Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7607282B2 - Stud cutting device and deck replacement method - Google Patents
[go: Go Back, main page]

JP7607282B2 - Stud cutting device and deck replacement method - Google Patents

Stud cutting device and deck replacement method Download PDF

Info

Publication number
JP7607282B2
JP7607282B2 JP2021064921A JP2021064921A JP7607282B2 JP 7607282 B2 JP7607282 B2 JP 7607282B2 JP 2021064921 A JP2021064921 A JP 2021064921A JP 2021064921 A JP2021064921 A JP 2021064921A JP 7607282 B2 JP7607282 B2 JP 7607282B2
Authority
JP
Japan
Prior art keywords
cutting device
stud
upper flange
studs
deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021064921A
Other languages
Japanese (ja)
Other versions
JP2022160272A (en
Inventor
恵史 三室
利通 一宮
公生 齋藤
聖介 村岸
淳 熊部
雄彦 菅野
浩太 藤尾
大樹 藤永
英男 梶原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2021064921A priority Critical patent/JP7607282B2/en
Publication of JP2022160272A publication Critical patent/JP2022160272A/en
Application granted granted Critical
Publication of JP7607282B2 publication Critical patent/JP7607282B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、形鋼の表面から突出するスタッドを切除するスタッド切除装置に関する。
本発明はまた、既設の橋梁などにおいて、鋼桁(形鋼)上の床版の架け替え(既設床版の撤去とこれに替わる新設床版の設置)を行う場合の、既設床版の撤去後に鋼桁上に残置されたスタッドの切除を含む、床版架け替え方法に関する。
The present invention relates to a stud cutting device that cuts off a stud protruding from a surface of a steel section.
The present invention also relates to a method for replacing a deck on a steel girder (shaped steel) in an existing bridge or the like (removal of the existing deck and installation of a new deck in its place), which includes cutting off studs left on the steel girder after removal of the existing deck.

橋梁は、例えば、複数の橋脚と、各々が複数の橋脚の上に跨がって橋軸方向に並列に延びる複数の鋼桁(例えばH形鋼又はI形鋼)と、橋軸直角方向に長く複数の鋼桁の上に跨がって配置されて橋軸方向に並べられるプレキャストコンクリート製の床版と、を含んで構成される。 The bridge is composed of, for example, multiple piers, multiple steel girders (e.g., H-shaped steel or I-shaped steel) each extending in parallel in the bridge axis direction across the multiple piers, and a precast concrete deck that is long in the direction perpendicular to the bridge axis, spanning across the multiple steel girders and aligned in the bridge axis direction.

ここで、鋼桁の上面には、スタッド(スタッドジベル)が、鋼桁の延在方向に所定の間隔で、また各位置に鋼桁の延在方向と直角方向に並べて、複数本(例えば4本)ずつ植設されている。その一方、床版には、前記複数本のスタッドと対応する位置に長孔(上下方向の貫通孔)が形成されている。これは、鋼桁上に床版を設置して、前記複数本のスタッドを長孔内に位置させた後、長孔内にモルタルを充填することで、鋼桁と床版とを一体化するためである。 Here, multiple studs (stud dowels) (for example, four studs) are planted on the top surface of the steel girder at regular intervals in the direction in which the steel girder extends, and are lined up at each position perpendicular to the direction in which the steel girder extends. Meanwhile, long holes (vertical through holes) are formed in the deck at positions corresponding to the multiple studs. This is so that the steel girder and deck can be integrated by placing the deck on the steel girder and positioning the multiple studs in the long holes, and then filling the holes with mortar.

かかる床版については、長年の使用によるコンクリートの劣化や内部の鉄筋の腐食などの理由で、架け替え(既設床版の撤去とこれに替わる新設床版の設置)が求められる場合がある。 Such decks may need to be replaced (removal of the existing deck and installation of a new one) due to reasons such as deterioration of the concrete after many years of use or corrosion of the internal rebar.

特許文献1には、床版架け替え方法について、特に、鋼桁上から既設床版を撤去した後、新設床版を設置する前に、ケレン装置を用いて、鋼桁の上面にケレン処理を施すことについて、記載されている。既設床版を撤去すると、鋼桁の上面にコンクリート片などの付着物が残留してしまうからである。
ケレン装置としては、手持ち式のグラインダー又はサンダーを利用し、これを組み込んで自走式の装置を構成している。
Patent Document 1 describes a method for replacing decks, in particular, a method for removing the existing deck from above the steel girders and scraping the top surface of the steel girders using a scraping device before installing a new deck, because removing the existing deck leaves concrete fragments and other adhering material on the top surface of the steel girders.
A handheld grinder or sander is used as the scraping device, and is incorporated into a self-propelled device.

また、既設床版が撤去された鋼桁上には、スタッドが残置される。
残置されたスタッドは疲労しているので、切除して、新しいスタッドを植設することが好ましい。スペースに余裕がある場合は、残置されたスタッドとは別の場所に新しいスタッドを植設してもよいが、残置されたスタッドが新設床版と干渉しないよう、根元部で切断する必要がある。
In addition, studs are left behind on the steel girders after the existing deck has been removed.
The remaining studs are fatigued, so it is preferable to cut them off and install new studs. If there is enough space, new studs may be installed in a different location from the remaining studs, but the remaining studs must be cut off at the base so that they do not interfere with the new deck.

このため、残置されたスタッドについては、作業者が手持ち式のカッター(円形回転刃を有する切断工具)を用いて、根元部で切断することにより、除去していた。 For this reason, workers would remove any remaining studs by cutting them off at their base using a handheld cutter (a cutting tool with a circular rotating blade).

特開2020-176420号公報JP 2020-176420 A

しかしながら、切断工具を用いるとは言え、手作業によるスタッドの切除は、時間がかかり、また一人が1本ずつ行うため、多数のスタッドがある場合に、多大な時間を要することとなり、床版架け替え工事の遅延につながっていた。 However, even with the use of cutting tools, manually removing studs takes time, and because it must be done by one person, when there are many studs, it takes a significant amount of time, leading to delays in the deck replacement work.

本発明は、このような実状に鑑み、形鋼の表面から突出するスタッドを好適に切除することができる、スタッド切除装置を提供することを課題とする。 In view of the above circumstances, the present invention aims to provide a stud cutting device that can effectively cut off studs protruding from the surface of structural steel.

本発明に係るスタッド切除装置は、H形鋼からなる鋼桁であって橋軸方向に延びる前記鋼桁の上側フランジの上面から突出するスタッドを切除する装置であって、橋軸方向を前後方向とし、橋軸直角方向を左右方向とした場合において、The stud cutting device of the present invention is a device for cutting studs protruding from the upper surface of the upper flange of a steel girder made of H-shaped steel and extending in the bridge axis direction, and when the bridge axis direction is the front-rear direction and the direction perpendicular to the bridge axis is the left-right direction,
前記上側フランジ上を前後方向に移動可能であり、かつ、前記上側フランジの前後方向における任意の位置で前記上側フランジに固定可能な架台と、a stand that is movable in a front-rear direction on the upper flange and that can be fixed to the upper flange at any position in the front-rear direction of the upper flange;
前記架台の上側にて前記架台に支持されて左右方向に延びるレールと、a rail supported by the base on an upper side of the base and extending in a left-right direction;
前記レールに沿って左右方向に移動可能な左右一対の移動装置と、A pair of left and right moving devices that are movable in the left and right directions along the rail;
前記左右一対の移動装置の各々の下側に取付けられた切断装置と、a cutting device attached to the underside of each of the pair of left and right moving devices;
を含み、Including,
前記架台は、The frame is
天板と左右一対の側板とにより構成されて前後方向に見て下側開放のコ字状に形成された本体と、A main body is formed in a U-shape with an open lower side when viewed in the front-rear direction, the main body being composed of a top plate and a pair of left and right side plates;
前記左右一対の側板の各々に回転可能に取付けられた走行ローラと、a running roller rotatably attached to each of the pair of left and right side plates;
前記左右一対の側板の各々の下端部に取付けられたトグルクランプと、a toggle clamp attached to a lower end of each of the pair of left and right side plates;
を備え、Equipped with
前記天板は、前記上側フランジの上方に位置し、The top plate is located above the upper flange,
前記左右一対の側板は、それぞれ、前記切断装置の通過部となる開口部を有し、Each of the pair of left and right side plates has an opening through which the cutting device passes,
前記走行ローラは、前記上側フランジの上面の左右の縁部上を走行可能であり、The running rollers are capable of running on the left and right edges of the upper surface of the upper flange,
前記トグルクランプは、レバー部とクランプ部とを備え、前記トグルクランプは、前記レバー部の回動操作による前記クランプ部の移動により、前記上側フランジを前記走行ローラと前記クランプ部とで挟持することによって、前記架台を前記上側フランジの前後方向における任意の位置で固定することができるように構成されており、the toggle clamp includes a lever portion and a clamp portion, and the toggle clamp is configured such that the upper flange is clamped between the running roller and the clamp portion by moving the clamp portion through a rotational operation of the lever portion, thereby allowing the platform to be fixed at any position in the front-rear direction of the upper flange,
前記切断装置は、水平面内を回転する円形回転刃を有し、前記円形回転刃は、前記上側フランジの上面に対して前記円形回転刃の下面が平行に近接配置されて回転駆動され、前記レールに沿って送られて、前記スタッドの根元部を切断することを特徴とする。The cutting device has a circular rotary blade that rotates in a horizontal plane, and the circular rotary blade is rotated with the lower surface of the circular rotary blade positioned parallel to and close to the upper surface of the upper flange, and is fed along the rail to cut the base portion of the stud.

本発明はまた、前記鋼桁上に設けられた床版の架け替え方法を提供する。
本方法は、前記鋼桁上から既設床版を撤去した後、前述のスタッド切除装置を用いて、前記上側フランジ上面上に残置されて前記上側フランジ上面から突出する前記スタッドを切除する工程と、前記スタッドの切除後で、前記鋼桁上に新設床版を設置する前に、前記上側フランジ上面上に新規にスタッドを溶接により植設する工程と、を含む。
The present invention also provides a method for replacing a deck installed on the steel girder.
This method includes the steps of removing the existing deck from above the steel girder, and then using the aforementioned stud cutting device to cut out the studs that remain on and protrude from the upper surface of the upper flange , and after cutting out the studs, and before installing a new deck on the steel girder, welding new studs onto the upper surface of the upper flange .

本発明によれば、鋼桁などを構成する形鋼の表面から突出するスタッドを好適に切除することができる。
これにより、床版架け替え工事でのスタッド切除作業を効率良く行うことができ、工事の迅速な進行を図ることができる。
According to the present invention, studs protruding from the surface of structural steel that constitutes a steel girder or the like can be suitably cut off.
This allows stud cutting work during deck replacement work to be carried out efficiently, enabling the work to progress quickly.

床版架け替え対象の橋梁の例を示す概略図Schematic diagram showing an example of a bridge that will be subject to deck replacement 本発明の一実施形態として示すスタッド切除装置の正面図FIG. 1 is a front view of a stud cutting device according to an embodiment of the present invention; 同上のスタッド切除装置の平面図FIG. 2 is a plan view of the stud cutting device of the same 同上のスタッド切除装置の右側面図FIG. 2 is a right side view of the stud cutting device. スタッド切除の様子を示す平面図Plan view showing stud removal 本発明の他の実施形態として示すスタッド切除装置の正面図FIG. 13 is a front view of a stud cutting device according to another embodiment of the present invention; 同上他の実施形態でのスタッド切除装置の右側面図FIG. 11 is a right side view of the stud cutting device according to another embodiment of the present invention;

以下、本発明の実施の形態について、詳細に説明する。
図1は床版架け替え対象の橋梁の例を示す概略図で、(A)は正面縦断面図、(B)は平面図である。
Hereinafter, an embodiment of the present invention will be described in detail.
FIG. 1 is a schematic diagram showing an example of a bridge to be subjected to deck replacement, in which (A) is a front longitudinal cross-sectional view and (B) is a plan view.

鋼桁1は、H形鋼(又はI形鋼)からなり、図示しない橋脚上に支持されて、複数本並列に、橋軸方向に延在している。 The steel girder 1 is made of H-shaped steel (or I-shaped steel), is supported on piers (not shown), and extends in parallel in the bridge axis direction.

床版2は、プレキャストコンクリート製で、橋軸直角方向に長く、複数の鋼桁1上(H形鋼の上側フランジ上)に跨がって配置される。1枚の床版2の橋軸方向の長さは2m程度であり、橋軸方向に並べられて、路床を構成する。 The deck 2 is made of precast concrete, is long in the direction perpendicular to the bridge axis, and is placed across multiple steel girders 1 (on the upper flanges of H-shaped steel). The length of each deck 2 in the bridge axis direction is about 2 m, and they are lined up in the bridge axis direction to form the roadbed.

ここで、鋼桁1上には、床版2との一体化のため、多数のスタッド(スタッドジベル)3が溶接により植設(溶植)されている。スタッド3は、例えば4本ずつ橋軸直角方向に一列に並べられ、これらが橋軸方向に所定の間隔で配置されている。 A large number of studs (stud dowels) 3 are welded (melted) onto the steel girder 1 to integrate it with the deck 2. The studs 3 are arranged in a row of, for example, four studs per row, perpendicular to the bridge axis, and are spaced at a specified interval in the bridge axis direction.

その一方、床版2には、各4本のスタッド3と対応する位置に、上下方向に貫通する長孔4が形成されている。
従って、鋼桁1上に床版2を載置して、スタッド3を4本ずつ長孔4内に位置させた後、長孔4内にモルタルを充填することで、鋼桁1と床版2とを一体化することができる。
On the other hand, the deck slab 2 has long holes 4 formed at positions corresponding to each of the four studs 3, penetrating the deck slab in the vertical direction.
Therefore, the deck 2 is placed on the steel girder 1, four studs 3 are positioned in each of the long holes 4, and then the long holes 4 are filled with mortar, thereby making it possible to integrate the steel girder 1 and the deck 2.

上記のような床版架け替え対象の橋梁では、鋼桁1上から既設の床版2を撤去すると、鋼桁1上にスタッド3が残置される。
かかるスタッド3については、疲労しているので、切除して、新設の床版を設置する前に、新しいスタッドを溶植することが望ましい。スペースに余裕がある場合は、残置されたスタッド3とは別の場所に新しいスタッドを溶植してもよいが、残置されたスタッド3が新設の床版と干渉しないよう、突出長が2cm以下程度となるように、根元部で切断する必要がある。
In a bridge that is to have its deck replaced as described above, when the existing deck 2 is removed from the steel girders 1, the studs 3 are left behind on the steel girders 1.
Since such studs 3 are fatigued, it is desirable to cut them off and melt-plant new studs before installing the new deck. If there is enough space, new studs may be melt-planted in a location separate from the remaining studs 3, but it is necessary to cut them off at the base so that the protruding length is about 2 cm or less so that the remaining studs 3 do not interfere with the new deck.

本発明では、上記のようなスタッド切除作業に好適に用いることができる、スタッド切除装置を提供する。 The present invention provides a stud cutting device that can be suitably used for the above-mentioned stud cutting work.

図2は本発明の一実施形態として示すスタッド切除装置の鋼桁延在方向に見た正面図、図3は同上のスタッド切除装置の平面図、図4は同上のスタッド切除装置の右側面図である。また、図5はスタッド切除の様子を示す平面図で、図2のV-V矢視図に相当する。 Figure 2 is a front view of a stud cutting device shown as one embodiment of the present invention, viewed in the direction of steel girder extension, Figure 3 is a plan view of the stud cutting device, and Figure 4 is a right side view of the stud cutting device. Figure 5 is a plan view showing the stud cutting process, and corresponds to the V-V arrow view of Figure 2.

スタッド切除装置5は、既設の床版が撤去されて上面にスタッド3が残置された鋼桁1にセットされる。 The stud cutting device 5 is set on the steel girder 1 after the existing deck has been removed and the studs 3 remain on the upper surface.

なお、本実施形態では、鋼桁1は、250mm×250mmのH形鋼とする。また、スタッド3は、鋼桁1上(H形鋼の上側フランジ上)に4本ずつ橋軸直角方向に一列に並べられ、これらが橋軸方向に200mm間隔で配置されているものとする。かかる寸法は理解を容易にするためであり、これに限るものでないことは言うまでもない。 In this embodiment, the steel girder 1 is an H-shaped steel beam measuring 250 mm x 250 mm. The studs 3 are arranged in a row of four on the steel girder 1 (on the upper flange of the H-shaped steel beam) perpendicular to the bridge axis, and are spaced 200 mm apart in the bridge axis direction. These dimensions are for ease of understanding, and needless to say, they are not limited to these.

スタッド切除装置5は、これを鋼桁1にセットするための架台10を含む。
架台10の本体は、図2に示されるように、正面視で(鋼桁1の延在方向に見て)天板11と左右の側板12、12とから下側開放のコ字状断面に形成されている。
The stud cutting device 5 includes a stand 10 for setting it on the steel girder 1 .
As shown in FIG. 2, the main body of the stand 10 is formed from a top plate 11 and left and right side plates 12, 12 into a U-shaped cross section that is open downward when viewed from the front (in the extending direction of the steel girder 1).

天板11は鋼桁1の上方に位置させる。
左右の側板12、12は、図4に示されるように、側面視で中央部に開口部13を有している。これは後述する切断装置40の通過部となる。
The top plate 11 is positioned above the steel girder 1.
4, the left and right side plates 12, 12 have an opening 13 in the center when viewed from the side. This is a passage for a cutting device 40, which will be described later.

左右の側板12、12には、それぞれを貫通させて、ロックナットにより軸方向位置を調整可能に、ボルト軸14、14が取付けられている。そして、各ボルト軸14の内側端部に、走行ローラ15が回転可能に取付けられている。これらの走行ローラ15は、外フランジ付きの車輪であって、鋼桁1の上面の左右の縁部に係合する。これにより、架台10が鋼桁1の延在方向に移動可能となっている。 Bolt shafts 14, 14 are attached to the left and right side plates 12, 12, penetrating each of them so that their axial position can be adjusted with a lock nut. Traveling rollers 15 are rotatably attached to the inner end of each bolt shaft 14. These traveling rollers 15 are wheels with outer flanges that engage with the left and right edges of the upper surface of the steel girder 1. This allows the frame 10 to move in the extension direction of the steel girder 1.

また、左右の側板12、12には、それぞれ下端部に、トグルクランプ16、16が取付けられている。各トグルクランプ16は、レバー部の内側への回動操作により、クランプ部16aが図示のごとく上方へ移動して、鋼桁1の上フランジを走行ローラ15とクランプ部16aとで挟持することにより、架台10を位置固定することができる。その一方、レバー部の外側への回動操作により、クランプ部16aが鋼桁1から離れて、位置固定を解除することができる。 Toggle clamps 16, 16 are attached to the lower end of each of the left and right side panels 12, 12. When the lever of each toggle clamp 16 is rotated inward, the clamp portion 16a moves upward as shown in the figure, and the upper flange of the steel girder 1 is clamped between the running roller 15 and the clamp portion 16a, thereby fixing the position of the frame 10. On the other hand, when the lever is rotated outward, the clamp portion 16a moves away from the steel girder 1, and the fixed position can be released.

従って、架台10は、H形鋼からなる鋼桁1の延在方向に移動可能で、かつ任意の位置でワンタッチで固定可能である。
なお、トグルクランプ16としては、株式会社ミスミグループ本社製の「トグルクランプTDE41F」を使用した。
Therefore, the frame 10 can be moved in the extension direction of the steel girder 1 made of H-shaped steel, and can be fixed at any position with a single touch.
As the toggle clamp 16, a "Toggle Clamp TDE41F" manufactured by Misumi Group Headquarters Co., Ltd. was used.

スタッド切除装置5はまた、架台10に支持されて鋼桁1の延在方向と直角方向で鋼桁1の上面と平行に、架台10の両側方へ延びる断面角形のレール20を含む。
レール20を支持するため、架台10にはその天板11の中央部に支持板17が立設・支持されていて、レール20はその長手方向の中央部で支持板17に支持されて、支持板17の左右に延びている。
The stud cutting device 5 also includes rails 20 with a square cross section that are supported by the frame 10 and extend to both sides of the frame 10 in a direction perpendicular to the extension direction of the steel girder 1 and parallel to the upper surface of the steel girder 1.
In order to support the rail 20, a support plate 17 is erected and supported in the center of the top plate 11 of the stand 10, and the rail 20 is supported by the support plate 17 at its longitudinal center and extends to the left and right of the support plate 17.

そして、レール20の左右の下面には、それぞれ、レール20の長手方向に沿って、ラックギア22、22が取付けられている。 Rack gears 22, 22 are attached to the left and right undersides of the rail 20 along the longitudinal direction of the rail 20.

スタッド切除装置5はまた、レール20の左右に、レール20に沿って移動可能な移動装置30、30と、これらの移動装置30、30に支持されて一体に移動可能な切断装置40、40とを含む。 The stud cutting device 5 also includes moving devices 30, 30 that can move along the rail 20 on the left and right sides of the rail 20, and cutting devices 40, 40 that are supported by these moving devices 30, 30 and can move together with them.

各移動装置30は、キャリッジ31と、自動送り装置32とを含む。
キャリッジ31は、断面中央部に角孔を有し、レール20に対し、摺動可能に取付けられている。
自動送り装置32は、キャリッジ31の側方に、適宜の取付部材を介して、取付けられている。
Each moving device 30 includes a carriage 31 and an automatic feed device 32 .
The carriage 31 has a square hole in the center of its cross section, and is slidably attached to the rail 20 .
The automatic feed device 32 is attached to the side of the carriage 31 via an appropriate mounting member.

自動送り装置32は、内蔵の送りモータ(図示せず)と、これによりウォームギア、ウォームホイール、減速歯車機構及びクラッチ機構を介して駆動されるピニオン軸33と、ピニオン軸33に取付けられてレール20のラックギア22と噛み合うピニオンギア34(図3参照)とを有している。 The automatic feed device 32 has a built-in feed motor (not shown), a pinion shaft 33 that is driven by the motor via a worm gear, a worm wheel, a reduction gear mechanism, and a clutch mechanism, and a pinion gear 34 (see Figure 3) that is attached to the pinion shaft 33 and meshes with the rack gear 22 of the rail 20.

従って、自動送り装置32は、内蔵の送りモータの作動により、ピニオンギア34がレール20のラックギア22に噛み合って、キャリッジ31と一体的にレール20に沿って移動することができる。なお、送りモータの負荷電流を検出し、これに基づいて送り量を制御することが望ましい。 Therefore, when the built-in feed motor is activated, the pinion gear 34 of the automatic feed device 32 meshes with the rack gear 22 of the rail 20, and the automatic feed device 32 can move along the rail 20 together with the carriage 31. It is preferable to detect the load current of the feed motor and control the feed amount based on this.

なお、自動送り装置32としては、市販の株式会社コンセック製の「自動送り装置EHAC-80A」を使用した。これは、コアドリルの自動送り装置(特開平10-296574号公報参照)であるが、転用することができる。 The automatic feeder 32 used was a commercially available "automatic feeder EHAC-80A" manufactured by Consec Corporation. This is an automatic feeder for core drills (see JP-A-10-296574), but can be repurposed.

各切断装置40は、移動装置30のキャリッジ31の下方に、適宜の取付部材を介して、取付けられている。
従って、自動送り装置32によるレール20に沿ったキャリッジ31の移動に伴わせて、切断装置40を送り動作することができる。
Each cutting device 40 is attached below the carriage 31 of the moving device 30 via an appropriate mounting member.
Therefore, the cutting device 40 can be fed in accordance with the movement of the carriage 31 along the rail 20 by the automatic feed device 32.

各切断装置40は、キャリッジ31に取付けられる本体部41の先端に、図示しないモータにより駆動されて水平面内を回転する円形回転刃(チップソー)42を有していて、円形回転刃42の上面側は先端部を除きカバー43(図5参照)により覆われている。
なお、切断装置40としては、手持ち式の市販の株式会社IKK製の「ツライチカッターDEC-51」を使用した。
Each cutting device 40 has a circular rotary blade (tip saw) 42 at the tip of a main body 41 attached to the carriage 31, which is driven by a motor not shown and rotates in a horizontal plane, and the upper surface side of the circular rotary blade 42 is covered by a cover 43 (see Figure 5) except for the tip.
As the cutting device 40, a commercially available handheld "Flush Cutter DEC-51" manufactured by IKK Corporation was used.

次に、スタッド切除装置5によるスタッド3の切除の様子を主に図5を参照して説明する。 Next, the process of removing the stud 3 using the stud removal device 5 will be described with reference mainly to Figure 5.

図5(A)では、スタッド切除装置5(その架台10)は、鋼桁1上にその延在方向に直角方向に並べられている4本ずつのスタッド3の列を、左右一対の切断装置40、40(特にその円形回転刃42、42)が、列の両端から挟み込むような位置で、トグルクランプ16を用いて、固定されている。 In FIG. 5(A), the stud cutting device 5 (its base 10) is fixed using toggle clamps 16 in a position where a pair of cutting devices 40, 40 (particularly their circular rotary blades 42, 42) on the left and right sides clamp both ends of a row of four studs 3 arranged on a steel girder 1 in a direction perpendicular to its extension direction.

この状態から、移動装置30、30(自動送り装置32、32)を作動させて、切断装置40、40(円形回転刃42、42)を鋼桁1の上面上へ移動させる。
これにより、図5(B)のように、先ず、4本のスタッド3のうち、外側の2本がほぼ同時に根元部で切断され、除去される。
From this state, the moving devices 30, 30 (automatic feed devices 32, 32) are operated to move the cutting devices 40, 40 (circular rotary blades 42, 42) onto the upper surface of the steel girder 1.
As a result, as shown in FIG. 5B, first, the outer two of the four studs 3 are cut off at their bases almost simultaneously and removed.

そして更に自動送り装置32、32により切断装置40、40(円形回転刃42、42)を内側へ移動させることで、図5(C)のように、外側の2本に続き、内側の2本がほぼ同時に根元部で切断され、除去される。
このように左右から一度に2本ずつ切除することで、切除作業を効率良く、短時間で行うことができる。なお、スタッド3はまれに奇数(例えば3本)の場合もあるが、この場合でも、片側から3本切除するより、両側から2本と1本切除することで、短時間で切除できる。
Then, by further moving the cutting devices 40, 40 (circular rotary blades 42, 42) inward by the automatic feed devices 32, 32, the two inner strands are cut at their roots and removed almost simultaneously, following the two outer strands, as shown in Figure 5 (C).
By cutting two studs at a time from the left and right in this way, the cutting work can be completed efficiently and in a short time. Note that in rare cases where there is an odd number of studs 3 (for example, three), cutting two studs and one stud from each side can still be completed in a short time, rather than cutting three studs from one side.

この後は、切断装置40、40の作動(円形回転刃42、42の回転)を停止させ、自動送り装置32、32を逆転させて、図5(D)のように、切断装置40、40(円形回転刃42、42)を鋼桁1上から待避させる。 After this, the operation of the cutting devices 40, 40 (rotation of the circular rotary blades 42, 42) is stopped, the automatic feed devices 32, 32 are reversed, and the cutting devices 40, 40 (circular rotary blades 42, 42) are moved away from above the steel girder 1 as shown in Figure 5 (D).

そして、トグルクランプ16による位置固定を解除して、スタッド切除装置5(その架台10)を、鋼桁1の延在方向に(すなわち図3及び図4のスタッド切除作業の進行方向に)、4本ずつのスタッド3のピッチ分を移動させ、再びトグルクランプ16を用いて位置固定する。
これにより、次の4本のスタッド3を切除可能となる。
Then, the position fixed by the toggle clamp 16 is released, and the stud cutting device 5 (its base 10) is moved in the extension direction of the steel girder 1 (i.e., in the direction in which the stud cutting work proceeds in Figures 3 and 4) by the pitch of four studs 3, and the position is again fixed using the toggle clamp 16.
This allows the next four studs 3 to be cut off.

次に本発明の他の実施形態について図6及び図7により説明する。
図6は本発明の他の実施形態として示すスタッド切除装置の正面図、図7は同上他の実施形態でのスタッド切除装置の右側面図である。
なお、図1~図3の実施形態と同一要素には同一符号を付して説明を省略し、異なる要素について説明する。
Next, another embodiment of the present invention will be described with reference to FIGS.
FIG. 6 is a front view of a stud cutting device according to another embodiment of the present invention, and FIG. 7 is a right side view of the stud cutting device according to the same embodiment.
1 to 3 are given the same reference numerals and their explanations are omitted, and only different elements are explained.

本実施形態では、移動装置30のキャリッジ31と切断装置40との間に、位置調整装置(ラボジャッキ)50が介装される。
従って、切断装置40は、移動装置30のキャリッジ31の下方に、位置調整装置50を介して取付けられる。
In this embodiment, a position adjustment device (lab jack) 50 is interposed between the carriage 31 of the moving device 30 and the cutting device 40 .
Therefore, the cutting device 40 is attached below the carriage 31 of the moving device 30 via a position adjustment device 50 .

位置調整装置50は、上側の取付板と下側の取付板との間に伸縮機構を有して、上下方向(高さ方向)に伸縮可能であり、これにより、鋼桁1の表面に対する切断装置40(円形回転刃42)の近接位置を調整することができる。 The position adjustment device 50 has an extension mechanism between the upper and lower mounting plates and can be extended and retracted in the vertical direction (height direction), thereby allowing the proximity position of the cutting device 40 (circular rotary blade 42) to the surface of the steel girder 1 to be adjusted.

なお、ここで用いる位置調整装置50は、「精密ラボジャッキ」と呼ばれ、研究や実験の際に機器や用品の高さを合わせるために使用する市販の道具である。高さの調整方法には、ラチェットハンドル式、ノブ式、ジャッキアップ式などがあり、リモートスイッチを備えた機種は、遠隔操作も可能である。 The position adjustment device 50 used here is called a "precision lab jack" and is a commercially available tool used to adjust the height of equipment and supplies during research and experiments. There are various height adjustment methods, such as ratchet handle type, knob type, and jack-up type, and models equipped with a remote switch can also be operated remotely.

このように、移動装置30(キャリッジ31)と切断装置40(円形回転刃42)との間にあって伸縮可能で鋼桁1の表面に対する切断装置40(円形回転刃42)の位置(近接位置)を調整する位置調整装置50を用いることにより、スタッド3の切除に際し、刃先が浮かないように、実質的に押付け力を発生させて、スタッド3をより根元部で切断でき、よりきれいに切除することができる。 In this way, by using a position adjustment device 50 that is extendable and retractable between the moving device 30 (carriage 31) and the cutting device 40 (circular rotary blade 42) and adjusts the position (proximity position) of the cutting device 40 (circular rotary blade 42) relative to the surface of the steel girder 1, a pressing force is generated to prevent the cutting edge from floating when cutting the stud 3, and the stud 3 can be cut closer to the base, resulting in a cleaner cut.

次に、既設の橋梁において、鋼桁(形鋼)上の床版の架け替え(既設床版の撤去とこれに替わる新設床版の設置)を行う場合の、既設床版の撤去後に鋼桁上に残置されたスタッドの切除を含む、床版架け替え方法について、工程順に、説明する。 Next, we will explain the method of replacing deck slabs on steel girders (shaped steel) in an existing bridge (removing the existing deck slab and installing a new one in its place), including the cutting of studs left on the steel girders after removing the existing deck slab, in the order of steps.

(1)既設床版撤去工程
既設の橋梁において、鋼桁上の床版の架け替えを行う際は、先ず、既設床版を鋼桁に対し縁切りした後、既設床版を撤去する。
(1) Existing deck removal process When replacing a deck on a steel girder on an existing bridge, the existing deck is first cut off from the steel girders and then removed.

(2)スタッド切除工程
既設床版の縁切り・撤去後に、本発明に係るスタッド切除装置を用いて、鋼桁上に残置されて表面から突出するスタッド(既設スタッド)を切除する。
(2) Stud Removal Process After the edges of the existing deck have been cut and removed, the studs (existing studs) remaining on the steel girders and protruding from the surface are removed using the stud removing device of the present invention.

(3)新設スタッド溶植工程
既設スタッドの切除後、鋼桁上に新規にスタッド(新設スタッド)を溶接により植設(溶植)する。
(3) New stud welding process After removing the existing stud, a new stud (new stud) is welded (welded) onto the steel girder.

(4)防錆剤塗布工程
新設スタッド溶植工程と前後して、鋼桁上面のケレン清掃を行い、また、角部については面取り処理を施した後、鋼桁上面に防錆剤を塗布する。
(4) Rust inhibitor application process: Before or after the new stud welding process, the top surface of the steel girder is cleaned and the corners are chamfered. After that, a rust inhibitor is applied to the top surface of the steel girder.

(5)高さ調整工程
防錆剤の乾燥後、床版の高さを調整するための硬質ゴム、床版下の無収縮モルタルの漏れを止めるためのソールスポンジを設置する。
(5) Height Adjustment Process After the rust inhibitor has dried, hard rubber is installed to adjust the height of the deck slab, and sole sponge is installed to stop leakage of non-shrink mortar from under the deck slab.

(6)新設床版設置工程
新設床版を搬入し、架設する。なお、新設床版には、新設スタッドの列と対応する位置に上下方向に貫通する長孔が設けられており、新設スタッドを長孔内に位置させた後、長孔内にモルタルを充填することで、鋼桁と新設床版とを一体化する。
(6) New Deck Installation Process The new deck is brought in and erected. The new deck has long holes that penetrate vertically at positions corresponding to the rows of new studs. After the new studs are positioned in the long holes, the long holes are filled with mortar to integrate the steel girders and the new deck.

なお、以上では主に床版架け替え工事における鋼桁(H形鋼又はI形鋼)からのスタッド切除について説明したが、本発明は、床版架け替え工事に限らず、またH形鋼やI形鋼に限らず、各種の形鋼からのスタッド切除に適用可能である。 The above mainly describes the cutting of studs from steel girders (H-beams or I-beams) during deck replacement work, but the present invention is not limited to deck replacement work, and is not limited to H-beams or I-beams, but can be applied to the cutting of studs from various types of steel beams.

また、図示の実施形態はあくまで本発明を概略的に例示するものであり、本発明は、説明した実施形態により直接的に示されるものに加え、特許請求の範囲内で当業者によりなされる各種の改良・変更を包含するものであることは言うまでもない。
なお、出願当初の請求項は以下のとおりであった。
[請求項1]
形鋼の表面から突出するスタッドを切除する装置であって、
前記形鋼の延在方向に移動可能で任意の位置で固定可能な架台と、
前記架台に支持されて前記形鋼の延在方向と直角方向で前記表面と平行に延びるレールと、
前記レールに沿って移動可能な移動装置と、
前記移動装置に支持された切断装置と、
を含み、
前記切断装置は、前記スタッドが突出する前記形鋼の表面に対し平行に近接配置されて回転駆動される円形回転刃を有し、前記レールに沿って送られて、前記スタッドの根元部を切断することを特徴とする、スタッド切除装置。
[請求項2]
前記スタッドは、前記形鋼の延在方向における1つの位置に、前記形鋼の延在方向と直角方向に並べられて複数設けられていて、
前記移動装置及び前記切断装置は、一対設けられ、前記レールの両端から内側に向かって移動することを特徴とする、請求項1記載のスタッド切除装置。
[請求項3]
前記架台は、前記形鋼の延在方向に移動可能な走行ローラと、前記形鋼をワンタッチで挟持・解放可能なトグルクランプとを有することを特徴とする、請求項1又は請求項2記載のスタッド切除装置。
[請求項4]
前記移動装置は、送りモータと、該送りモータにより駆動されるピニオンギアとを有し、該ピニオンギアが前記レールに取付けられたラックギアに噛み合うことにより、前記レールに沿って移動することを特徴とする、請求項1~請求項3のいずれか1つに記載のスタッド切除装置。
[請求項5]
前記移動装置と前記切断装置との間にあって伸縮可能で前記形鋼の表面に対する前記切断装置の位置を調整する位置調整装置を更に含むことを特徴とする、請求項1~請求項4のいずれか1つに記載のスタッド切除装置。
[請求項6]
鋼桁上に設けられた床版を架け替える方法であって、
鋼桁上から既設床版を撤去した後、請求項1~請求項5のいずれか1つに記載のスタッド切除装置を用いて、鋼桁上に残置されて表面から突出するスタッドを切除する工程と、
前記スタッドの切除後で、鋼桁上に新設床版を設置する前に、鋼桁上に新規にスタッドを溶接により植設する工程と、
を含む、床版架け替え方法。
Furthermore, it goes without saying that the illustrated embodiments are merely schematic illustrations of the present invention, and that the present invention encompasses various improvements and modifications made by those skilled in the art within the scope of the claims, in addition to those directly shown in the described embodiments.
The claims as originally filed were as follows:
[Claim 1]
A device for cutting off studs protruding from a surface of a steel section, comprising:
A stand that can be moved in the extension direction of the shaped steel and can be fixed at any position;
A rail supported by the frame and extending parallel to the surface in a direction perpendicular to the extension direction of the steel section;
A moving device movable along the rail;
a cutting device supported by the moving device;
Including,
The cutting device has a circular rotary blade that is arranged parallel to and close to the surface of the steel section from which the stud protrudes and is driven to rotate, and is fed along the rail to cut off the root portion of the stud.
[Claim 2]
The studs are provided in a plurality of positions in the extension direction of the shaped steel, aligned in a direction perpendicular to the extension direction of the shaped steel,
2. The stud cutting device according to claim 1, wherein the moving device and the cutting device are provided in pairs and move inwardly from both ends of the rail.
[Claim 3]
3. The stud cutting device according to claim 1, wherein the base has a running roller that can move in the extending direction of the structural steel, and a toggle clamp that can clamp and release the structural steel with a single touch.
[Claim 4]
The stud cutting device described in any one of claims 1 to 3, characterized in that the moving device has a feed motor and a pinion gear driven by the feed motor, and moves along the rail by meshing with the pinion gear with a rack gear attached to the rail.
[Claim 5]
A stud cutting device as described in any one of claims 1 to 4, further comprising a position adjustment device located between the moving device and the cutting device, which is extendable and contractible and adjusts the position of the cutting device relative to the surface of the steel section.
[Claim 6]
A method for replacing a deck installed on a steel girder, comprising:
After removing the existing deck from above the steel girder, a step of cutting off the studs remaining on the steel girder and protruding from the surface using the stud cutting device according to any one of claims 1 to 5;
After removing the stud, before installing a new deck on the steel girder, a step of newly installing a stud on the steel girder by welding;
A method for replacing a deck slab, comprising:

1 鋼桁(H形鋼)
2 床版
3 スタッド
4 長孔
5 スタッド切除装置
10 架台
11 天板
12 側板
13 開口部
14 ボルト軸
15 走行ローラ
16 トグルクランプ
16a クランプ部
17 支持板
20 レール
22 ラックギア
30 移動装置
31 キャリッジ
32 自動送り装置
33 ピニオン軸
34 ピニオンギア
40 切断装置
41 本体部
42 円形回転刃
43 カバー
50 位置調整装置(ラボジャッキ)
1. Steel girder (H-shaped steel)
2 Deck 3 Stud 4 Slot 5 Stud cutting device 10 Stand 11 Top plate 12 Side plate 13 Opening 14 Bolt shaft 15 Travel roller 16 Toggle clamp 16a Clamp unit 17 Support plate 20 Rail 22 Rack gear 30 Movement device 31 Carriage 32 Automatic feed device 33 Pinion shaft 34 Pinion gear 40 Cutting device 41 Main body 42 Circular rotary blade 43 Cover 50 Position adjustment device (lab jack)

Claims (7)

H形鋼からなる鋼桁であって橋軸方向に延びる前記鋼桁の上側フランジの上面から突出するスタッドを切除する装置であって、橋軸方向を前後方向とし、橋軸直角方向を左右方向とした場合において、
前記上側フランジ上を前後方向に移動可能であり、かつ、前記上側フランジの前後方向における任意の位置で前記上側フランジに固定可能な架台と、
前記架台の上側にて前記架台に支持されて左右方向に延びるレールと、
前記レールに沿って左右方向に移動可能な左右一対の移動装置と、
前記左右一対の移動装置の各々の下側に取付けられた切断装置と
含み、
前記架台は、
天板と左右一対の側板とにより構成されて前後方向に見て下側開放のコ字状に形成された本体と、
前記左右一対の側板の各々に回転可能に取付けられた走行ローラと、
前記左右一対の側板の各々の下端部に取付けられたトグルクランプと、
を備え、
前記天板は、前記上側フランジの上方に位置し、
前記左右一対の側板は、それぞれ、前記切断装置の通過部となる開口部を有し、
前記走行ローラは、前記上側フランジの上面の左右の縁部上を走行可能であり、
前記トグルクランプは、レバー部とクランプ部とを備え、前記トグルクランプは、前記レバー部の回動操作による前記クランプ部の移動により、前記上側フランジを前記走行ローラと前記クランプ部とで挟持することによって、前記架台を前記上側フランジの前後方向における任意の位置で固定することができるように構成されており、
前記切断装置は、水平面内を回転する円形回転刃を有し、前記円形回転刃は、前記上側フランジの上面に対して前記円形回転刃の下面が平行に近接配置されて回転駆動され、前記レールに沿って送られて、前記スタッドの根元部を切断する
タッド切除装置。
A device for removing studs protruding from the upper surface of the upper flange of a steel girder made of H-shaped steel and extending in the bridge axis direction , in which the bridge axis direction is the front-to-back direction and the direction perpendicular to the bridge axis is the left-to-right direction,
a stand that is movable in a front-rear direction on the upper flange and that can be fixed to the upper flange at any position in the front-rear direction of the upper flange;
a rail supported by the base on an upper side of the base and extending in a left-right direction ;
A pair of left and right moving devices that are movable in the left and right directions along the rail;
a cutting device attached to the underside of each of the pair of left and right moving devices ;
Including ,
The frame is
A main body formed in a U-shape with an open lower side when viewed in the front-rear direction, the main body being composed of a top plate and a pair of left and right side plates;
a running roller rotatably attached to each of the pair of left and right side plates;
a toggle clamp attached to a lower end of each of the pair of left and right side plates;
Equipped with
The top plate is located above the upper flange,
Each of the pair of left and right side plates has an opening through which the cutting device passes,
The running rollers are capable of running on the left and right edges of the upper surface of the upper flange,
the toggle clamp includes a lever portion and a clamp portion, and the toggle clamp is configured such that the upper flange is clamped between the running roller and the clamp portion by moving the clamp portion through a rotational operation of the lever portion, thereby allowing the platform to be fixed at any position in the front-rear direction of the upper flange,
the cutting device has a circular rotary blade that rotates within a horizontal plane, and the circular rotary blade is rotated while a lower surface of the circular rotary blade is disposed parallel to and close to an upper surface of the upper flange , and is fed along the rail to cut the base portion of the stud .
Stud cutting device.
前記切断装置は、前記円形回転刃の上面側を覆うカバーを更に有し、The cutting device further includes a cover that covers an upper surface side of the circular rotary blade,
左側の前記移動装置と、左側の前記移動装置の下側に取り付けられた前記切断装置とは、前記スタッドの切除時に前記レールの左端から右側に向かって移動し、the left-side moving device and the cutting device attached to the underside of the left-side moving device move from the left end of the rail toward the right side when cutting off the stud;
右側の前記移動装置と、右側の前記移動装置の下側に取り付けられた前記切断装置とは、前記スタッドの切除時に前記レールの右端から左側に向かって移動し、the right-side moving device and the cutting device attached to the underside of the right-side moving device move from the right end of the rail toward the left side when cutting off the stud;
左側の前記移動装置の下側に取り付けられた前記切断装置の前記カバーの右端部には、前記円形回転刃を露出させるための切欠部が形成されており、A cutout portion is formed at a right end of the cover of the cutting device attached to the lower side of the left moving device to expose the circular rotary blade,
右側の前記移動装置の下側に取り付けられた前記切断装置の前記カバーの左端部には、前記円形回転刃を露出させるための切欠部が形成されている、A cutout portion for exposing the circular rotary blade is formed at the left end of the cover of the cutting device attached to the lower side of the right-side moving device.
請求項1に記載のスタッド切除装置。The stud cutting device of claim 1 .
上面視で、前記カバーの直径が、前記円形回転刃の直径よりも大きく、When viewed from above, the diameter of the cover is larger than the diameter of the circular rotary blade;
前記切欠部が、上面視で、左右方向に延びる矩形状をなす、The cutout portion has a rectangular shape extending in the left-right direction when viewed from above.
請求項2に記載のスタッド切除装置。The stud cutting device of claim 2.
前記スタッドは、前記上側フランジの上面の前後方向における1つの位置に、左右方向に並べられて複数設けられている、請求項1~請求項3のいずれか1つに記載のスタッド切除装置。 The stud cutting device according to any one of claims 1 to 3, wherein the studs are arranged in a plurality of rows in the left-right direction at a single position in the front-to-rear direction on the upper surface of the upper flange . 前記移動装置は、送りモータと、該送りモータにより駆動されるピニオンギアとを有し、該ピニオンギアが前記レールに取付けられたラックギアに噛み合うことにより、前記レールに沿って移動する、請求項1~請求項4のいずれか1つに記載のスタッド切除装置。 The stud cutting device according to any one of claims 1 to 4, wherein the moving device has a feed motor and a pinion gear driven by the feed motor, and moves along the rail by meshing with the pinion gear with a rack gear attached to the rail. 前記移動装置と前記切断装置との間にあって上下方向に伸縮可能で前記上側フランジの上面に対する前記円形回転刃の位置を調整する位置調整装置を更に含む、請求項1~請求項5のいずれか1つに記載のスタッド切除装置。 A stud cutting device as described in any one of claims 1 to 5 , further comprising a position adjustment device located between the moving device and the cutting device, which is extendable and contractible in the vertical direction and adjusts the position of the circular rotary blade relative to the upper surface of the upper flange. 前記鋼桁上に設けられた床版を架け替える方法であって、
前記鋼桁上から既設床版を撤去した後、請求項1~請求項6のいずれか1つに記載のスタッド切除装置を用いて、前記上側フランジの上面上に残置されて前記上側フランジの上面から突出する前記スタッドを切除する工程と、
前記スタッドの切除後で、前記鋼桁上に新設床版を設置する前に、前記上側フランジの上面上に新規にスタッドを溶接により植設する工程と
含む、床版架け替え方法。
A method for replacing a deck installed on the steel girder ,
After removing the existing deck from above the steel girder, a step of cutting off the studs remaining on the upper surface of the upper flange and protruding from the upper surface of the upper flange using a stud cutting device according to any one of claims 1 to 6;
After removing the studs and before installing a new deck on the steel girder, a step of newly installing studs on the upper surface of the upper flange by welding ;
A method for replacing a deck slab, comprising :
JP2021064921A 2021-04-06 2021-04-06 Stud cutting device and deck replacement method Active JP7607282B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021064921A JP7607282B2 (en) 2021-04-06 2021-04-06 Stud cutting device and deck replacement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021064921A JP7607282B2 (en) 2021-04-06 2021-04-06 Stud cutting device and deck replacement method

Publications (2)

Publication Number Publication Date
JP2022160272A JP2022160272A (en) 2022-10-19
JP7607282B2 true JP7607282B2 (en) 2024-12-27

Family

ID=83657652

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021064921A Active JP7607282B2 (en) 2021-04-06 2021-04-06 Stud cutting device and deck replacement method

Country Status (1)

Country Link
JP (1) JP7607282B2 (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000080622A (en) 1998-09-03 2000-03-21 Kurimoto Ltd Snowplow for bridge girder
JP2015124548A (en) 2013-12-26 2015-07-06 日本車輌製造株式会社 Method for removing sole plate
JP2017089302A (en) 2015-11-13 2017-05-25 首都高速道路株式会社 Floor slab removal method for composite girder
US20180135261A1 (en) 2016-11-16 2018-05-17 Guy C. Nelson Prefabricated, prestressed bridge module
JP2018091052A (en) 2016-12-05 2018-06-14 川田工業株式会社 Method of removing existing concrete from bridge
JP2020012275A (en) 2018-07-17 2020-01-23 佐藤鉄工株式会社 Removal method of floor slab and rail fixing device
CN110820557A (en) 2019-12-12 2020-02-21 中国铁建大桥工程局集团有限公司 Steel truss arch bridge maintenance car
JP2020176420A (en) 2019-04-17 2020-10-29 鹿島建設株式会社 Floor slab replacement method and steel girder construction equipment
JP2022035542A (en) 2020-08-21 2022-03-04 三井住友建設株式会社 Composite slab removal method and device
JP2022095247A (en) 2020-12-16 2022-06-28 オリエンタル白石株式会社 Hole drilling method, hole drilling device and concrete slab cutting method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6433304A (en) * 1987-07-29 1989-02-03 Daikure Kk Execution of wall height column
JPH0643682B2 (en) * 1989-05-02 1994-06-08 ショーボンド建設株式会社 Bridge floor slab removal method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000080622A (en) 1998-09-03 2000-03-21 Kurimoto Ltd Snowplow for bridge girder
JP2015124548A (en) 2013-12-26 2015-07-06 日本車輌製造株式会社 Method for removing sole plate
JP2017089302A (en) 2015-11-13 2017-05-25 首都高速道路株式会社 Floor slab removal method for composite girder
US20180135261A1 (en) 2016-11-16 2018-05-17 Guy C. Nelson Prefabricated, prestressed bridge module
JP2018091052A (en) 2016-12-05 2018-06-14 川田工業株式会社 Method of removing existing concrete from bridge
JP2020012275A (en) 2018-07-17 2020-01-23 佐藤鉄工株式会社 Removal method of floor slab and rail fixing device
JP2020176420A (en) 2019-04-17 2020-10-29 鹿島建設株式会社 Floor slab replacement method and steel girder construction equipment
CN110820557A (en) 2019-12-12 2020-02-21 中国铁建大桥工程局集团有限公司 Steel truss arch bridge maintenance car
JP2022035542A (en) 2020-08-21 2022-03-04 三井住友建設株式会社 Composite slab removal method and device
JP2022095247A (en) 2020-12-16 2022-06-28 オリエンタル白石株式会社 Hole drilling method, hole drilling device and concrete slab cutting method

Also Published As

Publication number Publication date
JP2022160272A (en) 2022-10-19

Similar Documents

Publication Publication Date Title
JP6709037B2 (en) Floor removal method for composite girder
JP7113452B2 (en) Floor slab removal method and rail fixture
US20180058029A1 (en) Device for cutting concrete piles
KR100794379B1 (en) Press block cutting device
JP7607282B2 (en) Stud cutting device and deck replacement method
JP6715667B2 (en) Reconstruction method for lining of existing 2-lane road tunnel
JP7012042B2 (en) Deck cutting method and cutting device
JP2020176451A (en) Cutting machine for concrete excavation and concrete excavation method
WO2008034415A1 (en) Mobile enclosure comprising advancing units
KR100711708B1 (en) Concrete file cutting device for foundation workers
KR102211130B1 (en) Removal device and method for expansion joint concrete
JPH02292404A (en) Removal of bridge floor board
JP6944216B1 (en) Cutting method and cutting equipment
US4621944A (en) Rapid repair of runways
JP6811987B2 (en) Cutting method and cutting equipment used for this method
JP7225015B2 (en) Steel girder construction equipment
JP2023159984A (en) Cutting equipment and concrete member cutting method
US8863667B1 (en) Railroad tie removal machine
DE3641890C2 (en)
US7578239B1 (en) Methods of replacing railway half ties
DE10323364B4 (en) Device for cutting a notch in a concrete wall
DE3641853C2 (en)
KR20170001395A (en) Concrete guideway construction method using height-adjustable steel mould
JP7668332B1 (en) Curing material transport device
JP2012214971A (en) Cutting device

Legal Events

Date Code Title Description
RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7426

Effective date: 20210407

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20210407

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240214

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240927

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241008

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241118

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241203

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241209

R150 Certificate of patent or registration of utility model

Ref document number: 7607282

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150