Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7558680B2 - Management device, management method, and management program - Google Patents
[go: Go Back, main page]

JP7558680B2 - Management device, management method, and management program - Google Patents

Management device, management method, and management program Download PDF

Info

Publication number
JP7558680B2
JP7558680B2 JP2020093487A JP2020093487A JP7558680B2 JP 7558680 B2 JP7558680 B2 JP 7558680B2 JP 2020093487 A JP2020093487 A JP 2020093487A JP 2020093487 A JP2020093487 A JP 2020093487A JP 7558680 B2 JP7558680 B2 JP 7558680B2
Authority
JP
Japan
Prior art keywords
dryer
work
progress
display
processing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020093487A
Other languages
Japanese (ja)
Other versions
JP2021189678A (en
Inventor
雄介 西田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanmar Holdings Co Ltd
Original Assignee
Yanmar Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanmar Holdings Co Ltd filed Critical Yanmar Holdings Co Ltd
Priority to JP2020093487A priority Critical patent/JP7558680B2/en
Publication of JP2021189678A publication Critical patent/JP2021189678A/en
Application granted granted Critical
Publication of JP7558680B2 publication Critical patent/JP7558680B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、穀物を乾燥させる乾燥機を管理する管理装置、管理方法、及び管理プログラムに関する。 The present invention relates to a management device, a management method, and a management program for managing a dryer that dries grains.

一般的に、乾燥機は、収穫された穀物を乾燥機内に投入する張込作業、張り込まれた穀物を乾燥させる乾燥作業、乾燥後に籾摺り等の次工程の処理のために穀物を排出する排出作業等の複数の作業工程を連続的に実行する。従来、複数台の乾燥機について、乾燥機の作業状態を作業内容別に中央監視室のモニタ画面に表示する技術が知られている。具体的には、従来の技術では、各乾燥機における現在の作業状態について、作業前、作業中、作業休止中などの情報がモニタ画面に表示される。これにより、ユーザーは、モニタ画面を確認して現在実行中の作業工程及び作業状態を把握する。 Generally, dryers perform multiple work processes in succession, such as loading harvested grain into the dryer, drying the loaded grain, and discharging the grain after drying for the next process such as hulling. Conventionally, there is known technology for displaying the work status of multiple dryers on a monitor screen in a central monitoring room by work type. Specifically, in conventional technology, information about the current work status of each dryer, such as before work, working, and paused, is displayed on the monitor screen. This allows the user to check the monitor screen to understand the work process currently being performed and the work status.

特開平5-138048号公報Japanese Patent Application Publication No. 5-138048

しかしながら、前記従来の技術では、現在実行中の作業工程に関する作業状態(作業前、作業中、作業休止中など)しか表示されないため、ユーザーは、全体の作業工程に対する現在実行中の作業工程の進捗状況を把握することが困難である。 However, with the above-mentioned conventional technology, only the work status (before work, working, work paused, etc.) of the currently ongoing work process is displayed, making it difficult for the user to grasp the progress of the currently ongoing work process relative to the overall work process.

本発明の目的は、穀物を乾燥させる乾燥機における全体の作業工程に対する現在実行中の作業工程の進捗状況を把握することが可能な管理装置、管理方法、及び管理プログラムを提供することにある。 The object of the present invention is to provide a management device, a management method, and a management program that can grasp the progress of a currently running work process relative to the entire work process in a dryer that dries grains.

本発明に係る管理装置は、特定処理部と提示処理部とを備える。前記特定処理部は、複数の作業工程を所定の順に実行することにより穀物を乾燥させる乾燥機が現在実行中の作業工程である第1作業工程を特定する。前記提示処理部は、前記複数の作業工程のそれぞれの進捗状況を表示する複数の進捗表示部において、前記特定処理部により特定される前記第1作業工程の進捗状況を提示する。 The management device according to the present invention includes a specific processing unit and a presentation processing unit. The specific processing unit identifies a first work process that is a work process currently being performed by a dryer that dries grains by performing a plurality of work processes in a predetermined order. The presentation processing unit presents the progress status of the first work process identified by the specific processing unit in a plurality of progress display units that display the progress status of each of the plurality of work processes.

本発明に係る管理方法は、複数の作業工程を所定の順に実行することにより穀物を乾燥させる乾燥機において現在実行中の作業工程である第1作業工程を特定することと、前記複数の作業工程のそれぞれに対応する複数の進捗表示部において、前記第1作業工程の進捗状況を提示することと、を一又は複数のプロセッサーにより実行する方法である。 The management method according to the present invention is a method executed by one or more processors to identify a first work process that is a currently running work process in a dryer that dries grain by executing a plurality of work processes in a predetermined order, and to present the progress of the first work process in a plurality of progress display sections that respectively correspond to the plurality of work processes.

本発明に係る管理プログラムは、複数の作業工程を所定の順に実行することにより穀物を乾燥させる乾燥機において現在実行中の作業工程である第1作業工程を特定することと、前記複数の作業工程のそれぞれに対応する複数の進捗表示部において、前記第1作業工程の進捗状況を提示することと、を一又は複数のプロセッサーに実行させるためのプログラムである。 The management program of the present invention is a program for causing one or more processors to execute the following operations in a dryer that dries grain by executing multiple work processes in a predetermined order: identifying a first work process that is a work process currently being executed in the dryer; and presenting the progress status of the first work process in multiple progress display sections that correspond to each of the multiple work processes.

本発明によれば、穀物を乾燥させる乾燥機における全体の作業工程に対する現在実行中の作業工程の進捗状況を把握することが可能な管理装置、管理方法、及び管理プログラムを提供することができる。 The present invention provides a management device, a management method, and a management program that can grasp the progress of a currently running work process relative to the entire work process in a dryer that dries grains.

図1は、本発明の実施形態に係る管理システムのシステム構成を示す図である。FIG. 1 is a diagram showing the system configuration of a management system according to an embodiment of the present invention. 図2は、本発明の実施形態に係る管理システムで使用される乾燥処理情報の一例を示す図である。FIG. 2 is a diagram showing an example of drying process information used in the management system according to the embodiment of the present invention. 図3は、本発明の実施形態に係るユーザー端末に表示される進捗状況ページの一例を示す図である。FIG. 3 is a diagram showing an example of a progress status page displayed on a user terminal according to an embodiment of the present invention. 図4は、本発明の実施形態に係る管理システムにおいて進捗度を算出する方法を説明するための図である。FIG. 4 is a diagram for explaining a method for calculating the progress in the management system according to the embodiment of the present invention. 図5は、本発明の実施形態に係る管理システムで実行される進捗状況提示処理の手順の一例を示すフローチャートである。FIG. 5 is a flowchart showing an example of a procedure of a progress presentation process executed in the management system according to the embodiment of the present invention. 図6は、本発明の実施形態に係るユーザー端末に表示される進捗状況ページに含まれる進捗状況の一例を示す図である。FIG. 6 is a diagram showing an example of a progress status included in a progress status page displayed on a user terminal according to an embodiment of the present invention. 図7は、本発明の実施形態に係るユーザー端末に表示される進捗状況ページに含まれる進捗状況の一例を示す図である。FIG. 7 is a diagram showing an example of a progress status included in a progress status page displayed on a user terminal according to an embodiment of the present invention. 図8は、本発明の実施形態に係るユーザー端末に表示される進捗状況ページに含まれる進捗状況の一例を示す図である。FIG. 8 is a diagram showing an example of a progress status included in a progress status page displayed on a user terminal according to an embodiment of the present invention. 図9は、本発明の実施形態に係るユーザー端末に表示される進捗状況ページに含まれる進捗状況の一例を示す図である。FIG. 9 is a diagram showing an example of a progress status included in a progress status page displayed on a user terminal according to an embodiment of the present invention. 図10は、本発明の実施形態に係るユーザー端末に表示される進捗状況ページに含まれる進捗状況の一例を示す図である。FIG. 10 is a diagram showing an example of a progress status included in a progress status page displayed on a user terminal according to an embodiment of the present invention. 図11は、本発明の実施形態に係るユーザー端末に表示される進捗状況ページに含まれる進捗状況の一例を示す図である。FIG. 11 is a diagram showing an example of a progress status included in a progress status page displayed on a user terminal according to an embodiment of the present invention.

以下の実施形態は、本発明を具体化した一例であって、本発明の技術的範囲を限定するものではない。 The following embodiment is an example of the present invention and does not limit the technical scope of the present invention.

図1に示されるように、本発明の実施形態に係る管理システム1は、管理装置2と、ユーザー端末3と、一又は複数の乾燥機4とを備える。管理装置2、ユーザー端末3、及び乾燥機4は、通信網N1を介して通信可能である。例えば、管理装置2及び乾燥機4は、携帯電話回線網、パケット回線網、又はLANを介して通信可能である。また、管理装置2及びユーザー端末3は、インターネット、LAN、WAN、又は公衆電話回線を介して通信可能である。なお、管理システム1は、複数の乾燥機4を連携させる連携ユニット(不図示)を備えてもよい。この場合、複数の乾燥機4は前記連携ユニットに接続され、前記連携ユニットが通信網N1に接続される。これにより、例えば複数の乾燥機4と管理装置2とが前記連携ユニットを介して通信可能となる。なお、本実施形態では、前記連携ユニットを省略している。 As shown in FIG. 1, the management system 1 according to the embodiment of the present invention includes a management device 2, a user terminal 3, and one or more dryers 4. The management device 2, the user terminal 3, and the dryers 4 can communicate with each other via a communication network N1. For example, the management device 2 and the dryers 4 can communicate with each other via a mobile phone line network, a packet line network, or a LAN. The management device 2 and the user terminal 3 can communicate with each other via the Internet, a LAN, a WAN, or a public telephone line. The management system 1 may include a linking unit (not shown) that links multiple dryers 4. In this case, the multiple dryers 4 are connected to the linking unit, and the linking unit is connected to the communication network N1. This allows, for example, multiple dryers 4 and the management device 2 to communicate with each other via the linking unit. In this embodiment, the linking unit is omitted.

管理装置2は、一又は複数の乾燥機4において実行される乾燥処理の作業状態を監視及び管理する機器(サーバー)である。図1には、一例として、3台(1号機、2号機、3号機)の乾燥機4を示している。各乾燥機4は、同一の構造であってもよいし異なる構造であってもよい。ユーザー端末3は、ユーザーが操作する操作端末である。例えば、ユーザーは、ユーザー端末3において、管理装置2が提供する乾燥機サポートサービスのウェブサイトにアクセスして、一又は複数の乾燥機4の稼働状況、作業状態等の情報を含むウェブページを表示させることが可能である。 The management device 2 is a device (server) that monitors and manages the working status of the drying process performed in one or more dryers 4. As an example, FIG. 1 shows three dryers 4 (No. 1, No. 2, and No. 3). Each dryer 4 may have the same structure or a different structure. The user terminal 3 is an operation terminal operated by a user. For example, the user can access the website of the dryer support service provided by the management device 2 on the user terminal 3 and display a web page including information such as the operating status and working state of one or more dryers 4.

[乾燥機4]
図1に示されるように、乾燥機4は、制御部41、記憶部42、操作表示部43、及び通信部44などを備える。乾燥機4は、収穫された穀物を複数の作業工程を連続的に実行することにより当該穀物を乾燥させる乾燥処理を実行する。乾燥機4は、周知の構成を備える。すなわち、本発明の乾燥機は、周知の乾燥機を適用することができる。
[Dryer 4]
1, the dryer 4 includes a control unit 41, a memory unit 42, an operation display unit 43, and a communication unit 44. The dryer 4 executes a drying process for drying harvested grain by continuously executing a plurality of work processes. The dryer 4 has a known configuration. In other words, a known dryer can be applied to the dryer of the present invention.

乾燥対象の穀物の種類は、例えば、籾、麦、豆等である。本発明の穀物の種類はこれらに限定されない。 The types of grains to be dried include, for example, rice, wheat, beans, etc. The types of grains used in the present invention are not limited to these.

また、前記乾燥処理は、複数の作業工程を含む。例えば、前記乾燥処理は、張込工程、循環工程、乾燥工程、冷却工程、排出工程を含む。なお、前記乾燥処理において、循環工程及び冷却工程は乾燥工程に含まれてもよい。また、前記乾燥処理は、前記5個の作業工程に他の作業工程が追加されてもよい。本発明の乾燥処理は、少なくとも張込工程、乾燥工程、排出工程を含む。 The drying process includes a plurality of work steps. For example, the drying process includes a loading process, a circulation process, a drying process, a cooling process, and a discharge process. In the drying process, the circulation process and the cooling process may be included in the drying process. In addition, the drying process may include other work steps in addition to the five work steps. The drying process of the present invention includes at least a loading process, a drying process, and a discharge process.

前記張込工程では、収穫された穀物が乾燥機4内に投入される張込作業を行う。例えば、ユーザーはコンバインで刈り取った穀物を乾燥機4の張込口(不図示)から乾燥機4内に投入する。ユーザーは必要に応じて張込作業を複数回繰り返す。 In the loading process, the harvested grain is loaded into the dryer 4. For example, the user loads the grain harvested with a combine into the dryer 4 through a loading port (not shown). The user repeats the loading process multiple times as necessary.

前記循環工程では、乾燥機4に張り込まれた穀物を循環させる循環作業を行う。具体的には、前記循環工程では、乾燥機4内に張り込まれた穀物の変質等を防止するためにスクリュー等により乾燥機4内で穀物を循環させる。前記循環作業は、前記張込作業中に行われてもよい。 In the circulation process, a circulation operation is performed to circulate the grain loaded into the dryer 4. Specifically, in the circulation process, the grain is circulated inside the dryer 4 using a screw or the like to prevent deterioration of the grain loaded into the dryer 4. The circulation operation may be performed during the loading operation.

前記乾燥工程では、乾燥機4内の温度を上昇させて穀物を乾燥させる乾燥作業を行う。具体的には、前記乾燥工程では、バーナーを駆動させて熱風(乾燥風)を発生させ、乾燥機4内で循環している穀物に乾燥風を当てて穀物に含まれる余分な水分を除去する。乾燥機4は、水分センサーを備え、穀物の水分量(含水率)を検出する。乾燥機4は、例えば前記水分量が目標値(例えば15%)に到達するまで前記乾燥作業を行う。 In the drying process, the temperature inside the dryer 4 is raised to dry the grains. Specifically, in the drying process, a burner is driven to generate hot air (drying air), and the drying air is directed at the grains circulating inside the dryer 4 to remove excess moisture contained in the grains. The dryer 4 is equipped with a moisture sensor and detects the moisture amount (moisture content) of the grains. The dryer 4 performs the drying process, for example, until the moisture amount reaches a target value (for example, 15%).

前記冷却工程では、乾燥作業が行われた穀物の温度を下げる冷却作業を行う。具体的には、前記冷却工程では、穀物の温度よりも低い温度の風を穀物に当てて高温状態の穀物を冷却する。 In the cooling process, a cooling operation is carried out to lower the temperature of the grains that have been dried. Specifically, in the cooling process, wind at a temperature lower than the temperature of the grains is blown onto the grains to cool the hot grains.

前記排出工程では、穀物を乾燥機4から外部に排出する排出作業を行う。乾燥機4から排出された穀物(例えば籾)は、例えば籾摺り機に移される。 In the discharge process, the grain is discharged from the dryer 4 to the outside. The grain (e.g., rice husks) discharged from the dryer 4 is transferred to, for example, a rice huller.

通信部44は、乾燥機4を有線又は無線で通信網N1に接続し、通信網N1を介して管理装置2などの外部機器との間で所定の通信プロトコルに従ったデータ通信を実行するための通信インターフェースである。 The communication unit 44 is a communication interface that connects the dryer 4 to the communication network N1 by wire or wirelessly and performs data communication with external devices such as the management device 2 via the communication network N1 in accordance with a specified communication protocol.

操作表示部43は、各種情報を表示する液晶ディスプレイ又は有機ELディスプレイのような表示部と、操作を受け付けるタッチパネル、マウス、又はキーボードのような操作部とを備えるユーザーインターフェースである。例えば、操作表示部43は、前記乾燥処理に関する各種項目を設定する設定画面、前記乾燥処理の開始操作及び終了操作、各作業工程の開始操作及び停止操作などを受け付ける操作画面、乾燥処理の進捗状況及び作業状態を表示する作業状態画面などを表示する。また、操作表示部43は、前記各画面においてユーザーの操作を受け付ける。 The operation display unit 43 is a user interface that includes a display unit such as a liquid crystal display or an organic EL display that displays various information, and an operation unit such as a touch panel, a mouse, or a keyboard that accepts operations. For example, the operation display unit 43 displays a setting screen for setting various items related to the drying process, an operation screen that accepts operations to start and end the drying process and operations to start and stop each work process, and a work status screen that displays the progress and work status of the drying process. The operation display unit 43 also accepts user operations on each of the screens.

記憶部42は、乾燥機4に関する各種情報を記憶する。例えば、記憶部42は、乾燥機4の識別情報(例えば号機番号、型式など)、乾燥機4に張込可能な張込量の上限値を表す最大張込量などの固有情報と、穀物の乾燥処理に対応する処理情報とを記憶する。前記処理情報には、乾燥機4に張り込まれた穀物の種類(籾、麦、豆等)、乾燥機4に張り込まれた穀物の張込量、現在実行中の作業工程、当該作業工程の作業状態(運転中、停止等)、乾燥機4に張り込まれた穀物の現在の水分量、現在実行中の作業工程の終了予定時刻などの情報が含まれる。 The memory unit 42 stores various information related to the dryer 4. For example, the memory unit 42 stores unique information such as the identification information of the dryer 4 (e.g., the machine number, model, etc.), the maximum loading amount indicating the upper limit of the loading amount that can be loaded into the dryer 4, and processing information corresponding to the grain drying process. The processing information includes information such as the type of grain loaded into the dryer 4 (paddy, wheat, beans, etc.), the loading amount of grain loaded into the dryer 4, the work process currently being performed, the work status of the work process (operating, stopped, etc.), the current moisture content of the grain loaded into the dryer 4, and the scheduled end time of the work process currently being performed.

また、記憶部42には、制御部41に前記乾燥処理を実行させるための制御プログラムが記憶されている。 The memory unit 42 also stores a control program for causing the control unit 41 to execute the drying process.

制御部41は、CPU、ROM、及びRAMなどの制御機器を有する。前記CPUは、各種の演算処理を実行するプロセッサーである。前記ROMは、前記CPUに各種の演算処理を実行させるためのBIOS及びOSなどの制御プログラムが予め記憶される不揮発性の記憶部である。前記RAMは、各種の情報を記憶する揮発性又は不揮発性の記憶部であり、前記CPUが実行する各種の処理の一時記憶メモリー(作業領域)として使用される。そして、制御部41は、前記ROM又は記憶部42に予め記憶された前記制御プログラムを前記CPUで実行することにより乾燥機4を制御する。 The control unit 41 has control devices such as a CPU, a ROM, and a RAM. The CPU is a processor that executes various arithmetic processes. The ROM is a non-volatile storage unit in which control programs such as a BIOS and an OS for causing the CPU to execute various arithmetic processes are stored in advance. The RAM is a volatile or non-volatile storage unit that stores various information, and is used as a temporary storage memory (work area) for various processes executed by the CPU. The control unit 41 controls the dryer 4 by executing the control program stored in advance in the ROM or the storage unit 42 by the CPU.

具体的に、制御部41は、操作表示部43がユーザーから受け付けた操作内容に応じた処理を実行する。例えば、ユーザーが前記操作画面において前記乾燥処理を開始させる操作、及び張込作業を開始させる操作を行うと、制御部41は張込工程を開始する。ユーザーが穀物の張込作業を終えて前記操作画面において張込作業を終了する操作を行うと、制御部41は張込工程を停止する。なお、制御部41は、現在時刻が張込工程の終了予定時刻(後述)に到達した場合に張込工程を停止してもよい。前記終了予定時刻は、管理装置2において算出されてもよい。 Specifically, the control unit 41 executes processing according to the operation content received from the user by the operation display unit 43. For example, when the user performs an operation on the operation screen to start the drying process and an operation to start the loading work, the control unit 41 starts the loading process. When the user finishes the loading work of the grain and performs an operation on the operation screen to end the loading work, the control unit 41 stops the loading process. Note that the control unit 41 may stop the loading process when the current time reaches the scheduled end time of the loading process (described later). The scheduled end time may be calculated by the management device 2.

続いて、ユーザーが前記操作画面において前記循環作業を開始させる操作を行うと、制御部41は循環工程を開始する。制御部41は、現在時刻が循環工程の終了予定時刻になると循環工程を停止する。なお、制御部41は、例えば穀物の張込量に基づいて循環工程の終了予定時刻を算出する。 Next, when the user performs an operation to start the circulation work on the operation screen, the control unit 41 starts the circulation process. The control unit 41 stops the circulation process when the current time becomes the scheduled end time of the circulation process. The control unit 41 calculates the scheduled end time of the circulation process based on, for example, the amount of grain loaded.

続いて、ユーザーが前記操作画面において前記乾燥作業を開始させる操作を行うと、制御部41は乾燥工程を開始する。制御部41は、現在時刻が乾燥工程の終了予定時刻になると乾燥工程を停止する。なお、制御部41は、例えば穀物の水分量が目標値(例えば15%)に到達するまでに要する作業所要時間に基づいて乾燥工程の終了予定時刻を算出する。また、制御部41は、前記水分センサーにより検出される水分量が目標値に到達した場合に乾燥工程を停止してもよい。 Next, when the user performs an operation to start the drying operation on the operation screen, the control unit 41 starts the drying process. The control unit 41 stops the drying process when the current time becomes the scheduled end time of the drying process. Note that the control unit 41 calculates the scheduled end time of the drying process based on, for example, the operation time required for the moisture content of the grain to reach a target value (e.g., 15%). The control unit 41 may also stop the drying process when the moisture content detected by the moisture sensor reaches the target value.

続いて、ユーザーが前記操作画面において前記冷却作業を開始させる操作を行うと、制御部41は冷却工程を開始する。制御部41は、現在時刻が冷却工程の終了予定時刻になると冷却工程を停止する。最後に、ユーザーが前記操作画面において前記排出作業を開始させる操作を行うと、制御部41は排出工程を開始する。制御部41は、穀物の排出が完了すると、排出工程を停止して前記乾燥処理を終了する。なお、制御部41は、例えば穀物の張込量に基づいて冷却工程及び排出工程のそれぞれの終了予定時刻を算出する。 Next, when the user performs an operation on the operation screen to start the cooling operation, the control unit 41 starts the cooling process. The control unit 41 stops the cooling process when the current time becomes the scheduled end time of the cooling process. Finally, when the user performs an operation on the operation screen to start the discharging operation, the control unit 41 starts the discharging process. When the discharge of the grain is completed, the control unit 41 stops the discharging process and ends the drying process. The control unit 41 calculates the scheduled end times of the cooling process and the discharging process, for example, based on the amount of grain loaded.

各作業工程の終了予定時刻の算出方法の詳細は後述するが、主として、乾燥工程の終了予定時刻は乾燥機4により前記作業所要時間に基づいて算出され、乾燥工程を除いた他の作業工程の終了予定時刻は管理装置2により過去の作業履歴に基づいて算出される。なお、乾燥工程の終了予定時刻についても管理装置2により過去の作業履歴に基づいて算出されてもよい。また、乾燥機4の制御部41は、前記設定画面においてユーザーが設定した各作業工程の作業時間に基づいて、各作業工程の終了予定時刻を算出してもよい。また、制御部41は、一つの作業工程が終了した場合に、自動的に次の作業工程を開始してもよい。 Details of the method for calculating the scheduled end time of each work process will be described later, but mainly, the scheduled end time of the drying process is calculated by the dryer 4 based on the required work time, and the scheduled end times of the other work processes except for the drying process are calculated by the management device 2 based on past work history. The scheduled end time of the drying process may also be calculated by the management device 2 based on past work history. Furthermore, the control unit 41 of the dryer 4 may calculate the scheduled end time of each work process based on the work time of each work process set by the user on the setting screen. Furthermore, the control unit 41 may automatically start the next work process when one work process is completed.

制御部41は、前記乾燥処理を実行中に前記処理情報を更新する。例えば、制御部41は、現在実行中の作業工程、作業状態、終了予定時刻、穀物の現在の水分量などをリアルタイムに更新する。また、制御部41は、現在実行中の作業工程及び作業状態を操作表示部43の作業状態画面に表示させる。また、制御部41は、管理装置2からのアクセス要求に応じて、前記乾燥機の固有情報及び処理情報を管理装置2に出力する。 The control unit 41 updates the processing information while the drying process is being performed. For example, the control unit 41 updates the currently executing work process, work status, scheduled completion time, current moisture content of the grain, etc. in real time. The control unit 41 also displays the currently executing work process and work status on the work status screen of the operation display unit 43. The control unit 41 also outputs the unique information and processing information of the dryer to the management device 2 in response to an access request from the management device 2.

[管理装置2]
図1に示されるように、管理装置2は、制御部21、記憶部22、操作表示部23、及び通信部24などを備えるサーバーである。なお、管理装置2は、1台のコンピュータに限らず、複数台のコンピュータが協働して動作するコンピュータシステムであってもよい。また、管理装置2で実行される各種の処理は、一又は複数のプロセッサーによって分散して実行されてもよい。
[Management device 2]
1, the management device 2 is a server including a control unit 21, a storage unit 22, an operation display unit 23, and a communication unit 24. The management device 2 is not limited to a single computer, and may be a computer system in which multiple computers work together. Various processes executed by the management device 2 may be executed in a distributed manner by one or multiple processors.

通信部24は、管理装置2を有線又は無線で通信網N1に接続し、通信網N1を介して一又は複数の乾燥機4、ユーザー端末3などの外部機器との間で所定の通信プロトコルに従ったデータ通信を実行するための通信インターフェースである。 The communication unit 24 is a communication interface that connects the management device 2 to the communication network N1 by wire or wirelessly and performs data communication in accordance with a specified communication protocol with one or more external devices such as a dryer 4 and a user terminal 3 via the communication network N1.

操作表示部23は、各種の情報を表示する液晶ディスプレイ又は有機ELディスプレイのような表示部と、操作を受け付けるタッチパネル、マウス、又はキーボードのような操作部とを備えるユーザーインターフェースである。 The operation display unit 23 is a user interface that includes a display unit such as a liquid crystal display or an organic EL display that displays various information, and an operation unit such as a touch panel, mouse, or keyboard that accepts operations.

記憶部22は、各種の情報を記憶するHDD(Hard Disk Drive)又はSSD(Solid State Drive)などの不揮発性の記憶部である。記憶部22には、制御部21に後述の進捗状況提示処理(図5参照)を実行させるための進捗状況提示プログラムなどの制御プログラムが記憶されている。例えば、前記進捗状況提示プログラムは、CD又はDVDなどのコンピュータ読取可能な記録媒体に非一時的に記録されており、管理装置2が備えるCDドライブ又はDVDドライブなどの読取装置(不図示)で読み取られて記憶部22に記憶される。なお、前記進捗状況提示プログラムは、サーバー(不図示)から通信網N1を介して管理装置2にダウンロードされて記憶部22に記憶されてもよい。 The storage unit 22 is a non-volatile storage unit such as a HDD (Hard Disk Drive) or SSD (Solid State Drive) that stores various information. The storage unit 22 stores control programs such as a progress status presentation program for causing the control unit 21 to execute a progress status presentation process (see FIG. 5) described below. For example, the progress status presentation program is non-temporarily recorded on a computer-readable recording medium such as a CD or DVD, and is read by a reading device (not shown) such as a CD drive or DVD drive provided in the management device 2 and stored in the storage unit 22. The progress status presentation program may be downloaded from a server (not shown) to the management device 2 via the communication network N1 and stored in the storage unit 22.

また、記憶部22は、穀物の乾燥処理に関する乾燥処理情報D1等のデータを記憶する。制御部21は、各乾燥機4から取得する前記固有情報及び前記処理情報に基づいて、乾燥処理情報D1を記憶部22に記憶する。 The memory unit 22 also stores data such as drying processing information D1 related to the drying processing of grains. The control unit 21 stores the drying processing information D1 in the memory unit 22 based on the unique information and the processing information acquired from each dryer 4.

図2は、乾燥処理情報D1の一例を示す図である。図2に示されるように、乾燥処理情報D1には、乾燥機4ごとに、対応する「名称」、「型式」、「状態」、「種類」、「張込量」、「最大張込量」、「水分量」、「終了予定時刻」、「進捗度」などの情報が含まれる。前記名称は、乾燥機4の識別情報であり、例えば号機番号が登録される。前記号機番号は、例えば乾燥機4の設定画面、前記ウェブサイトの設定ページ等において登録される。前記型式は、乾燥機4の固有の型式及び番号である。 Figure 2 is a diagram showing an example of drying process information D1. As shown in Figure 2, the drying process information D1 includes information such as the corresponding "name", "model", "status", "type", "loading amount", "maximum loading amount", "moisture content", "scheduled end time", and "progress" for each dryer 4. The name is identification information for the dryer 4, and for example, the machine number is registered. The machine number is registered, for example, in the setting screen of the dryer 4, the setting page of the website, etc. The model is the unique model and number of the dryer 4.

前記状態は、乾燥機4の現在の作業状態を示す情報である。例えば、1号機の乾燥機4が張込工程を実行中である場合、前記状態に「張込」が登録される。また、2号機の乾燥機4が乾燥工程を実行中である場合、前記状態に「乾燥」が登録される。また、3号機の乾燥機4が乾燥工程を終了して停止中である場合、前記状態に「停止(乾燥)」が登録される。 The status is information that indicates the current working status of the dryer 4. For example, if the first dryer 4 is performing the loading process, "loading" is registered as the status. Also, if the second dryer 4 is performing the drying process, "drying" is registered as the status. Also, if the third dryer 4 has finished the drying process and is stopped, "stopped (drying)" is registered as the status.

前記種類は、乾燥対象の穀物の種類を示す情報である。前記張込量は、乾燥機4に張り込まれた穀物の量を示す情報である。前記最大張込量は、乾燥機4に張込可能な張込量の上限値を示す情報である。前記水分量は、現在の穀物の水分量を示す情報である。前記終了予定時刻は、現在実行中の作業工程が終了する予定時刻を示す情報である。前記終了予定時刻は、乾燥機4において算出されてもよいし、管理装置2において算出されてもよい。例えば、乾燥工程の前記終了予定時刻は、乾燥機4において算出され、乾燥工程を除いた他の作業工程の前記終了予定時刻は、管理装置2において算出される。管理装置2は、乾燥工程の前記終了予定時刻を乾燥機4から取得する。また、管理装置2は、例えば、過去の作業履歴に基づいて前記他の作業工程の前記終了予定時刻を算出する(後述の[他の実施形態]参照)。なお、管理装置2は、乾燥工程の前記終了予定時刻についても過去の作業履歴に基づいて算出してもよい。 The type is information indicating the type of grain to be dried. The loading amount is information indicating the amount of grain loaded into the dryer 4. The maximum loading amount is information indicating the upper limit of the loading amount that can be loaded into the dryer 4. The moisture content is information indicating the current moisture content of the grain. The scheduled end time is information indicating the scheduled end time of the currently running work process. The scheduled end time may be calculated in the dryer 4 or in the management device 2. For example, the scheduled end time of the drying process is calculated in the dryer 4, and the scheduled end times of the other work processes excluding the drying process are calculated in the management device 2. The management device 2 obtains the scheduled end time of the drying process from the dryer 4. In addition, the management device 2 calculates the scheduled end times of the other work processes based on, for example, past work history (see [Other embodiments] described later). In addition, the management device 2 may also calculate the scheduled end time of the drying process based on past work history.

前記進捗度は、乾燥機4が現在実行中の作業工程の現在の進捗度を示す情報である。例えば、前記進捗度は、現在実行中の作業工程の作業所要時間に対する、作業が進行した時間(作業を行った時間)の割合を示す情報である。制御部41は、前記作業所要時間と現在時刻とに基づいて、現在実行中の作業工程の進捗度を算出する。前記進捗度の具体的な算出方法は後述する。 The degree of progress is information indicating the current degree of progress of the work process currently being performed by the dryer 4. For example, the degree of progress is information indicating the ratio of the time during which the work has progressed (the time during which the work has been performed) to the time required for the work process currently being performed. The control unit 41 calculates the degree of progress of the work process currently being performed based on the time required for the work and the current time. A specific method for calculating the degree of progress will be described later.

制御部21は、各乾燥機4がそれぞれ前記乾燥処理を開始すると、前記乾燥処理の状態(進捗状況)に応じて乾燥処理情報D1に含まれる各情報を更新する。 When each dryer 4 starts the drying process, the control unit 21 updates each piece of information contained in the drying process information D1 according to the state (progress) of the drying process.

なお、他の実施形態として、乾燥処理情報D1の一部又は全部が、管理装置2から通信網N1を介してアクセス可能な他のサーバーに記憶されてもよい。この場合、管理装置2の制御部21は、前記他のサーバーから前記情報を取得して、後述の進捗状況提示処理(図5参照)などの各処理を実行してもよい。例えば、乾燥処理情報D1は、各乾燥機4に記憶されてもよい。 In another embodiment, some or all of the drying process information D1 may be stored in another server accessible from the management device 2 via the communication network N1. In this case, the control unit 21 of the management device 2 may obtain the information from the other server and execute various processes such as the progress status presentation process (see FIG. 5) described below. For example, the drying process information D1 may be stored in each dryer 4.

また、記憶部22には、ユーザー端末3に表示されるウェブサイト(例えば乾燥機サポートサイト)に含まれる、進捗状況ページP1(図3参照)、設定ページ(不図示)などの各種のウェブページを生成するためのレイアウトデータ及び画像データなども記憶される。なお、本実施形態において、管理装置2の制御部21は、前記各種のウェブページを生成してそのウェブページの情報をユーザー端末3に送信することにより、ユーザー端末3に前記各種のウェブページを表示させることが可能である。また、他の実施形態として、管理装置2の制御部21は、ユーザー端末3に前記各種のウェブページを表示するために必要なデータを送信することにより、ユーザー端末3の制御部31に前記各種のウェブページの表示を実行させてもよい。 The memory unit 22 also stores layout data and image data for generating various web pages, such as a progress status page P1 (see FIG. 3) and a settings page (not shown), included in a website (e.g., a dryer support site) displayed on the user terminal 3. In this embodiment, the control unit 21 of the management device 2 can display the various web pages on the user terminal 3 by generating the various web pages and sending information about the web pages to the user terminal 3. In another embodiment, the control unit 21 of the management device 2 can cause the control unit 31 of the user terminal 3 to display the various web pages by sending data necessary for displaying the various web pages to the user terminal 3.

進捗状況ページP1は、ユーザー端末3において前記乾燥機サポートサイトにログインすることによりユーザー端末3に表示される。 The progress page P1 is displayed on the user terminal 3 by logging in to the dryer support site on the user terminal 3.

図3には、進捗状況ページP1の一例を示している。進捗状況ページP1には、乾燥機4ごとに、乾燥処理情報D1(図2参照)に含まれる情報、例えば「名称」、「型式」、「状態」、「種類」、「張込量/最大張込量」、「水分量」、「終了予定時刻」の情報が表示される。前記状態には、乾燥機4が現在実行中の作業工程の名称がテキスト(文字)表示され、さらに前記乾燥処理に含まれる全作業工程に対応する複数の進捗表示部Fが表示される。図3では、張込工程に対応する進捗表示部F1、循環工程に対応する進捗表示部F2、乾燥工程に対応する進捗表示部F3、冷却工程に対応する進捗表示部F4、排出工程に対応する進捗表示部F5を例示している。各進捗表示部Fには、作業工程の進捗状況が表示される。各進捗表示部Fは、本発明の進捗表示部の一例である。 Figure 3 shows an example of the progress status page P1. The progress status page P1 displays information included in the drying process information D1 (see Figure 2) for each dryer 4, such as "name", "model", "status", "type", "loading amount/maximum loading amount", "moisture content", and "scheduled end time". In the status, the name of the work process currently being performed by the dryer 4 is displayed in text (characters), and multiple progress display sections F corresponding to all work processes included in the drying process are displayed. Figure 3 shows progress display section F1 corresponding to the loading process, progress display section F2 corresponding to the circulation process, progress display section F3 corresponding to the drying process, progress display section F4 corresponding to the cooling process, and progress display section F5 corresponding to the discharge process. Each progress display section F displays the progress of the work process. Each progress display section F is an example of a progress display section of the present invention.

ところで、従来、複数台の乾燥機4について、乾燥機4の作業状態を作業内容別にモニタ画面に表示する技術が知られている。具体的には、従来の技術では、各乾燥機における現在の作業状態について、作業前、作業中、作業休止中などの情報がモニタ画面に表示される。しかしながら、前記従来の技術では、現在実行中の作業工程に関する作業状態(作業前、作業中、作業休止中など)しか表示されないため、ユーザーは、全体の作業工程に対する現在実行中の作業工程の進捗状況を把握することが困難である。 Incidentally, there is a known technology in the past that displays the working status of multiple dryers 4 on a monitor screen by type of work. Specifically, in the conventional technology, information about the current working status of each dryer, such as before work, working, or paused, is displayed on the monitor screen. However, in the conventional technology, only the working status (before work, working, paused, etc.) related to the currently running work process is displayed, making it difficult for the user to grasp the progress of the currently running work process relative to the overall work process.

これに対して、以下に示すように、本実施形態に係る管理装置2では、乾燥機4における全体の作業工程に対する現在実行中の作業工程の進捗状況を把握することが可能である。 In contrast, as shown below, the management device 2 according to this embodiment makes it possible to grasp the progress of the currently running work process relative to the overall work process in the dryer 4.

具体的に、本実施形態に係る管理装置2の制御部21は、取得処理部211、特定処理部212、算出処理部213、提示処理部214などの各種の処理部を含む。なお、制御部21は、前記CPUで前記進捗状況提示プログラムに従った各種の処理を実行することによって前記各種の処理部として機能する。また、一部又は全部の前記処理部が電子回路で構成されていてもよい。なお、前記進捗状況提示プログラムは、複数のプロセッサーを前記処理部として機能させるためのプログラムであってもよい。 Specifically, the control unit 21 of the management device 2 according to this embodiment includes various processing units such as an acquisition processing unit 211, a specific processing unit 212, a calculation processing unit 213, and a presentation processing unit 214. The control unit 21 functions as the various processing units by executing various processes in accordance with the progress presentation program using the CPU. Some or all of the processing units may be configured with electronic circuits. The progress presentation program may be a program for causing multiple processors to function as the processing units.

取得処理部211は、各乾燥機4から、乾燥対象の穀物の種類、張込量、現在実行中の作業工程(本発明の第1作業工程に対応)を表す作業状態、当該作業工程の開始時刻、当該作業工程の終了予定時刻、水分量などの前記処理情報を取得する。また、取得処理部211は、各乾燥機4から識別情報(名称、型式)、最大張込量などの固有情報を取得する。取得処理部211は、取得した各情報を乾燥処理情報D1(図2参照)に登録する。取得処理部211は、本発明の取得処理部の一例である。 The acquisition processing unit 211 acquires the above-mentioned processing information from each dryer 4, such as the type of grain to be dried, the loading amount, the work status indicating the currently executing work process (corresponding to the first work process of the present invention), the start time of the work process, the scheduled end time of the work process, and the moisture content. The acquisition processing unit 211 also acquires unique information from each dryer 4, such as identification information (name, model) and maximum loading amount. The acquisition processing unit 211 registers each piece of acquired information in the drying processing information D1 (see Figure 2). The acquisition processing unit 211 is an example of the acquisition processing unit of the present invention.

特定処理部212は、乾燥機4が現在実行中の作業工程(以下、第1作業工程という。)を特定する。具体的には、特定処理部212は、取得処理部211により取得される前記作業状態により第1作業工程を特定する。また、特定処理部212は、複数の乾燥機4のそれぞれについて、前記第1作業工程を特定する。特定処理部212は、本発明の特定処理部の一例である。 The specific processing unit 212 identifies the work process currently being performed by the dryer 4 (hereinafter referred to as the first work process). Specifically, the specific processing unit 212 identifies the first work process based on the work status acquired by the acquisition processing unit 211. The specific processing unit 212 also identifies the first work process for each of the multiple dryers 4. The specific processing unit 212 is an example of the specific processing unit of the present invention.

例えば、1号機の乾燥機4が張込工程を現在実行中である場合、特定処理部212は、1号機の乾燥機4に対応する前記第1作業工程として張込工程を特定する。また例えば、2号機の乾燥機4が乾燥工程を現在実行中である場合、特定処理部212は、2号機の乾燥機4に対応する前記第1作業工程として乾燥工程を特定する。また例えば、3号機の乾燥機4が乾燥工程を終了して停止中である場合、特定処理部212は、3号機の乾燥機4に対応する前記第1作業工程として乾燥工程を特定する。 For example, if the dryer 4 of the first unit is currently performing the loading process, the specific processing unit 212 identifies the loading process as the first work process corresponding to the dryer 4 of the first unit. For another example, if the dryer 4 of the second unit is currently performing the drying process, the specific processing unit 212 identifies the drying process as the first work process corresponding to the dryer 4 of the second unit. For another example, if the dryer 4 of the third unit has finished the drying process and is stopped, the specific processing unit 212 identifies the drying process as the first work process corresponding to the dryer 4 of the third unit.

算出処理部213は、前記第1作業工程の現在の進捗状況に対応する進捗度を算出する。前記進捗度は、前記第1作業工程の作業所要時間に対する、作業が進行した時間(作業を行った時間)の割合を示す値であり、「0」~「1」の値で表される。すなわち、算出処理部213は、前記第1作業工程の全体の作業所要時間を「1」に規定して、当該作業所要時間に対する作業の進行度合いを算出する。具体的に、算出処理部213は、前記第1作業工程の開始時刻及び終了予定時刻から算出される作業所要時間と、現在時刻とに基づいて、前記第1作業工程の進捗度を算出する。例えば、前記第1作業工程の作業所要時間のうち半分の時間が経過した場合、算出処理部213は、前記第1作業工程の進捗度として「0.5」を算出する。また、例えば、前記第1作業工程の作業所要時間の全てが経過した場合、算出処理部213は、前記第1作業工程の進捗度として「1」を算出する。算出処理部213は、算出した進捗度を乾燥処理情報D1に登録する(図2参照)。算出処理部213は、本発明の算出処理部の一例である。 The calculation processing unit 213 calculates the degree of progress corresponding to the current progress status of the first work process. The degree of progress is a value indicating the ratio of the time during which the work has progressed (the time during which the work has been performed) to the required work time of the first work process, and is expressed as a value between "0" and "1". That is, the calculation processing unit 213 defines the total required work time of the first work process as "1" and calculates the degree of progress of the work relative to the required work time. Specifically, the calculation processing unit 213 calculates the degree of progress of the first work process based on the required work time calculated from the start time and the scheduled end time of the first work process and the current time. For example, when half of the required work time of the first work process has elapsed, the calculation processing unit 213 calculates "0.5" as the degree of progress of the first work process. Also, for example, when the entire required work time of the first work process has elapsed, the calculation processing unit 213 calculates "1" as the degree of progress of the first work process. The calculation processing unit 213 registers the calculated progress in the drying processing information D1 (see FIG. 2). The calculation processing unit 213 is an example of the calculation processing unit of the present invention.

提示処理部214は、複数の作業工程のそれぞれの進捗状況を表示する複数の進捗表示部Fにおいて、特定処理部212により特定される前記第1作業工程の進捗状況を提示する。また、提示処理部214は、複数の乾燥機4のそれぞれについて、複数の進捗表示部Fにおいて前記第1作業工程の進捗状況を提示する。具体的に、提示処理部214は、複数の進捗表示部Fを所定の順に並べて表示させ、かつ、前記第1作業工程に対応する第1進捗表示部Fに前記第1作業工程の進捗状況を表示させる。第1進捗表示部Fは、本発明の第1進捗表示部の一例である。 The presentation processing unit 214 presents the progress of the first work process identified by the identification processing unit 212 in multiple progress display units F that display the progress of each of the multiple work processes. The presentation processing unit 214 also presents the progress of the first work process for each of the multiple dryers 4 in multiple progress display units F. Specifically, the presentation processing unit 214 displays the multiple progress display units F in a predetermined order, and displays the progress of the first work process in the first progress display unit F that corresponds to the first work process. The first progress display unit F is an example of a first progress display unit of the present invention.

例えば、図3に示されるように、提示処理部214は、進捗状況ページP1の「状態」欄に、張込工程に対応する進捗表示部F1、循環工程に対応する進捗表示部F2、乾燥工程に対応する進捗表示部F3、冷却工程に対応する進捗表示部F4、及び排出工程に対応する進捗表示部F5を、前記乾燥処理の作業順に並べて表示させる。また、提示処理部214は、各進捗表示部Fを時間軸方向に所定の幅を有するタイムバーで表示させ、前記複数の進捗表示部Fに対応する複数のタイムバーを作業順に前記時間軸方向に並べて表示させる。また、提示処理部214は、各進捗表示部Fの前記時間軸方向の幅を同一の幅で表示させる。さらに、提示処理部214は、各乾燥機4において、同一の作業工程に対応する進捗表示部Fを、同一の幅で表示させ、かつ上下方向の位置が一致するように表示させる。 For example, as shown in FIG. 3, the presentation processing unit 214 displays in the "Status" column of the progress status page P1 a progress display unit F1 corresponding to the loading process, a progress display unit F2 corresponding to the circulation process, a progress display unit F3 corresponding to the drying process, a progress display unit F4 corresponding to the cooling process, and a progress display unit F5 corresponding to the discharge process, arranged in the order of the drying process. The presentation processing unit 214 also displays each progress display unit F as a time bar having a predetermined width in the time axis direction, and displays multiple time bars corresponding to the multiple progress display units F arranged in the time axis direction in the order of the work. The presentation processing unit 214 also displays the width of each progress display unit F in the time axis direction with the same width. Furthermore, the presentation processing unit 214 displays the progress display units F corresponding to the same work process in each dryer 4 with the same width and with the same vertical position.

ここで、提示処理部214は、前記第1作業工程に対応する前記第1進捗表示部Fに、算出処理部213により算出される前記進捗度に対応する識別情報を表示させる。具体的に、提示処理部214は、前記第1作業工程に対応する前記第1進捗表示部Fにおいて、開始時刻に対応する作業開始位置から前記進捗度に対応する進捗位置までの表示態様を、前記進捗位置から前記終了予定時刻に対応する終了予定位置までの表示態様とは異ならせて表示させる。以下に、具体例を示す。 Here, the presentation processing unit 214 displays identification information corresponding to the degree of progress calculated by the calculation processing unit 213 in the first progress display unit F corresponding to the first work process. Specifically, the presentation processing unit 214 displays, in the first progress display unit F corresponding to the first work process, a display mode from the work start position corresponding to the start time to the progress position corresponding to the degree of progress differently from a display mode from the progress position to the scheduled end position corresponding to the scheduled end time. A specific example is shown below.

図4には、図3に示す2号機の乾燥機4の各進捗表示部Fの一部を拡大した図を示している。図4では、乾燥機4が乾燥工程を実行中であることを示している。図4に示されるように、進捗表示部F3の左端は乾燥工程の開始時刻t1に対応する開始位置X1を表し、進捗表示部F3の右端は乾燥工程の終了予定時刻t3に対応する終了位置X3を表し、X2は前記進捗度に対応する進捗位置を表している。「t3-t1」は乾燥工程の作業所要時間に相当する。この場合、算出処理部213は、現在時刻をt2とした場合に、以下の式(1)により進捗度を算出する。
進捗度=(t2-t1)/(t3-t1) ・・・(1)
FIG. 4 shows an enlarged view of a part of each progress display section F of the dryer 4 of the No. 2 machine shown in FIG. 3. FIG. 4 shows that the dryer 4 is performing the drying process. As shown in FIG. 4, the left end of the progress display section F3 represents the start position X1 corresponding to the start time t1 of the drying process, the right end of the progress display section F3 represents the end position X3 corresponding to the scheduled end time t3 of the drying process, and X2 represents the progress position corresponding to the degree of progress. "t3-t1" corresponds to the work time required for the drying process. In this case, the calculation processing section 213 calculates the degree of progress by the following formula (1) when the current time is t2.
Progress rate=(t2−t1)/(t3−t1) (1)

例えば、乾燥工程の開始時刻t1が「16:00」、終了予定時刻t3が「翌7:00」、現在時刻t2が「22:00」である場合、算出処理部213は、乾燥工程の進捗度として「0.4」を算出する。この場合、開始位置X1を基準「0」とし、終了位置X3を「1」とすると、進捗位置X2は「0.4」となる。提示処理部214は、進捗表示部F3に、進捗度「0.4」に対応する識別情報を表示させる。具体的に、提示処理部214は、進捗表示部F3において、開始位置X1から進捗位置X2までの第1領域R1を第1表示態様で表示させ、進捗位置X2から終了位置X3までの第2領域R2を第1表示態様とは異なる第2表示態様で表示させる。例えば、提示処理部214は、第1領域R1及び第2領域R2の表示色を異ならせる。なお、提示処理部214は、第1領域R1及び第2領域R2の背景模様を異ならせてもよい。前記第1表示態様は、本発明の前記進捗度に対応する識別情報の一例である。 For example, if the start time t1 of the drying process is "16:00", the scheduled end time t3 is "7:00 the next day", and the current time t2 is "22:00", the calculation processing unit 213 calculates "0.4" as the progress degree of the drying process. In this case, if the start position X1 is set as the reference "0" and the end position X3 is set as "1", the progress position X2 becomes "0.4". The presentation processing unit 214 displays identification information corresponding to the progress degree "0.4" in the progress display unit F3. Specifically, the presentation processing unit 214 displays the first region R1 from the start position X1 to the progress position X2 in a first display mode in the progress display unit F3, and displays the second region R2 from the progress position X2 to the end position X3 in a second display mode different from the first display mode. For example, the presentation processing unit 214 makes the display colors of the first region R1 and the second region R2 different from each other. The presentation processing unit 214 may make the background patterns of the first region R1 and the second region R2 different. The first display mode is an example of identification information corresponding to the progress level of the present invention.

乾燥工程が進行して現在時刻t2が終了予定時刻t3に到達すると、乾燥工程が終了し、乾燥工程に対応する進捗度が「1」になり、進捗位置X2は「1」になる。この場合、進捗表示部F3は第1領域R1のみで構成されるため、提示処理部214は、進捗表示部F3全体を前記第1表示態様で表示させる。 When the drying process progresses and the current time t2 reaches the scheduled end time t3, the drying process ends, the progress degree corresponding to the drying process becomes "1", and the progress position X2 becomes "1". In this case, since the progress display section F3 is composed of only the first region R1, the presentation processing section 214 displays the entire progress display section F3 in the first display mode.

また、提示処理部214は、現在実行中の作業工程に対応する進捗表示部Fの第1領域R1を、作業を終了した作業工程に対応する進捗表示部Fと同一の表示態様(第1表示態様)で表示させる。例えば図4に示されるように、提示処理部214は、乾燥工程に対応する進捗表示部F3の第1領域R1を、作業が終了した循環工程に対応する進捗表示部F2と同一の表示態様で表示させる。また、提示処理部214は、現在実行中の作業工程に対応する進捗表示部Fの第2領域R2を、次の作業工程に対応する進捗表示部Fと同一の表示態様(第2表示態様)で表示させる。例えば図4に示されるように、提示処理部214は、乾燥工程に対応する進捗表示部F3の第2領域R2を、次の冷却工程に対応する進捗表示部F4と同一の表示態様で表示させる。 The presentation processor 214 also displays the first region R1 of the progress display section F corresponding to the currently executing work process in the same display mode (first display mode) as the progress display section F corresponding to the work process that has been completed. For example, as shown in FIG. 4, the presentation processor 214 displays the first region R1 of the progress display section F3 corresponding to the drying process in the same display mode as the progress display section F2 corresponding to the circulation process that has been completed. The presentation processor 214 also displays the second region R2 of the progress display section F corresponding to the currently executing work process in the same display mode (second display mode) as the progress display section F corresponding to the next work process. For example, as shown in FIG. 4, the presentation processor 214 displays the second region R2 of the progress display section F3 corresponding to the drying process in the same display mode as the progress display section F4 corresponding to the next cooling process.

このように、提示処理部214は、複数の作業工程のうち作業が終了した作業工程に対応する進捗表示部Fと、前記第1進捗表示部Fのうち前記進捗状況に対応する部分(第1領域R1)とを、同一の表示態様で表示させる。そして、提示処理部214は、複数の作業工程の各進捗表示部Fの表示態様を作業の進行に応じて時間軸方向に変化させていく。これにより、ユーザーは、どの程度作業が進行しているのか、どの作業工程が終了したのか、現在の作業の進捗状況などを直感的に把握することが可能となる。 In this way, the presentation processing unit 214 displays the progress display section F corresponding to a work process that has been completed among the multiple work processes and the portion of the first progress display section F that corresponds to the progress status (first area R1) in the same display mode. The presentation processing unit 214 then changes the display mode of each progress display section F of the multiple work processes in the time axis direction according to the progress of the work. This allows the user to intuitively grasp how much work has progressed, which work processes have been completed, the current progress status of the work, etc.

さらに、提示処理部214は、前記第1作業工程の作業状態を表すテキスト情報を、複数の進捗表示部Fの近傍に表示させる。具体的に、提示処理部214は、乾燥処理情報D1(図2参照)に含まれる現在実行中の作業工程及び当該作業工程の作業状態(運転中、停止等)に対応するテキスト情報を、進捗状況ページP1の「状態」欄において、複数の進捗表示部Fの近傍に表示させる。例えば、1号機の乾燥機4が張込工程を実行中である場合、提示処理部214は、図3に示すように、「張込」の文字を進捗表示部F1~F5の上に表示させる。また例えば、2号機の乾燥機4が乾燥工程を実行中である場合、提示処理部214は、図3に示すように、「乾燥」の文字を進捗表示部F1~F5の上に表示させる。 Furthermore, the presentation processing unit 214 displays text information indicating the operation status of the first operation process near the multiple progress display units F. Specifically, the presentation processing unit 214 displays text information corresponding to the currently executed operation process and the operation status of the operation process (operating, stopped, etc.) included in the drying processing information D1 (see FIG. 2) near the multiple progress display units F in the "Status" column of the progress status page P1. For example, when the first dryer 4 is executing the loading process, the presentation processing unit 214 displays the word "loading" above the progress display units F1 to F5 as shown in FIG. 3. Also, when the second dryer 4 is executing the drying process, the presentation processing unit 214 displays the word "drying" above the progress display units F1 to F5 as shown in FIG. 3.

ここで、提示処理部214は、前記第1作業工程が終了した場合には、前記第1進捗表示部Fにおいて前記第1作業工程が終了したことを識別可能な進捗状況を表示させ、かつ、少なくとも作業の終了を表すテキスト情報を前記複数の進捗表示部Fの近傍に表示させる。例えば、3号機の乾燥機4が乾燥工程を終了した場合には、提示処理部214は、図3に示すように、乾燥工程に対応する進捗表示部F3全体を第1領域R1の表示態様(第1表示態様)で表示させ、かつ、「停止」の文字を進捗表示部F1~F5の上に表示させる。これにより、ユーザーは、乾燥工程が終了して乾燥機4が停止中であることを把握することができる。なお、提示処理部214は、停止対象の作業工程を識別可能なテキスト情報、例えば「停止(乾燥)」の文字を表示させてもよい。提示処理部214は、本発明の提示処理部の一例である。 Here, when the first work process is completed, the presentation processing unit 214 displays a progress status that can identify that the first work process has been completed in the first progress display unit F, and displays at least text information indicating the completion of the work near the multiple progress display units F. For example, when the third dryer 4 has completed the drying process, the presentation processing unit 214 displays the entire progress display unit F3 corresponding to the drying process in the display mode (first display mode) of the first region R1 as shown in FIG. 3, and displays the word "stop" above the progress display units F1 to F5. This allows the user to understand that the drying process has been completed and the dryer 4 is stopped. The presentation processing unit 214 may also display text information that can identify the work process to be stopped, such as the word "stop (drying)". The presentation processing unit 214 is an example of a presentation processing unit of the present invention.

他の実施形態として、提示処理部214は、前記進捗度に対応する進捗情報をテキスト形式で進捗状況ページP1の「状態」欄に表示させてもよい。例えば、提示処理部214は、1号機の乾燥機4に対応する「状態」欄に「張込(60%)」の文字を表示させ、2号機の乾燥機4に対応する「状態」欄に「乾燥(40%)」の文字を表示させる。 In another embodiment, the presentation processing unit 214 may display the progress information corresponding to the degree of progress in text format in the "Status" column of the progress status page P1. For example, the presentation processing unit 214 displays the words "Loaded (60%)" in the "Status" column corresponding to the first dryer 4, and displays the words "Drying (40%)" in the "Status" column corresponding to the second dryer 4.

なお、乾燥工程が終了して乾燥機4が停止状態になると、ユーザーは、乾燥機4の操作表示部43に表示される操作画面において、確認ボタンを押下、さらに次の作業工程(冷却工程)を開始させる開始ボタンを押下する。これにより、乾燥機4は冷却工程を開始する。 When the drying process is completed and the dryer 4 is stopped, the user presses the confirmation button on the operation screen displayed on the operation display unit 43 of the dryer 4, and then presses the start button to start the next operation process (cooling process). This causes the dryer 4 to start the cooling process.

[ユーザー端末3]
図1に示されるように、ユーザー端末3は、制御部31、記憶部32、操作表示部33、及び通信部34などを備える。ユーザー端末3は、例えば携帯電話、スマートフォン、タブレット端末、又はパーソナルコンピューターのような情報処理装置である。
[User terminal 3]
1, the user terminal 3 includes a control unit 31, a storage unit 32, an operation display unit 33, and a communication unit 34. The user terminal 3 is an information processing device such as a mobile phone, a smartphone, a tablet terminal, or a personal computer.

通信部34は、ユーザー端末3を有線又は無線で通信網N1に接続し、通信網N1を介して管理装置2などの外部機器との間で所定の通信プロトコルに従ったデータ通信を実行するための通信インターフェースである。 The communication unit 34 is a communication interface that connects the user terminal 3 to the communication network N1 by wire or wirelessly and performs data communication with external devices such as the management device 2 via the communication network N1 in accordance with a specified communication protocol.

操作表示部33は、各種のウェブページなどの情報を表示する液晶ディスプレイ又は有機ELディスプレイのような表示部と、操作を受け付けるタッチパネル、マウス、又はキーボードのような操作部とを備えるユーザーインターフェースである。 The operation display unit 33 is a user interface that includes a display unit such as a liquid crystal display or an organic EL display that displays information such as various web pages, and an operation unit such as a touch panel, mouse, or keyboard that accepts operations.

記憶部32は、各種の情報を記憶するHDD、SSD又はフラッシュメモリーなどの不揮発性の記憶部である。例えば、記憶部32には、ブラウザプログラム等の制御プログラムが記憶される。具体的に、前記ブラウザプログラムは、HTTP(Hypertext Transfer Protocol)などの通信プロトコルに従って管理装置2などの外部装置との間で通信処理を制御部31に実行させるための制御プログラムである。また、前記ブラウザプログラムは、管理装置2との間で予め定められた通信プロトコルに従って通信処理を実行するための専用アプリケーションであることも考えられる。 The storage unit 32 is a non-volatile storage unit such as an HDD, SSD, or flash memory that stores various types of information. For example, a control program such as a browser program is stored in the storage unit 32. Specifically, the browser program is a control program that causes the control unit 31 to execute communication processing with an external device such as the management device 2 according to a communication protocol such as HTTP (Hypertext Transfer Protocol). The browser program may also be a dedicated application for executing communication processing with the management device 2 according to a predetermined communication protocol.

制御部31は、CPU、ROM、及びRAMなどの制御機器を有する。前記CPUは、各種の演算処理を実行するプロセッサーである。前記ROMは、前記CPUに各種の処理を実行させるためのBIOS及びOSなどの制御プログラムが予め記憶された不揮発性の記憶部である。前記RAMは、各種の情報を記憶する揮発性又は不揮発性の記憶部であり、前記CPUが実行する各種の処理の一時記憶メモリー(作業領域)として使用される。そして、制御部31は、前記ROM又は記憶部32に予め記憶された各種の制御プログラムを前記CPUで実行することによりユーザー端末3を制御する。 The control unit 31 has control devices such as a CPU, a ROM, and a RAM. The CPU is a processor that executes various arithmetic operations. The ROM is a non-volatile storage unit in which control programs such as a BIOS and an OS for causing the CPU to execute various processes are stored in advance. The RAM is a volatile or non-volatile storage unit that stores various information, and is used as a temporary storage memory (work area) for the various processes executed by the CPU. The control unit 31 controls the user terminal 3 by having the CPU execute various control programs that are stored in advance in the ROM or the storage unit 32.

具体的に、制御部31は、記憶部32に記憶されている前記ブラウザプログラムに従って各種の処理を実行することによりブラウザ処理部311として機能する。ブラウザ処理部311は、管理装置2から通信網N1を介して提供されるウェブページを操作表示部33に表示させ、操作表示部33に対する操作を管理装置2に入力するブラウザ処理を実行することが可能である。すなわち、ユーザー端末3は、制御部31によって前記ブラウザプログラムが実行されることにより、管理装置2の操作用端末として機能することが可能である。なお、制御部31に含まれる一部又は全部の処理部は電子回路で構成されていてもよい。 Specifically, the control unit 31 functions as a browser processing unit 311 by executing various processes according to the browser program stored in the memory unit 32. The browser processing unit 311 is capable of executing browser processing to display a web page provided from the management device 2 via the communication network N1 on the operation display unit 33 and input operations on the operation display unit 33 to the management device 2. In other words, the user terminal 3 can function as an operation terminal for the management device 2 by the control unit 31 executing the browser program. Note that some or all of the processing units included in the control unit 31 may be configured with electronic circuits.

具体的に、ユーザー端末3では、管理装置2で提供される乾燥機サポートサービスのウェブサイト(乾燥機サポートサイト)に対応する所定のURLへのアクセス要求を行うためのユーザー操作が行われた場合に、制御部31が、管理装置2から前記乾燥機サポートサイトのウェブページ(進捗状況ページP1)のデータを取得して、操作表示部33に前記ウェブサイトの進捗状況ページP1(図3参照)を表示させる。 Specifically, when a user operation is performed on the user terminal 3 to request access to a specific URL corresponding to a website (dryer support site) of the dryer support service provided by the management device 2, the control unit 31 acquires data of the webpage (progress page P1) of the dryer support site from the management device 2, and causes the operation display unit 33 to display the progress page P1 of the website (see Figure 3).

なお、例えば前記所定のURLへのアクセス要求は、予め登録されたウェブサイトの一覧からの選択操作、又はテキスト入力操作などによって行われる。また、ユーザー端末3に管理装置2に対応する専用アプリケーションがインストールされている場合には、ユーザー端末3のユーザーが当該専用アプリケーションを起動する操作を行うことにより操作表示部33に前記乾燥機サポートサイトの進捗状況ページP1が表示される。 For example, a request to access the specified URL is made by a selection operation from a list of preregistered websites, a text input operation, or the like. In addition, if a dedicated application corresponding to the management device 2 is installed in the user terminal 3, the progress status page P1 of the dryer support site is displayed on the operation display unit 33 when the user of the user terminal 3 performs an operation to start the dedicated application.

ユーザーは、乾燥機4から離れた場所において、ユーザー端末3に表示される進捗状況ページP1により乾燥機4の前記乾燥処理の進捗状況を把握することができる。 A user can grasp the progress of the drying process of the dryer 4 from a location away from the dryer 4 by viewing the progress page P1 displayed on the user terminal 3.

[進捗状況提示処理]
以下、図5を参照しつつ、管理装置2の制御部21によって実行される前記進捗状況提示処理の一例について説明する。例えば、前記進捗状況提示処理は、ユーザーがユーザー端末3において前記乾燥機サポートサイトにログインした場合に制御部21によって開始される。また、前記進捗状況提示処理は、乾燥機4に対する所定のユーザー操作に応じて開始されてもよい。
[Progress Status Presentation Processing]
An example of the progress status presentation process executed by the control unit 21 of the management device 2 will be described below with reference to Fig. 5. For example, the progress status presentation process is started by the control unit 21 when a user logs in to the dryer support site on the user terminal 3. The progress status presentation process may also be started in response to a predetermined user operation on the dryer 4.

なお、本願発明は、制御部21により前記進捗状況提示処理の一部又は全部を実行する進捗状況提示方法(管理方法)の発明、又は、当該進捗状況提示方法の一部又は全部を制御部21に実行させるための進捗状況提示プログラム(管理プログラム)の発明として捉えてもよい。また、前記進捗状況提示処理は、一又は複数のプロセッサーによって実行されてもよい。例えば、前記進捗状況提示処理は、管理装置2の制御部21及び乾燥機4の制御部41によって協働して実行されてもよい。 The present invention may be understood as an invention of a progress status presentation method (management method) in which the control unit 21 executes part or all of the progress status presentation process, or an invention of a progress status presentation program (management program) for causing the control unit 21 to execute part or all of the progress status presentation method. The progress status presentation process may also be executed by one or more processors. For example, the progress status presentation process may be executed by the control unit 21 of the management device 2 and the control unit 41 of the dryer 4 in cooperation with each other.

ステップS1において、制御部21は、各乾燥機4から、乾燥対象の穀物の種類、張込量、現在実行中の作業工程(第1作業工程)を表す作業状態、当該作業工程の開始時刻、当該作業工程の終了予定時刻、水分量などの前記処理情報を取得したか否かを判定する。前記処理情報が取得されたと判定された場合(S1:Yes)、処理がステップS2に移行する。制御部21は、前記処理情報を取得するまで待機する(S1:No)。制御部21は、前記処理情報が取得すると、取得した各情報を乾燥処理情報D1(図2参照)に登録する。 In step S1, the control unit 21 determines whether or not it has acquired the processing information from each dryer 4, such as the type of grain to be dried, the loading amount, the work status indicating the currently executing work process (first work process), the start time of the work process, the scheduled end time of the work process, and the moisture content. If it is determined that the processing information has been acquired (S1: Yes), the process proceeds to step S2. The control unit 21 waits until it acquires the processing information (S1: No). When the control unit 21 acquires the processing information, it registers each piece of acquired information in the drying processing information D1 (see FIG. 2).

ステップS2において、制御部21は、各乾燥機4の現在実行中の作業工程(第1作業工程)を特定する。制御部41は、乾燥処理情報D1に登録された「状態」の情報により第1作業工程を特定する。 In step S2, the control unit 21 identifies the work process (first work process) currently being performed by each dryer 4. The control unit 41 identifies the first work process based on the "status" information registered in the drying process information D1.

ステップS3において、制御部21は、各乾燥機4の前記第1作業工程の進捗度を算出する。具体的に、制御部21は、前記第1作業工程の開始時刻及び終了予定時刻と、現在時刻とに基づいて、各乾燥機4の前記第1作業工程の進捗度を算出する。すなわち、制御部21は、前記式(1)により進捗度を算出する。制御部21は、算出した進捗度を乾燥処理情報D1に登録する(図2参照)。 In step S3, the control unit 21 calculates the degree of progress of the first work process for each dryer 4. Specifically, the control unit 21 calculates the degree of progress of the first work process for each dryer 4 based on the start time and scheduled end time of the first work process and the current time. That is, the control unit 21 calculates the degree of progress using the formula (1). The control unit 21 registers the calculated degree of progress in the drying process information D1 (see FIG. 2).

ステップS4において、制御部21は、前記進捗度が「0」より大きくかつ「1」未満(0<「進捗度」<1)であるか否かを判定する。前記進捗度が「0」より大きくかつ「1」未満であると判定された場合(S4:Yes)、処理がステップS5に移行する。一方、前記進捗度が「0」又は「1」と判定された場合(S4:No)、処理がステップS41に移行する。例えば、作業工程が実行中である場合、前記進捗度は「0」より大きくかつ「1」未満になるため、処理はステップS5に移行する。一方、例えば、作業工程が終了した場合、前記進捗度は「0」又は「1」になるため、処理はステップS41に移行する。 In step S4, the control unit 21 determines whether the degree of progress is greater than "0" and less than "1" (0 < "degree of progress" < 1). If it is determined that the degree of progress is greater than "0" and less than "1" (S4: Yes), the process proceeds to step S5. On the other hand, if the degree of progress is determined to be "0" or "1" (S4: No), the process proceeds to step S41. For example, if a work process is being carried out, the degree of progress is greater than "0" and less than "1", so the process proceeds to step S5. On the other hand, if a work process has ended, the degree of progress is greater than "0" or "1", so the process proceeds to step S41.

ステップS5において、制御部21は、前記第1作業工程の作業状態を表示させる。具体的に、制御部21は、前記第1作業工程の作業状態を表すテキスト情報を、進捗状況ページP1の「状態」欄において、複数の進捗表示部Fの近傍に表示させる。例えば図3に示すように、制御部21は、1号機の乾燥機4が張込工程を実行中である場合に「張込」の文字を進捗表示部F1~F5の上に表示させ、2号機の乾燥機4が乾燥工程を実行中である場合に「乾燥」の文字を進捗表示部F1~F5の上に表示させる。 In step S5, the control unit 21 displays the work status of the first work process. Specifically, the control unit 21 displays text information indicating the work status of the first work process in the "Status" column of the progress status page P1 near the multiple progress display units F. For example, as shown in FIG. 3, when the first dryer 4 is performing the loading process, the control unit 21 displays the word "Loading" above the progress display units F1 to F5, and when the second dryer 4 is performing the drying process, the control unit 21 displays the word "Drying" above the progress display units F1 to F5.

ステップS6において、制御部21は、複数の作業工程のそれぞれの進捗状況を表示する複数の進捗表示部Fにおいて、前記第1作業工程の進捗状況を提示する。例えば図3に示すように、制御部21は、各乾燥機4に対応させて、進捗表示部F1~F5を作業順に時間軸方向に並べて表示させ、かつ、前記第1作業工程に対応する第1進捗表示部Fに前記第1作業工程の進捗状況を表示させる。例えば図4に示すように、制御部21は、乾燥工程に対応する進捗表示部F3において、開始時刻t1に対応する開始位置X1から前記進捗度に対応する進捗位置X2までの第1領域R1を第1表示態様で表示させ、進捗位置X2から終了予定時刻t3に対応する終了位置X3までの第2領域R2を第2表示態様で表示させる。また、制御部21は、前記第1作業工程の前に終了した作業工程が存在する場合には終了した作業工程に対応する進捗表示部Fを前記第1表示態様で表示させる。さらに、制御部21は、前記第1作業工程の後に作業工程が存在する場合には後の作業工程に対応する進捗表示部Fを前記第2表示態様で表示させる。ステップS6の後、処理がステップS1に戻り、制御部21は上述の処理を繰り返す。 In step S6, the control unit 21 presents the progress of the first work process in a plurality of progress display sections F that display the progress of each of a plurality of work processes. For example, as shown in FIG. 3, the control unit 21 displays the progress display sections F1 to F5 in the order of work in the time axis direction corresponding to each dryer 4, and displays the progress of the first work process in the first progress display section F corresponding to the first work process. For example, as shown in FIG. 4, the control unit 21 displays the first region R1 from the start position X1 corresponding to the start time t1 to the progress position X2 corresponding to the progress degree in the first display mode in the progress display section F3 corresponding to the drying process, and displays the second region R2 from the progress position X2 to the end position X3 corresponding to the scheduled end time t3 in the second display mode. In addition, if there is a work process that has been completed before the first work process, the control unit 21 displays the progress display section F corresponding to the completed work process in the first display mode. Furthermore, if there is a work process after the first work process, the control unit 21 displays the progress display section F corresponding to the subsequent work process in the second display mode. After step S6, the process returns to step S1, and the control unit 21 repeats the above-mentioned process.

一方、前記ステップS4において、前記進捗度が「0」又は「1」と判定された場合には(S4:No)、ステップS41が実行される。ステップS41において、制御部21は、前記第1作業工程が終了して乾燥機4が停止していることを表す情報を表示させる。具体的に、制御部21は、前記第1作業工程の作業状態「停止」を表すテキスト情報を、進捗状況ページP1の「状態」欄において、複数の進捗表示部Fの近傍に表示させる。例えば図3に示すように、制御部21は、3号機の乾燥機4が乾燥工程を終了して停止中である場合に「停止」の文字を進捗表示部F1~F5の上に表示させる。 On the other hand, if the progress level is determined to be "0" or "1" in step S4 (S4: No), step S41 is executed. In step S41, the control unit 21 displays information indicating that the first work process has ended and the dryer 4 has stopped. Specifically, the control unit 21 displays text information indicating the work status of the first work process as "stopped" near multiple progress display units F in the "status" column of the progress status page P1. For example, as shown in FIG. 3, the control unit 21 displays the word "stopped" above the progress display units F1 to F5 when the third dryer 4 has finished the drying process and is stopped.

ステップS42において、制御部21は、複数の作業工程のそれぞれの進捗状況を表示する複数の進捗表示部Fにおいて、前記第1作業工程の進捗状況(終了状態)を提示する。例えば図3に示すように、制御部21は、3号機の乾燥機4について、乾燥工程に対応する進捗表示部F3全体を前記第1表示態様で表示させる。また、制御部21は、前記第1作業工程の前に終了した作業工程が存在する場合には終了した作業工程に対応する進捗表示部Fを前記第1表示態様で表示させる。さらに、制御部21は、前記第1作業工程の後に作業工程が存在する場合には後の作業工程に対応する進捗表示部Fを前記第2表示態様で表示させる。ステップS42の後、処理がステップS1に戻り、制御部21は上述の処理を繰り返す。 In step S42, the control unit 21 presents the progress status (end state) of the first work process in multiple progress display sections F that display the progress status of each of the multiple work processes. For example, as shown in FIG. 3, the control unit 21 displays the entire progress display section F3 corresponding to the drying process for the third dryer 4 in the first display mode. Furthermore, if there is a completed work process before the first work process, the control unit 21 displays the progress display section F corresponding to the completed work process in the first display mode. Furthermore, if there is a work process after the first work process, the control unit 21 displays the progress display section F corresponding to the subsequent work process in the second display mode. After step S42, the process returns to step S1, and the control unit 21 repeats the above-mentioned process.

前記進捗状況提示処理により、ユーザー端末3に各乾燥機4において実行される前記乾燥処理の進捗状況が表示される。また、ユーザーが進捗状況ページP1において「自動更新」を設定した場合には(図3参照)、前記進捗状況が自動更新されて表示される。 The progress status presentation process displays the progress status of the drying process being performed in each dryer 4 on the user terminal 3. In addition, if the user sets "automatic update" on the progress status page P1 (see Figure 3), the progress status is automatically updated and displayed.

以上説明したように、管理装置2は、乾燥機4が現在実行中の作業工程である第1作業工程を特定し、前記複数の作業工程のそれぞれの進捗状況を表示する複数の進捗表示部Fにおいて、前記第1作業工程の進捗状況を提示する。これにより、ユーザーは全体の作業工程に対する現在実行中の作業工程の進捗状況を把握することが可能である。 As described above, the management device 2 identifies the first work process, which is the work process currently being performed by the dryer 4, and presents the progress of the first work process in multiple progress display sections F that display the progress of each of the multiple work processes. This allows the user to grasp the progress of the currently performed work process relative to the overall work process.

例えば、図3に示す進捗状況ページP1により、ユーザーは、1号機の乾燥機4が5個の作業工程のうち張込工程を現在実行中であり、また張込工程の作業が6割程度終了していることを把握することができる。また、ユーザーは、2号機の乾燥機4が5個の作業工程のうち乾燥工程を現在実行中であり、また乾燥工程の作業が4割程度終了していることを把握することができる。また、ユーザーは、3号機の乾燥機4が5個の作業工程のうち乾燥工程が終了して停止中であり、また乾燥工程の作業が全て終了していることを把握することができる。このように、管理装置2は、現在の作業の進捗位置を全作業工程の中に表示させ、かつ作業の進捗に応じて進捗位置を移動させる。これにより、ユーザーは直感的に作業の進捗状況を把握することができる。 For example, the progress status page P1 shown in FIG. 3 allows the user to know that the No. 1 dryer 4 is currently performing the loading process out of the five work processes, and that about 60% of the work in the loading process has been completed. The user can also know that the No. 2 dryer 4 is currently performing the drying process out of the five work processes, and that about 40% of the work in the drying process has been completed. The user can also know that the No. 3 dryer 4 has completed the drying process out of the five work processes and is stopped, and that all work in the drying process has been completed. In this way, the management device 2 displays the progress position of the current work among all work processes, and moves the progress position according to the progress of the work. This allows the user to intuitively understand the progress of the work.

[他の実施形態]
以下、本実施形態に係る管理システム1の他の実施形態について説明する。
[Other embodiments]
Hereinafter, other embodiments of the management system 1 according to the present embodiment will be described.

前記実施形態では、算出処理部213は、乾燥機4から出力される現在実行中の第1作業工程の開始時刻及び終了予定時刻と現在時刻とに基づいて、前記第1作業工程の進捗度を算出している。これに対して、他の実施形態として、算出処理部213は、過去の作業履歴に基づいて前記第1作業工程の終了予定時刻を予測し、乾燥機4から取得する前記第1作業工程の開始時刻と予測した前記終了予定時刻と現在時刻とに基づいて前記第1作業工程の進捗度を算出してもよい。 In the above embodiment, the calculation processing unit 213 calculates the degree of progress of the first work process based on the start time and scheduled end time of the first work process currently being executed output from the dryer 4 and the current time. In contrast, in another embodiment, the calculation processing unit 213 may predict the scheduled end time of the first work process based on past work history, and calculate the degree of progress of the first work process based on the start time of the first work process obtained from the dryer 4, the predicted scheduled end time, and the current time.

具体的に、前記作業履歴には、過去に各乾燥機4で実行された乾燥処理に含まれる各作業工程の開始時刻、終了時刻、張込量などの実績情報が互いに関連付けられて登録され、当該作業履歴は管理装置2の記憶部22に記憶される。取得処理部211は、乾燥機4から現在実行中の作業工程(第1作業工程)を表す作業状態、当該第1作業工程の開始時刻を取得し、前記作業履歴から当該第1作業工程に関連付けられた開始時刻及び終了時刻を取得する。例えば、取得処理部211は、前記作業履歴から、今回の乾燥処理における張込量と同等の張込量が関連付けられた一又は複数の前記第1作業工程の開始時刻及び終了時刻を取得する。 Specifically, the work history registers performance information such as the start time, end time, and loading amount of each work process included in the drying process performed in the past by each dryer 4 in association with each other, and the work history is stored in the memory unit 22 of the management device 2. The acquisition processing unit 211 acquires from the dryer 4 the work state representing the work process currently being performed (first work process) and the start time of the first work process, and acquires the start time and end time associated with the first work process from the work history. For example, the acquisition processing unit 211 acquires from the work history the start time and end time of one or more of the first work processes associated with a loading amount equivalent to the loading amount in the current drying process.

算出処理部213は、前記作業履歴から取得された前記第1作業工程に対応する一又は複数の開始時刻及び終了時刻に基づいて、過去の前記第1作業工程に対応する一又は複数の作業所要時間を算出する。また、算出処理部213は、算出した一又は複数の作業所要時間に基づいて、今回の前記第1作業工程に対応する作業所要時間及び終了予定時刻を予測する。例えば、算出処理部213は、複数の作業所要時間の平均時間を第1作業工程に対応する作業所要時間として予測し、乾燥機4から取得した前記開始時刻に当該作業所要時間を加算して前記第1作業工程に対応する終了予定時刻を予測する。そして、算出処理部213は、乾燥機4から取得した前記開始時刻と、予測した前記終了予定時刻と、現在時刻とに基づいて、前記式(1)により前記第1作業工程の進捗度を算出する。 The calculation processing unit 213 calculates one or more required work times corresponding to the first work process in the past based on one or more start times and end times corresponding to the first work process acquired from the work history. The calculation processing unit 213 also predicts the required work time and scheduled end time corresponding to the first work process this time based on the calculated one or more required work times. For example, the calculation processing unit 213 predicts the average time of multiple required work times as the required work time corresponding to the first work process, and adds the required work time to the start time acquired from the dryer 4 to predict the scheduled end time corresponding to the first work process. The calculation processing unit 213 then calculates the progress of the first work process using the formula (1) based on the start time acquired from the dryer 4, the predicted scheduled end time, and the current time.

これにより、例えば乾燥機4において終了予定時刻を算出することが困難な作業工程(例えば張込工程)について、適切な進捗度を算出することができる。このため、前記作業工程についても適切な進捗状況をユーザーに提示することができる。なお、算出処理部213は、予測した前記終了予定時刻の情報を乾燥機4に出力してもよい。この場合、乾燥機4は、例えば取得した前記終了予定時刻に基づいて現在実行中の作業工程を停止させてもよい。 This makes it possible to calculate an appropriate degree of progress for a work process (e.g., a loading process) for which it is difficult to calculate the scheduled end time in the dryer 4. This makes it possible to present the user with an appropriate progress status for the work process as well. The calculation processing unit 213 may output information on the predicted scheduled end time to the dryer 4. In this case, the dryer 4 may stop the work process currently being performed based on the acquired scheduled end time, for example.

また、前記実施形態では、提示処理部214は、図3に示すように、複数の進捗表示部Fにおいて、作業が終了した作業工程に対応する進捗表示部Fと、現在実行中の作業工程に対応する進捗表示部Fのうち進捗位置(現在位置)までの第1領域R1(図4参照)とを、同一の表示態様(第1表示態様)で表示させている。すなわち、提示処理部214は、複数の進捗表示部Fにおいて、最初の作業工程(ここでは張込工程)の開始時刻から現在時刻までの作業時間(進行時間)に対応する領域を同一の表示態様で表示させている。 In the above embodiment, as shown in FIG. 3, the presentation processing unit 214 displays in the multiple progress display units F the progress display unit F corresponding to the work process for which work has been completed and the first region R1 (see FIG. 4) up to the progress position (current position) in the progress display unit F corresponding to the work process currently being performed in the same display mode (first display mode). In other words, the presentation processing unit 214 displays in the multiple progress display units F the region corresponding to the work time (progress time) from the start time of the first work process (here, the loading process) to the current time in the same display mode.

これに対して、他の実施形態として、提示処理部214は、図6に示すように、複数の進捗表示部Fのそれぞれに個別の表示態様を割り当ててもよい。なお、図6には、進捗状況ページP1に含まれる進捗状況(作業状態)の一部を示している。例えば、提示処理部214は、張込工程に対応する進捗表示部F1に第1の表示色を割り当て、循環工程に対応する進捗表示部F2に第2の表示色を割り当て、乾燥工程に対応する進捗表示部F3に第3の表示色を割り当て、冷却工程に対応する進捗表示部F4に第4の表示色を割り当て、排出工程に対応する進捗表示部F5に第5の表示色を割り当てる。そして、提示処理部214は、各進捗表示部Fにおいて、第1領域R1を前記割り当てた表示色で表示させ、第2領域R2を基準色(例えば白色)で表示させる。これにより、ユーザーは、現在実行中の作業工程を直感的に把握することができる。 In contrast to this, as another embodiment, the presentation processing unit 214 may assign individual display modes to each of the multiple progress display sections F, as shown in FIG. 6. FIG. 6 shows a portion of the progress (work state) included in the progress status page P1. For example, the presentation processing unit 214 assigns a first display color to the progress display section F1 corresponding to the loading process, a second display color to the progress display section F2 corresponding to the circulation process, a third display color to the progress display section F3 corresponding to the drying process, a fourth display color to the progress display section F4 corresponding to the cooling process, and a fifth display color to the progress display section F5 corresponding to the discharge process. Then, the presentation processing unit 214 displays the first region R1 in the assigned display color and the second region R2 in a reference color (e.g., white) in each progress display section F. This allows the user to intuitively grasp the work process currently being performed.

また、他の実施形態として、提示処理部214は、複数の作業工程のうち作業が終了した作業工程に対応する進捗表示部Fと、第1進捗表示部Fのうち前記進捗状況に対応する部分とを、互いに異なる表示態様で表示させてもよい。例えば図7に示すように、提示処理部214は、複数の作業工程のうち作業が終了した作業工程に対応する進捗表示部Fを第3表示態様で表示させ、現在実行中の作業工程に対応する進捗表示部Fを第1表示態様で表示させ、未だ実行していない後の作業工程に対応する進捗表示部Fを第2表示態様で表示させてもよい。これにより、ユーザーは、終了した作業工程及び現在実行中の作業工程を容易に把握することができる。 In another embodiment, the presentation processing unit 214 may display the progress display section F corresponding to a work process that has been completed among the multiple work processes and the portion of the first progress display section F corresponding to the progress status in different display modes. For example, as shown in FIG. 7, the presentation processing unit 214 may display the progress display section F corresponding to a work process that has been completed among the multiple work processes in the third display mode, the progress display section F corresponding to a work process that is currently being performed in the first display mode, and the progress display section F corresponding to a subsequent work process that has not yet been performed in the second display mode. This allows the user to easily grasp the work processes that have been completed and the work processes currently being performed.

また、他の実施形態として、提示処理部214は、複数の作業工程のそれぞれに対応する進捗表示部Fの大きさ(幅)を、各作業工程の作業所要時間に応じた大きさで表示させてもよい。例えば図8に示すように、乾燥工程の作業所要時間が他の作業工程の作業所要時間よりも長い場合に、提示処理部214は、乾燥工程に対応する進捗表示部F3の時間軸方向の幅を他の作業工程に対応する進捗表示部の幅よりも長くして表示させる。 In another embodiment, the presentation processing unit 214 may display the size (width) of the progress display section F corresponding to each of the multiple work processes in a size that corresponds to the required work time for each work process. For example, as shown in FIG. 8, when the required work time for the drying process is longer than the required work times for the other work processes, the presentation processing unit 214 displays the width of the progress display section F3 corresponding to the drying process in the time axis direction longer than the width of the progress display sections corresponding to the other work processes.

また、他の実施形態として、乾燥機4ごとに乾燥処理の作業工程が異なる場合に、提示処理部214は、図8に示すように、乾燥機4ごとの全体の進捗表示部Fの幅を同一の幅に揃えて表示させてもよい。 In another embodiment, when the drying process steps are different for each dryer 4, the presentation processing unit 214 may display the overall progress display section F for each dryer 4 with the same width, as shown in FIG. 8.

また、前記実施形態では、提示処理部214は、前記第1作業工程の進捗状況を進捗表示部Fの表示態様を変化させることによりユーザーに提示させている。これに対して、他の実施形態として、提示処理部214は、図9に示すように、前記第1作業工程の進捗状況を進捗マークM1(本発明の識別情報の一例)により提示してもよい。具体的に、提示処理部214は、前記第1作業工程に対応する第1進捗表示部Fにおいて、前記進捗度に応じた位置(進捗位置)に進捗マークM1を表示させる。なお、提示処理部214は、前記実施形態のように、さらに前記第1作業工程に対応する進捗表示部Fの表示態様を変化させてもよい。 In addition, in the above embodiment, the presentation processing unit 214 presents the progress status of the first work process to the user by changing the display mode of the progress display unit F. In contrast to this, in another embodiment, the presentation processing unit 214 may present the progress status of the first work process by a progress mark M1 (an example of the identification information of the present invention) as shown in FIG. 9. Specifically, the presentation processing unit 214 displays the progress mark M1 at a position (progress position) according to the progress level in the first progress display unit F corresponding to the first work process. Note that the presentation processing unit 214 may further change the display mode of the progress display unit F corresponding to the first work process, as in the above embodiment.

また、前記実施形態では、提示処理部214は、複数の作業工程のそれぞれに対応する複数の進捗表示部Fを時間軸方向に作業順に並べて表示させている。これに対して、他の実施形態として、提示処理部214は、図10に示すように、複数の作業工程のそれぞれに対応する複数の進捗表示部Fを、各作業工程内における時間軸方向に直交する方向に作業順に並べて表示させてもよい。図10に示す例では、提示処理部214は、張込工程、循環工程、乾燥工程、冷却工程、及び排出工程を下方にこの順に並べて表示させる。 In addition, in the above embodiment, the presentation processing unit 214 displays multiple progress display sections F corresponding to each of the multiple work processes in the order of work along the time axis. In contrast to this, in another embodiment, the presentation processing unit 214 may display multiple progress display sections F corresponding to each of the multiple work processes in the order of work along a direction perpendicular to the time axis within each work process, as shown in FIG. 10. In the example shown in FIG. 10, the presentation processing unit 214 displays the loading process, circulation process, drying process, cooling process, and discharge process in this order at the bottom.

また、他の実施形態として、提示処理部214は、図11に示すように、複数の作業工程のそれぞれに対応する複数の進捗表示部Fを円グラフで表示させてもよい。図11に示すように、円全体で乾燥処理全体を示し、円を5等分した各領域が各作業工程に対応する進捗表示部Fに相当する。提示処理部214は、円の中心を基準として進捗度に応じて進捗表示部Fの表示態様を変化させることにより第1作業工程の進捗状況を提示する。 In another embodiment, the presentation processing unit 214 may display multiple progress display sections F corresponding to multiple work processes in a pie chart, as shown in FIG. 11. As shown in FIG. 11, the entire circle indicates the entire drying process, and each of the five equal areas of the circle corresponds to a progress display section F corresponding to each work process. The presentation processing unit 214 presents the progress of the first work process by changing the display mode of the progress display section F according to the degree of progress based on the center of the circle.

1 :管理システム
2 :管理装置
3 :ユーザー端末
4 :乾燥機
21 :制御部
22 :記憶部
23 :操作表示部
24 :通信部
211 :取得処理部
212 :特定処理部
213 :算出処理部
214 :提示処理部
F :進捗表示部
REFERENCE SIGNS LIST 1: Management system 2: Management device 3: User terminal 4: Dryer 21: Control unit 22: Storage unit 23: Operation display unit 24: Communication unit 211: Acquisition processing unit 212: Identification processing unit 213: Calculation processing unit 214: Presentation processing unit F: Progress display unit

Claims (15)

乾燥機に穀物を張り込む張込工程と前記張込工程に続く後工程とを含む複数の作業工程を順に実行することにより穀物を乾燥させる、第1乾燥機及び第2乾燥機のそれぞれにおいて、現在実行中の作業工程である第1作業工程を特定する特定処理部と、
前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記複数の作業工程のそれぞれの進捗状況を表示する複数の進捗表示部において、前記特定処理部により特定される前記第1作業工程の進捗状況を提示する提示処理部と、
を備え、
前記提示処理部は、前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する予め設定されたそれぞれの表示欄において、当該表示欄の表示幅に合わせて前記複数の進捗表示部を作業順に連結して表示させ、かつ、前記複数の進捗表示部のそれぞれの表示幅を、前記穀物の張込量に基づいて算出される各作業工程の作業所要時間の割合に応じた幅で表示させ、
さらに、前記提示処理部は、前記第1乾燥機が実行する少なくとも一つの前記作業工程と、前記第2乾燥機が実行する少なくとも一つの前記作業工程とが互いに異なる場合に、前記第1乾燥機が実行する前記複数の作業工程に対応する前記複数の進捗表示部を連結した全体幅と、前記第2乾燥機が実行する前記複数の作業工程に対応する前記複数の進捗表示部を連結した全体幅とを同じ幅で表示させる、管理装置。
a specific processing unit that identifies a first work process, which is a work process currently being performed , in each of a first dryer and a second dryer , the first dryer and the second dryer sequentially executing a plurality of work processes including a loading process of loading grain into the dryer and a post-process subsequent to the loading process;
a presentation processing unit that presents a progress status of the first work process identified by the identification processing unit in a plurality of progress display units that display a progress status of each of the plurality of work processes corresponding to the first dryer and the second dryer ;
Equipped with
the presentation processing unit displays the plurality of progress display sections in a linked order of operation in accordance with a display width of each of the display sections set in advance corresponding to the first dryer and the second dryer, and displays the display width of each of the plurality of progress display sections in a width corresponding to a proportion of a required work time for each work process calculated based on the loading amount of the grain ;
Furthermore, when at least one of the work processes performed by the first dryer and at least one of the work processes performed by the second dryer are different from each other, the presentation processing unit displays an overall width of the connected progress display units corresponding to the multiple work processes performed by the first dryer and an overall width of the connected progress display units corresponding to the multiple work processes performed by the second dryer in the same width .
記提示処理部は、前記第1乾燥機及び前記第2乾燥機のそれぞれについて、前記穀物の張込量と、前記張込量に基づいて算出される現在実行中の前記第1作業工程の終了予定時刻とを、前記複数の進捗表示部に対応付けて表示させる、
請求項1に記載の管理装置。
the presentation processing unit causes the loading amount of the grain and the scheduled end time of the first work process currently being executed, which is calculated based on the loading amount, to be displayed on the plurality of progress display units for each of the first dryer and the second dryer.
The management device according to claim 1 .
前記提示処理部は、前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記表示欄において、前記第1作業工程に対応する第1進捗表示部に前記第1作業工程の進捗状況を表示させる、
請求項1又は2に記載の管理装置。
the presentation processing unit causes a first progress display unit corresponding to the first work process to display a progress status of the first work process in the display field corresponding to each of the first dryer and the second dryer ,
The management device according to claim 1 or 2 .
前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記第1作業工程の現在の進捗度を算出する算出処理部をさらに備え、
前記提示処理部は、前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記表示欄において、前記第1作業工程の作業所要時間を規定する前記第1進捗表示部に、前記算出処理部により算出される前記進捗度に対応する識別情報を表示させる、
請求項に記載の管理装置。
A calculation processing unit is further provided that calculates a current progress degree of the first work process corresponding to each of the first dryer and the second dryer ,
the presentation processing unit causes the first progress display unit, which specifies a required work time for the first work process, to display identification information corresponding to the degree of progress calculated by the calculation processing unit in the display fields corresponding to the first dryer and the second dryer, respectively.
The management device according to claim 3 .
前記提示処理部は、前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記表示欄において、前記第1作業工程の開始時刻から終了予定時刻までの前記作業所要時間を規定する前記第1進捗表示部において、前記開始時刻に対応する開始位置から前記進捗度に対応する進捗位置までの表示態様を、前記進捗位置から前記終了予定時刻に対応する終了位置までの表示態様とは異ならせて表示させる、
請求項に記載の管理装置。
the presentation processing unit, in the display fields corresponding to the first dryer and the second dryer, displays in a different manner from a display mode from a start position corresponding to the start time to a progress position corresponding to the progress degree in the first progress display unit that specifies the required work time from a start time to a scheduled end time of the first work process, to a display mode from the progress position corresponding to the progress degree to an end position corresponding to the scheduled end time.
The management device according to claim 4 .
前記第1乾燥機及び前記第2乾燥機のそれぞれから、前記第1作業工程を表す作業状態と前記開始時刻と前記終了予定時刻とを取得する取得処理部をさらに備え、
前記算出処理部は、前記取得処理部により取得される前記開始時刻及び前記終了予定時刻と、現在時刻とに基づいて、前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記第1作業工程の前記進捗度を算出する、
請求項に記載の管理装置。
an acquisition processing unit that acquires a work state representing the first work process, the start time, and the scheduled end time from each of the first dryer and the second dryer ,
The calculation processing unit calculates the degree of progress of the first work process corresponding to each of the first dryer and the second dryer based on the start time and the scheduled end time acquired by the acquisition processing unit and a current time.
The management device according to claim 5 .
前記第1乾燥機及び前記第2乾燥機のそれぞれから前記第1作業工程を表す作業状態と前記開始時刻とを取得し、前記複数の作業工程に関する作業履歴を記憶する記憶部から前記第1作業工程に対応する作業履歴を取得する取得処理部をさらに備え、
前記算出処理部は、前記取得処理部により取得される前記作業履歴に基づいて前記第1作業工程の前記終了予定時刻を予測し、前記取得処理部により取得される前記開始時刻と予測した前記終了予定時刻と現在時刻とに基づいて、前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記第1作業工程の前記進捗度を算出する、
請求項に記載の管理装置。
an acquisition processing unit that acquires a work state representing the first work process and the start time from each of the first dryer and the second dryer , and acquires a work history corresponding to the first work process from a storage unit that stores work histories related to the plurality of work processes;
the calculation processing unit predicts the scheduled end time of the first work process based on the work history acquired by the acquisition processing unit, and calculates the degree of progress of the first work process corresponding to each of the first dryer and the second dryer based on the start time acquired by the acquisition processing unit, the predicted scheduled end time, and a current time.
The management device according to claim 5 .
前記提示処理部は、前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記表示欄において、前記複数の作業工程のうち作業が終了した作業工程に対応する進捗表示部と、前記第1進捗表示部のうち前記進捗状況に対応する部分とを、同一の表示態様で表示させる、
請求項のいずれかに記載の管理装置。
the presentation processing unit displays, in the display fields corresponding to the first dryer and the second dryer, a progress display section corresponding to a work process in which work has been completed among the plurality of work processes and a portion of the first progress display section corresponding to the progress status in the same display mode.
The management device according to any one of claims 3 to 7 .
前記提示処理部は、前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記表示欄において、前記複数の作業工程のうち作業が終了した作業工程に対応する進捗表示部と、前記第1進捗表示部のうち前記進捗状況に対応する部分とを、互いに異なる表示態様で表示させる、
請求項のいずれかに記載の管理装置。
the presentation processing unit displays, in the display fields corresponding to the first dryer and the second dryer, a progress display section corresponding to a work process in which work has been completed among the plurality of work processes and a portion of the first progress display section corresponding to the progress status in different display modes.
The management device according to any one of claims 3 to 7 .
前記提示処理部は、前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記表示欄において、各進捗表示部を時間軸方向に所定の幅を有するタイムバーで表示させ、前記複数の進捗表示部に対応する複数のタイムバーを前記所定の順に前記時間軸方向に並べて表示させる、
請求項1~のいずれかに記載の管理装置。
the presentation processing unit displays each progress display section in a time bar having a predetermined width in a time axis direction in the display field corresponding to each of the first dryer and the second dryer, and displays a plurality of time bars corresponding to the plurality of progress display sections in the predetermined order in the time axis direction.
The management device according to any one of claims 1 to 9 .
前記提示処理部は、前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記表示欄において、前記第1作業工程の作業状態を表すテキスト情報を、前記複数の進捗表示部の近傍に表示させる、
請求項1~10のいずれかに記載の管理装置。
the presentation processing unit displays text information representing a work status of the first work process in the display fields corresponding to the first dryer and the second dryer near the plurality of progress display units.
The management device according to any one of claims 1 to 10 .
前記提示処理部は、前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記表示欄において、前記第1作業工程が終了した場合に、前記第1作業工程に対応する第1進捗表示部において前記第1作業工程が終了したことを識別可能な進捗状況を表示させ、かつ、少なくとも作業の終了を表すテキスト情報を前記複数の進捗表示部の近傍に表示させる、
請求項1~11のいずれかに記載の管理装置。
the presentation processing unit, when the first work process is completed , in the display fields corresponding to the first dryer and the second dryer, causes a first progress display unit corresponding to the first work process to display a progress status that enables identification that the first work process has been completed, and causes at least text information indicating the completion of work to be displayed near the plurality of progress display units.
The management device according to any one of claims 1 to 11 .
前記複数の作業工程は、張込作業、循環作業、乾燥作業、冷却作業、及び排出作業の各作業工程を含む、
請求項1~12のいずれかに記載の管理装置。
The plurality of work processes include a loading operation, a circulation operation, a drying operation, a cooling operation, and a discharge operation.
The management device according to any one of claims 1 to 12 .
乾燥機に穀物を張り込む張込工程と前記張込工程に続く後工程とを含む複数の作業工程を順に実行することにより穀物を乾燥させる、第1乾燥機及び第2乾燥機のそれぞれにおいて、現在実行中の作業工程である第1作業工程を特定することと、
前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記複数の作業工程のそれぞれの進捗状況を表示する複数の進捗表示部において、前記第1作業工程の進捗状況を提示することと、
前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する予め設定されたそれぞれの表示欄において、当該表示欄の表示幅に合わせて前記複数の進捗表示部を作業順に連結して表示させ、かつ、前記複数の進捗表示部のそれぞれの表示幅を、前記穀物の張込量に基づいて算出される各作業工程の作業所要時間の割合に応じた幅で表示させることと、
前記第1乾燥機が実行する少なくとも一つの前記作業工程と、前記第2乾燥機が実行する少なくとも一つの前記作業工程とが互いに異なる場合に、前記第1乾燥機が実行する前記複数の作業工程に対応する前記複数の進捗表示部を連結した全体幅と、前記第2乾燥機が実行する前記複数の作業工程に対応する前記複数の進捗表示部を連結した全体幅とを同じ幅で表示させることと、
を一又は複数のプロセッサーが実行する管理方法。
A method for drying grain by sequentially executing a plurality of work processes including a loading process of loading grain into the dryers and a post-process following the loading process, comprising: identifying a first work process that is a work process currently being executed in each of a first dryer and a second dryer ;
presenting a progress status of the first work process in a plurality of progress display units that display progress statuses of the plurality of work processes corresponding to each of the first dryer and the second dryer ;
In each of the preset display sections corresponding to the first dryer and the second dryer, the plurality of progress display sections are linked and displayed in order of operation in accordance with the display width of the display section, and the display width of each of the plurality of progress display sections is displayed in accordance with the proportion of the required work time for each work process calculated based on the loading amount of the grain ;
when at least one of the work processes performed by the first dryer and at least one of the work processes performed by the second dryer are different from each other, displaying an overall width obtained by connecting the plurality of progress display units corresponding to the plurality of work processes performed by the first dryer and an overall width obtained by connecting the plurality of progress display units corresponding to the plurality of work processes performed by the second dryer in the same width;
A management method executed by one or more processors.
乾燥機に穀物を張り込む張込工程と前記張込工程に続く後工程とを含む複数の作業工程を順に実行することにより穀物を乾燥させる、第1乾燥機及び第2乾燥機のそれぞれにおいて、現在実行中の作業工程である第1作業工程を特定することと、
前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する前記複数の作業工程のそれぞれの進捗状況を表示する複数の進捗表示部において、前記第1作業工程の進捗状況を提示することと、
前記第1乾燥機及び前記第2乾燥機のそれぞれに対応する予め設定されたそれぞれの表示欄において、当該表示欄の表示幅に合わせて前記複数の進捗表示部を作業順に連結して表示させ、かつ、前記複数の進捗表示部のそれぞれの表示幅を、前記穀物の張込量に基づいて算出される各作業工程の作業所要時間の割合に応じた幅で表示させることと、
前記第1乾燥機が実行する少なくとも一つの前記作業工程と、前記第2乾燥機が実行する少なくとも一つの前記作業工程とが互いに異なる場合に、前記第1乾燥機が実行する前記複数の作業工程に対応する前記複数の進捗表示部を連結した全体幅と、前記第2乾燥機が実行する前記複数の作業工程に対応する前記複数の進捗表示部を連結した全体幅とを同じ幅で表示させることと、
を一又は複数のプロセッサーに実行させるための管理プログラム。
A method for drying grain by sequentially executing a plurality of work processes including a loading process of loading grain into the dryers and a post-process following the loading process, comprising: identifying a first work process that is a work process currently being executed in each of a first dryer and a second dryer ;
presenting a progress status of the first work process in a plurality of progress display units that display progress statuses of the plurality of work processes corresponding to each of the first dryer and the second dryer ;
In each of the preset display sections corresponding to the first dryer and the second dryer, the plurality of progress display sections are linked and displayed in order of operation in accordance with the display width of the display section, and the display width of each of the plurality of progress display sections is displayed in accordance with the proportion of the required work time for each work process calculated based on the loading amount of the grain ;
when at least one of the work processes performed by the first dryer and at least one of the work processes performed by the second dryer are different from each other, displaying an overall width obtained by connecting the plurality of progress display units corresponding to the plurality of work processes performed by the first dryer and an overall width obtained by connecting the plurality of progress display units corresponding to the plurality of work processes performed by the second dryer in the same width;
A management program for causing one or more processors to execute the above.
JP2020093487A 2020-05-28 2020-05-28 Management device, management method, and management program Active JP7558680B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020093487A JP7558680B2 (en) 2020-05-28 2020-05-28 Management device, management method, and management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020093487A JP7558680B2 (en) 2020-05-28 2020-05-28 Management device, management method, and management program

Publications (2)

Publication Number Publication Date
JP2021189678A JP2021189678A (en) 2021-12-13
JP7558680B2 true JP7558680B2 (en) 2024-10-01

Family

ID=78849592

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020093487A Active JP7558680B2 (en) 2020-05-28 2020-05-28 Management device, management method, and management program

Country Status (1)

Country Link
JP (1) JP7558680B2 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001202340A (en) 2000-01-18 2001-07-27 Seiko Epson Corp Display device, portable information processing device, information recording medium, and electronic device
JP2002074437A (en) 2000-08-30 2002-03-15 Hitachi Ltd Aircraft spot management system
JP2003279591A (en) 2002-03-25 2003-10-02 Iseki & Co Ltd Grain retention detector of circulation type grain dryer
JP2004139472A (en) 2002-10-18 2004-05-13 Hitachi East Japan Solutions Ltd Work schedule planning system, work schedule planning method, program, and medium
JP2009127907A (en) 2007-11-21 2009-06-11 Iseki & Co Ltd Grain dryer display
JP2010073014A (en) 2008-09-19 2010-04-02 Canon Inc Information processing apparatus, control method therefor, and program therefor
JP2016105031A (en) 2014-12-01 2016-06-09 井関農機株式会社 Operation management system of grain dryer

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06300445A (en) * 1993-04-16 1994-10-28 Yamamoto Mfg Co Ltd Display of grain water content in grain dryer

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001202340A (en) 2000-01-18 2001-07-27 Seiko Epson Corp Display device, portable information processing device, information recording medium, and electronic device
JP2002074437A (en) 2000-08-30 2002-03-15 Hitachi Ltd Aircraft spot management system
JP2003279591A (en) 2002-03-25 2003-10-02 Iseki & Co Ltd Grain retention detector of circulation type grain dryer
JP2004139472A (en) 2002-10-18 2004-05-13 Hitachi East Japan Solutions Ltd Work schedule planning system, work schedule planning method, program, and medium
JP2009127907A (en) 2007-11-21 2009-06-11 Iseki & Co Ltd Grain dryer display
JP2010073014A (en) 2008-09-19 2010-04-02 Canon Inc Information processing apparatus, control method therefor, and program therefor
JP2016105031A (en) 2014-12-01 2016-06-09 井関農機株式会社 Operation management system of grain dryer

Also Published As

Publication number Publication date
JP2021189678A (en) 2021-12-13

Similar Documents

Publication Publication Date Title
US20210028983A1 (en) System and method for managing computing devices
CN114911332A (en) Server fan regulation and control method, system, electronic equipment and storage medium
JP6778303B2 (en) Performance management system, how to provide a combination of performance configuration parameters, how to update performance parameters, computer software and storage media
US20060259902A1 (en) Embedded system self-updating method and device
JP2015225361A (en) A / B test measurement method and measurement management system
US20200225720A1 (en) Information Handling System Having Regional Cooling
TWI832201B (en) Computer-implemented method and computing system
US20160328307A1 (en) Resource monitoring system and method thereof
JP7558680B2 (en) Management device, management method, and management program
JP2015148861A (en) Information processing system and program management method
CN120371447B (en) Method and device for starting and displaying server
JP5237327B2 (en) Information processing apparatus and program
CN111008106B (en) Server monitoring management method and device, electronic equipment and storage medium
WO2022070292A1 (en) Vdi resource allocation determination device, vdi resource allocation determination method, and vdi resource allocation determination program
CN107533490A (en) Control system and programmable logic controller (PLC)
TWI710957B (en) Method and system for accelerating boot
US10551858B2 (en) Selection of a default phase in a multiphase voltage regulator based on a wear score
JP6703804B2 (en) Information processing program, information processing apparatus, information processing system, and information processing method
JP2017162105A5 (en)
JP6455478B2 (en) Information processing apparatus, program, and software module
US12282900B2 (en) Method and system for determining computer fan usage and maintenance
JP2018101238A (en) Information processing apparatus, control method, program
JP2020129275A (en) Information processing device, method, and program
WO2014091623A1 (en) Programmable controller system, programmable display therefor, assistance device, and program
US11416584B2 (en) License management system, license management method, non-transitory computer readable recording medium storing and license management program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230220

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20231129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231205

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240201

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240423

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240621

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240903

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240918

R150 Certificate of patent or registration of utility model

Ref document number: 7558680

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150