Tower crane transport unit and tower crane transport method Download PDF

Info

Publication number
JP7555840B2
JP7555840B2 JP2021017095A JP2021017095A JP7555840B2 JP 7555840 B2 JP7555840 B2 JP 7555840B2 JP 2021017095 A JP2021017095 A JP 2021017095A JP 2021017095 A JP2021017095 A JP 2021017095A JP 7555840 B2 JP7555840 B2 JP 7555840B2
Authority
JP
Japan
Prior art keywords
tower crane
platform
mast
transport vehicle
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021017095A
Other languages
Japanese (ja)
Other versions
JP2022120290A (en
Inventor
隆 藤内
法典 坂本
広幸 栃山
祐明 冨永
宏明 田畑
馨 高松
啓太郎 山浦
尚史 山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Transport Machinery Co Ltd
Shimizu Corp
Original Assignee
IHI Transport Machinery Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Transport Machinery Co Ltd, Shimizu Corp filed Critical IHI Transport Machinery Co Ltd
Priority to JP2021017095A priority Critical patent/JP7555840B2/en
Publication of JP2022120290A publication Critical patent/JP2022120290A/en
Application granted granted Critical
Publication of JP7555840B2 publication Critical patent/JP7555840B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Jib Cranes (AREA)

Description

本発明は、タワークレーンの運搬ユニット及びタワークレーンの運搬方法に関するものである。 The present invention relates to a transport unit for a tower crane and a method for transporting a tower crane.

従来から、風力発電で使用される風車等の構造物を建設する際には、オールテレーンクレーン等の移動式のクレーンが使用されている。また、多段伸縮式のタワークレーンでの建設も提案されている(下記の特許文献1参照)。 Traditionally, mobile cranes such as all-terrain cranes have been used to construct structures such as wind turbines used in wind power generation. Construction using multi-stage telescopic tower cranes has also been proposed (see Patent Document 1 below).

特許第4402923号公報Patent No. 4402923

近年、風力発電で使用される風車は、発電効率を上げるために高層化及び大型化し、現状のオールテレーンクレーン等の移動式のクレーンでは揚重できない場合がある。このため、揚重可能な規模の自立式のタワークレーンを使用することが考えられる。発電所には複数台の風車が設置されるため、一基の風車を建設する際にタワークレーンを組み立てて、風車の建設完了後にタワークレーンを解体して、次の風車の建設現場まで解体したタワークレーンを運搬して、タワークレーンを再度組み立てると、タワークレーンの解体作業及び組み立て作業に時間がかかり、工期が長期化してしまうという問題点がある。 In recent years, wind turbines used in wind power generation have become taller and larger to increase power generation efficiency, and there are cases where they cannot be lifted with current mobile cranes such as all-terrain cranes. For this reason, it is considered to use a free-standing tower crane large enough to lift them. Since multiple wind turbines are installed at a power plant, if a tower crane is assembled when constructing one wind turbine, dismantled after construction of the wind turbine is completed, and then transported to the construction site of the next wind turbine and reassembled, there is a problem that the dismantling and reassembly of the tower crane takes time, lengthening the construction period.

そこで、本発明は、上記事情に鑑みてなされたものであり、工期の短縮を図ることができるタワークレーンの運搬ユニット及びタワークレーンの運搬方法を提供する。 The present invention was made in consideration of the above circumstances, and provides a tower crane transport unit and a tower crane transport method that can shorten the construction period.

上記目的を達成するために、本発明は以下の手段を採用している。
すなわち、本発明に係るタワークレーンの運搬ユニットは、運搬車と、該運搬車の荷台部に設置された架台と、該架台から上方に延びるマストの下部と、該マストの下部に支持され、揚重装置を有する旋回体と、前記荷台部に設けられ、前記架台を前記荷台部に位置決めする位置決め部と、を備える。
In order to achieve the above object, the present invention employs the following means.
In other words, the transport unit of the tower crane of the present invention comprises a transport vehicle, a platform installed on the loading platform of the transport vehicle, a lower part of a mast extending upward from the platform, a rotating body supported by the lower part of the mast and having a lifting device, and a positioning part provided on the loading platform for positioning the platform on the loading platform.

本構成によれば、使用後のタワークレーンからマストにおける下部以外の部分を解体(撤去)して、旋回体をマストの下部まで下降させて、架台を運搬車の荷台部に設置して、位置決め部で架台を荷台部に位置決めすれば、タワークレーンの運搬ユニットとなる。タワークレーンの運搬ユニットを次の建設現場まで移動させて、運搬車から架台を降ろして、マストの下部に解体したマストの部分を連結して、旋回体を上昇させればタワークレーンが完成する。よって、タワークレーンの解体作業はマストの下部よりも上側の部分のみであるため、タワークレーンの解体作業及び組み立て作業に要する時間が短縮され、工期の短縮を図ることができる。 According to this configuration, after use, the mast other than the lower part is dismantled (removed) from the tower crane, the rotating body is lowered to the lower part of the mast, the platform is installed on the loading platform of the transport vehicle, and the platform is positioned on the loading platform by the positioning unit to form the transport unit of the tower crane. The tower crane transport unit is then moved to the next construction site, the platform is lowered from the transport vehicle, the dismantled mast part is connected to the lower part of the mast, and the rotating body is raised to complete the tower crane. Therefore, since the dismantling work of the tower crane only covers the part above the lower part of the mast, the time required for dismantling and assembling the tower crane is reduced, and the construction period can be shortened.

また、本発明に係るタワークレーンの運搬ユニットでは、前記架台は、平面視で十文字状に形成され、前記位置決め部は、平面視で十字状をなす前記架台の直角部に配置されていてもよい。 In addition, in the transport unit of the tower crane according to the present invention, the platform may be formed in a cross shape in a plan view, and the positioning part may be disposed at a right angle of the platform that is cross-shaped in a plan view.

このように構成されたタワークレーンの運搬ユニットでは、位置決め部は平面視十字状をなす架台の直角部に配置され、架台の直角部を形成する二面が位置決め部と当接して、架台の二方向の移動が規制される。 In a tower crane transport unit configured in this way, the positioning part is placed at the right angle of the platform, which is cross-shaped when viewed from above, and the two faces that form the right angle of the platform abut against the positioning part, restricting movement of the platform in two directions.

また、本発明に係るタワークレーンの運搬ユニットでは、前記位置決め部は、平面視で直線状をなす第一直線部と、該第一直線部と直交し平面視で直線状をなす第二直線部と、を有し、前記位置決め部の前記第一直線部及び前記第二直線部は、前記架台の直角部に配置されていてもよい。 In addition, in the transport unit of the tower crane according to the present invention, the positioning part has a first straight line part that is linear in plan view and a second straight line part that is perpendicular to the first straight line part and linear in plan view, and the first straight line part and the second straight line part of the positioning part may be disposed at a right angle part of the platform.

このように構成されたタワークレーンの運搬ユニットでは、平面視で直線状をなす第一直線部及び第二直線部が架台の直角部を形成する二面に当接するため、位置決め部と架台との当接面積が大きくなり、架台の位置ずれがより一層抑制される。 In a tower crane transport unit configured in this manner, the first and second straight sections, which are linear in plan view, abut against two surfaces that form a right angle on the platform, increasing the contact area between the positioning section and the platform, further preventing the platform from shifting out of position.

また、本発明に係るタワークレーンの運搬方法は、上記のいずれか一に記載のタワークレーンの運搬ユニットの形態でタワークレーンを運搬するタワークレーンの運搬方法であって、マストにおけるマストの下部以外の部分を解体して、吊り下げ部を有する旋回体を前記マストの下部まで下降させるマスト解体工程と、架台の下方に運搬車を挿入する運搬車挿入工程と、前記運搬車の荷台部を上昇させて、該荷台部で前記架台を支持し、前記荷台部に設けられた位置決め部で前記架台を前記荷台部に位置決めする位置決め工程と、前記架台に取り付けられた脚を撤去する脚取り外し工程と、前記運搬車の荷台部を下降させて、前記タワークレーンの運搬ユニットを次の建設現場に移動させる移動工程と、を備える。 The tower crane transportation method according to the present invention is a tower crane transportation method for transporting a tower crane in the form of any one of the tower crane transportation units described above, and includes a mast dismantling process for dismantling a portion of the mast other than the lower part of the mast and lowering a rotating body having a hanging part to the lower part of the mast, a transport vehicle insertion process for inserting a transport vehicle under a platform, a positioning process for raising the platform part of the transport vehicle, supporting the platform on the platform part, and positioning the platform on the platform part with a positioning part provided on the platform part, a leg removal process for removing the legs attached to the platform, and a moving process for lowering the platform part of the transport vehicle and moving the tower crane transportation unit to the next construction site.

このように構成されたタワークレーンの運搬方法では、マスト解体工程で、マストにおける下部以外の部分を解体(撤去)して、旋回体をマストの下部まで下降させる。位置決め工程で、運搬車の荷台部に設けられた位置決め部で架台を荷台部に位置決めする。脚取り外し工程で、脚を撤去して、タワークレーンの運搬ユニットとなる。移動工程で、タワークレーンの運搬ユニットを次の建設現場まで移動させて、運搬車から架台を降ろして、マストの下部に解体したマストの部分を連結して、旋回体を上昇させればタワークレーンが完成する。よって、タワークレーンの解体作業はマストの下部よりも上側の部分のみであるため、タワークレーンの解体作業及び組み立て作業に要する時間が短縮され、工期の短縮を図ることができる。 In the tower crane transportation method configured in this manner, in the mast dismantling process, the parts of the mast other than the lower part are dismantled (removed), and the rotating body is lowered to the lower part of the mast. In the positioning process, the platform is positioned on the platform part by a positioning unit provided on the platform part of the transport vehicle. In the leg removal process, the legs are removed to form the tower crane transportation unit. In the moving process, the tower crane transportation unit is moved to the next construction site, the platform is lowered from the transport vehicle, the dismantled mast part is connected to the lower part of the mast, and the rotating body is raised to complete the tower crane. Therefore, since the tower crane dismantling work only involves the part above the lower part of the mast, the time required for the dismantling and assembly work of the tower crane is shortened, and the construction period can be shortened.

また、本発明に係るタワークレーンの運搬方法は、前記次の建設現場において、前記運搬車の荷台部を上昇させて、前記架台に前記脚を取り付ける脚取り付け工程と、前記運搬車の荷台部を下降させて、該運搬車を前記架台の下方から移動させる運搬車移動工程と、を備える。 The tower crane transport method according to the present invention also includes a leg attachment process for raising the platform of the transport vehicle and attaching the legs to the platform at the next construction site, and a vehicle movement process for lowering the platform of the transport vehicle and moving the transport vehicle from below the platform.

このように構成されたタワークレーンの運搬方法では、次の建設現場で、脚取り付け工程で脚を取り付けて、運搬車移動工程で運搬車を移動(撤去)させる。その後、マストの下部に撤去しておいたマストを連結し、旋回体を上昇させれる。このようにして、前の建設現場で使用したタワークレーンをマストの一部(下部以外の部分)だけ解体して次の建設現場で使用することができるため、タワークレーンの組み立てに要する時間が短縮され、工期の短縮を図ることができる。 In the tower crane transportation method configured in this manner, at the next construction site, the legs are attached in a leg attachment process, and the transport vehicle is moved (removed) in a transport vehicle movement process. The mast that was removed is then connected to the lower part of the mast, and the rotating body is raised. In this way, the tower crane used at the previous construction site can be used at the next construction site by dismantling only part of the mast (the part other than the lower part), thereby reducing the time required to assemble the tower crane and shortening the construction period.

本発明に係るタワークレーンの運搬ユニット及びタワークレーンの運搬方法によれば、工期の短縮を図ることができる。 The tower crane transport unit and tower crane transport method of the present invention can shorten the construction period.

本発明の一実施形態に係るタワークレーンの運搬方法の対象となるタワークレーンにおいて、建設作業時の状態を示す図である。FIG. 1 is a diagram showing a state during construction work of a tower crane that is the subject of a tower crane transportation method according to one embodiment of the present invention. 本発明の一実施形態に係るタワークレーンの運搬方法の対象となるタワークレーンにおいて、移動時の状態を示す図である。FIG. 1 is a diagram showing a state of a tower crane during movement, which is the subject of a tower crane transportation method according to one embodiment of the present invention. 本発明の一実施形態に係るタワークレーンの下部の構成を示す図である。FIG. 2 is a diagram showing the configuration of the lower part of a tower crane according to one embodiment of the present invention. 本発明の一実施形態に係るタワークレーンの運搬方法を説明する図である。1 is a diagram illustrating a method for transporting a tower crane according to one embodiment of the present invention. FIG. 本発明の一実施形態に係るタワークレーンの運搬方法を説明する図であり、建設作業後の図4の後工程を示す。FIG. 5 is a diagram for explaining a method for transporting a tower crane according to an embodiment of the present invention, showing a post-process of FIG. 4 after construction work. 本発明の一実施形態に係るタワークレーンの運搬方法を説明する図であり、建設作業後の図5の後工程を示す。FIG. 6 is a diagram for explaining a method for transporting a tower crane according to an embodiment of the present invention, showing a process subsequent to that shown in FIG. 5 after construction work. 本発明の一実施形態に係るタワークレーンの運搬方法を説明する図であり、建設作業後の図6の後工程を示す。FIG. 7 is a diagram for explaining a method for transporting a tower crane according to an embodiment of the present invention, showing a post-process of FIG. 6 after construction work.

本発明の一実施形態に係るタワークレーンの運搬ユニット及びタワークレーンの運搬方法について、図面を用いて説明する。
まず、建設作業時のタワークレーンについて説明する。
A transport unit for a tower crane and a transport method for a tower crane according to one embodiment of the present invention will be described with reference to the drawings.
First, a tower crane during construction work will be described.

図1に示すように、タワークレーン100は、例えば風車Wを建設する際に使用される。図1では、風車Wのブレードの図示を省略している。尚、タワークレーン100を使用して建設するものは風車Wに限られず、高層の構造物等でもよい。 As shown in FIG. 1, the tower crane 100 is used, for example, when constructing a wind turbine W. In FIG. 1, the blades of the wind turbine W are not shown. Note that the tower crane 100 can be used to construct things other than wind turbines W, such as high-rise structures.

タワークレーン100は、図1に示す建設作業時の形態(タワークレーン100Aとする)と、図2に示す移動時の形態(タワークレーン100Bとする)とに、形態が変更可能である。 The tower crane 100 can be changed between a configuration for construction work shown in FIG. 1 (referred to as tower crane 100A) and a configuration for transportation shown in FIG. 2 (referred to as tower crane 100B).

建設作業時のタワークレーン100Aは、ベース1と、マスト21と、旋回体22と、斜材26と、を備えている。 During construction work, the tower crane 100A comprises a base 1, a mast 21, a rotating body 22, and a diagonal member 26.

ベース1は、敷台11と、架台12と、脚13と、を有している。図4に示すように、敷台11は、各脚13の先端部13aの下方に配置されている。本実施形態では、脚13が4本あり、敷台11は4箇所に配置されている。敷台11は、地面等の作業面G上に設置されている。 The base 1 has a base 11, a stand 12, and legs 13. As shown in FIG. 4, the base 11 is disposed below the tip 13a of each leg 13. In this embodiment, there are four legs 13, and the bases 11 are disposed in four locations. The base 11 is placed on a work surface G, such as the ground.

架台12は、マスト21の直下に配置されている。架台12は、例えばH鋼等の鋼材で構成されている。本実施形態では、架台12は、平面視で十文字状に形成されている。架台12は、中央部12aと、中央部12aから四方向に延びる4本の延出部12bと、を有している。直交する延出部12bの角部を、直角部12cとする。架台12の下面12dは、作業面Gから上方に離間している。 The stand 12 is disposed directly below the mast 21. The stand 12 is made of steel, such as H-beams. In this embodiment, the stand 12 is formed in a cross shape in a plan view. The stand 12 has a central portion 12a and four extending portions 12b extending in four directions from the central portion 12a. The corners of the extending portions 12b that intersect at right angles are called right-angle portions 12c. The bottom surface 12d of the stand 12 is spaced upward from the work surface G.

脚13は、架台12の各延出部12bの先端部に連結されている。脚13の延在方向は、延出部12bの延在方向と略同一である。換言すると、平面視で、延出部12b及び脚13は、中央部12aから一直線上に延びている。脚13は、例えばH鋼等の鋼材で構成されている。脚13の下面13dは、作業面Gから上方に離間しているとともに、架台12の下面12dよりも高い位置に配置されている。 The legs 13 are connected to the tip of each extension portion 12b of the stand 12. The extension direction of the legs 13 is substantially the same as the extension direction of the extension portion 12b. In other words, in a plan view, the extension portion 12b and the legs 13 extend in a straight line from the central portion 12a. The legs 13 are made of steel such as H-beams. The lower surface 13d of the legs 13 is spaced above the work surface G and is positioned higher than the lower surface 12d of the stand 12.

架台12と脚13との連結構造、及び脚13と敷台11との連結構造について、図3を用いて説明する。なお、図3に示す連結構造は一例であり、他の構造であってもよい。 The connection structure between the stand 12 and the legs 13, and the connection structure between the legs 13 and the base 11 will be described with reference to FIG. 3. Note that the connection structure shown in FIG. 3 is an example, and other structures may be used.

図3に示すように、脚13の下部は、架台12側に延出する脚支持部13bを有している。架台12の上部は、脚13側に延出する架台連結部12eを有している。架台連結部12eは、脚支持部13bの上方に介装材14を介して設置されている。なお、架台連結部12eは、脚支持部13b上に直接設置されていてもよい。介装材14に替えて、脚13と架台12とを水平方向を向くピン(不図示)によって接合する構成であってもよい。 As shown in FIG. 3, the lower part of the leg 13 has a leg support part 13b extending towards the pedestal 12. The upper part of the pedestal 12 has a pedestal connection part 12e extending towards the leg 13. The pedestal connection part 12e is installed above the leg support part 13b via an intermediate material 14. The pedestal connection part 12e may be installed directly on the leg support part 13b. Instead of the intermediate material 14, the leg 13 and the pedestal 12 may be joined by a pin (not shown) facing horizontally.

延出部12bの先端部は、第一連結板121を有している。第一連結板121は、板状に形成されている。第一連結板121の板面は、水平方向を向いている。脚13は、第一連結板121と対向するように第二連結板131を有している。第二連結板131は、板状に形成されている。第二連結板131の板面は、第一連結板121と同じ方向を向いている。第一連結板121及び第二連結板131に形成された取付孔にボルト132が挿入され、ナット133に締結されている。これによって、架台12と脚13とは連結されている。架台12及び脚13の上面には、ボルト132及びナット133の取付作業用の開口が形成されていてもよい。 The tip of the extension 12b has a first connecting plate 121. The first connecting plate 121 is formed in a plate shape. The plate surface of the first connecting plate 121 faces the horizontal direction. The leg 13 has a second connecting plate 131 facing the first connecting plate 121. The second connecting plate 131 is formed in a plate shape. The plate surface of the second connecting plate 131 faces the same direction as the first connecting plate 121. A bolt 132 is inserted into an attachment hole formed in the first connecting plate 121 and the second connecting plate 131, and is fastened to a nut 133. In this way, the frame 12 and the leg 13 are connected. An opening for attachment of the bolt 132 and the nut 133 may be formed on the upper surface of the frame 12 and the leg 13.

脚13の先端部13aは、上面に位置する上面板136と、下面に位置する下面板137と、を有している。上面板136と下面板137とは、上下方向に離間して配置されている。上面板136及び下面板137は、板状に形成されている。上面板136及び下面板137の板面は、上下方向を向いている。上面板136及び下面板137に形成された取付孔にボルト138が挿入され、敷台11に締結されている。これによって、脚13は、敷台11に連結されている。 The tip 13a of the leg 13 has an upper plate 136 located on the upper surface and a lower plate 137 located on the lower surface. The upper plate 136 and the lower plate 137 are arranged spaced apart in the vertical direction. The upper plate 136 and the lower plate 137 are formed in a plate shape. The plate surfaces of the upper plate 136 and the lower plate 137 face in the vertical direction. Bolts 138 are inserted into mounting holes formed in the upper plate 136 and the lower plate 137 and are fastened to the base 11. In this way, the leg 13 is connected to the base 11.

図1に示すように、マスト21は、複数のマスト部材21aが上下方向に分離可能に連結されている。例えば、マスト部材21aは鉄骨造であり、上下に隣接するマスト部材21aはボルト及びナット等の連結手段によって連結及び分離可能な構成である。 As shown in FIG. 1, the mast 21 is made up of multiple mast members 21a that are separably connected in the vertical direction. For example, the mast members 21a are made of steel, and adjacent mast members 21a can be connected and separated by connecting means such as bolts and nuts.

マスト部材21aのうち、最下部に位置するものを底部マスト部材(マストの下部)21bと称する。底部マスト部材21bの下端部は、架台12に連結されている。 The lowest mast member 21a is called the bottom mast member (lower part of the mast) 21b. The lower end of the bottom mast member 21b is connected to the frame 12.

旋回体22は、旋回台23と、ジブ24と、揚重装置25と、を有している。旋回台23は、マスト部材21aのうち最上部に位置する最上部マスト部材21cに支持されている。旋回台23は、最上部マスト部材21cに上下方向を軸線方向として軸線回りに回動可能に支持されている。旋回台23に着席したオペレーターがタワークレーン100を操縦するようになっている。なお、旋回台23にオペレーターがいなくて、遠隔操作でタワークレーン100を操縦可能であってもよい。ジブ24は、旋回台23に取り付けられている。ジブ24の基端部は、旋回台23に揺動可能に軸支されている。揚重装置25は、ウインチ25aと、ワイヤー25bと、フック25cと、を有している。ウインチ25aは、旋回台23に設けられている。ワイヤー25bは、ウインチ25aによって巻上げ及び巻下げ可能とされ、ジブ24の先端部に係合されている。フック25cは、ワイヤー25bの先端部に設けられ、風車Wの構成部材を吊り下げ可能とされている。 The rotating body 22 has a rotating base 23, a jib 24, and a lifting device 25. The rotating base 23 is supported by the uppermost mast member 21c located at the uppermost part of the mast member 21a. The rotating base 23 is supported by the uppermost mast member 21c so as to be rotatable around an axis with the vertical direction as the axis direction. An operator seated on the rotating base 23 operates the tower crane 100. Note that there may be no operator on the rotating base 23 and the tower crane 100 may be operated remotely. The jib 24 is attached to the rotating base 23. The base end of the jib 24 is pivotally supported on the rotating base 23 so as to be able to swing. The lifting device 25 has a winch 25a, a wire 25b, and a hook 25c. The winch 25a is provided on the rotating base 23. The wire 25b can be wound up and down by the winch 25a and is engaged with the tip of the jib 24. The hook 25c is attached to the tip of the wire 25b and can suspend components of the wind turbine W.

上記のタワークレーン100Aは、移動時には図2に示すようにタワークレーン100Bに形態を変更して、運搬車3に設置される。タワークレーン100Bが運搬車3に設置されたものをタワークレーンの運搬ユニット10と称する。タワークレーンの運搬ユニット10は、運搬車3と、位置決め部(図4参照)4と、タワークレーン100Bと、を備えている。タワークレーン100Bは、架台12と、底部マスト部材21bと、旋回体22と、を備えている。 When moving, the tower crane 100A described above changes its form to tower crane 100B as shown in FIG. 2 and is installed on the transport vehicle 3. The tower crane 100B installed on the transport vehicle 3 is called the tower crane transport unit 10. The tower crane transport unit 10 comprises the transport vehicle 3, a positioning unit (see FIG. 4) 4, and the tower crane 100B. The tower crane 100B comprises a platform 12, a bottom mast member 21b, and a rotating body 22.

運搬車3は、重量物を設置可能で、走行可能なものであれば適宜採用可能である。本実施形態では、運搬車3として、リフトアップが可能な多軸ドーリー車が採用されている。 The transport vehicle 3 can be any suitable vehicle that can carry heavy objects and is capable of running. In this embodiment, a multi-axle dolly vehicle that can be lifted up is used as the transport vehicle 3.

図4(旋回体22の図示を省略している)に示すように、運搬車3は、複数の走行可能な車輪30と、荷台部31と、リフト部32と、を有している。荷台部31は、平板状に形成され、上面に重量物を設置可能である。荷台部31は、リフト部32を介して車輪30と接続されている。リフト部32は、荷台部31を上下に昇降可能である。 As shown in FIG. 4 (the rotating body 22 is not shown), the transport vehicle 3 has a number of drivable wheels 30, a loading platform 31, and a lifting unit 32. The loading platform 31 is formed in a flat plate shape, and a heavy object can be placed on the upper surface. The loading platform 31 is connected to the wheels 30 via the lifting unit 32. The lifting unit 32 can raise and lower the loading platform 31.

荷台部31には、設置板34が固定されている。設置板34は、荷台部31の上面に配置される上面板部34aと、荷台部31の側面に配置される側面板部34bと、を有している。側面板部34bは、荷台部31にボルト及びナットの連結手段34cによって連結されている。 An installation plate 34 is fixed to the loading platform 31. The installation plate 34 has an upper plate portion 34a arranged on the upper surface of the loading platform 31 and a side plate portion 34b arranged on the side of the loading platform 31. The side plate portion 34b is connected to the loading platform 31 by a bolt and nut connecting means 34c.

位置決め部4は、設置板34の上面34uに固定されている。本実施形態では、4個の位置決め部4は、運搬するタワークレーン100Bの架台12の直角部12cに対応した位置に配置されている。位置決め部4は、設置板34の上面34uに溶接やボルト及ナット等の連結手段によって固定されている。 The positioning parts 4 are fixed to the upper surface 34u of the installation plate 34. In this embodiment, the four positioning parts 4 are arranged at positions corresponding to the right angle parts 12c of the platform 12 of the tower crane 100B to be transported. The positioning parts 4 are fixed to the upper surface 34u of the installation plate 34 by connecting means such as welding or bolts and nuts.

位置決め部4は、平面視L字状に形成されている。位置決め部4は、第一直線部41と、第二直線部42と、を有している。第一直線部41及び第二直線部42は、平面視で直線状をなすように形成されている。第一直線部41と第二直線部42とは、平面視で直交配置されている。図7に示すように、第一直線部41と第二直線部42との交差部43は、架台12の直角部12cに配置されている。タワークレーン100自体は自重で自立可能であり、位置決め部4によって架台12が設置板34の上に位置決めされている。 The positioning portion 4 is formed in an L-shape in plan view. The positioning portion 4 has a first straight portion 41 and a second straight portion 42. The first straight portion 41 and the second straight portion 42 are formed to be linear in plan view. The first straight portion 41 and the second straight portion 42 are disposed perpendicular to each other in plan view. As shown in FIG. 7, the intersection 43 between the first straight portion 41 and the second straight portion 42 is disposed at the right angle portion 12c of the platform 12. The tower crane 100 itself can stand on its own weight, and the platform 12 is positioned on the installation plate 34 by the positioning portion 4.

図2に示すように、タワークレーンの運搬ユニット10では、ベース1のうち敷台11及び脚13は撤去され架台12のみが設置されている。複数のマスト部材21aのうち底部マスト部材21b以外のマスト部材21aは撤去されている。旋回体22は、底部マスト部材21bに支持されている。 As shown in FIG. 2, in the tower crane transport unit 10, the base 1 has the base 11 and legs 13 removed, and only the platform 12 is installed. Of the multiple mast members 21a, all mast members 21a except the bottom mast member 21b have been removed. The rotating body 22 is supported by the bottom mast member 21b.

次に、タワークレーンの運搬方法について説明する。
一の風車Wの建設完了後に、次の風車Wの建設現場に、タワークレーン100を移動させるに際し、まず、マスト解体工程を行う。
建設作業完了時の形態のタワークレーン100Aにおいて、マスト21のうち底部マスト部材21bを残して他のマスト部材21aを解体する。旋回体22を下方のマスト部材21aに下降させて、上側のマスト部材21aを撤去する作業を順次行い、旋回体22を底部マスト部材21bまで下降させる。その際、斜材26は旋回体22の下降の支障になる前に撤去する。
Next, a method for transporting a tower crane will be described.
When the tower crane 100 is moved to the construction site of the next wind turbine W after the construction of one wind turbine W is completed, a mast dismantling process is first carried out.
In the tower crane 100A in the configuration at the time of completion of the construction work, the mast members 21a of the mast 21 are dismantled except for the bottom mast member 21b. The rotating body 22 is lowered to the lower mast member 21a, and the upper mast member 21a is removed in sequence, and the rotating body 22 is lowered to the bottom mast member 21b. At that time, the diagonal members 26 are removed before they interfere with the descent of the rotating body 22.

次に、運搬車挿入工程を行う。
図4に示すように、運搬車3に設置板34を固定した状態で、ベース1の下方に運搬車3を挿入する。この状態では、設置板34の上面34uと架台12の下面12dとの間には隙間が生じている。
Next, the transport vehicle insertion process is carried out.
4, with the installation plate 34 fixed to the transport vehicle 3, the transport vehicle 3 is inserted below the base 1. In this state, a gap is generated between the upper surface 34u of the installation plate 34 and the lower surface 12d of the stand 12.

次に、位置決め工程を行う。
脚13と敷台11とを連結しているボルト138(図3参照。)を取り外す。図5に示すように、運搬車3のリフト部32を駆動して、荷台部31を上昇させる。荷台部31に固定された設置板34の上面34uが架台12の下面12dに当接するとともに、脚13が敷台11から浮く高さまで荷台部31を上昇させる。
Next, a positioning step is performed.
The bolts 138 (see FIG. 3) connecting the legs 13 and the base 11 are removed. As shown in FIG. 5, the lift unit 32 of the transport vehicle 3 is driven to raise the loading platform 31. The upper surface 34u of the installation plate 34 fixed to the loading platform 31 abuts against the lower surface 12d of the stand 12, and the loading platform 31 is raised to a height at which the legs 13 are lifted off the base 11.

脚13と敷台11との間には、フィラー15bを配置する。脚13の下面13dは架台12の下面12dよりも高い位置に配置されているため、脚13の下面13dと荷台部31に固定された設置板34の上面34uとの間にもフィラー15aを配置して、高さを調整する。このようにして、荷台部31でベース1を支持する。 Fillers 15b are placed between the legs 13 and the base 11. Because the bottom surfaces 13d of the legs 13 are positioned higher than the bottom surface 12d of the stand 12, fillers 15a are also placed between the bottom surfaces 13d of the legs 13 and the top surface 34u of the installation plate 34 fixed to the loading platform 31 to adjust the height. In this way, the base 1 is supported by the loading platform 31.

このとき、設置板34に設けられた位置決め部4の交差部43を架台12の直角部12cに配置して、架台12を設置板34の上に位置決めする。 At this time, the intersection 43 of the positioning portion 4 provided on the installation plate 34 is placed at the right angle portion 12c of the stand 12, and the stand 12 is positioned on the installation plate 34.

次に、脚取り外し工程を行う。
架台12と脚13とを連結しているボルト132及びナット133を取り外す。図6に示すように、脚13を他のクレーン等の揚重機械で吊り上げて撤去する。4本全ての脚13を撤去する。その後、敷台11も必要に応じて撤去する。
Next, the leg removal process is carried out.
The bolts 132 and nuts 133 connecting the base 12 and the legs 13 are removed. As shown in Fig. 6, the legs 13 are lifted and removed by another lifting machine such as a crane. All four legs 13 are removed. Thereafter, the base 11 is also removed as necessary.

次に、移動工程を行う。
図7に示すように、運搬車3のリフト部32を駆動して、荷台部31を下降させる。タワークレーンの運搬ユニット10を次の建設現場に移動させる。
Next, the moving step is carried out.
7, the lift section 32 of the transport vehicle 3 is driven to lower the loading platform section 31. The transport unit 10 of the tower crane is moved to the next construction site.

次の建設現場では、タワークレーンの運搬ユニット10を建設時のタワークレーン100Aに組み立て直す。
脚取り付け工程を行う。
運搬車3のリフト部32を駆動して、荷台部31を所定の高さまで上昇させる。図6に示すように、設置される脚13の先端部13aの下方に敷台11及びフィラー15bを配置するととともに、設置板34上にもフィラー15aを配置しておく。架台12と脚13とをボルト132及びナット133で締結して、4本の脚13を架台12に取り付ける。
At the next construction site, the tower crane's transport unit 10 is reassembled into the tower crane 100A used at the time of construction.
The leg attachment process is carried out.
The lift section 32 of the transport vehicle 3 is driven to raise the loading platform section 31 to a predetermined height. As shown in Fig. 6, the base 11 and the filler 15b are placed below the tip end 13a of the leg 13 to be installed, and the filler 15a is also placed on the installation plate 34. The base 12 and the legs 13 are fastened with bolts 132 and nuts 133 to attach the four legs 13 to the base 12.

次に、運搬車移動工程を行う。
運搬車3のリフト部32を駆動して、荷台部31を下降させる。脚13と敷台11とをボルト138で締結する。運搬車3を架台12の下方から移動させる。その後、底部マスト部材21bの上側に他のマスト部材21aを順次連結して、旋回体22を所定の位置まで上昇させ、建設作業時のタワークレーン100Aが完成する。
Next, the transport vehicle moving process is carried out.
The lift section 32 of the transport vehicle 3 is driven to lower the loading platform 31. The legs 13 and the base 11 are fastened with bolts 138. The transport vehicle 3 is moved from below the platform 12. After that, the other mast members 21a are sequentially connected to the upper side of the bottom mast member 21b, and the rotating body 22 is raised to a predetermined position, completing the tower crane 100A for construction work.

本実施形態によれば、建設作業時のタワークレーン100Aからマスト21における底部マスト部材21b以外のマスト部材21aを解体(撤去)して、旋回体22を底部マスト部材21bまで下降させる。架台12を運搬車3の荷台部31に固定された設置板34に設置して、設置板34に設けられた位置決め部4で架台12を設置板34に位置決めする。これによって、移動時の形態のタワークレーン100Bを有するタワークレーンの運搬ユニット10となる。タワークレーンの運搬ユニット10を次の建設現場まで移動させて、運搬車3から架台12を降ろして、底部マスト部材21bに解体したマスト部材21aを連結して、旋回体22を上昇させれば、建設作業時のタワークレーン100Aが完成する。よって、タワークレーン100の解体はマスト21における底部マスト部材21b以外のマスト部材21aのみであるため、タワークレーン100の解体及び組み立てに要する時間が短縮され、工期の短縮を図ることができる。 According to this embodiment, the mast members 21a other than the bottom mast member 21b of the mast 21 are dismantled (removed) from the tower crane 100A during construction work, and the rotating body 22 is lowered to the bottom mast member 21b. The platform 12 is installed on the installation plate 34 fixed to the loading platform 31 of the transport vehicle 3, and the platform 12 is positioned on the installation plate 34 by the positioning part 4 provided on the installation plate 34. This results in a tower crane transport unit 10 having a tower crane 100B in a moving form. The tower crane transport unit 10 is moved to the next construction site, the platform 12 is lowered from the transport vehicle 3, the dismantled mast member 21a is connected to the bottom mast member 21b, and the rotating body 22 is raised, completing the tower crane 100A during construction work. Therefore, since the tower crane 100 only requires dismantling the mast member 21a of the mast 21, excluding the bottom mast member 21b, the time required to dismantle and assemble the tower crane 100 is reduced, and the construction period can be shortened.

また、位置決め部4は平面視十字状をなす架台12の直角部12cに配置され、架台12の直角部12cを形成する二面が位置決め部4と当接して、架台12の二方向の移動が規制される。 The positioning portion 4 is disposed at the right angle portion 12c of the base 12, which is cross-shaped when viewed from above, and the two faces forming the right angle portion 12c of the base 12 abut against the positioning portion 4, restricting the movement of the base 12 in two directions.

また、平面視で直線状をなす第一直線部41及び第二直線部42が架台12の直角部12cを形成する二面に当接するため、位置決め部4と架台12との当接面積が大きくなり、架台12の位置ずれがより一層抑制される。 In addition, the first straight portion 41 and the second straight portion 42, which are linear in plan view, abut against two surfaces that form the right angle portion 12c of the mount 12, so that the contact area between the positioning portion 4 and the mount 12 is increased, and misalignment of the mount 12 is further suppressed.

なお、上述した実施の形態において示した各構成部材の諸形状や組み合わせ等は一例であって、本発明の主旨から逸脱しない範囲において設計要求等に基づき種々変更可能である。 The shapes and combinations of the components shown in the above-mentioned embodiment are merely examples, and may be modified in various ways based on design requirements, etc., without departing from the spirit of the present invention.

例えば、位置決め部4によって、架台12が設置板34に位置決めされているが、本発明はこれに限られない。ボルト及びナットによって架台12を運搬車3の荷台部31に固定して、架台12を荷台部31に位置決めする構成であってもよい。 For example, the positioning unit 4 positions the platform 12 on the installation plate 34, but the present invention is not limited to this. The platform 12 may be fixed to the loading platform 31 of the transport vehicle 3 by bolts and nuts, and the platform 12 may be positioned on the loading platform 31.

1 ベース
3 運搬車
4 位置決め部
10 タワークレーンの運搬ユニット
12 架台
12c 直角部
13 脚
21 マスト
21b 底部マスト部材(マストの下部)
22 旋回体
25 揚重装置
31 荷台部
41 第一直線部
42 第二直線部
100 タワークレーン
100A 建設作業時のタワークレーン
100B 移動時のタワークレーン
1 Base 3 Transport vehicle 4 Positioning unit 10 Tower crane transport unit 12 Platform 12c Right angle portion 13 Leg 21 Mast 21b Bottom mast member (lower part of mast)
22 Rotating body 25 Lifting device 31 Cargo platform 41 First straight section 42 Second straight section 100 Tower crane 100A Tower crane during construction work 100B Tower crane during movement

Claims (5)

運搬車と、
該運搬車の荷台部に設置された架台と、
該架台から上方に延びるマストの下部と、
該マストの下部に支持され、揚重装置を有する旋回体と、
前記荷台部に設けられ、前記架台を前記荷台部に位置決めする位置決め部と、を備えるタワークレーンの運搬ユニット。
A transport vehicle,
A platform installed on the platform of the transport vehicle;
a lower portion of a mast extending upward from the frame;
A rotating body supported on a lower portion of the mast and having a lifting device;
A tower crane transport unit comprising: a positioning section provided on the loading platform section and positioning the platform on the loading platform section.
前記架台は、平面視で十文字状に形成され、
前記位置決め部は、平面視で十字状をなす前記架台の直角部に配置されている請求項1に記載のタワークレーンの運搬ユニット。
The stand is formed in a cross shape in a plan view,
The transport unit of a tower crane according to claim 1 , wherein the positioning portion is arranged at a right angle of the platform that is cross-shaped in a plan view.
前記位置決め部は、平面視で直線状をなす第一直線部と、該第一直線部と直交し平面視で直線状をなす第二直線部と、を有し、
前記第一直線部及び前記第二直線部は、前記架台の直角部に配置されている請求項1または2に記載のタワークレーンの運搬ユニット。
The positioning portion has a first straight line portion that is linear in a plan view and a second straight line portion that is perpendicular to the first straight line portion and linear in a plan view,
The transport unit of a tower crane according to claim 1 or 2, wherein the first straight portion and the second straight portion are arranged at right angles to the platform.
請求項1から3のいずれか一項に記載のタワークレーンの運搬ユニットの形態でタワークレーンを運搬するタワークレーンの運搬方法であって、
マストにおけるマストの下部以外の部分を解体して、揚重装置を有する旋回体を前記マストの下部まで下降させるマスト解体工程と、
架台の下方に運搬車を挿入する運搬車挿入工程と、
前記運搬車の荷台部を上昇させて、該荷台部で前記架台を支持し、前記荷台部に設けられた位置決め部で前記架台を前記荷台部に位置決めする位置決め工程と、
前記架台に取り付けられた脚を撤去する脚取り外し工程と、
前記運搬車の荷台部を下降させて、前記タワークレーンの運搬ユニットを次の建設現場に移動させる移動工程と、を備えるタワークレーンの運搬方法。
A method for transporting a tower crane in the form of a tower crane transport unit according to any one of claims 1 to 3, comprising the steps of:
a mast dismantling process in which a portion of the mast other than a lower portion of the mast is dismantled and a rotating body having a lifting device is lowered to the lower portion of the mast;
a vehicle inserting step of inserting a vehicle under the frame;
a positioning step of lifting a loading platform of the transport vehicle, supporting the platform on the loading platform, and positioning the platform on the loading platform by a positioning portion provided on the loading platform;
a leg removing step of removing the legs attached to the frame;
A transporting method for a tower crane, comprising: a moving process of lowering the loading platform of the transport vehicle and moving the transport unit of the tower crane to a next construction site.
前記次の建設現場において、
前記運搬車の荷台部を上昇させて、前記架台に前記脚を取り付ける脚取り付け工程と、
前記運搬車の荷台部を下降させて、該運搬車を前記架台の下方から移動させる運搬車移動工程と、を備える請求項4に記載のタワークレーンの運搬方法。
At the following construction site:
a leg attachment step of lifting a platform of the transport vehicle and attaching the legs to the platform;
5. The method for transporting a tower crane according to claim 4, further comprising a transport vehicle moving step of lowering a loading platform of the transport vehicle to move the transport vehicle from below the frame.
JP2021017095A 2021-02-05 2021-02-05 Tower crane transport unit and tower crane transport method Active JP7555840B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021017095A JP7555840B2 (en) 2021-02-05 2021-02-05 Tower crane transport unit and tower crane transport method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021017095A JP7555840B2 (en) 2021-02-05 2021-02-05 Tower crane transport unit and tower crane transport method

Publications (2)

Publication Number Publication Date
JP2022120290A JP2022120290A (en) 2022-08-18
JP7555840B2 true JP7555840B2 (en) 2024-09-25

Family

ID=82849277

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021017095A Active JP7555840B2 (en) 2021-02-05 2021-02-05 Tower crane transport unit and tower crane transport method

Country Status (1)

Country Link
JP (1) JP7555840B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000255985A (en) 1999-02-26 2000-09-19 Potain Sa Device for simultaneously extending or folding jib chip elements of crane
JP2005082352A (en) 2003-09-10 2005-03-31 Tadano Ltd Tower crane
JP2018503572A (en) 2014-12-09 2018-02-08 ヴォッベン プロパティーズ ゲーエムベーハーWobben Properties Gmbh Tower rotary crane for building a wind turbine generator and method for building a tower rotary crane
US20200369495A1 (en) 2017-07-27 2020-11-26 S&L Access Systems Ab Lifting Assembly For Elevating Components To A Wind Turbine And A Method For Using The Lifting Assembly

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5218452B2 (en) * 1972-06-28 1977-05-21
JPS54153670U (en) * 1978-04-19 1979-10-25
JPH01132690U (en) * 1988-03-03 1989-09-08

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000255985A (en) 1999-02-26 2000-09-19 Potain Sa Device for simultaneously extending or folding jib chip elements of crane
JP2005082352A (en) 2003-09-10 2005-03-31 Tadano Ltd Tower crane
JP2018503572A (en) 2014-12-09 2018-02-08 ヴォッベン プロパティーズ ゲーエムベーハーWobben Properties Gmbh Tower rotary crane for building a wind turbine generator and method for building a tower rotary crane
US20200369495A1 (en) 2017-07-27 2020-11-26 S&L Access Systems Ab Lifting Assembly For Elevating Components To A Wind Turbine And A Method For Using The Lifting Assembly

Also Published As

Publication number Publication date
JP2022120290A (en) 2022-08-18

Similar Documents

Publication Publication Date Title
JP6655840B2 (en) Crane equipment used at the construction site of reinforced concrete buildings
JP2009113922A (en) Construction method of tower-like structure and construction crane
CN102701083A (en) Special equipment and method for wind turbine parts replacement
EP2746570A1 (en) Installation apparatus and method of mounting a wind turbine
JP2002147340A (en) Wind turbine generator installation method and wind turbine generator
JP7555840B2 (en) Tower crane transport unit and tower crane transport method
JP6545965B2 (en) Climbing crane
JP7666998B2 (en) Tower crane mast support structure
JP3905103B2 (en) Tower-like building erection method and erection device
JP3700306B2 (en) Wind power generator construction method
JP2018150089A (en) Operation method of tower crane
CN220976400U (en) A ring beam type slewing device for pile-circling crane
JP2000204792A (en) Frame for assembly and/or maintenance for tower-shaped building, and assembly and/or maintenance method for tower-shaped building
JP7177431B2 (en) Lift-up device and tower-like structure construction method
JP2579715B2 (en) External tower crane
JPH10205430A (en) Construction method of wind power generator
JP3827321B1 (en) Windmill assembling apparatus and assembling method
JP7144471B2 (en) Method for stacking tower members and lifting equipment used in method for stacking tower members
KR100427751B1 (en) An installation beam of tower-crane for an outer wall
JP7586877B2 (en) Method for dismantling and assembling a wind turbine
JP7174806B1 (en) Wind turbine dismantling method, wind turbine assembly method, and wind turbine construction stand
JP4914130B2 (en) Climbing crane
KR20140047791A (en) Installing apparatus and method of wind power generator
JP7775530B1 (en) Wind turbine generator assembly method, assembly system, and wind turbine generator disassembly method
KR101171714B1 (en) Integrated tower with a crane for wind power generator and construction method of the wind power generator using thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231120

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240816

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240820

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240911

R150 Certificate of patent or registration of utility model

Ref document number: 7555840

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115