JP7604341B2 - Maintenance Support System - Google Patents
[go: Go Back, main page]

JP7604341B2 - Maintenance Support System - Google Patents

Maintenance Support System Download PDF

Info

Publication number
JP7604341B2
JP7604341B2 JP2021142255A JP2021142255A JP7604341B2 JP 7604341 B2 JP7604341 B2 JP 7604341B2 JP 2021142255 A JP2021142255 A JP 2021142255A JP 2021142255 A JP2021142255 A JP 2021142255A JP 7604341 B2 JP7604341 B2 JP 7604341B2
Authority
JP
Japan
Prior art keywords
procurement
parts
time
warehouse
support system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021142255A
Other languages
Japanese (ja)
Other versions
JP2023035417A5 (en
JP2023035417A (en
Inventor
益祥 馮
啓朗 室
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP2021142255A priority Critical patent/JP7604341B2/en
Publication of JP2023035417A publication Critical patent/JP2023035417A/en
Publication of JP2023035417A5 publication Critical patent/JP2023035417A5/ja
Application granted granted Critical
Publication of JP7604341B2 publication Critical patent/JP7604341B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は,同じ稼働現場に設置されている複数台の機械の保守支援システムに係わり,特に、機械が異常と判定された場合に適切な保守支援情報を提示する保守支援システムに関する。 The present invention relates to a maintenance support system for multiple machines installed at the same operating site, and in particular to a maintenance support system that presents appropriate maintenance support information when a machine is determined to be abnormal.

建設機械や風車など長時間に亘って運転し続ける機械においては,顧客(機械のオーナー,ユーザー,代理店または営業所)の収益が最大になるようにするため,稼働率の向上が重要である。そのため,故障が起きる前に適切かつ迅速な部品交換や修理を実施できる,または,故障が起きても迅速に機械を修理して再稼働できるような保守支援システムが望まれる。 For machines that operate continuously for long periods of time, such as construction machinery or wind turbines, improving the operating rate is important to maximize profits for customers (machine owners, users, agents, or sales offices). Therefore, there is a need for a maintenance support system that can quickly and appropriately replace parts or carry out repairs before a breakdown occurs, or that can quickly repair machines and get them back up and running again if a breakdown does occur.

そのような保守支援システムを実現するため,機械にセンサを装備し,センサデータを収集して分析することで,機械の状態を常時監視しながら適切な保守指示を送る「保守支援システム」が必要である。 To realize such a maintenance support system, a "maintenance support system" is required that is able to constantly monitor the condition of machines and send appropriate maintenance instructions by equipping the machines with sensors and collecting and analyzing sensor data.

例えば,特許文献1では,部品の故障予兆から故障時間を想定し,当該部品の新規生産に要する時間と比較することで,想定故障時点までの期間が生産所要時間より長い場合は部品生産を指示し,想定故障時点までの期間が生産所要時間以下であると判定した場合は,在庫部品の手配を指示する仕組みが提案されている。 For example, Patent Document 1 proposes a system that estimates the time to failure based on the signs of a part failure, compares it with the time required to newly produce that part, and issues an instruction to produce the part if the time until the expected failure is longer than the required production time, and issues an instruction to arrange for the part to be stocked if it is determined that the time until the expected failure is equal to or shorter than the required production time.

一方,建設機械や風車などの機械は,同じ稼働現場に複数台が設置されることが多い故,複数機械を資産として管理するシステムが提案されている。例えば,特許文献2では,工事現場の情報データベースと,機械の情報データベースと,機械の稼働情報データベースとが備えられた建設機械の資産管理システムが提案されている。 Meanwhile, since multiple construction machines, wind turbines, and other machines are often installed at the same operating site, systems have been proposed to manage multiple machines as assets. For example, Patent Document 2 proposes an asset management system for construction machines that includes a construction site information database, a machine information database, and a machine operation information database.

特開2014-2660号公報JP 2014-2660 A 特開2003-186949号公報JP 2003-186949 A

前述のように,機械に異常が検知された場合,その異常を早期に対応することが要望されている。そして,例えば1つのコア部品が在庫切れ,または輸送に時間を要するといった事象が発生すると,部品調達の期間によっては,機械が長期間に亘って休止しなければならない恐れがある。このような観点から,機械の保守または修理に必要な部品が迅速に調達できることが要望されている。 As mentioned above, when an abnormality is detected in a machine, there is a demand for responding to that abnormality as soon as possible. Furthermore, if an event occurs in which, for example, a core part is out of stock or requires a long period of time to transport, depending on the time it takes to procure the part, there is a risk that the machine will have to be shut down for an extended period of time. From this perspective, there is a demand for parts required for machine maintenance or repair to be procured quickly.

上記特許文献1に開示されている技術では,故障予兆検知による部品調達の迅速化を図ったものの,部品調達の所要時間により機械の停止時間が増加する恐れがある。特に建設機械や風車などの場合は,遠隔地で稼働している場合が多く,交換部品を倉庫から機械の稼働現場までに輸送する際に日数を要することが多いので,部品調達の長期化による機械停止時間増加が懸念される。 The technology disclosed in Patent Document 1 aims to speed up parts procurement by detecting signs of failure, but there is a risk that the time required to procure parts will increase machine downtime. In particular, construction machinery, wind turbines, and the like are often operated in remote locations, and it often takes several days to transport replacement parts from a warehouse to the machine's operating site, so there is concern that longer parts procurement times will increase machine downtime.

一方,同じ稼働現場に機械が複数台ある場合は,故障した機械と同じまたは類似の機種が設置されていることがあり,これら機械が故障した機械の交換部品と同じ部品または互換性のある部品(以下両者を総称して「互換性のある部品」と言う)を持っている場合がある。このような互換性のある部品を持っているほかの機械が停止している,或いは稼働計画の変更により停止する予定であれば,そのような稼働現場の機械から部品を「調達」することが部品調達の迅速化に繋がり,機械の稼働率向上に貢献できる。 On the other hand, when there are multiple machines at the same operating site, some of them may be the same or similar models as the broken machine, and these machines may have the same parts as the replacement parts for the broken machine or compatible parts (hereinafter, both are collectively referred to as "compatible parts"). If other machines that have such compatible parts are stopped or are scheduled to be stopped due to a change in the operating plan, "procuring" the parts from machines at such operating sites can speed up parts procurement and contribute to improving the operating rate of the machines.

しかしながら,上記特許文献2は,同じ稼働現場に設置されている複数の機械を資産として管理する技術の開示にとどまり,同じ(または類似の)機種の機械間で互換性のある部品の供給を融通する仕組みについては言及されていない。 However, the above-mentioned Patent Document 2 only discloses technology for managing multiple machines installed at the same operating site as assets, and does not mention a mechanism for sharing the supply of compatible parts between machines of the same (or similar) model.

本発明は,このような問題に鑑みてなされたもので,その目的は,同じ稼働現場に複数台の機械が設置されている場合,機械の修理に必要な部品を倉庫から調達するか或いは稼動現場のほかの機械から調達するかの両方を考慮して,最適な部品調整を行うことで,部品調達の迅速化を図る保守支援システムを提供することである。 The present invention was made in consideration of these problems, and its purpose is to provide a maintenance support system that, when multiple machines are installed at the same operating site, speeds up parts procurement by making optimal part adjustments, taking into account both whether parts needed to repair a machine should be procured from a warehouse or from other machines at the operating site.

上記の目的を達成するため,本発明は,同じ稼働現場に配置されている複数台の機械の保守支援システムであって,演算処理を行う制御装置と,前記制御装置の演算処理に必要なデータを記憶する記憶装置と,通信装置とを備え,前記制御装置は,前記通信装置を介して取得した前記複数台の機械のそれぞれの稼働データに基づいて,各機械の状態を分析し,前記分析によってある機械が異常と判定された場合に,前記記憶装置に記憶された第1情報に基づいて当該機械の故障を修理するために必要な対策部品とその数量を特定し,前記対策部品を,倉庫および前記同じ稼働現場に配置されているほかの機械から調達する部品調達に要する複数の調達時間を算出し,前記複数の調達時間のうちの少なくとも1つの調達時間を前記通信装置を介して情報提示装置に送信するものとする。 To achieve the above object, the present invention provides a maintenance support system for multiple machines located at the same operating site, comprising a control device for performing arithmetic processing, a storage device for storing data necessary for the arithmetic processing of the control device, and a communication device, the control device analyzes the state of each machine based on the operation data of each of the multiple machines acquired via the communication device, and when a machine is determined to be abnormal by the analysis, identifies countermeasure parts and their quantity required to repair the failure of the machine based on the first information stored in the storage device, calculates multiple procurement times required to procure the countermeasure parts from a warehouse and other machines located at the same operating site, and transmits at least one of the multiple procurement times to an information presentation device via the communication device.

好ましくは,前記制御装置は、前記記憶装置に記憶された第2情報に基づいて前記対策部品を倉庫から調達する倉庫部品調達に要する第1調達時間を算出し,前記記憶装置に記憶された第3情報に基づいて前記対策部品を前記同じ稼働現場に配置されているほかの機械から調達する現場部品調達に要する第2調達時間を算出し,前記第1調達時間および前記第2調達時間を前記通信装置を介して情報提示装置に送信する。 Preferably, the control device calculates a first procurement time required for warehouse part procurement to procure the countermeasure part from a warehouse based on the second information stored in the storage device, calculates a second procurement time required for on-site part procurement to procure the countermeasure part from another machine located at the same operating site based on the third information stored in the storage device, and transmits the first procurement time and the second procurement time to the information presentation device via the communication device.

前記制御装置は,前記対策部品の一部を前記倉庫から調達する倉庫調達と,前記対策部品の残りを前記同じ稼働現場に配置されているほかの機械から調達する現場調達とを組み合わせた組み合わせ調達において,前記複数の調達時間のうちの最小の調達時間を前記通信装置を介して情報提示装置に送信してもよい。 The control device may transmit the shortest procurement time among the multiple procurement times to the information presentation device via the communication device in a combined procurement that combines warehouse procurement, in which some of the countermeasure parts are procured from the warehouse, and on-site procurement, in which the remaining countermeasure parts are procured from other machines located at the same operating site.

本発明によれば,対策部品を,倉庫だけでなく、同じ稼働現場に配置されているほかの機械から調達する部品調達に要する複数の調達時間を算出し,その少なくとも1つの調達時間を情報提示装置に送信するので,倉庫部品調達時間と現場部品調達時間の両方を考慮して部品調達を行うことが可能となり,部品調達の迅速化が図れる。これにより故障による機械の非稼働時間を最小化し,機械の稼働率が向上し,機械の稼働による収益の最大化が期待できる。 According to the present invention, multiple procurement times required to procure parts for countermeasures not only from a warehouse but also from other machines located at the same operating site are calculated, and at least one of the procurement times is transmitted to the information presentation device, making it possible to procure parts taking into account both the warehouse parts procurement time and the on-site parts procurement time, thereby speeding up parts procurement. This minimizes the time that machines are not in operation due to breakdowns, improves the machine's operating rate, and is expected to maximize profits from machine operation.

本発明の第1の実施例における保守支援システムと,この保守支援システムと情報のやり取りを行う機械群,部品倉庫および情報提示装置を含むネットワーク構成を示す図である。1 is a diagram showing a network configuration including a maintenance support system in a first embodiment of the present invention, a group of machines that exchange information with the maintenance support system, a parts warehouse, and an information presentation device. 制御装置の処理内容を示す機能ブロック図である。FIG. 2 is a functional block diagram showing the processing contents of a control device. 記憶装置に収納されているデータベースの構成を示す図である。FIG. 2 is a diagram showing the configuration of a database stored in a storage device. ある機械の異常度の分布および状態判定に用いる閾値の一例を示す図である。1 is a diagram showing an example of a distribution of anomaly levels of a certain machine and threshold values used for determining the state of the machine; 故障・修理履歴データベースのデータ構造の一例を示す図である。FIG. 2 is a diagram illustrating an example of a data structure of a failure/repair history database. 対策部品データベースのデータ構造の一例を示す図である。FIG. 4 is a diagram illustrating an example of a data structure of a countermeasure component database. 倉庫データベースのデータ構造の一例を示す図である。FIG. 2 is a diagram illustrating an example of a data structure of a warehouse database. 現場データベースのデータ構造の一例を示す図である。FIG. 2 is a diagram illustrating an example of a data structure of a site database. 倉庫部品調達時間算出部の処理手順を示す図である。FIG. 13 is a diagram showing a processing procedure of a warehouse parts procurement time calculation unit. 機械情報データベースのデータ構造の一例を示す図である。FIG. 4 is a diagram illustrating an example of a data structure of a machine information database. 部品互換性データベースのデータ構造の一例を示す図である。FIG. 4 is a diagram illustrating an example of a data structure of a part compatibility database. 現場部品調達時間算出部の処理手順を示す図である。FIG. 11 is a diagram showing a processing procedure of a site parts procurement time calculation unit. 倉庫部品調達費用算出部の処理手順を示す図である。FIG. 13 is a diagram showing a processing procedure of a warehouse parts procurement cost calculation unit. 現場部品調達費用算出部の処理手順を示す図である。FIG. 11 is a diagram showing a processing procedure of a field parts procurement cost calculation unit. 出力部の表示指令により情報提示装置の画面に表示される表示例を示す図である。11A and 11B are diagrams illustrating an example of a display displayed on a screen of the information presentation device in response to a display command from an output unit. 本発明の第2の実施例における制御装置の処理内容を示す機能ブロック図である。FIG. 11 is a functional block diagram showing the processing contents of a control device in a second embodiment of the present invention. 本発明の第2の実施例における部品調達組合せ作成部の結果である部品調達組合せのデータ構造の一例を示す図である。FIG. 13 is a diagram showing an example of a data structure of a parts procurement combination resulting from a parts procurement combination creation unit in the second embodiment of the present invention. 本発明の第2の実施例における部品調達時間算出部と部品調達費用算出の計算結果のデータ構造の一例を示す図である。13 is a diagram showing an example of a data structure of a part procurement time calculation unit and a calculation result of a part procurement cost calculation in the second embodiment of the present invention. FIG.

以下,本発明の実施例を,保守支援システムの対象である機械が建設機械の代表例である油圧ショベルである場合について,図面を参照して説明する。 Below, an embodiment of the present invention will be described with reference to the drawings, assuming that the machine targeted by the maintenance support system is a hydraulic excavator, which is a typical example of construction machinery.

~全体構成~
図1は,本発明の第1の実施例における保守支援システムと,この保守支援システムと情報のやり取りを行う機械群,部品倉庫および情報提示装置を含むネットワーク構成を示す図である。図中,保守支援システムは符号1で,機械群は符号10で,部品倉庫は符号40で,情報提示装置は符号50でそれぞれ示されている。以下において,部品倉庫は単に倉庫と言うことがある。
~Overall composition~
1 is a diagram showing a network configuration including a maintenance support system according to a first embodiment of the present invention, a group of machines that exchange information with the maintenance support system, a parts warehouse, and an information presentation device. In the figure, the maintenance support system is indicated by reference number 1, the group of machines by reference number 10, the parts warehouse by reference number 40, and the information presentation device by reference number 50. In the following, the parts warehouse may be simply referred to as the warehouse.

図1において,保守支援システム1は,機械群10の機械10a,10b,10c・・・の状態を監視して機械群10の保守作業を支援するシステムであり,サーバ100と記憶装置200とを備えている。サーバ100は,演算処理を行う制御装置100aと通信装置100bとを有している。記憶装置200には制御装置100aの演算処理に必要なデータが記憶されている。保守支援システム1は,例えばメーカの管理事務所にサービス営業所に配置されている。 In FIG. 1, the maintenance support system 1 is a system that monitors the status of machines 10a, 10b, 10c, etc. in a group of machines 10 to support maintenance work for the group of machines 10, and is equipped with a server 100 and a storage device 200. The server 100 has a control device 100a that performs arithmetic processing, and a communication device 100b. The storage device 200 stores data necessary for the arithmetic processing of the control device 100a. The maintenance support system 1 is installed, for example, in a manufacturer's management office or service sales office.

制御装置100aは,電源,CPU(Central Processing Unit),メモリ,入出力装置等を備える1台または複数台のコンピューターで構成されている。制御装置100aは,通信装置100bを介して,LAN(Local Area Network)やインターネット等で構成されたネットワーク20に接続されている。 The control device 100a is composed of one or more computers equipped with a power supply, a CPU (Central Processing Unit), memory, input/output devices, etc. The control device 100a is connected to a network 20 composed of a LAN (Local Area Network), the Internet, etc., via a communication device 100b.

記憶装置200は,例えば1つまたは複数のハードディスクで構成されている。記憶装置200はサーバ100内に設置してもよいし,ネットワーク20を介してサーバ100と接続してもよい。記憶装置200は,制御装置100aの処理に係わるデータを,電子ファイル形式またはリレーショナル・データベースなどのデータベース形式で記憶している。 The storage device 200 is composed of, for example, one or more hard disks. The storage device 200 may be installed in the server 100, or may be connected to the server 100 via the network 20. The storage device 200 stores data related to the processing of the control device 100a in electronic file format or database format such as a relational database.

機械群10の機械10a,10b,10c・・・は,同じ稼働現場に配置された複数台の機械であり,それぞれ,複数のサブユニットまたは部品から構成されている。また,機械10a,10b,10c・・・は,それぞれ,圧力や温度等を計測する各種のセンサ11と,制御装置12と,通信装置13とを備え,制御装置12は,センサ11で計測した圧力や温度等の情報(稼働データ)を,通信装置13を介して保守支援システム1に送信することができる。機械10a,10b,10c・・・は,それぞれ,稼働計画と保守計画を持っており,その計画に基づいて稼働,停止,保守が行われる。 The machines 10a, 10b, 10c, etc. of the machine group 10 are multiple machines arranged at the same operating site, and each is composed of multiple subunits or parts. Each of the machines 10a, 10b, 10c, etc. is equipped with various sensors 11 that measure pressure, temperature, etc., a control device 12, and a communication device 13, and the control device 12 can transmit information (operation data) such as pressure and temperature measured by the sensor 11 to the maintenance support system 1 via the communication device 13. Each of the machines 10a, 10b, 10c, etc. has an operation plan and a maintenance plan, and operation, shutdown, and maintenance are performed based on the plan.

なお,図1において,機械群10の機械10a,10b,10c・・・として建設機械の代表例である油圧ショベルを例示しているが,機械10a,10b,10c・・・は建設機械に限られず,風車等のほかの機械であってもよい。 In FIG. 1, the machines 10a, 10b, 10c, etc. of the group of machines 10 are illustrated as hydraulic excavators, which are a typical example of construction machines, but the machines 10a, 10b, 10c, etc. are not limited to construction machines and may be other machines such as wind turbines.

部品倉庫40は,機械群10が使用する部品を保管し,保管した部品の在庫管理や,部品の入荷および出荷を管理するものである。部品倉庫40は,図示しない制御装置および通信装置を備え,通信装置を介してネットワーク20に接続され,更に保守支援システム1のサーバ100に接続されている。 The parts warehouse 40 stores the parts used by the machine group 10, and manages the inventory of the stored parts, as well as the arrival and shipment of parts. The parts warehouse 40 is equipped with a control device and a communication device (not shown), and is connected to the network 20 via the communication device, and is further connected to the server 100 of the maintenance support system 1.

情報提示装置50は,例えばスマートフォン(スマホ)に代表される携帯端末であり,入力機能と表示機能と撮影機能等の各種機能を備えている。情報提示装置50もネットワーク20を介して保守支援システム1のサーバ100に接続され,サーバ100から送信された調達情報を含む各種情報(後述)を表示し,顧客(機械のオーナー,ユーザー,代理店または営業所)を含む関係者に提示する。ユーザーは,例えば,稼動現場の点検員,営業所のサービス員などである。顧客以外の関係者は,例えばメーカの保守点検員である。 The information presentation device 50 is a mobile terminal such as a smartphone, and has various functions such as input, display, and photography. The information presentation device 50 is also connected to the server 100 of the maintenance support system 1 via the network 20, and displays various information (described below) including procurement information sent from the server 100, and presents it to relevant parties including customers (machine owners, users, agents, or sales offices). Users are, for example, inspectors at the operation site and service personnel at sales offices. Stakeholders other than customers are, for example, maintenance and inspection personnel at the manufacturer.

~制御装置および記憶装置~
図2は,制御装置100aの処理内容を示す機能ブロック図である。制御装置100aは,機械状態分析部102と,対策部品推定部103と,倉庫部品調達時間算出部104と,現場部品調達時間算出部105と,倉庫部品調達費用算出部106と,現場部品調達費用算出部107,部品調達方法決定部108と,出力部109とから構成され,図示矢印の順序で処理が実行される。
-Control device and storage device-
2 is a functional block diagram showing the processing contents of the control device 100a. The control device 100a is composed of a machine state analysis unit 102, a countermeasure part estimation unit 103, a warehouse part procurement time calculation unit 104, a field part procurement time calculation unit 105, a warehouse part procurement cost calculation unit 106, a field part procurement cost calculation unit 107, a part procurement method determination unit 108, and an output unit 109, and processes are executed in the order of the illustrated arrows.

図3は,記憶装置200に収納されているデータベースの構成を示す図である。記憶装置200は,故障・修理履歴データベースD001,対策部品データベースD002,倉庫データベースD003,現場データベースD004,機械情報データベースD005,部品互換性データベースD006を有している。これらデータベースD001~D006のデータ構造は後述する。 Figure 3 shows the configuration of the databases stored in the storage device 200. The storage device 200 has a failure and repair history database D001, a countermeasure parts database D002, a warehouse database D003, a site database D004, a machine information database D005, and a parts compatibility database D006. The data structures of these databases D001 to D006 will be described later.

~制御装置の処理内容~
制御装置100aは,その特徴として,通信装置100bを介して取得した複数台の機械のそれぞれの稼働データに基づいて,各機械の状態を分析し,分析によってある機械が異常と判定された場合に,記憶装置200に記憶された第1情報(後述)に基づいて機械の故障を修理するために必要な対策部品とその数量を特定し,対策部品を,倉庫40および同じ稼働現場に配置されているほかの機械10a,10b,10c・・・から調達する部品調達に要する複数の調達時間を算出し,複数の調達時間のうちの少なくとも1つの調達時間を通信装置100bを介して情報提示装置に送信する。
~Processing contents of the control device~
A characteristic of the control device 100a is that it analyzes the status of each machine based on the operation data of each of a plurality of machines obtained via the communication device 100b, and if the analysis determines that a certain machine is abnormal, it identifies the countermeasure parts and their quantity required to repair the machine's failure based on the first information (described later) stored in the memory device 200, calculates multiple procurement times required to procure the countermeasure parts from the warehouse 40 and other machines 10a, 10b, 10c, ... located at the same operating site, and transmits at least one of the multiple procurement times to the information presentation device via the communication device 100b.

制御装置100aは上記のような処理を実行するため,図2に示した処理部102~109を備えている。 To execute the above-mentioned processing, the control device 100a is equipped with processing units 102 to 109 shown in FIG. 2.

以下に,制御装置100aの各部の処理内容を説明する。 The processing contents of each part of the control device 100a are explained below.

<機械状態分析部102>
機械状態分析部102は,機械群10の全ての機械10a,10b,10c・・・から,累積稼働時間などの稼働情報およびセンサ11で計測した圧力や温度等の計測情報を含む稼働データを通信装置100bを介して取得し,その稼働データに基づいて各機械の状態を分析する。
<Machine Condition Analysis Unit 102>
The machine condition analysis unit 102 acquires operation data, including operation information such as cumulative operating time and measurement information such as pressure and temperature measured by the sensor 11, from all of the machines 10a, 10b, 10c, ... in the machine group 10 via the communication device 100b, and analyzes the condition of each machine based on the operation data.

また,機械状態分析部102は,機械10a,10b,10c・・・のそれぞれの稼働データに基づいて各機械の健全性指標を算出し,健全性指標に基づいて各機械が正常か異常かを分類することで,各機械の状態を分析する。 The machine condition analysis unit 102 also calculates a health index for each machine based on the operation data of each machine 10a, 10b, 10c, etc., and analyzes the condition of each machine by classifying each machine as normal or abnormal based on the health index.

具体的には,機械状態分析部102は,各機械から取得した稼働データから,データマイニングまたは機械学習,余寿命診断等のアルゴリズムを用いて健全性指標を算出する。本実施例では,異常検知アルゴリズムを用いた場合の状態分析方法について説明する。 Specifically, the machine condition analysis unit 102 calculates a health index from the operation data acquired from each machine using algorithms such as data mining, machine learning, and remaining life assessment. In this embodiment, a condition analysis method using an anomaly detection algorithm is described.

異常検知アルゴリズムでは,各機械の稼働データから「特徴量」と呼ばれる物理量を作成し,正常な機械で得られた特徴量から正常モデルを作成する。特徴量は,各機械の稼働データから抽出した複数の物理量の組合せであり,ベクトル形式で記述される。以下,ベクトル形式で記述した複数の特徴量の組合せを特徴量ベクトルと称す。特徴量ベクトルに対応する正常モデルは,正常な機械で得られた特徴量ベクトルの平均(以下,平均ベクトル)および分散で記述することができる。各機械の異常度は,新たに得られた物理量に対し,その特徴量ベクトルと平均ベクトルとの距離を定量化して異常度として算出する。例えばマハラノビス・タグチ法という統計的アルゴリズムによれば,各機械の異常度を以下の式(1)で計算することができる。 In the anomaly detection algorithm, physical quantities called "features" are created from the operation data of each machine, and a normal model is created from the features obtained from normal machines. Features are a combination of multiple physical quantities extracted from the operation data of each machine, and are described in vector format. Hereinafter, a combination of multiple features described in vector format will be referred to as a feature vector. The normal model corresponding to the feature vector can be described by the average (hereinafter referred to as the mean vector) and variance of the feature vectors obtained from normal machines. The degree of anomaly for each machine is calculated by quantifying the distance between the feature vector and the mean vector for the newly obtained physical quantity. For example, according to a statistical algorithm called the Mahalanobis-Taguchi method, the degree of anomaly for each machine can be calculated using the following formula (1).

Figure 0007604341000001
Figure 0007604341000001

ここで,aは異常度であり,xは新たに得られた特徴量ベクトルであり,μは平均ベクトルであり,σは正常な機械で得られた特徴量ベクトルxの標準偏差(分散の平方根)である。式(1)の右辺の分子は,新たな特徴量ベクトルxから平均ベクトルμまでの距離の二乗を示し,右辺の分母は,平均ベクトルμの算出に用いた特徴量ベクトルxの分散を示す。 Here, a is the degree of anomaly, x is the newly obtained feature vector, μ is the mean vector, and σ is the standard deviation (square root of the variance) of the feature vector x obtained by a normal machine. The numerator on the right side of equation (1) indicates the square of the distance from the new feature vector x to the mean vector μ, and the denominator on the right side indicates the variance of the feature vector x used to calculate the mean vector μ.

異常度の大きさである異常度aを機械の健全性指標として用いることにより,それに応じて機械の状態が正常または異常かについて判断することができる。良く利用される手法では,異常度aの閾値を設定し,異常度aが閾値を超える場合は「異常」と判定し,閾値を超えていない場合は「正常」と判定する。 By using the degree of abnormality a, which is the magnitude of the abnormality, as an indicator of the machine's health, it is possible to judge whether the machine's condition is normal or abnormal accordingly. A commonly used method is to set a threshold value for the degree of abnormality a, and if the degree of abnormality a exceeds the threshold, it is judged to be "abnormal," and if it does not exceed the threshold, it is judged to be "normal."

図4は,ある機械の異常度aの分布および状態判定に用いる閾値の一例を示す図である。図中の閾値は,機械の異常度aから算出される異常と正常の境界線である。異常度aと閾値を用いて,機械の異常を判定するアルゴリズムを次のような擬似コードで記述することができる。 Figure 4 shows an example of the distribution of the degree of abnormality a of a certain machine and the threshold value used to determine the state. The threshold value in the figure is the boundary between abnormality and normality calculated from the degree of abnormality a of the machine. Using the degree of abnormality a and the threshold value, an algorithm for determining whether a machine is abnormal can be written in the following pseudocode.

Figure 0007604341000002
Figure 0007604341000002

<対策部品推定部103>
対策部品推定部103は,機械状態分析部102において,ある機械の稼動データの異常度aが閾値を超え,異常と判定された(以下において「異常が検出された」と言うことがある)場合,記憶装置200の故障・修理履歴データベースD001と対策部品データベースD002に記憶された情報(第1情報)に基づいて当該機械の故障を修理するために必要な対策部品とその数量を特定する。
<Countermeasure part estimation unit 103>
When the machine condition analysis unit 102 determines that the degree of abnormality a of the operation data of a certain machine exceeds a threshold value and an abnormality has occurred (hereinafter, this may be referred to as "an abnormality has been detected"), the countermeasure part estimation unit 103 identifies the countermeasure parts and their quantity required to repair the failure of the machine, based on the information (first information) stored in the failure/repair history database D001 and the countermeasure part database D002 in the storage device 200.

図5は,故障・修理履歴データベースD001のデータ構造の一例を示す図である。故障・修理履歴データベースD001は,故障・修理のケースごとに分析時の健全性指標の値を記憶し,分析時の健全性指標の値ごとに,故障モードと,故障までの日数,修理に使われる交換部品リスト,修理所要時間,修理費用等を記憶している。 Figure 5 is a diagram showing an example of the data structure of the failure/repair history database D001. The failure/repair history database D001 stores the value of the health index at the time of analysis for each failure/repair case, and for each value of the health index at the time of analysis, stores the failure mode, the number of days until failure, a list of replacement parts used for repair, the time required for repair, the repair cost, etc.

図6は,対策部品データベースD002のデータ構造の一例を示す図である。対策部品データベースD002は,故障モードごとに,故障を修理するために必要な対策部品の部品番号と対策部品の名前と対策部品の数量を記憶している。 Figure 6 shows an example of the data structure of the countermeasure parts database D002. The countermeasure parts database D002 stores, for each failure mode, the part numbers, names, and quantities of countermeasure parts required to repair the failure.

まず,対策部品推定部103は,ある機械の稼動データの異常度a(健全性指標)が閾値を超え,その機械が異常であると判定されたとき,当該機械の状態の分析に用いた異常度a(健全性指標)の値に基づいて故障モードを特定し,この故障モードを修理するために必要な対策部品とその数量を含む対策部品のリストを生成する。 First, when the degree of anomaly a (health index) of the operation data of a certain machine exceeds a threshold value and the machine is judged to be abnormal, the countermeasure part estimation unit 103 identifies the failure mode based on the value of the degree of anomaly a (health index) used to analyze the state of the machine, and generates a list of countermeasure parts including the countermeasure parts and their quantities required to repair this failure mode.

具体的には,対策部品推定部103は,故障・修理履歴データベースD001に記憶されている故障モードのうち,分析時の健全性指標の値に対応する故障モードを選択し,この選択した故障モードを,機械状態分析部102において異常が検出されたときの故障モードであると推定する。 Specifically, the countermeasure part estimation unit 103 selects the failure mode that corresponds to the value of the soundness index at the time of analysis from among the failure modes stored in the failure/repair history database D001, and estimates that this selected failure mode is the failure mode when an abnormality is detected by the machine condition analysis unit 102.

また,対策部品推定部103は,対策部品データベースD002に記憶されている情報を用い,対策部品データベースD002に記憶されている,故障モードごとの故障を修理するために必要な部品とその数量の情報に基づいて,特定した故障モードを修理するために必要な対策部品とその数量を取得して特定する。 The countermeasure parts estimation unit 103 also uses the information stored in the countermeasure parts database D002 to acquire and identify the countermeasure parts and their quantities required to repair the identified failure mode, based on the information on the parts and their quantities required to repair the failure for each failure mode stored in the countermeasure parts database D002.

ここで,故障モードは,健全性指標を計算する前に,機械の知識と故障履歴から,当該機械に起こり得る故障の形態として予め定められている。故障モードの例としては,例えばバッテリーの劣化,バケットのツースの損傷などがある。バッテリーの劣化はバッテリーの充電状態(SOC)の劣化によって生じる故障であり,バッテリーの充電状態に関する計測情報を分析することで健全性指標を算出することができる。バケットのツースの損傷はツースの摩耗によって生じる故障であり,累積稼働時間の稼働情報を分析することで健全性指標を算出することができる。 Here, the failure modes are determined in advance as possible failure modes that may occur in the machine based on knowledge of the machine and its failure history before calculating the health index. Examples of failure modes include battery degradation and damage to bucket teeth. Battery degradation is a failure caused by deterioration of the battery's state of charge (SOC), and the health index can be calculated by analyzing measurement information related to the battery's state of charge. Bucket tooth damage is a failure caused by wear of the teeth, and the health index can be calculated by analyzing operation information on the cumulative operating time.

<倉庫部品調達時間算出部104>
倉庫部品調達時間算出部104は,記憶装置200の倉庫データベースD003と現場データベースD004に記憶された情報(第2情報)に基づいて,上述した対策部品を部品倉庫40から調達する倉庫部品調達に要する倉庫部品調達時間(第1調達時間)Tを算出する。
<Warehouse parts procurement time calculation unit 104>
The warehouse parts procurement time calculation unit 104 calculates a warehouse parts procurement time (first procurement time) T S required for warehouse parts procurement to procure the above-mentioned countermeasure parts from the parts warehouse 40, based on the information (second information) stored in the warehouse database D003 and the site database D004 of the storage device 200.

倉庫部品調達時間Tとは,健全性指標が閾値を超え,機械の異常が検出された時点から対策部品の全てが稼働現場(以下単に現場と言うことがある)に到着するまでの時間を意味する。 The warehouse parts procurement time T S means the time from the time when the health index exceeds the threshold and a machine abnormality is detected to the time when all of the countermeasure parts arrive at the operation site (hereinafter sometimes simply referred to as the site).

図7は,倉庫データベースD003のデータ構造の一例を示す図である。倉庫データベースD003は,倉庫の基本情報および当該倉庫に保管されている全ての部品のリストを記憶している。倉庫の基本情報には,少なくとも倉庫名,倉庫の住所,倉庫の連絡先などが含まれる。部品リストには,倉庫に保管されている全ての部品について,少なくとも部品の部品番号,部品名,重量,寸法,単価,在庫数量,輸送手段などが含まれる。 Figure 7 shows an example of the data structure of the warehouse database D003. The warehouse database D003 stores basic information about the warehouse and a list of all parts stored in the warehouse. The basic information about the warehouse includes at least the warehouse name, warehouse address, and contact information for the warehouse. The parts list includes at least the part number, part name, weight, dimensions, unit price, inventory quantity, and transportation method for all parts stored in the warehouse.

図8は,現場データベースD004のデータ構造の一例を示す図である。現場データベースD004は,少なくとも,現場の名称と,現場の住所と,現場に実施されているプロジェクトの期間と,当該プロジェクトの期待収益と,当該プロジェクト掘削計画と,当該現場に所有される機械のリストを記憶している。 Figure 8 is a diagram showing an example of the data structure of the site database D004. The site database D004 stores at least the name of the site, the address of the site, the duration of the project being implemented at the site, the expected profit of the project, the drilling plan for the project, and a list of machines owned at the site.

図9は倉庫部品調達時間算出部104の処理手順を示す図である。 Figure 9 shows the processing procedure of the warehouse parts procurement time calculation unit 104.

倉庫部品調達時間算出部104は,ステップS4401において,倉庫データベースD003から,対策部品の重量,寸法,在庫数量,輸送手段,倉庫の住所等の情報を取得し,現場データベースD004から稼働現場の住所を取得する。 In step S4401, the warehouse parts procurement time calculation unit 104 obtains information such as the weight, dimensions, inventory quantity, transportation method, and warehouse address of the countermeasure parts from the warehouse database D003, and obtains the address of the operation site from the site database D004.

次いで,ステップS4402において,ステップS4401で取得した対策部品の重量,寸法,在庫数量,輸送手段,倉庫の住所,稼働現場の住所の情報に基づいて,部品を倉庫40から現場の機械まで調達する際の倉庫部品調達時間Tを算出する。具体的には,在庫数量が十分にある場合は,対策部品の重量,寸法,倉庫の住所,現場の住所,輸送手段の情報から対策部品を輸送するための輸送手段を特定し,この輸送手段と倉庫の住所および現場の住所に基づいて,対策部品を倉庫40から現場まで輸送するのに要する想定輸送時間を倉庫部品調達時間Tとして算出する。在庫数量が不足する場合は,不足する数量の部品を外部から調達する時間を含めて倉庫部品調達時間Tとする。 Next, in step S4402, a warehouse parts procurement time T S for procuring the parts from the warehouse 40 to the machine at the site is calculated based on the information on the weight, dimensions, inventory quantity, transportation means, warehouse address, and operation site address of the countermeasure parts acquired in step S4401 . Specifically, when the inventory quantity is sufficient, a transportation means for transporting the countermeasure parts is specified from the information on the weight, dimensions, warehouse address, site address, and transportation means of the countermeasure parts, and an estimated transportation time required to transport the countermeasure parts from the warehouse 40 to the site is calculated as the warehouse parts procurement time T S based on this transportation means, the warehouse address, and the site address. When the inventory quantity is insufficient, the warehouse parts procurement time T S is set to include the time to procure the insufficient quantity of parts from outside.

<現場部品調達時間算出部105>
現場部品調達時間算出部105は,記憶装置200の機械情報データベースD005と部品互換性データベースD006に記憶された情報(第3情報)に基づいて,上述した対策部品を同じ稼働現場に配置されているほかの機械から調達する現場部品調達に要する現場部品調達時間(第2調達時間)Tを算出する。
<On-site parts procurement time calculation unit 105>
The on-site parts procurement time calculation unit 105 calculates the on-site parts procurement time (second procurement time) T G required for on-site parts procurement to procure the above-mentioned countermeasure parts from other machines located at the same operating site, based on the information (third information) stored in the machine information database D005 and the part compatibility database D006 of the storage device 200.

現場部品調達時間Tとは,健全性指標が閾値を超え,機械の異常が検出された時点から対策部品の全てが同じ稼働現場に配置されているほかの機械から提供可能となるまでの時間を意味する。 The on-site parts procurement time T G refers to the time from the point when the health index exceeds the threshold and a machine abnormality is detected to the point when all of the countermeasure parts are available from other machines located at the same operating site.

図10は,機械情報データベースD005のデータ構造の一例を示す図である。機械情報データベースD005は,機械群10の全ての機械について,少なくとも,各機械の機種情報,稼働計画,修理履歴,部品リスト,部品互換性情報,および単位時間内の平均掘削量を保存している。機種情報は,当該機械の機種・モデル名,型式,製造番号,製造年月日などの基本情報を記憶している。稼働計画は,対象の稼働現場において当該機械の稼働時間,操作モードといった稼働予定に関する情報を含む。修理履歴は,当該機械の過去における修理と部品交換に関する情報を含み,これらの情報は故障・修理履歴データベースD001から取得してもよい。部品リストは,当該機械が所有している全ての部品を含む。部品互換性情報は,当該機械の各部品について,ほかの機種の部品との間に互換性がある部品(以下,互換部品と言うこともある)の情報を含む。互換性のある部品間では,片方の部品が故障した場合,ほかの部品を代替品として使用することが可能である。単位時間内の平均掘削量は,油圧ショベルが掘削した土砂の重量の過去の時間当たりの平均値である。 Figure 10 is a diagram showing an example of the data structure of the machine information database D005. The machine information database D005 stores at least the model information, operation plan, repair history, parts list, parts compatibility information, and average excavation volume per unit time for all machines in the machine group 10. The model information stores basic information such as the model name, type, serial number, and manufacturing date of the machine. The operation plan includes information on the operation schedule such as the operation time and operation mode of the machine at the target operation site. The repair history includes information on past repairs and part replacements of the machine, and this information may be obtained from the failure/repair history database D001. The parts list includes all parts owned by the machine. The parts compatibility information includes information on parts that are compatible with parts of other models (hereinafter, sometimes referred to as compatible parts) for each part of the machine. If one part breaks down between compatible parts, the other part can be used as a substitute. The average excavation volume per unit time is the average value per hour of the weight of soil excavated by the hydraulic excavator in the past.

図11は,部品互換性データベースD006のデータ構造の一例を示す図である。部品互換性データベースD006は,機械群10の全ての機械が備える全ての部品について,当該部品と互換できる部品のリストを記憶している。 Figure 11 is a diagram showing an example of the data structure of the parts compatibility database D006. The parts compatibility database D006 stores a list of parts that are compatible with all parts equipped on all machines in the machine group 10.

図12は現場部品調達時間算出部105の処理手順を示す図である。 Figure 12 shows the processing procedure of the on-site parts procurement time calculation unit 105.

現場部品調達時間算出部105は,ステップS5501において,機械情報データベースD005から,稼働現場に配置されている機械に関する情報として,対策部品と互換性のある部品を提供できる機械のリスト(以下「互換部品機械リスト」と言う)と,当該機械の稼働計画,部品リストおよび部品互換性情報を含む情報を取得する。上述したように,部品リストは各機械を構成する部品のリストであり,部品互換性情報は,各部品について互換可能な部品のリストである。部品互換性情報は,部品互換性データベースD006から取得してもよいし,部品互換性データベースD006を併用して取得してもよい。 In step S5501, the on-site parts procurement time calculation unit 105 obtains, from the machine information database D005, information regarding the machines located at the operation site, including a list of machines that can provide parts compatible with the countermeasure parts (hereinafter referred to as the "compatible parts machine list"), the operation plan of the machine, the parts list, and parts compatibility information. As described above, the parts list is a list of parts that make up each machine, and the parts compatibility information is a list of parts that are compatible with each part. The parts compatibility information may be obtained from the parts compatibility database D006, or may be obtained by using the parts compatibility database D006 in combination.

次いで,ステップS5502において,ステップS5501で取得した互換部品機械リストと部品リストおよび部品互換性情報に基づいて,対策部品推定部103において特定した対策部品のそれぞれに対し,互換部品の情報を取得する。 Next, in step S5502, information on compatible parts is obtained for each countermeasure part identified by the countermeasure part estimation unit 103 based on the compatible part machine list, parts list, and part compatibility information obtained in step S5501.

現場部品調達時間算出部105は,ステップS5503において,ステップS5501で取得した互換部品機械のリストについて,それぞれの機械の「稼働計画」と照合し,それぞれの機械の互換部品を提供可能な日を予測し,この互換部品提供日の情報に基づいて現場部品調達時間Tを算出する。互換部品を提供できる機械が複数台存在する場合は,機械の互換部品の調達時間を全て計算し,互換部品の提供日の最も早い機械を選択し,その機械の互換部品の調達時間を現場部品調達時間Tとする。 In step S5503, the on-site parts procurement time calculation unit 105 compares the list of machines with compatible parts acquired in step S5501 with the "operation plan" of each machine, predicts the date on which compatible parts for each machine can be provided, and calculates the on-site parts procurement time T G based on the information on the compatible parts provision date. If there are multiple machines that can provide compatible parts, it calculates the procurement times of the compatible parts for all the machines, selects the machine with the earliest compatible parts provision date, and sets the procurement time of the compatible parts for that machine as the on-site parts procurement time T G.

<倉庫部品調達費用算出部106>
倉庫部品調達費用算出部106は,機械のダウンタイムDによる機械稼働ロス費用(第1稼働ロス費用)CSKを含めて,対策部品を部品倉庫40から調達するのに要するトータル費用を算出する。
<Warehouse parts procurement cost calculation unit 106>
The warehouse parts procurement cost calculation unit 106 calculates the total cost required to procure the countermeasure parts from the parts warehouse 40, including the machine operation loss cost (first operation loss cost) CSK due to the machine downtime DK .

図13は,倉庫部品調達費用算出部106の処理手順を示す図である。 Figure 13 shows the processing procedure of the warehouse parts procurement cost calculation unit 106.

倉庫部品調達費用算出部106は,まず,ステップS401,S402において,記憶装置200の図7に示した倉庫データベースD003と図8に示した現場データベースD004に記憶された情報(第4情報)に基づいて必要な数量の対策部品を倉庫40から調達する倉庫部品調達に要する倉庫部品調達費用(第1調達費用)Cを算出する。 First, in steps S401 and S402, the warehouse parts procurement cost calculation unit 106 calculates a warehouse parts procurement cost (first procurement cost) C S required for procuring warehouse parts for procuring the required quantity of countermeasure parts from the warehouse 40 based on the information (fourth information) stored in the warehouse database D003 shown in FIG. 7 and the site database D004 shown in FIG. 8 in the storage device 200.

まず,倉庫部品調達費用算出部106は,ステップS401において,図9のステップS4401と同様に,倉庫データベースD003から,対策部品の重量,寸法,在庫数量,輸送手段,倉庫の住所等の情報を取得し,現場データベースD004から稼働現場の住所を取得する。また,ステップS401では,倉庫データベースD003から,対策部品の価格に関する情報を取得する。 First, in step S401, the warehouse parts procurement cost calculation unit 106 acquires information such as the weight, dimensions, inventory quantity, transportation means, and warehouse address of the countermeasure parts from the warehouse database D003, as in step S4401 of FIG. 9, and acquires the address of the operation site from the site database D004. Also, in step S401, information on the price of the countermeasure parts is acquired from the warehouse database D003.

倉庫部品調達費用算出部106は,ステップS402において,倉庫データベースD003および現場データベースD004から取得した情報に基づいて,部品を部品倉庫40から稼働現場の機械まで調達するのに要する倉庫部品調達費用Cを算出する。 In step S402, the warehouse parts procurement cost calculation unit 106 calculates the warehouse parts procurement cost C S required to procure the parts from the parts warehouse 40 to the machine at the operation site, based on the information acquired from the warehouse database D003 and the site database D004 .

具体的には,倉庫部品調達費用算出部106は,倉庫データベースD003から各部品の単価Pを取得し,対策部品推定部103で生成した対策部品リストから各部品の数量Mを取得する。また,倉庫部品調達費用算出部106は,倉庫データベースD003から取得される輸送手段の情報から調達部品の輸送費用Tを算出する。ただし,複数の部品をまとめて輸送する場合は,まとめ輸送の費用を使う。 Specifically, the warehouse parts procurement cost calculation unit 106 acquires the unit price P i of each part from the warehouse database D003, and acquires the quantity M i of each part from the countermeasure parts list generated by the countermeasure parts estimation unit 103. In addition, the warehouse parts procurement cost calculation unit 106 calculates the transportation cost T i of the procurement part from the information on the transportation means acquired from the warehouse database D003. However, when multiple parts are transported together, the cost of bulk transportation is used.

そして,以下の式(3)を用いて倉庫部品調達費用Cを算出する。 Then, the warehouse parts procurement cost C S is calculated using the following formula (3).

Figure 0007604341000003
Figure 0007604341000003

倉庫部品調達費用算出部106は,ステップS403において,図9のステップS4402と同様に,対策部品の重量,寸法,倉庫の住所,現場の住所,輸送手段の情報に基づいて,対策部品を倉庫40から現場まで輸送するのに要する倉庫部品調達時間(第1調達時間)Tを算出する。倉庫部品調達費用算出部106は,ステップS403の処理を省略し,図9のステップS4402で算出した倉庫部品調達時間を用いてもよい。 In step S403, the warehouse parts procurement cost calculation unit 106 calculates a warehouse parts procurement time (first procurement time) T S required to transport the countermeasures part from the warehouse 40 to the site based on the weight and dimensions of the countermeasures part, the address of the warehouse, the address of the site, and information on the transportation means, in the same manner as in step S4402 in Fig. 9. The warehouse parts procurement cost calculation unit 106 may omit the processing of step S403 and use the warehouse parts procurement time calculated in step S4402 in Fig. 9.

倉庫部品調達費用算出部106は,ステップS404,S405において,倉庫部品調達時間(第1調達時間)Tと,記憶装置200の図5に示した故障・修理履歴データベースD001と図8に示した現場データベースD004と図10に示した機械情報データベースD005に記憶された情報(第5情報)に基づいて,対策部品を倉庫40から調達する倉庫部品調達を行う際の機械のダウンタイムDSKによる機械稼働ロス費用(第1稼働ロス費用)CSKを算出する。 In steps S404 and S405, the warehouse parts procurement cost calculation unit 106 calculates a machine operation loss cost (first operation loss cost) C SK due to machine downtime D SK when performing warehouse parts procurement to procure countermeasure parts from the warehouse 40, based on the warehouse parts procurement time (first procurement time) T S and the information (fifth information) stored in the failure/repair history database D001 shown in FIG . 5, the site database D004 shown in FIG. 8, and the machine information database D005 shown in FIG. 10 in the storage device 200.

まず,倉庫部品調達費用算出部106は,ステップS404において,倉庫部品調達時間(第1調達時間)Tと記憶装置200の故障・修理履歴データベースD001に記憶された情報に基づいて対策部品を倉庫40から調達する倉庫部品調達を行う際の機械のダウンタイムDSKを算出し,次いで,ステップS405において,記憶装置200の現場データベースD004と機械情報データベースD005に記憶された情報に基づいて機械のダウンタイムDSKによる機械稼働ロス費用(第1稼働ロス費用)CSKを算出する。 First, in step S404, the warehouse parts procurement cost calculation unit 106 calculates a machine downtime DSK when warehouse parts procurement is performed to procure countermeasure parts from the warehouse 40, based on the warehouse parts procurement time (first procurement time) T S and the information stored in the failure/repair history database D001 of the storage device 200, and then, in step S405, calculates a machine operation loss cost (first operation loss cost) C SK due to the machine downtime D SK , based on the information stored in the site database D004 and the machine information database D005 of the storage device 200.

ここで,倉庫部品調達費用算出部106は,故障・修理履歴データベースD001に記憶されている情報であり,該当する故障および修理のケースごと或いは該当する健全性指標ごとの「故障までの日数」および「修理所要時間」の情報を用いて機械のダウンタイムDを算出する。「故障までの日数」は,機械状態分析部102において計算された健全性指標が閾値を超え,機械の異常が検出された時点から故障が発生した時点までの日数である。 Here, the warehouse parts procurement cost calculation unit 106 calculates the machine downtime DK using information on "days until failure" and "time required for repair" for each relevant failure and repair case or for each relevant health index, which is information stored in the failure/repair history database D001 . The "days until failure" is the number of days from the time when the health index calculated by the machine condition analysis unit 102 exceeds a threshold value and a machine abnormality is detected to the time when a failure occurs.

更に説明すると,倉庫部品調達費用算出部106は,ステップS404において,機械状態分析部102で機械の異常が検出された時点を倉庫部品調達時間Tの起点として,倉庫部品調達時間Tから稼働現場への部品到着予定日を推定し,機械の修理開始日を予測する。機械の修理開始日は,全ての対策部品が現場に到着した日を起点として算出する。次いで,「修理所要時間」の情報から当該故障の想定修理時間を見積もり,機械の修理終了日を予測する。具体的には,当該故障と同じ故障モードの「修理所要時間」の平均を算出して故障の想定修理時間を予測する。そして,この想定修理時間に倉庫部品調達時間Tを加算して修理終了日を予測する。更にステップS404において,当該故障と同じ故障モードの「故障までの日数」の平均を算出して想定故障日を予測する。予測した修理終了日と想定故障日とを比較し,その差分(想定故障日-修理終了日)の日数を機械のダウンタイムDとする。なお,当該差分が負の値である場合は,機械のダウンタイムDはゼロであるとする。 To explain further, in step S404, the warehouse parts procurement cost calculation unit 106 estimates the expected arrival date of parts at the operating site from the warehouse parts procurement time T S , using the time when the machine abnormality was detected by the machine condition analysis unit 102 as the starting point of the warehouse parts procurement time T S , and predicts the machine repair start date. The machine repair start date is calculated using the date when all countermeasure parts arrive at the site as the starting point. Next, the expected repair time of the failure is estimated from the information on the "repair time required" and the repair end date of the machine is predicted. Specifically, the average of the "repair time required" of the same failure mode as the failure is calculated to predict the expected repair time of the failure. Then, the warehouse parts procurement time T S is added to this expected repair time to predict the repair end date. Furthermore, in step S404, the average of the "number of days until failure" of the same failure mode as the failure is calculated to predict the expected failure date. The predicted repair end date and the expected failure date are compared, and the difference (expected failure date - repair end date) is set as the machine downtime D K. If the difference is a negative value, the machine downtime DK is set to zero.

また,倉庫部品調達費用算出部106は,図8に示した現場データベースD004に記憶されている「工事プロジェクトの期待収益」Pおよび「工事プロジェクトの全体掘削量」Aと,図10に示した機械情報データベースD005に記憶されている情報である,対策部品と互換性のある部品を使用する機械の「単位時間の平均掘削量」Wの情報を用いて,機械のダウンタイムDによる機械稼働ロス費用(第1稼働ロス費用)CSKを算出する。 In addition, the warehouse parts procurement cost calculation unit 106 calculates a machine operation loss cost (first operation loss cost) CSK due to machine downtime DK, using the “expected profit of the construction project” P r and the “total excavation volume of the construction project” A stored in the site database D004 shown in FIG. 8, and information on the “average excavation volume per unit time” WK of a machine that uses parts compatible with the countermeasure parts, which is information stored in the machine information database D005 shown in FIG . 10.

具体的には,倉庫部品調達費用算出部106は,ステップS405において,上記機械のダウンタイムDSKと,「工事プロジェクトの期待収益」Pと,「工事プロジェクトの全体掘削量」Aと,機械の「時間単位の平均掘削量」Wとから,下記の式(4)により当該機械の機械稼働ロス費用CSKを算出する。
SK=(Pr/A)×DSK×W (4)
Specifically, in step S405, the warehouse parts procurement cost calculation unit 106 calculates the machine operation loss cost CSK of the machine in question using the downtime DSK of the machine, the “expected profit of the construction project” P r , the “total excavation volume of the construction project” A, and the “average excavation volume per hour” WK of the machine , using the following formula (4).
C SK = (P r /A) x D SK x W K (4)

次いで,倉庫部品調達費用算出部106は,ステップS406において,倉庫部品調達費用(第1調達費用)Cと機械稼働ロス費用(第1稼働ロス費用)CSKに基づいて,必要な数量の対策部品を倉庫40から調達する倉庫部品調達に要する倉庫調達トータル費用(第1調達トータル費用)CS_totalを算出する。 Next, in step S406, the warehouse parts procurement cost calculation unit 106 calculates a warehouse total procurement cost (first procurement total cost) C_total required for procuring warehouse parts to procure the required quantity of countermeasure parts from the warehouse 40, based on the warehouse parts procurement cost (first procurement cost) C_total and the machine operation loss cost (first operation loss cost) C_sk .

このとき倉庫部品調達費用算出部106は,図5に示した故障・修理履歴データベースD001に記憶されている情報である,該当するケース(健全性指標)の「修理費用」Cを用いて倉庫調達トータル費用(第1調達トータル費用)CS_totalを算出する。「修理費用」Cは部品交換を含む故障の修理作業に要する費用である。 At this time, the warehouse parts procurement cost calculation unit 106 calculates the warehouse procurement total cost (first procurement total cost) C S_total using the "repair cost" CV of the corresponding case (soundness index), which is information stored in the failure/repair history database D001 shown in Fig. 5. The "repair cost" CV is the cost required for repair work of the failure, including part replacement.

具体的には,倉庫部品調達費用算出部106は,倉庫部品調達費用Cおよび稼働ロス費用CSKと「修理費用」Cを,下記の式(5)のように合計し,倉庫調達トータル費用CS_totalを算出する。
S_total=C+CSK+C (5)
Specifically, the warehouse parts procurement cost calculation unit 106 calculates the warehouse parts procurement cost C S , the operation loss cost C SK , and the “repair cost” C V as shown in the following formula (5) to calculate the warehouse procurement total cost C S_total .
C S_total = C S + C SK + C V (5)

<現場部品調達費用算出部107>
現場部品調達費用算出部107は,機械のダウンタイムによる機械稼働ロス費用(第2稼働ロス費用)CGKを含めて,対策部品を稼働現場に設置されているほかの機械から調達するのに要するトータル費用を算出する。
<On-site parts procurement cost calculation unit 107>
The on-site parts procurement cost calculation unit 107 calculates the total cost required to procure countermeasure parts from other machines installed at the operation site, including the machine operation loss cost (second operation loss cost) C GK due to machine downtime.

図14は,現場部品調達費用算出部107の処理手順を示す図である。 Figure 14 shows the processing procedure of the on-site parts procurement cost calculation unit 107.

図14において,ステップS501,S502,S503の処理は,図12に示したステップS5501,S5502,S5503の処理と実質的に同じである。現場部品調達の場合,ステップS402の倉庫部品調達費用のような部品調達費用は発生しないので,図13のステップS402に相当する処理は行う必要はない。 In FIG. 14, the processing of steps S501, S502, and S503 is substantially the same as the processing of steps S5501, S5502, and S5503 shown in FIG. 12. In the case of on-site parts procurement, there is no part procurement cost such as the warehouse parts procurement cost in step S402, so there is no need to perform the processing equivalent to step S402 in FIG. 13.

現場部品調達費用算出部107は,ステップS501において,機械情報データベースD005から稼働現場に配置されている機械に関する情報を取得し,ステップS502において,対策部品推定部103において特定した対策部品のそれぞれに対し,互換部品の情報を取得し,ステップS503において,現場部品調達時間Tを算出する。 In step S501, the on-site parts procurement cost calculation unit 107 acquires information about machines located at the operation site from the machine information database D005, in step S502, acquires information about compatible parts for each of the countermeasure parts identified by the countermeasure part estimation unit 103, and in step S503, calculates the on-site parts procurement time T G.

図14において,ステップS501,S502,S503の処理を省略し,ステップS503において,図12のステップS5503で算出した現場部品調達時間Tを用いてもよい。 In FIG. 14, the processes of steps S501, S502, and S503 may be omitted, and the on-site parts procurement time T G calculated in step S503 in FIG. 12 may be used in step S503.

図14において,ステップS504,S505の処理は,図13に示したステップS404,S405の処理と扱うパラメータを除いて同じである。 In Figure 14, the processing in steps S504 and S505 is the same as that in steps S404 and S405 shown in Figure 13, except for the parameters handled.

現場部品調達費用算出部107は,ステップS504,S505において,現場部品調達時間(第2調達時間)Tと記憶装置200の故障・修理履歴データベースD001,現場データベースD004および機械情報データベースD005に記憶された情報(第6情報)に基づいて対策部品(互換部品)を同じ稼働現場に配置されているほかの機械から調達する現場部品調達を行う際の機械のダウンタイムによる機械稼働ロス費用(第2稼働ロス費用)CGKを算出する。 In steps S504 and S505, the on-site parts procurement cost calculation unit 107 calculates a machine operation loss cost (second operation loss cost) C GK due to machine downtime when on-site parts procurement is performed to procure countermeasure parts (compatible parts) from other machines located at the same operating site, based on the on-site parts procurement time (second procurement time) T G and the information (sixth information) stored in the failure/repair history database D001, the site database D004, and the machine information database D005 of the storage device 200.

このとき,機械稼働ロス費用CGK(第2稼働ロス費用)は,倉庫部品調達費用算出部106のステップS404,405における機械稼働ロス費用(第1稼働ロス費用)CSKの算出の場合と同様,ステップS504において故障機械のダウンタイムDGKを予測し,ステップS505において,上述した式(4)と同様の以下の式(6)を用いて機械のダウンタイムDGKによる機械稼働ロス費用CGKを算出する。
GK=(Pr/A)×DGK×W (6)
At this time, as in the case of calculating the machine operation loss cost (first operation loss cost) C SK in steps S404 and 405 by the warehouse parts procurement cost calculation unit 106, the downtime D GK of the broken machine is predicted in step S504, and in step S505, the machine operation loss cost C GK due to the machine downtime D GK is calculated using the following equation (6), which is similar to the above-mentioned equation (4).
C GK = (P r /A) x D GK x W K (6)

現場部品調達費用算出部107は,ステップS506において,上記のように算出した機械稼働ロス費用(第2稼働ロス費用)CGKに基づいて必要な数量の対策部品を同じ稼働現場に配置されているほかの機械から調達する現場部品調達に要する現場調達トータル費用(第2調達トータル費用)CG_totalを算出する。 In step S506, the on-site parts procurement cost calculation unit 107 calculates the on-site total procurement cost (second procurement total cost) CG_total required for on-site parts procurement to procure the required quantity of countermeasure parts from other machines located at the same operation site based on the machine operation loss cost (second operation loss cost) CGK calculated as described above .

具体的には,現場部品調達費用算出部107は,故障・修理履歴データベースD001から部品交換と故障修理にかかる「修理費用」Cを取得し,機械のダウンタイムによる稼働ロス費用CDKと「修理費用」Cを下記の式(7)のように合計し,現場調達トータル費用CG_totalを算出する。
G_total=CDK+C (7)
Specifically, the on-site parts procurement cost calculation unit 107 obtains the “repair cost” CV for part replacement and fault repair from the failure/repair history database D001, and calculates the total on-site procurement cost CG_total by adding up the operation loss cost CDK due to machine downtime and the “repair cost” CV according to the following formula (7).
C G_total = C DK + C V (7)

<部品調達方法決定部108>
部品調達方法決定部108は,異常が検出された場合の故障を修理するために推奨される部品調達方法を決定する。
<Parts Procurement Method Determination Unit 108>
The parts procurement method determination unit 108 determines a parts procurement method that is recommended for repairing a failure when an abnormality is detected.

具体的には,部品調達方法決定部108は,倉庫部品調達時間算出部104で算出された倉庫部品調達時間(第1調達時間)Tと現場部品調達時間算出部105で算出された現場部品調達時間(第2調達時間)Tとを比較し,T≧Tの場合は,現場部品調達が部品調達時間から推奨される部品調達方法であると決定し,T<Tの場合は,倉庫部品調達が部品調達時間から推奨される部品調達方法であると決定する。 Specifically, the parts procurement method determination unit 108 compares the warehouse parts procurement time (first procurement time) T S calculated by the warehouse parts procurement time calculation unit 104 with the on-site parts procurement time (second procurement time) T G calculated by the on-site parts procurement time calculation unit 105, and if T S ≧ T G , determines that on-site parts procurement is the parts procurement method recommended based on the parts procurement time, and if T S < T G , determines that warehouse parts procurement is the parts procurement method recommended based on the parts procurement time.

また,部品調達方法決定部108は,倉庫部品調達費用算出部106で算出された倉庫調達トータル費用(第1調達トータル費用)CS_totalと,現場部品調達費用算出部107で算出された現場調達トータル費用(第2調達トータル費用)CG_totalとを比較し,CS_total≧CG_totalの場合は,現場部品調達が部品調達費用から推奨される部品調達方法であると決定し,CS_total<CG_totalの場合は,倉庫部品調達が部品調達費用から推奨される部品調達方法であると決定する。 In addition, the parts procurement method determination unit 108 compares the warehouse procurement total cost (first procurement total cost) C S_total calculated by the warehouse parts procurement cost calculation unit 106 with the on-site procurement total cost (second procurement total cost) C G_total calculated by the on-site parts procurement cost calculation unit 107, and if C S_total ≧ C G_total , determines that on-site parts procurement is the parts procurement method recommended based on the parts procurement cost, and if C S_total < C G_total , determines that warehouse parts procurement is the parts procurement method recommended based on the parts procurement cost.

<出力部109>
出力部109は,上記のように機械状態分析部102~部品調達方法決定部108から得られた各種情報を,通信装置100bを介して顧客(機械のオーナー,ユーザー,代理店または営業所)を含む関係者が所持する情報提示装置50,例えばスマートフォンに送信する。
<Output Unit 109>
The output unit 109 transmits the various information obtained from the machine condition analysis unit 102 to the parts procurement method determination unit 108 as described above to an information presentation device 50, such as a smartphone, carried by relevant parties including customers (machine owners, users, agents or sales offices) via the communication device 100b.

出力部109は情報提示装置50に以下の情報を送信する。 The output unit 109 transmits the following information to the information presentation device 50.

・故障検出時刻:機械状態分析部102において,健全性指標が所定の閾値を超えたとき(異常と判定されたとき)の時刻
・故障モード:機械状態分析部102において,健全性指標が所定の閾値を超えたときの故障モード
・対策部品リスト:対策部品推定部103で特定された対策部品のリスト
・倉庫から対策部品を調達するのに要する予測時間:倉庫部品調達時間算出部104で算出された倉庫部品調達時間T
・倉庫から対策部品を調達するのに要する予測費用:倉庫部品調達費用算出部106で算出された倉庫調達トータル費用CS_total
・現場から対策部品を調達するのに要する予測時間:現場部品調達時間算出部105で算出された現場部品調達時間T
・現場から対策部品を調達するのに要する予測費用:現場部品調達費用算出部107で算出された現場調達トータル費用CG_total
・部品調達時間から推奨される部品調達方法:部品調達方法決定部108において、部品調達時間から決められた部品調達方法
・部品調達費用から推奨される部品調達方法:部品調達方法決定部108において、部品調達費用から決められた部品調達方法
また,出力部109は情報提示装置50に更に以下の情報を送信してもよい。
Fault detection time: the time when the soundness index exceeds a predetermined threshold value (when it is determined to be abnormal) in the machine state analysis unit 102. Fault mode: the fault mode when the soundness index exceeds a predetermined threshold value in the machine state analysis unit 102. Countermeasure parts list: a list of countermeasure parts identified by the countermeasure parts estimation unit 103. Estimated time required to procure countermeasure parts from a warehouse: warehouse parts procurement time T S calculated by the warehouse parts procurement time calculation unit 104.
Estimated cost required to procure countermeasure parts from the warehouse: total warehouse procurement cost C S_total calculated by the warehouse part procurement cost calculation unit 106
Estimated time required to procure countermeasure parts from the site: On-site parts procurement time T calculated by the on-site parts procurement time calculation unit 105
Estimated cost required to procure countermeasure parts from the site: On-site procurement total cost C G_total calculated by the on-site part procurement cost calculation unit 107
- Part procurement method recommended based on part procurement time: A part procurement method determined by the part procurement method determination unit 108 based on the part procurement time. - Part procurement method recommended based on part procurement cost: A part procurement method determined by the part procurement method determination unit 108 based on the part procurement cost. In addition, the output unit 109 may further transmit the following information to the information presentation device 50.

・倉庫部品調達費用C
・機械のダウンタイムDSK,DGK
・機械のダウンタイムDSK,DGKによる機械稼働ロス費用CSK,CGK
これらの情報は情報提示装置に表示されることで,ユーザーを始めとする関係者は,情報の内容を確認することができる。
・Warehouse parts procurement cost C S
・Machine downtime DSK , DGK
- Machine downtime DSK , DGK due to loss of machine operation CSK , CGK
This information is displayed on an information display device, allowing users and other interested parties to check the content of the information.

また,出力部109は,情報提示装置50に上記の各種情報を関係者に分かりやすく表示するための表示指令を出力する。 The output unit 109 also outputs a display command to the information presentation device 50 to display the various pieces of information described above in an easy-to-understand manner for the relevant parties.

図15は,出力部109の表示指令により情報提示装置50の画面に表示される表示例を示す図である。 Figure 15 shows an example of a display displayed on the screen of the information presentation device 50 in response to a display command from the output unit 109.

図15において,符号300は情報提示装置50の画面に表示される調達情報の表示領域であり,表示領域300には,「故障検出時刻」と「故障モード」を含む故障情報リスト301と,対策部品リストのタブ302と,調達関連情報のタブ303とが表示される。 In FIG. 15, reference numeral 300 denotes a display area for procurement information displayed on the screen of the information presentation device 50. In the display area 300, a failure information list 301 including "failure detection time" and "failure mode", a tab 302 for a countermeasure parts list, and a tab 303 for procurement-related information are displayed.

表示領域300において,対策部品リストのタブ302を指でタッチすると画面表示は対策部品リストの表示領域304に切り換わり,対策部品リストの部品名称と必要数量を含む対策部品リストが表示され,調達関連情報のタブ303を指でタッチすると画面表示は調達関連情報の表示領域305に切り換わり,倉庫のタブ305a,現場のタブ305b,倉庫と現場のタブ305c,推奨調達方法のタブ305dが表示される。なお,対策部品リストの表示領域304に含まれる部品が複数である場合、部品ごとに「倉庫」または「現場」のいずれが時間・費用面で優位かが異なることもありうる。そのため、部品名称、必要数量に加えて、推奨調達方法の情報を表示してもよい。この情報は電話番号やメールアドレスなど調達先への依頼連絡を含み、「倉庫」または「現場」の表示を選択することで、直接部品発注がなされる。 In the display area 300, when the countermeasure parts list tab 302 is touched with a finger, the screen display switches to the countermeasure parts list display area 304, where the countermeasure parts list including the part names and required quantities is displayed. When the procurement related information tab 303 is touched with a finger, the screen display switches to the procurement related information display area 305, where the warehouse tab 305a, the site tab 305b, the warehouse and site tab 305c, and the recommended procurement method tab 305d are displayed. Note that when there are multiple parts included in the countermeasure parts list display area 304, it may be the case that the "warehouse" or the "site" is more advantageous in terms of time and cost for each part. Therefore, in addition to the part name and required quantity, information on the recommended procurement method may be displayed. This information includes the request contact information for the supplier, such as a phone number and an email address, and by selecting the display of "warehouse" or "site", the part is directly ordered.

また,表示領域305において,倉庫のタブ305aを指でタッチすると画面表示は倉庫調達に関する表示領域306Aに切り換わり,調達時間のタブ306aと調達費用のタブ306bが表示される。更に,表示領域306Aにおいて,調達時間のタブ306aを指でタッチすると表示画面は倉庫調達時間の表示領域307aに切り換わり,倉庫部品調達時間算出部104で算出された倉庫部品調達時間Tが表示され,調達費用のタブ306bを指でタッチすると表示画面は倉庫調達費用の表示領域307bに切り換わり,倉庫部品調達費用算出部106で算出された倉庫部品調達費用CS_totalが表示される。 In addition, when the warehouse tab 305a is touched with a finger in the display area 305, the screen display is switched to a display area 306A related to warehouse procurement, where a procurement time tab 306a and a procurement cost tab 306b are displayed. Furthermore, when the procurement time tab 306a is touched with a finger in the display area 306A, the display screen is switched to a warehouse procurement time display area 307a, where the warehouse parts procurement time T S calculated by the warehouse parts procurement time calculation unit 104 is displayed, and when the procurement cost tab 306b is touched with a finger, the display screen is switched to a warehouse procurement cost display area 307b, where the warehouse parts procurement cost C S_total calculated by the warehouse parts procurement cost calculation unit 106 is displayed.

同様に,表示領域305において,現場のタブ305bを指でタッチすると表示画面は現場調達に関する表示領域306Bに切り換わり,調達時間のタブ306cと調達費用のタブ306dが表示される。更に,表示領域306Bにおいて,調達時間のタブ306cを指でタッチすると表示画面は現場調達時間の表示領域307cに切り換わり,現場部品調達時間算出部105で算出された現場部品調達時間Tが表示され,調達費用のタブ306dを指でタッチすると表示画面は現場調達費用の表示領域307dに切り換わり,現場部品調達費用算出部107で算出された現場部品調達費用CG_totalが表示される。 Similarly, when the on-site tab 305b is touched with a finger in the display area 305, the display screen switches to a display area 306B relating to on-site procurement, and a procurement time tab 306c and a procurement cost tab 306d are displayed. Furthermore, when the procurement time tab 306c is touched with a finger in the display area 306B, the display screen switches to a on-site procurement time display area 307c, and the on-site parts procurement time T G calculated by the on-site parts procurement time calculation unit 105 is displayed, and when the procurement cost tab 306d is touched with a finger, the display screen switches to a on-site procurement cost display area 307d, and the on-site parts procurement cost C G_total calculated by the on-site parts procurement cost calculation unit 107 is displayed.

表示領域305において,倉庫と現場のタブ305cを指でタッチすると表示画面は倉庫調達と現場調達に関する表示領域308aに切り換わり,倉庫部品調達時間Tおよび倉庫部品調達費用CS_totalと現場部品調達時間Tおよび現場部品調達費用CG_totalが対比して表示される。表示領域305において,推奨調達方法のタブ305dを指でタッチすると表示画面は推奨調達方法に関する表示領域308bに切り換わり,部品調達時間から推奨される部品調達方法およびその調達時間と部品調達費用から推奨される部品調達方法およびその調達費用が対比して表示される。 In the display area 305, when the warehouse and site tabs 305c are touched with a finger, the display screen switches to a display area 308a relating to warehouse procurement and site procurement, where the warehouse parts procurement time T S and warehouse parts procurement cost C S_total are displayed in comparison with the site parts procurement time T G and site parts procurement cost C G_total . In the display area 305, when the recommended procurement method tab 305d is touched with a finger, the display screen switches to a display area 308b relating to the recommended procurement method, where the parts procurement method recommended based on the parts procurement time, the procurement time, and the parts procurement method recommended based on the parts procurement cost and the procurement cost are displayed in comparison.

なお,上記表示領域300から表示領域308bまでの表示の遷移は,階層表示,並列表示のいずれであってもよいし,それらの組合せであってもよい。また部品の在庫状況は変動しうるので、更新タブを設けておき、表示後に時間が経過した場合そのタブを押下することで最新の在庫に更新することができることとしてもよい。その際、履歴タブをさらに設けておき、そのタブを押下することで、前回の表示結果を参照する構成としてもよい。 The transition of the display from the display area 300 to the display area 308b may be either a hierarchical display or a parallel display, or a combination of both. Since the inventory status of parts may change, an update tab may be provided so that if time has passed since the display, the latest inventory can be updated by pressing the tab. In this case, a history tab may also be provided so that the previous display results can be referenced by pressing the tab.

また,表示項目および表示方法は,情報提示装置50で動作するアプリケーションソフトに応じて適宜変更可能である。 In addition, the display items and display methods can be changed as appropriate depending on the application software running on the information presentation device 50.

~効果~
本実施例によれば,同じ稼働現場に複数台の機械10a,10b,10c・・・が設置されている場合,機械の修理に必要な部品を倉庫40から調達する場合の倉庫部品調達時間と,稼動現場のほかの機械から調達する場合の現場部品調達時間を算出し,倉庫部品調達時間と現場部品調達時間をその他の関連する情報とともに情報提示装置50に送信するので,倉庫部品調達時間と現場部品調達時間の両方を考慮して部品調達を行うことが可能となり,部品調達の迅速化が図れる。これにより故障による機械の非稼働時間を最小化し,機械の稼働率が向上し,機械の稼働による収益の最大化が期待できる。
~Effect~
According to this embodiment, when multiple machines 10a, 10b, 10c, etc. are installed at the same operating site, the warehouse parts procurement time when parts required to repair the machines are procured from the warehouse 40 and the on-site parts procurement time when parts are procured from other machines at the operating site are calculated, and the warehouse parts procurement time and the on-site parts procurement time are transmitted to the information presentation device 50 together with other related information, so that parts procurement can be performed taking into account both the warehouse parts procurement time and the on-site parts procurement time, and parts procurement can be expedited. This minimizes the downtime of machines due to breakdowns, improves the operating rate of the machines, and is expected to maximize profits from the operation of the machines.

また,本実施例では,機械の修理に必要な部品を倉庫40から調達する場合の倉庫部品調達費用と,稼動現場のほかの機械から調達する場合の現場部品調達費用を算出し,倉庫部品調達時間と現場部品調達時間に加えて倉庫部品調達費用と現場部品調達費用を情報提示装置50に送信するので,部品調達費用をも考慮した部品調達を行うことが可能となり,部品調達の迅速化に加えて費用面での部品調達の最適化が図れ,機械の稼働による収益の最大化が期待できる。 In addition, in this embodiment, the warehouse parts procurement cost when parts required to repair the machine are procured from the warehouse 40 and the on-site parts procurement cost when procured from another machine at the operating site are calculated, and the warehouse parts procurement cost and on-site parts procurement cost in addition to the warehouse parts procurement time and on-site parts procurement time are transmitted to the information presentation device 50. This makes it possible to procure parts while taking into account the parts procurement cost, which not only speeds up parts procurement but also optimizes parts procurement in terms of cost, and is expected to maximize profits from machine operation.

また,本実施例では,倉庫部品調達時間と現場部品調達時間とを比較し,小さい方の調達時間に係わる倉庫部品調達或いは現場部品調達を部品調達時間から推奨される部品調達方法として決定するとともに,倉庫部品調達費用と現場部品調達費用とを比較し,小さい方の調達費用に係わる倉庫部品調達或いは現場部品調達を部品調達費用から推奨される部品調達方法として決定し,決定された調達方法を情報提示装置50に送信するので,ユーザーを含む関係者は,故障修理の部品調達を倉庫部品調達と現場部品調達のいずれにするかが決めやすくなる。 In addition, in this embodiment, the warehouse parts procurement time is compared with the on-site parts procurement time, and the warehouse parts procurement or on-site parts procurement associated with the shorter procurement time is determined as the recommended parts procurement method based on the parts procurement time. The warehouse parts procurement cost is compared with the on-site parts procurement cost, and the warehouse parts procurement or on-site parts procurement associated with the shorter procurement cost is determined as the recommended parts procurement method based on the parts procurement cost. The determined procurement method is transmitted to the information presentation device 50, so that the users and other related parties can easily decide whether to procure parts for repairing a breakdown through warehouse parts procurement or on-site parts procurement.

本発明の第2の実施例における保守支援システムを説明する。 This section describes a maintenance support system in a second embodiment of the present invention.

第1の実施例では,全ての部品を倉庫40か同じ稼働現場に配置されているほかの機械かのどちらか一方から調達することを前提として,倉庫部品調達時間と現場部品調達時間,或いは倉庫部品調達費用と現場部品調達費用を算出し,それらの調達時間および調達費用を関係者に提示する,或いは倉庫部品調達時間と現場部品調達時間の短い方或いは倉庫部品調達費用と現場部品調達費用の安い方を推奨される部品調達時間或いは部品調達費用として決定し,関係者に提示した。 In the first embodiment, on the premise that all parts are procured from either the warehouse 40 or other machines located at the same operating site, the warehouse parts procurement time and the on-site parts procurement time, or the warehouse parts procurement cost and the on-site parts procurement cost, are calculated, and these procurement times and procurement costs are presented to the relevant parties, or the shorter of the warehouse parts procurement time and the on-site parts procurement time, or the cheaper of the warehouse parts procurement cost and the on-site parts procurement cost, is determined as the recommended parts procurement time or parts procurement cost, and presented to the relevant parties.

本実施例においても,制御装置が,対策部品を,倉庫40および同じ稼働現場に配置されているほかの機械から調達する部品調達に要する調達時間および複数の調達費用を算出し、複数の調達時間のうちの少なくとも1つの調達時間、更には複数の調達費用のうちの少なくとも1つの調達費用を通信装置100bを介して情報提示装置に送信する点では,第1の実施例と同じである。 In this embodiment, the control device calculates the procurement time and multiple procurement costs required to procure the countermeasure parts from the warehouse 40 and other machines located at the same operating site, and transmits at least one of the multiple procurement times and at least one of the multiple procurement costs to the information presentation device via the communication device 100b, which is the same as the first embodiment.

本実施例で第1の実施例と異なるのは,前記制御装置は,対策部品の一部を倉庫40から調達する倉庫調達と,対策部品の残りを同じ稼働現場に配置されているほかの機械から調達する現場調達とを組み合わせた組み合わせ調達において,前記複数の調達時間のうちの最小の調達時間を前記通信装置を介して情報提示装置に送信する点である。また、本実施例では、組み合わせ調達の全てに対し調達時間と調達費用を算出する。 The difference between this embodiment and the first embodiment is that in combined procurement that combines warehouse procurement, in which some of the countermeasure parts are procured from the warehouse 40, and on-site procurement, in which the remaining countermeasure parts are procured from other machines located at the same operating site, the control device transmits the shortest procurement time of the multiple procurement times to the information presentation device via the communication device. Also, in this embodiment, procurement times and procurement costs are calculated for all combined procurements.

ここで,対策部品の一部を倉庫40から調達し,対策部品の残りを同じ稼働現場に配置されているほかの機械から調達するというような,倉庫40と現場に配置されているほかの機械を組み合わせて部品を調達する場合,対策部品の数に応じた組合せ数が発生する。 Here, when procuring parts by combining warehouse 40 and other machines located at the same operating site, such as procuring some of the countermeasure parts from warehouse 40 and the remaining countermeasure parts from other machines located at the same operating site, the number of combinations will be generated according to the number of countermeasure parts.

例えば,対策部品がa,b,cの3つである場合,その組み合わせは6通りあり,本実施例ではそれら全ての組合せに対してデータベースD001~D006に記憶された種々の情報を用いて調達時間或いは調達費用を算出する。 For example, if there are three countermeasure components, a, b, and c, there are six possible combinations, and in this embodiment, the procurement time or procurement cost is calculated for all of these combinations using various information stored in databases D001 to D006.

図16は,本実施例における制御装置100aの処理内容を示す機能ブロック図である。制御装置100aは,機械状態分析部102と,対策部品推定部103と,部品調達組合せ作成部210と,部品調達時間算出部211と,部品調達費用算出部212と,出力部109とから構成され,図示矢印の順序で処理が実行される。機械状態分析部102と,対策部品推定部103と,出力部109の処理内容は第1の実施例のものと同じである。 Figure 16 is a functional block diagram showing the processing contents of the control device 100a in this embodiment. The control device 100a is composed of a machine condition analysis unit 102, a countermeasure part estimation unit 103, a part procurement combination creation unit 210, a part procurement time calculation unit 211, a part procurement cost calculation unit 212, and an output unit 109, and processing is performed in the order of the arrows shown in the figure. The processing contents of the machine condition analysis unit 102, the countermeasure part estimation unit 103, and the output unit 109 are the same as those in the first embodiment.

制御装置100aの部品調達組合せ作成部210では、全ての対策部品の調達先の組合せについてリストを作成する。任意の対策部品jにとっては,調達先の選択肢が「倉庫」と「現場」の二通りがある。よって、部品調達先の組合せ数m=2である。 The parts procurement combination creation unit 210 of the control device 100a creates a list of combinations of procurement sources for all countermeasure parts. For any countermeasure part j, there are two options for the procurement source: "warehouse" and "site". Therefore, the number of combinations of parts procurement sources is m = 2n .

図17は,部品調達組合せ作成部210の組合せのデータ構造を示す図である。 Figure 17 shows the data structure of combinations in the parts procurement combination creation unit 210.

部品調達時間算出部211では、全ての部品調達組合せに対して部品調達時間を算出する。具体的には,任意の部品調達組合せcomb(i)について、各対策部品の調達先に応じて、当該部品の調達時間を算出する。部品の調達先が「倉庫」の場合は、前記倉庫部品調達時間算出部104に記載の方法を用いて部品調達時間を算出する。部品の調達先が「現場」の場合は、前記現場部品調達時間算出部105に記載の方法を用いて部品調達時間を算出する。全対策部品の調達時間を算出した後に,全対策部品の調達時間の中で最大の調達時間を部品調達組合せcomb(i)の調達時間とする。即ち,
Tcomb(i)=Max{T,T2,T3,……,Tn} (8)
ただし,Tcomb(i)は部品調達組合せ(i)の調達時間であり、Tjは部品調達組合せ(i)における部品jの調達時間であり,「Max{}」は最大値を取得する演算子である。
The parts procurement time calculation unit 211 calculates parts procurement times for all parts procurement combinations. Specifically, for any parts procurement combination comb(i), the procurement time of the parts is calculated according to the procurement source of each countermeasure part. If the procurement source of the parts is the "warehouse", the parts procurement time is calculated using the method described in the warehouse parts procurement time calculation unit 104. If the procurement source of the parts is the "worksite", the parts procurement time is calculated using the method described in the worksite parts procurement time calculation unit 105. After calculating the procurement times of all countermeasure parts, the longest procurement time among the procurement times of all countermeasure parts is set as the procurement time of the parts procurement combination comb(i). That is,
T comb(i) = Max {T 1 , T 2 , T 3 , ..., T n } (8)
Here, T comb(i) is the procurement time of the part procurement combination (i), T j is the procurement time of the part j in the part procurement combination (i), and “Max{ }” is an operator for obtaining the maximum value.

部品調達費用算出部212では、全ての部品調達組合せに対して部品調達費用を算出する。具体的には,任意の部品調達組合せcomb(i)について、各対策部品の調達先に応じて、当該部品の調達費用を算出する。部品の調達先が「倉庫」の場合は、前記倉庫部品調達費用算出部106に記載の方法を用いて部品調達費用を算出する。部品の調達先が「現場」の場合は、前記現場部品調達費用算出部107に記載の方法を用いて部品調達費用を算出する。全対策部品の調達費用を算出した後に,全対策部品の調達費用の合計を部品調達組合せcomb(i)の調達費用とする。即ち,
comb(i)=Σ{C,C2,C3,……,Cn} (9)
ただし,Ccomb(i)は部品調達組合せ(i)の調達時間であり、Cjは部品調達組合せ(i)における部品jの調達費用である。
The parts procurement cost calculation unit 212 calculates the parts procurement costs for all parts procurement combinations. Specifically, for any parts procurement combination comb(i), the procurement cost of that part is calculated according to the procurement source of each countermeasure part. If the procurement source of the part is the "warehouse", the parts procurement cost is calculated using the method described in the warehouse parts procurement cost calculation unit 106. If the procurement source of the part is the "site", the parts procurement cost is calculated using the method described in the site parts procurement cost calculation unit 107. After calculating the procurement costs of all countermeasure parts, the sum of the procurement costs of all countermeasure parts is set as the procurement cost of the parts procurement combination comb(i). That is,
C comb(i) = Σ{C 1 , C 2 , C 3 , ..., C n } (9)
Here, C comb(i) is the procurement time of the parts procurement combination (i), and C j is the procurement cost of the parts j in the parts procurement combination (i).

図18は,制御装置100aの部品調達時間算出部211と部品調達費用算出部212の計算結果の一部を示す図である。全ての部品調達組合せについて、それぞれの調達時間と調達費用を表示する。 Figure 18 shows some of the calculation results of the parts procurement time calculation unit 211 and parts procurement cost calculation unit 212 of the control device 100a. The procurement time and procurement cost for each part procurement combination are displayed.

出力部109は,上記のように計算した複数の調達時間と複数の調達費用のうち,最小の調達時間,或いは,最小の調達時間と最小の調達費用を出力する。 The output unit 109 outputs the minimum procurement time, or the minimum procurement time and the minimum procurement cost, from among the multiple procurement times and multiple procurement costs calculated as described above.

また、実施例2の場合、表示領域308bでは、全ての部品調達組合せの中で、調達時間が最小となる部品調達組合せおよび調達費用が最小となる部品調達組合せが対比して表示される。 In the case of Example 2, the display area 308b displays, in comparison, the part procurement combination with the shortest procurement time and the part procurement combination with the shortest procurement cost among all part procurement combinations.

本実施例によれば,対策部品の一部を倉庫40から調達する倉庫調達と,対策部品の残りを同じ稼働現場に配置されているほかの機械から調達する現場調達とを組み合わせた組み合わせ調達において,組み合わせ調達の全てに対し調達時間と調達費用を算出するので,対策部品を部品ごとに分けて調達時間と調達費用を算出することが可能となり,調達時間と調達費用のそれぞれについて第1実施例よりも小さな調達時間或いは調達費用を算出することが可能となり,更なる部品調達の迅速化と最適化を図ることが可能となる。 According to this embodiment, in combined procurement that combines warehouse procurement, in which some of the countermeasure parts are procured from the warehouse 40, and on-site procurement, in which the remaining countermeasure parts are procured from other machines located at the same operating site, the procurement time and procurement cost are calculated for all combined procurements, so that it is possible to calculate the procurement time and procurement cost by dividing the countermeasure parts by part, and it is possible to calculate a procurement time or procurement cost that is shorter than that of the first embodiment for each of the procurement time and procurement cost, thereby making it possible to further speed up and optimize parts procurement.

~その他~
以上,本発明の好適な実施形態について説明したが,本発明は上記実施形態に限定されないことはいうまでもない。また,建設機械を例として本発明の保守支援装置の実施例について説明したが,本発明は建設機械以外の機械へも適用できることはいうまでもない。
~Other~
Although the preferred embodiment of the present invention has been described above, it goes without saying that the present invention is not limited to the above embodiment. Also, although the embodiment of the maintenance support device of the present invention has been described using a construction machine as an example, it goes without saying that the present invention can be applied to machines other than construction machines.

1 保守支援システム
10 機械群
10a,10b,10c・・・ 機械
11 センサ
12 制御装置
13 通信装置
20 ネットワーク
40 倉庫
50 情報提示装置(スマートフォン)
100 サーバ
100a 制御装置
100b 通信装置
102 機械状態分析部
103 対策部品推定部
104 倉庫部品調達時間算出部
105 現場部品調達時間算出部
106 倉庫部品調達費用算出部
107 現場部品調達費用算出部
108 部品調達方法決定部
109 出力部
200 記憶装置
D001 故障・修理履歴データベース
D002 対策部品データベース
D003 倉庫データベース
D004 現場データベース
D005 機械情報データベース
D006 部品互換性データベース
210 部品調達組合せ作成部
211 部品調達時間算出部
212 部品調達費用算出部
1 Maintenance support system 10 Machine group 10a, 10b, 10c... Machine 11 Sensor 12 Control device 13 Communication device 20 Network 40 Warehouse 50 Information presentation device (smartphone)
Reference Signs List 100 Server 100a Control device 100b Communication device 102 Machine state analysis unit 103 Countermeasure parts estimation unit 104 Warehouse parts procurement time calculation unit 105 On-site parts procurement time calculation unit 106 Warehouse parts procurement cost calculation unit 107 On-site parts procurement cost calculation unit 108 Parts procurement method determination unit 109 Output unit 200 Storage device D001 Failure/repair history database D002 Countermeasure parts database D003 Warehouse database D004 On-site database D005 Machine information database D006 Parts compatibility database 210 Parts procurement combination creation unit 211 Parts procurement time calculation unit 212 Parts procurement cost calculation unit

Claims (14)

同じ稼働現場に配置されている複数台の機械の保守支援システムであって,
演算処理を行う制御装置と,
前記制御装置の演算処理に必要なデータを記憶する記憶装置と,
通信装置とを備え,
前記制御装置は,
前記通信装置を介して取得した前記複数台の機械のそれぞれの稼働データに基づいて,各機械の状態を分析し,
前記分析によってある機械が異常と判定された場合に,前記記憶装置に記憶された第1情報に基づいて当該機械の故障を修理するために必要な対策部品とその数量を特定し,
前記対策部品を,倉庫および前記同じ稼働現場に配置されているほかの機械から調達する部品調達に要する複数の調達時間を算出し,
前記複数の調達時間のうちの少なくとも1つの調達時間を前記通信装置を介して情報提示装置に送信することを特徴とする保守支援システム。
A maintenance support system for multiple machines located at the same operating site,
A control device for performing calculations;
A storage device that stores data necessary for the arithmetic processing of the control device;
a communication device;
The control device includes:
Analyzing the state of each machine based on the operation data of each of the plurality of machines acquired via the communication device;
When a machine is determined to be abnormal by the analysis, a countermeasure part and a quantity thereof required to repair the failure of the machine are identified based on the first information stored in the storage device;
Calculating a plurality of procurement times required for procuring the countermeasure parts from a warehouse and other machines located at the same operating site;
A maintenance support system comprising: a communication device that transmits at least one of the plurality of procurement times to an information presentation device via the communication device.
請求項1に記載の保守支援システムにおいて,
前記制御装置は,
前記記憶装置に記憶された第2情報に基づいて前記対策部品を倉庫から調達する倉庫部品調達に要する第1調達時間を算出し,
前記記憶装置に記憶された第3情報に基づいて前記対策部品を前記同じ稼働現場に配置されているほかの機械から調達する現場部品調達に要する第2調達時間を算出し,
前記第1調達時間および前記第2調達時間を前記通信装置を介して情報提示装置に送信することを特徴とする保守支援システム。
The maintenance support system according to claim 1,
The control device includes:
calculating a first procurement time required for procuring the countermeasure part from a warehouse based on the second information stored in the storage device;
calculating a second procurement time required for procuring the countermeasure part from another machine located at the same operating site based on the third information stored in the storage device;
A maintenance support system, comprising: a communication device that transmits the first procurement time and the second procurement time to an information presentation device via the communication device.
請求項2に記載の保守支援システムにおいて,
前記制御装置は,更に,
前記記憶装置に記憶された第4情報に基づいて前記倉庫部品調達に要する第1調達費用を算出し,
前記第1調達時間と前記記憶装置に記憶された第5情報に基づいて前記倉庫部品調達を行う際の前記機械のダウンタイムによる第1稼働ロス費用を算出し,
前記第1調達費用と前記第1稼働ロス費用に基づいて前記倉庫部品調達に要する第1調達トータル費用を算出し,
前記第2調達時間と前記記憶装置に記憶された第6情報に基づいて前記現場部品調達を行う際の前記機械のダウンタイムによる第2稼働ロス費用を算出し,
前記第2稼働ロス費用に基づいて前記現場部品調達に要する第2調達トータル費用を算出し,
前記第1調達時間および前記第2調達時間と,前記第1調達トータル費用および前記第2調達トータル費用を前記通信装置を介して情報提示装置に送信することを特徴とする保守支援システム。
The maintenance support system according to claim 2,
The control device further comprises:
Calculating a first procurement cost required for procuring the warehouse parts based on the fourth information stored in the storage device;
Calculating a first operation loss cost due to downtime of the machine when procuring the warehouse parts based on the first procurement time and the fifth information stored in the storage device;
Calculating a first total procurement cost required for procuring the warehouse parts based on the first procurement cost and the first operation loss cost;
Calculating a second operation loss cost due to downtime of the machine when procuring the on-site parts based on the second procurement time and the sixth information stored in the storage device;
Calculating a second total procurement cost required for procuring the on-site parts based on the second operation loss cost;
A maintenance support system characterized in that the first procurement time, the second procurement time, the first total procurement cost, and the second total procurement cost are transmitted to an information presentation device via the communication device.
請求項2に記載の保守支援システムにおいて,
前記制御装置は,前記第1調達時間と前記第2調達時間とを比較し,前記第1調達時間が前記第2調達時間以上の場合は,前記現場部品調達を部品調達時間から推奨される部品調達方法として決定し,前記第1調達時間が前記第2調達時間未満の場合は,前記倉庫部品調達を前記部品調達時間から推奨される部品調達方法として決定し,前記決定した推奨される部品調達方法を,前記通信装置を介して前記情報提示装置に送信することを特徴とする保守支援システム。
The maintenance support system according to claim 2,
The control device compares the first procurement time with the second procurement time, and if the first procurement time is equal to or greater than the second procurement time, determines that the on-site parts procurement is the recommended parts procurement method based on the parts procurement time, and if the first procurement time is less than the second procurement time, determines that the warehouse parts procurement is the recommended parts procurement method based on the parts procurement time, and transmits the determined recommended parts procurement method to the information presentation device via the communication device.
請求項3に記載の保守支援システムにおいて,
前記制御装置は,
前記第1調達時間と前記第2調達時間とを比較し,前記第1調達時間が前記第2調達時間以上の場合は,前記現場部品調達を推奨される部品調達方法として決定し,前記第1調達時間が前記第2調達時間未満の場合は,前記倉庫部品調達を推奨される部品調達方法として決定し,前記決定した推奨される部品調達方法を前記通信装置を介して前記情報提示装置に送信するとともに,
前記第1調達トータル費用と前記第2調達トータル費用とを比較し,前記第1調達トータル費用が前記第2調達トータル費用以上の場合は,前記現場部品調達を推奨される部品調達方法として決定し,前記第1調達トータル費用が前記第2調達トータル費用未満の場合は,前記倉庫部品調達を推奨される部品調達方法として決定し,前記決定した推奨される部品調達方法を,前記通信装置を介して前記情報提示装置に送信することを特徴とする保守支援システム。
The maintenance support system according to claim 3,
The control device includes:
comparing the first procurement time with the second procurement time, and if the first procurement time is equal to or longer than the second procurement time, determining the on-site parts procurement as a recommended parts procurement method, and if the first procurement time is shorter than the second procurement time, determining the warehouse parts procurement as a recommended parts procurement method, and transmitting the determined recommended parts procurement method to the information presentation device via the communication device;
A maintenance support system characterized by comparing the first procurement total cost with the second procurement total cost, and if the first procurement total cost is equal to or greater than the second procurement total cost, determining that the on-site parts procurement is the recommended parts procurement method, and if the first procurement total cost is less than the second procurement total cost, determining that the warehouse parts procurement is the recommended parts procurement method, and transmitting the determined recommended parts procurement method to the information presentation device via the communication device.
請求項に記載の保守支援システムにおいて,
前記情報提示装置は,前記保守支援システムの関係者が所持するスマートフォンであり,前記制御装置は,前記第1調達時間および前記第2調達時間を前記スマートフォンに表示させることを特徴とする保守支援システム。
The maintenance support system according to claim 2 ,
A maintenance support system characterized in that the information presentation device is a smartphone carried by a person involved in the maintenance support system, and the control device displays the first procurement time and the second procurement time on the smartphone.
請求項1又は2に記載の保守支援システムにおいて,
前記制御装置は,前記通信装置を介して取得した前記複数台の機械のそれぞれの稼働データに基づいて前記機械の健全性指標を算出し,前記健全性指標に基づいて前記機械の状態が正常か異常かを判定し,前記各機械の状態を分析することを特徴とする保守支援システム。
The maintenance support system according to claim 1 or 2,
A maintenance support system characterized in that the control device calculates a health index of the machines based on the operation data of each of the multiple machines obtained via the communication device, determines whether the condition of the machines is normal or abnormal based on the health index, and analyzes the condition of each of the machines.
請求項7記載の保守支援システムにおいて,
前記制御装置は,前記分析によってある機械が異常と判定された場合に,前記各機械の状態の分析に用いた前記健全性指標の値に基づいて故障モードを特定し,
前記制御装置は,前記第1情報として記憶された,前記故障モードごとの故障を修理するために必要な部品とその数量を含む情報に基づいて,前記故障モードを修理するために必要な前記対策部品とその数量を特定することを特徴とする保守支援システム。
The maintenance support system according to claim 7,
When a machine is determined to be abnormal by the analysis, the control device identifies a failure mode based on the value of the health index used in analyzing the state of each machine;
The control device is characterized in that it identifies the countermeasure parts and their quantities required to repair the failure mode based on information including the parts and their quantities required to repair the failure for each failure mode stored as the first information.
請求項3に記載の保守支援システムにおいて,
前記制御装置は,前記記憶装置に前記第5情報として記憶された,故障および修理のケースごとの故障までの日数,修理所要時間を含む情報と前記第1調達時間に基づいて,前記異常と判定された機械の第1ダウンタイムを算出し,
前記第1ダウンタイムと,前記記憶装置に前記第5情報として記憶された,前記対策部品と互換性のある部品を使用する機械の単位時間の平均掘削量と,工事プロジェクトの期待収益および工事プロジェクトの全体掘削量を含む情報とに基づいて,前記第1稼働ロス費用を算出することを特徴とする保守支援システム。
The maintenance support system according to claim 3,
The control device calculates a first downtime of the machine determined to be abnormal based on information including the number of days until failure and the time required for repair for each case of failure and repair stored as the fifth information in the storage device and the first delivery time,
a maintenance support system which calculates the first operating loss cost based on the first downtime, an average excavation volume per unit time of a machine which uses a part compatible with the countermeasure part and which is stored as the fifth information in the storage device, and information including an expected profit of a construction project and a total excavation volume of the construction project.
請求項3に記載の保守支援システムにおいて,
前記制御装置は,前記記憶装置に前記第6情報として記憶された,故障および修理のケースごとの故障までの日数,修理所要時間を含む情報と前記第2調達時間に基づいて,前記異常と判定された機械の第2ダウンタイムを算出し,
前記第2ダウンタイムと,前記記憶装置に前記第6情報として記憶された,前記対策部品と互換性のある部品を使用する機械の単位時間の平均掘削量と,工事プロジェクトの期待収益および工事プロジェクトの全体掘削量を含む情報とに基づいて,前記第2稼働ロス費用を算出することを特徴とする保守支援システム。
The maintenance support system according to claim 3,
the control device calculates a second downtime of the machine determined to be abnormal based on information including the number of days until failure and the time required for repair for each case of failure and repair stored as the sixth information in the storage device and the second delivery time;
a maintenance support system which calculates the second operating loss cost based on the second downtime, an average excavation volume per unit time of a machine which uses a part compatible with the countermeasure part and which is stored as the sixth information in the storage device, and information including an expected profit of the construction project and a total excavation volume of the construction project.
請求項1に記載の保守支援システムにおいて,
前記制御装置は,
前記対策部品の一部を前記倉庫から調達する倉庫調達と,前記対策部品の残りを前記同じ稼働現場に配置されているほかの機械から調達する現場調達とを組み合わせた組み合わせ調達において,前記複数の調達時間のうちの最小の調達時間を前記通信装置を介して情報提示装置に送信することを特徴とする保守支援システム。
The maintenance support system according to claim 1,
The control device includes:
A maintenance support system characterized in that, in a combined procurement that combines warehouse procurement, in which some of the countermeasure parts are procured from the warehouse, and on-site procurement, in which the remainder of the countermeasure parts are procured from other machines located at the same operating site, the shortest procurement time among the multiple procurement times is transmitted to an information presentation device via the communication device.
請求項11に記載の保守支援システムにおいて,
前記制御装置は,前記組み合わせ調達の全てに対し前記複数の調達時間を算出することを特徴とする保守支援システム。
The maintenance support system according to claim 11,
The maintenance support system is characterized in that the control device calculates the multiple procurement times for all of the combined procurements.
請求項11に記載の保守支援システムにおいて,
前記制御装置は,更に,
前記対策部品を,前記倉庫および前記同じ稼働現場に配置されているほかの機械から調達する部品調達に要する複数の調達費用を算出し,
前記複数の調達費用のうちの最小の調達費用を前記最小の調達時間とともに,前記通信装置を介して情報提示装置に送信することを特徴とする保守支援システム。
The maintenance support system according to claim 11,
The control device further comprises:
Calculating a plurality of procurement costs required for procuring the countermeasure parts from the warehouse and other machines located at the same operating site;
A maintenance support system characterized in that a minimum procurement cost among the plurality of procurement costs is transmitted together with the minimum procurement time to an information presentation device via the communication device.
請求項13に記載の保守支援システムにおいて,
前記制御装置は,前記組み合わせ調達の全てに対し前記複数の調達費用を算出することを特徴とする保守支援システム。
The maintenance support system according to claim 13,
The maintenance support system is characterized in that the control device calculates the multiple procurement costs for all of the combined procurements.
JP2021142255A 2021-09-01 2021-09-01 Maintenance Support System Active JP7604341B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021142255A JP7604341B2 (en) 2021-09-01 2021-09-01 Maintenance Support System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021142255A JP7604341B2 (en) 2021-09-01 2021-09-01 Maintenance Support System

Publications (3)

Publication Number Publication Date
JP2023035417A JP2023035417A (en) 2023-03-13
JP2023035417A5 JP2023035417A5 (en) 2024-03-15
JP7604341B2 true JP7604341B2 (en) 2024-12-23

Family

ID=85504164

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021142255A Active JP7604341B2 (en) 2021-09-01 2021-09-01 Maintenance Support System

Country Status (1)

Country Link
JP (1) JP7604341B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2026069538A1 (en) * 2024-09-26 2026-04-02 Ntt株式会社 Selection device

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005104710A (en) 2003-10-02 2005-04-21 Nec Fielding Ltd Part delivery arrangement device and part delivery arrangement method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6748046B2 (en) * 2017-09-29 2020-08-26 日立建機株式会社 Parts procurement system and parts procurement method
JP7209604B2 (en) * 2019-08-29 2023-01-20 株式会社日立ビルシステム How to order parts

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005104710A (en) 2003-10-02 2005-04-21 Nec Fielding Ltd Part delivery arrangement device and part delivery arrangement method

Also Published As

Publication number Publication date
JP2023035417A (en) 2023-03-13

Similar Documents

Publication Publication Date Title
US8170893B1 (en) Eliminating sources of maintenance losses
US9530256B2 (en) Generating cumulative wear-based indicators for vehicular components
US20130041705A1 (en) Distribution network maintenance planning
CN108510221A (en) Have the function of carrying out the inventory management system of stock control and preventive maintenance
US20110066898A1 (en) Predictive analysis method for improving and expediting realization of system safety, availability and cost performance increases
TWI688846B (en) Maintenance plan generation system
Kovacs et al. A modified Weibull model for service life prediction and spare parts forecast in heat treatment industry
KR20100127245A (en) User interface with visualization of real and virtual data
US20200123878A1 (en) Systems and methods for scheduling and executing maintenance
JP7733468B2 (en) Maintenance Support System
JP2004323162A (en) Maintenance business simulator, maintenance service planning support system, and maintenance business support system
KR20230041345A (en) A system for managing equipment using digital twin information
US20250164974A1 (en) Production Management Device, Production Management System, and Production Management Method
JP2014049010A (en) Inspection maintenance data verification device, inspection maintenance data verification system, and inspection maintenance data verification method
JP7604341B2 (en) Maintenance Support System
JP6802103B2 (en) Sales support device
CN107614804B (en) Excavator support device
US20160104124A1 (en) Systems and Methods for Fleet Maintenance Management
Bahou et al. Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation
JP2024057316A (en) Failure probability evaluation system and failure probability evaluation method
US20170330132A1 (en) Method and system to manage supervision activity in utility system to reduce damage
KR20190001414A (en) Method, server and program for providing real-time robot monitoring service
JP7461899B2 (en) Maintenance Support System
JP7759003B2 (en) Information processing program, information processing method, and information processing device
JP2002117164A (en) Repair cost predicting system for working vehicle

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240307

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240307

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20241120

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241126

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241211

R150 Certificate of patent or registration of utility model

Ref document number: 7604341

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150