JP7580207B2 - Column and beam structure - Google Patents
Column and beam structure Download PDFInfo
- Publication number
- JP7580207B2 JP7580207B2 JP2020091184A JP2020091184A JP7580207B2 JP 7580207 B2 JP7580207 B2 JP 7580207B2 JP 2020091184 A JP2020091184 A JP 2020091184A JP 2020091184 A JP2020091184 A JP 2020091184A JP 7580207 B2 JP7580207 B2 JP 7580207B2
- Authority
- JP
- Japan
- Prior art keywords
- column
- steel
- joined
- girder
- joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Description
本発明は、柱梁架構に関する。 The present invention relates to a column-beam structure.
平屋の工場等の大スパン構造の建物においては、ラーメン構造とすることが多い(例えば、特許文献1、2を参照)。 For buildings with large span structures such as single-story factories, rigid frame structures are often used (see, for example, Patent Documents 1 and 2).
しかし、鉄骨造の柱と鉄骨造の梁によるラーメン構造とする場合、柱に梁を剛接合するための鉄骨加工に手間が掛かってしまう。 However, if you use a rigid frame structure with steel columns and steel beams, it takes a lot of work to process the steel frame to rigidly connect the beams to the columns.
また、鉄筋コンクリート造の柱と鉄骨造の梁によるラーメン構造とする場合、梁を柱に埋め込んで柱に梁を剛接合する方法は、2方向の梁同士を接合する必要があり、さらに、これらの梁を柱のコンクリート中に埋め込む施工手間が掛かってしまう。また、柱の柱頭部の上面に設けられたトッププレートの上に梁端部を載せて、トッププレートに梁端部を溶接接合する方法は、梁端部がピン接合となるので大スパンの梁には適さない。 In addition, when creating a rigid frame structure with reinforced concrete columns and steel beams, embedding the beams in the columns and rigidly joining them to the columns requires joining beams in two directions, and the construction work of embedding these beams in the concrete of the columns is time-consuming. In addition, the method of placing the beam end on a top plate installed on the upper surface of the column capital and welding the beam end to the top plate is not suitable for large span beams because the beam end is pin-jointed.
本発明は、上記の事実を考慮し、柱と梁の接合構造を簡略化して柱梁架構の施工性を向上させることを目的とする。 Taking the above facts into consideration, the present invention aims to simplify the joint structure between columns and beams and improve the workability of column-beam structures.
請求項1に記載の柱梁架構は、支持構造体上に立設された柱と、前記柱の頭部に架け渡されて接合され、一方向へ配置された第1鉄骨梁と、前記第1鉄骨梁と交差するように前記第1鉄骨梁の上面に架け渡されて接合された第2鉄骨梁と、を有する。 The column-beam structure described in claim 1 has a column erected on a support structure, a first steel beam that is spanned and joined to the top of the column and arranged in one direction, and a second steel beam that is spanned and joined to the top surface of the first steel beam so as to intersect with the first steel beam.
請求項1に係る柱梁架構によれば、一方向へ配置された第1鉄骨梁が、支持構造体上に立設された柱の頭部に架け渡されて接合されている。 According to the column-beam structure of claim 1, the first steel beam arranged in one direction is spanned and joined to the head of the column erected on the support structure.
これにより、柱と第1鉄骨梁の接合構造を、第1鉄骨梁を柱の頭部上に載置して接合するだけの構造にして簡略化することができるので、接合構造を構成するために柱や第1鉄骨梁に施す加工の手間を低減することができ、また、柱梁架構の施工性を向上させることができる。 This simplifies the joint structure between the column and the first steel beam by simply placing the first steel beam on the top of the column and joining it, reducing the amount of work required to process the column and the first steel beam to form the joint structure and improving the ease of construction of the column-beam structure.
また、第1鉄骨梁は、鉛直荷重に対して柱に剛接合されているように働くので、柱に梁がピン接合されている接合構造と比較して、大きなスパンの梁を構成することができる。 In addition, because the first steel beam acts as if it were rigidly connected to the column against vertical loads, a beam with a larger span can be constructed compared to a joint structure in which the beam is pin-connected to the column.
さらに、従来のような、柱から張り出して設けられた梁ブラケットに鉄骨梁が接合される継手構造では、梁ブラケットの長さで継手位置が決まってしまうが、本柱梁架構では、第1鉄骨梁の継手位置を応力の小さい位置とすることができる。これにより、第1鉄骨梁の継手構造を簡略化したり、第1鉄骨梁のスパン中間部断面を大きくサイズダウンしたりすることができる。 Furthermore, in conventional joint structures where a steel beam is joined to a beam bracket that protrudes from a column, the joint position is determined by the length of the beam bracket, but in this column-beam structure, the joint position of the first steel beam can be set to a position with low stress. This makes it possible to simplify the joint structure of the first steel beam and significantly reduce the cross section of the middle part of the span of the first steel beam.
また、請求項1に係る柱梁架構によれば、第2鉄骨梁が、第1鉄骨梁と交差するようにして第1鉄骨梁の上面に架け渡されて接合されている。 In addition, according to the column-beam structure of claim 1, the second steel beam is joined to the top surface of the first steel beam so as to intersect with the first steel beam.
これにより、第1鉄骨梁と第2鉄骨梁の接合構造を、第2鉄骨梁を第1鉄骨梁の上面に載置して接合するだけの構造にして簡略化することができるので、接合構造を構成するために第1鉄骨梁や第2鉄骨梁に施す鉄骨加工の手間を低減することができ、また、柱梁架構の施工性を向上させることができる。 This simplifies the joint structure between the first steel beam and the second steel beam by simply placing the second steel beam on top of the first steel beam and joining it, reducing the effort required for steel processing on the first steel beam and the second steel beam to form the joint structure and improving the ease of construction of the column-beam structure.
また、第2鉄骨梁は、第1鉄骨梁上を跨るようにして連続して配置されるので、第1鉄骨梁に剛接合されているように働く。これにより、第2鉄骨梁の断面を小さくすることができ、鉄骨数量を低減することができる。 The second steel beam is also placed continuously across the first steel beam, so it acts as if it is rigidly connected to the first steel beam. This allows the cross section of the second steel beam to be smaller, and the amount of steel required to be reduced.
さらに、請求項1に係る柱梁架構によれば、柱の頭部に第1鉄骨梁を載せて接合し、第1鉄骨梁の上面に第2鉄骨梁を載せて接合するようにして、柱、第1鉄骨梁、第2鉄骨梁をこの順に重ねたレイヤー構造を構成している。 Furthermore, according to the column-beam structure of claim 1, a first steel beam is placed on and joined to the top of the column, and a second steel beam is placed on and joined to the top surface of the first steel beam, forming a layered structure in which the column, first steel beam, and second steel beam are stacked in this order.
これにより、柱梁架構の施工効率を向上させ、施工の短工期化や省人化を図ることができる。 This will improve the efficiency of column-beam construction, shortening construction time and reducing the number of workers required.
請求項2に記載の柱梁架構は、請求項1に記載の柱梁架構において、前記柱は、プレキャストコンクリート造である。 The column-beam structure described in claim 2 is the column-beam structure described in claim 1, in which the columns are made of precast concrete.
請求項2に係る柱梁架構によれば、柱は、プレキャストコンクリート造である。 According to the column-beam structure of claim 2, the columns are made of precast concrete.
これにより、施工現場での柱の施工手間を低減することができるので、柱梁架構の施工性をより向上させることができる。 This reduces the amount of work required to construct columns at the construction site, further improving the ease of construction of column-beam structures.
請求項3に記載の柱梁架構は、請求項1又は請求項2に記載の柱梁架構において、前記第1鉄骨梁は、梁端部材と、前記梁端部材よりも梁成の小さい梁中間部材と、を備えている。 The column-beam structure described in claim 3 is the column-beam structure described in claim 1 or claim 2, in which the first steel beam has a beam end member and a beam intermediate member having a beam thickness smaller than that of the beam end member.
請求項3に係る柱梁架構によれば、第1鉄骨梁は、梁端部材と、梁端部材よりも梁成の小さい梁中間部材と、を備えている。 According to the column-beam structure of claim 3, the first steel beam has a beam end member and a beam intermediate member having a beam thickness smaller than that of the beam end member.
これにより、第1鉄骨梁を少ない鉄骨数量で構成することができる。 This allows the first steel beam to be constructed using a smaller amount of steel.
以上説明したように、本発明に係る柱梁架構によれば、柱と梁の接合構造を簡略化することにより柱梁架構の施工性を向上させることができる。 As described above, the column-beam structure of the present invention can improve the ease of construction by simplifying the joint structure between the columns and beams.
以下、図面を参照しながら、一実施形態に係る柱梁架構について説明する。 Below, we will explain one embodiment of the column-beam structure with reference to the drawings.
(柱梁架構)
図1には、本実施形態に係る柱梁架構10が適用された建物12が示されている。なお、各図に示される矢印Xは、建物12の梁間方向(以下、「梁間方向X」とする)を示し、矢印Yは、平面視にて矢印Xと直交する建物12の桁行方向(以下、「桁行方向Y」とする)を示している。
(Column and beam structure)
1 shows a building 12 to which a column-beam frame 10 according to this embodiment is applied. Note that an arrow X shown in each drawing indicates a beam direction of the building 12 (hereinafter referred to as "beam direction X"), and an arrow Y indicates a girder direction of the building 12 that is perpendicular to the arrow X in a plan view (hereinafter referred to as "girder direction Y").
図1に示されるように、建物12は、平屋の大スパン構造の工場であり、直接基礎を構成する支持構造体としてのマットスラブ14の上に建てられている。図2に示されるように、マットスラブ14は、支持地盤16の上に形成された表層地盤18の上に設けられている。 As shown in Figure 1, the building 12 is a one-story factory with a large span structure, and is built on a mat slab 14 as a supporting structure that constitutes a spread foundation. As shown in Figure 2, the mat slab 14 is built on a surface layer 18 formed on a supporting ground 16.
図1及び図2に示されるように、柱梁架構10は、柱20と、第1鉄骨梁としての大梁22と、第2鉄骨梁としての小梁24と、を有して構成されている。大梁22及び小梁24は、H形鋼により構成されている。 As shown in Figures 1 and 2, the column-beam structure 10 is composed of a column 20, a main beam 22 as a first steel beam, and a sub-beam 24 as a second steel beam. The main beam 22 and the sub-beam 24 are composed of H-shaped steel.
柱20は、プレキャストコンクリート造であり、支持地盤16の上に設けられたラブルコンクリート26の上に打設されて形成されたマットスラブ14の上に立設されている。柱20は、建物12に生じる地震力(水平力)を片持ち柱として負担する剛強な部材により構成されている。 The columns 20 are made of precast concrete and stand on a mat slab 14 that is poured on rubble concrete 26 that is laid on the supporting ground 16. The columns 20 are made of strong members that can bear the seismic force (horizontal force) that occurs in the building 12 as a cantilever column.
図1に示されるように、大梁22は、全てが一方向としての梁間方向Xへ配置され、桁行方向Yに対して所定の間隔をあけて複数並行配置されている。 As shown in FIG. 1, all of the girders 22 are arranged in one direction, the span direction X, and are arranged parallel to each other at a predetermined interval in the row direction Y.
図3、図4及び図5に示されるように、大梁22は、柱20の頭部としての柱頭部28の上面に載置されている。また、大梁22の下フランジ32の両外側に下フランジ32と一体に設けられたベースプレート34を、柱頭部28に設けられ柱頭部28の上面から上方へ突出したアンカーボルト30によりボルト固定することによって、大梁22は柱20の柱頭部28に接合されている。これにより、大梁22は、柱20の柱頭部28の上を跨るように連続して配置され、柱20の柱頭部28に架け渡されて接合されている。 As shown in Figures 3, 4 and 5, the girder 22 is placed on the upper surface of the column capital 28, which serves as the head of the column 20. The girder 22 is joined to the column capital 28 of the column 20 by bolting a base plate 34, which is provided integrally with the lower flange 32 on both outer sides of the lower flange 32 of the girder 22, with an anchor bolt 30 provided on the column capital 28 and protruding upward from the upper surface of the column capital 28. As a result, the girder 22 is continuously arranged so as to straddle the top of the column capital 28 of the column 20, and is joined to the column capital 28 of the column 20.
図2及び図6に示すように、大梁22は、梁端部材36と、梁端部材36よりも梁成の小さい梁中間部材38と、を備えている。梁端部材36及び梁中間部材38は、H形鋼により構成されている。 As shown in Figures 2 and 6, the girder 22 includes a beam end member 36 and a beam intermediate member 38 that has a smaller beam thickness than the beam end member 36. The beam end member 36 and the beam intermediate member 38 are made of H-shaped steel.
図6に示すように、梁端部材36と梁中間部材38とは、継手部40でスプライスプレート42、44によりボルト接合されている。この継手部40の継手位置は、大梁22に生じる応力の小さい位置に設定されている。 As shown in FIG. 6, the beam end member 36 and the beam intermediate member 38 are bolted together at the joint 40 using splice plates 42, 44. The joint position of the joint 40 is set at a position where the stress generated in the main girder 22 is small.
図1に示されるように、小梁24は、全てが桁行方向Yへ配置され、梁間方向Xに対して所定の間隔をあけて複数並行配置されている。すなわち、小梁24は、大梁22と直角に交差するように配置されている。 As shown in FIG. 1, all of the small beams 24 are arranged in the girder direction Y, and are arranged in parallel at a predetermined interval in the span direction X. In other words, the small beams 24 are arranged so as to intersect with the main beams 22 at right angles.
図3及び図5に示されるように、小梁24は、大梁22の上面に載置されている。また、大梁22の上フランジ78に小梁24の下フランジ80をボルト46によりボルト接合することによって、小梁24は大梁22に接合されている。 As shown in Figures 3 and 5, the secondary beam 24 is placed on the upper surface of the main beam 22. The secondary beam 24 is joined to the main beam 22 by bolting the lower flange 80 of the secondary beam 24 to the upper flange 78 of the main beam 22 with bolts 46.
これにより、小梁24は、大梁22上を跨るようにして連続して配置され、大梁22の上面に架け渡されて接合されている。 As a result, the small beams 24 are arranged continuously across the main beam 22 and are joined to the upper surface of the main beam 22.
図8に示すように、小梁24同士は、継手部48でスプライスプレート50、52によりボルト接合されている。この継手部48の継手位置は、小梁24に生じる応力の小さい位置に設定されている。これにより、継手部48は、小梁24のウェブ82と下フランジ80のみをスプライスプレート50、52によりボルト接合する形式となっている。 As shown in FIG. 8, the sub-beams 24 are bolted together at the joint 48 using splice plates 50 and 52. The joint position of the joint 48 is set at a position where the stress generated in the sub-beam 24 is small. As a result, the joint 48 is a type in which only the web 82 and the lower flange 80 of the sub-beam 24 are bolted together using the splice plates 50 and 52.
図8に示すように、小梁24の上には、折板屋根84が設けられている。折板屋根84は、小梁24の上に設置されたタイトフレーム54と、このタイトフレーム54の上に取り付けられた屋根材としての鋼製の折板56と、を有して構成されている。図1及び図2には、説明の都合上、折板屋根84が省略されている。 As shown in FIG. 8, a folded-plate roof 84 is provided on the joists 24. The folded-plate roof 84 is composed of a steel frame 54 installed on the joists 24 and a steel folded plate 56 as a roofing material attached on top of the steel frame 54. For convenience of explanation, the folded-plate roof 84 is omitted from FIG. 1 and FIG. 2.
そして、これまで説明したように、柱梁架構10は、柱20の柱頭部28に大梁22を載せて接合し、大梁22の上面に小梁24を載せて接合するようにして、柱20、大梁22、小梁24をこの順に重ねたレイヤー構造を構成している(図2を参照)。 As explained above, the column-beam structure 10 has a layered structure in which the columns 20, the girders 22, and the minor beams 24 are stacked in this order, with the main beams 22 placed and joined to the column capitals 28 of the columns 20, and the minor beams 24 placed and joined to the top surfaces of the main beams 22 (see Figure 2).
(柱梁架構の施工方法)
次に、本実施形態に係る柱梁架構の施工方法の一例について説明する(図2、図5及び図8を参照)。
(Construction method of column-beam frame)
Next, an example of a construction method for the column-beam structure according to this embodiment will be described (see Figs. 2, 5 and 8).
先ず、マットスラブ14上に柱20を立設する。 First, the columns 20 are erected on the mat slab 14.
次に、柱20の柱頭部28の上面に大梁22を載せて配置し、柱20の柱頭部28に大梁22を架け渡す。 Next, the girder 22 is placed on the top surface of the column capital 28 of the column 20, and the girder 22 is placed across the column capital 28 of the column 20.
次に、柱20の柱頭部28に大梁22をアンカーボルト30により接合する。 Next, the girder 22 is joined to the column capital 28 of the column 20 using anchor bolts 30.
次に、大梁22の上面に小梁24を載せて配置し、大梁22の上面に小梁24を架け渡す。 Next, the minor beam 24 is placed on the top surface of the main beam 22, and the minor beam 24 is placed across the top surface of the main beam 22.
次に、大梁22に小梁24をボルト46により接合する。 Next, the minor beam 24 is joined to the major beam 22 using bolts 46.
次に、小梁24上にタイトフレーム54を設置し、このタイトフレーム54上に折板56を取り付けて折板屋根84を形成する。 Next, a tight frame 54 is installed on the joists 24, and a folded plate 56 is attached to the tight frame 54 to form a folded plate roof 84.
(効果)
次に、本実施形態の効果について説明する。
(effect)
Next, the effects of this embodiment will be described.
図1及び図2に示されるように、本実施形態の柱梁架構10によれば、一方向へ配置された大梁22が、マットスラブ14上に立設された柱20の柱頭部28に架け渡されて接合されている。 As shown in Figures 1 and 2, in the column-beam structure 10 of this embodiment, a girder 22 arranged in one direction is spanned and joined to the column capital 28 of a column 20 erected on a mat slab 14.
これにより、柱20と大梁22の接合構造を、大梁22を柱20の柱頭部28上に載置して接合するだけの構造にして簡略化することができるので、接合構造を構成するために柱20や大梁22に施す加工の手間を低減することができ、また、柱梁架構10の施工性を向上させることができる。 This simplifies the joint structure between the column 20 and the girder 22 by simply placing the girder 22 on the column capital 28 of the column 20 and joining it, reducing the amount of work required to process the column 20 and the girder 22 to form the joint structure and improving the ease of construction of the column-beam structure 10.
また、大梁22は、鉛直荷重に対して柱20に剛接合されているようにして働くので、柱に梁がピン接合されている接合構造と比較して、大きなスパンの梁を構成することができる。 In addition, the girder 22 acts as if it were rigidly connected to the column 20 against vertical loads, making it possible to construct a beam with a larger span compared to a joint structure in which the beam is pin-connected to the column.
さらに、従来のような、柱から張り出して設けられた梁ブラケットに鉄骨梁が接合される継手構造では、梁ブラケットの長さで継手位置が決まってしまう。例えば、運搬上の制約により、柱に設けられる梁ブラケットを短くしなければならない場合、梁ブラケットに鉄骨梁を接合する継手位置を、大きな応力が発生する位置にする必要がある。そのため、梁ブラケットと鉄骨梁とで断面サイズを切り分ける梁においても、梁の断面サイズを大きく落とすことができずに、鉄骨数量が多くなってしまう。 Furthermore, in conventional joint structures in which a steel beam is joined to a beam bracket that protrudes from a column, the position of the joint is determined by the length of the beam bracket. For example, if the beam bracket attached to the column must be shortened due to transportation constraints, the joint position for joining the steel beam to the beam bracket must be located at a position where large stress is generated. As a result, even in beams where the cross-sectional size is divided between the beam bracket and the steel beam, the cross-sectional size of the beam cannot be significantly reduced, and the amount of steel required increases.
これに対して本実施形態の柱梁架構10では、図2及び図6に示すように、大梁22の継手部40の位置を応力の小さい位置とすることができる。これにより、大梁22の継手構造を簡略化してボルト本数を低減したり、大梁22のスパン中間部断面を大きくサイズダウンしたりすることができる。 In contrast, in the beam-column structure 10 of this embodiment, as shown in Figures 2 and 6, the joint 40 of the girder 22 can be positioned at a position where stress is small. This makes it possible to simplify the joint structure of the girder 22 and reduce the number of bolts, and to significantly reduce the cross-section of the middle part of the span of the girder 22.
また、図1及び図2に示すように、本実施形態の柱梁架構10によれば、小梁24が、大梁22と交差するようにして大梁22の上面に架け渡されて接合されている。 As shown in Figures 1 and 2, according to the column-beam structure 10 of this embodiment, the small beam 24 is joined to the upper surface of the main beam 22 so as to cross the main beam 22.
これにより、大梁22と小梁24の接合構造を、小梁24を大梁22の上面に載置して接合するだけの構造にして簡略化することができるので、接合構造を構成するために大梁22や小梁24に施す鉄骨加工の手間を低減することができ、また、柱梁架構10の施工性を向上させることができる。 This simplifies the joint structure between the main girder 22 and the secondary beam 24 by simply placing the secondary beam 24 on the top surface of the main girder 22 and joining it, reducing the effort required for steel processing on the main girder 22 and secondary beam 24 to form the joint structure and improving the ease of construction of the column-beam structure 10.
また、小梁24は、大梁22上を跨るようにして連続して配置されるので、大梁22に剛接合されているようにして働く。これにより、小梁24の断面を小さくすることができ、鉄骨数量を低減することができる。また、大梁に突き合わせ溶接で小梁を接合する接合構造と比較して、大梁22や小梁24に施す加工手間を低減することができる。 The secondary beams 24 are arranged continuously across the main beams 22, so they act as if they are rigidly connected to the main beams 22. This allows the cross section of the secondary beams 24 to be smaller, and the amount of steel required to be reduced. In addition, compared to a joint structure in which secondary beams are joined to the main beams by butt welding, the amount of processing required for the main beams 22 and secondary beams 24 can be reduced.
図7に示すように、従来の剛接合小梁の継手構造では、継手部64において、大梁58のウェブ88に剛接合された梁フランジ60の端部を、スプライスプレート66、68により小梁62に接合している。また、梁フランジ60及び小梁62の上フランジ上面から上方へ突出するスプライスプレート66、ボルト及びナットの分を嵩上げする嵩上げ材74を、梁フランジ60及び小梁62の上フランジ上に設けるとともに、継手部64上にカバー材76を設け、この嵩上げ材74及びカバー材76の上にタイトフレーム70を設置し、このタイトフレーム70の上に折板72を取り付けて折板屋根86を構成している。すなわち、梁フランジ60及び小梁62の上フランジ上面から上方へ突出するスプライスプレート66、ボルト及びナットにタイトフレーム70が干渉しないように、嵩上げ材74やカバー材76のような別部材が必要になってしまう。 As shown in FIG. 7, in the conventional joint structure of the rigidly-jointed sub-beam, the end of the beam flange 60, which is rigidly joined to the web 88 of the main beam 58, is joined to the sub-beam 62 by the splice plates 66 and 68 at the joint 64. In addition, the splice plate 66 protruding upward from the upper surface of the upper flange of the beam flange 60 and the sub-beam 62, and the raising material 74 for raising the amount of the bolts and nuts are provided on the upper flange of the beam flange 60 and the sub-beam 62, and the cover material 76 is provided on the joint 64, the tight frame 70 is installed on the raising material 74 and the cover material 76, and the folded plate 72 is attached on the tight frame 70 to form the folded plate roof 86. In other words, separate members such as the raising material 74 and the cover material 76 are required so that the tight frame 70 does not interfere with the splice plate 66 protruding upward from the upper surface of the upper flange of the beam flange 60 and the sub-beam 62, the bolts and nuts.
これに対して、本実施形態の柱梁架構10では、図8に示すように、小梁24同士が接合される継手部48の継手位置は、小梁24に生じる応力の小さい位置に設定されて、継手部48は、小梁24のウェブ82と下フランジ80のみをスプライスプレート50、52によりボルト接合する形式となっている。これにより、継手部48(小梁24)の上面がフラットとなるため、嵩上げ処置を施さずに、タイトフレーム54を小梁24の上フランジ上面にそのまま取付けることができる。 In contrast, in the column-beam structure 10 of this embodiment, as shown in FIG. 8, the joint position of the joint section 48 where the sub-beams 24 are joined is set at a position where the stress generated in the sub-beams 24 is small, and the joint section 48 is a type in which only the web 82 and the lower flange 80 of the sub-beam 24 are bolted together using splice plates 50, 52. As a result, the upper surface of the joint section 48 (sub-beam 24) is flat, so that the tight frame 54 can be attached directly to the upper surface of the upper flange of the sub-beam 24 without performing any height-raising procedure.
さらに、本実施形態の柱梁架構10によれば、柱20の柱頭部28に大梁22を載せて接合し、大梁22の上面に小梁24を載せて接合するようにして、柱20、大梁22、小梁24をこの順に重ねたレイヤー構造を構成している。これにより、柱梁架構10の施工効率を向上させ、施工の短工期化や省人化を図ることができる。 Furthermore, according to the column-beam structure 10 of this embodiment, the main girder 22 is placed on and joined to the column capital 28 of the column 20, and the sub-beam 24 is placed on and joined to the top surface of the main girder 22, forming a layered structure in which the column 20, the main girder 22, and the sub-beam 24 are stacked in this order. This improves the construction efficiency of the column-beam structure 10, and can shorten the construction period and reduce the number of people required.
また、図2に示すように、本実施形態の柱梁架構10によれば、柱20は、プレキャストコンクリート造である。これにより、施工現場での柱20の施工手間を低減することができるので、柱梁架構10の施工性をより向上させることができる。 As shown in FIG. 2, in the column-beam structure 10 of this embodiment, the columns 20 are made of precast concrete. This reduces the labor required to construct the columns 20 at the construction site, thereby further improving the ease of construction of the column-beam structure 10.
さらに、図2及び図6に示すように、本実施形態の柱梁架構10によれば、大梁22は、梁端部材36と、梁端部材36よりも梁成の小さい梁中間部材38と、を備えている。これにより、大梁22を少ない鉄骨数量で構成することができる。 Furthermore, as shown in Figures 2 and 6, according to the column-beam structure 10 of this embodiment, the girder 22 includes a beam end member 36 and a beam intermediate member 38 that has a smaller beam thickness than the beam end member 36. This allows the girder 22 to be constructed with a small amount of steel.
(変形例)
次に、上記実施形態の変形例について説明する。
(Modification)
Next, a modification of the above embodiment will be described.
上記実施形態では、図2に示すように、大梁22及び小梁24をH形鋼により構成した例を示したが、大梁22及び小梁24は、鉄骨造であればよい。例えば、大梁22及び小梁24を溝形鋼により構成してもよい。 In the above embodiment, as shown in FIG. 2, an example was shown in which the main beam 22 and the sub-beam 24 were made of H-shaped steel, but the main beam 22 and the sub-beam 24 may be made of steel. For example, the main beam 22 and the sub-beam 24 may be made of channel steel.
また、上記実施形態では、図2に示すように、柱20をプレキャストコンクリート造とした例を示したが、他の構造の柱であってもよい。例えば、柱20を現場打ち鉄筋コンクリート造や鉄骨造の柱としてもよい。 In the above embodiment, as shown in FIG. 2, the column 20 is made of precast concrete, but it may be made of other structures. For example, the column 20 may be made of cast-in-place reinforced concrete or steel frame.
さらに、上記実施形態では、図3に示すように、柱20に大梁22をアンカーボルト30により接合した例を示したが、他の接合方法で接合してもよい。例えば、柱20に大梁22をボルト接合により接合してもよい。 In addition, in the above embodiment, as shown in FIG. 3, an example is shown in which the girder 22 is joined to the column 20 by the anchor bolt 30, but other joining methods may be used. For example, the girder 22 may be joined to the column 20 by bolt joining.
また、上記実施形態では、図1に示すように、平屋の建物12に本発明の柱梁架構10を適用した例を示したが、複数階の建物の屋上部に本発明の柱梁架構10を適用するようにしてもよい。 In the above embodiment, as shown in FIG. 1, an example is shown in which the column-beam structure 10 of the present invention is applied to a single-story building 12, but the column-beam structure 10 of the present invention may also be applied to the rooftop of a multi-story building.
以上、本発明の一実施形態について説明したが、本発明はこうした実施形態に限定されるものでなく、一実施形態及び各種の変形例を適宜組み合わせて用いても良いし、本発明の要旨を逸脱しない範囲において、種々なる態様で実施し得ることは勿論である。 Although one embodiment of the present invention has been described above, the present invention is not limited to this embodiment, and one embodiment and various modified examples may be used in appropriate combination, and the present invention may of course be embodied in various forms without departing from the spirit of the present invention.
10 柱梁架構
14 マットスラブ(支持構造体)
20 柱
22 大梁(第1鉄骨梁)
24 小梁(第2鉄骨梁)
28 柱頭部(頭部)
36 梁端部材
38 梁中間部材
10 Column-beam frame 14 Mat slab (support structure)
20 Column 22 Large beam (first steel beam)
24. Small beam (second steel beam)
28 Capital part (head)
36 Beam end member 38 Beam intermediate member
Claims (2)
下フランジと、前記下フランジの外側の端部に前記下フランジと同一面となるように一体に接合されたベースプレートとを備え、前記柱の頭部に前記ベースプレートを介して傾斜した状態で架け渡されて接合され、一方向へ配置された第1鉄骨梁と、
前記第1鉄骨梁と交差するように前記第1鉄骨梁の上フランジに架け渡されて接合された第2鉄骨梁と、
を有する柱梁架構。 a precast concrete column erected on a support structure;
a first steel beam including a lower flange and a base plate integrally joined to an outer end of the lower flange so as to be flush with the lower flange, the first steel beam being joined to the head of the column via the base plate in an inclined state and disposed in one direction;
A second steel beam that is spanned and joined to an upper flange of the first steel beam so as to intersect with the first steel beam;
A column-beam structure having:
請求項1に記載の柱梁架構。 The first steel beam includes a beam end member and a beam intermediate member that is bolted to the beam end member and has a beam width smaller than that of the beam end member.
The column-beam structure according to claim 1 .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020091184A JP7580207B2 (en) | 2020-05-26 | 2020-05-26 | Column and beam structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020091184A JP7580207B2 (en) | 2020-05-26 | 2020-05-26 | Column and beam structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2021188273A JP2021188273A (en) | 2021-12-13 |
| JP7580207B2 true JP7580207B2 (en) | 2024-11-11 |
Family
ID=78848209
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2020091184A Active JP7580207B2 (en) | 2020-05-26 | 2020-05-26 | Column and beam structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7580207B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7665211B2 (en) * | 2022-12-21 | 2025-04-21 | 株式会社田中構造設計 | Beam-column joint structure |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001295378A (en) | 2000-04-17 | 2001-10-26 | Fujita Corp | Building frame structure |
| JP2014077339A (en) | 2012-09-19 | 2014-05-01 | Takenaka Komuten Co Ltd | Equipment material construction structure and beam joint structure |
| JP2015063852A (en) | 2013-09-25 | 2015-04-09 | 清水建設株式会社 | Underground pit structure |
| JP2015214807A (en) | 2014-05-08 | 2015-12-03 | 株式会社竹中工務店 | Heterogeneous steel beam joint structure |
| JP2016014273A (en) | 2014-07-02 | 2016-01-28 | 株式会社竹中工務店 | Pile foundation structure |
| JP2021046704A (en) | 2019-09-18 | 2021-03-25 | 株式会社竹中工務店 | Steel frame beam joint structure |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4660349A (en) * | 1984-07-23 | 1987-04-28 | Tricarico Rocco V | Method of erecting a building using preconstructed modular units |
| JPH0546561Y2 (en) * | 1987-05-18 | 1993-12-07 | ||
| JP2972956B2 (en) * | 1990-05-31 | 1999-11-08 | 清水建設株式会社 | Column and beam joining method and its structure |
| JP2836476B2 (en) * | 1994-03-11 | 1998-12-14 | 鹿島建設株式会社 | Frame structure |
| JP3098719B2 (en) * | 1996-10-17 | 2000-10-16 | 株式会社熊谷組 | Building structures using piles as pillars |
| JP6728742B2 (en) * | 2016-02-16 | 2020-07-22 | 前田建設工業株式会社 | Steel beam |
-
2020
- 2020-05-26 JP JP2020091184A patent/JP7580207B2/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001295378A (en) | 2000-04-17 | 2001-10-26 | Fujita Corp | Building frame structure |
| JP2014077339A (en) | 2012-09-19 | 2014-05-01 | Takenaka Komuten Co Ltd | Equipment material construction structure and beam joint structure |
| JP2015063852A (en) | 2013-09-25 | 2015-04-09 | 清水建設株式会社 | Underground pit structure |
| JP2015214807A (en) | 2014-05-08 | 2015-12-03 | 株式会社竹中工務店 | Heterogeneous steel beam joint structure |
| JP2016014273A (en) | 2014-07-02 | 2016-01-28 | 株式会社竹中工務店 | Pile foundation structure |
| JP2021046704A (en) | 2019-09-18 | 2021-03-25 | 株式会社竹中工務店 | Steel frame beam joint structure |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2021188273A (en) | 2021-12-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3486866B2 (en) | Framed wall construction incorporating a wooden ramen frame | |
| JP7580207B2 (en) | Column and beam structure | |
| CN111827553B (en) | A kind of prefabricated floor structure and installation method | |
| KR102453459B1 (en) | Column-beam construction structure and column-beam construction method using joint assembly with flange joint member | |
| JP6752599B2 (en) | Seismic structure and seismic retrofitting method | |
| JP7058158B2 (en) | How to install outdoor stairs structure and outdoor stairs structure | |
| JP2006183286A (en) | Connection structure of corrugated steel web for corrugated steel web u-shaped component bridge | |
| JP7127350B2 (en) | Beam-column connection structure and construction method of beam-column connection structure | |
| JP7434067B2 (en) | steel building | |
| JPH11190068A (en) | Building structure | |
| JP2023067236A (en) | Slab base structure before concrete placement, reinforced concrete slab structure, method of constructing slab base structure before concrete placement, and method of constructing reinforced concrete slab structure | |
| JP2977367B2 (en) | Precast concrete block foundation for modular buildings | |
| JP7851098B2 (en) | Structures and construction methods for structures | |
| JPS627339B2 (en) | ||
| JP7603428B2 (en) | Earthquake-resistant reinforcement structure | |
| JP7535343B1 (en) | Shaft end auxiliary member and member connection structure using the same | |
| JP7811456B2 (en) | Column beam structure | |
| JP3174283B2 (en) | Composite beam and method of connecting composite beam to purlin | |
| JPH11148136A (en) | Bearing force improvement structure in foundation for construction | |
| JP2000136564A (en) | Floor panel type steel frame structure and frame system | |
| JP2007224586A (en) | Composite structure building and method of constructing composite structure building | |
| JP2026003816A (en) | Column and beam frame construction method | |
| JPH11336190A (en) | Construction method of steel column and steel beam | |
| JP2026057273A (en) | basic structure | |
| JP2024092219A (en) | Fixture for precast concrete plate and method for constructing concrete structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230330 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20231204 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240109 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240226 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20240604 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240802 |
|
| A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20240808 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20241022 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20241029 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7580207 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |