Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7588045B2 - CONTROLLER, CONTROL PROGRAM, CONTROL METHOD, AND POWER SUPPLY SYSTEM - Google Patents
[go: Go Back, main page]

JP7588045B2 - CONTROLLER, CONTROL PROGRAM, CONTROL METHOD, AND POWER SUPPLY SYSTEM - Google Patents

CONTROLLER, CONTROL PROGRAM, CONTROL METHOD, AND POWER SUPPLY SYSTEM Download PDF

Info

Publication number
JP7588045B2
JP7588045B2 JP2021122641A JP2021122641A JP7588045B2 JP 7588045 B2 JP7588045 B2 JP 7588045B2 JP 2021122641 A JP2021122641 A JP 2021122641A JP 2021122641 A JP2021122641 A JP 2021122641A JP 7588045 B2 JP7588045 B2 JP 7588045B2
Authority
JP
Japan
Prior art keywords
storage battery
power
discharging
charging
systems
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021122641A
Other languages
Japanese (ja)
Other versions
JP2023018482A (en
Inventor
昌弘 数見
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yokogawa Electric Corp
Yokogawa Solution Service Corp
Original Assignee
Yokogawa Electric Corp
Yokogawa Solution Service Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yokogawa Electric Corp, Yokogawa Solution Service Corp filed Critical Yokogawa Electric Corp
Priority to JP2021122641A priority Critical patent/JP7588045B2/en
Publication of JP2023018482A publication Critical patent/JP2023018482A/en
Application granted granted Critical
Publication of JP7588045B2 publication Critical patent/JP7588045B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、コントローラ、制御プログラム、制御方法及び電力供給システムに関する。 The present invention relates to a controller, a control program, a control method, and a power supply system.

例えば特許文献1は、各々が蓄電池に接続された複数の電力変換装置それぞれの電力変換効率が高くなるように充放電電力を制御する手法を開示する。 For example, Patent Document 1 discloses a method for controlling charging and discharging power so that the power conversion efficiency of each of multiple power conversion devices connected to a storage battery is increased.

特開2020-137131号公報JP 2020-137131 A

蓄電池の充放電効率も充放電電力によって変化する。特許文献1のように電力変換装置の電力変換効率を見ているだけでは、蓄電池の充放電効率及び電力変換装置の電力変換効率の全体の効率を最適化することができない場合がある。 The charge/discharge efficiency of the storage battery also changes depending on the charge/discharge power. By only looking at the power conversion efficiency of the power conversion device, as in Patent Document 1, it may not be possible to optimize the overall efficiency of the charge/discharge efficiency of the storage battery and the power conversion efficiency of the power conversion device.

本発明は、蓄電池の充放電効率及び電力変換装置の電力変換効率の全体の効率を最適化することを目的とする。 The present invention aims to optimize the overall efficiency of the charge/discharge efficiency of the storage battery and the power conversion efficiency of the power conversion device.

一側面に係るコントローラは、少なくとも1つの運転目的に従って、複数の蓄電池システムそれぞれを充放電制御するコントローラであって、複数の蓄電池システムそれぞれは、蓄電池、及び、当該蓄電池に接続された電力変換装置を含み、少なくとも1つの運転目的は、複数の蓄電池システムそれぞれの動作効率が高くなるように複数の蓄電池システムそれぞれを充放電させる第1の運転目的を含み、動作効率は、充放電電力に対する蓄電池の充放電効率及び電力変換装置の電力変換効率の全体の効率である。 A controller according to one aspect is a controller that controls the charging and discharging of each of a plurality of storage battery systems in accordance with at least one operating objective, each of the plurality of storage battery systems including a storage battery and a power conversion device connected to the storage battery, and the at least one operating objective includes a first operating objective of charging and discharging each of the plurality of storage battery systems so that the operating efficiency of each of the plurality of storage battery systems is high, and the operating efficiency is the overall efficiency of the charging and discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to the charging and discharging power.

一側面に係る制御プログラムは、コンピュータに、少なくとも1つの運転目的に従って、複数の蓄電池システムそれぞれを充放電制御する処理を実行させる制御プログラムであって、複数の蓄電池システムそれぞれは、蓄電池、及び、当該蓄電池に接続された電力変換装置を含み、少なくとも1つの運転目的は、複数の蓄電池システムそれぞれの動作効率が高くなるように複数の蓄電池システムそれぞれを充放電させる第1の運転目的を含み、動作効率は、充放電電力に対する蓄電池の充放電効率及び電力変換装置の電力変換効率の全体の効率である。 A control program according to one aspect causes a computer to execute processing for controlling the charging and discharging of each of a plurality of storage battery systems in accordance with at least one operating objective, each of the plurality of storage battery systems including a storage battery and a power conversion device connected to the storage battery, and the at least one operating objective includes a first operating objective of charging and discharging each of the plurality of storage battery systems so that the operating efficiency of each of the plurality of storage battery systems is high, and the operating efficiency is the overall efficiency of the charging and discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to the charging and discharging power.

一側面に係る制御方法は、少なくとも1つの運転目的に従って、複数の蓄電池システムそれぞれを充放電制御する制御方法であって、複数の蓄電池システムそれぞれは、蓄電池、及び、当該蓄電池に接続された電力変換装置を含み、少なくとも1つの運転目的は、複数の蓄電池システムそれぞれの動作効率が高くなるように複数の蓄電池システムそれぞれを充放電させる第1の運転目的を含み、動作効率は、充放電電力に対する蓄電池の充放電効率及び電力変換装置の電力変換効率の全体の効率である。 A control method according to one aspect is a control method for controlling the charging and discharging of each of a plurality of storage battery systems in accordance with at least one operating objective, each of the plurality of storage battery systems including a storage battery and a power conversion device connected to the storage battery, the at least one operating objective including a first operating objective of charging and discharging each of the plurality of storage battery systems so that the operating efficiency of each of the plurality of storage battery systems is high, and the operating efficiency is the overall efficiency of the charging and discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to the charging and discharging power.

一側面に係る電力供給システムは、複数の蓄電池システムと、少なくとも1つの運転目的に従って、複数の蓄電池システムそれぞれを充放電制御するコントローラと、を備え、複数の蓄電池システムそれぞれは、蓄電池、及び、当該蓄電池に接続された電力変換装置を含み、少なくとも1つの運転目的は、複数の蓄電池システムそれぞれの動作効率が高くなるように複数の蓄電池システムそれぞれを充放電させる第1の運転目的を含み、動作効率は、充放電電力に対する蓄電池の充放電効率及び電力変換装置の電力変換効率の全体の効率である。 A power supply system according to one aspect includes a plurality of storage battery systems and a controller that controls charging and discharging of each of the plurality of storage battery systems according to at least one operating objective, each of the plurality of storage battery systems including a storage battery and a power conversion device connected to the storage battery, and the at least one operating objective includes a first operating objective of charging and discharging each of the plurality of storage battery systems so that the operating efficiency of each of the plurality of storage battery systems is high, and the operating efficiency is the overall efficiency of the charging and discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to the charging and discharging power.

本発明によれば、蓄電池の充放電効率及び電力変換装置の電力変換効率の全体の効率を最適化することが可能になる。 The present invention makes it possible to optimize the overall efficiency of the charge/discharge efficiency of the storage battery and the power conversion efficiency of the power conversion device.

実施形態に係るコントローラ4が用いられる電力供給システム100の概略構成の例を示す図である。1 is a diagram illustrating an example of a schematic configuration of a power supply system 100 in which a controller 4 according to an embodiment is used. システムデータ444の例を示す図である。FIG. 4 is a diagram showing an example of system data 444. 複数の蓄電池システム2それぞれのシステムデータ444の例を示す図である。A figure showing an example of system data 444 for each of multiple storage battery systems 2. 複数の蓄電池システム2それぞれのシステムデータ444の例を示す図である。A figure showing an example of system data 444 for each of multiple storage battery systems 2. 複数の蓄電池システム2それぞれのシステムデータ444の例を示す図である。A figure showing an example of system data 444 for each of multiple storage battery systems 2. 複数の蓄電池システム2それぞれのシステムデータ444の例を示す図である。A figure showing an example of system data 444 for each of multiple storage battery systems 2. 電力供給システム100において実行される処理の例を示すフローチャートである。4 is a flowchart illustrating an example of a process executed in the power supply system 100. コントローラのハードウェア構成の例を示す図である。FIG. 2 illustrates an example of a hardware configuration of a controller. 第1応用例に係るコントローラ4が用いられる電力供給システム100の概略構成の例を示す図である。1 is a diagram showing an example of a schematic configuration of a power supply system 100 in which a controller 4 according to a first application example is used. 発電装置Gの電力PGの例を示す図である。FIG. 2 is a diagram showing an example of power PG of a power generation device G. 蓄電池11の電力P1の目標値の例を示す図である。11 is a diagram showing an example of a target value of power P1 of the storage battery 11. FIG. 発電装置Gの電力PGと蓄電池11の電力P1の目標値との合計電力(PG+P1の目標値)の例を示す図である。11 is a diagram showing an example of the total power (target value of PG+P1) of the target values of the power PG of the power generation device G and the power P1 of the storage battery 11. FIG. 蓄電池21の電力P2の目標値の例を示す図である。11 is a diagram showing an example of a target value of power P2 of the storage battery 21. FIG. 連携点3の電力P3の例を示す図である。FIG. 13 is a diagram showing an example of power P3 at collaboration point 3. 蓄電池11の電力P1及び充放電電力量の例を示す図である。1 is a diagram showing an example of power P1 of a storage battery 11 and an example of a charge/discharge power amount. 蓄電池21の電力P2及び充放電電力量の例を示す図である。11 is a diagram showing an example of power P2 of the storage battery 21 and an example of the amount of charge and discharge power. FIG. 比較例の概略構成を示す図である。FIG. 1 is a diagram showing a schematic configuration of a comparative example. 比較例の電力P3Eの例を示す図である。FIG. 13 is a diagram illustrating an example of power P3E in a comparative example. 比較例の蓄電池21Eの電力P2E及び充放電電力量の例を示す図である。11 is a diagram showing an example of power P2E and charge/discharge power amount of a storage battery 21E of a comparative example. FIG. 蓄電池11の電力P1の目標値の例を示す図である。11 is a diagram showing an example of a target value of power P1 of the storage battery 11. FIG. 発電装置Gの電力PGと蓄電池11の電力P1の目標値との合計電力(PG+P1の目標値)の例を示す図である。11 is a diagram showing an example of the total power (target value of PG+P1) of the target values of the power PG of the power generation device G and the power P1 of the storage battery 11. FIG. 蓄電池21の電力P2の目標値の例を示す図である。11 is a diagram showing an example of a target value of power P2 of the storage battery 21. FIG. 連携点3の電力P3の例を示す図である。FIG. 13 is a diagram showing an example of power P3 at collaboration point 3. 蓄電池11の電力P1及び充放電電力量の例を示す図である。1 is a diagram showing an example of power P1 of a storage battery 11 and an example of a charge/discharge power amount. 蓄電池21の電力P2及び充放電電力量の例を示す図である。11 is a diagram showing an example of power P2 of the storage battery 21 and an example of the amount of charge and discharge power. FIG. 平均化された電力PGに基づく電力P1の目標値の算出の例を示す図である。FIG. 13 is a diagram showing an example of calculation of a target value of power P1 based on averaged power PG. 発電装置Gの電力PGと蓄電池11の電力P1の目標値との合計電力(PG+P1の目標値)の例を示す図である。11 is a diagram showing an example of the total power (target value of PG+P1) of the target values of the power PG of the power generation device G and the power P1 of the storage battery 11. FIG. 蓄電池21の電力P2の目標値の例を示す図である。11 is a diagram showing an example of a target value of power P2 of the storage battery 21. FIG. 連携点3の電力P3の例を示す図である。FIG. 13 is a diagram showing an example of power P3 at collaboration point 3. 蓄電池11の電力P1及び充放電電力量の例を示す図である。1 is a diagram showing an example of power P1 of a storage battery 11 and an example of a charge/discharge power amount. 蓄電池21の電力P2及び充放電電力量の例を示す図である。11 is a diagram showing an example of power P2 of the storage battery 21 and an example of the amount of charge and discharge power. FIG. 蓄電池11の電力P1のシフトの例を示す図である。FIG. 11 is a diagram showing an example of a shift in power P1 of the storage battery 11. 蓄電池11の電力P1のシフトの例を示す図である。FIG. 11 is a diagram showing an example of a shift in power P1 of the storage battery 11. 第2応用例に係るコントローラ4Aが用いられる電力供給システム100Aの概略構成の例を示す図である。FIG. 11 is a diagram showing an example of a schematic configuration of a power supply system 100A in which a controller 4A according to a second application example is used. 蓄電池11の電力P1の目標値の計画の例を示す図である。11 is a diagram showing an example of a plan for a target value of power P1 of the storage battery 11. FIG. 負荷の例を示す図である。電力線Wに接続され、電力線Wからの電力を消費する負荷を負荷Lと称し図示する。1 is a diagram showing an example of a load, which is connected to a power line W and consumes power from the power line W and is referred to as a load L. 変形例に係るコントローラ4Bの概略構成の例を示す図である。FIG. 13 is a diagram illustrating an example of a schematic configuration of a controller 4B according to a modified example.

以下、図面を参照しつつ実施形態について説明する。同一の要素、機能及び処理等には同一の符号を付し、重複する説明は適宜省略する。 The following describes the embodiments with reference to the drawings. The same elements, functions, processes, etc. are designated by the same reference numerals, and duplicate descriptions are omitted as appropriate.

図1は、実施形態に係るコントローラ4が用いられる電力供給システム100の概略構成の例を示す図である。電力供給システム100は、複数の蓄電池システム2と、連携点3と、コントローラ4と、電力線Wと、電力線W2と含む。 Figure 1 is a diagram showing an example of the schematic configuration of a power supply system 100 in which a controller 4 according to an embodiment is used. The power supply system 100 includes a plurality of storage battery systems 2, a connection point 3, a controller 4, a power line W, and a power line W2.

先に電力線W、電力線W2及び連携点3について説明する。電力線W及び電力線W2は、複数の蓄電池システム2と、連携点3とを接続する。電力線W2は、複数の蓄電池システム2と電力線Wとの間に接続される。とくに説明がある場合を除き、電力線W及び電力線W2は交流電力線であるものとする。交流電力は有効電力を指し示すものとする。なお、電力線W2は、複数の蓄電池システム2を束ねる電力線として便宜上図示され説明される。電力線W2は無くてもよく、その場合、電力線Wが、蓄電池システム2と連携点3とを接続する。 First, the power line W, the power line W2, and the connection point 3 will be described. The power line W and the power line W2 connect the multiple storage battery systems 2 to the connection point 3. The power line W2 is connected between the multiple storage battery systems 2 and the power line W. Unless otherwise specified, the power line W and the power line W2 are assumed to be AC power lines. AC power refers to active power. For convenience, the power line W2 is illustrated and described as a power line bundling the multiple storage battery systems 2. The power line W2 may be omitted, in which case the power line W connects the storage battery systems 2 to the connection point 3.

連携点3は、電力線Wと電力網9との接続点である。連携点3を介して、蓄電池システム2と電力網9との間で電力の授受が行われる。電力網9の例は商用電力網(商用系統)であり、その場合、電力供給システム100は電力網9と連携運転してよい。 The connection point 3 is a connection point between the power line W and the power grid 9. Electric power is exchanged between the storage battery system 2 and the power grid 9 via the connection point 3. An example of the power grid 9 is a commercial power grid (commercial system), and in this case, the power supply system 100 may operate in cooperation with the power grid 9.

複数の蓄電池システム2は、電力線W、より具体的には電力線W2からみたときに互いに並列に接続される。複数の蓄電池システム2それぞれを区別できるように、蓄電池システム2-1、蓄電池システム2-2、蓄電池システム2-3及び蓄電池システム2-nとして図示する。なお、複数の蓄電池システム2の数は2以上であればよく、従って、nは2以上の整数であればよい。 The multiple storage battery systems 2 are connected in parallel to each other when viewed from the power line W, more specifically, from the power line W2. In order to distinguish between the multiple storage battery systems 2, they are illustrated as storage battery system 2-1, storage battery system 2-2, storage battery system 2-3, and storage battery system 2-n. Note that the number of multiple storage battery systems 2 may be two or more, and therefore n may be an integer of two or more.

蓄電池システム2は、蓄電池21と、PCS22と、端子23と、バッテリコントローラ24とを含む。複数の蓄電池システム2それぞれの蓄電池21を区別できるように、蓄電池21-1、蓄電池21-2、蓄電池21-3及び蓄電池21-nと称し図示する。PCS22、端子23及びバッテリコントローラ24についても同様である。 The storage battery system 2 includes a storage battery 21, a PCS 22, terminals 23, and a battery controller 24. In order to distinguish between the storage batteries 21 of each of the multiple storage battery systems 2, they are illustrated as storage battery 21-1, storage battery 21-2, storage battery 21-3, and storage battery 21-n. The same is true for the PCS 22, terminals 23, and battery controller 24.

蓄電池21は、PCS22を介して、電力線W2ひいては電力線Wとの間で充放電を行う。PCS22は、蓄電池21に接続され、蓄電池21を充放電させる電力変換装置である。より具体的に、PCS22は、蓄電池21からの電力を交流電力に変換して電力線W2に供給したり、電力線W2からの交流電力を直流電力に変換して蓄電池21に供給したりする双方向電力変換装置である。PCS22は、Power Conditioning System、Power Converter等とも称される。 The storage battery 21 charges and discharges between the power line W2 and the power line W via the PCS 22. The PCS 22 is a power conversion device that is connected to the storage battery 21 and charges and discharges the storage battery 21. More specifically, the PCS 22 is a bidirectional power conversion device that converts the power from the storage battery 21 into AC power and supplies it to the power line W2, and converts the AC power from the power line W2 into DC power and supplies it to the storage battery 21. The PCS 22 is also called a Power Conditioning System, Power Converter, etc.

PCS22を介した蓄電池21の充放電電力を、電力pと称し図示する。電力pにおいては、放電電力がプラスであるものとする。蓄電池システム2-1、蓄電池システム2-2、蓄電池システム2-3及び蓄電池システム2-nの電力pを、電力p-1、電力p-2、電力p-3及び電力p-nと称し図示する。 The charging and discharging power of the storage battery 21 via the PCS 22 is illustrated and referred to as power p. With respect to power p, the discharged power is assumed to be positive. The power p of the storage battery system 2-1, storage battery system 2-2, storage battery system 2-3, and storage battery system 2-n is illustrated and referred to as power p-1, power p-2, power p-3, and power p-n.

複数の蓄電池システム2それぞれの電力pは、電力線W2でまとめられる。電力線W2によってまとめられた電力を、電力P2と称し図示する。電力P2においても、放電電力がプラスであるものとする。電力P2は、電力p-1~電力p-nの合計電力である。以下、複数の蓄電池システム2それぞれの電力pを、「各電力p」とも称する。 The power p of each of the multiple storage battery systems 2 is combined by the power line W2. The power combined by the power line W2 is referred to as power P2 and illustrated. The discharge power of power P2 is also assumed to be positive. Power P2 is the total power of power p-1 to power p-n. Hereinafter, the power p of each of the multiple storage battery systems 2 is also referred to as "each power p."

端子23は、蓄電池システム1の出力端子であり、PCS22と電力線Wとの接続を与える。バッテリコントローラ24は、PCS22を制御することによって、蓄電池21を充放電制御する。例えば、バッテリコントローラ24は、PCS22に出力指令値を与える。出力指令値は、例えば電力pの大きさ及び向き(充電又は放電)を規定する。他にも、バッテリコントローラ24は、端子23における電力pを監視したり、蓄電池21のSOC(State Of Charge)や残存容量を監視したりする。バッテリコントローラ24は、コントローラ4と通信可能に構成される。SOCの単位の例は、%であり、残存容量の単位の例は、Ah、Wh等である。以後、矛盾の無い範囲で、SOC及び残存容量は適宜読み替えられてよく、また、SOC及び残存容量の一方が他方を含む意味に解されてよい。 The terminal 23 is an output terminal of the storage battery system 1, and provides a connection between the PCS 22 and the power line W. The battery controller 24 controls the charging and discharging of the storage battery 21 by controlling the PCS 22. For example, the battery controller 24 provides an output command value to the PCS 22. The output command value specifies, for example, the magnitude and direction (charging or discharging) of the power p. In addition, the battery controller 24 monitors the power p at the terminal 23, and monitors the SOC (State Of Charge) and remaining capacity of the storage battery 21. The battery controller 24 is configured to be able to communicate with the controller 4. An example of the unit of the SOC is %, and an example of the unit of the remaining capacity is Ah, Wh, etc. Hereinafter, the SOC and remaining capacity may be interpreted as appropriate within the scope of no contradiction, and one of the SOC and remaining capacity may be interpreted as including the other.

コントローラ4は、電力供給システム100の運転目的に従って、複数の蓄電池システム2それぞれを充放電制御する。コントローラ4は、取得部41と、算出部42と、充放電制御部43と、記憶部44とを含む。 The controller 4 controls the charging and discharging of each of the multiple storage battery systems 2 according to the operation purpose of the power supply system 100. The controller 4 includes an acquisition unit 41, a calculation unit 42, a charge and discharge control unit 43, and a memory unit 44.

取得部41は、蓄電池システム2の充放電制御に必要な情報を取得する。例えば、取得部41は、電力情報を取得する。電力情報の例は、電力値等であり、図示しない電力測定装置等によって測定、監視等される。電力の例は、蓄電池システム2の電力p等である。例えば、電力pの情報は、蓄電池システム2のバッテリコントローラ24からコントローラ4に送信され、取得部41によって取得される。 The acquisition unit 41 acquires information necessary for charge/discharge control of the storage battery system 2. For example, the acquisition unit 41 acquires power information. An example of the power information is a power value, etc., which is measured, monitored, etc. by a power measuring device (not shown). An example of the power is the power p of the storage battery system 2. For example, the information on the power p is transmitted from the battery controller 24 of the storage battery system 2 to the controller 4 and acquired by the acquisition unit 41.

また、取得部41は、蓄電池情報を取得する。蓄電池情報の例は、蓄電池21の残存容量及び電力価格である。残存容量を残存容量Qと称し、電力価格を電力価格Cと称する。残存容量Qは、バッテリコントローラ24からコントローラ4に送信され、取得部41によって取得される。電力価格Cは、蓄電池21に充電されている電力(残存容量Qに対応する電力)の価格である。例えば、蓄電池21の充電が行われた時間帯の電力価格(例えば電気料金)が、電力価格Cとなり得る。電力価格の異なる複数の時間帯で蓄電池21の充電が行われていた場合には、それぞれの電力価格を対応する充電電力量で重み付け平均して求められた価格が電力価格Cとして用いられてよい。電力価格Cは、バッテリコントローラ24が算出してもよいし、コントローラ4が算出してもよい。バッテリコントローラ24で算出された電力価格C、若しくは、電力価格Cの算出のもととなる充電時間帯等の情報が、バッテリコントローラ24からコントローラ4に送信され、取得部41によって取得される。 The acquisition unit 41 also acquires storage battery information. Examples of storage battery information are the remaining capacity and power price of the storage battery 21. The remaining capacity is referred to as the remaining capacity Q, and the power price is referred to as the power price C. The remaining capacity Q is transmitted from the battery controller 24 to the controller 4 and acquired by the acquisition unit 41. The power price C is the price of the power (power corresponding to the remaining capacity Q) charged to the storage battery 21. For example, the power price C may be the power price (e.g., the electricity rate) during the time period during which the storage battery 21 is charged. When the storage battery 21 is charged during multiple time periods with different power prices, the price obtained by weighting and averaging the respective power prices with the corresponding charging power amount may be used as the power price C. The power price C may be calculated by the battery controller 24 or the controller 4. The power price C calculated by the battery controller 24, or information such as the charging time period on which the power price C is calculated, is transmitted from the battery controller 24 to the controller 4 and acquired by the acquisition unit 41.

算出部42は、電力P2の目標値に基づいて、各電力pの目標値を算出する。電力P2の目標値は、コントローラ4の外部から与えられてもよいし、算出部42内で算出されてもよい。算出部42による算出の詳細は後述する。 The calculation unit 42 calculates the target value of each power p based on the target value of the power P2. The target value of the power P2 may be provided from outside the controller 4 or may be calculated within the calculation unit 42. Details of the calculation by the calculation unit 42 will be described later.

充放電制御部43は、算出部42によって算出された各電力pの目標値に基づいて、複数の蓄電池システム2それぞれを充放電制御する。例えば、充放電制御部43は、電力pの目標値に対応するPCS22の出力指令値をバッテリコントローラ24に送信する。バッテリコントローラ24は、受信した出力指令値をPCS22に与える。PCS22は、与えられた出力指令値に従って蓄電池21を充放電させる。蓄電池システム2の電力pが目標値に近づく。 The charge/discharge control unit 43 controls the charging and discharging of each of the multiple storage battery systems 2 based on the target value of each power p calculated by the calculation unit 42. For example, the charge/discharge control unit 43 transmits an output command value of the PCS 22 corresponding to the target value of the power p to the battery controller 24. The battery controller 24 provides the received output command value to the PCS 22. The PCS 22 charges and discharges the storage battery 21 according to the provided output command value. The power p of the storage battery system 2 approaches the target value.

記憶部44は、コントローラ4での制御に必要な種々の情報を記憶する。記憶部44に記憶される情報として、制御プログラム441及びシステムデータ444が例示される。制御プログラム441は、コントローラ4において実行される制御(処理)をコンピュータに実行させるプログラムである。システムデータ444は、蓄電池システム2に関するデータである。システムデータ444について、図2~図6を参照して説明する。 The memory unit 44 stores various information necessary for control by the controller 4. Examples of information stored in the memory unit 44 include a control program 441 and system data 444. The control program 441 is a program that causes a computer to execute the control (processing) executed by the controller 4. The system data 444 is data related to the storage battery system 2. The system data 444 will be described with reference to Figures 2 to 6.

図2は、システムデータ444の例を示す図である。この例では、システムデータ444は、蓄電池システム2と、効率関数E(p)と、残存容量Qと、電力価格Cとを対応付けて記述する。蓄電池システム2-1、蓄電池システム2-2、蓄電池システム2-3及び蓄電池システム2-nそれぞれの効率関数E(p)を、効率関数E(p)、効率関数E(p)、効率関数E(p)及び効率関数E(p)と称する。残存容量Q及び電力価格Cについても同様である。 2 is a diagram showing an example of the system data 444. In this example, the system data 444 describes the storage battery system 2, an efficiency function E(p), a remaining capacity Q, and an electricity price C in association with each other. The efficiency functions E(p) of the storage battery system 2-1, the storage battery system 2-2, the storage battery system 2-3, and the storage battery system 2-n are referred to as efficiency function E 1 (p), efficiency function E 2 (p), efficiency function E 3 (p), and efficiency function E n (p). The same applies to the remaining capacity Q and the electricity price C.

効率関数E(p)は、蓄電池システム2の電力pを引数とし、蓄電池システム2の動作効率Eを戻り値とする関数である。動作効率Eは、蓄電池システム2の充放電電力に対する蓄電池21の充放電効率とPCS22の電力変換効率との全体の効率である。或る電力pでの蓄電池21の充放電効率をηbatとし、PCS22の電力変換効率をηpcsとすると、その電力pでの動作効率Eは、下記の式(1)のように、充放電効率ηbatと、電力変換効率ηpcsとの積で表される。充電と放電で効率が異なる場合は各変数を分けてもよい。

Figure 0007588045000001
The efficiency function E(p) is a function that takes the power p of the storage battery system 2 as an argument and the operation efficiency E of the storage battery system 2 as a return value. The operation efficiency E is the overall efficiency of the charge/discharge efficiency of the storage battery 21 and the power conversion efficiency of the PCS 22 with respect to the charge/discharge power of the storage battery system 2. If the charge/discharge efficiency of the storage battery 21 at a certain power p is η bat and the power conversion efficiency of the PCS 22 is η pcs , the operation efficiency E at that power p is expressed as the product of the charge/discharge efficiency η bat and the power conversion efficiency η pcs , as shown in the following formula (1). When the efficiency differs between charging and discharging, each variable may be separated.
Figure 0007588045000001

残存容量Q及び電力価格Cについては、先に説明したとおりである。効率関数E(p)、残存容量Q及び電力価格Cは、複数の蓄電池システム2それぞれで異なり得る。これについて、図3~図6を参照して説明する。 The remaining capacity Q and the electricity price C are as explained above. The efficiency function E(p), remaining capacity Q, and electricity price C may differ for each of the multiple storage battery systems 2. This will be explained with reference to Figures 3 to 6.

図3~図6は、複数の蓄電池システム2それぞれのシステムデータ444の例を示す図である。図3、図4、図5及び図6には、蓄電池システム2-1、蓄電池システム2-2、蓄電池システム2-3及び蓄電池システム2-nのシステムデータ444が例示される。各図の(A)には効率関数E(p)が模式的に示され、(B)には残存容量Q及び電力価格Cが模式的に示される。 Figures 3 to 6 are diagrams showing examples of system data 444 for each of multiple storage battery systems 2. Figures 3, 4, 5, and 6 show examples of system data 444 for storage battery system 2-1, storage battery system 2-2, storage battery system 2-3, and storage battery system 2-n. In each figure, (A) shows a schematic representation of the efficiency function E(p), and (B) shows a schematic representation of the remaining capacity Q and the power price C.

図3~図6の(A)において、電力p(の大きさ)に対する動作効率Eが最大となるピーク位置を含む動作領域が破線で囲まれて示される。理解されるように、複数の蓄電池システム2それぞれの動作効率のピーク位置は、互いに異なり得る。複数の蓄電池システム2それぞれの蓄電池21の充放電効率のピーク位置が異なったり、それぞれのPCS22の電力変換効率のピーク位置が異なったりする等の理由からである。蓄電池21の充放電効率のピーク位置の相違の要因の例は、蓄電池21の設計(型番等)が異なる場合や、使用期間(運用開始時期等)が異なる場合等である。設計が異なれば、充放電電力に対する充放電効率を示す充放電効率特性が異なり得る。使用期間が異なれば、蓄電池21の劣化の進行の程度等が異なるので、充放電効率特性が異なり得る。PCS22についても同様のことがいえる。 3 to 6A, the operating region including the peak position where the operating efficiency E with respect to the power p (magnitude) is maximum is surrounded by a dashed line. As can be understood, the peak position of the operating efficiency of each of the multiple storage battery systems 2 may differ from each other. This is because the peak positions of the charge and discharge efficiency of the storage batteries 21 of each of the multiple storage battery systems 2 may differ, or the peak positions of the power conversion efficiency of each PCS 22 may differ. Examples of factors that cause differences in the peak positions of the charge and discharge efficiency of the storage batteries 21 include cases where the design (model number, etc.) of the storage batteries 21 is different, or cases where the period of use (start of operation, etc.) is different. If the design is different, the charge and discharge efficiency characteristics indicating the charge and discharge efficiency with respect to the charge and discharge power may differ. If the period of use is different, the degree of deterioration of the storage batteries 21, etc. will differ, and therefore the charge and discharge efficiency characteristics may differ. The same can be said for the PCS 22.

例示される蓄電池システム2の中では、蓄電池システム2-1のピーク位置に対応する電力pの大きさが最も大きく、蓄電池システム2-2のピーク位置に対応する電力pの大きさが最も小さい。蓄電池システム2-3及び蓄電池システム2-nのピーク位置に対応する電力pの大きさは、それらの間の大きさである。なお、蓄電池システム2の電力pの大きさがゼロの場合には、蓄電池システム2のPCS22が停止し、電力消費が最小化される。この電力pの大きさがゼロの位置も、ピーク位置として扱われてよい。この場合には、充放電を行う蓄電池システム2の数の制御(台数制御)も、蓄電池システム2の充放電制御に含まれる。 Of the illustrated storage battery systems 2, the magnitude of power p corresponding to the peak position of storage battery system 2-1 is the largest, and the magnitude of power p corresponding to the peak position of storage battery system 2-2 is the smallest. The magnitudes of power p corresponding to the peak positions of storage battery system 2-3 and storage battery system 2-n are between them. When the magnitude of power p of storage battery system 2 is zero, the PCS 22 of storage battery system 2 is stopped, and power consumption is minimized. The position where the magnitude of power p is zero may also be treated as a peak position. In this case, control of the number of storage battery systems 2 that perform charging and discharging (unit number control) is also included in the charge and discharge control of storage battery system 2.

図3~図6の(B)に示されるように、複数の蓄電池システム2それぞれの残存容量Qは、互いに異なり得る。電力価格Cについても同様である。例示される蓄電池システム2の中では、蓄電池システム2-1の残存容量Qが最も大きく(例えばSOC100%)、蓄電池システム2-nの残存容量Qが最も小さい(例えばSOC20%)。蓄電池システム2-2の残存容量Q2及び蓄電池システム2-3の残存容量Q3は、それらの間の大きさ(例えばSOC50%及びSOC70%)である。 3 to 6B, the remaining capacity Q of each of the multiple storage battery systems 2 may differ from one another. The same applies to the electricity price C. Among the illustrated storage battery systems 2, the remaining capacity Q1 of storage battery system 2-1 is the largest (e.g., SOC 100%), and the remaining capacity Qn of storage battery system 2-n is the smallest (e.g., SOC 20%). The remaining capacity Q2 of storage battery system 2-2 and the remaining capacity Q3 of storage battery system 2-3 are between them (e.g., SOC 50% and SOC 70%).

図1に戻り、システムデータ444の一部は予め生成されて記憶部44に記憶され、他は記憶部44に適時生成、取得等されて記憶部44に記憶される。例えば、蓄電池システム2の初期の効率関数E(p)は、予め生成され、記憶部44に記憶される。蓄電池システム2の使用期間等によって効率関数E(p)が変化し得るので、効率関数E(p)は、適時アップデートされてよい。残存容量Q及び電力価格Cは、取得部41によって取得され、記憶部44に記憶される。 Returning to FIG. 1, part of the system data 444 is generated in advance and stored in the storage unit 44, and the rest is generated, acquired, etc., as appropriate and stored in the storage unit 44. For example, an initial efficiency function E(p) of the battery system 2 is generated in advance and stored in the storage unit 44. Since the efficiency function E(p) may change depending on the period of use of the battery system 2, etc., the efficiency function E(p) may be updated as appropriate. The remaining capacity Q and the electricity price C are acquired by the acquisition unit 41 and stored in the storage unit 44.

他にも、記憶部44は、取得部41による取得や算出部42による算出に関するさまざまな情報を記憶する。 In addition, the memory unit 44 stores various information related to the acquisition by the acquisition unit 41 and the calculation by the calculation unit 42.

算出部42について詳述する。算出部42は、電力P2の目標値と、システムデータ444とに基づいて、各電力pの目標値を算出する。算出部42は、各電力pの目標値の合計が、電力P2の目標値と等しくなるように、各電力pの目標値を算出する。本実施形態では、少なくとも1つの運転目的に従って、各電力pの目標値が算出される。以下では、3つの運転目的を例に挙げて説明する。 The calculation unit 42 will be described in detail. The calculation unit 42 calculates the target value of each power p based on the target value of power P2 and the system data 444. The calculation unit 42 calculates the target value of each power p so that the sum of the target values of each power p is equal to the target value of power P2. In this embodiment, the target value of each power p is calculated according to at least one operation objective. The following describes three operation objectives as examples.

第1の運転目的は、複数の蓄電池システム2それぞれの動作効率Eが高くなるように複数の蓄電池システム2それぞれを充放電させることを含む。第1の運転目的は、充電時(電力P2の目標値が正)及び放電時(電力P2の目標値が負)のいずれでも採用可能である。例えば、算出部42は、複数の蓄電池システム2それぞれの動作効率Eがピーク位置に近づくように、各電力pの目標値を算出する。第1の運転目的に従う充放電制御により、複数の蓄電池システム2それぞれの動作効率Eを最適化することができる。 The first operating objective includes charging and discharging each of the multiple storage battery systems 2 so that the operating efficiency E of each of the multiple storage battery systems 2 is high. The first operating objective can be adopted both during charging (the target value of power P2 is positive) and during discharging (the target value of power P2 is negative). For example, the calculation unit 42 calculates the target value of each power p so that the operating efficiency E of each of the multiple storage battery systems 2 approaches a peak position. By controlling charging and discharging in accordance with the first operating objective, the operating efficiency E of each of the multiple storage battery systems 2 can be optimized.

第2の運転目的は、複数の蓄電池システム2それぞれの蓄電池21のうち、残存容量Qの大きい蓄電池21を優先して放電させ、残存容量Qの小さい蓄電池21を優先して充電させることを含む。第2の運転目的は、充電時及び放電時のいずれでも採用可能である。例えば、放電時には、算出部42は、残存容量Qが大きい(つまり空き容量が小さい)蓄電池21の電力pが、他の蓄電池21の電力pよりも大きくなるように、各電力pの目標値を算出する。充電時には、算出部42は、残存容量Qが小さい(つまり空き容量が大きい)蓄電池21の電力pが、他の蓄電池21の電力pより大きくなるように、各電力pの目標値を算出する。第2の運転目的に従う充放電制御により、各蓄電池21の残存容量Qの差を小さくする(バランスさせる)ことができる。各蓄電池21の残存容量Qを結果的にSOC50%付近にすることができるため、その後の運転が充電になっても放電になっても対応できる容量を確保することができる。 The second operation objective includes giving priority to discharging the storage battery 21 with a large remaining capacity Q among the storage batteries 21 of each of the multiple storage battery systems 2, and giving priority to charging the storage battery 21 with a small remaining capacity Q. The second operation objective can be adopted both during charging and discharging. For example, during discharging, the calculation unit 42 calculates the target value of each power p so that the power p of the storage battery 21 with a large remaining capacity Q (i.e., small free capacity) is larger than the power p of the other storage batteries 21. During charging, the calculation unit 42 calculates the target value of each power p so that the power p of the storage battery 21 with a small remaining capacity Q (i.e., large free capacity) is larger than the power p of the other storage batteries 21. The difference in the remaining capacity Q of each storage battery 21 can be reduced (balanced) by the charge/discharge control according to the second operation objective. Since the remaining capacity Q of each storage battery 21 can be brought to approximately SOC 50% as a result, a capacity that can be handled even if the subsequent operation is charging or discharging can be secured.

第3の運転目的は、複数の蓄電池システム2それぞれの蓄電池21のうち、充電されている電力の価格が低い(安い)蓄電池21を優先して放電させることを含む。第3の運転目的は、充電時及び放電時のうち、放電時のみ採用可能である。例えば、算出部42は、電力価格Cが低い電力が充電されている蓄電池21の電力pが、他の蓄電池21の電力pよりも大きくなるように、各電力pの目標値を算出する。第3の運転目的に従う充放電制御により、電力価格Cが低い電力を優先して供給し、一方で、電力価格Cが高い電力をなるべく蓄電池21に温存することができる。電力コストの節約等のメリットが得られる。 The third operating objective includes giving priority to discharging the storage batteries 21 with a low (cheap) price of charged electricity among the storage batteries 21 in each of the multiple storage battery systems 2. The third operating objective can be adopted only during discharging, out of charging and discharging. For example, the calculation unit 42 calculates the target value of each power p so that the power p of the storage battery 21 charged with electricity with a low power price C is greater than the power p of the other storage batteries 21. By controlling charging and discharging in accordance with the third operating objective, it is possible to give priority to supplying electricity with a low power price C, while conserving as much electricity with a high power price C as possible in the storage batteries 21. Benefits such as saving electricity costs can be obtained.

一実施形態において、判定値Dが用いられる。判定値Dは、少なくとも1つの運転目的の反映の度合いを示す値(スコア)である。複数の運転目的を考慮する場合、判定値Dは、各々が重み付けされた複数の運転目的の度合いを示す。算出部42は、判定値Dが最も大きくなるように(スコアが最大化するように)、各電力pの目標値を算出する。放電時と充電時とで、用いられる判定値Dが異なり得る。以下、放電時及び充電時の順に説明する。なお、以下で示す判定式は一例である。 In one embodiment, a judgment value D is used. The judgment value D is a value (score) indicating the degree of reflection of at least one driving purpose. When multiple driving purposes are taken into consideration, the judgment value D indicates the degree of each of the multiple driving purposes, each of which is weighted. The calculation unit 42 calculates the target value of each power p so that the judgment value D becomes the largest (so that the score is maximized). The judgment value D used during discharging and charging may differ. Below, the explanation will be given in the order of discharging and charging. Note that the judgment formula shown below is an example.

放電時に用いられる判定値Dを、判定値D1と称する。判定値D1は、蓄電池システム2の動作効率Eが大きいほど判定値D1が大きくなるように定められる。また、判定値D1は、残存容量Qが大きいほど判定値D1が大きくなるように定められる。また、判定値D1は、電力価格Cが低いほど判定値D1が大きくなるように定められる。 The judgment value D used during discharge is referred to as judgment value D1. The judgment value D1 is determined so that the greater the operating efficiency E of the storage battery system 2, the greater the judgment value D1. The judgment value D1 is also determined so that the greater the remaining capacity Q, the greater the judgment value D1. The judgment value D1 is also determined so that the lower the electricity price C, the greater the judgment value D1.

例えば、算出部42は、以下の式(2)で与えられる判定値D1が最も大きくなり、且つ、式(3)を満たすように、各電力pを算出する。

Figure 0007588045000002
Figure 0007588045000003
上記の式(2)の左辺は、判定値D1である。右辺において、pは、k番目の蓄電池システム2の電力pの目標値である。E(P)は、k番目の蓄電池システム2の効率関数E(p)である。Qは、k番目の蓄電池システム2の蓄電池21の残存容量Qである。Cは、k番目の蓄電池システム2の蓄電池21に充電されている電力の電力価格Cである。係数Kは、効率関数E(p)の重み付け係数である。係数Kは、残存容量Qの重み付け係数である。係数Kは、電力価格Cの重み付け係数である。 For example, the calculation unit 42 calculates each power p so that the determination value D1 given by the following formula (2) is maximized and formula (3) is satisfied.
Figure 0007588045000002
Figure 0007588045000003
The left side of the above equation (2) is the judgment value D1. On the right side, pk is the target value of the power p of the kth storage battery system 2. Ek ( Pk ) is the efficiency function E(p) of the kth storage battery system 2. Qk is the remaining capacity Q of the storage battery 21 of the kth storage battery system 2. Ck is the electricity price C of the electricity charged to the storage battery 21 of the kth storage battery system 2. The coefficient Ke is a weighting coefficient for the efficiency function E(p). The coefficient Kq is a weighting coefficient for the remaining capacity Q. The coefficient Kc is a weighting coefficient for the electricity price C.

係数Kを大きくするほど、判定値D1に占める動作効率Eの割合が大きくなり、第1の運転目的の重みが大きくなる。係数Kを大きくするほど、判定値D1に占める残存容量Qの割合が大きくなり、第2の運転目的(ここでは放電時の第2の運転目的)の重みが大きくなる。係数Kを小さくするほど、判定値D1に占める電力価格Cの逆数の割合、すなわち電力価格Cの低い電力を供給することの割合が大きくなり、第3の運転目的の重みが大きくなる。 The larger the coefficient K e is, the larger the proportion of the operational efficiency E in the judgment value D1 becomes, and the weight of the first operational objective becomes greater. The larger the coefficient K q is, the larger the proportion of the remaining capacity Q in the judgment value D1 becomes, and the weight of the second operational objective (here, the second operational objective during discharging) becomes greater. The smaller the coefficient K c is, the larger the proportion of the reciprocal of the power price C in the judgment value D1, i.e., the proportion of supplying power with a low power price C, becomes, and the weight of the third operational objective becomes greater.

なお、判定値D1が第1の運転目的の反映の度合いだけを示す場合には、上記の式(2)の右辺は、効率関数E(p)に関する項目だけで記述されてもよい。同様に、第2の運転目的の場合には、残存容量Qに関する項目だけで記述されてもよい。第3の運転目的の場合には、電力価格Cに関する項目だけで記述されてもよい。 When the judgment value D1 indicates only the degree of reflection of the first operating objective, the right-hand side of the above formula (2) may be described only with terms related to the efficiency function E(p). Similarly, in the case of the second operating objective, it may be described only with terms related to the remaining capacity Q. In the case of the third operating objective, it may be described only with terms related to the electricity price C.

上記の式(3)の左辺は、電力P2の目標値である。右辺は、各電力pの目標値の合計値である。 The left side of the above equation (3) is the target value for power P2. The right side is the sum of the target values for each power p.

一方で、充電時に用いられる判定値Dを、判定値D2と称する。判定値D2は、蓄電池システム2の動作効率Eが大きいほど判定値D2が大きくなるように定められる。また、判定値D2は、残存容量Qが小さいほど判定値D2が大きくなるように定められる。 On the other hand, the judgment value D used during charging is referred to as judgment value D2. The judgment value D2 is set so that the judgment value D2 increases as the operating efficiency E of the storage battery system 2 increases. The judgment value D2 is also set so that the judgment value D2 increases as the remaining capacity Q decreases.

例えば、算出部42は、以下の式(4)で与えられる判定値D2が最も大きくなり、且つ、前述の式(3)を満たすように、各電力pを算出する。

Figure 0007588045000004
上記の式(4)の左辺は、判定値D2である。右辺は、先に説明した式(2)と比較して、電力価格Cに関する項が無い点、及び、残存容量Qに関する項が逆数となっている点において相違する。係数Kを大きくするほど、判定値D2に占める動作効率Eの割合が大きくなり、第1の運転目的の重みが大きくなる。係数Kを大きくするほど、判定値D2に占める残存容量Qの逆数(つまり空き容量)の割合が小さくなり、第2の運転目的(ここでは充電時の目標)の重みが大きくなる。 For example, the calculation unit 42 calculates each power p so that the judgment value D2 given by the following formula (4) is maximized and the above-mentioned formula (3) is satisfied.
Figure 0007588045000004
The left side of the above formula (4) is the judgment value D2. The right side differs from the previously described formula (2) in that there is no term related to the power price C, and the term related to the remaining capacity Q is an inverse. The larger the coefficient K e is, the larger the proportion of the operation efficiency E in the judgment value D2 becomes, and the weight of the first operation objective becomes greater. The larger the coefficient K q is, the smaller the proportion of the inverse of the remaining capacity Q (i.e., available capacity) in the judgment value D2 becomes, and the weight of the second operation objective (here, the target during charging) becomes greater.

なお、判定値D2が第1の運転目的の反映の度合いだけを示す場合には、上記の式(4)の右辺は、効率関数E(p)に関する項目だけで記述されてもよい。同様に、第2の運転目的の場合には、残存容量Qに関する項目だけで記述されてもよい。 When the judgment value D2 indicates only the degree of reflection of the first driving objective, the right-hand side of the above formula (4) may be described only in terms related to the efficiency function E(p). Similarly, in the case of the second driving objective, it may be described only in terms related to the remaining capacity Q.

先にも述べたように、上記の式(2)~式(4)は、判定値D1及び判定値D2の計算式の一例に過ぎない。判定値D1及び判定値D2の趣旨を逸脱しない範囲内において、判定値D1及び判定値D2を与えることのできるさまざまな計算式が用いられてよい。 As mentioned above, the above formulas (2) to (4) are merely examples of formulas for calculating the judgment value D1 and the judgment value D2. Various formulas that can give the judgment value D1 and the judgment value D2 may be used as long as they do not deviate from the spirit of the judgment value D1 and the judgment value D2.

図1に戻り、例えば以上のようにして、算出部42は、少なくとも1つの運転目的に従って、各電力pを算出する。運転目的は、手動又は自動で設定され、例えば取得部41によって取得される。複数の運転目的が優先度(重み付けに相当)とともに設定されてよい。その場合、算出部42は、優先度に応じて上述係数K、係数K、係数Kを調整したうえで、各電力p2の目標値を算出する。優先度が高いほど、対応する重み付け係数が大きくなるように調整される。充放電制御部43は、算出部42によって算出された各電力pに基づいて、すなわち少なくとも1つの運転目的に従って、複数の蓄電池システム2それぞれを充放電制御する。判定値Dが用いられる場合には、充放電制御部43は、例えば上述の判定値D1や判定値D2が最も大きくなるように、複数の蓄電池システム2それぞれを充放電制御する。 Returning to FIG. 1, for example, the calculation unit 42 calculates each power p according to at least one operation purpose in the above manner. The operation purpose is set manually or automatically, and is acquired by, for example, the acquisition unit 41. A plurality of operation purposes may be set together with priorities (corresponding to weighting). In this case, the calculation unit 42 calculates the target value of each power p2 after adjusting the coefficients K e , K q , and K c according to the priorities. The higher the priority, the larger the corresponding weighting coefficient is adjusted. The charge/discharge control unit 43 controls the charge/discharge of each of the plurality of storage battery systems 2 based on each power p calculated by the calculation unit 42, i.e., according to at least one operation purpose. When the judgment value D is used, the charge/discharge control unit 43 controls the charge/discharge of each of the plurality of storage battery systems 2 so that, for example, the above-mentioned judgment value D1 or judgment value D2 is maximized.

図7は、コントローラ4において実行される処理(制御方法)の例を示すフローチャートである。このフローチャートの処理は、電力P2の目標値が与えられたことに応じて開始される。 Figure 7 is a flowchart showing an example of a process (control method) executed by the controller 4. The process of this flowchart is started in response to a target value of power P2 being given.

ステップS1において、放電又は充電のいずれであるかが判断される。例えば、コントローラ4の算出部42は、電力P2の目標値が正の場合に放電と判断し、電力P2の目標値が負の場合に充電と判断する。放電である場合(ステップS1:Yes)、ステップS2に処理が進められる。そうでない場合、すなわち充電の場合(ステップS1:No)、ステップS4に処理が進められる。 In step S1, it is determined whether discharging or charging is occurring. For example, the calculation unit 42 of the controller 4 determines that discharging is occurring when the target value of power P2 is positive, and determines that charging is occurring when the target value of power P2 is negative. If discharging is occurring (step S1: Yes), processing proceeds to step S2. If not, i.e., if charging is occurring (step S1: No), processing proceeds to step S4.

ステップS2において、判定値D1の係数が調整される。コントローラ4の算出部42は、第1の運転目的、第2の運転目的及び第3の運転目的の優先度に応じて、前述の式(2)中の係数K、K及びKを調整する。 In step S2, the coefficients of the judgment value D1 are adjusted. The calculation unit 42 of the controller 4 adjusts the coefficients K e , K q , and K c in the above-mentioned formula (2) in accordance with the priorities of the first driving objective, the second driving objective, and the third driving objective.

ステップS3において、各電力pの目標値が算出される。コントローラ4の算出部42は、先のステップS2で係数調整した判定値D1が最も大きくなるように、各電力pの目標値を算出する。ステップS3の処理が完了した後は、ステップS6に処理が進められる。 In step S3, the target value of each power p is calculated. The calculation unit 42 of the controller 4 calculates the target value of each power p so that the judgment value D1, the coefficient of which was adjusted in the previous step S2, is maximized. After the processing of step S3 is completed, the process proceeds to step S6.

ステップS4において、判定値D2の係数が調整される。コントローラ4の算出部42は、第1の運転目的及び第2の運転目的の優先度に応じて、前述の式(4)中の係数K及びKを調整する。 In step S4, the coefficient of the determination value D2 is adjusted. The calculation unit 42 of the controller 4 adjusts the coefficients K e and K q in the above-mentioned formula (4) in accordance with the priorities of the first driving objective and the second driving objective.

ステップS5において、各電力pの目標値が算出される。コントローラ4の算出部42は、先のステップS4で係数調整した判定値D2が最も大きくなるように、各電力pの目標値を算出する。ステップS5の処理が完了した後は、ステップS6に処理が進められる。 In step S5, the target value of each power p is calculated. The calculation unit 42 of the controller 4 calculates the target value of each power p so that the judgment value D2, the coefficient of which was adjusted in the previous step S4, is maximized. After the processing of step S5 is completed, the process proceeds to step S6.

ステップS6において、充放電制御が行われる。コントローラ4の充放電制御部43は、先のステップS3又はステップS5において算出された各電力pの目標値に基づいて、複数の蓄電池システム2それぞれを充放電制御する。 In step S6, charge and discharge control is performed. The charge and discharge control unit 43 of the controller 4 controls the charge and discharge of each of the multiple storage battery systems 2 based on the target value of each power p calculated in the previous step S3 or step S5.

図8は、コントローラのハードウェア構成の例を示す図である。例示されるハードウェア構成を備えるコンピュータ等が、これまで説明したコントローラ4として機能する。コントローラ4は、ハードウェア構成として、バス等で相互に接続される通信装置4a、表示装置4b、HDD(Hard Disk Drive)4c、メモリ4d及びプロセッサ4eを備える。 Figure 8 is a diagram showing an example of the hardware configuration of a controller. A computer or the like having the illustrated hardware configuration functions as the controller 4 described above. The controller 4 has, as its hardware configuration, a communication device 4a, a display device 4b, a HDD (Hard Disk Drive) 4c, a memory 4d, and a processor 4e, all of which are interconnected by a bus or the like.

通信装置4aは、ネットワークインタフェースカードなどであり、他の装置との通信を可能にする。表示装置4bは、例えばタッチパネルやディスプレイなどである。HDD4cは、記憶部44として機能し、例えば制御プログラム441を記憶する。 The communication device 4a is a network interface card or the like, and enables communication with other devices. The display device 4b is, for example, a touch panel or a display. The HDD 4c functions as a storage unit 44, and stores, for example, a control program 441.

プロセッサ4eは、制御プログラム441をHDD4c等から読み出してメモリ4dに展開することで、コンピュータをコントローラ4として機能させる。コントローラ4としての機能は、これまで説明したような取得部41の機能、算出部42の機能及び充放電制御部43の機能等を含む。 The processor 4e reads the control program 441 from the HDD 4c or the like and loads it into the memory 4d, causing the computer to function as the controller 4. The functions of the controller 4 include the functions of the acquisition unit 41, the calculation unit 42, and the charge/discharge control unit 43, as described above.

制御プログラム441は、インターネットなどのネットワークを介して配布することができる。また、制御プログラム441は、ハードディスク、フレキシブルディスク(FD)、CD-ROM、MO(Magneto-Optical disk)、DVD(Digital Versatile Disc)などのコンピュータで読み取り可能な記録媒体に記録され、コンピュータによって記録媒体から読み出されることによって実行することができる。 The control program 441 can be distributed via a network such as the Internet. In addition, the control program 441 can be recorded on a computer-readable recording medium such as a hard disk, a flexible disk (FD), a CD-ROM, an MO (Magneto-Optical disk), or a DVD (Digital Versatile Disc), and can be executed by being read from the recording medium by a computer.

以上で説明したように、コントローラ4は、少なくとも1つの運転目的に従って、複数の蓄電池システム2それぞれを充放電制御する。複数の蓄電池システム2それぞれは、蓄電池21、及び、蓄電池21に接続されたPCS22(電力変換装置)を含む。少なくとも1つの運転目的は、複数の蓄電池システム2それぞれの動作効率Eが高くなるように複数の蓄電池システム2それぞれを充放電させる第1の運転目的を含む。動作効率Eは、電力p(充放電電力)に対する蓄電池21の充放電効率ηbat及びPCS22の電力変換効率ηpcsの全体の効率である。 As described above, the controller 4 controls charging and discharging of each of the multiple storage battery systems 2 in accordance with at least one operation objective. Each of the multiple storage battery systems 2 includes a storage battery 21 and a PCS 22 (power conversion device) connected to the storage battery 21. The at least one operation objective includes a first operation objective of charging and discharging each of the multiple storage battery systems 2 so that the operation efficiency E of each of the multiple storage battery systems 2 is high. The operation efficiency E is the overall efficiency of the charge and discharge efficiency η bat of the storage battery 21 and the power conversion efficiency η pcs of the PCS 22 with respect to power p (charge and discharge power).

上記のコントローラ4によれば、複数の蓄電池システム2それぞれの動作効率Eが高くなるように、複数の蓄電池システム2が充放電制御される。従って、蓄電池21の充放電効率ηbat及びPCS22(電力変換装置)の電力変換効率ηpcsの全体の効率を最適化することができる。 According to the controller 4 described above, the charging and discharging of the multiple storage battery systems 2 is controlled so as to increase the operation efficiency E of each of the multiple storage battery systems 2. Therefore, it is possible to optimize the overall efficiency, including the charging and discharging efficiency η bat of the storage batteries 21 and the power conversion efficiency η pcs of the PCS 22 (power conversion device).

図2~図6等を参照して説明したように、複数の蓄電池システム2それぞれの動作効率Eのピーク位置が互いに異なっており、第1の運転目的は、複数の蓄電池システム2それぞれの動作効率Eをピーク位置に近づけることを含んでよい。例えばこのようにして、複数の蓄電池システム2それぞれの動作効率Eを最適化することができる。 As described with reference to Figures 2 to 6, the peak positions of the operating efficiency E of each of the multiple storage battery systems 2 are different from each other, and the first operation objective may include bringing the operating efficiency E of each of the multiple storage battery systems 2 closer to the peak position. For example, in this manner, the operating efficiency E of each of the multiple storage battery systems 2 can be optimized.

複数の蓄電池システム2それぞれの蓄電池21の充放電効率ηbatのピーク位置が互いに異なっていてよい。例えば、複数の蓄電池システム2それぞれの蓄電池21の設計や使用期間の相違により、充放電効率ηbatのピーク位置が互いに異なり得る。設計や使用期間の異なる蓄電池21を各々が含む複数の蓄電池システム2の動作効率Eを最適化することができる。例えば、蓄電池システム2の追加や交換等にも柔軟に対応することができる。 The peak positions of the charge/discharge efficiency η bat of the storage batteries 21 of the multiple storage battery systems 2 may be different from each other. For example, the peak positions of the charge/discharge efficiency η bat may be different from each other due to differences in the design and period of use of the storage batteries 21 of the multiple storage battery systems 2. It is possible to optimize the operation efficiency E of the multiple storage battery systems 2 each including storage batteries 21 with different designs and periods of use. For example, it is possible to flexibly respond to addition or replacement of the storage battery system 2.

少なくとも1つの運転目的は、複数の蓄電池システム2それぞれの蓄電池21のうち、残存容量Qの大きい蓄電池21を優先して放電させ、残存容量Qの小さい蓄電池21を優先して充電させる、第2の運転目的をさらに含んでよい。第2の運転目的に従う充放電制御により、各蓄電池21の残存容量Qを近づける(バランスさせる)ことができる。 At least one of the operating objectives may further include a second operating objective of preferentially discharging the storage battery 21 with a larger remaining capacity Q among the storage batteries 21 in each of the multiple storage battery systems 2 and preferentially charging the storage battery 21 with a smaller remaining capacity Q. By controlling charging and discharging according to the second operating objective, the remaining capacities Q of the storage batteries 21 can be brought closer together (balanced).

少なくとも1つの運転目的は、複数の蓄電池システム2それぞれの蓄電池21のうち、充電されている電力の価格(電力価格C)が低い蓄電池21を優先して放電させる第3の運転目的をさらに含んでよい。第3の運転目的に従う充放電制御により、電力価格Cが低い電力を優先して供給し、一方で、電力価格Cが高い電力をなるべく蓄電池21に温存することができる。電力コストの節約等のメリットが得られる。 The at least one operating objective may further include a third operating objective of preferentially discharging the storage battery 21 with a low price of charged electricity (electricity price C) among the storage batteries 21 in each of the multiple storage battery systems 2. By controlling charging and discharging in accordance with the third operating objective, it is possible to preferentially supply electricity with a low electricity price C, while conserving electricity with a high electricity price C as much as possible in the storage battery 21. This provides benefits such as saving electricity costs.

コントローラ4は、少なくとも1つの運転目的の反映の度合いを示す判定値D(判定値D1や判定値D2)が大きくなるように、複数の蓄電池システム2それぞれを充放電制御してよい。判定値Dは、各々が重み付けされた複数の運転目的の度合いを示してよい。例えばこのような判定値Dを用いることで、運転目的に応じた充放電制御を行うことができる。 The controller 4 may control the charging and discharging of each of the multiple storage battery systems 2 so that a judgment value D (judgment value D1 or judgment value D2) indicating the degree of reflection of at least one driving purpose becomes large. The judgment value D may indicate the degree of multiple driving purposes, each of which is weighted. For example, by using such a judgment value D, charging and discharging control according to the driving purpose can be performed.

図1等を参照して説明した制御プログラム441も、開示される技術の1つである。制御プログラム441は、コンピュータに、少なくとも1つの運転目的(第1の運転目的を含む)に従って、複数の蓄電池システム2それぞれを充放電制御する処理を実行させる。図7等を参照して説明した制御方法も、開示される技術の1つである。制御方法は、少なくとも1つの運転目的(第1の運転目的を含む)に従って、複数の蓄電池システム2それぞれを充放電制御する(ステップS6)。図1等を参照して説明した電力供給システム100も、開示される技術の1つである。電力供給システム100は、複数の蓄電池システム2と、少なくとも1つの運転目的(第1の運転目的を含む)に従って、複数の蓄電池システム2それぞれを充放電制御するコントローラ4と、を備える。これらの制御プログラム441、制御方法及び電力供給システム100によっても、これまで説明したように、蓄電池21の充放電効率ηbat及びPCS22の電力変換効率ηpcsの全体の効率を最適化することができる。 The control program 441 described with reference to FIG. 1 and the like is also one of the disclosed techniques. The control program 441 causes a computer to execute a process of controlling the charging and discharging of each of the multiple storage battery systems 2 according to at least one operating purpose (including the first operating purpose). The control method described with reference to FIG. 7 and the like is also one of the disclosed techniques. The control method controls the charging and discharging of each of the multiple storage battery systems 2 according to at least one operating purpose (including the first operating purpose) (step S6). The power supply system 100 described with reference to FIG. 1 and the like is also one of the disclosed techniques. The power supply system 100 includes multiple storage battery systems 2 and a controller 4 that controls the charging and discharging of each of the multiple storage battery systems 2 according to at least one operating purpose (including the first operating purpose). As described above, the control program 441, the control method, and the power supply system 100 can also optimize the overall efficiency of the charging and discharging efficiency η bat of the storage battery 21 and the power conversion efficiency η pcs of the PCS 22.

<応用例>
これまで説明した複数の蓄電池システム2は、例えば電力の平滑化に用いられる。その場合、複数の蓄電池システム2は、別の蓄電池システムと組み合わされて用いられてよい。コントローラ4は、それらの蓄電池システムそれぞれを充放電制御してよい。以後、これまで説明した蓄電池システムの充放電電力を、単に、蓄電池の充放電電力と呼ぶ場合がある。蓄電池システムの充放電制御を、単に、蓄電池の充放電制御と呼ぶ場合がある。
<Application Examples>
The multiple storage battery systems 2 described above are used, for example, for power smoothing. In that case, the multiple storage battery systems 2 may be used in combination with another storage battery system. The controller 4 may control the charging and discharging of each of these storage battery systems. Hereinafter, the charging and discharging power of the storage battery systems described above may be simply referred to as the charging and discharging power of the storage batteries. The charging and discharging control of the storage battery system may be simply referred to as the charging and discharging control of the storage batteries.

<第1応用例>
図9は、第1応用例に係るコントローラ4が用いられる電力供給システム100の概略構成の例を示す図である。電力供給システム100は、発電装置Gと、蓄電池システム1とをさらに含む。なお、複数の蓄電池システム2は、とくに説明がある場合を除き、単に蓄電池システム2と呼ぶ。蓄電池システム2の蓄電池21の充放電電力が、これまで説明した電力P2である。電力線Wは、発電装置G、蓄電池システム1及び蓄電池システム2と、連携点3とを接続する。連携点3を介して、発電装置G、蓄電池システム1及び蓄電池システム2と、電力網9との間で電力の授受が行われる。連携点3における授受電力を、電力P3と称し図示する。電力P3においては、電力網9に向かう電力がプラスであるものとする。
<First Application Example>
FIG. 9 is a diagram showing an example of a schematic configuration of a power supply system 100 in which a controller 4 according to a first application example is used. The power supply system 100 further includes a power generation device G and a storage battery system 1. The multiple storage battery systems 2 are simply called storage battery systems 2 unless otherwise specified. The charging and discharging power of the storage battery 21 of the storage battery system 2 is the power P2 described above. The power line W connects the power generation device G, the storage battery system 1, and the storage battery system 2 to a connection point 3. Power is exchanged between the power generation device G, the storage battery system 1, and the storage battery system 2, and the power grid 9 via the connection point 3. The power exchanged at the connection point 3 is called power P3 and illustrated. In the power P3, the power toward the power grid 9 is assumed to be positive.

発電装置Gによる発電は、自然エネルギーを利用した発電を含む。自然エネルギーの例は、風力エネルギー、太陽光エネルギー等であり、その場合、発電装置Gは、風力発電装置、太陽光発電装置等を含んで構成される。発電装置Gの発電電力、より具体的には発電装置Gから電力線Wに向かう電力を電力PGと称し図示する。 The power generation by the power generation device G includes power generation using natural energy. Examples of natural energy are wind energy and solar energy, and in that case, the power generation device G is composed of a wind power generation device, a solar power generation device, etc. The generated power of the power generation device G, more specifically, the power flowing from the power generation device G to the power line W, is referred to as power PG and illustrated.

図10は、発電装置Gの電力PGの例を示す図である。グラフの横軸は時刻tを示し、グラフの縦軸は電力(kW)を示す。或る時間帯における電力PGの時間変化が例示される。図10に示されるように、発電電力PGは刻一刻と変化する。 Figure 10 is a diagram showing an example of the power PG of the power generation device G. The horizontal axis of the graph indicates time t, and the vertical axis of the graph indicates power (kW). The graph shows an example of the change in power PG over time during a certain time period. As shown in Figure 10, the generated power PG changes every moment.

電力の時間変化を表す指標として、変化速度を用いる。変化速度は、単位期間ごとの電力値の変化率を示し、例えば発電装置Gの定格電力(定格出力)に対する電力値の変化量の比率(%)で表される。短周期安定目標の単位期間は1分であることが一般的であり、変化速度は%/分であるものとする。 The rate of change is used as an index to represent the change in power over time. The rate of change indicates the rate of change in the power value per unit period, and is expressed, for example, as the ratio (%) of the amount of change in the power value to the rated power (rated output) of the power generating device G. The unit period for the short-cycle stability target is generally one minute, and the rate of change is %/minute.

発電装置Gの電力PGだけが電力線Wに供給されると、電力PGの大きな変化速度がそのまま連携点3の電力P3の変化速度として現れる。電力網9の安定性等の観点から、連携点3の電力P3の変化速度の抑制が求められる。この変化速度の抑制、換言すると発電装置の安定化が、蓄電池システム1及び蓄電池システム2の目的の1つである。 When only the power PG of the power generation device G is supplied to the power line W, the large rate of change of the power PG is directly reflected as the rate of change of the power P3 at the connection point 3. From the viewpoint of the stability of the power grid 9, it is necessary to suppress the rate of change of the power P3 at the connection point 3. Suppressing this rate of change, in other words, stabilizing the power generation device, is one of the purposes of the storage battery system 1 and the storage battery system 2.

図9に戻り、蓄電池システム1は、蓄電池11と、PCS12と、端子13と、バッテリコントローラ14とを含む。これらの要素は、蓄電池システム2の対応する部分と同様であるので、詳細な説明は省略する。蓄電池システム1の充放電電力を、電力P1と称し図示する。電力P1においても、放電電力がプラスであるものとする。 Returning to FIG. 9, the storage battery system 1 includes a storage battery 11, a PCS 12, a terminal 13, and a battery controller 14. These elements are similar to the corresponding parts of the storage battery system 2, so detailed explanations are omitted. The charging and discharging power of the storage battery system 1 is referred to as power P1 and is illustrated. In the case of power P1, the discharging power is also positive.

蓄電池11及び蓄電池21は、互いに異なる特徴を有する第1の蓄電池及び第2の蓄電池である。蓄電池11は大容量型蓄電池であり、蓄電池21は高出力型蓄電池である。大容量型蓄電池は、高出力型蓄電池と比較して、大きな充放電電力量(電池容量)が得られやすい一方で大きな充放電電力(出力)が得られにくいという特徴を有する。高出力型蓄電池は、大容量型蓄電池と比較して、大きな充放電電力が得られやすい一方で大きな充放電電力量が得られにくいという特徴を有する。これらの特徴の異なる蓄電池が存在することは公知であるので、これ以上の詳細な説明は省略する。 Storage battery 11 and storage battery 21 are a first storage battery and a second storage battery having different characteristics. Storage battery 11 is a large-capacity storage battery, and storage battery 21 is a high-output storage battery. A large-capacity storage battery has the characteristic that it is easier to obtain a large amount of charge/discharge power (battery capacity) but it is difficult to obtain a large amount of charge/discharge power (output) compared to a high-output storage battery. A high-output storage battery has the characteristic that it is easier to obtain a large amount of charge/discharge power but it is difficult to obtain a large amount of charge/discharge power compared to a large-capacity storage battery. Since it is publicly known that storage batteries with these different characteristics exist, further detailed explanation is omitted.

蓄電池11は、蓄電池21の電池容量よりも大きい電池容量を有する。また、蓄電池11の最大充放電電力(最大出力)が、蓄電池21の最大充放電電力よりも小さくなるように、蓄電池11及び蓄電池21がコントローラ4によって充放電制御される。なお、ここでいう蓄電池11の最大充放電電力は、電力P1の絶対値の最大値を指し示す。蓄電池21の最大充放電電力は、電力P2の絶対値の最大値を指し示す。 The storage battery 11 has a battery capacity larger than that of the storage battery 21. The controller 4 controls the charging and discharging of the storage battery 11 and the storage battery 21 so that the maximum charging and discharging power (maximum output) of the storage battery 11 is smaller than the maximum charging and discharging power of the storage battery 21. Note that the maximum charging and discharging power of the storage battery 11 here indicates the maximum absolute value of the power P1. The maximum charging and discharging power of the storage battery 21 indicates the maximum absolute value of the power P2.

コントローラ4は、蓄電池システム1の蓄電池11及び蓄電池システム2の蓄電池21を充放電制御する。コントローラ4の取得部41によって取得される電力情報には、発電装置Gの電力PG、蓄電池11の電力P1及び蓄電池21の電力P2、連携点3の電力P3等も含まれる。例えば、電力PGの情報は、発電装置Gからコントローラ4に送信され、取得部41によって取得される。電力P1及び電力P2の情報は、バッテリコントローラ14及びバッテリコントローラ24からコントローラ4に送信され、取得部41によって取得される。電力P3の情報は、連携点3からコントローラ4に送信され、取得部41によって取得される。また、取得部41によって取得される蓄電池情報には、蓄電池11の残存容量等も含まれる。 The controller 4 controls the charging and discharging of the storage battery 11 of the storage battery system 1 and the storage battery 21 of the storage battery system 2. The power information acquired by the acquisition unit 41 of the controller 4 includes the power PG of the power generation device G, the power P1 of the storage battery 11, the power P2 of the storage battery 21, the power P3 of the connection point 3, and the like. For example, the information on the power PG is transmitted from the power generation device G to the controller 4 and acquired by the acquisition unit 41. The information on the power P1 and the power P2 is transmitted from the battery controller 14 and the battery controller 24 to the controller 4 and acquired by the acquisition unit 41. The information on the power P3 is transmitted from the connection point 3 to the controller 4 and acquired by the acquisition unit 41. The battery information acquired by the acquisition unit 41 also includes the remaining capacity of the storage battery 11, and the like.

算出部42は、取得部41によって取得された情報に基づいて、蓄電池11の電力P1の目標値及び蓄電池21の電力P2の目標値を算出する。詳細は後述する。 The calculation unit 42 calculates the target value of the power P1 of the storage battery 11 and the target value of the power P2 of the storage battery 21 based on the information acquired by the acquisition unit 41. Details will be described later.

充放電制御部43は、算出部42によって算出された電力P1の目標値及び電力P2の目標値に基づいて、蓄電池11及び蓄電池21を充放電制御する。例えば、充放電制御部43は、電力P1の目標値に対応するPCS12の出力指令値をバッテリコントローラ14に送信する。バッテリコントローラ14は、受信した出力指令値をPCS12に与える。PCS12は、与えられた出力指令値に従って蓄電池11を充放電させる。蓄電池11の電力P1が目標値に近づく。また、充放電制御部43は、電力P2の目標値に対応するPCS22の出力指令値をバッテリコントローラ24に送信する。バッテリコントローラ24は、受信した出力指令値をPCS22に与える。PCS22は、与えられた出力指令値に従って蓄電池21を充放電させる。蓄電池21の電力P2が目標値に近づく。 The charge/discharge control unit 43 controls the charge/discharge of the storage battery 11 and the storage battery 21 based on the target value of the power P1 and the target value of the power P2 calculated by the calculation unit 42. For example, the charge/discharge control unit 43 transmits an output command value of the PCS 12 corresponding to the target value of the power P1 to the battery controller 14. The battery controller 14 provides the received output command value to the PCS 12. The PCS 12 charges and discharges the storage battery 11 according to the provided output command value. The power P1 of the storage battery 11 approaches the target value. The charge/discharge control unit 43 also transmits an output command value of the PCS 22 corresponding to the target value of the power P2 to the battery controller 24. The battery controller 24 provides the received output command value to the PCS 22. The PCS 22 charges and discharges the storage battery 21 according to the provided output command value. The power P2 of the storage battery 21 approaches the target value.

充放電制御部43による充放電制御は、先に述べた変化速度の単位期間(1分等)以下の間隔で行われる。充放電制御の間隔の例は、数秒、十数秒、数十秒、1分等である。なお、算出部42による算出の間隔も、充放電制御の間隔と同じであってよい。 The charge/discharge control by the charge/discharge control unit 43 is performed at intervals of less than the unit period (such as one minute) of the rate of change described above. Examples of intervals for charge/discharge control are several seconds, tens of seconds, several tens of seconds, one minute, etc. The intervals for calculation by the calculation unit 42 may also be the same as the intervals for charge/discharge control.

算出部42について詳述する。算出部42は、第1算出部421と、第2算出部422とを含む。第1算出部421は、電力P1の目標値を算出する。第2算出部422は、電力P2の目標値を算出する。第1算出部421及び第2算出部422は、連携点3の電力P3の変化速度を抑制するように、電力P1の目標値及び電力P2の目標値を算出する。以下では、変化速度は1%/分以下に抑制されるものとする。 The calculation unit 42 will be described in detail. The calculation unit 42 includes a first calculation unit 421 and a second calculation unit 422. The first calculation unit 421 calculates a target value of power P1. The second calculation unit 422 calculates a target value of power P2. The first calculation unit 421 and the second calculation unit 422 calculate the target value of power P1 and the target value of power P2 so as to suppress the rate of change of power P3 at the linkage point 3. In the following, it is assumed that the rate of change is suppressed to 1%/min or less.

第1算出部421は、電力P1の大きさが設定値を上回らない範囲内で、連携点3の電力P3の変化速度を抑制するように、電力P1の目標値を算出する。設定値は、蓄電池21の最大充放電電力よりも小さい値に設定される。第1算出部421は、計算上で電力P1の目標値の大きさが設定値を上回る場合には、設定値と同じ大きさの電力を、電力P1の目標値として算出する。これにより、電力P1の目標値は、設定値に制限(固定)される。以下では、設定値が400kWである場合を例に挙げて説明する。 The first calculation unit 421 calculates a target value for the power P1 so as to suppress the rate of change of the power P3 at the linkage point 3 within a range in which the magnitude of the power P1 does not exceed the set value. The set value is set to a value smaller than the maximum charge/discharge power of the storage battery 21. If the calculated target value of the power P1 exceeds the set value, the first calculation unit 421 calculates a power of the same magnitude as the set value as the target value of the power P1. As a result, the target value of the power P1 is limited (fixed) to the set value. The following describes an example in which the set value is 400 kW.

図11は、蓄電池11の電力P1の目標値の例を示す図である。電力P1の大きさが400kWを上回らない範囲内、すなわち電力P1が±400kWの範囲内で、電力P3の変化速度を抑制するように、電力P1の目標値が算出される。計算上で電力P1が+400kWを上回る場合には、+400kWが電力P1の目標値として算出される。計算上で電力P1が-400kWを下回る場合には、-400kWが電力P1の目標値として算出される。 Figure 11 is a diagram showing an example of a target value for power P1 of the storage battery 11. The target value for power P1 is calculated so as to suppress the rate of change of power P3 within a range in which the magnitude of power P1 does not exceed 400 kW, i.e., within a range of power P1 of ±400 kW. If the calculated power P1 exceeds +400 kW, +400 kW is calculated as the target value for power P1. If the calculated power P1 falls below -400 kW, -400 kW is calculated as the target value for power P1.

図9に戻り、第2算出部422は、電力PGと、第1算出部421によって算出された電力P1の目標値との合計電力を算出する。この合計電力は、電力P1によって変化速度が抑制された後の電力P3であり、蓄電池21の電力P2が無いと仮定した場合の電力P3に相当する。 Returning to FIG. 9, the second calculation unit 422 calculates the total power of the power PG and the target value of the power P1 calculated by the first calculation unit 421. This total power is the power P3 after the rate of change has been suppressed by the power P1, and corresponds to the power P3 when it is assumed that the power P2 of the storage battery 21 does not exist.

図12は、発電装置Gの電力PGと蓄電池11の電力P1の目標値との合計電力(PG+P1の目標値)の例を示す図である。もともとの電力PG(図10)と比較すると、変化速度がかなり抑制されている。ただし、電力P1の目標値が設定値に制限された期間では、変化速度の抑制が未だ十分ではない。すなわち変化速度は1%/分以下に抑制されていない。 Figure 12 is a diagram showing an example of the total power (target value of PG+P1) of the power PG of the power generation device G and the target value of the power P1 of the storage battery 11. Compared to the original power PG (Figure 10), the rate of change is significantly suppressed. However, during the period when the target value of the power P1 is limited to the set value, the rate of change is still not sufficiently suppressed. In other words, the rate of change is not suppressed to 1%/min or less.

図9に戻り、第2算出部422は、電力PGと電力P1の目標値との合計電力の変化速度、すなわち電力P1によって抑制された後の電力P3の変化速度をさらに抑制するように、電力P2の目標値を算出する。 Returning to FIG. 9, the second calculation unit 422 calculates the target value of power P2 so as to further suppress the rate of change of the total power of power PG and the target value of power P1, i.e., the rate of change of power P3 after it has been suppressed by power P1.

図13は、蓄電池21の電力P2の目標値の例を示す図である。上述の図12において変化速度の抑制が十分でなかった期間での変化速度をさらに抑制するように、蓄電池21の電力P2の目標値が算出される。 Figure 13 is a diagram showing an example of a target value of the power P2 of the storage battery 21. The target value of the power P2 of the storage battery 21 is calculated so as to further suppress the rate of change in the period in which the rate of change was not sufficiently suppressed in Figure 12 described above.

図9に戻り、算出部42では、第2算出部422によって算出された電力P2の目標値に基づいて、複数の蓄電池システム2それぞれの電力p(各電力p)の目標値が算出される。具体的な算出手法は、先に図1~図7を参照して説明したとおりであるので、詳細な説明は繰り返さない。以降の説明において、電力P2の目標値は、各電力pの目標値の合計値として適宜読み替えられてよい。 Returning to FIG. 9, the calculation unit 42 calculates the target value of the power p (each power p) of each of the multiple storage battery systems 2 based on the target value of the power P2 calculated by the second calculation unit 422. The specific calculation method is as described above with reference to FIGS. 1 to 7, so a detailed description will not be repeated. In the following description, the target value of the power P2 may be interpreted as the sum of the target values of each power p, as appropriate.

充放電制御部43は、算出部42によって算出された電力P1の目標値及び電力P2の目標値に基づいて、蓄電池11及び蓄電池21を充放電制御する。すなわち、充放電制御部43は、蓄電池11の最大充放電電力が、蓄電池21の最大充放電電力よりも小さくなるように、蓄電池11及び蓄電池21を充放電させる。より具体的に、充放電制御部43は、電力P1の大きさが設定値(蓄電池21の最大充放電電力よりも小さい値)を上回らない範囲内で、電力P3の変化速度を抑制するように、蓄電池11を充放電させる。そして、充放電制御部43は、蓄電池11によって抑制された後の電力P3の変化速度をさらに抑制するように、蓄電池21を充放電させる。 The charge/discharge control unit 43 controls the charging and discharging of the storage battery 11 and the storage battery 21 based on the target value of the power P1 and the target value of the power P2 calculated by the calculation unit 42. That is, the charge/discharge control unit 43 charges and discharges the storage battery 11 and the storage battery 21 so that the maximum charge/discharge power of the storage battery 11 is smaller than the maximum charge/discharge power of the storage battery 21. More specifically, the charge/discharge control unit 43 charges and discharges the storage battery 11 so as to suppress the rate of change of the power P3 within a range in which the magnitude of the power P1 does not exceed a set value (a value smaller than the maximum charge/discharge power of the storage battery 21). Then, the charge/discharge control unit 43 charges and discharges the storage battery 21 so as to further suppress the rate of change of the power P3 after it has been suppressed by the storage battery 11.

図14は、連携点3の電力P3の例を示す図である。電力P1及び電力P2によって、任意の時刻tにおける電力P3の変化速度がいずれも抑制される。すなわち変化速度が1%/分以下に抑制される。 Figure 14 is a diagram showing an example of power P3 at connection point 3. The rate of change of power P3 at any time t is suppressed by power P1 and power P2. In other words, the rate of change is suppressed to 1%/min or less.

以上のように充放電制御された蓄電池11及び蓄電池21それぞれの最大充放電電力及び電池容量について、図15及び図16を参照して説明する。 The maximum charge/discharge power and battery capacity of each of the storage batteries 11 and 21 that are charge/discharge controlled as described above will be described with reference to Figures 15 and 16.

図15は、蓄電池11の電力P1及び充放電電力量の例を示す図である。蓄電池11の最大充放電電力は、電力P1が±400kWの範囲内に制限されるので、400kWである。蓄電池11が必要とする電池容量は、充放電電力量が約+70kWHから約-1430kWhの間で変化するので、約1500kWhである。 Figure 15 is a diagram showing an example of the power P1 and the charge/discharge power amount of the storage battery 11. The maximum charge/discharge power of the storage battery 11 is 400 kW because the power P1 is limited within the range of ±400 kW. The battery capacity required by the storage battery 11 is approximately 1500 kWh because the charge/discharge power amount varies between approximately +70 kWh and approximately -1430 kWh.

図16は、蓄電池21の電力P2及び充放電電力量の例を示す図である。蓄電池21の最大充放電電力は、電力P2が約+480kWから約-930kWの間で変化するので、約930kWである。蓄電池21が必要とする電池容量は、充放電電力量が約+0kWhから約-270kWhの間で変化するので、約270kWhである。 Figure 16 is a diagram showing an example of the power P2 and the charge/discharge power amount of the storage battery 21. The maximum charge/discharge power of the storage battery 21 is about 930 kW, since the power P2 varies between about +480 kW and about -930 kW. The battery capacity required by the storage battery 21 is about 270 kWh, since the charge/discharge power amount varies between about +0 kWh and about -270 kWh.

蓄電池11の最大充放電電力400kWは、蓄電池21の最大充放電電力約930kWよりも小さい。また、蓄電池21が必要とする電池容量約270kWhは、蓄電池11が必要とする電池容量約1500kWhよりも小さい。従って、蓄電池11の出力(最大充放電電力)を抑制しつつ、蓄電池21の電池容量(充放電電力量)を抑制することができる。この効果について、比較例を用いてさらに説明する。 The maximum charge/discharge power of 400 kW of storage battery 11 is smaller than the maximum charge/discharge power of approximately 930 kW of storage battery 21. In addition, the battery capacity of approximately 270 kWh required by storage battery 21 is smaller than the battery capacity of approximately 1500 kWh required by storage battery 11. Therefore, the battery capacity (amount of charge/discharge power) of storage battery 21 can be suppressed while suppressing the output (maximum charge/discharge power) of storage battery 11. This effect will be further explained using a comparative example.

図17は、比較例の概略構成を示す図である。比較例に係る電力供給システム100Eは、これまで説明した電力供給システム100(図9)と比較して、とくに、蓄電池システム1を含まない点において相違する。電力供給システム100E中のいくつかの要素の符号には「E」を追加している。電力供給システム100Eでは、蓄電池システム2Eの蓄電池21Eの電力P2Eによってのみ、連携点3Eの電力P3Eの変化速度が抑制される。 Figure 17 is a diagram showing a schematic configuration of a comparative example. The power supply system 100E according to the comparative example differs from the power supply system 100 (Figure 9) described so far in that it does not include a storage battery system 1. An "E" has been added to the reference numerals of some elements in the power supply system 100E. In the power supply system 100E, the rate of change of the power P3E at the connection point 3E is suppressed only by the power P2E of the storage battery 21E of the storage battery system 2E.

図18は、比較例の電力P3Eの例を示す図である。電力P3Eの変化速度を抑制する電力P2Eで、蓄電池21Eが充放電制御される。 Figure 18 is a diagram showing an example of power P3E in a comparative example. The storage battery 21E is controlled to charge and discharge with power P2E, which suppresses the rate of change of power P3E.

図19は、比較例の蓄電池21Eの電力P2E及び充放電電力量の例を示す図である。蓄電池21Eの最大充放電電力は、電力P2Eが約+820kWから約-1270kWの間で変化するので、約1270kWである。蓄電池21Eが必要とする電池容量は、充放電電力量が約+0kWhから約-600kWhで変化するので、約600kWhである。比較例の蓄電池21Eが必要とする電池容量約600kWhは、先に図16を参照して説明した蓄電池21が必要とする電池容量約270kWhよりもかなり大きい。 Figure 19 is a diagram showing an example of the power P2E and the charge/discharge power amount of the storage battery 21E of the comparative example. The maximum charge/discharge power of the storage battery 21E is about 1270 kW because the power P2E varies between about +820 kW and about -1270 kW. The battery capacity required by the storage battery 21E is about 600 kWh because the charge/discharge power amount varies between about +0 kWh and about -600 kWh. The battery capacity of about 600 kWh required by the storage battery 21E of the comparative example is significantly larger than the battery capacity of about 270 kWh required by the storage battery 21 described above with reference to Figure 16.

改めて図18及び図19を参照して蓄電池21Eの充放電電力量(必要な電池容量)が大きくなることの原因を考察する。例えば時刻t1~時刻t2において、電力PGの時間変化がかなり大きくなることに起因して、電力PGと、連携点3Eの電力P3Eとの差分が大きくなる勾配状態が継続する。ここでの勾配状態の継続は、同符号での勾配の差分(正の差分又は負の差分)が継続することを意味する。このような差分が継続する結果、電力P2Eが同じ方向(この例では充電方向)になる状態が継続し、蓄電池21Eが必要とする電池容量が大きくなる。実施形態に係る電力供給システム100では、蓄電池11が、勾配を抑制するための容量を負担する。その分、蓄電池21が必要とする電池容量が抑制される。従って、先にも述べたように、蓄電池11の出力の抑制だけでなく、蓄電池21の電池容量の抑制をも行うことが可能になる。 18 and 19, the cause of the increase in the charge/discharge power amount (required battery capacity) of the storage battery 21E will be considered. For example, from time t1 to time t2, the time change of the power PG becomes considerably large, and a gradient state in which the difference between the power PG and the power P3E of the linkage point 3E increases continues. The continuation of the gradient state here means that the gradient difference (positive difference or negative difference) with the same sign continues. As a result of such a difference continuing, the state in which the power P2E is in the same direction (the charging direction in this example) continues, and the battery capacity required by the storage battery 21E becomes large. In the power supply system 100 according to the embodiment, the storage battery 11 bears the capacity for suppressing the gradient. The battery capacity required by the storage battery 21 is suppressed accordingly. Therefore, as described above, it is possible to suppress not only the output of the storage battery 11 but also the battery capacity of the storage battery 21.

<蓄電池11の一時停止>
上記の図18及び図19を参照して説明した知見に基づけば、勾配状態が長く継続しないときに蓄電池11の充放電を停止しても、蓄電池21の電池容量を抑制するという効果は得られる。このような充放電制御が充放電制御部43によって行われてもよい。
<Temporary Stop of Storage Battery 11>
18 and 19 , even if the charging and discharging of the storage battery 11 is stopped when the gradient state does not continue for a long time, the effect of suppressing the battery capacity of the storage battery 21 can be obtained. Such a charging and discharging control may be performed by the charging and discharging control unit 43.

例えば、算出部42の第1算出部421は、勾配状態が長く継続しない状態(非勾配状態)が一定期間継続していると判断した場合、蓄電池11の電力P1の目標値をゼロとして算出する。非勾配状態が継続しているか否かの判断には、閾値判断が用いられてよい。例えば、発電装置Gの電力PGの変化速度が閾値未満の状態が一定期間継続すると、第1算出部421は、非勾配状態が継続していると判断する。例えば、10分間の平均勾配が10%以下である場合、蓄電池11の充放電を一時停止させてよい。閾値の大きさ及び一定期間の長さは、任意に設定されてよい。 For example, if the first calculation unit 421 of the calculation unit 42 determines that a state in which the gradient state does not continue for a long time (non-gradient state) has continued for a certain period of time, it calculates the target value of the power P1 of the storage battery 11 as zero. A threshold judgment may be used to determine whether the non-gradient state continues. For example, if a state in which the rate of change of the power PG of the power generation device G is less than a threshold continues for a certain period of time, the first calculation unit 421 determines that the non-gradient state continues. For example, if the average gradient over 10 minutes is 10% or less, the charging and discharging of the storage battery 11 may be temporarily halted. The magnitude of the threshold and the length of the certain period may be set arbitrarily.

上述のように第1算出部421が電力P1の目標値をゼロとして算出した結果、充放電制御部43は、電力P1がゼロになるように蓄電池11を充放電制御させる。その間、蓄電池11の充放電は、一時的に停止される。すなわち、充放電制御部43は、電力P3の変化速度が閾値未満の状態が一定期間継続したことに応じて、蓄電池11の充放電を一時停止する。 As a result of the first calculation unit 421 calculating the target value of power P1 as zero as described above, the charge/discharge control unit 43 controls the charge/discharge of the storage battery 11 so that the power P1 becomes zero. During this time, the charge/discharge of the storage battery 11 is temporarily stopped. In other words, the charge/discharge control unit 43 temporarily stops the charge/discharge of the storage battery 11 in response to the state in which the rate of change of the power P3 remains below the threshold for a certain period of time.

停止開始後、ある程度の期間(長さは任意に設定されてよい)が経過したり、再び勾配状態の継続が開始したりすると、第1算出部421は、これまでと同様に、電力P3の変化速度を抑制するように、電力P1の目標値を算出する。充放電制御部43は、蓄電池11を充放電させる。具体例について、図20~図25を参照して説明する。 After the start of the stop, when a certain period of time (the length may be set arbitrarily) has passed or when the gradient state starts to continue again, the first calculation unit 421 calculates the target value of the power P1 so as to suppress the rate of change of the power P3, as before. The charge/discharge control unit 43 charges and discharges the storage battery 11. Specific examples will be described with reference to Figs. 20 to 25.

図20は、蓄電池11の電力P1の目標値の例を示す図である。時刻t3は、先に説明した図18の時刻t2よりも後の時刻である。非勾配状態が一定期間継続し、時刻t3に至る。時刻t3において、電力P1の目標値がゼロとして算出される。この算出は、時刻t4まで繰り返される。時刻t4において、再び±400kWの範囲内で電力P1の目標値が算出される。 Figure 20 is a diagram showing an example of the target value of the power P1 of the storage battery 11. Time t3 is a time later than time t2 in Figure 18 described above. The non-gradient state continues for a certain period of time, and time t3 is reached. At time t3, the target value of the power P1 is calculated as zero. This calculation is repeated until time t4. At time t4, the target value of the power P1 is again calculated within the range of ±400 kW.

図21は、発電装置Gの電力PGと蓄電池11の電力P1の目標値との合計電力(PG+P1の目標値)の例を示す図である。電力P1の目標値が設定値に制限された期間やゼロとして算出された期間では、変化速度の抑制が未だ十分ではない。 Figure 21 is a diagram showing an example of the total power (target value of PG+P1) of the power PG of the power generation device G and the target value of the power P1 of the storage battery 11. During the period when the target value of the power P1 is limited to the set value or calculated as zero, the rate of change is not yet sufficiently suppressed.

第2算出部422については、これまでと同様である。第2算出部422は、電力P1によって抑制された後の電力P3の変化速度をさらに抑制するように、電力P2の目標値を算出する。 The second calculation unit 422 is the same as before. The second calculation unit 422 calculates a target value for power P2 so as to further suppress the rate of change of power P3 after it has been suppressed by power P1.

図22は、蓄電池21の電力P2の目標値の例を示す図である。上述の図21において変化速度の抑制が十分でなかった期間での変化速度をさらに抑制するように、蓄電池21の電力P2の目標値が算出される。 Figure 22 is a diagram showing an example of a target value of the power P2 of the storage battery 21. The target value of the power P2 of the storage battery 21 is calculated so as to further suppress the rate of change in the period in which the rate of change was not sufficiently suppressed in Figure 21 described above.

図23は、連携点3の電力P3の例を示す図である。電力P1及び電力P2によって、任意の時刻tにおける電力P3の変化速度がいずれも抑制される。 Figure 23 shows an example of power P3 at connection point 3. Power P1 and power P2 suppress the rate of change of power P3 at any time t.

図24は、蓄電池11の電力P1及び充放電電力量の例を示す図である。蓄電池11の最大充放電電力は、電力P1が±400kWの範囲内に制限されるので、400kWである。蓄電池11が必要とする電池容量は、充放電電力量が約+110kWHから約-420kWhの間で変化するので、約530kWhである。 Figure 24 is a diagram showing an example of the power P1 and the charge/discharge power amount of the storage battery 11. The maximum charge/discharge power of the storage battery 11 is 400 kW because the power P1 is limited within the range of ±400 kW. The battery capacity required by the storage battery 11 is approximately 530 kWh because the charge/discharge power amount varies between approximately +110 kWh and approximately -420 kWh.

図25は、蓄電池21の電力P2及び充放電電力量の例を示す図である。蓄電池21の最大充放電電力は、電力P2が約+480kWから約-930kWの間で変化するので、930kWである。蓄電池21が必要とする電池容量は、充放電電力量が約+0kWhから約-330kWhの間で変化するので、約330kWhである。 Figure 25 is a diagram showing an example of the power P2 and the charge/discharge power amount of the storage battery 21. The maximum charge/discharge power of the storage battery 21 is 930 kW, since the power P2 varies between approximately +480 kW and approximately -930 kW. The battery capacity required by the storage battery 21 is approximately 330 kWh, since the charge/discharge power amount varies between approximately +0 kWh and approximately -330 kWh.

蓄電池21が必要とする電池容量約330kWhは、蓄電池11が必要とする電池容量約530kWhよりも小さい。このように非勾配状態のときに蓄電池11の充放電を一時停止しても、依然として蓄電池21の電池容量を抑制することができる。 The battery capacity required by storage battery 21, approximately 330 kWh, is smaller than the battery capacity required by storage battery 11, approximately 530 kWh. In this way, even if the charging and discharging of storage battery 11 is temporarily suspended during a non-gradient state, the battery capacity of storage battery 21 can still be suppressed.

<長周期型蓄電池としての蓄電池11で勾配をキャンセル>
再び図9に戻り、大容量型蓄電池である蓄電池11の充放電が比較的長い周期(長周期)での平滑化に用いられ、高出力型蓄電池である蓄電池21の充放電が比較的短い周期(短周期)での平滑化に用いられてもよい。この場合、蓄電池11は長周期用蓄電池であり、蓄電池21は短周期用蓄電池であるといえる。蓄電池システム1は長周期用蓄電池システムであり、蓄電池システム2は短周期用蓄電池システムであるといえる。
<Gradient cancellation using storage battery 11 as a long-period storage battery>
Returning to Fig. 9 again, the charging and discharging of storage battery 11, which is a large-capacity storage battery, may be used for smoothing over a relatively long period (long cycle), and the charging and discharging of storage battery 21, which is a high-output storage battery, may be used for smoothing over a relatively short period (short cycle). In this case, storage battery 11 can be said to be a long-cycle storage battery, and storage battery 21 can be said to be a short-cycle storage battery. Storage battery system 1 can be said to be a long-cycle storage battery system, and storage battery system 2 can be said to be a short-cycle storage battery system.

例えば、第1算出部421は、所定期間ごとの発電装置Gの電力PGに基づいて、電力P1の目標値を算出する。所定期間は、先に説明した変化速度の単位期間(1分等)よりも長い期間であり、例えば、数分、十数分、数十分、数時間等の期間である。 For example, the first calculation unit 421 calculates the target value of the power P1 based on the power PG of the power generation device G for each predetermined period. The predetermined period is a period longer than the unit period (such as one minute) of the rate of change described above, and is, for example, a period of several minutes, several tens of minutes, several tens of minutes, several hours, etc.

一実施形態において、第1算出部421は、平均化された発電装置Gの電力PGに基づいて、電力P1の目標値を算出してよい。1つの平均値を得るための期間が、所定期間に対応する。平均化手法はとくに限定されないが、例えば指数化平均、区間平均、移動平均等が用いられてよい。指数化平均はメモリ容量が他の平均化法と比較し少なくてよく、突発的な変化に追従しやすいという特徴を有する。区間平均は長く同じ変化が継続する場合はその傾向を示しやすく、平均化後のデータ処理負担が少ないという特徴を有する。移動平均は長く同じ変化が継続する場合には、代表的に用いられる。第1算出部421は、平均化された電力PGを算出する。 In one embodiment, the first calculation unit 421 may calculate the target value of the power P1 based on the averaged power PG of the power generation device G. The period for obtaining one average value corresponds to the predetermined period. The averaging method is not particularly limited, and for example, exponential averaging, interval averaging, moving average, etc. may be used. Exponential averaging requires less memory capacity than other averaging methods and is characterized by being easy to follow sudden changes. Interval averaging is characterized by being easy to show the trend when the same change continues for a long time and having a small data processing burden after averaging. The moving average is typically used when the same change continues for a long time. The first calculation unit 421 calculates the averaged power PG.

図26は、平均化された電力PGに基づく電力P1の目標値の算出の例を示す図である。第1算出部421は、平均化された電力PGの変動を抑制する計算上での電力P1の目標値を、電力P1cとして算出する。電力P1cは、電力P1の目標値の候補値ともいえる。以下では、設定値が400kWである場合を例に挙げて説明する。 Figure 26 is a diagram showing an example of calculation of the target value of power P1 based on the averaged power PG. The first calculation unit 421 calculates the target value of power P1 calculated to suppress fluctuations in the averaged power PG as power P1c. Power P1c can also be considered a candidate value for the target value of power P1. The following describes an example where the set value is 400 kW.

電力P1cは、約1140kWから約-510kWの広範囲にわたって変化する。これまでも説明してきたように、例えば設定値が400kWである場合、第1算出部421は、±400kWの範囲内(設定値の範囲内)で電力P1の目標値を算出する。電力P1cの大きさが400kWを上回る場合には、電力P1の目標値が設定値に固定されてよい。非勾配状態が一定期間継続しているときには、電力P1の目標値がゼロとして算出されてよい。これら以外の算出手法も可能である。ここで例示する形態では、第1算出部421は、電力P1cの大きさが400kWを上回る場合に、電力P1の目標値の大きさをシフトさせる。以下、具体的に説明する。 The power P1c varies over a wide range from about 1140 kW to about -510 kW. As explained above, for example, when the set value is 400 kW, the first calculation unit 421 calculates the target value of the power P1 within the range of ±400 kW (within the set value range). When the magnitude of the power P1c exceeds 400 kW, the target value of the power P1 may be fixed to the set value. When the non-gradient state continues for a certain period of time, the target value of the power P1 may be calculated as zero. Other calculation methods are also possible. In the embodiment exemplified here, the first calculation unit 421 shifts the magnitude of the target value of the power P1 when the magnitude of the power P1c exceeds 400 kW. Specific explanations are given below.

一実施形態において、第1算出部421は、電力P1の目標値が、電力P1cの時間変化と同様の時間変化を継続させつつ、電力P1の目標値の大きさが設定値を上回らないように、電力P1の目標値の大きさをシフトさせる。この例では、時間変化は、平均化された電力PGの時間変化に対応する。例えば、第1算出部421は、電力の大きさが400kWを上回るタイミングで、シフト量に相当するオフセットを与えることにより、電力の大きさをシフトさせる。シフト後の電力の大きさが再び400kWを上回る場合には、第1算出部421は、そのタイミングでさらなるオフセットを与える。例えばこのようにして得られた電力の値が、蓄電池11の電力P1の目標値として算出される。 In one embodiment, the first calculation unit 421 shifts the magnitude of the target value of the power P1 so that the magnitude of the target value of the power P1 does not exceed a set value while maintaining the target value of the power P1 to change over time in the same manner as the change over time of the power P1c. In this example, the change over time corresponds to the change over time of the averaged power PG. For example, the first calculation unit 421 shifts the magnitude of the power by providing an offset equivalent to the shift amount at the timing when the magnitude of the power exceeds 400 kW. If the magnitude of the power after the shift again exceeds 400 kW, the first calculation unit 421 provides a further offset at that timing. For example, the value of the power obtained in this manner is calculated as the target value of the power P1 of the storage battery 11.

図26に示される例では、時刻t11~時刻t15それぞれにおいて、電力P1の目標値の大きさがゼロにシフトする。具体的に、時刻t14及び時刻t15において、電力P1の目標値が+400kW付近からゼロまでシフトする。例えばそれらの時刻の各々において-400kWのオフセットが与えられる。時刻t11~時刻t13において、電力P1の目標値が-400kW付近からゼロまでシフトする。例えばそれらの時刻の各々において、+400kWのオフセットが与えられる。 In the example shown in FIG. 26, the magnitude of the target value of power P1 shifts to zero at each of times t11 to t15. Specifically, at times t14 and t15, the target value of power P1 shifts from near +400 kW to zero. For example, an offset of -400 kW is applied at each of these times. From time t11 to time t13, the target value of power P1 shifts from near -400 kW to zero. For example, an offset of +400 kW is applied at each of these times.

図27は、発電装置Gの電力PGと蓄電池11の電力P1の目標値との合計電力(PG+P1の目標値)の例を示す図である。所定期間ごとの大きな変動は平滑化されているが、所定期間よりも短い期間を単位期間とする変化速度は未だ抑制されていない。 Figure 27 shows an example of the total power (target value of PG+P1) of the power PG of the power generation device G and the target value of the power P1 of the storage battery 11. Large fluctuations for each specified period have been smoothed out, but the rate of change for unit periods shorter than the specified period has not yet been suppressed.

図28は、蓄電池21の電力P2の目標値の例を示す図である。電力P3の変化速度を抑制するように、蓄電池21の電力P2の目標値が算出される。 Figure 28 is a diagram showing an example of a target value for the power P2 of the storage battery 21. The target value for the power P2 of the storage battery 21 is calculated so as to suppress the rate of change of the power P3.

充放電制御部43は、以上のように算出された電力P1の目標値及び電力P2の目標値に基づいて、蓄電池11及び蓄電池21を充放電制御してもよい。例えば、充放電制御部43は、電力P3の変化速度の単位期間よりも長い所定期間ごとの電力PGに基づいて、蓄電池11を充放電制御する。そして、充放電制御部43は、単位期間ごとの電力PGに基づいて、蓄電池21を充放電制御する。その際、充放電制御部43は、蓄電池11の電力P1の時間変化を継続させつつ、その大きさが設定値を上回らないように、電力P1の大きさをシフトさせる。 The charge/discharge control unit 43 may control the charging and discharging of the storage battery 11 and the storage battery 21 based on the target value of power P1 and the target value of power P2 calculated as described above. For example, the charge/discharge control unit 43 controls the charging and discharging of the storage battery 11 based on the power PG for each predetermined period that is longer than the unit period of the rate of change of the power P3. The charge/discharge control unit 43 then controls the charging and discharging of the storage battery 21 based on the power PG for each unit period. In this case, the charge/discharge control unit 43 shifts the magnitude of the power P1 so that the magnitude does not exceed a set value while continuing the time change of the power P1 of the storage battery 11.

図29は、連携点3の電力P3の例を示す図である。電力P1及び電力P2によって、任意の時刻tにおける電力P3の変化速度がいずれも抑制される。 Figure 29 shows an example of power P3 at connection point 3. Power P1 and power P2 suppress the rate of change of power P3 at any time t.

図30は、蓄電池11の電力P1及び充放電電力量の例を示す図である。蓄電池11の最大充放電電力は、電力P1が±400kWの範囲内に制限されるので、400kWである。蓄電池11が必要とする電池容量は、充放電電力量が約+280kWhから約-520kWhの間で変化するので、約800kWhである。 Figure 30 is a diagram showing an example of the power P1 and the charge/discharge power amount of the storage battery 11. The maximum charge/discharge power of the storage battery 11 is 400 kW because the power P1 is limited within the range of ±400 kW. The battery capacity required by the storage battery 11 is approximately 800 kWh because the charge/discharge power amount varies between approximately +280 kWh and approximately -520 kWh.

図31は、蓄電池21の電力P2及び充放電電力量の例を示す図である。蓄電池21の最大充放電電力は、電力P2が約+960kWから約-1120kWの間で変化するので、約1120kWである。蓄電池21が必要とする電池容量は、充放電電力量が約+0kWhから約-380kWhの間で変化するので、約380kWhである。 Figure 31 is a diagram showing an example of the power P2 and the charge/discharge power amount of the storage battery 21. The maximum charge/discharge power of the storage battery 21 is about 1120 kW, since the power P2 varies between about +960 kW and about -1120 kW. The battery capacity required by the storage battery 21 is about 380 kWh, since the charge/discharge power amount varies between about +0 kWh and about -380 kWh.

従って、蓄電池11を長周期用蓄電池として用いたり、電力P1の大きさを制限値の範囲内でシフトさせたりしても、蓄電池11の出力を抑制しつつ、蓄電池21の電池容量を抑制することができる。なお、電力P1のシフトによっても蓄電池21の電池容量が抑制されるのは、蓄電池11が、発電装置Gの電力PGの時間変化に応じた時間変化を継続するように充放電制御されることで、勾配を抑制するための容量を負担するからである。 Therefore, even if the storage battery 11 is used as a long-cycle storage battery or the magnitude of the power P1 is shifted within the range of the limit value, the battery capacity of the storage battery 21 can be suppressed while suppressing the output of the storage battery 11. Note that the battery capacity of the storage battery 21 is suppressed even by shifting the power P1 because the storage battery 11 is controlled to charge and discharge so as to continue the time change according to the time change of the power PG of the power generation device G, and thus bears the capacity for suppressing the gradient.

上記では、蓄電池11の電力P1の大きさをゼロにシフトさせる例について説明した。これ以外にも、さまざまなシフトが可能である。例えば、電力P1の大きさが、蓄電池11の充放電が逆転する大きさまでシフトしてもよい。この点も含め、図32及び図33を参照して説明する。 The above describes an example in which the magnitude of the power P1 of the storage battery 11 is shifted to zero. In addition to this, various other shifts are possible. For example, the magnitude of the power P1 may be shifted to a magnitude that reverses the charging and discharging of the storage battery 11. This point will also be described with reference to Figures 32 and 33.

図32及び図33は、蓄電池11の電力P1のシフトの例を示す図である。設定値として、上限電力P1UL及び下限電力P1LLが例示される。上限電力P1ULは、電力P1の上限値を規定する。下限電力P1LLは、電力P1の下限値を規定する。 32 and 33 are diagrams showing an example of a shift in the power P1 of the storage battery 11. Examples of set values include an upper limit power P1 UL and a lower limit power P1 LL . The upper limit power P1 UL specifies the upper limit value of the power P1. The lower limit power P1 LL specifies the lower limit value of the power P1.

図32に示される例では、蓄電池11の電力P1は、負から正に向かう勾配を作るように時間変化している。電力P1cが上限電力P1ULを上回るタイミングで、電力P1が電力P1までシフトする。これによって蓄電池21の負から正に向かわせるための必要充放電電力量を抑制できる。 32, the power P1 of the storage battery 11 changes over time to create a gradient from negative to positive. At the timing when the power P1c exceeds the upper limit power P1UL , the power P1 shifts to the power P1U . This makes it possible to suppress the amount of charge/discharge power required to change the power of the storage battery 21 from negative to positive.

図33に示される例では、電力P1は、正から負に向かう勾配を作るように時間変化している。電力P1cが下限電力P1LLを下回るタイミングで、電力P1が電力P1までシフトする。これによって蓄電池21の正から負に向かわせるための必要充放電容量を抑制できる。 33, the power P1 changes over time to create a gradient from positive to negative. At the timing when the power P1c falls below the lower limit power P1LL , the power P1 shifts to the power P1L . This makes it possible to suppress the charge/discharge capacity required to change the storage battery 21 from positive to negative.

重要なのは勾配であって、絶対値ではない。P1LLとP1ULの値が充電方向であれば、蓄電池11の充電電力量を増やすことができるし、P1LLとP1ULの値が放電方向であれば、蓄電池11の放電電力量を増やすことができる。これによって蓄電池11の蓄電容量も制御、抑制することもできる。 What is important is the gradient, not the absolute value. If the values of P1 LL and P1 UL are in the charging direction, the amount of charging power of the storage battery 11 can be increased, and if the values of P1 LL and P1 UL are in the discharging direction, the amount of discharging power of the storage battery 11 can be increased. This also makes it possible to control and restrict the storage capacity of the storage battery 11.

上限電力P1UL及び下限電力P1LLの大きさ(絶対値)は、同じであっても良いし、異なっていてもよい。図32に示されるシフト後の電力P1は、上限電力P1ULよりも小さい値であればよい。電力P1は、ゼロ以下であってもよい。電力P1がゼロより小さい場合、電力P1の大きさは、蓄電池11の充放電が逆転する大きさまでシフトする。図33に示されるシフト後の電力P1は、下限電力P1LLよりも大きい値であればよい。電力P1は、ゼロ以上であってもよい。電力P1がゼロよりも大きい場合、電力P1の大きさは、蓄電池11の充放電が逆転する大きさまでシフトする。 The magnitudes (absolute values) of the upper limit power P1 UL and the lower limit power P1 LL may be the same or different. The shifted power P1 U shown in FIG. 32 may be a value smaller than the upper limit power P1 UL . The power P1 U may be zero or less. When the power P1 U is smaller than zero, the magnitude of the power P1 shifts to a magnitude at which the charging and discharging of the storage battery 11 is reversed. The shifted power P1 L shown in FIG. 33 may be a value larger than the lower limit power P1 LL . The power P1 L may be zero or more. When the power P1 L is greater than zero, the magnitude of the power P1 shifts to a magnitude at which the charging and discharging of the storage battery 11 is reversed.

<第2応用例>
第2応用例では、蓄電池11が、予測に基づいて計画的に充放電制御される。
<Second Application Example>
In the second application example, the charging and discharging of the storage battery 11 is controlled in a planned manner based on predictions.

図34は、第2応用例に係るコントローラ4Aが用いられる電力供給システム100Aの概略構成の例を示す図である。コントローラ4Aは、コントローラ4(図9)と比較して、取得部41、算出部42及び記憶部44に代えて、取得部41A、算出部42A及び記憶部44Aを含む点、並びに、計画部45をさらに含む点において相違する。 Figure 34 is a diagram showing an example of the schematic configuration of a power supply system 100A in which a controller 4A according to the second application example is used. The controller 4A differs from the controller 4 (Figure 9) in that it includes an acquisition unit 41A, a calculation unit 42A, and a memory unit 44A instead of the acquisition unit 41, the calculation unit 42, and the memory unit 44, and further includes a plan unit 45.

取得部41Aは、これまでに説明した電力情報や蓄電池情報の他に、発電装置Gの電力PGの予測に必要な情報も取得する。そのような情報の例は、気象情報等であり、例えば時刻や時間帯ごとの風力、日射量、気温等を示す情報である。気象情報等は、例えば図示しない外部ネットワーク等を介して取得される。 In addition to the power information and battery information described above, the acquisition unit 41A also acquires information necessary for predicting the power PG of the power generation device G. An example of such information is meteorological information, such as information indicating wind power, solar radiation, and temperature for each time and time period. The meteorological information is acquired, for example, via an external network (not shown).

計画部45は、蓄電池21の電力P2の目標値を計画する。例えば、計画部45は、上述の取得部41Aによって取得された気象情報等に基づいて、将来の発電装置Gの電力PGを予測する。より具体的に、計画部45は、将来の時刻や時間帯ごとの発電装置Gの電力PGの予測値を算出する。発電電力予測のための種々の公知の手法が用いられてよい。 The planning unit 45 plans a target value for the power P2 of the storage battery 21. For example, the planning unit 45 predicts the future power PG of the power generation device G based on meteorological information acquired by the acquisition unit 41A described above. More specifically, the planning unit 45 calculates a predicted value of the power PG of the power generation device G for each future time and time period. Various known methods for predicting power generation may be used.

計画部45は、算出した発電装置Gの電力PGの予測値の変動を抑制する電力P1の目標値を計画する。例えば、計画部45は、計画時間帯ごとの電力PGの予測値に基づいて、計画時間帯ごとの電力P1の目標値を計画する。計画時間帯は、先に説明した第1実施形態における所定期間に相当し得る。各計画時間帯の長さは、同じでなくてもよい。例えば、15分、30分等の計画時間帯ごとの電力P1の目標値が、24時間先、48時間先等まで計画される。 The planning unit 45 plans a target value of power P1 that suppresses fluctuations in the calculated predicted value of power PG of the power generating device G. For example, the planning unit 45 plans a target value of power P1 for each planning time period based on the predicted value of power PG for each planning time period. The planning time period may correspond to the predetermined period in the first embodiment described above. The length of each planning time period does not have to be the same. For example, the target value of power P1 for each planning time period of 15 minutes, 30 minutes, etc. is planned up to 24 hours ahead, 48 hours ahead, etc.

図35は、蓄電池11の電力P1の目標値の計画の例を示す図である。時刻t21~時刻t22、時刻t22~時刻t23、時刻t23~時刻t24、時刻t24~時刻t25、時刻t25~時刻t26、時刻t26~時刻t27、時刻t27~時刻t28及び時刻t28~時刻t29それぞれが、計画時間帯に相当する。計画時間帯ごとの電力PGの予測値に基づいて、電力PGの変動を抑制する電力P1の目標値が計画される。 Figure 35 is a diagram showing an example of a plan for the target value of power P1 of the storage battery 11. Time t21 to time t22, time t22 to time t23, time t23 to time t24, time t24 to time t25, time t25 to time t26, time t26 to time t27, time t27 to time t28, and time t28 to time t29 each correspond to a planned time period. A target value for power P1 that suppresses fluctuations in power PG is planned based on the predicted value of power PG for each planned time period.

この例では、電力P1の目標値は、計画時間帯ごとに、その計画時間帯にわたって、時間に対して一定の傾きを有して変化するように計画されるか、又は、一定の大きさを有するように計画される。時刻t23~時刻t24及び時刻t27~時刻t28では、電力P1の目標値は、正の傾きを有して変化するように計画される。時刻t21~時刻t22及び時刻t25~時刻t26では、電力P1の目標値は、負の傾きを有して変化するように計画される。時刻t22~時刻t23、時刻t24~時刻t25、時刻t26~時刻t27及び時刻t28~時刻t29では、電力P1の目標値は、一定の大きさを有するように計画される。 In this example, the target value of power P1 is planned to change with a constant slope over time or to have a constant magnitude for each planning time period. From time t23 to time t24 and from time t27 to time t28, the target value of power P1 is planned to change with a positive slope. From time t21 to time t22 and from time t25 to time t26, the target value of power P1 is planned to change with a negative slope. From time t22 to time t23, from time t24 to time t25, from time t26 to time t27, and from time t28 to time t29, the target value of power P1 is planned to have a constant magnitude.

計画部45は、電力P1の目標値の時間変化を継続させつつ、その大きさが設定値を上回らないように、その大きさをシフトさせる。シフト手法は、先に説明した第1実施形態における算出部42の第1算出部421と同様の手法が用いられてよい。例えば、時刻t21~時刻t22において、電力P1の目標値は、負の傾きを継続しつつ、-400kWを下回らないようにシフトする。時刻t23~時刻t24において、電力P1の目標値は、正の傾きを継続しつつ、+400kWを上回らないようにシフトする。 The planning unit 45 shifts the magnitude of the target value of the power P1 while continuing the change over time so that the magnitude does not exceed the set value. The shifting method may be the same as that used by the first calculation unit 421 of the calculation unit 42 in the first embodiment described above. For example, from time t21 to time t22, the target value of the power P1 is shifted so as not to fall below -400 kW while continuing the negative slope. From time t23 to time t24, the target value of the power P1 is shifted so as not to exceed +400 kW while continuing the positive slope.

なお、時刻t25~時刻t26及び時刻t27~時刻t28のように、電力P1の目標値がシフトしない計画時間帯も当然に存在し得る。また、時刻t22~時刻t23、時刻t24~時刻t25、時刻t26~時刻t27及び時刻t28~時刻t29では、電力P1の目標値が一定であるので、電力P1の目標値はシフトしない。 Of course, there may be planned time periods during which the target value of power P1 does not shift, such as from time t25 to time t26 and from time t27 to time t28. Also, the target value of power P1 is constant from time t22 to time t23, from time t24 to time t25, from time t26 to time t27, and from time t28 to time t29, so the target value of power P1 does not shift.

図34に戻り、算出部42Aは、算出部42(図1)と比較して、第1算出部421に代えて第1算出部421Aを含む点において相違する。例えば、第1算出部421Aは、計画部45によって計画された電力P1の目標値をそのまま電力P1の目標値として算出する。第1算出部421Aは無くてもよく、その場合、計画部45が第1算出部421Aの機能を兼ねる。 Returning to FIG. 34, calculation unit 42A differs from calculation unit 42 (FIG. 1) in that it includes a first calculation unit 421A instead of the first calculation unit 421. For example, first calculation unit 421A calculates the target value of power P1 planned by the planning unit 45 as the target value of power P1 as is. The first calculation unit 421A may not be necessary, in which case the planning unit 45 also performs the function of the first calculation unit 421A.

第2算出部422は、連携点3の電力P3の変化速度を抑制する電力P2の目標値を算出する。充放電制御部43は、算出部42Aの算出結果に基づいて、蓄電池11及び蓄電池21を充放電制御する。詳細は第1応用例と同様であるので、説明は繰り返さない。 The second calculation unit 422 calculates a target value of the power P2 that suppresses the rate of change of the power P3 at the connection point 3. The charge/discharge control unit 43 controls the charge/discharge of the storage battery 11 and the storage battery 21 based on the calculation result of the calculation unit 42A. The details are the same as those of the first application example, so the description will not be repeated.

記憶部44Aは、コントローラ4Aでの制御に必要な種々の情報を記憶する。記憶部44Aに記憶される情報として、制御プログラム441Aが例示される。制御プログラム441Aは、コントローラ4Aにおいて実行される制御(処理)をコンピュータに実行させるプログラムである。この他にも、記憶部44Aは、取得部41Aによって取得された電力情報、蓄電池情報及び気象情報等を記憶したり、計画部45での計画や算出部42での算出に必要な情報を記憶したりする。 The memory unit 44A stores various information necessary for control by the controller 4A. An example of information stored in the memory unit 44A is the control program 441A. The control program 441A is a program that causes a computer to execute the control (processing) executed by the controller 4A. In addition, the memory unit 44A stores power information, battery information, weather information, etc. acquired by the acquisition unit 41A, and stores information necessary for planning by the planning unit 45 and calculation by the calculation unit 42.

電力供給システム100Aにおいても、蓄電池11の電力P1の時間変化が継続しつつ、その大きさが設定値を上回らないようにシフトする。従って、蓄電池11の出力の抑制と、蓄電池21の電池容量の抑制とを両立することができる。 In the power supply system 100A, the power P1 of the storage battery 11 continues to change over time, but is shifted so that its magnitude does not exceed a set value. This makes it possible to both suppress the output of the storage battery 11 and suppress the battery capacity of the storage battery 21.

電力供給システム100Aにおいては、電力P1の目標値を、計画時間帯ごとに、一定の傾きを有して変化するように計画したり、一定の大きさを有するように計画したりするだけでよい。これにより、例えば複雑な制御を回避できるという効果もある。この効果は、電力P1のシフトが無い場合でも得られる効果であり、この意味において、電力P1をシフトさせない形態も電力供給システム100Aの形態の1つとなり得る。 In the power supply system 100A, it is only necessary to plan the target value of the power P1 to change with a certain gradient for each planning time period, or to plan it to have a certain magnitude. This has the effect of, for example, avoiding complex control. This effect can be obtained even if there is no shift in the power P1, and in this sense, a form in which the power P1 is not shifted can also be one form of the power supply system 100A.

一実施形態において、蓄電池のSOCを考慮した制御が行われてよい。例えば、計画部45は、計画時間帯中の終期での蓄電池21のSOCが目標SOC(残存容量の目標値)に近くなるように、蓄電池11の電力P1の目標値を計画してよい。蓄電池11によって蓄電池21の電力を賄う計画ともいえる。計画時間帯中の終期は、その計画時間帯の終了時刻の数秒前、数十秒前、数分前等であってよい。目標SOCの例は、約50%である。蓄電池21の電池容量を最大限に活用できる可能性が高まる。例えばリチウムイオン電池のように満充電付近で放置すると劣化が進行する特性があるので、SOC50%付近での充放電頻度を増やすことで、蓄電池劣化の進行を抑制できる可能性が高まる。 In one embodiment, control may be performed taking into account the SOC of the storage battery. For example, the planning unit 45 may plan a target value for the power P1 of the storage battery 11 so that the SOC of the storage battery 21 at the end of the planned time period is close to the target SOC (target value of remaining capacity). This can also be said to be a plan to supply the power of the storage battery 21 with the storage battery 11. The end of the planned time period may be a few seconds, tens of seconds, or a few minutes before the end time of the planned time period. An example of the target SOC is about 50%. The possibility of maximizing the battery capacity of the storage battery 21 is increased. For example, a lithium-ion battery has a characteristic that deterioration progresses if it is left near full charge, so by increasing the frequency of charging and discharging near SOC 50%, the possibility of suppressing the progression of deterioration of the storage battery is increased.

計画部45は、計画時間帯の終期での蓄電池21の実際のSOCに基づいて、次の計画時間帯の電力P2の目標値を再計画してよい。次の計画時間帯の終期での蓄電池21のSOCが目標SOCに近くなる可能性が高まる。次の計画時間帯の電力P2の目標値の再計画は、その時点から24時間先、48時間先等までの電力P1の目標値を改めて計画することを含んでよい。 The planning unit 45 may re-plan the target value of the power P2 for the next planning time period based on the actual SOC of the storage battery 21 at the end of the planning time period. This increases the likelihood that the SOC of the storage battery 21 at the end of the next planning time period will be close to the target SOC. Re-planning the target value of the power P2 for the next planning time period may include re-planning the target value of the power P1 for the next 24 hours, 48 hours, etc. from that time period.

一実施形態において、許容範囲内において、蓄電池21の電力P2をできるだけ小さくするように、蓄電池21が充放電制御されてよい。例えば、±1%/分よりも小さい電力P3の変化速度を、あえて+1%/分や-1%/分に近づけ、その分、蓄電池21の電力P2を小さくする充放電制御が採用されてもよい。電力P2の大きさが抑制される分、蓄電池21が必要とする電池容量をさらに抑制することができる。また、蓄電池21の充放電を抑制することで劣化の進行を抑制することができる。 In one embodiment, the charge and discharge of the storage battery 21 may be controlled so as to minimize the power P2 of the storage battery 21 within an acceptable range. For example, a charge and discharge control may be adopted in which the rate of change of the power P3, which is smaller than ±1%/min, is intentionally brought closer to +1%/min or -1%/min, thereby reducing the power P2 of the storage battery 21 accordingly. Since the magnitude of the power P2 is reduced, the battery capacity required by the storage battery 21 can be further reduced. Furthermore, by suppressing the charge and discharge of the storage battery 21, the progression of deterioration can be suppressed.

<変形例>
これまで説明した形態のいくつかの変形例について説明する。一実施形態おいて、電力を消費する負荷(需要)が電力供給システムに含まれてよい。これについて、図36を参照して説明する。
<Modification>
Some modified examples of the above-described embodiments will be described. In one embodiment, a load (demand) that consumes power may be included in the power supply system. This will be described with reference to FIG.

図36は、負荷の例を示す図である。電力線Wに接続され、電力線Wからの電力を消費する負荷を負荷Lと称し図示する。負荷Lの例は、家屋、工場等である。負荷Lが消費する電力を消費電力PLと称し図示する。消費電力PLの情報も、例えば負荷Lからコントローラに送信され取得される。 Figure 36 is a diagram showing an example of a load. A load that is connected to a power line W and consumes power from the power line W is referred to as load L and illustrated. Examples of the load L are a house, a factory, etc. The power consumed by the load L is referred to as power consumption PL and illustrated. Information on the power consumption PL is also transmitted from the load L to the controller and acquired, for example.

発電装置Gの電力PGの少なくとも一部は、負荷Lで消費される。残りの電力(PG-PL)は、連携点3を介して電力網9に供給可能な電力である。この電力をこれまで説明した電力PGと同様に扱うことで、連携点3の電力P3の変化速度を抑制することができる。矛盾の無い範囲で、発電装置Gの電力PGは、発電装置Gの電力PGから負荷Lの電力PLを差し引いた減算した電力に読み替えられてよい。 At least a portion of the power PG of the power generation device G is consumed by the load L. The remaining power (PG-PL) is power that can be supplied to the power grid 9 via the connection point 3. By treating this power in the same way as the power PG described above, the rate of change of the power P3 at the connection point 3 can be suppressed. To the extent that there is no contradiction, the power PG of the power generation device G may be interpreted as the power obtained by subtracting the power PL of the load L from the power PG of the power generation device G.

発電装置Gの電力PGの少なくとも一部は、負荷Lで消費される。残りの電力(PG-PL)は、連携点3を介して電力網9に供給可能な電力である。この電力をこれまで説明した電力PGと同様に扱うことで、連携点3の電力P3の変化速度を抑制することができる。矛盾の無い範囲で、発電装置Gの電力PGは、発電装置Gの電力PGから負荷Lの電力PLを差し引いた減算した電力に読み替えられてよい。 At least a portion of the power PG of the power generation device G is consumed by the load L. The remaining power (PG-PL) is power that can be supplied to the power grid 9 via the connection point 3. By treating this power in the same way as the power PG described above, the rate of change of the power P3 at the connection point 3 can be suppressed. To the extent that there is no contradiction, the power PG of the power generation device G may be interpreted as the power obtained by subtracting the power PL of the load L from the power PG of the power generation device G.

上記実施形態では、複数の蓄電池システム2それぞれがコントローラ4によって充放電制御される例について説明した。ただし、複数の蓄電池システム1が存在してもよく、その場合には、複数の蓄電池システム1それぞれが、蓄電池システム2と同様に、コントローラ4によって充放電制御されてよい。 In the above embodiment, an example has been described in which the charging and discharging of each of the multiple storage battery systems 2 is controlled by the controller 4. However, multiple storage battery systems 1 may be present, in which case each of the multiple storage battery systems 1 may be controlled to charge and discharge by the controller 4, similar to the storage battery system 2.

一実施形態において、電力P1及び電力P2の目標値の算出に、学習済みモデルが用いられてよい。これについて、図37を参照して説明する。 In one embodiment, a trained model may be used to calculate the target values of power P1 and power P2. This will be described with reference to FIG. 37.

図37は、変形例に係るコントローラ4Bの概略構成の例を示す図である。コントローラ4Bは、コントローラ4(図9)と比較して、算出部42及び記憶部44に代えて、算出部42B及び記憶部44Bを含む点、並びに、学習部46をさらに含む点において相違する。 Figure 37 is a diagram showing an example of the schematic configuration of a controller 4B according to a modified example. Controller 4B differs from controller 4 (Figure 9) in that it includes a calculation unit 42B and a memory unit 44B instead of the calculation unit 42 and the memory unit 44, and in that it further includes a learning unit 46.

記憶部44Bに記憶される情報として、制御プログラム441B、学習済みモデル442及び訓練データ443が例示される。制御プログラム441Bは、コントローラ4Bにおいて実行される制御(処理)をコンピュータに実行させるプログラムである。学習済みモデル442は、例えば、取得部41によって取得された情報に対応するデータ(入力データ)が入力されると、電力P1及び電力P2の目標値に対応するデータ(出力データ)を出力する。出力データが対応する電力P1及び電力P2の目標値は、先に説明した算出部42(図1)によって算出される電力P1及び電力P2の目標値と同様である。 Examples of information stored in the memory unit 44B include a control program 441B, a learned model 442, and training data 443. The control program 441B is a program that causes a computer to execute control (processing) executed in the controller 4B. For example, when data (input data) corresponding to information acquired by the acquisition unit 41 is input, the learned model 442 outputs data (output data) corresponding to the target values of power P1 and power P2. The target values of power P1 and power P2 to which the output data corresponds are similar to the target values of power P1 and power P2 calculated by the calculation unit 42 (Figure 1) described above.

学習済みモデル442は、入力データが入力されると、出力データを出力するように、訓練データ443を用いて訓練(機械学習等)され、生成される。訓練データ443の例は、入力データと出力データとを組み合わせたデータセットである。データセットは、電力供給システムにおいて行われた過去の蓄電池11及び蓄電池21の充放電制御のデータ、実験データ、シミュレーションデータ等を用いて準備されてよい。 The learned model 442 is generated by training (machine learning, etc.) using training data 443 so as to output output data when input data is input. An example of the training data 443 is a data set that combines input data and output data. The data set may be prepared using data on past charge/discharge control of the storage batteries 11 and 21 performed in the power supply system, experimental data, simulation data, etc.

算出部42Bは、学習済みモデル442を用いて、電力P1及び電力P2の目標値を算出する。算出部42Bは、入力データを学習済みモデル442に入力することによって得られた出力データを、電力P1及び電力P2の目標値として取得する。 The calculation unit 42B calculates the target values of power P1 and power P2 using the trained model 442. The calculation unit 42B obtains the output data obtained by inputting the input data into the trained model 442 as the target values of power P1 and power P2.

算出部42Bによって算出(取得)された電力P1及び電力P2の目標値に基づいて、充放電制御部43は、蓄電池11及び蓄電池21を充放電制御する。 Based on the target values of power P1 and power P2 calculated (acquired) by calculation unit 42B, charge/discharge control unit 43 controls the charging and discharging of storage battery 11 and storage battery 21.

学習部46は、記憶部44Bに記憶された訓練データ443を用いて学習済みモデル442の学習を行う。これにより、学習済みモデル442を生成でき、また、最新の訓練データ443に基づいて学習済みモデル442をアップデートすることができる。なお、学習部46及び訓練データ443は、コントローラ4Bの外部(例えば図示しないサーバ装置等の情報処理装置)に設けられてもよい。この場合には、コントローラ4Bの外部において生成された訓練済みの学習済みモデル442がコントローラ4Bに提供され用いられる。 The learning unit 46 learns the learned model 442 using the training data 443 stored in the memory unit 44B. This makes it possible to generate the learned model 442 and to update the learned model 442 based on the latest training data 443. Note that the learning unit 46 and the training data 443 may be provided outside the controller 4B (for example, an information processing device such as a server device not shown). In this case, the trained learned model 442 generated outside the controller 4B is provided to and used by the controller 4B.

なお、図示しないが、コントローラ4A(図34)の計画部45による電力P1の目標値の計画等にも、学習済みモデルが用いられてよい。また、複数の蓄電池システム2それぞれの電力pの目標値の算出等にも、学習済みモデルが用いられてよい。 Although not shown, the learned model may also be used for planning the target value of power P1 by the planning unit 45 of the controller 4A (FIG. 34). The learned model may also be used for calculating the target value of power p for each of the multiple storage battery systems 2.

一実施形態において、蓄電池システム1のバッテリコントローラ14の機能が、コントローラ4に組み入れられてよい。蓄電池システム1の構成の簡素化等が可能になる。蓄電池システム2のバッテリコントローラ24の機能が、コントローラ4に組み入れられてよい。蓄電池システム2の構成の簡素化等が可能になる。 In one embodiment, the function of the battery controller 14 of the storage battery system 1 may be incorporated into the controller 4. This allows for the configuration of the storage battery system 1 to be simplified, etc. The function of the battery controller 24 of the storage battery system 2 may be incorporated into the controller 4. This allows for the configuration of the storage battery system 2 to be simplified, etc.

以上で説明した応用例では、コントローラ4は、発電装置Gの電力PG(発電電力)に基づいて、発電装置G、発電装置Gに接続された蓄電池システム1(第1の蓄電池システム)及び蓄電池システム2(第2の蓄電池システム)と、電力網9との間の連携点3の電力P3(授受電力)の変化速度(単位期間ごとの電力値の変化率)を抑制するように、蓄電池システム1及び蓄電池システム2を充放電制御する。蓄電池システム1の蓄電池11は、蓄電池システム2の蓄電池21の電池容量よりも大きい電池容量を有する。充放電制御は、蓄電池システム1の最大充放電電力が、蓄電池システム2の最大充放電電力よりも小さくなるように、蓄電池システム1及び蓄電池システム2を充放電させることを含む。ここでの蓄電池システム2は、複数の蓄電池システム2であり、先に図1~図7等を参照して説明したように、少なくとも1つの運転目的(第1の運転目的を含む)に従って、それぞれが充放電制御される。 In the application example described above, the controller 4 controls the charging and discharging of the storage battery system 1 and the storage battery system 2 based on the power PG (generated power) of the power generation device G so as to suppress the rate of change (rate of change in power value per unit period) of the power P3 (transferred and received power) at the connection point 3 between the power generation device G, the storage battery system 1 (first storage battery system) and the storage battery system 2 (second storage battery system) connected to the power generation device G, and the power grid 9. The storage battery 11 of the storage battery system 1 has a battery capacity larger than the battery capacity of the storage battery 21 of the storage battery system 2. The charging and discharging control includes charging and discharging the storage battery system 1 and the storage battery system 2 so that the maximum charging and discharging power of the storage battery system 1 is smaller than the maximum charging and discharging power of the storage battery system 2. The storage battery system 2 here is a plurality of storage battery systems 2, and as previously described with reference to Figures 1 to 7, each of them is controlled to be charged and discharged according to at least one operating purpose (including the first operating purpose).

上記のコントローラ4では、蓄電池11及び蓄電池21の2種類の蓄電池が、連携点3の電力P3の変化速度を抑制するように充放電制御される。発電装置を安定化させることができる。また、充放電制御される。蓄電池11は、蓄電池21の電池容量よりも大きい電池容量を有する。蓄電池11の最大充放電電力は、蓄電池21の最大充放電電力よりも小さくなるように充放電制御される。このように用いられる蓄電池11は、大容量型蓄電池である。蓄電池21は、高出力型蓄電池である。図15~図19等を参照して説明したように、蓄電池11の出力(最大充放電電力)を抑制しつつ、蓄電池11を用いない場合よりも、蓄電池21の電池容量(充放電電力量)を抑制することができる。蓄電池11(大容量型蓄電池)の出力の抑制と蓄電池21(高出力型蓄電池)の電池容量の抑制との両立が可能になる。 In the controller 4, the two types of storage batteries, storage battery 11 and storage battery 21, are controlled to charge and discharge so as to suppress the rate of change of the power P3 at the connection point 3. The power generation device can be stabilized. In addition, charging and discharging are controlled. Storage battery 11 has a battery capacity larger than that of storage battery 21. Charging and discharging are controlled so that the maximum charging and discharging power of storage battery 11 is smaller than the maximum charging and discharging power of storage battery 21. The storage battery 11 used in this manner is a large-capacity storage battery. Storage battery 21 is a high-output storage battery. As described with reference to Figures 15 to 19, the battery capacity (charge and discharge power amount) of storage battery 21 can be suppressed more than when storage battery 11 is not used, while suppressing the output (maximum charging and discharging power) of storage battery 11. It is possible to achieve both suppression of the output of storage battery 11 (large-capacity storage battery) and suppression of the battery capacity of storage battery 21 (high-output storage battery).

加えて、複数の蓄電池システム2それぞれの動作効率Eが高くなるように、複数の蓄電池システム2が充放電制御される。従って、蓄電池21の充放電効率ηbat及びPCS22(電力変換装置)の電力変換効率ηpcsの全体の効率を最適化することができる。とくに、高出力型の蓄電池である蓄電池21を含む蓄電池システム2の動作効率Eを高めることで、蓄電池11の電池容量を抑制する効果がさらに高められる。 In addition, the charging and discharging of the multiple storage battery systems 2 is controlled so that the operation efficiency E of each of the multiple storage battery systems 2 is increased. Therefore, it is possible to optimize the overall efficiency of the charging and discharging efficiency η bat of the storage battery 21 and the power conversion efficiency η pcs of the PCS 22 (power conversion device). In particular, by increasing the operation efficiency E of the storage battery system 2 including the storage battery 21, which is a high-output storage battery, the effect of suppressing the battery capacity of the storage battery 11 is further enhanced.

1 蓄電池システム
2 蓄電池システム
3 連携点
4 コントローラ
41 取得部
42 算出部
43 充放電制御部
44 記憶部
45 計画部
46 学習部
441 制御プログラム
442 学習済みモデル
443 訓練データ
444 システムデータ
G 発電装置
P1 電力
P2 電力
p 電力
PG 電力
PL 消費電力
Reference Signs List 1 Battery storage system 2 Battery storage system 3 Coordination point 4 Controller 41 Acquisition unit 42 Calculation unit 43 Charge/discharge control unit 44 Memory unit 45 Planning unit 46 Learning unit 441 Control program 442 Learned model 443 Training data 444 System data G Power generation device P1 Power P2 Power p Power PG Power PL Power consumption

Claims (9)

転目的に従って、複数の蓄電池システムそれぞれを充放電制御するコントローラであって、
前記複数の蓄電池システムそれぞれは、蓄電池、及び、当該蓄電池に接続された電力変換装置を含み、
前記転目的は、前記複数の蓄電池システムそれぞれの動作効率が高くなるように前記複数の蓄電池システムそれぞれを充放電させる第1の運転目的と、前記複数の蓄電池システムそれぞれの蓄電池のうち、残存容量の大きい蓄電池を優先して放電させ、残存容量の小さい蓄電池を優先して充電させる第2の運転目的と、前記複数の蓄電池システムそれぞれの蓄電池のうち、充電されている電力の価格が低い蓄電池を優先して放電させる第3の運転目的とを含み、
前記動作効率は、充放電電力に対する前記蓄電池の充放電効率及び前記電力変換装置の電力変換効率の全体の効率であ
前記コントローラは、前記第1の運転目的、前記第2の運転目的及び前記第3の運転目的の全体の反映の度合いを示す判定値が大きくなるように、前記複数の蓄電池システムそれぞれを充放電制御する、
コントローラ。
A controller that controls charging and discharging of each of a plurality of storage battery systems according to an operation purpose,
Each of the plurality of storage battery systems includes a storage battery and a power conversion device connected to the storage battery,
the operation objectives include a first operation objective of charging and discharging each of the plurality of storage battery systems so as to increase the operating efficiency of each of the plurality of storage battery systems; a second operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a large remaining capacity with priority and charging, among the batteries of each of the plurality of storage battery systems, a battery having a small remaining capacity with priority; and a third operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a low price of electricity being charged with priority ;
the operating efficiency is an overall efficiency of the charging/discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to charging/discharging power,
The controller controls charging and discharging of each of the plurality of storage battery systems so that a determination value indicating a degree of overall reflection of the first operation objective, the second operation objective, and the third operation objective becomes large.
controller.
前記複数の蓄電池システムそれぞれの動作効率のピーク位置が互いに異なっており、
前記第1の運転目的は、前記複数の蓄電池システムそれぞれの動作効率をピーク位置に近づけることを含む、
請求項1に記載のコントローラ。
The peak positions of the operation efficiencies of the plurality of storage battery systems are different from one another,
The first operating objective includes bringing the operating efficiency of each of the plurality of storage battery systems closer to a peak position.
The controller of claim 1 .
前記複数の蓄電池システムそれぞれの蓄電池の充放電効率のピーク位置が互いに異なっている、
請求項2に記載のコントローラ。
The peak positions of the charge/discharge efficiency of each of the plurality of storage battery systems are different from each other.
The controller of claim 2 .
前記複数の蓄電池システムそれぞれの蓄電池は、設計及び使用期間の少なくとも一方が互いに異なっている、
請求項3に記載のコントローラ。
The storage batteries of the plurality of storage battery systems are different from each other in at least one of design and period of use.
The controller of claim 3 .
前記判定値は、各々が重み付けされた複数の運転目的の全体の度合いを示す、
請求項に記載のコントローラ。
The determination value indicates an overall degree of each of the weighted driving purposes.
The controller of claim 1 .
前記コントローラは、発電装置の発電電力に基づいて、前記発電装置、前記発電装置に接続された第1の蓄電池システム及び第2の蓄電池システムと、電力網との間の授受電力の変化速度を抑制するように、前記第1の蓄電池システム及び前記第2の蓄電池システムを充放電制御し、
前記第1の蓄電池システムの蓄電池は、前記第2の蓄電池システムの蓄電池の電池容量よりも大きい電池容量を有し、
前記充放電制御は、前記第1の蓄電池システムの最大充放電電力が、前記第2の蓄電池システムの最大充放電電力よりも小さくなるように、前記第1の蓄電池システム及び前記第2の蓄電池システムを充放電させることを含み、
前記第2の蓄電池システムが、前記複数の蓄電池システムである、
請求項1~のいずれか1項に記載のコントローラ。
the controller controls charging and discharging of the first storage battery system and the second storage battery system so as to suppress a rate of change in power exchanged between the power generation device, the first storage battery system and the second storage battery system connected to the power generation device, and a power grid, based on power generated by the power generation device;
a storage battery of the first storage battery system has a battery capacity larger than a battery capacity of a storage battery of the second storage battery system;
the charge/discharge control includes charging/discharging the first storage battery system and the second storage battery system such that a maximum charge/discharge power of the first storage battery system is smaller than a maximum charge/discharge power of the second storage battery system;
The second storage battery system is the plurality of storage battery systems.
The controller according to any one of claims 1 to 4 .
コンピュータに、
転目的に従って、複数の蓄電池システムそれぞれを充放電制御する処理を実行させる制御プログラムであって、
前記複数の蓄電池システムそれぞれは、蓄電池、及び、当該蓄電池に接続された電力変換装置を含み、
前記転目的は、前記複数の蓄電池システムそれぞれの動作効率が高くなるように前記複数の蓄電池システムそれぞれを充放電させる第1の運転目的と、前記複数の蓄電池システムそれぞれの蓄電池のうち、残存容量の大きい蓄電池を優先して放電させ、残存容量の小さい蓄電池を優先して充電させる第2の運転目的と、前記複数の蓄電池システムそれぞれの蓄電池のうち、充電されている電力の価格が低い蓄電池を優先して放電させる第3の運転目的とを含み、
前記動作効率は、充放電電力に対する前記蓄電池の充放電効率及び前記電力変換装置の電力変換効率の全体の効率であ
前記第1の運転目的、前記第2の運転目的及び前記第3の運転目的の全体の反映の度合いを示す判定値が大きくなるように、前記複数の蓄電池システムそれぞれを充放電制御する、
制御プログラム。
On the computer,
A control program for executing a process of controlling charging and discharging each of a plurality of storage battery systems according to an operation purpose,
Each of the plurality of storage battery systems includes a storage battery and a power conversion device connected to the storage battery,
the operation objectives include a first operation objective of charging and discharging each of the plurality of storage battery systems so as to increase the operating efficiency of each of the plurality of storage battery systems; a second operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a large remaining capacity with priority and charging, among the batteries of each of the plurality of storage battery systems, a battery having a small remaining capacity with priority; and a third operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a low price of electricity being charged with priority ;
the operating efficiency is an overall efficiency of the charging/discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to charging/discharging power,
controlling charging and discharging of each of the plurality of battery storage systems so that a determination value indicating a degree of overall reflection of the first operation objective, the second operation objective, and the third operation objective becomes large;
Control program.
転目的に従って、複数の蓄電池システムそれぞれを充放電制御する制御方法であって、
前記複数の蓄電池システムそれぞれは、蓄電池、及び、当該蓄電池に接続された電力変換装置を含み、
前記転目的は、前記複数の蓄電池システムそれぞれの動作効率が高くなるように前記複数の蓄電池システムそれぞれを充放電させる第1の運転目的と、前記複数の蓄電池システムそれぞれの蓄電池のうち、残存容量の大きい蓄電池を優先して放電させ、残存容量の小さい蓄電池を優先して充電させる第2の運転目的と、前記複数の蓄電池システムそれぞれの蓄電池のうち、充電されている電力の価格が低い蓄電池を優先して放電させる第3の運転目的とを含み、
前記動作効率は、充放電電力に対する前記蓄電池の充放電効率及び前記電力変換装置の電力変換効率の全体の効率であ
前記第1の運転目的、前記第2の運転目的及び前記第3の運転目的の全体の反映の度合いを示す判定値が大きくなるように、前記複数の蓄電池システムそれぞれを充放電制御する、
制御方法。
A control method for controlling charging and discharging of each of a plurality of storage battery systems according to an operation purpose, comprising:
Each of the plurality of storage battery systems includes a storage battery and a power conversion device connected to the storage battery,
the operation objectives include a first operation objective of charging and discharging each of the plurality of storage battery systems so as to increase the operating efficiency of each of the plurality of storage battery systems; a second operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a large remaining capacity with priority and charging, among the batteries of each of the plurality of storage battery systems, a battery having a small remaining capacity with priority; and a third operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a low price of electricity being charged with priority ;
the operating efficiency is an overall efficiency of the charging/discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to charging/discharging power,
controlling charging and discharging of each of the plurality of battery storage systems so that a determination value indicating a degree of overall reflection of the first operation objective, the second operation objective, and the third operation objective becomes large;
Control methods.
複数の蓄電池システムと、
転目的に従って、前記複数の蓄電池システムそれぞれを充放電制御するコントローラと、
を備え、
前記複数の蓄電池システムそれぞれは、蓄電池、及び、当該蓄電池に接続された電力変換装置を含み、
前記転目的は、前記複数の蓄電池システムそれぞれの動作効率が高くなるように前記複数の蓄電池システムそれぞれを充放電させる第1の運転目的と、前記複数の蓄電池システムそれぞれの蓄電池のうち、残存容量の大きい蓄電池を優先して放電させ、残存容量の小さい蓄電池を優先して充電させる第2の運転目的と、前記複数の蓄電池システムそれぞれの蓄電池のうち、充電されている電力の価格が低い蓄電池を優先して放電させる第3の運転目的とを含み、
前記動作効率は、充放電電力に対する前記蓄電池の充放電効率及び前記電力変換装置の電力変換効率の全体の効率であ
前記コントローラは、前記第1の運転目的、前記第2の運転目的及び前記第3の運転目的の全体の反映の度合いを示す判定値が大きくなるように、前記複数の蓄電池システムそれぞれを充放電制御する、
電力供給システム。
A plurality of storage battery systems;
a controller that controls charging and discharging of each of the plurality of storage battery systems according to an operation purpose;
Equipped with
Each of the plurality of storage battery systems includes a storage battery and a power conversion device connected to the storage battery,
the operation objectives include a first operation objective of charging and discharging each of the plurality of storage battery systems so as to increase the operating efficiency of each of the plurality of storage battery systems; a second operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a large remaining capacity with priority and charging, among the batteries of each of the plurality of storage battery systems, a battery having a small remaining capacity with priority; and a third operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a low price of electricity being charged with priority ;
the operating efficiency is an overall efficiency of the charging/discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to charging/discharging power,
The controller controls charging and discharging of each of the plurality of storage battery systems so that a determination value indicating a degree of overall reflection of the first operation objective, the second operation objective, and the third operation objective becomes large.
Power supply system.
JP2021122641A 2021-07-27 2021-07-27 CONTROLLER, CONTROL PROGRAM, CONTROL METHOD, AND POWER SUPPLY SYSTEM Active JP7588045B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021122641A JP7588045B2 (en) 2021-07-27 2021-07-27 CONTROLLER, CONTROL PROGRAM, CONTROL METHOD, AND POWER SUPPLY SYSTEM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021122641A JP7588045B2 (en) 2021-07-27 2021-07-27 CONTROLLER, CONTROL PROGRAM, CONTROL METHOD, AND POWER SUPPLY SYSTEM

Publications (2)

Publication Number Publication Date
JP2023018482A JP2023018482A (en) 2023-02-08
JP7588045B2 true JP7588045B2 (en) 2024-11-21

Family

ID=85158043

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021122641A Active JP7588045B2 (en) 2021-07-27 2021-07-27 CONTROLLER, CONTROL PROGRAM, CONTROL METHOD, AND POWER SUPPLY SYSTEM

Country Status (1)

Country Link
JP (1) JP7588045B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012016258A (en) 2010-04-14 2012-01-19 Sekisui Chem Co Ltd Power control system
WO2012176868A1 (en) 2011-06-24 2012-12-27 三洋電機株式会社 Power supply system
JP2014171335A (en) 2013-03-04 2014-09-18 Toshiba Corp Secondary battery system comprising a plurality of batteries and distribution method for charge/discharge power and the like
JP2015033307A (en) 2013-08-07 2015-02-16 サンケン電気株式会社 Power fluctuation suppressing device using multiple power storage devices and controlling method therefor
JP2017118654A (en) 2015-12-22 2017-06-29 ナブテスコ株式会社 Energy stabilizer
JP2018191486A (en) 2017-05-11 2018-11-29 株式会社東芝 Power storage system, controller, charge/discharge control method, and program

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5369184B2 (en) * 2009-06-25 2013-12-18 パナソニック株式会社 Power supply
JP6400484B2 (en) * 2015-01-07 2018-10-03 株式会社東芝 Power storage system, power storage control method, and power storage control program

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012016258A (en) 2010-04-14 2012-01-19 Sekisui Chem Co Ltd Power control system
WO2012176868A1 (en) 2011-06-24 2012-12-27 三洋電機株式会社 Power supply system
JP2014171335A (en) 2013-03-04 2014-09-18 Toshiba Corp Secondary battery system comprising a plurality of batteries and distribution method for charge/discharge power and the like
JP2015033307A (en) 2013-08-07 2015-02-16 サンケン電気株式会社 Power fluctuation suppressing device using multiple power storage devices and controlling method therefor
JP2017118654A (en) 2015-12-22 2017-06-29 ナブテスコ株式会社 Energy stabilizer
JP2018191486A (en) 2017-05-11 2018-11-29 株式会社東芝 Power storage system, controller, charge/discharge control method, and program

Also Published As

Publication number Publication date
JP2023018482A (en) 2023-02-08

Similar Documents

Publication Publication Date Title
JP7059583B2 (en) Energy management system, power supply and demand plan optimization method, and power supply and demand plan optimization program
CN101902049B (en) Method for operating energy storage system
US20230307918A1 (en) System and method for bi-directional direct current charging in electric vehicle supply equipment
JP5639540B2 (en) Storage battery supply and demand plan creation device and storage battery supply and demand plan creation method
CN102474105B (en) Power system demand control equipment, demand control program and recording medium
CN102687033B (en) Method for controlling secondary battery and power storage device
JP6192531B2 (en) Power management system, power management apparatus, power management method, and program
JP6430775B2 (en) Storage battery device
WO2021064206A1 (en) Methods and systems for power management in a microgrid
US20170331291A1 (en) Power adjustment device, power distribution system, power adjustment method, and non-transitory computer-readable medium in which program is stored
KR20160128781A (en) Apparatus and method for charge and discharge scheduling in energy storage device
WO2023042456A1 (en) Battery capacity estimation device, charging plan generation device, discharging plan generation device, and battery capacity estimation method
JP2016163400A (en) Controller, control method, and program
JP2022109168A (en) Charge-discharge controller
JP2013165593A (en) Power generation control device, power generation control method, power generation control program and power generation control system
JP6158107B2 (en) Energy management system
JP7601725B2 (en) CONTROLLER, CONTROL PROGRAM, CONTROL METHOD, AND POWER SUPPLY SYSTEM
WO2015118744A1 (en) Energy management system
CN117767477A (en) Energy storage control method, device, system and medium
JP6020297B2 (en) Control plan generation method, control plan generation device, and control plan generation program
JP7588045B2 (en) CONTROLLER, CONTROL PROGRAM, CONTROL METHOD, AND POWER SUPPLY SYSTEM
JP2018174623A (en) Power management device, applied power generation calculation method
CN110692174B (en) Method for determining set point parameters, set point determiner and computer readable device
JP5738220B2 (en) Output smoothing apparatus, output smoothing method and program
JP7374610B2 (en) Storage battery operation device and storage battery operation method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230922

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240531

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240611

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240807

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241029

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241111

R150 Certificate of patent or registration of utility model

Ref document number: 7588045

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150