JP7590899B2 - Method for conveying belt-shaped member for rehabilitation pipe - Google Patents
[go: Go Back, main page]

JP7590899B2 - Method for conveying belt-shaped member for rehabilitation pipe - Google Patents

Method for conveying belt-shaped member for rehabilitation pipe Download PDF

Info

Publication number
JP7590899B2
JP7590899B2 JP2021051056A JP2021051056A JP7590899B2 JP 7590899 B2 JP7590899 B2 JP 7590899B2 JP 2021051056 A JP2021051056 A JP 2021051056A JP 2021051056 A JP2021051056 A JP 2021051056A JP 7590899 B2 JP7590899 B2 JP 7590899B2
Authority
JP
Japan
Prior art keywords
pipe
shaped member
strip
spiral body
belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021051056A
Other languages
Japanese (ja)
Other versions
JP2022149084A (en
Inventor
雅稀 後藤
善央 久保
公貴 岡下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2021051056A priority Critical patent/JP7590899B2/en
Publication of JP2022149084A publication Critical patent/JP2022149084A/en
Application granted granted Critical
Publication of JP7590899B2 publication Critical patent/JP7590899B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining Or Joining Of Plastics Or The Like (AREA)

Description

本発明は、既設管内で帯状部材から更生管を製管する工程において、帯状部材を搬送する方法に関する。
The present invention relates to a method for transporting a strip-shaped member in a process for producing a rehabilitation pipe from the strip-shaped member within an existing pipe.

老朽化した下水管等の既設管を例えばSPR(Spiral Pipe Renewal)工法によって更生することは公知である。このSPR工法では、既設管内で製管機を用い、帯状部材(プロファイル)を螺旋状に巻回するとともに一周違いに隣接する巻き部分の縁部どうしを嵌合することによって、更生管を製管し既設管をライニングする。 It is well known to rehabilitate existing pipes such as deteriorated sewer pipes using, for example, the SPR (Spiral Pipe Renewal) method. In this SPR method, a pipe-making machine is used to spirally wind a strip-shaped member (profile) inside the existing pipe, and the edges of adjacent wound sections are fitted together in a single rotation to produce a rehabilitated pipe and line the existing pipe.

特許文献1,2に示すように、帯状部材には巻き癖が付されている。この帯状部材は、マンホールの近傍の地上に設置されたドラムからマンホールに導入され、さらに製管途中の更生管を通って更生管の先端に位置する製管機に供給される。 As shown in Patent Documents 1 and 2, the strip-shaped material is given a curl. This strip-shaped material is introduced into the manhole from a drum installed on the ground near the manhole, and is then passed through the rehabilitated pipe in the middle of being made and is supplied to the pipe making machine located at the tip of the rehabilitated pipe.

特開2020-101206号公報JP 2020-101206 A 特許6832109号公報Patent No. 6832109

上記帯状部材は螺旋状をなして製管機まで搬送されるが、この搬送は全て作業者が担っていた。既設管が長い場合には例えば30mおきに作業者が複数配置され、帯状部材を手で持って搬送する。そのため、特に更生管の管径が大きく既設管が長い場合には、帯状部材の重量が大となり、作業者に重労働を強いることになる。高剛性の帯状部材を用いる場合、通水状態で搬送する場合には、さらに作業が厳しくなる。 The belt-shaped member is transported in a spiral shape to the pipe making machine, and this transportation is entirely done by workers. When the existing pipe is long, multiple workers are stationed, for example at 30m intervals, and transport the belt-shaped member by hand. Therefore, when the diameter of the rehabilitating pipe is large and the existing pipe is long, the weight of the belt-shaped member becomes large, forcing workers to do heavy work. When a highly rigid belt-shaped member is used, or when it is transported while water is flowing through it, the work becomes even more difficult.

前記課題を解決するため、本発明は、巻き癖が付された帯状部材を既設管内で螺旋状に巻回するとともに隣接する巻き部分を連結することにより、更生管を延伸させながら製管する工程において、巻き部分が連結される前の帯状部材からなる螺旋体を、製管場所に向けて前記更生管内を搬送する方法であって、前記螺旋体の前記巻き部分に引掛具を掛け、前記引掛具を牽引装置で牽引することにより、前記螺旋体を前記製管場所に向けて搬送することを特徴とする。
上記方法によれば、帯状部材からなる螺旋体を牽引装置で牽引することにより、作業者の負担を軽減することができる。
In order to solve the above-mentioned problems, the present invention provides a method for transporting a spiral body made of a strip-shaped member before the wound portions are connected through a rehabilitating pipe toward a pipe making location in a process of producing a rehabilitated pipe while stretching it by spirally winding a strip-shaped member with a winding tendency inside an existing pipe and connecting adjacent wound portions, the method being characterized in that the spiral body is transported toward the pipe making location by hanging a hooking tool on the wound portion of the spiral body and towing the hooking tool with a towing device.
According to the above method, the helical body made of the belt-shaped member is pulled by the pulling device, thereby reducing the burden on the worker.

好ましくは、前記製管機の稼働を停止させた状態で、連続した一巻き分の帯状部材からなる前記螺旋体を、前記牽引装置により、前記製管機に向けて一度に搬送する。
上記方法によれば、製管機の稼働に合わせて帯状部材を搬送せずに済む。また、製管機へ供給される帯状部材のピッチが安定し、製管機への負荷を軽減できるとともに安定した製管を行うことができる。
Preferably, with the operation of the pipe making machine stopped, the helical body consisting of one continuous turn of belt-shaped material is transported toward the pipe making machine by the traction device in one go.
According to the above method, it is not necessary to transport the strip-shaped material in accordance with the operation of the pipe making machine. Also, the pitch of the strip-shaped material fed to the pipe making machine is stable, which reduces the load on the pipe making machine and enables stable pipe making.

好ましくは、前記引掛具が前記螺旋体の長手方向に間隔をおいて複数個所に掛けられる。
上記方法によれば、螺旋体を安定して搬送することができる。
Preferably, the hook is hung at a plurality of locations spaced apart in the longitudinal direction of the spiral body.
According to the above method, the spiral body can be transported stably.

さらに好ましくは、前記引掛具が、一対の索条と、前記一対の索条の長手方向に間隔をおいて前記一対の索条間にかけ渡された複数の掛け部材とを有し、前記掛け部材が前記螺旋体の前記巻き部分に掛けられる。
上記方法によれば、帯状部材をより一層安定して搬送することができる。
More preferably, the hooking device has a pair of cords and a plurality of hanging members stretched between the pair of cords at intervals in the longitudinal direction of the pair of cords, the hanging members being hung on the winding portion of the spiral body.
According to the above method, the belt-shaped material can be transported more stably.

好ましくは、前記引掛具の前記掛け部材が、前記巻き部分の中心より下方で前記巻き部分の最下位部より上方に掛けられた状態で、前記螺旋体が牽引される。
上記方法によれば、掛け部材を安定して巻き部分に掛けることができるとともに、螺旋体を効率良く安定して搬送することができる。
Preferably, the spiral body is pulled in a state in which the hanging member of the hook is hung below the center of the wound portion and above the lowest part of the wound portion.
According to the above method, the hanging member can be stably hung on the wound portion, and the spiral body can be transported efficiently and stably.

本発明の他の態様は、巻き癖が付された更生管用の帯状部材からなる螺旋体を搬送する際に用いられる引掛具であって、一対の索条と、前記一対の索条の長手方向に間隔をおいて前記一対の索条間にかけ渡された複数の掛け部材と、を備えたことを特徴とする。
上記構成によれば、簡単で嵩張らない構造でありながら、確実に螺旋体に引掛けることができる。
Another aspect of the present invention is a hanging device used when transporting a spiral body consisting of a belt-shaped material for rehabilitation pipes with a curled tendency, characterized in that it comprises a pair of cords and a number of hanging members stretched between the pair of cords at intervals in the longitudinal direction of the pair of cords.
According to the above configuration, the structure is simple and not bulky, yet can be reliably hooked onto the spiral body.

好ましくは、前記掛け部材が直線状に延びている。この構成によれば、螺旋体の巻き部分に確実に掛けることができる。
より好ましくは、前記掛け部材が直管からなり、全長にわたり軸線方向に延びるスリットを有する。この構成によれば、掛け部材が帯状部材に強く当たっても、その弾性により帯状部材を傷つけない。
Preferably, the hanging member extends linearly. With this configuration, it can be hung reliably on the winding portion of the spiral body.
More preferably, the hanging member is made of a straight tube and has a slit extending in the axial direction over its entire length. With this configuration, even if the hanging member hits the belt-shaped member hard, the hanging member will not damage the belt-shaped member due to its elasticity.

好ましくは、前記掛け部材がフレキシブルである。この構成によれば、螺旋体への装着作業が楽である。 Preferably, the hanging member is flexible. This configuration makes it easy to attach to the spiral body.

本発明によれば、帯状部材を製管機へ搬送する作業の負担を軽減することができる。 The present invention can reduce the burden of transporting strip-shaped materials to a pipe making machine.

既設管に沿って更生管を製管する工程の第1段階を示す概略縦断面図である。A schematic vertical cross-sectional view showing the first stage of a process for manufacturing a rehabilitation pipe along an existing pipe. 製管工程の第2段階において、ドラムから導入された帯状部材に引掛具を装着し始めた状態を示す概略縦断面図である。A schematic vertical cross-sectional view showing the state in which a hooking device has begun to be attached to a strip-shaped material introduced from a drum during the second stage of the pipe making process. 同第2段階において、帯状部材からなる螺旋体に引掛具の装着が完了した状態を示す概略縦断面図である。11 is a schematic vertical cross-sectional view showing the state in which the attachment of the hook to the spiral body made of a belt-shaped member is completed in the second stage. FIG. 同第2段階において、螺旋体を製管機に向けて牽引している途中の状態を示す概略縦断面図である。A schematic vertical cross-sectional view showing the state in which the spiral body is being pulled toward the pipe making machine in the second stage. 同第2段階において、螺旋体の牽引による搬送が完了し、さらに製管機に向けて螺旋体を縮めた状態を示す概略縦断面図である。This is a schematic vertical cross-sectional view showing the state in the second stage where the spiral body has been completed by towing and is further contracted toward the pipe making machine. 帯状部材の横断面図である。FIG. 引掛具の平面図である。FIG. 同引掛具の掛け部材の一部を示す拡大斜視図である。FIG. 4 is an enlarged perspective view showing a part of the hanging member of the hook. 更生管内において螺旋体の巻き部分に掛け部材が掛けられた状態を示す横断面図である。10 is a cross-sectional view showing a state in which a hanging member is hung on a winding portion of a spiral body inside a rehabilitation pipe. FIG. 螺旋体の巻き部分に掛け部材が掛けられた状態を示す側面図である。13 is a side view showing a state in which a hanging member is hung on a winding portion of a spiral body. FIG.

以下、本発明の一実施形態を、図面を参照しながら説明する。図1Aに示す既設管1は、例えば下水道管であり、マンホール2A,2B間に配管されている。老朽化した既設管1はその内周に更生管3をライニングすることで、更生される。 One embodiment of the present invention will be described below with reference to the drawings. The existing pipe 1 shown in FIG. 1A is, for example, a sewer pipe, and is laid between manholes 2A and 2B. The deteriorated existing pipe 1 is rehabilitated by lining its inner circumference with a rehabilitation pipe 3.

更生管3は、帯状部材10(プロファイル)から製管される。図2に示すように、帯状部材10は、ポリ塩化ビニルなどの合成樹脂からなる主帯材11と、スチール等の金属からなる補強帯材12を有し、同一断面を有して帯状に長く延びている。主帯材11の幅方向一側縁部には雌型嵌合部11aが形成され、他側縁部には雄型嵌合部11bが形成されている。雄型嵌合部11aは雌型嵌合部11bの溝と相補形状をなしている。
帯状部材10は、筒状のドラムに巻かれた状態で、現場に搬送される。ドラムには、巻き癖形成装置が設けられている。施工時、ドラムから引き出された帯状部材10は、巻き癖形成装置を通過することで、更生管3より小径の巻き癖が付与される。なお、帯状部材10は、ドラムに巻かれていることで、ある程度巻き癖が付与される。更生管3より小径の巻き癖が付いていれば、巻き癖形成装置を通過させる必要はない。
The rehabilitation pipe 3 is manufactured from a strip-shaped member (profile) 10. As shown in Fig. 2, the strip-shaped member 10 has a main strip 11 made of synthetic resin such as polyvinyl chloride and a reinforcing strip 12 made of metal such as steel, and extends long in a strip shape with the same cross section. A female fitting portion 11a is formed on one widthwise edge of the main strip 11, and a male fitting portion 11b is formed on the other widthwise edge. The male fitting portion 11a has a shape complementary to the groove of the female fitting portion 11b.
The strip-shaped member 10 is transported to the site in a state where it is wound around a cylindrical drum. The drum is provided with a curl forming device. During construction, the strip-shaped member 10 pulled out from the drum passes through the curl forming device, whereby the strip-shaped member 10 is curled to a smaller diameter than the rehabilitating pipe 3. Note that the strip-shaped member 10 is curled to a certain extent by being wound around the drum. If the strip-shaped member 10 is curled to a smaller diameter than the rehabilitating pipe 3, there is no need to pass the curl forming device.

以下、更生管のライニング工程の概略を説明する。なお、このライニング工程は、既設管1に水が流れている状態でも実行することができる。
ライニング工程の第1段階
図1Aに示すように、帯状部材10は、更生管3より小径に巻き癖が付けられた状態で、発進側マンホール2Aの近傍の地上に設置されたドラム4に巻かれている。帯状部材10はドラム4からマンホール2A内に引き出され、既設管1内の管端近傍に設けられた製管機5に供給される。製管機5は、巻き癖が付けられた帯状部材10を所定径に巻回しながら隣接する巻き部分(一周違いの部分)の縁部同士を厚み方向に挟圧することにより、一方の巻き部分の雌型嵌合部11aと他方の巻き部分の雄型嵌合部11bを嵌合させ、更生管3を製管する。なお、既設管1内には製管機5の近傍に油圧装置6が配置されており、この油圧装置6は、到達側マンホール2Bの近傍の地上に設置された発電機7から電力を受けて製管機5を駆動する。
The outline of the lining process for a rehabilitating pipe will be described below. Note that this lining process can be performed even when water is flowing through the existing pipe 1.
The first step in the lining process
As shown in Fig. 1A, the belt-shaped member 10 is wound around a drum 4 installed on the ground near the starting manhole 2A in a state where the belt-shaped member 10 is curled to a smaller diameter than the rehabilitating pipe 3. The belt-shaped member 10 is pulled out from the drum 4 into the manhole 2A and supplied to a pipe making machine 5 installed near the end of the existing pipe 1. The pipe making machine 5 wraps the belt-shaped member 10 with the curled member 10 to a predetermined diameter while pinching and pressing the edges of adjacent wound portions (parts that are one turn apart) in the thickness direction, thereby fitting the female fitting portion 11a of one wound portion with the male fitting portion 11b of the other wound portion to produce the rehabilitating pipe 3. A hydraulic device 6 is disposed in the existing pipe 1 near the pipe making machine 5, and the hydraulic device 6 receives electric power from a generator 7 installed on the ground near the destination manhole 2B to drive the pipe making machine 5.

上述したように製管機5により、更生管3の先端に位置する帯状部材10の巻き部分に帯状部材10の新たな巻き部分が連なり、更生管3が到達側マンホール2Bに向かって延伸していく。図1Aにおいてこの製管方向を符号Sで示す。帯状部材10は、マンホール2Aから製管途中の更生管3を通って更生管3の先端の製管機5に供給される。製管機5は、更生管3が延伸するに伴いマンホール2Bに向かって移動する(自走する)。 As described above, the pipe making machine 5 connects a new winding of the band-shaped member 10 to the winding of the band-shaped member 10 located at the tip of the rehabilitated pipe 3, and the rehabilitated pipe 3 extends toward the arrival manhole 2B. In FIG. 1A, this pipe making direction is indicated by the symbol S. The band-shaped member 10 is supplied from the manhole 2A through the rehabilitated pipe 3 in the middle of being made, to the pipe making machine 5 at the tip of the rehabilitated pipe 3. The pipe making machine 5 moves (self-propelled) toward the manhole 2B as the rehabilitated pipe 3 extends.

1ドラム分の帯状部材10の供給が終了したら、新たなドラム4の帯状部材10を供給し、更生管3の先端に位置する帯状部材10の終端と新規の帯状部材10の始端とを接続して更生管3の製管を続ける。 When the supply of one drum's worth of strip-shaped material 10 has been completed, a new drum 4 of strip-shaped material 10 is supplied, and the end of the strip-shaped material 10 located at the tip of the rehabilitated pipe 3 is connected to the beginning of the new strip-shaped material 10 to continue the production of the rehabilitated pipe 3.

ライニング工程の第2段階
更生管3の先端に位置する製管機5が、マンホール2A側の既設管1の管端から所定距離を超えるとともに、1ドラム分の帯状部材10の供給が完了した時には、製管機5の稼働を停止し、以下に詳述するように、本願発明に係る帯状部材10の搬送と製管機5による更生管3の製管を繰り返す。
When the pipe making machine 5 located at the tip of the rehabilitated pipe 3 in the second stage of the lining process exceeds a predetermined distance from the end of the existing pipe 1 on the manhole 2A side and the supply of one drum's worth of strip-shaped material 10 is completed, the operation of the pipe making machine 5 is stopped and the transportation of the strip-shaped material 10 according to the present invention and the production of the rehabilitated pipe 3 by the pipe making machine 5 are repeated, as described in detail below.

マンホール2Aに引掛具20を巻いたリール8を設置し、マンホール2Bの近傍の地上には、ウインチ9(牽引装置)を設置し、既設管1のマンホール2B側の管端近傍にはローラ9aを設置する。 A reel 8 with a hook 20 wound around it is placed in manhole 2A, a winch 9 (traction device) is placed on the ground near manhole 2B, and a roller 9a is placed near the end of the existing pipe 1 on the manhole 2B side.

引掛具20は、図3に示すように、一対のワイヤ21(索条)と、一対のワイヤ21間にかけ渡された複数の直線状に延びる掛け部材22とを有して、はしご形状をなしている。掛け部材22は、例えば500~700mmの長さを有し、ワイヤ21に沿って所定間隔、例えば1m間隔で配され、その両端がワイヤ21に固定されている。図4に示すように、掛け部材22は塩化ビニル樹脂等の樹脂製の真管により構成されており、その全長にわたり軸線方向に延びるスリット22aが形成されている。 As shown in Figure 3, the hook 20 has a pair of wires 21 (cords) and multiple hanging members 22 extending in straight lines that are stretched across the pair of wires 21, forming a ladder shape. The hanging members 22 are, for example, 500 to 700 mm long and are placed at regular intervals, for example 1 m apart, along the wire 21, with both ends fixed to the wire 21. As shown in Figure 4, the hanging members 22 are made of a solid tube made of resin such as polyvinyl chloride resin, and have slits 22a formed in the tube that extend in the axial direction along their entire length.

ワイヤ21の後端部は掛け部材22から延長されており、この延長部が介添用把持部21aとして提供される。引掛具20の比重は水より大きい。引掛具20のワイヤ21と掛け部材22は、汚物が付着しても水で洗い流せるように被覆するのが好ましい。 The rear end of the wire 21 extends from the hanging member 22, and this extension serves as the assistant's grip 21a. The specific gravity of the hook 20 is greater than that of water. The wire 21 and hanging member 22 of the hook 20 are preferably covered so that even if dirt adheres to them, they can be washed away with water.

巻き癖が付いた帯状部材2を、ドラム4からのマンホール2Aに導入し、さらに更生管3の管端から更生管3内に導入する。この際、帯状部材2の導入に合わせるようにしてリール8から引掛具20を更生管3の管底部に沿ってマンホール2Bに向けて引き出す。この際、図5、図6に示すように、掛け部材22は巻き癖が付けられている帯状部材10に所定ピッチ毎に挿入される。 The belt-shaped member 2 with the curl is introduced into the manhole 2A from the drum 4, and then introduced into the rehabilitated pipe 3 from the end of the pipe. At this time, the hook 20 is pulled out from the reel 8 along the bottom of the rehabilitated pipe 3 toward the manhole 2B in time with the introduction of the belt-shaped member 2. At this time, as shown in Figures 5 and 6, the hanging member 22 is inserted into the belt-shaped member 10 with the curl at a predetermined pitch.

上記のようにして、図1Cに示すように、引掛具20を装着した螺旋体Cが得られる。この螺旋体Cは1ドラム分(一巻き分)の連続した帯状部材10からなる。
次に、図1Dに示すように、ウインチ9からワイヤ30(牽引索条)を引き出してローラ9aにかけ渡し、製管機5に通し、引掛具20の先端に連結する。すなわち、ワイヤ30の先端は、2つに分岐しており、これら分岐部31を引掛具20の一対のワイヤ21の先端にそれぞれ連結する。この状態で、ウインチ9を駆動してワイヤ30を牽引すると、引掛具20がマンホール2Bへと引かれ、この引掛具20の掛け部材22に所定ピッチ毎に引っ掛けられた螺旋体Cが製管機5に向かって搬送される。
In the manner described above, a spiral body C having a hook 20 attached thereto is obtained, as shown in Fig. 1C. This spiral body C is made of a continuous belt-shaped member 10 for one drum (one turn).
1D, a wire 30 (traction rope) is pulled out from the winch 9, hung over a roller 9a, passed through the pipe making machine 5, and connected to the tip of the hooking tool 20. That is, the tip of the wire 30 branches into two, and these branched parts 31 are respectively connected to the tips of the pair of wires 21 of the hooking tool 20. When the winch 9 is driven in this state to pull the wire 30, the hooking tool 20 is pulled toward the manhole 2B, and the spiral C hooked at a predetermined pitch to the hanging member 22 of the hooking tool 20 is transported toward the pipe making machine 5.

図5、図6に示すように、引掛部材20の掛け部材22は、帯状部材10の巻き部分の最下位部(更生管3の管底に接する部位)ではなくそれより上方(ただし、巻き部分の中心より下方)に掛けられているため、この巻き部分が大きく傾斜せずに安定して螺旋体Cを搬送することができる。また、複数の掛け部材22で帯状部材10を引っ掛けながら搬送するので、局所的に大きな力が加わらず、安定して螺旋体Cを搬送することができる。さらに、図6に示すように掛け部材22は巻き部分の左右2か所に当たるので、この点でも安定した搬送を行うことができる。 As shown in Figures 5 and 6, the hanging member 22 of the hook member 20 is hung not at the lowest part of the wound portion of the belt-shaped member 10 (the part that contacts the bottom of the rehabilitation pipe 3) but above it (but below the center of the wound portion), so the wound portion does not tilt significantly and the spiral body C can be transported stably. Also, because the belt-shaped member 10 is transported while being hooked by multiple hanging members 22, no large force is applied locally and the spiral body C can be transported stably. Furthermore, as shown in Figure 6, the hanging members 22 come into contact with two places, one on the left and one on the right of the wound portion, which also allows for stable transport.

掛け部材22は軸線方向にスリット22aを有し径方向に弾性変形することができるので、帯状部材10を傷つけない。 The hanging member 22 has a slit 22a in the axial direction and can elastically deform in the radial direction, so it does not damage the belt-shaped member 10.

掛け部材22は螺旋体Cの巻き部分に、予定した高さで当たることが好ましい。引掛具20の比重が水より大きいので、既設管1を流れる水により引掛具20が浮き上がるのを防止できる。また、一対のワイヤ21の後端部の介添用把持部21aを介添者Mが手で持ち、掛け部材22を予定した高さでほぼ水平に維持することができる。 It is preferable that the hanging member 22 hits the winding portion of the spiral body C at a planned height. Because the specific gravity of the hooking device 20 is greater than that of water, the hooking device 20 can be prevented from floating up due to the water flowing through the existing pipe 1. In addition, the caregiver M can hold the assistant grips 21a at the rear ends of the pair of wires 21 in his or her hands and maintain the hanging member 22 approximately horizontally at the planned height.

図1Eに示すように、搬送された帯状部材10の先端が製管機5に達したら、帯状部材10の後端を押して帯状部材10のピッチを縮めるのが好ましい。製管機5への負荷を軽減するためである。 As shown in FIG. 1E, when the leading end of the transported strip member 10 reaches the pipe making machine 5, it is preferable to push the rear end of the strip member 10 to reduce the pitch of the strip member 10. This is to reduce the load on the pipe making machine 5.

次に、製管途中の更生管3の帯状部材の終端を、搬送された螺旋体Cの帯状部材10の始端と接続した後、製管機5により更生管3の製管を再開する。この際、引掛具20を螺旋体Cに残置させた状態でも製管を行うことができるが、製管再開前に螺旋体Cから撤収してもよい。この引掛具20は掛け部材22をワイヤ21で連結しただけであるので、嵩張らない。 Next, the end of the strip-shaped member of the rehabilitated pipe 3 in the middle of pipe production is connected to the beginning of the strip-shaped member 10 of the transported spiral body C, and pipe production of the rehabilitated pipe 3 is resumed by the pipe production machine 5. At this time, pipe production can be performed with the hooking device 20 left on the spiral body C, but it may also be removed from the spiral body C before pipe production is resumed. This hooking device 20 is not bulky, as it is simply a hanging member 22 connected by a wire 21.

上述の巻き癖された帯状部材10からなる螺旋体Cの搬送と製管機5による更生管3の繰り返すことにより、更生管3が延伸され、やがて更生管3の先端と製管機5が、既設管1のマンホール2Bの管端に到達する。これにより、更生管3の製管工程すなわち既設管1へのライニング工程が完了する。 By repeatedly transporting the spiral body C made of the above-mentioned wound strip-shaped member 10 and forming the rehabilitated pipe 3 with the pipe making machine 5, the rehabilitated pipe 3 is stretched, and eventually the tip of the rehabilitated pipe 3 and the pipe making machine 5 reach the pipe end of the manhole 2B of the existing pipe 1. This completes the pipe making process of the rehabilitated pipe 3, i.e., the process of lining the existing pipe 1.

具体例
以下、具体例を挙げて説明する。
既設管1の内径が1500mm、更生管3の内径が1360mm、帯状部材10の巻き癖の内径が1210mm、更生管3の内面に露出する帯状部材10の主面の幅が97mm、1ドラム分の帯状部材10の全長が約200mの場合、1ドラム分で製管される更生管の長さは約4.5mである。
Specific Examples Specific examples will now be described.
If the inner diameter of the existing pipe 1 is 1500 mm, the inner diameter of the rehabilitation pipe 3 is 1360 mm, the inner diameter of the winding tendency of the strip-shaped member 10 is 1210 mm, the width of the main surface of the strip-shaped member 10 exposed on the inner surface of the rehabilitation pipe 3 is 97 mm, and the total length of the strip-shaped member 10 for one drum is approximately 200 m, the length of the rehabilitation pipe produced for one drum is approximately 4.5 m.

引掛具20の掛け部材22は、1m間隔で配置され、螺旋体Cに2ピッチ間隔で挿入される。掛け部材22の外径は15mm、長さ500mmである。
1ドラム分の螺旋体Cの長さは約27mで巻き部分の数が約53であり、引掛具20は約30本の掛け部材22を有している。
上記の場合、製管機5が既設管1におけるマンホール2A側の管端から30mを超えて1ドラム分の帯状部材10の供給が終了した時に、第1段階から第2段階に移行する。
The hanging members 22 of the hook 20 are arranged at intervals of 1 m and are inserted into the spiral body C at intervals of 2 pitches. The hanging members 22 have an outer diameter of 15 mm and a length of 500 mm.
The length of the spiral body C for one drum is about 27 m, the number of turns is about 53, and the hook 20 has about 30 hanging members 22.
In the above case, when the pipe making machine 5 reaches a position more than 30 m from the pipe end on the manhole 2A side of the existing pipe 1 and finishes supplying one drum's worth of strip-shaped material 10, the first stage is shifted to the second stage.

他の具体例を説明する。
既設管1の内径が1200mm、更生管3の内径が1090mm、帯状部材10の巻き癖の内径が940mm、更生管3の内面に露出する帯状部材10の主面の幅が85mm、1ドラム分の帯状部材10の全長が約300mである。
引掛具20の掛け部材22は、1m間隔で配置され、螺旋体Cに3ピッチ間隔で挿入される。掛け部材22の外径は15mm、長さ500mmである。
1ドラム分の螺旋体Cの長さは約33mで巻き部分の数が約100であり、引掛具20は約35本の掛け部材22を有している。
上記の場合、製管機5が既設管1におけるマンホール2A側の管端から35mを超えて1ドラム分の帯状部材10の供給が終了した時に、第1段階から第2段階に移行する。
Another specific example will be described.
The inner diameter of the existing pipe 1 is 1200 mm, the inner diameter of the rehabilitation pipe 3 is 1090 mm, the inner diameter of the winding tendency of the strip-shaped member 10 is 940 mm, the width of the main surface of the strip-shaped member 10 exposed on the inner surface of the rehabilitation pipe 3 is 85 mm, and the total length of one drum of the strip-shaped member 10 is approximately 300 m.
The hanging members 22 of the hook 20 are arranged at intervals of 1 m and are inserted into the spiral body C at intervals of 3 pitches. The hanging members 22 have an outer diameter of 15 mm and a length of 500 mm.
The length of the spiral body C for one drum is about 33 m, the number of turns is about 100, and the hook 20 has about 35 hanging members 22.
In the above case, when the pipe making machine 5 reaches a position 35 m beyond the pipe end on the manhole 2A side of the existing pipe 1 and finishes supplying one drum's worth of strip-shaped material 10, the process shifts from the first stage to the second stage.

上記実施形態において、はしご状の引掛具20を全長にわたって更生管3の管底に敷いた状態で、巻き癖が付いた1ドラム分の帯状部材10を更生管3に導入してもよい。 In the above embodiment, one drum's worth of the curled strip-shaped member 10 may be introduced into the rehabilitating pipe 3 with the ladder-shaped hook 20 placed over the entire length of the pipe bottom of the rehabilitating pipe 3.

引掛具の掛け部材は、フレキシブルなワイヤやロープであってもよい。この場合、掛け部材が更生管3の管底に沿って沈むので、介添者がワイヤ21の介添用把持部21aを持って、掛け部材を更生管3の管底より上方に引き上げる必要がある。掛け部材がフレキシブルな場合には、引掛具を全長にわたって更生管3の管底に敷いた状態で巻き癖が付された帯状部材を更生管に導入するのが好ましい。 The hanging member of the hook may be a flexible wire or rope. In this case, the hanging member sinks along the bottom of the rehabilitated pipe 3, so an assistant must hold the assistant grip 21a of the wire 21 and pull the hanging member up above the bottom of the rehabilitated pipe 3. If the hanging member is flexible, it is preferable to introduce a curled belt-shaped member into the rehabilitated pipe with the hook placed over its entire length on the bottom of the rehabilitated pipe 3.

帯状部材を更生管に導入する際に、引掛具を帯状部材の側面または上面に仮固定しておき、帯状部材の導入が終了した後に螺旋体を回転させることにより引掛具を下部に位置させるようにしてもよい。 When the strip-shaped member is introduced into the rehabilitation pipe, the hook may be temporarily fixed to the side or top of the strip-shaped member, and after the introduction of the strip-shaped member is completed, the spiral body may be rotated to position the hook at the bottom.

上記実施形態では、1ドラム分の連続した帯状部材10からなる螺旋体Cを一度に搬送したが、ドラムに巻かれる帯状部材が長い場合には、ドラム4から製管機5までの連続した帯状部材の一部からなる螺旋体を搬送してもよい。この場合も、作業者の負担を軽減することができる。 In the above embodiment, the spiral C consisting of one drum's worth of continuous strip material 10 was transported at one time, but if the strip material to be wound around the drum is long, a spiral consisting of a portion of the continuous strip material from the drum 4 to the pipe making machine 5 may be transported. In this case, too, the burden on the worker can be reduced.

本発明は、前記実施形態に限定されるものではなく、その趣旨を逸脱しない範囲において種々の改変をなすことができる。
引掛具20のワイヤ21、ウインチ9のワイヤ30の代わりにロープを用いてもよい。
既設管は、上水道管、農業用水管、水力発電導水管、ガス管、トンネル等であってもよい。
帯状部材10は、隣どうしを直接嵌合等により連結する構造でなくてもよい。例えば帯状の連結部材を介して、帯状部材10の隣どうしを間接的に連結する構造であってもよい。
製管機を用いて更生管を形成する代わりに、人手で更生管を製管してもよい。
帯状部材は金属製補強材を含まなくてもよい。
The present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention.
A rope may be used in place of the wire 21 of the hook 20 and the wire 30 of the winch 9.
The existing pipes may be water supply pipes, agricultural water pipes, hydroelectric power generation water pipes, gas pipes, tunnels, etc.
The belt-shaped members 10 do not have to be structured so that adjacent belt-shaped members 10 are directly connected to each other by fitting, etc. For example, adjacent belt-shaped members 10 may be structured so that they are indirectly connected to each other via a belt-shaped connecting member.
Instead of using a pipe making machine to form a rehabilitated pipe, the rehabilitated pipe may be made by hand.
The strip need not include metal reinforcements.

本発明は、老朽化した下水管等の既設管の更生技術に適用できる。 This invention can be applied to the rehabilitation of existing pipes such as aging sewer pipes.

1 既設管
3 更生管
5 製管機
9 ウインチ(牽引装置)
10 帯状部材
20 引掛具
21 ワイヤ(索条)
21a 介添用把持部
22 掛け部材
22a スリット
1 Existing pipe 3 Rehabilitation pipe 5 Pipe making machine 9 Winch (traction device)
10: belt-shaped member 20: hook 21: wire (cord)
21a Assistant grip 22 Hanging member 22a Slit

Claims (5)

巻き癖が付された帯状部材を既設管内で螺旋状に巻回するとともに隣接する巻き部分を連結することにより、更生管を延伸させながら製管する工程において、巻き部分が連結される前の帯状部材からなる螺旋体を、製管場所に向けて前記更生管内を搬送する方法であって、
前記螺旋体の前記巻き部分に引掛具を掛け、前記引掛具を牽引装置で牽引することにより、前記螺旋体を前記製管場所に向けて搬送することを特徴とする更生管用帯状部材の搬送方法。
A method for producing a rehabilitated pipe while stretching the pipe by helically winding a belt-shaped member having a winding tendency inside an existing pipe and connecting adjacent wound portions, comprising: transporting a spiral body made of the belt-shaped member before the wound portions are connected inside the rehabilitated pipe toward a pipe manufacturing location,
A method for transporting a strip-shaped member for rehabilitation pipes, characterized in that a hook is hung on the wound portion of the spiral body and the hook is pulled by a traction device, thereby transporting the spiral body toward the pipe making site.
製管機の稼働を停止させた状態で、連続した一巻き分の帯状部材からなる前記螺旋体を、前記牽引装置により、前記製管機に向けて一度に搬送することを特徴とする請求項1に記載の更生管用帯状部材の搬送方法。 A method for transporting strip-shaped materials for rehabilitating pipes as described in claim 1, characterized in that, while the operation of the pipe making machine is stopped, the spiral body consisting of one continuous turn of strip-shaped material is transported toward the pipe making machine at once by the traction device. 前記引掛具が前記螺旋体の長手方向に間隔をおいて複数個所に掛けられることを特徴とする請求項1または2に記載の更生管用帯状部材の搬送方法。 The method for transporting a belt-shaped member for rehabilitation pipes according to claim 1 or 2, characterized in that the hooks are hung at multiple locations at intervals in the longitudinal direction of the spiral body. 前記引掛具が、一対の索条と、前記一対の索条の長手方向に間隔をおいて前記一対の索条間にかけ渡された複数の掛け部材とを有し、前記掛け部材が前記螺旋体の前記巻き部分に掛けられることを特徴とする請求項3に記載の更生管用帯状部材の搬送方法。 The method for transporting a belt-shaped member for rehabilitation pipes according to claim 3, characterized in that the hooking device has a pair of cables and a plurality of hanging members that are hung between the pair of cables at intervals in the longitudinal direction of the pair of cables, and the hanging members are hung on the wound portion of the spiral body. 前記引掛具の前記掛け部材が、前記巻き部分の中心より下方で前記巻き部分の最下位部より上方に掛けられた状態で、前記螺旋体が牽引されることを特徴とする請求項4に記載の更生管用帯状部材の搬送方法。 The method for transporting a belt-shaped member for rehabilitation pipes according to claim 4, characterized in that the spiral body is pulled in a state in which the hanging member of the hooking device is hung below the center of the wound portion and above the lowest part of the wound portion.
JP2021051056A 2021-03-25 2021-03-25 Method for conveying belt-shaped member for rehabilitation pipe Active JP7590899B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021051056A JP7590899B2 (en) 2021-03-25 2021-03-25 Method for conveying belt-shaped member for rehabilitation pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021051056A JP7590899B2 (en) 2021-03-25 2021-03-25 Method for conveying belt-shaped member for rehabilitation pipe

Publications (2)

Publication Number Publication Date
JP2022149084A JP2022149084A (en) 2022-10-06
JP7590899B2 true JP7590899B2 (en) 2024-11-27

Family

ID=83463763

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021051056A Active JP7590899B2 (en) 2021-03-25 2021-03-25 Method for conveying belt-shaped member for rehabilitation pipe

Country Status (1)

Country Link
JP (1) JP7590899B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000320726A (en) 1999-05-12 2000-11-24 Sekisui Chem Co Ltd Helical tube forming band winding drum holder and method of using the same
JP2009149049A (en) 2007-11-28 2009-07-09 Sekisui Chem Co Ltd Rehabilitation of existing pipes
JP2012101484A (en) 2010-11-11 2012-05-31 Sekisui Chem Co Ltd Method for making regenerative pipe
JP2014185706A (en) 2013-03-25 2014-10-02 Kubota-C. I Co Ltd Lining method, coil molding body laying device and coil cartridge
JP2017145844A (en) 2016-02-15 2017-08-24 積水化学工業株式会社 Pipeline rehabilitation method and supporting apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000320726A (en) 1999-05-12 2000-11-24 Sekisui Chem Co Ltd Helical tube forming band winding drum holder and method of using the same
JP2009149049A (en) 2007-11-28 2009-07-09 Sekisui Chem Co Ltd Rehabilitation of existing pipes
JP2012101484A (en) 2010-11-11 2012-05-31 Sekisui Chem Co Ltd Method for making regenerative pipe
JP2014185706A (en) 2013-03-25 2014-10-02 Kubota-C. I Co Ltd Lining method, coil molding body laying device and coil cartridge
JP2017145844A (en) 2016-02-15 2017-08-24 積水化学工業株式会社 Pipeline rehabilitation method and supporting apparatus

Also Published As

Publication number Publication date
JP2022149084A (en) 2022-10-06

Similar Documents

Publication Publication Date Title
US9248485B2 (en) Method for producing spiral pipe
JP5291399B2 (en) Rehabilitation of existing pipes
EP0379493A1 (en) Slip control for helically wound pipes.
JP4041815B2 (en) Cable spiral support
JP7590899B2 (en) Method for conveying belt-shaped member for rehabilitation pipe
JP6329260B2 (en) Winder forming device
JP2010023350A (en) Tube forming apparatus and method for forming tubular body using the tube forming apparatus
JP7547273B2 (en) Method for rehabilitating existing pipes and pipe manufacturing device for rehabilitating pipes
JP7211897B2 (en) Rehabilitation method and structure for existing tubular body
JPH08261363A (en) Lining construction method and construction equipment for irregular cross section pipe
JP5249741B2 (en) Pipe lining material drawing device and drawing method
JP6220654B2 (en) Rehabilitation of existing pipes
JP3193888B2 (en) Construction method of lining pipe in sewer
JP2019166758A (en) Method for winding-off of rehabilitation pipe and belt material for winding-off
JP7231400B2 (en) Rehabilitation method for shelters and existing pipes
JP5856519B2 (en) Lining method
JPH11188794A (en) Construction method of lining pipe in sewer
JP2016000490A (en) Reinforcing pipes with reinforcing material for pipes and pipe making method using the same
JP2021080751A (en) Tunnel structure, pipe insertion device to tunnel, and pipe insertion method
JP2026060384A (en) Strip-shaped member for rehabilitation of existing pipes and method for rehabilitation of existing pipes
JP5837854B2 (en) Piping method
JP6196540B2 (en) Strip-shaped member molding apparatus and molding method therefor
JP2021008952A (en) Rehabilitation pipe construction method
JPH04244688A (en) Laying method for pipeline
JPH09300466A (en) Profile for existing pipe lining

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231213

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240617

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240625

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240702

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20240910

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240925

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20241003

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241022

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241115

R150 Certificate of patent or registration of utility model

Ref document number: 7590899

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150