Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7603527B2 - Control device, control method and power supply system - Google Patents
[go: Go Back, main page]

JP7603527B2 - Control device, control method and power supply system - Google Patents

Control device, control method and power supply system Download PDF

Info

Publication number
JP7603527B2
JP7603527B2 JP2021087362A JP2021087362A JP7603527B2 JP 7603527 B2 JP7603527 B2 JP 7603527B2 JP 2021087362 A JP2021087362 A JP 2021087362A JP 2021087362 A JP2021087362 A JP 2021087362A JP 7603527 B2 JP7603527 B2 JP 7603527B2
Authority
JP
Japan
Prior art keywords
power
load
battery
output
capacitor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021087362A
Other languages
Japanese (ja)
Other versions
JP2022180721A (en
Inventor
恭一 佐孝
聡 松田
潤一 高田
直樹 田中
諭 末廣
裕孝 久保田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP2021087362A priority Critical patent/JP7603527B2/en
Publication of JP2022180721A publication Critical patent/JP2022180721A/en
Application granted granted Critical
Publication of JP7603527B2 publication Critical patent/JP7603527B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Hybrid Electric Vehicles (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Control Of Eletrric Generators (AREA)

Description

本開示は、制御装置、制御方法および電源システムに関する。 The present disclosure relates to a control device, a control method, and a power supply system.

特許文献1には、主発電機と、主発電機をアシストする電力システムとを備える船舶が開示されている。特許文献1に記載されている電力システムは、蓄電池からなる第1電力貯蔵装置と、キャパシタからなる第2電力貯蔵装置とを備える。特許文献1に記載されている船舶では、停泊中や港湾付近での低速走行時に、電力システムを船内に電力を供給する唯一の電力源として動作させることで、港湾でのゼロエミッションを実現することができる。 Patent Document 1 discloses a ship equipped with a main generator and a power system that assists the main generator. The power system described in Patent Document 1 includes a first power storage device consisting of a storage battery and a second power storage device consisting of a capacitor. The ship described in Patent Document 1 can achieve zero emissions at the port by operating the power system as the only power source supplying power to the ship while anchored or traveling at low speed near the port.

特開2017-136894号公報JP 2017-136894 A

しかしながら、特許文献1に記載の電力システムでは、電力システムを唯一の電力源として動作させることができるようにするため、蓄電池を小型化することが困難な場合があるという課題があった。 However, the power system described in Patent Document 1 has the problem that it can be difficult to miniaturize the storage battery in order to operate the power system as the sole power source.

本開示は、上記課題を解決するためになされたものであって、蓄電池を小型化することができる制御装置、制御方法および電源システムを提供することを目的とする。 The present disclosure has been made to solve the above problems, and aims to provide a control device, a control method, and a power supply system that can reduce the size of storage batteries.

上記課題を解決するために、本開示に係る制御装置は、回転電機を用いて発電する発電装置と、電気を充放電する蓄電装置と、前記発電装置と前記蓄電装置から供給された電力で駆動される電気負荷とを備える電源システムの制御装置であって、前記制御装置は、前記電気負荷の負荷電力の平均分に基づいて前記発電装置の出力電力を制御する。 To solve the above problem, the control device disclosed herein is a control device for a power supply system including a power generation device that generates electricity using a rotating electric machine, a power storage device that charges and discharges electricity, and an electrical load that is driven by the power supplied from the power generation device and the power storage device, and the control device controls the output power of the power generation device based on the average load power of the electrical load.

本開示に係る制御方法は、回転電機を用いて発電する発電装置と、電気を充放電する蓄電装置と、前記発電装置と前記蓄電装置から供給された電力で駆動される電気負荷とを備える電源システムの制御方法であって、前記制御装置は、前記電気負荷の負荷電力の平均分に基づいて前記発電装置の出力電力を制御する。 The control method disclosed herein is a control method for a power supply system that includes a power generation device that generates electricity using a rotating electric machine, a power storage device that charges and discharges electricity, and an electrical load that is driven by the power generation device and the power storage device, and the control device controls the output power of the power generation device based on the average load power of the electrical load.

本開示に係る電源システムは、回転電機を用いて発電する発電装置と、電気を充放電する蓄電装置と、前記発電装置と前記蓄電装置から供給された電力で駆動される電気負荷と、前記電気負荷の平均電力に基づいて前記発電装置の出力電力を制御する制御装置とを備える。 The power supply system according to the present disclosure includes a power generation device that generates electricity using a rotating electric machine, a power storage device that charges and discharges electricity, an electrical load that is driven by the power generation device and the power storage device, and a control device that controls the output power of the power generation device based on the average power of the electrical load.

本開示の制御装置、制御方法および電源システムによれば、蓄電池を小型化することができる。 The control device, control method, and power supply system disclosed herein allow the storage battery to be made smaller.

本開示の第1実施形態に係る電源システムの構成例を示す図である。1 is a diagram illustrating a configuration example of a power supply system according to a first embodiment of the present disclosure. 本開示の第1実施形態に係る電源システムの動作例を示す模式図である。FIG. 2 is a schematic diagram showing an operation example of the power supply system according to the first embodiment of the present disclosure. 本開示の第1実施形態に係る電力供給最適化部の構成例を示すブロック図である。3 is a block diagram showing an example configuration of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. 本開示の第1実施形態に係る電力供給最適化部の動作例を説明するための模式図である。5 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. 本開示の第1実施形態に係る電力供給最適化部の動作例を説明するための模式図である。5 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. 本開示の第1実施形態に係る電力供給最適化部の動作例を説明するための模式図である。5 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. 本開示の第1実施形態に係る電力供給最適化部の動作例を説明するための模式図である。5 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. 本開示の第1実施形態に係る電力供給最適化部の動作例を説明するための模式図である。5 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. 本開示の第1実施形態に係る電力供給最適化部の動作例を説明するための模式図である。5 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. 本開示の第1実施形態に係る電力供給最適化部の動作例を説明するための模式図である。5 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. FIG. 本開示の第1実施形態に係る電力供給最適化部の動作例を説明するためのフローチャートである。6 is a flowchart for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. 本開示の第1実施形態に係る電力供給最適化部の動作例を説明するためのフローチャートである。6 is a flowchart for explaining an example of the operation of a power supply optimization unit according to the first embodiment of the present disclosure. 本開示の第2実施形態に係る電源システムの構成例を示す図である。FIG. 11 is a diagram illustrating a configuration example of a power supply system according to a second embodiment of the present disclosure. 本開示の第2実施形態に係る電力供給最適化部の構成例を示すブロック図である。FIG. 11 is a block diagram showing an example configuration of a power supply optimization unit according to a second embodiment of the present disclosure. 本開示の第2実施形態に係る電力供給最適化部の構成例を示すブロック図である。FIG. 11 is a block diagram showing an example configuration of a power supply optimization unit according to a second embodiment of the present disclosure. 本開示の第2実施形態に係る電力供給最適化部の動作例を説明するための模式図である。FIG. 11 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the second embodiment of the present disclosure. 本開示の第2実施形態に係る電力供給最適化部の動作例を説明するための模式図である。FIG. 11 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the second embodiment of the present disclosure. 本開示の第2実施形態に係る電力供給最適化部の動作例を説明するための模式図である。FIG. 11 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the second embodiment of the present disclosure. 本開示の第2実施形態に係る電力供給最適化部の動作例を説明するための模式図である。FIG. 11 is a schematic diagram for explaining an example of the operation of a power supply optimization unit according to the second embodiment of the present disclosure. 本開示の第2実施形態に係る電力供給最適化部の構成例を説明するための模式図である。FIG. 11 is a schematic diagram for explaining a configuration example of a power supply optimization unit according to a second embodiment of the present disclosure. 本開示の第2実施形態に係る電力供給最適化部の構成例を説明するための模式図である。FIG. 11 is a schematic diagram for explaining a configuration example of a power supply optimization unit according to a second embodiment of the present disclosure. 本開示の第2実施形態に係る電源システムの構成例を説明するための模式図である。FIG. 11 is a schematic diagram for explaining a configuration example of a power supply system according to a second embodiment of the present disclosure. 本開示の第2実施形態に係る電源システムの構成例を説明するための模式図である。FIG. 11 is a schematic diagram for explaining a configuration example of a power supply system according to a second embodiment of the present disclosure. 少なくとも1つの実施形態に係るコンピュータの構成を示す概略ブロック図である。FIG. 1 is a schematic block diagram illustrating a configuration of a computer according to at least one embodiment.

<第1実施形態>
(電源システムの構成)
以下、本開示の第1実施形態に係る制御装置、制御方法および電源システムについて、図1~図12を参照して説明する。図1は、本開示の第1実施形態に係る電源システムの構成例を示す図である。図2は、本開示の第1実施形態に係る電源システムの動作例を示す模式図である。図3は、本開示の第1実施形態に係る電力供給最適化部の構成例を示すブロック図である。図4~図10は、本開示の第1実施形態に係る電力供給最適化部の動作例を説明するための模式図である。図11および図12は、本開示の第1実施形態に係る電力供給最適化部の動作例を説明するためのフローチャートである。なお、各図において同一または対応する構成には同一の符号を用いて説明を適宜省略する。
First Embodiment
(Power supply system configuration)
Hereinafter, a control device, a control method, and a power supply system according to a first embodiment of the present disclosure will be described with reference to FIGS. 1 to 12. FIG. 1 is a diagram showing a configuration example of a power supply system according to a first embodiment of the present disclosure. FIG. 2 is a schematic diagram showing an operation example of the power supply system according to a first embodiment of the present disclosure. FIG. 3 is a block diagram showing a configuration example of a power supply optimization unit according to a first embodiment of the present disclosure. FIGS. 4 to 10 are schematic diagrams for explaining an operation example of the power supply optimization unit according to a first embodiment of the present disclosure. FIGS. 11 and 12 are flowcharts for explaining an operation example of the power supply optimization unit according to a first embodiment of the present disclosure. Note that the same or corresponding configurations in each drawing are designated by the same reference numerals, and the description thereof will be omitted as appropriate.

図1に示す本開示の第1実施形態に係る電源システム100は、一例として、パラレル方式のハイブリッドシステム車両に搭載された車載用電源システムとして構成されている。図1に示す電源システム100は、本開示に係る制御装置の一構成例としての電力供給最適化部1と、発電装置の一構成例としてのエンジン発電機2と、蓄電装置3と、負荷装置の一構成例としての大型補機等の負荷4と、電圧センサ61と、電流センサ62とを備える。 The power supply system 100 according to the first embodiment of the present disclosure shown in FIG. 1 is configured as an on-board power supply system mounted on a parallel hybrid system vehicle, as an example. The power supply system 100 shown in FIG. 1 includes a power supply optimization unit 1 as an example of a control device according to the present disclosure, an engine generator 2 as an example of a power generation device, an electricity storage device 3, a load 4 such as a large auxiliary machine as an example of a load device, a voltage sensor 61, and a current sensor 62.

エンジン発電機2は、内燃機関式のエンジン21と、回転電機の一構成例としてのモータ/発電機(以下、電動発電機)22と、インバータ23とを備える。エンジン21は、電動発電機22を駆動して電力を発電するとともに、トランスミッション7を介して駆動輪等からなる走行負荷8を駆動する。電動発電機22は、交流回転電機であり、エンジン21によって駆動され、発電機として動作して発電したり、蓄電装置3から供給された電力によって電動機として動作し、走行負荷8を駆動したりする。インバータ23は、電動発電機22が発電した交流電力を直流電力に変換してバス5に出力したり、バス5を介して蓄電装置3から供給された直流電力を交流電力に変換して電動発電機22へ供給し、電動発電機22を回転駆動したりする。また、インバータ23は、電力供給最適化部1が出力したエンジン発電機出力指令値に基づいて、発電時の電動発電機22の出力電力を制御する。 The engine generator 2 includes an internal combustion engine 21, a motor/generator (hereinafter, motor generator) 22 as an example of a rotating electric machine, and an inverter 23. The engine 21 drives the motor generator 22 to generate electric power, and drives a running load 8 consisting of drive wheels and the like via a transmission 7. The motor generator 22 is an AC rotating electric machine that is driven by the engine 21 and operates as a generator to generate electric power, or operates as an electric motor using electric power supplied from the power storage device 3 to drive the running load 8. The inverter 23 converts the AC power generated by the motor generator 22 into DC power and outputs it to the bus 5, or converts the DC power supplied from the power storage device 3 via the bus 5 into AC power and supplies it to the motor generator 22, thereby rotating and driving the motor generator 22. The inverter 23 also controls the output power of the motor generator 22 during power generation based on the engine generator output command value output by the power supply optimization unit 1.

蓄電装置3は、バッテリ(蓄電池)31と、DC/DCコンバータ(直流-直流変換装置)32と、状態監視回路33とを備える。バッテリ31は、例えばリチウムイオン電池等の電荷を充放電する二次電池である。DC/DCコンバータ32は、エンジン発電機2からバス5を介して供給された直流電力を所定の電圧に変換してバッテリ31を充電したり、バッテリ31の放電電力を所定の電圧に変換してバス5へ出力したりする。また、DC/DCコンバータ32は、電力供給最適化部1が出力したDC/DCコンバータ指令電流値に基づいて、バス5へ出力する直流電流(=バッテリ31からの放電電流)と、バス5から入力する直流電流(=バッテリ31への充電電流)を制御する。状態監視回路33は、バッテリ31の充放電電流、充放電電圧、温度等を監視し、バッテリ31のSOC(State Of Charge;充電状態あるいは充電率)を演算し、求めた結果を、バッテリSOC(信号あるいは情報)として電力供給最適化部1へ出力する。 The power storage device 3 includes a battery (storage battery) 31, a DC/DC converter (DC-DC conversion device) 32, and a status monitoring circuit 33. The battery 31 is a secondary battery that charges and discharges, for example, a lithium ion battery. The DC/DC converter 32 converts the DC power supplied from the engine generator 2 via the bus 5 to a predetermined voltage to charge the battery 31, and converts the discharge power of the battery 31 to a predetermined voltage to output to the bus 5. The DC/DC converter 32 also controls the DC current output to the bus 5 (= the discharge current from the battery 31) and the DC current input from the bus 5 (= the charging current to the battery 31) based on the DC/DC converter command current value output by the power supply optimization unit 1. The state monitoring circuit 33 monitors the charge/discharge current, charge/discharge voltage, temperature, etc. of the battery 31, calculates the SOC (State of Charge; charging state or charging rate) of the battery 31, and outputs the result as the battery SOC (signal or information) to the power supply optimization unit 1.

負荷4は、例えば、大型補機、高出力アクチュエータや移動式の工作機械等の消費電力が比較的急峻に変化する電気負荷である。消費電力が比較的急峻に変化するとは、例えば、負荷4のピーク時の消費電力に対応するように選択したバッテリ31の容量が、負荷4の平均消費電力に対応するように選択したバッテリ31の容量よりも大きいことを意味する。なお、負荷4は、1つの電気負荷であってもよいし、複数の電気負荷であってもよい。 The load 4 is an electrical load whose power consumption changes relatively sharply, such as a large auxiliary machine, a high-output actuator, or a mobile machine tool. A relatively sharp change in power consumption means, for example, that the capacity of the battery 31 selected to correspond to the peak power consumption of the load 4 is greater than the capacity of the battery 31 selected to correspond to the average power consumption of the load 4. The load 4 may be one electrical load or multiple electrical loads.

電圧センサ61は、負荷4の近傍のバス5の電圧を計測し、計測した結果を電力供給最適化部1へ出力する。電流センサ62は、バス5から負荷4へ供給される電流を計測し、計測した結果を電力供給最適化部1へ出力する。 The voltage sensor 61 measures the voltage of the bus 5 near the load 4 and outputs the measurement result to the power supply optimization unit 1. The current sensor 62 measures the current supplied from the bus 5 to the load 4 and outputs the measurement result to the power supply optimization unit 1.

図1に示す本開示の第1実施形態に係る電源システム100は、後述する電力供給最適化部1による制御によって、図2に示すように、エンジン発電機2の出力電力が、負荷4が消費する負荷電力の平均分と等しくなるように、エンジン発電機2の出力電力を制御する。また、電源システム100は、負荷4が消費する負荷電力の平均分からの変動分が、蓄電装置3からの充放電電力と等しくなるように、蓄電装置3の出力電力を制御する。この構成によれば、エンジン発電機2が負荷4の消費電力の一部を負担するので、蓄電装置3の出力電力を抑え、バッテリ31の小型化を容易に図ることができる。 The power supply system 100 according to the first embodiment of the present disclosure shown in FIG. 1 controls the output power of the engine generator 2 so that the output power of the engine generator 2 is equal to the average load power consumed by the load 4, as shown in FIG. 2, by the control of the power supply optimization unit 1 described later. The power supply system 100 also controls the output power of the power storage device 3 so that the fluctuation from the average load power consumed by the load 4 is equal to the charge/discharge power from the power storage device 3. With this configuration, the engine generator 2 bears part of the power consumption of the load 4, so that the output power of the power storage device 3 can be suppressed and the battery 31 can be easily made smaller.

(電力供給最適化部1の構成)
図3に示すように、電力供給最適化部1は、例えばハードウェアとソフトウェアとの組み合わせから構成される機能的構成として、負荷電力平均分P ̄load計算部11と、補正量ΔPbatt計算部12と、エンジン発電機出力指令値Pinv*計算部13と、DC/DCコンバータ指令電流値計算部14とを備える。ここで「 ̄」はオーバーラインに対応する。また、明細書中では、見やすさを考慮し、各変数の添え字等については文字サイズを変化せずにそのまま全角文字として記述している。
(Configuration of power supply optimization unit 1)
As shown in Fig. 3, the power supply optimization unit 1 includes, as a functional configuration formed by a combination of hardware and software, a load power average P load calculation unit 11, a correction amount ΔPbatt calculation unit 12, an engine generator output command value Pinv* calculation unit 13, and a DC/DC converter command current value calculation unit 14. Here, "" corresponds to an overline. In addition, in the specification, for ease of reading, the subscripts of each variable are written as full-width characters without changing the character size.

本実施形態では、バッテリ31の出力を抑え、蓄電装置3を小型化することを念頭に置き、急峻な変動を伴う負荷電力に対し、次のような電力の流れを考える。図2に示す通り、負荷電力を、エンジン発電機2の応答速度よりも速い変動に相当する変動分と、平均電力に相当する平均分の和と見なし、エンジン発電機2が平均分の電力を出力する状況を考える。この状況におけるDC/DCコンバータ32の動作として、エンジン発電機2の出力が負荷電力よりも大きい場合はバッテリ31に電力を流し、小さい場合にはバッテリ31から負荷4に電力を供給するよう動作すれば、丁度変動分の電力をバッテリ31が負担することになる。このため、DC/DCコンバータ32が上述の動作をすれば、エンジン発電機2が電力を供給していることから、バッテリ31の出力が抑えられる。このような状況を実現するには、DC/DCコンバータ32およびエンジン発電機2の動作を決定する制御器が必要となる。本実施形態では、この制御器が電力供給最適化部1である。 In this embodiment, the following power flow is considered for load power with abrupt fluctuations, with the aim of suppressing the output of the battery 31 and miniaturizing the storage device 3 in mind. As shown in FIG. 2, the load power is considered to be the sum of a fluctuation portion corresponding to a fluctuation faster than the response speed of the engine generator 2 and an average portion corresponding to the average power, and a situation is considered in which the engine generator 2 outputs the average amount of power. In this situation, the DC/DC converter 32 operates such that when the output of the engine generator 2 is larger than the load power, power is passed to the battery 31, and when the output is smaller, power is supplied from the battery 31 to the load 4, so that the battery 31 bears just the fluctuation amount of power. Therefore, if the DC/DC converter 32 operates as described above, the engine generator 2 is supplying power, and the output of the battery 31 is suppressed. To realize such a situation, a controller that determines the operation of the DC/DC converter 32 and the engine generator 2 is required. In this embodiment, this controller is the power supply optimization unit 1.

図1の電源システム100において、電力供給最適化部1は、受信したバス電圧・負荷電流・モード信号・バッテリSOCからDC/DCコンバータの指令電流値およびエンジン発電機の出力指令値を計算し、それぞれをDC/DCコンバータ32とインバータ23に送信することでこれらの機器を制御する。バス電圧・負荷電流・モード信号を取得するために、バス5には電圧センサ61、バス-補機負荷間には電流センサ62、負荷4には図示していない制御装置を設置する。またバッテリ31のSOCの信号はバッテリに附随する(電流、電圧、温度等を監視する)状態監視回路33から受信する。 In the power supply system 100 of FIG. 1, the power supply optimization unit 1 calculates the command current value of the DC/DC converter and the output command value of the engine generator from the received bus voltage, load current, mode signal, and battery SOC, and transmits them to the DC/DC converter 32 and inverter 23 to control these devices. To obtain the bus voltage, load current, and mode signal, a voltage sensor 61 is installed on the bus 5, a current sensor 62 is installed between the bus and the auxiliary load, and a control device (not shown) is installed on the load 4. In addition, the SOC signal of the battery 31 is received from a status monitoring circuit 33 (which monitors the current, voltage, temperature, etc.) associated with the battery.

ここで、モード信号とは負荷4の状態を示す信号であり、(ST1)停止、(ST2)待機、(ST3)スタンバイ、(ST4)動作中の4種のうちのいずれかをとる(図7にて、補機負荷電力の波形例を用い、各状態の説明を示す)。例えば、図8にまとめて示すように、停止は、補機が完全に停止しており、負荷電力を全く生じない状態である。待機は、冷却系を除く補助的な装置の負荷電力が発生している状態である。スタンバイは、冷却系を含め補助的な装置の負荷電力が発生している状態である。動作中は、主となる補機が動作し、急峻な変動を伴う負荷電力が発生しうる状態である。 Here, the mode signal is a signal that indicates the state of the load 4, and takes one of four types: (ST1) stopped, (ST2) waiting, (ST3) standby, or (ST4) operating (Figure 7 explains each state using an example waveform of the auxiliary load power). For example, as summarized in Figure 8, stopped is a state in which the auxiliary equipment is completely stopped and no load power is generated. Waiting is a state in which load power is generated by auxiliary equipment excluding the cooling system. Standby is a state in which load power is generated by auxiliary equipment including the cooling system. Operating is a state in which the main auxiliary equipment is operating and load power with sudden fluctuations may be generated.

モード信号が「(ST4)動作中」の場合、負荷4から急峻な変動を伴う負荷電力が発生しており、この状況において、電力供給最適化部1は、バス電圧および負荷電流信号から負荷電力の平均分に相当する電力値を計算し、エンジン発電機2の出力指令値としてインバータ23に送信する(エンジン発電機出力指令値の具体的算出法は後述する)。また、バス電圧がある基準電圧値を下回る場合には放電、上回る場合には充電となるような指令電流値をDC/DCコンバータ32に送信する(このような指令電流を生成するためには、例えば、図4の特性を利用すればよい)。これは、エンジン発電機2が負荷電力より大きい場合バス電圧が上昇するためバッテリ31に充電し、小さい場合にはバス電圧が低下するためバッテリ31から放電する動作となるよう指示することを意味する。このため、DC/DCコンバータ32は適切に電力の流れを制御することになり、バッテリ31が負荷電力の変動分を、エンジン発電機2が平均分を負担する動作をする、すなわち、DC/DCコンバータ32がバッテリ31とエンジン発電機2の2つの電源の想定動作を実現することになる。 When the mode signal is "(ST4) in operation", the load 4 generates load power with abrupt fluctuations. In this situation, the power supply optimization unit 1 calculates a power value equivalent to the average of the load power from the bus voltage and load current signals, and transmits it to the inverter 23 as an output command value for the engine generator 2 (a specific calculation method for the engine generator output command value will be described later). In addition, a command current value is transmitted to the DC/DC converter 32 so that the bus voltage is discharged when it is below a certain reference voltage value, and charged when it is above it (for example, the characteristics in FIG. 4 can be used to generate such a command current). This means that when the engine generator 2 is larger than the load power, the bus voltage rises, so the battery 31 is charged, and when it is smaller, the bus voltage drops, so the battery 31 is discharged. Therefore, the DC/DC converter 32 appropriately controls the flow of power, so that the battery 31 bears the fluctuation of the load power and the engine generator 2 bears the average of the load power, that is, the DC/DC converter 32 realizes the expected operation of the two power sources, the battery 31 and the engine generator 2.

なお、DC/DCコンバータ32は急峻な負荷変動に追従するよう動作させる必要があるため、電力供給最適化部1におけるDC/DCコンバータ指令電流値計算部14をDC/DCコンバータ32の(ローカルな)制御器の中に含めてもよい。その場合には、ローカル制御器にバス電圧を送信するための電圧センサを追設する。 In addition, since the DC/DC converter 32 needs to operate to follow sudden load fluctuations, the DC/DC converter command current value calculation unit 14 in the power supply optimization unit 1 may be included in the (local) controller of the DC/DC converter 32. In that case, a voltage sensor is added to send the bus voltage to the local controller.

本実施形態では、電力供給最適化部1を導入した構成により、エンジン発電機2の応答速度よりも速い変動を伴う負荷に対して、DC/DCコンバータ32の動作により電力の流れを制御し、バッテリ31とエンジン発電機2に想定の電力供給動作をさせることができる。同時に、エンジン発電機2が負荷電力の一部を負担していることから、バッテリ出力を抑えることができ、蓄電装置3の小型化につながる。 In this embodiment, the configuration that introduces the power supply optimization unit 1 allows the DC/DC converter 32 to control the flow of power for a load that fluctuates faster than the response speed of the engine generator 2, and allows the battery 31 and the engine generator 2 to perform the expected power supply operation. At the same time, since the engine generator 2 bears part of the load power, the battery output can be suppressed, leading to a reduction in the size of the storage device 3.

DC/DCコンバータ指令電流値計算部14は、バス電圧に基づいてDC/DCコンバータ32の出力電力(充放電電力)を制御する際の出力電流の指令値であるDC/DCコンバータ指令電流値を計算し、求めたDC/DCコンバータ指令電流値をDC/DCコンバータ32へ出力する。図4は、バス電圧VBUSと、DC/DCコンバータ32の出力電流との対応関係の一例を示す。図4に示す例では、バス電圧が620V以下で放電が開始され、電圧の低下に伴って放電電流が増加し、600V以下では放電時の制限電流一定となる。また、バス電圧が670V以上で充電が開始され、電圧の上昇に伴って充電電流が増加し、700V以上では充電時の制限電流一定となる。 The DC/DC converter command current value calculation unit 14 calculates the DC/DC converter command current value, which is the command value of the output current when controlling the output power (charge/discharge power) of the DC/DC converter 32 based on the bus voltage, and outputs the calculated DC/DC converter command current value to the DC/DC converter 32. FIG. 4 shows an example of the correspondence between the bus voltage VBUS and the output current of the DC/DC converter 32. In the example shown in FIG. 4, discharging starts when the bus voltage is 620V or less, the discharge current increases as the voltage decreases, and the limit current during discharging is constant when the bus voltage is 600V or less. Charging starts when the bus voltage is 670V or more, the charge current increases as the voltage increases, and the limit current during charging is constant when the bus voltage is 700V or more.

図2に示すようにエンジン発電機2の出力電力が負荷4の消費電力の平均分に一致するように制御されている場合、バス電圧は負荷4の消費電力の変動分に応じて変化するので、例えば図4に示すようにDC/DCコンバータ指令電流値計算部14がバス電圧に基づいてDC/DCコンバータ指令電流値を制御することで、蓄電装置3の出力電力を、負荷電力の変動分に応じた値とすることができる。なお、バス電圧に基づくDC/DCコンバータの出力制御については、例えば特許第3886940号公報に記載されている。 When the output power of the engine generator 2 is controlled to match the average power consumption of the load 4 as shown in FIG. 2, the bus voltage changes according to the fluctuation in the power consumption of the load 4. Therefore, for example, as shown in FIG. 4, the DC/DC converter command current value calculation unit 14 controls the DC/DC converter command current value based on the bus voltage, so that the output power of the storage device 3 can be set to a value according to the fluctuation in the load power. Note that the output control of the DC/DC converter based on the bus voltage is described, for example, in Patent No. 3886940.

負荷電力平均分P ̄load計算部11は、以下のようにして負荷電力の平均分を算出する。すなわち、負荷電力平均分P ̄load計算部11は、負荷電力平均分を、エンジン発電機出力指令値として用いることを念頭に、負荷電力の平均分を式(1)の示す通り、センサにより取得したバス電圧と負荷電流の積の時間平均で計算する。 The load power average component P ̄load calculation unit 11 calculates the average component of the load power as follows. That is, the load power average component P ̄load calculation unit 11 calculates the average component of the load power as the time average of the product of the bus voltage and the load current acquired by the sensor, as shown in formula (1), with the intention of using the average component of the load power as the engine generator output command value.

Figure 0007603527000001
Figure 0007603527000001

ここで、P ̄loadは負荷電力の平均分(移動平均値)である。また、VBUSは電圧センサ61が計測したバス電圧、Iloadは電流センサ62が計測した負荷電流である。 Here, P load is the average load power (moving average value). VBUS is the bus voltage measured by the voltage sensor 61, and Iload is the load current measured by the current sensor 62.

時間平均を計算するにあたり、その時間長さTは、式(1)をそのままエンジン発電機の出力指令値として用いた場合に、出力指令値の変動がエンジン発電機の応答速度より遅くなるよう、(想定される)負荷変動の周期に対し、十分長くとる。 When calculating the time average, the time length T is set to be sufficiently long with respect to the period of the (anticipated) load fluctuation so that if equation (1) is used directly as the output command value for the engine generator, the fluctuation in the output command value will be slower than the response speed of the engine generator.

なお、式(1)は負荷電流のセンサ値を用いて直接負荷電力を計算しているが、代替手段として、インバータ23や、DC/DCコンバータ32のバス5への出力電流値(センサ値)を用いて供給電力の平均分を計算し、負荷電力の平均分としてもよい。 Note that while equation (1) calculates the load power directly using the sensor value of the load current, as an alternative, the average of the supplied power may be calculated using the output current value (sensor value) of the inverter 23 or the DC/DC converter 32 to the bus 5, and this may be used as the average of the load power.

Figure 0007603527000002
Figure 0007603527000002

Figure 0007603527000003
Figure 0007603527000003

Figure 0007603527000004
Figure 0007603527000004

ここで、Pinvはインバータ23の出力電力、P ̄DCDCはDC/DCコンバータ32の平均出力電力である。Iinvはインバータ電流であり、インバータ23内の図示していない電流センサで計測した値である。IDCDCはDC/DCコンバータ電流であり、DC/DCコンバータ32内の図示していない電流センサで計測した値である。 Here, Pinv is the output power of the inverter 23, and P_DCDC is the average output power of the DC/DC converter 32. Iinv is the inverter current, a value measured by a current sensor (not shown) in the inverter 23. IDCDC is the DC/DC converter current, a value measured by a current sensor (not shown) in the DC/DC converter 32.

また、インバータ23とDC/DCコンバータ32の出力を、センサ値だけでなく、指令値や制御器内部パラメータを利用した次の式により算出してもよい。 The outputs of the inverter 23 and the DC/DC converter 32 may also be calculated using the following formula, which uses not only the sensor values but also command values and internal parameters of the controller.

Figure 0007603527000005
Figure 0007603527000005

Figure 0007603527000006
Figure 0007603527000006

ηmotはモータ効率(制御器内部パラメータ)、ηinvはインバータ効率(制御器内部パラメータ)、ωはモータ回転速度(センサ値)、τはモータトルク(指令値)である。また、ηDCDCはDC/DCコンバータ効率、Vbattはバッテリ電圧(センサ値)、KbattはSOCから電力への換算係数、SOCbattはバッテリSOC(センサ値)である。 ηmot is the motor efficiency (controller internal parameter), ηinv is the inverter efficiency (controller internal parameter), ω is the motor rotation speed (sensor value), and τ is the motor torque (command value). ηDCDC is the DC/DC converter efficiency, Vbatt is the battery voltage (sensor value), Kbatt is the conversion coefficient from SOC to power, and SOCbatt is the battery SOC (sensor value).

各種平均出力の算出に用いたセンサ値、指令値、制御器内部パラメータについては図5にまとめる。 The sensor values, command values, and controller internal parameters used to calculate the various average outputs are summarized in Figure 5.

補正量ΔPbatt計算部12は、以下のようにして、負荷電力平均分P ̄load計算部11が計算した負荷電力平均分に生じる誤差に対する補正量ΔPbattを計算する。 The correction amount ΔPbatt calculation unit 12 calculates the correction amount ΔPbatt for the error that occurs in the load power average portion calculated by the load power average portion P ̄load calculation unit 11 as follows:

上述の通り、負荷電力平均分P ̄load計算部11は、負荷電力の平均分は式(1)(あるいは式(2)~(4))により推定しているが、センサの誤差や時間平均の遅れ等の影響により、実際の値に対して乖離を生じることがある。図6は、その例として、負荷の起動時における負荷電力の振る舞いと時間平均の遅れにより実際値と推定値で乖離が生じる様子を表している。なお、図6では、負荷電力の実際値を実線で示し、推定値(算出された平均負荷電力)を細線の破線で示し、状態毎に求めた平均電力を実際の平均負荷電力として太線の破線で示している。このような状況においては、バッテリ31のSOCが変動し、規定値を逸脱する恐れがある。そこで、後述するエンジン発電機出力指令値Pinv*計算部13は、エンジン発電機の出力指令値を求める際には、式(5)のように負荷電力の平均分に補正量を加える。 As described above, the load power average portion P load calculation unit 11 estimates the load power average portion using formula (1) (or formulas (2) to (4)), but due to the influence of sensor errors and delays in time averaging, deviations from the actual value may occur. Figure 6 shows, as an example, the behavior of the load power at the start of the load and the state in which deviations occur between the actual value and the estimated value due to delays in time averaging. In Figure 6, the actual value of the load power is shown by a solid line, the estimated value (calculated average load power) is shown by a thin dashed line, and the average power calculated for each state is shown by a thick dashed line as the actual average load power. In such a situation, the SOC of the battery 31 may fluctuate and deviate from the specified value. Therefore, when calculating the output command value of the engine generator, the engine generator output command value Pinv* calculation unit 13, which will be described later, adds a correction amount to the average load power as shown in formula (5).

Figure 0007603527000007
Figure 0007603527000007

ここで、Pinv*はエンジン発電機出力指令値、ΔPbattは補正量である。 Here, Pinv* is the engine generator output command value, and ΔPbatt is the correction amount.

補正量ΔPbattは以下の考えに従い、設定する。いま、システム設計からの要求として、バッテリ31のSOCが「低い」もしくは「高い」場合に、バッテリSOCの単位時間当たりに回復させる量が与えられているものとする。このとき、式(6)に示す、SOCの変化とバッテリの出(入)力電力の関係式を利用し、補正量の設計値を決める(バッテリ31の電圧は一定とした)。 The correction amount ΔPbatt is set according to the following concept. Now, assume that the system design requires that the amount of battery SOC to be restored per unit time when the SOC of battery 31 is "low" or "high." In this case, the design value of the correction amount is determined using the relationship between the change in SOC and the battery's input (output) power, shown in equation (6) (the voltage of battery 31 is assumed to be constant).

Figure 0007603527000008
Figure 0007603527000008

ここで、ΔSOCはSOCの変化量、Vbattはバッテリ電圧、Abattはバッテリ31の電流容量であり、tは時間である。 Here, ΔSOC is the change in SOC, Vbatt is the battery voltage, Abatt is the current capacity of battery 31, and t is time.

例えば、バッテリ電圧は300[V]、バッテリの電流容量は80[Ah]とした場合に、1秒間でSOCを0.025%増加あるいは減少させたい場合、補正量は次の値となる。 For example, if the battery voltage is 300 [V] and the battery current capacity is 80 [Ah], and you want to increase or decrease the SOC by 0.025% in one second, the correction amount will be the following value.

Figure 0007603527000009
Figure 0007603527000009

上で算出した補正量の値は、バッテリのSOCが「低い」もしくは「高い」状態の場合に適用するものとし、この範囲を逸脱する場合には倍の補正を加えるものとするならば、補正量は図10のように取ることができる。図10は、バッテリ31のSOCと、補正量ΔPbattの対応関係を定めるテーブル121を示す。補正量ΔPbatt計算部12は、例えば、図10に示すテーブル121を用いて、補正量ΔPbattを算出する。 The correction amount calculated above is applied when the battery SOC is in a "low" or "high" state, and if the correction is doubled when the battery SOC deviates from this range, the correction amount can be taken as shown in FIG. 10. FIG. 10 shows a table 121 that defines the correspondence between the SOC of the battery 31 and the correction amount ΔPbatt. The correction amount ΔPbatt calculation unit 12 calculates the correction amount ΔPbatt using, for example, the table 121 shown in FIG. 10.

エンジン発電機出力指令値Pinv*計算部13は、負荷電力平均分P ̄load計算部11が求めた負荷電力平均分P ̄loadと、補正量ΔPbatt計算部12が求めた正量ΔPbattに基づいて、上述した式(5)を用いて、エンジン発電機出力指令値Pinv*を計算し、インバータ23へ出力する。 The engine generator output command value Pinv* calculation unit 13 calculates the engine generator output command value Pinv* using the above-mentioned formula (5) based on the load power average portion P ̄load calculated by the load power average portion P ̄load calculation unit 11 and the positive amount ΔPbatt calculated by the correction amount ΔPbatt calculation unit 12, and outputs the calculated value to the inverter 23.

ただし、式(5)で対応しようとすると、次のような状況で瞬時的に負荷への給電が不足する可能性がある。図6にみられるような、スタンバイ状態から大型補機動作状態に移行した直後に大きな負荷変動が発生する状況を考える。このとき、時間平均により算出された平均電力小さいため、エンジン発電機2の出力も小さくなり、バッテリ31の負担する電力が許容される最大出力を超え、負荷への給電が不足する可能性がある。 However, if we try to deal with this using equation (5), there is a possibility that the power supply to the load will be momentarily insufficient in the following situation. Consider a situation in which a large load fluctuation occurs immediately after switching from standby state to large auxiliary operation state, as shown in Figure 6. In this case, since the average power calculated by time averaging is small, the output of the engine generator 2 also becomes small, and the power borne by the battery 31 exceeds the maximum allowable output, which may result in an insufficient power supply to the load.

この状況をさけるため、エンジン発電機出力指令値Pinv*計算部13は、以下のようにして負荷への供給電力を確保する。例えば、スタンバイ状態から大型補機動作状態に移行した直後において、エンジン発電機2の出力指令値Pinv*は、式(5)でなく、図9に示すように、バッテリ31の出力と合計して、瞬時的な高負荷電力に十分対応できる値(固定値)Pinv_constにより与える。同時に、負荷電力平均分P ̄load計算部11は、式(1)の計算を行い、その値がPinv_const以上になった時点から、エンジン発電機の指令値を式(5)で与えるものとする。上記のように、大型補機動作状態に移行した時点で、最初から式(5)を使用せずに固定値を与えることで負荷への供給電力を確保する。なお、例えば、待機状態からスタンバイ状態への変更時にも、エンジン発電機出力指令値Pinv*を固定値Pinv_constとしてもよい。この固定値Pinv_constの導入により、充放電電流の大きな変化を抑えることができるので、バッテリの小型化を図ることができる。 To avoid this situation, the engine generator output command value Pinv* calculation unit 13 secures the power supply to the load as follows. For example, immediately after the transition from the standby state to the large auxiliary operation state, the output command value Pinv* of the engine generator 2 is given by a value (fixed value) Pinv_const that can sufficiently handle instantaneous high load power when added to the output of the battery 31 as shown in FIG. 9, instead of by equation (5). At the same time, the load power average P ̄load calculation unit 11 performs the calculation of equation (1), and when the value becomes equal to or greater than Pinv_const, the command value of the engine generator is given by equation (5). As described above, when the transition is made to the large auxiliary operation state, the power supply to the load is secured by giving a fixed value without using equation (5) from the beginning. Note that, for example, even when changing from the standby state to the standby state, the engine generator output command value Pinv* may be set to the fixed value Pinv_const. By introducing this fixed value Pinv_const, large changes in charging and discharging current can be suppressed, which allows for the miniaturization of the battery.

なお、エンジン発電機出力指令値Pinv*計算部13は、バッテリのSOCが高く、かつ、負荷電力の平均分が小さい場合、エンジン発電機の指令電力が負となりエンジン発電機が力行する場合がある。この状況をさけるため、エンジン発電機の出力が0以上の値となるよう、エンジン発電機の出力指令値に制限を設ける。 When the battery SOC is high and the average load power is small, the engine generator output command value Pinv* calculation unit 13 may cause the engine generator to operate in a powered manner, with the command power for the engine generator being negative. To avoid this situation, a limit is set on the engine generator output command value so that the engine generator output is a value equal to or greater than 0.

エンジン発電機出力指令値Pinv*計算部13による以上までのエンジン発電機の出力指令値の決定の流れを図11に示す。 The flow of the engine generator output command value Pinv* calculation unit 13's determination of the engine generator output command value is shown in Figure 11.

図11は、エンジン発電機出力指令値Pinv*計算部13による処理の流れを示す。図11に示す処理は、所定の周期で繰り返し実行される。図11に示す処理では、まず、エンジン発電機出力指令値Pinv*計算部13が、例えばモード信号が状態の変化を最初に示した場合等、所定の条件が満たされる場合、エンジン発電機出力指令値Pinv*を所定の固定値Pinv_constに設定する(ステップS21)。次に、エンジン発電機出力指令値Pinv*計算部13は、P ̄load+ΔPbattが固定値Pinv_const以上であるか否か(あるいはP ̄load+ΔPbattが固定値Pinv_constから所定の範囲内の値であるか否か)を判断する(ステップS22)。P ̄load+ΔPbattが固定値Pinv_const以上である場合(あるいはP ̄load+ΔPbattが固定値Pinv_constから所定の範囲内の値である場合)(ステップS22:YES)、エンジン発電機出力指令値Pinv*計算部13は、エンジン発電機出力指令値Pinv*をP ̄load+ΔPbattとする(ステップS23)。次に、エンジン発電機出力指令値Pinv*計算部13は、P ̄load+ΔPbattが0より小さいか否かを判断する(ステップS24)。P ̄load+ΔPbattが0より小さい場合(ステップS24:YES)、エンジン発電機出力指令値Pinv*計算部13は、エンジン発電機出力指令値Pinv*を0とする(ステップS25)。ステップS22で「No」の場合、ステップS24で「No」の場合、または、ステップS25を実行した場合、エンジン発電機出力指令値Pinv*計算部13は、図11に示す処理を終了する。 Figure 11 shows the flow of processing by the engine generator output command value Pinv* calculation unit 13. The processing shown in Figure 11 is executed repeatedly at a predetermined cycle. In the processing shown in Figure 11, first, when a predetermined condition is satisfied, for example, when the mode signal first indicates a change in state, the engine generator output command value Pinv* calculation unit 13 sets the engine generator output command value Pinv* to a predetermined fixed value Pinv_const (step S21). Next, the engine generator output command value Pinv* calculation unit 13 determines whether P  ̄ load + ΔPbatt is equal to or greater than the fixed value Pinv_const (or whether P  ̄ load + ΔPbatt is within a predetermined range from the fixed value Pinv_const) (step S22). If P load + ΔPbatt is equal to or greater than the fixed value Pinv_const (or if P load + ΔPbatt is within a predetermined range from the fixed value Pinv_const) (step S22: YES), the engine generator output command value Pinv* calculation unit 13 sets the engine generator output command value Pinv* to P load + ΔPbatt (step S23). Next, the engine generator output command value Pinv* calculation unit 13 determines whether P load + ΔPbatt is smaller than 0 (step S24). If P load + ΔPbatt is smaller than 0 (step S24: YES), the engine generator output command value Pinv* calculation unit 13 sets the engine generator output command value Pinv* to 0 (step S25). If step S22 is "No", if step S24 is "No", or if step S25 is executed, the engine generator output command value Pinv* calculation unit 13 ends the process shown in FIG. 11.

(電力供給最適化部1の動作)
図12は、電力供給最適化部1の動作例を示す。図12に示す処理は、所定の周期で繰り返し実行される。図12に示す処理では、まず、電力供給最適化部1が、バス電圧、負荷電流、モード信号、バッテリSOC等の各情報を取得する(ステップS1)。次に、電力供給最適化部1は、エンジン発電機の出力指令値を決定する(ステップS2)。電力供給最適化部1は、DC/DCコンバータの指令電流値を決定する(ステップS3)。次に、電力供給最適化部1は、決定した各値を出力して(ステップS4)、図12に示す処理を終了する。
(Operation of power supply optimization unit 1)
Fig. 12 shows an example of the operation of the power supply optimization unit 1. The process shown in Fig. 12 is repeatedly executed at a predetermined cycle. In the process shown in Fig. 12, first, the power supply optimization unit 1 acquires various information such as the bus voltage, the load current, the mode signal, the battery SOC, etc. (step S1). Next, the power supply optimization unit 1 determines an output command value for the engine generator (step S2). The power supply optimization unit 1 determines a command current value for the DC/DC converter (step S3). Next, the power supply optimization unit 1 outputs the determined values (step S4) and ends the process shown in Fig. 12.

(第1実施形態の作用・効果)
本実施形態によれば、急峻な負荷変動を伴う負荷電力に対し、エンジン発電機がその負荷の一部を担保することで、バッテリの出力を抑え、バッテリの小型化につながる。
(Actions and Effects of the First Embodiment)
According to this embodiment, the engine generator covers part of the load power that is accompanied by abrupt load fluctuations, thereby suppressing the output of the battery and leading to a reduction in the size of the battery.

<第2実施形態>
(電源システムの構成)
以下、本開示の第2実施形態に係る制御装置、制御方法および電源システムについて、図13~図23を参照して説明する。図13は、本開示の第2実施形態に係る電源システムの構成例を示す図である。図14は、本開示の第2実施形態に係る電力供給最適化部の構成例を示すブロック図である。図15は、本開示の第2実施形態に係る電力供給最適化部の構成例を示すブロック図である。図16~図23は、本開示の第2実施形態に係る電力供給最適化部の動作例を説明するための模式図である。なお、第1実施形態と同一の構成については同一の符号を付けて説明を適宜省略する。
Second Embodiment
(Power supply system configuration)
Hereinafter, a control device, a control method, and a power supply system according to a second embodiment of the present disclosure will be described with reference to Figs. 13 to 23. Fig. 13 is a diagram showing a configuration example of a power supply system according to a second embodiment of the present disclosure. Fig. 14 is a block diagram showing a configuration example of a power supply optimization unit according to a second embodiment of the present disclosure. Fig. 15 is a block diagram showing a configuration example of a power supply optimization unit according to a second embodiment of the present disclosure. Figs. 16 to 23 are schematic diagrams for explaining an operation example of the power supply optimization unit according to the second embodiment of the present disclosure. Note that the same reference numerals are used to designate the same configuration as in the first embodiment, and the description will be omitted as appropriate.

第2実施形態の電源システム100aは、図13に示すように、図1に示す第1実施形態の電源システム100において、蓄電装置3を、バッテリ31とキャパシタ34が並列に接続された蓄電装置3aに置き換えている。なお、電力供給最適化部1aは、DC/DCコンバータ指令電流値に代えて、バッテリ用DC/DCコンバータ指令電流値をDC/DCコンバータ32へ出力する。 As shown in FIG. 13, the power supply system 100a of the second embodiment is the power supply system 100 of the first embodiment shown in FIG. 1, in which the power storage device 3 is replaced with a power storage device 3a in which a battery 31 and a capacitor 34 are connected in parallel. Note that the power supply optimization unit 1a outputs a battery DC/DC converter command current value to the DC/DC converter 32 instead of the DC/DC converter command current value.

図13に示す本開示の第2実施形態に係る電源システム100aは、第1実施形態と同様、パラレル方式のハイブリッドシステム車両に搭載された車載用電源システムとして構成されている。図13に示す電源システム100aは、本開示に係る制御装置の一構成例としての電力供給最適化部1aと、エンジン発電機2と、蓄電装置3aと、負荷4と、電圧センサ61と、電流センサ62とを備える。 The power supply system 100a according to the second embodiment of the present disclosure shown in FIG. 13 is configured as an on-board power supply system mounted on a parallel hybrid system vehicle, similar to the first embodiment. The power supply system 100a shown in FIG. 13 includes a power supply optimization unit 1a as an example of a configuration of a control device according to the present disclosure, an engine generator 2, a power storage device 3a, a load 4, a voltage sensor 61, and a current sensor 62.

蓄電装置3aは、バッテリ31と、DC/DCコンバータ32と、状態監視回路33と、キャパシタ34と、DC/DCコンバータ35と、状態監視回路36とを備える。 The power storage device 3a includes a battery 31, a DC/DC converter 32, a status monitoring circuit 33, a capacitor 34, a DC/DC converter 35, and a status monitoring circuit 36.

キャパシタ34は、電気二重層キャパシタ等の蓄電器である。DC/DCコンバータ35は、エンジン発電機2からバス5を介して供給された直流電力を所定の電圧に変換してキャパシタ34を充電したり、キャパシタ34の放電電力を所定の電圧に変換してバス5へ出力したりする。また、DC/DCコンバータ35は、電力供給最適化部1aが出力したキャパシタ用DC/DCコンバータ指令電流値に基づいて、バス5へ出力する直流電流(=キャパシタ34からの放電電流)と、バス5から入力する直流電流(=キャパシタ34への充電電流)を制御する。状態監視回路36は、キャパシタ34の充放電電流、充放電電圧、温度等を監視し、キャパシタ34のSOCを演算し、求めた結果を、キャパシタSOC(信号あるいは情報)として電力供給最適化部1aへ出力する。 The capacitor 34 is a storage device such as an electric double layer capacitor. The DC/DC converter 35 converts the DC power supplied from the engine generator 2 via the bus 5 to a predetermined voltage to charge the capacitor 34, and converts the discharge power of the capacitor 34 to a predetermined voltage to output to the bus 5. The DC/DC converter 35 also controls the DC current (= discharge current from the capacitor 34) output to the bus 5 and the DC current (= charge current to the capacitor 34) input from the bus 5 based on the capacitor DC/DC converter command current value output by the power supply optimization unit 1a. The state monitoring circuit 36 monitors the charge/discharge current, charge/discharge voltage, temperature, etc. of the capacitor 34, calculates the SOC of the capacitor 34, and outputs the calculated result to the power supply optimization unit 1a as the capacitor SOC (signal or information).

(電力供給最適化部1aの構成)
図14に示すように、電力供給最適化部1aは、機能的構成として、負荷電力平均分P ̄load計算部11と、補正量ΔPbatt計算部12aと、エンジン発電機出力指令値Pinv*計算部13と、バッテリ用DC/DCコンバータ指令電流値計算部15と、キャパシタ用DC/DCコンバータ指令電流値計算部16と、補正量Δk計算部17とを備える。
(Configuration of power supply optimization unit 1a)
As shown in FIG. 14 , the power supply optimization unit 1a has, as its functional configuration, a load power average portion P_load calculation unit 11, a correction amount ΔPbatt calculation unit 12a, an engine generator output command value Pinv* calculation unit 13, a battery DC/DC converter command current value calculation unit 15, a capacitor DC/DC converter command current value calculation unit 16, and a correction amount Δk calculation unit 17.

図13の電源システム100aにはエンジン発電機2、バッテリ31、キャパシタ34の3種の電源が存在しており、各電源の想定動作を説明する。まず、エンジン発電機2は第1実施形態と同様に負荷電力の平均分に相当する電力を出力する。次に、バッテリ31とキャパシタ34については、エンジン発電機2が負荷電力の平均分を出力していることから、バッテリ31とキャパシタ34の出力の和が負荷電力の変動分に相当するよう充放電させる。加えて、蓄電装置3aを小型化するためには、変動分負荷電力に対してキャパシタ34の出力割合を(キャパシタの出力可能範囲で)大きくする。 The power supply system 100a in FIG. 13 has three types of power supplies: the engine generator 2, the battery 31, and the capacitor 34. The expected operation of each power supply will be described. First, the engine generator 2 outputs power equivalent to the average load power, as in the first embodiment. Next, the battery 31 and the capacitor 34 are charged and discharged so that the sum of the outputs of the battery 31 and the capacitor 34 corresponds to the fluctuation in the load power, since the engine generator 2 outputs the average load power. In addition, in order to miniaturize the power storage device 3a, the output ratio of the capacitor 34 to the fluctuation in the load power is increased (within the output possible range of the capacitor).

上記の各電源の動作を実現するにあたり、第1実施形態の場合と同様に、電力供給最適化部1aと称する制御器を導入する(図13参照)。第1実施形態の場合との相違点として、キャパシタ用のDC/DCコンバータを制御するため、キャパシタ用DC/DCコンバータに送信する指令電流が追加されている。また、エンジン発電機2の出力指令値の算出に用いるキャパシタのSOCの信号は、キャパシタに附随する(電流、電圧、温度等を監視する)状態監視回路36から送信されている。 To realize the operation of each of the above power sources, a controller called the power supply optimization unit 1a is introduced, as in the first embodiment (see FIG. 13). The difference from the first embodiment is that a command current is added to the capacitor DC/DC converter to control the capacitor DC/DC converter. In addition, the capacitor SOC signal used to calculate the output command value of the engine generator 2 is sent from a state monitoring circuit 36 associated with the capacitor (which monitors the current, voltage, temperature, etc.).

いま、エンジン発電機2の出力指令値としては、負荷電力の平均分に相当する電力値が与えられており、エンジン発電機2は負荷電力の平均分の電力を供給しているものとする。このとき、バッテリ31とキャパシタ34が変動分の電力を負担する動作をすればよいが、両者の入出力電力を適切に制御しないと、バッテリ31の負担する電力を小さくすることができず、蓄電装置3aの小型化につながらない。このため、バッテリ31とキャパシタ34の出力電力比を調整し、バッテリの負担する電力が小さくなるよう、電力供給最適化部1aは図15の制御ロジックを備える。 Now, assume that the engine generator 2 is given an output command value of a power value equivalent to the average load power, and that the engine generator 2 is supplying power equivalent to the average load power. At this time, the battery 31 and capacitor 34 should be able to operate to cover the fluctuating power, but unless the input and output power of both are appropriately controlled, the power covered by the battery 31 cannot be reduced, and this does not lead to a reduction in the size of the power storage device 3a. For this reason, the power supply optimization unit 1a has the control logic of FIG. 15 to adjust the output power ratio between the battery 31 and the capacitor 34 and reduce the power covered by the battery.

図15は、バッテリ用DC/DCコンバータ指令電流値計算部15と、キャパシタ用DC/DCコンバータ指令電流値計算部16と、補正量Δk計算部17の構成例を示す。補正量Δk計算部17は、バッテリのSOCと、キャパシタのSOCと、バス電圧と、蓄電装置3aの出力電力を入力として、補正量Δkのマップ171を用いて、補正量Δkを計算して、出力する。 Figure 15 shows an example of the configuration of the battery DC/DC converter command current value calculation unit 15, the capacitor DC/DC converter command current value calculation unit 16, and the correction amount Δk calculation unit 17. The correction amount Δk calculation unit 17 receives the battery SOC, the capacitor SOC, the bus voltage, and the output power of the power storage device 3a as input, calculates the correction amount Δk using a correction amount Δk map 171, and outputs it.

バッテリ用DC/DCコンバータ指令電流値計算部15は、指令電流生成マップ151と、乗算器152と、k1特性マップ153と、加算器154と、乗算器155を備える。指令電流生成マップ151は、例えば図2に示す特性で、バス電圧を、バッテリ用DC/DCコンバータ指令電流値(蓄電装置3aの出力電流)に変換するマップである。乗算器152は、蓄電装置3aの出力電流とバス電圧を乗算し、蓄電装置3aの出力電力を算出する。k1特性マップ153は、出力電力に基づいて係数k1を出力する。加算器154は、係数k1と補正量Δkを加算して出力する。乗算器155は、蓄電装置3aの出力電流に、係数k1と補正量Δkを加算した値を掛け合わせ、バッテリ用DC/DCコンバータ指令電流値を算出して出力する。 The battery DC/DC converter command current value calculation unit 15 includes a command current generation map 151, a multiplier 152, a k1 characteristic map 153, an adder 154, and a multiplier 155. The command current generation map 151 is a map that converts the bus voltage into a battery DC/DC converter command current value (output current of the power storage device 3a) with the characteristics shown in FIG. 2, for example. The multiplier 152 multiplies the output current of the power storage device 3a by the bus voltage to calculate the output power of the power storage device 3a. The k1 characteristic map 153 outputs a coefficient k1 based on the output power. The adder 154 adds the coefficient k1 and a correction amount Δk and outputs the result. The multiplier 155 multiplies the output current of the power storage device 3a by a value obtained by adding the coefficient k1 and the correction amount Δk, and calculates and outputs the battery DC/DC converter command current value.

一方、キャパシタ用DC/DCコンバータ指令電流値計算部16は、指令電流生成マップ161と、乗算器162と、k2特性マップ163と、加算器164と、乗算器165を備える。指令電流生成マップ161は、指令電流生成マップ151と同一特性のマップであり、例えば図2に示す特性で、バス電圧を、キャパシタ用DC/DCコンバータ指令電流値(蓄電装置3aの出力電流)に変換するマップである。乗算器162は、蓄電装置3aの出力電流とバス電圧を乗算し、蓄電装置3aの出力電力を算出する。k2特性マップ163は、出力電力に基づいて係数k2を出力する。加算器164は、係数k2から補正量Δkを減算して出力する。乗算器165は、蓄電装置3aの出力電流に、係数k2から補正量Δkを減算した値を掛け合わせ、キャパシタ用DC/DCコンバータ指令電流値を算出して出力する。 On the other hand, the capacitor DC/DC converter command current value calculation unit 16 includes a command current generation map 161, a multiplier 162, a k2 characteristic map 163, an adder 164, and a multiplier 165. The command current generation map 161 is a map with the same characteristics as the command current generation map 151, and is a map that converts the bus voltage into a capacitor DC/DC converter command current value (output current of the power storage device 3a) with the characteristics shown in FIG. 2, for example. The multiplier 162 multiplies the output current of the power storage device 3a by the bus voltage to calculate the output power of the power storage device 3a. The k2 characteristic map 163 outputs a coefficient k2 based on the output power. The adder 164 subtracts a correction amount Δk from the coefficient k2 and outputs it. The multiplier 165 multiplies the output current of the power storage device 3a by a value obtained by subtracting the correction amount Δk from the coefficient k2, and calculates and outputs the capacitor DC/DC converter command current value.

バッテリおよびキャパシタ用のDC/DCコンバータの指令電流計算部15および16においては、いずれも共通の指令電流生成特性(指令電流生成マップ151および161)(例えば、図2示すようなマップ)を備え、その出力信号である指令電流に乗算器155および165で係数k1およびk2がかかる形となる。指令電流生成にあたり、同じバス電圧を参照していることから、これらのDC/DCコンバータの出力電力比は丁度k1:k2になるよう充放電する。k1およびk2は、バッテリ31とキャパシタ34の出力電力の和(以下、P_bcと呼ぶ)に対する関数となっており、P_bcがキャパシタ34の最大許容出力値以下の場合には、キャパシタ34がほとんど全ての充放電電力を負担するようk2をk1より十分大きく(例えば、k1=0.1、k2=0.9と)設定する。 The command current calculation units 15 and 16 of the DC/DC converters for the battery and capacitor both have common command current generation characteristics (command current generation maps 151 and 161) (for example, a map as shown in FIG. 2), and the command current, which is the output signal, is multiplied by coefficients k1 and k2 in multipliers 155 and 165. Since the same bus voltage is referenced when generating the command current, these DC/DC converters charge and discharge so that the output power ratio is exactly k1:k2. k1 and k2 are functions of the sum of the output power of the battery 31 and the capacitor 34 (hereinafter referred to as P_bc), and when P_bc is equal to or less than the maximum allowable output value of the capacitor 34, k2 is set to be sufficiently larger than k1 (for example, k1=0.1, k2=0.9) so that the capacitor 34 bears almost all of the charge and discharge power.

また、P_bcがキャパシタ34の最高許容出力以上となる場合は、キャパシタ34の出力が丁度その最高許容出力値となるよう、バッテリ31の負担率を徐々に増やす形でk1、k2を設定する(後述するが、グラフの概形としては図16のようになる)。 Also, if P_bc is equal to or greater than the maximum allowable output of capacitor 34, k1 and k2 are set to gradually increase the burden on battery 31 so that the output of capacitor 34 becomes exactly the maximum allowable output value (this will be described later, but the rough shape of the graph will be as shown in Figure 16).

なお、図15に示すロジックは電力供給最適化部1aに備えられるが、急峻な負荷変動に追従するためにその応答速度を速める目的で、キャパシタ34およびバッテリ31のDC/DCコンバータの指令電流計算部はキャパシタ34とバッテリ31の(ローカルな)制御器の中に備えてもよい。その場合には、それぞれのローカル制御器にバス電圧を送信するための電圧センサを追設する。 The logic shown in FIG. 15 is provided in the power supply optimization unit 1a, but in order to increase the response speed to follow sudden load fluctuations, the command current calculation unit for the DC/DC converters of the capacitor 34 and the battery 31 may be provided in the (local) controllers of the capacitor 34 and the battery 31. In that case, a voltage sensor for transmitting the bus voltage is added to each local controller.

ここで、上記のk1,k2の設定ではキャパシタの充放電が優先されることになるが、この状況ではキャパシタのSOCが犠牲になる状況が発生する。例えば、エンジン発電機の出力指令値が、センサの誤差や計算アルゴリズム固有の性質等の影響で、実際の負荷電力の平均分によりも低い値となった場合、バッテリ31とキャパシタ34は充放電を行うものの、放電の割合が大きくなる。加えて、バッテリ31に対してキャパシタ34の出力電力比を大きくしていることから、キャパシタ34の放電量が大きくなり、SOCが低下する。このような、キャパシタ34のSOCが犠牲になる状況を回避する目的で、k1、k2の値にはバッテリ31およびキャパシタ34のSOCに応じて補正量Δk計算部17にて計算された補正量Δkを加減算し、出力電力比を変更する。図13の電源システム100aは、基本的にキャパシタ34の充放電を優先するよう動作するが、下記の(1)および(2)の状況では、バッテリ31の充放電を優先させたい。 Here, in the above k1 and k2 settings, the charging and discharging of the capacitor is prioritized, but in this situation, the SOC of the capacitor is sacrificed. For example, if the output command value of the engine generator becomes lower than the average of the actual load power due to the influence of the sensor error or the inherent nature of the calculation algorithm, the battery 31 and the capacitor 34 are charged and discharged, but the discharge rate is large. In addition, since the output power ratio of the capacitor 34 to the battery 31 is large, the discharge amount of the capacitor 34 increases and the SOC decreases. In order to avoid such a situation in which the SOC of the capacitor 34 is sacrificed, the correction amount Δk calculated by the correction amount Δk calculation unit 17 according to the SOC of the battery 31 and the capacitor 34 is added to or subtracted from the values of k1 and k2 to change the output power ratio. The power supply system 100a in FIG. 13 basically operates to prioritize the charging and discharging of the capacitor 34, but in the following situations (1) and (2), it is desired to prioritize the charging and discharging of the battery 31.

(1)充電時(バス電圧が基準電圧値以上)において、キャパシタ34のSOCが高くかつバッテリ31のSOCが低い場合。 (1) When charging (bus voltage is equal to or higher than the reference voltage value), the SOC of capacitor 34 is high and the SOC of battery 31 is low.

(2)放電時(バス電圧が基準電圧値以下)において、キャパシタ34のSOCが低くかつバッテリのSOC31が高い場合。 (2) When discharging (bus voltage is below the reference voltage value), the SOC of capacitor 34 is low and the SOC 31 of the battery is high.

そのため、バス電圧・バッテリのSOC・キャパシタのSOCを参照し、(1)もしくは(2)の状況に当てはまる場合には、係数k1、k2に補正量Δkを加減算することによりk1+Δk、k2-Δkと変更する。バッテリ31の充放電を優先させることから、k2-Δkに対しk1+Δkが十分大きく(例えば、k1+Δk=0.9、k2-Δk=0.1と)なるよう補正量Δkの値を設定する。この補正量Δkの計算にあたっては、バッテリ31とキャパシタ34のSOCの情報が必要となるが、これらの信号はバッテリ31とキャパシタ34それぞれに附随する(電流、電圧、温度等を監視する)状態監視回路33および36から送信する。 Therefore, the bus voltage, battery SOC, and capacitor SOC are referenced, and if the situation corresponds to (1) or (2), the coefficients k1 and k2 are changed to k1+Δk and k2-Δk by adding or subtracting a correction amount Δk. Since charging and discharging of the battery 31 is prioritized, the value of the correction amount Δk is set so that k1+Δk is sufficiently large compared to k2-Δk (for example, k1+Δk=0.9, k2-Δk=0.1). To calculate this correction amount Δk, information on the SOC of the battery 31 and capacitor 34 is required, and these signals are sent from status monitoring circuits 33 and 36 (which monitor the current, voltage, temperature, etc.) associated with the battery 31 and capacitor 34, respectively.

係数k1、k2および補正量Δkの具体的な取り方は、例えば次のようにすることができる。いま、負荷電力に対する各種電源(エンジン発電機・バッテリ・キャパシタ)の分担を図16のようにすることを考える。図16はエンジン発電機の出力を含んでおり、 バッテリ31とキャパシタ34の分担に着目するため、図16からエンジン発電機の出力差し引いた電力分担を図17に示す。図17は、負荷電力がある値以下の場合はほぼキャパシタ34に負担させ、負荷電力がそれ以上の値になった場合には、バッテリ31からも供給させることを意味しており、このように負荷電力を分担させることで、バッテリ31の出力を低減することを考える。図17の縦軸はバッテリ31とキャパシタ34の合計出力になっており、各々の出力を合計出力に対する比率で表すと図16のようになる。つまり、バッテリ31とキャパシタ35の出力電力がこの比率になるよう動作させたいので、k1、k2は図18のグラフの形で与えればよい。図15のk1特性マップ153とk2特性マップ163は、図18の特性のように定めることができる。 The specific method of taking the coefficients k1, k2 and the correction amount Δk can be, for example, as follows. Now, consider the allocation of the load power to various power sources (engine generator, battery, capacitor) as shown in FIG. 16. FIG. 16 includes the output of the engine generator, and in order to focus on the allocation of the battery 31 and the capacitor 34, the power allocation obtained by subtracting the output of the engine generator from FIG. 16 is shown in FIG. 17. FIG. 17 means that when the load power is below a certain value, the load power is almost entirely borne by the capacitor 34, and when the load power exceeds that value, the load power is also supplied from the battery 31. By allocating the load power in this way, the output of the battery 31 is reduced. The vertical axis of FIG. 17 is the total output of the battery 31 and the capacitor 34, and the output of each is expressed as a ratio to the total output as shown in FIG. 16. In other words, since it is desired to operate the output power of the battery 31 and the capacitor 35 to be at this ratio, k1 and k2 can be given in the form of a graph in FIG. 18. The k1 characteristic map 153 and the k2 characteristic map 163 in FIG. 15 can be defined as the characteristics in FIG. 18.

なお、図17において、蓄電装置合計出力電力の全域においてバッテリ出力電力を0としていないのは、蓄電装置3aの動作時に、DC/DCコンバータ32を常時、動作状態としておく方が、DC/DCコンバータ32の起動時のバッテリ31から(への)急峻な電流変化を抑制しやすいためである。 In FIG. 17, the battery output power is not set to 0 over the entire range of the total output power of the power storage device because keeping the DC/DC converter 32 in operation at all times when the power storage device 3a is in operation makes it easier to suppress abrupt changes in current from (to) the battery 31 when the DC/DC converter 32 is started up.

次に、補正量Δkの具体的設定方法について説明する。第2実施形態においては、下記の(1)および(2)の状況では、バッテリ31の充放電を優先させたい。 Next, a specific method for setting the correction amount Δk will be described. In the second embodiment, it is desirable to prioritize charging and discharging the battery 31 in the following situations (1) and (2).

(1)充電時(バス電圧が基準電圧値以上)において、キャパシタのSOCが高くかつバッテリのSOCが低い場合。 (1) When charging (bus voltage is above the reference voltage value), the capacitor SOC is high and the battery SOC is low.

(2)放電時(バス電圧が基準電圧値以下)において、キャパシタのSOCが低くかつバッテリのSOCが高い場合。 (2) When discharging (bus voltage is below the reference voltage value), the capacitor SOC is low and the battery SOC is high.

上記は定性的な表現であり、(1)および(2)の状況となる基準電圧値とバッテリ・キャパシタのSOCの閾値を図20にまとめる。図20は、図15に示す補正量Δkのマップ171の構成例を示す。図20は、図4からバッテリの充放電動作が切り替わる基準電圧値を645[V]とした場合の、補正量Δkの設定例である。図20に示す補正量Δkのマップ171は、充電時のマップ172と、放電時のマップ173を含んでいる。係数(k1、k2)は、(0、0)の場合が補正量Δkによる補正が行われないことを示し、(Δk、-Δk)の場合が補正量Δkによる補正が行われることを示す。 The above is a qualitative expression, and the reference voltage value and the battery capacitor SOC threshold value for the situations (1) and (2) are summarized in Figure 20. Figure 20 shows an example of the configuration of map 171 of the correction amount Δk shown in Figure 15. Figure 20 shows an example of setting the correction amount Δk when the reference voltage value at which the battery charging and discharging operations are switched from Figure 4 is set to 645 [V]. Map 171 of the correction amount Δk shown in Figure 20 includes map 172 during charging and map 173 during discharging. The coefficients (k1, k2) indicate that no correction is made using the correction amount Δk when they are (0, 0), and that correction is made using the correction amount Δk when they are (Δk, -Δk).

また、補正量Δkの取り方としては、補正量を加える状況において充放電のほとんど全てをバッテリ31に負担させる場合、負荷電力に応じて図19のようにとる(図19はk1+Δ:k2-Δ=0.9:0.1とする場合の例である)。 The correction amount Δk is calculated as shown in Figure 19 according to the load power when the battery 31 is to bear almost all of the charge and discharge load in a situation where a correction amount is added (Figure 19 shows an example where k1+Δ:k2-Δ=0.9:0.1).

なお、バッテリ31あるいはキャパシタ34のSOCは、図20の「低」「高」を逸脱しないように制御される。 The SOC of the battery 31 or the capacitor 34 is controlled so as not to deviate from the "low" or "high" range in Figure 20.

補正量Δkを用いることで、バッテリとキャパシタの出力電力を想定の比率で制御する事が可能となる。これにより、蓄電装置として、バッテリ単体の場合に比べて、小型になる。 By using the correction amount Δk, it is possible to control the output power of the battery and the capacitor at an expected ratio. This makes the power storage device smaller than a single battery.

また、第2実施形態において補正量ΔPbatt計算部12aは、次のようにして補正量ΔPbattを計算する。以下では、蓄電装置3aとしてキャパシタ34を併用する場合の補正量ΔPbattの取り方について説明する。 In addition, in the second embodiment, the correction amount ΔPbatt calculation unit 12a calculates the correction amount ΔPbatt as follows. Below, we will explain how to obtain the correction amount ΔPbatt when the capacitor 34 is also used as the storage device 3a.

本実施形態のようにキャパシタ34を併用する場合、補正量ΔPbattはバッテリ31とキャパシタ34の両方のSOCを参照し、その値を決定する。具体的には図21に示すマップ121aのように設定する。以下では、図21のように設定する考え方について説明する。 When the capacitor 34 is also used as in this embodiment, the correction amount ΔPbatt is determined by referring to the SOC of both the battery 31 and the capacitor 34. Specifically, it is set as shown in map 121a in FIG. 21. The idea behind setting it as shown in FIG. 21 will be explained below.

補正量ΔPbattの設定を考えるにあたり、次の4つの状況を考える。 When considering setting the correction amount ΔPbatt, consider the following four situations:

(1)バッテリのSOCが高く、キャパシタのSOCが中程度の場合。
(2)バッテリのSOCが低く、キャパシタのSOCが中程度の場合。
(3)バッテリのSOCの状態によらず、キャパシタのSOCが高い場合。
(4)バッテリのSOCの状態によらず、キャパシタのSOCが低い場合。
(1) When the battery SOC is high and the capacitor SOC is medium.
(2) When the battery SOC is low and the capacitor SOC is medium.
(3) When the capacitor SOC is high regardless of the battery SOC state.
(4) When the capacitor SOC is low, regardless of the battery SOC state.

(1)の状況にて、バッテリ31のSOCを低下させるため、エンジン発電機2の出力を低減するよう、補正量ΔPbattとして負の値を設定することを考える。このとき、エンジン発電機2の出力は負荷電力の平均分より小さい値となり、バス電圧が基準電圧以下の値をとる。この場合、本実施形態にて導入した係数k1、k2に補正がかかり(図20参照)、バッテリ31の充放電が優先される。このため、バッテリ31の放電が進行し、バッテリ31のSOCが中程度となる。よって、バッテリ31とキャパシタ34両者のSOCは(補正が不要な)中程度の状態になる。(2)の状況においても、同様の考え方で補正量Δkの値として正の値を設定すると、エンジン発電機2の出力が増加することにより、バッテリ31の充電が進行し、バッテリ31のSOCが中程度となる。 In the situation (1), a negative value is set as the correction amount ΔPbatt to reduce the output of the engine generator 2 in order to lower the SOC of the battery 31. At this time, the output of the engine generator 2 is smaller than the average load power, and the bus voltage is equal to or lower than the reference voltage. In this case, the coefficients k1 and k2 introduced in this embodiment are corrected (see FIG. 20), and charging and discharging of the battery 31 are prioritized. As a result, the discharge of the battery 31 progresses, and the SOC of the battery 31 becomes medium. Therefore, the SOC of both the battery 31 and the capacitor 34 becomes medium (no correction is required). In the situation (2), if a positive value is set as the correction amount Δk based on the same concept, the output of the engine generator 2 increases, charging of the battery 31 progresses, and the SOC of the battery 31 becomes medium.

(3)の状況にて、キャパシタ34のSOCを低下させるため、エンジン発電機2の出力を低減するよう、補正量ΔPbattとして負の値を設定することを考える。このとき、エンジン発電機2の出力は負荷電力の平均分より小さい値となり、バス電圧が基準電圧以下の値をとる。この場合、本実施形態にて導入した係数k1、k2に補正はかからず(図20参照)、キャパシタの充放電が優先される。このため、キャパシタ34の放電が進行し、キャパシタ34のSOCが中程度となる。(4)の状況においても、同様の考え方で補正量Δkの値として正の値を設定すると、エンジン発電機2の出力が増加することにより、キャパシタ34の充電が進行し、キャパシタ34のSOCが中程度となる。これより、(3)および(4)の状況にて、上述のように補正量ΔPbattを加えると、(1)および(2)もしくはバッテリとキャパシタ両者のSOCが中程度の状態となる。(1)および(2)の状況に移る場合には、先に述べた通りの補正量ΔPbattの加え方により、バッテリとキャパシタ両者のSOCが(補正が不要な)中程度となる。 In the situation (3), a negative value is set as the correction amount ΔPbatt to reduce the output of the engine generator 2 in order to lower the SOC of the capacitor 34. At this time, the output of the engine generator 2 is smaller than the average load power, and the bus voltage is equal to or lower than the reference voltage. In this case, the coefficients k1 and k2 introduced in this embodiment are not corrected (see FIG. 20), and the charging and discharging of the capacitor are prioritized. Therefore, the discharging of the capacitor 34 progresses, and the SOC of the capacitor 34 becomes medium. In the situation (4), if a positive value is set as the correction amount Δk based on the same idea, the output of the engine generator 2 increases, so that the charging of the capacitor 34 progresses, and the SOC of the capacitor 34 becomes medium. Thus, when the correction amount ΔPbatt is added as described above in the situations (3) and (4), the SOC of (1) and (2) or both the battery and the capacitor becomes medium. When transitioning to situations (1) and (2), the SOC of both the battery and the capacitor will be at a medium level (no correction required) by adding the correction amount ΔPbatt as described above.

以上より、図21のように、バッテリとキャパシタのSOCの状態に応じて補正量ΔPbattを加えれば、バッテリとキャパシタのSOCを中程度に回復させることができる。 From the above, by adding a correction amount ΔPbatt according to the state of the SOC of the battery and capacitor, as shown in Figure 21, it is possible to restore the SOC of the battery and capacitor to a moderate level.

なお、(3)および(4)の状況にある場合、キャパシタのSOCを増加もしくは低下させることが目的であるため、具体的な補正量ΔPbattの値は、式(6)におけるバッテリ電圧・電流容量をキャパシタ電圧・電流容量に置き換えて算出してもよい。 In the case of situations (3) and (4), since the purpose is to increase or decrease the SOC of the capacitor, the specific correction amount ΔPbatt value may be calculated by replacing the battery voltage and current capacity in equation (6) with the capacitor voltage and current capacity.

(第2実施形態の作用・効果)
上述の構成により、エンジン発電機2は負荷電力の平均分を、バッテリ31とキャパシタ34は変動分を負担するよう電力を出力する。加えて、バッテリ31とキャパシタ34に関してはDC/DCコンバータの動作により、急峻な負荷変動に追従しつつ、キャパシタ34の負担する電力を多くするため、バッテリ31の出力を抑えることができる。
(Actions and Effects of the Second Embodiment)
With the above-mentioned configuration, the engine generator 2 outputs power to cover the average load power, while the battery 31 and the capacitor 34 output power to cover the fluctuating power. In addition, the DC/DC converter operation of the battery 31 and the capacitor 34 allows the output of the battery 31 to be suppressed, since the power shared by the capacitor 34 is increased while following steep load fluctuations.

本実施形態では、蓄電装置の構成としてバッテリだけでなく、出力密度の高い蓄電デバイス(例えば、EDLC(電気二重層キャパシタ)等)との併用によりバッテリの負担する電力を低減する。図22は、バッテリとキャパシタの電気的特性を比較した図である。キャパシタは、バッテリに比べ、エネルギー密度が低いものの出力密度が高いため、キャパシタを用いた方が小型化につながる。一方で、図23に示す通り、負荷に対してある程度の給電の継続性が必要であり、キャパシタ単体では対応できず、エネルギー密度の高いバッテリがある程度の容量で必要となる。本実施形態では、バッテリとキャパシタの併用により、蓄電装置の容量を低減している。 In this embodiment, the power storage device is configured not only with a battery, but also with a high output density power storage device (for example, an EDLC (electric double layer capacitor)) to reduce the power burden on the battery. Figure 22 is a diagram comparing the electrical characteristics of a battery and a capacitor. Compared to a battery, a capacitor has a lower energy density but a higher output density, so using a capacitor leads to smaller size. On the other hand, as shown in Figure 23, a certain degree of continuity of power supply to the load is required, which cannot be achieved by a capacitor alone, and a battery with a high energy density is required with a certain capacity. In this embodiment, the capacity of the power storage device is reduced by using a battery and a capacitor in combination.

本実施形態によれば、バッテリとキャパシタの出力電力を想定の比率で制御する事が可能となる。また、これにより、蓄電装置として、バッテリ単体の場合に比べて、小型にすることができる。 According to this embodiment, it is possible to control the output power of the battery and the capacitor at an expected ratio. This also allows the power storage device to be made smaller than a single battery.

(作用効果)
本開示の制御装置、制御方法および電源システムによれば、蓄電池を小型化することができる。
(Action and Effect)
According to the control device, control method, and power supply system of the present disclosure, the storage battery can be made smaller.

(その他の実施形態)
以上、本開示の実施の形態について図面を参照して詳述したが、具体的な構成はこの実施の形態に限られるものではなく、本開示の要旨を逸脱しない範囲の設計変更等も含まれる。
Other Embodiments
Although the embodiments of the present disclosure have been described in detail above with reference to the drawings, the specific configuration is not limited to this embodiment, and design changes and the like that do not depart from the gist of the present disclosure are also included.

〈コンピュータ構成〉
図24は、少なくとも1つの実施形態に係るコンピュータの構成を示す概略ブロック図である。
コンピュータ90は、プロセッサ91、メインメモリ92、ストレージ93、および、インタフェース94を備える。
上述の電力供給最適化部1および1aは、コンピュータ90に実装される。そして、上述した各処理部の動作は、プログラムの形式でストレージ93に記憶されている。プロセッサ91は、プログラムをストレージ93から読み出してメインメモリ92に展開し、当該プログラムに従って上記処理を実行する。また、プロセッサ91は、プログラムに従って、上述した各記憶部に対応する記憶領域をメインメモリ92に確保する。
Computer Configuration
FIG. 24 is a schematic block diagram illustrating a configuration of a computer according to at least one embodiment.
The computer 90 comprises a processor 91 , a main memory 92 , a storage 93 , and an interface 94 .
The above-mentioned power supply optimization units 1 and 1a are implemented in a computer 90. The operations of the above-mentioned processing units are stored in the form of a program in a storage 93. The processor 91 reads the program from the storage 93, loads it in the main memory 92, and executes the above-mentioned processing in accordance with the program. The processor 91 also secures storage areas in the main memory 92 corresponding to the above-mentioned storage units in accordance with the program.

プログラムは、コンピュータ90に発揮させる機能の一部を実現するためのものであってもよい。例えば、プログラムは、ストレージに既に記憶されている他のプログラムとの組み合わせ、または他の装置に実装された他のプログラムとの組み合わせによって機能を発揮させるものであってもよい。なお、他の実施形態においては、コンピュータは、上記構成に加えて、または上記構成に代えてPLD(Programmable Logic Device)などのカスタムLSI(Large Scale Integrated Circuit)を備えてもよい。PLDの例としては、PAL(Programmable Array Logic)、GAL(Generic Array Logic)、CPLD(Complex Programmable Logic Device)、FPGA(Field Programmable Gate Array)等が挙げられる。この場合、プロセッサによって実現される機能の一部または全部が当該集積回路によって実現されてよい。 The program may be for realizing some of the functions to be performed by the computer 90. For example, the program may be for realizing the functions by combining with other programs already stored in the storage, or by combining with other programs implemented in other devices. In other embodiments, the computer may include a custom LSI (Large Scale Integrated Circuit) such as a PLD (Programmable Logic Device) in addition to or instead of the above configuration. Examples of PLDs include PAL (Programmable Array Logic), GAL (Generic Array Logic), CPLD (Complex Programmable Logic Device), FPGA (Field Programmable Gate Array), etc. In this case, some or all of the functions realized by the processor may be realized by the integrated circuit.

ストレージ93の例としては、HDD(Hard Disk Drive)、SSD(Solid State Drive)、磁気ディスク、光磁気ディスク、CD-ROM(Compact Disc Read Only Memory)、DVD-ROM(Digital Versatile Disc Read Only Memory)、半導体メモリ等が挙げられる。ストレージ93は、コンピュータ90のバスに直接接続された内部メディアであってもよいし、インタフェース94または通信回線を介してコンピュータ90に接続される外部メディアであってもよい。また、このプログラムが通信回線によってコンピュータ90に配信される場合、配信を受けたコンピュータ90が当該プログラムをメインメモリ92に展開し、上記処理を実行してもよい。少なくとも1つの実施形態において、ストレージ93は、一時的でない有形の記憶媒体である。 Examples of storage 93 include HDD (Hard Disk Drive), SSD (Solid State Drive), magnetic disk, magneto-optical disk, CD-ROM (Compact Disc Read Only Memory), DVD-ROM (Digital Versatile Disc Read Only Memory), semiconductor memory, etc. Storage 93 may be an internal medium directly connected to the bus of computer 90, or an external medium connected to computer 90 via interface 94 or a communication line. In addition, when this program is distributed to computer 90 via a communication line, computer 90 that receives the program may expand the program in main memory 92 and execute the above-mentioned processing. In at least one embodiment, storage 93 is a non-transitory tangible storage medium.

<付記>
各実施形態に記載の電力供給最適化部1および1aは、例えば以下のように把握される。
<Additional Notes>
The power supply optimization units 1 and 1a described in each embodiment can be understood, for example, as follows.

(1)第1の態様に係る電力供給最適化部1および1a(制御装置)は、回転電機を用いて発電する発電装置(エンジン発電機2)と、電気を充放電する蓄電装置3、3aと、前記発電装置と前記蓄電装置から供給された電力で駆動される電気負荷4とを備える電源システム100、100aの制御装置であって、前記制御装置は、前記電気負荷の負荷電力の平均分に基づいて前記発電装置の出力電力を制御する。この態様および以下の各態様によれば、平均分を発電装置の出力でまかなうことができるので、容易に蓄電装置の小型化を図ることができる。 (1) The power supply optimization units 1 and 1a (control devices) according to the first aspect are control devices for power supply systems 100, 100a that include a power generation device (engine generator 2) that generates electricity using a rotating electric machine, a power storage device 3, 3a that charges and discharges electricity, and an electric load 4 that is driven by the power supplied from the power generation device and the power storage device, and the control device controls the output power of the power generation device based on the average portion of the load power of the electric load. According to this aspect and each of the following aspects, the average portion can be covered by the output of the power generation device, and therefore the power storage device can be easily miniaturized.

(2)第2の態様に係る電力供給最適化部1および1a(制御装置)は、(1)の電力供給最適化部1および1a(制御装置)であって、前記制御装置は、前記蓄電装置の充電状態(SOC)に応じて、前記発電装置の出力電力の制御を補正する。この態様によれば、充電状態を一定の範囲に維持することが容易となる。 (2) The power supply optimization units 1 and 1a (control devices) according to the second aspect are the power supply optimization units 1 and 1a (control devices) of (1), and the control devices correct the control of the output power of the power generation device according to the state of charge (SOC) of the power storage device. According to this aspect, it becomes easy to maintain the state of charge within a certain range.

(3)第3の態様に係る電力供給最適化部1および1a(制御装置)は、(1)または(2)の電力供給最適化部1および1a(制御装置)であって、前記電気負荷は、少なくとも2つの異なる所定の状態で動作し、前記制御装置は、前記状態が変化した場合、所定電力となるように前記発電装置の出力電力を制御した後、前記平均分に基づいて前記発電装置の出力電力を制御する。この態様によれば、動作状態が変化した場合に急峻な充放電流の変化が発生することを防止することができる。 (3) The power supply optimization units 1 and 1a (control devices) according to a third aspect are the power supply optimization units 1 and 1a (control devices) according to (1) or (2), in which the electrical load operates in at least two different predetermined states, and when the state changes, the control device controls the output power of the power generation device to a predetermined power, and then controls the output power of the power generation device based on the average portion. According to this aspect, it is possible to prevent abrupt changes in charging and discharging current from occurring when the operating state changes.

(4)第4の態様に係る電力供給最適化部1a(制御装置)は、(1)または(2)の電力供給最適化部1a(制御装置)であって、前記蓄電装置3aが、蓄電池31とキャパシタ34とを有し、前記制御装置は、前記キャパシタの充放電電流が許容充放電電流に対して余裕がある場合、前記キャパシタの充放電電流が前記蓄電池の充放電電流を上回るように前記蓄電池の充放電電流と前記キャパシタの充放電電流の割合を制御する。 (4) The power supply optimization unit 1a (control device) according to the fourth aspect is the power supply optimization unit 1a (control device) of (1) or (2), in which the power storage device 3a has a storage battery 31 and a capacitor 34, and the control device controls the ratio of the charge/discharge current of the storage battery to the charge/discharge current of the capacitor so that the charge/discharge current of the capacitor exceeds the charge/discharge current of the storage battery when the charge/discharge current of the capacitor has a margin relative to the allowable charge/discharge current.

(5)第5の態様に係る電力供給最適化部1a(制御装置)は、(4)の電力供給最適化部1a(制御装置)であって、前記制御装置は、前記蓄電池の充電状態と前記キャパシタの充電状態に応じて、前記割合を補正する。 (5) The power supply optimization unit 1a (control device) according to the fifth aspect is the power supply optimization unit 1a (control device) of (4), and the control device corrects the ratio according to the charging state of the storage battery and the charging state of the capacitor.

100、100a…電源システム
1、1a…電力供給最適化部
2…エンジン発電機(発電装置)
3、3a…蓄電装置
4…負荷(電気負荷)
31…バッテリ(蓄電池)
34…キャパシタ
100, 100a... Power supply system 1, 1a... Power supply optimization unit 2... Engine generator (power generation device)
3, 3a...electric storage device 4...load (electric load)
31...Battery (storage battery)
34...Capacitor

Claims (6)

回転電機を用いて発電する発電装置と、電気を充放電する蓄電装置と、前記発電装置と前記蓄電装置から供給された電力で駆動される電気負荷とを備える電源システムの制御装置であって、
前記制御装置は、前記電気負荷の負荷電力の平均分に基づいて前記発電装置の出力電力を制御し、
前記電気負荷は、少なくとも2つの異なる所定の状態で動作し、
前記制御装置は、前記状態が変化した場合、当該状態に対応する所定の固定値の電力となるように前記発電装置の出力電力を制御した後、前記負荷電力の平均分が前記所定の固定値以上になった時点から、当該負荷電力の平均分で前記発電装置の出力電力を制御する、
制御装置。
A control device for a power supply system including a power generation device that generates electricity using a rotating electric machine, a power storage device that charges and discharges electricity, and an electric load that is driven by electric power supplied from the power generation device and the power storage device,
the control device controls the output power of the power generation device based on an average portion of the load power of the electric load;
the electrical load operates under at least two different predetermined conditions;
When the state changes, the control device controls the output power of the power generation device so that the output power becomes a predetermined fixed value corresponding to the state, and then, from a point in time when the average portion of the load power becomes equal to or greater than the predetermined fixed value, controls the output power of the power generation device to the average portion of the load power.
Control device.
前記制御装置は、前記蓄電装置の充電状態に応じて、前記発電装置の出力電力の制御を補正する
請求項1に記載の制御装置。
The control device according to claim 1 , wherein the control device corrects control of the output power of the power generation device in accordance with a state of charge of the power storage device.
前記蓄電装置が、蓄電池とキャパシタとを有し、
前記制御装置は、前記キャパシタの充放電電流が許容充放電電流に対して余裕がある場合、前記キャパシタの充放電電流が前記蓄電池の充放電電流を上回るように前記蓄電池の充放電電流と前記キャパシタの充放電電流の割合を制御する
請求項1または2に記載の制御装置。
the power storage device includes a storage battery and a capacitor,
When the charge/discharge current of the capacitor has a margin relative to an allowable charge/discharge current, the control device controls a ratio of the charge/discharge current of the storage battery to the charge/discharge current of the capacitor so that the charge/discharge current of the capacitor exceeds the charge/discharge current of the storage battery.
The control device according to claim 1 or 2 .
前記制御装置は、前記蓄電池の充電状態と前記キャパシタの充電状態に応じて、前記割合を補正する
請求項3に記載の制御装置。
The control device corrects the ratio according to a charging state of the storage battery and a charging state of the capacitor.
The control device according to claim 3 .
回転電機を用いて発電する発電装置と、電気を充放電する蓄電装置と、前記発電装置と前記蓄電装置から供給された電力で駆動される電気負荷とを備える電源システムの制御方法であって、
前記電気負荷の負荷電力の平均分に基づいて前記発電装置の出力電力を制御するステップを有し、
前記電気負荷は、少なくとも2つの異なる所定の状態で動作し、
前記発電装置の出力電力を制御するステップでは、前記状態が変化した場合、当該状態に対応する所定の固定値の電力となるように前記発電装置の出力電力を制御した後、前記負荷電力の平均分が前記所定の固定値以上になった時点から、当該負荷電力の平均分で前記発電装置の出力電力を制御する、
制御方法。
A control method for a power supply system including a power generation device that generates electricity using a rotating electric machine, a power storage device that charges and discharges electricity, and an electric load that is driven by electric power supplied from the power generation device and the power storage device, comprising:
controlling the output power of the power generation device based on an average portion of the load power of the electrical load;
the electrical load operates under at least two different predetermined conditions;
In the step of controlling the output power of the power generation device, when the state changes, the output power of the power generation device is controlled so as to become a predetermined fixed value of power corresponding to the state, and then, from a point in time when the average portion of the load power becomes equal to or greater than the predetermined fixed value, the output power of the power generation device is controlled at the average portion of the load power.
Control methods.
回転電機を用いて発電する発電装置と、
電気を充放電する蓄電装置と、
前記発電装置と前記蓄電装置から供給された電力で駆動される電気負荷と、
前記電気負荷の負荷電力の平均分に基づいて前記発電装置の出力電力を制御する制御装置と
を備え、
前記電気負荷は、少なくとも2つの異なる所定の状態で動作し、
前記制御装置は、前記状態が変化した場合、当該状態に対応する所定の固定値の電力となるように前記発電装置の出力電力を制御した後、前記負荷電力の平均分が前記所定の固定値以上になった時点から、当該負荷電力の平均分で前記発電装置の出力電力を制御する、
電源システム。
A power generation device that generates power using a rotating electric machine;
A storage device that charges and discharges electricity;
an electric load driven by electric power supplied from the power generation device and the power storage device;
a control device that controls the output power of the power generation device based on an average load power of the electric load;
the electrical load operates under at least two different predetermined conditions;
When the state changes, the control device controls the output power of the power generation device so that the output power becomes a predetermined fixed value corresponding to the state, and then, from a point in time when the average portion of the load power becomes equal to or greater than the predetermined fixed value, controls the output power of the power generation device to the average portion of the load power.
Power supply system.
JP2021087362A 2021-05-25 2021-05-25 Control device, control method and power supply system Active JP7603527B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021087362A JP7603527B2 (en) 2021-05-25 2021-05-25 Control device, control method and power supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021087362A JP7603527B2 (en) 2021-05-25 2021-05-25 Control device, control method and power supply system

Publications (2)

Publication Number Publication Date
JP2022180721A JP2022180721A (en) 2022-12-07
JP7603527B2 true JP7603527B2 (en) 2024-12-20

Family

ID=84327701

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021087362A Active JP7603527B2 (en) 2021-05-25 2021-05-25 Control device, control method and power supply system

Country Status (1)

Country Link
JP (1) JP7603527B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001112178A (en) 1999-10-01 2001-04-20 Mitsubishi Heavy Ind Ltd Power generation system
JP2012066624A (en) 2010-09-21 2012-04-05 Suzuki Motor Corp Power generation control device for electric vehicle
JP2018039463A (en) 2016-09-09 2018-03-15 トヨタ自動車株式会社 Hybrid car

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001112178A (en) 1999-10-01 2001-04-20 Mitsubishi Heavy Ind Ltd Power generation system
JP2012066624A (en) 2010-09-21 2012-04-05 Suzuki Motor Corp Power generation control device for electric vehicle
JP2018039463A (en) 2016-09-09 2018-03-15 トヨタ自動車株式会社 Hybrid car

Also Published As

Publication number Publication date
JP2022180721A (en) 2022-12-07

Similar Documents

Publication Publication Date Title
US10011184B2 (en) Power supply system for vehicle
US9007001B2 (en) Power supply system and vehicle equipped with power supply system
JP5478743B2 (en) Power regeneration power system
CN105599614B (en) The control method and external power supply system of the external power supply system of the vehicle of fuel cell are installed
JP7010069B2 (en) Fuel cell system, vehicle equipped with fuel cell system, and control method of fuel cell system
US20180262018A1 (en) Power supply device, method of controlling power supply device, and storage medium storing power supply device control program
CN110165252B (en) Fuel cell system
CN111277133A (en) Apparatus and method for controlling low voltage DC-DC converter of vehicle
US20170282899A1 (en) Power supply system, transportation apparatus, and power transmission method
CN103947073A (en) Charge and discharge control device, charge control method, discharge control method, and program
US10457272B2 (en) Motive power system, transportation apparatus, and electric power transmission method
JP6426014B2 (en) Bidirectional inverter and storage system using the same
JP2016116255A (en) Electric power supply unit
JP2019119392A (en) Control device of hybrid system in vehicle
JP7603527B2 (en) Control device, control method and power supply system
JP2013182779A (en) Method and device for controlling battery state
KR102435344B1 (en) Battery system of eco-friendly vehicle and method for controlling the same
CN120642163A (en) Battery charging system, battery charging control method, and battery charging control device
JP6195320B2 (en) Power storage device charge / discharge control system
JP2023154861A (en) Secondary battery control device and secondary battery full charge capacity estimation method
JP2018098894A (en) Electric power system
JP2016124481A (en) Vehicle power supply control device
US11654845B2 (en) Control device, vehicle, control method, and storage medium storing a control program
JP2024140743A (en) Solar Charging System
JP2025163547A (en) Power Supply System

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240314

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240911

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240917

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241031

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241112

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241210

R150 Certificate of patent or registration of utility model

Ref document number: 7603527

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150