JP7591978B2 - Train control device and train control method - Google Patents
[go: Go Back, main page]

JP7591978B2 - Train control device and train control method - Google Patents

Train control device and train control method Download PDF

Info

Publication number
JP7591978B2
JP7591978B2 JP2021092295A JP2021092295A JP7591978B2 JP 7591978 B2 JP7591978 B2 JP 7591978B2 JP 2021092295 A JP2021092295 A JP 2021092295A JP 2021092295 A JP2021092295 A JP 2021092295A JP 7591978 B2 JP7591978 B2 JP 7591978B2
Authority
JP
Japan
Prior art keywords
train
storage
track
train control
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021092295A
Other languages
Japanese (ja)
Other versions
JP2022184442A (en
Inventor
祥太 木村
努 宮内
基也 鈴木
雄飛 堤
有紀 黒澤
勝美 石川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2021092295A priority Critical patent/JP7591978B2/en
Publication of JP2022184442A publication Critical patent/JP2022184442A/en
Application granted granted Critical
Publication of JP7591978B2 publication Critical patent/JP7591978B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は列車制御装置及び列車制御方法に関する。 The present invention relates to a train control device and a train control method.

鉄道の車両基地等には、車両を留置するために多くの留置線が存在しており、大規模な土地を必要としている。そして、多くの留置線の線路設備を維持するためには多大な費用を要する。このため、サステナブルな鉄道設備を構築する観点から、鉄道の運行に支障を生じない範囲内で車両を留置するための留置線の規模を抑制し、車両基地等に要する費用を抑制することが求められている。
そして、留置線を抑制するためには、その代替設備の確保とその運行計画を作成する必要がある。
Railway depots and other facilities have many sidings for storing vehicles, and require a large amount of land. Furthermore, maintaining the track facilities for many sidings is very costly. For this reason, from the perspective of building sustainable railway facilities, there is a need to limit the size of sidings for storing vehicles within a range that does not interfere with railway operations, and to limit the costs required for depots and other facilities.
In order to reduce the use of storage lines, it is necessary to secure alternative facilities and create operation plans for them.

留置線の使用量を削減する運行計画を作成し、列車を制御する発明として、特許文献1がある。この公報には、列車の制御目標を表すダイヤを、列車が停車する各駅における旅客の行先およびその数を時間帯毎に示す移動需要の予測結果に応じて変更する目標ダイヤ作成装置が開示されている。目標ダイヤ作成装置は、移動需要の予測結果を表す予測需要情報に基づいて列車の混雑度を算出し、混雑度が所定の許容範囲外となる違反箇所を抽出する違反箇所抽出プログラムP01aを有する。また、目標ダイヤ作成装置は、違反箇所の混雑度が許容範囲内となるように、あるいは違反箇所の混雑度が許容範囲に近づくように、列車の行先の変更を含めて運行ダイヤを変更するダイヤ修正プログラムP01bを有する。
これらの中で、旅客の需要に応じて車両基地や留置線の各番線も統合的に管理し最適な運行計画を提案するシステムが説明されている。
Patent Document 1 is an invention for creating an operation plan that reduces the use of storage lines and controlling trains. This publication discloses a target timetable creation device that changes a timetable that represents a control target for a train according to a predicted result of travel demand that indicates the destination and the number of passengers at each station where the train stops for each time period. The target timetable creation device has a violation point extraction program P01a that calculates the congestion degree of a train based on predicted demand information that represents the predicted result of travel demand, and extracts a violation point where the congestion degree is outside a predetermined allowable range. The target timetable creation device also has a timetable correction program P01b that changes the operation timetable, including changing the destination of the train, so that the congestion degree of the violation point is within the allowable range or approaches the allowable range.
Among these, a system is described that comprehensively manages each track in the vehicle depot and storage lines according to passenger demand and proposes optimal operation plans.

特開2019-73146号公報JP 2019-73146 A

特許文献1に記載の技術は、留置線の利用方法も含めた運行ダイヤグラム(以下、「ダイヤ」と略称する。)を提案することで、留置線の各番線も含めた効率的な運行を可能とする。しかしながら、特許文献1においては、既存の留置線をすべて用いることを前提として制御を行っている。このため、車両基地等の留置線を削減することまでは意図されていない。さらに、列車の運行状況に応じて、本線上に新たな留置線路を設定することは想定されていない。 The technology described in Patent Document 1 enables efficient operation including each siding track by proposing a train schedule (hereinafter abbreviated as "timetable") that includes the use of sidings. However, in Patent Document 1, control is performed on the assumption that all existing sidings will be used. For this reason, it is not intended to reduce sidings at depots, etc. Furthermore, it is not envisaged that new siding tracks will be set up on the main line depending on the train operation status.

本発明の目的は、列車の運行状況に応じて、本線上に一時的な留置線路を設定可能な列車制御装置を提供するものである。 The objective of the present invention is to provide a train control device that can set up temporary storage tracks on the main line depending on the train operation status.

上記の課題を解決するために、代表的な本発明の列車制御装置の一つは、本線上に列車の留置線路を設定可能な列車制御装置であって、転線可能な設備を有する前記本線上の区間において、留置線路を設定し、前記留置線以外の線路を走行許可線路として設定し、運行対象の列車(以下、「運行列車」という。)に前記走行許可線路を走行させ、
留置対象の列車(以下、「留置列車」という。)を前記留置線路に留置させる運行制限進路計画を作成する運行計画作成部を有する。
In order to solve the above problems, one representative train control device of the present invention is a train control device capable of setting a train storage track on a main line, in which the storage track is set in a section of the main line having a facility capable of switching tracks, tracks other than the storage track are set as running-permitted tracks, and a train to be operated (hereinafter referred to as an "operating train") is operated on the running-permitted tracks,
The system has an operation plan creation unit that creates an operation restriction route plan for causing a train to be stored (hereinafter referred to as a "stored train") to be stored on the storage track.

本発明によれば、列車の運行状況に応じて本線上に一時的な留置線路を設定可能な列車制御装置を提供することができる。
上記した以外の課題、構成および効果は、以下の実施をするための形態における説明により明らかにされる。
According to the present invention, it is possible to provide a train control device that can set up temporary storage tracks on a main line depending on the train operation status.
Problems, configurations and effects other than those described above will become apparent from the description of the following embodiments.

図1は、本線、渡線、留置線路を説明する概略図である。FIG. 1 is a schematic diagram illustrating a main line, crossover tracks, and storage tracks. 図2は、本線、実質的な渡線、留置線路を説明する概略図である。FIG. 2 is a schematic diagram illustrating the main line, the actual crossing tracks, and the storage tracks. 図3は、渡線が複数ある場合の留置線路候補の設定を説明する概略図である。FIG. 3 is a schematic diagram for explaining the setting of storage track candidates when there are multiple crossover tracks. 図4は、渡線が複数ある場合の留置線路候補の抽出方法を説明するためのフローチャートである。FIG. 4 is a flowchart for explaining a method for extracting storage track candidates when there are multiple crossover tracks. 図5は、本発明の第3実施形態の列車制御装置の概略構成図である。FIG. 5 is a schematic configuration diagram of a train control device according to a third embodiment of the present invention. 図6Aは、運行計画作成部102の処理を説明するフローチャートである。FIG. 6A is a flowchart illustrating the processing of the operation plan creation unit 102. 図6Bは、運行計画作成部102の処理を説明する他のフローチャートである。FIG. 6B is another flowchart illustrating the processing of the operation plan creation unit 102. 図7Aは、留置線路候補となる区間Xが設定されている路線における、上下方面列車の経路を模式的に示した図である。FIG. 7A is a diagram showing a schematic diagram of the routes of up- and down-bound trains on a line in which a section X that is a candidate for a storage track is set. 図7Bは、留置線路候補が留置路線に切り替わった後の路線における、上り方面及び下り方面の列車の経路を模式的に示した図である。FIG. 7B is a diagram showing a schematic diagram of the routes of upbound and downbound trains on the line after the storage track candidate is switched to a storage line. 図8は、遅延時評価部103の処理を説明するフローチャートである。FIG. 8 is a flowchart for explaining the process of the delay time evaluation unit 103. 図9は、留置解除評価部104の処理を説明するフローチャートである。FIG. 9 is a flowchart for explaining the process of the retention release evaluation unit 104. 図10は、留置解除の際の列車運行の流れを説明する概略図である。FIG. 10 is a schematic diagram illustrating the flow of train operation when a train is released from storage.

以下、本発明の実施形態について、図面を用いて説明する。なお、この実施形態により本発明が限定されるものではない。また、図面の記載において、同一部分には同一の符号を付して示している。
本開示において、「本線」とは、営業運行に用いる線路、つまり、乗客等を乗せた車両が走行する線路を意味する。
「留置線路」とは、一時的に車両を停めておくための本線上の線路を意味する。
「渡線」とは、近接する二つの軌道を連結するために設けられた、2組の分岐器と軌道から構成される分岐線路を意味する。通常は、上り線及び下り線の間を連結した軌道である。しかし、実質的に近接する二つの軌道を連結している軌道構造であれば、本開示における渡線に含まれるものとする。
「転線」とは、列車が上記の渡線を用いて、近接する他の軌道に移動することを意味する。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Note that the present invention is not limited to the embodiment. In addition, in the description of the drawings, the same parts are denoted by the same reference numerals.
In this disclosure, "main line" refers to a track used for commercial operation, i.e., a track on which vehicles carrying passengers, etc. run.
"Storage track" means a track on a main line for temporarily parking rolling stock.
"Crossover" means a branch track consisting of two sets of switches and tracks that are provided to connect two adjacent tracks. Usually, it is a track that connects an up line and a down line. However, any track structure that substantially connects two adjacent tracks is included in the crossover in this disclosure.
"Switching" means that a train uses the above-mentioned crossing to move onto another nearby track.

(第1実施形態)
以下、図1及び2を用いて第1実施形態について説明する。図1は、本線、渡線、留置線路を説明する概略図である。
図1において、実線で表す上り線路10及び下り線路20は、営業運行に用いる線路であり、本線に該当する。図1の区間においては渡線A、渡線Bが設けられているため、例えば、下り列車Tは、渡線A、渡線Bを用いれば、点線で示す下り列車経路50を走行許可路線とすることにより、下り線路20から、上り線路10を経て、再度下り線路20に到達することができる。このため、図1に示すように区間Xを留置線路として留置列車を留置することができる。
First Embodiment
Hereinafter, a first embodiment will be described with reference to Figures 1 and 2. Figure 1 is a schematic diagram illustrating a main line, a crossover track, and a storage track.
In Fig. 1, the up line 10 and the down line 20 shown by solid lines are used for commercial operation and correspond to the main line. Since crossover tracks A and B are provided in the section shown in Fig. 1, for example, a down train T can use crossover tracks A and B to travel from the down line 20, via the up line 10, and reach the down line 20 again by setting the down train route 50 shown by dotted lines as a route for which running is permitted. Therefore, as shown in Fig. 1, section X can be used as a storage track to store a stored train.

図2は、本線、実質的な渡線、留置線路を説明する概略図である。図2においては、近接する二つの軌道を連結している実質的な渡線を用いている点で図1の場合と異なっている。以下の説明において、上述の図1と同一又は同等の構成要素については同一の符号を付し、その説明を簡略又は省略する。 Figure 2 is a schematic diagram explaining the main track, the actual crossover track, and the storage track. Figure 2 differs from Figure 1 in that an actual crossover track is used to connect two adjacent tracks. In the following explanation, components that are the same as or equivalent to those in Figure 1 above are given the same reference numerals, and their explanation will be simplified or omitted.

図2においては、路線上にA駅、B駅、C駅が存在しており、それぞれの駅には、ホームAH1、AH2、BH1、BH2、BH3、CH1、CH2が設けられている。そして、A駅及びB駅には、上り線路10及び下り線路20から列車を引き込むための路線が設置されている。このような場合、下り列車Tは、列車を引き込むための路線を用いて、ば、点線で示す下り列車経路51を走行許可路線とすることにより、下り線路20から上り線路10を経て、再度下り線路20に到達することができる。
つまり、図2に示すような列車を引き込むための路線は、実質的に近接する二つの軌道を連結している軌道構造となる。そして、図2に示すように、留置線路となる区間Xは、駅間を跨って設定することもできる。
2, stations A, B, and C are located on the line, and platforms AH1, AH2, BH1, BH2, BH3, CH1, and CH2 are provided at each station. Lines are provided at stations A and B for drawing trains from up track 10 and down track 20. In this case, by using the lines for drawing trains, for example, by setting down train route 51 shown by a dotted line as the running permission line, down track T can travel from down track 20 via up track 10 and reach down track 20 again.
In other words, the track for pulling in trains as shown in Fig. 2 has a track structure that essentially connects two adjacent tracks. As shown in Fig. 2, the section X that serves as the storage track can also be set across stations.

このように、転線可能な設備を有する本線上の区間を活用して、走行許可線路と留置線路とを設定し、運行列車に走行許可線路を走行させ、留置列車を留置線路に留置させる運行制限進路計画を作成すれば、車両基地における留置線の使用を低減させることができる。
さらに、本実施形態における留置路線は、本線上の様々な区間で設けることが可能であるため、留置の需要に応じて、柔軟に設置及び解除が可能である。このため、留置線の削減にとどまらず、効率的な運行計画が作成可能となる。
In this way, by utilizing sections of the main line that have facilities that can be switched, setting up permitted tracks and storage tracks, and creating an operation restriction route plan that allows operating trains to run on the permitted tracks and leaves stored trains on the storage tracks, it is possible to reduce the use of storage tracks at the depot.
Furthermore, since the storage tracks in this embodiment can be provided in various sections on the main line, they can be flexibly installed and removed according to the storage demand. This not only reduces the number of storage tracks, but also enables efficient operation plans to be created.

(第2実施形態)
第2実施形態は、列車制御装置が留置線候補抽出部を有する点で、第1実施形態と異なる。以下の説明において、上述の実施形態と同一又は同等の構成要素については同一の符号を付し、その説明を簡略又は省略する。
Second Embodiment
The second embodiment differs from the first embodiment in that the train control device has a storage line candidate extraction unit. In the following description, the same or equivalent components as those in the above-mentioned embodiment are denoted by the same reference numerals, and the description thereof will be simplified or omitted.

<留置線候補抽出部>
まず、留置線候補抽出部の前提条件について、図1及び図3を用いて説明する。
図1において、渡線に使用される分岐器は、線路が分岐する側と、線路が合流する側があり、合流する側から分岐する側へ進む場合に限り転線が可能となる。
<Storage line candidate extraction unit>
First, the prerequisites for the storage line candidate extraction unit will be described with reference to FIG. 1 and FIG.
In FIG. 1, the switch used for the crossover has a side where the tracks branch off and a side where the tracks merge, and switching is possible only when traveling from the merging side to the branching side.

図1の例では、列車T1は、渡線Bを経由して上り線路10に転線が可能となり、渡線Aを経由して再び下り線路20へ戻る走行は可能である。しかし、上り線路の列車T2は渡線Aを経由して上り線路10から下り線路20へ転線し、渡線Bを経由して上り線路10へ戻る走行は不可能である。 In the example of Figure 1, train T1 can switch to the up track 10 via crossover B, and can return to the down track 20 via crossover A. However, train T2 on the up track cannot switch from the up track 10 to the down track 20 via crossover A, and cannot return to the up track 10 via crossover B.

このため、留置線路候補を抽出するためには、図1に示すように、まず、分岐器の分岐側で挟まれる区間を抽出する。このように留置線路候補を抽出すれば、運行列車は渡線を経由し、留置線路候補を避けて走行することが可能となる。
なお、各分岐器の位置や分岐側が上り方向と下り方向のどちらを向いているかの情報は、路線設計情報から得ることが可能である。
For this reason, in order to extract storage track candidates, first, the section sandwiched between the branching sides of the turnouts is extracted as shown in Figure 1. By extracting storage track candidates in this way, it becomes possible for trains to run via crossings and avoid the storage track candidates.
The position of each switch and information on whether the switch faces in the up or down direction can be obtained from the route design information.

図1では渡線が2本のみ設定されている路線の一例を説明したが、渡線が複数ある路線の場合であっても、同じ考え方を適用して、留置線路候補を複数抽出することが可能である。
次に、図3を用いて、渡線が複数ある場合について説明する。
図3は、渡線が複数ある場合の留置線路候補の設定を説明する概略図である。渡線が複数ある路線では、一部の区間を重複させた複数の留置線路候補を抽出することもできる。
図3に示すように、留置線路となる区間Yは渡線Cと渡線Eの分岐器の分岐側で挟まれる区間であり、留置線路となる区間Xは渡線Dと渡線Eの分岐器の分岐側で挟まれる区間である。そして、区間Xと区間Yは、渡線Dから渡線Eの間で重複して設定されている。
Although FIG. 1 illustrates an example of a line with only two crossover tracks, the same concept can be applied to a line with multiple crossover tracks to extract multiple storage track candidates.
Next, a case where there are a plurality of crossover wires will be described with reference to FIG.
3 is a schematic diagram for explaining the setting of storage track candidates when there are multiple crossing tracks. In a line with multiple crossing tracks, multiple storage track candidates with some overlapping sections can be extracted.
As shown in Fig. 3, section Y, which will be the storage track, is the section sandwiched between the crossover line C and the branch side of the switch of the crossover line E, and section X, which will be the storage track, is the section sandwiched between the crossover line D and the branch side of the switch of the crossover line E. Sections X and Y are set to overlap between crossover line D and crossover line E.

次に、留置線候補抽出部の機能の一例を図4を用いて説明する。
図4は、渡線が複数ある場合の留置線路候補の抽出方法を説明するためのフローチャートである。
留置線候補抽出部においては、路線設計情報に含まれるすべての分岐器について、2つの分岐器の番線および分岐側の向きを相互に比較する。そして、2つの分岐器が同じ番線であって、かつ、分岐側の向きが逆であり、かつ、分岐側同士が向き合っている場合に、当該分岐器に挟まれた区間を留置線路候補として抽出することとなる。
これを実施するためには、例えば、図4に示す以下の工程を採用することができる。
Next, an example of the function of the storage line candidate extraction unit will be described with reference to FIG.
FIG. 4 is a flowchart for explaining a method for extracting storage track candidates when there are multiple crossover tracks.
The storage track candidate extraction unit compares the track number and the direction of the branch side of two switches for all switches included in the line design information. If two switches have the same track number, the directions of the branch sides are opposite, and the branch sides face each other, the section between the switches is extracted as a storage track candidate.
To achieve this, for example, the following steps shown in FIG. 4 can be adopted.

ステップ451は、路線設計情報に含まれるすべての分岐器について、分岐器の位置毎に繰り返し処理を行うループである。この処理は、路線設計情報に含まれる分岐器についてすべて行った後に処理を終了する。 Step 451 is a loop that performs repeated processing for each switch position for all switches included in the route design information. This processing ends after performing the processing for all switches included in the route design information.

ステップ452は、ステップ451のループ処理で参照中の分岐器に対して、留置線路を構成し得る分岐器を判定するためのステップである。ステップ452においても、路線設計情報に含まれるすべての分岐器について、位置毎に繰り返し処理を行う。
具体的には、ステップ451のループ処理で参照中の分岐器の番線および分岐側の向きと、ステップ452のループ処理で参照中の分岐器の番線及び分岐側の向きを比較し、両者が同じ番線、分岐側の向きが逆、分岐側同士が向き合っている場合にステップ454へ進み、それ以外の場合はステップ452のループ処理へ戻る。
ステップ454は、ステップ451のループ処理で参照中の分岐器と、ステップ452のループ処理で参照中の分岐器で挟まれた区間を留置線路候補として追加し、ステップ452のループ処理へ進む。
このようにして、本線上のすべての分岐器に対して、これと対になって留置線路を構成し得る分岐器をすべて抽出することができる。
そして、留置線候補抽出部は、これらの線路を留置線路候補として出力する。
Step 452 is a step for determining a turnout that can constitute a storage track for the turnout being referred to in the loop processing of step 451. In step 452 as well, the process is repeated for each position for all the turnouts included in the line design information.
Specifically, the line number and direction of the branch side of the switch currently being referenced in the loop processing of step 451 are compared with the line number and direction of the branch side of the switch currently being referenced in the loop processing of step 452. If the two have the same line number, the branch sides have opposite directions, or the branch sides face each other, the process proceeds to step 454; otherwise, the process returns to the loop processing of step 452.
In step 454, the section between the switch being referenced in the loop processing of step 451 and the switch being referenced in the loop processing of step 452 is added as a storage track candidate, and the process proceeds to the loop processing of step 452.
In this manner, for every turnout on the main line, it is possible to extract all turnouts that can be paired with it to form a storage track.
Then, the storage line candidate extraction unit outputs these lines as storage line candidates.

(第3実施形態)
第3実施形態は、列車制御装置がシミュレーション機能を有する点で、第1、第2実施形態と異なる。以下の説明において、上述の実施形態と同一又は同等の構成要素については同一の符号を付し、その説明を簡略又は省略する。
Third Embodiment
The third embodiment differs from the first and second embodiments in that the train control device has a simulation function. In the following description, the same or equivalent components as those in the above-mentioned embodiments are denoted by the same reference numerals, and the description thereof will be simplified or omitted.

<列車制御装置>
図5は、本発明の第3実施形態の列車制御装置の概略構成図である。図5に示す列車制御装置100は、列車運行状態取得部101、運行計画作成部102、遅延時評価部103、留置解除評価部104、判断部105、列車制御部106、シミュレーション計算部107から構成される。
<Train control device>
Fig. 5 is a schematic diagram of a train control device according to a third embodiment of the present invention. The train control device 100 shown in Fig. 5 is composed of a train operation state acquisition unit 101, an operation plan creation unit 102, a delay evaluation unit 103, a storage release evaluation unit 104, a judgment unit 105, a train control unit 106, and a simulation calculation unit 107.

列車運行状態取得部101は、列車制御装置100が制御対象とする路線内を走行する全列車の走行位置、速度、運行計画ダイヤグラム(以下、「計画ダイヤ」という。)に対する遅れ情報を取得し、列車運行状態情報111を作成する。そして、列車運行状態情報111は、列車運行状態取得部101から、運行計画作成部102、遅延時評価部103および留置解除評価部104へ出力される。 The train operation status acquisition unit 101 acquires information on the running positions, speeds, and delays relative to the operation plan diagram (hereinafter referred to as the "planned schedule") of all trains running on the line controlled by the train control device 100, and creates train operation status information 111. The train operation status information 111 is then output from the train operation status acquisition unit 101 to the operation plan creation unit 102, the delay evaluation unit 103, and the storage release evaluation unit 104.

運行計画作成部102は、列車運行状態情報111を取得し、本線上の一部区間を留置線路に指定するために用いる運行制限進路計画112を作成する。そして、運行制限進路計画112は、運行計画作成部102から、遅延時評価部103、留置解除評価部104、判断部105へ出力される。
なお、運行制限進路計画112には、回送列車を含む各列車の進路計画とダイヤ、本線上のどの位置を留置線として設定するかの情報が含まれている。運行計画作成部102の詳細は後述する。
The operation plan creation unit 102 acquires train operation status information 111 and creates an operation restriction route plan 112 used to designate a section of the main line as a storage track. The operation restriction route plan 112 is then output from the operation plan creation unit 102 to the delay evaluation unit 103, the storage release evaluation unit 104, and the judgment unit 105.
The operation restriction route plan 112 includes route plans and timetables for each train, including out-of-service trains, and information on which positions on the main line should be set as storage tracks. The operation plan creation unit 102 will be described in detail later.

遅延時評価部103は、列車運行状態情報111と運行制限進路計画112を取得し、遅延発生をトリガーとして、本線上の一部区間が留置線路に指定されている状態で運行を続けた場合の評価値113を算出する。そして、評価値113は、遅延時評価部103から判断部105へ出力される。
なお、評価値113には、消費電力量、遅延の影響を受ける人数、その他遅延によって発生するコストなどの情報が含まれている。遅延時評価部103の詳細は後述する。
The delay evaluation unit 103 acquires train operation status information 111 and an operation restriction route plan 112, and calculates an evaluation value 113 for a case where operation is continued with a part of a main line designated as a storage track, triggered by the occurrence of a delay. The evaluation value 113 is then output from the delay evaluation unit 103 to the judgment unit 105.
The evaluation value 113 includes information such as the amount of power consumption, the number of people affected by the delay, and other costs incurred by the delay. The delay evaluation unit 103 will be described in detail later.

留置解除評価部104は、列車運行状態情報111と運行制限進路計画112を取得し、遅延発生をトリガーとして、本線上に設定された留置線路を解除して、走行許可路線に変更した場合の進路計画である留置解除進路計画114Aと、本線上に設定された留置線路を解除して、走行許可路線に変更した場合の評価値114Bを算出する。そして、留置解除進路計画114Aおよび評価値114Bをまとめた情報として評価値114が留置解除評価部104から判断部105へ出力される。
なお、評価値114には、消費電力量、遅延の影響を受ける人数、その他遅延によって発生するコストなどの情報が含まれている。
また、留置解除進路計画114Aには、回送列車を含む各列車の進路計画とダイヤ、本線上のどの留置線を解除するかの情報が含まれている。留置解除評価部104の詳細は後述する。
The storage release evaluation unit 104 acquires the train operation status information 111 and the operation restriction route plan 112, and calculates a storage release route plan 114A, which is a route plan when the storage track set on the main line is released and the line is changed to a route permitted for running, triggered by the occurrence of a delay, and an evaluation value 114B when the storage track set on the main line is released and the line is changed to a route permitted for running. Then, the storage release evaluation unit 104 outputs the evaluation value 114 to the judgment unit 105 as information combining the storage release route plan 114A and the evaluation value 114B.
The evaluation value 114 includes information such as the amount of power consumption, the number of people affected by the delay, and other costs incurred due to the delay.
The storage release route plan 114A includes route plans and timetables of each train including a deadhead train, and information on which storage line on the main line to release the train from. The storage release evaluation unit 104 will be described in detail later.

判断部105は、本線上の一部区間が留置線路に指定されている状態で運行を続けた場合の評価値113、本線上に設定された留置線路を解除した場合の進路計画である留置解除進路計画114Aと、本線上に設定された留置線路を解除した場合の評価値114Bをまとめた評価値114を取得し、最終的に採用する進路計画115を設定する。そして、最終的な進路計画115は、判断部105から列車制御部106へ出力される。判断部105の詳細は後述する。 The judgment unit 105 obtains an evaluation value 114 that is a compilation of an evaluation value 113 in the case where operation is continued with a portion of the main line designated as a siding track, a siding release route plan 114A that is a route plan in the case where the siding track set on the main line is released, and an evaluation value 114B in the case where the siding track set on the main line is released, and sets a route plan 115 to be finally adopted. The final route plan 115 is then output from the judgment unit 105 to the train control unit 106. Details of the judgment unit 105 will be described later.

列車制御部106は、最終的な進路計画115を取得し、最終的な進路計画115に従って、列車制御装置が対象とする路線内の全列車を制御する。列車制御部106の詳細については後述する。 The train control unit 106 obtains the final route plan 115 and controls all trains on the line targeted by the train control device according to the final route plan 115. Details of the train control unit 106 will be described later.

シミュレーション計算部107は、シミュレーション条件117を取得し、指定された列車運行シミュレーションを行い、シミュレーション結果127を出力する。
シミュレーション計算部107は、車両重量や牽引力等の車両に関する設計情報と、線路の勾配や曲線、制限速度や分岐器位置などの路線設計情報、各列車の計画ダイヤ、運行制限進路計画を基に、各時間における全列車の位置速度を計算する機能を有する。
The simulation calculation unit 107 acquires the simulation conditions 117 , performs a specified train operation simulation, and outputs a simulation result 127 .
The simulation calculation unit 107 has a function of calculating the position and speed of all trains at each time based on design information about the vehicles, such as vehicle weight and tractive force, route design information, such as track gradient and curves, speed limits and switch positions, planned timetables for each train, and operation restriction route plans.

<運行計画作成部>
図6A及び図6Bは、運行計画作成部102の処理を説明するフローチャートである。以下、運行計画作成部102の処理の詳細について、図6Aを用いて説明する。
図6Aの処理は、任意のタイミングで開始されてよい。例えば、開始スイッチを人が押下することで処理を開始してもよいし、あらかじめ定められた周期ごとに処理を開始してもよい。また、運行管理装置などと連携し、処理開始の指令を受信することで処理を開始する構成でもよい。
<Operation Planning Department>
6A and 6B are flowcharts illustrating the processing of the operation plan creation unit 102. Hereinafter, the details of the processing of the operation plan creation unit 102 will be described with reference to FIG. 6A.
The process of Fig. 6A may be started at any timing. For example, the process may be started by a person pressing a start switch, or may be started at a predetermined cycle. In addition, the process may be started by receiving a command to start the process in cooperation with a traffic management device or the like.

ステップ201は、列車制御装置が制御対象とする路線内の区間から、留置線路の候補となる区間である留置線路候補を抽出する。留置線路候補の抽出方法は第2実施形態と同様であるので説明は省略する。 In step 201, the train control device extracts storage track candidates, which are sections that are candidates for storage tracks, from the sections of the line that are the subject of control. The method for extracting storage track candidates is the same as in the second embodiment, so a description thereof will be omitted.

ステップ202は、ステップ201で抽出された留置線路候補数分だけ以降の処理を繰り返し行う繰り返し処理である。留置線路候補数分だけ繰り返し処理が終了するとステップ205へ進む。留置線路候補が複数存在する場合、繰り返し処理の順番は、留置線路候補の中から優先度が高い順に処理が実行されることが望ましい。
留置線路候補は、路線内の区間の様々な場所に、様々な容量で存在するため、留置線路の利便性は、個々の留置線路ごとに異なる。
Step 202 is a repetitive process in which the following process is repeated for the number of storage line candidates extracted in step 201. When the repetitive process is completed for the number of storage line candidates, the process proceeds to step 205. When there are multiple storage line candidates, it is preferable that the order of the repetitive process is such that the process is executed in descending order of priority among the storage line candidates.
Since storage track candidates exist in various locations within the line section and with various capacities, the convenience of the storage track varies from one storage track to another.

<優先度の設定>
優先度の設定方法としては、いくつかの方法が考えられる。本線上に留置線路を設けると留置線路上は、営業運行ができなく、渡線を用いた迂回が必要となる。このため、列車需要の大きい地域の本線上に留置線路を設けると、遅延が発生しやすいリスクが生じる。一方、列車需要の少ない地域に留置線路を設けると、回送列車をその地域まで運行する必要があり、往復のためにエネルギーを消費することとなる。
<Priority setting>
There are several possible methods for setting priorities. If siding tracks are installed on the main line, commercial operations cannot be performed on the siding tracks, and a detour using crossing tracks is required. For this reason, if siding tracks are installed on the main line in areas with high train demand, there is a risk that delays will occur. On the other hand, if siding tracks are installed in areas with low train demand, it will be necessary to operate deadhead trains to the area, consuming energy for the round trip.

こうしたことから、例えば、列車の運行に要する消費電力量の最小化を重視する場合は、留置列車を留置線路から営業運行の需要がある場所まで回送する距離を減らすように留置路線候補の優先度を高めることが望ましい。つまり、営業運行の需要が大きいターミナル駅に近い留置線路候補の優先度を最も高くすれば、全体の回送距離を最小化できるため、消費電力の削減が可能となる。そして、留置線路がターミナル駅から離れるにしたがって、その優先度を低くするよう設定することが望ましい。 For this reason, for example, if the emphasis is on minimizing the amount of power consumption required to operate trains, it is desirable to increase the priority of potential siding tracks so as to reduce the distance that parked trains must travel from the siding tracks to locations where there is demand for commercial operation. In other words, by giving the highest priority to potential siding tracks that are close to terminal stations with high demand for commercial operation, the overall travel distance can be minimized, making it possible to reduce power consumption. It is then desirable to set the priority of siding tracks that are farther away from terminal stations lower.

また、遅延発生時の遅延拡大を防止することを重視する場合は、列車運行本数の少ない区間、例えば、末端区間に近い留置線路の優先度を最も高くすることが望ましい。つまり、列車運行本数の少ない区間においては、一度遅延が発生すると遅延が拡大しやすいため、早急に留置されている列車を回送して営業運行に復帰させる必要がある。このため、列車運行本数の少ない区間の留置路線候補の優先度を高め、列車運行本数の多い区間、例えば、需要の大きいターミナル駅に近づくにつれて、優先度を低く設定することが望ましい。 In addition, when the priority is to prevent delays from becoming more severe when they do occur, it is desirable to give the highest priority to sections with few trains running, for example, siding tracks close to terminal sections. In other words, in sections with few trains running, once a delay occurs, it is easy for the delay to become more severe, so it is necessary to quickly send parked trains back into service. For this reason, it is desirable to give a higher priority to siding track candidates in sections with few trains running, and to set a lower priority as the section approaches a higher number of trains running, for example, a terminal station with high demand.

さらに、回送距離を減らしつつ、遅延発生時の遅延拡大を防止したい場合には、区間の中で列車本数が減少し始める最初の駅間に存在する留置線路候補の優先度を最も高くすることが考えられる。これは、例えば、大都市圏から離れ、列車本数が減少し始める最初の駅間であれば、回送するための距離が比較的短く、しかも、列車運行本数が少ないことから、遅延拡大が発生しやすい区間に容易に回送しやすいためである。以降は区間における列車本数と回送の需要先との距離との関係を総合的に勘案して優先度を設定する方法も考えられる。
また、災害リスクからの車両の防護を重視する場合は、気象観測機関が提供する気象情報と連携し、大雨や洪水のリスクが比較的高い区間に近い留置線路候補の優先度を低くしたり、地震発生時などに津波の被害を受ける可能性がある災害ポテンシャルの高い区間に近い留置線路候補の優先度を低くする、等の設定方法も考えられる。
Furthermore, if you want to reduce the distance traveled while preventing delays from expanding when delays occur, you can consider giving the highest priority to the storage track candidates that exist between the first stations in the section where the number of trains starts to decrease. This is because, for example, if the first stations are far from a metropolitan area and the number of trains starts to decrease, the distance for forwarding is relatively short and the number of trains in operation is small, making it easy to forward trains to sections where delays are likely to expand. From here on, you can also consider a method of setting the priority by comprehensively considering the relationship between the number of trains in the section and the distance to the destination of the demand for forwarding.
In addition, if the priority is placed on protecting vehicles from disaster risks, one possible setting method would be to work in cooperation with weather information provided by meteorological observation agencies to lower the priority of potential storage tracks located near sections with a relatively high risk of heavy rain and flooding, or to lower the priority of potential storage tracks located near sections with a high disaster potential that may be affected by tsunamis in the event of an earthquake, etc.

また、複数の編成を併結して運行する必要がある路線の場合、併結した状態の列車を留置できる長さが確保できる留置線路候補の優先度を高くし、分割しなければ留置できないような長さしか確保できない留置線路候補の優先度を低くする設定方法も考えられる。 In addition, for lines where multiple trains need to be operated coupled together, a possible setting method would be to give a higher priority to storage track candidates that can ensure the length required to store coupled trains, and a lower priority to storage track candidates that can only ensure the length required to store trains without splitting them.

<留置路線の追加>
ステップ203は、最新の運行制限進路計画に、留置時間条件と共に、留置線路候補を留置線路として追加する。そして、ステップ204へ進む。
<シミュレーションの実施>
ステップ204は、最新の運行制限進路計画を基に、列車運行シミュレーションの条件を設定し、シミュレーション条件117としてシミュレーション計算部107へ出力する。そして、シミュレーション計算部107から出力されたシミュレーション結果127を受信したら、ステップ205へ進む。
<Addition of storage routes>
In step 203, the storage track candidate is added as a storage track together with the storage time condition to the latest operation restriction route plan. Then, the process proceeds to step 204.
<Simulation execution>
In step 204, conditions for a train operation simulation are set based on the latest operation restriction route plan, and are output to the simulation calculation unit 107 as simulation conditions 117. Then, when the simulation result 127 output from the simulation calculation unit 107 is received, the process proceeds to step 205.

<シミュレーションの判定1>
ステップ205は、ステップ204の列車運行シミュレーションの結果、留置ができない回送列車の編成数が許容値以下であり、かつ留置時間の間に列車の遅延が発生しないことを判定する。ステップ205において、留置ができない回送列車の編成数が許容値以下であり、かつ遅延が発生しないことが確認できた場合には、Yesとして、ステップ206に進む。ステップ205において、留置ができない回送列車の編成数が許容値以下ではないか、または、遅延が発生した場合には、Noとして、ステップ206に進む。
なお、列車の遅延発生の判定方法としては、1秒でも遅着が発生した場合を遅延発生と判定してもよいし、任意に定めることができる遅着許容時分を設定しておき、それを超えて遅着する列車が発生した場合に遅延発生と判定し、遅延が遅着許容時分以内の場合は遅延が発生しないことを確認できたとしてもよい。
<Simulation Judgment 1>
In step 205, it is determined that the number of formations of out-of-service trains that cannot be stored is equal to or less than the allowable value and that no train delay will occur during the storage time as a result of the train operation simulation in step 204. If it is confirmed in step 205 that the number of formations of out-of-service trains that cannot be stored is equal to or less than the allowable value and that no delay will occur, the answer is Yes and the process proceeds to step 206. If the number of formations of out-of-service trains that cannot be stored is equal to or less than the allowable value or a delay has occurred in step 205, the answer is No and the process proceeds to step 206.
As a method for determining whether a train has been delayed, a delay may be determined if the train is late by even one second, or an arbitrarily set allowable late arrival time may be set, and a delay may be determined if a train arrives later than this time, and it may be confirmed that no delay has occurred if the delay is within the allowable late arrival time.

ステップ206は、ステップ204の列車運行シミュレーションの結果、遅延が発生したか否か、留置ができない回送列車の編成数が許容値以下であるか否かを判定する。遅延が発生している場合にはNoとして、ステップ202の繰り返し処理に進む。
また、遅延が発生していないが、留置ができない回送列車の編成数が許容値以下でない場合には、Yesとして、ステップ209に進む。
なお、列車の遅延判定方法は、上述したステップ205と同様に判定基準を定めることができる。
In step 206, it is determined whether a delay has occurred and whether the number of train sets that cannot be stored is equal to or less than the allowable value as a result of the train operation simulation in step 204. If a delay has occurred, the result is No, and the process proceeds to the repetition of step 202.
Also, if no delay has occurred but the number of train sets that cannot be stored is not below the allowable value, the answer is Yes and the process proceeds to step 209.
The method of determining train delays can be based on criteria similar to those used in step 205 described above.

<シミュレーションの判定2>
シミュレーションの判定1では、ステップ205の後にステップ206を行う方法を説明したが、ステップ205とステップ206は順序を逆にしてもよい。
図6Bは、運行計画作成部102の処理を説明するシミュレーションの判定2のフローチャートである。
図6Bは、図6Aにおけるステップ205とステップ206の順序を逆にした点で図6Aと異なる。以下の説明において、上述の図6Aと同一又は同等の構成要素については同一の符号を付し、その説明を簡略又は省略する。
<Simulation Judgment 2>
In the simulation judgment 1, the method of performing step 206 after step 205 has been described, but the order of steps 205 and 206 may be reversed.
FIG. 6B is a flowchart of determination 2 of the simulation, which explains the processing of the operation plan creation unit 102.
Fig. 6B differs from Fig. 6A in that the order of steps 205 and 206 in Fig. 6A is reversed. In the following description, the same or equivalent components as those in Fig. 6A above are denoted by the same reference numerals, and the description thereof will be simplified or omitted.

図6Bの例では、ステップ206は、ステップ204の列車運行シミュレーションの結果、留置ができない回送列車の編成数が許容値以下であるか否かを判定する。留置ができない回送列車の編成数が許容値以下である場合には、Yesとしてステップ205に進む。
また、留置ができない回送列車の編成数が許容値以下ではない場合には、Noとして、ステップ209に進む。
In the example of Fig. 6B, step 206 determines whether or not the number of train sets that cannot be stored is equal to or less than the allowable value as a result of the train operation simulation in step 204. If the number of train sets that cannot be stored is equal to or less than the allowable value, the determination is Yes and the process proceeds to step 205.
If the number of train sets that cannot be stored is not below the allowable value, the answer is No and the process proceeds to step 209.

ステップ205は、ステップ204の列車運行シミュレーションの結果、留置ができない回送列車の編成数が許容値以下であり、かつ留置時間の間に列車の遅延が発生しないことを判定する。ステップ205において、留置ができない回送列車の編成数が許容値以下であり、かつ遅延が発生しないことが確認できた場合には、Yesとして、ステップ208に進む。ステップ205において、遅延が発生した場合には、Noとして、ステップ202の繰り返し処理に進む。 In step 205, it is determined that the number of train sets that cannot be stored is equal to or less than the allowable value, and that no train delays will occur during the storage time, based on the results of the train operation simulation in step 204. If it is confirmed in step 205 that the number of train sets that cannot be stored is equal to or less than the allowable value, and that no delays will occur, the process judges Yes and proceeds to step 208. If a delay has occurred in step 205, the process judges No and proceeds to the repeat process of step 202.

なお、列車の遅延判定方法は、シミュレーション判定1におけるステップ205の場合と同様に判定基準を定めることができる。
また、留置ができない回送列車の編成数の許容値の設定方法については、列車本数が多く遅延発生時の遅延拡大が発生しやすい路線であれば、大きい値を設定し、列車本数が少なく、遅延発生時の遅延拡大がしにくい路線であれば、省エネ性を考慮して0に設定することが望ましい。
In addition, the method of judging train delays can set the judgment criteria in the same manner as in step 205 in simulation judgment 1.
Regarding the method of setting the allowable number of train sets for non-revenue trains that cannot be stored, if the line has a large number of trains and is prone to the delay expanding when a delay occurs, a large value should be set, whereas if the line has a small number of trains and is unlikely to cause the delay to expand when a delay occurs, it is desirable to set it to 0 in consideration of energy conservation.

なお、上述の説明では、留置ができない回送列車の編成数が許容値以下であるか否かの観点と遅延が発生したか否かの観点を2段階のステップ205及びステップ206を用いたフローチャートとして説明した。しかし、ステップ205及びステップ206は1段階ステップで処理してもよい。
すなわち、ステップ205及びステップ206は、ステップ204の列車運行シミュレーションの結果に戻づいて、以下の3ルートに選択的に進むステップとしてまとめることとしてもよい。
(A)留置ができない回送列車の編成数が許容値以下であり、かつ遅延が発生しないことが確認できた場合には、ステップ208に進む。
(B)遅延は発生しないが、留置ができない回送列車の編成数が許容値以下ではない場合にはステップ209に進む。
(C)遅延が発生した場合にはステップ202の繰り返し処理に進む。
In the above explanation, the viewpoints of whether or not the number of trains that cannot be stored is equal to or less than the allowable value and whether or not a delay has occurred have been explained as a flowchart using two steps, step 205 and step 206. However, step 205 and step 206 may be processed in a single step.
That is, steps 205 and 206 may be integrated into a step of selectively proceeding to one of the following three routes based on the result of the train operation simulation in step 204.
(A) If it is confirmed that the number of train sets that cannot be stored is within the allowable value and no delay will occur, proceed to step 208.
(B) If no delay will occur but the number of train sets that cannot be stored is not below the allowable value, proceed to step 209.
(C) If a delay occurs, proceed to the repeat process of step 202.

ステップ209は、ステップ204の列車運行シミュレーションの条件に、留置線路を追加して、ステップ204へ進む。ステップ209で留置線路を追加する場合は、ステップ202で説明した優先順位で留置線路を追加することが望ましい。 In step 209, a storage track is added to the conditions of the train operation simulation in step 204, and the process proceeds to step 204. When adding a storage track in step 209, it is desirable to add the storage track in the order of priority described in step 202.

ステップ207は、列車運行シミュレーションの結果、遅延が発生しない留置線路候補を見つけることができなかった場合の処理である。この場合は、最善の留置路線候補を留置路線に採用した場合であっても、却って遅延が発生するか、必要な回送列車の留置ができない状況であることが判明したわけである。このため、ステップ207として、処理開始時の運行制限進路計画を出力し、処理を終了することとなる。 Step 207 is the process to be performed when the train operation simulation fails to find a storage track candidate that will not cause delays. In this case, even if the best storage track candidate is adopted as the storage track, it has been found that delays will occur or the necessary out-of-service trains will not be able to be stored. For this reason, in step 207, the operation restriction route plan at the start of the process is output, and the process ends.

ステップ208は、最終的な運行制限進路計画を出力し、処理を終了する。つまり、ステップ208は、列車運行シミュレーションの結果、遅延を発生させることなく留置線路を設定可能である条件が見つかった場合の処理である。この場合の運行制限進路計画には、留置線路を設定することを前提として、回送列車を含む各列車の進路情報と、留置線路の設定情報が含まれる。 Step 208 outputs the final operation restriction route plan and ends the process. In other words, step 208 is the process performed when the train operation simulation finds conditions under which a siding track can be set without causing a delay. In this case, the operation restriction route plan includes route information for each train, including out-of-service trains, and setting information for the siding track, assuming that a siding track will be set.

<列車運行シミュレーション>
次に、図6A及び図6Bのステップ204で実施する列車運行シミュレーションの流れについて、図7A,Bを用いて説明する。
<Train operation simulation>
Next, the flow of the train operation simulation performed in step 204 in FIGS. 6A and 6B will be described with reference to FIGS. 7A and 7B.

図7Aは、留置線路候補となる区間Xが設定されている路線における、上り方面及び下り方面の列車の経路を模式的に示した図である。
図7Bは、留置線路候補が留置路線に切り替わった後の路線における、上り方面及び下り方面の列車の経路を模式的に示した図である。
列車運行シミュレーションは、図5の列車運行状態取得部101から取得した各列車の位置、速度を初期状態として開始される。初期状態においては、留置線路候補の区間Xはまだ走行許可線路となっており、運行列車が走行できる状態となっている。つまり、各列車は、あらかじめ定められた計画ダイヤに沿って営業運行を行っている。
FIG. 7A is a diagram showing a schematic diagram of routes of trains going in the up and down directions on a line in which a section X that is a candidate for a storage track is set.
FIG. 7B is a diagram showing a schematic diagram of the routes of upbound and downbound trains on the line after the storage track candidate is switched to a storage line.
The train operation simulation is started with the initial state being the position and speed of each train acquired from the train operation status acquisition unit 101 in Fig. 5. In the initial state, the section X of the storage track candidate is still a running permitted track, and trains can run on it. In other words, each train is operating commercially according to a predetermined planned timetable.

列車運行シミュレーションの計算ステップが進み、営業運行を終えた回送列車T3が発生した場合、回送列車は最寄りの留置線路候補の区間Xに向かって、営業列車の合間を縫って走行する。
この時、回送列車は、各駅間の走行時分や各駅の発着時分をあらかじめ定めた回送列車用計画ダイヤを用いて、営業運行終了時に最も近い留置線路候補に向かって走行するようにしてもよい。また、回送列車は営業列車に対して十分に安全な距離を取りながら、先行する営業列車に追従する形で留置線路候補に向かって走行してもよい。
When the calculation steps of the train operation simulation progress and a deadhead train T3 that has completed its commercial operation occurs, the deadhead train travels toward the nearest candidate storage track section X, weaving its way between commercial trains.
At this time, the deadhead train may run toward the nearest storage track candidate at the end of commercial operation using a planned timetable for deadhead trains that predetermines the running time between stations and the arrival and departure times at each station. Also, the deadhead train may run toward the storage track candidate in a manner following the preceding commercial train while keeping a sufficiently safe distance from the commercial train.

回送列車T3が留置線路候補の区間Xの区間に到達した時刻から、この区間を走行許可線路から留置線路に切り替え、留置される回送列車T3以外の列車T4が進入ができないよう設定する。
なお、留置線路が列車で満たされ、これ以上列車を追加で留置できない場合、以降の回送列車はその留置線路を目標とせず、空いている別の最寄りの留置線路を目標として走行するようにすることが望ましい。
さらに、留置線路が列車で満たされ、これ以上列車を追加で留置できない状況で、他に空いている留置線路がない場合は、以降の回送列車はその留置線路を目標とせず、営業車両の合間を縫って本線上を回送し続けることが望ましい。
From the time when the deadhead train T3 reaches the section X of the candidate storage track, this section is switched from a running-permitted track to a storage track, and it is set so that trains T4 other than the deadhead train T3 to be stored cannot enter.
In addition, when a storage track is filled with trains and no more trains can be stored there, it is preferable for subsequent trains to not target that storage track, but to target the nearest available storage track instead.
Furthermore, when a storage track is filled with trains and no more trains can be stored there, and there are no other available storage tracks, it is desirable for subsequent out-of-service trains not to target that storage track, but to continue to travel on the main line, weaving between the gaps in service vehicles.

区間Xを走行線路から留置線路に切り替えて以降は、図7Bに示すように、回送列車ではない下り列車Tは渡線Bで上り線路10へ転線し、渡線Aを経由して再び下り線路20へ戻る下り列車経路50に沿って走行する。
その後、再び列車需要が増加し、留置線路として設定されている区間Xに停車していた留置列車がすべて、区間Xから出発したタイミングで、区間Xを図7Aの状態に戻し、走行許可線路に切り替える。最終的に、区間Xを営業列車が走行し、その列車が駅に到着した時点でシミュレーションを終了する。
また、シミュレーションが終了した時点で、従前の計画ダイヤと比較した場合の各列車のシミュレーション上の遅延時間を集計する。
After section X is switched from a running track to a storage track, as shown in FIG. 7B , a down train T that is not a deadhead train switches to the up track 10 at the crossover track B, and travels along the down train route 50, passing through the crossover track A and returning to the down track 20 again.
After that, when the train demand increases again and all the trains parked in section X, which is set as a storage track, depart from section X, section X is returned to the state of Fig. 7A and switched to a running-permitted track. Finally, the simulation ends when a commercial train runs on section X and arrives at the station.
In addition, when the simulation is completed, the simulated delay times of each train are tallied in comparison with the previous planned timetable.

なお、留置線路に配置した車両は、営業運行再開時刻に営業運行再開駅に到着できるよう、留置線路から営業運行再開駅までの走行時間を逆算して留置線路を出発する。この時の営業運行再開時の列車回送においても、あらかじめ定められた回送ダイヤに従って走行してもよいし、営業列車の合間を縫って走行するようにしてもよい。
なお、今回の説明では、営業列車についてのみ言及して説明を行ったが、メンテナンス車両等を含めて列車運行シミュレーションを実施してもよい。
In addition, the trains placed on the storage tracks depart from the storage tracks by calculating backwards the running time from the storage tracks to the station where commercial operations are to be resumed so that they can arrive at the station where commercial operations are to be resumed at the time commercial operations are to be resumed. When trains are sent out at the time of resuming commercial operations, they may also run according to a predetermined out-of-service timetable, or they may run between commercial trains.
In the above explanation, only commercial trains have been mentioned, but the train operation simulation may also be carried out including maintenance vehicles, etc.

<遅延時評価部>
図5の遅延時評価部103の処理の詳細について、図8を用いて説明する。
図8は、遅延時評価部103の処理を説明するフローチャートである。
ステップ501では、遅延時評価部103は、列車運行状態取得部101から取得した、各列車の計画ダイヤに対する遅れ情報を基に、遅延が発生している列車があるか否かを判定する。遅延が発生している列車がある場合は、Yesとして、ステップ502へ進む。遅延が発生している列車がない場合は、Noとして、評価値は出力せずに処理を終了する。
<Delay Time Evaluation Section>
The details of the processing of the delay time evaluation unit 103 in FIG. 5 will be described with reference to FIG.
FIG. 8 is a flowchart for explaining the process of the delay time evaluation unit 103.
In step 501, the delay evaluation unit 103 determines whether or not there is a train that is experiencing a delay, based on the delay information of each train against the planned timetable acquired from the train operation status acquisition unit 101. If there is a train that is experiencing a delay, the result is Yes, and the process proceeds to step 502. If there is no train that is experiencing a delay, the result is No, and the process ends without outputting an evaluation value.

ステップ502では、遅延時評価部103は、列車運行状態取得部101から取得した各列車の位置と速度、運行計画作成部102から取得した運行制限進路計画112を基に、留置線路を解除せずに、継続する場合の遅延時間を予測する。
このため、シミュレーションを行う時点で留置線路を継続する場合の列車運行シミュレーションの条件をシミュレーション条件117として作成し、シミュレーション計算部107へ出力する。そして、シミュレーション計算部107から出力されたシミュレーション結果127を受信した後にステップ503へ進む。
In step 502, the delay evaluation unit 103 predicts the delay time if the storage track is continued without being released, based on the position and speed of each train obtained from the train operation status acquisition unit 101 and the operation restriction route plan 112 obtained from the operation plan creation unit 102.
For this reason, the conditions for the train operation simulation in the case where the storage track is continued at the time of performing the simulation are created as simulation conditions 117, and output to the simulation calculation unit 107. Then, after receiving the simulation results 127 output from the simulation calculation unit 107, the process proceeds to step 503.

ステップ503では、遅延時評価部103は、ステップ502の列車運行シミュレーションで算出した評価値を、本線上の一部区間が留置線路に指定されている状態で運行を続けた場合の評価値113として出力し、処理を終了する。 In step 503, the delay evaluation unit 103 outputs the evaluation value calculated in the train operation simulation in step 502 as the evaluation value 113 in the case where operation is continued with a portion of the main line designated as a storage track, and ends the process.

<留置解除評価部>
図5の留置解除評価部104の処理の詳細について、図9を用いて説明する。
図9は、留置解除評価部104の処理を説明するフローチャートである。
留置解除評価部104は、ステップ601において、列車運行状態取得部101から取得した、各列車の計画ダイヤに対する遅れ情報を基に、遅延が発生している列車があるか否かを判定する。遅延が発生している列車がある場合には、Yesとしてステップ602へ、遅延が発生している列車がない場合には、Noとして処理を終了する。
<Detention Release Evaluation Department>
The details of the process of the retention release evaluation unit 104 in FIG. 5 will be described with reference to FIG.
FIG. 9 is a flowchart for explaining the process of the retention release evaluation unit 104.
In step 601, the storage release evaluation unit 104 determines whether or not there is a train that is delayed based on the delay information of each train against the planned timetable acquired from the train operation status acquisition unit 101. If there is a train that is delayed, the process proceeds to step 602 as Yes, and if there is no train that is delayed, the process ends as No.

ステップ602では、留置解除評価部104は、遅延が発生している列車がある場合には、列車運行状態取得部101から取得した各列車の位置と速度、運行計画作成部102から取得した運行制限進路計画112を基に、留置線路を解除した場合の遅延時間を予測する。
このため、シミュレーションを行う時点で留置線路を解除した場合の列車運行シミュレーションの条件をシミュレーション条件117として作成し、シミュレーション計算部107へ出力する。
そして、シミュレーション計算部107から出力されたシミュレーション結果127を受信した後に、ステップ603へ進む。ステップ602の列車運行シミュレーションの詳細については後述する。
In step 602, if a train is delayed, the storage release evaluation unit 104 predicts the delay time if the storage track is released based on the position and speed of each train obtained from the train operation status acquisition unit 101 and the operation restriction route plan 112 obtained from the operation plan creation unit 102.
For this reason, the conditions for the train operation simulation in the case where the storage track is released at the time of performing the simulation are created as simulation conditions 117 and output to the simulation calculation unit 107.
Then, after receiving the simulation result 127 output from the simulation calculation unit 107, the process proceeds to step 603. The train operation simulation in step 602 will be described in detail later.

ステップ603では、留置解除評価部104は、ステップ602のシミュレーションで算出した評価値を、本線上に設定された留置線路を解除した場合の評価値114Bとして出力し、また本線上に設定された留置線路を解除した場合の進路計画である留置解除進路計画114Aを出力し、処理を終了する。 In step 603, the parking release evaluation unit 104 outputs the evaluation value calculated in the simulation in step 602 as the evaluation value 114B in the case where the parking track set on the main line is released, and also outputs the parking release route plan 114A, which is the route plan in the case where the parking track set on the main line is released, and ends the process.

<列車運行シミュレーション>
ステップ602の列車運行シミュレーションの詳細について説明する。
ステップ602の列車運行シミュレーションは、車両重量や牽引力等の車両に関する設計情報と、線路の勾配や曲線、制限速度などの路線設計情報、各列車の計画ダイヤ、運行制限進路計画を基に、各時間における全列車の位置速度を計算する。
<Train operation simulation>
The train operation simulation in step 602 will now be described in detail.
The train operation simulation in step 602 calculates the positions and speeds of all trains at each time based on vehicle design information such as vehicle weight and tractive force, route design information such as track gradient, curves, and speed limits, planned timetables for each train, and route restrictions.

以下、留置解除の際の列車運行シミュレーションの流れについて説明する。
図10は、留置解除の際の列車運行の流れを説明する概略図である。列車運行シミュレーションは、列車運行状態取得部101から入力した、各列車の位置、速度を初期状態として開始される。シミュレーション開始時において、留置線路は直ちに走行線路に切り替えられ、留置列車は回送列車として走行させることとなる。この場合、回送列車の走行経路を、最小限にとどめるためには、図10に示すように、回送列車T5乃至T8を図中の(1)、(2)、(3)の順に移動させることが望ましい。つまり(1)留置線路から渡線Aよりも下り側に移動する。(2)折り返し操作を行って、渡線Aを経由して上り線路10に移動し、渡線Bを経由して下り線路20に移動する。(3)折り返し操作を行って、元の留置線路である区間Xに戻る。このような(1)乃至(3)のルートを採用することが望ましい。
The flow of the train operation simulation when the train is released from storage will be explained below.
FIG. 10 is a schematic diagram for explaining the flow of train operation when the train is released from storage. The train operation simulation is started with the position and speed of each train input from the train operation state acquisition unit 101 as the initial state. At the start of the simulation, the storage track is immediately switched to the running track, and the storage train is made to run as a deadhead train. In this case, in order to minimize the running route of the deadhead train, it is desirable to move the deadhead trains T5 to T8 in the order of (1), (2), and (3) in the figure, as shown in FIG. 10. That is, (1) move from the storage track to the down side of the crossover A. (2) perform a turnaround operation to move to the up track 10 via the crossover A, and move to the down track 20 via the crossover B. (3) perform a turnaround operation to return to the section X, which is the original storage track. It is desirable to adopt such routes (1) to (3).

ただし、渡線A走行前及び渡線B走行後に発生する回送列車の折り返しには多少の時間を要する。このため、区間Xに複数の編成が留置されていた場合には、全留置列車を同じ場所で折り返すと、区間Xを他の運行列車が走行できるようにするまで相当程度の時間を要する可能性がある。その場合、回送列車を下り線路20の渡線Aよりさらに先まで走行させ、その先にある渡線Cも併せて活用し、上り線路10へ転線するようにしてもよい。
そして、シミュレーションにおいて、営業列車の遅延時刻が所定値以下に収まったる時刻が検出された場合には、遅延が収束すると判断して、区間Xを再び留置線路として設定し、留置線路に戻ってきた回送列車を順次留置する運行制限路線計画を作成することができる。
However, it takes some time for the deadhead train to turn around before traveling on crossing line A and after traveling on crossing line B. For this reason, if multiple formations are stored in section X, if all the stored trains are turned around at the same place, it may take a considerable amount of time before other trains can run on section X. In that case, the deadhead train may be run further beyond crossing line A on the down track 20, and the crossing line C beyond that may also be used to switch to the up track 10.
Then, if the simulation detects a time when the delay time of a commercial train falls within a predetermined value, it is determined that the delay will converge, and an operation restriction route plan can be created in which section X is set as a storage track again and deadhead trains that have returned to the storage track are stored in sequence.

最終的に、遅延時評価部103のステップ502で列車運行シミュレーションを終了した時刻と同様の時刻でシミュレーションを終了し、各列車の遅延時間と、全列車の消費電力量を集計し、評価値として出力する。 Finally, the simulation ends at the same time as the train operation simulation ended in step 502 of the delay evaluation unit 103, and the delay times of each train and the power consumption of all trains are tallied and output as evaluation values.

<判断部>
以下では、判断部105の詳細について説明する。
判断部105は、本線上の一部区間が留置線路に指定されている状態で運行を続けた場合の評価値113、本線上に設定された留置線路を解除した場合の評価値114Bが入力されるまでは、本線上の一部区間を留置線路に指定する運行制限進路計画112を進路計画として採用している。
このため、本線上の一部区間を留置線路に指定する運行制限進路計画を最終的な進路計画115として列車制御部106へ出力する。
<Judgment Department>
The determination unit 105 will be described in detail below.
The judgment unit 105 adopts the operation restriction route plan 112 that designates a portion of the main line as a storage track as the route plan until an evaluation value 113 for continuing operation while a portion of the main line is designated as a storage track and an evaluation value 114B for removing the storage track set on the main line are input.
For this reason, an operation restriction route plan that designates a portion of the main line as a storage track is output to the train control unit 106 as the final route plan 115.

一方、本線上の一部区間が留置線路に指定されている状態で運行を続けた場合の評価値113、本線上に設定された留置線路を解除した場合の評価値114Bが入力された場合、両評価値の優劣を評価し、前者が優れていると判断した場合は、本線上の一部区間を留置線路に指定する運行制限進路計画112を最終的な進路計画115として列車制御部106へ出力する。
一方、それ以外の場合は、本線上に設定された留置線路を解除した場合の進路計画である留置解除進路計画114Aを最終的な進路計画115として列車制御部106へ出力する。
On the other hand, when an evaluation value 113 for continuing operation with a section of the main line designated as a siding track and an evaluation value 114B for removing the siding track set on the main line are input, the superiority of both evaluation values is evaluated, and if it is determined that the former is superior, an operation restriction route plan 112 for designating a section of the main line as a siding track is output to the train control unit 106 as a final route plan 115.
On the other hand, in other cases, a storage release route plan 114A, which is a route plan when the storage track set on the main line is released, is output to the train control unit 106 as the final route plan 115.

評価値の優劣の評価方法としては、消費電力量と遅延による影響をそれぞれコストに換算し、両者のコストの合計を比較してより小さい値となる方を優秀であると判断する方法が考えられる。 One possible method for evaluating the superiority of evaluation values is to convert the power consumption and the impact of delay into costs, compare the total of both costs, and judge the one with the smaller value to be superior.

例えば、消費電力量からコストを算出する際には消費電力量と電気料金を掛けて算出すればよい。遅延による影響については、旅客が他の路線や交通機関を選択したことによる運賃収入損失の推定値や、振替輸送を行う際に要する費用などを、遅延時間ごとにあらかじめデータベースとして格納しておき、それを参照してコストとして算出する手法が考えられる。
また、遅延による影響については、乗車時間が余計にかかることによる旅客の経済的損失を、時間価値と遅延時間によって算出する方法も提案されているため、それを利用して算出してもよい。
For example, when calculating costs from the amount of power consumed, it is sufficient to multiply the amount of power consumed by the electricity rate. Regarding the impact of delays, a method can be considered in which estimated values of fare revenue lost due to passengers choosing other routes or means of transport, costs required for alternative transport, etc. are stored in a database in advance for each delay time, and these can be used to calculate costs.
Regarding the impact of delays, a method has been proposed to calculate the economic loss to passengers due to extra travel time using the time value and delay time, so this method may be used for calculation.

<列車制御部>
列車制御部106は、最終的な進路計画115に従って、列車制御装置が対象とする路線内の全列車を制御する。列車制御部106における留置線路の扱いは、列車運行シミュレーション時と同様である。すなわち、留置線路が設定される場合、最初は留置線路区間も走行許可路線として扱い、回送列車が留置線路に到達したタイミングでその留置線路区間を他の列車が進入できない留置線路として扱う。そして、回送列車がすべて留置線路を出た段階で、その区間を再び走行許可路線として扱い、営業列車の進入を許すこととなる。
<Train Control Unit>
The train control unit 106 controls all trains on the line targeted by the train control device according to the final route plan 115. The train control unit 106 handles the siding tracks in the same way as during train operation simulation. That is, when a siding track is set, the siding track section is initially treated as a route permitted to run, and when a dead-by train reaches the siding track, the siding track section is treated as a siding track that other trains cannot enter. Then, when all the dead-by trains have left the siding track, the section is again treated as a route permitted to run, and commercial trains are allowed to enter.

<効果>
本実施形態により、使用車両数が少ない時間帯においては、本線上に留置線路を設けることにより、車両基地等の留置線を最小化することが可能となる。
本線上の営業車両の数は、1日の中で倍程度の差があることから、こうした営業車両の増減を活用して本線上に留置線路を設けると、相当程度の留置線路の確保が可能となり、車両基地などにおける固定的な留置線の抑制に大きな効果が期待できる。
また、本線上に留置線路を設定している時間帯において、本線上で何らかの遅延が発生することが起こり得る。その際、本線上に留置線路を設定していることが遅延解消のボトルネックとなり、遅延が拡大する虞もある。本実施形態においては、そのような事態の発生を抑制するために、遅延の発生時には、留置線路の解除の必要性をシミュレーションを用いて判定し、本線上の留置線路の解除の要否を的確に判断できるものである。これによって、留置線の使用数を削減可能な列車制御システムの提供が可能となる。
<Effects>
According to this embodiment, by providing sidings on the main line during times when the number of vehicles in use is low, it is possible to minimize the number of sidings at vehicle depots, etc.
The number of commercial vehicles on the main line can vary by about double over the course of a day, so if this increase or decrease in the number of commercial vehicles can be utilized to set up storage tracks on the main line, it will be possible to secure a considerable amount of storage track, which is expected to have a significant effect on reducing the need for fixed storage tracks at depots and the like.
In addition, during the time period when the siding tracks are set on the main line, some delays may occur on the main line. In that case, the setting of the siding tracks on the main line may become a bottleneck in resolving the delay, and there is a risk that the delay may increase. In this embodiment, in order to prevent such a situation from occurring, a simulation is used to determine the need to release the siding tracks when a delay occurs, and it is possible to accurately determine whether or not the siding tracks on the main line need to be released. This makes it possible to provide a train control system that can reduce the number of siding tracks used.

また、留置線路をどの箇所に設定すべきか、どの箇所の留置線路を継続し、または解除すべきかについては、様々な観点が存在する。例えば、代表的な観点としては、消費電力の観点、ユーザーの利便性に関する遅延時間の観点、災害リスクの観点などが存在する。本実施形態においては、これらの観点を自在に選択し、設定できるため、様々なニーズに対応することが可能である。
本技術は既存路線における留置線使用本数削減に寄与することもできるが、建設中の新線に応用することで、車両基地に接続していない区間における部分開業に寄与することも可能となる。
In addition, there are various viewpoints as to where the storage track should be set and where the storage track should be continued or released. For example, representative viewpoints include power consumption, delay time for user convenience, and disaster risk. In the present embodiment, these viewpoints can be freely selected and set, so that it is possible to meet various needs.
This technology can contribute to reducing the number of storage tracks used on existing lines, but by applying it to new lines currently under construction, it can also contribute to the partial opening of sections that are not connected to train depots.

<補足事項>
本発明は、上記の実施の形態に限定されるものではなく、その要旨を逸脱しない範囲内の様々な変形例が含まれる。例えば、本発明は、上記の実施の形態で説明した全ての構成を備えるものに限定されず、その構成の一部を削除したものも含まれる。また、ある実施の形態に係る構成の一部を、他の実施の形態に係る構成に追加又は置換することが可能である。
<Additional Information>
The present invention is not limited to the above-described embodiments, and includes various modifications within the scope of the gist of the present invention. For example, the present invention is not limited to those having all the configurations described in the above-described embodiments, and includes those in which some of the configurations have been deleted. In addition, it is possible to add or replace some of the configurations of one embodiment with the configurations of another embodiment.

101…列車運行状態取得部
102…運行計画作成部
103…遅延時評価部
104…留置解除評価部
105…判断部
106…列車制御部
111…列車運行状態情報
112…運行制限進路計画
101...Train operation status acquisition unit 102...Operation plan creation unit 103...Delay evaluation unit 104...Detention release evaluation unit 105...Judgment unit 106...Train control unit 111...Train operation status information 112...Operation restriction route plan

Claims (13)

本線上に列車の留置線路を設定可能な列車制御装置であって、
転線可能な設備を有する前記本線上の区間において、留置線路を設定し、
前記留置線以外の線路を走行許可線路として設定し、
運行対象の列車(以下、「運行列車」という。)に前記走行許可線路を走行させ、
留置対象の列車(以下、「留置列車」という。)を前記留置線路に留置させる運行制限進路計画を作成する運行計画作成部を有する列車制御装置。
A train control device capable of setting a train storage track on a main line,
In a section of the main line having a switching facility, a storage track is set up;
Setting tracks other than the storage tracks as running permitted tracks,
A train to be operated (hereinafter referred to as an "operation train") is caused to run on the running-permitted track,
A train control device having an operation plan creation unit that creates an operation restriction route plan for a train to be stored (hereinafter referred to as a "stored train") on the storage track.
請求項1に記載の列車制御装置において、
前記列車制御装置は、留置路線候補抽出部を有し、
前記留置路線候補抽出部は、路線設計情報に含まれる分岐器について、2つの分岐器の番線および分岐側の向きを相互に比較し、両者が同じ番線であって、分岐側の向きが逆であり、分岐側同士が向き合っている場合に、当該分岐器に挟まれた区間を留置線路候補として抽出する
ことを特徴とする列車制御装置。
The train control device according to claim 1,
The train control device has a storage line candidate extraction unit,
The train control device is characterized in that the storage line candidate extraction unit compares the track number and branch side direction of two switches included in the line design information, and if both have the same track number, the branch sides face each other in opposite directions, and the branch sides face each other, extracts the section between the switches as a storage line candidate.
請求項2に記載の列車制御装置において、
前記列車制御装置は、シミュレーション計算部を有し、
前記シミュレーション計算部は、前記運行計画作成部が作成した前記運行制限進路計画に基づいてシミュレーションを行い、
前記列車制御装置は、前記運行計画作成部が、前記シミュレーションにおいて列車の遅延が発生しないことが確認できた場合に、前記運行制限進路計画に従い運行列車及び留置列車を制御する
ことを特徴とする列車制御装置。
The train control device according to claim 2,
The train control device has a simulation calculation unit,
The simulation calculation unit performs a simulation based on the operation restriction route plan created by the operation plan creation unit,
The train control device is characterized in that, when the operation plan creation unit confirms in the simulation that no train delays will occur, the train control device controls operating trains and stored trains in accordance with the operation restriction route plan.
請求項3に記載の列車制御装置において、
前記列車制御装置は、遅延時評価部と留置解除評価部を有し、
前記遅延時評価部は、遅延発生時に留置線路を解除せずに継続する場合の評価値(以下、「運行制限評価値」という。)を算出し、
前記留置解除評価部は、遅延発生時に留置線路を解除した場合の進路計画(以下、「留置解除進路計画」という。)を作成し、前記留置解除進路計画を採用した場合の評価値(以下、「留置解除評価値」という。)を算出し、
前記列車制御装置は、前記運行制限評価値と、前記留置解除評価値の比較に基づいて、前記運行制限進路計画と前記留置解除進路計画のどちらを採用するか決定することを特徴とする列車制御装置。
The train control device according to claim 3,
The train control device has a delay time evaluation unit and a storage release evaluation unit,
The delay evaluation unit calculates an evaluation value (hereinafter referred to as an "operation restriction evaluation value") in the case where the storage track is continued without being released when a delay occurs,
The retention release evaluation unit creates a route plan (hereinafter referred to as a "retention release route plan") in the case where the retention track is released when a delay occurs, and calculates an evaluation value (hereinafter referred to as a "retention release evaluation value") in the case where the retention release route plan is adopted,
The train control device is characterized in that it determines whether the operation restriction route plan or the storage release route plan is to be adopted based on a comparison between the operation restriction evaluation value and the storage release evaluation value.
請求項4に記載の列車制御装置において、
前記運行制限評価値と前記留置解除評価値は、前記運行列車の遅延時間に基づいて算出するか、又は、前記運行列車及び前記留置列車の運行により消費する電力に基づいて算出するか、又は、遅延する列車に乗車する人数に基づいて算出することを特徴とする列車制御装置。
The train control device according to claim 4,
The train control device is characterized in that the operation restriction evaluation value and the storage release evaluation value are calculated based on a delay time of the operating train, or based on the power consumed by the operation of the operating train and the stored train, or based on the number of people boarding the delayed train.
請求項4または5に記載の列車制御装置において、
前記留置解除評価部は、前記運行制限進路計画に従い列車を走行させている状況において、列車が前記運行制限進路計画を満たした走行ができないことを検知したタイミングで前記留置解除進路計画の作成を開始する
ことを特徴とする列車制御装置。
In the train control device according to claim 4 or 5,
The train control device is characterized in that the storage release evaluation unit starts creating the storage release route plan when it detects that the train cannot run in a manner that satisfies the operation restriction route plan while the train is running in accordance with the operation restriction route plan.
請求項4から6のいずれか一項に記載の列車制御装置において、
前記留置解除評価部は、前記シミュレーション計算部を用いてシミュレーションを行い、
前記シミュレーションにおいて、列車の遅延が所定時間発生しないことが確認できた場合に、留置線路から解除した線路を再び前記留置線路に切り替える運行制限進路計画を作成することを特徴とする列車制御装置。
In the train control device according to any one of claims 4 to 6,
The detention release evaluation unit performs a simulation using the simulation calculation unit,
This train control device is characterized by creating an operation restriction route plan that switches a track that has been released from the storage track back to the storage track when it is confirmed in the simulation that no train delays will occur for a specified period of time.
留置路線候補抽出部及び運行計画作成部を有する列車制御装置において、
前記留置路線候補抽出部は、
路線設計情報に含まれる分岐器について、2つの分岐器の番線および分岐側の向きを相互に比較し、
両者が同じ番線であって、分岐側の向きが逆であり、分岐側同士が向き合っている場合に、当該分岐器に挟まれた区間を留置線路候補として抽出し、
前記運行計画作成部は、
前記抽出した留置線路候補の中から留置線路を設定し、
前記留置線以外の線路を走行許可線路として設定し、
運行対象の列車(以下、「運行列車」という。)に前記走行許可線路を走行させ、
留置対象の列車(以下、「留置列車」という。)を前記留置線路に留置させる運行制限進路計画を作成する
ことを特徴とする列車制御方法。
In a train control device having a storage route candidate extraction unit and an operation plan creation unit,
The storage route candidate extraction unit
For the turnouts included in the line design information, the track numbers and the directions of the turnouts of the two turnouts are compared with each other,
If both are the same track number, the directions of the branching sides are opposite, and the branching sides face each other, the section between the turnouts is extracted as a candidate for storage track,
The operation plan creation unit,
A storage line is set from the extracted storage line candidates,
Setting tracks other than the storage tracks as running permitted tracks,
A train to be operated (hereinafter referred to as an "operation train") is caused to run on the running-permitted track,
A train control method comprising: creating an operation restriction route plan for causing a train to be stored (hereinafter referred to as a "stored train") to be stored on the storage track.
請求項8に記載の列車制御方法において、
前記列車制御装置は、シミュレーション計算部を有し、
前記シミュレーション計算部は、前記運行計画作成部が作成した前記運行制限進路計画に基づいてシミュレーションを行い、
前記運行計画作成部が、前記シミュレーションにおいて列車の遅延が発生しないことが確認できた場合に、前記運行制限進路計画に従い運行列車及び留置列車を制御する
ことを特徴とする列車制御方法。
9. The train control method according to claim 8,
The train control device has a simulation calculation unit,
The simulation calculation unit performs a simulation based on the operation restriction route plan created by the operation plan creation unit,
A train control method, characterized in that the operation plan creation unit controls operating trains and stored trains in accordance with the operation restriction route plan when it is confirmed in the simulation that no train delays will occur.
請求項9に記載の列車制御方法において、
前記列車制御装置は、遅延時評価部と留置解除評価部を有し、
前記遅延時評価部は、遅延発生時に留置線路を解除せずに継続する場合の評価値(以下、「運行制限評価値」という。)を算出し、
前記留置解除評価部は、遅延発生時に留置線路を解除した場合の進路計画(以下、「留置解除進路計画」という。)を作成し、前記留置解除進路計画を採用した場合の評価値(以下、「留置解除評価値」という。)を算出し、
前記列車制御装置は、前記運行制限評価値と、前記留置解除評価値の比較に基づいて、前記運行制限進路計画と前記留置解除進路計画のどちらを採用するか決定する
ことを特徴とする列車制御方法。
The train control method according to claim 9,
The train control device has a delay time evaluation unit and a storage release evaluation unit,
The delay evaluation unit calculates an evaluation value (hereinafter referred to as an "operation restriction evaluation value") in the case where the storage track is continued without being released when a delay occurs,
The detention release evaluation unit creates a route plan (hereinafter referred to as a "detention release route plan") in the case where the detention track is released when a delay occurs, and calculates an evaluation value (hereinafter referred to as a "detention release evaluation value") in the case where the detention release route plan is adopted,
The train control method is characterized in that the train control device determines whether to adopt the operation restriction route plan or the storage release route plan based on a comparison between the operation restriction evaluation value and the storage release evaluation value.
請求項10に記載の列車制御方法において、
前記運行制限評価値と前記留置解除評価値は、前記運行列車の遅延時間に基づいて算出するか、又は、前記運行列車及び前記留置列車の運行により消費する電力に基づいて算出するか、又は、遅延する列車に乗車する人数に基づいて算出する
ことを特徴とする列車制御方法。
The train control method according to claim 10,
The train control method is characterized in that the operation restriction evaluation value and the storage release evaluation value are calculated based on a delay time of the operating train, or based on the power consumed by the operation of the operating train and the stored train, or based on the number of people boarding the delayed train.
請求項10または11に記載の列車制御方法において、
前記留置解除評価部は、前記運行制限進路計画に従い列車を走行させている状況において、列車が前記運行制限進路計画を満たした走行ができないことを検知したタイミングで、前記留置解除進路計画の作成を開始する
ことを特徴とする列車制御方法。
The train control method according to claim 10 or 11,
The train control method is characterized in that the storage release evaluation unit starts creating the storage release route plan when it detects that the train cannot run in a manner that satisfies the operation restriction route plan while the train is running in accordance with the operation restriction route plan.
請求項10から12のいずれか一項に記載の列車制御方法において、
前記留置解除評価部は、前記シミュレーション計算部を用いてシミュレーションを行い、
前記シミュレーションにおいて、列車の遅延が所定時間発生しないことが確認できた場合には、留置線路から解除した線路を再び前記留置線路に切り替える運行制限進路計画を作成する
ことを特徴とする列車制御方法。
A train control method according to any one of claims 10 to 12,
The detention release evaluation unit performs a simulation using the simulation calculation unit,
This train control method is characterized by creating an operation restriction route plan for switching a track that has been released from the storage track back to the storage track when it is confirmed in the simulation that no train delays will occur for a specified period of time.
JP2021092295A 2021-06-01 2021-06-01 Train control device and train control method Active JP7591978B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021092295A JP7591978B2 (en) 2021-06-01 2021-06-01 Train control device and train control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021092295A JP7591978B2 (en) 2021-06-01 2021-06-01 Train control device and train control method

Publications (2)

Publication Number Publication Date
JP2022184442A JP2022184442A (en) 2022-12-13
JP7591978B2 true JP7591978B2 (en) 2024-11-29

Family

ID=84437754

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021092295A Active JP7591978B2 (en) 2021-06-01 2021-06-01 Train control device and train control method

Country Status (1)

Country Link
JP (1) JP7591978B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6135396A (en) 1997-02-07 2000-10-24 Ge-Harris Railway Electronics, Llc System and method for automatic train operation
WO2014155733A1 (en) 2013-03-29 2014-10-02 三菱重工業株式会社 On-board device, signal system, and control method for traveling body
WO2016175134A1 (en) 2015-04-28 2016-11-03 株式会社日立製作所 Operation management system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06212825A (en) * 1992-11-30 1994-08-02 Mitsubishi Heavy Ind Ltd Three-dimensional train housing facility
JPH06221015A (en) * 1993-01-22 1994-08-09 Mitsubishi Heavy Ind Ltd Rotating multistory vehicle storage facility
JP2700291B2 (en) * 1993-06-18 1998-01-19 東日本旅客鉄道株式会社 Train operation control system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6135396A (en) 1997-02-07 2000-10-24 Ge-Harris Railway Electronics, Llc System and method for automatic train operation
WO2014155733A1 (en) 2013-03-29 2014-10-02 三菱重工業株式会社 On-board device, signal system, and control method for traveling body
WO2016175134A1 (en) 2015-04-28 2016-11-03 株式会社日立製作所 Operation management system

Also Published As

Publication number Publication date
JP2022184442A (en) 2022-12-13

Similar Documents

Publication Publication Date Title
CN109733445B (en) Distributed scheduling method based on multi-agent system model under emergency
Suh et al. Effect of skip-stop policy on a Korean subway system
CN114604294B (en) Dealing with unidirectionality in conjunction with virtual marshalling techniques train operation adjusting method for interrupt scene
HK1245201B (en) Crossing control apparatus, vehicle on-board control system, crossing control system, and crossing closing time shortening method
CN112550372B (en) A Method of Automatically Changing Crossroads and Turning Backs When Operations Are Suspended Based on Operation Diagrams
Cuppi et al. High density European Rail Traffic Management System (HD-ERTMS) for urban railway nodes: The case study of Rome
CN106494469B (en) A kind of speed car crosses the method for avoidance automatically
Christoforou et al. Managing planned disruptions of mass transit systems
JP7591978B2 (en) Train control device and train control method
Allen et al. Accommodation of long-term growth on north America's commuter railroads
Zajac et al. Concept of reducing harmful emissions by road transport vehicles in the tourist route Karpacz–Jelenia Góra
Dang Low-level modeling for trains routing and scheduling in railway stations
Gill Assessment of mass transit turn-back capacity using dynamic simulation models
Koning Comparing the performance of ERTMS level 2 fixed block and ERTMS level 3 moving block signalling systems using simulation techniques
Fazio Relationship between light rail systems design and system operations
JP2020138684A (en) Operation plan generation device and operation plan generation method
Limboonngam et al. Mixed traffic timetable simulation analysis: A case study of red line commuter train
Giedryś et al. Adaptation of the Łódź Agglomeration Railway node to a new role in the high-speed rail system
Flamm et al. Increasing Capacity and Reducing Travel Times in High-speed Train Operations through Virtual Coupling
Gast et al. Analysis of the Impact of the Effects of Modernisation of the Railway Line on the Quality of Travel on the Section Piła–Poznań
Ji et al. Integrated Scheduling of Metro Fire Engines and Trains for Metro Fire Rescue
ANDERSSON et al. Station design on high speed railway in Scandinavia, A study of how track and platform technical design aspects are affected by high speed railway concepts planned for the Oslo–Göteborg line.
Jong et al. Development and application of rail transit capacity models in Taiwan
Andreasson Extending PRT capabilities
Wesołowski Suburban rail in Poland: Decline at the dawn of suburbanization?

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240207

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20241016

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241029

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241119

R150 Certificate of patent or registration of utility model

Ref document number: 7591978

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150