Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7564685B2 - Water-impermeable structure of seawall at marine disposal site - Google Patents
[go: Go Back, main page]

JP7564685B2 - Water-impermeable structure of seawall at marine disposal site - Google Patents

Water-impermeable structure of seawall at marine disposal site Download PDF

Info

Publication number
JP7564685B2
JP7564685B2 JP2020183350A JP2020183350A JP7564685B2 JP 7564685 B2 JP7564685 B2 JP 7564685B2 JP 2020183350 A JP2020183350 A JP 2020183350A JP 2020183350 A JP2020183350 A JP 2020183350A JP 7564685 B2 JP7564685 B2 JP 7564685B2
Authority
JP
Japan
Prior art keywords
waterproof
waterproof sheet
sheet
layer
revetment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020183350A
Other languages
Japanese (ja)
Other versions
JP2021116681A (en
Inventor
正利 石田
典尚 池谷
多克 和木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyo Kogyo Co Ltd
Original Assignee
Taiyo Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyo Kogyo Co Ltd filed Critical Taiyo Kogyo Co Ltd
Publication of JP2021116681A publication Critical patent/JP2021116681A/en
Priority to JP2024137536A priority Critical patent/JP7773596B2/en
Application granted granted Critical
Publication of JP7564685B2 publication Critical patent/JP7564685B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Revetment (AREA)
  • Processing Of Solid Wastes (AREA)

Description

本発明は海面処分場護岸の遮水構造に係り、特に海面処分場等を建設する際に埋立域を囲むために構築される遮水護岸に設けられる遮水シートの護岸基部及び鉛直遮水工における遮水シート接合部、遮水護岸構造への定着部での遮水を確実に行えるようにした海面処分場護岸の遮水構造に関する。 The present invention relates to a waterproof structure for a seawall at a sea surface disposal site, and in particular to a waterproof structure for a seawall at a sea surface disposal site that ensures waterproofing at the seawall base of the waterproof sheet installed on the waterproof seawall constructed to surround the landfill area when constructing a sea surface disposal site, the waterproof sheet joints in the vertical waterproofing works, and the fixed parts to the waterproof seawall structure.

従来、一般廃棄物及び産業廃棄物の海面最終処分場は、遮水護岸を構築するために、連結部分を遮水構造とした複数のケーソンやセル等の護岸構造物によって区画して建設されている。これらの埋立域側では供用後の護岸構造物及び基礎地盤により囲まれた管理型廃棄物最終処分場から周辺海域及び周辺陸域への廃棄物や保有水の浸出防止を図るために、遮水シート等による各種の遮水構造が施工されている。 Conventionally, marine final disposal sites for municipal and industrial waste are constructed by dividing the area into sections using multiple caissons, cells, and other revetment structures with waterproof joints to create a waterproof revetment. On the landfill side, various waterproof structures using waterproof sheets, etc. are constructed to prevent the leakage of waste and retained water from the managed waste final disposal site, which is surrounded by the revetment structure and foundation ground after operation, into the surrounding sea and land areas.

これらの遮水構造については、「一般廃棄物の最終処分場及び産業廃棄物の最終処分場に係る技術上の基準を定める省令(以下、基準省令)」(非特許文献1)にその基本構造が明示されている。図15は、固化処理土59を裏埋め土として用いた遮水護岸50によって海面が区画され、建設された海面処分場の一例において、廃棄物58による埋立が完了した状態を示した概略断面図である。この海面処分場となる埋立域62は、遮水護岸の前面側のケーソン式混成堤護岸と背面側の鋼製矢板56とによって区画された内部が固化処理土59によって裏埋めされて遮水護岸50で区画されている。 The basic structure of these waterproof structures is specified in the "Ministry Ordinance Prescribing Technical Standards for Final Disposal Sites for Municipal Waste and Industrial Waste (hereinafter, Standards Ministerial Ordinance)" (Non-Patent Document 1). Figure 15 is a schematic cross-sectional view of an example of a sea surface disposal site constructed in which the sea surface is partitioned by a waterproof revetment 50 using solidified treated soil 59 as backfill soil, after landfilling with waste 58 has been completed. The landfill area 62 that will become this sea surface disposal site is partitioned by a caisson-type composite embankment on the front side of the waterproof revetment and steel sheet piles 56 on the back side, with the interior backfilled with solidified treated soil 59 and partitioned by the waterproof revetment 50.

ケーソン式混成堤護岸は、深層混合処理土層52上に構築された捨石マウンド53上にケーソン64が設置され、捨石マウンド53の埋立域62側の法面に沿って、遮水シート71からなる表面遮水工70が形成されている。表面遮水工70の上には、表面遮水工70全体を覆うように、上部被覆層としての押え捨石57が構築されている。 The caisson-type composite embankment has a caisson 64 installed on a rubble mound 53 constructed on a deep mixed soil layer 52, and a surface waterproofing work 70 consisting of a waterproof sheet 71 is formed along the slope of the rubble mound 53 on the landfill area 62 side. A riprap 57 is constructed as an upper covering layer on top of the surface waterproofing work 70 so as to cover the entire surface waterproofing work 70.

一方、背面側の鋼製矢板56の外面側(埋立域62側)の表面全面にわたり、表面遮水工70と同様の構成からなる遮水シート71からなる外側鉛直遮水工75が施され、その背後(内陸側)の埋立域62は搬入された廃棄物58で埋め立てられる。 On the other hand, an outer vertical waterproofing work 75 consisting of a waterproof sheet 71 having the same structure as the surface waterproofing work 70 is applied over the entire outer surface (landfill area 62 side) of the steel sheet pile 56 on the rear side, and the landfill area 62 behind it (inland side) is filled with the transported waste 58.

このように、一般に海面処分場は、埋立護岸構造物の各部に遮水工が付加された管理型廃棄物埋立護岸として構築される。各部の遮水工として、たとえば捨石マウンド53の法面から天端を覆うように敷設された表面遮水工70とケーソン64の基部との間には、アスファルトマスチック根固め層30が形成される。このような表面遮水工70では、遮水シート71を押さえるように施工される押さえブロック33と遮水シート71及びケーソン64との接合部分における遮水性を確保するために、アスファルトマスチック根固め層30と遮水シート71とが密着するのに必要な最小限の長さ(浸透路長)を確保することが必要である。 In this way, marine disposal sites are generally constructed as managed waste landfill revetments with waterproofing added to each part of the landfill revetment structure. For example, asphalt mastic base protection layer 30 is formed between surface waterproofing 70 laid to cover the slope and top of rubble mound 53 as the waterproofing work for each part and the base of caisson 64. In such surface waterproofing 70, in order to ensure waterproofing at the joints between the holding block 33 constructed to hold down the waterproof sheet 71 and the waterproof sheet 71 and caisson 64, it is necessary to ensure the minimum length (seepage path length) required for the asphalt mastic base protection layer 30 and the waterproof sheet 71 to adhere closely to each other.

これらの構成のうち、遮水護岸50の背面側の鋼製矢板56は、深層混合処理土層52に所定の根入れ長を確保して建て込まれ、頂部付近がケーソン64を控え工としたタイロッドTに保持された状態で埋立域62が区画されている。 Of these components, the steel sheet piles 56 on the rear side of the water-impermeable revetment 50 are erected with a specified embedment length in the deep mixed soil layer 52, and the landfill area 62 is defined with the top of the piles held in place by tie rods T with caissons 64 as retaining structures.

このように、鋼製矢板56は不透水性壁体としての機能が求められており、さらに経年劣化による構造性能の低下を防止するために、鋼製矢板56の外面側(埋立域62側)の表面全面にわたり、外側鉛直遮水工75が付設される。外側鉛直遮水工75には積層シート構造からなる遮水シート71が使用されている。 The steel sheet piles 56 are thus required to function as impermeable walls, and to prevent deterioration of the structural performance due to aging, an outer vertical waterproofing structure 75 is attached to the entire surface of the outer side (the landfill area 62 side) of the steel sheet piles 56. The outer vertical waterproofing structure 75 uses a waterproof sheet 71 with a laminated sheet structure.

ところで、この鋼製矢板56の外面鉛直遮水工75において、鋼製矢板56の建て込みと、鋼製矢板56の表面に遮水シート71を取り付ける作業とは、冬季に行わず年度を跨いで工事が行われる。このとき各工区間(たとえば、当該年度工区と、次年度工区との間)の工区境において、工事休止期間の間、ケーソン64に定着される遮水シートの端部71a(図16,17)を海中の全水深において安定した状態にしておく必要がある。また、工区境において、遮水シート71が連続しない分断部15が生じるため、工区境において分断された遮水シート71の端部71bでの遮水性を確保する必要がある。 In the outer vertical waterproofing work 75 of the steel sheet piles 56, the erection of the steel sheet piles 56 and the installation of the waterproof sheet 71 on the surface of the steel sheet piles 56 are not carried out in the winter but are carried out across fiscal years. At this time, at the boundary between each work section (for example, between the work section of the current year and the work section of the next year), the end 71a (Figs. 16 and 17) of the waterproof sheet fixed to the caisson 64 needs to be kept stable at all depths in the sea during the construction suspension period. In addition, because a divided section 15 where the waterproof sheet 71 is not continuous occurs at the work section boundary, it is necessary to ensure waterproofing at the end 71b of the waterproof sheet 71 that is divided at the work section boundary.

このような遮水シートの分断部でのシート端部での遮水性を確保するためにシート接続構造体が提案されている(特許文献1)。このシート接続構造体に設けられる遮水シートの接合部において、接合される遮水シートのそれぞれの端部を覆うように、連結体の枠体をシート端部に被せ、その内部にアスファルト混合物等の遮水材を充填するようになっている。 A sheet connection structure has been proposed to ensure watertightness at the ends of such waterproof sheets at the divided parts (Patent Document 1). At the joints of the waterproof sheets provided in this sheet connection structure, the frame of the connector is placed over the ends of the sheets so as to cover each end of the waterproof sheets to be joined, and the inside is filled with a waterproof material such as an asphalt mixture.

特許第4441240号公報Patent No. 4441240

環境庁 法令・告示・通達、“一般廃棄物の最終処分場及び産業廃棄物の最終処分場に係る技術上の基準を定める省令”、[online]、最終更新:平成29年6月9日公布改正、環境省、[令和2年3月6日検索]、インターネット<URL:https://elaws.e-gov.go.jp/search/elawsSearch/elaws_search/lsg0500/detail?lawId=352M50000102001&openerCode=1>Environment Agency, Laws, Notifications and Notices, "Ministry Ordinance on Technical Standards for Final Disposal Sites for General Waste and Final Disposal Sites for Industrial Waste", [online], last updated: Amended and published on June 9, 2017, Ministry of the Environment, [searched on March 6, 2020], Internet <URL: https://elaws.e-gov.go.jp/search/elawsSearch/elaws_search/lsg0500/detail?lawId=352M50000102001&openerCode=1>

ところで、遮水シート71の端部が保持されるアスファルトマスチック根固め層30は、流動状態のアスファルトマスチックが仕切型枠としての押さえコンクリートブロック33で囲まれた区画内に充填され、冷固したものである。この時のアスファルトマスチック根固め層30内で浸透路長Lは、たとえば根固め層30の底辺長に相当し、L>1,250mm(たとえば1,250mm=必要密着長500mm×安全率2.5)確保することが求められている。また、表面が鉛直遮水工75で覆われた鋼製矢板56の基部においても、遮水シート20の端部は押さえブロック33等で遮水シート20とアスファルトマスチック根固め層30及び処理土表面等に密着させて十分な遮水性能を発揮させる必要がある。 The asphalt mastic base layer 30, in which the ends of the waterproof sheet 71 are held, is formed by filling a section surrounded by holding concrete blocks 33 as partition forms with asphalt mastic in a fluid state, and then cooling and solidifying. In the asphalt mastic base layer 30, the seepage path length L corresponds to, for example, the length of the bottom edge of the base layer 30, and it is required to ensure that L>1,250 mm (for example, 1,250 mm = required contact length 500 mm x safety factor 2.5). In addition, even at the base of the steel sheet pile 56, the surface of which is covered with the vertical waterproofing work 75, the ends of the waterproof sheet 20 must be held in contact with the waterproof sheet 20, the asphalt mastic base layer 30, and the treated soil surface by holding blocks 33, etc., to ensure sufficient waterproofing performance.

しかし、捨石マウンド53上に設置されたケーソン64の基部と捨石マウンド53の法肩との距離が短く、アスファルトマスチック根固め層の底面長が確保できない場合や、遮水シート71の接合部の構造上、浸透路長を確保できない場合がある。 However, there are cases where the distance between the base of the caisson 64 installed on the rubble mound 53 and the toe of the rubble mound 53 is short, making it impossible to ensure the bottom length of the asphalt mastic foot protection layer, or where the structure of the joints of the waterproof sheet 71 makes it impossible to ensure the infiltration path length.

特許文献1に開示されたシート接続構造体では、遮水シートの接合部において、それぞれの遮水シートの端部での遮水性能は保持することが可能となるが、それぞれの遮水シートを接合する工程を含む場合において、分断された箇所での遮水シート端部を安定した状態で保持する点や、その状態での遮水性を確保する点については考慮されていない。 In the sheet connection structure disclosed in Patent Document 1, it is possible to maintain the waterproofing performance at the ends of each waterproof sheet at the joints of the waterproof sheets, but when the process of joining each waterproof sheet is included, no consideration is given to holding the waterproof sheet ends in a stable state at the separated points or ensuring waterproofing in that state.

また、鉛直遮水工75において、図16,図17に示したように、ケーソン64などの構造物への定着部となる遮水シート71のシート端部71aや、遮水シート71の接合部でのシート端部71bでの遮水を、その深度方向の全高にわたって確実に行う必要がある。 In addition, in the vertical waterproofing work 75, as shown in Figures 16 and 17, it is necessary to reliably perform waterproofing at the sheet end 71a of the waterproof sheet 71, which is the fixed part to the structure such as the caisson 64, and at the sheet end 71b at the joint of the waterproof sheet 71, over the entire height in the depth direction.

そこで、本発明の目的は上述した従来の技術が有する問題点を解消するために、アスファルトマスチック遮水部内に定着された遮水シート各部の端部とアスファルトマスチックとの間において、十分な浸透路長を確保することで、遮水シートの根固め部でのシート端部、構造物への定着部でのシート端部、遮水シート分断部におけるシート端部において、十分な遮水性を確保できるようにした海面処分場護岸の遮水構造を提供することにある。 The object of the present invention is to provide a waterproof structure for a seawall at a sea surface disposal site that ensures sufficient waterproofing at the ends of the waterproof sheet at the base fixing portion, the ends of the sheet at the fixing portion to the structure, and the ends of the waterproof sheet at the divided portion, by ensuring a sufficient seepage path length between the ends of each part of the waterproof sheet fixed in the asphalt mastic waterproof portion and the asphalt mastic, in order to solve the problems of the conventional technology described above.

上記目的を達成するために、本発明の海面処分場護岸の遮水構造は、海面処分場護岸を区画するように造成された護岸構造物の基部に、不透水性遮水材料を充填してなる根固め遮水層を介して、前記護岸構造物を支持する遮水基盤面上に敷設された遮水層を構成する遮水シートの端部を定着させる遮水構造であって、前記根固め遮水層は、前記遮水シート上に設けられた押さえ工と前記護岸構造物との間の空間に充填された冷固したアスファルトマスチック根固め層からなり、前記遮水シートは、端部が前記護岸構造物の基部まで延在するように敷設され、第1の中間遮水シートが前記遮水シート上の前記根固め遮水層と前記押さえ工との間に密着し、前記遮水層の遮水シートから立ち上げられた形状が保持されるように、前記遮水シートに溶着接合され、前記第1の中間遮水シートに加え、前記第1の中間遮水シートと前記護岸構造物との間の前記遮水シートに、少なくとも1枚の第2の中間遮水シートが、前記根固め遮水層内で前記遮水シートから立ち上げられた形状で保持されるように、前記遮水シートに溶着接合され、
前記根固め遮水層表面と前記遮水シートとの間の浸透路長を、前記第1の中間遮水シートと前記第2の中間遮水シートの表面を経由させて延長させたことを特徴とする。
In order to achieve the above object, the waterproof structure of the present invention for a sea surface disposal site revetment is a waterproof structure in which an end of a waterproof sheet constituting a waterproof layer laid on a waterproof base surface supporting the revetment structure is fixed to a base of the revetment structure constructed to divide the sea surface disposal site revetment via a footing waterproof layer formed by filling an impermeable waterproof material, the footing waterproof layer being made of a cooled and solidified asphalt mastic footing layer filled in a space between a retainer provided on the waterproof sheet and the revetment structure , and the end of the waterproof sheet is fixed to the revetment structure via a footing waterproof layer formed by filling an impermeable waterproof material. a first intermediate waterproof sheet is welded to the waterproof sheet so as to be in close contact with the base of the structure, the first intermediate waterproof sheet is welded to the waterproof sheet so as to be in close contact with the base of the structure and the retaining work, and the first intermediate waterproof sheet is welded to the waterproof sheet so as to be able to maintain the shape of the waterproof sheet standing up from the waterproof sheet of the waterproof layer; and in addition to the first intermediate waterproof sheet, at least one second intermediate waterproof sheet is welded to the waterproof sheet between the first intermediate waterproof sheet and the revetment structure, the second intermediate waterproof sheet is welded to the waterproof sheet so as to be able to maintain the shape of the waterproof sheet standing up from the waterproof sheet within the base waterproof layer;
The method is characterized in that the seepage path length between the surface of the root-protection water-proofing layer and the water-proof sheet is extended via the surfaces of the first intermediate water-proof sheet and the second intermediate water-proof sheet .

前記第2の中間遮水シートは、前記第1の中間遮水シートより短い長さで、前記根固め遮水層内に埋設されるようにして立ち上げられた形状が保持されることが好ましい。 It is preferable that the second intermediate waterproof sheet has a length shorter than that of the first intermediate waterproof sheet and is embedded in the root protection waterproof layer so as to maintain the erected shape.

前記第2の中間遮水シートの長さは、前記第1の中間遮水シートの長さの1/2であることが好ましい。 The length of the second intermediate waterproof sheet is preferably half the length of the first intermediate waterproof sheet.

前記遮水層は、遮水シートと、その両面を挟む保護マットとの積層シートからなることが好ましい。 The waterproof layer is preferably made of a laminated sheet of a waterproof sheet and protective mats sandwiching both sides of the waterproof sheet.

前記不透水性遮水材料は、所定の遮水性能を有する、アスファルト系材料、コンクリート系材料、土質系材料、ケミカル系材料から選択されることが好ましい。 The impermeable water-blocking material is preferably selected from asphalt-based materials, concrete-based materials, soil-based materials, and chemical-based materials that have a predetermined water-blocking performance.

本発明の海面処分場護岸の遮水構造の一実施形態が用いられている海面処分場(全体構造の一例として図15参照)のケーソン式混成堤護岸のケーソンと捨石マウンドの天端近傍を示した側断面図。A side cross-sectional view showing the caisson and rubble mound near the top of a caisson-type composite breakwater at a marine disposal site (see Figure 15 as an example of the overall structure) in which one embodiment of the waterproofing structure for the seawall at a marine disposal site of the present invention is used. 図1に示した遮水構造の基部を拡大して示した拡大側断面図。FIG. 2 is an enlarged cross-sectional side view showing a base portion of the waterproof structure shown in FIG. 1 . 図15に示した鋼製矢板の根入れ部上端に本発明の遮水構造を適用した実施形態を拡大して示した拡大側断面図。FIG. 16 is an enlarged cross-sectional side view showing an embodiment in which the waterproof structure of the present invention is applied to the upper end of the embedded portion of the steel sheet pile shown in FIG. 図1に示した遮水構造の他の実施形態を拡大して示した拡大側断面図。2 is an enlarged cross-sectional side view showing another embodiment of the water impermeable structure shown in FIG. 1 . さらに他の実施形態の遮水構造を拡大して示した拡大側断面図。FIG. 11 is an enlarged cross-sectional side view showing a waterproof structure according to still another embodiment. 鋼製矢板の遮水構造の他の実施形態の全体構造を示した側断面図。FIG. 11 is a side cross-sectional view showing the overall structure of another embodiment of a water-proof structure for a steel sheet pile. 鋼製矢板の根入れ部上端近傍での遮水構造を拡大して示した拡大側断面図。An enlarged side cross-sectional view showing the waterproof structure near the upper end of the embedded portion of the steel sheet pile. 本発明の海面処分場護岸の遮水構造を、海面処分場(一例として図16)のケーソン式混成堤護岸に適用した一実施形態を示した部分平面図。FIG. 16 is a partial plan view showing an embodiment in which the waterproof structure of the seawall of a marine disposal site of the present invention is applied to a caisson-type composite breakwater at a marine disposal site (FIG. 16 is an example of the waterproof structure). 図8に示した遮水シート分断部(IX)での遮水シート端部の遮水構造の一実施形態を拡大して示した部分平面図。FIG. 9 is an enlarged partial plan view showing one embodiment of a waterproof structure of the end of the waterproof sheet at the waterproof sheet separation portion (IX) shown in FIG. 8 . 図9に示した分岐遮水シートの変形例を示した部分平面図。FIG. 10 is a partial plan view showing a modified example of the branched waterproof sheet shown in FIG. 9 . 遮水シート端部の遮水構造の他の実施形態を示した部分平面図。FIG. 4 is a partial plan view showing another embodiment of the waterproof structure at the end of the waterproof sheet. 図8に示したケーソン側定着部(XII)での遮水シート端部の遮水構造の一実施形態を拡大して示した部分平面図。A partial plan view showing an enlarged view of one embodiment of the waterproof structure of the end of the waterproof sheet at the caisson side anchorage (XII) shown in Figure 8. 遮水シート端部の遮水構造の他の実施形態を示した部分平面図。FIG. 4 is a partial plan view showing another embodiment of the waterproof structure at the end of the waterproof sheet. 遮水シート端部の遮水構造のさらに他の実施形態を示した部分平面図。FIG. 4 is a partial plan view showing yet another embodiment of the waterproof structure at the end of the waterproof sheet. 従来の海面処分場護岸の遮水構造の一例の全体構造を示した側断面図。FIG. 1 is a side cross-sectional view showing the overall structure of an example of a conventional waterproof structure for a seawall at a sea surface disposal site. 従来の海面処分場護岸の鉛直遮水工におけるケーソンと鋼製矢板の設置状態、ケーソン側定着部、遮水シート分断部の位置例を示した部分平面図。A partial plan view showing the installation state of caissons and steel sheet piles in a vertical waterproofing structure of a conventional seawall at a marine disposal site, as well as examples of the positions of the caisson side anchorages and waterproofing sheet separation parts. 図16に示したケーソンと鋼製矢板の設置状態、ケーソン側定着部、遮水シート分断部の位置例を示した部分正面図。A partial front view showing the installation state of the caisson and steel sheet pile shown in Figure 16, the caisson side anchorage part, and an example of the position of the waterproof sheet dividing part.

以下、本発明の海面処分場護岸の遮水構造の実施するための形態について添付図面を参照して説明する。 Below, the embodiment of the waterproof structure for the seawall of a marine disposal site of the present invention will be explained with reference to the attached drawings.

[表面遮水工基部における遮水構造の構成]
図1は、本発明の遮水構造を、図15に例示した海面処分場と同じ規模の海面処分場の遮水護岸のケーソン4の基部と捨石マウンド3の端部との間の接合部分に適用した実施形態を示している。図2は、図1の捨石マウンド3の天端部分のケーソン4の基部との間の遮水構造を拡大して示している。
[Configuration of the waterproof structure at the base of the surface waterproof structure]
Fig. 1 shows an embodiment in which the waterproof structure of the present invention is applied to a joint between the base of a caisson 4 of a waterproof revetment and the end of a rubble mound 3 of a sea surface disposal site of the same scale as the sea surface disposal site illustrated in Fig. 15. Fig. 2 shows an enlarged view of the waterproof structure between the base of the caisson 4 at the top end portion of the rubble mound 3 of Fig. 1.

図1に示したケーソン4は、海面処分場を区画する遮水護岸1の前面側(海洋側)の構造物として、深層混合処理土層52(図15)上に造成された捨石マウンド3上に設置されている。ケーソン4は、内部に中詰め砂が充填された公知の鉄筋コンクリート製、鋼製、ハイブリッド製の函体からなり、複数の同形のケーソン4を捨石マウンド3上に列状に配置され、その背面が個か処理度9で裏埋めされる。これにより、沿岸水域に所定面積、広さからなる埋立域11(図15)を区画する遮水護岸1の前面側の構造物として機能する。 The caissons 4 shown in Figure 1 are installed on a rubble mound 3 constructed on a deep mixed treated soil layer 52 (Figure 15) as a structure on the front side (ocean side) of the waterproof revetment 1 that divides the sea surface disposal site. The caissons 4 are made of known reinforced concrete, steel, or hybrid boxes filled with filler sand inside, and multiple caissons 4 of the same shape are arranged in a row on the rubble mound 3, and their backs are backfilled with a treatment level of 9. This allows them to function as a structure on the front side of the waterproof revetment 1 that divides the landfill area 11 (Figure 15) of a specified area and width in the coastal waters.

図1、図2に示したように、ケーソン4は、捨石マウンド3上の天端の幅方向のほぼ中央位置に設置される。捨石マウンド3の法面には表面遮水工10が捨石マウンド3の法肩から法尻までの法面全体を覆うように敷設され、その上面に表面遮水工10を保護するための押え捨石5が所定層厚で積み上げられている。さらに、表面遮水工10の上端部は、アスファルトマスチック浸透防止用の目潰し砕石7が所定層厚で敷設された捨石マウンド3の天端面を覆い、ケーソン4の基部に到達するように延設されている。 As shown in Figures 1 and 2, the caisson 4 is installed at approximately the center of the width of the top of the rubble mound 3. A surface waterproofing work 10 is laid on the slope of the rubble mound 3 so as to cover the entire slope from the top to the bottom of the slope of the rubble mound 3, and a prescribed layer of protective rubble 5 is piled on top of the work to protect the surface waterproofing work 10. Furthermore, the upper end of the surface waterproofing work 10 is extended to cover the top surface of the rubble mound 3, on which a prescribed layer of crushed stone 7 for preventing asphalt mastic penetration has been laid.

表面遮水工10は、芯材としての遮水シート20の両面が保護マット22で積層された三層一体型の積層シートからなる。遮水シート20は、低密度ポリエチレンシート(LLDPE:厚さ3mm)からなり、その上下面に保護マット22としての不織布が一体的に積層された三層一体型の積層シートの構成からなる。このように、遮水シートの両面に保護マット22としての不織布を積層して配置することにより、捨石マウンド3の裏込め材料の表面に不織布が接し、裏込め材料と遮水層との間に大きな静止摩擦力と、緩衝作用が確保できる。遮水シートに好適な他の素材としては、ポリ塩化ビニル(PVC)製シート、不織布とPVCシートとの積層シート、熱可塑性系エラストマー(TPE)シート、高密度ポリエチレンシート(HDPE)の単体シート等があり、これらを適宜選択して使用することができる。シート厚としては沈下等による伸び等を考慮して1.5~3.0mm程度とすることが好ましい。 The surface waterproofing work 10 is composed of a three-layer laminated sheet in which both sides of the waterproof sheet 20 as the core material are laminated with protective mats 22. The waterproof sheet 20 is composed of a low-density polyethylene sheet (LLDPE: thickness 3 mm), and the upper and lower surfaces are laminated with nonwoven fabric as protective mats 22, forming a three-layer laminated sheet. By arranging the nonwoven fabric as protective mats 22 laminated on both sides of the waterproof sheet in this way, the nonwoven fabric comes into contact with the surface of the backfill material of the rubble mound 3, and a large static friction force and a buffering effect can be secured between the backfill material and the waterproof layer. Other materials suitable for the waterproof sheet include polyvinyl chloride (PVC) sheets, laminated sheets of nonwoven fabric and PVC sheets, thermoplastic elastomer (TPE) sheets, and single sheets of high-density polyethylene sheets (HDPE), and these can be appropriately selected and used. It is preferable that the sheet thickness is about 1.5 to 3.0 mm, taking into account elongation due to settlement, etc.

保護マット22は、本実施形態ではポリエチレンテレフタラート(PET)不織布(500g/m2)が用いられている。2枚の保護マット22で遮水シート20を挟むように積層し、表面遮水工10が構成されている。保護マット22のその他の好適な材料としては、ポリエチレン(PE)やポリプロピレン(PP)等を使用することができるが、遮水シートの各面に接する現場状況によっては、遮水シート20の片面のみに保護マット22を使用しても良い。 In this embodiment, a polyethylene terephthalate (PET) nonwoven fabric (500 g/ m2 ) is used for the protective mat 22. The waterproof sheet 20 is sandwiched between two protective mats 22 to form the surface waterproof work 10. Other suitable materials for the protective mat 22 include polyethylene (PE) and polypropylene (PP), but the protective mat 22 may be used on only one side of the waterproof sheet 20 depending on the on-site conditions in contact with each side of the waterproof sheet.

ここで、本発明の遮水構造1の端部の構成について、図2、図3を参照して説明する。一般部の表面遮水工10は、遮水シート20の両面が保護マット22で挟まれた三層一体型の積層シートからなるが、ケーソン4の基部位置に定着される端部では、図2に示したように、目潰し砕石7上に下面側の保護マット22L、遮水シート20が敷設され、遮水シート20上にアスファルトマスチック根固め層30が形成されている。このアスファルトマスチック根固め層30は、法肩側に設置された押さえコンクリートブロック33とケーソン4との間にアスファルトマスチックを充填して構築されたブロック体で、このアスファルトマスチック根固め層30と押さえコンクリートブロック33との間には、遮水シート20の幅方向の中間位置のシート上面に接合され、中間遮水シートとして機能する立ち上がり遮水シート21が、立ち上がり保護マット23とともにアスファルトマスチック根固め層30と押さえコンクリートブロック33の間に密着して挟まれるように設けられている。この境界部分に立ち上がり遮水シート21を付加することにより、表面遮水工10の端部での所定の浸透路長が確保され、この境界部分での遮水性が確保されている。 Here, the configuration of the end of the waterproof structure 1 of the present invention will be described with reference to Figures 2 and 3. The surface waterproofing work 10 of the general part is composed of a three-layer integrated laminated sheet in which both sides of the waterproof sheet 20 are sandwiched between protective mats 22, but at the end that is fixed to the base position of the caisson 4, as shown in Figure 2, the lower protective mat 22L and the waterproof sheet 20 are laid on the crushed stone 7, and an asphalt mastic footing layer 30 is formed on the waterproof sheet 20. This asphalt mastic footing layer 30 is a block body constructed by filling asphalt mastic between the holding concrete block 33 installed on the slope side and the caisson 4, and between this asphalt mastic footing layer 30 and the holding concrete block 33, a rising waterproof sheet 21 that is joined to the upper surface of the waterproof sheet 20 at the middle position in the width direction and functions as an intermediate waterproof sheet is provided so as to be sandwiched in close contact with the rising protective mat 23 between the asphalt mastic footing layer 30 and the holding concrete block 33. By adding a rising waterproof sheet 21 to this boundary portion, a specified seepage path length is ensured at the end of the surface waterproofing work 10, ensuring waterproofing at this boundary portion.

立ち上がり遮水シート21は、捨石マウンド3の天端面に敷設された遮水シート20の上面から上方に枝分かれるように遮水性を保持して溶着接合された、一般部の遮水シート20と同等の厚さ、仕様を有する遮水シートである。この立ち上がり遮水シート21の外面(アスファルトマスチック根固め層30と反対側)には、一般部の上面側の保護マット22の端部を折り上げるように延長させて立ち上がり保護マット23が密着している。 The rising waterproof sheet 21 is a waterproof sheet with the same thickness and specifications as the general waterproof sheet 20, which is welded and joined while maintaining its waterproofness so that it branches out upward from the upper surface of the waterproof sheet 20 laid on the top surface of the rubble mound 3. A rising protective mat 23 is attached to the outer surface of this rising waterproof sheet 21 (the side opposite the asphalt mastic foot protection layer 30) by folding up the end of the protective mat 22 on the upper surface side of the general part and extending it.

従来、アスファルトマスチック根固め層30の底面幅Dを設定するに際し、遮水シート20とアスファルトマスチック根固め層30との間の遮水性を確保するために、通常の構造では底面幅Dに相当する長さの浸透路長L(たとえば1,250mm=必要密着長500mm×安全率2.5)を確保することが必要であるところ、本発明では、立ち上がり遮水シート21が遮水性を保持して遮水シート20に接合されているため、この立ち上がり遮水シート21の高さH分を浸透路長として加算して浸透路長Lを
L=D+H
として考慮することができる。
よって、捨石マウンド3の天端面の寸法に制限があり、アスファルトマスチック根固め層30の底面幅Dで必要な浸透路長Lが確保できないような場合にも遮水工の端部での遮水性仕様を確保することができる。
Conventionally, when setting the bottom width D of the asphalt mastic foot protection layer 30, in order to ensure water impermeability between the waterproof sheet 20 and the asphalt mastic foot protection layer 30, it is necessary to ensure a seepage path length L (for example, 1,250 mm = necessary contact length 500 mm x safety factor 2.5) equivalent to the bottom width D in a normal structure. However, in the present invention, since the rising waterproof sheet 21 is joined to the waterproof sheet 20 while maintaining water impermeability, the height H of the rising waterproof sheet 21 is added as the seepage path length to obtain the seepage path length L: L = D + H
It can be considered as:
Therefore, even if there are limitations on the dimensions of the top surface of the rubble mound 3 and the required infiltration path length L cannot be secured with the bottom width D of the asphalt mastic foot protection layer 30, the water-tight specifications at the end of the water-tight work can be secured.

図3は、図15に示した遮水護岸1の背面側の鋼製矢板6の根入れ部上端の地盤面との境界部分6a(以下、根入れ境界6aと記す。)における遮水構造を拡大して示している。図3に示したように、鋼製矢板6の先端は遮水基盤として施工された深層混合処理土(C.D.M.)2に根入れされているが、鋼製矢板6を挟んだ遮水護岸1の内部及び埋立域11の両側の混合処理土2の表面に不陸整正用水中不分離コンクリート36が打設されて表面がほぼ平面化され、さらに、コンクリート表面に厚さ約15cmのアスファルトマスチック密着層35が形成され、鋼製矢板6の根入れ境界6aでの遮水性が確保されている。 Figure 3 shows an enlarged view of the waterproof structure at the boundary 6a (hereinafter referred to as the embedment boundary 6a) between the upper end of the embedded part of the steel sheet pile 6 on the back side of the waterproof revetment 1 shown in Figure 15 and the ground surface. As shown in Figure 3, the tip of the steel sheet pile 6 is embedded in the deep mixed treated soil (C.D.M.) 2 that was constructed as a waterproof base, but the inside of the waterproof revetment 1 between the steel sheet pile 6 and the surface of the mixed treated soil 2 on both sides of the reclaimed area 11 are poured with underwater non-separable concrete 36 for unevenness correction, making the surface almost flat, and furthermore, an asphalt mastic adhesion layer 35 with a thickness of about 15 cm is formed on the concrete surface, ensuring waterproofing at the embedment boundary 6a of the steel sheet pile 6.

遮水護岸1の内部のアスファルトマスチック密着層35の表面には捨石マウンド3上に敷設された表面遮水工10の遮水シート20と上側保護マット22Uの端部が鋼製矢板6の根入れ境界6a位置まで延設され、上側保護マット22Uの端部の所定範囲にわたって根固めアスファルトマスチック根固め層30が形成されている。一方、鋼製矢板6の埋立域11側の側面には外側鉛直遮水工27が施されている。外側鉛直遮水工27では、捨石マウンド3の表面遮水工10と同様に、遮水シート20が保護マット20で挟まれた三層一体型の積層シートが用いられている。 On the surface of the asphalt mastic adhesive layer 35 inside the waterproof revetment 1, the ends of the waterproof sheet 20 and upper protective mat 22U of the surface waterproof work 10 laid on the rubble mound 3 are extended to the embedment boundary 6a position of the steel sheet pile 6, and a foot-fixing asphalt mastic foot-fixing layer 30 is formed over a predetermined range of the end of the upper protective mat 22U. Meanwhile, an outer vertical waterproof work 27 is provided on the side of the steel sheet pile 6 facing the landfill area 11. In the outer vertical waterproof work 27, a three-layer integrated laminated sheet is used in which the waterproof sheet 20 is sandwiched between the protective mats 20, just like the surface waterproof work 10 of the rubble mound 3.

埋立域11側の鋼製矢板6から所定範囲にわたる基盤面にも、三層一体型の積層シートからなる基盤面遮水工15が形成されている。鋼製矢板6の外側鉛直遮水工27の基部と基盤面遮水工15の端部とは、図3に示したように、押さえコンクリートブロック33で区画された部分に充填されたアスファルトマスチック根固め層30によって遮水性能が確保されている。このとき基盤面遮水工15において、図2に示した構成と同じ構成からなる遮水シート20の上面に接合された立ち上がり遮水シート21と立ち上がり保護マット23とが、アスファルトマスチック根固め層30と押さえコンクリートブロック33の側面に沿って密着して設けられている。この基盤面遮水工15の浸透路長も、基盤面遮水工15の遮水シート20と立ち上がり遮水シート21のシート長の和とすることができる。これにより、鋼製矢板6の根入れ境界6aの基盤面遮水工15においても遮水性が確保されている。 A three-layered laminated sheet is also formed on the foundation surface over a predetermined range from the steel sheet pile 6 on the reclaimed area 11 side. The waterproofing performance of the base of the outer vertical waterproofing 27 of the steel sheet pile 6 and the end of the foundation surface waterproofing 15 is ensured by the asphalt mastic footing layer 30 filled in the area partitioned by the holding concrete block 33, as shown in Figure 3. At this time, in the foundation surface waterproofing 15, the rising waterproof sheet 21 and the rising protective mat 23 joined to the upper surface of the waterproof sheet 20 having the same configuration as that shown in Figure 2 are provided in close contact with the side of the asphalt mastic footing layer 30 and the holding concrete block 33. The infiltration path length of this foundation surface waterproofing 15 can also be the sum of the sheet lengths of the waterproof sheet 20 and the rising waterproof sheet 21 of the foundation surface waterproofing 15. As a result, waterproofing is also ensured in the foundation surface waterproofing 15 at the embedment boundary 6a of the steel sheet pile 6.

図4は、上述した捨石マウンド3の天端における表面遮水工10の遮水シート20に接合された立ち上がり遮水シート21の変形例を示している。同図に示したように、捨石マウンド3の天端のケーソン4の背面側基部と押さえコンクリートブロック33とで区画された範囲に形成されたアスファルトマスチック根固め層30では、押さえコンクリートブロック33とアスファルトマスチック根固め層30との間に、第1の中間遮水シートとしての立ち上がり遮水シート21Aを、アスファルトマスチック根固め層30の幅方向のほぼ中央位置に、高さ(長さ)が立ち上がり遮水シート21Aの1/2である、第2の中間遮水シートとしての立ち上がり遮水シート21Bを設け、遮水シート20とこれらの2枚の立ち上がり遮水シート21A,21Bで浸透路長の延長を図っている。2枚の立ち上がり遮水シート21A,21Bを表面遮水工10の遮水シート20から鉛直に立ち上がるように配置されることで、表面遮水工10の端部の浸透路長Lは、図4で破線表示したように、これら遮水シート2021A,21Bの長さの和となる。すなわち、アスファルトマスチック根固め層30の底面幅D、高さHとすると、
L=D+H+(H/2)+(H/2)
とすることができ、アスファルトマスチック根固め層30における遮水性能をより発揮させることができる。本実施形態では、立ち上がり遮水シート21Bの長さは、立ち上がり遮水シート21Aの1/2であったが、立ち上がり遮水シート21Bの長さは、立ち上がり遮水シート21Bがアスファルトマスチック根固め層30内において、自立して埋設されるように保持できる程度に短ければ、適宜長さを変更できる。
4 shows a modified example of the rising waterproof sheet 21 joined to the waterproof sheet 20 of the surface waterproof work 10 at the top of the rubble mound 3. As shown in the figure, in the asphalt mastic foot protection layer 30 formed in the area partitioned by the back side base of the caisson 4 at the top of the rubble mound 3 and the holding concrete block 33, a rising waterproof sheet 21A as a first intermediate waterproof sheet is provided between the holding concrete block 33 and the asphalt mastic foot protection layer 30, and a rising waterproof sheet 21B as a second intermediate waterproof sheet having a height (length) 1/2 that of the rising waterproof sheet 21A is provided at the approximate center position in the width direction of the asphalt mastic foot protection layer 30 , and the waterproof sheet 20 and these two rising waterproof sheets 21A and 21B are used to extend the seepage path length. By arranging the two rising waterproof sheets 21A, 21B so as to rise vertically from the waterproof sheet 20 of the surface waterproof work 10, the seepage path length L at the end of the surface waterproof work 10 is the sum of the lengths of these waterproof sheets 20 , 21A , 21B , as shown by the dashed line in Figure 4. In other words, if the bottom width of the asphalt mastic foot protection layer 30 is D and the height is H,
L=D+H+(H/2)+(H/2)
This allows the waterproofing performance of the asphalt mastic foot protection layer 30 to be more effectively exhibited. In this embodiment, the length of the rising waterproof sheet 21B is half that of the rising waterproof sheet 21A , but the length of the rising waterproof sheet 21B can be appropriately changed as long as the length is short enough to enable the rising waterproof sheet 21B to be embedded in the asphalt mastic foot protection layer 30 and to be supported independently.

図5各図は、図4と同じ構造のアスファルトマスチック根固め層30内において、立ち上がり遮水シート21Bの枚数を3枚、5枚と増やして表面遮水工10の遮水シート20に接合させた変形例を示している。これらの変形例では、立ち上がり遮水シート21Bの枚数を増やした分、必要な密着長(浸透路長)を確保するのに必要な各シート高さを低くできるため、アスファルトマスチック根固め層30の高さHを低くしてアスファルトマスチックの充填量を低減することも可能になる。 Each figure in Figure 5 shows a modified example in which the number of rising waterproof sheets 21B is increased to three or five and joined to the waterproof sheet 20 of the surface waterproofing work 10 in an asphalt mastic foot protection layer 30 having the same structure as in Figure 4. In these modified examples, the height of each sheet required to ensure the required adhesion length (seepage path length) can be reduced by increasing the number of rising waterproof sheets 21B, so it is also possible to reduce the amount of asphalt mastic filling by lowering the height H of the asphalt mastic foot protection layer 30.

図6は、図15に示した海面処分場の例と同じく、護岸前面側のケーソン式混成堤護岸と背面側の鋼製矢板6とによって区画された内部が固化処理土9によって裏埋めされた遮水護岸1を示している。この例で図15の遮水護岸1と異なる構成は、背面側の鋼製矢板6の内面側(固化処理土側)の表面全面にわたり、内側鉛直遮水工26が施されている点である。この遮水護岸1の遮水構造は表面遮水工10と内側鉛直遮水工26とから構成されている。 Figure 6 shows a waterproof revetment 1, similar to the example of a sea surface disposal site shown in Figure 15, with the interior partitioned by a caisson-type composite breakwater on the front side of the revetment and steel sheet piles 6 on the rear side, backfilled with solidification treated soil 9. The configuration of this example differs from that of the waterproof revetment 1 in Figure 15 in that an inner vertical waterproof structure 26 is provided over the entire surface of the inner side (solidification treated soil side) of the steel sheet piles 6 on the rear side. The waterproof structure of this waterproof revetment 1 is composed of a surface waterproof structure 10 and an inner vertical waterproof structure 26.

図7は、図6に示した遮水護岸1の鋼製矢板6の内側鉛直遮水工26の基部と表面遮水工10の法尻側の先端部分を拡大して示している。この場合にも、図3に示した場合と同様に、鋼製矢板6の先端部は遮水基盤として施工された深層混合処理土2に根入れされ、内部の混合処理土表面に不陸整正用水中不分離コンクリート36が打設され、その表面に所定厚さのアスファルトマスチック密着層35が形成されている。 Figure 7 shows an enlarged view of the base of the inner vertical waterproofing work 26 of the steel sheet pile 6 of the waterproof revetment 1 shown in Figure 6 and the tip of the slope side of the surface waterproofing work 10. In this case, as in the case shown in Figure 3, the tip of the steel sheet pile 6 is embedded in the deep mixed treated soil 2 that has been constructed as a waterproof base, and underwater non-separable concrete 36 for uneven leveling is poured into the surface of the internal mixed treated soil, and an asphalt mastic adhesive layer 35 of a specified thickness is formed on the surface.

アスファルトマスチック密着層35の表面には捨石マウンド3(図6)上に敷設された表面遮水工10の遮水シート20の先端部が鋼製矢板6の根入れ境界6aまで延設され、この先端部の遮水性を確保するために、保護マット22上に設置された押さえコンクリートブロック33で区画された所定範囲にアスファルトマスチック根固め層30が形成されている。このとき、鋼製矢板6の内面側面には、三層一体型の積層シートからなる内側鉛直遮水工26が施されている。 On the surface of the asphalt mastic adhesive layer 35, the tip of the waterproof sheet 20 of the surface waterproofing work 10 laid on the rubble mound 3 (Figure 6) is extended to the embedment boundary 6a of the steel sheet pile 6, and in order to ensure waterproofing of this tip, an asphalt mastic foot protection layer 30 is formed in a specified area partitioned by a retaining concrete block 33 installed on the protective mat 22. At this time, an inner vertical waterproofing work 26 consisting of a three-layer integrated laminated sheet is applied to the inner side surface of the steel sheet pile 6.

この鋼製矢板6の根入れ境界6aでの内側鉛直遮水工26の基部と表面遮水工10の先端部において、図3に示した構成と同様に、アスファルトマスチック根固め層30と押さえコンクリートブロック33の間には、アスファルトマスチック根固め層30と押さえコンクリートブロック33の側面に沿って立ち上がるように、立ち上がり遮水シート21と立ち上がり保護マット23とが設けられている。これによりこの内側鉛直遮水工26と表面遮水工10との間においても遮水性が保持されるようになっている。図6に示した内側鉛直遮水工26を採用した場合、図3に示したような外側鉛直遮水工27の場合に比べ、混合処理土層2の外側に位置する既存地盤12の将来的に発生するおそれのある沈下によって生じる混合処理土層2との段差の影響を受けないという利点がある。 At the base of the inner vertical waterproofing work 26 and the tip of the surface waterproofing work 10 at the embedment boundary 6a of the steel sheet pile 6, as in the configuration shown in FIG. 3, a rising waterproofing sheet 21 and a rising protective mat 23 are provided between the asphalt mastic footing layer 30 and the holding concrete block 33 so as to rise along the side of the asphalt mastic footing layer 30 and the holding concrete block 33. This allows waterproofing to be maintained between the inner vertical waterproofing work 26 and the surface waterproofing work 10. When the inner vertical waterproofing work 26 shown in FIG. 6 is adopted, there is an advantage that it is not affected by the step with the mixed treated soil layer 2 caused by the future settlement of the existing ground 12 located outside the mixed treated soil layer 2, compared to the case of the outer vertical waterproofing work 27 shown in FIG. 3.

[鉛直遮水工における遮水構造の構成]
図8は、他の発明としての海面処分場護岸の遮水構造を、図15,16に例示した海面処分場と同程度の規模の海面処分場の遮水護岸の鋼製矢板の外側鉛直遮水工27(71)として取り付けられた遮水シート20の分断部15と、遮水護岸としてのケーソン側定着部4Aに適用した実施形態を示している。


[Configuration of the waterproof structure in vertical waterproof construction]
Figure 8 shows an embodiment in which a waterproof structure for a seawall at a marine disposal site, as another invention , is applied to a divided portion 15 of a waterproof sheet 20 attached as an outer vertical waterproof structure 27 (71) of steel sheet piles of a waterproof seawall at a marine disposal site of a similar scale to the marine disposal site illustrated in Figures 15 and 16, and to a caisson side fixed portion 4A as a waterproof seawall.


図8及び補足的に図15,16に示したように、海面処分場となる埋立域11(62)を区画する遮水護岸1の前面側(海洋側)の構造物として、ケーソン4(64)が深層混合処理土層52上に造成された捨石マウンド53上に設置されている。ケーソン4(64)は、内部に中詰め砂(図示せず)が充填された公知の鉄筋コンクリート製函体からなり、複数の同形のケーソン4を列状(図8ではL字形状)に捨石マウンド53(図15)上に設置され、沿岸水域に所定面積、広さからなる埋立域11(62)を区画する遮水護岸1の前面側の構造物として機能する。 As shown in Figure 8 and supplementary Figures 15 and 16, caissons 4 (64) are installed on rubble mounds 53 constructed on deep mixed treated soil layers 52 as structures on the front side (ocean side) of the waterproof revetment 1 that defines the landfill area 11 (62) that will be the sea surface disposal site. The caissons 4 (64) are made of known reinforced concrete boxes filled with filler sand (not shown), and multiple identical caissons 4 are installed in a row (L-shaped in Figure 8) on the rubble mound 53 (Figure 15), functioning as structures on the front side of the waterproof revetment 1 that defines the landfill area 11 (62) of a specified area and width in the coastal waters.

一方、遮水護岸1の背面側の構造物として、背面に固化処理土9(59)が裏埋めされたケーソン4から所定の離れを確保した位置に鋼製矢板6(56)が、不透水性壁体を構成するように建て込まれている。鋼製矢板6(56)の頂部付近は、前面側のケーソン4(64)を控え工としたタイロッドTに保持されている。鋼製矢板6の外側面(埋立域11(62)側)の表面には、その全面を覆うように、外側鉛直遮水工27(71)が設けられている。 On the other hand, as a structure on the rear side of the water-resistant revetment 1, a steel sheet pile 6 (56) is erected at a position that ensures a certain distance from the caisson 4, whose rear side is backed with solidified treated soil 9 (59), so as to form an impermeable wall. The top of the steel sheet pile 6 (56) is supported by a tie rod T, which uses the caisson 4 (64) on the front side as a retaining structure. An outer vertical water-resistant structure 27 (71) is provided on the outer surface of the steel sheet pile 6 (on the reclaimed area 11 (62) side) so as to cover the entire surface.

(遮水シート分断部におけるシート端部の遮水構造の構成)
外側鉛直遮水工27(71)の積層遮水シート20は、図8に示したように、施工される各工区において施工期間が異なるため、各工区の工区境(以下、分断部15と記す。)において、分断された状態で鋼製矢板6(56)に取り付けられる。以下、この分断部15における本発明の遮水シートのシート端部の遮水構造の構成について説明する。以下、かっこ内符号の記載を略す。
(Configuration of waterproof structure at sheet end in waterproof sheet divided portion)
As shown in Figure 8, the laminated waterproof sheet 20 of the outer vertical waterproof structure 27 (71) has a different construction period for each work section, so it is attached in a divided state to the steel sheet pile 6 (56) at the boundary between each work section (hereinafter referred to as the dividing section 15). The configuration of the waterproof structure of the sheet end of the waterproof sheet of the present invention at this dividing section 15 will be described below. Below, the symbols in parentheses will be omitted.

図9は、外側鉛直遮水工27の分断部15((図8-IX))における本発明の遮水構造の一実施形態を示した拡大図である。同図には、鋼製矢板6の外側面に沿って取り付けられ、工区境において分断された積層遮水シート20の端部を平面視した状態が示されている。3層からなる積層遮水シート20の端部は、同図に示したように、片面の保護シート22を除いた保護シート22と遮水シート21の2層構成の遮水シートが鋼製矢板6の表面に取り付けられている。さらに鋼製矢板6の屈曲部から分岐した形状で側方に延長する遮水シート25(以下、分岐遮水シート25と記す。)が付加されている。この分岐遮水シート25は、遮水シート21と同等の厚さ、仕様を有する保護シート22、遮水シート21の2層構成の遮水シートで、遮水シート21と鋼製矢板6の屈曲部で枝分かれするように、その根元部が遮水シート21の表面に溶着接合され、分断部15内の所定範囲まで延設され、これにより分断部15内において十分な浸透路長が確保される。 Figure 9 is an enlarged view showing one embodiment of the waterproofing structure of the present invention at the separation section 15 (Figure 8-IX) of the outer vertical waterproofing work 27. The figure shows a plan view of the end of a laminated waterproofing sheet 20 attached along the outer surface of a steel sheet pile 6 and separated at the boundary of the construction area. As shown in the figure, the end of the three-layer laminated waterproofing sheet 20 has a two-layer waterproofing sheet consisting of a protective sheet 22 and a waterproofing sheet 21, excluding the protective sheet 22 on one side, attached to the surface of the steel sheet pile 6. In addition, a waterproofing sheet 25 (hereinafter referred to as a branched waterproofing sheet 25) is added, extending laterally in a branched shape from the bent part of the steel sheet pile 6. This branched waterproof sheet 25 is a two-layer waterproof sheet consisting of a protective sheet 22 and a waterproof sheet 21, which have the same thickness and specifications as the waterproof sheet 21. The base of the waterproof sheet 25 is welded and joined to the surface of the waterproof sheet 21 so that it branches out at the bend between the waterproof sheet 21 and the steel sheet pile 6, and is extended to a specified range within the dividing section 15, thereby ensuring a sufficient seepage path length within the dividing section 15.

分岐遮水シート25は、図9に示したように、隣接工区で施工された遮水シート21に取り付けられた分岐遮水シート25と、分断部15(隣接工区との工区境)において、分断部15に関して略対称な一直線状をなして配置されている。さらに、同図に示したように、遮水シート端部21aと分岐遮水シート25とが配置された鋼製矢板6の埋立域11(図8)側がカバープレート31で覆われ、所定容積の空間(以下、分断部空間38と記す。)が形成されている。 As shown in Figure 9, the branched waterproof sheet 25 is arranged in a straight line that is approximately symmetrical with respect to the dividing section 15 (the boundary between the adjacent construction sections) with the branched waterproof sheet 25 attached to the waterproof sheet 21 constructed in the adjacent construction section. Furthermore, as shown in the figure, the landfill area 11 (Figure 8) side of the steel sheet pile 6 on which the waterproof sheet end 21a and the branched waterproof sheet 25 are arranged is covered with a cover plate 31, forming a space of a specified volume (hereinafter referred to as the dividing section space 38).

カバープレート31は、図9に示したように、プレート本体31aの両側がクランク状に屈曲したフランジ部31bが形成された加工鋼板で、溶接等によってあらじめ頭部が鋼製矢板6側の所定位置に取り付けられたボルト32の位置をガイドとしてカバープレート31で分断部15を覆い、フランジ部31bの貫通孔から現れたボルト32をナット締めしてカバープレート31を所定位置に取り付けることができる。 As shown in Figure 9, the cover plate 31 is a processed steel plate with flanges 31b bent into a crank shape on both sides of the plate body 31a. The cover plate 31 covers the separation section 15 using the position of the bolt 32, the head of which has been attached in advance to a predetermined position on the steel sheet pile 6 side by welding or the like, as a guide, and the cover plate 31 can be attached to the predetermined position by tightening the nut on the bolt 32 emerging from the through hole in the flange 31b.

さらに、図9に示したように、鋼製矢板6とカバープレート31とで囲まれた分断部空間38内は、溶融状態で充填され、冷固したアスファルトマスチックAsで満たされ、遮水シート端部21a、分岐遮水シート25とはアスファルトマスチックAsに密着した状態で完全に埋没している。これにより、分断部15に位置する隣接した工区の各遮水シート端部の浸透路長は十分に確保され、分断部15での遮水シートの遮水性が確保される。 Furthermore, as shown in Figure 9, the separation space 38 surrounded by the steel sheet pile 6 and the cover plate 31 is filled with asphalt mastic As that is filled in a molten state and then cooled and solidified, and the waterproof sheet end 21a and the branch waterproof sheet 25 are completely buried in contact with the asphalt mastic As. This ensures that the infiltration path length of each waterproof sheet end of the adjacent work sections located in the separation section 15 is sufficient, and the waterproofing of the waterproof sheet at the separation section 15 is ensured.

図10(a)~(d)は、分岐遮水シート25の変形例を示した部分拡大図である。図9に示した分岐遮水シート25は、遮水シート21の表面から直線状に延びた形状をなすが、分岐遮水シート25による遮水シート端部21aにおける浸透路長の延長、すなわち遮水性能の向上を図るために、各種の変形例を採用することができる。たとえば図10(a)は、分岐遮水シート25の先端部分にフランジ25aを設けて全体がT字形状となるようにした例である。分岐遮水シート25の先端部分にフランジ25aに相当するシート片を溶着あるいは一体成形して先端形状をT字形状やL字形状することで、分岐遮水シート25の先端部分での浸透路長を延長することができる。同図(b)は、分岐遮水シート25の先端部分に樹脂製の丸棒状体25bを一体成形した変形例を示している。同図(c)、(d)は、シート長が短い第2,3の分岐遮水シート25B,25Cを遮水シート21に複数箇所設けた例を示している。これらの例では第1の分岐遮水シート25Aに沿った浸透路長に第2,3の分岐遮水シート25B,25Cの浸透路長が加算されるので、より十分な浸透路長が確保できる。 Figures 10(a) to (d) are partial enlarged views showing modified examples of the branched waterproof sheet 25. The branched waterproof sheet 25 shown in Figure 9 has a shape that extends linearly from the surface of the waterproof sheet 21, but various modified examples can be adopted to extend the seepage path length at the waterproof sheet end 21a by the branched waterproof sheet 25, i.e., to improve the waterproof performance. For example, Figure 10(a) shows an example in which a flange 25a is provided at the tip of the branched waterproof sheet 25 to make the whole T-shaped. By welding or integrally molding a sheet piece equivalent to the flange 25a at the tip of the branched waterproof sheet 25 to make the tip shape T-shaped or L-shaped, the seepage path length at the tip of the branched waterproof sheet 25 can be extended. Figure 10(b) shows a modified example in which a resin round rod-shaped body 25b is integrally molded at the tip of the branched waterproof sheet 25. Figures (c) and (d) show examples in which second and third branched waterproof sheets 25B and 25C, which have short sheet lengths, are provided in multiple locations on the waterproof sheet 21. In these examples, the permeation path length of the second and third branched waterproof sheets 25B and 25C is added to the permeation path length along the first branched waterproof sheet 25A, so a more sufficient permeation path length can be ensured.

図11は、海面処分場護岸の遮水構造の他の実施形態を示している。同図に示したように、この実施形態では、カバープレート35と鋼製矢板6とを連結固定する2本の長尺の連結ボルト32が分断部空間38内の鋼製矢板6の内側表面に溶接されている。この連結ボルト32の先端を平板状のカバープレート35の連結孔(図示せず)に挿通することで、カバープレート35の位置決め固定を簡単で、精度よく行うことができる。なお、カバープレート35の両端部35aで分断部15に両側から延びる遮水シート21を確実に押圧して保持できる。 Figure 11 shows another embodiment of the waterproof structure of the seawall of the sea surface disposal site. As shown in the figure, in this embodiment, two long connecting bolts 32 that connect and fix the cover plate 35 and the steel sheet pile 6 are welded to the inner surface of the steel sheet pile 6 in the separation space 38. By inserting the tips of these connecting bolts 32 into connecting holes (not shown) in the flat cover plate 35, the positioning and fixing of the cover plate 35 can be performed simply and accurately. In addition, both ends 35a of the cover plate 35 can reliably press and hold the waterproof sheet 21 extending from both sides of the separation section 15.

(ケーソン側定着部におけるシート端部の遮水構造の構成)
図12は、図8に示した鋼製矢板6の外側鉛直遮水工27のケーソン4における定着部(以下、ケーソン側定着部4Aと記す。)での遮水シート端部21aの遮水構造の一実施形態を示している。ケーソン側定着部4Aにおいても、遮水シート端部21aをケーソン表面4aに確実に密着させて遮水シート端部21aの浸透路長を十分確保する必要がある。そのために遮水シート端部21aをケーソン表面4aに定着する部分に定着部空間40を確保し、遮水シート側から定着部空間40に延びる分岐遮水シート25を設けることで浸透路長を延長させている。このとき定着部空間40の一面はカバープレート41で覆われている。カバープレート41は、端部にフランジ41aを有するL字形をなし、このフランジ41a位置でアンカーボルト42によってケーソン表面4aに固定保持されている。カバープレート41の他端は、遮水シート端部21aを挟み込んで鋼製矢板6側に密着するようにしてボルト43で鋼製矢板6に締着されている。このときボルト42,43の取り付け位置には、ゴムパッキン44等が取り付けられ、水密性の向上が図られている。さらに、定着部空間40内には溶融状態のアスファルトマスチックAsが充填され、遮水シート端部21aのケーソン側定着部4Aでの確実な遮水構造が形成されている。
(Configuration of the water-proof structure of the sheet end at the caisson side fixing part)
12 shows an embodiment of the waterproof structure of the waterproof sheet end 21a at the anchoring part (hereinafter, referred to as the caisson side anchoring part 4A) in the caisson 4 of the outer vertical waterproof structure 27 of the steel sheet pile 6 shown in FIG. 8. In the caisson side anchoring part 4A, it is necessary to securely attach the waterproof sheet end 21a to the caisson surface 4a to sufficiently secure the seepage path length of the waterproof sheet end 21a. For this purpose, an anchoring part space 40 is secured in the part where the waterproof sheet end 21a is anchored to the caisson surface 4a, and the seepage path length is extended by providing a branch waterproof sheet 25 extending from the waterproof sheet side to the anchoring part space 40. At this time, one side of the anchoring part space 40 is covered with a cover plate 41. The cover plate 41 is L-shaped with a flange 41a at the end, and is fixed and held to the caisson surface 4a by an anchor bolt 42 at the position of the flange 41a. The other end of the cover plate 41 is fastened to the steel sheet pile 6 by bolts 43 so as to sandwich the waterproof sheet end 21a and to be in close contact with the steel sheet pile 6. At this time, rubber packing 44 or the like is attached to the mounting positions of the bolts 42, 43 to improve watertightness. Furthermore, the anchoring space 40 is filled with molten asphalt mastic As, forming a reliable waterproof structure at the caisson side anchoring part 4A of the waterproof sheet end 21a.

図13は、ケーソン側定着部4Aにおいて、遮水シート端部21aの定着端を定着部空間40内に位置させた他の実施形態を示している。同図に示したように、この実施形態において、定着部空間40は鋼製矢板6と鋼製矢板6の開放側を覆うカバープレート45とで区画されている。カバープレート45は、平面視して屈曲部が直角をなす略Z字形状断面からなり、プレート両端の各屈曲部にはリブプレート45aが、長手方向(深さ方向)に所定間隔をあけて取り付けられ、屈曲部の直角形状が保持されている。カバープレート45の根元部45bは、アンカーボルト46によってケーソン表面4aに固定保持されている。一般部から定着部空間40まで延設された遮水シート端部21aは、定着部空間40内の鋼製矢板6の内のり表面に沿ってケーソン表面4aまで延設され、アンカーピン47によってケーソン表面4aに定着されている。またケーソン表面4aに沿ったシート端部21a付近には浸透路長を延長するための分岐遮水シート25が溶着されている。また、定着部空間40内にもアスファルトマスチックAsが充填され、冷固した状態でされ、遮水シート端部21aのケーソン側定着部4Aでの確実な遮水構造が形成されている。 Figure 13 shows another embodiment in which the fixing end of the waterproof sheet end 21a is positioned within the fixing space 40 in the caisson side fixing portion 4A. As shown in the figure, in this embodiment, the fixing space 40 is partitioned by the steel sheet pile 6 and the cover plate 45 that covers the open side of the steel sheet pile 6. The cover plate 45 has a substantially Z-shaped cross section with a right angle at the bent portion in a plan view, and rib plates 45a are attached to each bent portion at both ends of the plate at a predetermined interval in the longitudinal direction (depth direction), maintaining the right angle shape of the bent portion. The root portion 45b of the cover plate 45 is fixed and held to the caisson surface 4a by the anchor bolt 46. The waterproof sheet end 21a extended from the general portion to the fixing space 40 is extended to the caisson surface 4a along the inner surface of the steel sheet pile 6 in the fixing space 40, and is fixed to the caisson surface 4a by the anchor pin 47. In addition, a branched waterproof sheet 25 for extending the seepage path length is welded near the sheet end 21a along the caisson surface 4a. Asphalt mastic As is also filled into the anchoring space 40 and cooled and solidified, forming a reliable waterproof structure at the caisson side anchoring part 4A of the waterproof sheet end 21a.

図14はケーソン側定着部4Aにおいて、遮水シート端部21aの定着端を、定着端カバーとしての鋼製矢板6Cとケーソン表面4aとで囲まれた定着部空間40内に位置させた他の実施形態を示している。定着部空間40は、同図に示したように、ケーソン表面4aと、図示しない固定金物でケーソン表面4aにケーソンの高さ方向に沿って固定された鋼製矢板6Cで区画されている。なお、ケーソン表面4aと鋼製矢板6Cの端部との間には密着性を高めるためのアスファルトブロック48が挟在され、ケーソン表面4aと鋼製矢板6Cとの隙間が閉塞されて遮水性が保持されている。 Figure 14 shows another embodiment in which the fixed end of the waterproof sheet end 21a in the caisson side fixing section 4A is located in the fixing section space 40 surrounded by the caisson surface 4a and a steel sheet pile 6C as a fixing end cover. As shown in the figure, the fixing section space 40 is partitioned by the caisson surface 4a and a steel sheet pile 6C fixed to the caisson surface 4a along the height direction of the caisson with a fixing metal fitting (not shown). In addition, an asphalt block 48 is sandwiched between the caisson surface 4a and the end of the steel sheet pile 6C to improve adhesion, and the gap between the caisson surface 4a and the steel sheet pile 6C is blocked to maintain waterproofing.

一方、一般部から定着部空間40まで延設された遮水シート端部21aは、さらに隙間調整プレート49の表面とケーソン表面4aとに沿って張設され、先端部分が鋼製矢板6Cの一端から定着部空間40内に導かれている。隙間調整プレート49の根元部49aは、アンカーボルト46によってケーソン表面4aに固定保持されている。遮水シート端部21aは定着部空間40内において、ケーソン表面4aに沿って延設されるとともに、鋼製矢板6Cの内側表面に沿って所定長だけ延設されている。また、鋼製矢板6Cの端部位置には、浸透路長を延長するための分岐遮水シート25が遮水シート端部21aの表面に溶着されている。また、定着部空間40内にもアスファルトマスチックAsが充填され、冷固した状態で、遮水シート端部21aのケーソン側定着部4Aでの確実な遮水構造が形成されている。 On the other hand, the waterproof sheet end 21a extending from the general part to the anchoring space 40 is further stretched along the surface of the gap adjustment plate 49 and the caisson surface 4a, and the tip part is led into the anchoring space 40 from one end of the steel sheet pile 6C. The root part 49a of the gap adjustment plate 49 is fixed to the caisson surface 4a by the anchor bolt 46. The waterproof sheet end 21a extends along the caisson surface 4a in the anchoring space 40 and extends a predetermined length along the inner surface of the steel sheet pile 6C. In addition, at the end position of the steel sheet pile 6C, a branch waterproof sheet 25 for extending the seepage path length is welded to the surface of the waterproof sheet end 21a. In addition, asphalt mastic As is filled in the anchoring space 40, and in a cooled and solidified state, a reliable waterproof structure is formed at the caisson side anchoring part 4A of the waterproof sheet end 21a.

以上で説明したように、本発明の各実施形態では、各基部のアスファルトマスチック層の遮水シート20上の所定位置に設置された仕切型枠材としての押さえコンクリートブロック33で区画された空間、遮水シート20の上面と立ち上がり遮水シート21の側面とで囲まれた空間、及び分断部空間38、定着部空間40あるいは遮水シート21の端部21aと分岐遮水シート25の側面とに囲まれた空間に溶融状態のアスファルトマスチックが密に充填され、粘弾性体しての機能を保持して冷固することで、各部での遮水性が確保される。なお、不透水性の充填遮水材としてのアスファルトマスチックに代えて、ハンドリング性、使用時における遮水性等が同等に期待できる各種のアスファルト系混合物の他、コンクリート系材料、土質系材料、ケミカル系材料等を使用することもできる。 As described above, in each embodiment of the present invention, the molten asphalt mastic is densely filled in the space partitioned by the holding concrete block 33 as a partition formwork material installed at a predetermined position on the waterproof sheet 20 of the asphalt mastic layer of each base, the space surrounded by the upper surface of the waterproof sheet 20 and the side of the rising waterproof sheet 21, and the dividing space 38, the fixing space 40, or the space surrounded by the end 21a of the waterproof sheet 21 and the side of the branching waterproof sheet 25, and the waterproofing is ensured in each part by cooling and solidifying while retaining its function as a viscoelastic body. In addition, instead of asphalt mastic as a water-impermeable filling waterproofing material, various asphalt-based mixtures that can be expected to have the same handling properties and waterproofing properties during use, as well as concrete-based materials, soil-based materials, chemical-based materials, etc. can also be used.

以上の説明において、本発明は種々の実施形態に限定されるものではなく、各請求項に示した範囲内での種々の変更が可能である。すなわち、請求項に示した範囲内で適宜変更した技術的手段を組み合わせて得られる実施形態も、本発明の技術的範囲に含まれる。 In the above description, the present invention is not limited to the various embodiments, and various modifications are possible within the scope of the claims. In other words, the technical scope of the present invention also includes embodiments obtained by combining technical means that are appropriately modified within the scope of the claims.

1 海面処分場
2 混合処理土層
3 捨石マウンド
4 ケーソン
4A ケーソン側定着部
6,6C 鋼製矢板
10 表面遮水工
11 埋立域
15 基盤面遮水工
20 遮水シート
22 保護マット
22U 上側保護マット
22L 下側保護マット
25 分岐遮水シート
26 内側鉛直遮水工
27 外側鉛直遮水工
30 分断部空間
30 アスファルトマスチック根固め層
33 押さえコンクリートブロック
35 アスファルトマスチック密着層
38 分断部空間
31,35,41,45 カバープレート
40 定着部空間
As アスファルトマスチック
Reference Signs List 1: Sea surface disposal site 2: Mixed treated soil layer 3: Rubble mound 4: Caisson 4A: Caisson side anchoring portion 6, 6C: Steel sheet pile 10: Surface waterproofing work 11: Reclaimed land area 15: Base surface waterproofing work 20: Waterproof sheet 22: Protective mat 22U: Upper protective mat 22L: Lower protective mat 25: Branched waterproof sheet 26: Inner vertical waterproofing work 27: Outer vertical waterproofing work 30: Separation space 30: Asphalt mastic foot fixing layer 33: Holding concrete block 35: Asphalt mastic adhesion layer 38: Separation space 31, 35, 41, 45: Cover plate 40: Anchorage space As: Asphalt mastic

Claims (5)

海面処分場護岸を区画するように造成された護岸構造物の基部に、不透水性遮水材料を充填してなる根固め遮水層を介して、前記護岸構造物を支持する遮水基盤面上に敷設された遮水層を構成する遮水シートの端部を定着させる遮水構造であって、
前記根固め遮水層は、前記遮水シート上に設けられた押さえ工と前記護岸構造物との間の空間に充填された冷固したアスファルトマスチック根固め層からなり、
前記遮水シートは、端部が前記護岸構造物の基部まで延在するように敷設され、第1の中間遮水シートが前記遮水シート上の前記根固め遮水層と前記押さえ工との間に密着し、前記遮水シートから立ち上げられた形状が保持されるように、前記遮水シートに溶着接合され、
前記第1の中間遮水シートに加え、前記第1の中間遮水シートと前記護岸構造物との間の前記遮水シートに、少なくとも1枚の第2の中間遮水シートが、前記根固め遮水層内で前記遮水シートから立ち上げられた形状で保持されるように、前記遮水シートに溶着接合され、
前記根固め遮水層表面と前記遮水シートとの間の浸透路長を、前記第1の中間遮水シートと前記第2の中間遮水シートの表面を経由させて延長させたことを特徴とする海面処分場護岸の遮水構造。
A waterproof structure in which an end of a waterproof sheet constituting a waterproof layer laid on a waterproof base surface supporting a revetment structure is fixed to a base of the revetment structure constructed to divide a sea surface disposal site revetment, via a foot-blocking waterproof layer formed by filling the foot-blocking waterproof layer with an impermeable waterproof material, the end of the waterproof sheet constituting the waterproof layer being laid on a waterproof base surface supporting the revetment structure,
The foot-proofing waterproof layer is composed of a cooled and solidified asphalt mastic foot-proofing layer filled in a space between a holding work provided on the waterproof sheet and the revetment structure,
The waterproof sheet is laid so that an end portion thereof extends to the base of the revetment structure, and a first intermediate waterproof sheet is welded and joined to the waterproof sheet so that the first intermediate waterproof sheet is in close contact between the foot protection waterproof layer on the waterproof sheet and the supporting work, and the shape of the first intermediate waterproof sheet raised from the waterproof sheet is maintained.
In addition to the first intermediate waterproof sheet, at least one second intermediate waterproof sheet is welded and joined to the waterproof sheet between the first intermediate waterproof sheet and the revetment structure so as to be held in a shape raised from the waterproof sheet within the foot protection waterproof layer;
A waterproof structure for a seawall at a sea surface disposal site, characterized in that the seepage path length between the surface of the foot-proofing waterproof layer and the waterproof sheet is extended via the surfaces of the first intermediate waterproof sheet and the second intermediate waterproof sheet .
前記第2の中間遮水シートは、前記第1の中間遮水シートより短い長さで、前記根固め遮水層内に埋設されるようにして立ち上げられた形状が保持された請求項に記載の海面処分場護岸の遮水構造。 The waterproof structure of a seawall at a marine disposal site as described in claim 1 , wherein the second intermediate waterproof sheet has a length shorter than that of the first intermediate waterproof sheet and is buried within the root reinforcement waterproof layer to maintain its erected shape. 前記第2の中間遮水シートの長さは、前記第1の中間遮水シートの長さの1/2である請求項に記載の海面処分場護岸の遮水構造。 3. The waterproof structure for a seawall at a sea surface disposal site according to claim 2 , wherein the length of the second intermediate waterproof sheet is half the length of the first intermediate waterproof sheet. 前記遮水層は、前記遮水シートと、その両面を挟む保護マットとの積層シートからなる請求項1に記載の海面処分場護岸の遮水構造。 2. The waterproof structure for a seawall at a sea surface disposal site according to claim 1, wherein the waterproof layer is made of a laminated sheet of the waterproof sheet and protective mats sandwiching both sides of the waterproof sheet. 前記不透水性遮水材料は、所定の遮水性能を有する、アスファルト系材料、コンクリート系材料、土質系材料、ケミカル系材料から選択された請求項1に記載の海面処分場護岸の遮水構造。 The waterproof structure of a sea surface disposal site revetment according to claim 1, wherein the impermeable waterproof material is selected from asphalt-based materials, concrete-based materials, soil-based materials, and chemical-based materials that have a predetermined waterproofing performance.
JP2020183350A 2020-01-23 2020-10-30 Water-impermeable structure of seawall at marine disposal site Active JP7564685B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2024137536A JP7773596B2 (en) 2020-01-23 2024-08-19 Water-impermeable structure of seawall at marine disposal site

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020009191 2020-01-23
JP2020009191 2020-01-23

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2024137536A Division JP7773596B2 (en) 2020-01-23 2024-08-19 Water-impermeable structure of seawall at marine disposal site

Publications (2)

Publication Number Publication Date
JP2021116681A JP2021116681A (en) 2021-08-10
JP7564685B2 true JP7564685B2 (en) 2024-10-09

Family

ID=77174355

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2020183350A Active JP7564685B2 (en) 2020-01-23 2020-10-30 Water-impermeable structure of seawall at marine disposal site
JP2024137536A Active JP7773596B2 (en) 2020-01-23 2024-08-19 Water-impermeable structure of seawall at marine disposal site

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2024137536A Active JP7773596B2 (en) 2020-01-23 2024-08-19 Water-impermeable structure of seawall at marine disposal site

Country Status (1)

Country Link
JP (2) JP7564685B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12293506B2 (en) 2021-07-20 2025-05-06 Inovision Software Solutions, Inc. Method to locate defects in e-coat
JP7525828B2 (en) 2021-09-27 2024-07-31 Jfeスチール株式会社 Quay or revetment structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004181393A (en) 2002-12-04 2004-07-02 Toyo Constr Co Ltd Water-blocking structure and water-blocking method at sea surface disposal site
JP2008023487A (en) 2006-07-24 2008-02-07 Taiyo Kogyo Corp Joint structure between water-impervious sheets in water bottom and method for joining water-impervious sheets
JP2008080325A (en) 2006-09-01 2008-04-10 World Engineering Kk Construction method of impermeable layer
JP2019107603A (en) 2017-12-18 2019-07-04 東洋建設株式会社 Construction method of water shield sheet and water shield liner
JP2021101063A (en) 2019-12-24 2021-07-08 ワールドエンジニアリング株式会社 Water shielding structure for control type revetment and water shielding structure for water shielding sheet end

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06146238A (en) * 1991-12-28 1994-05-27 Bridgestone Corp Water-tight stationary structure between structure and water-tight sheet
JP2985597B2 (en) * 1993-02-15 1999-12-06 株式会社大林組 Detecting method of defective part of joint part of impermeable sheet
JP3162949B2 (en) * 1995-06-05 2001-05-08 修治 長野 Laying structure of impermeable sheet at waste disposal site
JP4441240B2 (en) 2003-04-02 2010-03-31 シバタ工業株式会社 Sheet connection structure
JP4628906B2 (en) * 2005-09-06 2011-02-09 シバタ工業株式会社 Manufacturing method of water shielding sheet structure
JP5728206B2 (en) 2010-11-24 2015-06-03 ワールドエンジニアリング株式会社 Construction method of partition revetment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004181393A (en) 2002-12-04 2004-07-02 Toyo Constr Co Ltd Water-blocking structure and water-blocking method at sea surface disposal site
JP2008023487A (en) 2006-07-24 2008-02-07 Taiyo Kogyo Corp Joint structure between water-impervious sheets in water bottom and method for joining water-impervious sheets
JP2008080325A (en) 2006-09-01 2008-04-10 World Engineering Kk Construction method of impermeable layer
JP2019107603A (en) 2017-12-18 2019-07-04 東洋建設株式会社 Construction method of water shield sheet and water shield liner
JP2021101063A (en) 2019-12-24 2021-07-08 ワールドエンジニアリング株式会社 Water shielding structure for control type revetment and water shielding structure for water shielding sheet end

Also Published As

Publication number Publication date
JP2024149814A (en) 2024-10-18
JP7773596B2 (en) 2025-11-19
JP2021116681A (en) 2021-08-10

Similar Documents

Publication Publication Date Title
JP7773596B2 (en) Water-impermeable structure of seawall at marine disposal site
RS50131B (en) DAMP AND WATERPROOFING PROCEDURE
AU2013263720A1 (en) Wall Seal System
JP5146972B2 (en) Construction method of impermeable walls
JP4761780B2 (en) Construction method of impermeable layer
JP4293435B2 (en) Construction method of managed revetment
JP5728206B2 (en) Construction method of partition revetment
JP4726147B2 (en) Construction method of impermeable layer
JP2004204581A (en) Water-blocking method for managed revetment
JP4822375B2 (en) Water-blocking structure of revetment
JP4315620B2 (en) Impermeable treatment method for managed waste landfill revetment
JP5099709B2 (en) Construction method of managed revetment
JP4088871B2 (en) Impermeable wall structure and impermeable wall structure using the impermeable wall
JP4410572B2 (en) Construction method of revetment for landfill
JP4927766B2 (en) Joint structure for upper and lower split caisson and its construction method
JP4979228B2 (en) Additional construction method of impermeable layer
JP4749444B2 (en) Impermeable layer connection method
JP7182451B2 (en) Water-shielding structure of the landfill area of the sea surface disposal site
JP7507008B2 (en) Water-resistant structure at the end of water-resistant sheet and method for constructing same
JP6013889B2 (en) Upper concrete impermeable structure of revetment impermeable wall
JP2001152425A (en) Seawall structure of revetment
JP4440568B2 (en) Revetment structure
JP2009052217A (en) Foundation construction method for revetment structures
CN221855608U (en) Waterproof construction structure for preventing building foundation from floating upwards
JP4606454B2 (en) Construction method of managed revetment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231006

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240415

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240423

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20240619

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240819

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240903

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240927

R150 Certificate of patent or registration of utility model

Ref document number: 7564685

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150