JP7561096B2 - Method for estimating retained concrete and method for constructing concrete structure - Google Patents
[go: Go Back, main page]

JP7561096B2 - Method for estimating retained concrete and method for constructing concrete structure - Google Patents

Method for estimating retained concrete and method for constructing concrete structure Download PDF

Info

Publication number
JP7561096B2
JP7561096B2 JP2021116898A JP2021116898A JP7561096B2 JP 7561096 B2 JP7561096 B2 JP 7561096B2 JP 2021116898 A JP2021116898 A JP 2021116898A JP 2021116898 A JP2021116898 A JP 2021116898A JP 7561096 B2 JP7561096 B2 JP 7561096B2
Authority
JP
Japan
Prior art keywords
concrete
tremie pipe
depth
pouring
switching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021116898A
Other languages
Japanese (ja)
Other versions
JP2023013024A (en
Inventor
定幸 石▲崎▼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2021116898A priority Critical patent/JP7561096B2/en
Publication of JP2023013024A publication Critical patent/JP2023013024A/en
Application granted granted Critical
Publication of JP7561096B2 publication Critical patent/JP7561096B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

本発明は、滞留コンクリート推定方法およびコンクリート構造物の構築方法に関する。 The present invention relates to a method for estimating retained concrete and a method for constructing a concrete structure.

コンクリート構造物を構築する場合において、高い位置からコンクリートを打設する場合に、トレミー管を利用してコンクリートを落とし込む場合がある。例えば、特許文献1には、トレミー管を利用した場所打ちコンクリート杭の施工方法が開示されている。トレミー管を用いてコンクリートを打設する際には、既打設コンクリートにトレミー管の先端を挿入した状態で行うのが一般的である。
例えば、特許文献1のコンクリート構造物の施工方法では、異なる種類のコンクリートを上下に打ち継ぐ場合において、トレミー管を利用して下部コンクリートを所定の高さ(先行打設高さ)まで打設した後、下部コンクリートにトレミー管の先端を挿入した状態で上部コンクリートの打設を開始して切り換え完了高さまで下部コンクリートの一部を押しあげた後、引き続き切り換え完了高さの上方に上部コンクリートを打設する。
トレミー管を利用して高所からコンクリートを打設した場合には、トレミー管の内部のコンクリートは打設箇所に落下しているものとして取り扱われるのが一般的である。一方、既打設コンクリートに先端が挿入されたトレミー管の内部には、トレミー管の内面とコンクリートとの間に発生した摩擦力により、コンクリートが滞留する場合がある。そのため、設計された高さまでコンクリートを打設すると、トレミー管内に滞留するコンクリートが余分になる。したがって、トレミー管を利用して高所から低所にコンクリートを打設する場合には、トレミー管内に滞留するコンクリートの量を考慮したうえでコンクリートの打設完了高さ(先行打設高さ等)を設定するのが望ましい。
In constructing a concrete structure, when pouring concrete from a high position, a tremie pipe may be used to drop the concrete. For example, Patent Document 1 discloses a method for constructing a cast-in-place concrete pile using a tremie pipe. When pouring concrete using a tremie pipe, it is common to insert the tip of the tremie pipe into the already poured concrete.
For example, in the concrete structure construction method of Patent Document 1, when different types of concrete are poured above and below, a tremie pipe is used to pour the lower concrete to a predetermined height (pre-pouring height), and then pouring of the upper concrete is started with the tip of the tremie pipe inserted into the lower concrete, pushing up part of the lower concrete to the switching completion height, and then the upper concrete is subsequently poured above the switching completion height.
When concrete is poured from a high place using a tremie pipe, the concrete inside the tremie pipe is generally treated as having fallen to the pouring location. On the other hand, concrete may be retained inside the tremie pipe when the tip is inserted into the already poured concrete due to the frictional force generated between the inner surface of the tremie pipe and the concrete. Therefore, if concrete is poured up to the designed height, excess concrete will be retained inside the tremie pipe. Therefore, when concrete is poured from a high place to a low place using a tremie pipe, it is desirable to set the concrete pouring completion height (pre-pouring height, etc.) taking into account the amount of concrete retained inside the tremie pipe.

特開2020-020192号公報JP 2020-020192 A

本発明は、トレミー管を用いてコンクリートを打設する場合において、トレミー管内に滞留するコンクリート量を推定する滞留コンクリート推定方法と、この滞留コンクリート推定方法を利用したコンクリート構造物の構築方法を提案することを課題とする。 The present invention aims to propose a method for estimating the amount of concrete retained in a tremie pipe when pouring concrete using the tremie pipe, and a method for constructing a concrete structure using this method for estimating retained concrete.

本発明の滞留コンクリート推定方法は、トレミー管の先端を既打設コンクリートに挿入した状態で前記トレミー管内を自由落下させたコンクリートを打設する場合において、前記トレミー管内に滞留する前記コンクリートの上面から前記既打設コンクリートの上面までの高低差である滞留高さを算出するものである。前記滞留高さは、前記トレミー管内にコンクリートが滞留している状態におけるトレミー管外部圧力とトレミー管内部圧力とが等しいものとして算出する。前記トレミー管外部圧力は、前記トレミー管の前記既打設コンクリートへの挿入深さに基づいて前記トレミー管の外部から作用する圧力である。前記トレミー管内部圧力は、前記トレミー管内に滞留する前記コンクリートの自重から求まる力から前記コンクリートと前記トレミー管の内面との摩擦抵抗力を減じた値を前記トレミー管5の内空断面積で除した値である
なお、前記トレミー管外部圧力は、前記挿入深さに前記コンクリートの単位体積重量を乗じた値と、前記既打設コンクリートの上方に滞留する安定液の深さに前記安定液の単位体積重量を乗じた値とを足し合わせた値とするのが望ましい。また、前記トレミー管内部圧力は、前記滞留高さと前記挿入深さとの合計値に前記コンクリートの単位体積重量および前記トレミー管の内空断面積を乗じた値から、前記滞留高さと前記挿入深さとの合計値にコンクリートの摩擦抵抗応力および前記トレミー管の内周長を乗じた値を減じた値を、前記トレミー管の内空断面積で除した値とするのが望ましい。さらに、前記摩擦抵抗力は、コンクリートをビンガム流体と仮定した場合のレオロジー定数であり、前記コンクリートが流動し始める限界のせん断応力に基づいた値とするのが望ましい。
かかる滞留コンクリート推定方法によれば、トレミー管内に滞留するコンクリートの量(高さ)を推定できるため、トレミー管内に滞留するコンクリートの量を考慮して、コンクリートを打設することができ、ひいては、合理的な施工が可能となる。例えば、異なる種類のコンクリートを上下に連続して打設する場合において、設計上の切換深度にて適切にコンクリートを切り換えることができる。
The method for estimating retained concrete of the present invention calculates a retained height, which is a height difference between the top surface of the concrete retained in the tremie pipe and the top surface of the already-cast concrete, when concrete is poured by allowing the concrete to freely fall inside the tremie pipe with the tip of the tremie pipe inserted into the already-cast concrete. The retained height is calculated assuming that the tremie pipe external pressure and the tremie pipe internal pressure are equal when concrete is retained in the tremie pipe. The tremie pipe external pressure is a pressure acting from the outside of the tremie pipe based on the insertion depth of the tremie pipe into the already-cast concrete. The tremie pipe internal pressure is a value obtained by subtracting the frictional resistance force between the concrete and the inner surface of the tremie pipe from the force calculated from the self-weight of the concrete retained in the tremie pipe, and dividing the value by the inner hollow cross-sectional area of the tremie pipe 5.
The tremie pipe external pressure is preferably a sum of the insertion depth multiplied by the unit volume weight of the concrete and the depth of the stabilizing liquid retained above the cast concrete multiplied by the unit volume weight of the stabilizing liquid. The tremie pipe internal pressure is preferably a value obtained by multiplying the sum of the retention height and the insertion depth by the unit volume weight of the concrete and the inner cross-sectional area of the tremie pipe, minus the sum of the retention height and the insertion depth multiplied by the friction resistance stress of concrete and the inner circumference of the tremie pipe, divided by the inner cross-sectional area of the tremie pipe. The friction resistance force is a rheological constant when concrete is assumed to be a Bingham fluid, and is preferably a value based on the limit shear stress at which the concrete begins to flow.
According to the method for estimating the amount of concrete retained in the tremie pipe, the amount (height) of concrete retained in the tremie pipe can be estimated, so that concrete can be poured taking into consideration the amount of concrete retained in the tremie pipe, which in turn enables rational construction. For example, when pouring different types of concrete one above the other in succession, the concrete can be appropriately switched at the designed switching depth.

また、本発明のコンクリート構造物の構築方法は、下部コンクリートの上に前記下部コンクリートとは異なる種類のコンクリートからなる上部コンクリートを打ち継ぐことによりコンクリート構造物を構築するものであって、下部コンクリートから上部コンクリートへの切り換えが完了する位置である切換完了深度の下方に下部コンクリートの打設が完了する位置である打設切換深度を設定し、当該打設切換深度まで下部コンクリートを打設する第一工程と、トレミー管の下端が前記打設切換深度の下方に位置した状態で上部コンクリートの供給を開始し、前記切換完了深度まで上部コンクリートを供給する第二工程と、前記切換完了深度の上方に上部コンクリートを打設する第三工程とを備えている。
前記第一工程では、前記滞留コンクリート推定方法により求まる前記滞留高さに相当するコンクリート量の影響を見込んだ深度まで下部コンクリートを打設するのが望ましい。
また、前記第二工程では、前記滞留コンクリート推定方法により求まる前記滞留高さに相当するコンクリート量以上の上部コンクリートを前記トレミー管内に供給する第一打設作業と、前記トレミー管の下部コンクリートへの挿入深さを調整するトレミー管調整作業と、前記トレミー管内への上部コンクリートの供給を再開して前記切換完了深度まで前記上部コンクリートを打設する第二打設作業とを行うのが望ましい。
さらに、トレミー管の打設切換深度の下方への挿入長さを設定するとともに、前記トレミー管から前記打設切換深度よりも下側に供給される上部コンクリートの体積および前記滞留高さに相当するコンクリート量を見込んで、前記切換完了深度と前記打設切換深度の差である切換長さを算出するのが望ましい。
かかるコンクリート構造物の構築方法によれば、トレミー管内に滞留するコンクリート量を考慮して、下部コンクリートの打設深度(打設切換深度)を設定するため、切換長さを安全側に設定できる。
In addition, the method for constructing a concrete structure of the present invention constructs a concrete structure by pouring an upper concrete made of a different type of concrete on top of a lower concrete, and includes a first step of setting a pouring switching depth, which is a position where pouring of the lower concrete is completed, below a switching completion depth, which is a position where switching from the lower concrete to the upper concrete is completed, and pouring the lower concrete up to the pouring switching depth, a second step of starting the supply of upper concrete with the lower end of the tremie pipe positioned below the pouring switching depth and supplying the upper concrete up to the switching completion depth, and a third step of pouring the upper concrete above the switching completion depth.
In the first step, it is desirable to pour the lower concrete to a depth that takes into account the influence of the amount of concrete equivalent to the retained height obtained by the retained concrete estimation method.
In addition, in the second step, it is desirable to perform a first pouring operation of supplying upper concrete into the tremie pipe with an amount of concrete equal to or greater than the amount of concrete corresponding to the retained height determined by the retained concrete estimation method, a tremie pipe adjustment operation of adjusting the insertion depth of the tremie pipe into the lower concrete, and a second pouring operation of resuming the supply of upper concrete into the tremie pipe and pouring the upper concrete up to the switching completion depth.
Furthermore , it is desirable to set the insertion length of the tremie pipe below the pouring switching depth, and to calculate the switching length, which is the difference between the switching completion depth and the pouring switching depth, taking into account the volume of upper concrete supplied from the tremie pipe below the pouring switching depth and the amount of concrete equivalent to the retention height .
According to this method for constructing a concrete structure, the pouring depth of the lower concrete (pouring switching depth) is set taking into account the amount of concrete remaining in the tremie pipe, so that the switching length can be set on the safe side.

本発明は、滞留コンクリート推定方法によれば、トレミー管を用いてコンクリートを打設する場合において、トレミー管内に滞留するコンクリート量を適切に推定することが可能となる。また、この滞留コンクリート推定方法を利用したコンクリート構造物の構築方法によれば、トレミー管内に滞留するコンクリートを考慮することで、効率的かつ経済的な施工が可能となる。 The present invention provides a method for estimating retained concrete, which makes it possible to appropriately estimate the amount of concrete retained in a tremie pipe when pouring concrete using the tremie pipe. In addition, a method for constructing a concrete structure using this method for estimating retained concrete enables efficient and economical construction by taking into account the concrete retained in the tremie pipe.

本発明の実施形態に係る場所打ちコンクリート杭の一部を示す断面図である。FIG. 2 is a cross-sectional view showing a portion of a cast-in-place concrete pile according to an embodiment of the present invention. 図1に示す場所打ちコンクリート杭の施工状況を示す断面図であって、(a)は第一工程、(b)は第二工程、(c)は第三工程である。2A to 2C are cross-sectional views showing the construction status of the cast-in-place concrete pile shown in FIG. 1, where (a) is a first step, (b) is a second step, and (c) is a third step. 先行打設高さよりも下側に供給した上部コンクリートを示す斜視図である。FIG. 1 is a perspective view showing upper concrete supplied below the advance pouring height. 環状領域を示す斜視図である。FIG. 第一評価法の概要を示す図であって、(a)はトレミー管内に下部コンクリートが残留している状態、(b)はトレミー管内の下部コンクリートを排出した状態である。FIG. 1 is a diagram showing an overview of the first evaluation method, in which (a) shows a state in which lower concrete remains in the tremie pipe, and (b) shows a state in which the lower concrete in the tremie pipe has been discharged. 第二評価法における第二工程の概要を示す断面図であって、(a)は第一打設作業、(b)はトレミー管調整作業、(c)は第二打設作業である。11 is a cross-sectional view showing an overview of the second step in the second evaluation method, where (a) is the first concrete pouring work, (b) is the tremie pipe adjustment work, and (c) is the second concrete pouring work. 現場施工試験時の測点の配置を示す平面図であって、(a)はトレミー管が1本の場合、(b)はトレミー管が2本の場合である。FIG. 11 is a plan view showing the arrangement of measurement points during on-site construction testing, where (a) is the case where one tremie pipe is used, and (b) is the case where two tremie pipes are used. 現場施工試験結果を示すグラフである。1 is a graph showing the results of a field construction test.

本実施形態では、場所打ちコンクリート杭(コンクリート構造物)1において、合理的な杭の構築を目的として、強度の異なる二種類のコンクリートを深さ方向(上下)に連続して打設する場合について説明する。図1に本実施形態の場所打ちコンクリート杭1の一部を示す。本実施形態の場所打ちコンクリート杭1は、地震時に応力が大きくなる杭上部のコンクリート強度を高くするために、下部コンクリート2の上に下部コンクリート2よりも設計基準強度が高い上部コンクリート3を打ち継ぐことにより形成する。図2に本実施形態のコンクリート構造物の構築方法の各施工段階を示す。
本実施形態のコンクリート構造物の構築方法は、所定高さ(以下、「打設切換深度H1」という)まで下部コンクリート2を打設する第一工程(図2(a)参照)と、下部コンクリート2のコンクリート打設面(既打設コンクリートの上面)2aよりも下方から上部コンクリート3の供給を開始して既打設コンクリートの上面が切換完了深度H2に到達するまで上部コンクリート3を供給するまで第二工程(図2(b)参照)と、切換完了深度H2の上方に上部コンクリート3を打設する第三工程(図2(c)参照)とを備えている。
In this embodiment, a case will be described in which two types of concrete with different strengths are cast continuously in the depth direction (up and down) in a cast-in-place concrete pile (concrete structure) 1 for the purpose of constructing a rational pile. Fig. 1 shows a part of the cast-in-place concrete pile 1 of this embodiment. The cast-in-place concrete pile 1 of this embodiment is formed by continuously pouring an upper concrete 3, which has a higher design standard strength than the lower concrete 2, on top of a lower concrete 2 in order to increase the concrete strength of the upper part of the pile where stress increases during an earthquake. Fig. 2 shows each construction stage of the method for constructing a concrete structure of this embodiment.
The method for constructing a concrete structure in this embodiment includes a first step (see Figure 2(a)) of pouring a lower concrete 2 up to a predetermined height (hereinafter referred to as the "pouring switching depth H1"), a second step (see Figure 2(b)) of starting to supply an upper concrete 3 from below the concrete pouring surface (top surface of already poured concrete) 2a of the lower concrete 2 and supplying the upper concrete 3 until the top surface of the already poured concrete reaches the switching completion depth H2, and a third step (see Figure 2(c)) of pouring the upper concrete 3 above the switching completion depth H2.

第一工程では、図2(a)に示すように、既打設コンクリートの上面(コンクリート打設面)が打設切換深度H1に到達するまで下部コンクリート2を供給する。下部コンクリート2は、地中に形成された掘削孔6内に挿入されたトレミー管5を利用して掘削孔6の下端から供給する。掘削孔6内には、孔壁の安定性を確保するための安定液slが貯留されている。トレミー管5は、既打設コンクリートに先端を挿入した状態で、コンクリート打設面2aの上昇に合わせて上昇させる。打設切換深度H1は、打設切換深度H1は、下部コンクリート2の供給を完了する位置であって、下部コンクリート2から上部コンクリート3への切り換えが完了する位置である切換完了深度H2の下方に設定する。打設切換深度H1は、場所打ちコンクリート杭1に作用する応力の推定値(設計値)から切換完了深度H2(コンクリート強度を高くする範囲)を設定し、この切換完了深度H2においてコンクリートが下部コンクリート2から上部コンクリート3に完全に切り換えられるように、打設切換深度H1を設定する。 In the first step, as shown in FIG. 2(a), the lower concrete 2 is supplied until the top surface of the already-cast concrete (concrete casting surface) reaches the casting switching depth H1. The lower concrete 2 is supplied from the bottom end of the borehole 6 formed in the ground using a tremie pipe 5 inserted into the borehole 6. A stabilizing liquid sl is stored in the borehole 6 to ensure the stability of the hole wall. The tremie pipe 5 is raised with its tip inserted into the already-cast concrete in accordance with the rise of the concrete casting surface 2a. The casting switching depth H1 is set below the switching completion depth H2, which is the position where the supply of the lower concrete 2 is completed and where the switching from the lower concrete 2 to the upper concrete 3 is completed. The casting switching depth H1 is set to a switching completion depth H2 (range in which concrete strength is increased) based on the estimated value (design value) of the stress acting on the cast-in-place concrete pile 1, and the casting switching depth H1 is set so that the concrete is completely switched from the lower concrete 2 to the upper concrete 3 at this switching completion depth H2.

ここで、打設切換深度H1は、式1により算出する。打設切換深度H1は、場所打ちコンクリート杭1の作用応力に基づいて設定された切換完了深度H2から切換長さhを差し引くことにより算出する。切換長さhは、下部コンクリート2の打設後に、上部コンクリート3の供給を開始してから、既打設コンクリートが全て上部コンクリート3に切り換わるまでの区間であって、打設切換深度H1と切換完了深度H2との高低差である。
H1=H2-h ・・・ 式1
H1 :打設切換深度
H2 :切換完了深度
:切換長さ
Here, the pouring switching depth H1 is calculated by Equation 1. The pouring switching depth H1 is calculated by subtracting the switching length h from the switching completion depth H2, which is set based on the acting stress of the cast-in-place concrete pile 1. The switching length h is the section from when the supply of the upper concrete 3 starts after the lower concrete 2 is poured until all of the already poured concrete is switched to the upper concrete 3, and is the height difference between the pouring switching depth H1 and the switching completion depth H2.
H1=H2-h... Formula 1
H1 : Pouring switching depth H2 :Switching completion depth h : Switching length

第二工程では、図2(b)に示すように、トレミー管5の下端が打設切換深度H1の下方に位置した状態で上部コンクリート3の供給を開始し、切換完了深度H2に既打設コンクリートの上面が到達するまで上部コンクリート3を供給する。上部コンクリート3を打設切換深度H1よりも下側に供給すると、上部コンクリート3が下部コンクリート2を押しのけながら注入される。上部コンクリート3は、下部コンクリート2内において供給開始時点のトレミー管5の直下に半楕円状または半円状(先端部分31)に供給された後、先端部分31の直上に上部コンクリート3が円柱状(円柱部分32)に供給される(図3参照)。一方、下部コンクリート2は、上部コンクリート3が供給されることによって、打設切換深度H1の下側に供給された上部コンクリート3と同等の体積の下部コンクリート2が打設切換深度H1の下側から打設切換深度H1よりも上側に移動する。このとき、打設切換深度H1の上側に移動した下部コンクリート2は、打設切換深度H1よりも上側の外側部分(トレミー管5を中心とした環状領域21)に移動する(図2(c)参照)。打設切換深度H1の上側に移動した下部コンクリート2(環状領域21)の上端は、切換完了深度H2以下に位置する。 In the second step, as shown in FIG. 2(b), the supply of the upper concrete 3 is started with the lower end of the tremie pipe 5 positioned below the casting switching depth H1, and the upper concrete 3 is supplied until the top surface of the already cast concrete reaches the switching completion depth H2. When the upper concrete 3 is supplied below the casting switching depth H1, the upper concrete 3 is injected while pushing aside the lower concrete 2. The upper concrete 3 is supplied in a semi-elliptical or semi-circular shape (tip portion 31) directly below the tremie pipe 5 at the start of supply in the lower concrete 2, and then the upper concrete 3 is supplied in a cylindrical shape (cylindrical portion 32) directly above the tip portion 31 (see FIG. 3). On the other hand, as the upper concrete 3 is supplied, the lower concrete 2, which has a volume equivalent to the upper concrete 3 supplied below the casting switching depth H1, moves from below the casting switching depth H1 to above the casting switching depth H1. At this time, the lower concrete 2 that has moved above the pouring switching depth H1 moves to the outer portion (annular region 21 centered on the tremie pipe 5) above the pouring switching depth H1 (see FIG. 2(c)). The upper end of the lower concrete 2 (annular region 21) that has moved above the pouring switching depth H1 is located below the switching completion depth H2.

従来の切換長さh(打設切換深度H1および切換完了深度H2)の評価方法として、例えば以下の方法がある(特許文献1参照)。
環状領域21は、下部コンクリート2と上部コンクリート3とが混在する区間であり、環状領域21の高さ(環状領域高さh)は、切換長さhの基準となる。環状領域高さhは、式2に示すように、打設切換深度H1よりも下側に供給された上部コンクリート3の体積Vが、環状領域21に移動した下部コンクリート2の体積であるとして、環状領域21の体積を算出する。ここで、打設切換深度H1よりも下側に供給された上部コンクリート3は、図3に示すように、先端部分31と円柱部分32の体積の合計とする。一方、環状領域21は、図4に示すように、内径φ、外径φの円筒状体とする。
h=h
=V/S ・・・式2
V=V1+V2
S=π/4×(φ -φ
V1=πφ /4×T
V2=2/3×πφ /4×Δh
:環状領域高さ
:先行打設高さよりも下側に供給した上部コンクリートの体積
V1 :先行打設高さよりも下側に供給した上部コンクリートの円柱部分の体積
V2 :先行打設高さよりも下側に供給した上部コンクリートの先端部分の体積
:環状領域の断面積
φ :場所打ちコンクリート杭の外径
φ :環状領域の内径
φ :先行打設高さよりも下側に供給した上部コンクリートの円柱部分の直径
:第二工程において下部コンクリートに挿入するトレミー管の深さ
Δh:第二工程において供給された上部コンクリートの下端からトレミー管先端までの距離である下部流出深さ
この他、実験結果や流動解析(CFD)による解析結果などから切換長さhを評価することも可能である。
Conventional methods for evaluating the switching length h (pouring switching depth H1 and switching completion depth H2) include, for example, the following method (see Patent Document 1).
The annular region 21 is a section where the lower concrete 2 and the upper concrete 3 are mixed, and the height of the annular region 21 (annular region height hT ) is the reference for the switching length h. As shown in Equation 2, the volume of the annular region 21 is calculated by assuming that the volume V of the upper concrete 3 supplied below the pouring switching depth H1 is the volume of the lower concrete 2 that has moved to the annular region 21. Here, the upper concrete 3 supplied below the pouring switching depth H1 is the sum of the volumes of the tip portion 31 and the cylindrical portion 32, as shown in Fig. 3. Meanwhile, the annular region 21 is a cylindrical body with an inner diameter φi and an outer diameter φ0, as shown in Fig. 4.
h = hT
h T =V/S...Formula 2
V = V1 + V2
S=π/4×(φ o 2 −φ i 2 )
V1=πφ r 2 /4×T
V2=2/3×πφ r 2 /4×Δh 0
h T : Height of annular region V : Volume of upper concrete supplied below the pre-cast height V1 : Volume of the cylindrical part of the upper concrete supplied below the advance pouring height V2 : Volume of the tip of the upper concrete supplied below the advance pour height S : Cross-sectional area of the annular region φ o : Outer diameter of the cast-in-place concrete pile φ i : Inner diameter of the annular region φ r : Diameter of the cylindrical part of the upper concrete supplied below the pre-casting height T Δh0 : Lower outflow depth, which is the distance from the bottom end of the upper concrete supplied in the second step to the tip of the tremie pipe. In addition, it is also possible to evaluate the switching length h from experimental results, analysis results using flow analysis (CFD), etc.

第三工程では、図2(c)に示すように、既打設コンクリート(上部コンクリート3)に下端を挿入した状態で、トレミー管5を引き上げつつ切換完了深度H2の上方に上部コンクリート3を供給する。 In the third step, as shown in Figure 2 (c), with its lower end inserted into the already poured concrete (upper concrete 3), the tremie pipe 5 is pulled up and the upper concrete 3 is supplied above the switching completion depth H2.

切換長さh(打設切換深度H1および切換完了深度H2)に、本特許に基づく、トレミー管5内に滞留するコンクリートの影響を考慮する方法として、例えば、以下の三つの方法(第一評価方法~第三評価方法)より行えばよい。
(1)第一評価方法
切換長さhは、第一工程後にトレミー管5内に滞留するコンクリートの滞留高さHに相当するコンクリート量を考慮した式3により算出する。図5に第一評価方法の概要を示す。滞留高さHは、図5(a)に示すように、トレミー管5の先端を既打設コンクリートに挿入した状態で、トレミー管5内に自由落下させたコンクリートを打設する場合において、トレミー管5内に滞留するコンクリートの上面から既打設コンクリートの上面までの高低差である。上部コンクリート3の打設を開始すると、トレミー管5内に残留する下部コンクリート2が最初に排出されるため、この下部コンクリート2の量を含めて、上部コンクリート3に切り換わるタイミングを算出する(図5(b)参照)。
切換長さhは、滞留高さHに相当するコンクリート量により増加する下部コンクリートの高さ(切換長さ増分Δh)を環状領域高さhに加えた高さとする。
h=h+Δh ・・・式3
Δh=α×ΔT
h :切換長さ
:環状領域高さ
Δh:切換長さ増分
ΔT:滞留コンクリートに対応する根入れ長さ増分
α :流体解析(CFD)や実験などにより求めた根入れ増分に対する係数
As a method based on this patent for taking into account the influence of concrete remaining in the tremie pipe 5 on the switching length h (pouring switching depth H1 and switching completion depth H2), for example, the following three methods (first evaluation method to third evaluation method) may be used.
(1) First evaluation method The switching length h is calculated by Equation 3, which takes into consideration the amount of concrete equivalent to the retention height H of the concrete retained in the tremie pipe 5 after the first process. Figure 5 shows an overview of the first evaluation method. The retention height H is the height difference from the top surface of the concrete retained in the tremie pipe 5 to the top surface of the already-cast concrete when concrete is poured by freely dropping into the tremie pipe 5 with the tip of the tremie pipe 5 inserted in the already-cast concrete, as shown in Figure 5(a). When pouring of the upper concrete 3 starts, the lower concrete 2 remaining in the tremie pipe 5 is discharged first, so the timing of switching to the upper concrete 3 is calculated, including the amount of this lower concrete 2 (see Figure 5(b)).
The switching length h is the height obtained by adding the height of the lower concrete (switching length increment Δh) increased by the amount of concrete equivalent to the retention height H to the annular region height hT .
h=h T +Δh...Formula 3
Δh=α×ΔT
h: Switching length hT : Annular region height Δh: Switching length increment ΔT: Embedment length increment corresponding to retained concrete α: Coefficient for embedment increment obtained by fluid analysis (CFD), experiment, etc.

(2)第二評価方法
第二評価方法における切換長さhは、式4に示すように、滞留高さHに相当するコンクリート量に対応する根入れ長さ増分ΔTを環状領域高さhに加えた高さとする。すなわち、第二評価方法では、切換長さ増分Δhを根入れ長さ増分ΔTとする。
h=h+ΔT ・・・式4
h :切換長さ
:環状領域高さ
ΔT:根入れ長さ増分
(2) Second Evaluation Method In the second evaluation method, the switching length h is defined as the height obtained by adding an embedment length increment ΔT corresponding to the amount of concrete equivalent to the retention height H to the annular region height hT , as shown in Equation 4. That is, in the second evaluation method, the switching length increment Δh is defined as the embedment length increment ΔT.
h=h T +ΔT...Formula 4
h: Switching length hT : Height of annular region ΔT: Increment of penetration length

なお、第二評価方法を使用する場合には、第二工程において、図6(a)および(b)に示すように、滞留高さHに相当するコンクリート量以上の上部コンクリート3をトレミー管5内に供給する第一打設作業と、図6(b)および(c)に示すように、トレミー管5の下部コンクリート2への挿入深さTを調整するトレミー管調整作業と、図2(b)に示すように、トレミー管5内への上部コンクリート3の供給を再開して切換完了深度H2まで上部コンクリート3を打設する第二打設作業とを行うのが望ましい。 When using the second evaluation method, it is desirable to carry out in the second step a first pouring operation in which an amount of upper concrete 3 equivalent to or greater than the amount of concrete corresponding to the retention height H is supplied into the tremie pipe 5 as shown in Figures 6(a) and (b), a tremie pipe adjustment operation in which the insertion depth T of the tremie pipe 5 into the lower concrete 2 is adjusted as shown in Figures 6(b) and (c), and a second pouring operation in which the supply of upper concrete 3 is resumed into the tremie pipe 5 and the upper concrete 3 is poured up to the switching completion depth H2 as shown in Figure 2(b).

(3)第三評価方法
第三評価方法では、式5に示すように、式1において滞留高さHに相当するコンクリート量に対応する根入れ長さ増分ΔTを考慮したものとする。
H1=H2-h-ΔT ・・・ 式5
h=V/S
V=V1+V2
S=π/4×(φ -φ
V1=πφ /4×(T+ΔT)
V2=2/3×πφ /4×Δh
H1 :打設切換深度
H2 :切換完了深度
:切換長さ
:環状領域高さ
:先行打設高さよりも下側に供給した上部コンクリートの体積
V1 :先行打設高さよりも下側に供給した上部コンクリートの円柱部分の体積
V2 :先行打設高さよりも下側に供給した上部コンクリートの先端部分の体積
:環状領域の断面積
φ :場所打ちコンクリート杭の外径
φ :環状領域の内径
φ :先行打設高さよりも下側に供給した上部コンクリートの円柱部分の直径
:第二工程において下部コンクリートに挿入するトレミー管の深さ
Δh:第二工程において供給された上部コンクリートの下端からトレミー管先端までの距離である下部流出深さ
(3) Third Evaluation Method In the third evaluation method, as shown in Equation 5, the increment in embedment length ΔT corresponding to the amount of concrete equivalent to the retention height H in Equation 1 is taken into consideration.
H1=H2-h-ΔT... Formula 5
h = V/S
V = V1 + V2
S=π/4×(φ o 2 −φ i 2 )
V1=πφ r 2 /4×(T+ΔT)
V2=2/3×πφ r 2 /4×Δh 0
H1 : Pouring switching depth H2 :Switching completion depth h : Switching length hT : Annular region height V : Volume of upper concrete supplied below the pre-cast height V1 : Volume of the cylindrical part of the upper concrete supplied below the advance pouring height V2 : Volume of the tip of the upper concrete supplied below the advance pouring height S : Cross-sectional area of the annular region φ o : Outer diameter of the cast-in-place concrete pile φ i : Inner diameter of the annular region φ r : Diameter of the cylindrical part of the upper concrete supplied below the pre-casting height T Δh 0 : Depth of the tremie pipe inserted into the lower concrete in the second step Δh 0 : Lower outflow depth, which is the distance from the bottom end of the upper concrete supplied in the second step to the tip of the tremie pipe

ここで、滞留高さHは、式6に示すように、トレミー管5内にコンクリートが滞留している状態におけるトレミー管外部圧力pとトレミー管内部圧力pとが等しいものとして算出する。
=p ・・・ 式6
:トレミー管外部圧力
:トレミー管内部圧力
Here, the retention height H is calculated assuming that the tremie pipe external pressure p0 and the tremie pipe internal pressure pt are equal when concrete is retained in the tremie pipe 5, as shown in Equation 6.
p 0 = p t ... Formula 6
p 0 : External pressure of tremie tube p t : Internal pressure of tremie tube

トレミー管外部圧力pは、トレミー管5の既打設コンクリートへの挿入深さT(図2(b)参照)に基づいて、トレミー管5の外部から作用する圧力である。トレミー管外部圧力pは、式7に示すように、挿入深さTにコンクリートの単位体積重量γを乗じた値と、既打設コンクリートの上方に滞留する安定液slの深さHslに安定液slの単位体積重量γslを乗じた値とを足し合わせた値である。
=γT+γslsl ・・・式7
γ:コンクリートの単位体積重量
:挿入深さ
γsl:安定液の単位体積重量
sl:安定液の深さ
The tremie pipe external pressure p0 is a pressure acting from outside the tremie pipe 5 based on the insertion depth T of the tremie pipe 5 into the already-cast concrete (see FIG. 2(b)). As shown in Equation 7, the tremie pipe external pressure p0 is the sum of the insertion depth T multiplied by the unit volume weight γc of the concrete and the depth Hsl of the stabilizing liquid sl retained above the already-cast concrete multiplied by the unit volume weight γsl of the stabilizing liquid sl.
p 0 = γ c T + γ sl H sl ...Formula 7
γ c : Unit weight of concrete T : Insertion depth γsl : Unit weight of stabilizing liquid Hsl : Depth of stabilizing liquid

トレミー管内部圧力pは、式8に示すように、トレミー管5内に滞留するコンクリート(下部コンクリート)の自重から求まる圧力からコンクリートとトレミー管5の内面との摩擦抵抗力を差し引いた値である。トレミー管5内に滞留するコンクリートの自重から求まる圧力は、滞留高さHと挿入深さTとの合計値にコンクリートの単位体積重量γを乗じた値にトレミー管5の内空断面積Aを乗じることで算出する。また、コンクリートとトレミー管5の内面との摩擦抵抗力は、滞留高さHと挿入深さTとの合計値にコンクリートの摩擦抵抗応力fを乗じた値にトレミー管の内周長φを乗じることで算出する。
そして、トレミー管内部圧力pは、自重から求まる力から摩擦抵抗力を減じた値をトレミー管5の内空断面積で除することで算出する。
ここで、本実施形態では、コンクリートの摩擦抵抗応力fにコンクリートの降伏値τを用いる。コンクリートの降伏値τ(=摩擦抵抗f)は、コンクリートをビンガム流体と仮定した場合のレオロジー定数であり、コンクリートが流動し始める限界のせん断応力に基づく値である。
As shown in Equation 8, the tremie pipe internal pressure p t is a value obtained by subtracting the frictional resistance force between the concrete and the inner surface of the tremie pipe 5 from the pressure obtained from the weight of the concrete (lower concrete) retained in the tremie pipe 5. The pressure obtained from the weight of the concrete retained in the tremie pipe 5 is calculated by multiplying the sum of the retention height H and the insertion depth T by the unit volume weight γ c of the concrete, and then multiplying this value by the inner hollow cross-sectional area A of the tremie pipe 5. In addition, the frictional resistance force between the concrete and the inner surface of the tremie pipe 5 is calculated by multiplying the sum of the retention height H and the insertion depth T by the frictional resistance stress f of the concrete, and then multiplying this value by the inner circumference φ of the tremie pipe.
The internal pressure p t of the tremie tube is calculated by subtracting the frictional resistance force from the force calculated from the weight, and dividing the result by the internal cross-sectional area of the tremie tube 5.
In this embodiment, the concrete yield value τ is used as the friction resistance stress f of the concrete. The concrete yield value τ (=friction resistance f) is a rheological constant when the concrete is assumed to be a Bingham fluid, and is a value based on the limit shear stress at which the concrete begins to flow.

Figure 0007561096000001
Figure 0007561096000001

式6~8より、滞留高さHは、式9により表すことができる。なお、Rはトレミー管の内径である。 From equations 6 to 8, the retention height H can be expressed by equation 9. Note that R is the inner diameter of the tremie tube.

Figure 0007561096000002
Figure 0007561096000002

以上、本実施形態のコンクリート構造物の構築方法によれば、設計上の切換完了高さの近傍で、コンクリートの切り換えを完了させることができるため、強度が異なるコンクリートを高さ方向で連続して打設する場合において、打設コンクリートの強度の変化点を合理的に設定することが可能となる。その結果、必要な耐力を有した場所打ちコンクリート杭1を経済的に施工することができる。
また、本実施形態によれば、トレミー管5内に滞留するコンクリートの量(滞留高さH)を推定できるため、トレミー管5内に滞留するコンクリートの量を考慮して、コンクリートを打設することができ、ひいては、合理的な施工が可能となる。
As described above, according to the method for constructing a concrete structure of this embodiment, the concrete switching can be completed near the design switching completion height, so that when concretes of different strengths are poured continuously in the height direction, it is possible to rationally set the point at which the strength of the poured concrete changes. As a result, the cast-in-place concrete pile 1 with the required strength can be constructed economically.
Furthermore, according to this embodiment, the amount of concrete remaining in the tremie pipe 5 (retention height H) can be estimated, so that concrete can be poured taking into account the amount of concrete remaining in the tremie pipe 5, thereby enabling rational construction.

以下、式9を利用して、トレミー管5内に滞留するコンクリート量の推定方法の妥当性を確認した現場施工試験結果を示す。
施工試験では、4ケースの試験体について、コンクリート打設後にトレミー管5内外のコンクリートの天端レベルを計測した。図7(a)に試験体1,2を示し、図7(b)試験体3,4を示す。試験体1,2では、図7(a)に示すように、掘削孔6の中心部にトレミー管5を配管し、試験体3,4では2本のトレミー管5,5を掘削孔6の中心を挟んで対向するように配管した。測点Pは、トレミー管5内と、トレミー管5外の掘削孔6中心付近1点と、外周部にほぼ等間隔に設定した4点において測定した。すなわち、図7(a)に示すように、試験体1,2では計6点、図7(b)に示すように試験体3,4では計7点において測定した。トレミー管5内の計測値(試験体3,4では平均値)と、トレミー管5外の各測点における計測値の平均値により、コンクリート高さを求めた。
Below, the results of a field construction test that confirmed the validity of the method for estimating the amount of concrete retained in the tremie pipe 5 using Equation 9 are shown.
In the construction test, the top level of the concrete inside and outside the tremie pipe 5 was measured for four test specimens after concrete was poured. Figure 7(a) shows test specimens 1 and 2, and Figure 7(b) shows test specimens 3 and 4. In test specimens 1 and 2, the tremie pipe 5 was installed in the center of the borehole 6 as shown in Figure 7(a), and in test specimens 3 and 4, two tremie pipes 5, 5 were installed facing each other across the center of the borehole 6. Measurement points P were measured inside the tremie pipe 5, one point near the center of the borehole 6 outside the tremie pipe 5, and four points set at approximately equal intervals on the outer periphery. That is, as shown in Figure 7(a), a total of six points were measured for test specimens 1 and 2, and a total of seven points were measured for test specimens 3 and 4 as shown in Figure 7(b). The concrete height was calculated from the measured value inside the tremie pipe 5 (average value for test specimens 3 and 4) and the average value of the measured values at each measurement point outside the tremie pipe 5.

計算条件を以下に示す。
安定液水位 GL-0m
安定液単位体積重量 γsl=10kN/m3
下部コンクリート単位体積重量 γ=22.6kN/m3
下部コンクリートの降伏値 τ=325Pa
上部コンクリート単位体積重量 γ=23.5kN/m3
上部コンクリートの降伏値 τ=100Pa
The calculation conditions are as follows:
Stable liquid level GL-0m
Stabilizing liquid unit volume weight γsl = 10kN/ m3
Bottom concrete unit weight γ c = 22.6 kN/m 3
Yield value of the lower concrete τ = 325 Pa
Upper concrete unit volume weight γ c = 23.5 kN/m 3
Yield value of upper concrete τ=100Pa

上部コンクリート3および下部コンクリート2の降伏値τは、スランプ試験の流動解析を別途実施して、スランプあるいはスランプフローが目標値になるように設定した。
図8にコンクリート高さの試験結果と、推定結果の関係を示す。
図8に示すように、推定結果はおおむね対応している。また、推定結果(図8中の点線)の方が、試験結果よりも大きいことから(推定の直線(点線)よりも上側に位置していることから)、推定結果が安全側であることが確認できた。
The yield values τ of the upper concrete 3 and the lower concrete 2 were set so that the slump or slump flow would be the target value by separately conducting a flow analysis of a slump test.
Figure 8 shows the relationship between the test results for concrete height and the estimated results.
As shown in Figure 8, the estimated results generally correspond to the experimental results. In addition, since the estimated results (dotted lines in Figure 8) are greater than the experimental results (since they are located above the estimated straight line (dotted line)), it was confirmed that the estimated results are on the safe side.

次に、現場打ちコンクリート杭の杭径および打設切換深度をパラメーターとして、トレミー管5内に残るコンクリートの滞留高さHおよび根入れ長さ増分ΔTを算出した。計算条件を以下に示す。また、表1に計算結果を示す。
杭径:1.6m、2.0m、2.4m、3.0m
打設切換深度:GL-10m,-20m、-30m、-40m、-50m
安定液水位 GL-0m
安定液単位体積重量 γsl=10kN/m3
トレミー管:内径25cm、根入れ長さ2m
コンクリート単位体積重量 γ=22.6kN/m3
コンクリートの降伏値 τ=325Pa
Next, the pile diameter of the cast-in-place concrete pile and the switching depth for pouring were used as parameters to calculate the retention height H of the concrete remaining in the tremie pipe 5 and the increment in embedded length ΔT. The calculation conditions are shown below. The calculation results are shown in Table 1.
Pile diameter: 1.6m, 2.0m, 2.4m, 3.0m
Pouring switching depth: GL-10m, -20m, -30m, -40m, -50m
Stable liquid level GL-0m
Stabilizing liquid unit volume weight γsl = 10kN/ m3
Tremie pipe: inner diameter 25 cm, root length 2 m
Concrete unit weight γ c = 22.6 kN/m 3
Concrete yield value τ = 325 Pa

Figure 0007561096000003
Figure 0007561096000003

表1に示すように、杭径の大きさに関わらず、打設切換深度が深くなるほど、根入れ長さ増分ΔTが大きくなった。また、杭径が小さいほど、根入れ長さ増分ΔTが大きくなった。 As shown in Table 1, regardless of the pile diameter, the deeper the driving switching depth, the larger the embedded length increment ΔT. Also, the smaller the pile diameter, the larger the embedded length increment ΔT.

以上、本発明に係る実施形態について説明したが、本発明は前述の実施形態に限られず、前記の各構成要素については本発明の趣旨を逸脱しない範囲で適宜変更が可能である。
例えば、前記実施形態では、円柱状の場所打ちコンクリート杭1を構築する場合について説明したが、コンクリート構造物は限定されるものではない。
また、滞留コンクリート推定方法は、種類の異なるコンクリートを深さ方向に連続して打設する場合に限定されるものではなく、1種類のコンクリートを打設する場合に使用してもよい。
また、前記実施形態では、一本の場所打ちコンクリート杭1に対して、一本のトレミー管5により施工する場合について説明したが、トレミー管5の本数は限定されるものではなく、例えば、複数本のトレミー管5を利用してもよい。
前記実施形態では、上部コンクリート3として、下部コンクリート2よりも設計基準強度が高いコンクリートを打設するものとしたが、上部コンクリート3は、例えば、下部コンクリート2よりも流動性が高い等、下部コンクリート2とは種類が異なるコンクリートであれば限定されない。
前記実施形態では、第一工程において、滞留高さに相当するコンクリート量を見込んだ深度まで下部コンクリートを打設するものとしたが、打設切換深度の設定方法は限定されるものではない。
また、前記実施形態では、前記第二工程において、滞留高さに相当するコンクリート量以上の上部コンクリートをトレミー管内に供給する第一打設作業と、トレミー管の下部コンクリートへの挿入深さを調整するトレミー管調整作業と、トレミー管内への上部コンクリートの供給を再開して切換完了深度まで上部コンクリートを打設する第二打設作業を行うものとしたが、第二工程の作業手順は限定されるものではない。
Although an embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and each of the above-described components can be appropriately modified without departing from the spirit of the present invention.
For example, in the above embodiment, a cylindrical cast-in-place concrete pile 1 is constructed, but the concrete structure is not limited thereto.
Furthermore, the method for estimating retained concrete is not limited to cases where different types of concrete are poured continuously in the depth direction, but may be used when pouring one type of concrete.
In addition, in the above embodiment, a case has been described in which a single tremie pipe 5 is used for construction on a single cast-in-place concrete pile 1, but the number of tremie pipes 5 is not limited, and for example, multiple tremie pipes 5 may be used.
In the above embodiment, the upper concrete 3 is poured using concrete having a higher design standard strength than the lower concrete 2, but the upper concrete 3 is not limited to this as long as it is a different type of concrete from the lower concrete 2, for example, one having a higher fluidity than the lower concrete 2.
In the above embodiment, in the first step, the lower concrete is poured to a depth that anticipates the amount of concrete equivalent to the retention height, but the method of setting the pouring switching depth is not limited.
In addition, in the above embodiment, the second step includes a first pouring operation of supplying upper concrete into the tremie pipe with an amount of concrete equal to or greater than the retention height, a tremie pipe adjustment operation of adjusting the insertion depth of the tremie pipe into the lower concrete, and a second pouring operation of resuming the supply of upper concrete into the tremie pipe and pouring the upper concrete up to the switching completion depth, but the work procedure of the second step is not limited.

1 場所打ちコンクリート杭
2 下部コンクリート
3 上部コンクリート
4 鉄筋かご
5 トレミー管
6 掘削孔
1 Cast-in-place concrete pile 2 Lower concrete 3 Upper concrete 4 Reinforced concrete cage 5 Tremie pipe 6 Borehole

Claims (6)

トレミー管の先端を既打設コンクリートに挿入した状態で、前記トレミー管内に自由落下させたコンクリートを打設する場合において、前記トレミー管内に滞留する前記コンクリートの上面から前記既打設コンクリートの上面までの高低差である滞留高さを算出する滞留コンクリート推定方法であって、
前記滞留高さは、前記トレミー管内にコンクリートが滞留している状態におけるトレミー管外部圧力とトレミー管内部圧力とが等しいものとして算出するものとし、
前記トレミー管外部圧力は、前記トレミー管の前記既打設コンクリートへの挿入深さに基づいて、前記トレミー管の外部から作用する圧力であり
前記トレミー管内部圧力は、前記トレミー管内に滞留する前記コンクリートの自重から求まる力から、前記コンクリートと前記トレミー管の内面との摩擦抵抗力を減じた値を前記トレミー管の内空断面積で除した値であることを特徴とする、滞留コンクリート推定方法。
A method for estimating retained concrete, in which concrete that has been allowed to fall freely into a tremie pipe is poured with the tip of the tremie pipe inserted into already-placed concrete, is provided for calculating a retained height, which is a height difference between an upper surface of the concrete retained in the tremie pipe and an upper surface of the already-placed concrete,
The retention height is calculated assuming that the external pressure of the tremie pipe and the internal pressure of the tremie pipe are equal when concrete is retained in the tremie pipe,
The tremie pipe external pressure is a pressure acting from the outside of the tremie pipe based on the insertion depth of the tremie pipe into the already-cast concrete,
A method for estimating retained concrete, characterized in that the internal pressure of the tremie pipe is a value obtained by subtracting the frictional resistance force between the concrete and the inner surface of the tremie pipe from the force calculated from the weight of the concrete retained in the tremie pipe, and dividing the result by the internal cross-sectional area of the tremie pipe.
前記トレミー管外部圧力は、前記挿入深さに前記コンクリートの単位体積重量を乗じた値と、前記既打設コンクリートの上方に滞留する安定液の深さに前記安定液の単位体積重量を乗じた値とを足し合わせた値であり、
前記トレミー管内部圧力は、前記滞留高さと前記挿入深さとの合計値に前記コンクリートの単位体積重量および前記トレミー管の内空断面積を乗じた値から、前記滞留高さと前記挿入深さとの合計値にコンクリートの摩擦抵抗応力および前記トレミー管の内周長を乗じた値を減じた値を、前記トレミー管の内空断面積で除した値であることを特徴とする、請求項1に記載の滞留コンクリート推定方法。
The tremie pipe external pressure is a value obtained by multiplying the insertion depth by the unit volume weight of the concrete and a value obtained by multiplying the depth of the stabilizing liquid retained above the cast concrete by the unit volume weight of the stabilizing liquid,
The method for estimating retained concrete as described in claim 1, characterized in that the internal pressure of the tremie pipe is a value obtained by multiplying the sum of the retained height and the insertion depth by the unit volume weight of the concrete and the internal cross-sectional area of the tremie pipe, minus the value obtained by multiplying the sum of the retained height and the insertion depth by the frictional resistance stress of concrete and the inner circumference of the tremie pipe, and dividing the result by the internal cross-sectional area of the tremie pipe.
前記摩擦抵抗応力が、コンクリートをビンガム流体と仮定した場合のレオロジー定数であり、前記コンクリートが流動し始める限界のせん断応力に基づく値であることを特徴とする、請求項2に記載の滞留コンクリート推定方法。 The method for estimating retained concrete according to claim 2, characterized in that the frictional resistance stress is a rheological constant when the concrete is assumed to be a Bingham fluid, and is a value based on the limit shear stress at which the concrete begins to flow. 下部コンクリートの上に前記下部コンクリートとは異なる種類のコンクリートからなる上部コンクリートを打ち継ぐコンクリート構造物の構築方法であって、
下部コンクリートから上部コンクリートへの切り換えが完了する位置である切換完了深度の下方に下部コンクリートの打設が完了する位置である打設切換深度を設定し、当該打設切換深度まで下部コンクリートを打設する第一工程と、
トレミー管の下端が前記打設切換深度の下方に位置した状態で上部コンクリートの供給を開始し、前記切換完了深度まで上部コンクリートを打設する第二工程と、
前記切換完了深度の上方に上部コンクリートを打設する第三工程と、を備えており、
前記第一工程では、請求項1乃至請求項3のいずれか1項に記載の滞留コンクリート推定方法により求まる前記滞留高さに相当するコンクリート量の影響を見込んだ深度まで下部コンクリートを打設することを特徴とする、コンクリート構造物の構築方法。
A method for constructing a concrete structure by pouring an upper concrete made of a different type of concrete onto a lower concrete, comprising:
A first step of setting a pouring switching depth, which is a position where pouring of the lower concrete is completed, below a switching completion depth, which is a position where switching from the lower concrete to the upper concrete is completed, and pouring the lower concrete up to the pouring switching depth;
A second step of starting to supply upper concrete with the lower end of the tremie pipe positioned below the pouring switching depth and pouring the upper concrete up to the switching completion depth;
and a third step of pouring upper concrete above the switching completion depth,
A method for constructing a concrete structure, characterized in that in the first step, lower concrete is poured to a depth that takes into account the influence of the amount of concrete equivalent to the retained height obtained by the retained concrete estimation method described in any one of claims 1 to 3.
下部コンクリートの上に前記下部コンクリートとは異なる種類のコンクリートからなる上部コンクリートを打ち継ぐコンクリート構造物の構築方法であって、
下部コンクリートから上部コンクリートへの切り換えが完了する位置である切換完了深度の下方に下部コンクリートの打設が完了する位置である打設切換深度を設定し、当該打設切換深度まで下部コンクリートを打設する第一工程と、
トレミー管の下端が前記打設切換深度の下方に位置した状態で上部コンクリートの供給を開始し、前記切換完了深度まで上部コンクリートを打設する第二工程と、
前記切換完了深度の上方に上部コンクリートを打設する第三工程と、を備えており、
前記第二工程では、請求項1乃至請求項3のいずれか1項に記載の滞留コンクリート推定方法により求まる前記滞留高さに相当するコンクリート量以上の上部コンクリートを前記トレミー管内に供給する第一打設作業と、
前記トレミー管の下部コンクリートへの挿入深さを調整するトレミー管調整作業と、
前記トレミー管内への上部コンクリートの供給を再開し、前記切換完了深度まで前記上部コンクリートを打設する第二打設作業と、を行うことを特徴とする、コンクリート構造物の構築方法。
A method for constructing a concrete structure by pouring an upper concrete made of a different type of concrete onto a lower concrete, comprising:
A first step of setting a pouring switching depth, which is a position where pouring of the lower concrete is completed, below a switching completion depth, which is a position where switching from the lower concrete to the upper concrete is completed, and pouring the lower concrete up to the pouring switching depth;
A second step of starting to supply upper concrete with the lower end of the tremie pipe positioned below the pouring switching depth and pouring the upper concrete up to the switching completion depth;
and a third step of pouring upper concrete above the switching completion depth,
In the second step, a first pouring operation is performed to supply an upper concrete amount equivalent to the retained concrete height obtained by the retained concrete estimation method according to any one of claims 1 to 3 into the tremie pipe;
a tremie pipe adjustment operation for adjusting the insertion depth of the tremie pipe into the lower concrete;
a second pouring operation of resuming the supply of upper concrete into the tremie pipe and pouring the upper concrete up to the switching completion depth.
トレミー管の打設切換深度の下方への挿入長さを設定するとともに、前記トレミー管から前記打設切換深度よりも下側に供給される上部コンクリートの体積および前記滞留高さに相当するコンクリート量を見込んで、前記切換完了深度と前記打設切換深度の差である切換長さを算出することを特徴とする、請求項4または請求項5に記載のコンクリート構造物の構築方法。 The method for constructing a concrete structure according to claim 4 or 5, characterized in that the insertion length of the tremie pipe below the pouring switching depth is set, and the switching length, which is the difference between the switching completion depth and the pouring switching depth, is calculated by anticipating the volume of upper concrete supplied from the tremie pipe below the pouring switching depth and the amount of concrete equivalent to the retention height.
JP2021116898A 2021-07-15 2021-07-15 Method for estimating retained concrete and method for constructing concrete structure Active JP7561096B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021116898A JP7561096B2 (en) 2021-07-15 2021-07-15 Method for estimating retained concrete and method for constructing concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021116898A JP7561096B2 (en) 2021-07-15 2021-07-15 Method for estimating retained concrete and method for constructing concrete structure

Publications (2)

Publication Number Publication Date
JP2023013024A JP2023013024A (en) 2023-01-26
JP7561096B2 true JP7561096B2 (en) 2024-10-03

Family

ID=85129387

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021116898A Active JP7561096B2 (en) 2021-07-15 2021-07-15 Method for estimating retained concrete and method for constructing concrete structure

Country Status (1)

Country Link
JP (1) JP7561096B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7462336B2 (en) * 2022-05-20 2024-04-05 株式会社ニューギン Gaming Machines
JP7424666B2 (en) * 2022-05-20 2024-01-30 株式会社ニューギン gaming machine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003162554A (en) 2001-11-27 2003-06-06 Nippon Mining & Metals Co Ltd Paste pipe flow design method and program for implementing the method
JP2006016787A (en) 2004-06-30 2006-01-19 Fujita Corp Cast-in-place concrete pile and its construction method
JP2016176310A (en) 2015-03-23 2016-10-06 株式会社竹中工務店 Construction method of cast-in-place concrete pile
JP2018062757A (en) 2016-10-12 2018-04-19 東洋建設株式会社 Device for feeding landfill material
JP2019124650A (en) 2018-01-19 2019-07-25 前田建設工業株式会社 Method for estimating flowability of concrete, method for manufacturing concrete, and device for estimating flowability of concrete
JP2020020192A (en) 2018-08-02 2020-02-06 大成建設株式会社 Construction method of concrete structure

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51140307A (en) * 1975-05-28 1976-12-03 Kajima Corp Tremie pipe
JPS55138517A (en) * 1979-04-13 1980-10-29 Taisei Corp Casting method of root-consolidating cement
GB8328404D0 (en) * 1983-10-24 1983-11-23 Dixon R K Concrete construction
JPS63198826A (en) * 1987-02-13 1988-08-17 Kajima Corp Casting method for underwater cement hardening material
JPH06200528A (en) * 1992-12-29 1994-07-19 Mitsui Constr Co Ltd Concrete covering depth measuring device and underwater concrete placing method
JPH07138948A (en) * 1993-11-18 1995-05-30 Elf:Kk Cast-in-place pile driving method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003162554A (en) 2001-11-27 2003-06-06 Nippon Mining & Metals Co Ltd Paste pipe flow design method and program for implementing the method
JP2006016787A (en) 2004-06-30 2006-01-19 Fujita Corp Cast-in-place concrete pile and its construction method
JP2016176310A (en) 2015-03-23 2016-10-06 株式会社竹中工務店 Construction method of cast-in-place concrete pile
JP2018062757A (en) 2016-10-12 2018-04-19 東洋建設株式会社 Device for feeding landfill material
JP2019124650A (en) 2018-01-19 2019-07-25 前田建設工業株式会社 Method for estimating flowability of concrete, method for manufacturing concrete, and device for estimating flowability of concrete
JP2020020192A (en) 2018-08-02 2020-02-06 大成建設株式会社 Construction method of concrete structure

Also Published As

Publication number Publication date
JP2023013024A (en) 2023-01-26

Similar Documents

Publication Publication Date Title
JP7561096B2 (en) Method for estimating retained concrete and method for constructing concrete structure
CN106958243B (en) Anchor formula anti-float anchor rod and its construction method after a kind of
JP7187743B2 (en) Confirmation method of concrete pouring and construction method of concrete structure
JP7503518B2 (en) Cast-in-place concrete pile construction method
JP2018119303A (en) Casting concrete pile construction method
CN110206046A (en) The interpolation steel reinforcement cage bamboo joint pile supporting construction and its construction method of harnessing landslide
JP6004298B1 (en) Pile foundation design method
CN209128992U (en) A device for judging whether the height of grouting in bored piles is in place
CN211735555U (en) Long spiral bored concrete pile overlength steel reinforcement cage back insertion construction verticality control assembly
KR102622750B1 (en) Compaction device for cast-in-place concrete piles and operating method thereof
JP2016176310A (en) Construction method of cast-in-place concrete pile
CN110486055A (en) A kind of tunnel double-lining concreting anti-come to nothing tamping control device and method
CN204040499U (en) Steel pipe column vertical locating device is inserted after contrary sequence method
JP7284105B2 (en) Concrete switching confirmation device
CN213508598U (en) Self-locking anti-floating anchor construction structure
JP2020020192A (en) Construction method of concrete structure
CN102747753B (en) Device for testing pile side grouting pressure of screwed filling pile and testing method thereof
US7484912B1 (en) Method and apparatus for consolidating concrete test samples
RU2620112C1 (en) Method of arranging pile foundations with widening by method of crushing
CN113802553A (en) Test anchor rod construction device and anti-floating test method
RU2813841C1 (en) Impression pile
CN111910627A (en) Anchoring device and anchoring method
JP2017180050A (en) Ground evaluation device and ground evaluation method
RU2554368C2 (en) Method of pile production by impression
CN217299887U (en) Floor thickness control device for concrete pouring

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231017

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240415

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240423

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240530

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240618

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240718

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240917

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240920

R150 Certificate of patent or registration of utility model

Ref document number: 7561096

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150