JP7587940B2 - Power Supply System - Google Patents
[go: Go Back, main page]

JP7587940B2 - Power Supply System - Google Patents

Power Supply System Download PDF

Info

Publication number
JP7587940B2
JP7587940B2 JP2020143052A JP2020143052A JP7587940B2 JP 7587940 B2 JP7587940 B2 JP 7587940B2 JP 2020143052 A JP2020143052 A JP 2020143052A JP 2020143052 A JP2020143052 A JP 2020143052A JP 7587940 B2 JP7587940 B2 JP 7587940B2
Authority
JP
Japan
Prior art keywords
power
distribution line
storage battery
facility
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020143052A
Other languages
Japanese (ja)
Other versions
JP2022038505A (en
Inventor
真宏 原田
伸太郎 村上
卓也 藤本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2020143052A priority Critical patent/JP7587940B2/en
Publication of JP2022038505A publication Critical patent/JP2022038505A/en
Application granted granted Critical
Publication of JP7587940B2 publication Critical patent/JP7587940B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Secondary Cells (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Description

本発明は、負荷へ電力を供給可能な電力供給システムの技術に関する。 The present invention relates to technology for a power supply system capable of supplying power to a load.

従来、負荷へ電力を供給可能な電力供給システムの技術は公知となっている。例えば、特許文献1に記載の如くである。 Technology for power supply systems capable of supplying power to a load has been publicly known. For example, see Patent Document 1.

特許文献1には、蓄電池(第一蓄電池)及び太陽光発電部を有した複数の蓄電システムを具備し、当該第一蓄電池の放電電力や太陽光発電部の発電電力を複数の負荷(住宅)に融通可能な電力供給システムが記載されている。前記電力供給システムにおいて、複数の蓄電システムは、系統電源と複数の負荷とを接続する配電線(第一の配電線)に設けられている。 Patent Document 1 describes a power supply system that includes multiple power storage systems having a storage battery (first storage battery) and a solar power generation unit, and that can supply the discharged power of the first storage battery and the generated power of the solar power generation unit to multiple loads (houses). In the power supply system, the multiple power storage systems are provided on a distribution line (first distribution line) that connects a system power source and the multiple loads.

しかしながら、前記電力供給システムにおいて、複数の蓄電システムから第一の配電線に出力された電力は、複数の蓄電システムを基準として系統電源と反対側(下流側)に設けられた複数の負荷へと供給することができるものの、例えば第一の配電線の中途部から別の配電線(第二の配電線)を介して接続された別の負荷や、当該別の負荷と共に前記第二の配電線に設けられた蓄電池(第二蓄電池)に供給することは想定されていない。そのため、蓄電システムから第一の配電線に出力された電力に応じて、第二の配電線に設けられた第二蓄電池を有効に活用することができる技術が望まれている。 However, in the power supply system, although the power output from the multiple storage systems to the first distribution line can be supplied to multiple loads provided on the opposite side (downstream side) of the grid power source based on the multiple storage systems, it is not envisaged that the power will be supplied to, for example, another load connected from the middle of the first distribution line via another distribution line (second distribution line), or to a storage battery (second storage battery) provided on the second distribution line together with the other load. Therefore, there is a demand for technology that can effectively utilize the second storage battery provided on the second distribution line in accordance with the power output from the storage systems to the first distribution line.

特開2019-165561号公報JP 2019-165561 A

本発明は、以上の如き状況を鑑みてなされたものであり、その解決しようとする課題は、第一の配電線の電力の流通態様に応じて、第二の配電線に設けられた第二蓄電池を有効に活用することができる電力供給システムを提供するものである。 The present invention was made in consideration of the above-mentioned circumstances, and the problem it aims to solve is to provide a power supply system that can effectively utilize a second storage battery installed on a second distribution line according to the power flow state of the first distribution line.

本発明の解決しようとする課題は以上の如くであり、次にこの課題を解決するための手段を説明する。 The problem that the present invention aims to solve is as described above, and the means for solving this problem will be explained next.

即ち、請求項1においては、系統電源と第一電力負荷とを接続する第一の配電線と、前記第一の配電線の中途部と第二電力負荷とを接続する第二の配電線と、前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第一の配電線に出力可能な第一発電部と、前記第一の配電線の前記中途部よりも系統電源側に設けられ、電力を検出可能な第一電力センサと、前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、前記第一発電部の発電電力を充放電可能であり、前記第一電力センサの検出結果に基づいた電力を前記第一の配電線に出力可能な第一蓄電池と、前記第二の配電線の前記第二電力負荷よりも前記中途部側に設けられ、電力を充放電可能である第二蓄電池と、少なくとも前記第一の配電線の電力の流通態様に応じて前記第二蓄電池を制御する制御部と、を具備し、前記制御部は、前記第一の配電線を上流側に流れる電力があって、前記第一蓄電池が放電していない場合、前記第一の配電線を上流側に流れる電力に基づいて、前記第二蓄電池に充電指示を行うものである。 That is, in claim 1, the present invention provides a power supply system including a first distribution line connecting a system power source and a first power load, a second distribution line connecting a middle portion of the first distribution line and a second power load, a first power generating unit provided between the middle portion of the first distribution line and the first power load, capable of generating power using natural energy and outputting the generated power to the first distribution line, a first power sensor provided closer to the system power source than the middle portion of the first distribution line and capable of detecting power, and a second power sensor provided between the middle portion of the first distribution line and the first power load, for charging and discharging the generated power of the first power generating unit. the first storage battery capable of being charged with electricity and outputting power based on the detection result of the first power sensor to the first distribution line; a second storage battery provided on the second distribution line toward the midway side of the second power load and capable of charging and discharging power; and a control unit that controls the second storage battery according to at least the flow state of power on the first distribution line, wherein when there is power flowing upstream on the first distribution line and the first storage battery is not discharging, the control unit issues a charge instruction to the second storage battery based on the power flowing upstream on the first distribution line .

請求項2においては、系統電源と第一電力負荷とを接続する第一の配電線と、前記第一の配電線の中途部と第二電力負荷とを接続する第二の配電線と、前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第一の配電線に出力可能な第一発電部と、前記第一の配電線の前記中途部よりも系統電源側に設けられ、電力を検出可能な第一電力センサと、前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、前記第一発電部の発電電力を充放電可能であり、前記第一電力センサの検出結果に基づいた電力を前記第一の配電線に出力可能な第一蓄電池と、前記第二の配電線の前記第二電力負荷よりも前記中途部側に設けられ、電力を充放電可能である第二蓄電池と、少なくとも前記第一の配電線の電力の流通態様に応じて前記第二蓄電池を制御する制御部と、を具備し、前記制御部は、前記第一の配電線を上流側に流れる電力があって、前記第一蓄電池が放電している場合、前記第二蓄電池に充電の停止指示を行うものである。 In claim 2, the present invention relates to a power generation system including a first distribution line connecting a system power source and a first power load, a second distribution line connecting a midway portion of the first distribution line and a second power load, a first power generation unit provided between the midway portion of the first distribution line and the first power load, capable of generating power using natural energy and outputting the generated power to the first distribution line, a first power sensor provided closer to the system power source than the midway portion of the first distribution line and capable of detecting power, and a second power sensor provided between the midway portion of the first distribution line and the first power load, the first power generation unit being configured to generate power by using natural energy and outputting the generated power to the first distribution line. the first storage battery capable of charging and discharging the generated power of a power load unit and outputting power to the first distribution line based on the detection result of the first power sensor; a second storage battery provided on the second distribution line closer to the midway point than the second power load and capable of charging and discharging power; and a control unit that controls the second storage battery according to at least the flow state of power on the first distribution line, wherein the control unit instructs the second storage battery to stop charging when power is flowing upstream on the first distribution line and the first storage battery is discharging .

請求項3においては、系統電源と第一電力負荷とを接続する第一の配電線と、前記第一の配電線の中途部と第二電力負荷とを接続する第二の配電線と、前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第一の配電線に出力可能な第一発電部と、前記第一の配電線の前記中途部よりも系統電源側に設けられ、電力を検出可能な第一電力センサと、前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、前記第一発電部の発電電力を充放電可能であり、前記第一電力センサの検出結果に基づいた電力を前記第一の配電線に出力可能な第一蓄電池と、前記第二の配電線の前記第二電力負荷よりも前記中途部側に設けられ、電力を充放電可能である第二蓄電池と、少なくとも前記第一の配電線の電力の流通態様に応じて前記第二蓄電池を制御する制御部と、前記第二の配電線の前記第二電力負荷よりも前記中途部側に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第二の配電線に出力可能な第二発電部と、を具備し、前記第二蓄電池は、前記第二発電部の発電電力を充放電可能であり、前記制御部は、前記第一の配電線及び前記第二の配電線を上流側に流れる電力があって、前記第一蓄電池が放電していない場合、前記第一の配電線及び前記第二の配電線を上流側に流れる電力に基づいて、前記第二蓄電池に充電指示を行うものである。 In claim 3, the present invention relates to a power supply system including a first distribution line connecting a system power source and a first power load, a second distribution line connecting a midway portion of the first distribution line and a second power load, a first power generation unit provided between the midway portion of the first distribution line and the first power load, capable of generating power using natural energy and outputting the generated power to the first distribution line, a first power sensor provided closer to the system power source than the midway portion of the first distribution line and capable of detecting power, a first storage battery provided between the midway portion of the first distribution line and the first power load, capable of charging and discharging the power generated by the first power generation unit and capable of outputting power based on a detection result of the first power sensor to the first distribution line, and a second power sensor provided between the midway portion of the first distribution line and the first power load, capable of charging and discharging the power generated by the first power generation unit and capable of outputting power based on a detection result of the first power sensor to the first distribution line, and The system comprises a second storage battery that is located on the midway side of the load and is capable of charging and discharging electric power; a control unit that controls the second storage battery according to at least the flow state of electric power on the first distribution line; and a second power generation unit that is located on the midway side of the second power load on the second distribution line and is capable of generating electric power using natural energy and outputting the generated electric power to the second distribution line, wherein the second storage battery is capable of charging and discharging the electric power generated by the second power generation unit, and the control unit issues a charging instruction to the second storage battery based on the electric power flowing upstream through the first distribution line and the second distribution line when there is electric power flowing upstream through the first distribution line and the second distribution line and the first storage battery is not discharging .

請求項4においては、系統電源と第一電力負荷とを接続する第一の配電線と、前記第一の配電線の中途部と第二電力負荷とを接続する第二の配電線と、前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第一の配電線に出力可能な第一発電部と、前記第一の配電線の前記中途部よりも系統電源側に設けられ、電力を検出可能な第一電力センサと、前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、前記第一発電部の発電電力を充放電可能であり、前記第一電力センサの検出結果に基づいた電力を前記第一の配電線に出力可能な第一蓄電池と、前記第二の配電線の前記第二電力負荷よりも前記中途部側に設けられ、電力を充放電可能である第二蓄電池と、少なくとも前記第一の配電線の電力の流通態様に応じて前記第二蓄電池を制御する制御部と、前記第二の配電線の前記第二電力負荷よりも前記中途部側に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第二の配電線に出力可能な第二発電部と、を具備し、前記第二蓄電池は、前記第二発電部の発電電力を充放電可能であり、前記制御部は、前記第一の配電線を上流側に流れる電力がなく、前記第二の配電線を前記中途部側に流れる電力がある場合、前記第二の配電線を上流側に流れる電力に基づいて、前記第二蓄電池に充電指示を行うものである。 In claim 4, the present invention relates to a power supply system including a first distribution line connecting a system power source and a first power load, a second distribution line connecting a midway portion of the first distribution line and a second power load, a first power generation unit provided between the midway portion of the first distribution line and the first power load, capable of generating power using natural energy and outputting the generated power to the first distribution line, a first power sensor provided closer to the system power source than the midway portion of the first distribution line and capable of detecting power, a first storage battery provided between the midway portion of the first distribution line and the first power load, capable of charging and discharging the power generated by the first power generation unit and capable of outputting power based on a detection result of the first power sensor to the first distribution line, and a storage battery provided between the midway portion of the first distribution line and the first power load, capable of charging and discharging the power generated by the first power generation unit and capable of outputting power to the first distribution line based on a detection result of the first power sensor. The system comprises a second storage battery that is located on the midway side of the second power load and is capable of charging and discharging power; a control unit that controls the second storage battery according to at least the power flow state of the first distribution line; and a second power generation unit that is located on the midway side of the second power load of the second distribution line and is capable of generating power using natural energy and outputting the generated power to the second distribution line, wherein the second storage battery is capable of charging and discharging the power generated by the second power generation unit, and the control unit issues a charging instruction to the second storage battery based on the power flowing upstream of the second distribution line when there is no power flowing upstream of the first distribution line and there is power flowing upstream of the second distribution line .

請求項5においては、前記制御部は、系統電源からの電力が前記第一の配電線を前記第一電力負荷側に流れている場合、前記第二蓄電池に放電指示を行うものである。 In a fifth aspect of the present invention, the control unit issues a discharge instruction to the second storage battery when power from a system power supply is flowing through the first distribution line to the first power load side .

本発明の効果として、以下に示すような効果を奏する。 The effects of the present invention are as follows:

本発明においては、第一の配電線の電力の流通態様に応じて、第二の配電線に設けられた第二蓄電池を有効に活用することができる。 In the present invention, the second storage battery installed on the second distribution line can be effectively utilized according to the power flow state of the first distribution line.

本発明の一実施形態に係る電力供給システムの構成を示したブロック図。1 is a block diagram showing a configuration of a power supply system according to an embodiment of the present invention; 制御部の接続関係を示した図。FIG. 4 is a diagram showing the connection relationship of a control unit. 第一蓄電システム動作制御を示したフローチャート。4 is a flowchart showing a first power storage system operation control. 第二蓄電システム動作制御を示したフローチャート。5 is a flowchart showing second power storage system operation control. 第一蓄電システム動作制御を実行する場合の電力の流通態様の一例を示した図。FIG. 4 is a diagram showing an example of a power distribution mode when a first power storage system operation control is executed. 図5の続きを示した図。FIG. 6 is a continuation of FIG. 5 . 第二蓄電システム動作制御を実行する場合の電力の流通態様の第一の例を示した図。FIG. 4 is a diagram showing a first example of a power distribution mode when a second power storage system operation control is executed. 図7の続きを示した図。FIG. 8 is a continuation of FIG. 7 . 第二蓄電システム動作制御を実行する場合の電力の流通態様の第二の例を示した図。FIG. 11 is a diagram showing a second example of a power distribution mode when a second power storage system operation control is executed. 図9の続きを示した図。FIG. 10 is a continuation of FIG. 9 . 第二蓄電システム動作制御を実行する場合の電力の流通態様の第三の例を示した図。FIG. 11 is a diagram showing a third example of a power distribution mode when the second power storage system operation control is executed. 図11の続きを示した図。FIG. 12 is a continuation of FIG. 11 . 第二蓄電システム動作制御を実行する場合の電力の流通態様の第四の例を示した図。FIG. 11 is a diagram showing a fourth example of a power distribution mode when the second power storage system operation control is executed. 図13の続きを示した図。FIG. 14 is a continuation of FIG. 13 . 第二蓄電システム動作制御を実行する場合の電力の流通態様の第五の例を示した図。FIG. 11 is a diagram showing a fifth example of a power distribution mode when the second power storage system operation control is executed. 図15の続きを示した図。FIG. 16 is a continuation of FIG. 15 .

以下では、本発明の一実施形態に係る電力供給システム1について説明する。 The following describes a power supply system 1 according to one embodiment of the present invention.

図1に示す電力供給システム1は、所定の事業者(アグリゲータ)によりエネルギー管理が行われる所定の地域(以下では「一括受電エリアA」と称する)に適用される。アグリゲータは、高圧一括受電を行って、受けた電力を一括受電エリアAにおける種々の需要家に供給することで、一括したエネルギー管理を行っている。なお、一括受電エリアAには、前記需要家の一例として、商業施設S及び住宅街区A1が設けられる。 The power supply system 1 shown in FIG. 1 is applied to a specified area (hereinafter referred to as "bulk receiving area A") where energy management is performed by a specified business operator (aggregator). The aggregator performs bulk receiving of high-voltage power and supplies the received power to various consumers in the bulk receiving area A, thereby performing bulk energy management. In the bulk receiving area A, a commercial facility S and a residential block A1 are provided as examples of such consumers.

商業施設Sは、商業を目的とした施設である。商業施設Sには、例えばスーパーマーケットやドラッグストア等がテナントとして入居している。商業施設Sには、後述するように各種の電気機器が設けられる。商業施設Sでは、使用する電力がアグリゲータから売却される。また、商業施設Sで余剰した電力をアグリゲータへ売却することもできる。 The commercial facility S is a facility for commercial purposes. Tenants in the commercial facility S include, for example, supermarkets and drugstores. As described below, the commercial facility S is equipped with various electrical devices. The electricity used by the commercial facility S is sold by an aggregator. In addition, surplus electricity in the commercial facility S can also be sold to the aggregator.

住宅街区A1は、エネルギー(例えば電力や熱)を互いに融通可能な複数の住宅Hの集合体である。住宅街区A1には、後述するように各種の電気機器が設けられる。住宅街区A1では、使用する電力がアグリゲータから各住宅Hへ売却される。また、住宅街区A1で余剰した電力をアグリゲータへ売却することもできる。なお、本実施形態においては、住宅街区A1に4つの住宅Hが設けられるものとする。また以下では、4つの住宅Hをそれぞれ、第一住宅H1、第二住宅H2、第三住宅H3及び第四住宅H4と称する場合がある。 The residential block A1 is a collection of multiple houses H that can share energy (e.g., electricity and heat) with each other. Various electrical appliances are provided in the residential block A1, as described below. In the residential block A1, the electricity used is sold from an aggregator to each house H. Also, surplus electricity in the residential block A1 can be sold to the aggregator. In this embodiment, it is assumed that four houses H are provided in the residential block A1. In the following, the four houses H may be referred to as the first house H1, the second house H2, the third house H3, and the fourth house H4, respectively.

図1及び図2に示すように、電力供給システム1は、商業施設Sの電気機器(施設側分電盤10及び施設側蓄電システム20)、引込分電盤30、住宅街区A1の電気機器(住宅側分電盤40及び住宅側蓄電システム50)、複数の電力メータ及び制御部70等を具備する。なお以下の説明において「上流側」及び「下流側」とは、系統電源Kからの電力の供給方向を基準とする。 As shown in Figures 1 and 2, the power supply system 1 includes electrical equipment in the commercial facility S (facility-side distribution board 10 and facility-side energy storage system 20), an inlet distribution board 30, electrical equipment in the residential block A1 (residential-side distribution board 40 and residential-side energy storage system 50), multiple power meters, a control unit 70, and the like. In the following description, "upstream side" and "downstream side" refer to the direction of power supply from the system power source K.

商業施設Sの電気機器には、施設側分電盤10及び施設側蓄電システム20が含まれる。 The electrical equipment of the commercial facility S includes a facility-side distribution board 10 and a facility-side power storage system 20.

施設側分電盤10は、所定の供給元から供給されてくる電力を、商業施設Sに入居しているテナントに分配するものである。施設側分電盤10には、前記テナント(すなわち、商業施設S)で消費される電力負荷が接続される(不図示)。なお以下では便宜上、施設側分電盤10を、商業施設Sの電力負荷と称する場合もある。施設側分電盤10は、第一配電線L1及び第二配電線L2を介して系統電源Kに接続される。第一配電線L1は、上流側端部が系統電源Kに接続されると共に、下流側端部が後述する第二接続点P2に接続される。また、第二配電線L2は、上流側端部が第二接続点P2に接続されると共に、下流側端部が施設側分電盤10(電力負荷)に接続される。 The facility-side distribution board 10 distributes power supplied from a specified supply source to tenants in the commercial facility S. The facility-side distribution board 10 is connected to a power load consumed by the tenant (i.e., the commercial facility S) (not shown). For convenience, the facility-side distribution board 10 may be referred to as the power load of the commercial facility S below. The facility-side distribution board 10 is connected to a system power source K via a first distribution line L1 and a second distribution line L2. The upstream end of the first distribution line L1 is connected to the system power source K, and the downstream end is connected to a second connection point P2, which will be described later. The upstream end of the second distribution line L2 is connected to the second connection point P2, and the downstream end is connected to the facility-side distribution board 10 (power load).

なお、本実施形態において、商業施設Sの電力負荷は、例えば後述する住宅街区A1の電力負荷と比較して非常に大きい。また、商業施設Sの電力負荷は、後述する施設側蓄電システム20が出力可能な電力(施設側蓄電池22の最大放電電力や施設側発電部21の最大出力電力)と比較しても非常に大きい。具体的には、例えば商業施設Sが営業中であれば、施設側蓄電池22が最大放電電力で放電すると共に施設側発電部21が最大出力電力で発電した場合であっても、当該電力負荷を賄えない程度に大きい。 In this embodiment, the power load of the commercial facility S is much larger than, for example, the power load of the residential block A1 described below. The power load of the commercial facility S is also much larger than the power that can be output by the facility-side power storage system 20 described below (the maximum discharge power of the facility-side storage battery 22 and the maximum output power of the facility-side power generation unit 21). Specifically, for example, when the commercial facility S is open for business, even if the facility-side storage battery 22 discharges at its maximum discharge power and the facility-side power generation unit 21 generates at its maximum output power, the power load is so large that it cannot be covered.

施設側蓄電システム20は、太陽光を利用して発電可能であると共に、電力を充放電可能なものである。施設側蓄電システム20は、第二配電線L2の中途部に接続される。具体的には、施設側蓄電システム20は、第二配電線L2において施設側分電盤10の上流側に接続される。施設側蓄電システム20は、施設側発電部21、施設側蓄電池22、施設側センサ23及び施設側パワコン24を具備する。 The facility-side power storage system 20 is capable of generating power using solar light and charging and discharging power. The facility-side power storage system 20 is connected to a midway point of the second distribution line L2. Specifically, the facility-side power storage system 20 is connected to the upstream side of the facility-side distribution board 10 on the second distribution line L2. The facility-side power storage system 20 includes a facility-side power generation unit 21, a facility-side storage battery 22, a facility-side sensor 23, and a facility-side power conditioner 24.

施設側発電部21は、太陽光を利用して発電する装置である。施設側発電部21は、太陽電池パネル等により構成される。施設側発電部21は、例えば商業施設Sの屋上等の日当たりの良い場所に設置される。 The facility-side power generation unit 21 is a device that generates electricity using sunlight. The facility-side power generation unit 21 is composed of a solar panel or the like. The facility-side power generation unit 21 is installed in a sunny location, such as the rooftop of the commercial facility S.

施設側蓄電池22は、電力を充放電可能に構成されるものである。施設側蓄電池22は、例えばリチウムイオン電池等により構成される。なお、本実施形態において、施設側蓄電池22の最大放電電力は2000Wである。また、施設側蓄電池22の最大充電電力は2000Wである。施設側蓄電池22は、後述する施設側センサ23の検出結果に基づいて充放電電力の大きさを調整する負荷追従運転を行うことができる。施設側蓄電池22は、予め設定された複数の運転モードのうち一の運転モードを実行することにより充放電等の所定の動作を行う。複数の運転モードには、放電モード、充電モード、待機モード及び充放電モードが含まれる。なお、これらのモードについての詳細な説明は後述する。 The facility-side storage battery 22 is configured to be able to charge and discharge power. The facility-side storage battery 22 is configured, for example, by a lithium-ion battery. In this embodiment, the maximum discharge power of the facility-side storage battery 22 is 2000 W. The maximum charge power of the facility-side storage battery 22 is 2000 W. The facility-side storage battery 22 can perform load-following operation to adjust the magnitude of charge and discharge power based on the detection results of the facility-side sensor 23 described below. The facility-side storage battery 22 performs a predetermined operation such as charging and discharging by executing one of multiple operating modes set in advance. The multiple operating modes include a discharge mode, a charge mode, a standby mode, and a charge and discharge mode. A detailed explanation of these modes will be given later.

施設側センサ23は、設置された箇所を流れる電力を検出するものである。施設側センサ23は、第一配電線L1の中途部に設けられる。具体的には、施設側センサ23は、第一配電線L1において、系統電源Kと後述する第二接続点P2との間に設置される。施設側センサ23は、後述する施設側パワコン24と接続される。 The facility-side sensor 23 detects the power flowing through the location where it is installed. The facility-side sensor 23 is provided in the middle of the first distribution line L1. Specifically, the facility-side sensor 23 is installed on the first distribution line L1 between the system power source K and a second connection point P2, which will be described later. The facility-side sensor 23 is connected to the facility-side power conditioner 24, which will be described later.

施設側パワコン24は、電力を適宜変換可能なハイブリッドパワーコンディショナである。施設側パワコン24は、施設側発電部21と施設側蓄電池22との間に設けられ、当該施設側発電部21と施設側蓄電池22とに接続される。施設側パワコン24は、施設側発電部21や施設側蓄電池22の直流電力を交流電力に変換することができる。施設側パワコン24は、第二配電線L2において施設側分電盤10の上流側に接続される。こうして施設側パワコン24により、施設側蓄電システム20が第二配電線L2に接続される。なお以下では、第二配電線L2における施設側パワコン24(施設側蓄電システム20)との接続点を「第一接続点P1」と称する。 The facility-side power conditioner 24 is a hybrid power conditioner capable of converting power appropriately. The facility-side power conditioner 24 is provided between the facility-side power generation unit 21 and the facility-side storage battery 22, and is connected to the facility-side power generation unit 21 and the facility-side storage battery 22. The facility-side power conditioner 24 can convert the DC power of the facility-side power generation unit 21 and the facility-side storage battery 22 into AC power. The facility-side power conditioner 24 is connected to the upstream side of the facility-side distribution board 10 on the second distribution line L2. In this way, the facility-side power conditioner 24 connects the facility-side storage system 20 to the second distribution line L2. In the following, the connection point of the second distribution line L2 with the facility-side power conditioner 24 (facility-side storage system 20) is referred to as the "first connection point P1".

こうして、施設側パワコン24は、施設側発電部21の発電電力を第二配電線L2へ出力することができる。また、施設側パワコン24は、施設側発電部21の発電電力や第二配電線L2を流れる電力を施設側蓄電池22に充電することができる。また、施設側パワコン24は、施設側蓄電池22の放電電力を第二配電線L2へ出力することができる。また、施設側パワコン24は、施設側蓄電池22の動作を制御することができる。 In this way, the facility-side power conditioner 24 can output the power generated by the facility-side power generation unit 21 to the second distribution line L2. The facility-side power conditioner 24 can also charge the facility-side storage battery 22 with the power generated by the facility-side power generation unit 21 and the power flowing through the second distribution line L2. The facility-side power conditioner 24 can also output the discharged power of the facility-side storage battery 22 to the second distribution line L2. The facility-side power conditioner 24 can also control the operation of the facility-side storage battery 22.

また、施設側パワコン24は、施設側発電部21と信号を送受信可能に構成され、当該信号に基づいて施設側発電部21の発電電力等に関する情報を取得することできる。また、施設側パワコン24は、施設側蓄電池22と信号を送受信可能に構成され、当該信号に基づいて施設側蓄電池22の残量や実行中の運転モード等に関する情報を取得することできる。また、施設側パワコン24は、施設側センサ23の信号を受信可能に構成され、当該施設側センサ23の検出結果に関する情報を取得することができる。 The facility-side power conditioner 24 is also configured to be able to send and receive signals to and from the facility-side power generation unit 21, and can obtain information about the power generated by the facility-side power generation unit 21 based on the signals. The facility-side power conditioner 24 is also configured to be able to send and receive signals to and from the facility-side storage battery 22, and can obtain information about the remaining charge of the facility-side storage battery 22 and the currently running operating mode based on the signals. The facility-side power conditioner 24 is also configured to be able to receive signals from the facility-side sensor 23, and can obtain information about the detection results of the facility-side sensor 23.

このように、商業施設Sにおいては、当該商業施設Sの電力負荷に対して、施設側蓄電システム20の施設側発電部21の発電電力や施設側蓄電池22の放電電力を供給することができる。しかしながら、上述の如く本実施形態においては、商業施設Sは、電力負荷が非常に大きいため、施設側発電部21の発電電力や施設側蓄電池22の放電電力だけでは基本的に(例えば夜間を含む商業施設Sが営業していない場合等の例外を除いて)必要な電力が不足する。そのため、商業施設Sは、多くの場合、系統電源Kから比較的大きい電力を購入している。 In this way, in the commercial facility S, the power generated by the facility-side power generation unit 21 of the facility-side power storage system 20 and the discharged power of the facility-side storage battery 22 can be supplied to the power load of the commercial facility S. However, as described above, in this embodiment, since the power load of the commercial facility S is very large, the power generated by the facility-side power generation unit 21 and the discharged power of the facility-side storage battery 22 are basically insufficient to meet the required power (except for exceptions such as when the commercial facility S is not open, including at night). For this reason, the commercial facility S often purchases a relatively large amount of power from the system power source K.

引込分電盤30は、所定の供給元から供給されてくる電力を適宜分配するものである。引込分電盤30は、第三配電線L3の中途部に設けられる。なお、第三配電線L3の上流側端部は、第一配電線L1と第二配電線L2との接続点(以下では「第二接続点P2」と称する)に接続される。また、第三配電線L3の下流側端部は、4つに分岐すると共に、分岐したそれぞれが4つの住宅Hの後述する住宅側分電盤40に接続される。 The incoming distribution board 30 distributes the power supplied from a specified source as appropriate. The incoming distribution board 30 is provided in the middle of the third distribution line L3. The upstream end of the third distribution line L3 is connected to the connection point between the first distribution line L1 and the second distribution line L2 (hereinafter referred to as the "second connection point P2"). The downstream end of the third distribution line L3 branches into four, and each of the branches is connected to a later-described house-side distribution board 40 of the four houses H.

住宅街区A1の電気機器には、各住宅Hの電気機器が含まれる。また、各住宅Hの電気機器には、住宅側分電盤40及び住宅側蓄電システム50が含まれる。 The electrical equipment in residential block A1 includes the electrical equipment in each home H. The electrical equipment in each home H also includes a home distribution board 40 and a home energy storage system 50.

なお、各住宅Hの住宅側分電盤40及び住宅側蓄電システム50の構成は、これらの配置を除いて互いに同一である。そこで以下では、特に断りが無ければ4つの住宅Hのうち第一住宅H1を例にあげて、当該第一住宅H1の住宅側分電盤40及び住宅側蓄電システム50について説明するものとする。 The configurations of the home distribution board 40 and home energy storage system 50 of each home H are identical to each other, except for their arrangement. Therefore, unless otherwise specified, the following will use the first home H1 of the four homes H as an example and explain the home distribution board 40 and home energy storage system 50 of the first home H1.

住宅側分電盤40は、所定の供給元から供給されてくる電力を、当該住宅側分電盤40に接続された第一住宅H1の電化製品(不図示)に分配するものである。なお以下では、住宅側分電盤40を、第一住宅H1の電力負荷と称する場合もある。なお、第一住宅H1の電力負荷は、商業施設Sの電力負荷と比較して非常に小さい。例えば多くの場合、全ての住宅Hの電力負荷の合計であっても、商業施設Sの電力負荷よりも小さい。住宅側分電盤40は、第三配電線L3の分岐した下流側端部に接続される。こうして、住宅側分電盤40は、第三配電線L3において引込分電盤30よりも下流側に設けられる。 The residential distribution board 40 distributes power supplied from a specified source to the electrical appliances (not shown) of the first residence H1 connected to the residential distribution board 40. In the following, the residential distribution board 40 may also be referred to as the power load of the first residence H1. The power load of the first residence H1 is very small compared to the power load of the commercial facility S. For example, in many cases, the total power load of all the residences H is smaller than the power load of the commercial facility S. The residential distribution board 40 is connected to the downstream end of the branched third distribution line L3. Thus, the residential distribution board 40 is provided downstream of the incoming distribution board 30 on the third distribution line L3.

住宅側蓄電システム50は、太陽光を利用して発電可能であると共に、電力を充放電可能なものである。住宅側蓄電システム50は、引込分電盤30に接続される。すなわち、住宅側分電盤40は、引込分電盤30を介して第三配電線L3に接続される。住宅側蓄電システム50は、住宅側発電部51、住宅側蓄電池52、住宅側センサ53及び住宅側パワコン54を具備する。 The home side power storage system 50 is capable of generating electricity using solar power and charging and discharging electricity. The home side power storage system 50 is connected to the inlet distribution board 30. That is, the home side distribution board 40 is connected to the third distribution line L3 via the inlet distribution board 30. The home side power storage system 50 includes a home side power generation unit 51, a home side storage battery 52, a home side sensor 53, and a home side power conditioner 54.

住宅側発電部51は、太陽光を利用して発電する装置である。住宅側発電部51は、太陽電池パネル等により構成される。住宅側発電部51は、例えば第一住宅H1の屋根等の日当たりの良い場所に設置される。なお、本実施形態において、住宅側発電部51の最大出力電力は5500Wである。 The home-side power generating unit 51 is a device that generates power using sunlight. The home-side power generating unit 51 is composed of a solar panel or the like. The home-side power generating unit 51 is installed in a sunny location, such as the roof of the first house H1. In this embodiment, the maximum output power of the home-side power generating unit 51 is 5,500 W.

住宅側蓄電池52は、電力を充放電可能に構成されるものである。住宅側蓄電池52は、例えばリチウムイオン電池等により構成される。なお、本実施形態において、住宅側蓄電池52の最大放電電力は2000Wである。また、住宅側蓄電池52の最大充電電力は2000Wである。住宅側蓄電池52は、後述する住宅側センサ53の検出結果に基づいて充放電電力の大きさを調整する負荷追従運転を行うことができる。住宅側蓄電池52は、予め設定された複数の運転モードのうち一の運転モードを実行することにより充放電等の所定の動作を行う。複数の運転モードには、商業施設Sの施設側蓄電池22と同様の放電モード等が含まれる。 The residential storage battery 52 is configured to be able to charge and discharge power. The residential storage battery 52 is configured, for example, with a lithium ion battery. In this embodiment, the maximum discharge power of the residential storage battery 52 is 2000 W. The residential storage battery 52 can perform load following operation to adjust the magnitude of charge and discharge power based on the detection results of the residential sensor 53 described below. The residential storage battery 52 performs a predetermined operation such as charging and discharging by executing one of multiple preset operation modes. The multiple operation modes include a discharge mode similar to that of the facility storage battery 22 of the commercial facility S.

住宅側センサ53は、設置された箇所を流れる電力を検出するものである。住宅側センサ53は、第一配電線L1の中途部に設けられる。具体的には、住宅側センサ53は、第一配電線L1において、施設側センサ23よりも上流側に設置される。住宅側センサ53は、後述する住宅側パワコン54と接続される。 The home sensor 53 detects the power flowing through the location where it is installed. The home sensor 53 is provided in the middle of the first distribution line L1. Specifically, the home sensor 53 is provided on the first distribution line L1, upstream of the facility sensor 23. The home sensor 53 is connected to the home power conditioner 54, which will be described later.

なお、4つの住宅Hの住宅側センサ53は、第一配電線L1に上流側から下流側へと順番に並ぶように設置される。本実施形態においては、4つの住宅側センサ53のうち、上流側から見て一番目(最も上流側)に第一住宅H1の住宅側センサ53が設置され、二番目に第二住宅H2の住宅側センサ53が設置され、三番目に第三住宅H3の住宅側センサ53が設置され、四番目(最も下流側)に第四住宅H4の住宅側センサ53が設置される。 The house side sensors 53 of the four houses H are installed on the first distribution line L1 in order from the upstream side to the downstream side. In this embodiment, of the four house side sensors 53, the house side sensor 53 of the first house H1 is installed first (furthest upstream) when viewed from the upstream side, the house side sensor 53 of the second house H2 is installed second, the house side sensor 53 of the third house H3 is installed third, and the house side sensor 53 of the fourth house H4 is installed fourth (furthest downstream).

住宅側パワコン54は、電力を適宜変換可能なハイブリッドパワーコンディショナである。住宅側パワコン54は、住宅側発電部51と住宅側蓄電池52との間に設けられ、当該住宅側発電部51と住宅側蓄電池52とに接続される。住宅側パワコン54は、住宅側発電部51や住宅側蓄電池52の直流電力を交流電力に変換することができる。また、住宅側パワコン54は、引込分電盤30に接続される。こうして住宅側パワコン54により、住宅側蓄電システム50が引込分電盤30に接続される。 The residential power conditioner 54 is a hybrid power conditioner capable of converting power as appropriate. The residential power conditioner 54 is provided between the residential power generation unit 51 and the residential storage battery 52, and is connected to the residential power generation unit 51 and the residential storage battery 52. The residential power conditioner 54 can convert the DC power of the residential power generation unit 51 and the residential storage battery 52 into AC power. The residential power conditioner 54 is also connected to the inlet distribution board 30. In this way, the residential power conditioner 54 connects the residential energy storage system 50 to the inlet distribution board 30.

なお、4つの住宅Hの住宅側パワコン54は、引込分電盤30に上流側から下流側へと順番に並ぶように接続される。本実施形態においては、上流側から下流側へと順番に、第一住宅H1の住宅側パワコン54、第二住宅H2の住宅側パワコン54、第三住宅H3の住宅側パワコン54、第四住宅H4の住宅側パワコン54が並ぶように接続される。すなわち、4つの住宅側蓄電システム50においても、前記4つの住宅側パワコン54を介して、上流側から見て一番目(最も上流側)に第一住宅H1の住宅側蓄電システム50が引込分電盤30に接続され、二番目に第二住宅H2の住宅側蓄電システム50が接続され、三番目に第三住宅H3の住宅側蓄電システム50が接続され、四番目(最も下流側)に第四住宅H4の住宅側蓄電システム50が接続される。 The home-side inverters 54 of the four homes H are connected to the inlet distribution board 30 in order from the upstream side to the downstream side. In this embodiment, the home-side inverters 54 of the first home H1, the second home H2, the third home H3, and the fourth home H4 are connected in order from the upstream side to the downstream side. That is, in the four home-side storage systems 50, the home-side storage system 50 of the first home H1 is connected to the inlet distribution board 30 first (most upstream) from the upstream side through the four home-side inverters 54, the home-side storage system 50 of the second home H2 is connected second, the home-side storage system 50 of the third home H3 is connected third, and the home-side storage system 50 of the fourth home H4 is connected fourth (most downstream).

こうして、住宅側パワコン54は、住宅側発電部51の発電電力を引込分電盤30へ出力することができる。また、住宅側パワコン54は、住宅側発電部51の発電電力や引込分電盤30からの電力を住宅側蓄電池52に充電することができる。また、住宅側パワコン54は、住宅側蓄電池52の放電電力を引込分電盤30へ出力することができる。また、住宅側パワコン54は、住宅側蓄電池52の動作を制御することができる。 In this way, the home side power conditioner 54 can output the power generated by the home side power generation unit 51 to the inlet distribution board 30. The home side power conditioner 54 can also charge the home side storage battery 52 with the power generated by the home side power generation unit 51 and the power from the inlet distribution board 30. The home side power conditioner 54 can also output the discharged power of the home side storage battery 52 to the inlet distribution board 30. The home side power conditioner 54 can also control the operation of the home side storage battery 52.

また、住宅側パワコン54は、住宅側発電部51と信号を送受信可能に構成され、当該信号に基づいて住宅側発電部51の発電電力等に関する情報を取得することできる。また、住宅側パワコン54は、住宅側蓄電池52と信号を送受信可能に構成され、当該信号に基づいて住宅側蓄電池52の残量や実行中の運転モード等に関する情報を取得することできる。また、住宅側パワコン54は、住宅側センサ53の信号を受信可能に構成され、当該住宅側センサ53の検出結果に関する情報を取得することができる。 The home side power conditioner 54 is also configured to be able to send and receive signals to and from the home side power generation unit 51, and can obtain information about the power generated by the home side power generation unit 51 based on the signals. The home side power conditioner 54 is also configured to be able to send and receive signals to and from the home side storage battery 52, and can obtain information about the remaining charge of the home side storage battery 52 and the operating mode currently being performed based on the signals. The home side power conditioner 54 is also configured to be able to receive signals from the home side sensor 53, and can obtain information about the detection results of the home side sensor 53.

複数の電力メータは、設置された箇所を流れる電力を検出するものである。複数の電力メータには、買電メータ61、第一売買電メータ62、第二売買電メータ63及び第三売買電メータ64が含まれる。 The multiple power meters detect the electricity flowing through the locations where they are installed. The multiple power meters include a power purchase meter 61, a first power purchase meter 62, a second power purchase meter 63, and a third power purchase meter 64.

買電メータ61は、第三配電線L3の中途部に設けられる。具体的には、買電メータ61は、第三配電線L3における下流側端部の分岐点と引込分電盤30との間に設置される。買電メータ61は、引込分電盤30から4つの住宅Hの住宅側分電盤40(電力負荷)へと流れる電力を取得することができる。すなわち、買電メータ61は、住宅街区A1の電力負荷の合計を取得することができる。 The power purchase meter 61 is provided midway along the third distribution line L3. Specifically, the power purchase meter 61 is installed between the branch point at the downstream end of the third distribution line L3 and the inlet distribution board 30. The power purchase meter 61 can obtain the power flowing from the inlet distribution board 30 to the residential distribution boards 40 (power loads) of the four homes H. In other words, the power purchase meter 61 can obtain the total power load of the residential block A1.

第一売買電メータ62は、第一配電線L1の中途部に設けられる。具体的には、第一売買電メータ62は、第一配電線L1における施設側センサ23と第二接続点P2との間に設置される。第一売買電メータ62は、系統電源Kから一括受電エリアAへと流れた電力(系統電源Kから購入した電力)を取得することができる。また、第一売買電メータ62は、一括受電エリアAから系統電源Kへと逆潮流された電力(系統電源Kへ売却した電力)を取得することができる。 The first electricity buying and selling meter 62 is provided in the middle of the first distribution line L1. Specifically, the first electricity buying and selling meter 62 is provided between the facility side sensor 23 and the second connection point P2 on the first distribution line L1. The first electricity buying and selling meter 62 can acquire the electricity that flows from the system power source K to the collective power receiving area A (electricity purchased from the system power source K). The first electricity buying and selling meter 62 can also acquire the electricity that flows backward from the collective power receiving area A to the system power source K (electricity sold to the system power source K).

第二売買電メータ63は、第二配電線L2の中途部に設けられる。具体的には、第一売買電メータ62は、第二配電線L2における第二接続点P2と第一接続点P1との間に設置される。第二売買電メータ63は、所定の供給元から商業施設Sの電気機器(施設側分電盤10及び施設側蓄電システム20)側へ流れた電力(商業施設Sが購入した電力)を取得することができる。また、第二売買電メータ63は、商業施設Sの施設側蓄電システム20から上流側へ逆潮流された電力(商業施設Sから売却した電力)を取得することができる。 The second electricity buying and selling meter 63 is provided in the middle of the second distribution line L2. Specifically, the first electricity buying and selling meter 62 is provided between the second connection point P2 and the first connection point P1 on the second distribution line L2. The second electricity buying and selling meter 63 can acquire electricity (electricity purchased by the commercial facility S) flowing from a specified source to the commercial facility S's electrical equipment (facility side distribution board 10 and facility side energy storage system 20). The second electricity buying and selling meter 63 can also acquire electricity (electricity sold by the commercial facility S) flowing backward from the commercial facility S's facility side energy storage system 20 to the upstream side.

第三売買電メータ64は、第三配電線L3の中途部に設けられる。具体的には、第三売買電メータ64は、第三配電線L3における上流側端部(第二接続点P2)と引込分電盤30との間に設置される。第三売買電メータ64は、所定の供給元から住宅街区A1の電気機器(4つの住宅Hの住宅側分電盤40及び住宅側蓄電システム50)側へ流れた電力(住宅街区A1が購入した電力)を取得することができる。また、第三売買電メータ64は、住宅街区A1から上流側へ逆潮流された電力(住宅街区A1から売却した電力)を取得することができる。 The third electricity buying and selling meter 64 is provided in the middle of the third distribution line L3. Specifically, the third electricity buying and selling meter 64 is installed between the upstream end (second connection point P2) of the third distribution line L3 and the inlet distribution board 30. The third electricity buying and selling meter 64 can obtain electricity (electricity purchased by the residential block A1) that flows from a specified source to the electrical equipment in the residential block A1 (the residential distribution boards 40 and the residential energy storage systems 50 of the four homes H). The third electricity buying and selling meter 64 can also obtain electricity that flows backward from the residential block A1 to the upstream side (electricity sold by the residential block A1).

図2に示す制御部70は、電力供給システム1の動作を管理するエネルギーマネジメントシステム(Energy Management System)である。制御部70は、一括受電エリアAにおける電力の供給態様を設定することができる。制御部70は、CPU等の演算処理部、RAMやROM等の記憶部及びタッチパネル等の入出力部等を具備し、所定の演算処理や記憶処理等を行うことができる。制御部70には、電力供給システム1の動作を制御する際に用いられる種々の情報やプログラム等が予め記憶される。制御部70は、施設側蓄電システム20の施設側パワコン24、4つの住宅側蓄電システム50の住宅側パワコン54、複数の電力メータ(買電メータ61、第一売買電メータ62、第二売買電メータ63及び第三売買電メータ64)に接続される。 The control unit 70 shown in FIG. 2 is an energy management system that manages the operation of the power supply system 1. The control unit 70 can set the power supply mode in the collective power receiving area A. The control unit 70 is equipped with an arithmetic processing unit such as a CPU, a storage unit such as a RAM or ROM, and an input/output unit such as a touch panel, and can perform predetermined arithmetic processing and storage processing. The control unit 70 stores various information and programs used when controlling the operation of the power supply system 1 in advance. The control unit 70 is connected to the facility side power conditioner 24 of the facility side power storage system 20, the home side power conditioners 54 of the four home side power storage systems 50, and multiple power meters (power purchase meter 61, first power purchase meter 62, second power purchase meter 63, and third power purchase meter 64).

制御部70は、商業施設Sの施設側蓄電システム20の動作を制御することができる。具体的には、制御部70は、施設側蓄電システム20の施設側パワコン24を介して施設側蓄電池22の動作(運転モード)を制御することができる。また、制御部70は、4つの住宅Hの住宅側蓄電システム50の動作を制御することができる。具体的には、制御部70は、各住宅側蓄電システム50の住宅側パワコン54を介して住宅側蓄電池52の動作(運転モード)を制御することができる。 The control unit 70 can control the operation of the facility-side power storage system 20 of the commercial facility S. Specifically, the control unit 70 can control the operation (operation mode) of the facility-side storage battery 22 via the facility-side power conditioner 24 of the facility-side power storage system 20. The control unit 70 can also control the operation of the home-side power storage systems 50 of the four homes H. Specifically, the control unit 70 can control the operation (operation mode) of the home-side storage battery 52 via the home-side power conditioner 54 of each home-side power storage system 50.

また、制御部70は、施設側蓄電システム20に関する情報を取得することができる。具体的には、制御部70は、施設側蓄電システム20の施設側パワコン24を介して、施設側発電部21の発電電力や、施設側蓄電池22の残量や実行中の運転モード等を取得することができる。 The control unit 70 can also acquire information about the facility-side power storage system 20. Specifically, the control unit 70 can acquire the generated power of the facility-side power generation unit 21, the remaining charge of the facility-side storage battery 22, the currently running operating mode, and the like, via the facility-side power conditioner 24 of the facility-side power storage system 20.

また、制御部70は、4つの住宅側蓄電システム50に関する情報を取得することができる。具体的には、制御部70は、各住宅側蓄電システム50の住宅側パワコン54を介して住宅側発電部51の発電電力や、住宅側蓄電池52の残量や実行中の運転モード(動作状況)等を取得することができる。また、制御部70は、取得した情報に基づいて、各住宅側蓄電池52が設置された後、現在に至るまでの間に放電された電力量の総和である積算放電量を算出することができる。 The control unit 70 can also obtain information about the four home-side energy storage systems 50. Specifically, the control unit 70 can obtain the generated power of the home-side power generation unit 51, the remaining charge of the home-side storage battery 52, the current operating mode (operating status), and the like, via the home-side power conditioner 54 of each home-side energy storage system 50. Based on the obtained information, the control unit 70 can also calculate the cumulative discharge amount, which is the sum of the amount of power discharged from the installation of each home-side storage battery 52 to the present.

また、制御部70は、複数の電力メータ(買電メータ61、第一売買電メータ62、第二売買電メータ63及び第三売買電メータ64)の検出結果を取得することができる。 The control unit 70 can also acquire the detection results of multiple power meters (power purchase meter 61, first power purchase meter 62, second power purchase meter 63, and third power purchase meter 64).

また、制御部70は、住宅側パワコン54を介して取得した各住宅Hの住宅側発電部51の発電電力に基づいて、全ての住宅側発電部51の(住宅街区A1全体としての)発電電力の合計(以下では「PV総発電」と称する)を取得(算出)することができる。また、制御部70は、買電メータ61から取得した検出結果に基づいて、全ての住宅Hの電力負荷の合計(以下では「住宅総負荷」と称する)を取得(算出)することができる。 The control unit 70 can also obtain (calculate) the total power generated by all of the home-side power generating units 51 (for the entire residential block A1) (hereinafter referred to as "total PV power generation") based on the power generated by the home-side power generating units 51 of each home H obtained via the home-side power conditioner 54. The control unit 70 can also obtain (calculate) the total power load of all of the homes H (hereinafter referred to as "total home load") based on the detection results obtained from the power purchase meter 61.

以下では、施設側蓄電システム20の施設側蓄電池22及び住宅側蓄電システム50の住宅側蓄電池52の運転モード(放電モード、充電モード、待機モード及び充放電モード)について説明する。 The following describes the operating modes (discharge mode, charge mode, standby mode, and charge/discharge mode) of the facility-side storage battery 22 of the facility-side energy storage system 20 and the home-side storage battery 52 of the home-side energy storage system 50.

なお、施設側蓄電池22及び住宅側蓄電池52の運転モードの内容は、負荷追従運転を行う際に用いるセンサを除いて互いに同一である。そこで以下では、特に断りが無ければ施設側蓄電池22を例にあげて、運転モードについて説明を行うものとする。 The operation modes of the facility-side storage battery 22 and the home-side storage battery 52 are identical to each other, except for the sensors used when performing load following operation. Therefore, unless otherwise specified, the operation modes will be explained below using the facility-side storage battery 22 as an example.

施設側蓄電池22の放電モードとは、放電を行うモードである。放電モードが実行された場合、施設側蓄電池22は、負荷追従運転により施設側センサ23の検出結果に基づいて放電を行う。具体的には、放電モードが実行されると、施設側蓄電池22は、施設側センサ23が下流側へ流れる電力を検出した場合に、当該検出した電力に対応した大きさの電力を放電する。なお、施設側蓄電池22の電池残量が放電可能な残量でない場合(例えば、電池残量が残量下限値である場合や最低残量である場合)には、施設側センサ23が下流側へ流れる電力を検出した場合であっても、施設側蓄電池22は放電を行わない(待機状態となる)。 The discharge mode of the facility-side storage battery 22 is a mode in which discharging is performed. When the discharge mode is executed, the facility-side storage battery 22 discharges based on the detection result of the facility-side sensor 23 by load following operation. Specifically, when the discharge mode is executed, if the facility-side sensor 23 detects power flowing downstream, the facility-side storage battery 22 discharges power of a magnitude corresponding to the detected power. Note that if the remaining battery level of the facility-side storage battery 22 is not sufficient to discharge (for example, if the remaining battery level is at the lower limit or minimum remaining level), the facility-side storage battery 22 does not discharge (enters a standby state) even if the facility-side sensor 23 detects power flowing downstream.

施設側蓄電池22の充電モードとは、充電を行うモードである。充電モードが実行された場合、施設側蓄電池22は、施設側発電部21の発電電力を充電する。また、施設側蓄電池22は、施設側発電部21が発電していない場合や、施設側発電部21の発電電力が施設側蓄電池22の最大充電電力よりも小さい場合には、施設側蓄電システム20の上流側から供給されてくる電力(例えば系統電源Kから購入した電力)も充電する。なお、充電モードが実行された場合であっても、施設側発電部21の発電電力が施設側蓄電池22の充電電力よりも大きい場合には、当該発電電力のうち余剰した電力が第二配電線L2に出力される。また、施設側蓄電池22が満充電である場合には、充電モードが実行された場合であっても施設側蓄電池22は充電を行わない(待機状態となる)。 The charging mode of the facility-side storage battery 22 is a mode in which charging is performed. When the charging mode is executed, the facility-side storage battery 22 is charged with the power generated by the facility-side power generation unit 21. In addition, when the facility-side power generation unit 21 is not generating power or when the power generated by the facility-side power generation unit 21 is smaller than the maximum charging power of the facility-side storage battery 22, the facility-side storage battery 22 also charges with power supplied from the upstream side of the facility-side power storage system 20 (for example, power purchased from the system power source K). Note that even when the charging mode is executed, if the power generated by the facility-side power generation unit 21 is greater than the charging power of the facility-side storage battery 22, the surplus power of the generated power is output to the second distribution line L2. In addition, when the facility-side storage battery 22 is fully charged, the facility-side storage battery 22 does not charge (is in a standby state) even when the charging mode is executed.

施設側蓄電池22の待機モードとは、待機するモードである。すなわち、待機モードが実行された場合、施設側蓄電池22は稼動したまま充放電を行わない(待機状態となる)。なお以下では、待機状態を「停止」と称する場合もある。 The standby mode of the facility-side storage battery 22 is a mode in which the battery is on standby. In other words, when the standby mode is executed, the facility-side storage battery 22 remains in operation but does not charge or discharge (it is in a standby state). In the following, the standby state may also be referred to as "stopped."

施設側蓄電池22の充放電モードとは、充放電を行うモードである。充放電モードが実行された場合、施設側蓄電池22は、負荷追従運転により施設側センサ23の検出結果に基づいて充放電を行う。 The charge/discharge mode of the facility-side storage battery 22 is a mode in which charging and discharging are performed. When the charge/discharge mode is executed, the facility-side storage battery 22 performs charging and discharging based on the detection results of the facility-side sensor 23 through load following operation.

具体的には、充放電モードが実行された場合、施設側蓄電池22は、放電モードと同様に、施設側センサ23が下流側へ流れる電力を検出した場合に、当該検出した電力に対応した大きさの電力を放電する。なお、施設側センサ23が下流側へ流れる電力を検出した場合であっても、施設側蓄電池22の電池残量が放電可能な残量でない場合等には、施設側蓄電池22は放電を行わない(待機状態となる)。 Specifically, when the charge/discharge mode is executed, the facility-side storage battery 22 discharges power of a magnitude corresponding to the detected power when the facility-side sensor 23 detects power flowing downstream, similar to the discharge mode. Note that even when the facility-side sensor 23 detects power flowing downstream, if the facility-side storage battery 22 does not have a remaining battery charge that allows discharge, the facility-side storage battery 22 does not discharge (enters a standby state).

また、充放電モードが実行された場合、施設側蓄電池22は、施設側センサ23が上流側へ流れる電力を検出した場合に、当該検出した電力に対応した大きさの電力を充電する。なお、施設側センサ23が上流側へ流れる電力を検出した場合であっても、満充電である場合等には、施設側蓄電池22は充電を行わない(待機状態となる)。 In addition, when the charge/discharge mode is executed, if the facility-side sensor 23 detects power flowing upstream, the facility-side storage battery 22 charges with power of a magnitude corresponding to the detected power. Note that even if the facility-side sensor 23 detects power flowing upstream, the facility-side storage battery 22 does not charge (enters a standby state) if the facility-side sensor 23 detects power flowing upstream, for example, if the facility-side storage battery 22 is fully charged.

なお、施設側蓄電池22の運転モードは、施設側パワコン24を介して行われる制御部70からの指示により切り替えられる。以下では、制御部70による施設側蓄電池22の放電モード、充電モード、待機モード及び充放電モードを実行する(切り替える)ための指示を、それぞれ放電指示、充電指示、待機(停止)指示及び充放電指示と称する場合がある。 The operation mode of the facility-side storage battery 22 is switched by instructions from the control unit 70 via the facility-side power conditioner 24. In the following, instructions from the control unit 70 to execute (switch) the discharge mode, charge mode, standby mode, and charge/discharge mode of the facility-side storage battery 22 may be referred to as a discharge instruction, a charge instruction, a standby (stop) instruction, and a charge/discharge instruction, respectively.

また、上述の如く施設側蓄電池22を例にあげて説明を行ったが、住宅側蓄電池52の運転モードの内容も同一である。具体的には、住宅側蓄電池52は、当該住宅側蓄電池52に対応する住宅側センサ53に検出結果に基づいて放電モードや充放電モードを実行する。なお、前記住宅側蓄電池52に対応する住宅側センサ53とは、4つの住宅側蓄電システム50のうち同一の住宅側蓄電システム50にある住宅側蓄電池52と住宅側センサ53との関係を意味する。 Although the facility-side storage battery 22 has been described as an example as above, the operation modes of the home-side storage battery 52 are also the same. Specifically, the home-side storage battery 52 executes a discharge mode or a charge/discharge mode based on the detection result of the home-side sensor 53 corresponding to the home-side storage battery 52. Note that the home-side sensor 53 corresponding to the home-side storage battery 52 refers to the relationship between the home-side storage battery 52 and the home-side sensor 53 in the same home-side storage system 50 among the four home-side power storage systems 50.

上述の如く構成された電力供給システム1においては、制御部70による住宅街区A1及び商業施設Sへの制御により電力の流通態様が決定される。制御部70による住宅街区A1及び商業施設Sへの制御では、当該住宅街区A1の住宅側蓄電池52及び商業施設Sの施設側蓄電池22の運転モードの切り換えが行われる。 In the power supply system 1 configured as described above, the power distribution mode is determined by the control of the residential block A1 and the commercial facility S by the control unit 70. In the control of the residential block A1 and the commercial facility S by the control unit 70, the operation modes of the residential side storage battery 52 in the residential block A1 and the facility side storage battery 22 in the commercial facility S are switched.

なお以下では、制御部70による住宅街区A1への制御、すなわち住宅側蓄電池52の運転モードの切り換え制御を「第一蓄電システム動作制御」と称する。また、制御部70による商業施設Sへの制御、すなわち施設側蓄電池22の運転モードの切り換え制御を「第二蓄電システム動作制御」と称する。制御部70による第一蓄電システム動作制御及び第二蓄電システム動作制御は、予め規定されたタイミング(例えば5分ごと)に繰り返し実行される。 In the following, the control by the control unit 70 over the residential block A1, i.e., the control of switching the operation mode of the residential storage battery 52, is referred to as "first power storage system operation control." Also, the control by the control unit 70 over the commercial facility S, i.e., the control of switching the operation mode of the facility storage battery 22, is referred to as "second power storage system operation control." The first power storage system operation control and the second power storage system operation control by the control unit 70 are repeatedly executed at predetermined timing (e.g., every 5 minutes).

以下では、図3を用いて、制御部70による第一蓄電システム動作制御(住宅側蓄電池52の運転モードの切り換え制御)について説明する。 The following describes the operation control of the first power storage system by the control unit 70 (control of switching the operation mode of the home storage battery 52) with reference to FIG. 3.

ステップS101において、制御部70は、現時点の住宅総負荷及びPV総発電に関する情報を取得する。なお、住宅総負荷とは、上述の如く、全ての(4つの)住宅Hの住宅負荷の消費電力の合計である。また、PV総発電とは、上述の如く、全ての(4つの)住宅側発電部51の発電電力の合計である。制御部70は、ステップS101の処理を実行した後、ステップS102の処理を実行する。 In step S101, the control unit 70 acquires information regarding the current total residential load and total PV power generation. As described above, the total residential load is the total power consumption of the residential loads of all (four) homes H. As described above, the total PV power generation is the total power generation of all (four) home-side power generation units 51. After executing the process of step S101, the control unit 70 executes the process of step S102.

ステップS102において、制御部70は、住宅総負荷がPV総発電以上であるか否かを判定する。制御部70は、住宅総負荷がPV総発電以上であると判定した場合(ステップS102:YES)、ステップS105の処理を実行する。一方、制御部70は、住宅総負荷がPV総発電よりも小さいと判定した場合(ステップS102:NO)、ステップS103の処理を実行する。 In step S102, the control unit 70 determines whether the total residential load is equal to or greater than the total PV power generation. If the control unit 70 determines that the total residential load is equal to or greater than the total PV power generation (step S102: YES), it executes the process of step S105. On the other hand, if the control unit 70 determines that the total residential load is less than the total PV power generation (step S102: NO), it executes the process of step S103.

ステップS103において、制御部70は、充電モードを実行する住宅側蓄電池52の台数を算出する。 In step S103, the control unit 70 calculates the number of home storage batteries 52 that will be in charging mode.

ここで、ステップS103の処理を実行する場合、住宅総負荷がPV総発電よりも小さいため、4つの住宅側発電部51の発電電力が4つの住宅Hの電力負荷に対して余剰した状態となっている。 When the processing of step S103 is executed, the total residential load is smaller than the total PV power generation, so the power generated by the four residential power generation units 51 is in excess of the power load of the four homes H.

そこで、制御部70は、余剰電力で何台の住宅側蓄電池52を充電させるのかを、「充電する蓄電池台数=(PV総発電-住宅総負荷)/蓄電池の最大充電電力」の式(1)によって算出する。なお、式(1)によって算出された数に小数点が含まれる場合は、小数点以下を切り捨てる。制御部70は、ステップS103の処理を実行した後、ステップS104の処理を実行する。 Therefore, the control unit 70 calculates how many home-side storage batteries 52 should be charged with the surplus power using formula (1) "Number of storage batteries to be charged = (Total PV power generation - Total home load) / Maximum storage battery charging power". Note that if the number calculated using formula (1) contains a decimal point, the decimal point is rounded down. After executing the process of step S103, the control unit 70 executes the process of step S104.

ステップS104において、制御部70は、ステップS103にて算出した台数の住宅側蓄電池52に充電指示を行う。このとき、制御部70は、全ての住宅側蓄電池52(又は、充電指示を行うことが可能な住宅側蓄電池52)から電池残量を取得し、当該電池残量が少ない住宅側蓄電池52から順に前記台数分だけ充電指示を行う(充電モードを実行させる)。また、制御部70は、充電指示を行った住宅側蓄電池52以外の住宅側蓄電池52に待機指示を行う(待機モードを実行させる)。制御部70は、ステップS104の処理を実行した後、第一蓄電システム動作制御を一旦終了させる。 In step S104, the control unit 70 issues a charge instruction to the number of home storage batteries 52 calculated in step S103. At this time, the control unit 70 obtains the remaining battery power from all home storage batteries 52 (or home storage batteries 52 for which a charge instruction can be issued), and issues a charge instruction to the number of home storage batteries 52 in order starting from the home storage battery 52 with the least remaining battery power (executes a charge mode). In addition, the control unit 70 issues a standby instruction to home storage batteries 52 other than the home storage battery 52 for which a charge instruction was issued (executes a standby mode). After executing the process of step S104, the control unit 70 temporarily ends the first power storage system operation control.

また、ステップS102で住宅総負荷がPV総発電以上であると判定した場合に移行するステップS105において、制御部70は、放電モードを実行する住宅側蓄電池52の台数を算出する。 In addition, in step S105, which is reached when it is determined in step S102 that the total residential load is equal to or greater than the total PV power generation, the control unit 70 calculates the number of residential storage batteries 52 that will be in the discharge mode.

ここで、ステップS105の処理を実行する場合、住宅総負荷がPV総発電以上であるため、4つの住宅側発電部51の発電電力だけでは4つの住宅Hの電力負荷に対して不足した状態となっている。 When the processing of step S105 is executed, the total residential load is equal to or greater than the total PV power generation, so the power generated by the four residential power generation units 51 alone is insufficient to meet the power load of the four homes H.

そこで、制御部70は、不足電力が何台の住宅側蓄電池52の放電で賄えるのかを、「放電する蓄電池台数=(住宅総負荷-PV総発電)/蓄電池の最大放電電力」の式(2)によって算出する。なお、式(2)によって算出された数に小数点が含まれる場合は、小数点以下を切り上げる。制御部70は、ステップS105の処理を実行した後、ステップS106の処理を実行する。 Therefore, the control unit 70 calculates how many home-side storage batteries 52 need to be discharged to cover the power shortage using formula (2) "Number of storage batteries to be discharged = (total home load - total PV power generation) / maximum discharge power of storage batteries." Note that if the number calculated using formula (2) contains a decimal point, the decimal point is rounded up. After executing the process of step S105, the control unit 70 executes the process of step S106.

ステップS106において、制御部70は、放電優先順位が高い蓄電システムから順に、ステップS105にて算出した台数分の住宅側蓄電池52に放電指示を行う。また、制御部70は、放電指示を行った住宅側蓄電池52以外の住宅側蓄電池52に待機指示を行う。制御部70は、ステップS106の処理を実行した後、第一蓄電システム動作制御を一旦終了させる。 In step S106, the control unit 70 issues a discharge command to the number of home storage batteries 52 calculated in step S105, starting with the storage system with the highest discharge priority. The control unit 70 also issues a standby command to the home storage batteries 52 other than the storage battery 52 to which the discharge command was issued. After executing the process of step S106, the control unit 70 temporarily ends the first storage system operation control.

なお、放電優先順位とは、複数の住宅側蓄電池52のうちどの住宅側蓄電池52を他の住宅側蓄電池52に対して優先的に放電させるのかの判断基準となるものである。制御部70は、放電優先順位を決定するために、まず全ての住宅側蓄電池52の積算放電量を取得する。具体的には、制御部70は、住宅側蓄電池52ごとに、設置してから現在に至るまでの間に放電された電力量の総和を取得する。そして、制御部70は、全ての住宅側蓄電池52に対して、積算放電量の少ない順番に高い放電優先順位(本実施形態においては、第1位、第2位、第3位)を設定する。 The discharge priority order is a criterion for determining which of the multiple home storage batteries 52 should be given priority for discharge over the other home storage batteries 52. To determine the discharge priority order, the control unit 70 first acquires the accumulated discharge amount of all home storage batteries 52. Specifically, the control unit 70 acquires the total amount of power discharged from the time of installation to the present for each home storage battery 52. The control unit 70 then sets the discharge priority order (in this embodiment, first, second, and third) for all home storage batteries 52 in order of least accumulated discharge amount.

このような第一蓄電システム動作制御により、住宅街区A1内において余剰電力がある場合(ステップS102:NO)は、住宅側発電部51の発電電力を、適宜な台数の住宅側蓄電池52に充電させることができる(ステップS103、ステップS104)。これにより、住宅街区A1内における住宅側発電部51の発電電力の自己消費率を向上させることができる。 By controlling the operation of the first power storage system in this manner, if there is surplus power in the residential block A1 (step S102: NO), the power generated by the residential power generation unit 51 can be charged to an appropriate number of residential storage batteries 52 (steps S103 and S104). This makes it possible to improve the self-consumption rate of the power generated by the residential power generation unit 51 in the residential block A1.

また、住宅街区A1内において不足電力がある場合(ステップS102:YES)は、適宜な台数の住宅側蓄電池52を放電させることができる(ステップS105、ステップS106)。これにより、4つの住宅Hの電力負荷を全体で一つの電力負荷として、当該4つの住宅Hの住宅側蓄電池52からの放電電力を供給(融通)することができる。こうして、住宅街区A1内における不足電力が、住宅街区A1外から供給された電力(例えば系統電源Kから購入した電力)によって賄われるのを可及的に抑制することができる。 Furthermore, if there is a power shortage in the residential block A1 (step S102: YES), an appropriate number of home storage batteries 52 can be discharged (steps S105, S106). This allows the power loads of the four homes H to be treated as a single power load, and allows the discharged power from the home storage batteries 52 of the four homes H to be supplied (accommodated). In this way, it is possible to minimize the power shortage in the residential block A1 being covered by power supplied from outside the residential block A1 (for example, power purchased from the power grid K).

なお、住宅側蓄電池52は、放電モードを実行する場合、対応する住宅側センサ53の検出結果に基づく負荷追従運転を行う。ここで、住宅側センサ53が設置された第一配電線L1は、上述の如く商業施設Sの比較的大きな電力負荷を賄うための、系統電源Kからの比較的大きな電力が流れている。したがって、多くの場合、放電モードを実行する住宅側蓄電池52は、対応する住宅側センサ53が検出する比較的大きな電力に基づいて、最大放電電力(2000W)で放電を行うこととなる。 When the residential storage battery 52 is in the discharge mode, it performs load following operation based on the detection results of the corresponding residential sensor 53. Here, the first distribution line L1 on which the residential sensor 53 is installed carries a relatively large amount of power from the system power source K to cover the relatively large power load of the commercial facility S as described above. Therefore, in many cases, the residential storage battery 52 in the discharge mode will discharge at the maximum discharge power (2000 W) based on the relatively large power detected by the corresponding residential sensor 53.

こうして、本実施形態においては、どの住宅側蓄電池52であっても、放電モードを実行する場合には、多くの場合最大放電電力で放電を行うことができる。すなわち、住宅側蓄電システム50及び住宅側センサ53の配置の上流側・下流側や住宅総負荷に対する不足電力の大小にかかわらず、住宅側蓄電池52の放電電力が小さくなること(放電効率が低下すること)を防止することができる。 Thus, in this embodiment, when the discharge mode is executed for any home storage battery 52, in most cases, discharge can be performed at the maximum discharge power. In other words, regardless of the upstream or downstream placement of the home storage system 50 and home sensor 53, or the magnitude of the power shortage relative to the total home load, it is possible to prevent the discharge power of the home storage battery 52 from becoming small (the discharge efficiency from decreasing).

なお、上述の如く、4つの住宅側発電部51の余剰電力で、何台の住宅側蓄電池52を充電させるのかを算出する場合に、式(1)によって算出された数に小数点が含まれる場合は、小数点以下を切り捨てる(ステップS103)。すなわち、余剰電力の全てが住宅側蓄電池52に充電されず、一部が第三配電線L3を上流側へ流れることとなる。また、上述の如く、4つの住宅側発電部51の不足電力が何台の住宅側蓄電池52の放電で賄えるのかを算出する場合に、式(2)によって算出された数に小数点が含まれる場合は、小数点以下を切り上げる(ステップS105)。すなわち、(上述の如く最大放電電力である)住宅側蓄電池52の放電電力の全てが住宅負荷に供給されず(住宅側蓄電池52の放電電力の一部が余剰するため)、一部が第三配電線L3を上流側へ流れることとなる。 As described above, when calculating how many home-side batteries 52 are to be charged with the surplus power of the four home-side power generating units 51, if the number calculated by formula (1) contains a decimal point, the decimal point is rounded down (step S103). That is, not all of the surplus power is charged to the home-side batteries 52, and some of the power flows upstream through the third distribution line L3. Also, as described above, when calculating how many home-side batteries 52 are discharged to cover the power shortage of the four home-side power generating units 51, if the number calculated by formula (2) contains a decimal point, the decimal point is rounded up (step S105). That is, not all of the discharged power of the home-side batteries 52 (which is the maximum discharged power as described above) is supplied to the home load (because some of the discharged power of the home-side batteries 52 is surplus), and some of the power flows upstream through the third distribution line L3.

ここで、図5及び図6は、第一蓄電システム動作制御を実行した場合の電力の流通態様の一例を示す図である。 Here, Figures 5 and 6 are diagrams showing an example of the distribution of electricity when the first power storage system operation control is executed.

図5に示す状態においては、住宅街区A1の電力負荷の合計(合計使用電力)が、7000Wであるものとする。また、住宅街区A1の住宅側発電部51の発電電力の合計が、0Wであるものとする。また、商業施設Sの電力負荷の合計(合計使用電力)が、10000Wであるものとする。また、系統電源Kからの電力(合計購入電力)が、17000Wであるものとする。 In the state shown in FIG. 5, the total power load (total power usage) of residential block A1 is 7,000 W. The total power generated by the residential power generation unit 51 in residential block A1 is 0 W. The total power load (total power usage) of commercial facility S is 10,000 W. The power from system power source K (total purchased power) is 17,000 W.

このような場合、住宅総負荷がPV総発電以上であるため、放電モードを実行する住宅側蓄電池52の台数が算出される(ステップS102:YES、ステップS105)。図5に示す状態においては、放電モードを実行する住宅側蓄電池52の台数として、4が算出される。すなわち、住宅街区A1の全ての住宅側蓄電池52に放電指示が行われる。 In this case, since the total residential load is equal to or greater than the total PV power generation, the number of residential storage batteries 52 that will execute the discharge mode is calculated (step S102: YES, step S105). In the state shown in FIG. 5, the number of residential storage batteries 52 that will execute the discharge mode is calculated as 4. That is, a discharge command is issued to all residential storage batteries 52 in residential block A1.

その結果、図6に示すように、住宅街区A1の全ての住宅側蓄電池52の放電電力の合計(合計放電電力)が、8000Wとなっている。そして、8000Wのうち、7000Wが住宅街区A1の電力負荷へと供給される。そして、残りの1000Wが第三配電線L3を上流側へと流れて、第二配電線L2を介して商業施設Sの電力負荷へと供給(融通)される。そして、系統電源Kからの電力(合計購入電力)が、9000Wへと減少される。このように、第一蓄電システム動作制御を実行したことにより、住宅街区A1における発電電力の一部を商業施設Sへと融通することができる。 As a result, as shown in FIG. 6, the sum of the discharged power (total discharged power) of all the residential storage batteries 52 in the residential block A1 is 8000 W. Of the 8000 W, 7000 W is supplied to the power load in the residential block A1. The remaining 1000 W flows upstream through the third distribution line L3 and is supplied (transferred) to the power load of the commercial facility S via the second distribution line L2. The power from the system power source K (total purchased power) is reduced to 9000 W. In this way, by executing the first storage system operation control, a portion of the generated power in the residential block A1 can be transferred to the commercial facility S.

以下では、後述する第二蓄電システム動作制御の技術的意義を明確にするため、まず制御部70による施設側蓄電池22の運転モードの切り換え制御が行われない場合(具体的には、施設側蓄電池22の運転モードとして充放電モードが継続して実行されている場合)の、商業施設Sにおける電力の流通態様について説明する。 In the following, in order to clarify the technical significance of the second power storage system operation control described later, we will first explain the state of power distribution in the commercial facility S when the control unit 70 does not control switching of the operation mode of the facility-side storage battery 22 (specifically, when the charge/discharge mode is continuously executed as the operation mode of the facility-side storage battery 22).

施設側蓄電池22は充放電モードを実行すると、上述の如く負荷追従運転により施設側センサ23の検出結果に基づいて充放電を行う。 When the facility-side storage battery 22 executes the charge/discharge mode, it charges and discharges based on the detection results of the facility-side sensor 23 through load following operation as described above.

ここで、上述の如く、商業施設Sにおいては、多くの場合、施設側発電部21の発電電力だけでは電力負荷に対して電力が不足するため、比較的大きい電力を系統電源Kから購入する。すなわち、施設側センサ23が設置された第一配電線L1では、商業施設Sの比較的大きな電力負荷を賄うための、系統電源Kからの(下流側への)比較的大きな電力が流れている。したがって、充放電モードを実行する施設側蓄電池22は、施設側センサ23が検出する比較的大きな電力に基づいて、最大放電電力(2000W)での放電を継続することとなる。 As described above, in many cases, the power generated by the facility-side power generation unit 21 alone is insufficient to cover the power load of the commercial facility S, so a relatively large amount of power is purchased from the system power source K. That is, in the first distribution line L1 on which the facility-side sensor 23 is installed, a relatively large amount of power flows (downstream) from the system power source K to cover the relatively large power load of the commercial facility S. Therefore, the facility-side storage battery 22, which is executing the charge/discharge mode, continues to discharge at the maximum discharge power (2000 W) based on the relatively large amount of power detected by the facility-side sensor 23.

このように、充放電モードを継続して実行した場合、施設側蓄電池22は放電を継続するため、系統電源Kからの電力や施設側発電部21の発電電力を充電する機会が無い。また仮に施設側蓄電池22が充電する機会を得たとしても、商業施設Sでの電力の使用量が非常に多いため、施設側蓄電池22は直ぐに放電してしまう。すなわち、施設側蓄電池22は、(放電可能な量以上に)電池残量を有した状態となっていることが殆どない。こうして、仮に施設側蓄電池22の運転モードの切り換え制御が行われない場合には、例えば停電が発生した場合に放電電力を利用できない等、施設側蓄電池22を有効に活用しているとは言い難い。 In this way, if the charge/discharge mode is continuously executed, the facility-side storage battery 22 continues to discharge, and therefore has no opportunity to charge with power from the grid power source K or the power generated by the facility-side power generation unit 21. Even if the facility-side storage battery 22 does have an opportunity to charge, the facility-side storage battery 22 will quickly discharge because the amount of power used at the commercial facility S is very large. In other words, the facility-side storage battery 22 is almost never in a state where it has a remaining battery capacity (more than the amount that can be discharged). Thus, if the operation mode of the facility-side storage battery 22 is not switched, for example, in the event of a power outage, the discharged power cannot be used, and it is difficult to say that the facility-side storage battery 22 is being used effectively.

そこで、電力供給システム1においては、施設側蓄電池22を有効に活用するため、第二蓄電システム動作制御を実行する。 Therefore, in the power supply system 1, second power storage system operation control is executed to effectively utilize the facility-side storage battery 22.

以下では、図4を用いて、制御部70による第二蓄電システム動作制御(施設側蓄電池22の運転モードの切り換え制御)について説明する。 The following describes the second power storage system operation control (operation mode switching control of the facility-side storage battery 22) by the control unit 70 using Figure 4.

なお、第二蓄電システム動作制御を開始する時点では、施設側蓄電池22の運転モードは特に限定されない。 When the second power storage system operation control starts, the operation mode of the facility-side storage battery 22 is not particularly limited.

ステップS201において、制御部70は、住宅街区A1で電力を購入しているかの判定を行う。制御部70は、第三売買電メータ64の検出結果に基づいて判定を行う。制御部70は、住宅街区A1で電力を購入している(住宅街区A1側に電力が流れている)と判定した場合(ステップS201:YES)、ステップS202の処理を実行する。一方、制御部70は、住宅街区A1で電力を購入していない(住宅街区A1側に電力が流れていない)と判定した場合(ステップS201:NO)、ステップS203の処理を実行する。 In step S201, the control unit 70 determines whether electricity is being purchased in the residential block A1. The control unit 70 makes this determination based on the detection result of the third electricity purchase and sale meter 64. If the control unit 70 determines that electricity is being purchased in the residential block A1 (electricity is flowing to the residential block A1 side) (step S201: YES), it executes the process of step S202. On the other hand, if the control unit 70 determines that electricity is not being purchased in the residential block A1 (electricity is not flowing to the residential block A1 side) (step S201: NO), it executes the process of step S203.

ステップS202において、制御部70は、商業施設Sの施設側蓄電池22に対して放電指示を行う。すなわち、制御部70は、施設側蓄電池22の運転モードを放電モードに切り換える(既に放電モードであれば当該モードを維持する)。こうして、施設側蓄電池22は、施設側センサ23の検出結果に基づいて負荷追従運転により放電を行うこととなる。制御部70は、ステップS202の処理を実行した後、第二蓄電システム動作制御を一旦終了させる。 In step S202, the control unit 70 issues a discharge command to the facility-side storage battery 22 of the commercial facility S. That is, the control unit 70 switches the operation mode of the facility-side storage battery 22 to a discharge mode (or maintains that mode if it is already in the discharge mode). In this way, the facility-side storage battery 22 discharges by load following operation based on the detection result of the facility-side sensor 23. After executing the process of step S202, the control unit 70 temporarily ends the second storage system operation control.

ステップS203において、制御部70は、住宅街区A1から逆潮流があるかを判定する。制御部70は、第三売買電メータ64の検出結果に基づいて判定を行う。制御部70は、住宅街区A1から逆潮流があると判定した場合(ステップS203:YES)、ステップS204の処理を実行する。一方、制御部70は、住宅街区A1から逆潮流がないと判定した場合(ステップS203:NO)、ステップS208の処理を実行する。 In step S203, the control unit 70 determines whether there is reverse power flow from the residential block A1. The control unit 70 makes this determination based on the detection result of the third electricity buying and selling meter 64. If the control unit 70 determines that there is reverse power flow from the residential block A1 (step S203: YES), it executes the process of step S204. On the other hand, if the control unit 70 determines that there is no reverse power flow from the residential block A1 (step S203: NO), it executes the process of step S208.

ステップS204において、制御部70は、住宅街区A1の住宅側蓄電池52が放電しているかを判定する。より詳細には、制御部70は、住宅街区A1の4つ(全ての)住宅側蓄電池52のうち少なくともいずれかの住宅側蓄電池52が放電しているかを判定する。制御部70は、住宅街区A1の各住宅側パワコン54を介して取得した住宅側蓄電池52の動作状況に基づいて判定を行う。制御部70は、住宅街区A1の住宅側蓄電池52が放電していない(いずれの住宅側蓄電池52も放電していない)と判定した場合(ステップS204:NO)、ステップS205の処理を実行する。一方、制御部70は、住宅街区A1の住宅側蓄電池52が放電している(少なくともいずれかの住宅側蓄電池52が放電している)と判定した場合(ステップS204:YES)、ステップS210の処理を実行する。 In step S204, the control unit 70 determines whether the residential storage battery 52 in the residential block A1 is discharging. More specifically, the control unit 70 determines whether at least one of the four (all) residential storage batteries 52 in the residential block A1 is discharging. The control unit 70 makes the determination based on the operating status of the residential storage batteries 52 acquired through each residential power conditioner 54 in the residential block A1. If the control unit 70 determines that the residential storage batteries 52 in the residential block A1 are not discharging (none of the residential storage batteries 52 are discharging) (step S204: NO), it executes the process of step S205. On the other hand, if the control unit 70 determines that the residential storage batteries 52 in the residential block A1 are discharging (at least one of the residential storage batteries 52 is discharging) (step S204: YES), it executes the process of step S210.

ステップS205において、制御部70は、商業施設Sから逆潮流があるかを判定する。制御部70は、第二売買電メータ63の検出結果に基づいて判定を行う。制御部70は、商業施設Sから逆潮流がないと判定した場合(ステップS205:NO)、ステップS206の処理を実行する。一方、制御部70は、商業施設Sから逆潮流があると判定した場合(ステップS205:YES)、ステップS207の処理を実行する。 In step S205, the control unit 70 determines whether there is reverse power flow from the commercial facility S. The control unit 70 makes this determination based on the detection result of the second electricity purchase and sale meter 63. If the control unit 70 determines that there is no reverse power flow from the commercial facility S (step S205: NO), it executes the process of step S206. On the other hand, if the control unit 70 determines that there is reverse power flow from the commercial facility S (step S205: YES), it executes the process of step S207.

ステップS206において、制御部70は、商業施設Sの施設側蓄電池22に対して、住宅街区A1からの逆潮流分の電力の充電指示を行う。すなわち、制御部70は、施設側蓄電池22の運転モードを充電モードに切り換える(既に充電モードであれば当該モードを維持する)と共に、第三売買電メータ64の検出結果と同一の大きさの電力を充電するよう、施設側蓄電池22に対して指示を行う。こうして、施設側蓄電池22は、住宅街区A1からの逆潮流分の電力を充電することができる。制御部70は、ステップS206の処理を実行した後、第二蓄電システム動作制御を一旦終了させる。 In step S206, the control unit 70 instructs the facility-side storage battery 22 of the commercial facility S to charge the reverse flow of power from the residential block A1. That is, the control unit 70 switches the operation mode of the facility-side storage battery 22 to charging mode (or maintains that mode if it is already in charging mode), and instructs the facility-side storage battery 22 to charge the same amount of power as the detection result of the third electricity buying and selling meter 64. In this way, the facility-side storage battery 22 can charge the reverse flow of power from the residential block A1. After executing the process of step S206, the control unit 70 temporarily terminates the second storage system operation control.

また、ステップS207において、制御部70は、商業施設Sの施設側蓄電池22に対して、総逆潮流分(すなわち、商業施設S及び住宅街区A1からの逆潮流分の合計)の電力の充電指示を行う。すなわち、制御部70は、施設側蓄電池22の運転モードを充電モードに切り換える(既に充電モードであれば当該モードを維持する)と共に、第二売買電メータ63及び第三売買電メータ64の検出結果の合計と同一の大きさの電力を充電するよう、施設側蓄電池22に対して指示を行う。こうして、施設側蓄電池22は、商業施設S及び住宅街区A1からの逆潮流分の合計の電力を充電することができる。制御部70は、ステップS207の処理を実行した後、第二蓄電システム動作制御を一旦終了させる。 In addition, in step S207, the control unit 70 instructs the facility-side storage battery 22 of the commercial facility S to charge the total amount of reverse power flow (i.e., the sum of the reverse power flow from the commercial facility S and the residential block A1). That is, the control unit 70 switches the operation mode of the facility-side storage battery 22 to the charging mode (or maintains the charging mode if it is already in the charging mode), and instructs the facility-side storage battery 22 to charge the same amount of power as the sum of the detection results of the second electricity buying and selling meter 63 and the third electricity buying and selling meter 64. In this way, the facility-side storage battery 22 can charge the total amount of reverse power flow from the commercial facility S and the residential block A1. After executing the process of step S207, the control unit 70 temporarily ends the second storage system operation control.

また上述の如く住宅街区A1から逆潮流がないと判定した場合(ステップS203:NO)に移行するステップS208において、制御部70は、商業施設Sから逆潮流があるかを判定する。制御部70は、第二売買電メータ63の検出結果に基づいて判定を行う。制御部70は、商業施設Sから逆潮流があると判定した場合(ステップS208:YES)、ステップS209の処理を実行する。一方、制御部70は、商業施設Sから逆潮流がないと判定した場合(ステップS208:NO)、第二蓄電システム動作制御を一旦終了させる。 Furthermore, in step S208, which is performed when it is determined that there is no reverse power flow from the residential block A1 as described above (step S203: NO), the control unit 70 determines whether there is a reverse power flow from the commercial facility S. The control unit 70 makes this determination based on the detection result of the second electricity buying and selling meter 63. If the control unit 70 determines that there is a reverse power flow from the commercial facility S (step S208: YES), it executes the processing of step S209. On the other hand, if the control unit 70 determines that there is no reverse power flow from the commercial facility S (step S208: NO), it temporarily terminates the second power storage system operation control.

ステップS209において、商業施設Sの施設側蓄電池22に対して、商業施設Sからの逆潮流分の電力の充電指示を行う。すなわち、制御部70は、施設側蓄電池22の運転モードを充電モードに切り換える(既に充電モードであれば当該モードを維持する)と共に、第二売買電メータ63の検出結果と同一の大きさの電力を充電するよう、施設側蓄電池22に対して指示を行う。こうして、施設側蓄電池22は、施設側蓄電池22からの逆潮流分の電力を充電することができる。制御部70は、ステップS209の処理を実行した後、第二蓄電システム動作制御を一旦終了させる。 In step S209, the control unit 70 instructs the facility-side storage battery 22 of the commercial facility S to charge the reverse flow of power from the commercial facility S. That is, the control unit 70 switches the operation mode of the facility-side storage battery 22 to charging mode (or maintains that mode if it is already in charging mode), and instructs the facility-side storage battery 22 to charge the same amount of power as the detection result of the second electricity buying and selling meter 63. In this way, the facility-side storage battery 22 can charge the reverse flow of power from the facility-side storage battery 22. After executing the process of step S209, the control unit 70 temporarily terminates the second power storage system operation control.

また上述の如く住宅街区A1の住宅側蓄電池52が放電していると判定した場合(ステップS204:YES)に移行するステップS210において、制御部70は、施設側蓄電池22に対して待機(停止)指示を行う。すなわち、制御部70は、施設側蓄電池22の運転モードを待機モードに切り換える(既に待機モードであれば当該モードを維持する)。こうして、施設側蓄電池22は、充電や放電を行っていたい場合であっても停止することができる。制御部70は、ステップS210の処理を実行した後、第二蓄電システム動作制御を一旦終了させる。 As described above, if it is determined that the home storage battery 52 in residential block A1 is discharging (step S204: YES), the control unit 70 issues a standby (stop) instruction to the facility storage battery 22 in step S210. That is, the control unit 70 switches the operation mode of the facility storage battery 22 to standby mode (or maintains that mode if it is already in standby mode). In this way, the facility storage battery 22 can be stopped even if charging or discharging is desired. After executing the process of step S210, the control unit 70 temporarily ends the second power storage system operation control.

以下では、上述の如き第二蓄電システム動作制御を実行した場合の電力の流通態様の一例について説明する。 The following describes an example of the power flow pattern when the second power storage system operation control described above is executed.

まず、図7及び図8は、第二蓄電システム動作制御を実行した場合の電力の流通態様の第一の例を示す図である。 First, Figures 7 and 8 are diagrams showing a first example of the power distribution state when the second power storage system operation control is executed.

図7に示す状態においては、住宅街区A1の電力負荷の合計(合計使用電力)が、7000Wであるものとする。また、住宅街区A1の住宅側発電部51の発電電力の合計(合計発電電力)が、8000Wであるものとする。そして、8000Wのうち、7000Wが住宅街区A1の電力負荷へと供給され、残りの1000Wが上流側へと流れて商業施設Sの電力負荷へと供給(融通)されているものとする。また、商業施設Sの電力負荷の合計(合計使用電力)が、10000Wであるものとする。また、商業施設Sの施設側発電部21の発電電力(太陽光発電)が、8000Wであるものとする。また、系統電源Kからの電力(合計購入電力)が、1000Wであるものとする。 In the state shown in FIG. 7, the total power load (total power usage) of the residential block A1 is 7000W. The total power generated by the residential power generation unit 51 of the residential block A1 (total power generation) is 8000W. Of the 8000W, 7000W is supplied to the power load of the residential block A1, and the remaining 1000W flows upstream and is supplied (accommodated) to the power load of the commercial facility S. The total power load (total power usage) of the commercial facility S is 10000W. The power generated (photovoltaic power generation) by the facility-side power generation unit 21 of the commercial facility S is 8000W. The power from the system power source K (total purchased power) is 1000W.

このような場合、住宅街区A1から逆潮流があり、かつ、住宅街区A1の住宅側蓄電池52が放電しておらず、かつ、商業施設Sから逆潮流がないため(ステップS203:YES、ステップS204:NO、ステップS205:NO)、施設側蓄電池22は住宅街区A1からの逆潮流分の電力を充電する(ステップS206)。 In this case, since there is a reverse power flow from the residential block A1, the residential battery 52 in the residential block A1 is not discharging, and there is no reverse power flow from the commercial facility S (step S203: YES, step S204: NO, step S205: NO), the facility battery 22 charges with the power equivalent to the reverse power flow from the residential block A1 (step S206).

その結果、図8に示すように、住宅街区A1の住宅側発電部51の発電電力のうち、上流側へ流れた1000W分の電力が、施設側蓄電池22に充電される。こうして、系統電源Kからの電力(合計購入電力)が、2000Wへと増加するものの、施設側蓄電池22に住宅街区A1の余剰電力を充電させることができる。 As a result, as shown in FIG. 8, of the power generated by the home-side power generation unit 51 in the residential block A1, 1000 W of power that flows upstream is charged to the facility-side storage battery 22. In this way, although the power from the system power source K (total purchased power) increases to 2000 W, the facility-side storage battery 22 can be charged with surplus power from the residential block A1.

次に、図9及び図10は、第二蓄電システム動作制御を実行した場合の電力の流通態様の第二の例を示す図である。 Next, Figures 9 and 10 show a second example of the power distribution mode when the second power storage system operation control is executed.

図9に示す状態においては、住宅街区A1の電力負荷の合計(合計使用電力)が、7000Wであるものとする。また、住宅街区A1の住宅側蓄電池52の放電電力の合計(合計放電電力)が、8000Wであるものとする。そして、8000Wのうち、7000Wが住宅街区A1の電力負荷へと供給され、残りの1000Wが上流側へと流れて商業施設Sの電力負荷へと供給(融通)されているものとする。また、商業施設Sの電力負荷の合計(合計使用電力)が、10000Wであるものとする。また、商業施設Sの施設側発電部21の発電電力(太陽光発電)が、0Wであるものとする。また、系統電源Kからの電力(合計購入電力)が、9000Wであるものとする。 In the state shown in FIG. 9, the total power load (total power usage) of the residential block A1 is 7000W. The total discharged power (total discharged power) of the residential side storage batteries 52 in the residential block A1 is 8000W. Of the 8000W, 7000W is supplied to the power load of the residential block A1, and the remaining 1000W flows upstream and is supplied (accommodated) to the power load of the commercial facility S. The total power load (total power usage) of the commercial facility S is 10000W. The generated power (photovoltaic power generation) of the facility side power generation unit 21 of the commercial facility S is 0W. The power (total purchased power) from the system power source K is 9000W.

このような場合、住宅街区A1から逆潮流があり、かつ、住宅街区A1の住宅側蓄電池52が放電しているため(ステップS203:YES、ステップS204:YES)、施設側蓄電池22は停止する(ステップS210)。 In this case, because there is a reverse power flow from residential block A1 and the home-side storage battery 52 in residential block A1 is discharging (step S203: YES, step S204: YES), the facility-side storage battery 22 is shut down (step S210).

その結果、図10に示すように、住宅街区A1の住宅側発電部51の発電電力のうち、上流側へ流れた1000Wの電力が、そのまま商業施設Sの電力負荷へと供給(融通)される。こうして、図8に示した場合とは異なり、施設側蓄電池22は、住宅街区A1から上流側へと流れる電力がある場合、当該電力が住宅側蓄電池52の放電電力である場合には、充電を行わない。こうして、一旦他の蓄電池(住宅側蓄電池52)に充電された電力を再度異なる蓄電池(施設側蓄電池22)に充電するという、非効率的な動作を回避することができる。 As a result, as shown in FIG. 10, of the power generated by the residential power generating unit 51 in residential block A1, 1000 W of power that flows upstream is directly supplied (interchanged) to the power load of the commercial facility S. Thus, unlike the case shown in FIG. 8, when there is power flowing upstream from residential block A1, the facility storage battery 22 does not charge if that power is discharging power from the residential storage battery 52. In this way, it is possible to avoid the inefficient operation of charging another storage battery (residential storage battery 52) with power that has once been charged, again into a different storage battery (facility storage battery 22).

次に、図11及び図12は、第二蓄電システム動作制御を実行した場合の電力の流通態様の第三の例を示す図である。 Next, Figures 11 and 12 are diagrams showing a third example of the power distribution mode when the second power storage system operation control is executed.

図11に示す状態においては、住宅街区A1の電力負荷の合計(合計使用電力)が、4000Wであるものとする。また、住宅街区A1の住宅側発電部51の発電電力の合計(合計発電電力)が、4000Wであるものとする。また、商業施設Sの電力負荷の合計(合計使用電力)が、1000Wであるものとする。また、商業施設Sの施設側発電部21の発電電力(太陽光発電)が、5000Wであるものとする。そして、5000Wのうち、1000Wが商業施設Sの電力負荷へと供給され、残りの4000Wが上流側へと流れて系統電源Kへと売却されているものとする。なおこのような状態(施設側発電部21の発電電力が商業施設Sの電力負荷に余剰している状態)は、商業施設Sが営業していない(定休日である)ことが想定される。 In the state shown in FIG. 11, the total power load (total power usage) of the residential block A1 is 4000W. The total power generated by the residential power generating unit 51 of the residential block A1 (total power generation) is 4000W. The total power load (total power usage) of the commercial facility S is 1000W. The power generated (photovoltaic power generation) of the facility-side power generating unit 21 of the commercial facility S is 5000W. Of the 5000W, 1000W is supplied to the power load of the commercial facility S, and the remaining 4000W flows upstream and is sold to the system power source K. Note that this state (a state in which the power generated by the facility-side power generating unit 21 is in excess of the power load of the commercial facility S) is assumed to be when the commercial facility S is not open (it is a regular holiday).

このような場合、住宅街区A1から逆潮流がなく、かつ、商業施設Sから逆潮流があるため(ステップS203:NO、ステップS208:YES)、施設側蓄電池22は、商業施設Sからの逆潮流分の電力を充電する(ステップS209)。 In this case, since there is no reverse power flow from the residential block A1 and there is a reverse power flow from the commercial facility S (step S203: NO, step S208: YES), the facility-side storage battery 22 is charged with the power equivalent to the reverse power flow from the commercial facility S (step S209).

その結果、図12に示すように、施設側蓄電池22は、商業施設Sの施設側発電部21の発電電力のうち、上流側へ流れていた4000W分の電力に対して充電を行う。なお、施設側蓄電池22の最大充電電力は2000Wであるため、図12に示す状態においては4000Wではなく2000Wの電力が充電されている。こうして、系統電源Kへと売却する電力は減少するものの、施設側蓄電池22に施設側発電部21の余剰電力(施設側発電部21の発電電力のうち商業施設Sの電力負荷に余剰する電力)を充電させることができる。 As a result, as shown in FIG. 12, the facility-side storage battery 22 is charged with 4000 W of power generated by the facility-side power generation unit 21 of the commercial facility S that was flowing upstream. Note that the maximum charging power of the facility-side storage battery 22 is 2000 W, so in the state shown in FIG. 12, 2000 W of power is charged instead of 4000 W. In this way, although the amount of power sold to the system power source K is reduced, the facility-side storage battery 22 can be charged with surplus power from the facility-side power generation unit 21 (power generated by the facility-side power generation unit 21 that is in excess of the power load of the commercial facility S).

次に、図13及び図14は、第二蓄電システム動作制御を実行した場合の電力の流通態様の第四の例を示す図である。 Next, Figures 13 and 14 are diagrams showing a fourth example of the power distribution mode when the second power storage system operation control is executed.

図13に示す状態においては、住宅街区A1の電力負荷の合計(合計使用電力)が、4000Wであるものとする。また、住宅街区A1の住宅側発電部51の発電電力の合計(合計発電電力)が、5000Wであるものとする。そして、5000Wのうち、4000Wが住宅街区A1の電力負荷へと供給され、残りの1000Wが上流側へと流れて系統電源Kへと売却されているものとする。また、商業施設Sの電力負荷の合計(合計使用電力)が、1000Wであるものとする。また、商業施設Sの施設側発電部21の発電電力(太陽光発電)が、5000Wであるものとする。そして、5000Wのうち、1000Wが商業施設Sの電力負荷へと供給され、残りの4000Wが上流側へと流れて系統電源Kへと売却されているものとする。また、系統電源Kへの売却する電力の電力(合計逆潮流)が、5000Wであるものとする。 In the state shown in FIG. 13, the total power load (total power usage) of the residential block A1 is 4000W. The total power generated by the residential power generation unit 51 of the residential block A1 (total power generation) is 5000W. Of the 5000W, 4000W is supplied to the power load of the residential block A1, and the remaining 1000W flows upstream and is sold to the system power source K. The total power load (total power usage) of the commercial facility S is 1000W. The power generated (photovoltaic power generation) of the facility power generation unit 21 of the commercial facility S is 5000W. Of the 5000W, 1000W is supplied to the power load of the commercial facility S, and the remaining 4000W flows upstream and is sold to the system power source K. The power (total reverse flow) of the power sold to the system power source K is 5000W.

このような場合、住宅街区A1から逆潮流があり、かつ、住宅街区A1の住宅側蓄電池52が放電しておらず、かつ、商業施設Sから逆潮流があるため(ステップS203:YES、ステップS204:NO、ステップS205:YES)、施設側蓄電池22は、商業施設S及び住宅街区A1からの逆潮流分の合計の電力を充電する(ステップS207)。 In this case, since there is a reverse power flow from the residential block A1, the residential side storage battery 52 in the residential block A1 is not discharging, and there is a reverse power flow from the commercial facility S (step S203: YES, step S204: NO, step S205: YES), the facility side storage battery 22 charges with the combined power of the reverse power flow from the commercial facility S and the residential block A1 (step S207).

その結果、図14に示すように、施設側蓄電池22は、商業施設Sの施設側発電部21の発電電力のうち上流側へ流れた4000W分と、住宅街区A1の住宅側発電部51の発電電力のうち上流側へ流れた1000W分との合計の電力に対して充電を行う。なお、施設側蓄電池22の最大充電電力は2000Wであるため、図14に示す状態においては5000Wではなく2000Wの電力が充電されている。こうして、系統電源Kへと売却する電力は減少するものの、施設側発電部21及び住宅側発電部51の余剰電力を施設側蓄電池22に充電させることができる。 As a result, as shown in FIG. 14, the facility-side storage battery 22 is charged with the total power of 4000 W of the power generated by the facility-side power generation unit 21 of the commercial facility S that flows upstream, and 1000 W of the power generated by the home-side power generation unit 51 of the residential block A1 that flows upstream. Note that the maximum charging power of the facility-side storage battery 22 is 2000 W, so in the state shown in FIG. 14, 2000 W of power is charged, not 5000 W. In this way, although the power sold to the system power source K is reduced, the surplus power of the facility-side power generation unit 21 and the home-side power generation unit 51 can be charged to the facility-side storage battery 22.

次に、図15及び図16は、第二蓄電システム動作制御を実行した場合の電力の流通態様の第五の例を示す図である。 Next, Figures 15 and 16 are diagrams showing a fifth example of the power distribution mode when the second power storage system operation control is executed.

図15に示す状態においては、住宅街区A1の電力負荷の合計(合計使用電力)が、10000Wであるものとする。また、住宅街区A1の住宅側蓄電池52の放電電力の合計(合計放電電力)が、8000Wであるものとする。また、住宅街区A1の電力負荷に対して住宅街区A1の住宅側蓄電池52の放電電力では不足するため、系統電源Kからの電力(購入電力)が、2000Wであるものとする。また、商業施設Sの電力負荷の合計(合計使用電力)が、10000Wであるものとする。また、系統電源Kからの電力(合計購入電力)が、12000Wであるものとする。 In the state shown in FIG. 15, the total power load (total power usage) of residential block A1 is 10,000 W. The total discharged power (total discharged power) of the residential storage batteries 52 in residential block A1 is 8,000 W. Since the discharged power of the residential storage batteries 52 in residential block A1 is insufficient for the power load of residential block A1, the power (purchased power) from system power source K is 2,000 W. The total power load (total power usage) of commercial facility S is 10,000 W. The power (total purchased power) from system power source K is 12,000 W.

このような場合、住宅街区A1で電力を購入しているため(ステップS201:YES)、施設側蓄電池22は、施設側センサ23の検出結果に基づいて負荷追従運転により放電を行う(ステップS202)。 In this case, since electricity is purchased in the residential block A1 (step S201: YES), the facility-side storage battery 22 discharges electricity through load following operation based on the detection results of the facility-side sensor 23 (step S202).

その結果、図16に示すように、施設側センサ23の検出結果が10000Wとなることから、施設側蓄電池22は最大放電電力である2000Wで放電を行う。施設側蓄電池22の放電電力は商業施設Sの電力負荷へと供給される。すなわち、商業施設Sの電力負荷の一部を、施設側蓄電池22の放電電力で賄うことができる。こうして、系統電源Kからの電力(合計購入電力)を減少させることができる。 As a result, as shown in FIG. 16, the detection result of the facility-side sensor 23 is 10,000 W, and the facility-side storage battery 22 discharges at a maximum discharge power of 2,000 W. The discharged power of the facility-side storage battery 22 is supplied to the power load of the commercial facility S. In other words, part of the power load of the commercial facility S can be covered by the discharged power of the facility-side storage battery 22. In this way, the power from the system power source K (total purchased power) can be reduced.

以上の如く、本実施形態に係る電力供給システム1においては、
系統電源Kと住宅側分電盤40(第一電力負荷)とを接続する第一の配電線(第一配電線L1及び第三配電線L3)と、
前記第一の配電線(第一配電線L1及び第三配電線L3)の第二接続点P2(中途部)と施設側分電盤10(第二電力負荷)とを接続する第二の配電線(第二配電線L2)と、
前記第一の配電線(第一配電線L1及び第三配電線L3)の前記第二接続点P2(中途部)と前記住宅側分電盤40(第一電力負荷)との間に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第一の配電線(第一配電線L1及び第三配電線L3)に出力可能な住宅側発電部51(第一発電部)と、
前記第一の配電線(第一配電線L1及び第三配電線L3)の前記第二接続点P2(中途部)よりも系統電源K側に設けられ、電力を検出可能な住宅側センサ53(第一電力センサ)と、
前記第一の配電線(第一配電線L1及び第三配電線L3)の前記第二接続点P2(中途部)と前記住宅側分電盤40(第一電力負荷)との間に設けられ、前記住宅側発電部51(第一発電部)の発電電力を充放電可能であり、前記住宅側センサ53(第一電力センサ)の検出結果に基づいた電力を前記第一の配電線(第一配電線L1及び第三配電線L3)に出力可能な住宅側蓄電池52(第一蓄電池)と、
前記第二の配電線(第二配電線L2)の前記施設側分電盤10(第二電力負荷)よりも前記第二接続点P2(中途部)側に設けられ、電力を充放電可能である施設側蓄電池22(第二蓄電池)と、
少なくとも前記第一の配電線(第一配電線L1及び第三配電線L3)の電力の流通態様に応じて前記施設側蓄電池22(第二蓄電池)を制御する制御部70と、
を具備するものである。
As described above, in the power supply system 1 according to this embodiment,
a first distribution line (a first distribution line L1 and a third distribution line L3) that connects the system power source K and a house-side distribution board 40 (a first power load);
A second distribution line (second distribution line L2) that connects a second connection point P2 (midway) of the first distribution line (first distribution line L1 and third distribution line L3) and a facility-side distribution board 10 (second power load);
a home-side power generating unit 51 (first power generating unit) that is provided between the second connection point P2 (midway) of the first distribution line (first distribution line L1 and third distribution line L3) and the home-side distribution board 40 (first power load), and that is capable of generating power using natural energy and outputting the generated power to the first distribution line (first distribution line L1 and third distribution line L3);
A home side sensor 53 (first power sensor) that is provided on the side of the system power source K from the second connection point P2 (midway portion) of the first distribution line (first distribution line L1 and third distribution line L3) and is capable of detecting power;
a home-side storage battery 52 (first storage battery) that is provided between the second connection point P2 (midway) of the first distribution line (first distribution line L1 and third distribution line L3) and the home-side distribution board 40 (first power load), that is capable of charging and discharging the power generated by the home-side power generation unit 51 (first power generation unit) and that is capable of outputting power to the first distribution line (first distribution line L1 and third distribution line L3) based on a detection result of the home-side sensor 53 (first power sensor);
a facility-side storage battery 22 (second storage battery) that is provided on the second distribution line (second distribution line L2) closer to the second connection point P2 (midway) than the facility-side distribution board 10 (second power load) and is capable of charging and discharging power;
A control unit 70 that controls the facility-side storage battery 22 (second storage battery) in accordance with a distribution state of power of at least the first distribution line (first distribution line L1 and third distribution line L3);
It is equipped with the following.

このような構成により、第一の配電線(第一配電線L1及び第三配電線L3)の電力の流通態様に応じて施設側蓄電池22を有効に活用することができる。
具体的には、第一の配電線(第一配電線L1及び第三配電線L3)の電力の流通態様、すなわち住宅側蓄電システム50(住宅側発電部51や住宅側蓄電池52)から第一の配電線(第一配電線L1及び第三配電線L3)に出力された電力が上流側へ流れているかに応じて施設側蓄電池22の充放電を行うことができるため、施設側蓄電池22を有効に活用することができる。
With this configuration, it is possible to effectively utilize the facility-side storage battery 22 in accordance with the power flow state of the first distribution line (the first distribution line L1 and the third distribution line L3).
Specifically, the facility-side storage battery 22 can be charged and discharged depending on the power flow pattern of the first distribution line (first distribution line L1 and third distribution line L3), i.e., depending on whether the power output from the home-side storage system 50 (home-side power generation unit 51 and home-side storage battery 52) to the first distribution line (first distribution line L1 and third distribution line L3) is flowing upstream, so that the facility-side storage battery 22 can be utilized effectively.

また、電力供給システム1において、
前記制御部70は、
前記第一の配電線(第一配電線L1及び第三配電線L3)を上流側に流れる電力があって、前記住宅側蓄電池52(第一蓄電池)が放電していない場合、
前記第一の配電線(第一配電線L1及び第三配電線L3)を上流側に流れる電力に基づいて、前記施設側蓄電池22(第二蓄電池)に充電指示を行うものである(ステップS203:YES、ステップS204:NO、ステップS206)。
In addition, in the power supply system 1,
The control unit 70
When there is power flowing upstream through the first distribution line (first distribution line L1 and third distribution line L3) and the home side storage battery 52 (first storage battery) is not discharging,
A charging instruction is given to the facility-side storage battery 22 (second storage battery) based on the power flowing upstream through the first distribution line (first distribution line L1 and third distribution line L3) (step S203: YES, step S204: NO, step S206).

このような構成により、本実施形態のように、商業施設Sの電力負荷が施設側蓄電システム20が出力可能な電力と比較しても非常に大きい場合に、住宅街区A1から上流側へ流れる電力に基づいて、施設側蓄電池22を充電させることができる。こうして、施設側蓄電池22は充電した電力を適宜放電可能となるため、当該施設側蓄電池22を有効に活用することができる。 With this configuration, as in this embodiment, when the power load of the commercial facility S is very large compared to the power that the facility-side power storage system 20 can output, the facility-side storage battery 22 can be charged based on the power flowing upstream from the residential block A1. In this way, the facility-side storage battery 22 can discharge the charged power as appropriate, so that the facility-side storage battery 22 can be used effectively.

また、電力供給システム1において、
前記制御部70は、
前記第一の配電線(第一配電線L1及び第三配電線L3)を上流側に流れる電力があって、前記住宅側蓄電池52(第一蓄電池)が放電している場合、
前記施設側蓄電池22(第二蓄電池)に充電の停止指示を行うものである(ステップS203:YES、ステップS204:YES、ステップS210)。
In addition, in the power supply system 1,
The control unit 70
When there is power flowing upstream through the first distribution line (first distribution line L1 and third distribution line L3) and the home side storage battery 52 (first storage battery) is discharging,
An instruction to stop charging is issued to the facility-side storage battery 22 (second storage battery) (step S203: YES, step S204: YES, step S210).

このような構成により、施設側蓄電池22は、住宅街区A1から上流側へと流れる電力がある場合であっても、当該電力が住宅側蓄電池52の放電電力である場合には充電を行わない。こうして、施設側蓄電池22において、一旦他の蓄電池(住宅側蓄電池52)に充電された電力を再度充電するという非効率的な動作を回避することができ、当該施設側蓄電池22を有効に活用することができる。 With this configuration, even if there is power flowing upstream from the residential block A1, the facility-side storage battery 22 will not charge if that power is discharging power from the home-side storage battery 52. In this way, the facility-side storage battery 22 can avoid the inefficient operation of recharging power that was once charged in another storage battery (the home-side storage battery 52), and the facility-side storage battery 22 can be used effectively.

また、電力供給システム1において、
前記第二の配電線(第二配電線L2)の前記施設側分電盤10(第二電力負荷)よりも前記第二接続点P2(中途部)側に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第二の配電線(第二配電線L2)に出力可能な施設側発電部21(第二発電部)を具備し、
前記施設側蓄電池22(第二蓄電池)は、
前記施設側発電部21(第二発電部)の発電電力を充放電可能であり、
前記制御部70は、
前記第一の配電線(第一配電線L1及び第三配電線L3)及び前記第二の配電線(第二配電線L2)を上流側に流れる電力があって、前記住宅側蓄電池52(第一蓄電池)が放電していない場合、
前記第一の配電線(第一配電線L1及び第三配電線L3)及び前記第二の配電線(第二配電線L2)を上流側に流れる電力に基づいて、前記施設側蓄電池22(第二蓄電池)に充電指示を行うものである(ステップS203:YES、ステップS204:NO、ステップS206、ステップS207)。
In addition, in the power supply system 1,
a facility-side power generating unit 21 (second power generating unit) that is provided on the second distribution line (second distribution line L2) closer to the second connection point P2 (midway) than the facility-side distribution board 10 (second power load), capable of generating power using natural energy and outputting the generated power to the second distribution line (second distribution line L2);
The facility-side storage battery 22 (second storage battery) is
The facility-side power generation unit 21 (second power generation unit) is capable of charging and discharging the generated power,
The control unit 70
When there is electric power flowing upstream through the first distribution line (first distribution line L1 and third distribution line L3) and the second distribution line (second distribution line L2), and the home side storage battery 52 (first storage battery) is not discharging,
A charging instruction is given to the facility-side storage battery 22 (second storage battery) based on the power flowing upstream through the first distribution line (first distribution line L1 and third distribution line L3) and the second distribution line (second distribution line L2) (step S203: YES, step S204: NO, step S206, step S207).

このような構成により、施設側発電部21及び住宅側発電部51の余剰電力に基づいて施設側蓄電池22に充電させることができる。こうして、施設側蓄電池22を有効に活用することができる。 With this configuration, the facility-side storage battery 22 can be charged based on the surplus power of the facility-side power generation unit 21 and the home-side power generation unit 51. In this way, the facility-side storage battery 22 can be effectively utilized.

また、電力供給システム1において、
前記第二の配電線(第二配電線L2)の前記施設側分電盤10(第二電力負荷)よりも前記第二接続点P2(中途部)側に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第二の配電線(第二配電線L2)に出力可能な施設側発電部21(第二発電部)を具備し、
前記施設側蓄電池22(第二蓄電池)は、
前記施設側発電部21(第二発電部)の発電電力を充放電可能であり、
前記制御部70は、
前記第一の配電線(第一配電線L1及び第三配電線L3)を前記第二接続点P2(中途部)側に流れる電力がなく、前記第二の配電線(第二配電線L2)を上流側に流れる電力がある場合、
前記第二の配電線(第二配電線L2)を上流側に流れる電力に基づいて、前記施設側蓄電池22(第二蓄電池)に充電指示を行うものである(ステップS203:NO、ステップS208:YES、ステップS209)。
In addition, in the power supply system 1,
a facility-side power generating unit 21 (second power generating unit) that is provided on the second distribution line (second distribution line L2) closer to the second connection point P2 (midway) than the facility-side distribution board 10 (second power load), capable of generating power using natural energy and outputting the generated power to the second distribution line (second distribution line L2);
The facility-side storage battery 22 (second storage battery) is
The facility-side power generation unit 21 (second power generation unit) is capable of charging and discharging the generated power,
The control unit 70
When there is no power flowing through the first distribution line (first distribution line L1 and third distribution line L3) to the second connection point P2 (midway portion) and there is power flowing through the second distribution line (second distribution line L2) to the upstream side,
A charge instruction is issued to the facility-side storage battery 22 (second storage battery) based on the power flowing upstream through the second distribution line (second distribution line L2) (step S203: NO, step S208: YES, step S209).

このような構成により、施設側発電部21の余剰電力に基づいて施設側蓄電池22に充電させることができる。こうして、施設側蓄電池22を有効に活用することができる。 With this configuration, the facility-side storage battery 22 can be charged based on the surplus power of the facility-side power generation unit 21. In this way, the facility-side storage battery 22 can be effectively utilized.

また、電力供給システム1において、
前記制御部70は、
系統電源Kからの電力が前記第一の配電線(第一配電線L1及び第三配電線L3)を前記住宅側分電盤40(第一電力負荷)側に流れている場合、
前記施設側蓄電池22(第二蓄電池)に放電指示を行うものである(ステップS201:YES、ステップS202)。
In addition, in the power supply system 1,
The control unit 70
When power from the system power source K flows through the first distribution line (the first distribution line L1 and the third distribution line L3) to the house side distribution board 40 (first power load),
An instruction to discharge is issued to the facility-side storage battery 22 (second storage battery) (step S201: YES, step S202).

このような構成により、例えば住宅街区A1からの電力が上流側へ流れている場合(すなわち、住宅街区A1からの電力が商業施設Sの電力負荷へ融通されている場合)とは異なるタイミングで施設側蓄電池22を放電させることができる。こうして、施設側蓄電池22の放電電力を可及的に商業施設Sの電力負荷へと供給することができ、施設側蓄電池22を有効に活用することができる。 With this configuration, for example, the facility-side storage battery 22 can be discharged at a different timing than when power from residential block A1 flows upstream (i.e., when power from residential block A1 is lent to the power load of commercial facility S). In this way, the discharged power of the facility-side storage battery 22 can be supplied to the power load of commercial facility S as much as possible, and the facility-side storage battery 22 can be used effectively.

以上、本発明の実施形態を説明したが、本発明は上記構成に限定されるものではなく、特許請求の範囲に記載された発明の範囲内で種々の変更が可能である。 Although an embodiment of the present invention has been described above, the present invention is not limited to the above configuration, and various modifications are possible within the scope of the invention described in the claims.

例えば、本実施形態において、施設側蓄電池22及び住宅側蓄電池52は、太陽光を利用して発電するものとしたが、他の自然エネルギー(例えば、水力や風力)を利用して発電するものであってもよい。 For example, in this embodiment, the facility-side storage battery 22 and the home-side storage battery 52 generate electricity using solar power, but they may also generate electricity using other natural energy sources (e.g., hydropower or wind power).

また、本実施形態において、住宅側蓄電池52が設置したから現在に至るまでの間に放電された電力量の総和を積算放電量としたが、これに限定するものではない。すなわち、例えば所定の一定期間(例えば、直近の24時間)の間に放電された電力量の総和を積算放電量とてもよい。また、本実施形態においては、積算放電量に基づいて放電優先順位を決定するものとしたが、放電優先順位を決定する基準はこれに限定されるものではなく、例えば住宅側蓄電池52の充電状態(電力を蓄積可能な定格容量に対して蓄積されている電池残量の割合)や充電回数に基づいて決定するものであってもよい。 In addition, in this embodiment, the total amount of electricity discharged from the time the home storage battery 52 was installed to the present is taken as the accumulated discharge amount, but this is not limited to this. That is, for example, the total amount of electricity discharged during a predetermined period (for example, the most recent 24 hours) may be taken as the accumulated discharge amount. In addition, in this embodiment, the discharge priority is determined based on the accumulated discharge amount, but the criteria for determining the discharge priority are not limited to this, and may be determined based on, for example, the charge state of the home storage battery 52 (the ratio of the remaining battery power stored to the rated capacity at which power can be stored) or the number of times it is charged.

また、本実施形態においては、住宅Hや住宅側蓄電システム50は4つであるとしたが、これに限定するものではない。すなわち、住宅Hや住宅側蓄電システム50は任意の数とすることができる。また同様に、商業施設Sや施設側蓄電システム20も任意の数とすることができる。 In addition, in this embodiment, the number of homes H and home-side power storage systems 50 is four, but this is not limited to four. In other words, the number of homes H and home-side power storage systems 50 can be any number. Similarly, the number of commercial facilities S and facility-side power storage systems 20 can also be any number.

また、各種の電力メータの配置は、本実施形態に係るものに限定されない。すなわち、制御部70は所望の情報を取得できるならば、電力メータの配置は任意に設定することができる。 The placement of the various power meters is not limited to that described in this embodiment. In other words, the placement of the power meters can be set arbitrarily as long as the control unit 70 can obtain the desired information.

また、住宅側蓄電システム50及び施設側蓄電システム20には、例えば固体高分子形燃料電池(PEFC)や、固体酸化物形燃料電池(SOFC : Solid Oxide Fuel Cell)等の燃料電池を設けることができる。また、住宅側蓄電池52及び施設側蓄電池22は、前記燃料電池の発電電力を充放電することもできる。 The residential energy storage system 50 and the facility energy storage system 20 can be provided with fuel cells, such as polymer electrolyte fuel cells (PEFCs) and solid oxide fuel cells (SOFCs). The residential storage battery 52 and the facility storage battery 22 can also charge and discharge the power generated by the fuel cells.

1 電力供給システム
10 施設側分電盤
22 施設側蓄電池
40 住宅側分電盤
51 住宅側発電部
52 住宅側蓄電池
53 住宅側センサ
70 制御部
K 系統電源
L1 第一配電線
L2 第二配電線
P2 接続点
REFERENCE SIGNS LIST 1 Power supply system 10 Facility-side distribution board 22 Facility-side storage battery 40 Residential-side distribution board 51 Residential-side power generation unit 52 Residential-side storage battery 53 Residential-side sensor 70 Control unit K System power supply L1 First distribution line L2 Second distribution line P2 Connection point

Claims (5)

系統電源と第一電力負荷とを接続する第一の配電線と、
前記第一の配電線の中途部と第二電力負荷とを接続する第二の配電線と、
前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第一の配電線に出力可能な第一発電部と、
前記第一の配電線の前記中途部よりも系統電源側に設けられ、電力を検出可能な第一電力センサと、
前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、前記第一発電部の発電電力を充放電可能であり、前記第一電力センサの検出結果に基づいた電力を前記第一の配電線に出力可能な第一蓄電池と、
前記第二の配電線の前記第二電力負荷よりも前記中途部側に設けられ、電力を充放電可能である第二蓄電池と、
少なくとも前記第一の配電線の電力の流通態様に応じて前記第二蓄電池を制御する制御部と、
を具備し、
前記制御部は、
前記第一の配電線を上流側に流れる電力があって、前記第一蓄電池が放電していない場合、
前記第一の配電線を上流側に流れる電力に基づいて、前記第二蓄電池に充電指示を行う、
力供給システム。
a first distribution line connecting a system power source and a first power load;
a second distribution line connecting a middle portion of the first distribution line and a second power load;
a first power generation unit that is provided between the midway portion of the first distribution line and the first power load, the first power generation unit being capable of generating power using natural energy and outputting the generated power to the first distribution line;
a first power sensor that is provided closer to a power system than the midway portion of the first distribution line and is capable of detecting power;
a first storage battery that is provided between the midway portion of the first distribution line and the first power load, the first storage battery being capable of charging and discharging the power generated by the first power generation unit and outputting power based on a detection result of the first power sensor to the first distribution line;
a second storage battery that is provided on the second distribution line closer to the midway point than the second power load and is capable of charging and discharging power;
a control unit that controls the second storage battery in accordance with at least a distribution state of electric power of the first distribution line;
Equipped with
The control unit is
When there is power flowing upstream through the first distribution line and the first storage battery is not discharging,
issuing a charge instruction to the second storage battery based on the electric power flowing upstream through the first distribution line;
Power supply system.
系統電源と第一電力負荷とを接続する第一の配電線と、
前記第一の配電線の中途部と第二電力負荷とを接続する第二の配電線と、
前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第一の配電線に出力可能な第一発電部と、
前記第一の配電線の前記中途部よりも系統電源側に設けられ、電力を検出可能な第一電力センサと、
前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、前記第一発電部の発電電力を充放電可能であり、前記第一電力センサの検出結果に基づいた電力を前記第一の配電線に出力可能な第一蓄電池と、
前記第二の配電線の前記第二電力負荷よりも前記中途部側に設けられ、電力を充放電可能である第二蓄電池と、
少なくとも前記第一の配電線の電力の流通態様に応じて前記第二蓄電池を制御する制御部と、
を具備し、
前記制御部は、
前記第一の配電線を上流側に流れる電力があって、前記第一蓄電池が放電している場合、
前記第二蓄電池に充電の停止指示を行う、
力供給システム。
a first distribution line connecting a system power source and a first power load;
a second distribution line connecting a middle portion of the first distribution line and a second power load;
a first power generation unit that is provided between the midway portion of the first distribution line and the first power load, the first power generation unit being capable of generating power using natural energy and outputting the generated power to the first distribution line;
a first power sensor that is provided closer to a power system than the midway portion of the first distribution line and is capable of detecting power;
a first storage battery that is provided between the midway portion of the first distribution line and the first power load, the first storage battery being capable of charging and discharging the power generated by the first power generation unit and outputting power based on a detection result of the first power sensor to the first distribution line;
a second storage battery that is provided on the second distribution line closer to the midway point than the second power load and is capable of charging and discharging power;
a control unit that controls the second storage battery in accordance with at least a distribution state of electric power of the first distribution line;
Equipped with
The control unit is
When there is power flowing upstream through the first distribution line and the first storage battery is discharging,
issuing an instruction to stop charging the second storage battery;
Power supply system.
系統電源と第一電力負荷とを接続する第一の配電線と、
前記第一の配電線の中途部と第二電力負荷とを接続する第二の配電線と、
前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第一の配電線に出力可能な第一発電部と、
前記第一の配電線の前記中途部よりも系統電源側に設けられ、電力を検出可能な第一電力センサと、
前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、前記第一発電部の発電電力を充放電可能であり、前記第一電力センサの検出結果に基づいた電力を前記第一の配電線に出力可能な第一蓄電池と、
前記第二の配電線の前記第二電力負荷よりも前記中途部側に設けられ、電力を充放電可能である第二蓄電池と、
少なくとも前記第一の配電線の電力の流通態様に応じて前記第二蓄電池を制御する制御部と、
前記第二の配電線の前記第二電力負荷よりも前記中途部側に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第二の配電線に出力可能な第二発電部と、
を具備し、
前記第二蓄電池は、
前記第二発電部の発電電力を充放電可能であり、
前記制御部は、
前記第一の配電線及び前記第二の配電線を上流側に流れる電力があって、前記第一蓄電池が放電していない場合、
前記第一の配電線及び前記第二の配電線を上流側に流れる電力に基づいて、前記第二蓄電池に充電指示を行う、
力供給システム。
a first distribution line connecting a system power source and a first power load;
a second distribution line connecting a middle portion of the first distribution line and a second power load;
a first power generation unit that is provided between the midway portion of the first distribution line and the first power load, the first power generation unit being capable of generating power using natural energy and outputting the generated power to the first distribution line;
a first power sensor that is provided closer to a power system than the midway portion of the first distribution line and is capable of detecting power;
a first storage battery that is provided between the midway portion of the first distribution line and the first power load, the first storage battery being capable of charging and discharging the power generated by the first power generation unit and outputting power based on a detection result of the first power sensor to the first distribution line;
a second storage battery that is provided on the second distribution line closer to the midway point than the second power load and is capable of charging and discharging power;
a control unit that controls the second storage battery in accordance with at least a distribution state of electric power of the first distribution line;
a second power generation unit that is provided on the second distribution line closer to the midway point than the second power load, capable of generating power using natural energy and outputting the generated power to the second distribution line;
Equipped with
The second storage battery is
The second power generation unit is capable of charging and discharging the generated power,
The control unit is
When there is electric power flowing upstream through the first distribution line and the second distribution line and the first storage battery is not being discharged,
issuing a charge instruction to the second storage battery based on electric power flowing upstream through the first distribution line and the second distribution line;
Power supply system.
系統電源と第一電力負荷とを接続する第一の配電線と、
前記第一の配電線の中途部と第二電力負荷とを接続する第二の配電線と、
前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第一の配電線に出力可能な第一発電部と、
前記第一の配電線の前記中途部よりも系統電源側に設けられ、電力を検出可能な第一電力センサと、
前記第一の配電線の前記中途部と前記第一電力負荷との間に設けられ、前記第一発電部の発電電力を充放電可能であり、前記第一電力センサの検出結果に基づいた電力を前記第一の配電線に出力可能な第一蓄電池と、
前記第二の配電線の前記第二電力負荷よりも前記中途部側に設けられ、電力を充放電可能である第二蓄電池と、
少なくとも前記第一の配電線の電力の流通態様に応じて前記第二蓄電池を制御する制御部と、
前記第二の配電線の前記第二電力負荷よりも前記中途部側に設けられ、自然エネルギーを用いて発電可能であって発電電力を前記第二の配電線に出力可能な第二発電部と、
を具備し、
前記第二蓄電池は、
前記第二発電部の発電電力を充放電可能であり、
前記制御部は、
前記第一の配電線を上流側に流れる電力がなく、前記第二の配電線を前記中途部側に流れる電力がある場合、
前記第二の配電線を上流側に流れる電力に基づいて、前記第二蓄電池に充電指示を行う、
力供給システム。
a first distribution line connecting a system power source and a first power load;
a second distribution line connecting a middle portion of the first distribution line and a second power load;
a first power generation unit that is provided between the midway portion of the first distribution line and the first power load, the first power generation unit being capable of generating power using natural energy and outputting the generated power to the first distribution line;
a first power sensor that is provided closer to a power system than the midway portion of the first distribution line and is capable of detecting power;
a first storage battery that is provided between the midway portion of the first distribution line and the first power load, the first storage battery being capable of charging and discharging the power generated by the first power generation unit and outputting power based on a detection result of the first power sensor to the first distribution line;
a second storage battery that is provided on the second distribution line closer to the midway point than the second power load and is capable of charging and discharging power;
a control unit that controls the second storage battery in accordance with at least a distribution state of electric power of the first distribution line;
a second power generation unit that is provided on the second distribution line closer to the midway point than the second power load, capable of generating power using natural energy and outputting the generated power to the second distribution line;
Equipped with
The second storage battery is
The second power generation unit is capable of charging and discharging the generated power,
The control unit is
When there is no power flowing upstream through the first distribution line and there is power flowing midway through the second distribution line,
issuing a charge instruction to the second storage battery based on the electric power flowing upstream through the second distribution line;
Power supply system.
前記制御部は、
系統電源からの電力が前記第一の配電線を前記第一電力負荷側に流れている場合、
前記第二蓄電池に放電指示を行う、
請求項1から請求項4までのいずれか一項に記載の電力供給システム。
The control unit is
When power from a system power source flows through the first distribution line to the first power load,
issuing a discharge instruction to the second storage battery;
The power supply system according to any one of claims 1 to 4.
JP2020143052A 2020-08-26 2020-08-26 Power Supply System Active JP7587940B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020143052A JP7587940B2 (en) 2020-08-26 2020-08-26 Power Supply System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020143052A JP7587940B2 (en) 2020-08-26 2020-08-26 Power Supply System

Publications (2)

Publication Number Publication Date
JP2022038505A JP2022038505A (en) 2022-03-10
JP7587940B2 true JP7587940B2 (en) 2024-11-21

Family

ID=80497927

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020143052A Active JP7587940B2 (en) 2020-08-26 2020-08-26 Power Supply System

Country Status (1)

Country Link
JP (1) JP7587940B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102916064B1 (en) * 2022-09-22 2026-01-20 주식회사 엘지에너지솔루션 System and method for communicating battery information

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120130556A1 (en) 2010-11-18 2012-05-24 Marhoefer John J Virtual power plant system and method incorporating renewal energy, storage and scalable value-based optimization
JP2019165561A (en) 2018-03-20 2019-09-26 大和ハウス工業株式会社 Power supply system
JP2019168806A (en) 2018-03-22 2019-10-03 大和ハウス工業株式会社 Management system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6147815B2 (en) * 2015-07-14 2017-06-14 大和ハウス工業株式会社 Electricity interchange system and residential area equipped with the same
JP6147816B2 (en) * 2015-07-16 2017-06-14 大和ハウス工業株式会社 Electricity interchange system and residential area equipped with the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120130556A1 (en) 2010-11-18 2012-05-24 Marhoefer John J Virtual power plant system and method incorporating renewal energy, storage and scalable value-based optimization
JP2019165561A (en) 2018-03-20 2019-09-26 大和ハウス工業株式会社 Power supply system
JP2019168806A (en) 2018-03-22 2019-10-03 大和ハウス工業株式会社 Management system

Also Published As

Publication number Publication date
JP2022038505A (en) 2022-03-10

Similar Documents

Publication Publication Date Title
JP6109108B2 (en) Power supply system
KR102234560B1 (en) The Connection System of Distributing type Load and Gathering type Load using Low Voltage Direct Circuit and The Operating Method thereof
CN105379049A (en) Power control device, power control method, and power control system
WO2011042781A1 (en) Power supply system
JP5944269B2 (en) Power supply system
JP2014158327A (en) Power supply apparatus
JP2016140125A (en) Power supply system
JP7386028B2 (en) power supply system
JP2017175785A (en) Power storage system, charge/discharge controller, control method therefor, and program
JP7587940B2 (en) Power Supply System
JP5507946B2 (en) Battery control unit
JP7312661B2 (en) Power interchange system
JP7426278B2 (en) power supply system
JP7406437B2 (en) Heat exchange system
JP7386029B2 (en) power supply system
JP7406436B2 (en) Power interchange system
JP7438826B2 (en) power supply system
WO2023223434A1 (en) Power feed system, full load distribution board, power feed device, power feed control method for power feed device, power feed path, power conversion device, and connection method
JP6085785B2 (en) Power supply system
JP2017221082A (en) Power storage system
JP2016073073A (en) Power supply system
JP2021005993A (en) Power supply system
JP2024178502A (en) Power Supply System
JP7303717B2 (en) Power interchange system
JP2021057962A (en) Power interchange system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230727

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240708

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240806

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240927

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241029

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241111

R150 Certificate of patent or registration of utility model

Ref document number: 7587940

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150