JP7541473B2 - Construction work management support device and construction work management support program - Google Patents
Construction work management support device and construction work management support program Download PDFInfo
- Publication number
- JP7541473B2 JP7541473B2 JP2020204509A JP2020204509A JP7541473B2 JP 7541473 B2 JP7541473 B2 JP 7541473B2 JP 2020204509 A JP2020204509 A JP 2020204509A JP 2020204509 A JP2020204509 A JP 2020204509A JP 7541473 B2 JP7541473 B2 JP 7541473B2
- Authority
- JP
- Japan
- Prior art keywords
- information
- distribution
- construction work
- management support
- storage unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims description 99
- 238000009826 distribution Methods 0.000 claims description 93
- 238000003860 storage Methods 0.000 claims description 93
- 238000007726 management method Methods 0.000 claims description 60
- 238000000034 method Methods 0.000 claims description 26
- 238000010586 diagram Methods 0.000 description 18
- 238000004891 communication Methods 0.000 description 8
- 230000006870 function Effects 0.000 description 7
- 238000009430 construction management Methods 0.000 description 6
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 2
- 239000000284 extract Substances 0.000 description 2
- 239000004973 liquid crystal related substance Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- KNMAVSAGTYIFJF-UHFFFAOYSA-N 1-[2-[(2-hydroxy-3-phenoxypropyl)amino]ethylamino]-3-phenoxypropan-2-ol;dihydrochloride Chemical compound Cl.Cl.C=1C=CC=CC=1OCC(O)CNCCNCC(O)COC1=CC=CC=C1 KNMAVSAGTYIFJF-UHFFFAOYSA-N 0.000 description 1
- 208000014633 Retinitis punctata albescens Diseases 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000004801 process automation Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、建設工事管理支援装置、及び建設工事管理プログラムに関する。 The present invention relates to a construction work management support device and a construction work management program.
特許文献1には、業務処理上の注意提示条件を記憶するメモリと表示装置とを有する中央処理装置が、業務処理状況と注意提示条件とを比較し、条件に合致する場合は注意情報をユーザに提示することが記載されている。
また、特許文献2には、技術情報を作成し改善する提供端末の情報をサーバに記憶させ、利用者の技術要求端末にダウンロードして、必要な技術情報を得ることが記載されている。
また、特許文献3には、生産管理情報と生産に関する技術情報とを互いに参照可能に管理して、効率的な生産に寄与することが記載されている。
Patent document 1 describes a central processing unit having a memory for storing warning presentation conditions for business processing and a display device, which compares the business processing status with the warning presentation conditions, and presents warning information to the user if the conditions are met.
Furthermore, Patent Document 2 describes a method in which information on a provider terminal that creates and improves technical information is stored in a server and downloaded to a user's technical request terminal to obtain the required technical information.
Furthermore, Japanese Patent Laid-Open No. 2003-233693 describes a method for contributing to efficient production by managing production management information and production-related technical information in a mutually referable manner.
ところで、サーバ上には有用な情報が公開されているが、情報の所在がわからない、検索に手間がかかるといった点から、十分に活用されていない。また、建設工事の着工時にプロジェクトに応じた情報を提供しても、各工種の担当者が情報を必要とする時期までにタイムラグがあり、情報の散逸・アップデートに漏れが発生する。 Although useful information is available on the server, it is not being fully utilized because people do not know where the information is located and searching for it is time-consuming. Furthermore, even if information is provided for a project when construction work begins, there is a time lag before the people in charge of each type of work need the information, resulting in the information being dispersed and not being updated.
本発明は、建設工事の各工種で必要な情報を、必要な人に配信することが可能となり、自ら必要な情報を探す場合に比べ、業務効率を向上させることを可能にすることを目的とする。 The purpose of this invention is to make it possible to distribute the necessary information for each type of construction work to those who need it, thereby improving work efficiency compared to when people have to search for the necessary information themselves.
上記目的を達成するために、第1の態様の建設工事管理支援装置は、建設工事の各工種で参照される情報を配信する条件を記憶する条件記憶部と、前記情報を前記配信する宛先を記憶する宛先記憶部と、前記情報を記憶する情報記憶部と、前記条件に従って、前記情報記憶部から前記情報を取得し、前記宛先に前記配信を実行する制御部と、を備える。 To achieve the above object, the construction work management support device of the first aspect includes a condition storage unit that stores conditions for distributing information referenced in each type of construction work, a destination storage unit that stores a destination to which the information is to be distributed, an information storage unit that stores the information, and a control unit that acquires the information from the information storage unit according to the conditions and executes the distribution to the destination.
第1の態様によれば、建設工事の各工種で必要な情報を、必要な人に配信することが可能となり、自ら必要な情報を探す場合に比べ、業務効率を向上させることができる。また、情報が見つけやすくなり、情報を有効活用することができる。 According to the first aspect, it becomes possible to distribute the necessary information for each type of construction work to those who need it, which improves work efficiency compared to when people search for the necessary information themselves. In addition, it becomes easier to find information, and the information can be used more effectively.
第2の態様の建設工事管理支援装置は、前記情報は、必要に応じて更新が可能であり、前記制御部は、前記配信時の前記更新の日時が最新の前記情報を配信することを特徴とする。 The second aspect of the construction work management support device is characterized in that the information can be updated as necessary, and the control unit distributes the information with the most recent update date and time at the time of distribution.
第2の態様によれば、アップデートされた最新の情報を配信することが可能となる。 According to the second aspect, it is possible to distribute the latest updated information.
第3の態様の建設工事管理支援装置は、前記条件には、前記情報毎の前記配信が実行されるタイミングが含まれる。 In the third aspect of the construction work management support device, the conditions include the timing at which the distribution of each piece of information is performed.
第3の態様によれば、情報が必要なタイミングで配信することが可能となり、前もって全て配信する場合に比べ、情報の散逸や見逃しを防止することが可能となる。 According to the third aspect, it is possible to distribute information at the required timing, which makes it possible to prevent information from being lost or overlooked, compared to when all information is distributed in advance.
第4の態様の建設工事管理支援装置は、建設工事の施工計画に基づいて作成され、各工程に前記工種が対応づけられた工程表を記憶する工程表記憶部を備え、前記制御部は、前記工程表から前記情報毎の前記配信が実行されるタイミングを取得する。 The construction work management support device of the fourth aspect includes a schedule storage unit that stores a schedule that is created based on the construction work execution plan and in which the work type is associated with each process, and the control unit obtains the timing for executing the distribution of each piece of information from the schedule.
第4の態様によれば、予め工程に工種を記憶させておくことで、当該工程表を読み込めば、情報の配信タイミングが取得されるため、情報の配信時期を入力する手間を省くことが可能となる。 According to the fourth aspect, by storing the work type in the process in advance, the timing of information distribution can be obtained by reading the process schedule, which eliminates the need to input the time for information distribution.
第5の態様の建設工事管理支援装置は、前記配信は、前記建設工事毎に対応した配信記憶部に前記取得した前記情報を記憶し、当該記憶された前記配信記憶部のアドレスを報知するメールを送信することにより行われる。 In the fifth aspect of the construction work management support device, the distribution is performed by storing the acquired information in a distribution memory unit corresponding to each construction work, and sending an email informing the address of the distribution memory unit where the information is stored.
第5の態様によれば、配信記憶部のアドレスをメールで配信することにより、情報のデータを直接渡す場合に比べ、情報を受け取るユーザの情報管理負荷の軽減及び情報の漏洩を防止することが可能となる。 According to the fifth aspect, by delivering the address of the delivery storage unit by email, it is possible to reduce the information management burden on the user receiving the information and prevent information leaks, compared to when the information data is directly handed over.
第6の態様の建設工事管理支援装置は、前記配信は、複数の前記情報を前記工種毎に分けて行われることを特徴とする。 The sixth aspect of the construction work management support device is characterized in that the distribution is performed by dividing the multiple pieces of information by the work type.
第6の態様によれば、工種毎に分けて配信されることにより、単に情報が配信される場合に比べ、情報が整理され、工種毎の作業に必要な情報を見つけやすくすることが可能となる。 According to the sixth aspect, by distributing information by type of work, the information is organized better than when information is simply distributed, making it easier to find the information needed for each type of work.
第7の態様の建設工事管理支援装置は、前記制御部は、アドレス帳から予め定められた人物のアドレスを抽出し、前記宛先に追加可能であることを特徴とする。 The seventh aspect of the construction work management support device is characterized in that the control unit is capable of extracting the address of a predetermined person from an address book and adding it to the destination.
第7の態様によれば、配信する必要がある人物が漏れることなく、配信を行うことが可能となる。また、宛先に追加する作業をすることなく、宛先を追加することが可能となる。 According to the seventh aspect, it is possible to distribute to all people who need to receive the message. It is also possible to add a destination without having to go through the trouble of adding the destination.
第8の態様の建設工事管理支援装置は、前記制御部は、前記配信後、予め定められた管理者に前記配信が完了した旨を報知する配信完了メールを送信することを特徴とする。 The eighth aspect of the construction work management support device is characterized in that, after the distribution, the control unit sends a distribution completion email to a predetermined manager to notify that the distribution has been completed.
第8の態様によれば、管理者が、配信が完了したことを管理することが可能となる。 According to the eighth aspect, the administrator can manage the completion of distribution.
第9態様に係る建設工事管理支援プログラムは、コンピュータを、第1態様~第8態様のいずれか1に記載の建設工事管理支援装置として機能させる。 The construction work management support program according to the ninth aspect causes a computer to function as a construction work management support device according to any one of the first to eighth aspects.
第9の態様によれば、建設工事の各工種で必要な情報を、必要な人に配信することが可能となり、自ら必要な情報を探す場合に比べ、業務効率を向上させることができる、建設工事管理支援プログラムを提供することができる。また、情報が見つけやすくなり、情報を有効活用することができる、建設工事管理支援プログラムを提供することができる。 According to the ninth aspect, a construction work management support program can be provided that makes it possible to distribute information required for each type of construction work to those who need it, thereby improving work efficiency compared to when users search for the necessary information themselves. It is also possible to provide a construction work management support program that makes it easier to find information and allows the information to be used effectively.
本発明によれば、建設工事の各工種で必要な情報を、必要な人に配信することが可能となり、自ら必要な情報を探す場合に比べ、業務効率を向上させることができる。また、情報が見つけやすくなり、情報を有効活用することができる、という効果が得られる。 According to the present invention, it is possible to distribute the necessary information for each type of construction work to the people who need it, which improves work efficiency compared to when people search for the necessary information themselves. In addition, it has the effect of making information easier to find and allowing the information to be used effectively.
以下、本開示の実施形態の一例を、図面を参照しつつ説明する。なお、各図面において同一又は等価な構成要素および部分には同一の参照符号を付与している。また、図面の寸法比率は、説明の都合上誇張されており、実際の比率とは異なる場合がある。 Below, an example of an embodiment of the present disclosure will be described with reference to the drawings. Note that the same reference symbols are used in each drawing to identify identical or equivalent components and parts. Also, the dimensional ratios in the drawings have been exaggerated for the convenience of explanation and may differ from the actual ratios.
図1は、本実施形態に係る建設工事管理支援システム10の概略構成を示す図である。 Figure 1 is a diagram showing the general configuration of the construction work management support system 10 according to this embodiment.
図1に示すように、建設工事管理支援システム10は、クライアント100と、建設工事管理支援装置(サーバ装置)200とが、ネットワークなどの通信手段に接続されて構成されている。なお、通信手段としては、後述するように、イントラネット、インターネットやイーサネット(登録商標)などの各種ネットワークを適用することができる。また、図1では、クライアント100を5台と、建設工事管理支援装置(サーバ装置)200を1台の例を示しているが、この数に限定するものではない。また、クライアント100は、建設工事管理支援システム10の管理者が使用するクライアント100と、作業所のユーザが使用するクライアント100と、を含む。ここで、建設工事管理支援システム10の管理者が使用するクライアント100は、本実施形態では、当該建設工事管理支援システム10の管理者が、後述する条件記憶部300や宛先記憶部310、情報記憶部320に記憶される情報の更新などを行うものである。また、作業所のユーザが使用するクライアント100は、本実施形態では、作業所のユーザが、後述する条件記憶部300の記憶される条件や宛先記憶部310に記憶される宛先の更新などを行うものである。また、建設工事管理支援装置(サーバ装置)200は、クラウドサーバであっても良い。 As shown in FIG. 1, the construction management support system 10 is configured by connecting a client 100 and a construction management support device (server device) 200 to a communication means such as a network. As described later, various networks such as an intranet, the Internet, and Ethernet (registered trademark) can be applied as the communication means. In addition, in FIG. 1, an example of five clients 100 and one construction management support device (server device) 200 is shown, but this number is not limited to this. In addition, the client 100 includes a client 100 used by the administrator of the construction management support system 10 and a client 100 used by a user at a work site. Here, in this embodiment, the client 100 used by the administrator of the construction management support system 10 is used by the administrator of the construction management support system 10 to update information stored in the condition storage unit 300, destination storage unit 310, and information storage unit 320 described later. In this embodiment, the client 100 used by the user at the work site is used by the user at the work site to update conditions stored in the condition storage unit 300 and destinations stored in the destination storage unit 310, which will be described later. The construction work management support device (server device) 200 may also be a cloud server.
図2は、クライアント100のハードウェア構成を示すブロック図である。 Figure 2 is a block diagram showing the hardware configuration of client 100.
図2に示すように、クライアント100は、CPU(Central Processing Unit)101、ROM(Read Only Memory)102、RAM(Random Access Memory)103、ストレージ104、通信インタフェース105、入力部106および表示部107を有する。各構成は、バス108を介して相互に通信可能に接続されている。 As shown in FIG. 2, the client 100 has a CPU (Central Processing Unit) 101, a ROM (Read Only Memory) 102, a RAM (Random Access Memory) 103, a storage 104, a communication interface 105, an input unit 106, and a display unit 107. Each component is connected to each other via a bus 108 so as to be able to communicate with each other.
CPU101は、中央演算処理ユニットであり、各種プログラムを実行したり、各部を制御したりする。すなわち、CPU101は、ROM102又はストレージ104からプログラムを読み出し、RAM103を作業領域としてプログラムを実行する。CPU101は、ROM102又はストレージ104に記録されているプログラムにしたがって、上記各構成の制御および各種の演算処理を行う。本実施形態では、ROM102又はストレージ104には、プログラム又はデータが格納されている。 The CPU 101 is a central processing unit that executes various programs and controls each part. That is, the CPU 101 reads a program from the ROM 102 or storage 104, and executes the program using the RAM 103 as a working area. The CPU 101 controls each of the above components and performs various calculation processes according to the program recorded in the ROM 102 or storage 104. In this embodiment, the ROM 102 or storage 104 stores programs or data.
ROM102は、各種プログラムおよび各種データを格納する。RAM103は、作業領域として一時的にプログラム又はデータを記憶する。ストレージ104は、HDD(Hard Disk Drive)、又はSSD(Solid State Drive)により構成され、オペレーティングシステムを含む各種プログラム、および各種データを格納する。 ROM 102 stores various programs and various data. RAM 103 temporarily stores programs or data as a working area. Storage 104 is composed of a HDD (Hard Disk Drive) or SSD (Solid State Drive) and stores various programs including an operating system and various data.
通信インタフェース105は、建設工事管理支援装置(サーバ装置)200等の他の機器と通信するためのインタフェースであり、例えば、イントラネット、インターネット、イーサネット(登録商標)、FDDI、Wi-Fi(登録商標)等の規格が用いられる。 The communication interface 105 is an interface for communicating with other devices such as the construction work management support device (server device) 200, and uses standards such as intranet, internet, Ethernet (registered trademark), FDDI, and Wi-Fi (registered trademark).
入力部106は、マウス等のポインティングデバイス、およびキーボードを含み、各種の入力を行うために使用される。 The input unit 106 includes a pointing device such as a mouse and a keyboard, and is used to perform various inputs.
また、建設工事管理支援システム10の管理者が、入力部106を用いて建設工事管理支援装置(サーバ装置)200にアクセスし、条件記憶部300や宛先記憶部310、情報記憶部320に記憶される情報の更新などを行う。また、作業所のユーザが、入力部106を用いて建設工事管理支援装置(サーバ装置)200にアクセスし、条件記憶部300に記憶される条件や宛先記憶部310に記憶される宛先の更新や、配信部240により配信された情報の取得を行う。 The administrator of the construction work management support system 10 uses the input unit 106 to access the construction work management support device (server device) 200, and updates the information stored in the condition storage unit 300, destination storage unit 310, and information storage unit 320. The user at the work site uses the input unit 106 to access the construction work management support device (server device) 200, and updates the conditions stored in the condition storage unit 300 and the destinations stored in the destination storage unit 310, and obtains the information distributed by the distribution unit 240.
表示部107は、たとえば、液晶ディスプレイであり、CPU101の制御に基づき各種の情報を表示する。本実施形態では、表示部107は、情報の更新などの際に更新される情報を表示したり、配信部240により配信された情報を表示したりする。また、表示部107は、タッチパネル方式を採用して、入力部106として機能しても良い。 The display unit 107 is, for example, a liquid crystal display, and displays various information under the control of the CPU 101. In this embodiment, the display unit 107 displays information to be updated when updating information, and displays information distributed by the distribution unit 240. The display unit 107 may also function as the input unit 106 by employing a touch panel system.
図3は、建設工事管理支援装置(サーバ装置)200のハードウェア構成を示すブロック図である。 Figure 3 is a block diagram showing the hardware configuration of the construction work management support device (server device) 200.
図3に示すように、建設工事管理支援装置(サーバ装置)200は、CPU201、ROM202、RAM203、記憶部(ストレージ)204、通信インタフェース205を有する。各構成は、バス206を介して相互に通信可能に接続されている。 As shown in FIG. 3, the construction work management support device (server device) 200 has a CPU 201, a ROM 202, a RAM 203, a memory unit (storage) 204, and a communication interface 205. Each component is connected to each other so that they can communicate with each other via a bus 206.
CPU201は、中央演算処理ユニットであり、各種プログラムを実行したり、各部を制御したりする。すなわち、CPU201は、ROM202又は記憶部(ストレージ)204からプログラムを読み出し、RAM203を作業領域としてプログラムを実行する。CPU201は、ROM202又は記憶部(ストレージ)204に記録されているプログラムにしたがって、上記各構成の制御および各種の演算処理を行う。本実施形態では、ROM202又は記憶部(ストレージ)204には、プログラムと各種データベースが格納されている。 The CPU 201 is a central processing unit that executes various programs and controls each part. That is, the CPU 201 reads a program from the ROM 202 or the memory unit (storage) 204, and executes the program using the RAM 203 as a working area. The CPU 201 controls each of the above components and performs various calculation processes according to the program recorded in the ROM 202 or the memory unit (storage) 204. In this embodiment, the ROM 202 or the memory unit (storage) 204 stores programs and various databases.
ROM202は、各種プログラムおよび各種データを格納する。RAM203は、作業領域として一時的にプログラム又はデータを記憶する。記憶部(ストレージ)204は、HDD又はSSDにより構成され、オペレーティングシステムを含む各種プログラム、および各種データを格納する。かかるプログラムには、RPA(Robotic Process Automation)が含まれる。RPAは、技術情報の配信処理等を自動で行うように形成された所謂ソフトウェアロボットであり、後述の手順を自動的に実行するようにプログラムされたものである。 The ROM 202 stores various programs and various data. The RAM 203 temporarily stores programs or data as a working area. The memory unit (storage) 204 is composed of an HDD or SSD, and stores various programs including an operating system, and various data. Such programs include RPA (Robotic Process Automation). RPA is a so-called software robot that is configured to automatically perform processes such as the distribution of technical information, and is programmed to automatically execute the procedures described below.
通信インタフェース205は、クライアント100等の他の機器と通信するためのインタフェースであり、例えば、イントラネット、インターネット、イーサネット(登録商標)、FDDI、Wi-Fi(登録商標)等の規格が用いられる。 The communication interface 205 is an interface for communicating with other devices such as the client 100, and uses standards such as intranet, internet, Ethernet (registered trademark), FDDI, and Wi-Fi (registered trademark).
なお、建設工事管理支援装置(サーバ装置)200には、その他、マウス等のポインティングデバイス、およびキーボードなどの、各種の入力を行うために使用される入力部や、液晶ディスプレイなどの、各種の情報を表示する表示部を備えても良い。 The construction work management support device (server device) 200 may also be equipped with an input unit, such as a pointing device like a mouse, a keyboard, etc., used for various inputs, and a display unit, such as a liquid crystal display, for displaying various information.
建設工事管理支援装置(サーバ装置)200の記憶部(ストレージ)204には、図4に示すように、条件記憶部300、宛先記憶部310、情報記憶部320、仕分け記憶部330、配信記憶部340としての記憶領域を有し、各種データを格納する。 The memory unit (storage) 204 of the construction work management support device (server device) 200 has memory areas as a condition memory unit 300, a destination memory unit 310, an information memory unit 320, a sorting memory unit 330, and a distribution memory unit 340, as shown in FIG. 4, and stores various data.
なお、建設工事管理支援装置(サーバ装置)200は、1つの建設工事管理支援装置(サーバ装置)200の記憶部204に、これらの条件記憶部300、宛先記憶部310、情報記憶部320、仕分け記憶部330、配信記憶部340としての記憶領域を有する場合に限定されず、複数の建設工事管理支援装置(サーバ装置)200に分けて有するようにしても良い。 The construction work management support device (server device) 200 is not limited to having the memory areas for the condition memory unit 300, destination memory unit 310, information memory unit 320, sorting memory unit 330, and distribution memory unit 340 in the memory unit 204 of a single construction work management support device (server device) 200, but may have these memory areas divided among multiple construction work management support devices (server devices) 200.
条件記憶部300は、建設工事毎に、当該建設工事の各工種で参照される情報を配信する条件を記憶するものである。かかる条件に基づいて制御部210(図10参照)により配信が行われる。ここで、工種は、具体的な名称は図示していないが、「土工事」や「コンクリート工事」、「鉄筋工事」などが該当する。条件記憶部300は、具体的には、図5における「配信予定」フォルダが相当するが、これに限定されず、条件が記憶されるフォルダは特に限定されない。 The condition storage unit 300 stores, for each construction work, the conditions for distributing information referenced by each type of work in that construction work. Distributing is performed by the control unit 210 (see FIG. 10) based on these conditions. Here, although specific names of the types of work are not shown, they include "earthwork," "concrete work," and "reinforcing bar work." Specifically, the condition storage unit 300 corresponds to the "Scheduled distribution" folder in FIG. 5, but is not limited to this, and the folder in which the conditions are stored is not particularly limited.
ここで、図7を用いて、条件記憶部300に記憶される情報ついて説明する。
図7は、工事コード「1000123」、プロジェクトコード「P140017」、工事名「○○ビル」(図9参照)の建設工事の条件記憶部300に記憶されている条件の一例を示す説明図である。配信の条件には、各工種で参照される情報毎の配信が実行されるタイミングが含まれる。すなわち、図7に示すように、例えば、工種A~Cは2020年4月に配信され、工種Dは2020年5月と6月に配信されるように条件が設定されている。かかる設定は、クライアント(作業所)100の入力部106を使用して、配信を望むユーザが行うものであるが、クライアント(管理者)100の入力部106を使用して建設工事管理支援システム10の管理者が行っても良い。ここで、図7の「○」は配信が実行されるタイミングであることを示しており、空欄は配信が実行されないことを示している。また、図7は、図5における「配信予定」フォルダに保存されている「情報配信予定表.xlsx」の一例である。
Here, the information stored in the condition storage unit 300 will be described with reference to FIG.
FIG. 7 is an explanatory diagram showing an example of conditions stored in the condition storage unit 300 for a construction work with a construction code of "1000123", a project code of "P140017", and a construction name of "XX Building" (see FIG. 9). The conditions for distribution include the timing at which the distribution of each piece of information referenced by each construction type is executed. That is, as shown in FIG. 7, for example, the conditions are set so that construction types A to C are distributed in April 2020, and construction type D is distributed in May and June 2020. Such settings are made by a user who desires distribution using the input unit 106 of the client (workplace) 100, but may also be made by the administrator of the construction work management support system 10 using the input unit 106 of the client (administrator) 100. Here, "○" in FIG. 7 indicates the timing at which distribution is executed, and a blank space indicates that distribution is not executed. FIG. 7 is also an example of "information distribution schedule.xlsx" saved in the "distribution schedule" folder in FIG. 5.
そして、各工種で参照される情報は、図8に示すように、情報毎にどの工種で参照されるかが指定されている。例えば、「AAについて」という情報は、工種Bで参照されることが指定されており、「BBについて」という情報は、工種Aと工種Nとで参照されることが指定されている。 As shown in Figure 8, the information referenced by each work type is specified for each piece of information as to which work type it is referenced by. For example, information "Regarding AA" is specified to be referenced by work type B, and information "Regarding BB" is specified to be referenced by work types A and N.
ここで、図8の「○」は、各工種で参照されることが指定されていることを示しており、空欄は参照されないことを示している。具体的には、2020年4月に配信される情報は、工種A~Cで配信されることが指定されている「AAについて」、「BBについて」、「CCについて」、「DDについて」、「FFについて」、「LLについて」、「ZZについて」である。また、2020年5月に配信される情報は、工種Dで配信されることが指定されている「DDについて」、「GGについて」、「JJについて」、「ZZについて」である。かかる指定は、クライアント(管理者)100の入力部106を用いて、建設工事管理支援システム10の管理者が行うものであるが、クライアント(作業者)100の入力部106を用いて、配信を望むユーザが行っても良い。また、図8は、図6における「INPUT」フォルダに保存されている「情報シート.xlsx」の一例である。 Here, the "○" in FIG. 8 indicates that it is specified to be referenced for each work type, and a blank indicates that it is not referenced. Specifically, the information to be distributed in April 2020 is "About AA," "About BB," "About CC," "About DD," "About FF," "About LL," and "About ZZ," which are specified to be distributed for work types A to C. Also, the information to be distributed in May 2020 is "About DD," "About GG," "About JJ," and "About ZZ," which are specified to be distributed for work type D. Such designation is made by the administrator of the construction work management support system 10 using the input unit 106 of the client (administrator) 100, but may also be made by a user who desires the distribution using the input unit 106 of the client (worker) 100. Also, FIG. 8 is an example of "Information Sheet.xlsx" saved in the "INPUT" folder in FIG. 6.
宛先記憶部310は、建設工事毎に情報を配信する宛先としてメールアドレスを記憶するものである。
ここで、図9A、図9Bを用いて、宛先記憶部310に記憶される情報について説明する。
The destination storage unit 310 stores email addresses as destinations to which information is to be distributed for each construction project.
Here, the information stored in destination storage unit 310 will be described with reference to FIGS. 9A and 9B. FIG.
図9Aは、宛先記憶部310に記憶されている情報の一例を示す説明図である。例えば、工事コード「1000123」、プロジェクトコード「P140017」、工事名「○○ビル」では、メールアドレス「xxx@aaa.co.jp」、「yyy@aaa.co.jp」、「vvv@aaa.co.jp」に情報を配信することが記憶されている。かかるメールアドレスの入力は、クライアント(作業所)100の入力部106を用いて、配信を望むユーザが行うものであるが、予め定められた人物については、制御部210が、別途記憶されているアドレス帳から当該予め定められた人物のアドレスを抽出し、宛先に追加することが可能である。すなわち、予め定められた人物、例えば、作業所長やグループリーダーなどは、初期設定としてユーザが宛先に追加する作業をすることなく、宛先に追加することが可能となり、配信する必要がある人物について漏れることなく、配信を行うことが可能となる。また、図9A、図6における「INPUT」フォルダに保存されている「工事コード一覧.xlsx」の一例である。また、宛先記憶部310は、具体的には、図6における「INPUT」フォルダが相当するが、これに限定されず、宛先が記憶されるフォルダは特に限定されない。 9A is an explanatory diagram showing an example of information stored in the destination storage unit 310. For example, for construction code "1000123", project code "P140017", and construction name "XX Building", it is stored that information is to be delivered to the email addresses "xxx@aaa.co.jp", "yyy@aaa.co.jp", and "vvv@aaa.co.jp". The email address is input by the user who wishes to receive the information using the input unit 106 of the client (workplace) 100, but for predetermined people, the control unit 210 can extract the address of the predetermined person from a separately stored address book and add it to the destination. In other words, predetermined people, such as the work site manager and group leader, can be added to the destination without the user having to add them to the destination as an initial setting, making it possible to deliver to all people who need to be delivered. Also, FIG. 9A is an example of "Construction Code List.xlsx" saved in the "INPUT" folder in FIG. 6. In addition, the destination storage unit 310 specifically corresponds to the "INPUT" folder in FIG. 6, but is not limited to this, and there is no particular limit to the folder in which destinations are stored.
なお、複数の建設工事の宛先を1つの表で管理すると、宛先の管理や、宛先の入力がし難いため、図9Bに示すように、建設工事毎に表を用意し、クライアント(作業所)100の入力部106を用いて、図9Bに示す表に入力し、建設工事管理支援システム10の管理者が図9Aに示す表に入力し直したり、RPAが図9Bに示す表から図9Aに示す表に入力したりしても良い。 Note that if the destinations for multiple construction projects are managed in one table, it is difficult to manage and input the destinations. Therefore, as shown in FIG. 9B, a table can be prepared for each construction project, and data can be entered into the table shown in FIG. 9B using the input unit 106 of the client (workplace) 100. The administrator of the construction project management support system 10 can then re-enter data into the table shown in FIG. 9A, or the RPA can enter data from the table shown in FIG. 9B into the table shown in FIG. 9A.
情報記憶部320は、配信される情報を記憶するものである。本実施形態では、イントラネット上の建設工事管理支援装置(サーバ装置)200の所定フォルダに記憶されており、図8に示すように当該イントラネット上のURLで特定されている。かかるURLは建設工事管理支援システム10の管理者によりメンテナンスされており、情報が移動した場合、削除された場合、ファイル名が変更された場合など、適宜変更されている。 The information storage unit 320 stores the information to be distributed. In this embodiment, the information is stored in a specified folder in the construction work management support device (server device) 200 on the intranet, and is identified by a URL on the intranet as shown in Figure 8. Such a URL is maintained by the administrator of the construction work management support system 10, and is changed as appropriate when information is moved, deleted, the file name is changed, etc.
また、情報記憶部320に記憶される情報は、各情報担当者によって必要に応じて更新が可能なものである。そのため、後述するように、配信部240は、配信時の更新の日時が最新の情報を配信する。 In addition, the information stored in the information storage unit 320 can be updated by each information manager as necessary. Therefore, as described below, the distribution unit 240 distributes information with the most recent update date and time at the time of distribution.
仕分け記憶部330は、後述する仕分け部220により仕分けられた情報が記憶されるものである。
ここで、図6を用いて、仕分け記憶部330について説明する。
図6は、仕分け記憶部330の一例を示す説明図である。仕分け記憶部330は、建設工事毎に対応したフォルダ、本実施形態では、イントラネット上の建設工事管理支援装置(サーバ装置)200の所定フォルダが指定されている。具体的には、プロジェクトコード毎に、フォルダが分けられている。例えば、プロジェクトコード「P140017」に関する配信は、「P140017」フォルダの下層に作成されるフォルダに配信される。そして、各プロジェクトコードのフォルダの下層に、工種毎のフォルダが作成される。また、かかる工種毎のフォルダは、後述する仕分け部220により作成される。
The sorting storage unit 330 stores information sorted by the sorting unit 220, which will be described later.
Here, the sorting storage unit 330 will be described with reference to FIG.
FIG. 6 is an explanatory diagram showing an example of the sorting storage unit 330. In the sorting storage unit 330, folders corresponding to each construction work, in this embodiment, a predetermined folder of the construction work management support device (server device) 200 on the intranet, are specified. Specifically, folders are separated for each project code. For example, a message related to project code "P140017" is sent to a folder created below the "P140017" folder. Then, a folder for each type of work is created below the folder for each project code. Moreover, such folders for each type of work are created by the sorting unit 220, which will be described later.
かかる工種毎のフォルダについて具体的に説明する。具体的には、「情報シート.xlsx」に登録されている全ての情報が工種毎に仕分けられ、記憶される。例えば、工種Aのフォルダに、工種Aで配信されることが指定されている「BBについて」、「FFについて」、「ZZについて」が工種Aのフォルダに仕分けられ、記憶される。また、工種Bで配信されることが指定されている「AAについて」、「CCについて」、「ZZについて」が工種Bのフォルダに仕分けられ、記憶される。そして、かかる仕分けと記憶が、全ての工種(工種A~工種N)について行われる。また、かかる仕分けの際に、後述するリネーム部230によりファイル名の変更が行われる。すなわち、例えば「AAについて」というファイル名は、元々は「aa」というファイル名であるが(図8のURL参照)、作業所のユーザが分かり難いため、ファイル名を変更するようにしている。 The folders for each work type will be described in detail. Specifically, all information registered in "Information Sheet.xlsx" is sorted and stored by work type. For example, "About BB", "About FF", and "About ZZ", which are specified to be distributed in work type A, are sorted and stored in the work type A folder. Also, "About AA", "About CC", and "About ZZ", which are specified to be distributed in work type B, are sorted and stored in the work type B folder. Then, such sorting and storage are performed for all work types (work types A to N). Also, during such sorting, the file name is changed by the renaming unit 230 described later. That is, for example, the file name "About AA" was originally "aa" (see URL in FIG. 8), but the file name is changed because it is difficult for users at the work site to understand.
なお、全ての工種について仕分けと記憶が行われる場合に限定されず、条件記憶部300により当該月に配信されることが指定されている情報のみを抽出して、仕分けるようにしても良い。例えば、2020年4月であれば、工種A~Cで配信されることが指定されている情報のみを抽出して仕分けるようにしても良い。また、仕分け記憶部330を設けず、条件記憶部300により当該月に配信されることが指定されている情報を抽出して仕分け部220による仕分けとリネーム部230によるリネームとを行った後、配信記憶部340に記憶させるようにしても良い。 Note that sorting and storage is not limited to the case where all work types are sorted and stored, and only information that is specified by the condition storage unit 300 to be distributed in the relevant month may be extracted and sorted. For example, in April 2020, only information that is specified to be distributed for work types A to C may be extracted and sorted. Also, without providing a sorting storage unit 330, information that is specified to be distributed in the relevant month by the condition storage unit 300 may be extracted, sorted by the sorting unit 220 and renamed by the renaming unit 230, and then stored in the distribution storage unit 340.
配信記憶部340は、後述する配信部240により配信された情報が記憶されるものである。 The distribution storage unit 340 stores information distributed by the distribution unit 240, which will be described later.
ここで、図5を用いて、配信記憶部340について説明する。
図5は、配信記憶部340の一例を示す説明図である。配信記憶部340は、建設工事毎に対応したフォルダ、本実施形態では、イントラネット上の建設工事管理支援装置(サーバ装置)200の所定フォルダが指定されている。具体的には、プロジェクトコード毎に、フォルダが分けられている。例えば、プロジェクトコード「P140017」に関する配信は、「P140017」フォルダの下層に作成されるフォルダに配信され、「P140018」に関する配信は、「P140018」フォルダの下層に作成されるフォルダに配信される。そして、各プロジェクトコードのフォルダの下層に、配信月フォルダが各月に作成される。例えば、「P140017」フォルダの下層に「配信月フォルダ(202000401分)」というフォルダが作成される。また、「配信月フォルダ」の下層に、工種毎のフォルダが作成される。また、かかる「配信月フォルダ」は、後述する配信部240により作成される。
Here, the distribution storage unit 340 will be described with reference to FIG.
FIG. 5 is an explanatory diagram showing an example of the distribution storage unit 340. In the distribution storage unit 340, a folder corresponding to each construction work, in this embodiment, a predetermined folder of the construction work management support device (server device) 200 on the intranet is specified. Specifically, a folder is divided for each project code. For example, a distribution related to the project code "P140017" is distributed to a folder created under the "P140017" folder, and a distribution related to "P140018" is distributed to a folder created under the "P140018" folder. Then, a distribution month folder is created for each month under the folder of each project code. For example, a folder called "distribution month folder (202000401)" is created under the "P140017" folder. Also, a folder for each type of work is created under the "distribution month folder". Also, such a "distribution month folder" is created by the distribution unit 240 described later.
かかる工種毎のフォルダについて具体的に説明する。
上述したように、仕分け部220により仕分けられ、工種毎に仕分けられた後、仕分け記憶部330に記憶された情報が、配信部240によりプロジェクト毎に条件記憶部300の当該月配信予定が参照されて、配信記憶部340にコピーされ、記憶される。
The folders for each type of work will now be described in detail.
As described above, after the information is sorted by the sorting unit 220 and sorted by work type, the information stored in the sorting memory unit 330 is copied and stored in the distribution memory unit 340 by the distribution unit 240, with reference to the distribution schedule for that month in the condition memory unit 300 for each project.
具体的には、上述したように、工事名「○○ビル」において、2020年4月に配信される情報は、工種A~Cで配信されることが指定されている「AAについて」、「BBについて」、「CCについて」、「DDについて」、「FFについて」、「LLについて」、「ZZについて」であり、かかる情報を工種毎、例えば、「配信月フォルダ(20200401分)」の下層に作成される「工種A」フォルダに「BBについて」、「FFについて」、「ZZについて」を、「工種B」フォルダに「AAについて」、「CCについて」、「ZZについて」を、「工種C」フォルダに「DDについて」、「LLについて」、「ZZについて」をそれぞれ記憶させる。かかる工種毎のフォルダは、配信が進むにつれて、「配信月フォルダ(20200501分)」、「配信月フォルダ(20200601分)」と増加していく。 Specifically, as described above, for the construction project named "XX Building", the information to be distributed in April 2020 is "About AA", "About BB", "About CC", "About DD", "About FF", "About LL", and "About ZZ", which are designated to be distributed for construction types A to C. For example, "About BB", "About FF", and "About ZZ" are stored in the "Construction Type A" folder created under the "Distribution Month Folder (20200401)", "About AA", "About CC", and "About ZZ" are stored in the "Construction Type B" folder, and "About DD", "About LL", and "About ZZ" are stored in the "Construction Type C" folder. As distribution progresses, the number of folders for each construction type increases to the "Distribution Month Folder (20200501)" and "Distribution Month Folder (20200601)".
建設工事管理支援装置(サーバ装置)200は、上記のハードウェア資源を用いて、各種の機能を実現する。建設工事管理支援装置(サーバ装置)200が実現する機能構成について説明する。 The construction work management support device (server device) 200 realizes various functions using the above hardware resources. The following describes the functional configuration realized by the construction work management support device (server device) 200.
図10は、建設工事管理支援装置(サーバ装置)200の機能構成の例を示すブロック図である。 Figure 10 is a block diagram showing an example of the functional configuration of the construction work management support device (server device) 200.
図10に示すように、建設工事管理支援装置(サーバ装置)200は、機能構成として、制御部210を備え、制御部210は、仕分け部220、リネーム部230、配信部240を有する。各機能構成は、CPU201がROM202又は記憶部(ストレージ)204に記憶されたプログラムを読み出し、実行することにより実現される。 As shown in FIG. 10, the construction work management support device (server device) 200 includes a control unit 210 as a functional configuration, and the control unit 210 has a sorting unit 220, a renaming unit 230, and a distribution unit 240. Each functional configuration is realized by the CPU 201 reading and executing a program stored in the ROM 202 or the memory unit (storage) 204.
制御部210は、建設工事管理支援装置(サーバ装置)200をそれぞれの手段として機能させるためのソフトウェア(コンピュータ・プログラム)であり、本実施形態では、RPAプログラムである。 The control unit 210 is software (computer program) for causing the construction work management support device (server device) 200 to function as each of the means, and in this embodiment, is an RPA program.
また、本実施形態では、仕分け部220とリネーム部230との機能を第1RPAが実行し、配信部240の機能を第2RPAが実行する。なお、第1RPAと第2RPAに分けず、1つのRPAが実行するようにしても良い。 In addition, in this embodiment, the functions of the sorting unit 220 and the renaming unit 230 are performed by the first RPA, and the functions of the distribution unit 240 are performed by the second RPA. Note that it is also possible to have one RPA perform these functions without dividing them into the first and second RPAs.
仕分け部220は、情報記憶部320から情報を取得し、取得した情報を工種毎に仕分けるものである。具体的には、工種毎に、図8に示す「○」が付いている情報をフィルタリングして抽出する。抽出した情報のURLをたどって当該情報のファイルをコピーして収集し、仕分け記憶部330の工種毎のフォルダに記憶する。ここで、仕分け部220による仕分けは、配信部240による配信の事前、例えば配信の当日の午前中や1日前などに実行されるようにしている。 The sorting unit 220 acquires information from the information storage unit 320 and sorts the acquired information by type of work. Specifically, for each type of work, it filters and extracts information marked with a "○" as shown in Figure 8. It follows the URL of the extracted information, copies and collects the file of the information, and stores it in a folder for each type of work in the sorting storage unit 330. Here, sorting by the sorting unit 220 is performed prior to distribution by the distribution unit 240, for example, in the morning on the day of distribution or one day before.
リネーム部230は、ファイル名を変更(リネーム)するものである。具体的には、リネームは、仕分け部220が仕分けした情報のファイルを仕分け記憶部330の工種毎のフォルダに記憶する際に、図8に示す情報の「資料名」「NO」「タイトル」欄に記載されている情報にリネームする。 The renaming unit 230 changes (renaming) file names. Specifically, when storing the files of information sorted by the sorting unit 220 in folders for each work type in the sorting storage unit 330, the files are renamed to the information listed in the "Material Name," "No.", and "Title" columns of the information shown in Figure 8.
なお、リネームのタイミングは、仕分け部220が仕分けした情報のファイルを工種毎のフォルダに記憶する際に行われる場合に限定されず、他のタイミング、例えば、後出する配信部240が、配信記憶部340に情報をコピーする際に行われても良い。また、リネームは、図8に示す「資料名」「NO」「タイトル」欄に記載されている情報にリネームする場合に限定されず、「資料名」「NO」「タイトル」欄に記載されている情報のいずれか1つであっても良いし、又、他から取得する情報にリネームしても良い。 The timing of renaming is not limited to when the sorting unit 220 stores the files of sorted information in folders for each work type, but may be performed at other times, for example, when the distribution unit 240 described later copies the information to the distribution storage unit 340. Furthermore, renaming is not limited to renaming to the information listed in the "Document Name", "No.", and "Title" columns shown in Figure 8, but may be any one of the information listed in the "Document Name", "No.", and "Title" columns, or may be renaming to information obtained from elsewhere.
配信部240は、宛先記憶部310に記憶された宛先に建設工事の各工種で参照される情報を配信するものである。配信は、建設工事毎に対応した配信記憶部340に、仕分け記憶部330から取得した情報を記憶し、当該記憶された配信記憶部340のアドレスを報知するメールを送信することにより行われる。 The distribution unit 240 distributes information referenced by each type of construction work to the destinations stored in the destination storage unit 310. Distribution is performed by storing information acquired from the sorting storage unit 330 in the distribution storage unit 340 corresponding to each construction work, and sending an email informing the address of the stored distribution storage unit 340.
また、配信は、図9Aから、情報配信対象プロジェクトのプロジェクトコードを参照し、当該プロジェクトコードのプロジェクトフォルダ内の条件記憶部300に記憶されている、当該プロジェクトの当該月情報配信対象工種に該当する工種の情報を、仕分け記憶部330から配信記憶部340にコピーすることで、工種毎に分けて行われる。 In addition, the distribution is performed by referencing the project code of the project for which information is to be distributed from FIG. 9A, and copying the information on the work types that correspond to the work types for which information is to be distributed for that month of the project, which is stored in the condition storage unit 300 in the project folder of that project code, from the sorting storage unit 330 to the distribution storage unit 340.
また、配信される情報は、当該配信時の更新の日時が最新の情報を配信する。
ここで、配信は、本実施形態では、条件記憶部300に記憶されたタイミングの月の月初(1日)に実行されるようにしているが、これに限定されず、他のタイミングであっても良い。また、複数の建設工事が進行中である場合は、各建設工事で配信のタイミングをずらすことで制御部210の負荷を軽減するようにしても良い。
Furthermore, the information to be distributed is the latest information with the latest update date and time at the time of distribution.
In this embodiment, the delivery is performed at the beginning of the month (the 1st) of the month whose timing is stored in the condition storage unit 300, but the delivery is not limited to this and may be performed at another timing. Also, when multiple construction works are in progress, the load on the control unit 210 may be reduced by shifting the delivery timing for each construction work.
また、配信部240は、配信後、予め定められた管理者、例えば、建設工事管理支援システム10の管理者に配信が完了した旨を報知する配信完了メールを送信するようにしている。 In addition, after distribution, the distribution unit 240 is configured to send a distribution completion email to a predetermined administrator, for example, the administrator of the construction work management support system 10, to inform the administrator that distribution has been completed.
その他、制御部210は、配信が種々のエラーにより完了できなかった場合は、建設工事管理支援システム10の管理者などの予め定められた宛先に、メールを送信し、エラーが発生していることを報知するようにしている。また、建設工事管理支援システム10の予め定められたフォルダ「OUTPUT」(図6参照)に、配信のログを記憶するようにしている。なお、配信のログは「OUTPUT」フォルダに記憶される場合に限定されず、他のフォルダであっても良い。 In addition, if the delivery cannot be completed due to various errors, the control unit 210 sends an email to a predetermined destination, such as the administrator of the construction work management support system 10, to notify the user that an error has occurred. Also, the control unit 210 stores the delivery log in a predetermined folder "OUTPUT" (see Figure 6) in the construction work management support system 10. Note that the delivery log is not limited to being stored in the "OUTPUT" folder, and may be stored in another folder.
次に、建設工事管理支援装置(サーバ装置)200の作用について説明する。 Next, we will explain the operation of the construction work management support device (server device) 200.
図11は、建設工事管理支援装置(サーバ装置)200による配信処理の流れを示すフローチャートである。CPU201がROM202又は記憶部(ストレージ)204からプログラムを読み出して、RAM203に展開して実行することにより、配信処理が行なわれる。 Figure 11 is a flowchart showing the flow of the distribution process by the construction work management support device (server device) 200. The distribution process is performed by the CPU 201 reading a program from the ROM 202 or the memory unit (storage) 204, expanding it into the RAM 203, and executing it.
まず、CPU201(仕分け部220)により、ステップS100において、配信のタイミングである月初(1日)であるか否かが判定される。月初(1日)であると判定された場合は、次のステップS101に進む。一方、月初(1日)であると判定されない場合は、再度、ステップS100となる。 First, in step S100, the CPU 201 (sorting unit 220) determines whether it is the beginning of the month (the 1st), which is the timing for distribution. If it is determined that it is the beginning of the month (the 1st), the process proceeds to the next step S101. On the other hand, if it is not determined that it is the beginning of the month (the 1st), the process returns to step S100.
ステップS101において、CPU201(仕分け部220)により、情報記憶部320から情報が取得される。そして、次のステップS102に進む。 In step S101, the CPU 201 (sorting unit 220) acquires information from the information storage unit 320. Then, the process proceeds to the next step S102.
ステップS102において、CPU201(仕分け部220)により、ステップS101において取得された情報が工種毎に仕分けられる。そして、次のステップS103に進む。 In step S102, the CPU 201 (sorting unit 220) sorts the information acquired in step S101 by work type. Then, the process proceeds to the next step S103.
ステップS103において、CPU201(リネーム部230)により、ステップS102において仕分けられた情報がリネームされる。そして、次のステップS104に進む。 In step S103, the CPU 201 (renaming unit 230) renames the information sorted in step S102. Then, the process proceeds to the next step S104.
ステップS104において、CPU201(配信部240)により、ステップS103においてリネームされた情報が、条件記憶部300に記憶された条件に従って、配信記憶部340に記憶される。そして、次のステップS105に進む。 In step S104, the information renamed in step S103 is stored in the distribution storage unit 340 by the CPU 201 (distribution unit 240) according to the conditions stored in the condition storage unit 300. Then, the process proceeds to the next step S105.
ステップS105において、CPU201(配信部240)により、配信記憶部340のアドレスが記載されたメールを宛先記憶部310により記憶された宛先に送信する。そして、次のステップS106に進む。 In step S105, the CPU 201 (distribution unit 240) sends an email containing the address of the distribution storage unit 340 to the destination stored in the destination storage unit 310. Then, the process proceeds to the next step S106.
ステップS106において、CPU201(配信部240)により、管理者に配信完了メールが送信される。そして、処理を終了する。 In step S106, the CPU 201 (distribution unit 240) sends a delivery completion email to the administrator. Then, the process ends.
なお、上記実施形態でCPU201がソフトウェア(プログラム)を読み込んで実行した処理を、CPU201以外の各種のプロセッサが実行しても良い。この場合のプロセッサとしては、FPGA(Field-Programmable Gate Array)等の製造後に回路構成を変更可能なPLD(Programmable Logic Device)、及びASIC(Application Specific Integrated Circuit)等の特定の処理を実行させるために専用に設計された回路構成を有するプロセッサである専用電気回路等が例示される。また、各処理を、これらの各種のプロセッサのうちの1つで実行してもよいし、同種又は異種の2つ以上のプロセッサの組み合わせ(例えば、複数のFPGA、及びCPUとFPGAとの組み合わせ等)で実行してもよい。また、これらの各種のプロセッサのハードウェア的な構造は、より具体的には、半導体素子等の回路素子を組み合わせた電気回路である。 In the above embodiment, the processing executed by the CPU 201 after reading the software (program) may be executed by various processors other than the CPU 201. Examples of processors in this case include a PLD (Programmable Logic Device) such as an FPGA (Field-Programmable Gate Array) whose circuit configuration can be changed after manufacture, and a dedicated electric circuit such as an ASIC (Application Specific Integrated Circuit) that is a processor having a circuit configuration designed exclusively to execute a specific process. Each process may be executed by one of these various processors, or may be executed by a combination of two or more processors of the same or different types (for example, multiple FPGAs, or a combination of a CPU and an FPGA). The hardware structure of these various processors is, more specifically, an electric circuit that combines circuit elements such as semiconductor elements.
また、上記実施形態では、各処理のプログラムがROM202又は記憶部(ストレージ)204に予め記憶(インストール)されている態様を説明したが、これに限定されない。プログラムは、CD-ROM(Compact Disk Read Only Memory)、DVD-ROM(Digital Versatile Disk Read Only Memory)、及びUSB(Universal Serial Bus)メモリ等の記録媒体に記録された形態で提供されてもよい。また、プログラムは、ネットワークを介して外部装置からダウンロードされる形態としても良い。 In the above embodiment, the programs for each process are pre-stored (installed) in the ROM 202 or the memory unit (storage) 204, but the present invention is not limited to this. The programs may be provided in a form recorded on a recording medium such as a CD-ROM (Compact Disk Read Only Memory), a DVD-ROM (Digital Versatile Disk Read Only Memory), or a USB (Universal Serial Bus) memory. The programs may also be downloaded from an external device via a network.
(変形例)
本発明は、上述した実施形態に限定されるものではなく、この発明の要旨を逸脱しない範囲内で様々な変形や応用が可能である。
(Modification)
The present invention is not limited to the above-described embodiment, and various modifications and applications are possible without departing from the spirit and scope of the present invention.
建設工事管理支援装置(サーバ装置)200の記憶部204に、工程表記憶部を更に備えても良い。かかる工程表記憶部は、建設工事の施工計画に基づいて作成され、各工程に前記工種が対応づけられた工程表を記憶するものである。かかる変形例の制御部210は、工程表が作成されると、各工程の境目である工程線をオブジェクト情報として認識し、工程表から各工種で参照される情報毎の配信が実行されるタイミングを取得する。そして、制御部210は、取得したタイミングを、「情報配信予定表.xlsx」(図7参照)に初期設定として「○」を付ける。これにより、工程表を読み込めば、情報の配信タイミングが取得されるため、情報の配信時期を入力する手間を省くことが可能となる。 The memory unit 204 of the construction work management support device (server device) 200 may further include a schedule memory unit. Such schedule memory unit stores a schedule that is created based on the construction work execution plan and in which the work type is associated with each process. When a schedule is created, the control unit 210 of this modified example recognizes the process lines that are the boundaries between each process as object information, and obtains the timing at which the information referenced by each work type will be distributed from the schedule. The control unit 210 then marks the obtained timing with a "○" as the initial setting in "information distribution schedule.xlsx" (see Figure 7). As a result, the timing of information distribution is obtained by reading the schedule, making it possible to eliminate the need to input the time for information distribution.
10 建設工事管理支援システム
100 クライアント
101 CPU
102 ROM
103 RAM
104 ストレージ
105 通信インタフェース
106 入力部
107 表示部
108 バス
200 建設工事管理支援装置(サーバ装置)
201 CPU
202 ROM
203 RAM
204 記憶部
205 通信インタフェース
206 バス
210 制御部
220 仕分け部
230 リネーム部
240 配信部
300 条件記憶部
310 宛先記憶部
320 情報記憶部
330 仕分け記憶部
340 配信記憶部
10 Construction work management support system 100 Client 101 CPU
102 ROM
103 RAM
104 Storage 105 Communication interface 106 Input unit 107 Display unit 108 Bus 200 Construction work management support device (server device)
201 CPU
202 ROM
203 RAM
204 Storage unit 205 Communication interface 206 Bus 210 Control unit 220 Sorting unit 230 Renaming unit 240 Distribution unit 300 Condition storage unit 310 Destination storage unit 320 Information storage unit 330 Sorting storage unit 340 Distribution storage unit
Claims (9)
前記情報を前記配信する宛先を記憶する宛先記憶部と、
前記情報を記憶する情報記憶部と、
前記情報記憶部から前記情報を取得し、取得した当該情報を前記工種毎に仕分ける仕分け部と、
前記条件に従って、前記仕分け部により仕分けられた前記情報を、前記宛先に前記配信を実行する制御部と、
を備える建設工事管理支援装置。 a condition storage unit that stores conditions for distributing information referenced in each type of construction work;
a destination storage unit that stores a destination to which the information is to be distributed;
An information storage unit that stores the information;
A sorting unit that acquires the information from the information storage unit and sorts the acquired information by the work type;
a control unit that executes the delivery of the information sorted by the sorting unit to the destination in accordance with the condition;
A construction work management support device equipped with the above.
前記制御部は、前記配信時の前記更新の日時が最新の前記情報を配信することを特徴とする請求項1に記載の建設工事管理支援装置。 The information can be updated as necessary;
2. The construction work management support device according to claim 1, wherein the control unit distributes the information in which the update date and time at the time of distribution is the latest.
前記制御部は、前記工程表から前記情報毎の前記配信が実行されるタイミングを取得する請求項3に記載の建設工事管理支援装置。 A schedule storage unit is provided for storing a schedule that is created based on a construction work execution plan and in which the work type is associated with each process,
The construction work management support device according to claim 3 , wherein the control unit acquires the timing at which the distribution for each piece of information is to be performed from the schedule.
アドレス帳から予め定められた人物のアドレスを抽出し、前記宛先に追加可能であることを特徴とする請求項1~6のいずれか1項に記載の建設工事管理支援装置。 The control unit is
7. The construction work management support device according to claim 1, further comprising: a means for extracting an address of a predetermined person from an address book and adding the address to the destination.
前記配信後、予め定められた管理者に前記配信が完了した旨を報知する配信完了メールを送信することを特徴とする請求項1~7のいずれか1項に記載の建設工事管理支援装置。 The control unit is
The construction work management support device according to any one of claims 1 to 7, characterized in that after the distribution, a distribution completion email is sent to a predetermined manager to notify that the distribution has been completed.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020204509A JP7541473B2 (en) | 2020-12-09 | 2020-12-09 | Construction work management support device and construction work management support program |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020204509A JP7541473B2 (en) | 2020-12-09 | 2020-12-09 | Construction work management support device and construction work management support program |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2022091593A JP2022091593A (en) | 2022-06-21 |
| JP7541473B2 true JP7541473B2 (en) | 2024-08-28 |
Family
ID=82067236
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2020204509A Active JP7541473B2 (en) | 2020-12-09 | 2020-12-09 | Construction work management support device and construction work management support program |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7541473B2 (en) |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001297131A (en) | 2000-04-12 | 2001-10-26 | Misawa Homes Co Ltd | Construction work progress management system, construction work progress management method, server for the system, and recording medium |
| JP2003141316A (en) | 2001-10-15 | 2003-05-16 | Btoc Usa Inc | Information transmitter, information transmission method, display processor and information transmission system |
| JP2003186948A (en) | 2001-12-17 | 2003-07-04 | Takenaka Komuten Co Ltd | Method for preparing operation management chart in construction work |
| JP2004234385A (en) | 2003-01-30 | 2004-08-19 | Kureo:Kk | Information distribution system, information distribution program, and information distribution method |
| JP2012230550A (en) | 2011-04-26 | 2012-11-22 | Civilsite Co Ltd | Construction management support device and construction management support program |
| JP2013134686A (en) | 2011-12-27 | 2013-07-08 | Maeda Corp | Process management system, management terminal, and process management method |
| JP2016184427A (en) | 2016-06-08 | 2016-10-20 | 前田建設工業株式会社 | Process management system, management terminal, and method for managing process |
| JP2020035201A (en) | 2018-08-30 | 2020-03-05 | 株式会社丸屋建設 | Construction support system |
-
2020
- 2020-12-09 JP JP2020204509A patent/JP7541473B2/en active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001297131A (en) | 2000-04-12 | 2001-10-26 | Misawa Homes Co Ltd | Construction work progress management system, construction work progress management method, server for the system, and recording medium |
| JP2003141316A (en) | 2001-10-15 | 2003-05-16 | Btoc Usa Inc | Information transmitter, information transmission method, display processor and information transmission system |
| JP2003186948A (en) | 2001-12-17 | 2003-07-04 | Takenaka Komuten Co Ltd | Method for preparing operation management chart in construction work |
| JP2004234385A (en) | 2003-01-30 | 2004-08-19 | Kureo:Kk | Information distribution system, information distribution program, and information distribution method |
| JP2012230550A (en) | 2011-04-26 | 2012-11-22 | Civilsite Co Ltd | Construction management support device and construction management support program |
| JP2013134686A (en) | 2011-12-27 | 2013-07-08 | Maeda Corp | Process management system, management terminal, and process management method |
| JP2016184427A (en) | 2016-06-08 | 2016-10-20 | 前田建設工業株式会社 | Process management system, management terminal, and method for managing process |
| JP2020035201A (en) | 2018-08-30 | 2020-03-05 | 株式会社丸屋建設 | Construction support system |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2022091593A (en) | 2022-06-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7571392B2 (en) | User definable task based interface | |
| US20100153952A1 (en) | Methods, systems, and computer program products for managing batch operations in an enterprise data integration platform environment | |
| JP2002543509A (en) | A stand-alone data management system that facilitates the manufacture of sheet metal parts | |
| JP7246301B2 (en) | Program development support system and program development support method | |
| JP4829256B2 (en) | Information processing program and information processing apparatus | |
| JP7541473B2 (en) | Construction work management support device and construction work management support program | |
| JP2007048009A (en) | Operation support system, its database server, preparation management device and program | |
| US11455581B2 (en) | Methods and systems for providing a user interface for managing parts production and delivery statuses | |
| JP5055317B2 (en) | Backup management method, program, and backup management apparatus | |
| JP3970205B2 (en) | Project information management apparatus and program | |
| JP2006107282A (en) | Community management system, community server, community management method and community management program | |
| JP2003288458A (en) | Integrated project management tool | |
| JP2005078224A (en) | Web site managing system | |
| JP7375375B2 (en) | Information processing device, information processing system, and information processing program | |
| JP3736467B2 (en) | Cable management system and management method | |
| JPH07271569A (en) | Program specification preparation system | |
| JP2011203939A (en) | File management device, file management method, and file management program | |
| JP4738145B2 (en) | Engineering database system and its handling method | |
| JP4502015B2 (en) | Information processing apparatus and program | |
| JP5594256B2 (en) | Information processing method, information processing program, and information processing apparatus | |
| JP7589792B2 (en) | CONFIG INPUT DEVICE, CONFIG INPUT METHOD, AND CONFIG INPUT PROGRAM | |
| JP4220507B2 (en) | Website update support apparatus, method and program | |
| JP2006134103A (en) | Project management support apparatus, project management support program, and project management support method | |
| JP4658185B2 (en) | Development management system, development management program, and recording medium recording the development management program | |
| JP7359218B2 (en) | Management device, management method and management program |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230921 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240613 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240625 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240806 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20240813 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20240816 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7541473 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |