JP7577243B2 - DC Power Distribution System - Google Patents
[go: Go Back, main page]

JP7577243B2 - DC Power Distribution System - Google Patents

DC Power Distribution System Download PDF

Info

Publication number
JP7577243B2
JP7577243B2 JP2024505755A JP2024505755A JP7577243B2 JP 7577243 B2 JP7577243 B2 JP 7577243B2 JP 2024505755 A JP2024505755 A JP 2024505755A JP 2024505755 A JP2024505755 A JP 2024505755A JP 7577243 B2 JP7577243 B2 JP 7577243B2
Authority
JP
Japan
Prior art keywords
power
load
storage battery
loads
distribution system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2024505755A
Other languages
Japanese (ja)
Other versions
JPWO2023170860A1 (en
Inventor
拓也 片岡
勇人 竹内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of JPWO2023170860A1 publication Critical patent/JPWO2023170860A1/ja
Application granted granted Critical
Publication of JP7577243B2 publication Critical patent/JP7577243B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems

Landscapes

  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Direct Current Feeding And Distribution (AREA)
  • Stand-By Power Supply Arrangements (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本願は、直流配電システムに関するものである。 This application relates to a DC power distribution system.

近年、停電時の対応および施設に供給される電力ピークシフト対応のために蓄電池の活用が拡大している。蓄電池の活用に用いられる電源システムとして、例えば、需要家へ直流電力を給配電する直流給配電システムが挙げられる。蓄電池をピークシフトおよび停電対応に用いる場合、ピークシフトにより蓄電池の電荷を放電しすぎた場合、停電時においてバックアップ電源としての機能を果たせなくなる場合がある。In recent years, the use of storage batteries has expanded to respond to power outages and to shift the peak power supply to facilities. One example of a power supply system that uses storage batteries is a direct current (DC) power supply and distribution system that supplies and distributes DC power to consumers. When using storage batteries for peak shifting and power outages, if the battery is discharged too much due to peak shifting, it may no longer be able to function as a backup power source during a power outage.

そこで、蓄電装置の残容量に応じた適切な電力配分を実現するため、優先順位の低い直流機器への電力供給時間は短く、優先順位の高い直流機器への電力供給時間は長く設定する直流配電システムが提案されている(例えば、特許文献1参照。)。すなわち、停電対応での自立運転時には、優先順位の低い直流機器から順に電力の供給が遮断され、優先順位の高い直流機器の動作継続時間をできる限り延長しようとするものである。 In order to achieve appropriate power distribution according to the remaining capacity of the power storage device, a DC power distribution system has been proposed in which the power supply time to DC devices with low priority is set short and the power supply time to DC devices with high priority is set long (see, for example, Patent Document 1). In other words, during independent operation in response to a power outage, the power supply is cut off starting with DC devices with low priority, in order to extend the operation duration of DC devices with high priority as much as possible.

特開2011-83088号公報(段落0041~0047、図3~図4)JP 2011-83088 A (paragraphs 0041 to 0047, Figures 3 to 4)

しかしながら自立運転時に蓄電池から電力を供給する場合においても、複数の電力変換器を介して負荷へと電力を供給することになり、電源システムを構成する電力変換器の電力消費によって、想定よりも動作継続時間が短くなることがあった。However, even when power is supplied from a storage battery during autonomous operation, power is supplied to the load via multiple power converters, and the power consumption of the power converters that make up the power supply system can sometimes result in the operating time being shorter than expected.

本願は、上記のような課題を解決するための技術を開示するものであり、自立運転時におけるシステム自体の電力消費を抑制し、重要負荷への電力供給可能時間をより長くすることができる直流配電システムを得ることを目的とする。 This application discloses technology for solving the problems described above, and aims to obtain a DC power distribution system that can reduce the power consumption of the system itself during autonomous operation and extend the time that power can be supplied to important loads.

本願に開示される直流配電システムは、系統電力から直流電力として電力が供給される直流バス、前記直流バスと蓄電池の間に配置され、前記蓄電池の充放電のための電力変換を行う蓄電池用電力変換器、複数の直流負荷それぞれと前記直流バスとの間に設けられ、前記直流バスに供給された電力をそれぞれの仕様に応じた電圧の直流電力に変換して供給する複数の負荷側電力変換器、および前記蓄電池用電力変換器と前記複数の負荷側電力変換器とを連携制御する制御部を備え、前記制御部は、前記系統電力からの供給が断たれた際、前記蓄電池の充電状態に応じて前記複数の直流負荷に通常通りに電力を供給する通常自立運転動作と、前記複数の直流負荷のうち、優先順位の高い重要負荷に供給対象を限定する制限動作とを切り替え、前記制限動作において、前記負荷側電力変換器のうち前記重要負荷に接続された電力変換器と前記蓄電池用電力変換器のうち、スイッチング素子によるスイッチング動作で電力変換を行う電力変換器の少なくともいずれかを、前記スイッチング動作を停止して入力側と出力側とを導通させることを特徴とする。The DC power distribution system disclosed in the present application includes a DC bus to which power is supplied as DC power from a grid power, a battery power converter arranged between the DC bus and a storage battery and performing power conversion for charging and discharging the storage battery, a plurality of load-side power converters arranged between each of a plurality of DC loads and the DC bus and converting the power supplied to the DC bus into DC power of a voltage according to the respective specifications and supplying the converted power, and a control unit that controls the battery power converter and the plurality of load-side power converters in a coordinated manner, and when the supply from the grid power is cut off, the control unit switches between a normal independent operation mode in which power is supplied to the plurality of DC loads as usual according to the state of charge of the storage battery, and a restricted operation in which the supply is limited to important loads having a high priority among the plurality of DC loads, and in the restricted operation, at least one of the power converters connected to the important loads among the load-side power converters and the power converters for the storage battery that perform power conversion by switching operation using switching elements is stopped in the switching operation to connect the input side and output side.

本願に開示される直流配電システムによれば、自立運転時においてシステム自体の電力消費を抑制できるので、蓄電池から重要負荷への電力供給可能時間をより長くすることができる直流配電システムを得ることができる。 According to the DC power distribution system disclosed in the present application, the power consumption of the system itself can be reduced during independent operation, thereby obtaining a DC power distribution system that can extend the time during which power can be supplied from the storage battery to important loads.

実施の形態1にかかる直流配電システムの構成を説明するための電源と負荷との接続関係を示すブロック図である。1 is a block diagram showing a connection relationship between power sources and loads for explaining a configuration of a DC power distribution system according to a first embodiment. FIG. 実施の形態1にかかる直流配電システムを構成する電力変換器の主回路を示す回路図である。1 is a circuit diagram showing a main circuit of a power converter constituting a DC power distribution system according to a first embodiment. 実施の形態1にかかる直流配電システムを構成する制御部のブロック図である。2 is a block diagram of a control unit constituting the DC power distribution system according to the first embodiment. FIG. 実施の形態1にかかる直流配電システムにおいて、蓄電池の充電率に応じた動作域の設定を説明するための図である。1 is a diagram for explaining setting of an operating region according to a charging rate of a storage battery in a DC power distribution system according to a first embodiment. FIG. 実施の形態1にかかる直流配電システムの動作を説明するためのフローチャートである。4 is a flowchart for explaining the operation of the DC power distribution system according to the first embodiment. 実施の形態1にかかる直流配電システムにおいて、蓄電池の充電率に応じた変形例にかかる動作域の設定を説明するための図である。10 is a diagram for explaining setting of an operating range according to a modified example in accordance with a charging rate of a storage battery in the DC power distribution system according to the first embodiment. FIG. 実施の形態2にかかる直流配電システムの構成を説明するための電源と負荷との接続関係を示すブロック図である。FIG. 11 is a block diagram showing a connection relationship between power sources and loads for explaining the configuration of a DC power distribution system according to a second embodiment. 実施の形態2にかかる直流配電システムにおいて自立運転に移行した後の動作を説明するためのフローチャートである。11 is a flowchart for explaining an operation after transition to independent operation in the DC power distribution system according to the second embodiment. 実施の形態2にかかる直流配電システムの動作例1を説明するためのブロック図である。FIG. 11 is a block diagram for explaining an operation example 1 of a DC power distribution system according to a second embodiment. 実施の形態2にかかる直流配電システムの動作例2を説明するためのブロック図である。FIG. 11 is a block diagram for explaining an operation example 2 of the DC power distribution system according to the second embodiment. 実施の形態2にかかる直流配電システムの動作例3を説明するためのブロック図である。FIG. 11 is a block diagram for explaining an operation example 3 of the DC power distribution system according to the second embodiment. 実施の形態2にかかる直流配電システムの動作例4を説明するためのブロック図である。FIG. 11 is a block diagram for explaining an operation example 4 of the DC power distribution system according to the second embodiment. 実施の形態2にかかる直流配電システムの動作例5を説明するためのブロック図である。FIG. 11 is a block diagram for explaining an operation example 5 of the DC power distribution system according to the second embodiment. 実施の形態3にかかる直流配電システムの動作例1を説明するためのブロック図である。FIG. 13 is a block diagram for explaining an operation example 1 of a DC power distribution system according to a third embodiment. 実施の形態3にかかる直流配電システムの動作例2を説明するためのブロック図である。FIG. 13 is a block diagram for explaining an operation example 2 of the DC power distribution system according to the third embodiment. 各実施の形態にかかる直流配電システムを構成する制御部のハードウエア構成例を示すブロック図である。2 is a block diagram showing an example of a hardware configuration of a control unit constituting the DC power distribution system according to each embodiment. FIG.

実施の形態1.
図1~図5は、実施の形態1にかかる直流配電システムの構成、および動作について説明するためのものであり、図1は直流配電システムの構成を説明するための、電源と負荷との接続関係を示す模式的なブロック図、図2は直流配電システムを構成する複数の電力変換器のうち、蓄電池用電力変換器の主回路を示す回路図、図3は直流配電システムを構成する制御部のブロック図である。そして、図4は蓄電池の充電率に応じた動作モード毎の動作域の設定を説明するための図、図5は直流配電システムの動作を説明するためのフローチャートである。
Embodiment 1.
Figures 1 to 5 are for explaining the configuration and operation of a DC power distribution system according to a first embodiment, with Figure 1 being a schematic block diagram showing the connection relationship between power sources and loads for explaining the configuration of the DC power distribution system, Figure 2 being a circuit diagram showing the main circuit of a power converter for a storage battery among multiple power converters that make up the DC power distribution system, and Figure 3 being a block diagram of a control unit that makes up the DC power distribution system. Figure 4 is a diagram for explaining the setting of an operating range for each operating mode according to the charging rate of the storage battery, and Figure 5 being a flowchart for explaining the operation of the DC power distribution system.

実施の形態1にかかる直流配電システム1は、図1に示すように主に直流バス8を中心に複数の電源側電力変換器4と負荷側電力変換器5が接続され、配電電力を制御する制御部3を備えている。また、当該システムの使用者、あるいはサーバ、エネルギーマネジメントシステム等で代表される上位の制御装置を介して、各種指令、各種設定値等の受信、計測情報の送信、表示を行うためのインタフェース回路2を備えている。 As shown in Fig. 1, the DC power distribution system 1 according to the first embodiment is mainly connected to a DC bus 8 via a plurality of source-side power converters 4 and load-side power converters 5, and is provided with a control unit 3 that controls the distributed power. It also has an interface circuit 2 for receiving various commands, various setting values, etc., and transmitting and displaying measurement information via a user of the system or a higher-level control device represented by a server, energy management system, etc.

本実施の形態では、主電源911は系統電力として交流系統を想定しているが、直流電源であってもよい。また、蓄電池912としてはリチウムイオン電池を想定しているが、鉛蓄電池など他の種類の蓄電池であってもよい。そして、主電源911と蓄電池912(まとめて電源91)から受電した電力を直流バス8でまとめ、それぞれの直流負荷92に適した直流電力に変換し配電するように構成している。In this embodiment, the main power source 911 is assumed to be an AC system as the system power, but may be a DC power source. The storage battery 912 is assumed to be a lithium ion battery, but may be another type of storage battery such as a lead storage battery. The power received from the main power source 911 and the storage battery 912 (collectively referred to as power source 91) is combined on the DC bus 8, converted into DC power suitable for each DC load 92, and distributed.

電源側電力変換器4を構成する受電用電力変換器41と蓄電池用電力変換器42には、それぞれ主電源911と蓄電池912が接続されている。負荷側電力変換器5を構成する負荷用電力変換器51と負荷用電力変換器52には、それぞれ1つあるいは複数の負荷機器921、負荷機器922(まとめて直流負荷92)が接続されている。The power receiving power converter 41 and the power converter for storage battery 42 constituting the power source side power converter 4 are respectively connected to a main power source 911 and a storage battery 912. The load power converter 51 and the load power converter 52 constituting the load side power converter 5 are respectively connected to one or more load devices 921 and load devices 922 (collectively DC loads 92).

そして、主電源911と受電用電力変換器41との間、および蓄電池912と蓄電池用電力変換器42との間には、それぞれ投入と遮断の切り替え自在な開閉器61、開閉器62(まとめて電源側開閉器6)を介している。同様に、負荷用電力変換器51と負荷機器921との間、および負荷用電力変換器52と負荷機器922との間には、それぞれ投入と遮断の切り替え自在な開閉器71、開閉器72(まとめて負荷側開閉器7)を介している。Between the main power source 911 and the receiving power converter 41, and between the storage battery 912 and the storage battery power converter 42, there are provided switches 61 and 62 (collectively referred to as power source side switches 6), which can be switched between on and off. Similarly, between the load power converter 51 and the load device 921, and between the load power converter 52 and the load device 922, there are provided switches 71 and 72 (collectively referred to as load side switches 7), which can be switched between on and off.

電源側開閉器6、負荷側開閉器7には、外部指令を用いた投入と遮断の切り替え動作が可能である機器を使用し、制御部3から指令される遮断信号に応じて停電時における遮断を実施する。なお、復帰時に手動で投入するようにすれば、少なくとも外部指令に応じて遮断が可能な機器であればよい。また、開閉器の開閉状態については制御部3へと出力する場合がある。 The power supply side circuit breaker 6 and the load side circuit breaker 7 use equipment that can switch between on and off using external commands, and cut off during a power outage in response to a cut-off signal sent from the control unit 3. If the equipment is to be manually turned on when power is restored, it is sufficient that the equipment is at least capable of cutting off in response to an external command. The open/closed state of the circuit breaker may be output to the control unit 3.

配電先の直流負荷92の種類は、例えば、照明負荷およびオフィスオートメーション機器等といった一般負荷、空調負荷等の動力負荷、サーバ等とIT機器負荷といったものがある。本実施の形態における直流配電システム1では、停電時における配電対象の優先順位として、直流負荷92が重要負荷であるか、一般負荷であるかに分類設定される。そのため、直流負荷92の重要度、および種類に応じて負荷側電力変換器5と直流負荷92との接続が振り分けられている。 The types of DC loads 92 to which power is distributed include, for example, general loads such as lighting loads and office automation equipment, power loads such as air conditioning loads, and IT equipment loads such as servers. In the DC power distribution system 1 of this embodiment, the DC loads 92 are classified as important loads or general loads as a priority for power distribution targets during a power outage. Therefore, the connection between the load-side power converter 5 and the DC loads 92 is allocated according to the importance and type of the DC loads 92.

ここで、電力変換器の構成と特性について説明する。直流配電システム1の受電用電力変換器41は主にPWMコンバータ(Pulse Width Modulation Converter)などが用いられ、蓄電池用電力変換器42および負荷側電力変換器5では主にチョッパ回路といった直流電力変換器が用いられる。蓄電池用電力変換器42は、図2に示すように2つの半導体スイッチS1、S2(ここではIGBT:Insulated Gate Bipolar Transistor)を用いて構成される昇圧チョッパ回路を用いている。なお、図2では簡易化のため主回路部のみを図示しており、制御回路、センサ等の描画を省略している。Here, the configuration and characteristics of the power converter will be described. The receiving power converter 41 of the DC power distribution system 1 mainly uses a PWM converter (Pulse Width Modulation Converter), while the storage battery power converter 42 and the load side power converter 5 mainly use DC power converters such as chopper circuits. The storage battery power converter 42 uses a boost chopper circuit configured with two semiconductor switches S1 and S2 (here, IGBTs: Insulated Gate Bipolar Transistors) as shown in Figure 2. Note that for simplicity, only the main circuit is shown in Figure 2, and the control circuit, sensors, etc. are omitted.

この回路では半導体スイッチS1、S2を交互にONすることを繰り返すスイッチング動作により、蓄電池の直流電力をより電圧の高い直流電力に昇圧(電力変換)している。この半導体スイッチS1、S2のON/OFFを切り替えるスイッチング動作時に損失が発生することが一般的に知られている。そのため、蓄電池912の電圧から昇圧する必要がない場合、半導体スイッチS1を常にONにして導通状態にすることでスイッチング動作による損失を削減しつつ、入力と出力(蓄電池912と直流バス8間)を導通させることができる。In this circuit, the DC power of the storage battery is boosted (power converted) to higher voltage DC power by repeatedly switching the semiconductor switches S1 and S2 alternately on. It is generally known that losses occur during the switching operation of switching the semiconductor switches S1 and S2 on and off. Therefore, when there is no need to boost the voltage from the storage battery 912, the semiconductor switch S1 is always kept on and in a conductive state, thereby reducing losses due to the switching operation and enabling conductivity between the input and output (between the storage battery 912 and the DC bus 8).

この動作を導通モードと呼称する。そこで、本願の直流配電システム1では、動作状態に応じて導通モードを使用し、システム自体の電力消費による損失の低減を図るように構成した。なお、この導通モードに関しては、図2に示したような昇圧チョッパ回路に限らず、例えば降圧チョッパ、昇降圧チョッパ等のその他変換回路、あるいはPWMインバータ等でも同等の動作が実施できる。This operation is called the conduction mode. Therefore, the DC power distribution system 1 of the present application is configured to use the conduction mode depending on the operating state, and to reduce losses due to power consumption by the system itself. Note that this conduction mode is not limited to the boost chopper circuit shown in Figure 2, but can also be performed by other conversion circuits such as a step-down chopper, a step-up/step-down chopper, or a PWM inverter.

そして、導通モードにおいては、スイッチング動作による損失を削減しつつ、入力と出力を導通させることができるので、電力変換器の種別を問わず、電力消費を抑制できる。ただし、一部の電力変換器では導通モードと同等の動作ができない種類も存在するが、そういった電力変換器は導通モードの仕様対象にはしないとする。In the conduction mode, the input and output can be made conductive while reducing losses due to switching operations, so power consumption can be reduced regardless of the type of power converter. However, there are some types of power converters that cannot operate in the same way as in the conduction mode, and such power converters are not subject to the conduction mode specifications.

つぎに制御部3の構成について、連系電力が供給されている際の連系運転動作モードと停電時の自立運転動作モードとを切り替え制御するための一般的な構成部分と、上述した導通モードの動作を制御するための構成について図3を用いて説明する。モード切り替え制御のための構成として、システム内の各機器のセンサ部等からの情報に基づいて各機器の状態を検出する状態検出部31と、状態検出部31およびインタフェース回路2から取得した情報、または指令に基づいて動作モードを判定する動作モード判定部32を備えている。Next, the configuration of the control unit 3 will be described with reference to Fig. 3, including general components for controlling switching between the grid-connected operation mode when grid-connected power is being supplied and the independent operation mode during a power outage, and a configuration for controlling the above-mentioned conduction mode operation. The configuration for mode switching control includes a state detection unit 31 that detects the state of each device in the system based on information from a sensor unit or the like of each device, and an operation mode determination unit 32 that determines the operation mode based on information or commands obtained from the state detection unit 31 and the interface circuit 2.

そして、上述した導通モードを実行するための構成として、動作モード判定部32と状態検出部31とインタフェース回路2からの情報、指令に基づいて各電力変換器への動作指令を生成する動作指令生成部33を備えている。また、蓄電池912の充電状態に応じた動作設定に用いる閾値等についての情報を保持する閾値データベース(図中DBと表記)34と、各直流負荷92の優先順位についての情報を保持する優先順位データベース35を備えている。さらに、各直流負荷92の動作電圧範囲、電力変換器の動作範囲等、機器の仕様についての情報を保持する機器仕様データベース36を備えている。なお、各電力変換器の動作指令については、出力電圧指令、および電力変換器の起動・停止に関わる信号、蓄電池912からの充放電電力指令等が含まれる。 As a configuration for executing the above-mentioned conduction mode, the power converter includes an operation mode determination unit 32, a state detection unit 31, and an operation command generation unit 33 that generates operation commands to each power converter based on information and commands from the interface circuit 2. The power converter also includes a threshold database (represented as DB in the figure) 34 that holds information on thresholds and the like used for operation settings according to the charge state of the storage battery 912, and a priority database 35 that holds information on the priority of each DC load 92. The power converter also includes an equipment specification database 36 that holds information on the specifications of the equipment, such as the operating voltage range of each DC load 92 and the operating range of the power converter. The operation commands for each power converter include output voltage commands, signals related to starting and stopping the power converter, and charge/discharge power commands from the storage battery 912.

つぎに、本実施の形態1にかかる直流配電システム1の動作設定に関して、図4の蓄電池の充電状態(以下SoC(State of Charge)と称する)の変動に応じた動作モード毎の動作域の設定についての概念図を参考にして説明する。動作モードの判定と動作域の設定は、蓄電池912のSoC、主電源911と受電用電力変換器41の動作状態を元に制御部3にて判定される。Next, the operation settings of the DC power distribution system 1 according to the first embodiment will be explained with reference to the conceptual diagram of the setting of the operating range for each operating mode according to the fluctuation of the state of charge (hereinafter referred to as SoC (State of Charge)) of the storage battery in Fig. 4. The determination of the operating mode and the setting of the operating range are determined by the control unit 3 based on the SoC of the storage battery 912, the operating states of the main power source 911 and the receiving power converter 41.

動作モードについては、主電源911と蓄電池912から受電した電力を用いて直流負荷92に電力を供給する連系運転動作モードと、主電源911との連系がなく、蓄電池912からの電力のみで直流負荷92へ電力供給を実施する自立運転動作モードの2つに大きく分類される。The operating modes are broadly classified into two: a grid-connected operation mode in which power is supplied to the DC load 92 using power received from the main power source 911 and the storage battery 912, and an independent operation mode in which there is no connection to the main power source 911 and power is supplied to the DC load 92 only using power from the storage battery 912.

連系運転動作モードでは、SoCが閾値Sth1以上か否かによって、蓄電池912からの充放電についての動作制限のない通常動作域と、蓄電池912からの放電を停止する準制限動作域が設定されている。自立運転動作モードでは、SoCが閾値Sth1以上か否かによって、複数の直流負荷92に通常通りの電力供給を実施する自立運転動作域と、予め重要負荷と定められた1つないし複数の限定された直流負荷92のみへの電力を供給する制限動作域が設定されている。In the grid-connected operation mode, a normal operation range with no operational restrictions on charging and discharging from the storage battery 912 and a semi-restricted operation range in which discharging from the storage battery 912 is stopped are set depending on whether the SoC is equal to or greater than the threshold value Sth1. In the independent operation mode, an independent operation range in which power is supplied to multiple DC loads 92 as usual and a restricted operation range in which power is supplied only to one or more limited DC loads 92 that are predefined as important loads are set depending on whether the SoC is equal to or greater than the threshold value Sth1.

また、いずれの動作モードに対しても、蓄電池912の保護のため、過充電による蓄電池912の寿命の減少を防止するための充電停止閾値Smaxと、過放電による蓄電池の寿命の減少を防止するための放電停止閾値Sminが別途設定されている。そして、充電停止閾値Smaxを超える領域は、蓄電池912への充電を停止する充電停止域に、放電停止閾値Sminを下回る領域は蓄電池912からの放電を停止する放電停止域に設定される。In addition, for each operation mode, a charge stop threshold Smax for preventing a reduction in the lifespan of the storage battery 912 due to overcharging and a discharge stop threshold Smin for preventing a reduction in the lifespan of the storage battery due to overdischarging are separately set in order to protect the storage battery 912. The region exceeding the charge stop threshold Smax is set as a charge stop region in which charging to the storage battery 912 is stopped, and the region below the discharge stop threshold Smin is set as a discharge stop region in which discharging from the storage battery 912 is stopped.

閾値Sth1は、予め重要度の高い直流負荷92の推定消費電力と電力供給時間より概算される必要電力量に基づいて設定される。例えば、蓄電池912を閾値Sth1から放電停止閾値Sminまで放電させたときに得られる電力量が必要電力量を上回るような値に設定され、充電停止閾値Smaxと放電停止閾値Sminとともに閾値データベース34に保持される。また、閾値Sth1はインタフェース回路2からリアルタイムで変更するように指示される場合がある。The threshold value Sth1 is set based on the required power amount roughly calculated in advance from the estimated power consumption and power supply time of the DC load 92 of high importance. For example, it is set to a value such that the amount of power obtained when the storage battery 912 is discharged from the threshold value Sth1 to the discharge stop threshold value Smin exceeds the required power amount, and is stored in the threshold value database 34 together with the charge stop threshold value Smax and the discharge stop threshold value Smin. In addition, the interface circuit 2 may instruct the threshold value Sth1 to be changed in real time.

上記構成、および設定を前提として、直流配電システム1の動作について、図5のフローチャートを参考にして説明する。なお、ここでは、負荷機器921はサーバ等のIT機器負荷が接続されており、優先順位としては重要負荷と設定され、負荷機器922は照明等の一般負荷が接続されており、負荷の優先順位としては一般負荷として設定されると想定する。 Assuming the above configuration and settings, the operation of the DC power distribution system 1 will be described with reference to the flowchart in Fig. 5. It is assumed here that load device 921 is connected to an IT device load such as a server, and is set as an important load in terms of priority, and load device 922 is connected to a general load such as lighting, and is set as a general load in terms of load priority.

はじめに、状態検出部31が検出した主電源911および受電用電力変換器41の動作状態に基づいて、動作モード判定部32が動作モードの判定を行う(ステップS100~S110)。上述したように、主電源911と受電用電力変換器41が運転している場合は主電源911と蓄電池912から受電した電力を用いて直流負荷92に電力を供給する連系運転動作モードであると判定する。一方、主電源911の停電、あるいは受電用電力変換器41の故障時においては、蓄電池912のみで直流負荷92へ電力供給を実施する自立運転動作モードと判定する。First, the operation mode determination unit 32 determines the operation mode based on the operation states of the main power source 911 and the power receiving power converter 41 detected by the state detection unit 31 (steps S100 to S110). As described above, when the main power source 911 and the power receiving power converter 41 are operating, it is determined that the operation mode is the interconnected operation mode in which power is supplied to the DC load 92 using power received from the main power source 911 and the storage battery 912. On the other hand, when the main power source 911 is out of power or the power receiving power converter 41 is broken, it is determined that the operation mode is the independent operation mode in which power is supplied to the DC load 92 only by the storage battery 912.

連系運転モードであると判定した場合(ステップS120で「No」)、直流配電システム1は主に主電源911である交流系統より受電した電力を直流負荷92へと供給する連系運転動作をする(ステップS200)。その際、Socが充電停止閾値Smax以下、放電停止閾値Smin以上の範囲になるよう動作させる。そして、状況変化により自立運転モードと判定されるまで、Socに応じて蓄電池912からの充放電動作に制限のない通常動作域か、蓄電池912からの放電を停止する準制限動作域に切り替える連系動作制御を継続する。If it is determined that the system is in the grid-connected operation mode (step S120: No), the DC power distribution system 1 performs grid-connected operation to supply power received from the AC system, which is the main power source 911, to the DC load 92 (step S200). At that time, the system is operated so that the Soc is in a range of less than the charge stop threshold Smax and more than the discharge stop threshold Smin. Then, until it is determined that the system is in the independent operation mode due to a change in the situation, the system continues grid-connected operation control to switch between a normal operation range in which there is no limit on the charge and discharge operation from the storage battery 912, and a semi-limited operation range in which the discharge from the storage battery 912 is stopped, depending on the Soc.

さらに連系運転動作時は上位制御装置、あるいはユーザーからの指令に応じてピークカット制御を実施する。ピークカット制御は、予め定められたピークカット指令と比べて受電電力が大きい場合に、蓄電池912から電力を放電し、受電電力を削減する制御を示す。また、ピークカット指令に対して受電電力が小さい場合は、蓄電池912への充電を実施する場合もある。ただし、この連系運転動作モードの動作は一般的な連系運転と同様であるため、詳細な説明は省略する。 Furthermore, during grid-connected operation, peak cut control is performed in response to commands from a higher-level control device or a user. Peak cut control refers to control in which power is discharged from the storage battery 912 to reduce the received power when the received power is greater than a predetermined peak cut command. Also, when the received power is less than the peak cut command, charging to the storage battery 912 may be performed. However, since the operation of this grid-connected operation mode is the same as general grid-connected operation, a detailed explanation will be omitted.

連系運転動作時においてピークカット制御のために蓄電池912の電力を消費しすぎた場合、自立運転動作において直流負荷92への電力供給継続時間が十分に確保できなくなる懸念がある。そのため、図4で示したように蓄電池912のSocが閾値Sth1を下回る場合、ピークカットのための蓄電池912の放電を制限する。この動作により、自立運転動作時における重要負荷への電力供給時間を確保する。 If too much power is consumed from the storage battery 912 due to peak cut control during grid-connected operation, there is a concern that the duration of power supply to the DC load 92 during independent operation may not be sufficiently secured. Therefore, as shown in Figure 4, when the Soc of the storage battery 912 falls below the threshold value Sth1, the discharge of the storage battery 912 for peak cut is limited. This operation ensures the duration of power supply to important loads during independent operation.

一方、交流系統の停電、もしくは受電用電力変換器41に故障が生じ、自立運転モードと判定される(ステップS120で「Yes」)と、蓄電池912が主電源となり、直流負荷92への電力供給を実施する自立運転動作を実行する。連系運転動作から自立運転に移行した場合、蓄電池のSoCに基づいて図4で説明した動作域の判定を実施する。On the other hand, if a power outage occurs in the AC system or a failure occurs in the receiving power converter 41 and it is determined that the system is in the independent operation mode ("Yes" in step S120), the storage battery 912 becomes the main power source and performs independent operation to supply power to the DC load 92. When switching from grid-connected operation to independent operation, the operating range described in Figure 4 is determined based on the SoC of the storage battery.

基本的に連系運転においては、SoCは放電停止閾値Smin以上、充電停止閾値Smax以下の範囲で動作しているので、自立運転への移行直後は、例えば、蓄電池912のSoCが閾値Sth1以上であるか否かを判定する(ステップS300)。閾値Sth1以上である場合(ステップS300で「Yes」)、蓄電池912から負荷機器921および負荷機器922へと全負荷供給が可能な自立運転動作域と判定し(ステップS600)、閾値Sth1を下回るまで自立運転動作を継続する。Basically, in grid-connected operation, the SoC operates in a range between the discharge stop threshold Smin and the charge stop threshold Smax, so immediately after the transition to independent operation, for example, it is determined whether the SoC of the storage battery 912 is equal to or greater than the threshold Sth1 (step S300). If it is equal to or greater than the threshold Sth1 ("Yes" in step S300), it is determined that the storage battery 912 is in an independent operation operating range in which full load can be supplied from the storage battery 912 to the load devices 921 and 922 (step S600), and the independent operation continues until it falls below the threshold Sth1.

対して蓄電池912のSoCが閾値Sth1を下回る場合(ステップS300で「No」)、蓄電池912から重要度の高い重要負荷へのみ電力供給を実施する制限動作域と判定し、重要負荷にのみ電力を供給する(ステップS410~)動作制御を行う。そのため、動作指令生成部33は、優先順位データベース35に保持された、一般負荷か重要負荷かを判別するための優先順位情報に基づいて、電力供給対象として負荷機器921を選定する。On the other hand, if the SoC of the storage battery 912 falls below the threshold value Sth1 ("No" in step S300), it is determined that the storage battery 912 is in a restricted operating range in which power is supplied only to important loads with high importance, and operation control is performed to supply power only to the important loads (steps S410 onward). Therefore, the operation command generation unit 33 selects the load device 921 as the target for power supply based on the priority information held in the priority database 35 for determining whether the load is a general load or an important load.

さらに、蓄電池912から重要負荷(負荷機器921)に至る給電系統を構成する機器仕様情報に基づいて、給電系統内の少なくとも1台の電力変換器を導通モード動作の対象として選定し(ステップS410)、選定結果に基づいた動作指令を生成する。 Furthermore, based on the equipment specification information constituting the power supply system from the storage battery 912 to the important load (load device 921), at least one power converter in the power supply system is selected as a target for conduction mode operation (step S410), and an operation command is generated based on the selection result.

例えば、蓄電池912の出力電圧範囲、負荷機器921の動作範囲(電圧)、および蓄電池用電力変換器42と負荷用電力変換器51の動作特性に基づいて、最も消費電力を抑える動作構成として、蓄電池用電力変換器42を導通モードの対象として選定する。その際、負荷用電力変換器51には、蓄電池912から直流電力が直接供給されることにより入力電圧が変化するが、その変化を補償して負荷機器921への出力電圧を維持するための動作に関する指令(動作指令)も生成する。さらには、例えば、負荷用電力変換器52のように、上記給電系統以外の機器についても、動作を停止する動作指令を生成する。For example, the storage battery power converter 42 is selected as the target for the conduction mode as the operating configuration that minimizes power consumption based on the output voltage range of the storage battery 912, the operating range (voltage) of the load device 921, and the operating characteristics of the storage battery power converter 42 and the load power converter 51. At this time, the input voltage of the load power converter 51 changes when DC power is directly supplied from the storage battery 912, but a command (operation command) is also generated regarding the operation to compensate for the change and maintain the output voltage to the load device 921. Furthermore, an operation command is generated to stop the operation of devices other than the above power supply system, such as the load power converter 52.

なお、負荷機器921の動作範囲が蓄電池912の出力電圧範囲内で、負荷機器921の効率に問題が生じない場合、蓄電池用電力変換器42に加え、負荷用電力変換器51も導通モードの対象としてもよい。あるいは、蓄電池用電力変換器42よりも負荷用電力変換器51を選定する方が消費電力の抑制効果が高い場合、負荷用電力変換器51のみを導通モードに選定してもよい。さらには、導通モードの選定に加え、出力電圧等の変更等、消費電力を抑制するための組み合わせを判定するようにしてもよい。 If the operating range of the load device 921 is within the output voltage range of the storage battery 912 and there is no problem with the efficiency of the load device 921, the load power converter 51 may also be subject to the conduction mode in addition to the storage battery power converter 42. Alternatively, if selecting the load power converter 51 has a greater effect of reducing power consumption than the storage battery power converter 42, only the load power converter 51 may be selected for the conduction mode. Furthermore, in addition to selecting the conduction mode, a combination for reducing power consumption, such as changing the output voltage, may be determined.

動作指令生成部33からの動作指令をシステム内の機器が受信すると、蓄電池912から重要度の高い負荷機器921へ電力が限定供給され、少なくとも一つが導通モードで動作する制限に移行する(ステップS420)。この状態において、蓄電池912のSoCが放電停止閾値Sminを下回ると(ステップS430で「Yes」)、自立運転を停止し(ステップS430)、運転を終了する。When an operation command is received by a device in the system from the operation command generating unit 33, power is supplied from the storage battery 912 to the load device 921 with high importance at least one of them is restricted to operate in a conductive mode (step S420). In this state, when the SoC of the storage battery 912 falls below the discharge stop threshold Smin ("Yes" in step S430), the independent operation is stopped (step S430) and the operation is terminated.

つまり、制限動作域では、蓄電池912の電圧と重要度の高い直流負荷92への配電電圧に応じて蓄電池用電力変換器42もしくは負荷用電力変換器51の少なくとも一方のスイッチング動作を停止し、導通モードにて動作させる。この動作によりスイッチングにより発生する損失を低減することが可能であり、蓄電池912から負荷機器921への電力供給時に発生する損失を低減し、供給対象を単に限定した場合よりも電力供給時間の増加を図ることができる。In other words, in the limited operating range, the switching operation of at least one of the battery power converter 42 and the load power converter 51 is stopped and operated in a conductive mode depending on the voltage of the battery 912 and the distribution voltage to the DC load 92 of high importance. This operation makes it possible to reduce losses caused by switching, reduce losses caused when power is supplied from the battery 912 to the load device 921, and increase the power supply time compared to when the supply target is simply limited.

なお、蓄電池用電力変換器42もしくは負荷用電力変換器51のどちらのスイッチング動作を停止するかについては予め設定するようにしてもよく、その情報を機器仕様データベース36等に保持するようにしてもよい。その場合も、蓄電池用電力変換器42と負荷用電力変換器51それぞれの損失特性と定格電圧、および蓄電池電圧と負荷機器921の定格電圧などの関係から、装置への負担および損失低減効果を鑑みて決定される。It is also possible to set in advance whether the switching operation of the battery power converter 42 or the load power converter 51 is to be stopped, and this information may be stored in the equipment specification database 36 or the like. In this case, too, the decision is made in consideration of the load on the device and the effect of reducing losses, based on the loss characteristics and rated voltages of the battery power converter 42 and the load power converter 51, respectively, and the relationship between the battery voltage and the rated voltage of the load device 921, etc.

変形例.
図6は、変化例として連系運転動作時と自立運転動作時において、蓄電池の充電率に対して、それぞれ異なる閾値を設けた際の動作域の設定を説明するための図4に対応する図である。上記例では、連系運転動作時における準制限動作域へ移行する閾値と自立運転動作時における制限動作域へ移行する閾値として、同じ閾値Sth1を用いたがこれに限ることはない。図6に示すように連系運転動作時の閾値として、自立運転動作時の閾値Sth1とは異なる値の第二閾値Sth2を用いるようにしてもよい。
Variant examples.
6 is a diagram corresponding to FIG. 4 for explaining the setting of the operating range when different thresholds are set for the charging rate of the storage battery during grid-connected operation and during independent operation as a variation example. In the above example, the same threshold Sth1 is used as the threshold for transitioning to the semi-limited operating range during grid-connected operation and the threshold for transitioning to the limited operating range during independent operation, but this is not limited to this. As shown in FIG. 6, a second threshold Sth2 having a value different from the threshold Sth1 during independent operation may be used as the threshold during grid-connected operation.

異なる閾値を設定することで、重要負荷の継続時間に基づいて設定された閾値Sth1に縛られることなく、連系動作における最適な動作設定が可能になる。 By setting different thresholds, it becomes possible to set optimal operation settings for grid-connection operation without being bound by threshold value Sth1, which is set based on the duration of the important load.

実施の形態2.
上記実施の形態1では、蓄電池と主電源のみで電源を構成した例を示したがこれに限ることはない。本実施の形態2では、太陽光パネルを加えて電源を構成した例について説明する。図7~図13は、実施の形態2にかかる直流配電システムの構成、および動作について説明するためのものであり、図7は直流配電システムの構成を説明するための、電源と負荷との接続関係を示す模式的なブロック図、図8は自立運転に移行した後の動作を説明するためのフローチャートである。
Embodiment 2.
In the above-mentioned embodiment 1, an example in which the power supply is configured only by a storage battery and a main power supply is shown, but the present invention is not limited to this. In the present embodiment 2, an example in which the power supply is configured by adding a solar panel will be described. Figures 7 to 13 are for explaining the configuration and operation of the DC power distribution system according to the embodiment 2. Figure 7 is a schematic block diagram showing the connection relationship between the power supply and the load for explaining the configuration of the DC power distribution system, and Figure 8 is a flowchart for explaining the operation after switching to independent operation.

そして、図9は動作例1として連系運転動作時の動作例を示す図7に対応するブロック図、図10は動作例2として太陽光パネルが発電しているときの自立運転動作時の動作例を示す図7に対応するブロック図、図11は動作例3として太陽光パネルの発電が停止しているときの自立運転動作時の動作例を示す図7に対応するブロック図である。また、図12、図13それぞれは動作例4、動作例5として、別の条件で太陽光パネルの発電が停止しているときの自立運転動作時の動作例を示す図7に対応するブロック図である。なお、制御部の基本構成、および自立運転動作における基本動作等について実施の形態1で説明した図2~図4を援用する。 Figure 9 is a block diagram corresponding to Figure 7 showing an example of operation during grid-connected operation as operation example 1, Figure 10 is a block diagram corresponding to Figure 7 showing an example of operation during independent operation when the solar panel is generating power as operation example 2, and Figure 11 is a block diagram corresponding to Figure 7 showing an example of operation during independent operation when power generation by the solar panel is stopped as operation example 3. Also, Figures 12 and 13 are block diagrams corresponding to Figure 7 showing examples of operation during independent operation when power generation by the solar panel is stopped under different conditions as operation examples 4 and 5, respectively. Note that Figures 2 to 4 described in embodiment 1 are used for the basic configuration of the control unit and the basic operations in independent operation.

本実施の形態2にかかる直流配電システム1は、実施の形態1で説明した直流配電システム1の拡張例として、図7に示すように発電設備である太陽光パネル913を電源91として追加し、直流負荷92の種類を増加させたものである。太陽光パネル913は、開閉器63、PV用電力変換器43を介して直流バス8に接続している。直流負荷92としては、新たに負荷機器923と負荷機器924を追加し、負荷機器923は負荷用電力変換器53、開閉器73を介して直流バス8に接続し、負荷機器924は電力変換器を介さず、開閉器74を介して直流バス8に接続している。 The DC power distribution system 1 according to the second embodiment is an example of an extension of the DC power distribution system 1 described in the first embodiment, in which a solar panel 913, which is a power generation facility, is added as a power source 91 and the types of DC loads 92 are increased as shown in FIG. 7. The solar panel 913 is connected to the DC bus 8 via a switch 63 and a PV power converter 43. As the DC load 92, a load device 923 and a load device 924 are newly added, and the load device 923 is connected to the DC bus 8 via a load power converter 53 and a switch 73, and the load device 924 is connected to the DC bus 8 via a switch 74 without going through a power converter.

ここで、受電用電力変換器41を除く他の電力変換器は、機器の電圧に合わせて直流電力の昇圧もしくは降圧のどちらかの機能を有するとする。そして、図9に示すように入力形態と電圧の異なる複数の電源91から得られた電力を、複数の直流負荷92それぞれに電圧の異なる直流電圧を給電しているとする。Here, the power converters other than the receiving power converter 41 have the function of either stepping up or stepping down the DC power according to the voltage of the device. As shown in Figure 9, the power obtained from multiple power sources 91 with different input forms and voltages is supplied to multiple DC loads 92 as DC voltages with different voltages.

例えば、電源側電力変換器4は交流400V、蓄電池用電力変換器42は直流400V、PV用電力変換器43は直流350Vとそれぞれ入力電力の形態と電圧が異なっているが、直流バス8に対して同じ750Vの直流電力を出力するように設定している。同様に、負荷側電力変換器5は同じ直流750Vで入力されるが、負荷用電力変換器51は直流600V、負荷用電力変換器52は直流380V、負荷用電力変換器53は直流282Vと、それぞれ異なる電圧の直流電力を出力するように設定されている。そして、本実施の形態2では直流負荷92の優先順位として負荷機器921と負荷機器924が一般負荷、負荷機器922と負荷機器923が重要負荷に設定されているとする。For example, the power source side power converter 4 is AC 400V, the battery power converter 42 is DC 400V, and the PV power converter 43 is DC 350V, so that the input power form and voltage are different, but they are set to output the same 750V DC power to the DC bus 8. Similarly, the load side power converter 5 is input with the same 750V DC, but is set to output DC power of different voltages, with the load power converter 51 being DC 600V, the load power converter 52 being DC 380V, and the load power converter 53 being DC 282V. In the second embodiment, the priority order of the DC load 92 is set to load devices 921 and 924 as general loads, and load devices 922 and 923 as important loads.

つぎに、本実施の形態2にかかる直流配電システム1の動作について説明する。太陽光パネル913およびPV用電力変換器43の動作は、基本的に太陽光パネル913から発電される電力を最大化する最大電力点追従制御動作(以下、MPPT(Maximum Power Point Tracking)制御と称する)を実施し、動作モードによらず発電を継続する。ただし、夜間等の時間帯、および雨天等の天候状況によって発電が期待できない場合は、スケジュール機能もしくは上位制御装置等により停止するように指令される。Next, the operation of the DC power distribution system 1 according to the second embodiment will be described. The solar panel 913 and the PV power converter 43 basically operate by performing maximum power point tracking control (hereinafter referred to as MPPT (Maximum Power Point Tracking) control) to maximize the power generated by the solar panel 913, and continue generating power regardless of the operating mode. However, when power generation is not expected due to time periods such as nighttime or weather conditions such as rain, a command to stop is issued by a schedule function or a higher-level control device.

制限動作域において、予め定められた直流負荷92の優先順位において一般負荷に分類される直流負荷92への電力供給を停止する点に変更はないが、導通モードの使用の有無については、太陽光パネル913からの発電が可能であるか否かによって判断される。基本的にPV用電力変換器43を介した太陽光パネル913からの発電電力が、導通モードへの変換により抑制される電力よりも十分に大きいため、導通モードの使用よりもPV用電力変換器43を運転継続することが優先されるからである。In the limited operating range, there is no change in the fact that power supply to DC loads 92 classified as general loads in the predetermined priority order of DC loads 92 is stopped, but whether or not to use the conduction mode is determined based on whether or not power can be generated from the solar panel 913. Basically, the power generated from the solar panel 913 via the PV power converter 43 is sufficiently greater than the power suppressed by switching to the conduction mode, so continuing to operate the PV power converter 43 is prioritized over using the conduction mode.

本実施の形態2では、基本的には太陽光パネル913およびPV用電力変換器43の状況に応じた動作を除けば、実施の形態1で説明した動作と同様の動作を実施する。しかし、制限動作域における動作に差異があるため図8のフローチャートを参考にして、ステップS300以降の動作について説明する。つまり、交流系統で停電が発生し、自立運転移行後に蓄電池912の放電が進み、SoCが閾値Sth1を下回り、制限域に移行した場合の動作について説明する。In this second embodiment, the operation is basically the same as that described in the first embodiment, except for the operation according to the state of the solar panel 913 and the PV power converter 43. However, since there is a difference in the operation in the limited operating range, the operation from step S300 onwards will be described with reference to the flowchart in Figure 8. In other words, the operation will be described when a power outage occurs in the AC system, the discharge of the storage battery 912 progresses after the transition to independent operation, the SoC falls below the threshold value Sth1, and the transition to the limited range is made.

制限動作域と判断すると(ステップS300で「No」)、例えば状態検出部31は、PV用電力変換器43の動作状態、日照に関わる時間情報といった太陽光パネル913の発電状況を示す情報、および負荷の状態を示す情報(配電電圧)を収集する。そして、太陽光パネル913から上述した導通モードへの変換によって抑制される電力を上回る電力が得られるか否か、つまり太陽光パネル913から有効な発電が可能であるか否かを判断する(ステップS310)。その際、現時点での発電量が高い場合であっても、日没に近い時間等、発電継続時間が短いと判断した場合は、発電不可と判断するようにしてもよい。If it is determined that the operating range is limited ("No" in step S300), for example, the state detection unit 31 collects information indicating the power generation status of the solar panel 913, such as the operating state of the PV power converter 43 and time information related to sunlight, and information indicating the load state (distribution voltage). Then, it is determined whether or not the solar panel 913 can obtain power that exceeds the power suppressed by the conversion to the conduction mode described above, that is, whether or not effective power generation is possible from the solar panel 913 (step S310). At that time, even if the current amount of power generation is high, if it is determined that the power generation duration is short, such as near sunset, it may be determined that power generation is not possible.

時間が昼間等で太陽光パネル913の発電が続いている状況においては、動作モード判定部32は、太陽光パネル913からの発電電力が十分にある、つまり発電可能と判断する(ステップS320で「Yes」)。動作指令生成部33は、優先順位データベース35に保持された、一般負荷か重要負荷かを判別するための優先順位情報に基づいて、電力供給対象として負荷機器922、負荷機器923を選定する(ステップS510)。During the daytime or other times when the solar panel 913 continues to generate power, the operation mode determination unit 32 determines that the solar panel 913 is generating sufficient power, i.e., is capable of generating power ("Yes" in step S320). The operation command generation unit 33 selects the load devices 922 and 923 as targets for power supply based on the priority information for determining whether the loads are general loads or important loads, which is stored in the priority database 35 (step S510).

選定結果に応じて動作指令生成部33は、重要負荷に至る給電系統以外の機器である負荷用電力変換器51を停止し、開閉器71と開閉器74を開放して一般負荷への電力供給を停止するための動作指令を生成する。すると、図10に示すように、蓄電池912と太陽光パネル913から負荷機器922と負荷機器923に至る給電系統以外の機器である負荷用電力変換器51を停止し、開閉器71と開閉器74を開放して一般負荷への電力供給が停止する(ステップS520)。Depending on the selection result, the operation command generating unit 33 generates an operation command to stop the load power converter 51, which is a device other than the power supply system leading to the important load, and to stop the power supply to the general load by opening the switch 71 and the switch 74. Then, as shown in FIG. 10, the load power converter 51, which is a device other than the power supply system leading from the storage battery 912 and the solar panel 913 to the load device 922 and the load device 923, is stopped, and the switch 71 and the switch 74 are opened to stop the power supply to the general load (step S520).

そして、蓄電池912のSoCが放電停止閾値Sminを下回るまで(ステップS430で「No])は、ステップS310へ移行し、太陽光パネル913の発電状況を随時判断するようにする。Then, until the SoC of the storage battery 912 falls below the discharge stop threshold Smin ("No" in step S430), proceed to step S310 and constantly check the power generation status of the solar panel 913.

一方、太陽光パネル913からの発電電力が不十分、つまり発電不可と判断すると(ステップS320で「No」)、実施の形態1で説明した制限動作域の動作(ステップS410)に移行する。そして、図11に示すように、一般負荷(負荷機器921、負荷機器924)への電力供給を停止するとともに、予め設定された設定テーブルを元に蓄電池用電力変換器42の動作を導通モードへと移行し、損失の低減を図る。なお、蓄電池用電力変換器42の動作を導通モードへ移行する際に直流バス8の電圧が急変しないように動作移行する制御が実施される。On the other hand, if it is determined that the power generated from the solar panel 913 is insufficient, i.e., power generation is not possible ("No" in step S320), the system transitions to the restricted operating range operation (step S410) described in embodiment 1. Then, as shown in FIG. 11, the power supply to the general loads (load devices 921, 924) is stopped, and the operation of the storage battery power converter 42 is transitioned to a conduction mode based on a preset setting table to reduce losses. When transitioning the operation of the storage battery power converter 42 to the conduction mode, control is performed to transition the operation so that the voltage of the DC bus 8 does not change suddenly.

別条件での動作例.
ここで、太陽光パネル913の発電が停止した場合において、別の条件での動作例(電力変換器の動作制御)について説明する。図12に示すように蓄電池電圧が重要負荷(負荷機器922、負荷機器923)の動作電圧範囲に収まる条件(例えば、直流350V)では、蓄電池用電力変換器42、負荷用電力変換器52、負荷用電力変換器53をすべて導通モードにする。
Example of operation under different conditions.
Here, an example of operation (operation control of the power converter) under different conditions will be described when power generation by the solar panel 913 stops. As shown in Fig. 12, under conditions (e.g., DC 350 V) where the storage battery voltage falls within the operating voltage range of the important loads (load devices 922 and 923), the storage battery power converter 42, the load power converter 52, and the load power converter 53 are all set to the conduction mode.

一方、図13に示すように、蓄電池電圧が重要負荷(負荷機器922、負荷機器923)の動作電圧範囲よりも低い条件(例えば、直流320V)では、蓄電池用電力変換器42のスイッチング動作をオンにして電力変換動作させる。その際、直流バス8の電圧が、重要負荷の動作電圧範囲に収まる出力電圧(例えば、直流350V)となるように蓄電池用電力変換器42の電力変換動作を制御する。そして、負荷用電力変換器52と負荷用電力変換器53は導通モードにし、直流バス8の直流電圧(本例では350V)がそのまま重要負荷に供給される。On the other hand, as shown in FIG. 13, under conditions where the battery voltage is lower (e.g., 320 V DC) than the operating voltage range of the important loads (load devices 922 and 923), the switching operation of the battery power converter 42 is turned on to perform power conversion. At that time, the power conversion operation of the battery power converter 42 is controlled so that the voltage of the DC bus 8 becomes an output voltage (e.g., 350 V DC) that falls within the operating voltage range of the important loads. Then, the load power converters 52 and 53 are placed in a conductive mode, and the DC voltage of the DC bus 8 (350 V in this example) is supplied directly to the important loads.

本実施の形態2のように、直流負荷92の台数の増加および太陽光パネル913等の発電設備の追加がある場合、太陽光パネル913の発電電力を十分に活用しつつ、一般負荷への供給停止、および電力変換器の動作台数を最小にすることでの損失を低減できる。これにより、単に一般負荷への供給を停止する場合よりも、蓄電池912から重要負荷への電力供給可能時間をより長くすることができる。 As in the second embodiment, when the number of DC loads 92 increases and power generation facilities such as solar panels 913 are added, it is possible to reduce losses by minimizing the number of operating power converters and stopping the supply to general loads while fully utilizing the power generated by the solar panels 913. This makes it possible to extend the time during which power can be supplied from the storage battery 912 to important loads, compared to when the supply to the general loads is simply stopped.

とくに、別条件における動作例として図12で説明した動作例4では、蓄電池912から重要負荷に至るまでの電力変換器を2段とも導通モードにすることで変換損失を抑えている。また、図11で説明した条件においても、蓄電池912の電圧(本例では400V)で重要負荷の動作が可能であれば、さらに蓄電池用電力変換器42も導通モードに設定してもよい。In particular, in operation example 4 described in Fig. 12 as an operation example under different conditions, the conversion loss is suppressed by setting both stages of the power converter from the storage battery 912 to the important load in the conduction mode. Also, even under the conditions described in Fig. 11, if the important load can be operated with the voltage of the storage battery 912 (400V in this example), the storage battery power converter 42 may also be set to the conduction mode.

一方、図13で説明した動作例5では、蓄電池912から重要負荷に至るまでの2段の電力変換器のうち、1段を導通モードにすることで、図11で説明した動作例3と同等の効果(変換損失の削減)が期待できる。On the other hand, in operation example 5 described in Figure 13, by setting one of the two stages of power converters from the storage battery 912 to the important load to a conduction mode, it is possible to expect an effect equivalent to that of operation example 3 described in Figure 11 (reduction of conversion loss).

なお、本実施の形態では、図7のような構成を示したが、さらなる負荷機器の追加、電源においても燃料電池のような発電設備、蓄電池として利用する電気自動車等の追加をしても同様の効果が得られることは言うまでもない。 In this embodiment, the configuration shown in Figure 7 is shown, but it goes without saying that the same effect can be obtained by adding further load equipment, or by adding power generation equipment such as a fuel cell, or an electric vehicle used as a storage battery, etc.

さらには、例えば、複数の重要負荷の動作電圧範囲に重なる領域がある場合、蓄電池用電力変換器42を共通部分の電圧域に設定し、重要負荷用の負荷側電力変換器5を導通モードにすることで、スイッチング対象の台数を低減するようにしてもよい。ただし、対象となりうる電力変換器には、動作指令に応じて入力電圧の変化への対応、および出力電圧の変動の少なくともいずれかが可能な機器を用いるようにする。Furthermore, for example, if there is an overlapping region in the operating voltage ranges of multiple important loads, the battery power converter 42 may be set to the common voltage region and the load side power converter 5 for the important load may be set to a conductive mode, thereby reducing the number of switching targets. However, the target power converters should be devices that can at least either respond to changes in input voltage or vary the output voltage in response to an operation command.

いずれの場合でも、直流負荷92およびシステム内の機器(とくに電力変換器)への過剰な負担がなく、消費電力の抑制効果を得られる組み合わせを選定できるようにすればよい。その際、予め設定された設定テーブルを元に組み合わせを選定してもよいし、機器仕様データベース36等に保持された情報に基づいて、動作指令生成部33等が選定、または判断するようにしてもよい。In either case, it is necessary to select a combination that can suppress power consumption without placing an excessive burden on the DC load 92 and the devices in the system (especially the power converter). In this case, the combination may be selected based on a preset setting table, or the operation command generation unit 33 or the like may select or determine the combination based on information stored in the device specification database 36 or the like.

実施の形態3.
本実施の形態3においては、上述した実施の形態1あるいは実施の形態2の構成と動作を前提とし、自立運転モードで全負荷供給する場合の電力振り分けに関する構成と動作について説明する。図14と図15は、実施の形態3にかかる直流配電システムの構成、および動作について説明するためのものであり、図14は動作例1として自立運転動作域において、全負荷に電力を振り分けた状態を示す実施の形態2の図7に対応するブロック図、図15は動作例2として自立運転動作域において、直流バスの電圧低下を回避するための負荷への供給を停止した状態を示す実施の形態2の図7に対応するブロック図である。なお、実施の形態1および2で用いた図2~図4、および図7~図10を援用する。
Embodiment 3.
In this third embodiment, the configuration and operation of power distribution in the case of supplying full load in the independent operation mode will be described on the premise of the configuration and operation of the first or second embodiment described above. Figures 14 and 15 are for explaining the configuration and operation of the DC power distribution system according to the third embodiment, in which Figure 14 is a block diagram corresponding to Figure 7 of the second embodiment, showing a state in which power is distributed to the full load in the independent operation operation range as an operation example 1, and Figure 15 is a block diagram corresponding to Figure 7 of the second embodiment, showing a state in which supply to the load is stopped to avoid a voltage drop of the DC bus in the independent operation operation range as an operation example 2. Note that Figures 2 to 4 and Figures 7 to 10 used in the first and second embodiments are used.

実施の形態3にかかる直流配電システム1の構成は実施の形態2で説明した図7と同様であるが、制御部3おける動作に差異があるため、動作例に基づいて説明する。蓄電池912および蓄電池用電力変換器42には、基本的には自立運転動作時において重要負荷へ十分な電力を供給できる容量のものが選定されるが、コストの問題によりすべての直流負荷92への十分な電力を供給できる容量ではない場合がある。The configuration of the DC power distribution system 1 according to the third embodiment is the same as that shown in FIG. 7 described in the second embodiment, but there is a difference in the operation of the control unit 3, and therefore an operation example will be described. The storage battery 912 and the storage battery power converter 42 are basically selected to have a capacity capable of supplying sufficient power to important loads during independent operation, but due to cost issues, they may not have a capacity capable of supplying sufficient power to all DC loads 92.

本実施の形態3においては、全負荷供給モードにおいて電力供給能力が足りなくなるような場合に対処するため、直流負荷92への優先順位をより詳細に決定するようにした。そして、直流負荷92の優先順位として、実施の形態2と同様の重要負荷か一般負荷かの分類に加え、一般負荷に分類された直流負荷92を重要度に応じてさらに順位を割り振る第二優先順位を設定するようにした。In the third embodiment, in order to deal with a case where the power supply capacity becomes insufficient in the full load supply mode, the priority of the DC loads 92 is determined in more detail. In addition to classifying the DC loads 92 as important loads or general loads as in the second embodiment, a second priority is set to further assign a rank to the DC loads 92 classified as general loads according to their importance.

ここで、電力供給能力の不足の判定については、各電力変換器からの出力電力情報を用いて判断することが望ましい。これは、自立運転動作域においては蓄電池用電力変換器42およびPV用電力変換器43を用いて、直流バス8の電圧を維持するが、直流負荷92の消費電力が供給能力を超過した場合、直流バス8の電圧が維持できず低下する。そのため、この電圧低下を検出することで、電力供給能力の不足を判定することができるからである。Here, it is desirable to judge the insufficiency of power supply capacity using the output power information from each power converter. This is because in the autonomous operation range, the voltage of the DC bus 8 is maintained using the battery power converter 42 and the PV power converter 43, but if the power consumption of the DC load 92 exceeds the supply capacity, the voltage of the DC bus 8 cannot be maintained and drops. Therefore, by detecting this voltage drop, it is possible to judge the insufficiency of power supply capacity.

ただし、電力変換器すべてに電力計測可能なセンサを実装することは現実的ではない。そのため、本実施の形態3においては、いずれかの電力変換器で必ず得られる直流バス8の電圧(直流バス電圧)の計測値を用いて電力供給能力の不足を判定するようにした。そして、直流バス電圧が電圧閾値Vthを下回るか否かで、電力供給能力の不足の有無を判定するようにし、電力供給能力が不足と判定した場合、電力供給不足が解消されるまで第二優先順位に従って直流負荷92への電力供給を順次停止するようにした。However, it is not realistic to install a sensor capable of measuring power in all power converters. Therefore, in the third embodiment, the measurement value of the voltage (DC bus voltage) of the DC bus 8, which is always obtained in one of the power converters, is used to determine the insufficiency of the power supply capacity. Then, the presence or absence of the insufficiency of the power supply capacity is determined based on whether or not the DC bus voltage is below the voltage threshold Vth. If it is determined that the power supply capacity is insufficient, the power supply to the DC loads 92 is sequentially stopped according to the second priority until the power supply shortage is resolved.

例えば、蓄電池912の最大電力供給能力が50kWであるとする。また、直流負荷92の優先順位は負荷機器922および負荷機器923が重要負荷に、負荷機器921および負荷機器924が一般負荷に設定され、第二優先順位として、負荷機器921の方が負荷機器924より上位であるとする。For example, the maximum power supply capacity of the storage battery 912 is assumed to be 50 kW. Furthermore, the priority of the DC load 92 is set such that load device 922 and load device 923 are set as important loads, load device 921 and load device 924 are set as general loads, and load device 921 has a higher second priority than load device 924.

そして自立運転モードで自立運転動作域において、図14に示すように、4つの直流負荷92が消費する総電力(電力需要量)が80kW(30kW+10kW+10kW+30kW)であるとする。それに対し、太陽光パネル913からは発電中に40kWの電力供給が可能であるとする。すると、蓄電池912から40kW分を供給させれば合計(電力供給量)が80kW(40kW+40kW)になり、電力供給能力は十分にあることになる。 In the independent operation mode and independent operation range, the total power (power demand) consumed by the four DC loads 92 is assumed to be 80 kW (30 kW + 10 kW + 10 kW + 30 kW), as shown in Figure 14. In contrast, the solar panel 913 is capable of supplying 40 kW of power during power generation. Then, if the storage battery 912 is caused to supply 40 kW, the total (power supply) will be 80 kW (40 kW + 40 kW), which means there is sufficient power supply capacity.

この太陽光パネル913が発電できている状況から時間が進んで夜間等になり、太陽光パネル913からの発電が停止した場合、蓄電池912から最大の50kWの電力を供給させたとしても電力供給量が不足し、直流バス電圧が低下する。例えば、動作モード判定部32において、状態検出部31が検出した直流バス電圧と電圧閾値Vthとを比較し、電圧閾値Vthを下回っていた場合、電力供給不足であると判定される。If time passes from a state in which the solar panel 913 is generating power and it becomes nighttime, for example, and power generation from the solar panel 913 stops, the power supply will be insufficient even if the storage battery 912 supplies a maximum of 50 kW of power, and the DC bus voltage will drop. For example, the operation mode determination unit 32 compares the DC bus voltage detected by the state detection unit 31 with a voltage threshold value Vth, and if the voltage is below the voltage threshold value Vth, it is determined that there is a power supply shortage.

すると、動作指令生成部33において、第二優先順位における最下位の負荷機器924への電力供給を停止するため、開閉器74を開放させる動作指令が生成され、図15に示す動作へと推移する。なお、図15に示す第2動作例では、負荷機器924を解列することで電力供給量の不足が解消されたが、もし不足が解消されない場合はさらに上位の負荷機器921の電力供給が停止される。なお、この後再度、太陽光パネル913の発電が再開され電力供給量が増加した場合、ユーザーからの入力、あるいは上位制御装置からの指令によって負荷機器921、負荷機器924と上位の直流負荷92から再度接続するようにしてもよい。Then, in the operation command generating unit 33, an operation command is generated to open the switch 74 in order to stop the power supply to the load device 924, which is the lowest in the second priority order, and the operation proceeds to that shown in FIG. 15. In the second operation example shown in FIG. 15, the shortage in the power supply is resolved by disconnecting the load device 924, but if the shortage is not resolved, the power supply to the higher-level load device 921 is stopped. If the power generation of the solar panel 913 is resumed thereafter and the power supply increases, the load devices 921 and 924 may be reconnected from the higher-level DC load 92 by input from the user or a command from the higher-level control device.

なお、本例では、重要負荷への電力供給が十分に達成できる蓄電池912と蓄電池用電力変換器42が選定されるとしたが、重要負荷に対して蓄電池912の電力供給能力が不足する場合も想定される。しかし、その場合においては重要負荷のなかで重要度の順番(第三優先順位)が割り振られ、一般負荷と同様に電力供給能力が不足した場合、重要度の低い直流負荷92から順に解列する動作が実施される。In this example, the storage battery 912 and the storage battery power converter 42 are selected so that they can adequately supply power to the important loads, but it is also possible that the power supply capacity of the storage battery 912 is insufficient for the important loads. In such a case, the important loads are assigned an order of importance (third priority), and, as with general loads, when there is an insufficient power supply capacity, the DC loads 92 with the lowest importance are disconnected in order.

このように、自立運転動作時において電源91からの電力供給能力が不足し、すべての直流負荷92への電力供給することが難しい場合でも、第二優先順位または第三優先順位が下位の直流負荷92から解列していくことにより、電力供給を継続することができる。In this way, even if the power supply capacity from the power source 91 is insufficient during autonomous operation and it is difficult to supply power to all of the DC loads 92, the power supply can be continued by disconnecting the DC loads 92 starting with those with the second or third lowest priority.

なお、本願の直流配電システム1を構成する制御部3は、図16に示すようにプロセッサ301と記憶装置302を備えた一つのハードウエア30によって構成することも考えられる。記憶装置302は、図示していないが、ランダムアクセスメモリ等の揮発性記憶装置と、フラッシュメモリ等の不揮発性の補助記憶装置とを具備する。また、フラッシュメモリの代わりにハードディスクの補助記憶装置を具備してもよい。プロセッサ301は、記憶装置302から入力されたプログラムを実行する。この場合、補助記憶装置から揮発性記憶装置を介してプロセッサ301にプログラムが入力される。また、プロセッサ301は、演算結果等のデータを記憶装置302の揮発性記憶装置に出力してもよいし、揮発性記憶装置を介して補助記憶装置にデータを保存してもよい。 The control unit 3 constituting the DC power distribution system 1 of the present application may be configured as a single piece of hardware 30 including a processor 301 and a storage device 302 as shown in FIG. 16. Although not shown, the storage device 302 includes a volatile storage device such as a random access memory and a non-volatile auxiliary storage device such as a flash memory. Also, instead of the flash memory, a hard disk auxiliary storage device may be included. The processor 301 executes a program input from the storage device 302. In this case, the program is input to the processor 301 from the auxiliary storage device via the volatile storage device. Also, the processor 301 may output data such as the calculation results to the volatile storage device of the storage device 302, or may store the data in the auxiliary storage device via the volatile storage device.

さらに、本願は、様々な例示的な実施の形態および実施例が記載されているが、1つ、または複数の実施の形態に記載された様々な特徴、態様、および機能は特定の実施の形態の適用に限られるのではなく、単独で、または様々な組み合わせで実施の形態に適用可能である。従って、例示されていない無数の変形例が、本願明細書に開示される技術の範囲内において想定される。例えば、少なくとも1つの構成要素を変形する場合、追加する場合または省略する場合、さらには、少なくとも1つの構成要素を抽出し、他の実施の形態の構成要素と組み合わせる場合が含まれるものとする。Furthermore, although various exemplary embodiments and examples are described in this application, the various features, aspects, and functions described in one or more embodiments are not limited to the application of a particular embodiment, but may be applied to the embodiments alone or in various combinations. Thus, countless variations not illustrated are envisioned within the scope of the technology disclosed in this specification. For example, this includes cases in which at least one component is modified, added, or omitted, and further cases in which at least one component is extracted and combined with components of other embodiments.

例えば、負荷側電力変換器5は、それぞれ異なる直流電圧に変換する例を示したがこれに限ることはなく、同じ電圧に変換する複数の負荷側電力変換器5があってもよく、優先順位が同であっても、違っていてもよい。また、系統電力である主電源911が直流電源の場合、その電圧が直流バス8に求められる電圧と実質的に一致する場合には、受電用電力変換器41を省略することも可能である。For example, the load side power converters 5 convert to different DC voltages, but this is not limiting, and there may be multiple load side power converters 5 that convert to the same voltage, and the priorities may be the same or different. In addition, if the main power source 911, which is the system power, is a DC power source, the receiving power converter 41 may be omitted if its voltage substantially matches the voltage required for the DC bus 8.

以上のように、本願の直流配電システム1によれば、系統電力(主電源911)から(直接、あるいは受電用電力変換器41を介して)直流電力として電力が供給される直流バス8、直流バス8と蓄電池912の間に配置され、蓄電池912の充放電のための電力変換を行う蓄電池用電力変換器42、複数の直流負荷92それぞれと直流バス8との間に設けられ、直流バス8に供給された電力をそれぞれの仕様に応じた電圧の直流電力に変換して供給する複数の負荷側電力変換器5、および蓄電池用電力変換器42と複数の負荷側電力変換器5とを連携制御する制御部3を備え、制御部3は、系統電力(主電源911、受電用電力変換器41)からの供給が断たれた際、蓄電池912の充電状態に応じて複数の直流負荷92に通常通りに電力を供給する通常自立運転動作と、複数の直流負荷92のうち、優先順位の高い重要負荷に供給対象を限定する制限動作とを切り替え、制限動作において、負荷側電力変換器5のうち重要負荷に接続された電力変換器と蓄電池用電力変換器42のうち、スイッチング素子S1、S2によるスイッチング動作で電力変換を行う電力変換器の少なくともいずれかを、スイッチング動作を停止して入力側と出力側とを導通させるように構成した。これにより、スイッチング動作による電力消費の削減によって、自立運転時においてシステム自体の電力消費を抑制できるので、蓄電池912から重要負荷への電力供給可能時間をより長くすることができる。As described above, the DC power distribution system 1 of the present application includes a DC bus 8 to which power is supplied as DC power from the grid power (main power source 911) (directly or via a power receiving converter 41), a battery power converter 42 that is disposed between the DC bus 8 and the storage battery 912 and performs power conversion for charging and discharging the storage battery 912, a plurality of load-side power converters 5 that are disposed between each of a plurality of DC loads 92 and the DC bus 8 and convert the power supplied to the DC bus 8 into DC power of a voltage according to the respective specifications and supply the converted power, and a control unit 3 that controls the battery power converter 42 and the plurality of load-side power converters 5 in cooperation with each other, and the control unit 3 When the supply from the grid power (main power source 911, power receiving power converter 41) is cut off, the system switches between a normal independent operation mode in which power is normally supplied to a plurality of DC loads 92 according to the charging state of the storage battery 912 and a limited operation mode in which the supply is limited to important loads having a high priority among the plurality of DC loads 92, and in the limited operation mode, at least one of the power converters that perform power conversion by switching operation of switching elements S1 and S2 among the load side power converters 5 connected to the important loads and the storage battery power converter 42 is configured to stop switching operation and to make the input side and output side conductive. As a result, the power consumption of the system itself can be suppressed during independent operation by reducing the power consumption by the switching operation, and the time during which power can be supplied from the storage battery 912 to the important loads can be extended.

制御部3は、蓄電池912の充電状態が閾値Sth1を下回ると通常自立運転動作から制限動作に切り替えるので、蓄電池912の容量を最大限に利用して重要負荷の運転時間を必要な時間まで継続させることができる。また、導通を実行しない場合と比べて、閾値Sth1を低く設定できるので、通常自立運転動作の時間も延ばすことができる。 When the charge state of the storage battery 912 falls below the threshold value Sth1, the control unit 3 switches from normal independent operation to limited operation, so that the capacity of the storage battery 912 can be maximized to continue the operation time of the important load for the required time. In addition, since the threshold value Sth1 can be set lower than when conduction is not performed, the normal independent operation time can also be extended.

制御部3は、重要負荷と重要負荷に接続された電力変換器と蓄電池用電力変換器42の仕様に基づいて、消費電力の抑制が最大となるスイッチング動作の停止対象を選定するようにすれば、自立運転時においてシステム自体の電力消費を最大限に抑制できる。この場合、対象を予めテーブルとして記憶していてもよいし、仕様から動作範囲の調整代、消費量等を演算して、総消費量が最小となるように対象を選定してもよい。The control unit 3 can minimize the power consumption of the system itself during independent operation by selecting the target for which switching operation is stopped to maximize the reduction in power consumption based on the specifications of the important load, the power converter connected to the important load, and the power converter for the storage battery 42. In this case, the target may be stored in advance as a table, or the target may be selected so that the total consumption is minimized by calculating the adjustment allowance for the operating range, the consumption amount, etc. from the specifications.

直流バス8に電力供給を行う追加電源(例えば、太陽光パネル913)を備え、制御部3は、制限動作において、追加電源からの電力供給がある間は、スイッチング動作の停止による導通を解除するようにすれば、追加電源からの電力を有効利用して、重要負荷の運転時間をより延長できる。If an additional power source (e.g., solar panel 913) is provided to supply power to the DC bus 8, and the control unit 3 is configured to release conduction by stopping the switching operation during the limiting operation while power is being supplied from the additional power source, the power from the additional power source can be effectively utilized to extend the operating time of important loads.

その際、制御部3は、通常自立運転動作において、蓄電池912および追加電源からの電力供給量が複数の直流負荷92の電力需要量に対して不足している場合、電力需要量が電力供給量以下になるまで、複数の直流負荷92のうち、優先順位の低い負荷から解列するようにすれば、系統電力が断たれた場合にも自立運転動作を継続することができる。In this case, in normal independent operation, if the amount of power supply from the storage battery 912 and the additional power source is insufficient for the amount of power demand of the multiple DC loads 92, the control unit 3 will disconnect the loads with the lowest priority among the multiple DC loads 92 until the amount of power demand falls below the amount of power supply, thereby allowing independent operation to continue even if the grid power is cut off.

さらにその際、制御部3は、直流バス8の電圧に基づいて、電力供給量が電力需要量に対して不足しているか否かを判断するようにすれば、過剰なセンサを搭載することなく、上記制御が可能になる。 Furthermore, at that time, if the control unit 3 determines whether the amount of power supply is insufficient compared to the amount of power demand based on the voltage of the DC bus 8, the above control can be achieved without installing excessive sensors.

1:直流配電システム、 2:インタフェース回路、 3:制御部、 31:状態検出部、 32:動作モード判定部、 33:動作指令生成部、 34:閾値データベース、 35:優先順位データベース、 36:機器仕様データベース、 4:電源側電力変換器、 42:蓄電池用電力変換器、 5:負荷側電力変換器、 6:電源側開閉器、 7:負荷側開閉器、 8:直流バス、 91:電源、 911:主電源(系統電力)、 912:蓄電池、 913:太陽光パネル(追加電源)、 92:直流負荷、 Smax:充電停止閾値、 Smin:放電停止閾値、 Sth1:閾値、 Vth:電圧閾値。 1: DC power distribution system, 2: Interface circuit, 3: Control unit, 31: Status detection unit, 32: Operation mode determination unit, 33: Operation command generation unit, 34: Threshold database, 35: Priority order database, 36: Equipment specification database, 4: Power source side power converter, 42: Power converter for storage battery, 5: Load side power converter, 6: Power source side switch, 7: Load side switch, 8: DC bus, 91: Power source, 911: Main power source (grid power), 912: Storage battery, 913: Solar panel (additional power source), 92: DC load, Smax: Charging stop threshold, Smin: Discharging stop threshold, Sth1: Threshold, Vth: Voltage threshold.

Claims (6)

系統電力から直流電力として電力が供給される直流バス、
前記直流バスと蓄電池の間に配置され、前記蓄電池の充放電のための電力変換を行う蓄電池用電力変換器、
複数の直流負荷それぞれと前記直流バスとの間に設けられ、前記直流バスに供給された電力をそれぞれの仕様に応じた電圧の直流電力に変換して供給する複数の負荷側電力変換器、および
前記蓄電池用電力変換器と前記複数の負荷側電力変換器とを連携制御する制御部を備え、
前記制御部は、
前記系統電力からの供給が断たれた際、前記蓄電池の充電状態に応じて前記複数の直流負荷に通常通りに電力を供給する通常自立運転動作と、前記複数の直流負荷のうち、優先順位の高い重要負荷に供給対象を限定する制限動作とを切り替え、
前記制限動作において、前記負荷側電力変換器のうち前記重要負荷に接続された電力変換器と前記蓄電池用電力変換器のうち、スイッチング素子によるスイッチング動作で電力変換を行う電力変換器の少なくともいずれかを、前記スイッチング動作を停止して入力側と出力側とを導通させることを特徴とする直流配電システム。
A DC bus that receives power as DC power from the grid;
a battery power converter arranged between the DC bus and the battery and performing power conversion for charging and discharging the battery;
a plurality of load-side power converters provided between a plurality of DC loads and the DC bus, the load-side power converters converting power supplied to the DC bus into DC power having a voltage corresponding to each of the loads' specifications and supplying the converted power; and a control unit controlling the storage battery power converter and the plurality of load-side power converters in cooperation with each other,
The control unit is
when the supply from the grid power is cut off, switching is made between a normal independent operation mode in which power is normally supplied to the plurality of DC loads according to a charging state of the storage battery and a limited operation mode in which power is supplied only to important loads having a high priority among the plurality of DC loads;
a power converter connected to the important load among the load-side power converters and a power converter for the storage battery that performs power conversion by switching operation using a switching element among the load-side power converters, and at least one of the power converters is stopped from switching operation and conductive between the input side and the output side of the DC power distribution system, in the limiting operation.
前記制御部は、前記蓄電池の充電状態が閾値を下回ると前記通常自立運転動作から前記制限動作に切り替えることを特徴とする請求項1に記載の直流配電システム。The DC distribution system of claim 1, characterized in that the control unit switches from the normal independent operation to the limited operation when the charge state of the storage battery falls below a threshold value. 前記制御部は、前記重要負荷と前記重要負荷に接続された電力変換器と前記蓄電池用電力変換器の仕様に基づいて、消費電力の抑制が最大となる前記スイッチング動作の停止対象を選定することを特徴とする請求項1または2に記載の直流配電システム。The DC power distribution system according to claim 1 or 2, characterized in that the control unit selects the target for stopping the switching operation that maximizes the reduction in power consumption based on the specifications of the important load, the power converter connected to the important load, and the power converter for the storage battery. 前記直流バスに電力供給を行う追加電源を備え、
前記制御部は、前記制限動作において、前記追加電源からの電力供給がある間は、前記スイッチング動作の停止による前記導通を解除することを特徴とする請求項1から3のいずれか1項に記載の直流配電システム。
an additional power source for powering the DC bus;
The DC power distribution system according to any one of claims 1 to 3, characterized in that, in the limiting operation, the control unit cancels the conduction caused by stopping the switching operation while power is being supplied from the additional power source.
前記制御部は、前記通常自立運転動作において、前記蓄電池および前記追加電源からの電力供給量が前記複数の直流負荷の電力需要量に対して不足している場合、前記電力需要量が前記電力供給量以下になるまで、前記複数の直流負荷のうち、優先順位の低い負荷から解列することを特徴とする請求項4に記載の直流配電システム。The DC power distribution system of claim 4, characterized in that, when the amount of power supply from the storage battery and the additional power source is insufficient for the amount of power demand of the multiple DC loads during normal independent operation, the control unit disconnects the multiple DC loads starting with the loads with the lowest priority until the amount of power demand becomes equal to or less than the amount of power supply. 前記制御部は、前記直流バスの電圧に基づいて、前記電力供給量が前記電力需要量に対して不足しているか否かを判断することを特徴とする請求項5に記載の直流配電システム。The DC power distribution system according to claim 5, characterized in that the control unit determines whether the power supply is insufficient relative to the power demand based on the voltage of the DC bus.
JP2024505755A 2022-03-10 2022-03-10 DC Power Distribution System Active JP7577243B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/010573 WO2023170860A1 (en) 2022-03-10 2022-03-10 Dc power distribution system

Publications (2)

Publication Number Publication Date
JPWO2023170860A1 JPWO2023170860A1 (en) 2023-09-14
JP7577243B2 true JP7577243B2 (en) 2024-11-01

Family

ID=87936370

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2024505755A Active JP7577243B2 (en) 2022-03-10 2022-03-10 DC Power Distribution System

Country Status (2)

Country Link
JP (1) JP7577243B2 (en)
WO (1) WO2023170860A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011083088A (en) 2009-10-05 2011-04-21 Panasonic Electric Works Co Ltd Dc power distribution system
JP2012120414A (en) 2010-12-03 2012-06-21 Ntt Facilities Inc Dc power supply system and bidirectional power conversion device
JP2012228027A (en) 2011-04-18 2012-11-15 Sharp Corp Dc power feeding system and control method of the same

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04125038A (en) * 1990-09-13 1992-04-24 Toshiba Corp Dc uninterruptible power supply device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011083088A (en) 2009-10-05 2011-04-21 Panasonic Electric Works Co Ltd Dc power distribution system
JP2012120414A (en) 2010-12-03 2012-06-21 Ntt Facilities Inc Dc power supply system and bidirectional power conversion device
JP2012228027A (en) 2011-04-18 2012-11-15 Sharp Corp Dc power feeding system and control method of the same

Also Published As

Publication number Publication date
JPWO2023170860A1 (en) 2023-09-14
WO2023170860A1 (en) 2023-09-14

Similar Documents

Publication Publication Date Title
US9496725B2 (en) Power control apparatus, method, program, and integrated circuit, and storage battery unit
JP5988078B2 (en) Control device and power distribution system
JP5342598B2 (en) Power converter
KR100958610B1 (en) Uninterruptible Power Supply with Alternative Energy Sources Connected
EP2337184A2 (en) Grid-connected energy storage system and method of controlling grid-connected energy storage system
JP5988079B2 (en) Control device, conversion device, control method, and power distribution system
US20140327306A1 (en) Power conversion device
JP2013085459A (en) Power storage system and control method therefor
WO2012049965A1 (en) Power management system
WO2011039608A1 (en) Electric power distribution system
JP2011250673A (en) Energy controller and control method
JP2015027210A (en) Parallel-type power supply
KR20220075969A (en) Frequincy regulation operating method and grid system frequincy regulation system
JP2002218654A (en) Solar power system
JP2017118598A (en) Power supply system
US20060099463A1 (en) Direct current/direct current converter for a fuel cell system
JP2021175336A (en) Power conversion device, power conversion system, power supply system, and connection method of power conversion device
JP5841279B2 (en) Electric power charging device
JP6677186B2 (en) DC power supply system
JP2007028735A (en) Distributed power supply system and method
KR20180007673A (en) Hybrid energy storage system
KR101982123B1 (en) System and Method for Complementary Power Control in Bipolar DC distribution system
JP7577243B2 (en) DC Power Distribution System
JP6923121B2 (en) Power supply device
JP2014023383A (en) Photovoltaic power generation system and power supply system including the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240123

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240924

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241022

R150 Certificate of patent or registration of utility model

Ref document number: 7577243

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150