Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7554615B2 - Power System - Google Patents
[go: Go Back, main page]

JP7554615B2 - Power System - Google Patents

Power System Download PDF

Info

Publication number
JP7554615B2
JP7554615B2 JP2020159502A JP2020159502A JP7554615B2 JP 7554615 B2 JP7554615 B2 JP 7554615B2 JP 2020159502 A JP2020159502 A JP 2020159502A JP 2020159502 A JP2020159502 A JP 2020159502A JP 7554615 B2 JP7554615 B2 JP 7554615B2
Authority
JP
Japan
Prior art keywords
power
charge
value
control device
communication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020159502A
Other languages
Japanese (ja)
Other versions
JP2022052954A (en
Inventor
隆史 花尾
彰大 大堀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daihen Corp
Original Assignee
Daihen Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daihen Corp filed Critical Daihen Corp
Priority to JP2020159502A priority Critical patent/JP7554615B2/en
Publication of JP2022052954A publication Critical patent/JP2022052954A/en
Application granted granted Critical
Publication of JP7554615B2 publication Critical patent/JP7554615B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • Y02T90/167Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/126Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S30/00Systems supporting specific end-user applications in the sector of transportation
    • Y04S30/10Systems supporting the interoperability of electric or hybrid vehicles
    • Y04S30/12Remote or cooperative charging
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S30/00Systems supporting specific end-user applications in the sector of transportation
    • Y04S30/10Systems supporting the interoperability of electric or hybrid vehicles
    • Y04S30/14Details associated with the interoperability, e.g. vehicle recognition, authentication, identification or billing

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Description

本開示は、電力システムに関する。 This disclosure relates to power systems.

電力系統に接続された複数の電力制御装置を管理して、電力系統との間での送受電の制御を行う電力システムが普及しつつある。例えば、特許文献1には、複数の電力制御装置と処理装置とを備えた電力システムの一例が開示されている。処理装置は、接続点電力を目標電力に制御するための指標(制御指令値)を算出する。接続点電力は、電力系統と電力システムとの接続点における電力である。複数の電力制御装置は、例えば太陽光発電装置および蓄電池制御装置である。各電力制御装置は、処理装置が算出した制御指令値を用いて、分散的に出力電力を制御している。このとき、各電力制御装置は、制御指令値を用いた最適化問題に基づいて、出力電力の目標値を算出する。そして、出力電力が当該目標値となるように、出力電力を制御する。このようにして、電力システムのエネルギー管理を行っている。 Power systems that manage multiple power control devices connected to a power grid and control the transmission and reception of power between the power grid are becoming more widespread. For example, Patent Document 1 discloses an example of a power system equipped with multiple power control devices and a processing device. The processing device calculates an index (control command value) for controlling the connection point power to a target power. The connection point power is the power at the connection point between the power grid and the power system. The multiple power control devices are, for example, a solar power generation device and a storage battery control device. Each power control device controls the output power in a distributed manner using the control command value calculated by the processing device. At this time, each power control device calculates a target value for the output power based on an optimization problem using the control command value. Then, the output power is controlled so that the output power becomes the target value. In this way, energy management of the power system is performed.

特開2020-43642号公報JP 2020-43642 A

電力制御装置の多様化により、太陽光発電装置や蓄電池制御装置とは異なる種類の電力制御装置が電力系統に連系されつつある。このような電力制御装置としては、例えば電気自動車向けの充放電器(以下「EVスタンド」という)がある。EVは、Electric Vehicleの略称である。EVスタンドは、電気自動車の充電を行うものが一般的だが、中には電気自動車の放電を行うものもある。例えば災害時等に電力事業者から電力の供給が受けられない場合において、電気自動車を電源として電気自動車に蓄積された電力を利用することがある。そこで、電気自動車の充放電制御を含めたエネルギー管理が求められるが、特許文献1に記載の電力システムでは、EVスタンドを含めた電力制御が考慮されていない。 Due to the diversification of power control devices, types of power control devices other than solar power generation devices and storage battery control devices are being connected to the power grid. One example of such a power control device is a charger/discharger for electric vehicles (hereinafter referred to as an "EV stand"). EV is an abbreviation for Electric Vehicle. EV stands generally charge electric vehicles, but some also discharge electric vehicles. For example, in the event of a disaster or other such event where power cannot be supplied from the power company, the electric vehicle may be used as a power source to utilize the power stored in the electric vehicle. Therefore, energy management that includes charge/discharge control of electric vehicles is required, but the power system described in Patent Document 1 does not take into account power control including EV stands.

本開示は、上記事情に鑑みて考え出されたものであり、その目的は、電気自動車の充放電制御を含めたエネルギー管理を行う電力システムを提供することにある。 This disclosure was conceived in light of the above circumstances, and its purpose is to provide a power system that performs energy management, including charge and discharge control, for electric vehicles.

本開示の電力システムは、電力系統に接続され、当該電力系統との接続点における電力である接続点電力の電力制御を行う電力システムであって、前記接続点電力の値を検出する検出装置と、前記接続点電力の値を設定された調整目標値にするための誘導指令値を導出する処理装置と、各々が、前記接続点に電気的に接続され、かつ、前記誘導指令値を用いた最適化問題に基づいて、出力電力を制御する複数の電力制御装置と、を備えており、前記複数の電力制御装置は、蓄電池が接続された第1充放電制御装置と、電気自動車を接続可能な第2充放電制御装置と、を含み、前記第1充放電制御装置は、前記蓄電池の充放電を制御しており、前記第2充放電制御装置は、前記電気自動車の充放電を制御しており、前記検出装置と前記処理装置との間の通信、前記処理装置と前記第1充放電制御装置との間の通信、および、前記処理装置と前記第2充放電制御装置との間の通信のいずれかにおいて通信異常が生じたときに、前記第2充放電制御装置は、前記電気自動車の充放電を停止しつつ、前記通信異常が生じていることを報知することを特徴とする。 The power system of the present disclosure is a power system that is connected to a power grid and controls the connection point power, which is the power at the connection point with the power grid, and includes a detection device that detects the value of the connection point power, a processing device that derives an induced command value for making the value of the connection point power a set adjustment target value, and a plurality of power control devices that are each electrically connected to the connection point and control output power based on an optimization problem using the induced command value. The plurality of power control devices include a first charge/discharge control device to which a storage battery is connected and a second charge/discharge control device to which an electric vehicle can be connected. The first charge/discharge control device controls the charging/discharging of the storage battery, and the second charge/discharge control device controls the charging/discharging of the electric vehicle. When a communication abnormality occurs in any of the communication between the detection device and the processing device, the communication between the processing device and the first charge/discharge control device, and the communication between the processing device and the second charge/discharge control device, the second charge/discharge control device stops the charging/discharging of the electric vehicle and notifies the user that the communication abnormality has occurred.

前記電力システムの好ましい実施の形態においては、前記処理装置は、前記電気自動車の充電可否および放電可否を指定するフラグ情報を前記第2充放電制御装置に送信しており、前記第2充放電制御装置は、前記フラグ情報を受信し、前記誘導指令値および受信した前記フラグ情報に基づいて、前記電気自動車の充放電を制御しており、前記フラグ情報は、前記電力制御に対する制御モードに応じて決定される。 In a preferred embodiment of the power system, the processing device transmits flag information specifying whether the electric vehicle can be charged and discharged to the second charge/discharge control device, and the second charge/discharge control device receives the flag information and controls the charging and discharging of the electric vehicle based on the induced command value and the received flag information, and the flag information is determined according to the control mode for the power control.

前記電力システムの好ましい実施の形態においては、第1巻線、第2巻線および第3巻線を含む三巻線変圧器をさらに備え、前記第1巻線は、前記接続点に接続され、前記第2巻線は、前記第1充放電制御装置に接続され、前記第3巻線は、前記第2充放電制御装置に接続されている。 In a preferred embodiment of the power system, the power system further includes a three-winding transformer including a first winding, a second winding, and a third winding, the first winding being connected to the connection point, the second winding being connected to the first charge/discharge control device, and the third winding being connected to the second charge/discharge control device.

前記電力システムの好ましい実施の形態においては、前記処理装置は、前記複数の電力制御装置の各々から当該電力制御装置の出力電力をそれぞれ受信しており、受信した前記出力電力の合計値が前記第1巻線の巻線容量を超過する場合、前記誘導指令値として当該超過を解消させるための設定値を前記複数の電力制御装置の各々に送信する。 In a preferred embodiment of the power system, the processing device receives the output power of each of the power control devices from each of the multiple power control devices, and when the total value of the received output power exceeds the winding capacity of the first winding, the processing device transmits a setting value as the induction command value to each of the multiple power control devices to eliminate the excess.

前記電力システムの好ましい実施の形態においては、前記設定値は、前記接続点側から前記三巻線変圧器側に電力が供給されている状態において前記合計値が前記巻線容量を超過する場合、前記蓄電池の充放電を停止させる値であり、前記三巻線変圧器側から前記接続点側に電力が供給されている状態において前記合計値が前記巻線容量を超過する場合、前記電気自動車の充放電を停止させる値である。 In a preferred embodiment of the power system, the set value is a value that stops charging/discharging of the storage battery if the total value exceeds the winding capacity when power is being supplied from the connection point side to the three-winding transformer side, and is a value that stops charging/discharging of the electric vehicle if the total value exceeds the winding capacity when power is being supplied from the three-winding transformer side to the connection point side.

本開示の電力システムによれば、処理装置および複数の電力制御装置を備えている。前記処理装置は、接続点電力を目標電力にするための誘導指令値を算出する。前記複数の電力制御装置は、各々が誘導指令値を用いた最適化問題に基づいて、出力電力を制御する。前記複数の電力制御装置は、電気自動車を接続可能な第2充放電制御装置を含んでいる。第2充放電制御装置は、電気自動車の充放電を制御する。この構成によると、前記第2充放電制御装置は、誘導指令値を用いた最適化問題に基づいて、電気自動車の充放電を制御する。したがって、本開示の電力システムは、第2充放電制御装置によって、電気自動車の充放電制御を含めたエネルギー管理が可能である。 The power system of the present disclosure includes a processing device and a plurality of power control devices. The processing device calculates an induction command value for bringing the connection point power to a target power. The plurality of power control devices each control output power based on an optimization problem using the induction command value. The plurality of power control devices includes a second charge/discharge control device to which an electric vehicle can be connected. The second charge/discharge control device controls charging/discharging of the electric vehicle. According to this configuration, the second charge/discharge control device controls charging/discharging of the electric vehicle based on an optimization problem using the induction command value. Therefore, the power system of the present disclosure is capable of energy management, including charging/discharging control of the electric vehicle, by the second charge/discharge control device.

第1実施形態にかかる電力システムの全体構成を示している。1 shows an overall configuration of a power system according to a first embodiment. 誘導指令値と各電力制御装置の出力電力との関係を示す特性グラフの一例である。4 is an example of a characteristics graph showing the relationship between an induction command value and an output power of each power control device. 誘導指令値と各電力制御装置の出力電力との関係を示す特性グラフの他の例である。10 is another example of a characteristic graph showing the relationship between the induction command value and the output power of each power control device. 第2実施形態にかかる電力システムの全体構成を示している。1 shows an overall configuration of a power system according to a second embodiment.

本開示の電力システムの好ましい実施の形態について、図面を参照して、以下に説明する。以下の説明において、同一あるいは類似の構成要素には、同じ符号を付して、重複する説明を省略する。 A preferred embodiment of the power system of the present disclosure will be described below with reference to the drawings. In the following description, identical or similar components will be given the same reference numerals and duplicate descriptions will be omitted.

図1は、本実施形態の電力システムS1の全体構成を示している。電力システムS1は、電力線90、変圧器91、遮断器92、処理装置A1、複数の電力制御装置B1、検出装置C1、および、ネットワークハブH1を備える。複数の電力制御装置B1は、蓄電池用充放電制御装置10および複数のEV用充放電制御装置20を含む。蓄電池用充放電制御装置10には蓄電池19が接続されている。複数のEV用充放電制御装置20のそれぞれには複数の電気自動車29がそれぞれ1台ずつ接続可能である。本開示において、電気自動車29とは、電動機を動力源として走行可能な自動車をいい、燃料電池車や内燃機関が併設された自動車(たとえばプラグインハイブリッド車)などを含む。電動機は、電気自動車29に備えられた蓄電池に蓄積された電力によって動作する。 Figure 1 shows the overall configuration of the power system S1 of this embodiment. The power system S1 includes a power line 90, a transformer 91, a circuit breaker 92, a processing device A1, multiple power control devices B1, a detection device C1, and a network hub H1. The multiple power control devices B1 include a storage battery charge/discharge control device 10 and multiple EV charge/discharge control devices 20. A storage battery 19 is connected to the storage battery charge/discharge control device 10. Multiple electric vehicles 29 can be connected to each of the multiple EV charge/discharge control devices 20. In this disclosure, the electric vehicle 29 refers to a vehicle that can run using an electric motor as a power source, and includes a fuel cell vehicle and a vehicle equipped with an internal combustion engine (e.g., a plug-in hybrid vehicle). The electric motor operates using power stored in a storage battery provided in the electric vehicle 29.

電力システムS1は、接続点Kに接続され、電力系統Dに連系されている。電力システムS1は、電力系統Dに送電可能(逆潮流可能)であり、かつ、電力系統Dから受電可能である。本開示において、電力システムS1から電力系統Dに電力が出力されているとき、すなわち、逆潮流しているとき、接続点電力が正の値となるものとする。一方、電力系統Dから電力システムS1に電力が出力されているとき、接続点電力が負の値となるものとする。接続点電力とは、電力システムS1と電力系統Dとの接続点Kにおける電力のことである。 The power system S1 is connected to a connection point K and is interconnected with the power system D. The power system S1 is capable of transmitting power to the power system D (capable of reverse power flow) and receiving power from the power system D. In this disclosure, when power is being output from the power system S1 to the power system D, i.e., when reverse power flow is occurring, the connection point power is assumed to be a positive value. On the other hand, when power is being output from the power system D to the power system S1, the connection point power is assumed to be a negative value. The connection point power refers to the power at the connection point K between the power system S1 and the power system D.

電力システムS1は、処理装置A1と複数の電力制御装置B1とが協調して、接続点電力が目標電力となるように電力制御を行う。目標電力とは、接続点電力の目標値(調整目標値)のことである。電力システムS1の電力制御において、処理装置A1は、接続点電力を目標電力(調整目標値)に制御するための指標を算出する。この指標は、特許文献1に記載の制御指令値に相当し、本開示では「誘導指令値」という。各電力制御装置B1は、処理装置A1が算出した誘導指令値に基づいて、制御対象(蓄電池19あるいは各電気自動車29)の出力目標値を算出する。そして、各電力制御装置B1は、算出した出力目標値に基づいて、制御対象の出力電力を制御する。このように、電力システムS1は、複数の電力制御装置B1が分散的に出力電力の制御を行うことで、接続点電力を目標電力(調整目標値)に制御している。誘導指令値は、各電力制御装置B1が出力目標値を算出するためのものでもある。 In the power system S1, the processing device A1 and the multiple power control devices B1 cooperate to control the connection point power to the target power. The target power is the target value (adjustment target value) of the connection point power. In the power control of the power system S1, the processing device A1 calculates an index for controlling the connection point power to the target power (adjustment target value). This index corresponds to the control command value described in Patent Document 1, and is called an "induced command value" in this disclosure. Each power control device B1 calculates an output target value of the control object (storage battery 19 or each electric vehicle 29) based on the induced command value calculated by the processing device A1. Then, each power control device B1 controls the output power of the control object based on the calculated output target value. In this way, the power system S1 controls the connection point power to the target power (adjustment target value) by the multiple power control devices B1 controlling the output power in a distributed manner. The induced command value is also used by each power control device B1 to calculate the output target value.

電力負荷Lは、供給される電力を消費するものである。電力負荷Lは、電力系統Dや各電力制御装置B1から電力が供給される。電力負荷Lは、一般負荷L1と重要負荷L2とを含む。一般負荷L1は、例えば、災害時に電力が遮断されても、比較的影響が少ない電気機器を含む。重要負荷L2は、災害時でも電力を継続して供給する必要性がある重要な負荷であり、例えば、非常用のエレベータ、連続運転が必要な電気機器、建屋の照明や空調機器などが含まれる。 The power loads L consume the power that is supplied to them. Power is supplied to the power loads L from the power system D and each power control device B1. The power loads L include general loads L1 and important loads L2. The general loads L1 include, for example, electrical equipment that is relatively unaffected even if the power is cut off during a disaster. The important loads L2 are important loads that require a continuous supply of power even during a disaster, and include, for example, emergency elevators, electrical equipment that requires continuous operation, and building lighting and air conditioning equipment.

ネットワークハブH1は、処理装置A1と各電力制御装置B1との通信、および、処理装置A1と検出装置C1との通信を中継する。ネットワークハブH1と、処理装置A1、各電力制御装置B1および検出装置C1との間の各通信は、無線通信であってもよいし、有線通信であってもよい。なお、ネットワークハブH1が各機器間の通信を中継することなく、各機器間が直接通信してもよい。 The network hub H1 relays communication between the processing device A1 and each power control device B1, and between the processing device A1 and the detection device C1. Each communication between the network hub H1 and the processing device A1, each power control device B1, and the detection device C1 may be wireless communication or wired communication. Note that each device may communicate directly with each other without the network hub H1 relaying the communication between the devices.

電力線90は、電力システムS1における電力ネットワークを構築するためのものである。電力線90は、電力系統Dと電力負荷L(一般負荷L1および重要負荷L2)とを接続するもの、電力系統Dと変圧器91とを接続するもの、および、変圧器91と各電力制御装置B1とを接続するものがある。 The power lines 90 are used to construct a power network in the power system S1. Some of the power lines 90 connect the power system D to the power loads L (general loads L1 and important loads L2), some connect the power system D to the transformer 91, and some connect the transformer 91 to each power control device B1.

変圧器91は、例えば三相の三巻線変圧器で構成される。変圧器91は、第1巻線911、第2巻線912および第3巻線913を有する。第1巻線911は、遮断器92を介して、接続点Kに接続されている。第2巻線912には、蓄電池用充放電制御装置10が接続されている。第3巻線913には、複数のEV用充放電制御装置20がそれぞれ接続されている。第1巻線911の電圧および電力(皮相電力)は、例えば6600V、56kVAである。第2巻線912の電圧および電力(皮相電力)は、例えば300V、56kVAである。第3巻線913の電圧および電力(皮相電力)は、例えば210V、50kVAである。第1巻線911、第2巻線912および第3巻線913の各巻線容量は、例えば50kWである。第1巻線911、第2巻線912および第3巻線913の各電圧、各電力および各巻線容量は、これらの値に限定されない。変圧器91は、三巻線変圧器ではなく、接続点Kと蓄電池用充放電制御装置10との間に接続される二巻線変圧器および接続点Kと複数のEV用充放電制御装置20のそれぞれとの間に接続される二巻線変圧器の2つの二巻線変圧器で構成されていてもよい。ただし、三巻線変圧器を用いることで、2つの二巻線変圧器を用いる場合よりも、省スペース化および軽量化を図ることができる。 The transformer 91 is, for example, a three-phase, three-winding transformer. The transformer 91 has a first winding 911, a second winding 912, and a third winding 913. The first winding 911 is connected to a connection point K via a circuit breaker 92. The second winding 912 is connected to a storage battery charge/discharge control device 10. The third winding 913 is connected to a plurality of EV charge/discharge control devices 20. The voltage and power (apparent power) of the first winding 911 are, for example, 6600 V and 56 kVA. The voltage and power (apparent power) of the second winding 912 are, for example, 300 V and 56 kVA. The voltage and power (apparent power) of the third winding 913 are, for example, 210 V and 50 kVA. The winding capacity of each of the first winding 911, the second winding 912, and the third winding 913 is, for example, 50 kW. The voltage, power, and winding capacity of each of the first winding 911, the second winding 912, and the third winding 913 are not limited to these values. The transformer 91 may be configured not only as a three-winding transformer, but also as two two-winding transformers, a two-winding transformer connected between the connection point K and the storage battery charge/discharge control device 10, and a two-winding transformer connected between the connection point K and each of the multiple EV charge/discharge control devices 20. However, by using a three-winding transformer, it is possible to save space and reduce weight compared to the case of using two two-winding transformers.

遮断器92は、例えばVCB(真空遮断器)である。遮断器92は、電力系統Dの異常が検出されると、電路が遮断される。例えば、遮断器92は、UVR(不足電圧継電器:図示略)によって電力系統D側の短絡事故や停電などの異常が検出されたとき、OVGR(地絡過電圧継電器:図示略)によって電力系統Dの地絡事故が検出されたとき、RPR/UPR(逆電力継電器/不足電力継電器:図示略)によって電力系統D側への逆潮流や短絡事故などの異常が検出されたときに、遮断される。遮断器92の電路が遮断された状態では、重要負荷L2が電力系統Dから切り離される。このとき、電力システムS1は、自立運転を行い、蓄電池用充放電制御装置10およびEV用充放電制御装置20から電力を重要負荷L2に供給する。 The circuit breaker 92 is, for example, a VCB (vacuum circuit breaker). When an abnormality in the power system D is detected, the circuit breaker 92 cuts off the electric circuit. For example, the circuit breaker 92 cuts off when an abnormality such as a short circuit or power outage is detected on the power system D side by an UVR (undervoltage relay: not shown), when an earth fault is detected on the power system D by an OVGR (overvoltage earth relay: not shown), or when an abnormality such as reverse power flow to the power system D side or a short circuit is detected by an RPR/UPR (reverse power relay/underpower relay: not shown). When the circuit of the circuit breaker 92 is cut off, the important load L2 is separated from the power system D. At this time, the power system S1 performs an independent operation and supplies power to the important load L2 from the battery charge/discharge control device 10 and the EV charge/discharge control device 20.

検出装置C1は、接続点電力を検出する。検出装置C1は、検出部81および通信処理部82を含む。検出部81は、電力システムS1と電力系統Dとの接続点Kに設置され、接続点電力を検出する。検出部81は、例えば電力トランスデューサである。検出部81は、通信処理部82と通信可能であり、接続点電力の検出値を通信処理部82に出力する。通信処理部82は、検出部81から入力される接続点電力の検出値(アナログ値)をデジタル値に変換するAD変換器であり、変換後の接続点電力の検出値(デジタル値)を、ネットワークハブH1を介して、処理装置A1に送信する。検出装置C1には、適宜、電力システムS1を電力系統Dに連系するための各種保護装置がさらに設置される。例えば、電力システムS1が電力系統Dへの逆潮流を禁止されたシステムである場合、検出装置C1は、保護装置として、RPR(逆電力継電器)を含む。なお、検出装置C1は、ネットワークハブH1を介することなく直接処理装置A1と通信してもよい。 The detection device C1 detects the connection point power. The detection device C1 includes a detection unit 81 and a communication processing unit 82. The detection unit 81 is installed at the connection point K between the power system S1 and the power system D, and detects the connection point power. The detection unit 81 is, for example, a power transducer. The detection unit 81 can communicate with the communication processing unit 82, and outputs the detection value of the connection point power to the communication processing unit 82. The communication processing unit 82 is an AD converter that converts the detection value (analog value) of the connection point power input from the detection unit 81 into a digital value, and transmits the detection value (digital value) of the connection point power after the conversion to the processing device A1 via the network hub H1. The detection device C1 is further equipped with various protective devices for connecting the power system S1 to the power system D as appropriate. For example, if the power system S1 is a system in which reverse power flow to the power system D is prohibited, the detection device C1 includes an RPR (reverse power relay) as a protective device. In addition, the detection device C1 may communicate directly with the processing device A1 without going through the network hub H1.

処理装置A1は、ネットワークハブH1を介して、複数の電力制御装置B1および検出装置C1のそれぞれと通信可能である。処理装置A1は、接続点電力を監視し、接続点電力を目標電力(調整目標値)に制御するための誘導指令値を算出する。接続点電力は、検出装置C1が検出した検出値を用いてもよいし、各電力制御装置B1から通信によって取得した各出力電力の値から算出される推算値であってもよい。なお、後述する制御モードに応じて接続点電力として、検出値あるいは推算値のいずれかが用いられる。また、目標電力(調整目標値)は、後述する制御モードに応じて適宜予め設定されている。例えば、目標電力は、制御モードに応じて、予め処理装置A1に設定された値やユーザ操作により設定された値、上位装置(例えば電力会社など)から指示された値などが設定されうる。処理装置A1は、算出した誘導指令値を、複数の電力制御装置B1(蓄電池用充放電制御装置10および複数のEV用充放電制御装置20)のそれぞれに送信する。処理装置A1は、たとえば、下記(1)式および下記(2)式に示す状態方程式(連立微分方程式)が設定されており、この状態方程式を解くことで、誘導指令値pr(t)を算出する。処理装置A1は、誘導指令値の算出を所定時間(例えば1[sec])毎に行う。下記(1)式および下記(2)式において、P(t)は接続点電力、PC(t)は目標電力、λ(t)は状態変数、pr(t)は誘導指令値、εは勾配係数である。

Figure 0007554615000001
The processing device A1 can communicate with each of the multiple power control devices B1 and the detection devices C1 via the network hub H1. The processing device A1 monitors the connection point power and calculates an induction command value for controlling the connection point power to a target power (adjustment target value). The connection point power may be a detected value detected by the detection device C1, or may be an estimated value calculated from the value of each output power acquired by communication from each power control device B1. In addition, either the detected value or the estimated value is used as the connection point power according to a control mode described later. In addition, the target power (adjustment target value) is appropriately set in advance according to a control mode described later. For example, the target power may be a value previously set in the processing device A1, a value set by a user operation, a value instructed by a higher-level device (for example, a power company, etc.) according to the control mode. The processing device A1 transmits the calculated induction command value to each of the multiple power control devices B1 (the battery charge/discharge control device 10 and the EV charge/discharge control device 20). The processing device A1 is set with state equations (simultaneous differential equations) shown in the following formulas (1) and (2), for example, and calculates a guiding command value pr(t) by solving these state equations. The processing device A1 calculates the guiding command value every predetermined time (for example, 1 [sec]). In the following formulas (1) and (2), P(t) is the connection point power, P C (t) is the target power, λ(t) is the state variable, pr(t) is the guiding command value, and ε is the gradient coefficient.
Figure 0007554615000001

処理装置A1には、特許文献1に記載の電力システムと同様に、制御モードが設定されている。制御モードは、電力システムS1のシステム機能を決定する設定である。電力システムS1における制御モードには、たとえば、特許文献1に記載の制御モードと同様に、スケジュールモード、ピークカットモード、ピークカット補助モードおよびRPR回避モードを含む。また、その他、自立運転モードおよびDG連携モードなどを含む。自立運転モードは、遮断器92の電路が遮断された状態において、重要負荷L2への電力供給を制御することを目的としたモードである。DG連携モードは、ディーゼル発電機が追加された場合において、電力制御を行うことを目的としたモードである。 The processing device A1 is set with a control mode, similar to the power system described in Patent Document 1. The control mode is a setting that determines the system function of the power system S1. The control modes in the power system S1 include, for example, a schedule mode, a peak cut mode, a peak cut assistance mode, and an RPR avoidance mode, similar to the control modes described in Patent Document 1. In addition, they also include an independent operation mode and a DG linked mode. The independent operation mode is a mode intended to control the power supply to the important load L2 when the circuit of the circuit breaker 92 is interrupted. The DG linked mode is a mode intended to perform power control when a diesel generator is added.

処理装置A1には、充放電許可フラグが設定されている。充放電許可フラグには、充電許可フラグおよび放電許可フラグがある。充電許可フラグは、電気自動車29の充電を許可するか禁止するかを示すフラグ情報である。充電許可フラグは、電気自動車29の充電を禁止する場合には、フラグ値「0」が設定され、一方、電気自動車29の充電を許可する場合には、フラグ値「1」が設定される。放電許可フラグは、電気自動車29の放電を許可するか禁止するかを示すフラグ情報である。放電許可フラグは、電気自動車29の放電を禁止する場合には、フラグ値「0」が設定され、一方、電気自動車29の放電を許可する場合には、フラグ値「1」が設定される。処理装置A1には、特許文献1に記載の電力システムと同様に、制御モードが設定されており、充放電許可フラグおよび放電許可フラグはそれぞれ、処理装置A1に設定される制御モードによって予め設定されている。たとえば、スケジュールモードでは、充電許可フラグにフラグ値「1」が設定され、かつ、放電許可フラグにフラグ値「0」が設定される。ピークカットモードでは、充電許可フラグにフラグ値「1」が設定され、かつ、放電許可フラグにフラグ値「1」が設定される。ピークカット補助モードでは、充電許可フラグにフラグ値「1」が設定され、かつ、放電許可フラグにフラグ値「1」が設定される。RPR回避モードでは、充電許可フラグにフラグ値「1」が設定され、かつ、放電許可フラグにフラグ値「1」が設定される。自立運転モードでは、充電許可フラグにフラグ値「0」が設定され、かつ、放電許可フラグにフラグ値「1」が設定される。ただし、自立運転モードにおいて、充電許可フラグを所定の条件に応じて適宜変更される構成であってもよい。DG連携モードでは、充電許可フラグにフラグ値「1」が設定され、かつ、放電許可フラグにフラグ値「1」が設定される。なお、当該設定値は、利用者の操作により変更可能である。処理装置A1は、たとえば制御モードの設定変更がされる度に、充放電許可フラグの設定情報(充電許可フラグおよび放電許可フラグの各設定情報)を各EV用充放電制御装置20に送信する。充放電許可フラグの設定情報は、制御モードの設定変更がされる度に送信されるのではなく、定期的に送信されてもよい。 A charge/discharge permission flag is set in the processing device A1. The charge/discharge permission flag includes a charge permission flag and a discharge permission flag. The charge permission flag is flag information indicating whether charging of the electric vehicle 29 is permitted or prohibited. When charging of the electric vehicle 29 is prohibited, the charge permission flag is set to a flag value of "0", while when charging of the electric vehicle 29 is permitted, the flag value of "1" is set. The discharge permission flag is flag information indicating whether discharging of the electric vehicle 29 is permitted or prohibited. When discharging of the electric vehicle 29 is prohibited, the flag value of "0" is set, while when discharging of the electric vehicle 29 is permitted, the flag value of "1" is set. In the processing device A1, a control mode is set in the same way as in the power system described in Patent Document 1, and the charge/discharge permission flag and the discharge permission flag are each set in advance according to the control mode set in the processing device A1. For example, in the schedule mode, the charge permission flag is set to a flag value of "1", and the discharge permission flag is set to a flag value of "0". In the peak cut mode, the charging permission flag is set to a flag value of "1", and the discharging permission flag is set to a flag value of "1". In the peak cut assistance mode, the charging permission flag is set to a flag value of "1", and the discharging permission flag is set to a flag value of "1". In the RPR avoidance mode, the charging permission flag is set to a flag value of "1", and the discharging permission flag is set to a flag value of "1". In the independent operation mode, the charging permission flag is set to a flag value of "0", and the discharging permission flag is set to a flag value of "1". However, in the independent operation mode, the charging permission flag may be appropriately changed according to a predetermined condition. In the DG linked mode, the charging permission flag is set to a flag value of "1", and the discharging permission flag is set to a flag value of "1". The setting values can be changed by a user's operation. For example, every time the setting of the control mode is changed, the processing device A1 transmits setting information of the charging/discharging permission flag (setting information of the charging permission flag and the discharging permission flag) to each EV charge/discharge control device 20. The setting information for the charge/discharge permission flag may be sent periodically, rather than every time the control mode setting is changed.

蓄電池用充放電制御装置10は、蓄電池19の充放電を制御する。蓄電池用充放電制御装置10は、蓄電池パワーコンディショナ11および通信処理部12を含んでいる。本開示では、パワーコンディショナを「PCS」と記載する。蓄電池PCS11と通信処理部12とは、双方向通信を行う。蓄電池PCS11と通信処理部12とは、別のモジュールで構成されたものに限定されず、1つのモジュールで構成されてもよい。 The battery charge/discharge control device 10 controls the charging and discharging of the battery 19. The battery charge/discharge control device 10 includes a battery power conditioner 11 and a communication processing unit 12. In this disclosure, the power conditioner is referred to as "PCS." The battery PCS 11 and the communication processing unit 12 communicate bidirectionally. The battery PCS 11 and the communication processing unit 12 are not limited to being configured as separate modules, and may be configured as a single module.

通信処理部12は、処理装置A1と蓄電池PCS11との通信を中継する。通信処理部12は、処理装置A1から誘導指令値を受信し、受信した誘導指令値に基づいて、蓄電池PCS11の出力目標値を算出する。出力目標値の算出方法については、後述する。通信処理部12は、算出した出力目標値を含む制御指令を生成し、これを蓄電池PCS11に送信する。 The communication processing unit 12 relays communication between the processing device A1 and the storage battery PCS11. The communication processing unit 12 receives a guidance command value from the processing device A1, and calculates an output target value of the storage battery PCS11 based on the received guidance command value. The method of calculating the output target value will be described later. The communication processing unit 12 generates a control command including the calculated output target value, and transmits this to the storage battery PCS11.

蓄電池PCS11は、蓄電池19が接続され、蓄電池19の充放電を行う。図1では、蓄電池PCS11に、1つの蓄電池19が接続されているが、複数の蓄電池19が接続されていてもよい。蓄電池19は、例えば二次電池あるいはコンデンサである。蓄電池PCS11は、電力線90によって、変圧器91の第2巻線912に接続される。蓄電池PCS11は、変圧器91から入力される電力を蓄電池19に供給することで、蓄電池19の充電を行う。また、蓄電池PCS11は、蓄電池19に蓄積された電力を変圧器91に出力することで、蓄電池19の放電を行う。蓄電池PCS11は、通信処理部12から受信する制御指令に基づいて、蓄電池19の充電量および蓄電池19の放電量を制御することで、制御対象(蓄電池19)の出力電力を制御する。具体的には、蓄電池PCS11は、蓄電池19の出力電力が、制御指令に含まれる出力目標値となるように、電力制御を行う。蓄電池PCS11は、受信した制御指令における出力目標値が正の値のとき、蓄電池19の放電を行う。一方、受信した制御指令における出力目標値が負の値のとき、蓄電池19の充電を行う。 The storage battery PCS11 is connected to the storage battery 19 and charges and discharges the storage battery 19. In FIG. 1, one storage battery 19 is connected to the storage battery PCS11, but multiple storage batteries 19 may be connected. The storage battery 19 is, for example, a secondary battery or a capacitor. The storage battery PCS11 is connected to a second winding 912 of a transformer 91 by a power line 90. The storage battery PCS11 charges the storage battery 19 by supplying the power input from the transformer 91 to the storage battery 19. The storage battery PCS11 also discharges the storage battery 19 by outputting the power stored in the storage battery 19 to the transformer 91. The storage battery PCS11 controls the charge amount of the storage battery 19 and the discharge amount of the storage battery 19 based on a control command received from the communication processing unit 12, thereby controlling the output power of the controlled object (storage battery 19). Specifically, the storage battery PCS11 performs power control so that the output power of the storage battery 19 becomes the output target value included in the control command. When the output target value in the received control command is a positive value, the storage battery PCS11 discharges the storage battery 19. On the other hand, when the output target value in the received control command is a negative value, the storage battery PCS11 charges the storage battery 19.

蓄電池PCS11の定格出力はたとえば50kWである。図1に示す例では、電力システムS1は、1つの蓄電池用充放電制御装置10を備えているが、蓄電池用充放電制御装置10の数は限定されない。ただし、蓄電池用充放電制御装置10(蓄電池PCS11)の定格出力および数はそれぞれ、接続される蓄電池用充放電制御装置10の定格出力の合計値が第2巻線912の巻線容量を超えないように設定される。 The rated output of the storage battery PCS11 is, for example, 50 kW. In the example shown in FIG. 1, the power system S1 includes one storage battery charge/discharge control device 10, but the number of storage battery charge/discharge control devices 10 is not limited. However, the rated output and the number of storage battery charge/discharge control devices 10 (storage battery PCS11) are each set so that the total value of the rated output of the connected storage battery charge/discharge control devices 10 does not exceed the winding capacity of the second winding 912.

蓄電池PCS11は、蓄電池19への出力電力の値を検出し、これを通信処理部12に送信する。通信処理部12は、蓄電池PCS11から出力電力の検出値を受信し、これを処理装置A1に送信する。また、蓄電池PCS11は、接続される蓄電池19から、当該蓄電池19の充電率(SoC:State of Charge)を取得する。蓄電池PCS11は、蓄電池19の充電率を通信処理部12に送信する。蓄電池19の充電率の情報は、通信処理部12において、出力目標値の算出に用いられる。 The storage battery PCS11 detects the value of the output power to the storage battery 19 and transmits this to the communication processing unit 12. The communication processing unit 12 receives the detected value of the output power from the storage battery PCS11 and transmits this to the processing device A1. The storage battery PCS11 also acquires the charging rate (SoC: State of Charge) of the storage battery 19 from the connected storage battery 19. The storage battery PCS11 transmits the charging rate of the storage battery 19 to the communication processing unit 12. The information on the charging rate of the storage battery 19 is used by the communication processing unit 12 to calculate the output target value.

複数のEV用充放電制御装置20はそれぞれ、電気自動車29の充放電を制御する。複数のEV用充放電制御装置20はそれぞれ、EVスタンド21および通信処理部22を含んでいる。EVスタンド21と通信処理部22とは、双方向通信を行う。EVスタンド21と通信処理部22とは、別のモジュールで構成されたものに限定されず、1つのモジュールで構成されてもよい。 Each of the multiple EV charge/discharge control devices 20 controls the charging and discharging of an electric vehicle 29. Each of the multiple EV charge/discharge control devices 20 includes an EV stand 21 and a communication processing unit 22. The EV stand 21 and the communication processing unit 22 perform two-way communication. The EV stand 21 and the communication processing unit 22 are not limited to being configured as separate modules, and may be configured as a single module.

複数の通信処理部22はそれぞれ、処理装置A1と各EVスタンド21との通信を中継する。各通信処理部22は、処理装置A1から誘導指令値を受信し、受信した誘導指令値に基づいて、各EVスタンド21の出力目標値を算出する。出力目標値の算出方法については、後述する。各通信処理部22は、算出した出力目標値を含む制御指令を生成し、これを各EVスタンド21にそれぞれ送信する。 Each of the multiple communication processing units 22 relays communication between the processing device A1 and each EV stand 21. Each communication processing unit 22 receives a guidance command value from the processing device A1, and calculates an output target value for each EV stand 21 based on the received guidance command value. The method of calculating the output target value will be described later. Each communication processing unit 22 generates a control command including the calculated output target value, and transmits this to each EV stand 21.

複数のEVスタンド21はそれぞれ、電気自動車29が接続され、電気自動車29の充放電(詳細には電気自動車29に備えられた蓄電池の充放電)を行う。図1では、EVスタンド21に、1台の電気自動車29が接続されているが、複数台の電気自動車29が接続されてもよい。各EVスタンド21は、電力線90によって、変圧器91の第3巻線913に接続されている。各EVスタンド21は、変圧器91から入力される電力を各電気自動車29にそれぞれ供給することで、各電気自動車29の充電を行う。また、各EVスタンド21は、各電気自動車29にそれぞれ蓄積された電力を変圧器91に出力することで、各電気自動車29の放電を行う。各EVスタンド21は、各通信処理部22から受信する制御指令に基づいて各電気自動車29の充電量および各電気自動車29の放電量を制御することで、制御対象(各電気自動車29)の出力電力を制御する。具体的には、各EVスタンド21は、各電気自動車29の出力電力が、制御指令に含まれる出力目標値となるように、電力制御を行う。各EVスタンド21は、受信した制御指令における出力目標値が正の値のとき、各電気自動車29の放電を行う。一方、受信した制御指令における出力目標値が負の値のとき、電気自動車29の充電を行う。 Each of the EV stands 21 is connected to an electric vehicle 29 and charges and discharges the electric vehicle 29 (specifically, charges and discharges a storage battery provided in the electric vehicle 29). In FIG. 1, one electric vehicle 29 is connected to the EV stand 21, but multiple electric vehicles 29 may be connected. Each EV stand 21 is connected to a third winding 913 of a transformer 91 by a power line 90. Each EV stand 21 charges each electric vehicle 29 by supplying the power input from the transformer 91 to each electric vehicle 29. Each EV stand 21 also discharges each electric vehicle 29 by outputting the power stored in each electric vehicle 29 to the transformer 91. Each EV stand 21 controls the output power of the control target (each electric vehicle 29) by controlling the charge amount of each electric vehicle 29 and the discharge amount of each electric vehicle 29 based on the control command received from each communication processing unit 22. Specifically, each EV stand 21 performs power control so that the output power of each electric vehicle 29 becomes the output target value included in the control command. Each EV stand 21 discharges each electric vehicle 29 when the output target value in the received control command is a positive value. On the other hand, each EV stand 21 charges each electric vehicle 29 when the output target value in the received control command is a negative value.

複数のEVスタンド21の各定格出力はたとえば10kWである。図1に示す例では、電力システムS1は、5つのEV用充放電制御装置20を備えているが、EV用充放電制御装置20の数は限定されない。ただし、EV用充放電制御装置20(EVスタンド21)の定格出力および数はそれぞれ、EV用充放電制御装置20の定格出力の合計値が第3巻線913の巻線容量を超えないように設定される。本実施形態では、第3巻線913の巻線容量が50kWであり、かつ、定格出力が10kWであるEVスタンド21を複数台用いる場合には、最大5台のEVスタンド21を第3巻線913に接続可能である。 The rated output of each of the multiple EV stands 21 is, for example, 10 kW. In the example shown in FIG. 1, the power system S1 includes five EV charge/discharge control devices 20, but the number of EV charge/discharge control devices 20 is not limited. However, the rated output and number of the EV charge/discharge control devices 20 (EV stands 21) are set so that the total value of the rated output of the EV charge/discharge control devices 20 does not exceed the winding capacity of the third winding 913. In this embodiment, when multiple EV stands 21 with a winding capacity of 50 kW and a rated output of 10 kW are used, up to five EV stands 21 can be connected to the third winding 913.

各EVスタンド21は、電気自動車29への出力電力の値を検出し、これを各通信処理部22に送信する。各通信処理部22は、各EVスタンド21から出力電力の検出値を受信し、これを処理装置A1に送信する。また、各EVスタンド21は、接続される電気自動車29から、当該電気自動車29の充電率(SoC)を取得する。各EVスタンド21は、各電気自動車29の充電率を各通信処理部22に送信する。電気自動車29の充電率の情報は、各通信処理部22において、出力目標値の算出に用いられる。 Each EV stand 21 detects the value of the output power to the electric vehicle 29 and transmits it to each communication processing unit 22. Each communication processing unit 22 receives the detected value of the output power from each EV stand 21 and transmits it to the processing device A1. Each EV stand 21 also obtains the charging rate (SoC) of the electric vehicle 29 connected to it from that electric vehicle 29. Each EV stand 21 transmits the charging rate of each electric vehicle 29 to each communication processing unit 22. Information on the charging rate of the electric vehicle 29 is used by each communication processing unit 22 to calculate the output target value.

各EVスタンド21は、たとえばディスプレイ(図示略)やスピーカ(図示略)などの報知装置を備えている。各EVスタンド21は、報知装置での報知(たとえばディスプレイへの表示やスピーカからの音声出力)によって、充放電に関する情報あるいは電力システムS1の異常などを報知する。充放電に関する情報は、例えば、EVスタンド21の動作状態(充放電の準備中、準備完了、充放電中、充放電完了など)、電気自動車29の蓄電池の充電状態(SoC)、満充電にするための所要時間、満充電になるまでの残余時間、放電可能量、充放電に関する料金などがある。これにより、電力システムS1は、各EVスタンド21を介して、各電気自動車29の充電状況や電力システムS1の異常などを、ユーザに知らせることが可能である。ユーザあるいは管理者などへの報知は、ディスプレイやスピーカを用いたものに限定されず、無線通信を介して、ユーザまたは管理者などが使用する端末装置へ通知してもよい。 Each EV stand 21 is equipped with a notification device such as a display (not shown) or a speaker (not shown). Each EV stand 21 notifies information related to charging and discharging or abnormalities in the power system S1 by using the notification device (for example, display on the display or audio output from the speaker). Information related to charging and discharging includes, for example, the operating status of the EV stand 21 (preparing for charging/discharging, preparation complete, charging/discharging, charging/discharging complete, etc.), the state of charge (SoC) of the storage battery of the electric vehicle 29, the time required for full charging, the remaining time until full charging, the amount that can be discharged, and the fee for charging and discharging. This allows the power system S1 to notify the user of the charging status of each electric vehicle 29 and abnormalities in the power system S1 via each EV stand 21. Notification to the user or administrator is not limited to using a display or a speaker, and may be sent to a terminal device used by the user or administrator via wireless communication.

次に、各電力制御装置B1(具体的には、通信処理部12および複数の通信処理部22のそれぞれ)が行う出力目標値の算出方法について説明する。通信処理部12および複数の通信処理部22はそれぞれ、処理装置A1から受信した誘導指令値を用いて、予め設定された最適化問題に基づいて、出力目標値を算出する。この最適化問題は、評価関数と制約条件とを含んでいる。 Next, the method of calculating the output target value performed by each power control device B1 (specifically, each of the communication processing unit 12 and the multiple communication processing units 22) will be described. Each of the communication processing unit 12 and the multiple communication processing units 22 calculates the output target value based on a preset optimization problem using the guidance command value received from the processing device A1. This optimization problem includes an evaluation function and constraint conditions.

通信処理部12および複数の通信処理部22はそれぞれ、設定されている評価関数から導出される下記(3)式および下記(4)式で示す演算式が設定されており、この演算式によって、出力目標値Prefを算出する。下記(3)式および下記(4)式において、Prefは通信処理部12および複数の通信処理部22の各出力目標値、prは誘導指令値、prlmtは誘導指令値限界、a1~a4はそれぞれ、設計パラメータである。誘導指令値限界prlmtは、電力システムS1で用いる誘導指令値prの最大値および最小値を定義する値である。下記(4)式で算出される値Λは、誘導指令値prの最小値(-prlmt)と誘導指令値prの最大値(prlmt)との間の値に制限される。設計パラメータa1は、主に誘導指令値prの変化に応じた出力電力の変化量を調整するパラメータである。設計パラメータa2は、主に誘導指令値prが0付近での出力電力を調整するパラメータである。設計パラメータa3は、主に出力電力が変化し始める誘導指令値prを調整するパラメータである。設計パラメータa4は、接続される蓄電池19の充電率(SoC)あるいは接続される電気自動車29の充電率(SoC)に応じたパラメータである。これらの各設計パラメータa1~a4は、通信処理部12および複数の通信処理部22にそれぞれ設定されている。通信処理部12および複数の通信処理部22はそれぞれ、下記(3)式および下記(4)式で示す演算式ではなく、設定されている評価関数を解くことで、出力目標値Prefを算出してもよい。当該評価関数は、たとえば特許文献1に記載されたものと同じである。

Figure 0007554615000002
The communication processing unit 12 and the multiple communication processing units 22 are set with the following arithmetic expressions (3) and (4) derived from the set evaluation function, and calculate the output target value P ref by these arithmetic expressions. In the following arithmetic expressions (3) and (4), P ref is the output target value of each of the communication processing units 12 and the multiple communication processing units 22, pr is the induction command value, pr lmt is the induction command value limit, and a 1 to a 4 are each design parameters. The induction command value limit pr lmt is a value that defines the maximum and minimum values of the induction command value pr used in the power system S1. The value Λ calculated by the following arithmetic expression (4) is limited to a value between the minimum value (-pr lmt ) of the induction command value pr and the maximum value (pr lmt ) of the induction command value pr. The design parameter a 1 is a parameter that mainly adjusts the amount of change in the output power corresponding to the change in the induction command value pr. The design parameter a2 is a parameter that mainly adjusts the output power when the induction command value pr is near 0. The design parameter a3 is a parameter that mainly adjusts the induction command value pr at which the output power starts to change. The design parameter a4 is a parameter according to the state of charge (SoC) of the connected storage battery 19 or the state of charge (SoC) of the connected electric vehicle 29. These design parameters a1 to a4 are set in the communication processing unit 12 and the multiple communication processing units 22, respectively. The communication processing unit 12 and the multiple communication processing units 22 may calculate the output target value P ref by solving a set evaluation function instead of the calculation formula shown in the following formula (3) and formula (4). The evaluation function is the same as that described in Patent Document 1, for example.
Figure 0007554615000002

通信処理部12および複数の通信処理部22はそれぞれ、上記(3)式および上記(4)式で示す演算式によって算出された出力目標値Prefが、通信処理部12および複数の通信処理部22のそれぞれに設定される制約条件を満たしていない場合には、制約条件を満たすように、出力目標値を補正する。通信処理部12に設定される制約条件には、定格出力制約、残量制約、Cレート制約、および、出力電流制約(あるいは定格容量制約)などがある。各通信処理部22に設定される制約条件は、定格出力制約、充放電許可フラグ制約、および、出力電流制約(あるいは定格容量制約)などがある。たとえば定格出力制約では、算出された出力目標値Prefが、通信処理部12の定格出力あるいは複数の通信処理部22の各定格出力を超えていた場合、出力目標値Prefは、定格出力の値に補正される。また、充放電許可フラグ制約では、処理装置A1から受信する充放電許可フラグの設定情報(充電許可フラグおよび放電許可フラグの各設定情報)に応じて、電気自動車29を充電させないように制限されたり、電気自動車29を放電させないように制限されたりする。 When the output target value P ref calculated by the arithmetic expressions (3) and (4) does not satisfy the constraint conditions set in the communication processing unit 12 and the communication processing units 22, the communication processing unit 12 and the communication processing units 22 correct the output target value so as to satisfy the constraint conditions. The constraint conditions set in the communication processing unit 12 include a rated output constraint, a remaining amount constraint, a C rate constraint, and an output current constraint (or a rated capacity constraint). The constraint conditions set in each communication processing unit 22 include a rated output constraint, a charge/discharge permission flag constraint, and an output current constraint (or a rated capacity constraint). For example, in the rated output constraint, when the calculated output target value P ref exceeds the rated output of the communication processing unit 12 or each rated output of the communication processing units 22, the output target value P ref is corrected to the value of the rated output. In addition, the charge/discharge permission flag constraint restricts the electric vehicle 29 from being charged or restricts the electric vehicle 29 from being discharged depending on the setting information of the charge/discharge permission flag (each setting information of the charge permission flag and the discharge permission flag) received from the processing device A1.

電力システムS1では、上記各設計パラメータa1~a4および制約条件の各設定を適宜調整することにより、誘導指令値と各電力制御装置B1の出力電力との関係が、例えば図2に示す特性となるように構成されている。図2において、縦軸は出力電力であり、横軸は誘導指令値である。また、図2において、蓄電池用充放電制御装置10の出力電力の変化特性を一点鎖線、複数のEV用充放電制御装置20の出力電力の合計の変化特性を二点鎖線、蓄電池用充放電制御装置10の出力電力と複数のEV用充放電制御装置20の出力電力の合計値の変化特性を実線で示している。 In the power system S1, the settings of the above design parameters a1 to a4 and the constraint conditions are appropriately adjusted so that the relationship between the induced command value and the output power of each power control device B1 has the characteristics shown in Fig. 2, for example. In Fig. 2, the vertical axis represents the output power, and the horizontal axis represents the induced command value. In Fig. 2, the change characteristic of the output power of the storage battery charge/discharge control device 10 is shown by a dashed line, the change characteristic of the total of the output powers of the multiple EV charge/discharge control devices 20 is shown by a dashed double-dashed line, and the change characteristic of the output power of the storage battery charge/discharge control device 10 and the total value of the output powers of the multiple EV charge/discharge control devices 20 is shown by a solid line.

図2に示す例では、蓄電池用充放電制御装置10は、誘導指令値が0(ゼロ)より小さいとき、蓄電池19の放電を行い、誘導指令値が0(ゼロ)より大きいとき、蓄電池19の充電を行う。このとき、誘導指令値が0(ゼロ)より小さいほど、放電量が線形的に大きくなり、誘導指令値が0(ゼロ)より大きいほど、充電量が線形的に大きくなる。また、蓄電池用充放電制御装置10は、誘導指令値が0(ゼロ)のときは、蓄電池19の充電も放電も行わない。各EV用充放電制御装置20は、誘導指令値が-50より小さいとき、各電気自動車29の放電を行い、誘導指令値が-50より大きいとき、各電気自動車29の充電を行う。このとき、誘導指令値が-50より小さいほど、放電量が線形的に大きくなり、誘導指令値が-50より大きいほど、充電量が線形的に大きくなる。ただし、第3巻線913の巻線容量が50kWであることから、複数のEV用充放電制御装置20の出力電力の合計値が-50kWよりも小さくならないように制限されている。図2に示す例では、誘導指令値が0(ゼロ)のときに、複数のEV用充放電制御装置20の出力電力の合計値が-50kWとなるため、誘導指令値が0(ゼロ)以上では、-50kWで一定である。また、各EV用充放電制御装置20は、誘導指令値が-50のときは、各電気自動車29の充電も放電も行わない。 In the example shown in FIG. 2, the battery charge/discharge control device 10 discharges the battery 19 when the induction command value is smaller than 0 (zero), and charges the battery 19 when the induction command value is larger than 0 (zero). At this time, the smaller the induction command value is 0 (zero), the greater the discharge amount becomes linearly larger, and the greater the induction command value is 0 (zero), the greater the charge amount becomes linearly larger. Furthermore, when the induction command value is 0 (zero), the battery charge/discharge control device 10 does not charge or discharge the battery 19. When the induction command value is smaller than -50, each EV charge/discharge control device 20 discharges each electric vehicle 29, and when the induction command value is larger than -50, each electric vehicle 29 is charged. At this time, the smaller the induction command value is -50, the greater the discharge amount becomes linearly larger, and the greater the induction command value is -50, the greater the charge amount becomes linearly larger. However, because the winding capacity of the third winding 913 is 50 kW, the total output power of the multiple EV charge/discharge control devices 20 is limited so as not to become smaller than -50 kW. In the example shown in FIG. 2, when the induction command value is 0 (zero), the total output power of the multiple EV charge/discharge control devices 20 is -50 kW, so when the induction command value is 0 (zero) or greater, it remains constant at -50 kW. Furthermore, when the induction command value is -50, each EV charge/discharge control device 20 neither charges nor discharges each electric vehicle 29.

電力システムS1において、処理装置A1は、複数の電力制御装置B1(蓄電池用充放電制御装置10および複数のEV用充放電制御装置20)の各々から受信する各出力電力の合計値が第1巻線911の巻線容量を超過する場合には、誘導指令値として当該超過を解消させるための設定値(超過解消設定値)を複数の電力制御装置B1(蓄電池用充放電制御装置10および複数のEV用充放電制御装置20)の各々に送信する。なお、超過解消設定値の送信は、複数の電力制御装置B1の各出力電力の合計値が第1巻線911の巻線容量を超過する場合ではなく、当該合計値が第1巻線911の巻線容量よりも少し小さい値を超過する場合であってもよい。ただし、複数の電力制御装置B1の各出力電力の合計値が第1巻線911の巻線容量を超過する場合に誘導指令値として超過解消設定値を送信する構成においては、第1巻線911における電力が第1巻線911の巻線容量を超過しても少なくとも数分間は動作可能な変圧器91を利用することが望ましい。第1巻線911の巻線容量の超過には、第1巻線911から接続点Kへ電力が供給された状態において超過する場合(放電時超過状態)と、接続点Kから第1巻線911へ電力が供給された状態において超過する場合(充電時超過状態)とがある。放電時超過状態においては、超過解消設定値は、各電気自動車29の充放電を停止させる値である。第1巻線911の巻線容量が50kWであり、かつ、図2に示す例では、誘導指令値が約-65よりも小さいときに放電時超過状態となり、処理装置A1は、誘導指令値として例えば-50を各電力制御装置B1に送信する。なお、放電時超過状態での超過解消設定値(誘導指令値)は、-50に限定されず、放電時超過状態を解消させる値であればよい。例えば、図2に示す例では、放電時超過状態での超過解消設定値(誘導指令値)は、-65よりも大きい値であれば放電時超過状態を解消させることができる。充電時超過状態においては、超過解消設定値は、蓄電池19の充放電を停止させる値である。第1巻線911の巻線容量が50kWであり、かつ、図2に示す例では、誘導指令値が0(ゼロ)よりも大きい場合に充電時超過状態となり、処理装置A1は、例えば誘導指令値として0(ゼロ)を各電力制御装置B1に送信する。なお、充電時超過状態での超過解消設定値(誘導指令値)は、0(ゼロ)に限定されず、充電時超過状態を解消させる値であればよい。例えば、図2に示す例では、充電時超過状態での超過解消設定値(誘導指令値)は、0(ゼロ)より小さい値であれば充電時超過状態を解消させることができる。処理装置A1は、超過解消設定値を送信後、一定時間経過後に、上記(1)式および上記(2)式の演算により算出された誘導指令値の送信を再開する。 In the power system S1, when the total value of the output powers received from each of the multiple power control devices B1 (the battery charge/discharge control device 10 and the multiple EV charge/discharge control devices 20) exceeds the winding capacity of the first winding 911, the processing device A1 transmits a set value (excess elimination set value) for eliminating the excess as an induction command value to each of the multiple power control devices B1 (the battery charge/discharge control device 10 and the multiple EV charge/discharge control devices 20). Note that the transmission of the excess elimination set value may be performed not only when the total value of the output powers of the multiple power control devices B1 exceeds the winding capacity of the first winding 911, but also when the total value exceeds a value slightly smaller than the winding capacity of the first winding 911. However, in a configuration in which an excess resolution setting value is transmitted as an induction command value when the total value of the output powers of the multiple power control devices B1 exceeds the winding capacity of the first winding 911, it is desirable to use a transformer 91 that can operate for at least several minutes even if the power in the first winding 911 exceeds the winding capacity of the first winding 911. The winding capacity of the first winding 911 may be exceeded when power is supplied from the first winding 911 to the connection point K (excessive discharge state), or when power is supplied from the connection point K to the first winding 911 (excessive charge state). In the excess discharge state, the excess resolution setting value is a value that stops charging and discharging of each electric vehicle 29. In the example shown in FIG. 2, when the winding capacity of the first winding 911 is 50 kW and the induction command value is smaller than about -65, the discharge-time excess state occurs, and the processing device A1 transmits, for example, -50 as the induction command value to each power control device B1. The excess-resolution set value (induction command value) in the discharge-time excess state is not limited to -50, and may be any value that resolves the discharge-time excess state. For example, in the example shown in FIG. 2, if the excess-resolution set value (induction command value) in the discharge-time excess state is a value greater than -65, the discharge-time excess state can be resolved. In the charge-time excess state, the excess-resolution set value is a value that stops charging and discharging the storage battery 19. In the example shown in FIG. 2, when the winding capacity of the first winding 911 is 50 kW and the induction command value is greater than 0 (zero), the charge-time excess state occurs, and the processing device A1 transmits, for example, 0 (zero) as the induction command value to each power control device B1. In addition, the excess resolution set value (induction command value) in the charging excess state is not limited to 0 (zero) and may be any value that can resolve the charging excess state. For example, in the example shown in FIG. 2, the excess resolution set value (induction command value) in the charging excess state can resolve the charging excess state if it is a value smaller than 0 (zero). After transmitting the excess resolution set value, the processing device A1 resumes transmitting the induction command value calculated by the calculation of the above formulas (1) and (2) after a certain time has elapsed.

上記放電時超過状態および上記充電時超過状態について、例えば図2に示す特性と異なり、図3に示す特性である場合を、説明する。例えば電力システムS1において、EV用充放電制御装置20が5つではなく3つであった場合に、図3に示す特性となる。図3において、蓄電池用充放電制御装置10の出力電力の変化特性を一点鎖線、複数のEV用充放電制御装置20の出力電力の合計の変化特性を二点鎖線、蓄電池用充放電制御装置10の出力電力と複数のEV用充放電制御装置20の出力電力の合計値の変化特性を実線で示している。図3に示す例では、誘導指令値が約-75よりも小さい場合に放電時超過状態となり、処理装置A1は、誘導指令値として-50を各電力制御装置B1に送信する。なお、図3に示す例においても、放電時超過状態での超過解消設定値(誘導指令値)は、-50に限定されず、放電時超過状態を解消させる値であればよい。また、誘導指令値が40よりも大きい場合に充電時超過状態となり、処理装置A1は、誘導指令値として0(ゼロ)を各電力制御装置B1に送信する。なお、図3に示す例においても、充電時超過状態での超過解消設定値(誘導指令値)は、0(ゼロ)に限定されず、充電時超過状態を解消させる値であればよい。このように、超過解消設定値は、誘導指令値と各電力制御装置B1の出力電力との関係に応じて、適宜設定される。 The above-mentioned discharge excess state and the above-mentioned charge excess state will be described in the case where the characteristics shown in FIG. 3 are different from those shown in FIG. 2. For example, in the power system S1, if there are three EV charge/discharge control devices 20 instead of five, the characteristics shown in FIG. 3 will be obtained. In FIG. 3, the change characteristic of the output power of the battery charge/discharge control device 10 is shown by a dashed line, the change characteristic of the total of the output powers of the multiple EV charge/discharge control devices 20 is shown by a two-dot dashed line, and the change characteristic of the output power of the battery charge/discharge control device 10 and the total value of the output powers of the multiple EV charge/discharge control devices 20 is shown by a solid line. In the example shown in FIG. 3, when the induction command value is smaller than about -75, the discharge excess state occurs, and the processing device A1 transmits -50 as the induction command value to each power control device B1. Note that, even in the example shown in FIG. 3, the excess elimination set value (induction command value) in the discharge excess state is not limited to -50, and may be any value that eliminates the discharge excess state. Furthermore, if the induction command value is greater than 40, the charging excess state is reached, and the processing device A1 transmits an induction command value of 0 (zero) to each power control device B1. Note that, even in the example shown in FIG. 3, the excess resolution set value (induction command value) in the charging excess state is not limited to 0 (zero) and may be any value that resolves the charging excess state. In this way, the excess resolution set value is set appropriately according to the relationship between the induction command value and the output power of each power control device B1.

次に、電力システムS1において、各機器間の通信が正常に行われなかった場合について、説明する。例えば、通信が正常に行われない状況としては、各機器の間や各機器内部における各要素の間において通信断が発生した場合、あるいは、各機器の間や各機器内部における各要素の間の信号異常が発生した場合などがある。 Next, we will explain what happens when communication between devices in the power system S1 is not performed normally. For example, situations in which communication is not performed normally include when a communication interruption occurs between devices or between elements within each device, or when a signal abnormality occurs between devices or between elements within each device.

<ケース1:処理装置A1と検出装置C1との間の通信異常>
処理装置A1と検出装置C1(通信処理部82)との間に通信異常が発生すると、処理装置A1は、検出装置C1から接続点電力の検出値を正しく受信できない。その結果、処理装置A1は、誘導指令値を適切に算出できないことがあり、電力システムS1は、電力制御を適切に行えない可能性がある。
<Case 1: Communication Abnormality Between Processing Device A1 and Detection Device C1>
When a communication abnormality occurs between the processing device A1 and the detection device C1 (communication processing unit 82), the processing device A1 cannot correctly receive the detection value of the connection point power from the detection device C1. As a result, the processing device A1 may not be able to properly calculate the induction command value, and the power system S1 may not be able to properly control the power.

そこで、処理装置A1は、検出装置C1から接続点電力の検出値を正しく受信できなかった場合、誘導指令値として制御モードに応じた設定値(異常時設定値)を各電力制御装置B1に送信する。上記異常時設定値としては、例えば、ピークカットモードが設定されている場合、蓄電池19の充放電を停止させる値である。図2に示す例では、ピークカットモードに対する異常時設定値は、0(ゼロ)である。また、RPR回避モードが設定されている場合、蓄電池19を充電させる値である。図2に示す例では、RPR回避モードに対する異常時設定値は、0(ゼロ)より大きく100以下である。なお、設定されている制御モードに応じては、接続点電力として検出装置C1の検出値を用いない場合がある。例えば、スケジュールモード、自立運転モード、および、DG連携モードでは、接続点電力として推算値を用いて電力制御が行われる。また、ピークカット補助モードでは、図示しないデマンド監視装置からの信号に応じて電力制御が行われる。この場合、上記異常時設定値を誘導指令値として各電力制御装置B1に送信することなく、各制御モードに応じた通常の処理が行われる。さらに、処理装置A1は、検出装置C1から接続点電力の値を正しく受信できなかった場合、検出装置C1(あるいは通信処理部82)との間で通信異常が発生していることを示すシステム異常フラグをオンにする。そして、当該システム異常フラグがオンであることを示す通知(システム異常フラグオン通知)を各EV用充放電制御装置20に送信する。各EV用充放電制御装置20は、システム異常フラグオン通知を受信すると、当該EV用充放電制御装置20のEVスタンド21は、電気自動車29の充放電を停止するとともに、処理装置A1と検出装置C1(あるいは通信処理部82)との間で通信異常が発生している旨を報知する。 Therefore, when the processing device A1 cannot correctly receive the detection value of the connection point power from the detection device C1, it transmits a set value (abnormal setting value) according to the control mode as an induction command value to each power control device B1. For example, when the peak cut mode is set, the abnormal setting value is a value that stops charging and discharging the storage battery 19. In the example shown in FIG. 2, the abnormal setting value for the peak cut mode is 0 (zero). Also, when the RPR avoidance mode is set, it is a value that charges the storage battery 19. In the example shown in FIG. 2, the abnormal setting value for the RPR avoidance mode is greater than 0 (zero) and less than or equal to 100. Note that, depending on the set control mode, the detection value of the detection device C1 may not be used as the connection point power. For example, in the schedule mode, the independent operation mode, and the DG linkage mode, power control is performed using an estimated value as the connection point power. Also, in the peak cut assistance mode, power control is performed according to a signal from a demand monitoring device (not shown). In this case, normal processing according to each control mode is performed without transmitting the abnormal setting value as an induction command value to each power control device B1. Furthermore, if the processing device A1 is unable to correctly receive the connection point power value from the detection device C1, it turns on a system abnormality flag indicating that a communication abnormality has occurred between the detection device C1 (or the communication processing unit 82). Then, it transmits a notification indicating that the system abnormality flag is on (system abnormality flag on notification) to each EV charge/discharge control device 20. When each EV charge/discharge control device 20 receives the system abnormality flag on notification, the EV stand 21 of that EV charge/discharge control device 20 stops charging/discharging the electric vehicle 29 and notifies the user that a communication abnormality has occurred between the processing device A1 and the detection device C1 (or the communication processing unit 82).

<ケース2:処理装置A1と各電力制御装置B1との間の通信異常>
電力システムS1では、処理装置A1と各電力制御装置B1との間の通信に、片方向通信を用いる場合と双方向通信とを用いる場合がある。片方向通信は、例えばUDP通信により行われる。片方向通信は、処理装置A1から各電力制御装置B1に誘導指令値を送信する際に利用される。双方向通信は、例えばModbus通信により行われる。双方向通信は、各電力制御装置B1からは処理装置A1に出力電力の検出値を送信する際に利用される。したがって、電力システムS1では、片方向通信において通信異常が発生する場合と、双方向通信において通信異常が発生する場合とがあり、以下に、それぞれの場合について説明する。
<Case 2: Communication Abnormality Between Processing Device A1 and Each Power Control Device B1>
In the power system S1, one-way communication and two-way communication may be used for communication between the processing device A1 and each power control device B1. One-way communication is performed, for example, by UDP communication. One-way communication is used when transmitting an induction command value from the processing device A1 to each power control device B1. Two-way communication is performed, for example, by Modbus communication. Two-way communication is used when transmitting a detection value of output power from each power control device B1 to the processing device A1. Therefore, in the power system S1, communication abnormalities may occur in one-way communication and communication abnormalities may occur in two-way communication, and each case will be described below.

<ケース2-1:片方向通信について通信異常が発生した場合>
上記片方向通信において通信異常が発生した場合、各電力制御装置B1は、処理装置A1から誘導指令値を正しく受信できない。その結果、各電力制御装置B1は、出力目標値を正しく算出できず、出力電力の制御を適切に行えない。
<Case 2-1: When a communication error occurs in one-way communication>
When a communication error occurs in the one-way communication, each power control device B1 cannot correctly receive the induction command value from the processing device A1. As a result, each power control device B1 cannot correctly calculate the output target value and cannot appropriately control the output power.

そこで、蓄電池用充放電制御装置10は、処理装置A1から誘導指令値を正しく受信できなかった場合、蓄電池19の充放電を停止する。また、各EV用充放電制御装置20は、処理装置A1から誘導指令値を正しく受信できなかった場合、各電気自動車29の充放電を停止する。これらにより、上記片方向通信において通信異常が発生すると、蓄電池19の充放電が停止され、かつ、各電気自動車29の充放電が停止される。さらに、蓄電池用充放電制御装置10は、処理装置A1から誘導指令値を正しく受信できなかった場合、双方向通信により、第1片方向通信異常通知を処理装置A1に送信する。処理装置A1は、第1片方向通信異常通知を受信すると、第1片方向通信異常フラグをオンにする。そして、第1片方向通信異常フラグがオンであることを示す通知(第1片方向通信異常フラグオン通知)を、双方向通信により、各EV用充放電制御装置20に送信する。第1片方向通信異常フラグオン通知を受信した各EV用充放電制御装置20は、処理装置A1と蓄電池用充放電制御装置10との間の片方向通信に異常が発生していることをEVスタンド21から報知する。これにより、ユーザあるいは管理者は、各EVスタンド21を介して、処理装置A1と蓄電池用充放電制御装置10との間の片方向通信に異常が発生していることを知ることができる。また、各EV用充放電制御装置20は、処理装置A1から誘導指令値を正しく受信できなかった場合、双方向通信により、第2片方向通信異常通知を処理装置A1に送信する。処理装置A1は、第2片方向通信異常通知を受信すると、第2片方向通信異常フラグをオンにする。そして、第2片方向通信異常フラグがオンであることを示す通知(第2片方向通信異常フラグオン通知)を、双方向通信により、各EV用充放電制御装置20に送信する。第2片方向通信異常フラグオン通知を受信した各EV用充放電制御装置20は、処理装置A1と他のEV用充放電制御装置20との間の片方向通信に異常が発生していることを、EVスタンド21から報知する。これにより、ユーザあるいは管理者は、各EVスタンド21を介して、処理装置A1と蓄電池用充放電制御装置10との間の片方向通信に異常が発生していることを知ることができる。 Therefore, the battery charge/discharge control device 10 stops charging/discharging the battery 19 if it cannot correctly receive the induced command value from the processing device A1. Also, each EV charge/discharge control device 20 stops charging/discharging each electric vehicle 29 if it cannot correctly receive the induced command value from the processing device A1. As a result, when a communication abnormality occurs in the one-way communication, charging/discharging of the battery 19 is stopped, and charging/discharging of each electric vehicle 29 is stopped. Furthermore, when the battery charge/discharge control device 10 cannot correctly receive the induced command value from the processing device A1, it transmits a first one-way communication abnormality notification to the processing device A1 by two-way communication. When the processing device A1 receives the first one-way communication abnormality notification, it turns on the first one-way communication abnormality flag. Then, it transmits a notification indicating that the first one-way communication abnormality flag is on (first one-way communication abnormality flag on notification) to each EV charge/discharge control device 20 by two-way communication. Each EV charge/discharge control device 20 that has received the first one-way communication abnormality flag ON notification notifies the EV stand 21 that an abnormality has occurred in the one-way communication between the processing device A1 and the storage battery charge/discharge control device 10. This allows a user or manager to know that an abnormality has occurred in the one-way communication between the processing device A1 and the storage battery charge/discharge control device 10 via each EV stand 21. Furthermore, when each EV charge/discharge control device 20 is unable to correctly receive an induction command value from the processing device A1, it transmits a second one-way communication abnormality notification to the processing device A1 by bidirectional communication. When the processing device A1 receives the second one-way communication abnormality notification, it turns on the second one-way communication abnormality flag. Then, it transmits a notification indicating that the second one-way communication abnormality flag is ON (second one-way communication abnormality flag ON notification) to each EV charge/discharge control device 20 by bidirectional communication. Each EV charge/discharge control device 20 that receives the second one-way communication abnormality flag-on notification notifies the EV stand 21 that an abnormality has occurred in the one-way communication between the processing device A1 and the other EV charge/discharge control device 20. This allows the user or administrator to know, via each EV stand 21, that an abnormality has occurred in the one-way communication between the processing device A1 and the storage battery charge/discharge control device 10.

<ケース2-2:双方向通信において通信異常が発生した場合>
上記双方向通信において通信異常が発生した場合、処理装置A1は、各電力制御装置B1から出力電力の検出値を正しく受信できない。その結果、処理装置A1は、正しく受信できた出力電力の検出値しか用いることができない。つまり、処理装置A1が適切な誘導指令値を算出できない可能性があるため、電力システムS1の電力制御が適切に行われない可能性がある。
<Case 2-2: When a communication error occurs during two-way communication>
When a communication abnormality occurs in the two-way communication, the processing device A1 cannot correctly receive the detection value of the output power from each power control device B1. As a result, the processing device A1 can only use the detection value of the output power that has been correctly received. In other words, the processing device A1 may not be able to calculate an appropriate induction command value, and therefore the power control of the power system S1 may not be performed appropriately.

そこで、処理装置A1との間で通信異常が発生した各電力制御装置B1は、制御対象(蓄電池19あるいは電気自動車29)の充放電を停止する。例えば、処理装置A1と蓄電池用充放電制御装置10との間の双方向通信が通信異常となった場合、蓄電池用充放電制御装置10は、蓄電池19の充放電を停止する。一方、処理装置A1と各EV用充放電制御装置20との間の双方向通信が通信異常となった場合、各EV用充放電制御装置20は、各電気自動車29の充放電を停止する。これにより、上記双方向通信において通信異常が発生すると、処理装置A1との間で通信異常が発生した各電力制御装置B1において、制御対象(蓄電池19あるいは各電気自動車29)の充放電が停止される。 Therefore, each power control device B1 in which a communication abnormality occurs with the processing device A1 stops charging and discharging the controlled object (storage battery 19 or electric vehicle 29). For example, if a communication abnormality occurs in the two-way communication between the processing device A1 and the storage battery charge/discharge control device 10, the storage battery charge/discharge control device 10 stops charging and discharging the storage battery 19. On the other hand, if a communication abnormality occurs in the two-way communication between the processing device A1 and each EV charge/discharge control device 20, each EV charge/discharge control device 20 stops charging and discharging the respective electric vehicles 29. As a result, when a communication abnormality occurs in the above two-way communication, the charging and discharging of the controlled object (storage battery 19 or each electric vehicle 29) is stopped in each power control device B1 in which a communication abnormality occurs with the processing device A1.

さらに、処理装置A1と各電力制御装置B1との間で通信異常が発生したことを、各EVスタンド21を介して、ユーザあるいは管理者に報知する。例えば、処理装置A1と蓄電池用充放電制御装置10との間の双方向通信で通信異常が発生した場合、処理装置A1は、第1双方向通信異常フラグをオンにして、当該第1双方向通信異常フラグがオンであることを示す通知(第1双方向通信異常フラグオン通知)を各EV用充放電制御装置20に送信する。第1双方向通信異常フラグオン通知を受信した各EV用充放電制御装置20は、処理装置A1と蓄電池用充放電制御装置10との間の双方向通信で通信異常が発生していることを、各EVスタンド21から報知させる。これにより、ユーザあるいは管理者は、各EVスタンド21を介して、処理装置A1と蓄電池用充放電制御装置10との間の双方向通信に異常が発生していることを知ることができる。一方、処理装置A1と複数のEV用充放電制御装置20のいずれかとの間の双方向通信で通信異常が発生した場合、通信異常が発生したEV用充放電制御装置20は、処理装置A1との通信異常が発生していることを、EVスタンド21から報知させる。また、処理装置A1は、第2双方向通信異常フラグをオンにして、当該第2双方向通信異常フラグがオンであることを示す通知(第2双方向通信異常フラグオン通知)を、通信異常が発生していないEV用充放電制御装置20に送信する。そして、第2双方向通信異常フラグオン通知を受信したEV用充放電制御装置20は、他のEV用充放電制御装置20と処理装置A1との通信異常が発生していることを、EVスタンド21から報知させる。これにより、ユーザあるいは管理者は、各EVスタンド21を介して、処理装置A1とEV用充放電制御装置20との間の双方向通信に異常が発生していることを知ることができる。 Furthermore, the occurrence of a communication abnormality between the processing device A1 and each power control device B1 is notified to a user or administrator via each EV stand 21. For example, when a communication abnormality occurs in the two-way communication between the processing device A1 and the storage battery charge/discharge control device 10, the processing device A1 turns on the first two-way communication abnormality flag and transmits a notification indicating that the first two-way communication abnormality flag is on (first two-way communication abnormality flag on notification) to each EV charge/discharge control device 20. Each EV charge/discharge control device 20 that receives the first two-way communication abnormality flag on notification causes each EV stand 21 to notify that a communication abnormality has occurred in the two-way communication between the processing device A1 and the storage battery charge/discharge control device 10. This allows a user or administrator to know that an abnormality has occurred in the two-way communication between the processing device A1 and the storage battery charge/discharge control device 10 via each EV stand 21. On the other hand, if a communication abnormality occurs in the two-way communication between the processing device A1 and any one of the multiple EV charge/discharge control devices 20, the EV charge/discharge control device 20 in which the communication abnormality occurs causes the EV stand 21 to notify the EV charge/discharge control device 20 in which the communication abnormality occurs with the processing device A1. The processing device A1 also turns on the second two-way communication abnormality flag and transmits a notification indicating that the second two-way communication abnormality flag is on (second two-way communication abnormality flag on notification) to the EV charge/discharge control device 20 in which no communication abnormality occurs. Then, the EV charge/discharge control device 20 that receives the second two-way communication abnormality flag on notification causes the EV stand 21 to notify the EV charge/discharge control device 20 in which the communication abnormality occurs between the other EV charge/discharge control device 20 and the processing device A1. This allows the user or administrator to know, via each EV stand 21, that an abnormality has occurred in the two-way communication between the processing device A1 and the EV charge/discharge control device 20.

<ケース3:蓄電池PCS11と通信処理部12との間の通信異常>
蓄電池PCS11と通信処理部12との間で通信異常が発生すると、蓄電池PCS11は、通信処理部12から出力目標値を正しく受信できない。その結果、蓄電池PCS11は、目標とする電力値(出力目標値)が分からず、出力電力の制御を適切に行えない。また、通信処理部12は、蓄電池PCS11から出力電力の検出値および蓄電池19のSoCを正しく受信できない。その結果、通信処理部12は、出力電力の検出値を正しく受信できないことにより、処理装置A1に出力電力の検出値を送信できず、処理装置A1は、誘導指令値を適切に算出できない可能性がある。また、通信処理部12は、蓄電池19のSoCを受信できないことにより、出力目標値を適切に算出できない可能性がある。
<Case 3: Communication Abnormality Between Storage Battery PCS 11 and Communication Processing Unit 12>
When a communication abnormality occurs between the storage battery PCS11 and the communication processing unit 12, the storage battery PCS11 cannot correctly receive the output target value from the communication processing unit 12. As a result, the storage battery PCS11 does not know the target power value (output target value) and cannot properly control the output power. In addition, the communication processing unit 12 cannot correctly receive the detection value of the output power and the SoC of the storage battery 19 from the storage battery PCS11. As a result, the communication processing unit 12 cannot correctly receive the detection value of the output power, and therefore cannot transmit the detection value of the output power to the processing device A1, and the processing device A1 may not properly calculate the induction command value. In addition, the communication processing unit 12 may not correctly calculate the output target value, and therefore cannot receive the SoC of the storage battery 19.

そこで、蓄電池PCS11は、通信処理部12から出力目標値を正しく受信できなかった場合、蓄電池19の充放電を停止する。これにより、蓄電池PCS11と通信処理部12との間で通信異常が発生すると、蓄電池19の充放電が停止される。また、通信処理部12は、蓄電池PCS11から出力電力の値や蓄電池19のSoCの情報を正しく受信できなかった場合、第1内部異常通知を処理装置A1に送信する。処理装置A1は、第1内部異常通知を受信すると、第1内部異常フラグをオンにする。そして、第1内部異常フラグがオンであることを示す通知(第1内部異常フラグオン通知)を各EV用充放電制御装置20に送信する。このときの処理装置A1とEV用充放電制御装置20との通信は、片方向通信でも双方方向通信でもよい。第1内部異常フラグオン通知を受信した各EV用充放電制御装置20は、蓄電池用充放電制御装置10の内部で通信異常が発生していることをEVスタンド21から報知する。これにより、ユーザあるいは管理者は、蓄電池用充放電制御装置10の内部で通信異常が発生していることを知ることができる。なお、通信処理部12は、第1内部異常通知を処理装置A1ではなく各EV用充放電制御装置20に送信してもよい。この場合、第1内部異常通知を受信した各EV用充放電制御装置20は、蓄電池用充放電制御装置10の内部で通信異常が発生していることをEVスタンド21から報知する。 Therefore, if the storage battery PCS11 cannot correctly receive the output target value from the communication processing unit 12, it stops charging and discharging the storage battery 19. As a result, if a communication abnormality occurs between the storage battery PCS11 and the communication processing unit 12, charging and discharging of the storage battery 19 is stopped. Also, if the communication processing unit 12 cannot correctly receive the output power value or the SoC information of the storage battery 19 from the storage battery PCS11, it transmits a first internal abnormality notification to the processing device A1. When the processing device A1 receives the first internal abnormality notification, it turns on the first internal abnormality flag. Then, it transmits a notification indicating that the first internal abnormality flag is on (first internal abnormality flag on notification) to each EV charge and discharge control device 20. At this time, the communication between the processing device A1 and the EV charge and discharge control device 20 may be one-way communication or two-way communication. Each EV charge and discharge control device 20 that receives the first internal abnormality flag on notification notifies the EV stand 21 that a communication abnormality has occurred inside the storage battery charge and discharge control device 10. This allows the user or administrator to know that a communication abnormality has occurred inside the storage battery charge/discharge control device 10. The communication processing unit 12 may transmit the first internal abnormality notification to each EV charge/discharge control device 20 instead of the processing device A1. In this case, each EV charge/discharge control device 20 that receives the first internal abnormality notification notifies the EV stand 21 that a communication abnormality has occurred inside the storage battery charge/discharge control device 10.

<ケース4:EVスタンド21と通信処理部22との間の通信異常>
各EV用充放電制御装置20において、EVスタンド21と通信処理部22との間で通信異常が発生すると、EVスタンド21は、通信処理部22から出力目標値を正しく受信できない。この場合、EVスタンド21は、目標とする電力値(出力目標値)が分からず、出力電力の制御を適切に行えない。また、通信処理部22は、EVスタンド21から出力電力の検出値および電気自動車29のSoCを正しく受信できない。その結果、通信処理部22は、出力電力の検出値を正しく受信できないことにより、処理装置A1にEVスタンド21の出力電力の検出値を送信できず、処理装置A1は、誘導指令値を適切に算出できない可能性がある。また、通信処理部22は、EVスタンド21から電気自動車29のSoCを受信できないため、出力目標値を適切に算出できない可能性がある。
<Case 4: Communication Abnormality Between the EV Stand 21 and the Communication Processing Unit 22>
In each EV charge/discharge control device 20, when a communication abnormality occurs between the EV stand 21 and the communication processing unit 22, the EV stand 21 cannot correctly receive the output target value from the communication processing unit 22. In this case, the EV stand 21 does not know the target power value (output target value) and cannot properly control the output power. In addition, the communication processing unit 22 cannot correctly receive the detection value of the output power and the SoC of the electric vehicle 29 from the EV stand 21. As a result, since the communication processing unit 22 cannot correctly receive the detection value of the output power, it cannot transmit the detection value of the output power of the EV stand 21 to the processing device A1, and the processing device A1 may not properly calculate the induction command value. In addition, since the communication processing unit 22 cannot receive the SoC of the electric vehicle 29 from the EV stand 21, it may not properly calculate the output target value.

そこで、EVスタンド21と通信処理部22との間で通信異常が発生したEV用充放電制御装置20において、EVスタンド21は、通信処理部22から出力目標値を正しく受信できなかった場合、電気自動車29の充放電を停止する。これにより、EVスタンド21と通信処理部22との間で通信異常が発生したEV用充放電制御装置20において、電気自動車29の充放電が停止される。さらに、EVスタンド21は、報知装置を介して、EV用充放電制御装置20の内部で通信異常が発生していることを報知する。通信処理部22は、EVスタンド21から出力電力の値や電気自動車29のSoCの情報を正しく受信できなかった場合、第2内部異常通知を処理装置A1に送信する。処理装置A1は、第2内部異常通知を受信すると、第2内部異常フラグをオンする。そして、当該第2内部異常フラグがオンであることを示す通知(第2内部異常フラグオン通知)を、各EV用充放電制御装置20に送信する。第2内部異常フラグオン通知を受信した各EV用充放電制御装置20は、他のEV用充放電制御装置20の内部で通信異常が発生していることをEVスタンド21から報知する。ただし、内部で通信異常が発生しているEV用充放電制御装置20においては、上記のとおり、EVスタンド21の処理によりその旨が報知される。これにより、ユーザあるいは管理者は、複数のEV用充放電制御装置20のいずれかの内部で通信異常が発生していることを知ることができる。なお、内部で通信異常が発生しているEV用充放電制御装置20の通信処理部22は、第2内部異常通知を処理装置A1ではなく、他のEV用充放電制御装置20に送信してもよい。この場合、第2内部異常通知を受信した各EV用充放電制御装置20は、他のEV用充放電制御装置20の内部で通信異常が発生していることをEVスタンド21から報知する。 Therefore, in the EV charge/discharge control device 20 in which a communication abnormality occurs between the EV stand 21 and the communication processing unit 22, the EV stand 21 stops charging/discharging the electric vehicle 29 if it cannot correctly receive the output target value from the communication processing unit 22. As a result, in the EV charge/discharge control device 20 in which a communication abnormality occurs between the EV stand 21 and the communication processing unit 22, charging/discharging of the electric vehicle 29 is stopped. Furthermore, the EV stand 21 notifies the EV charge/discharge control device 20 of the occurrence of a communication abnormality through the notification device. If the communication processing unit 22 cannot correctly receive the output power value or the SoC information of the electric vehicle 29 from the EV stand 21, it transmits a second internal abnormality notification to the processing device A1. When the processing device A1 receives the second internal abnormality notification, it turns on the second internal abnormality flag. Then, it transmits a notification indicating that the second internal abnormality flag is on (second internal abnormality flag on notification) to each EV charge/discharge control device 20. Each EV charge/discharge control device 20 that receives the second internal abnormality flag ON notification notifies the other EV charge/discharge control device 20 from the EV stand 21 that a communication abnormality has occurred inside the EV charge/discharge control device 20. However, as described above, the EV charge/discharge control device 20 in which the communication abnormality has occurred is notified of the abnormality by the processing of the EV stand 21. This allows the user or administrator to know that a communication abnormality has occurred inside one of the multiple EV charge/discharge control devices 20. Note that the communication processing unit 22 of the EV charge/discharge control device 20 in which the communication abnormality has occurred may transmit the second internal abnormality notification to the other EV charge/discharge control device 20 instead of the processing device A1. In this case, each EV charge/discharge control device 20 that receives the second internal abnormality notification notifies the other EV charge/discharge control device 20 from the EV stand 21 that a communication abnormality has occurred inside the EV charge/discharge control device 20.

電力システムS1の作用および効果は、次の通りである。 The functions and effects of the power system S1 are as follows:

電力システムS1は、処理装置A1および複数の電力制御装置B1を備えている。処理装置A1は、接続点電力を目標電力にするための誘導指令値を算出する。複数の電力制御装置B1は、各々が誘導指令値を用いた最適化問題に基づいて、出力電力を制御する。複数の電力制御装置B1は、電気自動車29を接続可能なEV用充放電制御装置20を含んでいる。この構成によると、EV用充放電制御装置20は、誘導指令値を用いた最適化問題に基づいて、電気自動車29の充放電を制御する。したがって、電力システムS1は、EV用充放電制御装置20によって、電気自動車29の充放電制御を含めたエネルギー管理が可能である。 The power system S1 includes a processing device A1 and multiple power control devices B1. The processing device A1 calculates an induced command value for making the connection point power a target power. The multiple power control devices B1 each control output power based on an optimization problem using the induced command value. The multiple power control devices B1 include an EV charge/discharge control device 20 to which an electric vehicle 29 can be connected. According to this configuration, the EV charge/discharge control device 20 controls the charging and discharging of the electric vehicle 29 based on an optimization problem using the induced command value. Therefore, the power system S1 is capable of energy management, including the charging and discharging control of the electric vehicle 29, by the EV charge/discharge control device 20.

電力システムS1では、検出装置C1と処理装置A1との間の通信、処理装置A1と蓄電池用充放電制御装置10との間の通信、および、処理装置A1と各EV用充放電制御装置20との間の通信のいずれかにおいて通信異常が生じたときに、各EV用充放電制御装置20が各電気自動車29の充放電を停止しつつ、当該通信異常が生じていることを報知する。処理装置A1と蓄電池用充放電制御装置10とは、および、処理装置A1と各EV用充放電制御装置20とは、それぞれがネットワークハブH1を介して通信する。上記した通信のうちのいずれかかが通信異常となった場合、EV用充放電制御装置20は、電気自動車29の充放電を適切に行えず、意図せぬ充放電が行われる可能性がある。例えば、放電させてはいけない電気自動車29の放電を実行する可能性がある。そこで、電力システムS1では、上記した通信のうちのいずれかが通信異常となった場合、電気自動車29の充放電を停止させることで、電気自動車29の意図せぬ充放電を抑制できる。また、電力システムS1では、EV用充放電制御装置20が通信異常の発生を報知することで、EV用充放電制御装置20(EVスタンド21)のユーザが通信異常の発生を知ることができる。特に、電力システムS1は、従来(特許文献1に記載)の電力システムのように、管理者専用の端末装置がなく、リアルタイムに通信異常の発生を管理者に知らせることができない。そこで、EVスタンド21に備わる報知装置に報知させることで、EVスタンド21のユーザに異常が発生していることを知らせる。これにより、ユーザから管理者への通信異常の情報提供を促し、管理者が通信異常を早期発見することが可能となる。 In the power system S1, when a communication abnormality occurs in any of the communication between the detection device C1 and the processing device A1, the communication between the processing device A1 and the battery charge/discharge control device 10, and the communication between the processing device A1 and each EV charge/discharge control device 20, each EV charge/discharge control device 20 stops charging/discharging each electric vehicle 29 and notifies the occurrence of the communication abnormality. The processing device A1 and the battery charge/discharge control device 10, and the processing device A1 and each EV charge/discharge control device 20 each communicate via a network hub H1. If a communication abnormality occurs in any of the above-mentioned communications, the EV charge/discharge control device 20 may not be able to properly charge/discharge the electric vehicle 29, and unintended charging/discharging may occur. For example, there is a possibility that the electric vehicle 29 that should not be discharged is discharged. Therefore, in the power system S1, if a communication abnormality occurs in any of the above-mentioned communications, the charging/discharging of the electric vehicle 29 is stopped, thereby suppressing unintended charging/discharging of the electric vehicle 29. Furthermore, in the power system S1, the EV charge/discharge control device 20 notifies the user of the EV charge/discharge control device 20 (EV stand 21) of the occurrence of a communication abnormality, so that the user of the EV charge/discharge control device 20 (EV stand 21) can be informed of the occurrence of the communication abnormality. In particular, unlike conventional power systems (described in Patent Document 1), the power system S1 does not have a terminal device dedicated to the administrator, and is therefore unable to notify the administrator of the occurrence of a communication abnormality in real time. Therefore, by having an alarm device provided in the EV stand 21 notify the user of the EV stand 21 that an abnormality has occurred. This encourages the user to provide information about the communication abnormality to the administrator, enabling the administrator to discover the communication abnormality early.

電力システムS1では、処理装置A1は、充放電許可フラグの設定情報(充電許可フラグおよび放電許可フラグの各設定情報)を各EV用充放電制御装置20に送信している。充放電許可フラグは、設定される制御モードに応じて決定される。EV用充放電制御装置20(EVスタンド21)の動作として、充電のみを実施する場合と、放電のみを実施する場合と、充放電の両方を実施する場合とがある。これらは、制御モードに応じて変わる。そこで、電力システムS1では、制御モードに応じて充放電許可フラグが変更されることで、EV用充放電制御装置20による電気自動車29の充放電を適切に制御できる。 In the power system S1, the processing device A1 transmits setting information for the charge/discharge permission flag (setting information for the charge permission flag and the discharge permission flag) to each EV charge/discharge control device 20. The charge/discharge permission flag is determined according to the control mode that is set. The operation of the EV charge/discharge control device 20 (EV stand 21) may involve only charging, only discharging, or both charging and discharging. These operations change according to the control mode. Therefore, in the power system S1, the charge/discharge permission flag is changed according to the control mode, so that the charging and discharging of the electric vehicle 29 by the EV charge/discharge control device 20 can be appropriately controlled.

電力システムS1では、処理装置A1は、複数の電力制御装置B1(蓄電池用充放電制御装置10および複数のEV用充放電制御装置20)の出力電力の合計値が第1巻線911の巻線容量を超過する場合(あるいは当該巻線容量よりも少し小さい値を超過する場合)、誘導指令値として当該超過を解消させるための設定値(超過解消設定値)を、複数の電力制御装置B1のそれぞれに送信する。この構成によれば、第1巻線911における電力が第1巻線911の巻線容量を超過すると、上記超過解消設定値が誘導指令値として各電力制御装置B1に送信される。そして、各電力制御装置B1は、受信した誘導指令値(超過解消設定値)に基づいて、出力電力を制御するため、第1巻線911の巻線容量を超過する状態が解消される。つまり、電力システムS1は、変圧器91の故障(第1巻線911の故障)を抑制できる。 In the power system S1, when the total value of the output power of the multiple power control devices B1 (the battery charge/discharge control device 10 and the multiple EV charge/discharge control devices 20) exceeds the winding capacity of the first winding 911 (or exceeds a value slightly smaller than the winding capacity), the processing device A1 transmits a set value (excess elimination set value) for eliminating the excess as an induction command value to each of the multiple power control devices B1. According to this configuration, when the power in the first winding 911 exceeds the winding capacity of the first winding 911, the excess elimination set value is transmitted to each power control device B1 as an induction command value. Then, each power control device B1 controls the output power based on the received induction command value (excess elimination set value), so that the state in which the winding capacity of the first winding 911 is exceeded is eliminated. In other words, the power system S1 can suppress failure of the transformer 91 (failure of the first winding 911).

電力システムS1では、接続点Kから変圧器91に電力が供給されている状態(充電時超過状態)において、複数の電力制御装置B1の出力電力の合計値が第1巻線911の巻線容量を超過する場合、超過解消設定値は、蓄電池19の充放電を停止させる値である。一方、変圧器91から接続点Kに電力が供給されている状態(放電時超過状態)において、複数の電力制御装置B1の出力電力の合計値が第1巻線911の巻線容量を超過する場合、超過解消設定値は、各電気自動車29の充放電を停止させる値である。これにより、電力システムS1は、複数の電力制御装置B1の出力電力の合計値が第1巻線911の巻線容量を超過することを解消することができる。 In the power system S1, when the total value of the output power of the multiple power control devices B1 exceeds the winding capacity of the first winding 911 in a state where power is supplied from the connection point K to the transformer 91 (excessive charging state), the excess elimination set value is a value that stops charging and discharging of the storage battery 19. On the other hand, when the total value of the output power of the multiple power control devices B1 exceeds the winding capacity of the first winding 911 in a state where power is supplied from the transformer 91 to the connection point K (excessive discharging state), the excess elimination set value is a value that stops charging and discharging of each electric vehicle 29. In this way, the power system S1 can eliminate the situation where the total value of the output power of the multiple power control devices B1 exceeds the winding capacity of the first winding 911.

図4は、第2実施形態の電力システムS2の全体構成を示している。図4に示すように、電力システムS2は、電力システムS1と比較して、1つのEV用充放電制御装置20の代わりに、PV用出力制御装置30を備えている。PVは、Photovoltaics(太陽光発電)の略称である。 Figure 4 shows the overall configuration of the power system S2 of the second embodiment. As shown in Figure 4, compared to the power system S1, the power system S2 has a PV output control device 30 instead of one EV charge/discharge control device 20. PV is an abbreviation for Photovoltaics (photovoltaic power generation).

PV用出力制御装置30は、太陽電池39による発電を制御する。PV用出力制御装置30は、太陽光PCS31、通信処理部32および検出部33を含んでいる。太陽光PCS31と通信処理部32とは、双方向通信を行う。太陽光PCS31と通信処理部32とは、別のモジュールで構成されたものに限定されず、1つのモジュールで構成されていてもよい。 The PV output control device 30 controls power generation by the solar cell 39. The PV output control device 30 includes a solar PCS 31, a communication processing unit 32, and a detection unit 33. The solar PCS 31 and the communication processing unit 32 perform bidirectional communication. The solar PCS 31 and the communication processing unit 32 are not limited to being configured as separate modules, and may be configured as a single module.

検出部33は、太陽光PCS31の出力電力を検出する。そして、出力電力の検出値(アナログ値)をデジタル値に変換する。検出部33は、通信処理部32と通信可能であり、変換後の出力電力の検出値(デジタル値)を、通信処理部32に送信する。 The detection unit 33 detects the output power of the solar PCS 31. Then, the detection value (analog value) of the output power is converted into a digital value. The detection unit 33 can communicate with the communication processing unit 32, and transmits the converted detection value (digital value) of the output power to the communication processing unit 32.

通信処理部32は、処理装置A1と太陽光PCS31との通信を中継する。通信処理部32は、処理装置A1から誘導指令値を受信し、受信した誘導指令値に基づいて、太陽光PCS31の出力目標値を算出する。通信処理部32は、通信処理部12および各通信処理部22と同様に、上記(3)式および上記(4)式の演算により、出力目標値を算出する。ただし、通信処理部32に設定される制約条件は、通信処理部12および各通信処理部22とは異なる。通信処理部32は、算出した出力目標値を含む制御指令を生成し、これを太陽光PCS31に送信する。また、通信処理部32は、検出部33と処理装置A1との通信を中継する。通信処理部32は、検出部33から送信された出力電力の検出値を受信し、これを処理装置A1に送信する。 The communication processing unit 32 relays communication between the processing device A1 and the solar PCS 31. The communication processing unit 32 receives a guidance command value from the processing device A1 and calculates an output target value of the solar PCS 31 based on the received guidance command value. The communication processing unit 32 calculates the output target value by calculating the above formula (3) and the above formula (4) in the same way as the communication processing unit 12 and each communication processing unit 22. However, the constraint conditions set in the communication processing unit 32 are different from those of the communication processing unit 12 and each communication processing unit 22. The communication processing unit 32 generates a control command including the calculated output target value and transmits this to the solar PCS 31. The communication processing unit 32 also relays communication between the detection unit 33 and the processing device A1. The communication processing unit 32 receives the detection value of the output power transmitted from the detection unit 33 and transmits this to the processing device A1.

太陽光PCS31は、太陽電池39が接続され、太陽電池39が発電した電力(例えば直流電力)を系統連系に適した電力(例えば交流電力)に変換して出力する。図4では、太陽光PCS31に、1つの太陽電池39が接続されているが、複数の太陽電池39が接続されていてもよい。太陽光PCS31は、電力線90によって、変圧器91の第3巻線913に接続される。太陽光PCS31は、太陽電池39が発電した電力を変圧器91に出力する。太陽光PCS31は、通信処理部32から受信する制御指令に基づいて、太陽電池39の発電量を制御することで、制御対象(太陽電池39)の出力電力の制御を行う。具体的には、太陽光PCS31は、太陽電池39の出力電力が、制御指令に含まれる出力目標値となるように、電力制御を行う。なお、太陽光PCS31は、太陽電池39の出力電力(発電量)の制御を行わないものであってもよい。この場合の太陽光PCS31は、外部接点によって電力の出力を停止することが可能である。 The solar PCS 31 is connected to a solar cell 39, and converts the power (e.g., DC power) generated by the solar cell 39 into power (e.g., AC power) suitable for grid connection and outputs it. In FIG. 4, one solar cell 39 is connected to the solar PCS 31, but multiple solar cells 39 may be connected. The solar PCS 31 is connected to a third winding 913 of a transformer 91 by a power line 90. The solar PCS 31 outputs the power generated by the solar cell 39 to the transformer 91. The solar PCS 31 controls the output power of the control object (solar cell 39) by controlling the amount of power generated by the solar cell 39 based on a control command received from the communication processing unit 32. Specifically, the solar PCS 31 controls power so that the output power of the solar cell 39 becomes the output target value included in the control command. Note that the solar PCS 31 may not control the output power (power generation amount) of the solar cell 39. In this case, the solar PCS 31 can stop the output of power by an external contact.

次に、電力システムS2において、各機器間の通信が正常に行われなかった場合について、説明する。上記ケース1ないし上記ケース4に対しては、電力システムS2も電力システムS1と同様に処理される。 Next, we will explain what happens when communication between devices in power system S2 is not performed normally. For cases 1 to 4 above, power system S2 is processed in the same way as power system S1.

<ケース5:通信処理部32と検出部33との間の通信異常>
通信処理部32と検出部33との間で通信異常が発生すると、通信処理部32は、検出部33から太陽光PCS31の出力電力の検出値を正しく受信できない。その結果、通信処理部32は、出力電力値の検出値を処理装置A1に送信できないため、処理装置A1は、太陽光PCS31の出力電力が分からず、変圧器91の容量超過(第1巻線911の巻線容量超過や第3巻線913の巻線容量超過)や自立運転時の蓄電池19の過充電が起こり得る。
<Case 5: Communication Abnormality Between the Communication Processing Unit 32 and the Detection Unit 33>
When a communication abnormality occurs between the communication processing unit 32 and the detection unit 33, the communication processing unit 32 cannot correctly receive the detection value of the output power of the solar PCS 31 from the detection unit 33. As a result, the communication processing unit 32 cannot transmit the detection value of the output power value to the processing device A1, so that the processing device A1 does not know the output power of the solar PCS 31, and the capacity of the transformer 91 may be exceeded (the winding capacity of the first winding 911 may be exceeded or the winding capacity of the third winding 913 may be exceeded) or the storage battery 19 may be overcharged during independent operation.

そこで、処理装置A1は、通信処理部32から太陽光PCS31の出力電力の検出値を正しく受信できなかった場合、図示しない外部接点を通じて、太陽光PCS31を停止させる。なお、処理装置A1は、出力電力の検出値を正しく受信できなかった場合ではなく、通信処理部32から送信されるPV通信異常通知を受信した場合に、太陽光PCS31を停止させてもよい。さらに、処理装置A1は、通信処理部32から太陽光PCS31の出力電力の検出値を正しく受信できなかった場合、あるいは、通信処理部32から送信されるPV通信異常通知を受信した場合、PV通信異常フラグをオンにし、当該PV通信異常フラグがオンであることを示す通知(PV通信異常フラグオン通知)を、各EV用充放電制御装置20に送信する。PV通信異常フラグオン通知を受信した各EV用充放電制御装置20は、通信処理部32と検出部33との間で通信異常が発生していることを各EVスタンド21から報知する。 Therefore, when the processing device A1 cannot correctly receive the detection value of the output power of the solar PCS 31 from the communication processing unit 32, it stops the solar PCS 31 through an external contact (not shown). Note that the processing device A1 may stop the solar PCS 31 when it receives a PV communication abnormality notification transmitted from the communication processing unit 32, rather than when it cannot correctly receive the detection value of the output power. Furthermore, when the processing device A1 cannot correctly receive the detection value of the output power of the solar PCS 31 from the communication processing unit 32, or when it receives a PV communication abnormality notification transmitted from the communication processing unit 32, it turns on the PV communication abnormality flag and transmits a notification indicating that the PV communication abnormality flag is on (PV communication abnormality flag on notification) to each EV charge/discharge control device 20. Each EV charge/discharge control device 20 that receives the PV communication abnormality flag on notification notifies each EV stand 21 that a communication abnormality has occurred between the communication processing unit 32 and the detection unit 33.

電力システムS2においても、電力システムS1と同様に、EV用充放電制御装置20は、誘導指令値を用いた最適化問題に基づいて、電気自動車29の充放電を制御する。したがって、電力システムS2は、EV用充放電制御装置20によって、電気自動車29の充放電制御を含めたエネルギー管理が可能である。 In the power system S2, as in the power system S1, the EV charge/discharge control device 20 controls the charging and discharging of the electric vehicle 29 based on an optimization problem using an induced command value. Therefore, the power system S2 is capable of energy management, including the charging and discharging control of the electric vehicle 29, by the EV charge/discharge control device 20.

また、電力システムS2は、電力システムS1と同様に、電気自動車29の意図せぬ充放電を抑制し、かつ、EV用充放電制御装置20(EVスタンド21)のユーザが通信異常の発生を知ることができる。さらに、電力システムS2は、電力システムS1と同様に、制御モードに応じて充放電許可フラグが変更されることで、EV用充放電制御装置20による電気自動車29の充放電を適切に制御できる。さらに、電力システムS2は、電力システムS1と同様に、変圧器91の故障の抑制および第1巻線911の巻線容量の超過を解消できる。 Furthermore, like the power system S1, the power system S2 suppresses unintended charging and discharging of the electric vehicle 29, and allows the user of the EV charge/discharge control device 20 (EV stand 21) to be informed of the occurrence of a communication abnormality. Furthermore, like the power system S1, the power system S2 can appropriately control the charging and discharging of the electric vehicle 29 by the EV charge/discharge control device 20 by changing the charge/discharge permission flag according to the control mode. Furthermore, like the power system S1, the power system S2 can suppress failures of the transformer 91 and eliminate excess winding capacity of the first winding 911.

第2実施形態において、検出部33は出力電力の検出値を通信処理部32に送信し、通信処理部32は受信した出力電力の検出値を、ネットワークハブH1を介して、処理装置A1に送信する例を示したが、これと異なり、次のような構成であってもよい。それは、検出部33は、ネットワークハブH1と通信可能であり、出力電力の検出値を、ネットワークハブH1を介して、処理装置A1に送信してもよい。 In the second embodiment, the detection unit 33 transmits the detection value of the output power to the communication processing unit 32, and the communication processing unit 32 transmits the received detection value of the output power to the processing device A1 via the network hub H1. However, the following configuration may be used instead. That is, the detection unit 33 may be capable of communicating with the network hub H1, and may transmit the detection value of the output power to the processing device A1 via the network hub H1.

第2実施形態において、PV用出力制御装置30の構成は、上記した例に限定されず、蓄電池用充放電制御装置10と同様に、次のように構成されていてもよい。それは、太陽光PCS31が、太陽電池39の出力電力を検出し、これを通信処理部32に送信する。そして、通信処理部32が、太陽光PCS31から出力電力の検出値を受信し、ネットワークハブH1を介して受信した出力電力の検出値を処理装置A1に送信してもよい。この場合、PV用出力制御装置30は、検出部33を含んでいなくてもよい。 In the second embodiment, the configuration of the PV output control device 30 is not limited to the above example, and may be configured as follows, similar to the storage battery charge/discharge control device 10. That is, the solar PCS 31 detects the output power of the solar cell 39 and transmits it to the communication processing unit 32. The communication processing unit 32 may then receive the detected value of the output power from the solar PCS 31 and transmit the detected value of the output power received via the network hub H1 to the processing device A1. In this case, the PV output control device 30 may not include the detection unit 33.

本開示にかかる電力システムは、上記した実施形態に限定されるものではない。本開示の電力システムの各部の具体的な構成は、種々に設計変更自在である。 The power system disclosed herein is not limited to the above-described embodiment. The specific configuration of each part of the power system disclosed herein can be freely designed in various ways.

S1,S2:電力システム、A1:処理装置、B1:電力制御装置、C1:検出装置、D:電力系統、10:蓄電池用充放電制御装置、11:蓄電池PCS、12:通信処理部、19:蓄電池、20:EV用充放電制御装置、21:EVスタンド、22:通信処理部、29:電気自動車、30:PV用出力制御装置、31:太陽光PCS、32:通信処理部、33:検出部、39:太陽電池、81:検出部、82:通信処理部、91:変圧器、911:第1巻線、912:第2巻線、913:第3巻線 S1, S2: Power system, A1: Processing device, B1: Power control device, C1: Detection device, D: Power system, 10: Battery charge/discharge control device, 11: Battery PCS, 12: Communication processing unit, 19: Battery, 20: EV charge/discharge control device, 21: EV stand, 22: Communication processing unit, 29: Electric vehicle, 30: PV output control device, 31: Solar PCS, 32: Communication processing unit, 33: Detection unit, 39: Solar cell, 81: Detection unit, 82: Communication processing unit, 91: Transformer, 911: First winding, 912: Second winding, 913: Third winding

Claims (4)

電力系統に接続され、当該電力系統との接続点における電力である接続点電力の電力制御を行う電力システムであって、
前記接続点電力の値を検出する検出装置と、
前記接続点電力の値を設定された調整目標値にするための誘導指令値を導出する処理装置と、
各々が、前記接続点に電気的に接続され、かつ、前記誘導指令値を用いた最適化問題に基づいて、出力電力を制御する複数の電力制御装置と、
を備えており、
前記複数の電力制御装置は、蓄電池が接続された第1充放電制御装置と、電気自動車を接続可能な第2充放電制御装置と、を含み、
前記第1充放電制御装置は、前記蓄電池の充放電を制御しており、
前記第2充放電制御装置は、前記電気自動車の充放電を制御しており、
前記検出装置と前記処理装置との間の通信、前記処理装置と前記第1充放電制御装置との間の通信、および、前記処理装置と前記第2充放電制御装置との間の通信のいずれかにおいて通信異常が生じたときに、前記第2充放電制御装置は、前記電気自動車の充放電を停止しつつ、前記通信異常が生じていることを報知しており、
前記第2充放電制御装置は、報知装置を備えるEVスタンドを備えており、前記通信異常が生じていることの報知を、前記EVスタンドの前記報知装置から報知させる、
ことを特徴とする電力システム。
An electric power system that is connected to an electric power grid and performs power control of a connection point power, which is power at a connection point with the electric power grid,
a detection device for detecting the value of the node power;
A processing device that derives an induction command value for adjusting the value of the connection point power to a set adjustment target value;
a plurality of power control devices each electrically connected to the connection point and configured to control output power based on an optimization problem using the induction command value;
Equipped with
The plurality of power control devices include a first charge/discharge control device connected to a storage battery and a second charge/discharge control device to which an electric vehicle can be connected;
The first charge/discharge control device controls charging/discharging of the storage battery,
The second charge/discharge control device controls charging/discharging of the electric vehicle,
when a communication abnormality occurs in any of the communication between the detection device and the processing device, the communication between the processing device and the first charging/discharging control device, and the communication between the processing device and the second charging/discharging control device, the second charging/discharging control device notifies the occurrence of the communication abnormality while stopping charging/discharging of the electric vehicle;
The second charge/discharge control device includes an EV stand having an alarm device, and causes the alarm device of the EV stand to notify the occurrence of the communication abnormality.
1. A power system comprising:
前記処理装置は、前記電気自動車の充電可否および放電可否を指定するフラグ情報を前記第2充放電制御装置に送信しており、
前記第2充放電制御装置は、前記フラグ情報を受信し、前記誘導指令値および受信した前記フラグ情報に基づいて、前記電気自動車の充放電を制御しており、
前記フラグ情報は、前記電力制御に対する制御モードに応じて決定される、
請求項1に記載の電力システム。
the processing device transmits flag information for specifying whether the electric vehicle is capable of being charged and whether the electric vehicle is capable of being discharged to the second charge/discharge control device,
the second charge/discharge control device receives the flag information and controls charging/discharging of the electric vehicle based on the induced command value and the received flag information;
The flag information is determined according to a control mode for the power control.
The power system of claim 1 .
電力系統に接続され、当該電力系統との接続点における電力である接続点電力の電力制御を行う電力システムであって、
前記接続点電力の値を検出する検出装置と、
前記接続点電力の値を設定された調整目標値にするための誘導指令値を導出する処理装置と、
各々が、前記接続点に電気的に接続され、かつ、前記誘導指令値を用いた最適化問題に基づいて、出力電力を制御する複数の電力制御装置と、
第1巻線、第2巻線および第3巻線を含む三巻線変圧器と、
を備えており、
前記複数の電力制御装置は、蓄電池が接続された第1充放電制御装置と、電気自動車を接続可能な第2充放電制御装置と、を含み、
前記第1充放電制御装置は、前記蓄電池の充放電を制御しており、
前記第2充放電制御装置は、前記電気自動車の充放電を制御しており、
前記検出装置と前記処理装置との間の通信、前記処理装置と前記第1充放電制御装置との間の通信、および、前記処理装置と前記第2充放電制御装置との間の通信のいずれかにおいて通信異常が生じたときに、前記第2充放電制御装置は、前記電気自動車の充放電を停止しつつ、前記通信異常が生じていることを報知しており、
前記第1巻線は、前記接続点に接続され、
前記第2巻線は、前記第1充放電制御装置に接続され、
前記第3巻線は、前記第2充放電制御装置に接続されており、
前記処理装置は、前記複数の電力制御装置の各々から当該電力制御装置の出力電力をそれぞれ受信しており、受信した前記出力電力の合計値が前記第1巻線の巻線容量を超過する場合、前記誘導指令値として当該超過を解消させるための設定値を前記複数の電力制御装置の各々に送信する、
ことを特徴とする電力システム。
An electric power system that is connected to an electric power grid and performs power control of a connection point power, which is power at a connection point with the electric power grid,
a detection device for detecting the value of the node power;
A processing device that derives an induction command value for adjusting the value of the connection point power to a set adjustment target value;
a plurality of power control devices each electrically connected to the connection point and configured to control output power based on an optimization problem using the induction command value;
a three-winding transformer including a first winding, a second winding, and a third winding;
Equipped with
The plurality of power control devices include a first charge/discharge control device connected to a storage battery and a second charge/discharge control device to which an electric vehicle can be connected;
The first charge/discharge control device controls charging/discharging of the storage battery,
The second charge/discharge control device controls charging/discharging of the electric vehicle,
when a communication abnormality occurs in any of the communication between the detection device and the processing device, the communication between the processing device and the first charging/discharging control device, and the communication between the processing device and the second charging/discharging control device, the second charging/discharging control device notifies the occurrence of the communication abnormality while stopping charging/discharging of the electric vehicle;
the first winding is connected to the connection point;
the second winding is connected to the first charge/discharge control device;
the third winding is connected to the second charge/discharge control device,
the processing device receives output powers of the power control devices from the respective ones of the plurality of power control devices, and when a total value of the received output powers exceeds a winding capacity of the first winding, transmits a setting value for eliminating the excess as the induction command value to each of the plurality of power control devices;
1. A power system comprising:
前記設定値は、前記接続点側から前記三巻線変圧器側に電力が供給されている状態において前記合計値が前記巻線容量を超過する場合、前記蓄電池の充放電を停止させる値であり、前記三巻線変圧器側から前記接続点側に電力が供給されている状態において前記合計値が前記巻線容量を超過する場合、前記電気自動車の充放電を停止させる値である、
請求項3に記載の電力システム。
the set value is a value that stops charging/discharging of the storage battery when the total value exceeds the winding capacity in a state in which power is supplied from the connection point side to the three-winding transformer side, and is a value that stops charging/discharging of the electric vehicle when the total value exceeds the winding capacity in a state in which power is supplied from the three-winding transformer side to the connection point side.
The power system of claim 3 .
JP2020159502A 2020-09-24 2020-09-24 Power System Active JP7554615B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020159502A JP7554615B2 (en) 2020-09-24 2020-09-24 Power System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020159502A JP7554615B2 (en) 2020-09-24 2020-09-24 Power System

Publications (2)

Publication Number Publication Date
JP2022052954A JP2022052954A (en) 2022-04-05
JP7554615B2 true JP7554615B2 (en) 2024-09-20

Family

ID=80962897

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020159502A Active JP7554615B2 (en) 2020-09-24 2020-09-24 Power System

Country Status (1)

Country Link
JP (1) JP7554615B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7666444B2 (en) * 2022-08-05 2025-04-22 トヨタ自動車株式会社 Power system, control device, and power system control method
JP7711659B2 (en) * 2022-08-10 2025-07-23 トヨタ自動車株式会社 Server and Management Method
JP7382106B1 (en) 2023-09-11 2023-11-16 株式会社力電 Power reception and distribution systems, power distribution boards, and transformers compatible with EV chargers, etc.

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014033539A (en) 2012-08-03 2014-02-20 Sharp Corp Power controller, method, and program
JP2014054003A (en) 2012-09-05 2014-03-20 Sharp Corp Charge/discharge device and charge/discharge system
US20150022161A1 (en) 2011-10-20 2015-01-22 Lsis Co., Ltd. Electric vehicle and method of operating same
JP2018161018A (en) 2017-03-23 2018-10-11 株式会社日立製作所 Aggregation system and control method thereof, and hybrid power conversion device
JP2020010442A (en) 2018-07-03 2020-01-16 株式会社ダイヘン System interconnection system and system interconnection method
JP2020043642A (en) 2018-09-07 2020-03-19 株式会社ダイヘン Power system and processing device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150022161A1 (en) 2011-10-20 2015-01-22 Lsis Co., Ltd. Electric vehicle and method of operating same
JP2014033539A (en) 2012-08-03 2014-02-20 Sharp Corp Power controller, method, and program
JP2014054003A (en) 2012-09-05 2014-03-20 Sharp Corp Charge/discharge device and charge/discharge system
JP2018161018A (en) 2017-03-23 2018-10-11 株式会社日立製作所 Aggregation system and control method thereof, and hybrid power conversion device
JP2020010442A (en) 2018-07-03 2020-01-16 株式会社ダイヘン System interconnection system and system interconnection method
JP2020043642A (en) 2018-09-07 2020-03-19 株式会社ダイヘン Power system and processing device

Also Published As

Publication number Publication date
JP2022052954A (en) 2022-04-05

Similar Documents

Publication Publication Date Title
KR101412742B1 (en) Stand-alone Microgrid Control System and Method
JP5865602B2 (en) Power exchange system for exchanging electrical energy between battery and power grid, and method for exchanging electrical energy between battery and power grid
JP7554615B2 (en) Power System
US9013152B2 (en) Power stabilization system and power stabilizing method
WO2020026656A1 (en) Utility interconnection system, interconnection control device, and utility interconnection method
WO2019044774A1 (en) Power supply system
AU2018285903A1 (en) Multi-function energy station
CN102667144A (en) Output control method and output control device for wind-powered electricity generating facility
CN105186588A (en) Arc flash protection battery energy storage system and conversion system and protection method
JP2018182925A (en) Power supply system
JP7098867B2 (en) Power system and processing equipment
JP2020150690A (en) Power system and power controller
JP7341911B2 (en) relay device
JP6971196B2 (en) Power system and switching device
CN111384763A (en) An electric energy conversion and control device and an energy storage system having the same
EP2698897B1 (en) Power storage device and method for operating power storage device
KR101856628B1 (en) Apparatus and Method for Emergency Controlling Energy Storage System
JP5867149B2 (en) Power control unit and power control system
CN115912441A (en) PCS system and control method thereof
JP7530302B2 (en) Power System
CN116316756A (en) Container type battery energy storage method and system
US20210194270A1 (en) Storage Battery Unit, Storage Battery Device and Hybrid-Typed Power Supply System
JP2025043515A (en) Power system and centralized control device
JP2022006986A (en) Power source system
JP2026055986A (en) Power system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230712

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240319

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240327

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240516

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240820

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240909

R150 Certificate of patent or registration of utility model

Ref document number: 7554615

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150