How to remove residue from storage tanks Download PDF

Info

Publication number
JP7588036B2
JP7588036B2 JP2021093870A JP2021093870A JP7588036B2 JP 7588036 B2 JP7588036 B2 JP 7588036B2 JP 2021093870 A JP2021093870 A JP 2021093870A JP 2021093870 A JP2021093870 A JP 2021093870A JP 7588036 B2 JP7588036 B2 JP 7588036B2
Authority
JP
Japan
Prior art keywords
storage tank
tank
residual material
floating
strength characteristics
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021093870A
Other languages
Japanese (ja)
Other versions
JP2022185932A (en
Inventor
淳 山本
高志 丸山
英文 鈴木
耕平 古川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2021093870A priority Critical patent/JP7588036B2/en
Publication of JP2022185932A publication Critical patent/JP2022185932A/en
Application granted granted Critical
Publication of JP7588036B2 publication Critical patent/JP7588036B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

特許法第30条第2項適用 (1)令和2年8月1日に「令和2年度 土木学会全国大会 第75回 年次学術講演会講演概要集,第VI-1016頁,公益社団法人土木学会」において公開 (2)令和2年9月9日に「令和2年度 土木学会全国大会 第75回 年次学術講演会https://confit.atlas.jp/jsce2020」において公開Article 30, paragraph 2 of the Patent Act applies (1) Published on August 1, 2020 in "75th Annual Academic Conference of the Japan Society of Civil Engineers, 2020 National Convention, Abstracts of Lectures, page VI-1016, Japan Society of Civil Engineers" (2) Published on September 9, 2020 in "75th Annual Academic Conference of the Japan Society of Civil Engineers, 2020 National Convention, https://confit.atlas.jp/jsce2020"

本発明は、貯槽内残存物の除去方法に関する。 The present invention relates to a method for removing residual material from a storage tank.

下記特許文献1には、浮き屋根式貯槽の側板の解体工事において、貯槽に注水し、水面上に浮遊する浮き屋根を、解体作業のための足場に利用することを特徴とする浮き屋根式貯槽の側板解体工法が開示されている。
下記特許文献2には、タンク本体に水張りして残留ガスパージを行った内部に、浮体足場を水面上にて拡大縮小させて設置して、タンク本体に対する検査作業を行うようにした球形タンク検査方法が開示されている。
下記特許文献3には、柱状塔容器内へ流体を注入し、柱状塔容器の横断面に対応した形状を有して流体に浮かぶ筏状の作業台を組み立て、この作業台に作業員が乗り柱状塔容器内を点検整備する方法が開示されている。
The following Patent Document 1 discloses a method for dismantling the side panels of a floating roof tank, which is characterized by pouring water into the tank and using the floating roof, which floats on the water surface, as a scaffold for the dismantling work.
The following Patent Document 2 discloses a spherical tank inspection method in which the tank body is filled with water and purged of residual gas, and then a floating scaffolding is installed above the water surface by expanding and contracting, and inspection work is performed on the tank body.
The following Patent Document 3 discloses a method for inspecting and maintaining the inside of a columnar tower vessel by injecting a fluid into the columnar tower vessel, assembling a raft-like work platform that has a shape corresponding to the cross section of the columnar tower vessel and floats on the fluid, and having an operator stand on this work platform.

特開昭62-78363号公報Japanese Unexamined Patent Publication No. 62-78363 特開昭62-283296号公報Japanese Patent Application Publication No. 62-283296 特開平9-217481号公報Japanese Patent Application Publication No. 9-217481

タンク等の貯槽内の下部には、重金属、有機溶剤、農薬、油、有害な化学物質、高アルカリ等の物質が沈殿、固化した残存物が存在する場合がある。この場合、貯槽に対して解体、検査等の作業を行う際には、貯槽内に存在する残存物を除去する必要がある。
しかしながら、このような残存物を人力によって除去することは非効率であり、残存物の種類によっては作業員に残存物が接触しないよう対策を講じる必要がある。また、貯槽が老朽化している場合があるため、貯槽が倒壊して内部の残存物が外部へ流出することがないように、残存物の除去作業を慎重に行う必要がある。
一方、特許文献1~3には、貯槽内の残存物の除去については何ら触れられていない。
本発明は、前記した課題を解決し、貯槽内の下部に存在する残存物を、人力によらず且つ貯槽の倒壊を抑えつつ除去することを課題とする。
In the lower part of a storage tank or other vessel, there may be precipitated and solidified residues of heavy metals, organic solvents, pesticides, oil, harmful chemicals, high alkali, etc. In such cases, when dismantling or inspecting the tank, it is necessary to remove the residues present in the tank.
However, removing such remains by hand is inefficient, and depending on the type of remains, measures must be taken to prevent workers from coming into contact with the remains. In addition, since the storage tanks may be old, the removal work must be carried out carefully to prevent the tanks from collapsing and the remains inside from spilling out.
On the other hand, Patent Documents 1 to 3 make no mention of removing any residue from within the storage tank.
The present invention aims to solve the above-mentioned problems and to remove remaining material present at the bottom of a storage tank without using human power and while preventing the storage tank from collapsing.

前記課題を解決するための本発明は、貯槽内の下部に存在する残存物を除去する、貯槽内残存物の除去方法である。
この貯槽内残存物の除去方法では、まず、前記貯槽の上部に設けられた上部構造体を、残存物よりも上方に存在する液面に浮設した浮体足場から作業者が作業することにより撤去する。次に、土質試験によって前記残存物の深度方向の強度特性を把握する。続いて、把握された前記強度特性に適した掘削手段を選定する。そして、選定された前記掘削手段によって前記残存物を掘削して除去する。なお、前記浮体足場は、前記残存物を掘削する前に撤去する。
この発明では、残存物の強度特性( 硬さ) に適した掘削手段が選定されて使用される。これにより、残存物の強度特性に見合わない程に掘削力の大きい掘削手段を使用して貯槽に過剰な振動等の負荷を与えることを防止できる。したがって、貯槽が倒壊して内部の残存物が外部へ流出することを回避できる。また、貯槽内の下部に例えば高アルカリ等の物質が沈殿、固化した残存物が存在していた場合でも、人が直接触れることなく残存物を除去することができる。
このように、本発明によれば、貯槽内の下部に存在する残存物を、人力によらず且つ貯槽の倒壊を抑えつつ除去することができる。
In order to solve the above problems, the present invention provides a method for removing residual material in a storage tank, which removes residual material present in the lower part of the storage tank.
In this method for removing residual material from a tank, first, an upper structure installed on the top of the tank is removed by workers working from a floating scaffolding that is floating on the liquid surface above the residual material. Next, the strength characteristics of the residual material in the depth direction are determined by soil testing. Next, an excavation means suitable for the determined strength characteristics is selected. The residual material is then excavated and removed using the selected excavation means. The floating scaffolding is removed before the residual material is excavated.
In this invention, an excavation means suitable for the strength characteristics (hardness) of the remains is selected and used. This makes it possible to prevent the use of an excavation means with a digging force that is inappropriate for the strength characteristics of the remains, thereby preventing the tank from being subjected to excessive vibration or other loads. This makes it possible to prevent the tank from collapsing and the remains inside from spilling out. Furthermore, even if there is remains in the lower part of the tank, such as a substance such as a highly alkaline substance that has precipitated and solidified, the remains can be removed without direct human contact.
In this way, according to the present invention, residual material present in the lower part of the tank can be removed without using human force and while preventing the tank from collapsing.

前記貯槽内残存物の除去方法では、前記残存物を除去する前に、前記残存物よりも上方に存在する液体の液面に前記浮体足場を浮設し、前記浮体足場上で前記貯槽の一部の解体作業を行うことが好ましい。
この構成では、浮体足場を利用することで、貯槽の解体作業を貯槽の上部で行うことができる。また、液位を低下させることによって浮体足場を下降させることができるので、貯槽の上から下へ向けて解体作業を順次進めることができる。しかも、残存物を除去する前に貯槽の解体作業を進めることで、残存物の除去作業の開始時には、貯槽は、上部が取り去られて重心が低くなるため、より安定する。このため、貯槽の倒壊をより抑えることができるとともに、貯槽の解体作業を効率良く進めることができる。
In the method for removing residual material from within a storage tank, it is preferable that, before removing the residual material, the floating scaffolding is floated on the surface of the liquid above the residual material, and dismantling work for part of the storage tank is carried out on the floating scaffolding.
In this configuration, by using the floating scaffolding, the dismantling work of the tank can be carried out on the top of the tank. In addition, since the floating scaffolding can be lowered by lowering the liquid level, the dismantling work can be carried out sequentially from the top of the tank to the bottom. Moreover, by carrying out the dismantling work of the tank before removing the remaining objects, the tank becomes more stable when the work of removing the remaining objects begins because the top part has been removed and the center of gravity is lowered. This makes it possible to further prevent the tank from collapsing, and allows the dismantling work of the tank to be carried out efficiently.

前記貯槽内残存物の除去方法では、前記浮体足場は、前記貯槽の内部形状に合わせて前記液面上で拡大縮小させるように変形可能であることが好ましい。
この構成では、貯槽の内部形状が高さ方向において変化している場合でも、貯槽内の壁面に可能な限り接近して浮体足場を形成することができる。これにより、貯槽の解体作業をより良好に行うことができる。
前記貯槽内残存物の除去方法では、前記残存物が除去された後に、前記貯槽内に液体を注入して、前記浮体足場上でさらに前記解体作業を行うことが好ましい。
この構成では、浮体足場を利用して可能な限り貯槽の下方まで解体作業を行うことができる。これにより、貯槽の解体作業をより効率良く行うことができる。また、貯槽は、未だ解体されていない残りの部分が少なくなって重心がさらに低くなるため、より安定する。したがって、当該残りの部分は、横荷重等の負荷に対しても転倒することがないため、例えば重機を用いて解体することも可能となる。
前記貯槽内残存物の除去方法では、前記残存物を除去する前に、前記貯槽の上部から前記残存物よりも上方の所定高さ位置までの解体作業を行ってもよい。この場合、重機解体またはクレーンによる揚重解体が行われる。このように、残存物を除去する前に貯槽の解体作業を進めることで、残存物の除去作業の開始時には、貯槽は、上部が取り去られて重心が低くなるため、より安定する。したがって、浮体足場を用いることなく、貯槽の倒壊をより抑えることができるとともに、貯槽の解体作業を効率良く進めることができる。
In the method for removing remaining material from a tank, it is preferable that the floating scaffold is deformable so as to expand and contract on the liquid surface to match the internal shape of the tank.
In this configuration, even if the internal shape of the storage tank changes in the height direction, the floating scaffolding can be formed as close as possible to the wall surface of the storage tank, which makes it possible to more efficiently dismantle the storage tank.
In the method for removing remaining material from a storage tank, it is preferable that after the remaining material is removed, liquid is injected into the storage tank and the dismantling work is further carried out on the floating scaffold.
In this configuration, the floating scaffolding can be used to carry out the dismantling work as far down as possible into the tank. This allows the tank to be dismantled more efficiently. In addition, the tank becomes more stable because the remaining parts that have not yet been dismantled are reduced and the center of gravity is further lowered. Therefore, the remaining parts will not tip over even under loads such as lateral loads, and it becomes possible to dismantle the tank using heavy machinery, for example.
In the method for removing the remaining material in the tank, before removing the remaining material, dismantling work may be performed from the top of the tank to a predetermined height position above the remaining material. In this case, dismantling work is performed using heavy machinery or lifting and dismantling using a crane. By proceeding with the dismantling work of the tank before removing the remaining material in this way, the tank becomes more stable when the work of removing the remaining material begins because the top part has been removed and the center of gravity is lowered. Therefore, it is possible to further prevent the collapse of the tank without using a floating scaffold, and the dismantling work of the tank can be efficiently performed.

前記掘削手段は、クラムシェルおよびハンマーグラブを含み、前記クラムシェルが選定される場合の前記強度特性は、前記ハンマーグラブが選定される場合の前記強度特性よりも低いことが好ましい。
この構成では、残存物の強度特性がそれ程高くない場合には、浚渫等に適用されるものであって残存物にかかる垂直荷重が比較的小さくて済むクラムシェルが使用される。したがって、貯槽に過剰な負荷を与えることを確実に防止できる。
前記土質試験は、スウェーデン式サウンディング試験、オートマチックラムサウンディング試験、ポータブルコーン貫入試験、および簡易動的コーン貫入試験から選択された少なくとも一つを含むことが好ましい。
この構成では、このような地盤の性状を探査するための土質試験を利用することで、残存物の深度方向の強度特性を容易かつ確実に把握できる。
It is preferable that the excavation means includes a clamshell and a hammer grab, and the strength characteristics when the clamshell is selected are lower than the strength characteristics when the hammer grab is selected.
In this configuration, when the strength characteristics of the remains are not so high, clamshells are used, which are applicable to dredging and the like, and which require a relatively small vertical load on the remains, thus reliably preventing excessive load on the storage tank.
The soil test preferably includes at least one selected from a Swedish sounding test, an automatic ram sounding test, a portable cone penetration test, and a simplified dynamic cone penetration test.
In this configuration, by using soil tests to explore the properties of such ground, the strength characteristics of the remains in the depth direction can be easily and reliably grasped.

本発明によれば、貯槽内の下部に存在する残存物を、人力によらず且つ貯槽の倒壊を抑えつつ除去することができる。 According to the present invention, it is possible to remove residual material present at the bottom of a storage tank without using human power and while preventing the tank from collapsing.

本発明の実施形態に係る貯槽内残存物の除去方法が適用される貯槽の一例を示す概略側面図である。1 is a schematic side view showing an example of a storage tank to which a method for removing residual matter in a storage tank according to an embodiment of the present invention is applied. 本発明の実施形態に係る貯槽内残存物の除去方法の内容を示すフローチャートである。1 is a flowchart showing the content of a method for removing residual matter in a storage tank according to an embodiment of the present invention. 液面に浮体足場を浮設する様子を説明するための概略拡大断面図である。FIG. 11 is a schematic enlarged cross-sectional view for explaining how a floating scaffold is floated on the liquid surface. 図3のIV-IV線断面図である。FIG. 4 is a cross-sectional view taken along line IV-IV in FIG. 掘削手段の一例としてのクラムシェルを示す概略拡大側面図である。FIG. 2 is a schematic enlarged side view showing a clamshell as an example of an excavation means. 掘削手段の一例としてのハンマーグラブを示す概略拡大側面図である。FIG. 2 is a schematic enlarged side view showing a hammer grab as an example of an excavation means. 残存物を掘削して除去する様子を説明するための概略側面図である。FIG. 13 is a schematic side view for explaining the manner in which remaining material is excavated and removed. 本発明の別の実施形態に係る貯槽内残存物の除去方法の内容を示すフローチャートである。10 is a flowchart showing the content of a method for removing residual matter in a storage tank according to another embodiment of the present invention.

以下、本発明の実施形態について適宜図面を参照して説明する。なお、以下に示す図面において、同一または同種の部材については、同一の参照符号を付し、重複した説明を適宜省略する。また、部材の形状およびサイズは、説明の便宜のため、変形、誇張または省略して模式的に表す場合がある。 Embodiments of the present invention will be described below with reference to the drawings as appropriate. Note that in the drawings shown below, identical or similar components are given the same reference symbols, and duplicate descriptions will be omitted as appropriate. Also, for the convenience of explanation, the shapes and sizes of components may be represented diagrammatically by modifying, exaggerating, or omitting.

図1は、本発明の実施形態に係る貯槽内残存物の除去方法が適用される貯槽100の一例を示す概略側面図である。
図1に示すように、貯槽100は、例えば大型の円筒形タンクである。貯槽100は、液体、粉体、気体等の貯留物を収容するケーシング10を備えている。ケーシング10は、ここでは、円筒形状を呈する円筒部11と、円筒部11の下側に設けられた逆円錐形状の外形を呈するコーン部12と、円筒部11の上部の内側に配置された内部ケーシング13とを有している。内部ケーシング13は、上端が開口した有底円筒形状を呈しており、吊材14を介して円筒部11に支持されている。ケーシング10は、その中心軸が鉛直方向に沿うように、支持構造体15を介して地盤16上に設置されている。また、ケーシング10の上部には、各種作業の足場や支持部等を提供する上部構造体20が設置されている。
FIG. 1 is a schematic side view showing an example of a storage tank 100 to which a method for removing residual matter in a storage tank according to an embodiment of the present invention is applied.
As shown in FIG. 1, the storage tank 100 is, for example, a large cylindrical tank. The storage tank 100 includes a casing 10 that contains a liquid, a powder, a gas, or other stored material. The casing 10 includes a cylindrical portion 11 having a cylindrical shape, a cone portion 12 having an inverted cone shape provided on the lower side of the cylindrical portion 11, and an inner casing 13 disposed inside the upper portion of the cylindrical portion 11. The inner casing 13 has a bottomed cylindrical shape with an open upper end, and is supported by the cylindrical portion 11 via a hanging member 14. The casing 10 is installed on the ground 16 via a support structure 15 so that its central axis is aligned vertically. In addition, an upper structure 20 is installed on the upper portion of the casing 10 to provide a scaffold or support for various operations.

貯槽100のケーシング10内の下部には、ここでは、重金属、有機溶剤、農薬、油、有害な化学物質、高アルカリ等の物質が沈殿、固化した残存物30が存在している。したがって、貯槽100に対して解体、検査等の作業を行う際には、貯槽100内に存在する残存物30を除去する必要がある。
本実施形態は、貯槽100に対して例えば解体作業を行うに際して貯槽100内の下部に存在する残存物30を除去する方法を提供するものである。
Residual material 30, which is precipitated and solidified substances such as heavy metals, organic solvents, pesticides, oils, harmful chemicals, and high alkali, is present in the lower part of the casing 10 of the storage tank 100. Therefore, when performing work such as dismantling and inspection of the storage tank 100, it is necessary to remove the residual material 30 present in the storage tank 100.
This embodiment provides a method for removing remnants 30 present in the lower part of a storage tank 100 when, for example, dismantling work is performed on the storage tank 100.

次に、図2~図7を参照して、本発明の実施形態に係る貯槽内残存物の除去方法について説明する。図2は、本発明の実施形態に係る貯槽内残存物の除去方法の内容を示すフローチャートである。図3は、液面に浮体足場40を浮設する様子を説明するための概略拡大断面図である。図4は、図3のIV-IV線断面図である。
図3、図4に示すように、まず、浮体足場40が浮設される(図2のステップS1)。
すなわち、残存物30(図1参照)よりも上方に存在する水の水面(液体の液面)50に浮体足場40を浮かべる。具体的には、浮体足場40の構成部材41を水面50に複数搬入して組み合わせることで、水面50に浮体足場40が浮設される。ここで、貯槽100のケーシング10内に必要に応じて注水が行われる。構成部材41は、例えば、平面視で四角形状を呈しており、4つの構成部材41ごとに、それらの共通接触点である中心位置でピン(図示省略)によって連結される。浮体足場40の上下方向の位置は、貯槽100のケーシング10内に対して注水または排水することによって水位を変化させることで調整される。
なお、浮体足場40の上面の外側および内側の端部全周には、手摺42がそれぞれ設置されている。ケーシング10の上部の径方向外側には、作業員、資材、道具等が通る通路を提供する歩廊21が設置されている。作業者は、梯子22を介して歩廊21と浮体足場40との間を行き来可能となっている。
Next, a method for removing residual material from a tank according to an embodiment of the present invention will be described with reference to Figures 2 to 7. Figure 2 is a flow chart showing the content of the method for removing residual material from a tank according to an embodiment of the present invention. Figure 3 is a schematic enlarged cross-sectional view for explaining how a floating scaffold 40 is floated on the liquid surface. Figure 4 is a cross-sectional view taken along line IV-IV in Figure 3.
As shown in Figures 3 and 4, first, the floating scaffolding 40 is floated (step S1 in Figure 2).
That is, the floating scaffold 40 is floated on the water surface (liquid surface) 50 of the water present above the remnants 30 (see FIG. 1). Specifically, a plurality of constituent members 41 of the floating scaffold 40 are brought to the water surface 50 and combined to float the floating scaffold 40 on the water surface 50. Here, water is poured into the casing 10 of the storage tank 100 as necessary. The constituent members 41 have, for example, a rectangular shape in a plan view, and every four constituent members 41 are connected by a pin (not shown) at their central position, which is their common contact point. The vertical position of the floating scaffold 40 is adjusted by changing the water level by pouring or draining water into or from the casing 10 of the storage tank 100.
Handrails 42 are provided around the entire outer and inner ends of the upper surface of the floating scaffolding 40. A walkway 21 is provided on the radially outer side of the upper part of the casing 10 to provide a passageway for workers, materials, tools, etc. Workers can move between the walkway 21 and the floating scaffolding 40 via a ladder 22.

続いて、浮体足場40上で貯槽100の一部の解体作業が行われる(図2のステップS2)。具体的には、上部構造体20の大部分が、例えばガス溶断により切断され、クレーン等の揚重装置(図示省略)によって移動させられて地盤16上におろされる。また、内部ケーシング13が、例えばガス溶断により切断され、揚重装置によって移動させられて地盤16上におろされる。さらに、必要に応じて、ケーシング10の上部が、例えばガス溶断により切断され、揚重装置によって移動させられて地盤16上におろされる。
続いて、浮体足場40が撤去される(図2のステップS3)。具体的には、浮体足場40が複数の構成部材41に解体されて、水面50から搬出される。
Next, a part of the storage tank 100 is dismantled on the floating scaffolding 40 (step S2 in FIG. 2). Specifically, most of the upper structure 20 is cut, for example, by gas cutting, and moved by a lifting device such as a crane (not shown) and lowered onto the ground 16. The inner casing 13 is also cut, for example, by gas cutting, and moved by the lifting device and lowered onto the ground 16. Furthermore, if necessary, the upper part of the casing 10 is cut, for example, by gas cutting, and moved by the lifting device and lowered onto the ground 16.
Next, the floating scaffolding 40 is removed (step S3 in FIG. 2). Specifically, the floating scaffolding 40 is dismantled into a plurality of component members 41 and carried out from the water surface 50.

次に、残存物30の深度方向の強度特性が把握される(図2のステップS4)。具体的には、まず、貯槽100内の水が排出された後に、例えば吊りワイヤによって吊り下げられた足場板(図示省略)が設置される。続いて、この足場板を利用して、残存物30に対して、本実施形態では、土質試験の一つである例えばスウェーデン式サウンディング試験が行われる。この試験では、先端にドリル状の部品を取り付けた鉄の棒を地面に垂直に立て、垂直に立てた鉄の棒におもりを載せて、荷重に対する貫入量を測ることで、地盤の強度(硬さ;換算N値)が算出される。スウェーデン式サウンディング試験は、試験装置・試験方法が簡単で容易に実施できる利点がある。ただし、スウェーデン式サウンディング試験に限られず、例えばオートマチックラムサウンディング試験、ポータブルコーン貫入試験、簡易動的コーン貫入試験等、またはこれらの二つ以上が実施されてもよい。 Next, the strength characteristics of the remnant 30 in the depth direction are grasped (step S4 in FIG. 2). Specifically, first, after the water in the storage tank 100 is drained, a scaffolding board (not shown) is installed, for example, suspended by a hanging wire. Next, using this scaffolding board, in this embodiment, a soil test, for example, a Swedish sounding test, is performed on the remnant 30. In this test, an iron rod with a drill-shaped part attached to the tip is vertically set on the ground, a weight is placed on the vertical iron rod, and the penetration amount against the load is measured to calculate the strength of the ground (hardness; converted N value). The Swedish sounding test has the advantage that the test equipment and test method are simple and can be easily performed. However, it is not limited to the Swedish sounding test, and for example, an automatic ram sounding test, a portable cone penetration test, a simplified dynamic cone penetration test, etc., or two or more of these may be performed.

続いて、掘削手段60が選定される(図2のステップS5)。図5は、掘削手段60の一例としてのクラムシェル61を示す概略拡大側面図である。図6は、掘削手段60の一例としてのハンマーグラブ62を示す概略拡大側面図である。すなわち、ステップS4における土質試験によって把握された残存物30の深度方向の強度特性に適した掘削手段60が選定される。
掘削手段60は、例えば、クラムシェル61(図5参照)、またはハンマーグラブ62(図6参照)である。クラムシェル61は、吊ったバケットを口の開いた状態から閉じることで土砂等をつかみ取る方式のバケットである。ハンマーグラブ62は、落下力によって地盤に打ち込んで土砂等をつかみ取る方式のグラブである。掘削力は、ハンマーグラブ62の方がクラムシェル61よりも大きい。一方、1回当たりの掘削ボリュームは、クラムシェル61の方がハンマーグラブ62よりも大きい。本実施形態では、クラムシェル61が選定される場合の残存物30の深度方向の強度特性は、ハンマーグラブ62が選定される場合の残存物30の深度方向の強度特性よりも低く設定されている。
Next, the excavation means 60 is selected (step S5 in FIG. 2). Fig. 5 is a schematic enlarged side view showing a clamshell 61 as an example of the excavation means 60. Fig. 6 is a schematic enlarged side view showing a hammer grab 62 as an example of the excavation means 60. That is, the excavation means 60 suitable for the strength characteristics in the depth direction of the remnant 30 identified by the soil test in step S4 is selected.
The excavation means 60 is, for example, a clamshell 61 (see FIG. 5) or a hammer grab 62 (see FIG. 6). The clamshell 61 is a bucket that grabs soil and sand by closing a suspended bucket from an open state. The hammer grab 62 is a grab that grabs soil and sand by driving it into the ground with a dropping force. The hammer grab 62 has a larger excavation force than the clamshell 61. On the other hand, the clamshell 61 has a larger excavation volume per excavation than the hammer grab 62. In this embodiment, the strength characteristics in the depth direction of the remnant 30 when the clamshell 61 is selected are set lower than the strength characteristics in the depth direction of the remnant 30 when the hammer grab 62 is selected.

続いて、選定された掘削手段60によって残存物30が掘削されて除去される(図2のステップS6)。図7は、残存物30を掘削して除去する様子を説明するための概略側面図である。図7に示すように、具体的には、クレーン等の揚重装置70のワイヤ71に支持された掘削手段60によって貯槽100のケーシング10内の下部に存在する残存物30が掘削されて除去される。なお、コーン部12に存在する残存物30は、作業性の観点から、例えばロングバックホウ等の重機によって除去されてもよい。 Then, the remaining material 30 is excavated and removed by the selected excavation means 60 (step S6 in FIG. 2). FIG. 7 is a schematic side view for explaining the excavation and removal of the remaining material 30. Specifically, as shown in FIG. 7, the remaining material 30 present at the bottom of the casing 10 of the storage tank 100 is excavated and removed by the excavation means 60 supported by a wire 71 of a lifting device 70 such as a crane. Note that the remaining material 30 present in the cone section 12 may be removed by heavy machinery such as a long backhoe from the standpoint of workability.

残存物30が除去された後、再び浮体足場40が浮設される(図2のステップS7)。具体的には、貯槽100のケーシング10内に水が注入されて、ステップS1と同様にして、注入された水の水面50に浮体足場40が浮かぶように設置される。
続いて、浮体足場40上でさらに貯槽100の解体作業が行われる(図2のステップS8)。具体的には、貯槽100の残りの部分が、例えばガス溶断により切断され、クレーン等の揚重装置(図示省略)によって移動させられて地盤16上におろされる。
After the remnants 30 are removed, the floating scaffolding 40 is floated again (step S7 in FIG. 2). Specifically, water is poured into the casing 10 of the storage tank 100, and the floating scaffolding 40 is set so as to float on the water surface 50 of the poured water in the same manner as in step S1.
Next, the dismantling work of the storage tank 100 is further carried out on the floating scaffolding 40 (step S8 in FIG. 2). Specifically, the remaining part of the storage tank 100 is cut off, for example, by gas cutting, and moved by a lifting device such as a crane (not shown) and lowered onto the ground 16.

前記したように、本実施形態に係る貯槽内残存物の除去方法は、貯槽100内の下部に存在する残存物30を除去する方法である。この貯槽内残存物の除去方法では、まず、土質試験によって残存物30の深度方向の強度特性を把握する。続いて、把握された強度特性に適した掘削手段60を選定する。そして、選定された掘削手段60によって残存物30を掘削して除去する。
本実施形態では、残存物30の強度特性(硬さ)に適した掘削手段60が選定されて使用される。これにより、残存物30の強度特性に見合わない程に掘削力の大きい掘削手段60を使用して貯槽100に過剰な振動等の負荷を与えることを防止できる。したがって、貯槽100が倒壊して内部の残存物30が外部へ流出することを回避できる。また、貯槽100内の下部に例えば高アルカリ等の物質が沈殿、固化した残存物30が存在していた場合でも、人が直接触れることなく残存物30を除去することができる。
このように、本実施形態によれば、貯槽100内の下部に存在する残存物30を、人力によらず且つ貯槽100の倒壊を抑えつつ除去することができる。
As described above, the method for removing residual material from a tank according to this embodiment is a method for removing residual material 30 present in the lower part of the tank 100. In this method for removing residual material from a tank, first, a soil test is performed to determine the strength characteristics of the residual material 30 in the depth direction. Next, an excavation means 60 suitable for the determined strength characteristics is selected. Then, the selected excavation means 60 is used to excavate and remove the residual material 30.
In this embodiment, an excavation means 60 suitable for the strength characteristics (hardness) of the remnants 30 is selected and used. This makes it possible to prevent the use of an excavation means 60 with a large excavation force that is not commensurate with the strength characteristics of the remnants 30, thereby preventing excessive vibration or other loads from being applied to the storage tank 100. This makes it possible to prevent the storage tank 100 from collapsing and the remnants 30 inside from flowing out to the outside. Furthermore, even if remnants 30, such as highly alkaline substances, are present in the lower part of the storage tank 100 and have precipitated and solidified, the remnants 30 can be removed without direct human contact.
In this way, according to this embodiment, the remaining material 30 present at the bottom of the storage tank 100 can be removed without using human force and while preventing the storage tank 100 from collapsing.

また、本実施形態では、残存物30を除去する前に、残存物30よりも上方に存在する水の水面50に浮体足場40を浮設し、浮体足場40上で貯槽100の一部の解体作業を行う。この構成では、浮体足場40を利用することで、貯槽100の解体作業を貯槽100の上部で行うことができる。また、水位を低下させることによって浮体足場40を下降させることができるので、貯槽100の上から下へ向けて解体作業を順次進めることができる。しかも、残存物30を除去する前に貯槽100の解体作業を進めることで、残存物30の除去作業の開始時には、貯槽100は、上部が取り去られて重心が低くなるため、より安定する。このため、貯槽100の倒壊をより抑えることができるとともに、貯槽100の解体作業を効率良く進めることができる。 In addition, in this embodiment, before removing the remnants 30, a floating scaffold 40 is floated on the water surface 50 of the water above the remnants 30, and a part of the storage tank 100 is dismantled on the floating scaffold 40. In this configuration, by using the floating scaffold 40, the dismantling work of the storage tank 100 can be performed on the upper part of the storage tank 100. In addition, since the floating scaffold 40 can be lowered by lowering the water level, the dismantling work can be carried out sequentially from the top to the bottom of the storage tank 100. Moreover, by proceeding with the dismantling work of the storage tank 100 before removing the remnants 30, the storage tank 100 becomes more stable at the start of the removal work of the remnants 30 because the upper part of the storage tank 100 has been removed and the center of gravity is lowered. Therefore, the collapse of the storage tank 100 can be further suppressed, and the dismantling work of the storage tank 100 can be carried out efficiently.

また、本実施形態では、浮体足場40は、貯槽100の内部形状に合わせて水面上で拡大縮小させるように変形可能である。この構成では、貯槽100の内部形状が高さ方向において変化している場合でも、貯槽100内の壁面に可能な限り接近して浮体足場40を形成することができる。これにより、貯槽100の解体作業をより良好に行うことができる。 In addition, in this embodiment, the floating scaffolding 40 can be deformed to expand and contract on the water surface to match the internal shape of the storage tank 100. With this configuration, even if the internal shape of the storage tank 100 changes in the height direction, the floating scaffolding 40 can be formed as close as possible to the wall surface inside the storage tank 100. This makes it possible to more smoothly carry out the dismantling work of the storage tank 100.

また、本実施形態では、残存物30が除去された後に、貯槽100内に水を注入して、浮体足場40上でさらに解体作業を行う。この構成では、浮体足場40を利用して可能な限り貯槽100の下方まで解体作業を行うことができる。これにより、貯槽100の解体作業をより効率良く行うことができる。また、貯槽100は、未だ解体されていない残りの部分が少なくなって重心がさらに低くなるため、より安定する。したがって、当該残りの部分は、横荷重等の負荷に対しても転倒することがないため、例えば重機を用いて解体することも可能となる。 In addition, in this embodiment, after the remaining material 30 is removed, water is injected into the storage tank 100, and further dismantling work is carried out on the floating scaffolding 40. In this configuration, the floating scaffolding 40 can be used to carry out dismantling work as far down as possible into the storage tank 100. This allows the dismantling work of the storage tank 100 to be carried out more efficiently. In addition, the storage tank 100 becomes more stable because the remaining parts that have not yet been dismantled are reduced and the center of gravity is further lowered. Therefore, the remaining parts will not tip over even under loads such as lateral loads, and it becomes possible to dismantle them using heavy machinery, for example.

また、本実施形態では、掘削手段60は、クラムシェル61およびハンマーグラブ62を含む。そして、クラムシェル61が選定される場合の残存物30の強度特性は、ハンマーグラブ62が選定される場合の残存物30の強度特性よりも低い。この構成では、残存物30の強度特性がそれ程高くない場合には、浚渫等に適用されるものであって残存物30にかかる垂直荷重が比較的小さくて済むクラムシェル61が使用される。したがって、貯槽100に過剰な負荷を与えることを確実に防止できる。
また、本実施形態では、土質試験は、スウェーデン式サウンディング試験、オートマチックラムサウンディング試験、ポータブルコーン貫入試験、および簡易動的コーン貫入試験から選択された少なくとも一つを含む。この構成では、このような地盤の性状を探査するための土質試験を利用することで、残存物30の深度方向の強度特性を容易かつ確実に把握できる。
In this embodiment, the excavation means 60 includes a clamshell 61 and a hammer grab 62. When the clamshell 61 is selected, the strength characteristics of the remnant 30 are lower than the strength characteristics of the remnant 30 when the hammer grab 62 is selected. In this configuration, when the strength characteristics of the remnant 30 are not so high, the clamshell 61, which is applied to dredging and the like and requires a relatively small vertical load on the remnant 30, is used. Therefore, it is possible to reliably prevent excessive load from being applied to the storage tank 100.
In this embodiment, the soil test includes at least one selected from a Swedish sounding test, an automatic ram sounding test, a portable cone penetration test, and a simplified dynamic cone penetration test. In this configuration, by using such a soil test for investigating the properties of the ground, the strength characteristics of the remnant 30 in the depth direction can be easily and reliably grasped.

図8は、本発明の別の実施形態に係る貯槽内残存物の除去方法の内容を示すフローチャートである。以下、図1~図7に示す実施形態と相違する点について主に説明し、共通する点については説明を省略する。
図8に示すように、本実施形態では、まず、残存物30の深度方向の強度特性が把握される(図8のステップS11)。具体的には、例えば吊りワイヤによって吊り下げられた足場板(図示省略)を利用して、残存物30に対して、土質試験の一つである例えばスウェーデン式サウンディング試験が行われる。続いて、掘削手段60が選定される(図8のステップS12)。図8のステップS11,S12は、図2のステップS4,S5と同様の内容であるため、詳しい説明を省略する。
続いて、貯槽100の上部から残存物30の手前の高さまでが解体される(図8のステップS13)。すなわち、貯槽100の上部から残存物30よりも上方の所定高さ位置までの解体作業が行われる。この場合、重機解体またはクレーンによる揚重解体が行われる。このように、残存物30を除去する前に貯槽100の解体作業を進めることで、残存物30の除去作業の開始時には、貯槽100は、上部が取り去られて重心が低くなるため、より安定する。したがって、本実施形態によれば、浮体足場40(図4参照)を用いることなく、貯槽100の倒壊をより抑えることができるとともに、貯槽100の解体作業を効率良く進めることができる。
続いて、ステップS12において選定された掘削手段60によって残存物30が掘削されて除去される(図8のステップS14)。図8のステップS14は、図2のステップS6と同様の内容であるため、詳しい説明を省略する。続いて、残りの貯槽100の解体作業が行われる(図8のステップS15)。具体的には、貯槽100の残りの部分に対して、例えば重機解体またはクレーンによる揚重解体が行われる。
Fig. 8 is a flow chart showing the contents of a method for removing residual matter in a storage tank according to another embodiment of the present invention. Below, differences from the embodiment shown in Figs. 1 to 7 will be mainly described, and explanations of commonalities will be omitted.
As shown in Fig. 8, in this embodiment, first, the strength characteristics of the remnant 30 in the depth direction are grasped (step S11 in Fig. 8). Specifically, a Swedish sounding test, which is one of the soil tests, is performed on the remnant 30 using, for example, a scaffolding board (not shown) suspended by a hoisting wire. Next, an excavation means 60 is selected (step S12 in Fig. 8). Steps S11 and S12 in Fig. 8 are similar to steps S4 and S5 in Fig. 2, so detailed explanations are omitted.
Next, the tank 100 is dismantled from the top to the height just before the remnants 30 (step S13 in FIG. 8). That is, dismantling work is performed from the top of the tank 100 to a predetermined height position above the remnants 30. In this case, heavy machinery dismantling or lifting and dismantling by a crane is performed. In this way, by proceeding with the dismantling work of the tank 100 before removing the remnants 30, the tank 100 becomes more stable at the start of the removal work of the remnants 30 because the top part of the tank 100 is removed and the center of gravity is lowered. Therefore, according to this embodiment, it is possible to further prevent the collapse of the tank 100 without using the floating scaffolding 40 (see FIG. 4), and to efficiently proceed with the dismantling work of the tank 100.
Next, the remaining objects 30 are excavated and removed by the excavation means 60 selected in step S12 (step S14 in FIG. 8). Step S14 in FIG. 8 is the same as step S6 in FIG. 2, so a detailed description will be omitted. Next, the remaining storage tank 100 is dismantled (step S15 in FIG. 8). Specifically, the remaining parts of the storage tank 100 are dismantled using heavy machinery or lifted and dismantled using a crane, for example.

以上、本発明の実施形態について説明したが、本発明は前記実施形態に限定されることなく、その趣旨を逸脱しない範囲で適宜に変更が可能である。
例えば、前記実施形態では、ステップS7,S8において、残存物30が除去された後に、貯槽100内に水を注入して、浮体足場40上でさらに解体作業を行うが、これらの作業は省略されてもよい。この場合、ステップS7,S8を行うことなく例えば重機を用いてそのまま解体作業を行うことが可能である。
掘削手段60の例としてクラムシェル61とハンマーグラブ62とを挙げたが、これらに限定されるものではなく、他の掘削手段が使用されてもよい。例えば、掘削ボリュームおよび掘削力の向上を図るために、クラムシェル61に代えてドレッジャーバケットが使用されてもよい。
土質試験は、スウェーデン式サウンディング試験、オートマチックラムサウンディング試験、ポータブルコーン貫入試験、および簡易動的コーン貫入試験に限定されるものではなく、他の土質試験が行われてもよい。
浮体足場40の構成部材41は、平面視で、前記実施形態では四角形状を呈しているが、これに限定されるものではなく、例えば六角形状等の他の形状を呈していてもよい。
本発明は、貯槽100に対して検査等の他の作業を行うに際して貯槽100内の下部に存在する残存物30を除去する方法に適用されてもよい。
Although the embodiment of the present invention has been described above, the present invention is not limited to the above embodiment, and can be appropriately modified without departing from the spirit of the present invention.
For example, in the above embodiment, after the remaining objects 30 are removed in steps S7 and S8, water is poured into the storage tank 100 and further dismantling work is performed on the floating scaffolding 40, but these operations may be omitted. In this case, it is possible to perform the dismantling work directly using, for example, heavy machinery without performing steps S7 and S8.
Although the clamshell 61 and the hammer grab 62 are given as examples of the excavation means 60, the present invention is not limited thereto, and other excavation means may be used. For example, a dredger bucket may be used instead of the clamshell 61 to improve the excavation volume and excavation force.
The soil tests are not limited to Swedish sounding tests, automatic ram sounding tests, portable cone penetration tests, and simplified dynamic cone penetration tests, but other soil tests may be performed.
In the above embodiment, the constituent member 41 of the floating scaffolding 40 has a rectangular shape when viewed in a plan view, but this is not limited to this and may have other shapes, such as a hexagonal shape.
The present invention may be applied to a method for removing residual material 30 present at the bottom of a storage tank 100 when other work such as inspection is performed on the storage tank 100.

30 残存物
40 浮体足場
50 水面(液面)
60 掘削手段
61 クラムシェル
62 ハンマーグラブ
100 貯槽
30 Remains 40 Floating scaffolding 50 Water surface (liquid surface)
60 Excavation means 61 Clamshell 62 Hammer grab 100 Storage tank

Claims (6)

貯槽内の下部に存在する残存物を除去する方法であって、
前記貯槽の上部に設けられた上部構造体を撤去し、
土質試験によって前記残存物の深度方向の強度特性を把握し、
把握された前記強度特性に適した掘削手段を選定し、
選定された前記掘削手段によって前記残存物を掘削して除去する貯槽内残存物の除去方法であって、
前記上部構造体は、前記残存物よりも上方に存在する液面に浮設した浮体足場から作業者が作業することにより撤去し、
前記残存物を掘削する前に前記浮体足場を撤去すること、を特徴とする貯槽内残存物の除去方法。
A method for removing residual material present at the bottom of a storage tank, comprising the steps of:
The upper structure provided on the upper part of the storage tank is removed,
Grasping the strength characteristics of the remains in the depth direction through soil testing;
Selecting an excavation means suitable for the identified strength characteristics;
A method for removing residual material in a storage tank, comprising the steps of: excavating and removing the residual material using a selected excavation means,
The upper structure is removed by a worker working from a floating scaffolding that is floating on the liquid surface above the remaining objects,
A method for removing material remaining in a storage tank, comprising removing the floating scaffolding before excavating the material remaining .
前記浮体足場は、前記貯槽の内部形状に合わせて前記液面上で拡大縮小させるように変形可能であること、を特徴とする請求項に記載の貯槽内残存物の除去方法。 The method for removing material remaining in a tank as described in claim 1 , characterized in that the floating scaffolding is deformable so as to expand and contract on the liquid surface to match the internal shape of the tank. 前記残存物が除去された後に、前記貯槽内に液体を注入して、前記浮体足場上でさらに前記貯槽の一部の解体作業を行うこと、を特徴とする請求項または請求項に記載の貯槽内残存物の除去方法。 A method for removing residual material from a tank as described in claim 1 or claim 2 , characterized in that after the residual material is removed, liquid is injected into the tank and further dismantling work of part of the tank is carried out on the floating scaffolding. 前記残存物を除去する前に、前記貯槽の上部から前記残存物よりも上方の所定高さ位置までの解体作業を行うこと、を特徴とする請求項1に記載の貯槽内残存物の除去方法。 The method for removing residual material from a storage tank according to claim 1, characterized in that, before removing the residual material, dismantling work is carried out from the top of the storage tank to a predetermined height position above the residual material. 前記掘削手段は、クラムシェルおよびハンマーグラブを含み、前記クラムシェルが選定される場合の前記強度特性は、前記ハンマーグラブが選定される場合の前記強度特性よりも低いこと、を特徴とする請求項1から請求項のいずれか一項に記載の貯槽内残存物の除去方法。 A method for removing material remaining in a storage tank described in any one of claims 1 to 4, characterized in that the excavation means includes a clamshell and a hammer grab, and the strength characteristics when the clamshell is selected are lower than the strength characteristics when the hammer grab is selected. 前記土質試験は、スウェーデン式サウンディング試験、オートマチックラムサウンディング試験、ポータブルコーン貫入試験、および簡易動的コーン貫入試験から選択された少なくとも一つを含むこと、を特徴とする請求項1から請求項のいずれか一項に記載の貯槽内残存物の除去方法。 The method for removing residual material from a storage tank described in any one of claims 1 to 5 , characterized in that the soil test includes at least one selected from a Swedish sounding test, an automatic ram sounding test, a portable cone penetration test, and a simplified dynamic cone penetration test.
JP2021093870A 2021-06-03 2021-06-03 How to remove residue from storage tanks Active JP7588036B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021093870A JP7588036B2 (en) 2021-06-03 2021-06-03 How to remove residue from storage tanks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021093870A JP7588036B2 (en) 2021-06-03 2021-06-03 How to remove residue from storage tanks

Publications (2)

Publication Number Publication Date
JP2022185932A JP2022185932A (en) 2022-12-15
JP7588036B2 true JP7588036B2 (en) 2024-11-21

Family

ID=84441571

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021093870A Active JP7588036B2 (en) 2021-06-03 2021-06-03 How to remove residue from storage tanks

Country Status (1)

Country Link
JP (1) JP7588036B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030150188A1 (en) 2002-02-12 2003-08-14 Loizeaux J. Mark Domed structure for demolition and method of demolition
JP2020041280A (en) 2018-09-07 2020-03-19 株式会社加藤建設 Excavation method of ground in open caisson method
JP2020125905A (en) 2019-02-01 2020-08-20 一般社団法人Nb研究所 Fuel debris processing method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030150188A1 (en) 2002-02-12 2003-08-14 Loizeaux J. Mark Domed structure for demolition and method of demolition
JP2020041280A (en) 2018-09-07 2020-03-19 株式会社加藤建設 Excavation method of ground in open caisson method
JP2020125905A (en) 2019-02-01 2020-08-20 一般社団法人Nb研究所 Fuel debris processing method

Also Published As

Publication number Publication date
JP2022185932A (en) 2022-12-15

Similar Documents

Publication Publication Date Title
BE1020071A5 (en) METHOD FOR PROVIDING A FOUNDATION FOR A MASS FIXED AT HEIGHT AND A POSITIONING FRAME FOR CARRYING OUT THE METHOD.
CN108265635B (en) A kind of coastal dock is hurt bridge pier by damage and does not repair reinforcement method under Unloading Condition
CN110965804B (en) A method for removing the foundation of an offshore wind power jacket
KR20190109748A (en) System used in crane of ship
CN105987850A (en) Water area vane shear test platform with bucket truss and installation method
KR20200081143A (en) Pre-piling template using spudcan and installation method of offshore structure using thereof
CN102644290A (en) Steel cofferdam construction method suitable for construction of deep silt layer bridge in shallow sea area
JP7588036B2 (en) How to remove residue from storage tanks
CN111576247A (en) Double-wall steel cofferdam and short pile casing group integral positioning and mounting structure and construction method
CN103422486A (en) Shipborne truss combined in-situ testing platform
US10472791B1 (en) Removing submerged piles of offshore production platforms
JP2017071993A (en) A method of construction in the underwater deadline structure
CN118793053A (en) A pile driving guide frame and construction method thereof
JP6718769B2 (en) Excavation method for earth and sand and excavator
CN109024660A (en) Pile foundation method for dismounting and offshore foundation method for dismounting
CN210737541U (en) Positioning device for lowering protective cylinder of underwater cast-in-place pile
CN214616435U (en) Hole-forming automatic salvage equipment
CN116752829A (en) Offshore anemometer tower dismantling construction method
Hamidi et al. Ground improvement in deep waters using dynamic replacement
CN105040700B (en) The equipment removed for the internal sediment of minor diameter pile tube and using method thereof
CN115075230B (en) Construction method of pedestal pile and reinforcement cage used in construction method
JP2002234484A (en) Load test method for work barge
JPS58512A (en) Construction of large-size structure in dock
SHUKLA et al. Modelling of dragline boom structure.
JP7578284B2 (en) Sandbag manufacturing equipment

Legal Events

Date Code Title Description
A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20210617

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230829

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240522

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240528

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240702

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241105

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241111

R150 Certificate of patent or registration of utility model

Ref document number: 7588036

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150