JP7548498B2 - Initial stress measurement method - Google Patents
[go: Go Back, main page]

JP7548498B2 - Initial stress measurement method - Google Patents

Initial stress measurement method Download PDF

Info

Publication number
JP7548498B2
JP7548498B2 JP2020107123A JP2020107123A JP7548498B2 JP 7548498 B2 JP7548498 B2 JP 7548498B2 JP 2020107123 A JP2020107123 A JP 2020107123A JP 2020107123 A JP2020107123 A JP 2020107123A JP 7548498 B2 JP7548498 B2 JP 7548498B2
Authority
JP
Japan
Prior art keywords
tunnel
pilot hole
measuring device
initial stress
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020107123A
Other languages
Japanese (ja)
Other versions
JP2022001853A (en
Inventor
秀幸 村山
智之 新井
奈央 池田
淳一 児玉
隆之 菅原
大祐 福田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hokkaido University NUC
Fujita Corp
Original Assignee
Hokkaido University NUC
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hokkaido University NUC, Fujita Corp filed Critical Hokkaido University NUC
Priority to JP2020107123A priority Critical patent/JP7548498B2/en
Publication of JP2022001853A publication Critical patent/JP2022001853A/en
Application granted granted Critical
Publication of JP7548498B2 publication Critical patent/JP7548498B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Force Measurement Appropriate To Specific Purposes (AREA)

Description

本発明は、トンネルを掘削する際に地山の初期応力を測定する方法に関する。 The present invention relates to a method for measuring the initial stress of the ground when excavating a tunnel.

従来、鉱山における鉱物採掘等に先立って、周辺地山に初期に作用している地山応力値(以下「初期応力」という)の測定が行われており、各種の初期応力測定方法が知られている(例えば、下記非特許文献1参照)。
初期応力測定方法の一例として、「応力解放法」が知られている。この応力解放法では、図11に示すように、岩盤(地山)81中に削孔したパイロット孔80(例えば直径40mm)の孔底に岩盤応力計82を設置した後、より大きな孔径(例えば直径80mm)のビットで同じ箇所にボーリングを行って(オーバーコアリング)更にパイロット孔84を形成し、岩盤応力計を設置したパイロット孔80の周囲の岩盤応力を解放させ、この応力解放による岩盤の変形を計測する。そして、計測した岩盤の変形と応力を解放させる前の岩盤の応力状態(初期応力)との関係式(図7参照)を用いて、ボーリングを行う前の岩盤の応力状態を評価する。
Conventionally, prior to mineral extraction in a mine, the initial ground stress value acting on the surrounding ground (hereinafter referred to as "initial stress") has been measured, and various methods for measuring initial stress are known (for example, see Non-Patent Document 1 below).
As an example of the initial stress measurement method, the "stress release method" is known. In this stress release method, as shown in Fig. 11, a rock stress meter 82 is installed at the bottom of a pilot hole 80 (e.g., 40 mm in diameter) drilled in a rock mass (natural ground) 81, and then a further pilot hole 84 is formed by boring (overcoring) the same place with a bit of a larger hole diameter (e.g., 80 mm in diameter), and the rock stress around the pilot hole 80 in which the rock stress meter is installed is released, and the deformation of the rock mass due to this stress release is measured. Then, the stress state of the rock mass before boring is evaluated using the relational expression (see Fig. 7) between the measured deformation of the rock mass and the stress state (initial stress) of the rock mass before the stress is released.

一方、通常施工のトンネル掘削作業では、過去のトンネル掘削実績から地山性状(地山分類)に応じて、どの程度の支保を作用させれば地山が安定するかを想定し、その支保の組み合わせ(標準的な支保パターン)を採用しながら採掘を行っている。すなわち、一般的なトンネル掘削では初期応力の測定は行わず、過去の実績に基づいて施工計画を立てている(例えば、下記非特許文献2参照)。 On the other hand, in normal tunnel excavation work, the amount of support required to stabilize the ground is estimated based on the ground properties (ground classification) from past tunnel excavation results, and excavation is carried out using this combination of supports (standard support patterns). In other words, in general tunnel excavation, initial stress is not measured, and construction plans are made based on past results (for example, see Non-Patent Document 2 below).

横山幸也、「わが国で開発・改良された初期地圧測定法の基準化と国際化」、一般財団法人資源・素材学会、Journal of MMIJ Vol.129、P.683-693、2013年Yukiya Yokoyama, "Standardization and internationalization of the initial geostress measurement method developed and improved in Japan," Japan Society of Mineral Resources and Materials Science, Journal of MMIJ Vol. 129, pp. 683-693, 2013. 「2016年制定 トンネル標準示方書」、土木学会、2016年8月"2016 Tunnel Standard Specifications", Japan Society of Civil Engineers, August 2016

実際のトンネル掘削作業時には、断層破砕帯などの事前に想定できない地山不良部に遭遇し、計画通りの施工が困難な場合がある。このような場合、支保部材の組み合わせや地山強度を増加させるための補助工法の規模等を設計検討する必要があるが、その際に用いる設計ツールは、有限要素法などの数値解析手法を利用している。
この数値解析において地山の初期応力状態を設定することが求められるが、上述のようにトンネル掘削時には初期応力を測定しない場合がほとんどなので、既知のパラメータを用いて初期応力を推定して数値解析を行っている。具体的には、例えば土被り高さ(トンネルの地表からの深さ:m)と地山の単位体積重量γ(密度×重力kN/m)の積を鉛直荷重として想定して初期応力状態を再現する方法(自重解析)や、発生した変状現象からトンネルに作用していると考えられる荷重を推定して解析に反映するなどの方法が実用化されている。しかしながら、このような方法で算出した初期応力はあくまで推定値であり、実際の初期応力値とのずれがある可能性がある。
During actual tunnel excavation work, it is possible to encounter unanticipated poor ground conditions, such as fault fracture zones, making it difficult to carry out construction as planned. In such cases, it is necessary to consider the combination of support materials and the scale of auxiliary construction methods to increase the strength of the ground, and the design tools used for this purpose are numerical analysis methods such as the finite element method.
In this numerical analysis, it is required to set the initial stress state of the ground, but since the initial stress is not measured during tunnel excavation in most cases as described above, the initial stress is estimated using known parameters and numerical analysis is performed. Specifically, for example, a method of reproducing the initial stress state by assuming the product of the earth covering height (depth of the tunnel from the ground surface: m) and the unit volume weight γ of the ground (density x gravity kN/m 3 ) as a vertical load (self-weight analysis), or a method of estimating the load that is thought to be acting on the tunnel from the deformation phenomenon that has occurred and reflecting it in the analysis, have been put to practical use. However, the initial stress calculated by such a method is merely an estimated value and may deviate from the actual initial stress value.

一方で、トンネル掘削時に初期応力を測定する場合、従来の応力解放法では、岩盤応力計を設置するためのパイロット孔に加えて、応力を解放させるための大口径のパイロット孔の削孔を行う必要がある。また、トンネルで岩盤応力の評価を行う場合には、工期の遅延を防ぐために、掘削済の空洞の側壁や上下盤を利用して実施せざるを得ない。
すなわち、トンネル施工時において重要な情報となる切羽前方の応力状態を既存の方法で評価することは経済的な損失が大きいという課題がある。
On the other hand, when measuring the initial stress during tunnel excavation, the conventional stress relief method requires drilling a large-diameter pilot hole for releasing the stress in addition to a pilot hole for installing a rock stress meter. Also, when evaluating rock stress in a tunnel, it is necessary to use the side walls and upper and lower walls of the excavated cavity to prevent delays in the construction period.
In other words, there is a problem in that evaluating the stress state ahead of the tunnel face, which is important information during tunnel construction, using existing methods results in large economic losses.

本発明は、このような事情に鑑みなされたものであり、その目的は、トンネル掘削時に地山の初期応力を簡易かつトンネル掘削作業を妨げない方法で測定することにある。 The present invention was developed in consideration of these circumstances, and its purpose is to measure the initial stress of the ground during tunnel excavation in a simple manner that does not interfere with tunnel excavation work.

上述の目的を達成するため、請求項1の発明にかかる初期応力測定方法は、トンネルが掘削される地山の初期応力を測定する初期応力測定方法であって、切羽から前記地山内に向けてパイロット孔を形成するパイロット孔ボーリング工程と、前記パイロット孔の変形量を測定する変形量測定装置を前記パイロット孔に配置する測定装置配置工程と、前記切羽が少なくとも前記パイロット孔ボーリング工程時よりも前進するように前記地山を掘削することにより前記地山の応力を解放するトンネル掘削工程と、前記変形量測定装置の測定結果に基づいて前記地山の前記初期応力を算出する初期応力算出工程と、を含んだことを特徴とする。
請求項2の発明にかかる初期応力測定方法は、前記トンネル掘削工程では、前記変形量測定装置周辺の前記地山を残しながら、前記トンネルの掘削方向に対して前記切羽が前記変形量測定装置の配置位置よりも前方の位置となるまで掘削を行う、ことを特徴とする。
請求項3の発明にかかる初期応力測定方法は、前記トンネル掘削工程では、前記トンネルの掘削方向に対して前記切羽が前記変形量測定装置の配置位置よりも後方の位置で掘削を停止し、前記初期応力算出工程では、数値解析を用いて前記切羽の位置が前記変形量測定装置より前方となった際の前記変形量を推定する、ことを特徴とする。
請求項4の発明にかかる初期応力測定方法は、前記パイロット孔ボーリング工程は、前記地山の地質調査用のボーリングを兼ねる、ことを特徴とする。
請求項5の発明にかかる初期応力測定方法は、前記トンネル掘削工程後に前記パイロット孔から前記変形量測定装置を回収する回収工程を更に備え、前記回収工程後に前記パイロット孔ボーリング工程を現在の切羽から再度行い、前記測定装置配置工程では回収した前記変形量測定装置を再度形成された前記パイロット孔に配置する、ことを特徴とする。
請求項6の発明にかかる初期応力測定方法は、前記パイロット孔ボーリング工程では、前記トンネルの掘削方向に沿って前記パイロット孔を形成する、ことを特徴とする。
請求項7の発明にかかる初期応力測定方法は、前記パイロット孔ボーリング工程では、前記トンネルの掘削方向に対して所定角度で前記パイロット孔を形成する、ことを特徴とする。
In order to achieve the above-mentioned object, the initial stress measurement method of the invention of claim 1 is an initial stress measurement method for measuring the initial stress of a ground where a tunnel is excavated, and is characterized in that it includes a pilot hole boring process for forming a pilot hole from a tunnel face toward inside the ground, a measurement device placement process for placing a deformation measuring device in the pilot hole to measure the deformation amount of the pilot hole, a tunnel excavation process for releasing the stress of the ground by excavating the ground so that the tunnel face advances at least further than during the pilot hole boring process, and an initial stress calculation process for calculating the initial stress of the ground based on the measurement results of the deformation measuring device.
The initial stress measurement method of the invention of claim 2 is characterized in that, in the tunnel excavation process, excavation is carried out while leaving the natural ground around the deformation measuring device, until the face of the tunnel is positioned forward of the position where the deformation measuring device is installed in the excavation direction of the tunnel.
The initial stress measurement method of the invention of claim 3 is characterized in that, in the tunnel excavation process, excavation is stopped at a position where the face is rearward of the position of the deformation amount measuring device in the excavation direction of the tunnel, and, in the initial stress calculation process, the deformation amount when the position of the face is forward of the deformation amount measuring device is estimated using numerical analysis.
The initial stress measuring method according to the invention of claim 4 is characterized in that the pilot hole boring step also serves as boring for a geological survey of the natural ground.
The initial stress measurement method of the invention of claim 5 is characterized in that it further comprises a recovery process of recovering the deformation measuring device from the pilot hole after the tunnel excavation process, and after the recovery process, the pilot hole boring process is performed again from the current face, and in the measurement device placement process, the recovered deformation measuring device is placed in the pilot hole that is formed again.
The initial stress measuring method according to the invention of claim 6 is characterized in that in the pilot hole boring step, the pilot hole is formed along the excavation direction of the tunnel.
The initial stress measuring method according to the invention of claim 7 is characterized in that in the pilot hole boring step, the pilot hole is formed at a predetermined angle with respect to the excavation direction of the tunnel.

請求項1にかかる発明によれば、切羽から地山内に向けてパイロット孔を形成して変形量測定装置を配置し、その状態で通常のトンネル掘削作業を行うことにより地山の応力を解放して地山の初期応力を算出する。これにより、トンネル工事開始後に、掘削作業を妨げることなく随時地山の初期応力を測定することができ、トンネル工事の安全性および作業効率を向上させることができる。
請求項2にかかる発明によれば、変形量測定装置周辺の地山を残しながら、変形量測定装置の配置位置よりも前方まで掘削を行うので、変形量測定装置周辺の地山の応力を100%解放し、初期応力の測定精度を向上させる上で有利となる。
請求項3にかかる発明によれば、トンネルの掘削方向に対して切羽が変形量測定装置の配置位置よりも後方の位置で掘削を停止するとともに、数値解析を用いて切羽の位置が変形量測定装置より前方となった際の変形量を推定する。これにより、掘削作業により変形量測定装置が破損するのを防止するとともに、変形量測定装置の位置における応力が100%解放された際の変形量を求めて初期応力の算出精度を向上させることができる。
請求項4にかかる発明によれば、地山の地質調査用のボーリングによって形成されたパイロット孔に変形量測定装置を設置するので、新たなボーリング作業を行うことなく初期応力を算出することができ、トンネル工事の作業効率を向上させることができる。
請求項5にかかる発明によれば、変形量測定装置を回収した後にパイロット孔のボーリングを現在の切羽から再度行うので、地質調査用のボーリングを行わないトンネル工事現場においても容易に初期応力の算出を行うことができる。
請求項6にかかる発明によれば、トンネルの掘削方向に沿ってパイロット孔を形成するのでトンネルが形成される地山の箇所の変形量を測定することができ、初期応力の算出精度を向上させることができる。
請求項7にかかる発明によれば、トンネルの掘削方向に対して所定角度でパイロット孔を形成するので、トンネル掘削作業に影響を与えることなく変形量の測定を行うことができるとともに、トンネル掘削作業により誤って変形量測定装置を破損するのを防止することができる。
すなわち、本発明によれば、トンネル掘削時に地山の初期応力を簡易かつトンネル掘削作業を妨げずに測定することができる。
According to the invention of claim 1, a pilot hole is formed from the face into the natural ground, a deformation measuring device is arranged, and normal tunnel excavation work is carried out in this state to release the stress in the natural ground and calculate the initial stress in the natural ground. This makes it possible to measure the initial stress in the natural ground at any time after the start of tunnel construction without interrupting the excavation work, thereby improving the safety and work efficiency of the tunnel construction.
According to the invention of claim 2, excavation is carried out forward of the position of the deformation measuring device while leaving the ground around the deformation measuring device, which is advantageous in releasing 100% of the stress in the ground around the deformation measuring device and improving the measurement accuracy of the initial stress.
According to the invention of claim 3, excavation is stopped when the tunnel face is located behind the deformation measuring device in the excavation direction, and the deformation amount when the face is located ahead of the deformation measuring device is estimated using numerical analysis. This makes it possible to prevent the deformation measuring device from being damaged by excavation work, and to improve the calculation accuracy of the initial stress by determining the deformation amount when the stress at the deformation measuring device is 100% released.
According to the invention of claim 4, a deformation measuring device is installed in a pilot hole formed by boring for a geological survey of the natural ground, so that the initial stress can be calculated without performing new boring work, thereby improving the work efficiency of tunnel construction.
According to the invention of claim 5, after the deformation measuring device is recovered, the pilot hole is drilled again from the current face, so that the initial stress can be easily calculated even at a tunnel construction site where drilling for geological surveys is not performed.
According to the invention of claim 6, pilot holes are formed along the excavation direction of the tunnel, so that the amount of deformation at the location of the ground where the tunnel is to be formed can be measured, thereby improving the accuracy of calculating the initial stress.
According to the invention of claim 7, a pilot hole is formed at a predetermined angle to the excavation direction of the tunnel, so that the deformation amount can be measured without affecting the tunnel excavation work and it is possible to prevent the deformation amount measuring device from being accidentally damaged by the tunnel excavation work.
That is, according to the present invention, the initial stress of the ground during tunnel excavation can be measured easily and without interfering with the tunnel excavation work.

実施の形態にかかる初期応力測定方法が適用されるトンネル掘削工事現場を模式的に示す説明図である。1 is an explanatory diagram illustrating a tunnel excavation work site to which an initial stress measurement method according to an embodiment of the present invention is applied; 実施の形態にかかる初期応力測定方法の処理手順を示すフローチャートである。1 is a flowchart showing a processing procedure of an initial stress measuring method according to an embodiment. 実施の形態にかかる初期応力測定方法を模式的に示す説明図である。1A to 1C are explanatory diagrams illustrating a method for measuring an initial stress according to an embodiment of the present invention; 変形量測定装置の配置方法の一例を示す説明図である。FIG. 11 is an explanatory diagram showing an example of a method for arranging a deformation amount measuring device. 変形量測定装置の配置方法の一例を示す説明図である。FIG. 11 is an explanatory diagram showing an example of a method for arranging a deformation amount measuring device. 変形量測定装置の外観を模式的に示す説明図である。FIG. 2 is an explanatory diagram illustrating a schematic appearance of a deformation amount measuring device. 孔径変化法における応力算出方法を模式的に示す図である。FIG. 13 is a diagram showing a schematic diagram of a stress calculation method in a hole diameter change method. 孔径変化法で測定したひずみ値の一例を示すグラフである。1 is a graph showing an example of strain values measured by a hole diameter change method. 円錐孔底ひずみ法で測定したひずみ値の一例を示すグラフである。1 is a graph showing an example of strain values measured by a cone-hole bottom strain method. 数値解析モデルの一例を示す説明図である。FIG. 1 is an explanatory diagram illustrating an example of a numerical analysis model. 従来技術にかかる初期応力測定方法を模式的に示す説明図である。FIG. 1 is an explanatory diagram illustrating a method for measuring an initial stress according to a conventional technique.

以下に添付図面を参照して、本発明にかかる初期応力測定方法の好適な実施の形態を詳細に説明する。
本発明にかかる初期応力測定方法は、トンネルが掘削される地山の初期応力を測定する。
ここで、トンネル掘削工事とは、周辺地山を掘削して空間を確保して線状構造物であるトンネルを構築する工事であるが、地山の掘削は地山の応力解放を行う行為であるといえる。本実施の形態では、従来技術のようにオーバーコアリングにより応力解放を行うのではなく、トンネル掘削作業による応力解放を利用して地山の初期応力を測定する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the in-stress measuring method according to the present invention will be described in detail below with reference to the accompanying drawings.
The initial stress measuring method according to the present invention measures the initial stress of the natural ground where a tunnel is excavated.
Here, tunnel excavation work refers to the construction of a tunnel, which is a linear structure, by excavating the surrounding natural ground to secure space, and excavating the natural ground can be said to be an act of releasing the natural ground stress. In this embodiment, instead of releasing the stress by overcoring as in the conventional technology, the initial stress of the natural ground is measured by utilizing the stress release caused by the tunnel excavation work.

まず、実施の形態にかかる初期応力測定方法が適用されるトンネル掘削工事現場について説明する。本実施の形態では、機械掘削によりトンネル施工を行うものとする。
図1に示すトンネル掘削工事現場10において、符号Tは地山11に施工されたトンネル、12は切羽(トンネル切削面)である。トンネル掘削工事現場10では、自由断面掘削機14や図示しない大型ブレーカあるいはトンネルボーリングマシン(TBM)などを用いて切羽12の掘削を行う。掘削により発生した「ずり」は、ホイルローダや重ダンプなどで坑外へ運搬される。
First, a tunnel excavation work site to which the initial stress measuring method according to the embodiment is applied will be described. In the present embodiment, tunnel construction is carried out by mechanical excavation.
In a tunnel excavation site 10 shown in Figure 1, reference symbol T denotes a tunnel constructed in natural ground 11, and reference symbol 12 denotes a tunnel face (tunnel cutting surface). At the tunnel excavation site 10, the tunnel face 12 is excavated using a free cross-section excavator 14, a large breaker not shown, or a tunnel boring machine (TBM), etc. The "mud" generated by the excavation is transported to the outside of the tunnel by a wheel loader, a heavy dump truck, etc.

なお、図1に示すような機械掘削の他、ダイナマイトなどの爆薬を用いて発破することにより掘削する発破工法を適用した現場にも、本発明は適用可能である。
例えば、後述する図5のようにボーリングを扇状に施工し、形成したパイロット孔に変形量測定装置を設置するようにすれば、発破時における変形量測定装置の損傷や発破振動による変形量測定装置の移動を防止することができ、発破工法適用時における初期応力の測定に有効である。
In addition to the mechanical excavation shown in FIG. 1, the present invention can also be applied to a site where a blasting method is used in which excavation is carried out by blasting using explosives such as dynamite.
For example, if boring is performed in a fan shape as shown in Figure 5 described later and a deformation measuring device is installed in the pilot hole formed, damage to the deformation measuring device during blasting and movement of the deformation measuring device due to blasting vibrations can be prevented, which is effective in measuring the initial stress when blasting methods are applied.

図2は、実施の形態にかかる初期応力測定方法の手順を示すフローチャートである。
まず、図3Aに示すように、切羽12から地山11内に向けてボーリングを行い、パイロット孔30を形成する(ステップS200、パイロット孔ボーリング工程)。
なお、図3では、視認性の観点から、図中のパイロット孔30や後述する変形量測定装置32の大きさとトンネルTの断面積等との関係は、実際とは異なる縮尺で図示している。
FIG. 2 is a flowchart showing the procedure of the initial stress measuring method according to the embodiment.
First, as shown in FIG. 3A, boring is performed from the tunnel face 12 toward the natural ground 11 to form a pilot hole 30 (step S200, pilot hole boring process).
In addition, in FIG. 3, for the sake of visibility, the relationship between the size of the pilot hole 30 and the deformation amount measuring device 32 described later and the cross-sectional area of the tunnel T, etc. are shown on a scale different from the actual one.

本実施の形態では、初期地圧の測定に当たり、応力解放法の一例である孔径変化法を採用する。
孔径変化法は、小口径のパイロット孔における孔周方向の変位(3成分以上)と孔軸方向の変位(4成分以上)を独立に計測することによって、3次元的な地山の応力成分が得るものである(図7参照)。なお、軸方向の変位の測定が難しい場合には、孔周方向の変位のみ測定し、ボーリング軸に直交する2次元断面での地圧成分を決定する手法も適用される。
孔径変化法では、測定器をパイロット孔内に機械的に固定することで応力解放前後の孔径変化を測定できるため、測定作業が容易な点が特徴となる。
なお、本発明における初期地圧測定方法は、上述した孔径変化法に限らず、応力解放を利用する測定手法であれば、例えば円錐孔底ひずみ法など従来公知の様々な方法が適用可能である。
In this embodiment, the hole diameter change method, which is an example of a stress relief method, is adopted to measure the initial earth stress.
The borehole diameter change method obtains three-dimensional stress components of the ground by independently measuring the circumferential displacement (three or more components) and the axial displacement (four or more components) in a small-diameter pilot hole (see Figure 7). When it is difficult to measure the axial displacement, a method is also applied in which only the circumferential displacement is measured and the ground pressure components are determined in a two-dimensional cross section perpendicular to the boring axis.
The hole diameter change method is characterized by the ease of measurement, since the change in hole diameter before and after stress release can be measured by mechanically fixing a measuring device inside the pilot hole.
The method for measuring initial geostress in the present invention is not limited to the above-mentioned hole diameter change method, and various conventionally known methods, such as the cone-hole strain method, can be applied as long as they are measurement techniques that utilize stress release.

また、初期応力の測定のためにパイロット孔30を形成するのではなく、地質調査のための先進ボーリングにより形成された孔をパイロット孔30として利用してもよい。
すなわち、パイロット孔ボーリング工程が、地山11の地質調査用のボーリングを兼ねるようにしてもよい。
トンネル工事では、着工前の地質調査結果と施工時の地質状態とが一致しないことがある。特にトンネルの深奥部は、調査ボーリングを到達させることが難しく、正確な地質情報を得ることが困難な場合がある。このため、トンネル工事中に、切羽12より先の領域を一定距離ボーリング(先進ボーリング)して地質調査を行う場合がある。先進ボーリングにより形成された孔をパイロット孔30として利用することにより、効率的に応力測定を行うことができる。
In addition, instead of forming the pilot hole 30 for measuring the initial stress, a hole formed by advanced boring for geological survey may be used as the pilot hole 30.
In other words, the pilot hole boring process may also serve as boring for a geological survey of the natural ground 11.
In tunnel construction, the results of a geological survey before construction starts may not match the geological conditions at the time of construction. In particular, it may be difficult to reach the deep part of a tunnel with survey boring, making it difficult to obtain accurate geological information. For this reason, during tunnel construction, a geological survey may be conducted by boring a certain distance (advance boring) in the area beyond the tunnel face 12. By using the hole formed by advance boring as the pilot hole 30, stress measurement can be performed efficiently.

また、パイロット孔ボーリング工程では、図4に示すようにトンネルTの掘削方向Fに沿ってパイロット孔30を形成してもよいし、図5に示すようにトンネルTの掘削方向Fに対して所定角度α(またはα’、以下省略)でパイロット孔30を形成してもよい。なお、所定角度αとは、例えば45度以下とする。また、図5に示すように、複数のパイロット孔30(30A,30B)を形成してもよい。
なお、図4(A)および図5(A)は切羽12の正面図を、図4(B)および図5(B)は地山11のうち切羽12より前方の平面図を、図4(C)および図5(C)は地山11のうち切羽12より前方の立体図を、それぞれ示す。また、図4および図5の符号32(32A,32B)は、後述する変形量測定装置である。また、符号12は現在の切羽位置、符号12’は次回以降の切羽位置となる。
In the pilot hole boring process, the pilot hole 30 may be formed along the excavation direction F of the tunnel T as shown in Fig. 4, or may be formed at a predetermined angle α (or α', omitted below) with respect to the excavation direction F of the tunnel T as shown in Fig. 5. The predetermined angle α is, for example, 45 degrees or less. Also, as shown in Fig. 5, a plurality of pilot holes 30 (30A, 30B) may be formed.
4(A) and 5(A) show front views of the tunnel face 12, 4(B) and 5(B) show plan views of the natural ground 11 in front of the tunnel face 12, and 4(C) and 5(C) show three-dimensional views of the natural ground 11 in front of the tunnel face 12. Reference numerals 32 (32A, 32B) in Fig. 4 and Fig. 5 indicate deformation measuring devices, which will be described later. Reference numeral 12 indicates the current tunnel face position, and reference numeral 12' indicates the tunnel face position for the next tunnel face and thereafter.

図4のようにトンネルTの掘削方向Fに沿ってパイロット孔30を形成した場合、地山11のうちトンネルTが形成される箇所の初期応力が測定できる。また、後述するトンネル掘削工程において応力解放される箇所の延長線上にパイロット孔30を形成するので、より精度よく初期応力を測定することができる。 When the pilot hole 30 is formed along the excavation direction F of the tunnel T as shown in Figure 4, the initial stress of the part of the ground 11 where the tunnel T is to be formed can be measured. In addition, since the pilot hole 30 is formed on the extension line of the part where the stress is released in the tunnel excavation process described later, the initial stress can be measured more accurately.

また、図5のようにトンネルTの掘削方向Fに対して所定角度αでボーリングすることを「扇状ボーリング」と称する。施工時に実施する調査ボーリングや対策工としての水抜きボーリングは切羽で実施することが望ましいが、湧水が多い条件では切羽に地下水が集中し掘削時に切羽が不安定化しやすくなるため、切羽の脇部あるいは側壁から扇状ボーリングを行うケースは少なくない。
また、図5のような扇状ボーリングでは、地山11の掘削領域(トンネルTが形成される箇所)からずれた位置にパイロット孔30が形成され、変形量測定装置32が配置されるので、掘削作業に影響を与えることなく初期応力の測定を行うことができる。また、変形量測定装置32の設置位置がトンネル掘削断面からずれるので、変形量測定装置32を損傷することなく、切羽位置が変形量測定装置32よりも掘削方向Fの前方に位置するまでの解放応力を測ることができる。この場合、解放される応力は100%ではないため、解析での補完が必要となるが、トンネル掘削によりで解放される応力はパイロット孔30の大きさに対して非常に大きいため、トンネル周辺地山で顕著な変形量として計測できると考えられる。
In addition, boring at a certain angle α with respect to the excavation direction F of the tunnel T as shown in Figure 5 is called "fan boring". It is desirable to perform survey boring and drainage boring as countermeasure work at the face during construction, but in conditions with a lot of spring water, groundwater tends to concentrate at the face and make the face unstable during excavation, so there are many cases where fan boring is performed from the side or side wall of the face.
In addition, in the fan-shaped boring as shown in Fig. 5, the pilot hole 30 is formed at a position shifted from the excavation area (the place where the tunnel T is formed) of the natural ground 11, and the deformation amount measuring device 32 is arranged, so that the initial stress can be measured without affecting the excavation work. In addition, since the installation position of the deformation amount measuring device 32 is shifted from the tunnel excavation cross section, the released stress can be measured until the face position is located forward of the deformation amount measuring device 32 in the excavation direction F without damaging the deformation amount measuring device 32. In this case, the released stress is not 100%, so it is necessary to supplement it with analysis, but since the stress released by the tunnel excavation is very large compared to the size of the pilot hole 30, it is considered that it can be measured as a significant deformation amount in the natural ground around the tunnel.

つぎに、図3Bに示すように、パイロット孔30の変形量を測定する変形量測定装置32をパイロット孔30に配置する(ステップS202、測定装置配置工程)。
変形量測定装置32の一例を図6に示す。
図6に示す変形量測定装置32は、筐体320、周方向測定部322、軸方向測定部324を備える。筐体320は、内部にデータロガー(周方向測定部322、軸方向測定部324の測定値を記録する記録装置)およびバッテリが内蔵されている。このため、変形量測定装置32に配線を接続する必要がなく、配線を考慮することなく掘削作業を進めることができる。
周方向測定部322は、パイロット孔30の孔周方向の変位を測定する。周方向測定部322は、ゲージ325の先端に取付された周方向センサ326を備える。
軸方向測定部324は、パイロット孔30の孔軸方向の変位を測定する。軸方向測定部324は、筐体320に設けられた第1の固定点327、軸方向測定部324に設けられた第2の固定点328および軸方向センサ329を備える。
変形量測定装置32の全長は約300mm程度であり、直径約40mm程度である。
Next, as shown in FIG. 3B, a deformation amount measuring device 32 for measuring the deformation amount of the pilot hole 30 is disposed in the pilot hole 30 (step S202, measuring device disposing step).
An example of the deformation measuring device 32 is shown in FIG.
6 includes a housing 320, a circumferential measuring unit 322, and an axial measuring unit 324. The housing 320 has a built-in data logger (a recording device that records the measurements of the circumferential measuring unit 322 and the axial measuring unit 324) and a battery. Therefore, there is no need to connect wiring to the deformation measuring device 32, and excavation work can be carried out without having to consider wiring.
The circumferential direction measuring unit 322 measures the circumferential displacement of the pilot hole 30. The circumferential direction measuring unit 322 includes a circumferential direction sensor 326 attached to the tip of a gauge 325.
The axial direction measuring unit 324 measures the displacement of the pilot hole 30 in the hole axial direction. The axial direction measuring unit 324 includes a first fixed point 327 provided on the housing 320, a second fixed point 328 provided on the axial direction measuring unit 324, and an axial direction sensor 329.
The deformation measuring device 32 has a total length of about 300 mm and a diameter of about 40 mm.

本実施の形態では、切羽12が変形量測定装置32から一定距離となるまで掘削を進めた段階で変形量測定装置32を回収し、コンピュータでデータロガー内のデータを読み出して初期応力を算出するものとする。
また、例えば変形量測定装置32に通信装置を内蔵させ、各測定部322,324での測定値を随時コンピュータに送信し、リアルタイムで初期応力を算出するようにしてもよい。
In this embodiment, when excavation has progressed until the face 12 is a certain distance from the deformation measuring device 32, the deformation measuring device 32 is withdrawn and the data in the data logger is read by a computer to calculate the initial stress.
Also, for example, a communication device may be built into the deformation measuring device 32 so that the measured values at the measuring sections 322, 324 are transmitted to a computer as needed, and the initial stress may be calculated in real time.

なお、例えば円錐孔底ひずみ法である場合は、変形量測定装置32として複数のひずみゲージが表面に配置されたストレインセルを用いる。ストレインセルは、表面に三軸または二軸直交ひずみゲージが等間隔で所定数配置されたひずみ計であり、パイロット孔30の岩盤先端部に接着剤等で貼付することにより測定を行う。 For example, in the case of the conical hole bottom strain method, a strain cell with multiple strain gauges arranged on its surface is used as the deformation measurement device 32. The strain cell is a strain meter with a predetermined number of triaxial or biaxial orthogonal strain gauges arranged at equal intervals on its surface, and measurements are performed by attaching it to the tip of the rock in the pilot hole 30 with an adhesive or the like.

つづいて、図3Cに示すように、切羽12が少なくともパイロット孔ボーリング工程時よりも前進するように地山11を掘削することにより地山11の応力を解放する。本実施の形態では、トンネルTの掘削方向Fに対して切羽12が変形量測定装置32の後端部から所定距離X後方の位置となるまでトンネルTを掘削することにより地山11の応力を解放する(ステップS204,S206、トンネル掘削工程)。すなわち、トンネル掘削工程では、トンネルTの掘削方向に対して切羽12が変形量測定装置32の配置位置よりも後方の位置で掘削を停止する。 Next, as shown in FIG. 3C, the natural ground 11 is excavated so that the face 12 advances at least further than during the pilot hole boring process, thereby releasing the stress in the natural ground 11. In this embodiment, the tunnel T is excavated until the face 12 is positioned a predetermined distance X behind the rear end of the deformation measuring device 32 in the excavation direction F of the tunnel T, thereby releasing the stress in the natural ground 11 (steps S204, S206, tunnel excavation process). That is, in the tunnel excavation process, excavation is stopped when the face 12 is positioned behind the position of the deformation measuring device 32 in the excavation direction of the tunnel T.

変形量測定装置32は、トンネル掘削工程中継続して測定箇所における変形量を検出する。また、後述する初期応力算出工程において、変形量測定装置32の測定結果(変形量)と切羽12の位置とを対応付けできるように、例えば自由断面掘削機14の位置を記録しておく。
上述のように、本実施の形態では自由断面掘削機14を用いて機械掘削を行うため、任意の位置で掘削を中断することが可能である。掘削により変形量測定装置32が破損しないように、変形量測定装置32の手前の所定距離Xで掘削を中断する。
The deformation measuring device 32 continuously detects the deformation at the measurement point during the tunnel excavation process. In addition, for example, the position of the free section excavator 14 is recorded so that the measurement result (deformation) of the deformation measuring device 32 can be associated with the position of the tunnel face 12 in the initial stress calculation process described later.
As described above, in this embodiment, mechanical excavation is performed using the free section excavator 14, so excavation can be interrupted at any position. To prevent the deformation measuring device 32 from being damaged by excavation, excavation is interrupted at a predetermined distance X just before the deformation measuring device 32.

なお、例えば変形量測定装置32の周辺は地山を掘り残して、切羽12の外側部分は地山を堀り進めることにより、切羽12の位置が変形量測定装置32よりも掘削方向前方となるまで掘削作業を行ってから変形量測定装置32を回収してもよい。
すなわち、トンネル掘削工程では、変形量測定装置32周辺の地山11を残しながら、トンネルTの掘削方向に対して切羽12が変形量測定装置32の配置位置よりも前方の位置となるまで掘削を行うようにしてもよい。
また、図5のように扇状ボーリングを行った場合には、切羽12の位置が変形量測定装置32の側方を通過するまで(掘削方向前方となるまで)、すなわち解放応力の影響を受けなくなるまで掘削作業を行ってから変形量測定装置32を回収することが可能となる。
For example, excavation work can be carried out by leaving the ground around the deformation measuring device 32 and digging into the ground around the outer part of the face 12 until the position of the face 12 is forward of the deformation measuring device 32 in the excavation direction, and then the deformation measuring device 32 can be recovered.
In other words, during the tunnel excavation process, excavation may be carried out until the face 12 is positioned forward of the position of the deformation measuring device 32 in the excavation direction of the tunnel T, while leaving the ground 11 around the deformation measuring device 32.
In addition, when fan-shaped boring is performed as shown in Figure 5, it is possible to carry out drilling operations until the position of the drilling face 12 passes beside the deformation measuring device 32 (until it is forward in the drilling direction), that is, until it is no longer affected by the released stress, and then to retrieve the deformation measuring device 32.

切羽12が変形量測定装置32の貼付位置から所定距離となると(ステップS206:No)、作業員等がパイロット孔30から変形量測定装置32を回収する(ステップS208、回収工程)。
その後、回収した変形量測定装置32をトンネル工事現場の詰所等に搬送して初期応力算出工程に移行する。この時、変形量測定装置32を回収する毎に初期応力を算出してもよいし、現在の切羽から更に奥にボーリングを行って現在よりも先の位置に変形量測定装置32を配置して(もしくは地盤調査のためのパイロット孔30の更に奥の位置に変形量測定装置を再設置して)測定を行った後に初期応力を算出してもよい。
すなわち、回収工程後にパイロット孔ボーリング工程を現在の切羽から再度行い、測定装置配置工程では回収した変形量測定装置32を再度形成されたパイロット孔30に配置してもよい。この場合、複数回変形量の測定を行ってから初期応力算出工程をまとめて行うことになる。
When the face 12 is a predetermined distance from the attachment position of the deformation measuring device 32 (step S206: No), a worker or the like withdraws the deformation measuring device 32 from the pilot hole 30 (step S208, withdrawal process).
Thereafter, the recovered deformation amount measuring device 32 is transported to a station or the like at the tunnel construction site, and the process proceeds to the initial stress calculation step. At this time, the initial stress may be calculated each time the deformation amount measuring device 32 is recovered, or the deformation amount measuring device 32 may be placed at a position further ahead than the current face by boring further in from the current face (or the deformation amount measuring device may be reinstalled at a position further in from the pilot hole 30 for ground investigation), and the initial stress may be calculated after measurement.
That is, after the recovery step, the pilot hole boring step may be performed again from the current face, and in the measurement device placement step, the recovered deformation amount measuring device 32 may be placed in the newly formed pilot hole 30. In this case, the deformation amount is measured multiple times, and then the initial stress calculation step is performed all at once.

つづいて、トンネル工事現場の詰所等に設置されたパーソナルコンピューター(図示なし)により変形量測定装置32のデータロガー内のデータを用いて、測定箇所(変形量測定装置32の設置場所)における初期応力を算出する。すなわち、トンネル掘削工程中における変形量測定装置32の検出結果に基づいて、地山11の初期応力を算出する(ステップS210、初期応力算出工程) Next, a personal computer (not shown) installed in a station or the like at the tunnel construction site uses the data in the data logger of the deformation measuring device 32 to calculate the initial stress at the measurement location (the location where the deformation measuring device 32 is installed). That is, the initial stress of the ground 11 is calculated based on the detection results of the deformation measuring device 32 during the tunnel excavation process (step S210, initial stress calculation process).

図7は、孔径変化法における応力算出方法を模式的に示す図である。
孔周方向(半径方向)の変位を(U1,U2,U3)、孔軸方向の変位を(W4,W5,W6,W7)とすると、既知量である変位{W}は図7の式(1)のように表せる。一方、未知量である応力{σ}は図7の式(2)のように表せる。変位{W}と応力{σ}は図7の式(3)の関係にあるので、これを解いて応力{σ}を算出する。
FIG. 7 is a diagram showing a schematic diagram of a stress calculation method in the hole diameter change method.
If the displacement in the hole circumferential direction (radial direction) is (U1, U2, U3) and the displacement in the hole axial direction is (W4, W5, W6, W7), the known quantity of displacement {W} can be expressed as equation (1) in Fig. 7. On the other hand, the unknown quantity of stress {σ} can be expressed as equation (2) in Fig. 7. Since the displacement {W} and the stress {σ} are related by equation (3) in Fig. 7, this is solved to calculate the stress {σ}.

また、例えば円錐孔底ひずみ法の場合は、事前に各チャンネルのひずみ量と変位の校正係数を確定し、ひずみを変位に換算して観測方程式を解くことで6つの応力成分を得ることができる。 For example, in the case of the conical hole strain method, the strain and displacement calibration coefficients for each channel are determined in advance, and the six stress components can be obtained by converting the strain into displacement and solving the observation equation.

図8は、変形量測定装置(孔径変化法)で測定したひずみ値の一例を示すグラフである。
図8Aは周方向センサ326の検出結果を示し、図8Bは軸方向センサ329の検出結果を示す。図8Aおよび図8Bにおいて、縦軸は変位(ひずみを校正係数で変位に換算したもの)を示し、横軸は掘削開始からの経過時間(オーバーコアリング長併記)を示す。
図8における測定は、掘削(オーバーコアリング)開始位置から35cm(350mm)の位置に周方向センサ326が、28cm(280mm)の位置に第2の固定点328が、42cm(420mm)の位置に第1の固定点327が位置するように変形量測定装置32を配置し、掘削開始位置から100cm(1000mm)掘削を行ったものである。
図8を参照すると、掘削開始から約4900秒で掘削位置が周方向センサ326(35cm地点)を通過し、掘削開始から約5050秒で掘削位置が50cmとなり、データがほぼ収束している。
FIG. 8 is a graph showing an example of strain values measured by a deformation measuring device (hole diameter change method).
Fig. 8A shows the detection result of the circumferential sensor 326, and Fig. 8B shows the detection result of the axial sensor 329. In Fig. 8A and Fig. 8B, the vertical axis indicates displacement (strain converted into displacement using a calibration coefficient), and the horizontal axis indicates the elapsed time from the start of excavation (also shown with the overcoring length).
The measurements in Figure 8 were taken by positioning the deformation measuring device 32 so that the circumferential sensor 326 was located 35 cm (350 mm) from the start position of excavation (overcoring), the second fixed point 328 was located 28 cm (280 mm), and the first fixed point 327 was located 42 cm (420 mm), and excavation was carried out 100 cm (1000 mm) from the start position of excavation.
Referring to FIG. 8, the excavation position passes the circumferential sensor 326 (at 35 cm) at about 4900 seconds from the start of excavation, and the excavation position reaches 50 cm at about 5050 seconds from the start of excavation, and the data nearly converges.

ここで、本実施の形態では、トンネル切羽等の掘削による応力解放を活用して地山11の応力状態を測定することを特徴としているが、変形量測定装置32の保護のために完全(100%)には応力解放してない状態(切羽12が変形量測定装置32と所定距離にある状態)で測定を中断せざるを得ない。よって、測定では得ることができない完全な応力解放時の変形量を、応力解放の途中段階の測定データから数値解析によってデータ補間するのが好ましい。
すなわち、トンネル掘削工程でトンネルTの掘削方向に対して切羽12が変形量測定装置32の配置位置よりも後方の位置まで掘削を停止した場合、初期応力算出工程では、数値解析を用いて切羽12の位置が変形量測定装置32より前方となった際の変形量を推定する。
Here, this embodiment is characterized in that the stress state of the natural ground 11 is measured by utilizing stress release caused by excavation of a tunnel face, etc., but in order to protect the deformation amount measuring device 32, it is necessary to interrupt the measurement when the stress is not completely (100%) released (when the face 12 is at a predetermined distance from the deformation amount measuring device 32). Therefore, it is preferable to interpolate the amount of deformation at the time of complete stress release, which cannot be obtained by measurement, by numerical analysis from the measurement data during the middle stage of stress release.
In other words, if, during the tunnel excavation process, excavation is stopped until the face 12 reaches a position rearward of the position of the deformation measuring device 32 in the excavation direction of the tunnel T, the initial stress calculation process uses numerical analysis to estimate the amount of deformation when the position of the face 12 becomes forward of the deformation measuring device 32.

図9は、円錐孔底ひずみ法で測定したひずみ値の一例を示すグラフである。
図9において、左縦軸はひずみ値、右縦軸は温度、横軸は基準位置からの堀進長である。
各系統におけるひずみ値は、堀進長50mm付近で極大値を取り、一旦減少した後、堀進長100mm付近で収束値に至る。すなわち、堀進長100mm付近で応力が100%解放された状態となる。
一方で、例えば上記所定距離(切羽12と変形量測定装置32との距離)をXとすると、本実施の形態で実際に測定できるのは堀進長0cmからXの間のひずみ値のみである。このため、初期応力算出工程において、網掛けで示す堀進長Xから100mmの間の区間のひずみ値を、堀進長0mmからXのひずみ値に基づいて数値解析により補間する。
FIG. 9 is a graph showing an example of strain values measured by the cone-hole bottom strain method.
In FIG. 9, the left vertical axis represents the strain value, the right vertical axis represents the temperature, and the horizontal axis represents the excavation length from the reference position.
The strain value in each system reaches a maximum value near the excavation length of 50 mm, decreases once, and then reaches a convergent value near the excavation length of 100 mm. In other words, the stress is 100% released near the excavation length of 100 mm.
On the other hand, for example, if the above-mentioned predetermined distance (the distance between the face 12 and the deformation measuring device 32) is X, then in this embodiment, only the strain values between excavation lengths of 0 cm and X can actually be measured. For this reason, in the initial stress calculation process, the strain values in the section between excavation lengths X and 100 mm, shown shaded, are interpolated by numerical analysis based on the strain values from excavation lengths of 0 mm to X.

より詳細には、円形トンネルなどの比較的単純な形状のトンネルを対象に3次元モデルを作製し、初期の岩盤応力が既知である数値シミュレーションを行う。
具体的には、まず岩盤を等方弾性体と仮定し、既知の岩盤応力をモデルに与えた状態でトンネルの掘削解析を行い、パイロット孔の変形を分析する。次に、既に求めているパイロット孔の変形と初期の岩盤応力の関係式を用いて、パイロット孔の変形から初期の岩盤応力を推定する。最後に、この推定した岩盤応力とモデルに与えた岩盤応力が一致していることを確認する。
図10に数値解析モデルの一例を示す。
※応力計測は3次元計測(3次元の応力成分の測定)であり,数値解析も当然3次元解析となります.図9の解析メッシュは2次元に見えますが,3次元の図が必要であれば別途追加で送付します.ご検討ください.
More specifically, a three-dimensional model is created for a tunnel with a relatively simple shape, such as a circular tunnel, and a numerical simulation is performed in which the initial rock stress is known.
Specifically, we first assume that the rock mass is an isotropic elastic body, and perform a tunnel excavation analysis with known rock mass stress applied to the model, and analyze the deformation of the pilot hole. Next, we estimate the initial rock mass stress from the deformation of the pilot hole using the relationship between the deformation of the pilot hole and the initial rock mass stress that we have already obtained. Finally, we confirm that this estimated rock mass stress matches the rock mass stress applied to the model.
FIG. 10 shows an example of a numerical analysis model.
*Stress measurement is a three-dimensional measurement (measurement of three-dimensional stress components), and the numerical analysis is naturally also three-dimensional analysis. The analysis mesh in Figure 9 looks two-dimensional, but if a three-dimensional diagram is required, we will send it separately. Please consider this.

以上説明したように、実施の形態にかかる初期応力測定方法は、切羽12から地山11内に向けてパイロット孔30を形成して変形量測定装置32を配置し、その状態で通常のトンネル掘削作業を行うことにより地山11の応力を解放して地山11の初期応力を算出する。これにより、トンネル工事開始後に、掘削作業を妨げることなく随時地山11の初期応力を測定することができ、トンネル工事の安全性および作業効率を向上させることができる。 As described above, the initial stress measurement method according to the embodiment involves forming a pilot hole 30 from the face 12 toward the natural ground 11, positioning a deformation measurement device 32, and performing normal tunnel excavation work in this state to release the stress in the natural ground 11 and calculate the initial stress in the natural ground 11. This makes it possible to measure the initial stress in the natural ground 11 at any time after the start of tunnel construction without interfering with the excavation work, thereby improving the safety and work efficiency of tunnel construction.

また、実施の形態にかかる初期応力測定方法において、変形量測定装置周辺32の地山を残しながら、変形量測定装置32の配置位置よりも前方まで掘削を行うようにすれば、変形量測定装置32周辺の地山の応力を100%解放し、初期応力の測定精度を向上させる上で有利となる。 In addition, in the initial stress measurement method according to the embodiment, if excavation is performed forward of the location of the deformation measuring device 32 while leaving the natural ground around the deformation measuring device 32, the stress in the natural ground around the deformation measuring device 32 can be released 100%, which is advantageous in improving the measurement accuracy of the initial stress.

また、実施の形態にかかる初期応力測定方法において、トンネルの掘削方向に対して切羽12が変形量測定装置32の配置位置よりも後方の位置で掘削を停止するとともに、数値解析を用いて切羽12の位置が変形量測定装置32より前方となった際の変形量を推定するようにすれば、掘削作業により変形量測定装置32が破損するのを防止するとともに、変形量測定装置32の位置における応力が100%解放された際の変形量を求めて初期応力の算出精度を向上させることができる。 In addition, in the initial stress measurement method according to the embodiment, by stopping excavation when the tunnel face 12 is located behind the position of the deformation measuring device 32 in the tunnel excavation direction and estimating the deformation amount when the position of the face 12 is forward of the deformation measuring device 32 using numerical analysis, it is possible to prevent the deformation measuring device 32 from being damaged by the excavation work and to improve the accuracy of the calculation of the initial stress by determining the deformation amount when the stress at the position of the deformation measuring device 32 is 100% released.

また、実施の形態にかかる初期応力測定方法において、地山11の地質調査用のボーリングによって形成されたパイロット孔に変形量測定装置32を設置するので、新たなボーリング作業を行うことなく初期応力を算出することができ、トンネル工事の作業効率を向上させることができる。 In addition, in the initial stress measurement method according to the embodiment, a deformation measurement device 32 is installed in a pilot hole formed by boring for a geological survey of the natural ground 11, so that the initial stress can be calculated without performing new boring work, thereby improving the work efficiency of tunnel construction.

また、実施の形態にかかる初期応力測定方法において、変形量測定装置32を回収した後にパイロット孔のボーリングを現在の切羽から再度行うようにすれば、地質調査用のボーリングを行わないトンネル工事現場においても容易に初期応力の算出を行うことができる。 In addition, in the initial stress measurement method according to the embodiment, if the pilot hole is drilled again from the current face after the deformation measurement device 32 is retrieved, the initial stress can be easily calculated even at a tunnel construction site where no boring for geological surveys is performed.

また、実施の形態にかかる初期応力測定方法において、トンネルの掘削方向に沿ってパイロット孔30を形成するようにすれば、トンネルが形成される地山11の箇所の変形量を測定することができ、初期応力の算出精度を向上させることができる。 In addition, in the initial stress measurement method according to the embodiment, if pilot holes 30 are formed along the tunnel excavation direction, the amount of deformation at the location of the ground 11 where the tunnel is to be formed can be measured, improving the accuracy of the calculation of the initial stress.

また、実施の形態にかかる初期応力測定方法において、トンネルの掘削方向に対して所定角度でパイロット孔30を形成するようにすれば、トンネル掘削作業に影響を与えることなく変形量の測定を行うことができるとともに、トンネル掘削作業により誤って変形量測定装置32を破損するのを防止することができる。 In addition, in the initial stress measurement method according to the embodiment, if the pilot hole 30 is formed at a predetermined angle with respect to the tunnel excavation direction, the deformation amount can be measured without affecting the tunnel excavation work, and the deformation amount measuring device 32 can be prevented from being accidentally damaged by the tunnel excavation work.

10 トンネル掘削工事現場
11 地山
12 切羽
30 パイロット孔
32 変形量測定装置
320 筐体
322 周方向測定部
324 軸方向測定部
F 掘削方向
T トンネル
REFERENCE SIGNS LIST 10 Tunnel excavation site 11 Natural ground 12 Face 30 Pilot hole 32 Deformation measuring device 320 Housing 322 Circumferential direction measuring section 324 Axial direction measuring section F Excavation direction T Tunnel

Claims (5)

トンネルが掘削される地山の初期応力を測定する初期応力測定方法であって、
切羽から前記地山内に向けてパイロット孔を形成するパイロット孔ボーリング工程と、
前記パイロット孔の変形量を測定する繰り返し使用可能な変形量測定装置を前記パイロット孔に配置する測定装置配置工程と、
前記切羽が少なくとも前記パイロット孔ボーリング工程時よりも前進するように前記地山を掘削することにより前記地山の応力を解放するトンネル掘削工程と、
前記変形量測定装置の測定結果に基づいて前記地山の前記初期応力を算出する初期応力算出工程とを含み、
前記トンネル掘削工程では、前記変形量測定装置周辺の前記地山を残しながら、前記トンネルの掘削方向に対して前記切羽が前記変形量測定装置の配置位置よりも前方の位置となるまで掘削を行い、
前記初期応力算出工程では、完全な応力解放時の前記変形量を算出する、
ことを特徴とする初期応力測定方法。
An initial stress measurement method for measuring an initial stress in a ground where a tunnel is excavated, comprising the steps of:
A pilot hole boring process for forming a pilot hole from a face toward the natural ground;
a measuring device placement step of placing a reusable deformation amount measuring device in the pilot hole to measure the deformation amount of the pilot hole;
a tunnel excavation step of releasing stress in the ground by excavating the ground so that the face advances at least further than in the pilot hole boring step;
and an initial stress calculation step of calculating the initial stress of the natural ground based on a measurement result of the deformation measuring device ,
In the tunnel excavation step, while leaving the natural ground around the deformation measurement device, excavation is performed until the face of the tunnel is located forward of the arrangement position of the deformation measurement device in the excavation direction of the tunnel,
In the initial stress calculation step, the deformation amount at the time of complete stress release is calculated.
1. A method for measuring initial stress.
前記パイロット孔ボーリング工程は、前記地山の地質調査用のボーリングを兼ねる、
ことを特徴とする請求項記載の初期応力測定方法。
The pilot hole boring process also serves as boring for a geological survey of the ground.
2. The method for measuring initial stress according to claim 1 .
前記トンネル掘削工程後に前記パイロット孔から前記変形量測定装置を回収する回収工程を更に備え、
前記回収工程後に前記パイロット孔ボーリング工程を現在の切羽から再度行い、
前記測定装置配置工程では回収した前記変形量測定装置を再度形成された前記パイロット孔に配置する、
ことを特徴とする請求項記載の初期応力測定方法。
The tunnel excavation step further includes a recovery step of recovering the deformation amount measuring device from the pilot hole.
After the recovery process, the pilot hole boring process is performed again from the current face,
In the measuring device placement step, the recovered deformation measuring device is placed in the pilot hole that is formed again.
2. The method for measuring initial stress according to claim 1 .
前記パイロット孔ボーリング工程では、前記トンネルの掘削方向に沿って前記パイロット孔を形成する、
ことを特徴とする請求項1からのいずれか1項記載の初期応力測定方法。
In the pilot hole boring step, the pilot hole is formed along the excavation direction of the tunnel.
4. The method for measuring initial stress according to claim 1, wherein the initial stress is measured by the measuring device.
前記パイロット孔ボーリング工程では、前記トンネルの掘削方向に対して所定角度で前記パイロット孔を形成する、
ことを特徴とする請求項1からのいずれか1項記載の初期応力測定方法。
In the pilot hole boring step, the pilot hole is formed at a predetermined angle with respect to the excavation direction of the tunnel.
4. The method for measuring initial stress according to claim 1, wherein the initial stress is measured by the measuring device.
JP2020107123A 2020-06-22 2020-06-22 Initial stress measurement method Active JP7548498B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020107123A JP7548498B2 (en) 2020-06-22 2020-06-22 Initial stress measurement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020107123A JP7548498B2 (en) 2020-06-22 2020-06-22 Initial stress measurement method

Publications (2)

Publication Number Publication Date
JP2022001853A JP2022001853A (en) 2022-01-06
JP7548498B2 true JP7548498B2 (en) 2024-09-10

Family

ID=79244331

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020107123A Active JP7548498B2 (en) 2020-06-22 2020-06-22 Initial stress measurement method

Country Status (1)

Country Link
JP (1) JP7548498B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7802279B2 (en) * 2022-01-21 2026-01-20 株式会社フジタ Stress measurement device
JP7804276B2 (en) * 2022-01-21 2026-01-22 株式会社フジタ Stress measuring device and its operating tools
CN114963905A (en) * 2022-06-15 2022-08-30 四川川交路桥有限责任公司 Full through stress release hole, non-cut drilling and blasting method
CN115370417B (en) * 2022-07-22 2024-02-23 北京交通大学 Method and device for testing extrusion deformation of tunnel face

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000205978A (en) 1999-01-18 2000-07-28 Techno Togo:Kk Hole diameter variation measuring apparatus and method
JP2002541365A (en) 1999-04-01 2002-12-03 タハオス ゲゼルシャフト・ミット・ベシュレンクテル・ハフツング Method and apparatus for determining the initial stress state of a part of a rock characteristic curve for tunnel construction, tunnel construction measuring device, tunnel construction system
JP2004316117A (en) 2003-04-11 2004-11-11 Nagatomo Shigeki Measuring device for face forward bedrock displacement and measuring method
JP2009299316A (en) 2008-06-11 2009-12-24 Kajima Corp Displacement measuring device and displacement measuring method
JP2011052373A (en) 2009-08-31 2011-03-17 Nishimatsu Constr Co Ltd Method for managing construction of tunnel
CN102155239A (en) 2011-04-15 2011-08-17 中铁隧道集团有限公司 Ground stress release method for high ground stress soft rock tunnel positive step excavation
JP2015113572A (en) 2013-12-09 2015-06-22 株式会社大林組 Method to install precedent underground displacement gage
JP2020066843A (en) 2018-10-22 2020-04-30 株式会社大林組 Deformation prediction method for tunnel and deformation prediction system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4491022A (en) * 1983-02-17 1985-01-01 Wisconsin Alumni Research Foundation Cone-shaped coring for determining the in situ state of stress in rock masses
JPH02110312A (en) * 1988-10-20 1990-04-23 Fujita Corp Method and device for measuring displacement of the upper ground in front of the tunnel face
JPH09288021A (en) * 1996-04-23 1997-11-04 Fujita Corp Loose displacement measurement method
JP3871087B2 (en) * 1997-05-26 2007-01-24 株式会社フジタ In-situ rock mass shear strength test apparatus and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000205978A (en) 1999-01-18 2000-07-28 Techno Togo:Kk Hole diameter variation measuring apparatus and method
JP2002541365A (en) 1999-04-01 2002-12-03 タハオス ゲゼルシャフト・ミット・ベシュレンクテル・ハフツング Method and apparatus for determining the initial stress state of a part of a rock characteristic curve for tunnel construction, tunnel construction measuring device, tunnel construction system
JP2004316117A (en) 2003-04-11 2004-11-11 Nagatomo Shigeki Measuring device for face forward bedrock displacement and measuring method
JP2009299316A (en) 2008-06-11 2009-12-24 Kajima Corp Displacement measuring device and displacement measuring method
JP2011052373A (en) 2009-08-31 2011-03-17 Nishimatsu Constr Co Ltd Method for managing construction of tunnel
CN102155239A (en) 2011-04-15 2011-08-17 中铁隧道集团有限公司 Ground stress release method for high ground stress soft rock tunnel positive step excavation
JP2015113572A (en) 2013-12-09 2015-06-22 株式会社大林組 Method to install precedent underground displacement gage
JP2020066843A (en) 2018-10-22 2020-04-30 株式会社大林組 Deformation prediction method for tunnel and deformation prediction system

Also Published As

Publication number Publication date
JP2022001853A (en) 2022-01-06

Similar Documents

Publication Publication Date Title
JP7548498B2 (en) Initial stress measurement method
Fargnoli et al. Twin tunnel excavation in coarse grained soils: Observations and numerical back-predictions under free field conditions and in presence of a surface structure
Zhao et al. Experimental and numerical investigation of the effect of blast-induced vibration from adjacent tunnel on existing tunnel
JP5867957B2 (en) Method and system for predicting rock strength
CN103293560B (en) A kind of method of testing adopting triple stress court
JP5985371B2 (en) Geological exploration method during tunnel excavation
CN101270666B (en) Tunnel influence geological condition section-expanding horizontal drilling estimation and prediction method
JP6929179B2 (en) Hydraulic characterization method
Kurlenya et al. Experimental and analytical method for assessing stability of stopes
Divall et al. Twin-tunnelling-induced changes to clay stiffness
Sazid et al. Rock stress measurement methods in rock mechanics—a brief overview
CA2979330C (en) Draw-down pressure apparatus, systems, and methods
JP6820505B2 (en) Tunnel ground exploration method
JP3856392B2 (en) Evaluation method of natural ground in front of ground excavation part
Behera et al. A PPV-based prediction model to construct damage envelop for crater blasts
Zvarivadza et al. In-stope pillar scaling and fracturing in Southern African deep level gold mines
Zhou et al. Dynamic modelling of rock bolts at Kiirunavaara mine
Eftekhari et al. Uncertainties and complexities of the geological model in slope stability: a case study of Sabzkuh tunnel
Trinh et al. Continued rock stress and displacement measurements combined with numerical modeling as an active, realistic rock engineering tool
JP5319618B2 (en) Ground condition prediction method and tunnel excavation method
Armand et al. Mine by experiment performed in the Callovo-Oxfordian Claystone at the Meuse Haute Marne underground research laboratory (France)
Li et al. The hydromechanical behaviour of the Boom Clay observed during excavation of the connecting gallery at Mol site
JPH11256561A (en) Reinforcement design evaluation method
Garrido et al. Interaction between tunnels and slopes. Analysis of weak rock masses considering the Hoek-Brown failure criterion
Hutchinson et al. Observational design of underground cable bolt support systems utilizing instrumentation

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230417

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240228

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240312

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240430

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240611

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240719

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240806

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240820

R150 Certificate of patent or registration of utility model

Ref document number: 7548498

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350