JP7585111B2 - New and old monitoring and control switching system, and method for switching between new and old monitoring and control switching systems - Google Patents
New and old monitoring and control switching system, and method for switching between new and old monitoring and control switching systems Download PDFInfo
- Publication number
- JP7585111B2 JP7585111B2 JP2021046024A JP2021046024A JP7585111B2 JP 7585111 B2 JP7585111 B2 JP 7585111B2 JP 2021046024 A JP2021046024 A JP 2021046024A JP 2021046024 A JP2021046024 A JP 2021046024A JP 7585111 B2 JP7585111 B2 JP 7585111B2
- Authority
- JP
- Japan
- Prior art keywords
- control system
- monitoring
- old
- new
- control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Testing And Monitoring For Control Systems (AREA)
Description
本発明の実施形態は、新旧監視制御切替システム、新旧監視制御切替システムの切替方法に関する。 An embodiment of the present invention relates to a new and old monitoring and control switching system and a method for switching between the new and old monitoring and control switching systems.
上下水道などに係る水処理施設や、焼却施設、工場などでは設備機器などの動作を監視する監視制御システムが設けられる。監視制御システムにおいては、既設のシステム(旧監視制御システム)を新たなシステム(新監視制御システム)に更新する場合がある。通常、既設のシステムから新たなシステムへの更新は、施設の運用及び監視制御を停止することなく実行することが求められる。 Water treatment facilities related to water supply and sewerage, incineration facilities, factories, etc. are equipped with monitoring and control systems to monitor the operation of equipment and other facilities. In monitoring and control systems, there are cases where an existing system (old monitoring and control system) is updated to a new system (new monitoring and control system). Normally, the update from an existing system to a new system must be carried out without stopping the operation and monitoring and control of the facility.
図13は、従来の監視制御システムにおける切替方法を説明するためのシステム構成図である(特許文献1参照)。 Figure 13 is a system configuration diagram for explaining a switching method in a conventional monitoring and control system (see Patent Document 1).
図13に示す監視制御システムは、下位システム2、旧システム3、新システム4及び中継装置5を備える。下位システム2は、制御対象機器9-1~9-Nの動作を制御するシステムである。下位システム2は、コントローラ21-1~21-Nを備える。コントローラ21-iは、制御対象機器9-iの動作を制御する。制御対象機器9-1~9-Nは、監視制御システムによる監視または制御の対象となる機器である。 The monitoring and control system shown in FIG. 13 comprises a lower system 2, an old system 3, a new system 4, and a relay device 5. The lower system 2 is a system that controls the operation of the control target devices 9-1 to 9-N. The lower system 2 comprises controllers 21-1 to 21-N. The controller 21-i controls the operation of the control target device 9-i. The control target devices 9-1 to 9-N are devices that are subject to monitoring or control by the monitoring and control system.
旧システム3は、下位システム2の監視または制御を行う既設の上位システムである。旧システム3は、監視操作端末31、監視制御サーバ32-1及び32-2を備える。監視操作端末31は、下位システム2の監視または制御に関するユーザインタフェースを提供する機能を有する。監視制御サーバ32-1及び32-2は、下位システム2の監視または制御に関する各種のデータ処理を行う機能を有する。 The old system 3 is an existing upper system that monitors or controls the lower system 2. The old system 3 is equipped with a monitoring operation terminal 31, and monitoring control servers 32-1 and 32-2. The monitoring operation terminal 31 has a function of providing a user interface for monitoring or controlling the lower system 2. The monitoring control servers 32-1 and 32-2 have a function of performing various data processing related to the monitoring or control of the lower system 2.
新システム4は、下位システム2の監視または制御を行う新設の上位システムである。具体的には、新システム4は、監視操作端末31と同様の監視操作端末41、監視制御サーバ32と同様の監視制御サーバ42-1及び42-2を備えることにより、旧システム3と同様の機能を有する。以下、特に区別する必要がない場合、監視制御サーバ42-1及び42-2を監視制御サーバ42と記載する。 New system 4 is a newly established upper system that monitors or controls lower system 2. Specifically, new system 4 has a monitoring operation terminal 41 similar to monitoring operation terminal 31, and monitoring control servers 42-1 and 42-2 similar to monitoring control server 32, and thus has the same functions as old system 3. Hereinafter, unless there is a need to distinguish between them, monitoring control servers 42-1 and 42-2 will be referred to as monitoring control server 42.
中継装置5は、下位システム2と、旧システム3と、新システム4との間の通信を中継する機能を有する通信装置である。中継装置5は、レイヤ2スイッチやレイヤ3スイッチ等の通信装置である。 The relay device 5 is a communication device that has the function of relaying communication between the lower system 2, the old system 3, and the new system 4. The relay device 5 is a communication device such as a layer 2 switch or a layer 3 switch.
下位システム2、旧システム3及び新システム4は、それぞれ異なるLAN(LocalAreaNetwork)に収容される。下位システム2は下位LAN20に、旧システム3は旧上位LAN30に、新システム4は新上位LAN40に、それぞれ収容される。 The lower system 2, the old system 3, and the new system 4 are each accommodated in a different LAN (Local Area Network). The lower system 2 is accommodated in the lower LAN 20, the old system 3 is accommodated in the old upper LAN 30, and the new system 4 is accommodated in the new upper LAN 40.
図13に示す従来の監視制御システムでは、中継装置5を設けて、旧システム3と新システム4との間の通信を遮断するとともに、各上位システムと下位システム2との間の通信を中継する。 In the conventional monitoring and control system shown in FIG. 13, a relay device 5 is provided to block communication between the old system 3 and the new system 4, and to relay communication between each upper system and the lower system 2.
本発明の実施形態が解決しようとする課題は、中継装置を必要とすることなく、旧監視制御システムから新監視制御システムへ切り替えを可能とする新旧監視制御切替システム、新旧監視制御切替システムの切替方法を提供することである。 The problem that the embodiment of the present invention aims to solve is to provide a new/old monitoring and control switching system and a switching method between the new and old monitoring and control switching systems that enables switching from an old monitoring and control system to a new monitoring and control system without requiring a relay device.
実施形態によれば、新旧監視制御切替システムは、コントローラ、旧監視制御システム、新監視制御システム、伝送路を有する。コントローラは、設備機器の動作状態を示す状態データを送信する。旧監視制御システムは、前記状態データを前記コントローラから取得し、前記設備機器の動作状態を監視する。新監視制御システムは、前記状態データを前記コントローラから取得し、前記設備機器の動作状態を監視する。伝送路は、前記コントローラと、前記旧監視制御システム及び前記新監視制御システムとを、第1ネットワークと第2ネットワークのそれぞれにより接続する。前記コントローラは、前記旧監視制御システムと、前記第1ネットワーク及び前記第2ネットワークにより接続された状態にある場合、少なくとも前記第1ネットワーク又は前記第2ネットワークを通じて、前記旧監視制御システムと通信する。また、前記コントローラは、前記旧監視制御システムと前記第1ネットワークにより接続され、前記新監視制御システムと前記第2ネットワークにより接続された状態にある場合、前記第1ネットワークを通じて前記旧監視制御システムと通信し、前記第2ネットワークを通じて前記新監視制御システムと通信する。また、前記コントローラは、前記新監視制御システムと、前記第1ネットワーク及び前記第2ネットワークにより接続された状態にある場合、少なくとも前記第1ネットワーク又は前記第2ネットワークを通じて、前記旧監視制御システムと通信する。 According to an embodiment, the old/new monitoring and control switching system has a controller, an old monitoring and control system, a new monitoring and control system, and a transmission path. The controller transmits status data indicating the operating status of the equipment. The old monitoring and control system acquires the status data from the controller and monitors the operating status of the equipment. The new monitoring and control system acquires the status data from the controller and monitors the operating status of the equipment. The transmission path connects the controller to the old monitoring and control system and the new monitoring and control system via a first network and a second network, respectively. When the controller is in a state where the old monitoring and control system is connected via the first network and the second network, the controller communicates with the old monitoring and control system through at least the first network or the second network. Also, when the controller is connected to the old monitoring and control system via the first network and the new monitoring and control system via the second network, the controller communicates with the old monitoring and control system via the first network and communicates with the new monitoring and control system via the second network. Furthermore, when the controller is connected to the new monitoring and control system via the first network and the second network, it communicates with the old monitoring and control system through at least the first network or the second network.
以下、本実施形態について、図面を参照しながら説明する。 This embodiment will be described below with reference to the drawings.
図1は、本実施形態の新旧監視制御切替システムの構成の概略を示すブロック図である。新旧監視制御切替システムは、旧監視制御システム10、新監視制御システム100、コントローラ201,202を備える。 Figure 1 is a block diagram showing an outline of the configuration of the old and new monitoring and control switching system of this embodiment. The old and new monitoring and control switching system includes an old monitoring and control system 10, a new monitoring and control system 100, and controllers 201 and 202.
新旧監視制御切替システムは、旧監視制御システム10の運用を継続したままの状態で新監視制御システム100を構築し、コントローラ201,202と旧監視制御システム10との接続を、中継装置を使用することなく、コントローラ201,202と新監視制御システム100との接続に変更して、旧監視制御システム10か新監視制御システム100への切り替えを実行する。 The new and old monitoring and control switching system builds a new monitoring and control system 100 while continuing to operate the old monitoring and control system 10, and changes the connection between the controllers 201, 202 and the old monitoring and control system 10 to a connection between the controllers 201, 202 and the new monitoring and control system 100 without using a relay device, thereby switching from the old monitoring and control system 10 to the new monitoring and control system 100.
コントローラ201,202は、監視制御システムによる監視制御の対象とする設備機器等(図示せず)の動作を制御する下位システムである。図1では、2つのコントローラ201,202を示しているが、1つのコントローラ、あるいは3つ以上のコントローラが設けられていても良い。複数のコントローラ201,202には、それぞれ1つ以上の設備機器が接続され、設備機器の動作状態を示す各種データ(例えば、状態・故障・計測データ)を収集し、旧監視制御システム10あるいは新監視制御システム100に送信する。 The controllers 201 and 202 are subsystems that control the operation of equipment (not shown) that is the subject of monitoring and control by the monitoring and control system. Although two controllers 201 and 202 are shown in FIG. 1, one controller or three or more controllers may be provided. Each of the multiple controllers 201 and 202 is connected to one or more pieces of equipment, and collects various data indicating the operating status of the equipment (e.g., status, fault, and measurement data) and transmits it to the old monitoring and control system 10 or the new monitoring and control system 100.
旧監視制御システム10は、コントローラ201,202の監視または制御を行う上位システムである。旧監視制御システム10は、旧監視制御装置1、旧サーバ11を備える。旧監視制御装置1は、コントローラ201,202に接続された設備機器の動作状態を示すデータを取得し、設備機器に対する制御指示(操作出力・設定値データ)をコントローラ201,202に出力する機能を有する。旧サーバ11は、下位システムの監視または制御に関する各種のデータ処理を行う機能を有する。図1では、旧監視制御装置1と旧サーバ11をそれぞれ1台のみ示しているが、それぞれ複数台設ける構成とすることができる。 The old monitoring and control system 10 is a higher-level system that monitors or controls the controllers 201, 202. The old monitoring and control system 10 includes an old monitoring and control device 1 and an old server 11. The old monitoring and control device 1 has the function of acquiring data indicating the operating status of the equipment connected to the controllers 201, 202, and outputting control instructions (operation output and setting value data) for the equipment to the controllers 201, 202. The old server 11 has the function of performing various data processing related to the monitoring or control of the lower-level system. Although only one old monitoring and control device 1 and one old server 11 are shown in FIG. 1, a configuration in which multiple units of each are provided is possible.
新監視制御システム100は、コントローラ201,202の監視または制御を行う新設の上位システムである。新監視制御システム100は、旧監視制御システム10に設けられた旧監視制御装置1及び旧サーバ11と同様の新監視制御装置101、旧サーバ11を備えることにより、旧監視制御システム10と同様の機能または拡張された機能を有する。 The new monitoring and control system 100 is a newly established higher-level system that monitors or controls the controllers 201 and 202. The new monitoring and control system 100 has the same functions as the old monitoring and control system 10 or expanded functions by including a new monitoring and control device 101 and an old server 11 similar to the old monitoring and control device 1 and old server 11 provided in the old monitoring and control system 10.
新旧監視制御切替システムにおいて、コントローラ201,202、旧監視制御システム10及び新監視制御システム100は、冗長化された伝送路により相互に接続される。図1では、二重化されたLAN(Local Area Network)により接続される例を示している。二重化されたLANは、A系のネットワーク(第1ネットワーク)とB系のネットワーク(第2ネットワーク)を含む。 In the old and new monitoring and control switching system, the controllers 201, 202, the old monitoring and control system 10, and the new monitoring and control system 100 are interconnected by redundant transmission paths. FIG. 1 shows an example in which they are connected by a duplicated LAN (Local Area Network). The duplicated LAN includes an A-system network (first network) and a B-system network (second network).
コントローラ201,202は、制御系(A系)251と制御系(B系)252により二重化されたネットワークにより接続される。 The controllers 201 and 202 are connected by a duplicated network consisting of a control system (system A) 251 and a control system (system B) 252.
旧監視制御システム10の旧監視制御装置1と旧サーバ11は、旧監視制御システム制御系(A系)51と旧監視制御システム制御系(B系)52とにより二重化されたネットワークにより接続される。旧監視制御システム10が運用される場合には、旧監視制御システム制御系(A系)51と制御系(A系)251とが制御系(A系)351を介して接続され、旧監視制御システム制御系(B系)52と制御系(B系)252とが制御系(B系)352を介して接続される。 The old monitoring and control device 1 and old server 11 of the old monitoring and control system 10 are connected by a duplicated network made up of the old monitoring and control system control system (A system) 51 and the old monitoring and control system control system (B system) 52. When the old monitoring and control system 10 is in operation, the old monitoring and control system control system (A system) 51 and control system (A system) 251 are connected via control system (A system) 351, and the old monitoring and control system control system (B system) 52 and control system (B system) 252 are connected via control system (B system) 352.
新監視制御システム100の新監視制御装置101と新サーバ111は、新監視制御システム制御系(A系)151と新監視制御システム制御系(B系)152とにより二重化されたネットワークにより接続される。新監視制御システム100が運用される場合には、新監視制御システム制御系(A系)151と制御系(A系)251とが制御系(A系)451を介して接続され、新監視制御システム制御系(B系)152と制御系(B系)252とが制御系(B系)452を介して接続される。 The new monitoring and control device 101 and new server 111 of the new monitoring and control system 100 are connected by a duplicated network consisting of the new monitoring and control system control system (A system) 151 and the new monitoring and control system control system (B system) 152. When the new monitoring and control system 100 is in operation, the new monitoring and control system control system (A system) 151 and the control system (A system) 251 are connected via the control system (A system) 451, and the new monitoring and control system control system (B system) 152 and the control system (B system) 252 are connected via the control system (B system) 452.
旧監視制御システム10、新監視制御システム100、コントローラ201,202は、二重化されたネットワークにより接続されることで、一方のネットワーク(例えばA系)に障害が発生したとしても、他方のネットワーク(例えばB系)を利用して制御監視のための処理を継続する冗長化された機能を有する。 The old monitoring and control system 10, the new monitoring and control system 100, and the controllers 201 and 202 are connected by a duplicated network, so that even if a failure occurs in one of the networks (e.g., system A), the other network (e.g., system B) can be used to continue processing for control and monitoring, providing a redundant function.
従って、旧監視制御システム10の旧監視制御装置1と旧サーバ11は、制御系(A系)351あるいは制御系(B系)352の何れか一方が離線された場合、接続された状態にある他方の制御系(A系)351あるいは制御系(B系)352を通じて、コントローラ201,202との通信を実行して動作を継続することができる。 Therefore, if either the control system (system A) 351 or the control system (system B) 352 of the old monitoring and control system 10 is disconnected, the old monitoring and control device 1 and old server 11 can continue to operate by communicating with the controllers 201, 202 through the other control system (system A) 351 or control system (system B) 352 that remains connected.
同様にして、新監視制御システム100の新監視制御装置101と新サーバ111は、制御系(A系)451あるいは制御系(B系)452の何れか一方が接続された状態にある場合、接続状態にある制御系(A系)351あるいは制御系(B系)352を通じて、コントローラ201,202との通信を実行して動作を実行することができる。また、新監視制御装置101と新サーバ111は、制御系(A系)451と制御系(B系)452の両方によって接続された場合、冗長化された状態において監視制御の動作を実行することができる。 Similarly, when either control system (A system) 451 or control system (B system) 452 is in a connected state, the new monitoring and control device 101 and new server 111 of the new monitoring and control system 100 can communicate with the controllers 201, 202 and perform operations through the connected control system (A system) 351 or control system (B system) 352. Also, when the new monitoring and control device 101 and new server 111 are connected by both control system (A system) 451 and control system (B system) 452, they can perform monitoring and control operations in a redundant state.
図2は、本実施形態におけるコントローラ201,202の構成を示すブロック図である。 Figure 2 is a block diagram showing the configuration of controllers 201 and 202 in this embodiment.
コントローラ201,202は、バスで接続されたCPU(Central Processing Unit)やメモリや補助記憶装置などを備え、メモリに記憶されたプログラムをCPUが実行することにより各種の機能を実現する。コントローラ201,202は、プログラムの実行により、制御部211、入力部212、表示部213、通信部214、記憶部215を備える装置として機能する。 The controllers 201 and 202 are equipped with a CPU (Central Processing Unit), memory, auxiliary storage device, etc., which are connected by a bus, and various functions are realized by the CPU executing a program stored in the memory. By executing the program, the controllers 201 and 202 function as a device equipped with a control unit 211, an input unit 212, a display unit 213, a communication unit 214, and a storage unit 215.
制御部211は、制御対象とする施設機器の制御に関する各種処理を実行する。制御部211には、伝送種別設定部211A及び状態監視部211Bの機能が設けられる。 The control unit 211 executes various processes related to the control of the facility equipment to be controlled. The control unit 211 has the functions of a transmission type setting unit 211A and a status monitoring unit 211B.
伝送種別設定部211Aは、制御系(A系(第1ネットワーク))と制御系(B系(第2ネットワーク))のそれぞれについて、ブロードキャスト伝送あるいはマルチキャスト伝送の何れの伝送種別により通信するかを設定する。例えば、制御系(A系)を旧監視制御システム10のブロードキャスト伝送、制御系(B系)を新監視制御システム100のマルチキャスト伝送、または制御系(A系)を旧監視制御システム10のマルチキャスト伝送、制御系(B系)を新監視制御システム100のブロードキャスト伝送するように設定することができる。制御部211は、旧監視制御システム10と新監視制御システム100と通信をする状態において、伝送種別設定部211Aによる伝送種別の設定を実行することができる。制御部211は、伝送種別の設定に応じて、通信部214を通じて旧監視制御システム10あるいは新監視制御システム100に対するデータを、ブロードキャスト伝送あるいはマルチキャスト伝送により送信する。 The transmission type setting unit 211A sets whether the control system (A system (first network)) and the control system (B system (second network)) will communicate by broadcast transmission or multicast transmission. For example, the control system (A system) can be set to broadcast transmission of the old monitoring and control system 10, the control system (B system) to multicast transmission of the new monitoring and control system 100, or the control system (A system) can be set to multicast transmission of the old monitoring and control system 10, and the control system (B system) to broadcast transmission of the new monitoring and control system 100. The control unit 211 can execute the setting of the transmission type by the transmission type setting unit 211A in a state in which the old monitoring and control system 10 and the new monitoring and control system 100 are communicating. The control unit 211 transmits data to the old monitoring and control system 10 or the new monitoring and control system 100 by broadcast transmission or multicast transmission through the communication unit 214 according to the setting of the transmission type.
状態監視部211Bは、旧監視制御システム10(旧サーバ11)から送信(発報)される、システム内の装置(旧監視制御装置1、旧サーバ11)の状態情報を示す異常検知データ(第1異常検知データ)と、新監視制御システム100(新サーバ111)から送信(発報)される、システム内の装置(新監視制御装置101、新サーバ111)の状態情報を示す異常検知データ(第2異常検知データ)を、通信部214を通じて受信して、旧監視制御システム10と新監視制御システム100の動作状態を監視する。状態監視部211Bは、第1異常検知データと第2異常検知データをもとに、旧監視制御システム10と新監視制御システム100の状態を示す異常検知データ(第3異常検知データ)を生成し、この異常検知データをもとにシステム内の装置の異常を判別することができる。すなわち、旧監視制御システム10から新監視制御システム100への切り替え過程において、旧監視制御システム10と新監視制御システム100が併置運用されている状態であっても、正しく異常検知できるようにする。 The status monitoring unit 211B receives abnormality detection data (first abnormality detection data) indicating the status information of the devices in the system (old monitoring control device 1, old server 11) transmitted (issued) from the old monitoring control system 10 (old server 11) and abnormality detection data (second abnormality detection data) indicating the status information of the devices in the system (new monitoring control device 101, new server 111) transmitted (issued) from the new monitoring control system 100 (new server 111) via the communication unit 214, and monitors the operating status of the old monitoring control system 10 and the new monitoring control system 100. The status monitoring unit 211B generates abnormality detection data (third abnormality detection data) indicating the status of the old monitoring control system 10 and the new monitoring control system 100 based on the first abnormality detection data and the second abnormality detection data, and can determine abnormalities in the devices in the system based on this abnormality detection data. In other words, during the process of switching from the old monitoring and control system 10 to the new monitoring and control system 100, it is possible to correctly detect abnormalities even if the old monitoring and control system 10 and the new monitoring and control system 100 are operated side by side.
入力部212は、キーワード、マウス、タッチパネル等の入力装置を用いて構成される。また、入力部212は、入力装置を旧監視制御装置1に接続する通信インタフェースであっても良い。入力部212は、旧監視制御装置1に対するデータの入力や制御の指示を受け付けて、制御部211に出力する。 The input unit 212 is configured using input devices such as a keyword, a mouse, a touch panel, etc. The input unit 212 may also be a communication interface that connects the input device to the old monitoring and control device 1. The input unit 212 accepts data input and control instructions for the old monitoring and control device 1, and outputs them to the control unit 211.
表示部213は、液晶ディスプレイ等の表示装置を含んで構成される。また、表示部213は、表示装置を接続するインタフェースであっても良い。表示部213は、コントローラ201,202の監視又は制御に関するユーザインタフェース(例えば、設定画面)を表示する。 The display unit 213 includes a display device such as a liquid crystal display. The display unit 213 may also be an interface for connecting a display device. The display unit 213 displays a user interface (e.g., a setting screen) related to the monitoring or control of the controllers 201, 202.
通信部214は、二重化されたLAN(制御系(A系)251及び制御系(B系)252)に接続する通信インタフェースである。 The communication unit 214 is a communication interface that connects to a duplicated LAN (control system (A system) 251 and control system (B system) 252).
記憶部215は、HDD(Hard disk drive)装置やSSD(Solid State Drive)装置などの記憶装置を用いて構成される。記憶部215は、動作に必要な各種情報を記憶する。例えば、記憶部215は、監視制御の処理を実行するためのプログラムや、そのプログラムの実行時に参照されるデータなどが記憶される。さらに、記憶部215には、旧監視制御システム10及び新監視制御システム100を識別するための識別定義情報が記憶される。 The storage unit 215 is configured using a storage device such as a hard disk drive (HDD) device or a solid state drive (SSD) device. The storage unit 215 stores various information necessary for operation. For example, the storage unit 215 stores programs for executing monitoring and control processing, data referenced when the programs are executed, and the like. Furthermore, the storage unit 215 stores identification definition information for identifying the old monitoring and control system 10 and the new monitoring and control system 100.
例えば、制御部211は、通信部214を通じて受信された受信データに新監視制御システム100の識別情報が含まれているか否かを判定する。制御部211は、受信データに識別定義情報により定義された新監視制御システム100の識別情報が含まれている場合には送信元が新監視制御システム100であると判定し、識別情報が含まれていない場合には送信元が旧監視制御システム10であると判定する。従って、旧監視制御システム10は、監視制御システムの切り替えに伴って、データに新監視制御システム100とは異なる識別情報を付加するといったプログラムの変更(ソフトウェアをバージョンアップ)の必要がない。 For example, the control unit 211 determines whether or not the received data received through the communication unit 214 includes identification information of the new monitoring and control system 100. If the received data includes the identification information of the new monitoring and control system 100 defined by the identification definition information, the control unit 211 determines that the sender is the new monitoring and control system 100, and if the identification information is not included, the control unit 211 determines that the sender is the old monitoring and control system 10. Therefore, when the monitoring and control system is switched, the old monitoring and control system 10 does not need to make program changes (upgrade the software) such as adding identification information different from that of the new monitoring and control system 100 to the data.
図3は、本実施形態における旧サーバ11及び新サーバ111の構成を示すブロック図である。 Figure 3 is a block diagram showing the configuration of the old server 11 and the new server 111 in this embodiment.
旧サーバ11及び新サーバ111は、バスで接続されたCPU(Central Processing Unit)やメモリや補助記憶装置などを備え、メモリに記憶されたプログラムをCPUが実行することにより各種の機能を実現する。旧サーバ11及び新サーバ111は、プログラムの実行により、制御部121、入力部122、表示部123、通信部124、記憶部125を備える装置として機能する。 The old server 11 and the new server 111 each include a CPU (Central Processing Unit), memory, auxiliary storage device, etc., which are connected via a bus, and various functions are realized by the CPU executing programs stored in the memory. By executing the programs, the old server 11 and the new server 111 function as a device including a control unit 121, an input unit 122, a display unit 123, a communication unit 124, and a memory unit 125.
制御部121は、制御対象とする施設機器の制御に関する各種処理を実行する。制御部121は、コントローラ201,202から受信される設備機器の動作状態を示す各種データ(例えば、状態・故障・計測データ)を、監視制御装置に提供する機能を有する。また、制御部121は、状態情報送信部121Aの機能が設けられる。 The control unit 121 executes various processes related to the control of the facility equipment to be controlled. The control unit 121 has a function of providing various data (e.g., status, fault, and measurement data) indicating the operating status of the facility equipment received from the controllers 201 and 202 to the monitoring control device. The control unit 121 also has the function of a status information transmission unit 121A.
状態情報送信部121Aは、システム内の装置の状態を示す状態情報のデータをコントローラ201,202に送信する。旧サーバ11の状態情報送信部121Aは、システム内の旧監視制御装置1の状態情報を収集し、自装置(旧サーバ11)と旧監視制御装置1の状態情報を示す第1異常検知データを生成して、コントローラ201,202に送信する。新監視制御システム100の新サーバ111は、システム内の新監視制御装置101の状態情報を収集し、自装置(新サーバ111)と新監視制御装置101の状態情報を示す第2異常検知データを生成して、コントローラ201,202に送信する。 The status information transmission unit 121A transmits status information data indicating the status of devices in the system to the controllers 201, 202. The status information transmission unit 121A of the old server 11 collects status information of the old monitoring control device 1 in the system, generates first abnormality detection data indicating status information of its own device (old server 11) and the old monitoring control device 1, and transmits it to the controllers 201, 202. The new server 111 of the new monitoring control system 100 collects status information of the new monitoring control device 101 in the system, generates second abnormality detection data indicating status information of its own device (new server 111) and the new monitoring control device 101, and transmits it to the controllers 201, 202.
入力部122は、キーワード、マウス、タッチパネル等の入力装置を用いて構成される。また、入力部122は、入力装置を新監視制御装置101に接続する通信インタフェースであっても良い。入力部122は、新監視制御装置101に対するデータの入力や制御の指示を受け付けて、制御部121に出力する。 The input unit 122 is configured using input devices such as a keyword, a mouse, a touch panel, etc. The input unit 122 may also be a communication interface that connects the input devices to the new monitoring and control device 101. The input unit 122 accepts data input and control instructions for the new monitoring and control device 101 and outputs them to the control unit 121.
表示部123は、液晶ディスプレイ等の表示装置を含んで構成される。また、表示部123は、表示装置を接続するインタフェースであっても良い。表示部123は、コントローラ201,202の監視又は制御に関するユーザインタフェース(例えば、操作画面)を表示する。 The display unit 123 includes a display device such as a liquid crystal display. The display unit 123 may also be an interface for connecting a display device. The display unit 123 displays a user interface (e.g., an operation screen) related to the monitoring or control of the controllers 201, 202.
通信部124は、二重化されたLAN(制御系(A系)及び制御系(B系))に接続する通信インタフェースである。旧サーバ11の通信部124は、旧監視制御システム制御系(A系)51と旧監視制御システム制御系(B系)52と接続される。新サーバ111の通信部124は、新監視制御システム制御系(A系)151と新監視制御システム制御系(B系)152と接続される。 The communication unit 124 is a communication interface that connects to a duplicated LAN (control system (system A) and control system (system B)). The communication unit 124 of the old server 11 is connected to the old monitoring and control system control system (system A) 51 and the old monitoring and control system control system (system B) 52. The communication unit 124 of the new server 111 is connected to the new monitoring and control system control system (system A) 151 and the new monitoring and control system control system (system B) 152.
記憶部125は、HDD(Hard disk drive)装置やSSD(Solid State Drive)装置などの記憶装置を用いて構成される。記憶部125は、動作に必要な各種情報を記憶する。例えば、記憶部125は、監視制御の処理を実行するためのプログラムや、そのプログラムの実行時に参照されるデータなどが記憶される。 The storage unit 125 is configured using a storage device such as a hard disk drive (HDD) device or a solid state drive (SSD) device. The storage unit 125 stores various information necessary for operation. For example, the storage unit 125 stores programs for executing monitoring and control processes, data referenced when the programs are executed, and the like.
次に、旧監視制御システム10から新監視制御システム100への切替方法について説明する。 Next, we will explain how to switch from the old monitoring and control system 10 to the new monitoring and control system 100.
まず、本実施形態における新旧監視制御切替システムとの比較のために、中継装置を利用して旧監視制御システム10から新監視制御システム100へ切り替えを実行する場合について説明する。 First, to compare the old and new monitoring and control switching systems in this embodiment, we will explain the case where a relay device is used to switch from the old monitoring and control system 10 to the new monitoring and control system 100.
図4は、中継装置(A系)301と中継装置(B系)302を、旧監視制御システム10及び新監視制御システム100と、コントローラ201,202との間に実装した構成例を示している。 Figure 4 shows an example of a configuration in which a relay device (A system) 301 and a relay device (B system) 302 are implemented between the old monitoring and control system 10 and the new monitoring and control system 100 and the controllers 201 and 202.
旧監視制御システム10の旧監視制御装置1からの操作出力・設定値データのA系データは、旧監視制御システム制御系(A系)51から中継装置(A系)301、制御系(A系)251を経由して、コントローラ201またはコントローラ202へ送信される。 The A-system data of the operation output and setting value data from the old monitoring and control device 1 of the old monitoring and control system 10 is transmitted from the old monitoring and control system control system (A-system) 51 via the relay device (A-system) 301 and the control system (A-system) 251 to the controller 201 or controller 202.
同様に、旧監視制御システム10の旧監視制御装置1からの操作出力・設定値データのB系データは、旧監視制御システム制御系(B系)52から中継装置(B系)302、制御系(B系)252を経由して、コントローラ201またはコントローラ202へ送信される。 Similarly, the B system data of the operation output and setting value data from the old monitoring and control device 1 of the old monitoring and control system 10 is transmitted from the old monitoring and control system control system (B system) 52 via the relay device (B system) 302 and the control system (B system) 252 to the controller 201 or controller 202.
また、コントローラ201またはコントローラ202からの状態・故障・計測データのA系データは、制御系(A系)251、中継装置(A系)301を経由して、旧監視制御システム10の旧監視制御システム制御系(A系)51より旧監視制御装置1、旧サーバ11へ送信される。 In addition, A-system data of status, fault, and measurement data from controller 201 or controller 202 is sent from old monitoring and control system control system (A-system) 51 of old monitoring and control system 10 to old monitoring and control device 1 and old server 11 via control system (A-system) 251 and relay device (A-system) 301.
同様にコントローラ201またはコントローラ202の状態・故障・計測データのB系データは、制御系(B系)252、中継装置(B系)302を経由して、旧監視制御システム10の旧監視制御システム制御系(B系)52より旧監視制御装置1、旧サーバ11へ送信される。 Similarly, the B system data of the status, fault, and measurement data of the controller 201 or the controller 202 is transmitted from the old monitoring and control system control system (B system) 52 of the old monitoring and control system 10 to the old monitoring and control device 1 and the old server 11 via the control system (B system) 252 and the relay device (B system) 302.
一方、新監視制御システム100の新監視制御装置101からの操作出力・設定値データのA系データは、新監視制御システム制御系(A系)151から中継装置(A系)301、制御系(A系)251を経由してコントローラ201またはコントローラ202へ送信される。 On the other hand, the A system data of the operation output and setting value data from the new monitoring and control device 101 of the new monitoring and control system 100 is transmitted from the new monitoring and control system control system (A system) 151 to the controller 201 or controller 202 via the relay device (A system) 301 and the control system (A system) 251.
同様に新監視制御システム100の新監視制御装置101からの操作出力・設定値データのB系データは、新監視制御システム制御系(B系)152から中継装置(B系)302、制御系(B系)252を経由して、コントローラ201またはコントローラ202へ送信される。 Similarly, the B system data of the operation output and setting value data from the new monitoring and control device 101 of the new monitoring and control system 100 is transmitted from the new monitoring and control system control system (B system) 152 to the controller 201 or controller 202 via the relay device (B system) 302 and the control system (B system) 252.
また、コントローラ201またはコントローラ202からの状態・故障・計測データのA系データは、制御系(A系)251、中継装置(A系)301を経由して、新監視制御システム100の新監視制御システム制御系(A系)151より新監視制御装置101、新サーバ111へ送信される。 In addition, the A system data of status, fault, and measurement data from the controller 201 or controller 202 is transmitted from the new monitoring and control system control system (A system) 151 of the new monitoring and control system 100 to the new monitoring and control device 101 and new server 111 via the control system (A system) 251 and relay device (A system) 301.
同様にコントローラ201またはコントローラ202の状態・故障・計測データのB系データは、制御系(B系)252、中継装置(B系)302を経由して、新監視制御システム100の新監視制御システム制御系(B系)152より新監視制御装置100、新サーバ111へ送信される。 Similarly, the B system data of the status, fault, and measurement data of the controller 201 or controller 202 is transmitted from the new monitoring and control system control system (B system) 152 of the new monitoring and control system 100 to the new monitoring and control device 100 and new server 111 via the control system (B system) 252 and relay device (B system) 302.
以上より、中継装置(A系)301、中継装置(B系)302を使用することで、旧監視制御システム(旧監視制御装置1、旧サーバ11)と新監視制御システム(新監視制御装置101、新サーバ111)のネットワークが分離される。従って、旧監視制御システム10と新監視制御システム100の間でデータが混在することを防止できるため、切り替えの過渡期に有効に活用できる。 As described above, by using relay device (A system) 301 and relay device (B system) 302, the networks of the old monitoring and control system (old monitoring and control device 1, old server 11) and the new monitoring and control system (new monitoring and control device 101, new server 111) are separated. This prevents data from being mixed up between the old monitoring and control system 10 and the new monitoring and control system 100, making it possible to effectively utilize the system during the transitional period of changeover.
しかしながら、中継装置(A系)301及び中継装置(B系)302は、新旧監視制御システムの並置運用時、切替時は有効であるが、切替完了後は不要となる。従って、短期間の切り替えでは、中継装置(A系)301及び中継装置(B系)302の購入費用や設置場所確保などの運用のためのコストがかかる。 However, when the old and new monitoring and control systems are operated side by side, the relay device (A system) 301 and the relay device (B system) 302 are effective during the switchover but are unnecessary after the switchover is complete. Therefore, in a short-term switchover, the purchase cost of the relay device (A system) 301 and the relay device (B system) 302 and the operation costs such as securing the installation space are incurred.
次に、本実施形態における新旧監視制御切替システムの切替方法の動作について、図5に示すフローチャートを参照しながら説明する。図6、図7及び図8は、旧監視制御システム10、新監視制御システム100、コントローラ201,202を接続するネットワーク(制御系(A系)(B系))の変化を示す図である。 Next, the operation of the switching method between the old and new monitoring and control switching systems in this embodiment will be described with reference to the flowchart shown in FIG. 5. FIGS. 6, 7, and 8 are diagrams showing changes in the network (control systems (system A) and (system B)) connecting the old monitoring and control system 10, the new monitoring and control system 100, and the controllers 201 and 202.
図5のステップS1は、旧監視制御システム10のみが運用されている切り替え前の状態を示す。ステップS1では、新監視制御システム100が未設置の状態である。 Step S1 in Figure 5 shows the state before the switchover, in which only the old monitoring and control system 10 is in operation. In step S1, the new monitoring and control system 100 has not yet been installed.
図6(A)に示すように、コントローラ201,202は、旧監視制御システム10の旧監視制御装置1及び旧サーバ11と、A系のネットワーク(旧監視制御システム制御系(A系)51、制御系(A系)351)と、B系のネットワーク(旧監視制御システム制御系(B系)52、制御系(B系)352)と接続された状態ある。コントローラ201,202及び旧監視制御システム10は、相互に通信して施設機器の監視制御を実行する。 As shown in FIG. 6(A), the controllers 201, 202 are connected to the old monitoring and control device 1 and old server 11 of the old monitoring and control system 10, the A system network (old monitoring and control system control system (A system) 51, control system (A system) 351), and the B system network (old monitoring and control system control system (B system) 52, control system (B system) 352). The controllers 201, 202 and the old monitoring and control system 10 communicate with each other to monitor and control the facility equipment.
図5のステップS2は、新監視制御システム100の構築を開始した状態を示す。旧監視制御システム10で運用を継続しながら、新監視制御システム100を構築していく。 Step S2 in FIG. 5 shows the state where construction of the new monitoring and control system 100 has begun. The new monitoring and control system 100 is constructed while continuing operation of the old monitoring and control system 10.
図6(B)に示すように、コントローラ201,202は、A系のネットワークとB系のネットワークにより旧監視制御システム10と接続された状態にある。一方、コントローラ201,202は、新監視制御装置100の新サーバ111及び新監視制御装置101は、A系のネットワーク(新監視制御システム制御系(A系)151)、B系のネットワーク(新監視制御システム制御系(B系)152)の何れとも接続されていない状態である。 As shown in FIG. 6(B), the controllers 201 and 202 are connected to the old monitoring and control system 10 via the A-system network and the B-system network. On the other hand, the controllers 201 and 202, the new server 111 of the new monitoring and control device 100, and the new monitoring and control device 101 are not connected to either the A-system network (new monitoring and control system control system (A-system) 151) or the B-system network (new monitoring and control system control system (B-system) 152).
コントローラ201,202及び旧監視制御システム10は、引き続き、相互に通信して施設機器の監視制御を実行する。 The controllers 201, 202 and the old monitoring and control system 10 continue to communicate with each other to monitor and control the facility equipment.
図5のステップS3は、旧監視制御システム10と新監視制御システム100を並置運用するための準備ステップである。図7(A)に示すように、旧監視制御システム10では、制御系(B系)352による接続を停止し、旧監視制御システム制御系(B系)52と制御系(B系)252との離線を実施する。コントローラ201,202は、旧監視制御システム制御系(A系)のみ接続されている状態となる。 Step S3 in FIG. 5 is a preparation step for operating the old monitoring and control system 10 and the new monitoring and control system 100 side by side. As shown in FIG. 7(A), in the old monitoring and control system 10, the connection via the control system (B system) 352 is stopped, and the old monitoring and control system control system (B system) 52 is disconnected from the control system (B system) 252. The controllers 201 and 202 are now connected only to the old monitoring and control system control system (A system).
コントローラ201,202及び旧監視制御システム10は、片系のA系のネットワーク(旧監視制御システム制御系(A系)51、制御系(A系)351、制御系(A系)251)のみにより運用され、施設機器の監視制御を実行する。 The controllers 201, 202 and the old monitoring and control system 10 are operated only through one of the A-system networks (old monitoring and control system control system (A-system) 51, control system (A-system) 351, control system (A-system) 251) and perform monitoring and control of the facility equipment.
図5のステップS4は、新監視制御システム100をコントローラ201,202と接続するステップである。図7(B)に示すように、新監視制御システム100の新監視制御システム制御系(B系)152のみを、制御系(B系)452を介して制御系(B系)252と接続する。従って、コントローラ201,202は、B系ネットワーク(新監視制御システム制御系(B系)152、制御系(B系)452、制御系(B系)252))を介して、新監視制御システム100(新サーバ111、新監視制御装置101)と接続される。このとき、コントローラ201,202は、新監視制御システム100のA系ネットワーク(新監視制御システム制御系(A系)151)と接続していない状態である。 Step S4 in FIG. 5 is a step of connecting the new monitoring and control system 100 to the controllers 201 and 202. As shown in FIG. 7(B), only the new monitoring and control system control system (B system) 152 of the new monitoring and control system 100 is connected to the control system (B system) 252 via the control system (B system) 452. Therefore, the controllers 201 and 202 are connected to the new monitoring and control system 100 (new server 111, new monitoring and control device 101) via the B system network (new monitoring and control system control system (B system) 152, control system (B system) 452, control system (B system) 252). At this time, the controllers 201 and 202 are not connected to the A system network (new monitoring and control system control system (A system) 151) of the new monitoring and control system 100.
図5のステップS5は、旧監視制御システム10と新監視制御システム100を並置運用するステップである。図7(B)に示すように、旧監視制御システム10(旧監視制御装置1、旧サーバ11)は、A系ネットワーク(旧監視制御システム制御系(A系)51、制御系(A系)351、制御系(A系)251)を介してコントローラ201,202と接続され、新監視制御システム100(新監視制御装置100、新サーバ111)は、B系ネットワーク(新監視制御システム制御系(B系)152、制御系(B系)452、制御系(B系)252)を介して接続された状態にある。 Step S5 in FIG. 5 is a step for operating the old monitoring and control system 10 and the new monitoring and control system 100 side by side. As shown in FIG. 7(B), the old monitoring and control system 10 (old monitoring and control device 1, old server 11) is connected to the controllers 201, 202 via the A system network (old monitoring and control system control system (A system) 51, control system (A system) 351, control system (A system) 251), and the new monitoring and control system 100 (new monitoring and control device 100, new server 111) is connected via the B system network (new monitoring and control system control system (B system) 152, control system (B system) 452, control system (B system) 252).
これにより、旧監視制御システム10と新監視制御システム100は、制御系LANが混在しないので、コントローラ201,202との間で送受信されるデータが混触せず、並置運用が可能となる。 As a result, the old monitoring and control system 10 and the new monitoring and control system 100 do not use mixed control system LANs, so data sent and received between the controllers 201 and 202 does not get mixed up, making it possible to operate them side by side.
また、旧監視制御システム10がA系ネットワークのみによりコントローラ201,202と接続され、新監視制御システム100がB系ネットワークのみよりコントローラ201,202と接続されている状態であるため冗長化がされていない。しかし、新監視制御システム100と旧監視制御システム10の両方で監視できることからシステムで冗長化を図った状態であり、片方の監視制御システムが異常となっても運用が継続可能である。また、並置運用期間が短ければこのリスクはほとんどない。 In addition, there is no redundancy because the old monitoring and control system 10 is connected to the controllers 201, 202 only via the A-system network, and the new monitoring and control system 100 is connected to the controllers 201, 202 only via the B-system network. However, since monitoring can be performed by both the new monitoring and control system 100 and the old monitoring and control system 10, the system is redundant, and operation can continue even if one of the monitoring and control systems experiences an abnormality. Furthermore, if the period of parallel operation is short, there is almost no risk of this happening.
このように、本実施形態における本実施形態の新旧監視制御切替システムでは、図4に示す新旧監視制御切替システムのように、制御系A系の中継装置(A系)301と制御系B系の中継装置B系302を設置する必要がないため、中継装置(A系)301及び中継装置B系302の購入費用や設置場所を確保する必要がないためコストダウンが可能となる。 In this way, in the new and old monitoring and control switching system of this embodiment, unlike the new and old monitoring and control switching system shown in Figure 4, there is no need to install relay device (A system) 301 for control system A and relay device B system 302 for control system B. This means that there is no need to purchase relay device (A system) 301 and relay device B system 302 or secure installation space, which reduces costs.
図5のステップS6は、旧監視制御システム10と新監視制御システム100の並置運用から旧監視制御システム10を撤去するステップである。図8(A)に示すように、旧監視制御システム10では、制御系(A系)351による接続を停止し、旧監視制御システム制御系(A系)51と制御系(A系)251との離線を実施する。これによりコントローラ201,202は、旧監視制御システム10と接続していない状態となる。 Step S6 in FIG. 5 is a step for removing the old monitoring and control system 10 from the parallel operation of the old monitoring and control system 10 and the new monitoring and control system 100. As shown in FIG. 8 (A), in the old monitoring and control system 10, the connection by the control system (A system) 351 is stopped, and the old monitoring and control system control system (A system) 51 is disconnected from the control system (A system) 251. As a result, the controllers 201, 202 are no longer connected to the old monitoring and control system 10.
コントローラ201,202及び新監視制御システム100は、片系のB系のネットワーク(新監視制御システム制御系(B系)152、制御系(B系)452、制御系(B系)252)のみにより運用され、施設機器の監視制御を実行する。 The controllers 201, 202 and the new monitoring and control system 100 are operated only through one of the B-system networks (new monitoring and control system control system (B-system) 152, control system (B-system) 452, control system (B-system) 252) and perform monitoring and control of the facility equipment.
図5のステップS7は、新監視制御システム100のみで運用される最終ステップである。図8(B)に示すように、新監視制御システム100の新監視制御システム制御系(A系)152を、制御系(A系)451を介して制御系(A系)251と接続する。従って、コントローラ201,202は、A系ネットワーク(新監視制御システム制御系(A系)151、制御系(A系)451、制御系(A系)251)と、B系ネットワーク(新監視制御システム制御系(B系)152、制御系(B系)452、制御系(B系)252))とを介して、新監視制御システム100(新サーバ111、新監視制御装置101)と接続される。従って、新監視制御システム100及びコントローラ201,202は、相互に通信して施設機器の監視制御を実行することが可能な状態となる。これにより、旧監視制御システム10から新監視制御システム100へ切り替えが完了する。 Step S7 in FIG. 5 is the final step operated only by the new monitoring and control system 100. As shown in FIG. 8(B), the new monitoring and control system control system (A system) 152 of the new monitoring and control system 100 is connected to the control system (A system) 251 via the control system (A system) 451. Therefore, the controllers 201 and 202 are connected to the new monitoring and control system 100 (new server 111, new monitoring and control device 101) via the A system network (new monitoring and control system control system (A system) 151, control system (A system) 451, control system (A system) 251) and the B system network (new monitoring and control system control system (B system) 152, control system (B system) 452, control system (B system) 252). Therefore, the new monitoring and control system 100 and the controllers 201 and 202 are in a state where they can communicate with each other and perform monitoring and control of the facility equipment. This completes the switch from the old monitoring and control system 10 to the new monitoring and control system 100.
このようにして、本実施形態における新旧監視制御切替システムでは、図4に示すように、旧監視制御システム10及び新監視制御システム100と、コントローラ201,202との間に中継装置(A系)301及び中継装置B系302を設置することなく、新旧監視制御システムのデータが混触することなく切り替えが可能となる。 In this way, in the new and old monitoring and control switching system of this embodiment, as shown in FIG. 4, there is no need to install a relay device (A system) 301 and a relay device (B system) 302 between the old and new monitoring and control systems 10 and 100 and the controllers 201 and 202, and switching is possible without mixing up the data of the old and new monitoring and control systems.
従って、中継装置の実装が不要のためコスト低減が可能となる。また、中継装置を実装しないため、中継装置を実装するスペースも不要となる。 Therefore, costs can be reduced because there is no need to install a relay device. Also, because no relay device is installed, there is no need for space to install a relay device.
また、旧監視制御システムのソフトウェアをバージョンアップさせる必要がなくなるため、低コストと改造しないことによるリスク低減を図ることが可能となる。 In addition, there will be no need to upgrade the software of the old monitoring and control system, which will reduce costs and risk by not making modifications.
次に、旧監視制御システム10と制御系新監視制御システム100への制御系LANの伝送種別を変更する場合について説明する。 Next, we will explain how to change the transmission type of the control system LAN between the old monitoring and control system 10 and the new control monitoring and control system 100.
例えば、コントローラ201,202からの状態データの送信は、旧監視制御システム10に対してはブロードキャスト伝送で実施し、新監視制御システム100に対してはマルチキャスト伝送で実施するものとする。従来では、監視制御システムへの伝送種別を変更する場合、コントローラ201,202を停止させて、コントローラ201,202におけるデータ送信機能に対して切り替えを行っていた。また、伝送種別の切替をする場合、制御系のA系及び制御系B系の両方を同じ伝送種別とする必要があった。例えばブロードキャスト伝送からマルチキャスト伝送へ切り替える場合、制御系A系及び制御系B系の何れについてもマルチキャスト伝送へ切り替えられていた。 For example, the transmission of status data from the controllers 201, 202 is performed by broadcast transmission to the old monitoring and control system 10, and by multicast transmission to the new monitoring and control system 100. Conventionally, when changing the transmission type to the monitoring and control system, the controllers 201, 202 were stopped and the data transmission function in the controllers 201, 202 was switched over. Also, when switching the transmission type, it was necessary to set both the control system A and the control system B to the same transmission type. For example, when switching from broadcast transmission to multicast transmission, both the control system A and the control system B were switched over to multicast transmission.
本実施形態におけるコントローラ201,202では、制御部211に設けられた伝送種別設定部211Aの機能によって、制御系A系と制御系B系のそれぞれについて個別に伝送種別を変更できるようにする。従って、片系についてブロードキャスト伝送、他の片系をマルチキャスト伝送とする設定が可能となる。 In the controllers 201 and 202 of this embodiment, the transmission type setting unit 211A provided in the control unit 211 allows the transmission type to be changed individually for each of the control systems A and B. Therefore, it is possible to set one system to broadcast transmission and the other system to multicast transmission.
本実施形態における新旧監視制御切替システムでは、図7(B)に示す状態において、旧監視制御システム10と新監視制御システム100の並置運用が実施される。 In the new/old monitoring and control switching system of this embodiment, the old monitoring and control system 10 and the new monitoring and control system 100 are operated side-by-side in the state shown in FIG. 7(B).
従って、例えば、旧監視制御システム10がブロードキャスト伝送のみに対応し、新監視制御システム100がマルチキャスト伝送に対応しているような場合であっても、旧監視制御システム10と接続される制御系A系をブロードキャスト伝送に設定し、制御系B系をマルチキャスト伝送に設定にする。これにより、伝送種別の相違による障害等が発生させることなく、旧監視制御システム10から新監視制御システム100への切り替えをスムーズにすることができる。 Therefore, for example, even if the old monitoring and control system 10 only supports broadcast transmission and the new monitoring and control system 100 supports multicast transmission, control system A connected to the old monitoring and control system 10 is set to broadcast transmission, and control system B is set to multicast transmission. This allows for a smooth switchover from the old monitoring and control system 10 to the new monitoring and control system 100 without causing problems due to differences in transmission types.
また、旧監視制御システム10と新監視制御システム100を並置運用中は、片系の制御系LANを離線しているので、ブロードキャスト伝送とマルチキャスト伝送が混在することがない。また、例えば、新監視制御システム100については、ブロードキャスト伝送とマルチキャスト伝送の両対応としておけば、接続したままの伝送種別の切り替えも可能となる。 In addition, when the old monitoring and control system 10 and the new monitoring and control system 100 are operated side by side, the control system LAN of one system is disconnected, so broadcast transmission and multicast transmission are not mixed. Also, for example, if the new monitoring and control system 100 is made compatible with both broadcast transmission and multicast transmission, it will be possible to switch the transmission type while remaining connected.
図9及び図10は、本実施形態における伝送種別設定部211Aの具体例を説明するための図である。 Figures 9 and 10 are diagrams for explaining specific examples of the transmission type setting unit 211A in this embodiment.
図9は、コントローラ201,202をラダーソフトウェア(プログラム)により制御する構成とした場合の例を示している。図9に示すように、ラダーソフトウェアに、制御系A系(「BROADCAST_A」)と制御系B系(「BROADCAST_B」)のそれぞれについて、ブロードキャスト伝送あるいはマルチキャスト伝送を設定できる機能(伝送種別設定部211A)を設ける。 Figure 9 shows an example of a configuration in which the controllers 201 and 202 are controlled by ladder software (program). As shown in Figure 9, the ladder software is provided with a function (transmission type setting section 211A) that can set broadcast transmission or multicast transmission for each of control system A ("BROADCAST_A") and control system B ("BROADCAST_B").
例えば、制御部211は、入力部212による操作による伝送種別設定が指示された場合に、図9に示す設定画面を表示部213に表示させる。 For example, when a transmission type setting is instructed by operating the input unit 212, the control unit 211 causes the display unit 213 to display the setting screen shown in FIG. 9.
制御部211は、入力部212に対する入力操作によって、図9に示すラダーソフトのLDにある数字が「0」に設定されることによりブロードキャスト伝送を設定し、LDにある数字が「1」に設定されることによりマルチキャスト伝送を設定する。 The control unit 211 sets broadcast transmission by setting the number in the LD of the ladder software shown in FIG. 9 to "0" through an input operation on the input unit 212, and sets multicast transmission by setting the number in the LD to "1" through an input operation on the input unit 212.
コントローラ201,202の制御部211は、伝送種別設定部211Aによる設定に応じて、通信部214を介した制御系A(制御系(A系)251)と制御系B系(制御系(B系)252)のデータ送信を、ブロードキャスト伝送あるいはマルチキャスト伝送により実行させる。 The control unit 211 of the controllers 201 and 202 executes data transmission between control system A (control system (A system) 251) and control system B (control system (B system) 252) via the communication unit 214 by broadcast transmission or multicast transmission, according to the setting by the transmission type setting unit 211A.
なお、制御部211は、ネットワークを介して接続状態にある、旧サーバ11あるいは新サーバ111、さらには図示しない情報処理装置(パーソナルコンピュータ等)からオンラインにより伝送種別設定が要求された場合に、要求元の機器に図9に示す設定画面を表示させるようにしても良い。制御部211は、前述と同様にして要求元の機器において設定操作がされた場合に、設定内容を受信して記憶部215に記憶させる(オンライン切り替え)。制御部211は、設定内容に応じて、伝送種別を切り替える。 When a transmission type setting is requested online from the old server 11 or new server 111, or from an information processing device (such as a personal computer) not shown, which are connected via the network, the control unit 211 may cause the requesting device to display the setting screen shown in FIG. 9. When a setting operation is performed on the requesting device in the same manner as described above, the control unit 211 receives the setting contents and stores them in the storage unit 215 (online switching). The control unit 211 switches the transmission type depending on the setting contents.
従来、コントローラ201,202を停止させて切り替えを行っていたが、ラダーソフトウェアであれば、コントローラ201,202を動作させた状態で設定変更が可能である。従って、旧監視制御システム10から新監視制御システム100の切り替え過程において、コントローラ201,202を停止させることなく監視制御を継続させることができる。 Conventionally, the controllers 201 and 202 were stopped before switching, but with ladder software, it is possible to change settings while the controllers 201 and 202 are operating. Therefore, during the process of switching from the old monitoring and control system 10 to the new monitoring and control system 100, monitoring and control can be continued without stopping the controllers 201 and 202.
図10は、図9とは異なる設定機能(伝送種別設定部211A)の例を示す図である。図10に示すように、コントローラ201,202のエンジニアリングツールなどにより、制御系A系伝送種別設定と制御系B系伝送種別設定のそれぞれについて、ブロードキャスト伝送あるいはマルチキャスト伝送をパラメータ設定できる機能(伝送種別設定部211A)を設ける。図10の例では、制御系A系、制御系B系のそれぞれについて、個別にプルダウンメニューなどで、ブロードキャスト伝送あるいはマルチキャスト伝送を選択できるようにしている。 Figure 10 is a diagram showing an example of a setting function (transmission type setting unit 211A) different from that shown in Figure 9. As shown in Figure 10, a function (transmission type setting unit 211A) is provided that allows broadcast transmission or multicast transmission to be parameter-set for each of the control system A transmission type setting and the control system B transmission type setting using an engineering tool or the like for the controllers 201 and 202. In the example of Figure 10, broadcast transmission or multicast transmission can be selected individually for each of the control systems A and B using a pull-down menu or the like.
例えば、制御部211は、入力部212による操作による伝送種別設定が指示された場合に、図10に示す設定画面を表示部213に表示させる。 For example, when a transmission type setting is instructed by operating the input unit 212, the control unit 211 causes the display unit 213 to display the setting screen shown in FIG. 10.
制御部211は、入力部212に対する入力操作によって、図10に示す制御系A系、制御系B系のそれぞれのプルダウンメニューにおいて、ブロードキャスト伝送あるいはマルチキャスト伝送を設定する。 The control unit 211 sets broadcast transmission or multicast transmission in the pull-down menus of the control system A and the control system B shown in FIG. 10 by inputting operations on the input unit 212.
コントローラ201,202の制御部211は、伝送種別設定部211Aによる設定に応じて、通信部214を介した制御系A(制御系(A系)251)と制御系B系(制御系(B系)252)のデータ送信を、ブロードキャスト伝送あるいはマルチキャスト伝送により実行させる。また、前述と同様にして、オンライン切り替えができるようにしても良い。 The control unit 211 of the controllers 201 and 202 executes data transmission between control system A (control system (A system) 251) and control system B (control system (B system) 252) via the communication unit 214 by broadcast transmission or multicast transmission according to the setting by the transmission type setting unit 211A. Also, online switching may be possible in the same manner as described above.
なお、新監視制御システム100(新監視制御装置100、新サーバ111)、コントローラ201,202は、ブロードキャスト伝送とマルチキャスト伝送に両対応している。旧監視制御システム10もバージョンアップすることにより対応が可能となっても良い。 The new monitoring and control system 100 (new monitoring and control device 100, new server 111) and controllers 201 and 202 are compatible with both broadcast and multicast transmission. The old monitoring and control system 10 may also be upgraded to become compatible.
次に、本実施形態における新旧監視制御切替システムのコントローラ201,202による、旧監視制御システム10及び新監視制御システム100の状態監視について説明する。 Next, we will explain how the controllers 201, 202 of the old and new monitoring and control switching system in this embodiment monitor the status of the old and new monitoring and control system 100.
旧監視制御システム10の旧サーバ11は、システム内の装置(旧監視制御装置1、旧サーバ11)の状態を検知して、各装置の状態情報を示す第1異常検知データをコントローラ201,202に送信する。また、新監視制御システム100の新サーバ111は、システム内の装置(新監視制御装置101、新サーバ111)の状態を検知して、各装置の状態情報を示す第2異常検知データをコントローラ201,202に送信する。 The old server 11 of the old monitoring and control system 10 detects the status of the devices in the system (old monitoring and control device 1, old server 11) and transmits first abnormality detection data indicating the status information of each device to the controllers 201, 202. In addition, the new server 111 of the new monitoring and control system 100 detects the status of the devices in the system (new monitoring and control device 101, new server 111) and transmits second abnormality detection data indicating the status information of each device to the controllers 201, 202.
コントローラ201,202は、制御部211の状態監視部211Bにより、旧監視制御システム10及び新監視制御システム100から送信される第1異常検知データあるいは第2異常検知データをもとに、システムの状態(接続している機器が正常に起動されているかの状態)を監視する。 The controllers 201 and 202 monitor the system status (whether the connected devices are started up normally) based on the first abnormality detection data or the second abnormality detection data transmitted from the old monitoring and control system 10 and the new monitoring and control system 100 using the status monitoring unit 211B of the control unit 211.
本実施形態における新旧監視制御切替システムでは、図7(B)に示す状態において、旧監視制御システム10と新監視制御システム100の並置運用が実施される。この状態において、旧監視制御システム10から第1異常検知データが受信され、新監視制御システム100から第2異常検知データが受信された場合、状態情報が混在したり、チャタリング(例えば、旧監視制御システム10の機器が異常、新監視制御システム100の機器が正常を示す異常検知データを交互に受信する)したりするなど、安定して異常監視ができない状況が発生し得る。 In the old/new monitoring and control switching system of this embodiment, the old monitoring and control system 10 and the new monitoring and control system 100 are operated side-by-side in the state shown in FIG. 7(B). In this state, if first abnormality detection data is received from the old monitoring and control system 10 and second abnormality detection data is received from the new monitoring and control system 100, a situation may occur in which stable abnormality monitoring is not possible, such as a mixture of status information or chattering (for example, abnormality detection data indicating that a device in the old monitoring and control system 10 is abnormal and that a device in the new monitoring and control system 100 is normal is alternately received).
本実施形態における新旧監視制御切替システムでは、旧監視制御システム10と新監視制御システム100のそれぞれから受信される異常検知データをもとに、新旧監視制御システムの状態情報を示す第3異常検知データを生成し、第3異常検知データをもとに異常監視をする。 In the new/old monitoring and control switching system in this embodiment, third abnormality detection data indicating status information of the old and new monitoring and control systems is generated based on the abnormality detection data received from each of the old monitoring and control system 10 and the new monitoring and control system 100, and abnormalities are monitored based on the third abnormality detection data.
以下、本実施形態における第3異常検知データの生成の具体例について説明する。 Below, a specific example of generating the third anomaly detection data in this embodiment is described.
図11(A)に示すように、旧サーバ11及び新サーバ111から送信する異常検知データのフォーマットを設定する。図11(A)に示す例では、1ワード(2byte)のデータを用意し、0ビットを未使用、1~Fビットをそれぞれステーション番号(STN1~STN15)に割り当てる。 As shown in Figure 11 (A), the format of the anomaly detection data to be sent from the old server 11 and the new server 111 is set. In the example shown in Figure 11 (A), one word (2 bytes) of data is prepared, with 0 bit unused and 1 to F bits assigned to the station numbers (STN1 to STN15), respectively.
システム内の機器に異常が発生した場合、異常が発生した機器に対応するステーション番号のビットが「1」に設定された異常検知データが生成される。コントローラ201,202は、受信された異常検知データに「0」から「1」になったステーション番号がある場合に、このステーション番号に対応する機器に異常が発生したものと判断する。 When an abnormality occurs in a device within the system, abnormality detection data is generated in which the bit of the station number corresponding to the device where the abnormality occurred is set to "1". When the received abnormality detection data includes a station number that has changed from "0" to "1", the controllers 201 and 202 determine that an abnormality has occurred in the device corresponding to this station number.
このため、一方の監視制御システムのみに異常が発生した機器がある場合、コントローラ201,202は、異常が発生した機器に対応するステーション番号のビットが「1」に設定された異常検知データと、同じステーション番号のビットが「0」に設定された異常検知データを受信する(チャタリングする)。 Therefore, if an abnormality has occurred in a device in only one of the monitoring and control systems, controllers 201 and 202 will receive abnormality detection data in which the bit of the station number corresponding to the abnormal device is set to "1" and abnormality detection data in which the bit of the same station number is set to "0" (chattering will occur).
チャタリングを防止するため、以下のようにして、第3異常検知データを生成する。 To prevent chattering, the third anomaly detection data is generated as follows:
図11(B)は、旧監視制御システム10の旧監視制御装置1、旧サーバ11など、旧監視制御システム10に接続されている機器に対するステーション番号の設定を示している。 Figure 11 (B) shows the setting of station numbers for devices connected to the old monitoring and control system 10, such as the old monitoring and control device 1 and old server 11 of the old monitoring and control system 10.
図11(B)に示す例では、旧監視制御装置1が3台あり、それぞれのステーション番号を1,2,3とし、旧サーバ11が1台あり、ステーション番号を11(B)とした例を示している。 In the example shown in FIG. 11(B), there are three old monitoring and control devices 1, with station numbers 1, 2, and 3, and one old server 11, with station number 11(B).
また、図11(C)は、新監視制御システム100の新監視制御装置101、新サーバ111など、新監視制御システム100に接続されているステーション番号の設定を示している。 Figure 11 (C) also shows the setting of station numbers connected to the new monitoring and control system 100, such as the new monitoring and control device 101 and new server 111 of the new monitoring and control system 100.
図11(C)に示す例では、新監視制御装置101が3台あり、それぞれのステーション番号が8,9,10とし、新サーバ111が1台あり、ステーション番号が12(C)とした例を示している。 In the example shown in Figure 11 (C), there are three new monitoring and control devices 101, with station numbers 8, 9, and 10, and one new server 111, with station number 12 (C).
このとき、旧監視制御システム10と新監視制御システム100のステーション番号は重複しないものとする。 At this time, the station numbers of the old monitoring and control system 10 and the new monitoring and control system 100 must not overlap.
図12(A)(B)はチャタリングする事例を記載している。図12(A)に示すように、旧監視制御装置1からの第1異常検知データにおいて、異常を示す「1」となっているステーション番号1が、新監視制御装置101からの第2異常検知データのステーション番号1では「0」となることで異常がOFFとなっている。 Figures 12 (A) and (B) show examples of chattering. As shown in Figure 12 (A), in the first abnormality detection data from the old monitoring and control device 1, station number 1 is set to "1" indicating an abnormality, but in the second abnormality detection data from the new monitoring and control device 101, station number 1 is set to "0", turning the abnormality OFF.
そこで、状態監視部211Bは、図12(A)に示す第1異常検知データは、図11(B)に示す、旧監視制御システム10の第1異常検知データに対するステーション番号の設定のデータでマスク(AND)処理を実行する。また、状態監視部211Bは、図12(B)に示す第2異常検知データは、図11(C)に示す、新監視制御システム100の第2異常検知データに対するステーション番号の設定のデータでマスク(AND)処理を実行する。 The state monitoring unit 211B therefore performs masking (AND) processing on the first abnormality detection data shown in Fig. 12(A) with the data of the station number setting for the first abnormality detection data of the old monitoring and control system 10 shown in Fig. 11(B). Also, the state monitoring unit 211B performs masking (AND) processing on the second abnormality detection data shown in Fig. 12(B) with the data of the station number setting for the second abnormality detection data of the new monitoring and control system 100 shown in Fig. 11(C).
そして、状態監視部211Bは、第1異常検知データのマスクデータと第2異常検知データのマスクデータをORすることで、図12(C)に示すように、新旧監視制御システムの第3異常検知データを作成することができる。 Then, the status monitoring unit 211B can create third abnormality detection data for the old and new monitoring and control systems by ORing the masked data of the first abnormality detection data and the masked data of the second abnormality detection data, as shown in FIG. 12(C).
状態監視部211Bは、第3異常検知データをもとに、旧監視制御システム10及び新監視制御システム100の機器の状態を監視する。従って、図7(B)に示すように、旧監視制御システム10と新監視制御システム100とが並置運用が実施される状況であっても、正しく監視制御を継続して実行することが可能である。 The status monitoring unit 211B monitors the status of the equipment of the old monitoring and control system 10 and the new monitoring and control system 100 based on the third abnormality detection data. Therefore, as shown in FIG. 7(B), even in a situation where the old monitoring and control system 10 and the new monitoring and control system 100 are operated side by side, it is possible to continue to perform monitoring and control correctly.
本実施形態において、旧監視制御システムから新監視制御システムに切り替える際に、旧監視制御システムはコントローラと制御系A系により接続され、新監視制御システムはコントローラと制御系B系により接続される場合で説明したが、この実施形態は例として提示したものである。旧監視制御システムから新監視制御システムに切り替える際に、旧監視制御システムはコントローラと制御系Bにより接続され、新監視制御システムはコントローラと制御系A系により接続されてもよい。その場合、制御系A系が第2ネットワークであり、制御系B系が第1ネットワークとなる。 In this embodiment, when switching from the old monitoring and control system to the new monitoring and control system, the old monitoring and control system is connected via the controller and control system A, and the new monitoring and control system is connected via the controller and control system B, but this embodiment is presented as an example. When switching from the old monitoring and control system to the new monitoring and control system, the old monitoring and control system may be connected via the controller and control system B, and the new monitoring and control system may be connected via the controller and control system A. In that case, control system A is the second network, and control system B is the first network.
本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれると同様に、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。 Although several embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. These embodiments and their modifications are within the scope of the invention and its equivalents as set forth in the claims, as well as the scope and gist of the invention.
また、前述した実施の形態において記載した処理は、コンピュータに実行させることのできるプログラムとして、例えば磁気ディスク(フレキシブルディスク、ハードディスク等)、光ディスク(CD-ROM、DVD等)、半導体メモリなどの記録媒体に書き込んで各種装置に提供することができる。また、通信媒体により伝送して各種装置に提供することも可能である。コンピュータは、記録媒体に記録されたプログラムを読み込み、または通信媒体を介してプログラムを受信し、このプログラムによって動作が制御されることにより、上述した処理を実行する。 The processes described in the above-mentioned embodiments can be written as a program that can be executed by a computer onto a recording medium such as a magnetic disk (flexible disk, hard disk, etc.), an optical disk (CD-ROM, DVD, etc.), or a semiconductor memory, and provided to various devices. They can also be transmitted via a communication medium and provided to various devices. The computer reads the program recorded on the recording medium, or receives the program via the communication medium, and executes the above-mentioned processes by having its operation controlled by this program.
1…旧監視制御装置、11…旧サーバ、51…旧監視制御システム制御系(A系)、52…旧監視制御システム制御系(B系)、101…新監視制御装置、111…新サーバ、151…新監視制御システム制御系(A系)、152…新監視制御システム制御系(B系)、201,202…コントローラ、121,211…制御部、121A…状態情報送信部、211A…伝送種別設定部、211B…状態監視部、122,212…入力部、123,213…表示部、124,214…通信部、125,215…記憶部、251…制御系(A系)、252…制御系(B系)。 1...old monitoring and control device, 11...old server, 51...old monitoring and control system control system (A system), 52...old monitoring and control system control system (B system), 101...new monitoring and control device, 111...new server, 151...new monitoring and control system control system (A system), 152...new monitoring and control system control system (B system), 201, 202...controller, 121, 211...control unit, 121A...status information transmission unit, 211A...transmission type setting unit, 211B...status monitoring unit, 122, 212...input unit, 123, 213...display unit, 124, 214...communication unit, 125, 215...storage unit, 251...control system (A system), 252...control system (B system).
Claims (6)
前記状態データを前記コントローラから取得し、前記設備機器の動作状態を監視する旧監視制御システムと、
前記状態データを前記コントローラから取得し、前記設備機器の動作状態を監視する新監視制御システムと、
前記コントローラと、前記旧監視制御システム及び前記新監視制御システムとを、第1ネットワーク及び第2ネットワークのそれぞれにより接続する伝送路とを有し、
前記コントローラは、
前記旧監視制御システムと、前記第1ネットワーク及び前記第2ネットワークにより接続された状態にある場合、少なくとも前記第1ネットワーク又は前記第2ネットワークを通じて、前記旧監視制御システムと通信し、
前記旧監視制御システムと前記第1ネットワークにより接続され、前記新監視制御システムと前記第2ネットワークにより接続された状態にある場合、前記第1ネットワークを通じて前記旧監視制御システムと通信し、前記第2ネットワークを通じて前記新監視制御システムと通信し、
前記新監視制御システムと、前記第1ネットワーク及び前記第2ネットワークにより接続された状態にある場合、少なくとも前記第1ネットワーク又は前記第2ネットワークを通じて、前記新監視制御システムと通信する、
新旧監視制御切替システム。 A controller that transmits status data indicating an operating status of the facility device;
an old monitoring and control system that acquires the status data from the controller and monitors the operating status of the facility equipment;
a new monitoring and control system that acquires the status data from the controller and monitors the operating status of the facility equipment;
The controller, the old monitoring and control system, and the new monitoring and control system are connected via a first network and a second network,
The controller:
When the old monitoring and control system is connected via the first network and the second network, the old monitoring and control system communicates with the old monitoring and control system via at least the first network or the second network;
When the old monitoring and control system is connected via the first network and the new monitoring and control system is connected via the second network, the old monitoring and control system communicates via the first network and the new monitoring and control system communicates via the second network;
When the new monitoring and control system is connected via the first network and the second network, the new monitoring and control system communicates with the new monitoring and control system via at least the first network or the second network.
Old and new monitoring and control switching system.
前記第1ネットワークを前記旧監視制御システムのブロードキャスト伝送、前記第2ネットワークを前記新監視制御システムのマルチキャスト伝送、または第1ネットワークを前記旧監視制御システムのマルチキャスト伝送、前記第2ネットワークを前記新監視制御システムのブロードキャスト伝送により通信する、請求項1記載の新旧監視制御切替システム。 The controller:
2. The old and new monitoring and control switching system of claim 1, wherein the first network communicates by broadcast transmission of the old monitoring and control system and the second network communicates by multicast transmission of the new monitoring and control system, or the first network communicates by multicast transmission of the old monitoring and control system and the second network communicates by broadcast transmission of the new monitoring and control system.
前記第1ネットワークと前記第2ネットワークのそれぞれについて、ブロードキャスト伝送あるいはマルチキャスト伝送の何れの伝送種別により通信するかを設定する伝送種別設定部を有する、請求項1または請求項2記載の新旧監視制御切替システム。 The controller:
3. The old and new monitoring and control switching system according to claim 1, further comprising a transmission type setting unit that sets whether the first network and the second network are to be used for communication, either broadcast transmission or multicast transmission.
前記旧監視制御システムから送信される、システム内の装置の状態を示す第1異常検知データと、前記新監視制御システムから送信される、システム内の装置の状態を示す第2異常検知データをもとに、前記旧監視制御システムと前記新監視制御システムの状態を示す第3異常検知データを生成する状態監視部を有する、請求項1~4の何れかに記載の新旧監視制御切替システム。 The controller:
The old and new monitoring and control switching system according to any one of claims 1 to 4, further comprising a status monitoring unit that generates third abnormality detection data indicating the status of the old monitoring and control system and the new monitoring and control system based on first abnormality detection data indicating the status of the devices in the system transmitted from the old monitoring and control system, and second abnormality detection data indicating the status of the devices in the system transmitted from the new monitoring and control system.
前記状態データを前記コントローラから取得し、前記設備機器の動作状態を監視する旧監視制御システムと、
前記状態データを前記コントローラから取得し、前記設備機器の動作状態を監視する新監視制御システムと、
前記コントローラと、前記旧監視制御システム及び前記新監視制御システムとを、第1ネットワーク及び第2ネットワークのそれぞれにより接続する伝送路とを有する新旧監視制御切替システムの切替方法であって、
前記コントローラは、前記旧監視制御システムと前記第1ネットワーク及び前記第2ネットワークにより接続され、少なくとも前記第1ネットワーク又は前記第2ネットワークを通じて、前記旧監視制御システムと通信するステップと、
前記コントローラは、前記旧監視制御システムと前記第1ネットワークにより接続され、前記新監視制御システムと前記第2ネットワークにより接続され、前記第1ネットワークを通じて前記旧監視制御システムと通信し、前記第2ネットワークを通じて前記新監視制御システムと通信するステップと、
前記コントローラは、前記新監視制御システムと、前記第1ネットワーク及び前記第2ネットワークにより接続され、少なくとも前記第1ネットワーク又は前記第2ネットワークを通じて、前記新監視制御システムと通信するステップとを有する、新旧監視制御切替システムの切替方法。 A controller that transmits status data indicating an operating status of the facility device;
an old monitoring and control system that acquires the status data from the controller and monitors the operating status of the facility equipment;
a new monitoring and control system that acquires the status data from the controller and monitors the operating status of the facility equipment;
A switching method for a new and old monitoring and control switching system having a transmission line connecting the controller, the old monitoring and control system, and the new monitoring and control system via a first network and a second network,
The controller is connected to the old monitoring and control system via the first network and the second network, and communicates with the old monitoring and control system through at least the first network or the second network;
The controller is connected to the old monitoring and control system via the first network and to the new monitoring and control system via the second network, and communicates with the old monitoring and control system via the first network and communicates with the new monitoring and control system via the second network;
A method for switching between new and old monitoring and control switching systems, comprising a step in which the controller is connected to the new monitoring and control system via the first network and the second network, and communicates with the new monitoring and control system through at least the first network or the second network.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021046024A JP7585111B2 (en) | 2021-03-19 | 2021-03-19 | New and old monitoring and control switching system, and method for switching between new and old monitoring and control switching systems |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021046024A JP7585111B2 (en) | 2021-03-19 | 2021-03-19 | New and old monitoring and control switching system, and method for switching between new and old monitoring and control switching systems |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2022144841A JP2022144841A (en) | 2022-10-03 |
| JP7585111B2 true JP7585111B2 (en) | 2024-11-18 |
Family
ID=83454650
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021046024A Active JP7585111B2 (en) | 2021-03-19 | 2021-03-19 | New and old monitoring and control switching system, and method for switching between new and old monitoring and control switching systems |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7585111B2 (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005339469A (en) | 2004-05-31 | 2005-12-08 | Toshiba Corp | Replacing a management computer |
| JP2018092430A (en) | 2016-12-05 | 2018-06-14 | 東芝三菱電機産業システム株式会社 | Process controller switching support system |
| JP2018156583A (en) | 2017-03-21 | 2018-10-04 | 株式会社東芝 | Changeover method and monitoring control system |
-
2021
- 2021-03-19 JP JP2021046024A patent/JP7585111B2/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005339469A (en) | 2004-05-31 | 2005-12-08 | Toshiba Corp | Replacing a management computer |
| JP2018092430A (en) | 2016-12-05 | 2018-06-14 | 東芝三菱電機産業システム株式会社 | Process controller switching support system |
| JP2018156583A (en) | 2017-03-21 | 2018-10-04 | 株式会社東芝 | Changeover method and monitoring control system |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2022144841A (en) | 2022-10-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7613108B2 (en) | Redundant supervisory control system, and redundancy switching method of the same | |
| US8132042B2 (en) | Method and device for exchanging data on the basis of the OPC communications protocol between redundant process automation components | |
| WO2015190934A1 (en) | Method and system for controlling well operations | |
| JP4642881B2 (en) | Control device, control method, processing device, and program | |
| KR101457733B1 (en) | Apparatus for Duplexing Human Machine Interface | |
| CN112667428A (en) | BMC fault processing circuit, method and device, electronic equipment and storage medium | |
| JP7503679B2 (en) | Receiver | |
| JP7585111B2 (en) | New and old monitoring and control switching system, and method for switching between new and old monitoring and control switching systems | |
| CN107976940A (en) | Possess the numerical control system and numerical control device of display handoff functionality | |
| CN102402212B (en) | For method and the network of operational network | |
| JP2008299658A (en) | Monitoring control system | |
| KR100823722B1 (en) | Triplexing apparatus and method of PLC system | |
| JP2018030541A (en) | Interlocking device | |
| JP2007272702A (en) | Disk array subsystem, and redundancy maintenance method and program | |
| JP7326239B2 (en) | Controller and controller system | |
| JP2007067540A (en) | Dual system switching device | |
| JP2000020336A (en) | Duplex communication system | |
| JP4348485B2 (en) | Process control device | |
| JP2937595B2 (en) | Power system monitoring and control device | |
| JPH11122270A (en) | Remote monitoring and control device | |
| JP2019040331A (en) | Distributed control system and node | |
| JP2007304700A (en) | System and method for address management in duplex node system | |
| KR20000021045A (en) | Method and system for performing dual operating of computer control | |
| JP2005051965A (en) | Electric power system monitoring and controlling system | |
| JPS5890202A (en) | Process controller |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| RD01 | Notification of change of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7421 Effective date: 20230105 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240213 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240913 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20241008 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20241106 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7585111 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313115 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |