JP7600574B2 - Battery storage system and method for controlling battery storage system - Google Patents
[go: Go Back, main page]

JP7600574B2 - Battery storage system and method for controlling battery storage system - Google Patents

Battery storage system and method for controlling battery storage system Download PDF

Info

Publication number
JP7600574B2
JP7600574B2 JP2020151223A JP2020151223A JP7600574B2 JP 7600574 B2 JP7600574 B2 JP 7600574B2 JP 2020151223 A JP2020151223 A JP 2020151223A JP 2020151223 A JP2020151223 A JP 2020151223A JP 7600574 B2 JP7600574 B2 JP 7600574B2
Authority
JP
Japan
Prior art keywords
power
current sensor
power generation
storage battery
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020151223A
Other languages
Japanese (ja)
Other versions
JP2022045562A (en
Inventor
哲男 秋田
直樹 綾井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Electric Industries Ltd
Original Assignee
Sumitomo Electric Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Electric Industries Ltd filed Critical Sumitomo Electric Industries Ltd
Priority to JP2020151223A priority Critical patent/JP7600574B2/en
Publication of JP2022045562A publication Critical patent/JP2022045562A/en
Application granted granted Critical
Publication of JP7600574B2 publication Critical patent/JP7600574B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本開示は、蓄電池システム、及び蓄電池システムの制御方法に関する。 This disclosure relates to a storage battery system and a method for controlling a storage battery system.

商用電力系統と系統連系し、蓄電池に蓄電する蓄電池システムは、太陽光発電装置等の発電装置と組み合わせて用いられることがある(例えば、特許文献1参照)。
蓄電池システムは、商用電力系統への逆潮流を制限する制限機能を備える。この制限機能を実現するために、蓄電池システムは、自システムの出力の潮流を監視するための電流センサを備える。
さらに、蓄電池システムは、自システムの制御や自システムの操作者への出力のために発電装置の発電電力を監視する。このため、蓄電池システムは、発電装置の発電電力を求めるために必要な電流センサも備える。
2. Description of the Related Art A battery storage system that is interconnected with a commercial power grid and stores electricity in a battery is sometimes used in combination with a power generation device such as a solar power generation device (see, for example, Patent Document 1).
The battery storage system has a limiting function for limiting reverse power flow to the commercial power grid. To achieve this limiting function, the battery storage system has a current sensor for monitoring the power flow of the output of the system itself.
Furthermore, the battery storage system monitors the power generated by the power generation device in order to control the system itself and to output the power to an operator of the system, and therefore the battery storage system also includes a current sensor required to obtain the power generated by the power generation device.

特開2013-51834号公報JP 2013-51834 A

上記蓄電池システムは、既に発電装置が設置されている需要家に対して追加的に設置されることがある。
図9は、発電装置が設置された需要家内に蓄電池システムを設置した場合の従来の構成を示した図である。図9は、発電装置をいわゆるシングル発電で運用する場合を示している。
シングル発電とは、発電装置が発電電力を交流電路へ供給しているときには蓄電池システムの放電を制限する運用形態である。
The above-mentioned storage battery system may be additionally installed at a consumer facility where a power generation device is already installed.
Fig. 9 is a diagram showing a conventional configuration in which a storage battery system is installed in a consumer facility in which a power generation device is installed. Fig. 9 shows a case in which the power generation device is operated in a so-called single power generation mode.
Single power generation is an operation mode in which discharge of the storage battery system is limited when the power generation device is supplying generated power to the AC power circuit.

図9中、蓄電池システム100は、電力系統102と負荷104とを繋ぐ交流電路106に接続されている。交流電路106は、単相3線式である。
蓄電池システム100は、既設の発電装置108と負荷104との間に接続された蓄電装置110と、電力系統102と発電装置108との間に設けられた電流センサ112と、交流電路106から発電装置108へ延びる分岐路114に設けられた電流センサ116と、を備える。
9, a storage battery system 100 is connected to an AC electric circuit 106 that connects a power system 102 and a load 104. The AC electric circuit 106 is a single-phase three-wire system.
The battery storage system 100 includes a power storage device 110 connected between an existing power generation device 108 and a load 104, a current sensor 112 provided between the power system 102 and the power generation device 108, and a current sensor 116 provided on a branch path 114 extending from the AC circuit 106 to the power generation device 108.

電流センサ112は、自システムの出力の潮流を監視するためのセンサであり、交流電路106を構成するU線及びW線に設けられたCT(Current Transformer)112u及びCT112wを含む。
電流センサ116は、発電装置108の発電電力を求めるために用いられる。電流センサ116は、分岐路114に設けられたCT116aを含む。
The current sensor 112 is a sensor for monitoring the current flow of the output of the system itself, and includes current transformers (CTs) 112u and 112w provided on the U-line and W-line constituting the AC electric circuit 106.
The current sensor 116 is used to determine the generated power of the power generation device 108. The current sensor 116 includes a CT 116a provided in the branch path 114.

発電装置108の運用形態がシングル発電の場合、発電装置108の発電と蓄電装置110の放電とは同時に行われない。よって、電流センサ112は自システムの出力の潮流を監視するために用いることが可能である。 When the power generation device 108 is in a single power generation mode, the power generation device 108 does not generate power and the storage device 110 does not discharge power at the same time. Therefore, the current sensor 112 can be used to monitor the current flow of the output of the system itself.

図10は、発電装置が設置された需要家内に蓄電池システムを設置した場合の従来の構成を示した図であって、発電装置をいわゆるダブル発電で運用する場合を示している。
ダブル発電とは、発電装置が発電電力を交流電路へ供給しているときに蓄電池システムの放電を許容する運用形態である。
ダブル発電の場合、発電装置108が発電中であっても、自システムから放電することがある。このため、自システムの出力の潮流を監視する電流センサ112は、発電装置108と、蓄電装置110との間に設けられる。また、発電装置108の発電電力を求めるために用いられる電流センサ116は、電力系統102と発電装置108との間に設けられる。
FIG. 10 is a diagram showing a conventional configuration in which a storage battery system is installed in a consumer facility in which a power generation device is installed, and shows a case in which the power generation device is operated in a so-called double power generation mode.
Double power generation is an operation mode that allows the battery system to discharge while the power generation device supplies generated power to the AC circuit.
In the case of double power generation, even when the power generation device 108 is generating power, the power may be discharged from the system. For this reason, a current sensor 112 that monitors the output flow of the system is provided between the power generation device 108 and the power storage device 110. In addition, a current sensor 116 that is used to calculate the generated power of the power generation device 108 is provided between the power grid 102 and the power generation device 108.

このように、既に発電装置が設置されている需要家に対して蓄電池システム100を追加的に設置する際、発電装置の運用形態(シングル発電及びダブル発電)が異なると、各電流センサの設置位置が異なる。
つまり、発電装置の運用形態に応じた設置位置に各電流センサを設置する必要がある。そのため、各電流センサを誤った位置に設置する等の施工ミスが発生する可能性がある。この場合、各電流センサを適切な位置に設置しなおす必要があり、設置作業が煩雑化する。
In this way, when a storage battery system 100 is additionally installed at a consumer facility where a power generation device is already installed, the installation positions of each current sensor will differ depending on the operating mode of the power generation device (single power generation or double power generation).
In other words, it is necessary to install each current sensor in a position that corresponds to the operation mode of the power generation device. Therefore, there is a possibility that construction errors such as installing each current sensor in an incorrect position may occur. In this case, it is necessary to reinstall each current sensor in an appropriate position, which makes the installation work complicated.

本開示はこのような事情に鑑みてなされたものであり、施工ミスの発生を抑制することができる蓄電池システムの提供を目的とする。 This disclosure has been made in light of these circumstances, and aims to provide a storage battery system that can reduce the occurrence of construction errors.

実施形態である蓄電池システムは、電力系統と負荷との間に発電装置が接続された交流電路に系統連系する蓄電池システムであって、前記交流電路における前記発電装置の接続点よりも前記電力系統側の部分の電流を計測する第1電流センサと、前記交流電路における前記発電装置の接続点よりも前記負荷側の部分の電流を計測する第2電流センサと、蓄電池と、前記交流電路における前記第1電流センサよりも負荷側の部分に接続され、前記蓄電池を充放電させる充放電部と、前記第1電流センサの計測値及び前記第2電流センサの計測値のうちのいずれか一方を、前記蓄電池の放電時における前記交流電路の潮流を監視するための計測値として選択する選択部と、を備える。 The battery system according to the embodiment is a battery system that is connected to an AC circuit in which a power generation device is connected between a power grid and a load, and includes a first current sensor that measures the current in a portion of the AC circuit that is closer to the power grid than the connection point of the power generation device, a second current sensor that measures the current in a portion of the AC circuit that is closer to the load than the connection point of the power generation device, a battery, a charge/discharge unit that is connected to the portion of the AC circuit that is closer to the load than the first current sensor and charges/discharges the battery, and a selection unit that selects one of the measurement values of the first current sensor and the second current sensor as a measurement value for monitoring the current flow of the AC circuit when the battery is discharging.

また、他の実施形態である蓄電池システムの制御方法は、電力系統と負荷との間に発電装置が接続された交流電路に系統連系される蓄電池を有する蓄電池システムの制御方法であって、前記交流電路における前記発電装置の接続点よりも前記電力系統側の部分の電流を計測する第1電流センサの計測値、及び、前記交流電路における前記発電装置の接続点よりも前記負荷側の部分の電流を計測する第2電流センサの計測値のうちのいずれか一方を前記蓄電池の放電時における前記交流電路を監視するための計測値として選択する選択ステップと、前記選択ステップにより選択された計測値を用いて前記蓄電池の放電制御を行う放電制御ステップと、を含む。 In another embodiment, a control method for a storage battery system is a control method for a storage battery system having a storage battery that is connected to an AC circuit in which a power generation device is connected between a power grid and a load, and includes a selection step of selecting, as a measurement value for monitoring the AC circuit when the storage battery is discharged, one of a measurement value of a first current sensor that measures the current in a portion of the AC circuit closer to the power grid than the connection point of the power generation device and a measurement value of a second current sensor that measures the current in a portion of the AC circuit closer to the load than the connection point of the power generation device, and a discharge control step of controlling the discharge of the storage battery using the measurement value selected in the selection step.

本開示は、上述の特徴的な処理であるステップをコンピュータに実行させるためのプログラムとして実現したりすることができる。 The present disclosure can be realized as a program for causing a computer to execute the steps that are the characteristic processes described above.

本開示によれば、施工ミスの発生を抑制することができる。 This disclosure makes it possible to reduce the occurrence of construction errors.

図1は、第1実施形態に係る蓄電池システムが設置された需要家内の機器構成を示す図である。FIG. 1 is a diagram showing an equipment configuration in a consumer facility in which a storage battery system according to a first embodiment is installed. 図2は、蓄電装置の構成例を示すブロック図である。FIG. 2 is a block diagram showing a configuration example of the power storage device. 図3は、リモートコントローラ(以下、「リモコン」と記す)の操作パネルの一例を示す正面図である。FIG. 3 is a front view showing an example of an operation panel of a remote controller (hereinafter, referred to as a "remote control"). 図4は、本実施形態の制御装置が行う処理の一例を示すフローチャートである。FIG. 4 is a flowchart showing an example of a process performed by the control device of the present embodiment. 図5は、液晶表示部が表示する選択画面の一例を示す図である。FIG. 5 is a diagram showing an example of a selection screen displayed on the liquid crystal display unit. 図6は、第2実施形態に係る蓄電池システムが設置された需要家内の機器構成を示す図である。FIG. 6 is a diagram showing the equipment configuration in a consumer facility in which a storage battery system according to the second embodiment is installed. 図7は、第3実施形態に係る蓄電池システムが設置された需要家内の機器構成を示す図である。FIG. 7 is a diagram showing the equipment configuration in a consumer facility in which a storage battery system according to the third embodiment is installed. 図8は、第4実施形態に係る蓄電池システムが設置された需要家内の機器構成を示す図である。FIG. 8 is a diagram showing the equipment configuration in a consumer facility in which a storage battery system according to the fourth embodiment is installed. 図9は、発電装置が設置された需要家内に蓄電池システムを設置した場合の従来の構成を示した図であって、発電装置をシングル発電で運用する場合を示している。FIG. 9 is a diagram showing a conventional configuration in which a storage battery system is installed in a consumer facility in which a power generation device is installed, and shows a case in which the power generation device is operated as a single power generation device. 図10は、発電装置が設置された需要家内に蓄電池システムを設置した場合の従来の構成を示した図であって、発電装置をダブル発電で運用する場合を示している。FIG. 10 is a diagram showing a conventional configuration in which a storage battery system is installed in a consumer facility in which a power generation device is installed, and shows a case in which the power generation device is operated in double power generation mode.

最初に実施形態の内容を列記して説明する。
[実施形態の概要]
(1)実施形態である蓄電池システムは、電力系統と負荷との間に発電装置が接続された交流電路に系統連系する蓄電池システムであって、前記交流電路における前記発電装置の接続点よりも前記電力系統側の部分の電流を計測する第1電流センサと、前記交流電路における前記発電装置の接続点よりも前記負荷側の部分の電流を計測する第2電流センサと、蓄電池と、前記交流電路における前記第1電流センサよりも負荷側の部分に接続され、前記蓄電池を充放電させる充放電部と、前記第1電流センサの計測値及び前記第2電流センサの計測値のうちのいずれか一方を、前記蓄電池の放電時における前記交流電路の潮流を監視するための計測値として選択する選択部と、を備える。
First, the contents of the embodiment will be listed and described.
[Overview of the embodiment]
(1) A storage battery system according to an embodiment is a storage battery system that is connected to an AC circuit in which a power generation device is connected between a power grid and a load, and includes a first current sensor that measures a current in a portion of the AC circuit that is closer to the power grid than a connection point of the power generation device, a second current sensor that measures a current in a portion of the AC circuit that is closer to the load than the connection point of the power generation device, a storage battery, a charge/discharge unit that is connected to the portion of the AC circuit that is closer to the load than the first current sensor and charges and discharges the storage battery, and a selection unit that selects one of the measurement value of the first current sensor and the measurement value of the second current sensor as a measurement value for monitoring the current flow of the AC circuit when the storage battery is discharging.

上記構成によれば、発電装置の接続点よりも電力系統側に第1電流センサを設け、発電装置の接続点よりも負荷側に第2電流センサを設け、選択部が選択した計測値に基づいて交流電路の潮流を監視するので、両電流センサを交流電路に設けた後、第1電流センサ及び第2電流センサのうちのいずれか一方を交流電路の潮流を監視するための電流センサとして選択することができる。さらに、他方の電流センサの計測値は、一方の電流センサの計測値とともに発電装置の発電電力を求めるために用いることができる。
つまり、センサの配置はそのままで、第1電流センサ及び第2電流センサの役割を、発電装置の運用形態(シングル発電又はダブル発電)に応じて切り替えることができる。
この結果、発電装置の運用形態に関わらず、第1電流センサ及び第2電流センサの設置位置を画一化することができ、電流センサを誤った位置に設置する等といった施工ミスの発生を抑制することができる。
なお、シングル発電とは、発電装置が発電電力を交流電路へ供給しているときには蓄電池システムの放電を制限する運用形態であり、ダブル発電とは、発電装置が発電電力を交流電路へ供給しているときに蓄電池システムの放電を許容する運用形態である。
According to the above configuration, the first current sensor is provided closer to the power grid than the connection point of the power generator, and the second current sensor is provided closer to the load than the connection point of the power generator, and the current flow in the AC circuit is monitored based on the measurement value selected by the selection unit, so that after both current sensors are provided in the AC circuit, one of the first current sensor and the second current sensor can be selected as the current sensor for monitoring the current flow in the AC circuit. Furthermore, the measurement value of the other current sensor can be used together with the measurement value of the other current sensor to determine the generated power of the power generator.
In other words, the roles of the first current sensor and the second current sensor can be switched depending on the operation mode of the power generation device (single power generation or double power generation) while leaving the sensor arrangement unchanged.
As a result, regardless of the operation form of the power generation device, the installation positions of the first current sensor and the second current sensor can be standardized, and the occurrence of construction errors such as installing the current sensor in an incorrect position can be suppressed.
Note that single power generation is an operating mode in which discharging of the battery system is restricted when the power generation device is supplying generated power to the AC circuit, and double power generation is an operating mode in which discharging of the battery system is permitted when the power generation device is supplying generated power to the AC circuit.

(2)上記蓄電池システムにおいて、前記蓄電システムの操作者による操作入力を受け付ける入力部をさらに備え、前記選択部は、前記操作入力に応じて、前記第1電流センサの計測値及び前記第2電流センサの計測値のうちのいずれか一方を選択するように構成されていてもよい。
この場合、例えば、蓄電池システムを設置する際に、発電装置の運用形態が未知であっても、両電流センサを交流電路に設けた後に、入力部に操作入力を与えることで、発電装置の運用形態に応じて潮流の監視に適切な計測値を選択することができる。
さらに、蓄電池システムを設置した後に、発電装置の運用形態をシングル発電からダブル発電、又はダブル発電からシングル発電に変更する必要が生じた場合であっても、入力部に操作入力を与えることで、発電装置の運用形態に応じて潮流の監視に適切な計測値を選択することができる。
(2) The above-mentioned storage battery system may further include an input unit that accepts operational input from an operator of the storage battery system, and the selection unit may be configured to select either the measurement value of the first current sensor or the measurement value of the second current sensor in response to the operational input.
In this case, for example, when installing the battery storage system, even if the operating mode of the power generation equipment is unknown, by providing both current sensors to the AC circuit and then providing operational input to the input unit, it is possible to select measurement values appropriate for monitoring the current according to the operating mode of the power generation equipment.
Furthermore, even if it becomes necessary to change the operation mode of the power generation equipment from single generation to double generation, or from double generation to single generation after the storage battery system is installed, by providing operational input to the input unit, it is possible to select appropriate measurement values for monitoring the tide flow according to the operation mode of the power generation equipment.

(3)上記蓄電池システムにおいて、前記第1電流センサの計測値と、前記第2電流センサの計測値とに基づいて前記発電装置の発電電力を演算する演算部と、前記発電装置の発電電力を出力する出力部と、をさらに備えていてもよい。
この場合、制御部は、第1電流センサの計測値と、第2電流センサの計測値とから得られる発電装置の発電電力をシステムの操作者へ出力することができる。
(3) The above-mentioned storage battery system may further include a calculation unit that calculates the generated power of the power generation device based on the measurement value of the first current sensor and the measurement value of the second current sensor, and an output unit that outputs the generated power of the power generation device.
In this case, the control unit can output the generated power of the power generation device obtained from the measurement value of the first current sensor and the measurement value of the second current sensor to an operator of the system.

(4)上記蓄電池システムにおいて、前記出力部は、前記発電装置の発電電力を表示出力する表示部を含んでいてもよく、この場合、発電装置の発電電力を表示により出力することができる。 (4) In the above-described storage battery system, the output unit may include a display unit that displays and outputs the power generated by the power generation device. In this case, the power generated by the power generation device can be output by display.

(5)上記蓄電池システムにおいて、前記充放電部は、前記交流電路における前記第2電流センサよりも前記負荷側の部分に接続されていてもよい。
この場合、発電装置の運用形態がシングル発電であれば、第1電流センサの計測値が逆潮を示す場合、蓄電池の放電電力が逆潮していると判断することができる。
また、発電装置の運用形態がダブル発電であれば、第2電流センサの計測値が逆潮を示す場合、蓄電池の放電電力が逆潮していると判断することができる。
よって、蓄電池の放電電力が逆潮しているか否かを適切に監視することができる。
(5) In the above storage battery system, the charge/discharge unit may be connected to a portion of the AC current path closer to the load than the second current sensor.
In this case, if the operation mode of the power generation device is single power generation, when the measurement value of the first current sensor indicates reverse flow, it can be determined that the discharged power of the storage battery is flowing reversely.
Furthermore, if the power generation device is operated in a double power generation mode, when the measurement value of the second current sensor indicates reverse power flow, it can be determined that the discharged power of the storage battery is flowing reversely.
Therefore, it is possible to appropriately monitor whether or not the discharged power of the storage battery is flowing in reverse.

(6)また、上記蓄電池システムにおいて、前記充放電部は、前記交流電路における前記第1電流センサと、前記第2電流センサとの間に接続されていてもよい。
この場合、第1電流センサの計測値から得られる電力と第2電流センサの計測値から得られる電力との差分から自システムの放電電力を減算することで、発電装置の発電電力を求めることができる。よって、発電装置の発電電力と、第1電流センサの計測値とに基づいて、蓄電池の電力が逆潮しているか否かを監視することができる。
また、交流電路の潮流を監視するための計測値を第1電流センサの計測値から第2電流センサの計測値に切り替える場合、第1電流センサの配置はそのままで、第2電流センサの配置のみを変更すれば蓄電池の電力が逆潮しているか否かを監視することができる。よって、両電流センサの設置位置を混同することが無く、両電流センサを誤った位置に設置する等といった施工ミスの発生を抑制することができる。
(6) In the storage battery system, the charge/discharge unit may be connected between the first current sensor and the second current sensor in the AC current path.
In this case, the power generated by the power generation device can be calculated by subtracting the discharge power of the system from the difference between the power obtained from the measurement value of the first current sensor and the power obtained from the measurement value of the second current sensor. Therefore, it is possible to monitor whether the power of the storage battery is flowing in reverse based on the power generated by the power generation device and the measurement value of the first current sensor.
In addition, when switching the measurement value for monitoring the power flow of the AC circuit from that of the first current sensor to that of the second current sensor, it is possible to monitor whether the power of the storage battery is flowing in reverse by changing only the position of the second current sensor while leaving the position of the first current sensor as it is. This prevents the installation positions of the two current sensors from being confused, and suppresses the occurrence of construction errors such as installing the two current sensors in the wrong positions.

(7)上記蓄電池システムにおいて、前記交流電路は、中性線を含む単相3線であり、前記第1電流センサ及び前記第2電流センサのいずれか一方は、前記中性線以外の2つの電力線を流れる電流を検出する2つのセンサ素子を含み、前記第1電流センサ及び前記第2電流センサのいずれか他方は、前記中性線以外の2つの電力線のうちの前記発電装置が接続された一方の電力線を流れる電流を検出する1つのセンサ素子を含むものであってもよい。
この場合、第1電流センサ及び第2電流センサのうち、交流電路の潮流を監視するための電流センサとして用いられる電流センサについては、2つの電力線を流れる電流を検出する必要がある。
一方、発電装置の発電電力を求めるために用いられる電流センサについては、当該発電装置が接続されている、中性線以外の2つの電力線のいずれか一方にセンサ素子を設ければ発電装置の発電電力を求めることができる。この場合、中性線以外の2つの電力線の両方にセンサ素子を設けた場合と比較して、センサ素子の数を減らすことができる。
(7) In the above storage battery system, the AC circuit may be a single-phase three-wire circuit including a neutral wire, and either the first current sensor or the second current sensor may include two sensor elements that detect current flowing through two power lines other than the neutral wire, and the other of the first current sensor or the second current sensor may include one sensor element that detects current flowing through one of the two power lines other than the neutral wire to which the power generation device is connected.
In this case, of the first current sensor and the second current sensor, the current sensor used as the current sensor for monitoring the power flow of the AC current path needs to detect the currents flowing through the two power lines.
On the other hand, for a current sensor used to calculate the power generated by a power generator, the power generated by the power generator can be calculated by providing a sensor element on one of the two power lines other than the neutral line to which the power generator is connected. In this case, the number of sensor elements can be reduced compared to when sensor elements are provided on both of the two power lines other than the neutral line.

(8)上記蓄電池システムにおいて、複数の前記発電装置を含んでいてもよく、この場合、複数の発電装置の発電電力を合算して求めることができる。 (8) The above-mentioned battery storage system may include a plurality of the power generation devices. In this case, the power generated by the plurality of power generation devices can be calculated by adding them together.

(9)また、他の実施形態である蓄電池システムの制御方法は、電力系統と負荷との間に発電装置が接続された交流電路に系統連系される蓄電池を有する蓄電池システムの制御方法であって、前記交流電路における前記発電装置の接続点よりも前記電力系統側の部分の電流を計測する第1電流センサの計測値、及び、前記交流電路における前記発電装置の接続点よりも前記負荷側の部分の電流を計測する第2電流センサの計測値のうちのいずれか一方を前記蓄電池の放電時における前記交流電路を監視するための計測値として選択する選択ステップと、前記選択ステップにより選択された計測値を用いて前記蓄電池の放電制御を行う放電制御ステップと、を含む。 (9) Another embodiment of a control method for a storage battery system is a control method for a storage battery system having a storage battery that is connected to an AC circuit in which a power generation device is connected between a power grid and a load, and includes a selection step of selecting one of a measurement value of a first current sensor that measures the current in a portion of the AC circuit that is closer to the power grid than the connection point of the power generation device and a measurement value of a second current sensor that measures the current in a portion of the AC circuit that is closer to the load than the connection point of the power generation device as a measurement value for monitoring the AC circuit when the storage battery is discharged, and a discharge control step of controlling the discharge of the storage battery using the measurement value selected by the selection step.

[実施形態の詳細]
以下、好ましい実施形態について図面を参照しつつ説明する。
なお、以下に記載する各実施形態の少なくとも一部を任意に組み合わせてもよい。
〔第1実施形態について〕
図1は、第1実施形態に係る蓄電池システムが設置された需要家内の機器構成を示す図である。
図1中、蓄電池システム1は、単相3線式の商用電力系統2と、需要家内の負荷4とを繋ぐ交流電路6に接続されている。
交流電路6は、U線、O線(中性線)、及びW線の3つの電力線を含む。
[Details of the embodiment]
Hereinafter, preferred embodiments will be described with reference to the drawings.
At least a part of each of the embodiments described below may be combined in any manner.
[Regarding the first embodiment]
FIG. 1 is a diagram showing an equipment configuration in a consumer facility in which a storage battery system according to a first embodiment is installed.
In FIG. 1, a storage battery system 1 is connected to an AC circuit 6 that connects a single-phase three-wire commercial power system 2 and a load 4 at a consumer facility.
The AC electric circuit 6 includes three power lines: a U line, an O line (neutral line), and a W line.

需要家の負荷4は、U相(U-O線間)に接続される負荷や、W相(W-O線間)に接続される負荷、U-W線間に接続される負荷を含む。
なお、以下の説明では、交流電路6において商用電力系統2側を「上流」とし、負荷4側を「下流」とする。
The consumer load 4 includes a load connected to the U phase (between the U- and O-lines), a load connected to the W phase (between the W- and O-lines), and a load connected to the U- and W-lines.
In the following description, the commercial power system 2 side of the AC circuit 6 is referred to as the "upstream" side, and the load 4 side is referred to as the "downstream" side.

交流電路6には、蓄電池システム1の他に、第1発電装置8と、第2発電装置10とが接続されている。
第1発電装置8は、例えば、太陽光発電装置であり、U-W線間に接続されている。
第2発電装置10は、例えば、燃料電池発電装置を備えた家庭用コージェネレーションシステムであり、W-O線間に接続されている。
第1発電装置8、及び第2発電装置10は、商用電力系統2に系統連系するためのパワーコンディショナ(図示省略)と、発電を行う発電部(図示省略)とを備えている。発電部が発電した電力は、交流電路6を介して負荷4へ供給するように構成されている。
In addition to the storage battery system 1 , a first power generation device 8 and a second power generation device 10 are connected to the AC circuit 6 .
The first power generation device 8 is, for example, a solar power generation device, and is connected between the UW lines.
The second power generation unit 10 is, for example, a home cogeneration system equipped with a fuel cell power generation unit, and is connected between lines W and O.
The first power generating device 8 and the second power generating device 10 each include a power conditioner (not shown) for interconnecting with the commercial power grid 2, and a power generating unit (not shown) for generating power. The power generated by the power generating unit is configured to be supplied to the load 4 via the AC circuit 6.

蓄電池システム1は、蓄電装置14と、第1電流センサ16と、第2電流センサ18と、リモコン20とを備える。
第1電流センサ16及び第2電流センサ18は、交流電路6に設けられている。
第1電流センサ16は、第1発電装置8の接続点8u,8wよりも上流側(商用電力系統2側)に設けられている。つまり、第1電流センサ16は、商用電力系統2と、第1発電装置8の接続点8u,8wとの間に設けられている。よって、第1電流センサ16は、商用電力系統2と、接続点8u,8wとの間に流れる電流を検出する。
第1電流センサ16は、U線に設けられたセンサ素子16uと、W線に設けられたセンサ素子16wとを含む。センサ素子16u,16wは、U線及びW線に流れる電流を検出する。
センサ素子16u,16wは、蓄電装置14に接続されている。センサ素子16u,16wは、電流を検出した結果を示す出力(計測値)を蓄電装置14へ与える。センサ素子16u,16wの計測値は、交流電路6(U線及びW線)に流れる電流の電流値を示す情報と、その電流の潮流を示す情報とを含む。
The storage battery system 1 includes a power storage device 14 , a first current sensor 16 , a second current sensor 18 , and a remote control 20 .
The first current sensor 16 and the second current sensor 18 are provided in the AC circuit 6 .
The first current sensor 16 is provided upstream (on the commercial power system 2 side) of the connection points 8u, 8w of the first power generation device 8. In other words, the first current sensor 16 is provided between the commercial power system 2 and the connection points 8u, 8w of the first power generation device 8. Thus, the first current sensor 16 detects the current flowing between the commercial power system 2 and the connection points 8u, 8w.
The first current sensor 16 includes a sensor element 16u provided on the U line and a sensor element 16w provided on the W line. The sensor elements 16u and 16w detect the currents flowing through the U line and the W line.
The sensor elements 16u and 16w are connected to the power storage device 14. The sensor elements 16u and 16w provide outputs (measurement values) indicating the results of detecting the current to the power storage device 14. The measurement values of the sensor elements 16u and 16w include information indicating the current value of the current flowing through the AC circuit 6 (the U line and the W line) and information indicating the power flow of the current.

第2電流センサ18は、第1発電装置8の下流側に接続されている第2発電装置10の接続点10wよりも下流側(負荷4側)に設けられている。つまり、第2電流センサ18は、接続点8u,10wと、負荷4との間に設けられている。よって、第2電流センサ18は、接続点8u,10wと、負荷4との間に流れる電流を検出する。
第2電流センサ18は、U線に設けられたセンサ素子18uと、W線に設けられたセンサ素子18wとを含む。センサ素子18u,18wは、U線及びW線に流れる電流を検出する。
センサ素子18u,18wは、蓄電装置14に接続されている。センサ素子18u,18wは、電流を検出した結果を示す出力(計測値)を蓄電装置14へ与える。センサ素子18u,18wの計測値は、交流電路6(U線及びW線)に流れる電流の電流値を示す情報と、その電流の潮流を示す情報とを含む。
The second current sensor 18 is provided downstream (toward the load 4) of the connection point 10w of the second power generation device 10 that is connected to the downstream side of the first power generation device 8. In other words, the second current sensor 18 is provided between the connection points 8u, 10w and the load 4. Therefore, the second current sensor 18 detects a current flowing between the connection points 8u, 10w and the load 4.
The second current sensor 18 includes a sensor element 18u provided on the U line and a sensor element 18w provided on the W line. The sensor elements 18u and 18w detect the currents flowing through the U line and the W line.
The sensor elements 18u and 18w are connected to the power storage device 14. The sensor elements 18u and 18w provide outputs (measurement values) indicating the results of detecting the current to the power storage device 14. The measurement values of the sensor elements 18u and 18w include information indicating the current value of the current flowing through the AC circuit 6 (the U line and the W line) and information indicating the power flow of the current.

センサ素子16u,16w,18u,18wは、例えば、クランプ式のCT(Current Transformer)等を構成する。センサ素子16u,16w,18u,18wを、クランプ式のCTとした場合、着脱が容易である。 Sensor elements 16u, 16w, 18u, and 18w may, for example, be configured as clamp-type CTs (Current Transformers). If sensor elements 16u, 16w, 18u, and 18w are configured as clamp-type CTs, they can be easily attached and detached.

蓄電装置14は、第2電流センサ18よりも下流側(負荷4側)に接続されている。つまり、蓄電装置14は、第2電流センサ18と、負荷4との間に接続されている。 The power storage device 14 is connected downstream (toward the load 4) of the second current sensor 18. In other words, the power storage device 14 is connected between the second current sensor 18 and the load 4.

図2は、蓄電装置14の構成例を示すブロック図である。
図2中、蓄電装置14は、蓄電池24と、電力変換部26と、制御装置28とを備える。
蓄電池24は、例えば、リチウムイオン電池である。蓄電池24は、電力変換部26を介して交流電路6に接続されている。
電力変換部26は、双方向性のインバータ回路とDC/DCコンバータとを内蔵する。電力変換部26は、交流電路6に接続されており、交流電路6に系統連系し、電力変換を行って蓄電池24に充放電を行わせる充放電部としての機能を有する。
電力変換部26は、蓄電池から電力を放電させる場合、直流から交流への電力変換を行う。また、電力変換部26は、蓄電池に電力を充電する場合、交流から直流への電力変換を行う。
FIG. 2 is a block diagram showing an example of the configuration of the power storage device 14. As shown in FIG.
In FIG. 2 , the power storage device 14 includes a storage battery 24 , a power conversion unit 26 , and a control device 28 .
The storage battery 24 is, for example, a lithium ion battery. The storage battery 24 is connected to the AC circuit 6 via a power conversion unit 26.
The power conversion unit 26 has a bidirectional inverter circuit and a DC/DC converter built in. The power conversion unit 26 is connected to the AC power line 6, and has a function as a charge/discharge unit that is interconnected with the AC power line 6 and performs power conversion to charge and discharge the storage battery 24.
The power conversion unit 26 performs power conversion from DC to AC when discharging power from the storage battery, and performs power conversion from AC to DC when charging power to the storage battery.

また、電力変換部26は、電力変換部26が電力変換のために検出した電圧、電流等の情報を制御装置28に与える。
制御装置28は、第1電流センサ16及び第2電流センサ18からの計測値に加え、電力変換部26からの情報に基づいて、電力変換部26を制御する。
電力変換部26からの情報には、電力変換部26と交流電路6とを繋ぐ枝線14u,14wに流れる電流の電流値や、交流電路6の電圧が含まれる。
Moreover, the power conversion unit 26 provides the control device 28 with information on the voltage, current, etc. that the power conversion unit 26 detects for power conversion.
The control device 28 controls the power conversion unit 26 based on information from the power conversion unit 26 in addition to the measured values from the first current sensor 16 and the second current sensor 18 .
The information from the power conversion unit 26 includes the current value of the current flowing through the branch lines 14 u and 14 w connecting the power conversion unit 26 and the AC circuit 6 , and the voltage of the AC circuit 6 .

制御装置28は、電力変換部26を制御し、電力変換部26による蓄電池24の充放電を制御する機能を有する。制御装置28は、第1電流センサ16及び第2電流センサ18からの計測値や、電力変換部26からの情報に基づいて、自システム1(蓄電池24)の放電電力が逆潮しないように負荷追従制御を行うように構成されている。 The control device 28 has a function of controlling the power conversion unit 26 and controlling the charging and discharging of the storage battery 24 by the power conversion unit 26. The control device 28 is configured to perform load following control based on the measurement values from the first current sensor 16 and the second current sensor 18 and information from the power conversion unit 26 so that the discharged power of the system 1 (storage battery 24) is not reversed.

制御装置28は、選択部28aと、演算部28cとを機能的に有する。
選択部28aは、第1電流センサ16の計測値及び第2電流センサ18の計測値のうちのいずれか一方を、蓄電池24の放電時における交流電路6の潮流を監視するための計測値として選択する機能を有する。
選択部28aによって選択された計測値は、蓄電池24の電力の逆潮を監視するために用いられる。
演算部28cは、第1電流センサ16及び第2電流センサ18からの計測値や、電力変換部26からの情報に基づいて、発電装置8,10の発電電力や、売買電力等、本システム1の操作者へ出力する情報を演算する機能を有する。
The control device 28 functionally includes a selection unit 28a and a calculation unit 28c.
The selection unit 28a has the function of selecting either the measurement value of the first current sensor 16 or the measurement value of the second current sensor 18 as the measurement value for monitoring the current flow in the AC circuit 6 when the storage battery 24 is discharging.
The measurement value selected by the selection unit 28 a is used to monitor the reverse flow of power from the storage battery 24 .
The calculation unit 28c has the function of calculating information to be output to the operator of the system 1, such as the generated power of the power generation devices 8, 10 and the purchased and sold power, based on the measurement values from the first current sensor 16 and the second current sensor 18 and information from the power conversion unit 26.

制御装置28は、CPU(Central Processing Unit)等のプロセッサ、及び記憶部を備えたコンピュータによって構成されていてもよいし、制御装置28が有する各機能の一部又は全部を実現可能なハードウェア回路によって構成されていてもよい。また、制御装置28は、前記コンピュータと前記ハードウェア回路とを組み合わせて構成されていてもよい。制御装置28がコンピュータを含む場合、記憶部には、CPUが実行するためのコンピュータプログラム等が記憶されている。前記CPUは、前記記憶部のようなコンピュータ読み取り可能な非一過性の記録媒体に記録された前記コンピュータプログラムを読み込むことで、制御装置28が有する上記各機能部を実現する。 The control device 28 may be configured by a computer having a processor such as a CPU (Central Processing Unit) and a storage unit, or may be configured by a hardware circuit capable of realizing some or all of the functions of the control device 28. The control device 28 may also be configured by combining the computer and the hardware circuit. When the control device 28 includes a computer, the storage unit stores a computer program to be executed by the CPU, etc. The CPU realizes each of the above-mentioned functional units of the control device 28 by reading the computer program recorded on a computer-readable non-transitory recording medium such as the storage unit.

リモコン20は、蓄電装置14に有線又は無線によって接続されており、需要家内の室内等に設置される。よって、リモコン20は蓄電装置14とは別体の筐体を有する。リモコン20は、本システム1の操作者による操作入力を受け付ける入力部20aと、各種情報を表示することで操作者へ出力する出力部20bとを有する。
図3は、リモコン20の操作パネルの一例を示す正面図である。
図3に示すように、リモコン20の操作パネル30には、操作者により操作される複数の操作スイッチを含む操作スイッチ群32と、液晶表示部34と、4つの表示切替スイッチ36とが設けられている。
入力部20a(図2)は、操作スイッチ群32と、操作スイッチ群32を制御する制御部(図示せず)を含んで構成されている。操作スイッチ群32は、操作者による操作入力を受け付ける。操作スイッチ群32の制御部は、受け付けた操作者による操作入力に対応する命令を制御装置28へ与える。
前記命令を受け付けた制御装置28は、当該命令に基づいた動作を行う。
The remote control 20 is connected to the power storage device 14 by wire or wirelessly, and is installed inside a consumer's home or the like. Therefore, the remote control 20 has a housing separate from the power storage device 14. The remote control 20 has an input unit 20a that accepts operation input by an operator of the system 1, and an output unit 20b that displays various information to output to the operator.
FIG. 3 is a front view showing an example of an operation panel of the remote control 20. As shown in FIG.
As shown in FIG. 3, an operation panel 30 of the remote control 20 is provided with an operation switch group 32 including a plurality of operation switches operated by an operator, a liquid crystal display unit 34, and four display changeover switches 36.
The input unit 20a (FIG. 2) includes an operation switch group 32 and a control unit (not shown) that controls the operation switch group 32. The operation switch group 32 accepts operation inputs by an operator. The control unit of the operation switch group 32 gives the control device 28 a command corresponding to the accepted operation input by the operator.
The control device 28 that receives the command performs an operation based on the command.

出力部20b(図2)は、操作パネル22の液晶表示部34と、4つの表示切替スイッチ36とを含んで構成されている。
液晶表示部34は、制御装置28による命令に基づいた表示を出力する。また、液晶表示部34は、制御装置28から与えられる電力に関する情報を受け付けると、電力に関する情報を表示する。4つの表示切替スイッチ36は、需要家内の発電電力、消費電力、売買電力、及び蓄電池10bの充放電電力に対応している。液晶表示部34は、4つの表示切替スイッチ36のうちいずれかが操作者により操作されると、操作された表示切替スイッチ36に対応する電力の値を表示出力する。
The output section 20b (FIG. 2) includes the liquid crystal display section 34 of the operation panel 22 and four display changeover switches 36.
The liquid crystal display unit 34 outputs a display based on a command from the control device 28. Furthermore, when the liquid crystal display unit 34 receives information related to power provided from the control device 28, it displays the information related to power. The four display changeover switches 36 correspond to the power generated in the consumer's facility, the power consumed, the power bought and sold, and the power charged and discharged by the storage battery 10b. When any of the four display changeover switches 36 is operated by an operator, the liquid crystal display unit 34 displays and outputs the power value corresponding to the operated display changeover switch 36.

演算部28cは、上述したように、第1電流センサ16及び第2電流センサ18、電力変換部26からの情報に基づいて、自システム1が設置されている需要家内における各種電力(発電電力、消費電力、売買電力、及び蓄電池24の充放電電力)それぞれの値を求める。 As described above, the calculation unit 28c calculates the values of each type of power (generated power, consumed power, purchased and sold power, and charging and discharging power of the storage battery 24) within the consumer in which the system 1 is installed, based on information from the first current sensor 16, the second current sensor 18, and the power conversion unit 26.

ここで、商用電力系統2と需要家内との間で授受される電力である系統電力Pgridは、第1電流センサ16の計測値(電流値)と、電力変換部26から得られる交流電路6の電圧とから求められる。つまり、系統電力Pgridは、センサ素子16uとセンサ素子16wの両方から求められる電力を合算することで求められる。この系統電力Pgridが売買電力を示す。 Here, the grid power Pgrid, which is the power exchanged between the commercial power grid 2 and the consumer, is calculated from the measurement value (current value) of the first current sensor 16 and the voltage of the AC circuit 6 obtained from the power conversion unit 26. In other words, the grid power Pgrid is calculated by adding up the power calculated from both the sensor element 16u and the sensor element 16w. This grid power Pgrid indicates the power being bought and sold.

また、発電装置8,10の発電電流は、第1電流センサ16の計測値が示す電流値から第2電流センサ18の計測値が示す電流値を減算することで得られる。
よって、発電装置の発電電力Ppvは、第1電流センサ16の計測値と第2電流センサ18の計測値とに基づいて得られる発電装置8,10の発電電流値と、電力変換部26から得られる交流電路6の電圧とから求められる。発電電力Ppvは、センサ素子16uとセンサ素子16wの両方から求められる電力の合算値から、センサ素子18uとセンサ素子18wの両方から求められる電力の合算値を減算することで求められる。
なお、発電電力Ppvは、第1発電装置8の発電電力と、第2発電装置10の発電電力との合算値である。
Moreover, the generated current of the power generation devices 8 and 10 is obtained by subtracting the current value indicated by the measurement value of the second current sensor 18 from the current value indicated by the measurement value of the first current sensor 16 .
Therefore, the generated power Ppv of the power generation device is calculated from the generated current value of the power generation device 8, 10 obtained based on the measurement value of the first current sensor 16 and the measurement value of the second current sensor 18, and the voltage of the AC circuit 6 obtained from the power conversion unit 26. The generated power Ppv is calculated by subtracting the combined value of the power obtained from both sensor elements 18u and 18w from the combined value of the power obtained from both sensor elements 16u and 16w.
The generated power Ppv is the sum of the generated power of the first power generating unit 8 and the generated power of the second power generating unit 10 .

蓄電池24の充放電電力Pinvは、電力変換部26から得られる。
また、負荷4の消費電力Ploadは、下記式によって求められる。
消費電力Pload = Pgrid + Ppv + Pinv
The charging/discharging power Pinv of the storage battery 24 is obtained from the power conversion unit 26 .
The power consumption Pload of the load 4 is calculated by the following formula.
Power consumption Pload = Pgrid + Ppv + Pinv

なお、上記各値Pgrid,Ppv,Pinv,Ploadは、図1中に示す矢印の方向に電流が流れる場合に正の値を示す。
つまり、系統電力Pgrid(売買電力)は、電流が順潮流の場合に正の値を示す。
また、発電電力Ppvは、発電している場合に正の値を示す。
また、充放電電力Pinvは、放電している場合に正の値を示す。
It should be noted that the above values Pgrid, Ppv, Pinv, and Pload each have a positive value when a current flows in the direction of the arrow shown in FIG.
That is, the grid power Pgrid (traded power) indicates a positive value when the current is in the forward flow.
Moreover, the generated power Ppv indicates a positive value when power is being generated.
Moreover, the charge/discharge power Pinv indicates a positive value during discharging.

演算部28cは、求めた各種電力をリモコン20の液晶表示部34に表示させる。
これにより、制御装置28は、第1電流センサ16の計測値と、第2電流センサ18の計測値とから得られる発電装置8,10の発電電力を操作者へ出力することができる。
The calculation unit 28c causes the liquid crystal display unit 34 of the remote control 20 to display the various power values thus determined.
This allows the control device 28 to output the generated power of the power generation devices 8, 10 obtained from the measurement value of the first current sensor 16 and the measurement value of the second current sensor 18 to the operator.

また、本実施形態では、第1電流センサ16と、第2電流センサ18との間に、複数の発電装置(発電装置8,10)を設けたので、第1電流センサ16及び第2電流センサ18の計測値に基づく発電電力Ppvは、第1発電装置8の発電電力と、第2発電装置10の発電電力との合算値として得ることができる。 In addition, in this embodiment, multiple power generation devices (power generation devices 8, 10) are provided between the first current sensor 16 and the second current sensor 18, so the generated power Ppv based on the measured values of the first current sensor 16 and the second current sensor 18 can be obtained as the sum of the generated power of the first power generation device 8 and the generated power of the second power generation device 10.

なお、本実施形態の第1電流センサ16及び第2電流センサ18は共にU線及びW線の両方に設けられたセンサ素子を含むので、U-W線間に接続された第1発電装置8と、W-O線間に接続された第2発電装置10とが混在して交流電路6に接続されていても、両発電装置8,10が発電した電を検出することができ、第1発電装置8の発電電力と、第2発電装置10の発電電力との合算値である発電電力Ppvを求めることができる。 In addition, since the first current sensor 16 and the second current sensor 18 in this embodiment both include sensor elements provided on both the U line and the W line, even if the first power generating device 8 connected between the U-W lines and the second power generating device 10 connected between the W-O lines are both connected to the AC circuit 6, it is possible to detect the current generated by both power generating devices 8, 10, and to calculate the generated power Ppv, which is the sum of the generated power of the first power generating device 8 and the generated power of the second power generating device 10.

図4は、本実施形態の制御装置28が行う処理の一例を示すフローチャートである。
制御装置28は、蓄電池24の充放電を状況に応じて行うが、図4では、制御装置28が、蓄電池24に電力を放電させる場合についてのみ説明する。
まず、本システム1の操作者が本システム1を停止状態から起動すると、制御装置28は、リモコン20の液晶表示部34に、発電装置8,10の運用形態がシングル発電及びダブルのいずれであるかを操作者に選択させるための選択画面を表示させ(図4中、ステップS1)、操作者による操作入力をリモコン20によって受け付ける(図4中、ステップS2)。
FIG. 4 is a flowchart showing an example of a process performed by the control device 28 of the present embodiment.
The control device 28 charges and discharges the storage battery 24 depending on the situation, but FIG. 4 only describes a case where the control device 28 causes the storage battery 24 to discharge power.
First, when an operator of the system 1 starts up the system 1 from a stopped state, the control device 28 causes the liquid crystal display unit 34 of the remote control 20 to display a selection screen for allowing the operator to select whether the operation mode of the power generation units 8, 10 is single power generation or double power generation (step S1 in Figure 4), and accepts operation input by the operator via the remote control 20 (step S2 in Figure 4).

図5は、液晶表示部34が表示する選択画面の一例を示す図である。
図5中の選択画面40は、一方の選択肢である「シングル発電」を示すシングル発電表示40aと、他方の選択肢である「ダブル発電」を示すダブル発電表示40bとを含む。両表示40a,40bのいずれか一方には、その一方が選択されていることを示す選択表示40cが表示される。
選択表示40cは、両表示40a,40bのいずれか一方の周囲を囲む矩形状の表示である。図5では、シングル発電表示40aが選択表示40cに囲まれており、シングル発電表示40aが選択されていることを示している。
選択表示40cは、操作者による操作スイッチ群32の操作により、両表示40a,40bのいずれかを選択した状態に切り替えることができる。
FIG. 5 is a diagram showing an example of a selection screen displayed on the liquid crystal display unit 34. As shown in FIG.
5 includes a single power generation display 40a indicating one option, "single power generation," and a double power generation display 40b indicating the other option, "double power generation." Either one of the displays 40a, 40b has a selection display 40c indicating that the other one has been selected.
The selection display 40c is a rectangular display surrounding either one of the displays 40a, 40b. In Fig. 5, the single power generation display 40a is surrounded by the selection display 40c, which indicates that the single power generation display 40a is selected.
The selection display 40c can be switched by the operator operating the operation switch group 32 to select either of the displays 40a, 40b.

シングル発電表示40aが選択されている場合に、選択を確定する操作を操作者が行うと、操作スイッチ群32を制御する制御部は、シングル発電表示40aが選択されたことを示す情報を制御装置28へ与える。また、ダブル発電表示40bが選択されている場合に、選択を確定する操作を操作者が行うと、前記制御部は、ダブル発電表示40bが選択されたことを示す情報を制御装置28へ与える。
このように、本システム1は、発電装置8,10の運用形態がシングル発電及びダブルのいずれであるかを操作者に選択させるための選択画面を液晶表示部34に表示させ、操作者によって選択された操作入力(シングル発電又はダブル発電)を操作スイッチ群32によって受け付ける。
ここでは、シングル発電が選択された場合について説明する。
When the operator performs an operation to confirm the selection while the single power generation display 40a is selected, the control unit that controls the operation switch group 32 provides information indicating that the single power generation display 40a has been selected to the control device 28. Also, when the operator performs an operation to confirm the selection while the double power generation display 40b is selected, the control unit provides information indicating that the double power generation display 40b has been selected to the control device 28.
In this way, the present system 1 displays a selection screen on the LCD display unit 34 to allow the operator to select whether the operation mode of the power generation devices 8, 10 is single generation or double generation, and accepts the operation input selected by the operator (single generation or double generation) via the operation switch group 32.
Here, a case where single power generation is selected will be described.

なお、シングル発電とは、発電装置8,10が発電電力を交流電路6へ供給しているときには蓄電池システム1の放電を制限する運用形態である。
また、ダブル発電とは、発電装置8,10が発電電力を交流電路6へ供給しているときに蓄電池システム1の放電を許容する運用形態である。なお、いずれの運用形態の場合も、蓄電池24の放電電力が商用電力系統2への逆潮は制限される。
発電装置8,10の運用は、商用電力系統2を管理する電力会社との契約等によって定まる。
Note that single power generation refers to an operation mode in which discharging of the storage battery system 1 is restricted when the power generation devices 8 and 10 are supplying generated power to the AC power circuit 6 .
Further, double power generation is an operation mode in which the storage battery system 1 is permitted to discharge while the power generation devices 8 and 10 are supplying generated power to the AC circuit 6. In either operation mode, reverse flow of the discharged power of the storage battery 24 to the commercial power grid 2 is restricted.
The operation of the power generation devices 8 and 10 is determined by a contract or the like with the electric power company that manages the commercial power system 2 .

図4に戻って、ステップS2においてシングル発電を選択する旨の操作入力を受け付けると、制御装置28の選択部28aは、交流電路6の潮流監視に用いるセンサとして第1電流センサ16を選択する(図4中、ステップS3)。
選択部28aは、以降の処理において、第1電流センサ16の計測値を交流電路6の潮流監視に用いる計測値として用いる。
なお、ステップS2においてダブル発電を選択する旨の操作入力を受け付けると、制御装置28の選択部28aは、交流電路6の潮流監視に用いるセンサとして第2電流センサ18を選択する。
Returning to FIG. 4, when an operational input to select single power generation is received in step S2, the selection unit 28a of the control device 28 selects the first current sensor 16 as the sensor to be used for monitoring the current of the AC power path 6 (step S3 in FIG. 4).
In the subsequent processes, the selector 28 a uses the measurement value of the first current sensor 16 as the measurement value to be used for monitoring the power flow of the AC power line 6 .
When an operational input to select double power generation is received in step S2, the selector 28a of the control device 28 selects the second current sensor 18 as the sensor to be used for monitoring the power flow of the AC power path 6.

次いで、制御装置28は、第1電流センサ16及び第2電流センサ18の計測値や、電力変換部26からの情報を取得し(図4中、ステップS4)、蓄電池24に放電を行わせる(ステップS5)。
制御装置28は、ステップS4で得た計測値や電力変換部26からの情報に基づいて、蓄電池24の放電制御を行う。
Next, the control device 28 acquires the measured values of the first current sensor 16 and the second current sensor 18 and information from the power conversion unit 26 (step S4 in FIG. 4), and causes the storage battery 24 to discharge (step S5).
The control device 28 controls the discharge of the storage battery 24 based on the measurement values obtained in step S4 and information from the power conversion unit 26.

ステップS5において、制御装置28は、蓄電池24の放電電力が逆潮しないように負荷追従制御を行う。
この場合、制御装置28は、選択部28aが潮流監視用センサとして選択した第1電流センサ16の計測値に基づいて蓄電池24の放電制御を行う。
ここでは、シングル発電が選択されているので、蓄電池24の放電を行う場合、発電装置8,10は原則として発電を行っていない。よって、制御装置28は、第1電流センサ16の計測値が示す潮流が逆潮流とならないように制御を行う。第1電流センサ16の計測値が示す潮流が逆潮流となる場合、蓄電池24の放電電力が逆潮していることを示すからである。
In step S5, the control device 28 performs load following control so that the discharged power of the storage battery 24 does not flow backward.
In this case, the control device 28 controls the discharge of the storage battery 24 based on the measurement value of the first current sensor 16 selected by the selector 28a as the power flow monitoring sensor.
Here, since single power generation is selected, the power generation devices 8 and 10 are not generating power in principle when discharging the storage battery 24. Therefore, the control device 28 performs control so that the power flow indicated by the measurement value of the first current sensor 16 does not become a reverse power flow. This is because if the power flow indicated by the measurement value of the first current sensor 16 becomes a reverse power flow, this indicates that the discharged power of the storage battery 24 is flowing in reverse.

例えば、制御装置28は、第1電流センサ16の計測値が負荷4の消費電力Ploadの5%以上の範囲で順潮流となるように蓄電池24の放電を制御する。これにより、制御する上で生じる誤差等によって蓄電池24の放電電力が逆潮してしまうのを抑制することができる。 For example, the control device 28 controls the discharge of the storage battery 24 so that the measured value of the first current sensor 16 is in the range of 5% or more of the power consumption Pload of the load 4, resulting in a forward current flow. This makes it possible to prevent the discharged power of the storage battery 24 from flowing in reverse due to errors that occur during control.

ここで、シングル発電が選択される場合に、選択部28aによって第1電流センサ16(の計測値)が選択されるのは、交流電路6の潮流の監視は商用電力系統2により近い箇所で行われるのが好ましいからである。
シングル発電が選択される場合において、第2電流センサ18よりも上流側である第1電流センサ16が潮流監視用センサとして選択されるので、仮に発電装置8,10が発電しているときに蓄電池24に放電させてしまったとしても、第1電流センサ16の計測値に基づいて、蓄電池24の放電電力が逆潮しているか否かを判定することができる。
このような理由から、シングル発電が選択される場合には、選択部28aによって第1電流センサ16が選択される。
Here, when single power generation is selected, the selection unit 28a selects the first current sensor 16 (its measurement value) because it is preferable to monitor the power flow of the AC circuit 6 at a location closer to the commercial power system 2.
When single power generation is selected, the first current sensor 16, which is upstream of the second current sensor 18, is selected as the sensor for monitoring the power flow. Therefore, even if the power generation devices 8, 10 are discharging power into the storage battery 24 while generating power, it is possible to determine whether the discharged power of the storage battery 24 is flowing in reverse based on the measurement value of the first current sensor 16.
For this reason, when single power generation is selected, the first current sensor 16 is selected by the selection unit 28a.

ステップS5を終えると、制御装置28は、再度ステップS4へ戻り、同様の処理を繰り返す。
このようにして、制御装置28は、電力変換部26による蓄電池24の放電を制御する。
After completing step S5, the control device 28 returns to step S4 and repeats the same process.
In this manner, the control device 28 controls the discharging of the storage battery 24 by the power conversion unit 26 .

上記説明では、シングル発電が選択された場合について説明したが、ダブル発電が選択された場合について、以下説明する。
上述したように、ステップS2においてダブル発電を選択する旨の操作入力を受け付けると、制御装置28の選択部28aは、第2電流センサ18を交流電路6の潮流監視に用いるセンサとして選択する(図4中、ステップS3)。
選択部28aは、以降の処理において、第2電流センサ18の計測値を交流電路6の潮流監視に用いる計測値として用いる。
In the above description, the case where single power generation is selected has been described. The case where double power generation is selected will now be described.
As described above, when an operational input to select double power generation is received in step S2, the selection unit 28a of the control device 28 selects the second current sensor 18 as the sensor to be used for monitoring the current of the AC circuit 6 (step S3 in Figure 4).
In the subsequent processes, the selector 28 a uses the measurement value of the second current sensor 18 as the measurement value to be used for monitoring the power flow of the AC power line 6 .

次いで、制御装置28の制御装置28は、第1電流センサ16及び第2電流センサ18の計測値や、電力変換部26からの情報を取得し(図4中、ステップS4)、蓄電池24に放電を行わせる(ステップS5)。 Next, the control device 28 of the control device 28 acquires the measured values of the first current sensor 16 and the second current sensor 18 and information from the power conversion unit 26 (step S4 in FIG. 4), and causes the storage battery 24 to discharge (step S5).

ステップS5において、制御装置28は、蓄電池24の放電電力が逆潮しないように負荷追従制御を行う。
この場合、制御装置28は、選択部28aが潮流監視用センサとして選択した第2電流センサ18の計測値に基づいて蓄電池24の放電制御を行う。
第2電流センサ18の下流側には、蓄電装置14及び負荷4が接続されている。よって、制御装置28は、第2電流センサ18が示す潮流が逆潮とならないように制御を行う。発電装置8,10の発電電力に関わらず、第2電流センサ18が示す計測値が逆潮流となる場合、蓄電池24の放電電力が逆潮していることを示すからである。
よって、ダブル発電が選択される場合には、選択部28aによって第2電流センサ18が選択される。
In step S5, the control device 28 performs load following control so that the discharged power of the storage battery 24 does not flow backward.
In this case, the control device 28 controls the discharge of the storage battery 24 based on the measurement value of the second current sensor 18 selected by the selection unit 28a as the power flow monitoring sensor.
The power storage device 14 and the load 4 are connected downstream of the second current sensor 18. Therefore, the control device 28 performs control so that the power flow indicated by the second current sensor 18 does not become reverse power. This is because, regardless of the generated power of the power generation devices 8, 10, if the measured value indicated by the second current sensor 18 becomes reverse power flow, it indicates that the discharged power of the storage battery 24 is flowing reversely.
Therefore, when double power generation is selected, the second current sensor 18 is selected by the selection unit 28a.

ダブル発電が選択された場合も、制御装置28は、第2電流センサ18の計測値が負荷4の消費電力Ploadの5%以上の範囲で順潮流となるように蓄電池24の放電を制御する。 Even when double power generation is selected, the control device 28 controls the discharge of the storage battery 24 so that the measurement value of the second current sensor 18 is in the range of 5% or more of the power consumption Pload of the load 4 and the forward current flow is achieved.

上記のように構成された蓄電池システム1によれば、第1発電装置8の接続点8u,8wよりも商用電力系統2側に第1電流センサ16を設け、第2発電装置10の接続点10wよりも負荷4側に第2電流センサ18を設け、選択部28aが選択した計測値に基づいて交流電路6の潮流を監視するので、両電流センサ16,18を交流電路6に設けた後、第1電流センサ16及び第2電流センサ18のうちのいずれか一方を交流電路6の潮流を監視するための電流センサとして選択することができる。さらに、他方の電流センサの計測値は、一方の電流センサの計測値とともに発電装置8,10の発電電力を求めるために用いることができる。
つまり、第1電流センサ16及び第2電流センサ18の配置はそのままで、第1電流センサ16及び第2電流センサ18の役割を、発電装置8,10の運用形態(シングル発電又はダブル発電)に応じて切り替えることができる。
この結果、発電装置8,10の運用形態に関わらず、第1電流センサ16及び第2電流センサ18の設置位置を画一化することができ、電流センサを誤った位置に設置する等といった施工ミスの発生を抑制することができる。
According to the storage battery system 1 configured as described above, the first current sensor 16 is provided on the commercial power system 2 side of the connection points 8u, 8w of the first power generation device 8, the second current sensor 18 is provided on the load 4 side of the connection point 10w of the second power generation device 10, and the current flow of the AC circuit 6 is monitored based on the measurement value selected by the selection unit 28a, so that after both current sensors 16, 18 are provided on the AC circuit 6, either one of the first current sensor 16 and the second current sensor 18 can be selected as the current sensor for monitoring the current flow of the AC circuit 6. Furthermore, the measurement value of the other current sensor can be used, together with the measurement value of one current sensor, to obtain the generated power of the power generation devices 8, 10.
In other words, the positions of the first current sensor 16 and the second current sensor 18 can be left unchanged, but the roles of the first current sensor 16 and the second current sensor 18 can be switched depending on the operation mode (single power generation or double power generation) of the power generation devices 8, 10.
As a result, regardless of the operation form of the power generation devices 8, 10, the installation positions of the first current sensor 16 and the second current sensor 18 can be standardized, thereby preventing the occurrence of construction errors such as installing the current sensor in an incorrect position.

すなわち、蓄電池システム1を需要家内に設置するには、第1電流センサ16を発電装置8,10よりも商用電力系統2側に設け、第2電流センサ18を発電装置8,10よりも負荷4側に設け、両電流センサ16,18を設けた後、制御装置28に対して、第1電流センサ16の計測値及び第2電流センサ18の計測値のうちのいずれか一方を選択させるための入力を与え、選択部28aに第1電流センサ16の計測値及び第2電流センサ18の計測値のうちのいずれか一方を蓄電池24の放電の制御に用いる計測値として選択させればよい。 In other words, to install the storage battery system 1 at a consumer's facility, the first current sensor 16 is provided closer to the commercial power grid 2 than the power generation devices 8 and 10, and the second current sensor 18 is provided closer to the load 4 than the power generation devices 8 and 10. After providing both current sensors 16 and 18, an input is given to the control device 28 to select either the measurement value of the first current sensor 16 or the measurement value of the second current sensor 18, and the selection unit 28a is caused to select either the measurement value of the first current sensor 16 or the measurement value of the second current sensor 18 as the measurement value to be used in controlling the discharge of the storage battery 24.

また、本実施形態では、選択部28aが、入力部20a(操作スイッチ群32)によって受け付けられる操作者による操作入力に応じて、第1電流センサ16の計測値及び第2電流センサ18の計測値のうち、いずれか一方を電力変換部26の放電制御に用いる計測値として選択するように構成されている。
このため、例えば、発電装置8,10すでに設置されている需要家内に、蓄電池システム1を設置する際に、発電装置8,10の運用形態が未知であっても、両電流センサ16,18を交流電路6に設けた後、操作スイッチ群32に操作入力を与えることで、発電装置の運用形態に応じて潮流の監視に適切な計測値(電流センサ)を選択することができる。
さらに、蓄電池システムを設置した後に、発電装置の運用形態をシングル発電からダブル発電、又はダブル発電からシングル発電に変更する必要が生じた場合であっても、操作スイッチ群32に操作入力を与えることで、発電装置8,10の運用に応じて潮流の監視に適切な計測値(電流センサ)を選択することができる。
In addition, in this embodiment, the selection unit 28a is configured to select either the measurement value of the first current sensor 16 or the measurement value of the second current sensor 18 as the measurement value to be used for discharge control of the power conversion unit 26, in response to an operational input by an operator received by the input unit 20a (operation switch group 32).
Therefore, for example, when installing the storage battery system 1 at a consumer's premises where power generation devices 8, 10 are already installed, even if the operation mode of the power generation devices 8, 10 is unknown, by providing both current sensors 16, 18 to the AC circuit 6 and then providing operational input to the operation switch group 32, it is possible to select a measurement value (current sensor) appropriate for monitoring the current depending on the operation mode of the power generation devices.
Furthermore, even if it becomes necessary to change the operation mode of the power generation equipment from single generation to double generation, or from double generation to single generation after the storage battery system is installed, by providing operational input to the operation switch group 32, it is possible to select a measurement value (current sensor) appropriate for monitoring the tidal current in accordance with the operation of the power generation equipment 8, 10.

また、本実施形態では、電力変換部26が第2電流センサ18と負荷4との間に接続されており、第2電流センサ18よりも下流側(負荷4側)に接続されている。
この場合、発電装置8,10の運用形態がシングル発電であれば、第1電流センサ16の計測値が逆潮を示す場合、蓄電池24の放電電力が逆潮していると判断できる。また、発電装置8,10の運用形態がダブル発電であれば、第2電流センサ18の計測値が逆潮を示す場合、蓄電池24の放電電力が逆潮していると判断できる。
よって、蓄電池24の放電電力が逆潮しているか否かを適切に監視することができる。
In addition, in this embodiment, the power conversion unit 26 is connected between the second current sensor 18 and the load 4 , and is connected downstream of the second current sensor 18 (on the load 4 side).
In this case, if the operation mode of the power generation devices 8, 10 is single power generation, when the measurement value of the first current sensor 16 indicates reverse flow, it can be determined that the discharged power of the storage battery 24 is reverse flow. Also, if the operation mode of the power generation devices 8, 10 is double power generation, when the measurement value of the second current sensor 18 indicates reverse flow, it can be determined that the discharged power of the storage battery 24 is reverse flow.
Therefore, it is possible to appropriately monitor whether or not the discharged power of the storage battery 24 is flowing in reverse.

〔第2実施形態について〕
図6は、第2実施形態に係る蓄電池システム1が設置された需要家内の機器構成を示す図である。
本実施形態では、蓄電装置14が第2発電装置10と第2電流センサ18との間に接続されている点において、第1実施形態と相違する。
[Regarding the second embodiment]
FIG. 6 is a diagram showing the equipment configuration in a consumer facility in which a storage battery system 1 according to the second embodiment is installed.
This embodiment differs from the first embodiment in that the power storage device 14 is connected between the second power generation device 10 and a second current sensor 18 .

本実施形態では、発電装置8,10とともに蓄電装置14が第1電流センサ16と第2電流センサ18との間に接続されている。
この場合、発電装置8,10の発電電力Ppvは、第1電流センサ16の計測値に基づく電流値から、第2電流センサ18の計測値に基づく電流値と、蓄電装置14から放電される電流の電流値とを減算することで得られる電流値を用いて求めることができる。
In this embodiment, the power generation devices 8 and 10 as well as the power storage device 14 are connected between the first current sensor 16 and the second current sensor 18 .
In this case, the generated power Ppv of the power generation devices 8, 10 can be calculated using a current value obtained by subtracting the current value based on the measurement value of the second current sensor 18 and the current value of the current discharged from the storage device 14 from the current value based on the measurement value of the first current sensor 16.

よって、シングル発電の場合、発電装置8,10の発電電力と、第1電流センサ16の計測値に基づいて、蓄電池24の電力が逆潮しているか否かを監視することができる。
また、発電装置8,10の運用形態をシングル発電からダブル発電に変更することに応じて、交流電路6の潮流を監視するための電流センサを第1電流センサ16から第2電流センサ18に切り替える場合、第2電流センサ18の位置を蓄電装置14の下流側に配置する必要がある。
本実施形態では、第1電流センサ16の配置はそのままで、第2電流センサ18の配置を変更すれば、蓄電池24の放電電力の潮流を監視することができる。よって、両電流センサ16,18の設置位置を混同することが無く、両電流センサ16,18を誤った位置に設置する等といった施工ミスの発生を抑制することができる。
Therefore, in the case of single power generation, it is possible to monitor whether or not the power of the storage battery 24 is flowing in reverse, based on the power generated by the power generation devices 8 and 10 and the measurement value of the first current sensor 16 .
In addition, when changing the operational mode of the power generation devices 8, 10 from single power generation to double power generation and switching the current sensor for monitoring the current flow of the AC circuit 6 from the first current sensor 16 to the second current sensor 18, it is necessary to position the second current sensor 18 downstream of the storage device 14.
In this embodiment, by changing the location of the second current sensor 18 while leaving the location of the first current sensor 16 unchanged, it is possible to monitor the flow of discharged power from the storage battery 24. Therefore, there is no confusion about the installation positions of the two current sensors 16, 18, and it is possible to suppress the occurrence of construction errors such as installing the two current sensors 16, 18 in incorrect positions.

〔第3実施形態について〕
図7は、第3実施形態に係る蓄電池システム1が設置された需要家内の機器構成を示す図である。
本実施形態では、第2発電装置10がU-W線間に接続されている点、及び、第2電流センサ18が、センサ素子18uのみを含んで構成されている点において、第1実施形態と相違する。
[Regarding the third embodiment]
FIG. 7 is a diagram showing an equipment configuration in a consumer facility in which a storage battery system 1 according to the third embodiment is installed.
This embodiment differs from the first embodiment in that a second power generating device 10 is connected between the UW lines, and in that a second current sensor 18 includes only a sensor element 18u.

図7では、発電装置8,10の運用形態がシングル発電であり、第1電流センサ16が交流電路6の潮流を監視するための電流センサとして選択されている。
本実施形態において、第1電流センサ16は、O線(中性線)以外の2つの電力線を流れる電流を検出する2つのセンサ素子16u,16wを含んでいる。また、発電装置8,10の発電電力を求めるために用いられる第2電流センサ18は、発電装置8,10が接続されたU線を流れる電流を検出する1つのセンサ素子18uを含んでいる。
In FIG. 7 , the operation mode of the power generation devices 8 and 10 is single power generation, and the first current sensor 16 is selected as the current sensor for monitoring the power flow of the AC power line 6 .
In this embodiment, the first current sensor 16 includes two sensor elements 16u and 16w that detect the currents flowing through the two power lines other than the O line (neutral line). The second current sensor 18 used to calculate the power generated by the power generation devices 8 and 10 includes one sensor element 18u that detects the current flowing through the U line to which the power generation devices 8 and 10 are connected.

本実施形態では、第1発電装置8及び第2発電装置10が共にU-W線間に接続されているので、第2電流センサ18がセンサ素子18uのみを含んだ構成であっても、第1電流センサ16(センサ素子16u,16w)の計測値に基づく電流値と、第2電流センサ18(センサ素子18u)の計測値に基づく電流値との差分から発電装置8,10の発電電力Ppvを求めることができる。 In this embodiment, since the first power generating device 8 and the second power generating device 10 are both connected between the U-W lines, even if the second current sensor 18 includes only the sensor element 18u, the power generation power Ppv of the power generating devices 8 and 10 can be calculated from the difference between the current value based on the measurement value of the first current sensor 16 (sensor elements 16u, 16w) and the current value based on the measurement value of the second current sensor 18 (sensor element 18u).

このように、交流電路6の潮流を監視するための電流センサとして用いられる電流センサ(第1電流センサ16)については、U線及びW線を流れる電流を検出する必要がある。
一方、発電装置8,10の発電電力を求めるために用いられる電流センサ(第2電流センサ18)については、当該発電装置8,10が接続されている、中性線以外の2つの電力線(U線又はW線)のいずれか一方にセンサ素子を設ければ発電装置8,10の発電電力を求めることができる。
よって、本実施形態によれば、第1実施形態のように、第1電流センサ16及び第2電流センサ18の両方がU線及びW線を流れる電流を検出するセンサ素子16u,16w,18u,18wを含む場合と比較して、センサ素子の数を減らすことができる。
In this manner, the current sensor (first current sensor 16) used as a current sensor for monitoring the power flow of the AC power line 6 needs to detect the current flowing through the U line and the W line.
On the other hand, with regard to the current sensor (second current sensor 18) used to determine the power generated by the power generation devices 8, 10, the power generated by the power generation devices 8, 10 can be determined by providing a sensor element in either one of the two power lines (U line or W line) other than the neutral line to which the power generation devices 8, 10 are connected.
Therefore, according to this embodiment, the number of sensor elements can be reduced compared to the first embodiment, in which both the first current sensor 16 and the second current sensor 18 include sensor elements 16u, 16w, 18u, and 18w that detect the currents flowing through the U line and the W line.

なお、発電装置8,10の運用形態をシングル発電からダブル発電に変更することに応じて、交流電路6の潮流を監視するための電流センサを第1電流センサ16から第2電流センサ18に切り替える場合、W線に設けられるセンサ素子18wを第2電流センサ18の構成として加える必要がある。
これに対して、本実施形態では、第1電流センサ16及び第2電流センサ18のセンサ素子18uの配置はそのままで、センサ素子18wを設ければよいので、両電流センサ16,18の設置位置を混同することが無く、両電流センサ16,18を誤った位置に設置する等といった施工ミスの発生を抑制することができる。
In addition, when the operational mode of the power generation devices 8, 10 is changed from single power generation to double power generation and the current sensor for monitoring the current flow of the AC circuit 6 is switched from the first current sensor 16 to the second current sensor 18, it is necessary to add a sensor element 18w provided on the W line as a component of the second current sensor 18.
In contrast, in the present embodiment, the arrangement of the sensor elements 18u of the first current sensor 16 and the second current sensor 18 remains the same, and only the sensor element 18w is provided, so there is no confusion about the installation positions of the two current sensors 16, 18, and the occurrence of construction errors such as installing the two current sensors 16, 18 in incorrect positions can be suppressed.

〔第4実施形態について〕
図8は、第4実施形態に係る蓄電池システム1が設置された需要家内の機器構成を示す図である。
本実施形態では、発電装置11がW-O線間に接続されている点、及び、第1電流センサ16が、センサ素子16wのみを含んで構成されている点において、第1実施形態と相違する。
[Regarding the Fourth Embodiment]
FIG. 8 is a diagram showing the equipment configuration in a consumer facility in which a storage battery system 1 according to the fourth embodiment is installed.
This embodiment differs from the first embodiment in that the power generation device 11 is connected between the lines W and O, and in that the first current sensor 16 is configured to include only a sensor element 16w.

図8では、発電装置11の運用形態がダブル発電であり、第2電流センサ18が交流電路6の潮流を監視するための電流センサとして選択されている。
本実施形態において、第2電流センサ18は、O線(中性線)以外の2つの電力線を流れる電流を検出する2つのセンサ素子18u,18wを含んでいる。また、発電装置11の発電電力を求めるために用いられる第1電流センサ16は、発電装置11が接続されたW線を流れる電流を検出する1つのセンサ素子16wを含んでいる。
In FIG. 8 , the operation mode of the power generation device 11 is double power generation, and the second current sensor 18 is selected as the current sensor for monitoring the power flow of the AC power line 6 .
In this embodiment, the second current sensor 18 includes two sensor elements 18u and 18w that detect the currents flowing through the two power lines other than the O line (neutral line). The first current sensor 16 used to calculate the power generated by the power generation device 11 includes one sensor element 16w that detects the current flowing through the W line to which the power generation device 11 is connected.

本実施形態では、発電装置11がW-O線間に接続されているので、第1電流センサ16がセンサ素子16wのみを含んだ構成であっても、第1電流センサ16(センサ素子16w)の計測値に基づく電流値と、第2電流センサ18(センサ素子18w)の計測値に基づく電流値との差分から発電装置11の発電電力Ppvを求めることができる。 In this embodiment, since the power generation device 11 is connected between the W-O lines, even if the first current sensor 16 includes only the sensor element 16w, the power generation power Ppv of the power generation device 11 can be calculated from the difference between the current value based on the measurement value of the first current sensor 16 (sensor element 16w) and the current value based on the measurement value of the second current sensor 18 (sensor element 18w).

本実施形態の場合も、第3実施形態と同様、第1電流センサ16及び第2電流センサ18の両方がU線及びW線を流れる電流を検出するセンサ素子16u,16w,18u,18wを含む場合と比較して、センサ素子の数を減らすことができる。 In the case of this embodiment, as in the third embodiment, the number of sensor elements can be reduced compared to the case where both the first current sensor 16 and the second current sensor 18 include sensor elements 16u, 16w, 18u, and 18w that detect the currents flowing through the U line and the W line.

なお、本実施形態においても、発電装置11の運用形態をダブル発電からシングル発電に変更することに応じて、交流電路6の潮流を監視するための電流センサを第2電流センサ18から第1電流センサ16に切り替える場合、第1電流センサ16のセンサ素子16w及び第2電流センサ18の配置はそのままで、第1電流センサ16にU線の電流を検出するセンサ素子16uを設ければよいので、両電流センサ16,18の設置位置を混同することが無く、両電流センサ16,18を誤った位置に設置する等といった施工ミスの発生を抑制することができる。 In this embodiment, when the current sensor for monitoring the current flow of the AC circuit 6 is switched from the second current sensor 18 to the first current sensor 16 in response to changing the operating mode of the power generation device 11 from double power generation to single power generation, the arrangement of the sensor element 16w of the first current sensor 16 and the second current sensor 18 remains the same, and a sensor element 16u for detecting the current of the U line is provided in the first current sensor 16. This prevents confusion over the installation positions of the two current sensors 16, 18, and suppresses the occurrence of construction errors such as installing the two current sensors 16, 18 in the wrong positions.

〔その他〕
なお、今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。
上記各実施形態では、単相3線式の商用電力系統2に系統連系する場合を示したが、単相2線式の電力系統に系統連系するように構成することもできる。
〔others〕
It should be noted that the embodiments disclosed herein are illustrative in all respects and are not restrictive.
In each of the above embodiments, the case where the system is interconnected to a single-phase three-wire commercial power system 2 has been described, but the system may also be configured to be interconnected to a single-phase two-wire power system.

また、上記各実施形態では、選択部28aが、入力部20a(操作スイッチ群32)によって受け付けられる操作者による操作入力に応じて、第1電流センサ16の計測値及び第2電流センサ18の計測値のうち、いずれか一方を電力変換部26の放電制御に用いる計測値として選択するように構成した場合を示した。しかし、これに限定されるものではない。例えば、蓄電装置14が、リモコン20以外の外部装置との間で通信を行うためのモバイル通信等の通信装置を備えていれば、選択部28aに、通信装置を介して外部装置から与えられる命令に応じて、第1電流センサ16の計測値及び第2電流センサ18の計測値のうちのいずれか一方を選択させるという構成とすることもできる。 In addition, in each of the above embodiments, the selection unit 28a is configured to select one of the measurement values of the first current sensor 16 and the measurement value of the second current sensor 18 as the measurement value to be used for the discharge control of the power conversion unit 26 in response to an operation input by an operator received by the input unit 20a (operation switch group 32). However, this is not limited to this. For example, if the power storage device 14 is equipped with a communication device such as a mobile communication device for communicating with an external device other than the remote control 20, the selection unit 28a can be configured to select one of the measurement values of the first current sensor 16 and the measurement value of the second current sensor 18 in response to a command given from the external device via the communication device.

また、上記各実施形態では、出力部20bが、液晶表示部34による表示によって電力の値を出力した場合を例示したが、スピーカやプリンタ等を有する場合には、音声や印刷によって電力の値を出力してもよい。さらに、電力の値を表示する表示部は、液晶デバイス以外の表示デバイスを備える構成であってもよい。 In addition, in each of the above embodiments, the output unit 20b outputs the power value by displaying it on the liquid crystal display unit 34, but if a speaker, printer, or the like is provided, the power value may be output by voice or printing. Furthermore, the display unit that displays the power value may be configured to include a display device other than a liquid crystal device.

本発明の範囲は、上記した意味ではなく、請求の範囲によって示され、請求の範囲と均等の意味、及び範囲内でのすべての変更が含まれることが意図される。 The scope of the present invention is indicated by the claims, not by the meaning described above, and is intended to include all modifications within the scope of the claims and meanings equivalent thereto.

1 蓄電池システム
2 商用電力系統
4 負荷
6 交流電路
8 第1発電装置
8u 接続点
8w 接続点
10 第2発電装置
10b 蓄電池
10w 接続点
11 発電装置
14 蓄電装置
14u 枝線
14w 枝線
16 第1電流センサ
16u センサ素子
16w センサ素子
18 第2電流センサ
18u センサ素子
18w センサ素子
20 リモコン
20a 入力部
20b 出力部
22 操作パネル
24 蓄電池
26 電力変換部(充放電部)
28 制御装置
28a 選択部
28c 演算部
30 操作パネル
32 操作スイッチ群
34 液晶表示部
36 表示切替スイッチ
40 選択画面
40a シングル発電表示
40b ダブル発電表示
40c 選択表示
Pgrid 系統電力
Pinv 充放電電力
Pload 消費電力
Ppv 発電電力
1 Storage battery system 2 Commercial power system 4 Load 6 AC circuit 8 First power generation device 8u Connection point 8w Connection point 10 Second power generation device 10b Storage battery 10w Connection point 11 Power generation device 14 Storage battery 14u Branch line 14w Branch line 16 First current sensor 16u Sensor element 16w Sensor element 18 Second current sensor 18u Sensor element 18w Sensor element 20 Remote control 20a Input section 20b Output section 22 Operation panel 24 Storage battery 26 Power conversion section (charging/discharging section)
28 Control device 28a Selection unit 28c Calculation unit 30 Operation panel 32 Operation switch group 34 Liquid crystal display unit 36 Display changeover switch 40 Selection screen 40a Single power generation display 40b Double power generation display 40c Selection display Pgrid System power Pinv Charge/discharge power Pload Power consumption Ppv Generated power

Claims (5)

電力系統と負荷との間に、前記電力系統への逆潮流が許容される発電装置が接続された交流電路に系統連系する蓄電池システムであって、
前記交流電路における前記発電装置の接続点よりも前記電力系統側の部分の電流を計測する第1電流センサと、
前記交流電路における前記発電装置の接続点よりも前記負荷側の部分の電流を計測する第2電流センサと、
蓄電池と、
前記交流電路における前記第1電流センサよりも前記負荷側の部分に接続され、前記蓄電池を充放電させる充放電部と、
前記蓄電池システムの運用形態が、前記発電装置の発電電力が前記交流電路へ供給されている場合には前記蓄電池システムの放電を制限する第1運用形態か、前記発電装置の発電電力が前記交流電路へ供給されている場合に前記蓄電池システムの放電を許容する第2運用形態かに応じて、前記第1運用形態の場合には前記第1電流センサの計測値を、前記第2運用形態の場合には前記第2電流センサの計測値を、それぞれ、前記蓄電池の放電時における前記交流電路の潮流を監視するための計測値として選択する選択部と、を備え、
前記蓄電池システムの運用形態が前記第1運用形態の場合には、前記第2電流センサが、前記交流電路における前記充放電部が接続される部分よりも前記負荷側の部分の電流を計測するように配置され、
前記蓄電池システムの運用形態が前記第2運用形態の場合には、前記第2電流センサが、前記交流電路における前記充放電部が接続される部分と前記発電装置の接続点との間の電流を計測するように配置される
蓄電池システム。
A storage battery system that is connected to an AC circuit having a power generation device that allows reverse power flow to the power system between a power system and a load,
a first current sensor that measures a current in a portion of the AC current circuit that is closer to the power grid than a connection point of the power generation device;
a second current sensor that measures a current in a portion of the AC current circuit that is closer to the load than a connection point of the power generation device;
A storage battery,
a charge/discharge unit connected to a portion of the AC current path closer to the load than the first current sensor, and configured to charge and discharge the storage battery;
a selection unit that selects, depending on whether an operation mode of the storage battery system is a first operation mode that limits discharging of the storage battery system when power generated by the power generation device is supplied to the AC electric circuit, or a second operation mode that allows discharging of the storage battery system when power generated by the power generation device is supplied to the AC electric circuit, a measurement value of the first current sensor in the first operation mode and a measurement value of the second current sensor in the second operation mode, as a measurement value for monitoring the current flow of the AC electric circuit when the storage battery is discharging,
When the operation mode of the storage battery system is the first operation mode, the second current sensor is disposed to measure a current in a portion of the AC current path on the load side relative to a portion to which the charge/discharge unit is connected,
When the operation mode of the storage battery system is the second operation mode, the second current sensor is arranged to measure the current between the part of the AC circuit to which the charging/discharging unit is connected and the connection point of the power generation device.
前記第1電流センサの計測値と、前記第2電流センサの計測値とに基づいて前記発電装置の発電電力を演算する演算部と、
前記発電装置の発電電力を出力する出力部と、をさらに備える
請求項1に記載の蓄電池システム。
a calculation unit that calculates a generated power of the power generation device based on a measurement value of the first current sensor and a measurement value of the second current sensor;
The battery system according to claim 1 , further comprising: an output unit that outputs the generated power of the power generation device.
前記出力部は、前記発電装置の発電電力を表示出力する表示部を含む
請求項2に記載の蓄電池システム。
The storage battery system according to claim 2 , wherein the output unit includes a display unit that displays and outputs the generated power of the power generation device.
前記蓄電池システムは、複数の前記発電装置を含む
請求項1から請求項のいずれか一項に記載の蓄電池システム。
The battery system according to claim 1 , further comprising a plurality of the power generation devices.
電力系統と負荷との間に、前記電力系統への逆潮流が許容される発電装置が接続された交流電路に系統連系される蓄電池を有する蓄電池システムの制御方法であって、
前記蓄電池システムの運用形態が、前記発電装置の発電電力が前記交流電路へ供給されている場合には前記蓄電池システムの放電を制限する第1運用形態か、前記発電装置の発電電力が前記交流電路へ供給されている場合に前記蓄電池システムの放電を許容する第2運用形態かに応じて、前記第1運用形態の場合には前記交流電路における前記発電装置の接続点よりも前記電力系統側の部分の電流を計測する第1電流センサの計測値を、前記第2運用形態の場合には前記交流電路における前記発電装置の接続点よりも前記負荷側の部分の電流を計測する第2電流センサの計測値を、それぞれ、前記蓄電池の放電時における前記交流電路を監視するための計測値として選択する選択ステップと、
前記選択ステップにより選択された計測値を用いて前記蓄電池の放電制御を行う放電制御ステップと、を含み、
前記蓄電池システムの運用形態が前記第1運用形態の場合には、前記第2電流センサが、前記交流電路における前記充放電部が接続される部分よりも前記負荷側の部分の電流を計測するように配置され、
前記蓄電池システムの運用形態が前記第2運用形態の場合には、前記第2電流センサが、前記交流電路における前記充放電部が接続される部分と前記発電装置の接続点との間の電流を計測するように配置される
蓄電池システムの制御方法。
A control method for a storage battery system having a storage battery connected to an AC circuit connected to a power generation device that allows reverse power flow to the power system between a power grid and a load, comprising:
a selection step of selecting, depending on whether an operation mode of the storage battery system is a first operation mode that limits discharge of the storage battery system when power generated by the power generation device is supplied to the AC electric circuit, or a second operation mode that allows discharge of the storage battery system when power generated by the power generation device is supplied to the AC electric circuit, a measurement value of a first current sensor that measures a current in a portion of the AC electric circuit closer to the power grid than a connection point of the power generation device in the first operation mode, and a measurement value of a second current sensor that measures a current in a portion of the AC electric circuit closer to the load than a connection point of the power generation device in the second operation mode, as a measurement value for monitoring the AC electric circuit when the storage battery is discharging;
a discharge control step of controlling discharge of the storage battery by using the measurement value selected by the selection step,
When the operation mode of the storage battery system is the first operation mode, the second current sensor is disposed to measure a current in a portion of the AC current path on the load side relative to a portion to which the charge/discharge unit is connected,
A control method for a storage battery system, wherein, when the operation mode of the storage battery system is the second operation mode, the second current sensor is arranged to measure the current between a portion of the AC circuit to which the charging/discharging unit is connected and a connection point of the power generation device.
JP2020151223A 2020-09-09 2020-09-09 Battery storage system and method for controlling battery storage system Active JP7600574B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020151223A JP7600574B2 (en) 2020-09-09 2020-09-09 Battery storage system and method for controlling battery storage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020151223A JP7600574B2 (en) 2020-09-09 2020-09-09 Battery storage system and method for controlling battery storage system

Publications (2)

Publication Number Publication Date
JP2022045562A JP2022045562A (en) 2022-03-22
JP7600574B2 true JP7600574B2 (en) 2024-12-17

Family

ID=80774425

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020151223A Active JP7600574B2 (en) 2020-09-09 2020-09-09 Battery storage system and method for controlling battery storage system

Country Status (1)

Country Link
JP (1) JP7600574B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011188607A (en) 2010-03-08 2011-09-22 Seiko Electric Co Ltd Power supply system, power supply method, and control device
JP2013150485A (en) 2012-01-20 2013-08-01 Kyocera Corp Power supply system and power unit
WO2018221347A1 (en) 2017-05-29 2018-12-06 住友電気工業株式会社 Storage battery system and power display device
JP2018207707A (en) 2017-06-07 2018-12-27 パナソニックIpマネジメント株式会社 Power management system, power storage system, transmission method, program

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011188607A (en) 2010-03-08 2011-09-22 Seiko Electric Co Ltd Power supply system, power supply method, and control device
JP2013150485A (en) 2012-01-20 2013-08-01 Kyocera Corp Power supply system and power unit
WO2018221347A1 (en) 2017-05-29 2018-12-06 住友電気工業株式会社 Storage battery system and power display device
JP2018207707A (en) 2017-06-07 2018-12-27 パナソニックIpマネジメント株式会社 Power management system, power storage system, transmission method, program

Also Published As

Publication number Publication date
JP2022045562A (en) 2022-03-22

Similar Documents

Publication Publication Date Title
JP6686200B2 (en) Power control device, power control device control method, power control system, and power control system control method
JP6057604B2 (en) Power supply control device
US11394218B2 (en) Controller, electricity storage system, and recording medium
JP6365275B2 (en) Storage battery control device, power storage system, and storage battery charging method
JP6179855B2 (en) Power supply system, distribution board
WO2019082431A1 (en) Interconnected power storage system, and current-sensor mounting abnormality detection method
JP7600574B2 (en) Battery storage system and method for controlling battery storage system
JP2005245136A (en) Reverse power flow prevention type grid interconnection system
JP6050111B2 (en) Current sensor detection method and power control system
WO2016117315A1 (en) Electric power supply device
JP7156221B2 (en) charging device
JP7259742B2 (en) Storage battery system and power display device
JP2025016096A (en) Power Supply System
JP2003009399A (en) System interconnected power generating system
JP7185597B2 (en) Power storage device and power storage system including the power storage device
JP6022980B2 (en) Sensor position determination method
JP6731417B2 (en) Power control system and control method of power control system
JP7660408B2 (en) Power Conditioner System
JP7310427B2 (en) Electricity storage system and its control method
JP7238638B2 (en) How to determine the mounting state of the current sensor
JP2025036123A (en) Grid-connected energy storage system and method for detecting current sensor installation anomalies
JP2025018454A (en) POWER SUPPLY SYSTEM, POWER STORAGE SYSTEM, INSTALLATION METHOD, AND DISPLAY DEVICE
WO2017033401A1 (en) Power storage control device, power conversion device, power storage system, power storage control method, and program
JP2018038144A (en) Power management equipment
JP2024114332A (en) Distributed power systems and distribution boards

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230322

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240116

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240227

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240415

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240611

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240729

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240903

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241030

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241105

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241118

R150 Certificate of patent or registration of utility model

Ref document number: 7600574

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150