JP7606952B2 - How to build a structure on existing ground - Google Patents
How to build a structure on existing ground Download PDFInfo
- Publication number
- JP7606952B2 JP7606952B2 JP2021162609A JP2021162609A JP7606952B2 JP 7606952 B2 JP7606952 B2 JP 7606952B2 JP 2021162609 A JP2021162609 A JP 2021162609A JP 2021162609 A JP2021162609 A JP 2021162609A JP 7606952 B2 JP7606952 B2 JP 7606952B2
- Authority
- JP
- Japan
- Prior art keywords
- embankment
- piles
- foundation
- pile
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
本発明は現状地盤(原地盤)の地表面より高所に構造物を構築する場合に実施される現状地盤上への構造物の構築方法に関するものである。 The present invention relates to a method for constructing a structure on existing ground, which is carried out when constructing a structure at a height higher than the ground surface of the existing ground (original ground).
例えば平坦な地表面の現状地盤上に浄水場のような、構造物(施設)間の高低差(水位差)を利用する複数の構造物を分散させて配置するような場合、各構造物の基礎底面間に高低差を付け、下流に向かって水が流れるように構造物を構築することになる。 For example, when distributing multiple structures (facilities) that utilize the difference in elevation (water level difference) between them, such as a water purification plant, on an existing flat ground surface, the structures are constructed so that there is an elevation difference between the base of the foundations of each structure and the water flows downstream.
只、構造物の構築のために地盤を掘削することは、山留め壁と切梁の設置等の多くの仮設工事を伴うため、盛土を構築する場合より経費と工期が掛かる。この点からは、現状地盤上に複数の構造物の領域毎に天端高さの相違する盛土を構築する方が、構造物の構築分を含め、全体的には経費が抑えられながら、工期が短縮化され得るため、合理的な方法と言える。 However, excavating the ground to construct a structure requires a lot of temporary construction work, such as installing retaining walls and struts, and therefore costs more and takes longer than building embankments. From this point of view, building embankments with different top heights for each of the areas of multiple structures on the existing ground is a rational method, as it reduces overall costs, including the cost of constructing the structures, while shortening the construction period.
現状地盤上に盛土を構築する方法には、主に地盤面上に盛土を構築した後に盛土天端から現状地盤に到達する杭を打設する方法(特許文献1参照)と、地盤面上から上部区間が突出した状態で杭を地盤中に打設した後に、繊維補強材を利用しながら杭との一体性を確保するように盛土材を敷設する方法(特許文献2参照)がある。 Methods for constructing embankments on existing ground mainly include a method in which an embankment is constructed on the ground surface, and then piles are driven from the top of the embankment to reach the existing ground (see Patent Document 1), and a method in which piles are driven into the ground with their upper sections protruding above the ground surface, and then embankment material is laid using fiber reinforcement to ensure integrity with the piles (see Patent Document 2).
特許文献1では盛土の構築後に盛土の天端から、盛土構築前の原地盤に到達する地盤改良杭を構築しているため(請求項3、段落0013)、盛土の天端面上に地盤改良機を設置する必要が生じるが、地盤改良機を原地盤上から盛土上に移動させるための作業と撤去に困難を伴う場合がある。
In
例えば地盤改良機の移動用に、原地盤面から盛土天端面までに緩い傾斜のスロープを形成する作業が必要になる等、本来の工事以外の付帯工事に時間と費用を要する。スロープは構造物としての盛土には無関係であるため、利用価値がない限り、盛土の完成後には撤去されることになる。 For example, it is necessary to create a gentle slope from the original ground surface to the top surface of the embankment to allow for the movement of ground improvement equipment, and this requires time and money for additional work in addition to the actual construction. As the slope is unrelated to the embankment as a structure, it will be removed once the embankment is completed unless it has any useful value.
またスロープの形成には、盛土全体の周囲のいずれかの側にスロープを敷設できるだけの余分な敷地を必要とするため、盛土の構築に必要な敷地が限られ、スロープ分の余分な敷地が確保されない場合には、スロープの形成が不可能であるから、盛土上に地盤改良機を設置することが不可能になり、杭を構築することもできない。また構築された盛土の天端面が狭い場合、地盤改良機や杭打機などの重機を載せて取り廻すことが困難な場合も考えられる。 In addition, the creation of a slope requires extra land on either side of the entire embankment to allow for the construction of the slope, so the amount of land required to build the embankment is limited. If there is not enough land available for the slope, it is not possible to create the slope, making it impossible to install a ground improvement machine on the embankment and therefore impossible to construct piles. Furthermore, if the top surface of the constructed embankment is narrow, it may be difficult to load and maneuver heavy machinery such as a ground improvement machine or pile driver.
更に特許文献1の杭は地盤改良杭であるから、完成する杭の頭部は地表面以下に位置し、特許文献2のように杭の上部区間を地盤面上に突出(露出)させた状態で杭を完成させることができないため、盛土の構築前には、予定された盛土の天端面に頭部が位置する杭を構築することはできない。このことは、杭が現場造成杭(場所打ち杭)の場合にも言える。
Furthermore, because the piles in
特許文献2では盛土構築前の原地盤上から杭を打設し、杭の上部区間を地盤面から突出させているため、盛土上から杭を打設する場合のような、杭打ち機の設置に要するスロープの形成に伴う問題は回避されている。
In
但し、特許文献2の杭は原地盤上に形成される、繊維補強材1と盛土材からなる複数層の盛土層2の一体性を確保する目的で全盛土層2に亘り、全盛土層2を貫通するように補強土盛土A内に配置され(段落0002、0007、0010、図3、図4)、補強土盛土Aはそれが面する斜面上の盛土の崩落を防止する堰の役目を果たすように斜面の法尻等に設置される(段落0007、図4)。この関係で、杭の頭部は最終的に最上部の盛土材中に埋設されるため(段落0021、0022、図4)、杭頭部上に地上構造物を構築することは想定されない。
However, the piles in
なお、結果だけに着目すれば、特許文献1では地盤改良杭の天端面上に床版を構築していることから(請求項1、段落0009、0013、図1)、特許文献2に特許文献1を組み合わせれば、特許文献2の杭の天端面上に構造物の基礎を構築することは容易であるようにも見える。
If we focus only on the results, since in Patent Document 1 a deck slab is constructed on the top surface of the ground improvement piles (
しかしながら、特許文献2の発明は盛土の補強構造であって、杭の頭部が最上部の盛土材中に埋設された状態で完成する以上(段落0010、0021、0022)、未完成状態の杭の頭部上に構造物を構築することは想定されていない。
However, the invention in
本発明は上記背景より、地表面より高所に構造物を構築することを可能にする現状地盤上への構造物の構築方法を提案するものである。 In light of the above background, the present invention proposes a method for constructing a structure on the existing ground, which makes it possible to build a structure at a height higher than the ground surface.
請求項1に記載の現状地盤上への構造物の構築方法は、現状地盤の地表面より高所に構築予定の構造物の基礎の形成位置に対応した位置から、前記現状地盤中に水平方向に間隔を置き、上部区間が前記現状地盤上に露出した状態で複数本の杭を打ち込み、前記現状地盤上に、前記杭の少なくとも頭部の軸方向の一部が露出する高さまで盛土を構築した後、前記杭の頭部上に、または頭部の少なくとも一部を包含して前記構造物の前記基礎を構築し、前記基礎上に前記構造物の上部構造を構築することを構成要件とする。
請求項2に記載の現状地盤上への構造物の構築方法は、請求項1の方法において、前記杭の前記頭部の周囲に、前記盛土の最上部の天端面より相対的に低い天端面を形成することを構成要件とする。
The method of constructing a structure on the current ground as described in
The method for constructing a structure on the existing ground described in
「構築予定の構造物の基礎の形成位置に対応した位置」とは、盛土上に構築予定の構造物の基礎の構築位置、または設置位置を指す。「設置」はプレキャストコンクリート部材等の既製品の設置を意味する。「水平方向に間隔を置き」とは、主に杭が水平二方向に間隔を置いて配列することを言うが、必ずしもその必要はなく、構造物の規模や形態に応じては、水平一方向にのみ、杭が間隔を置いて配列すれば済む場合があることを意味する。 "A position corresponding to the formation position of the foundation of the structure to be constructed" refers to the construction position of the foundation of the structure to be constructed on the embankment, or the installation position. "Installation" refers to the installation of prefabricated products such as precast concrete members. "Spaced horizontally" mainly refers to the piles being spaced apart in two horizontal directions, but this is not always necessary, and depending on the size and shape of the structure, it may be sufficient to space the piles apart in only one horizontal direction.
「上部区間が現状地盤上に露出した状態で」とは、杭の頭部を含む、杭の上部寄りの一部の区間が現状地盤の地盤面から露出(突出)した状態で杭の打ち込み(打設)が完了することを言う。杭は現場造成杭(場所打ち杭)を除くコンクリート杭、鋼杭等の既製杭である。杭の先端(下端)は現状地盤の地中に到達する。支持杭である場合、先端は支持層に到達する。 "With the upper section exposed above the current ground" means that the driving (driving) of the piles is completed with a section near the top of the pile, including the head of the pile, exposed (protruding) above the ground surface of the current ground. The piles are prefabricated piles such as concrete piles and steel piles, excluding on-site construction piles (cast-in-place piles). The tip (bottom end) of the pile reaches underground in the current ground. If it is a bearing pile, the tip reaches the supporting layer.
「杭の少なくとも頭部の軸方向の一部が露出する高さ」とは、図1-(b)に示すように現状地盤1上に盛土3を構築したときに、頭部2a、あるいは頭部2aに相当する部分の一部から全体が露出することを言う。盛土3を構築した後、基礎41の構築の時点で杭頭部2aの天端面2bのみが盛土3の天端面(地表面)3aに露出する状態になる場合もある。少なくとも杭2の頭部2aの軸方向の一部が露出することで、特許文献2の杭とは異なり、図1-(c)に示すように杭頭部2a上に直接、構造物4の基礎41を構築し、杭2に構造物4を直接、支持させることが可能であり、基礎41の構築のために必ずしも杭頭部2a周辺の土を除去する必要がない。
The "height at which at least a part of the axial direction of the head of the pile is exposed" refers to the exposure of the
「杭の頭部上に、または頭部の少なくとも一部を包含して構造物の基礎を構築し」とは、基礎41を杭2の頭部2aにピン接合するか、半剛接合、または剛接合するか、に応じて頭部2aの露出の程度が異なることを言う。この他、図2-(c)に示すように基礎41が杭頭部2aの天端面2bに水平方向に滑り自在に載置されることもある。
"Constructing the foundation of a structure on the head of the pile or including at least a part of the head" means that the degree of exposure of the
ピン接合、または滑り自在の場合には、図2-(c)に示すように頭部2aの天端面2b上に基礎41の接合、または載置(支持)が可能であるため、頭部2a上に基礎41を構築することになる。半剛接合か剛接合の場合には、図1-(c)に示すように頭部2aの天端面2b寄りの一部を基礎41に取り込むように接合することになるため、頭部2aの一部を包含して基礎41を構築することになる。構造物4の上部構造45は基礎41上に構築される。
In the case of a pin joint or a sliding joint, the
整理すれば、基礎41を杭頭部2aにピン接合等する場合には、図2-(b)に示すように杭頭部2aの天端面2bに盛土3の天端面3aが揃うように盛土3を構築すればよく、半剛接合、または剛接合する場合には、図1-(b)に示すように天端面2bを含む杭頭部2aの少なくとも一部が露出するように盛土3を構築すればよい。盛土3の天端面3aは図1に示す例のように一定(同一高さ)とは限らない。
To summarize, when the
このように杭2の少なくとも頭部2aの軸方向の一部が露出する高さまで盛土3を構築することで、ピン接合か等の接合条件に拘わらず、構造物4の基礎41を杭2に直接、接合するか、支持させることができるため、杭2と基礎41との接合の自由度が高い。言い換えれば、構造物4の規模に応じて基礎41と杭2との接合条件を選択することができるため、複数本の杭2に構造物4を支持させる上で、構造物4の規模(質量)、構造種別の差異へも対応(追従)し易い。
In this way, by constructing the
本発明では現状地盤1上への盛土3の構築に先立って上部区間2Aが露出する杭2を打ち込むことで、盛土3の構築が先行する特許文献1で必要とされる杭打ち機を盛土3の天端面3a上に設置する作業も撤去(回収)する作業も不要になる。これに伴い、現状地盤1の地表面から盛土天端面3aまでの間へのスロープの形成が不要になり、スロープ形成のための時間と費用が節約される。地盤改良杭の天端面上に床版を構築している特許文献1では、前記のように盛土の構築前には地盤改良杭を構築できないため、工期と工費が犠牲になる不利益がある。
In the present invention, by driving
また前記のようにスロープの形成には、盛土の周囲にスロープを敷設できるだけの敷地を必要とする関係で、スロープを敷設するための敷地が確保されなければ、スロープの形成と杭打ち機の設置が不可能であり、特許文献1では杭を打ち込むこともできない。それに対し、本発明ではスロープの形成が不要であることで、盛土(盛土地盤)の周囲に余分な敷地が確保されない条件の場所においても本発明を実施し、盛土3の構築とその上への構造物4の構築をすることが可能である。
As mentioned above, the formation of a slope requires a site around the embankment large enough to lay the slope, and if the site for laying the slope is not secured, it is impossible to form the slope and install a pile driver, and in
特に複数本の杭2の内、図1-(b)に示すように平面上、最も外周側に位置する杭2を盛土3の天端面3aの平面上の縁より内周側に位置させれば(請求項3)、特許文献1のように盛土の縁に沿って杭が配置される場合のように、盛土の縁寄りの一部が崩落した場合に生じる杭の露出と、それによる杭の支持力低下が回避され易くなる。「平面上、」は平面で見たときの意味である。
In particular, if the
請求項3では盛土3の縁寄りの一部が崩落した場合も、直ちには杭2の露出が回避されることで、杭2に支持されている構造物4の安定性が確保され、特許文献1の層厚管理材のような盛土の表面保護材が不要になる。この他、図1-(c)に示すように構造物4の基礎41を平面上、包囲し、拘束するように上部盛土6を構築することも可能になる(請求項4)。
In
このように請求項3において、基礎41の外周側の、盛土3の天端面3a上に、基礎41を外周側から包囲する上部盛土6を構築すれば(請求項4)、構造物4の基礎41が外周側から拘束されるため、特に地震力に対する構造物4の安定性はより向上する。
In this way, in
現状地盤上への盛土の構築に先立って上部区間が露出する杭を現状地盤中に打ち込むため、盛土の構築が先行する場合に必要とされる、盛土の天端面上への杭打ち機の設置と撤去(回収)作業が不要になる。それに伴い、現状地盤の地表面から盛土天端面までの間へのスロープの形成が不要になり、スロープ形成のための時間と費用を節約することができる。スロープの形成が不要であることで、盛土地盤の周囲に余分な敷地が確保されない場所においても盛土の構築とその上への構造物の構築をすることができる。 Because piles with exposed upper sections are driven into the existing ground prior to the construction of the embankment on the existing ground, there is no need to install and remove (collect) a pile driver on the top surface of the embankment, which is required when the embankment is constructed first. As a result, there is no need to form a slope between the surface of the existing ground and the top surface of the embankment, saving time and money for slope formation. Because there is no need to form a slope, it is possible to build the embankment and structures on top of it even in places where there is no extra land available around the embankment ground.
また杭の少なくとも頭部の軸方向の一部が露出する高さまで盛土を構築するため、ピン接合か等の接合条件に拘わらず、構造物の基礎を杭に直接、接合することができる。この結果、構造物の規模に応じて基礎と杭との接合条件を選択することができるため、構造物の規模や構造種別の差異に対応しながら、複数本の杭に構造物を支持させることができる。 In addition, because the embankment is constructed to a height where at least a portion of the axial direction of the head of the pile is exposed, the foundation of the structure can be directly joined to the pile, regardless of the joining conditions such as pin joints, etc. As a result, the joining conditions between the foundation and the pile can be selected according to the scale of the structure, so that the structure can be supported by multiple piles while responding to differences in the scale and type of structure.
図1-(a)~(c)に基づき、現状地盤1中への複数本の杭2の打ち込みから、杭2上への構造物4の構築までの作業手順を説明する。
Based on Figures 1-(a) to (c), the work procedure from driving
図1-(c)は複数本の杭2の頭部2a上に構造物4を構築した後の、あるいは構造物4を構築中の様子を示すが、盛土3上に構築予定の構造物4の規模(質量)等に応じた本数の杭2を現状地盤1中に、(a)に示すように水平方向に間隔を置き、(a)に示す杭打ち機5を用いて必要深度まで打ち込む。頭部2aを含む杭2の上部区間2Aは現状地盤1の地表面から突出する。杭2はコンクリート杭等の既製杭であり、摩擦杭と支持杭がある。
Figure 1-(c) shows the state after a
地表面から突出する上部区間2Aの長さは現状地盤1上に構築される盛土3の厚さ(深さ)に相当するが、図1-(b)に示すように盛土3の構築時には杭2の頭部2aは盛土3の天端3a上に突出する。上部区間2Aの長さは図2-(b)に示すように基礎41の構築の時点で盛土3の厚さに一致する状態になる場合もある。盛土3の厚さは現状地盤1の地表面から盛土3の天端面3aまでの距離であるが、天端面3aの高さ(レベル)は図1-(b)に示すように杭2の周囲か否か等により相違することもある。
The length of the
最終的に上部区間2Aの長さが盛土3の厚さに一致する場合、図2-(b)に示すように盛土3完成後の基礎41構築の時点で、杭2の頭部2aの天端面2bのみが盛土3の天端面3aに露出し、盛土3の厚さより小さい場合、図1-(b)に示すように頭部2aの少なくとも軸方向の一部が周辺の盛土3の天端面3aから突出する。
If the length of the
杭2の打ち込み後、図1-(b)に示すように現状地盤1上に、杭2の少なくとも頭部2aの軸方向の一部が露出する高さまで盛土3を構築する。盛土3の材料は特に問われないが、構築後に複数本の杭2を拘束し、上部区間2Aの振動を抑制する上では、地盤改良土等、セメント系材料を含む材料や流動化土が有効である。
After the
図1に示す例では(c)に示すように盛土3の最上部の天端面3a上に基礎梁43の下端が位置し、その位置(レベル)より低い位置にフーチング42の下端が位置するように基礎41を構築する関係で、最上部の天端面3aより低い、フーチング42の下端の位置に、最上部より相対的に低い天端面3aが形成される。図1の例ではフーチング42の周囲に、フーチング42底面より上方の平面積が大きい、フーチング42構築のための作業空間が確保されているが、この空間にはフーチング42の構築後、埋戻し土や盛土3の材料等が充填される。
In the example shown in Figure 1, as shown in (c), the lower end of the
盛土3の構築後、(c)に示すように杭2に支持させる状態で構造物4の基礎41を構築する。図1は基礎41として、各杭2の頭部2aを包囲するようにフーチング42(独立基礎)を構築し、フーチング42、42間に基礎梁43を構築、あるいは敷設した場合の基礎41の形成例を示している。この場合、(b)に示すように杭2の天端面2bを含む頭部2aが露出するように盛土3が構築される。フーチング42を構築する場合に、天端面2bのみが露出するように盛土3が一旦、構築された場合には、フーチング42の形成時、頭部2aの周囲の一部の土が除去される。
After the
基礎41の構築に続き、基礎41の上に連続して構造物4の本体である上部構造45が構築される。フーチング42が頭部2aを包囲する場合、フーチング42は杭2の頭部2aには半剛接合、または剛接合され、基礎梁43を含めた基礎41と複数本の杭2との一体性は確保され易い。
Following the construction of the
図1-(c)では特に、基礎41を平面上、周囲から拘束し、構造物4の地震力に対する安定性を高める目的で、基礎41の周囲の盛土3上に上部盛土6を構築した場合の例を示している。この上部盛土6の構築を予定し、(b)では平面上、最も外周側に位置する杭2を盛土3の天端面3aの平面上の縁より内周側に位置させ、盛土3の縁と外周側の杭2との間に上部盛土6構築分の距離を確保している。上部盛土6の材料も問われないが、構造物4の安定性を高める上では、上部盛土6にもセメント系材料を含む材料や流動化土を使用することで、上部盛土6が地盤改良されるため、杭2を拘束して水平力(地震等)に抵抗することが可能となる。
Figure 1-(c) particularly shows an example of a case where an
図2は杭2の天端面2b上に基礎41としてのマットスラブ44を構築した場合の例を示す。この場合、マットスラブ44は複数本の杭2の天端面2b上に載る形になり、図1の例より相対的に基礎41と複数本の杭2との一体性は低下する関係で、図2-(a)に示すように図1の例より多くの杭2を打ち込んでいる。この場合も、頭部2aを含む杭2の上部区間2Aが現状地盤1の地表面から突出した状態で、杭2が打ち込まれる。
Figure 2 shows an example of a case where a
杭2の打ち込み後、図1の例と同様、(b)に示すように現状地盤1上に、杭2の少なくとも頭部2aの軸方向の一部が露出する高さまで盛土3を構築する。図1の例と同じく、基礎41の周囲の盛土3上に上部盛土6を構築する場合、盛土3の縁と外周側の杭2との間に上部盛土6構築分の距離が確保される。
After the
盛土3の構築後、(c)に示すように杭2に支持させる状態で構造物4の基礎41を構築する。図2の例では杭2の天端面2b上にマットスラブ44を構築するため、図1の例のように杭2の頭部2aを取り込むようにフーチング42を形成する必要はない。この関係で、頭部2aの軸方向の一部が露出する高さまで盛土3を構築した後、基礎41の構築の時点では杭2の天端面2bのみが露出すればよい。この例でも基礎41としてのマットスラブ44上に連続して上部構造45が構築される。
After the
(c)は基礎41としてのマットスラブ44が杭2の天端面2b上に水平方向に滑り自在に載置される場合の例を示している。この例では基礎41の構築の時点では杭2の天端面2bと盛土3の天端面3aが揃えられているため、マットスラブ44は杭2の天端面2bと盛土3の天端面3a上に載置され、両者に滑り自在に支持される。マットスラブ44は両天端面2b、3aに対して滑り自在であっても、一定以上の水平力が構造物4に作用したときにのみ、滑りが生じるように摩擦力等を設定することはできる。
1(c) shows an example in which a
この例でも基礎41を平面上、周囲から拘束し、構造物4の地震力に対する安定性を高める上では、基礎41の周囲の盛土3上に上部盛土6が構築される。
In this example, in order to restrain the
1……現状地盤、
2……杭、2a……頭部、2b……天端面、2A……上部区間、
3……盛土、3a……天端面、
4……構造物、41……基礎、42……フーチング、43……基礎梁、44……マットスラブ、45……上部構造、
5……杭打ち機、
6……上部盛土。
1...Current ground condition,
2... Pile, 2a... Head, 2b... Top surface, 2A... Upper section,
3... embankment, 3a... top surface,
4: Structure, 41: Foundation, 42: Footing, 43: Foundation beam, 44: Mat slab, 45: Superstructure,
5... Pile driver,
6...Upper embankment.
Claims (4)
前記現状地盤上に、前記杭の少なくとも頭部の軸方向の一部が露出する高さまで盛土を構築した後、
前記杭の頭部上に、または頭部の少なくとも一部を包含して前記構造物の前記基礎を構築し、前記基礎上に前記構造物の上部構造を構築することを特徴とする現状地盤上への構造物の構築方法。 A plurality of piles are driven into the existing ground at intervals horizontally from a position corresponding to the position of the foundation of a structure to be constructed higher than the ground surface of the existing ground, with the upper section exposed above the existing ground;
After constructing an embankment on the existing ground to a height where at least a part of the axial direction of the head of the pile is exposed,
A method for constructing a structure on existing ground, comprising constructing the foundation of the structure on or including at least a portion of the head of the pile, and constructing the superstructure of the structure on the foundation.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021162609A JP7606952B2 (en) | 2021-10-01 | 2021-10-01 | How to build a structure on existing ground |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021162609A JP7606952B2 (en) | 2021-10-01 | 2021-10-01 | How to build a structure on existing ground |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023053525A JP2023053525A (en) | 2023-04-13 |
| JP7606952B2 true JP7606952B2 (en) | 2024-12-26 |
Family
ID=85873485
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021162609A Active JP7606952B2 (en) | 2021-10-01 | 2021-10-01 | How to build a structure on existing ground |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7606952B2 (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2016084622A (en) | 2014-10-27 | 2016-05-19 | 株式会社竹中工務店 | Construction method for structure |
-
2021
- 2021-10-01 JP JP2021162609A patent/JP7606952B2/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2016084622A (en) | 2014-10-27 | 2016-05-19 | 株式会社竹中工務店 | Construction method for structure |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2023053525A (en) | 2023-04-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8898996B2 (en) | Method for forming a retaining wall, and corresponding retaining wall | |
| JP5619646B2 (en) | Construction method of underground structure and underground structure | |
| JP5579635B2 (en) | Underground structure and construction method of underground structure | |
| JP2000352296A (en) | Method o constructing passage just under underground structure | |
| KR20120126573A (en) | Soil cement wall structure and method for constructing thereof | |
| JP5764245B2 (en) | Construction method of underground structure and underground structure | |
| JP4029191B2 (en) | Subsidence suppression structure, construction method of settlement suppression structure | |
| JP7606952B2 (en) | How to build a structure on existing ground | |
| JP3930954B2 (en) | Construction method of structure | |
| JP5875651B2 (en) | Underground structure and construction method of underground structure | |
| JP2012162883A (en) | Underground structure, and construction method for the underground structure | |
| TW201741529A (en) | Method for constructing advanced pavement for preventing construction site collapse before construction of diaphragm wall in which support piles are first established and grid beams are welded to tops of the piles for supporting grouting and forming of a concrete pavement thereon | |
| KR20070052109A (en) | Simultaneous construction of slab and exterior wall and underground reverse casting using slim composite floor structure | |
| JP6543177B2 (en) | Building method | |
| Dellaria et al. | Combining multiple techniques to complete an urban deep excavation | |
| CN112627249B (en) | Construction method for shallow foundation reinforcement | |
| JP2019173453A (en) | Construction method of building | |
| CN114232666A (en) | Multi-span prestressed elastic foundation beam structure for spanning complex karst cave group and construction method | |
| CN114508113A (en) | Construction method of waist-supported anti-sliding pile structure | |
| CN113482038A (en) | Construction method of active retaining wall damaged foam concrete repair structure | |
| KR102690511B1 (en) | Construction method of pile foundation structure and crushed stone column foundation structure | |
| CN220704537U (en) | Deep foundation pit supporting structure | |
| KR100615149B1 (en) | Reverse casting method of concrete ground structure | |
| CN116876525B (en) | A triangular frame support pile foundation pit support structure and its construction method | |
| KR20210047481A (en) | Core wall structure of composite cassion for offshore runway |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20211001 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240220 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240808 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240820 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240920 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20241203 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20241216 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7606952 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |