

本発明の計画作成プログラムは、対象施設に係る施設情報の入力を受け付けるステップと、前記対象施設の属する地域の地域防災計画に基づいた情報の項目である大項目ごとに作成された小項目であって、職員および利用者の詳細情報を含む小項目に基づいて、職員配置および備蓄品の大項目において各係や各備蓄品の理論値を算出し、算出した理論値に基づいて前記対象施設の防災に係る計画書を作成するステップを、コンピュータに実行させる。 The plan creation program of the present invention causes a computer to execute the steps of accepting input of facility information related to a target facility, calculating theoretical values for each department and each stockpile item under the major items of staff deployment and stockpiles based on sub-items created for each major item, which is an information item based on the regional disaster prevention plan for the area to which the target facility belongs, and including detailed information on staff and users, and creating a disaster prevention plan for the target facility based on the calculated theoretical values .

本発明によれば、例えば老人ホームや介護施設などに必要な防災計画を作成することができる。 The present invention makes it possible to create disaster prevention plans necessary for nursing homes and care facilities, for example.

本発明の一実施の形態の計画作成装置の構成の一部の一例を示すブロック図FIG. 1 is a block diagram showing an example of a part of a configuration of a plan creation device according to an embodiment of the present invention. 本発明の一実施の形態の施設情報の一例を示す図FIG. 1 is a diagram showing an example of facility information according to an embodiment of the present invention. 本発明の一実施の形態の地域防災計画情報及び計画書に関する情報の一例を示す図FIG. 2 is a diagram showing an example of information on a local disaster prevention plan and a plan according to an embodiment of the present invention; 本発明の一実施の形態の計画書を作成する手順の一例を示すフロー図FIG. 1 is a flow chart showing an example of a procedure for creating a plan according to an embodiment of the present invention. 本発明の一実施の形態の修正計画書を作成する手順の一例を示すフロー図FIG. 1 is a flow diagram showing an example of a procedure for creating a revision plan according to an embodiment of the present invention.

(計画作成装置100の概略説明)
以下に図面を用いて、本発明の一実施の形態を詳細に説明する。以下で述べる構成、方法、フロー等は説明のための例示であって、システム、プログラム、コンピュータ、ケーブルなどの仕様に応じ、適宜変更が可能である。以下では、全ての図面において対応する要素には同一符号を付し、重複する説明を省略する。
(Outline of the plan creation device 100)
An embodiment of the present invention will be described in detail below with reference to the drawings. The configuration, method, flow, etc. described below are examples for the purpose of explanation, and can be changed as appropriate according to the specifications of the system, program, computer, cable, etc. In the following, the same reference numerals are used for corresponding elements in all drawings, and duplicated explanations will be omitted.

まず、本実施の形態における計画作成装置100について説明する。図1は、本発明の一実施の形態の計画作成装置100の構成の一部の一例を示すブロック図である。計画作成装置100は、制御部110、記憶部120、入力部130、送信部140を備える。制御部110は、入力部130を介して受け取った施設情報1000と記憶部120に記憶される地域防災計画情報2000とを使って、対象施設の防災に係る計画書3000を作成する。 First, the plan creation device 100 in this embodiment will be described. FIG. 1 is a block diagram showing an example of a portion of the configuration of the plan creation device 100 in one embodiment of the present invention. The plan creation device 100 includes a control unit 110, a storage unit 120, an input unit 130, and a transmission unit 140. The control unit 110 uses facility information 1000 received via the input unit 130 and regional disaster prevention plan information 2000 stored in the storage unit 120 to create a disaster prevention plan 3000 for the target facility.

防災に係る計画書とは、例えば消防局、経済産業省、総務省、国土交通省、厚生労働省などの各省庁や地方行政、地方自治体、地方公共団体などに提出する消防計画書、BCP計画書(事業継続計画書)、個別避難計画書、防災計画書、要避難者計画書などが挙げられる。作成する計画書3000の種類や数は1つまたは複数であって良い。 Examples of disaster prevention plans include fire prevention plans, BCP plans (business continuity plans), individual evacuation plans, disaster prevention plans, and evacuation plans to be submitted to various government ministries and agencies, such as the Fire Department, the Ministry of Economy, Trade and Industry, the Ministry of Internal Affairs and Communications, the Ministry of Land, Infrastructure, Transport and Tourism, and the Ministry of Health, Labor and Welfare, as well as local governments, local municipalities, and local public organizations. The number and type of plans 3000 to be created may be one or more.

記憶部120には、少なくとも一つの地域の地域防災計画の一部に関する地域防災計画情報2000が記憶される。入力部130は、キーボードやマウスなどの入力用インターフェースもしくは通信の受信部などであってよく、施設情報1000を受け付けることができればよい。通信はいかなる通信であってもよく、有線無線を問わない。または、インターフェースとの接続も、有線無線を問わない。 The memory unit 120 stores regional disaster prevention plan information 2000 relating to a portion of a regional disaster prevention plan for at least one region. The input unit 130 may be an input interface such as a keyboard or mouse, or a communication receiving unit, as long as it is capable of receiving the facility information 1000. The communication may be any type of communication, whether wired or wireless. Also, the connection to the interface may be either wired or wireless.

通信によって入力部130に施設情報1000が送信される場合は、必要情報がすでに入力済みの施設情報1000が送信されるとよい。送信部140は、作成した計画書3000を1つまたは複数の送信先へ送信する。送信先とは、例えば先述した消防局、経済産業省、総務省、国土交通省、厚生労働省などの各省庁や地方行政、地方自治体、地方公共団体などを含む。 When facility information 1000 is transmitted to input unit 130 via communication, it is preferable that facility information 1000 in which necessary information has already been input is transmitted. Transmission unit 140 transmits the created plan 3000 to one or more destinations. Destinations include, for example, the aforementioned fire department, the Ministry of Economy, Trade and Industry, the Ministry of Internal Affairs and Communications, the Ministry of Land, Infrastructure, Transport and Tourism, the Ministry of Health, Labor and Welfare, and other ministries and agencies, as well as local administrations, local municipalities, and local public organizations.

施設情報1000は後で詳細に説明するが、計画書3000を作成する対象の施設に関する情報である。地域防災計画情報2000も詳細を後述するが、各地方自治体・地方公共団体などが発行する地域防災計画そのものであってもよいし、地域防災計画の少なくとも一部を使って生成した情報であってもよい。各地方自治体・地方公共団体などがそれぞれ地域防災計画を発行しているので、内容も地方自治体・地方公共団体などによって異なる。したがて、記憶部120には1つまたは複数の地方の地域防災計画情報2000をそれぞれ記憶するとよい。 The facility information 1000, which will be described in detail later, is information relating to the facility for which the plan 3000 is to be created. The regional disaster prevention plan information 2000, which will also be described in detail later, may be the regional disaster prevention plan itself issued by each local government/local public organization, or may be information generated using at least a part of the regional disaster prevention plan. Since each local government/local public organization issues its own regional disaster prevention plan, the contents also differ depending on the local government/local public organization. Therefore, it is preferable to store regional disaster prevention plan information 2000 for one or more regions in the memory unit 120.

(施設情報1000について)
計画書3000を作成するには、対象となる施設の情報が必要となる。対象となる施設の情報の項目の一例が、図2に示される。図2は、本発明の一実施の形態の施設情報の一例を示す図である。
(Regarding facility information 1000)
To create the plan 3000, information on the target facility is required. An example of items of information on the target facility is shown in Fig. 2. Fig. 2 is a diagram showing an example of facility information according to an embodiment of the present invention.

施設情報1000は、例えば対象施設である老人ホームや介護施設などの情報であり、その施設の建物の築年数やフロア数などの情報を含む。また、施設で働く職員総数などといった人員数も含まれる。その他、職員や利用者(入居者)の個人情報や施設の立地情報、その施設の想定災害情報など、さまざまな情報を含むとよい。なお、想定被害情報は、直近の被害に準ずるとよく、過去の災害情報(過去被害データのアーカイブ)を含む。施設情報1000は、実際には、施設の担当者などから話を聞いて調査することができる。 The facility information 1000 is information about the target facility, such as a nursing home or care facility, and includes information such as the age of the facility's building and the number of floors. It also includes the number of personnel, such as the total number of staff working at the facility. It may also include various other information, such as personal information of staff and users (residents), information about the location of the facility, and information about anticipated disasters at the facility. The anticipated damage information may be similar to the most recent damage, and may include information about past disasters (archives of past damage data). In practice, the facility information 1000 can be investigated by speaking with facility personnel, etc.

(地域防災計画情報2000について)
次に、地域防災計画情報2000について説明する。図3は、本発明の一実施の形態の地域防災計画情報及び計画書に関する情報の一例を示す図である。図3の大項目とされている項目が、対象施設が属する地域の地方自治体・地方公共団体などが発行する地域防災計画に基づいた情報の項目であり、地域防災計画情報2000の一部である。すなわち、計画書3000は、対象施設が所属する地域の地方自治体・地方公共団体などが発行する地域防災計画に基づいて作成される。
(Regional Disaster Prevention Plan Information 2000)
Next, the regional disaster prevention plan information 2000 will be described. Fig. 3 is a diagram showing an example of regional disaster prevention plan information and information related to the plan in one embodiment of the present invention. The items shown as major items in Fig. 3 are items of information based on the regional disaster prevention plan issued by the local government, local public organization, etc. in the area to which the target facility belongs, and are part of the regional disaster prevention plan information 2000. In other words, the plan 3000 is created based on the regional disaster prevention plan issued by the local government, local public organization, etc. in the area to which the target facility belongs.

大項目ごとに、任意に小項目を作成する。大項目が職員情報、利用者情報の欄では、小項目は職員や利用者(入居者)の詳細情報項目であってもよいし。大項目が職員配置の欄では、係の種類をそれぞれ小項目としてもよい。大項目が備蓄品の欄では、水やタオルなど備蓄品の種類をそれぞれ小項目としてもよい。そして、小項目ごとに情報を整理する。大項目が職員配置及び備蓄品の欄においては、大項目が職員情報及び利用者情報の欄の結果などから、各係や各備蓄品の理論値を算出する。そして、小項目の内容や、理論値を使って、計画書3000を作成することができる。このように計画書3000を作成することによって、例えば老人ホームや介護施設などに必要な防災計画を自動的に作成することができる。 For each major item, minor items are created as desired. In columns with major items of staff information and user information, minor items may be detailed information about staff and users (residents). In columns with major items of staff allocation, each type of department may be a minor item. In columns with major items of stockpiles, each type of stockpiled item, such as water or towels, may be a minor item. Then, the information is organized for each minor item. In columns with major items of staff allocation and stockpiles, theoretical values for each department and each stockpiled item are calculated from the results of columns with major items of staff information and user information. Then, plan 3000 can be created using the contents of the minor items and the theoretical values. By creating plan 3000 in this way, disaster prevention plans necessary for nursing homes and care facilities, for example, can be automatically created.

(計画書3000について)
計画書3000は防災に関する計画であり、例えば消防計画書、BCP計画書、個別避難計画書、防災計画書、要避難者計画書などである。ここでの防災というのは、避難や消防、災害や緊急事態への対応など幅広い意味を有する。作成された計画書3000は、1つであっても複数であってもよい。
(Regarding Plan 3000)
The plan 3000 is a plan regarding disaster prevention, such as a fire prevention plan, a BCP plan, an individual evacuation plan, a disaster prevention plan, a plan for people who need to be evacuated, etc. Disaster prevention here has a broad meaning, such as evacuation, firefighting, and responses to disasters and emergencies. The plan 3000 created may be one or multiple.

例えば、一つの施設に対して、消防計画書、BCP計画書、個別避難計画書、防災計画書、要避難者計画書の全てを作成してもよい。そして、これらの計画書3000は、送信部140によって、各省庁や各地方自治体・地方公共団体などに送信されるとよい。なお、この時、消防計画書、BCP計画書、個別避難計画書、防災計画書、要避難者計画書は、それぞれ異なる窓口(例えば消防局、経済産業省、総務省、国土交通省、厚生労働省それぞれに所属する課など)に送信しなければならない場合がある。したがって、送信部140は、作成した計画書3000を複数の送信先に送信する。このように、対象施設に関する施設情報1000と地域防災計画情報2000とを使って、複数の異なる計画書3000を作成し、それらをそれぞれ別々の窓口に送信することができる。 For example, a fire prevention plan, a BCP plan, an individual evacuation plan, a disaster prevention plan, and a plan for people who need to be evacuated may all be created for one facility. These plans 3000 may then be sent by the transmission unit 140 to various ministries and agencies, local governments, and local public organizations. In this case, the fire prevention plan, the BCP plan, the individual evacuation plan, the disaster prevention plan, and the plan for people who need to be evacuated may each need to be sent to a different office (for example, a fire department, a section belonging to the Ministry of Economy, Trade and Industry, the Ministry of Internal Affairs and Communications, the Ministry of Land, Infrastructure, Transport and Tourism, or the Ministry of Health, Labor and Welfare). Therefore, the transmission unit 140 sends the created plan 3000 to multiple destinations. In this way, multiple different plans 3000 can be created using the facility information 1000 and the regional disaster prevention plan information 2000 related to the target facility, and each of them can be sent to a different office.

(計画作成方法に関する制御部110の制御手順)
次に、制御方法に関する制御部110の制御手順について説明する。図4は、本発明の一実施の形態の計画書3000を作成する手順の一例を示すフロー図である。なお、これらの処理は、図4で示した順序には限定されない。すなわち、あるステップでその前段のステップの結果を利用する関係にある等の制約がない限り、順序を入れ替えてもよい。
(Control procedure of the control unit 110 regarding the plan creation method)
Next, the control procedure of the control unit 110 regarding the control method will be described. Fig. 4 is a flow diagram showing an example of the procedure for creating the plan 3000 according to an embodiment of the present invention. Note that these processes are not limited to the order shown in Fig. 4. In other words, the order may be changed as long as there is no constraint such as a relationship in which a certain step utilizes the result of the previous step.

入力部130を介して、施設情報1000を受け付ける(ST1)。受け付けた施設情報1000と、記憶部120に記憶されている地域防災計画情報2000とを使って、計画書3000を作成する(ST2)。作成する計画書3000は1つであっても複数であってもよい。そして、作成した計画書3000を、各省庁や各地方自治体・地方公共団体などなどに送信する(ST3)。 Facility information 1000 is received via the input unit 130 (ST1). Using the received facility information 1000 and the regional disaster prevention plan information 2000 stored in the memory unit 120, a plan 3000 is created (ST2). Either one plan 3000 or multiple plans 3000 may be created. The created plan 3000 is then transmitted to various government ministries and agencies, local governments, local public organizations, etc. (ST3).

なお、複数の計画書3000を作成した場合は、複数の宛先に送信しても、1つの宛先に全てを送信してもよい。このように計画書3000を作成することによって、例えば老人ホームや介護施設などに必要な防災計画を自動的に作成することができる。さらに、提出先である窓口に、作成した防災計画を送信することができる。 When multiple plans 3000 are created, they may be sent to multiple destinations or all may be sent to one destination. By creating plans 3000 in this way, disaster prevention plans necessary for nursing homes and care facilities, for example, can be automatically created. Furthermore, the created disaster prevention plan can be sent to the counter where it is to be submitted.

(修正情報がある場合の修正計画書について)
作成した計画書3000を作成した後も、避難訓練などを実施するたびに修正が必要となる場合がある。避難訓練をすると、訓練計画、実施報告を各省庁や各地方自治体・地方公共団体などに提出する必要がある。すなわち、修正されて新たに作成された修正計画書(例えば訓練計画、実施報告を含む)が新たに必要となる。そこで、これから、修正情報を使った修正計画書の作成について説明する。
(Regarding the revised plan when there is revision information)
Even after the plan 3000 is created, revisions may be required each time an evacuation drill or the like is performed. When an evacuation drill is performed, the drill plan and implementation report must be submitted to each ministry and agency, local government, and local public organization. In other words, a revised and newly created revised plan (including, for example, a drill plan and implementation report) is required. Hereinafter, the creation of a revised plan using revision information will be described.

図5は、本発明の一実施の形態の修正計画書を作成する手順の一例を示すフロー図である。まず、訓練を行おうとする場合は、例えば防災士の資格保有者が訓練指示書を作成するとよい。そして、実際に訓練指示書に従って訓練を実施すると、訓練実施評価(検証及び検討)を行う。すなわち、訓練を通して、より良い避難経路があった場合や、避難補助の人数が実際に過不足しないか、現実的な手順となっているか、など、作成した防災計画の計画書3000の現実的な妥当性を検証する。そして、修正が必要であるかどうかを検討し、修正する場合は、ユーザーは修正情報を、入力部130を介して入力する。 Figure 5 is a flow diagram showing an example of the procedure for creating a revised plan in one embodiment of the present invention. First, when training is to be conducted, a training instruction manual should be created by, for example, a qualified disaster prevention specialist. Then, once the training is actually conducted according to the training instruction manual, a training implementation evaluation (verification and consideration) is performed. In other words, the practical validity of the disaster prevention plan 3000 created is verified through the training, such as whether there is a better evacuation route, whether the number of evacuation assistance personnel is actually sufficient or not, and whether the procedure is realistic. Then, it is considered whether revisions are necessary, and if so, the user inputs the revision information via the input unit 130.

制御部110は、入力部130に修正情報の入力があるかどうかを確認する(ST11)。入力部130に修正情報の入力がある場合(ST11:YES)、修正情報の入力を受け付ける(ST12)。そして、修正情報をもとに、修正した計画書3000を作成し(ST13)、修正して作成した計画書3000を送信先に送信する(ST14)。なお、ST11において、入力部130に修正情報の入力がない場合(ST11:NO)、そのまま終了となる。 The control unit 110 checks whether correction information has been input to the input unit 130 (ST11). If correction information has been input to the input unit 130 (ST11: YES), the input of the correction information is accepted (ST12). Then, based on the correction information, a corrected plan 3000 is created (ST13), and the corrected plan 3000 is sent to the destination (ST14). Note that in ST11, if correction information has not been input to the input unit 130 (ST11: NO), the process ends.

このように、訓練などを経て修正情報があった場合に、修正した計画書3000を作成することで、より精度の高い計画書3000とすることができる。そして、修正した計画書3000(例えば訓練計画、実施報告を含む)は、送信部140を介して、例えば消防局、経済産業省、総務省、国土交通省、厚生労働省などの各省庁や地方行政、地方自治体、地方公共団体などに提出される。 In this way, if there is any correction information after training or the like, a corrected plan 3000 can be created, resulting in a more accurate plan 3000. The corrected plan 3000 (including, for example, a training plan and implementation report) is then submitted via the transmission unit 140 to various ministries and agencies, such as the Fire Department, the Ministry of Economy, Trade and Industry, the Ministry of Internal Affairs and Communications, the Ministry of Land, Infrastructure, Transport and Tourism, and the Ministry of Health, Labor and Welfare, as well as local governments, local municipalities, and local public organizations.

計画作成装置100は、対象施設に係る施設情報1000の入力を受ける入力部130と、対象施設の属する地域の地域防災計画の少なくとも一部に関する地域防災計画情報2000が記憶される記憶部120と、施設情報1000と地域防災計画情報2000とを使って、対象施設の防災に係る計画書3000を作成する制御部110と、を備える。これによって、例えば老人ホームや介護施設などに必要な防災計画を作成することができる。 The plan creation device 100 includes an input unit 130 that receives facility information 1000 related to the target facility, a storage unit 120 that stores regional disaster prevention plan information 2000 related to at least a portion of the regional disaster prevention plan for the region to which the target facility belongs, and a control unit 110 that uses the facility information 1000 and the regional disaster prevention plan information 2000 to create a disaster prevention plan 3000 for the target facility. This makes it possible to create disaster prevention plans necessary for, for example, nursing homes and care facilities.

また、計画作成装置100は、さらに、計画書3000を外部に送信する送信部140を備え、制御部110は、計画書3000として、対象施設の防災に係る複数の種類の計画書3000を作成し、送信部140は、複数の種類の計画書3000を送信してもよい。これによって、例えば老人ホームや介護施設などに必要な複数の防災計画を自動的に作成し、それを異なる送信先にそれぞれ送信することができる。 The plan creation device 100 further includes a transmission unit 140 that transmits the plan 3000 to the outside, and the control unit 110 creates multiple types of plans 3000 related to disaster prevention for the target facility as the plans 3000, and the transmission unit 140 may transmit the multiple types of plans 3000. This makes it possible to automatically create multiple disaster prevention plans required for, for example, a nursing home or care facility, and transmit them to different destinations.

また、制御部110は、地域防災計画情報2000を使って、必要人員数及び必要物資の数の理論値を計画書3000に含むとよい。これによって、例えば老人ホームや介護施設などに必要な防災計画を高精度で自動的に作成することができる。 The control unit 110 may also use the regional disaster prevention plan information 2000 to include theoretical values for the number of personnel and supplies required in the plan 3000. This allows disaster prevention plans required for nursing homes and care facilities, for example, to be created automatically with high accuracy.

また、計画書3000を作成後に、入力部130が修正情報を受け付けた時、制御部110は、修正情報を使って新たな計画書3000を作成するとよい。これによって、例えば老人ホームや介護施設などに必要な防災計画を自動的に作成し、訓練などによって修正が必要であると分かった場合は、修正情報から新たな高精度の計画書3000を作成することができる。 In addition, after the plan 3000 is created, when the input unit 130 receives correction information, the control unit 110 can use the correction information to create a new plan 3000. This makes it possible to automatically create disaster prevention plans necessary for nursing homes and care facilities, for example, and if it becomes clear through training or the like that corrections are necessary, a new, highly accurate plan 3000 can be created from the correction information.

また、計画作成方法は、対象施設に係る施設情報1000の入力を受け(ST1)、施設情報1000と対象施設の属する地域の地域防災計画の少なくとも一部に関す地域防災計画情報2000とを使って、対象施設の防災に係る計画書3000を作成する。これによって、例えば老人ホームや介護施設などに必要な防災計画を作成することができる。 The plan creation method also receives facility information 1000 related to the target facility (ST1), and creates a disaster prevention plan 3000 for the target facility using the facility information 1000 and regional disaster prevention plan information 2000 related to at least a part of the regional disaster prevention plan for the region to which the target facility belongs. This makes it possible to create disaster prevention plans necessary for, for example, nursing homes and care facilities.

また、計画書3000を作成後に、入力部130が修正情報を受け付けた時、修正情報を使って新たな計画書3000を作成する。これによって、例えば老人ホームや介護施設などに必要な防災計画を自動的に作成し、訓練などによって修正が必要であると分かった場合は、修正情報から新たな高精度の計画書3000を作成することができる。 In addition, after the plan 3000 is created, when the input unit 130 receives correction information, the correction information is used to create a new plan 3000. This makes it possible to automatically create disaster prevention plans required for, for example, nursing homes and care facilities, and if it becomes clear through training or the like that corrections are necessary, a new, highly accurate plan 3000 can be created from the correction information.

また、計画作成プログラムは、対象施設に係る施設情報1000の入力を受け、施設情報1000と対象施設の属する地域の地域防災計画の少なくとも一部に関す地域防災計画情報2000とを使って、対象施設の防災に係る計画書3000を作成する、ことをコンピュータに実行させる。これによって、例えば老人ホームや介護施設などに必要な防災計画を作成することができる。 The plan creation program also causes the computer to receive facility information 1000 relating to the target facility, and create a disaster prevention plan 3000 for the target facility using the facility information 1000 and regional disaster prevention plan information 2000 relating to at least a part of the regional disaster prevention plan for the region to which the target facility belongs. This makes it possible to create disaster prevention plans necessary for, for example, nursing homes and care facilities.

また、計画書3000を作成後に、入力部130が修正情報を受け付けた時、修正情報を使って新たな計画書3000を作成することをコンピュータに実行させる。これによって、例えば老人ホームや介護施設などに必要な防災計画を自動的に作成し、訓練などによって修正が必要であると分かった場合は、修正情報から新たな高精度の計画書3000を作成することができる。 In addition, after the plan 3000 has been created, when the input unit 130 receives correction information, the computer is caused to create a new plan 3000 using the correction information. This makes it possible to automatically create disaster prevention plans necessary for, for example, nursing homes and care facilities, and if it becomes clear through training or the like that corrections are necessary, a new, highly accurate plan 3000 can be created from the correction information.

例えば老人ホームや介護施設などに必要な防災計画を作成することができる防災計画作成装置、防災計画作成方法及び防災計画作成プログラムを提供する。 We provide a disaster prevention plan creation device, a disaster prevention plan creation method, and a disaster prevention plan creation program that can create disaster prevention plans necessary for, for example, nursing homes and care facilities.

100 計画作成装置
110 制御部
120 記憶部
130 入力部
140 送信部
1000 施設情報
2000 地域防災計画情報
3000 計画書

REFERENCE SIGNS LIST 100 Plan creation device 110 Control unit 120 Storage unit 130 Input unit 140 Transmission unit 1000 Facility information 2000 Regional disaster prevention plan information 3000 Plan

Claims (8)

対象施設に係る施設情報の入力を受ける入力部と、
前記対象施設の属する地域の地域防災計画の少なくとも一部に関する地域防災計画情報が記憶される記憶部と、
前記地域防災計画に基づいた情報の項目である大項目ごとに作成された小項目であって、職員および利用者の詳細情報を含む小項目に基づいて、職員配置および備蓄品の大項目において各係や各備蓄品の理論値を算出し、算出した理論値に基づいて前記対象施設の防災に係る計画書を作成する制御部と、
を備える、計画作成装置。
an input unit for receiving input of facility information related to the target facility;
A storage unit that stores regional disaster prevention plan information related to at least a part of a regional disaster prevention plan for the region to which the target facility belongs;
A control unit that calculates theoretical values for each section and each stockpile item in the major items of staff deployment and stockpiles based on the minor items, which are items of information based on the regional disaster prevention plan, including detailed information on staff and users, and creates a disaster prevention plan for the target facility based on the calculated theoretical values;
A plan creation device comprising:
前記計画作成装置は、さらに、前記計画書を外部に送信する送信部を備え、
前記制御部は、前記計画書として、前記対象施設の防災に係る複数の種類の計画書を作成し、
前記送信部は、前記複数の種類の計画書を送信する、
請求項1に記載の計画作成装置。
The plan creation device further includes a transmission unit that transmits the plan to an outside,
The control unit creates a plurality of types of disaster prevention plans for the target facility as the plans,
The transmission unit transmits the plurality of types of plans.
The plan creation device according to claim 1 .
前記制御部は、前記地域防災計画情報を使って、必要人員数及び必要物資の数の理論値を前記計画書に含ませる
請求項1または2に記載の計画作成装置。
The control unit uses the regional disaster prevention plan information to include theoretical values of the number of required personnel and the number of required supplies in the plan.
The plan creation device according to claim 1 or 2.
前記計画書を作成後に、前記入力部が修正情報を受け付けた時、
前記制御部は、前記修正情報を使って新たな計画書を作成する、
請求項1または2に記載の計画作成装置。
When the input unit receives correction information after the plan is created,
The control unit creates a new plan using the correction information.
The plan creation device according to claim 1 or 2.
対象施設に係る施設情報の入力を受けるステップと、
前記対象施設の属する地域の地域防災計画に基づいた情報の項目である大項目ごとに作成された小項目であって、職員および利用者の詳細情報を含む小項目に基づいて、職員配置および備蓄品の大項目において各係や各備蓄品の理論値を算出し、算出した理論値に基づいて前記対象施設の防災に係る計画書を作成するステップを、コンピュータによって実行する、計画作成方法。
Receiving an input of facility information related to the target facility;
A planning method in which the steps of calculating theoretical values for each department and each stockpile item under the major items of staff deployment and stockpiles based on sub-items created for each major item, which is an information item based on the regional disaster prevention plan for the area to which the target facility belongs, and calculating theoretical values for each department and each stockpile item under the major items of staff deployment and stockpiles based on sub-items including detailed information on staff and users, and creating a disaster prevention plan for the target facility based on the calculated theoretical values, are carried out by a computer .
前記地域防災計画は前記コンピュータが備える記憶部に予め記憶されており、
前記計画書を作成後に、前記コンピュータが備える入力部が修正情報を受け付けた時、
前記修正情報を使って新たな計画書を作成するステップを、コンピュータによって実行する、
請求項5に記載の計画作成方法。
The local disaster prevention plan is stored in advance in a storage unit provided in the computer,
When the input unit of the computer receives correction information after the plan is created,
A step of creating a new plan using the modification information is carried out by a computer.
The method of claim 5.
対象施設に係る施設情報の入力を受け付けるステップと、
前記対象施設の属する地域の地域防災計画に基づいた情報の項目である大項目ごとに作成された小項目であって、職員および利用者の詳細情報を含む小項目に基づいて、職員配置および備蓄品の大項目において各係や各備蓄品の理論値を算出し、算出した理論値に基づいて前記対象施設の防災に係る計画書を作成するステップを、コンピュータに実行させる計画作成プログラム。
A step of accepting an input of facility information related to a target facility;
A planning program that causes a computer to execute the steps of: calculating theoretical values for each department and each stockpile item in the major items of staff deployment and stockpiles based on sub-items created for each major item, which is an information item based on the regional disaster prevention plan for the area to which the target facility belongs, and calculating theoretical values for each department and each stockpile item in the major items of staff deployment and stockpiles based on sub-items including detailed information on staff and users, and creating a disaster prevention plan for the target facility based on the calculated theoretical values .
前記地域防災計画は前記コンピュータが備える記憶部に予め記憶されており、
前記計画書を作成後に、前記コンピュータが備える入力部が修正情報を受け付けた時、
前記修正情報を使って新たな計画書を作成するステップを、
コンピュータに実行させる、
請求項7に記載の計画作成プログラム。
The local disaster prevention plan is stored in advance in a storage unit provided in the computer,
When the input unit of the computer receives correction information after the plan is created,
creating a new plan using the revision information ;
Have the computer run
The planning program according to claim 7.
JP2023013840A 2023-02-01 2023-02-01 Planning device, planning method, and planning program Active JP7541395B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023013840A JP7541395B2 (en) 2023-02-01 2023-02-01 Planning device, planning method, and planning program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2023013840A JP7541395B2 (en) 2023-02-01 2023-02-01 Planning device, planning method, and planning program

Publications (2)

Publication Number Publication Date
JP2024109187A JP2024109187A (en) 2024-08-14
JP7541395B2 true JP7541395B2 (en) 2024-08-28

Family

ID=92252504

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2023013840A Active JP7541395B2 (en) 2023-02-01 2023-02-01 Planning device, planning method, and planning program

Country Status (1)

Country Link
JP (1) JP7541395B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006252128A (en) 2005-03-10 2006-09-21 Shimizu Corp Slope failure prediction and evacuation information transmission system to surrounding area
JP2022124532A (en) 2021-02-16 2022-08-26 株式会社フジタ Construction record data management system
JP2022126365A (en) 2021-02-18 2022-08-30 株式会社東芝 Evacuation planning apparatus, method, and program

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006252128A (en) 2005-03-10 2006-09-21 Shimizu Corp Slope failure prediction and evacuation information transmission system to surrounding area
JP2022124532A (en) 2021-02-16 2022-08-26 株式会社フジタ Construction record data management system
JP2022126365A (en) 2021-02-18 2022-08-30 株式会社東芝 Evacuation planning apparatus, method, and program

Also Published As

Publication number Publication date
JP2024109187A (en) 2024-08-14

Similar Documents

Publication Publication Date Title
Baharuddin et al. The record-setting flood of 2014 in Kelantan: challenges and recommendations from an emergency medicine perspective and why the medical campus stood dry
Görmez et al. Locating disaster response facilities in Istanbul
Paul et al. Location-allocation planning of stockpiles for effective disaster mitigation
Jacques et al. Resilience of the Canterbury hospital system to the 2011 Christchurch earthquake
Lu et al. Robust vertex p-center model for locating urgent relief distribution centers
JPH1185853A (en) Disaster recovery response system
Grass et al. An accelerated L-shaped method for solving two-stage stochastic programs in disaster management
Cao et al. Modern emergency management
EP2801060A2 (en) Methods and apparatus for high performance design of a project
Anan et al. Experience from the Great East Japan Earthquake response as the basis for revising the Japanese Disaster Medical Assistance Team (DMAT) training program
Chen et al. Modeling and simulation of a hospital evacuation before a forecasted flood
Setyonugroho et al. Policy implementation model review of the post-disaster housing reconstruction in Indonesia case study: Aceh, Yogyakarta, and Lombok
Pei et al. Resilience assessment of the interdependent transportation–healthcare system during emergency response
Ugwu et al. Postdisaster recovery planning for interdependent infrastructure systems prioritizing the functionality of healthcare facilities
JP7541395B2 (en) Planning device, planning method, and planning program
Hu et al. Integrated design of emergency shelter and medical networks considering diurnal population shifts in urban areas
Oni Hospitality industry resilience strengthened through US government partnerships supporting tourism infrastructure, workforce training, and emergency preparedness
Edwards et al. The Wolfson Prize: designing the hospital of the future
Tommelein et al. No single takt planning method fits all projects
JP2014059777A (en) Foothold coordination system, foothold coordination method, and program
Richardson Collaborative Resilience: Integrating Departmental Functions for Campus Emergency Preparedness and Business Continuity
Khorram-Manesh et al. Can hotels be used as alternative care sites in disasters and public health emergencies—a narrative review
Born et al. Disaster management response guidelines for departments of orthopaedic surgery
Yeh et al. Disaster planning in a health sciences library: A grant-funded approach
Trunkey US trauma center preparation for a terrorist attack in the community

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230201

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240409

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240528

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240806

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240808

R150 Certificate of patent or registration of utility model

Ref document number: 7541395

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150