JP7557255B2 - Lining concrete pouring method - Google Patents
[go: Go Back, main page]

JP7557255B2 - Lining concrete pouring method - Google Patents

Lining concrete pouring method Download PDF

Info

Publication number
JP7557255B2
JP7557255B2 JP2021150218A JP2021150218A JP7557255B2 JP 7557255 B2 JP7557255 B2 JP 7557255B2 JP 2021150218 A JP2021150218 A JP 2021150218A JP 2021150218 A JP2021150218 A JP 2021150218A JP 7557255 B2 JP7557255 B2 JP 7557255B2
Authority
JP
Japan
Prior art keywords
concrete
tunnel
polystyrene foam
extruded polystyrene
inner formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021150218A
Other languages
Japanese (ja)
Other versions
JP2023042845A (en
Inventor
奨士 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP2021150218A priority Critical patent/JP7557255B2/en
Publication of JP2023042845A publication Critical patent/JP2023042845A/en
Application granted granted Critical
Publication of JP7557255B2 publication Critical patent/JP7557255B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、覆工コンクリートの打設方法に関し、特に山岳トンネルの施工における覆工コンクリートの打設に適用して有効な技術に関するものである。 The present invention relates to a method for pouring lining concrete, and in particular to a technology that is effective when applied to pouring lining concrete in the construction of mountain tunnels.

山岳トンネルの施工において、岩盤にダイナマイトを仕掛けて爆破することでトンネルを掘削する発破方式が用いられる。この工法は、掘削部分にコンクリートを吹き付けて硬化させてロックボルトを岩盤に設置し、地山自体の保持力を利用してトンネルを保持する工法である。ロックボルトの設置後は、セントルと呼ばれる半円筒形の型枠を嵌め込み、吹付けを行ったコンクリートとセントルとの間に覆工コンクリートを打設(充填)して仕上げが行われる。 In the construction of mountain tunnels, a blasting method is used in which dynamite is planted in the bedrock and then exploded to excavate the tunnel. This method involves spraying concrete into the excavated area, allowing it to harden, and installing rock bolts in the bedrock, using the natural holding power of the ground to hold the tunnel in place. After the rock bolts are installed, a semi-cylindrical formwork called a center is fitted into the excavated area, and lining concrete is poured (filled) between the sprayed concrete and the center to complete the construction.

ここで、セントルと吹付けコンクリートとの間詰(覆工コンクリートの打設)においてセントルの妻側からコンクリートが流出することを防止するために、エアバルクが使用されている。 Here, air bulk is used to prevent concrete from leaking out from the gable side of the center hole when filling the gap between the center hole and the shotcrete (pouring the lining concrete).

すなわち、トンネル延伸方向の断面図である図11および図11のZ-Z線に沿った断面図である図12に示すように、セントルCは、ロックボルトBが貫通して設置された吹付けコンクリート12と対向配置される内型枠Caと、内型枠Caの妻側において当該内型枠Caのトンネル横断方向外側にはみ出すように設置されたフランジCbを備えている。そして、フランジCb側の内型枠Caの上に空気を充填しない状態のエアバルクABを設置し、当該エアバルクABに空気を充填して膨張させることで吹付けコンクリート12と密着させておいて、内型枠Caと吹付けコンクリート12との空間13gに覆工コンクリートを打設している。 That is, as shown in Figure 11, which is a cross-sectional view in the tunnel extension direction, and Figure 12, which is a cross-sectional view along line Z-Z in Figure 11, the center C is equipped with an inner formwork Ca arranged opposite the shotcrete 12 through which the rock bolt B is inserted, and a flange Cb installed on the gable side of the inner formwork Ca so as to protrude outside the inner formwork Ca in the tunnel crossing direction. An air bulk AB that is not filled with air is installed on top of the inner formwork Ca on the flange Cb side, and air is filled into the air bulk AB to expand it and bring it into close contact with the shotcrete 12, and lining concrete is poured into the space 13g between the inner formwork Ca and the shotcrete 12.

また、内型枠Caの妻側と吹付けコンクリート12との間隔が大きくなってしまう場合には、図示するように、エアバルクABを複数重ねて使用することで、両者の間を塞いでいる。 In addition, if the gap between the gable side of the inner formwork Ca and the sprayed concrete 12 becomes too large, multiple air bulks AB are stacked on top of each other to seal the gap, as shown in the figure.

なお、図11および図12において、符号Gは地山、符号Sは鋼製支保工、符号11は鋼製支保工Sを保持するための仮吹付けコンクリートである。 In Figures 11 and 12, symbol G denotes the ground, symbol S denotes the steel support, and symbol 11 denotes the temporary sprayed concrete used to hold the steel support S.

エアバルクを用いたトンネル施工について記載された技術としては、例えば特許文献1(特開2017-223013号公報)が知られている。 One example of a technique that describes tunnel construction using air bulk is known from Patent Document 1 (JP Patent Publication No. 2017-223013).

特開2017-223013号公報JP 2017-223013 A

しかしながら、前述したエアバルクABを用いた施工方法では、次のような問題がある。 However, the construction method using the air bulk AB described above has the following problems:

すなわち、エアバルクABを膨張させると、その形状は円柱状になる。すると、エアバルクABを重ねて使用する場合には、円柱状のエアバルクABの上に円柱状のエアバルクABを載せるという形態になるため、エアバルクABの断面で考えた場合、図11に示すように、曲面を曲面で支えるようになる。そのため、エアバルクAB同士の接する面積が小さくなって不安定な設置となってしまい、施工性が悪化する。 In other words, when the air bulk AB is expanded, its shape becomes cylindrical. When the air bulk AB is used in a stacked manner, a cylindrical air bulk AB is placed on top of another cylindrical air bulk AB, and when considered in cross section of the air bulk AB, a curved surface is supported by a curved surface, as shown in Figure 11. This reduces the contact area between the air bulks AB, making the installation unstable and reducing workability.

また、エアバルクABの長さは4m程度と長尺物で重量が嵩む(例えば、直径150mmのエアバルクで約6kg、直径200mmのエアバルクで約8kg)ために、セントルCの内型枠Ca上の横断方向に沿って設置する際の作業性が極めて悪い。 In addition, the air bulks AB are long and about 4 m long, making them heavy (for example, an air bulk with a diameter of 150 mm weighs about 6 kg, and an air bulk with a diameter of 200 mm weighs about 8 kg), making it extremely difficult to install them in the transverse direction on the inner formwork Ca of the center C.

本発明は、上述の技術的背景からなされたものであって、セントルの内型枠と吹付けコンクリートとの間に覆工コンクリートを打設する際におけるセントルの妻側からのコンクリートの流出を簡便に防止することのできる覆工コンクリートの打設方法を提供することを目的とする。 The present invention was made in light of the above technical background, and aims to provide a method for pouring lining concrete that can easily prevent concrete from flowing out from the gable side of the center when pouring the lining concrete between the inner formwork of the center and the shotcrete.

上記課題を解決するため、請求項1に記載の本発明の覆工コンクリートの打設方法は、山岳トンネルの施工における覆工コンクリートの打設方法であって、トンネルの延伸方向に延びてトンネルの横断方向に湾曲した内型枠および当該内型枠の妻側においてトンネル横断方向外側にはみ出すように設置されたフランジを備えたセントルを吹付けコンクリートが打設された位置に設置し、前記フランジに沿った前記内型枠と前記吹付けコンクリートとの間に、空気の入っていない長尺状のエアバルクを内型枠側に1層設置した後に、所定の厚みを有する長尺板状部材である押出発泡ポリスチレンフォームを前記内型枠と前記吹付けコンクリートとの隙間に応じて前記エアバルクの上に少なくとも1層設置し、その後、前記エアバルクを膨張させて妻側の前記内型枠と前記吹付けコンクリートとの間を閉塞し、前記内型枠と前記吹付けコンクリートとで形成された空間に覆工コンクリートを打設する、ことを特徴とする。 In order to solve the above problems, the method of pouring lining concrete of the present invention described in claim 1 is a method of pouring lining concrete in the construction of a mountain tunnel, characterized in that a center having an inner formwork extending in the extension direction of the tunnel and curved in the transverse direction of the tunnel and a flange installed on the gable side of the inner formwork so as to protrude outward in the transverse direction of the tunnel is installed at a position where the sprayed concrete is poured, a layer of elongated air bulk without air is installed on the inner formwork side between the inner formwork and the shotcrete along the flange, and then at least one layer of extruded polystyrene foam, which is a elongated plate-shaped member having a predetermined thickness, is installed on top of the air bulk in accordance with the gap between the inner formwork and the shotcrete, and then the air bulk is expanded to close the gap between the inner formwork on the gable side and the shotcrete, and the lining concrete is poured into the space formed by the inner formwork and the shotcrete.

請求項2に記載の本発明の覆工コンクリートの打設方法は、上記請求項1記載の発明において、前記押出発泡ポリスチレンフォームの片面または両面には、トンネルの延伸方向に沿った切り欠きが所定の間隔で形成されている、ことを特徴とする。 The method of pouring lining concrete of the present invention described in claim 2 is characterized in that, in the invention described in claim 1 , notches are formed at predetermined intervals on one or both sides of the extruded polystyrene foam along the extension direction of the tunnel.

請求項3に記載の本発明の覆工コンクリートの打設方法は、上記請求項1または2記載の発明において、前記押出発泡ポリスチレンフォームには、硬化した覆工コンクリートとの剥離性を向上させる剥離処理が施されている、ことを特徴とする。 The method of pouring lining concrete of the present invention described in claim 3 is characterized in that, in the invention described in claim 1 or 2 , the extruded polystyrene foam has been subjected to a peeling treatment to improve its peelability from the hardened lining concrete.

請求項4に記載の本発明の覆工コンクリートの打設方法は、上記請求項3に記載の発明において、前記剥離処理は、表面が剥離剤面となった粘着テープで前記押出発泡ポリスチレンフォームの短手方向に沿って全体を巻く処理、または前記押出発泡ポリスチレンフォームの全体に剥離剤を塗布する処理である、ことを特徴とする。 The method of pouring covering concrete of the present invention described in claim 4 is characterized in that, in the invention described in claim 3 , the peeling treatment is a treatment of wrapping the entire extruded polystyrene foam in the short direction with adhesive tape having a release agent surface, or a treatment of applying a release agent to the entire extruded polystyrene foam.

本発明によれば、押出発泡ポリスチレンフォームはトンネルの延伸方向に対して平坦な形状となるため、エアバルクが安定して施工性が向上する。 According to the present invention, the extruded polystyrene foam has a flat shape in the extension direction of the tunnel , so that the air bulk is stable and workability is improved.

また、軽量で取り扱いが容易な押出発泡ポリスチレンフォームを用いることにより、設置時の作業性が向上する。 In addition, the use of extruded polystyrene foam, which is lightweight and easy to handle, improves workability during installation.

これにより、セントルの内型枠と吹付けコンクリートとの間に覆工コンクリートを打設する際におけるセントルの妻側からのコンクリートの流出を簡便に防止することが可能になる。 This makes it easy to prevent concrete from leaking out from the gable side of the center column when pouring lining concrete between the center column's inner formwork and the shotcrete.

(a)は本実施の形態に係る山岳トンネルの施工に用いられる連続ベルトコンベアシステムの平面図、(b)は(a)の連続ベルトコンベアシステムの側面図である。1A is a plan view of a continuous belt conveyor system used in the construction of a mountain tunnel in accordance with this embodiment, and FIG. 1B is a side view of the continuous belt conveyor system of FIG. 1A. 山岳トンネルの施工の概略を示すフローチャートである。1 is a flowchart outlining the construction of a mountain tunnel. (a)~(d)は本実施の形態に係る山岳トンネルの施工における覆工コンクリートの打設について順を追って示す説明図である。1A to 1D are explanatory diagrams showing the sequence of pouring of lining concrete in the construction of a mountain tunnel in this embodiment. 山岳トンネルの施工における覆工コンクリートの打設に際して設置される本発明の一実施の形態としての流出防止部材を含めたトンネル延伸方向の断面図である。1 is a cross-sectional view in the direction of tunnel extension, including an anti-flow member according to one embodiment of the present invention, which is installed when pouring lining concrete in the construction of a mountain tunnel. 図4のW-W線に沿った断面図である。5 is a cross-sectional view taken along line WW in FIG. 4. (a)は本実施の形態の流出防止部材に用いられた押出発泡ポリスチレンフォームを示す斜視図、(b)は片面に切り欠きを形成した(a)の押出発泡ポリスチレンフォームを示す斜視図、(c)は両面に切り欠きを形成した(a)の押出発泡ポリスチレンフォームを示す斜視図である。FIG. 1A is an oblique view showing the extruded polystyrene foam used in the outflow prevention member of this embodiment, FIG. 1B is an oblique view showing the extruded polystyrene foam of FIG. 1A with a notch formed on one side, and FIG. 1C is an oblique view showing the extruded polystyrene foam of FIG. 1A with a notch formed on both sides. 山岳トンネルの施工における覆工コンクリートの打設に際して設置される本発明の他の実施の形態としての流出防止部材を含めたトンネル延伸方向の断面図である。1 is a cross-sectional view in the tunnel extension direction including a flow prevention member according to another embodiment of the present invention, which is installed when pouring lining concrete in the construction of a mountain tunnel. 図7のX-X線に沿った断面図である。8 is a cross-sectional view taken along line XX in FIG. 7. 山岳トンネルの施工における覆工コンクリートの打設に際して設置される本発明のさらに他の実施の形態としての流出防止部材を含めたトンネル延伸方向の断面図である。1 is a cross-sectional view in the tunnel extension direction including a flow prevention member as yet another embodiment of the present invention, which is installed when pouring lining concrete in the construction of a mountain tunnel. 図9のY-Y線に沿った断面図である。10 is a cross-sectional view taken along line YY in FIG. 9. 山岳トンネルの施工における覆工コンクリートの打設に際して設置される従来の流出防止部材を含めたトンネル延伸方向の断面図である。FIG. 1 is a cross-sectional view in the direction of tunnel extension, including a conventional anti-flow member that is installed when pouring lining concrete in the construction of a mountain tunnel. 図11のZ-Z線に沿った断面図である。12 is a cross-sectional view taken along line Z-Z in FIG. 11.

以下、本発明の一例としての実施の形態について、図面に基づいて詳細に説明する。なお、実施の形態を説明するための図面において、同一の構成要素には原則として同一の符号を付し、その繰り返しの説明は省略する。 Below, an embodiment of the present invention will be described in detail with reference to the drawings. In the drawings for explaining the embodiment, the same components are generally designated by the same reference numerals, and repeated explanations will be omitted.

本実施の形態における覆工コンクリートの打設方法は、特に山岳トンネルの施工における覆工コンクリートの打設に適用されるものである。 The method of pouring lining concrete in this embodiment is particularly applicable to pouring lining concrete in mountain tunnel construction.

山岳トンネルの施工において、岩盤にダイナマイトを仕掛けて爆破することでトンネルを掘削する発破方式が用いられる。この工法は、掘削部分にコンクリートを吹き付けて硬化させてロックボルトを岩盤に設置し、地山自体の保持力を利用してトンネルを保持する工法であり、NATM(New Austrian Tunneling Method)と呼ばれる。 In mountain tunnel construction, a blasting method is used, in which dynamite is planted in the rock and then exploded to excavate the tunnel. This method involves spraying concrete into the excavated area, allowing it to harden, and then installing rock bolts in the rock, using the natural holding power of the ground to hold the tunnel in place. This method is called NATM (New Australian Tunneling Method).

まず、本実施の形態に係る山岳トンネルの施工に用いられる連続ベルトコンベアシステムの構成例について図1を参照して説明する。ここで、図1(a)は本実施の形態に係る山岳トンネルの施工に用いられる連続ベルトコンベアシステムの平面図、図1(b)は図1(a)の連続ベルトコンベアシステムの側面図である。 First, an example of the configuration of a continuous belt conveyor system used in the construction of a mountain tunnel according to this embodiment will be described with reference to FIG. 1. Here, FIG. 1(a) is a plan view of a continuous belt conveyor system used in the construction of a mountain tunnel according to this embodiment, and FIG. 1(b) is a side view of the continuous belt conveyor system of FIG. 1(a).

図示する連続ベルトコンベアシステム1は、トンネルTの切羽Kを発破により掘削した場合に生じたずり(掘削物)をトンネルTの抗口へと運ぶずり運搬用のシステムであり、クラッシャ2とテールピース台車3とベルトコンベア4とが、切羽Kから坑口に向かって順に縦列配置されている。 The illustrated continuous belt conveyor system 1 is a system for transporting the debris (excavated material) generated when the face K of the tunnel T is excavated by blasting to the mouth of the tunnel T, and a crusher 2, a tailpiece cart 3, and a belt conveyor 4 are arranged in a vertical line in that order from the face K to the mouth.

クラッシャ2は、発破により生じたずりをベルトコンベア4で運ぶことが可能な大きさに破砕する自走式の破砕機である。テールピース台車3は、クラッシャ2で破砕されたずりをベルトコンベア4に搬送する自走式の中継運搬装置であり、ベルトコンベア4の先端(つまり、ベルトコンベア4の切羽K側)に設置されている。ベルトコンベア4は、テールピース台車3を介して運ばれたずりを長尺となった搬送用のベルト4aに搭載してトンネルTの坑口に向かって運ぶ運搬装置であり、テールピース台車3の後端部からトンネルTの坑口側まで連続して延在した状態で設置されている。さらに、連続ベルトコンベアシステム1には、余長ベルト(延伸用ベルト)を収納するとともに、ベルト4aに適切な張力を与えるためのベルトストレージ5が設置されている。 The crusher 2 is a self-propelled crusher that crushes the rubble generated by blasting into a size that can be transported by the belt conveyor 4. The tailpiece cart 3 is a self-propelled relay transport device that transports the rubble crushed by the crusher 2 to the belt conveyor 4, and is installed at the end of the belt conveyor 4 (i.e., the face K side of the belt conveyor 4). The belt conveyor 4 is a transport device that loads the rubble transported via the tailpiece cart 3 onto a long transport belt 4a and transports it toward the mouth of the tunnel T, and is installed in a state where it extends continuously from the rear end of the tailpiece cart 3 to the mouth side of the tunnel T. Furthermore, the continuous belt conveyor system 1 is equipped with a belt storage 5 that stores the excess belt (stretching belt) and provides the belt 4a with an appropriate tension.

なお、連続ベルトコンベアシステム1には、これら以外に、ベルトストレージ5に収納された余長ベルトがなくなった場合にベルト4aを継ぎ足すためのベルト接合架台(図示せず)、ベルト4aを周回駆動させるための主駆動装置であるメインドライブ(図示せず)、ベルトコンベア4の昼間部においてベルト4aを駆動するブースタドライブ(図示せず)、各装置を制御するための換気・電気機器(図示せず)などが配置されている。 In addition to the above, the continuous belt conveyor system 1 also includes a belt joint stand (not shown) for joining belt 4a when the excess belt stored in the belt storage 5 runs out, a main drive (not shown) which is the main driving device for driving belt 4a in a circular motion, a booster drive (not shown) which drives belt 4a in the daytime portion of the belt conveyor 4, and ventilation and electrical equipment (not shown) for controlling each device.

また、連続ベルトコンベアシステム1は、トンネルTの幅方向の一方の片側に寄せられた状態となっており、トンネルTの幅方向の他方の片側は、掘削した岩盤の壁面にコンクリートを吹き付ける吹付け機(図示せず)、発破を装填するための孔(装薬孔)を切羽Kに穿孔するための切羽穿孔機(図示せず)、発破により生じたずりをクラッシャ2に積載するためのショベル7aを備えた自走式のサイドダンプ7やバックホウなどの積載用重機、岩盤の破砕や掘削や小割などの作業を行うためのブレーカ(図示せず)などのような各種の重機の通路として使用可能になっている。さらに、作業現場には、ロックボルトや鋼製支保工などをストックしておく資材置場(図示せず)が割り当てられている。 The continuous belt conveyor system 1 is also moved to one side of the tunnel T in the width direction, and the other side of the tunnel T in the width direction can be used as a passage for various heavy machinery such as a spraying machine (not shown) for spraying concrete on the excavated rock wall, a face drilling machine (not shown) for drilling holes (charge holes) in the face K for loading blasting, a self-propelled side dump 7 equipped with a shovel 7a for loading rubble generated by blasting onto the crusher 2, a backhoe, and a breaker (not shown) for crushing, excavating, and breaking the rock into smaller pieces. In addition, a material storage area (not shown) for storing rock bolts, steel supports, and the like is allocated to the work site.

連続ベルトコンベアシステム1において、発破の際には、先頭に位置するクラッシャ2の先端部が切羽Kから飛散するずりが届かない程度の位置に配置する。これにより、発破の際に切羽Kから飛散したずりに起因してクラッシャ2、テールピース台車3およびベルトコンベア4が破損するのを防止することができる。そして、発破後のずりの運搬の際には、サイドダンプ7が切羽Kに向かって移動し、掘削物であるずりをショベル7aでクラッシャ2に投入する。 In the continuous belt conveyor system 1, during blasting, the tip of the crusher 2 located at the front is positioned so that it cannot be reached by debris scattered from the face K. This makes it possible to prevent damage to the crusher 2, tailpiece cart 3, and belt conveyor 4 caused by debris scattered from the face K during blasting. Then, when transporting the debris after blasting, the side dump 7 moves toward the face K, and the excavated debris is dumped into the crusher 2 by the shovel 7a.

なお、図1(b)において、左右に延びる点線は、トンネルTの長さ方向における吹付けコンクリートの領域を示し、符号Bはコンクリートに設置されたロックボルトを示している。また、吹付けコンクリートおよびロックボルトBについては後述する。 In FIG. 1(b), the dotted lines extending left and right indicate the area of the shotcrete in the longitudinal direction of the tunnel T, and the symbol B indicates a rock bolt installed in the concrete. The shotcrete and rock bolt B will be described later.

次に、山岳トンネルの施工の概略について、図2のフローチャートを用いて説明する。 Next, we will explain the outline of mountain tunnel construction using the flowchart in Figure 2.

先ず、前述のように、切羽に装薬孔の穿孔を行い(ステップSt01)、爆薬の装填を行って(ステップSt02)、発破掘削を行う(ステップSt03)。そして、ずりの搬出を行う(ステップSt04)。 First, as described above, holes are drilled in the face to prepare explosives (step St01), explosives are loaded (step St02), and blasting excavation is performed (step St03). Then, the debris is removed (step St04).

次に、岩盤の状態等から鋼製支保工S(図4,6,9)を設置するか否かを判断し(ステップSt05)、設置する場合には、コンクリートの仮吹付けを行い(ステップSt06)、鋼製支保工Sの建込みを行う(ステップSt07)。ステップSt07で鋼製支保工Sの建込みを行ったならば仮吹きつけを行ったコンクリートの表面に、あるいは、ステップSt05で鋼製支保工Sを設置しない場合には直接地山G(図4,5,7~10)の表面に、コンクリートの吹付けを行って(ステップSt08)、ロックボルトB(図4,6,9)の設置を行う(ステップSt09)。 Next, it is determined whether or not to install steel supports S (Figs. 4, 6, 9) based on the condition of the rock (step St05). If steel supports S are to be installed, concrete is temporarily sprayed (step St06) and the steel supports S are erected (step St07). If the steel supports S are erected in step St07, concrete is sprayed onto the surface of the temporarily sprayed concrete, or directly onto the surface of the natural ground G (Figs. 4, 5, 7-10) if the steel supports S are not to be installed in step St05 (step St08), and rock bolts B (Figs. 4, 6, 9) are installed (step St09).

なお、本願において、鋼製支保工Sを設置する際に吹き付けられるコンクリートを仮吹付けコンクリート11(図4,5,7~10)といい、仮吹付けコンクリート11あるいは鋼製支保工Sを設置せずに地山Gの表面に吹き付けられるコンクリートを単に吹付けコンクリート12(図4,5,7~10)という。また、本願においては、鋼製支保工Sの建込みを行っていることを前提として、吹付けコンクリート12が仮吹付けコンクリート11に吹き付けられるものとする。但し、鋼製支保工Sの建込みを行わずに、吹付けコンクリート12を地山Gに直接吹き付けることを排除するものではない。 In this application, concrete sprayed when installing steel shoring S is referred to as temporary shotcrete 11 (Figs. 4, 5, 7-10), and concrete sprayed onto the surface of the ground G without installing temporary shotcrete 11 or steel shoring S is simply referred to as shotcrete 12 (Figs. 4, 5, 7-10). In this application, it is assumed that the steel shoring S has been erected, and that the shotcrete 12 is sprayed onto the temporary shotcrete 11. However, this does not exclude the possibility of spraying the shotcrete 12 directly onto the ground G without erecting the steel shoring S.

さて、ステップSt09でロックボルトBの設置を行ったならば、最後に、トンネル内への漏水を防ぐために必要に応じて防水シートを貼り、セントルを嵌め込んで、ステップSt08で施工された吹付けコンクリート12とセントルとの間に覆工コンクリートを打設して仕上げ作業を行う(ステップSt10)。なお、覆工コンクリートの打設は、例えば1日おきに実行される。そして、一連の作業が完了したか否かを判断し(ステップSt11)、完了したならばトンネルの施工を終了する。また、ステップSt11において作業が完了していない場合には、ステップSt01に戻って、以降の工程を繰り返す。 Now, once the rock bolt B has been installed in step St09, a waterproof sheet is applied as necessary to prevent water leakage into the tunnel, a center is fitted, and lining concrete is poured between the shotcrete 12 applied in step St08 and the center, for finishing work (step St10). Note that the pouring of lining concrete is carried out, for example, every other day. Then, it is determined whether the series of work has been completed (step St11), and if so, the construction of the tunnel is terminated. Also, if the work has not been completed in step St11, the process returns to step St01 and the subsequent steps are repeated.

ここで、図3を用いて、覆工コンクリート13の打設について説明する。図示するように、セントルCは半円筒形の型枠であり、トンネルTの吹付けコンクリート12の部分に覆工コンクリート13を打設するため、鋼製のレール(図示せず)上を移動可能になっている。図示するように、セントルCは、トンネルTの延伸方向に延びてトンネルTの横断方向に湾曲した内型枠Caと、セントルCの妻側においてトンネル横断方向外側にはみ出すように設置されたフランジCbとを備えている。そして、当該セントルCを移動させながら、セントルCと吹付けコンクリート12との空間13gに覆工コンクリート13を打設している。 Now, the pouring of the lining concrete 13 will be explained with reference to Figure 3. As shown in the figure, the center C is a semi-cylindrical formwork that can be moved on a steel rail (not shown) in order to pour the lining concrete 13 into the shotcrete 12 portion of the tunnel T. As shown in the figure, the center C has an inner formwork Ca that extends in the extension direction of the tunnel T and curves in the transverse direction of the tunnel T, and a flange Cb that is installed on the end side of the center C so as to protrude outward in the transverse direction of the tunnel. Then, while the center C is being moved, the lining concrete 13 is poured into the space 13g between the center C and the shotcrete 12.

すなわち、図3(a)に示すように、セントルCの内型枠Caを移動させて覆工コンクリートの打設位置(つまり、吹付けコンクリート12が打設された位置)に設置したならば、図3(b)に示すように、内型枠Caの妻側にフランジCbを取り付ける。続いて、打設したコンクリートがセントルCの妻側から流出することを防止するために、図3(c)に示すように、フランジCbに沿った内型枠Caと吹付けコンクリート12との間に流出防止部材14(詳細は後述する)を設置して妻側の内型枠Caと吹付けコンクリート12との間を閉塞する。そして、図3(d)に示すように、内型枠Caと吹付けコンクリート12とで形成された空間13gに覆工コンクリート13を打設する。 That is, as shown in FIG. 3(a), the inner formwork Ca of the center C is moved to the pouring position for the lining concrete (i.e., the position where the shotcrete 12 is poured), and then, as shown in FIG. 3(b), a flange Cb is attached to the gable side of the inner formwork Ca. Next, to prevent the poured concrete from flowing out of the gable side of the center C, as shown in FIG. 3(c), a flow prevention member 14 (details will be described later) is installed between the inner formwork Ca along the flange Cb and the shotcrete 12 to block the gap between the inner formwork Ca on the gable side and the shotcrete 12. Then, as shown in FIG. 3(d), the lining concrete 13 is poured into the space 13g formed by the inner formwork Ca and the shotcrete 12.

ここで、覆工コンクリート13を打設充填する際に、流出防止部材14が覆工コンクリート13に押されても、当該流出防止部材14の側面がフランジCbに押圧されて移動が阻止されるので、流出防止部材14がセントルCの妻側から落下することはない。このように、フランジCbは、覆工コンクリート13の打設時に、流出防止部材14がセントルCの妻側から落下しないように支える機能を果たしている。 Here, even if the outflow prevention member 14 is pressed by the lining concrete 13 when pouring and filling the lining concrete 13, the side of the outflow prevention member 14 is pressed against the flange Cb to prevent movement, so the outflow prevention member 14 will not fall from the end side of the center C. In this way, the flange Cb functions to support the outflow prevention member 14 so that it does not fall from the end side of the center C when pouring the lining concrete 13.

なお、覆工コンクリート13の打設に際しては、図3(d)に示すように、下から順番にコンクリートを注入して、最後に天井の部分にコンクリートを吹き上げて注入する。また、本実施の形態において、一度に覆工コンクリート13を注入する長さは、例えば10~15m程度、覆工コンクリート13の厚さは、例えば30cm以上である。但し、本発明における覆工コンクリート13の数値は、これらに限定されるものではない。 When pouring the lining concrete 13, as shown in FIG. 3(d), the concrete is poured from the bottom up, and finally the concrete is sprayed up and poured into the ceiling. In this embodiment, the length of the lining concrete 13 poured at one time is, for example, about 10 to 15 m, and the thickness of the lining concrete 13 is, for example, 30 cm or more. However, the numerical values of the lining concrete 13 in this invention are not limited to these.

また、本実施の形態では内型枠CaにフランジCbを取り付けているが、内型枠CaとフランジCbとが一体になっていて、フランジCbの取り付けが省略できるようになっていてもよい。 In addition, in this embodiment, the flange Cb is attached to the inner formwork Ca, but the inner formwork Ca and the flange Cb may be integrated, so that the attachment of the flange Cb can be omitted.

次に、覆工コンクリート13を打設する際に設置される流出防止部材14について、図4~図10を用いて説明する。 Next, the anti-flow member 14 that is installed when pouring the lining concrete 13 will be explained using Figures 4 to 10.

図4は山岳トンネルの施工における覆工コンクリートの打設に際して設置される本発明の一実施の形態としての流出防止部材を含めたトンネル延伸方向の断面図、図5は図4のW-W線に沿った断面図、図6は流出防止部材に用いられた押出発泡ポリスチレンフォームを示す斜視図である。 Figure 4 is a cross-sectional view in the tunnel extension direction including an anti-flow member according to one embodiment of the present invention that is installed when pouring lining concrete in mountain tunnel construction, Figure 5 is a cross-sectional view taken along line W-W in Figure 4, and Figure 6 is a perspective view showing the extruded polystyrene foam used in the anti-flow member.

図4および図5に示すように、流出防止部材14は、所定の厚みを有する長尺板状部材である押出発泡ポリスチレンフォームPFを設置するとともに、長尺状のエアバルクABを膨張させて設置したものである。また、押出発泡ポリスチレンフォームPFが内型枠Ca側に設置され、エアバルクABが吹付けコンクリート12側に設置されている。 As shown in Figures 4 and 5, the outflow prevention member 14 is made by installing an extruded polystyrene foam PF, which is a long plate-like member having a predetermined thickness, and expanding a long air bulk AB. The extruded polystyrene foam PF is installed on the inner formwork Ca side, and the air bulk AB is installed on the sprayed concrete 12 side.

ここで、押出発泡ポリスチレンフォームPFとは、ポリスチレンを溶解し、発泡剤や難燃剤などを混ぜて板状に押出形成した板状部材である(図6(a)参照)。この押出発泡ポリスチレンフォームPFは、製造段階で所望のサイズに加工することができるのみならず、作業現場でも簡単にカットができ、さらに、断熱性能が高く、水・湿気に強く、軽量であるために取り扱いが容易である。なお、押出発泡ポリスチレンフォームPFは、長さ910mm、幅225mm、厚さ50mmとなっているが、寸法は特に限定されるものではない。 Here, extruded polystyrene foam PF is a plate-shaped member made by dissolving polystyrene, mixing it with a foaming agent and a flame retardant, and extruding it into a plate shape (see Figure 6 (a)). This extruded polystyrene foam PF can be processed to the desired size during the manufacturing process, and can also be easily cut at the work site. In addition, it has high insulation performance, is resistant to water and moisture, and is lightweight, making it easy to handle. The extruded polystyrene foam PF has a length of 910 mm, a width of 225 mm, and a thickness of 50 mm, but the dimensions are not particularly limited.

本実施の形態では、このような押出発泡ポリスチレンフォームPFを内型枠Caに沿うようにして(つまり、押出発泡ポリスチレンフォームPFの長手方向がトンネルTの周方向となるようにして)3層設置し、その上に(つまり、吹付けコンクリート12側に)空気の入っていないエアバルクABを1層配置して膨張させることで、エアバルクABの膨張を利用して当該エアバルクABと押出発泡ポリスチレンフォームPFとで妻側の内型枠Caと吹付けコンクリート12との間を閉塞したものである。 In this embodiment, three layers of extruded polystyrene foam PF are installed along the inner formwork Ca (i.e., the longitudinal direction of the extruded polystyrene foam PF is the circumferential direction of the tunnel T), and one layer of air-free air bulk AB is placed on top of them (i.e., on the sprayed concrete 12 side) and allowed to expand, thereby utilizing the expansion of the air bulk AB to seal the space between the inner formwork Ca on the gable side and the sprayed concrete 12 with the air bulk AB and the extruded polystyrene foam PF.

なお、以下に説明する図7、図8を含め、押出発泡ポリスチレンフォームPFは3層設置されているが、3層である必要はない。つまり、押出発泡ポリスチレンフォームPFの設置数は、1枚の押出発泡ポリスチレンフォームPFの厚さ、膨張時のエアバルクABの径、および妻側の内型枠Caと吹付けコンクリート12との距離に応じて決定されることから、必ずしも3層となるものではなく、少なくとも1層設置されていればよい。但し、エアバルクABについては、1層のみ配置される。 Including Figures 7 and 8 described below, three layers of extruded polystyrene foam PF are installed, but three layers are not necessary. In other words, the number of extruded polystyrene foam PF installed is determined according to the thickness of one sheet of extruded polystyrene foam PF, the diameter of the air bulk AB when expanded, and the distance between the inner formwork Ca on the gable side and the sprayed concrete 12, so it is not necessary to install three layers, and it is sufficient to install at least one layer. However, only one layer of air bulk AB is installed.

なお、内型枠Caにおけるトンネル横断方向の長さと押出発泡ポリスチレンフォームPFの長さによっては、押出発泡ポリスチレンフォームPFを1層配置するのに、当該押出発泡ポリスチレンフォームPFが1枚で足りる場合もあるし、複数枚必要となる場合もある。同様に、エアバルクABについても、1層配置するのに1枚で足りる場合もあるし、複数枚必要となる場合もある。 Depending on the length of the inner formwork Ca in the tunnel transverse direction and the length of the extruded polystyrene foam PF, one sheet of extruded polystyrene foam PF may be sufficient to arrange one layer, or multiple sheets may be required. Similarly, one sheet of air bulk AB may be sufficient to arrange one layer, or multiple sheets may be required.

このような本実施の形態によれば、押出発泡ポリスチレンフォームPFはトンネルTの延伸方向に対して平坦な形状となるため、押出発泡ポリスチレンフォームPFとエアバルクABとを重ねて設置することにより、円柱状のエアバルクABの上に円柱状のエアバルクABを載せた場合のように曲面を曲面で支える(図11参照)ことがなくなるので、エアバルクABが安定して施工性が向上する。 In this embodiment, the extruded polystyrene foam PF has a flat shape in the extension direction of the tunnel T, so by stacking the extruded polystyrene foam PF and the air bulk AB, a curved surface is no longer supported by a curved surface as occurs when a cylindrical air bulk AB is placed on top of a cylindrical air bulk AB (see Figure 11), making the air bulk AB stable and improving workability.

また、軽量で取り扱いが容易な押出発泡ポリスチレンフォームPFを用いることにより、重量の嵩むエアバルクABの使用が最小限で済むので、設置時の作業性が向上する。 In addition, by using extruded polystyrene foam PF, which is lightweight and easy to handle, the use of heavy air bulk AB can be minimized, improving workability during installation.

これにより、セントルCの内型枠Caと吹付けコンクリート12との間に覆工コンクリート13を打設する際におけるセントルCの妻側からのコンクリートの流出を簡便に防止することが可能になる。 This makes it easy to prevent concrete from leaking out from the gable side of the center column C when pouring the lining concrete 13 between the inner formwork Ca of the center column C and the shotcrete 12.

なお、図4および図5に示す場合には、押出発泡ポリスチレンフォームPFが内型枠Ca側に設置され、エアバルクABが吹付けコンクリート12側に設置されているので、膨張により吹付けコンクリート12の凹凸に対する追随性が良好となり、妻側の内型枠Caと吹付けコンクリート12との間をより強固に閉塞することが可能になる。 In the case shown in Figures 4 and 5, the extruded polystyrene foam PF is installed on the inner formwork Ca side, and the air bulk AB is installed on the sprayed concrete 12 side, so that expansion improves the ability to conform to the unevenness of the sprayed concrete 12, making it possible to more firmly seal the gap between the inner formwork Ca on the gable side and the sprayed concrete 12.

なお、図6(a)に示すように、押出発泡ポリスチレンフォームPFをそのまま使用することもできるが、以下に説明する図7~図10を含め、図6(b)に示すように押出発泡ポリスチレンフォームPFの片面に、あるいは図6(c)に示すように押出発泡ポリスチレンフォームPFの両面に、トンネルTの延伸方向に沿った切り欠きPFcを所定の間隔で形成してもよい。一例を挙げると、前述した本実施の形態の押出発泡ポリスチレンフォームPFの寸法(長さ910mm、幅225mm、厚さ50mm)の場合、30mm間隔で深さ10mmの切り欠きPFcを形成する。また、両面に形成する場合には、切り欠きPFcが双方の面で交互になるようにする。 As shown in FIG. 6(a), the extruded polystyrene foam PF can be used as is, but notches PFc along the extension direction of the tunnel T may be formed at predetermined intervals on one side of the extruded polystyrene foam PF as shown in FIG. 6(b), including FIGS. 7 to 10 described below, or on both sides of the extruded polystyrene foam PF as shown in FIG. 6(c). As an example, in the case of the dimensions of the extruded polystyrene foam PF of the present embodiment described above (length 910 mm, width 225 mm, thickness 50 mm), notches PFc with a depth of 10 mm are formed at 30 mm intervals. Also, when forming on both sides, the notches PFc are alternated on both sides.

このように切り欠きPFcを形成すれば、押出発泡ポリスチレンフォームPFを内型枠Caの形状(トンネルTの形状)、あるいは後述する図7、図8に示すように、押出発泡ポリスチレンフォームPFを吹付けコンクリート12側に設置した場合には当該吹付けコンクリート12の形状に沿わせることが容易になり、妻側の内型枠Caと吹付けコンクリート12との間をより一層強固に閉塞することが可能になる。 By forming the notch PFc in this manner, it becomes easier to make the extruded polystyrene foam PF conform to the shape of the inner formwork Ca (the shape of the tunnel T), or, as shown in Figures 7 and 8 described below, if the extruded polystyrene foam PF is placed on the side of the sprayed concrete 12, to the shape of the sprayed concrete 12, making it possible to more firmly seal the gap between the inner formwork Ca on the gable side and the sprayed concrete 12.

なお、本実施の形態において、押出発泡ポリスチレンフォームPFの長手方向に沿った切り欠きPFcの断面形状は三角形となっているが、四角形など他の形状であってもよい。 In this embodiment, the cross-sectional shape of the notch PFc along the longitudinal direction of the extruded polystyrene foam PF is triangular, but it may be other shapes such as a rectangle.

ここで、以下に説明する図7~図10を含め、押出発泡ポリスチレンフォームPFには、硬化した覆工コンクリート13との剥離性を向上させるための剥離処理を施すことが望ましい。剥離処理の具体例を挙げると、表面が剥離剤面となった粘着テープで押出発泡ポリスチレンフォームPFの全体を巻く処理、あるいは押出発泡ポリスチレンフォームPFの全体に剥離剤を塗布する処理などが考えられる。 It is desirable to perform a release treatment on the extruded polystyrene foam PF, including the steps shown in Figures 7 to 10 below, to improve its releasability from the hardened lining concrete 13. Specific examples of the release treatment include wrapping the entire extruded polystyrene foam PF in adhesive tape with a release agent surface, or applying a release agent to the entire extruded polystyrene foam PF.

このようにすれば、硬化後の覆工コンクリート13が押出発泡ポリスチレンフォームPFに接着して当該押出発泡ポリスチレンフォームPFの端部がちぎれたりすることを防ぐことができ、脱型時の施工性の向上および複数回の再利用が可能になって耐久性の向上を図ることができる。また、一般的に、エアバルクABとよりも押出発泡ポリスチレンフォームPFの方が安価であるため、コスト削減を図ることができる。 In this way, the hardened lining concrete 13 adheres to the extruded polystyrene foam PF, preventing the ends of the extruded polystyrene foam PF from tearing off, improving workability when demolding and enabling multiple reuse, improving durability. Also, since extruded polystyrene foam PF is generally cheaper than air bulk AB, costs can be reduced.

なお、押出発泡ポリスチレンフォームPFを粘着テープで巻く場合には、当該押出発泡ポリスチレンフォームPFの短手方向に沿って巻くようにする。短手方向に沿って巻くことにより、押出発泡ポリスチレンフォームPFの長手方向に対して曲げにくくならない(つまり、内型枠Caに沿って曲げにくくならない)とともに、押出発泡ポリスチレンフォームPFの強度が向上する。 When wrapping the extruded polystyrene foam PF with adhesive tape, the tape should be wrapped along the short side of the extruded polystyrene foam PF. By wrapping along the short side, the extruded polystyrene foam PF does not become difficult to bend in the longitudinal direction (i.e., it does not become difficult to bend along the inner formwork Ca), and the strength of the extruded polystyrene foam PF is improved.

ここで、図4および図5に示す場合には、押出発泡ポリスチレンフォームPFが内型枠Ca側に設置され、エアバルクABが吹付けコンクリート12側に設置されているが、図7および図8に示すように、両者の設置位置を逆にして、エアバルクABが内型枠Ca側に設置され、押出発泡ポリスチレンフォームPFが吹付けコンクリート12側に設置されていてもよい。 In the case shown in Figures 4 and 5, the extruded polystyrene foam PF is installed on the inner formwork Ca side, and the air bulk AB is installed on the sprayed concrete 12 side, but as shown in Figures 7 and 8, the installation positions of the two may be reversed, with the air bulk AB installed on the inner formwork Ca side, and the extruded polystyrene foam PF installed on the sprayed concrete 12 side.

このようにすれば、重量の嵩むエアバルクABを、内型枠Caに載せるようになるので、作業者がエアバルクABを高い位置(つまり、押出発泡ポリスチレンフォームPFの上面)まで持ち上げる必要がなくなり、作業の軽減を図ることができる。 In this way, the heavy air bulk AB is placed on the inner formwork Ca, eliminating the need for workers to lift the air bulk AB to a high position (i.e., the top surface of the extruded polystyrene foam PF), thereby reducing the amount of work required.

また、図9および図10に示すように、エアバルクABを用いることなく、押出発泡ポリスチレンフォームPFのみで妻側の内型枠Caと吹付けコンクリート12との間を閉塞するようにしてもよい。なお、図示する場合には、押出発泡ポリスチレンフォームPFは3層設置されているが、3層である必要はない。つまり、押出発泡ポリスチレンフォームPFの設置数は、1枚の押出発泡ポリスチレンフォームPFの厚さ、および妻側の内型枠Caと吹付けコンクリート12との距離に応じて決定されることから、必ずしも3層となるものではなく、少なくとも1層設置されていればよい。 Also, as shown in Figures 9 and 10, the gap between the inner formwork Ca on the gable side and the sprayed concrete 12 may be blocked only by extruded polystyrene foam PF, without using air bulk AB. In the illustrated example, three layers of extruded polystyrene foam PF are installed, but three layers are not necessary. In other words, the number of extruded polystyrene foam PF installed is determined according to the thickness of one sheet of extruded polystyrene foam PF and the distance between the inner formwork Ca on the gable side and the sprayed concrete 12, so it is not necessary to install three layers, and it is sufficient to install at least one layer.

このようにすれば、重量の嵩むエアバルクABは不要になり、比較的軽量な押出発泡ポリスチレンフォームPFのみで妻側の内型枠Caと吹付けコンクリート12との間を閉塞することができるので、作業の軽減を図ることができる。 In this way, the heavy air bulk AB is no longer necessary, and the space between the inner formwork Ca on the gable side and the sprayed concrete 12 can be sealed using only the relatively lightweight extruded polystyrene foam PF, reducing the amount of work required.

以上本発明者によってなされた発明を実施の形態に基づき具体的に説明したが、本明細書で開示された実施の形態はすべての点で例示であって、開示された技術に限定されるものではない。すなわち、本発明の技術的な範囲は、前記の実施の形態における説明に基づいて制限的に解釈されるものでなく、あくまでも特許請求の範囲の記載に従って解釈されるべきであり、特許請求の範囲の記載技術と均等な技術および特許請求の範囲の要旨を逸脱しない限りにおけるすべての変更が含まれる。 The invention made by the inventor has been specifically described above based on the embodiments, but the embodiments disclosed in this specification are illustrative in all respects and are not limited to the disclosed technology. In other words, the technical scope of the present invention should not be interpreted restrictively based on the explanation in the above embodiments, but should be interpreted strictly according to the claims, and includes technologies equivalent to the technologies described in the claims and all modifications that do not deviate from the gist of the claims.

以上の説明では、本発明を、覆工コンクリートを打設する際におけるセントルの妻側の内型枠と吹付けコンクリートとの間の閉塞に適用した場合が示されているが、背面平滑型トンネルライニング工法(FILM(Flat Insulated Lining Method))にも適用することができる。背面平滑型トンネルライニング工法とは、吹付けコンクリートの凹凸部と内型枠に設置した防水シートとの空隙にモルタル等の裏込め材を充填して防水シートを全面接着する工法であり、当該工法において、妻側の内型枠と吹付けコンクリートとの間の閉塞に本発明を適用することが可能である。 The above explanation shows the application of the present invention to the sealing between the inner formwork on the gable side of the center tunnel and the shotcrete when pouring the lining concrete, but it can also be applied to the flat insulated lining method (FILM (Flat Insulated Lining Method)). The flat insulated lining method is a method in which the gap between the uneven parts of the shotcrete and the waterproof sheet installed on the inner formwork is filled with a backfill material such as mortar to completely adhere the waterproof sheet, and in this method, the present invention can be applied to the sealing between the inner formwork on the gable side and the shotcrete.

11 仮吹付けコンクリート
12 吹付けコンクリート
13 覆工コンクリート
13g 空間
14 流出防止部材
AB エアバルク
B ロックボルト
C セントル
Ca 内型枠
Cb フランジ
G 地山
PF 押出発泡ポリスチレンフォーム
PFc 切り欠き
S 鋼製支保工
T トンネル
11 Temporary shotcrete 12 Shotcrete 13 Lining concrete 13g Space 14 Outflow prevention member AB Air bulk B Rock bolt C Center Ca Inner formwork Cb Flange G Ground PF Extruded polystyrene foam PFc Notch S Steel support T Tunnel

Claims (4)

山岳トンネルの施工における覆工コンクリートの打設方法であって、
トンネルの延伸方向に延びてトンネルの横断方向に湾曲した内型枠および当該内型枠の妻側においてトンネル横断方向外側にはみ出すように設置されたフランジを備えたセントルを吹付けコンクリートが打設された位置に設置し、
前記フランジに沿った前記内型枠と前記吹付けコンクリートとの間に、空気の入っていない長尺状のエアバルクを内型枠側に1層設置した後に、所定の厚みを有する長尺板状部材である押出発泡ポリスチレンフォームを前記内型枠と前記吹付けコンクリートとの隙間に応じて前記エアバルクの上に少なくとも1層設置し、その後、前記エアバルクを膨張させて妻側の前記内型枠と前記吹付けコンクリートとの間を閉塞し、
前記内型枠と前記吹付けコンクリートとで形成された空間に覆工コンクリートを打設する、
ことを特徴とする覆工コンクリートの打設方法。
A method for pouring lining concrete in the construction of a mountain tunnel, comprising:
The tunnel is then fitted with a concrete splinter, which is located at the end of the tunnel and extends in the direction of the tunnel extension. The concrete splinters are then fitted with a concrete splinter, which is located at the end of the tunnel extension.
A layer of elongated air bulk that does not contain air is placed on the inner formwork side between the inner formwork and the sprayed concrete along the flange, and then at least one layer of extruded polystyrene foam, which is a long plate-shaped member having a predetermined thickness, is placed on top of the air bulk in accordance with the gap between the inner formwork and the sprayed concrete, and then the air bulk is expanded to close the gap between the inner formwork on the gable side and the sprayed concrete,
A lining concrete is poured into the space formed by the inner formwork and the shotcrete.
A method for pouring lining concrete.
前記押出発泡ポリスチレンフォームの片面または両面には、トンネルの延伸方向に沿った切り欠きが所定の間隔で形成されている、
ことを特徴とする請求項1記載の覆工コンクリートの打設方法。
The extruded polystyrene foam has cutouts at predetermined intervals along the extension direction of the tunnel on one or both sides thereof.
A method for pouring lining concrete according to claim 1.
前記押出発泡ポリスチレンフォームには、硬化した覆工コンクリートとの剥離性を向上させる剥離処理が施されている、
ことを特徴とする請求項1または2記載の覆工コンクリートの打設方法。
The extruded polystyrene foam is subjected to a release treatment to improve the release property from the hardened lining concrete.
3. A method for pouring lining concrete according to claim 1 or 2 .
前記剥離処理は、
表面が剥離剤面となった粘着テープで前記押出発泡ポリスチレンフォームの短手方向に沿って全体を巻く処理、
または前記押出発泡ポリスチレンフォームの全体に剥離剤を塗布する処理である、
ことを特徴とする請求項3記載の覆工コンクリートの打設方法。
The peeling treatment is
A treatment of wrapping the entire extruded polystyrene foam along the short side direction with an adhesive tape having a release agent surface;
Or a treatment of applying a release agent to the entire extruded polystyrene foam.
4. A method for pouring lining concrete according to claim 3 .
JP2021150218A 2021-09-15 2021-09-15 Lining concrete pouring method Active JP7557255B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021150218A JP7557255B2 (en) 2021-09-15 2021-09-15 Lining concrete pouring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021150218A JP7557255B2 (en) 2021-09-15 2021-09-15 Lining concrete pouring method

Publications (2)

Publication Number Publication Date
JP2023042845A JP2023042845A (en) 2023-03-28
JP7557255B2 true JP7557255B2 (en) 2024-09-27

Family

ID=85724093

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021150218A Active JP7557255B2 (en) 2021-09-15 2021-09-15 Lining concrete pouring method

Country Status (1)

Country Link
JP (1) JP7557255B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000257391A (en) 1999-03-10 2000-09-19 Kajima Corp Concrete casting equipment
JP2008106242A (en) 2006-09-25 2008-05-08 Diatex Co Ltd Easy-release adhesive tape and method for producing the same
JP2012062667A (en) 2010-09-15 2012-03-29 Fudo Tetra Corp Curing method of lining concrete and curing material used in the method
CN108316946A (en) 2017-01-17 2018-07-24 中国葛洲坝集团第五工程有限公司 Open type TBM synchronization lining method and devices
CN108386202A (en) 2018-03-30 2018-08-10 重庆大学 City underground running tunnel list shield TBM constructions

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60239208A (en) * 1984-05-15 1985-11-28 ダウ化工株式会社 Pattern formwork
JPH0799079B2 (en) * 1991-06-28 1995-10-25 株式会社鴻池組 Gable formwork equipment in concrete lining of tunnels
JP3202615B2 (en) * 1996-09-04 2001-08-27 株式会社鴻池組 Method and apparatus for installing concrete frame for tunnel lining
JPH11217931A (en) * 1998-02-02 1999-08-10 Engel Sangyo:Kk Foaming heat insulation formwork

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000257391A (en) 1999-03-10 2000-09-19 Kajima Corp Concrete casting equipment
JP2008106242A (en) 2006-09-25 2008-05-08 Diatex Co Ltd Easy-release adhesive tape and method for producing the same
JP2012062667A (en) 2010-09-15 2012-03-29 Fudo Tetra Corp Curing method of lining concrete and curing material used in the method
CN108316946A (en) 2017-01-17 2018-07-24 中国葛洲坝集团第五工程有限公司 Open type TBM synchronization lining method and devices
CN108386202A (en) 2018-03-30 2018-08-10 重庆大学 City underground running tunnel list shield TBM constructions

Also Published As

Publication number Publication date
JP2023042845A (en) 2023-03-28

Similar Documents

Publication Publication Date Title
JP7178243B2 (en) Tunnel lining construction method
KR102129608B1 (en) Semi open cut type tunnel construction method at low overburden
KR101479267B1 (en) Method for constructing tunnel by using pipe
JP6922280B2 (en) How to build a tunnel skeleton
JP6127193B1 (en) Construction method of large section underground structure
CN110067581B (en) Arrangement and construction method of pre-buried holes in reinforced concrete supporting layers at tunnel or roadway forks or openings
JP7557255B2 (en) Lining concrete pouring method
JP6257814B1 (en) Construction method of large section underground structure
KR101669669B1 (en) Construction methods of approaching dual tunnel
KR102135566B1 (en) Non excavation type underground tunnel construction method using steel pipe
JPH04213695A (en) Segment for shield tunnel
US3751929A (en) Method of supporting exposed ground or rock
CN114278333A (en) Construction method of ingate
JP6636774B2 (en) Integrated structure of pipe roof material
KR100217845B1 (en) Construction process of underground structure
JP2018204310A (en) Underground widened portion construction method
JP2933476B2 (en) Underground pipe laying method
JP6092359B1 (en) Large section lining body and large section tunnel construction method
JP7503356B2 (en) Tunnel construction method
JP7503354B2 (en) Tunnel construction method
JP7503355B2 (en) Tunnel construction method
JP2018204309A (en) Underground widened portion construction method
JP6874375B2 (en) How to build a tunnel skeleton
JP2666015B2 (en) Open shield method and concrete box used for it
JP2001020656A (en) Tunnel boring method in inferior ground

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230728

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240229

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240307

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20240430

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240704

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240912

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240912

R150 Certificate of patent or registration of utility model

Ref document number: 7557255

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150