JP7610216B2 - Channel construction unit and channel construction method - Google Patents
[go: Go Back, main page]

JP7610216B2 - Channel construction unit and channel construction method - Google Patents

Channel construction unit and channel construction method Download PDF

Info

Publication number
JP7610216B2
JP7610216B2 JP2021015145A JP2021015145A JP7610216B2 JP 7610216 B2 JP7610216 B2 JP 7610216B2 JP 2021015145 A JP2021015145 A JP 2021015145A JP 2021015145 A JP2021015145 A JP 2021015145A JP 7610216 B2 JP7610216 B2 JP 7610216B2
Authority
JP
Japan
Prior art keywords
panel
concrete
channel
fixing
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021015145A
Other languages
Japanese (ja)
Other versions
JP2022118552A (en
Inventor
行啓 町谷
健治 近藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daicel Miraizu Ltd
Original Assignee
Daicel Miraizu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daicel Miraizu Ltd filed Critical Daicel Miraizu Ltd
Priority to JP2021015145A priority Critical patent/JP7610216B2/en
Publication of JP2022118552A publication Critical patent/JP2022118552A/en
Application granted granted Critical
Publication of JP7610216B2 publication Critical patent/JP7610216B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Description

本発明は、溝路構築ユニット及び溝路構築方法に関する。 The present invention relates to a channel construction unit and a channel construction method.

排水溝等の通水溝路の施工方法として種々の方法が知られている(例えば、特許文献1、2等を参照)。例えば、コンクリート製のU字溝によって構成される溝路が広く知られているが、コンクリート製のU字溝は重量物であることから、その運搬や施工の際における取扱い性が悪く、作業性を向上できない一因とされている。 Various methods are known for constructing drainage gutters and other water-passing channels (see, for example, Patent Documents 1 and 2). For example, a channel constructed of a U-shaped concrete gutter is widely known, but a U-shaped concrete gutter is heavy and difficult to handle during transportation and construction, which is considered to be one of the reasons why workability cannot be improved.

一方、ベニヤ合板等といった木製型枠パネルを所定の溝路形状を形成するように組み付けると共に、コンクリートを流し込むべきコンクリート打設予定区域内に適宜鉄筋の配筋を行った後、コンクリート打設予定区域内にコンクリートを打設する在来工法が知られている。この在来工法では、コンクリート打設予定区域内にコンクリートを打設後、所定の養生期間が経過した後に硬化コンクリートから木製型枠パネルを取り外す脱型作業を行う必要がある。そのため、作業工程が複雑なものとなり、施工期間が長くなると共に施工コストが増大する一因となっていた。 Meanwhile, a conventional construction method is known in which wooden form panels such as plywood are assembled to form a predetermined channel shape, reinforcing bars are appropriately arranged in the area where the concrete is to be poured, and then concrete is poured into the area. With this conventional construction method, after pouring the concrete into the area where the concrete is to be poured, a demolding operation must be performed to remove the wooden form panels from the hardened concrete after a predetermined curing period has elapsed. This makes the work process complicated, which is one of the factors that lengthens the construction period and increases the construction costs.

更に、在来工法では、木製型枠パネルを再利用するためにパネル表面を清掃したり洗浄するのに手間が掛かり、また、洗浄に伴って汚水が多量に発生していた。また、清掃や洗浄を行っても再利用することのできない使用済みの木製型枠パネルは産業廃棄物として廃棄されてしまうことも問題であった。 Furthermore, with conventional construction methods, cleaning and washing the surfaces of wooden formwork panels in order to reuse them is time-consuming, and the washing process generates a large amount of wastewater. Another problem is that used wooden formwork panels that cannot be reused even after cleaning and washing are disposed of as industrial waste.

更に、溝路の側壁を形成するための木製型枠パネルは、通常、コンクリート打設予定区域内に配置したセパレータの端部を木製型枠パネルの貫通孔を通じて外側に露出させ、セパレータの端部に取り付けたフォームタイ(登録商標)を木製型枠パネル外面との間に単管パイプや端太材等を挟持した状態で締結することによって組み付けられ、これによってコンクリート側圧に対抗できるようにされている。しかしながら、このような木製型枠パネルの組み付けは、いわゆる型枠大工でないと作業することが難しい。そのため、熟練した型枠大工を人員確保することが年々難しくなって今日においては、より簡易に溝路を構築することのできる施工方法が望まれていた。 Furthermore, wooden form panels for forming the side walls of a channel are usually assembled by exposing the ends of separators placed in the area where concrete is to be poured to the outside through through holes in the wooden form panels, and fastening Form Ties (registered trademark) attached to the ends of the separators with single-wall pipes or thick end materials sandwiched between the outer surface of the wooden form panels, thereby making it possible to withstand the lateral pressure of the concrete. However, assembling such wooden form panels is difficult for anyone other than so-called form carpenters. For this reason, it is becoming more and more difficult to secure skilled form carpenters, and today there is a demand for a construction method that allows for easier construction of channels.

特許第5572360号公報Patent No. 5572360 特開昭56-73769号公報Japanese Unexamined Patent Publication No. 56-73769

本開示の技術は、上記した実情に鑑みてなされたものであり、その目的は、簡易で且つ作業性の優れた溝路構築ユニット及び溝路構築方法を提供することにある。 The technology disclosed herein has been developed in light of the above-mentioned circumstances, and its purpose is to provide a groove construction unit and groove construction method that are simple and easy to use.

本開示に係る技術は、型枠支保工を使用せずに溝路を構築する溝路構築方法であって、一方の面に溝路側面形成面が形成されると共に他方の面に堰板面が形成された、溝路の側面を形成するための1又は複数の側板パネルを用意する工程と、溝路の側部を形成するためのフレッシュコンクリートが充填される側部コンクリート充填予定区域に1又は複数の定着用部材を位置決め固定する定着部材設置工程と、溝路の上部開口を覆う蓋体を保持す
るための長尺の受枠本体と、当該受枠本体に設けられると共に前記定着用部材に接合されることで前記受枠本体を規定位置に固定するための定着部と、前記側板パネルの上端側領域を保持可能なパネル上端側保持部と、を有する、1又は複数の受枠ユニットを用意し、前記受枠ユニットにおける前記定着部を前記定着用部材に接合し、前記受枠本体を規定位置に設置する受枠設置工程と、前記堰板面を前記側部コンクリート充填予定区域側に向けた状態で前記側板パネルの上端側領域を前記パネル上端側保持部に保持するパネル設置工程と、前記側部コンクリート充填予定区域にフレッシュコンクリートを充填するコンクリート打設工程と、を含む。
The technology disclosed herein is a method for constructing a trench channel without using formwork support, comprising the steps of: preparing one or more side panel panels for forming the side of the trench channel, each having a trench channel side forming surface formed on one side and a dam surface formed on the other side; an anchoring member installation step of positioning and fixing one or more anchoring members in a side concrete filling area to be filled with fresh concrete to form the side of the trench channel; a long receiving frame body for holding a lid body that covers an upper opening of the trench channel; and a receiving frame body that is provided on the receiving frame body and joined to the anchoring member to form the side of the trench channel. The method includes a frame installation process for preparing one or more frame units having a fixing portion for fixing the frame body at a specified position and a panel upper end holding portion capable of holding the upper end region of the side panel, joining the fixing portion of the frame unit to the fixing member, and installing the frame body at a specified position, a panel installation process for holding the upper end region of the side panel panel in the panel upper end holding portion with the weir panel surface facing the side area intended to be filled with concrete, and a concrete pouring process for filling the side area intended to be filled with concrete with fresh concrete.

また、前記受枠本体は、前記蓋体の外縁側領域を載置する載置面を上面側に有する蓋体載置板部と、当該蓋体載置板部の内端縁から下方に垂設された第1挟持片と、を有し、前記定着部は、前記定着用部材に接合可能な固定片と、前記第1挟持片との間に第1嵌合溝が形成されるように当該第1挟持片と対向配置される第2挟持片と、を有し、前記パネル上端側保持部は、前記第1挟持片及び前記第2挟持片を含んで構成され、前記第1嵌合溝に嵌合された前記側板パネルの上端側領域を把持可能であり、前記パネル設置工程においては、前記側板パネルの上端側領域を前記第1嵌合溝に嵌合させてもよい。 The frame body has a lid body mounting plate portion having a mounting surface on the upper surface thereof on which the outer edge region of the lid body is placed, and a first clamping piece suspended downward from the inner edge of the lid body mounting plate portion, the fixing portion has a fixing piece that can be joined to the fixing member, and a second clamping piece that is arranged opposite the first clamping piece so that a first fitting groove is formed between the first clamping piece and the second clamping piece, the panel upper end side holding portion is configured to include the first clamping piece and the second clamping piece, and is capable of gripping the upper end side region of the side panel that is fitted into the first fitting groove, and in the panel installation process, the upper end side region of the side panel may be fitted into the first fitting groove.

また、本開示に係る溝路構築方法は、少なくとも前記コンクリート打設工程に先行して、前記側板パネルの下端側領域が溝路形成予定区域側にずれることを抑制するパネル下端側ずれ止め部材を設置するずれ止め部材設置工程を、更に含んでいてもよい。 The channel construction method according to the present disclosure may further include a step of installing a bottom-end anti-slip member, which installs a bottom-end anti-slip member that prevents the bottom end region of the side panel from shifting toward the planned channel formation area, at least prior to the concrete pouring step.

また、前記パネル下端側ずれ止め部材は、前記溝路形成予定区域の下方に位置すると共に溝路の底部を形成するためのフレッシュコンクリートが充填される底部コンクリート充填予定区域に位置決め固定され、前記側板パネルの下端側領域を保持可能なパネル下端側保持部材であってもよい。 The panel lower end anti-slip member may be a panel lower end holding member that is located below the planned groove formation area, is positioned and fixed in the planned bottom concrete filling area where fresh concrete will be filled to form the bottom of the groove, and is capable of holding the lower end region of the side panel.

また、前記パネル下端側ずれ止め部材は、前記側板パネルの下端側領域を嵌合可能な第2嵌合溝を有するパネル受部を有していてもよい。 The panel lower end anti-slip member may also have a panel receiving portion having a second fitting groove into which the lower end region of the side panel can be fitted.

また、本開示に係る溝路構築方法は、前記コンクリート打設工程において、前記側部コンクリート充填予定区域及び前記底部コンクリート充填予定区域にフレッシュコンクリートを同時充填してもよい。 In addition, the channel construction method according to the present disclosure may simultaneously fill the side concrete filling area and the bottom concrete filling area with fresh concrete during the concrete pouring step.

また、前記コンクリート打設工程において、前記パネル下端側保持部材によって保持されている前記側板パネルの下端面がフレッシュコンクリートに埋設されるように前記底部コンクリート充填予定区域にフレッシュコンクリートを充填してもよい。 In addition, in the concrete pouring process, fresh concrete may be filled into the bottom concrete filling area so that the lower end surface of the side panel held by the panel lower end holding member is embedded in the fresh concrete.

また、前記定着部材設置工程に先行して、一部が溝路の底部を形成するコンクリート床版を予め構築する床版構築工程を更に含み、前記パネル設置工程において、前記側板パネルの下端面が前記コンクリート床版の上面に当接するように前記側板パネルの上端側領域を前記パネル上端側保持部に固定し、前記位置ずれ抑止部材設置工程においては、前記コンクリート床版の上面のうちの前記側板パネルにおける前記溝路側面形成面で囲まれた領域に前記パネル下端側ずれ止め部材を設置してもよい。 The method may further include a slab construction step of constructing a concrete slab, a portion of which forms the bottom of the channel, prior to the fixing member installation step, and in the panel installation step, the upper end region of the side panel is fixed to the panel upper end retaining portion so that the lower end surface of the side panel abuts the upper surface of the concrete slab, and in the position shift prevention member installation step, the panel lower end side slip prevention member is installed in the region of the upper surface of the concrete slab that is surrounded by the channel side surface forming surface of the side panel.

また、本開示に係る技術は、型枠支保工を使用せずに溝路を構築する溝路構築ユニットとして特定することができる。すなわち、本開示に係る溝路構築ユニットは、溝路の側面を形成するための側板パネルであって、一方の面に溝路側面形成面が形成されると共に他方の面に堰板面が形成される1又は複数の側板パネルと、溝路の側部を形成するためのフレッシュコンクリートが充填される側部コンクリート充填予定区域に位置決め固定される1又は複数の定着用部材と、溝路の上部開口を覆う蓋体を保持するための長尺の受枠本体
と、当該受枠本体に設けられると共に前記定着用部材に接合されることで前記受枠本体を規定位置に固定するための定着部と、前記側板パネルの上端側領域を保持可能なパネル上端側保持部と、を有する、1又は複数の受枠ユニットと、を備える。
The technology according to the present disclosure can be specified as a channel construction unit for constructing a channel without using formwork supports. That is, the channel construction unit according to the present disclosure includes one or more side panel panels for forming the side of the channel, with a channel side forming surface formed on one side and a dam surface formed on the other side, one or more fixing members positioned and fixed in a side concrete filling planned area where fresh concrete for forming the side of the channel is filled, a long frame body for holding a cover body covering the upper opening of the channel, a fixing part provided on the frame body and joined to the fixing member for fixing the frame body in a specified position, and a panel upper end side holding part capable of holding an upper end side area of the side panel.

ここで、前記受枠本体は、前記蓋体の外縁側領域を載置する載置面を上面側に有する蓋体載置板部と、当該蓋体載置板部の内端縁から下方に垂設された第1挟持片と、を有し、前記定着部は、前記定着用部材に接合可能な固定片と、前記第1挟持片との間に第1嵌合溝が形成されるように当該第1挟持片と対向配置される第2挟持片と、を有し、前記パネル上端側保持部は、前記第1挟持片及び前記第2挟持片を含んで構成され、前記第1嵌合溝に嵌合された前記側板パネルの上端側領域を把持可能であってもよい。 Here, the frame body has a lid body mounting plate portion having a mounting surface on the upper surface side on which the outer edge side area of the lid body is placed, and a first clamping piece suspended downward from the inner edge of the lid body mounting plate portion, the fixing portion has a fixing piece that can be joined to the fixing member, and a second clamping piece that is arranged opposite the first clamping piece so that a first fitting groove is formed between the first clamping piece, and the panel upper end side holding portion is configured to include the first clamping piece and the second clamping piece, and may be capable of gripping the upper end side area of the side panel panel that is fitted into the first fitting groove.

また、前記側板パネルの下端側領域が溝路形成予定区域側にずれることを抑制するパネル下端側ずれ止め部材を、更に備えていてもよい。 The panel may further include a lower end anti-slip member that prevents the lower end region of the side panel from shifting toward the area where the groove is to be formed.

また、前記パネル下端側ずれ止め部材は、前記溝路形成予定区域の下方に位置すると共に溝路の底部を形成するためのフレッシュコンクリートが充填される底部コンクリート充填予定区域に位置決め固定され、前記側板パネルの下端側領域を保持可能なパネル下端側保持部材であってもよい。 The panel lower end anti-slip member may be a panel lower end holding member that is located below the planned groove formation area, is positioned and fixed in the planned bottom concrete filling area where fresh concrete will be filled to form the bottom of the groove, and is capable of holding the lower end region of the side panel.

また、前記パネル下端側保持部材は、前記側板パネルの下端側領域を嵌合可能な第2嵌合溝を有するパネル受部を有していてもよい。 The panel lower end holding member may also have a panel receiving portion having a second fitting groove into which the lower end region of the side panel can be fitted.

また、前記底部コンクリート充填予定区域におけるコンクリート天端設定高さは、前記パネル下端側保持部材によって保持されている前記側板パネルの下端面よりも相対的に高い位置に設定されていてもよい。 The concrete top setting height in the bottom concrete filling area may be set at a position relatively higher than the lower end surface of the side panel held by the panel lower end holding member.

また、前記溝路構築ユニットは、予め構築されたコンクリート床版であってその一部が溝路の底部を形成するコンクリート床版の上方に溝路の側部を構築するためのユニットであって、前記パネル上端側保持部は、前記側板パネルの下端面が前記コンクリート床版の上面に当接した状態となるように前記側板パネルの上端側領域を保持し、前記パネル下端側ずれ止め部材は、前記コンクリート床版の上面のうちの前記側板パネルにおける前記溝路側面形成面で囲まれた領域に設置されてもよい。 The channel construction unit may be a unit for constructing the side of a channel above a preconstructed concrete slab, a portion of which forms the bottom of the channel, and the panel upper end retaining portion may hold the upper end region of the side panel so that the lower end surface of the side panel is in contact with the upper surface of the concrete slab, and the panel lower end anti-slip member may be installed in an area of the upper surface of the concrete slab that is surrounded by the channel side surface forming surface of the side panel.

本開示によれば、簡易で且つ作業性の優れた溝路構築ユニット及び溝路構築方法を提供できる。
を提供できる。
According to the present disclosure, it is possible to provide a groove construction unit and a groove construction method that are simple and have excellent workability.
can be provided.

図1は、実施形態1に係る溝路構築ユニットを説明する図である。FIG. 1 is a diagram illustrating a groove construction unit according to the first embodiment. 図2は、実施形態1に係る溝路構築ユニットによって構築された溝路を説明する図である。FIG. 2 is a diagram illustrating a channel constructed by the channel construction unit according to the first embodiment. 図3は、実施形態1に係る溝路構築ユニットの平面配置例を示す図である。FIG. 3 is a diagram showing an example of a planar arrangement of the channel construction units according to the first embodiment. 図4は、図3に示すA-A位置における受枠ユニットの横断面図である。FIG. 4 is a cross-sectional view of the frame unit taken along the line AA shown in FIG. 図5は、実施形態1に係る受枠ユニットにおける受枠本体の斜視図である。FIG. 5 is an oblique view of the frame body in the frame unit of embodiment 1. 図6は、実施形態1に係る受枠ユニットにおける定着部を示す図である。FIG. 6 is a diagram showing a fixing portion in the receiving frame unit according to the first embodiment. 図7は、実施形態1に係る側板パネルの斜視図である。FIG. 7 is a perspective view of the side panel according to the first embodiment. 図8は、実施形態1に係るパネル下端側保持部材の斜視図である。FIG. 8 is a perspective view of the panel lower end side holding member according to the first embodiment. 図9は、実施形態1に係る定着部材設置工程の状況を説明する図である。FIG. 9 is a diagram illustrating a fixing member installation step according to the first embodiment. 図10は、実施形態1に係る定着部材設置工程が完了した状況を示す図である。FIG. 10 is a diagram showing a state in which the fixing member installation step according to the first embodiment is completed. 図11は、実施形態1に係る受枠設置工程の状況を説明する図である。FIG. 11 is a diagram illustrating the status of the receiving frame installation process according to the first embodiment. 図12は、実施形態1に係るジョイントピースを説明する図である。FIG. 12 is a view for explaining a joint piece according to the first embodiment. 図13は、実施形態1に係るずれ止め部材設置工程の状況を説明する図である。FIG. 13 is a diagram for explaining the state of the slip prevention member installation step according to the first embodiment. 図14は、実施形態1に係るパネル設置工程の状況を説明する図である。FIG. 14 is a diagram for explaining the state of the panel installation process according to the first embodiment. 図15は、実施形態1の幅止め材を説明する図である。FIG. 15 is a diagram illustrating the width stopper of the first embodiment. 図16は、実施形態1の変形例に係る溝路構築ユニットの平面配置例を示す図である。FIG. 16 is a diagram showing an example of a planar arrangement of a groove construction unit according to a modified example of the first embodiment. 図17は、図16のF-F矢視方向から溝路構築ユニットを眺めた状態を模式的に示す図である。FIG. 17 is a diagram showing a schematic view of the channel construction unit as viewed from the direction of arrows FF in FIG. 図18は、図16に示すG-G位置における受枠ユニットの横断面図である。FIG. 18 is a cross-sectional view of the frame unit taken along the line GG shown in FIG. 図19は、実施形態1の変形例に係る受枠ユニット4おける定着部を示す図である。FIG. 19 is a diagram showing a fixing portion in the receiving frame unit 4 according to a modified example of the first embodiment. 図20は、実施形態1の変形例に係る連結部材を介して受枠本体の端部領域同士が連結された連結部を上方から眺めた図である。FIG. 20 is a view of a connecting portion in which end regions of a receiving frame body are connected to each other via a connecting member according to a modified example of the first embodiment, as viewed from above. 図21は、実施形態1の変形例に係る受枠本体の連結部を正面から眺めた図である。FIG. 21 is a front view of a connecting portion of a frame body according to a modified example of embodiment 1. FIG. 図22は、実施形態1の変形例に係る受枠本体の連結部を側方から眺めた図である。FIG. 22 is a side view of the connecting portion of the frame body according to a modified example of embodiment 1. FIG. 図23は、実施形態1の変形例に係るジョイントピースによって連結される前のブラケットを説明する図である。FIG. 23 is a diagram illustrating brackets before being connected by a joint piece according to a modified example of the first embodiment. 図24は、実施形態1の変形例に係る一般用パネル下端側保持部材を説明する図である。FIG. 24 is a diagram illustrating a general-use panel lower-end side holding member according to a modified example of the first embodiment. 図25は、実施形態1の変形例に係るエンド用パネル下端側保持部材を説明する図である。FIG. 25 is a diagram illustrating an end panel lower end side holding member according to a modified example of the first embodiment. 図26は、実施形態1の変形例に係る溝路構築方法の状況を説明する図である。FIG. 26 is a diagram for explaining the state of a groove construction method according to a modified example of the first embodiment. 図27は、実施形態2に係る溝路構築ユニットを説明する図である。FIG. 27 is a diagram illustrating a groove construction unit according to the second embodiment. 図28は、実施形態2に係る溝路構築ユニットによって構築された溝路を説明する図である。FIG. 28 is a diagram illustrating a channel constructed by the channel construction unit according to the second embodiment. 図29は、実施形態2に係る定着部材設置工程及び受枠設置工程が完了した状況を示す図である。FIG. 29 is a diagram showing a state in which the fixing member setting step and the receiving frame setting step according to the second embodiment are completed. 図30は、実施形態2に係るパネル設置工程の状況を説明する図である。FIG. 30 is a diagram for explaining the state of a panel installation process according to the second embodiment. 図31は、実施形態2に係る位置ずれ抑止部材設置工程が完了した状況の概略上面図である。FIG. 31 is a schematic top view of the state after the displacement prevention member installation step according to the second embodiment is completed. 図32は、実施形態2の変形例に係る溝路構築ユニットを説明する図である。FIG. 32 is a diagram illustrating a groove construction unit according to a modified example of the second embodiment. 図33は、パネル下端側保持部材の変形例を示す図である。FIG. 33 is a diagram showing a modified example of the panel lower end side holding member. 図34は、図33に示すパネル下端側保持部材の設置例を説明する図である。FIG. 34 is a diagram for explaining an example of installation of the panel lower end side holding member shown in FIG. 図35は、受枠ユニットの変形例を説明する図である。FIG. 35 is a diagram illustrating a modified example of the receiving frame unit.

以下に、図面を参照して本開示の実施形態に係る溝路構築ユニット及びこれを用いた溝路構築方法について説明する。なお、実施形態における各構成及びそれらの組み合わせ等は、一例であって、本開示の主旨から逸脱しない範囲内で、適宜、構成の付加、省略、置換、及びその他の変更が可能である。本開示は、実施形態によって限定されることはなく、請求の範囲によってのみ限定される。 Below, a groove construction unit according to an embodiment of the present disclosure and a groove construction method using the same will be described with reference to the drawings. Note that each configuration and their combinations in the embodiments are merely examples, and additions, omissions, substitutions, and other modifications of configurations are possible as appropriate within the scope of the gist of the present disclosure. The present disclosure is not limited by the embodiments, but is limited only by the claims.

<実施形態1>
《溝路構築ユニット及び溝路》
図1は、実施形態1に係る溝路構築ユニット1を説明する図である。図2は、実施形態1に係る溝路構築ユニット1によって構築された溝路100を説明する図である。
<Embodiment 1>
<<Ditch Construction Unit and Ditch>>
Fig. 1 is a diagram illustrating a groove construction unit 1 according to embodiment 1. Fig. 2 is a diagram illustrating a groove 100 constructed by the groove construction unit 1 according to embodiment 1.

実施形態1に係る溝路100は、図1に示す溝路構築ユニット1を使用して施工される。溝路100は、特に限定されないが、排水溝や側溝等といった通水溝路が例示できる。また、油や液体危険物等を外部流出させないための溝路や配管・配線を設置するための溝路であってもよい。溝路100は、例えば、長手方向に対向状に形成された側面101,101、側面101,101の下端同士を接続する底面102によって規定され、その上部には上部開口103が形成されている。溝路100の側面101,101は、溝路100の長手方向に沿って対向状に配設された略長尺板状の側板パネル2の表面によって形成されている。また、図2に示す符号CHは、硬化コンクリート(硬化後のコンクリート)である。また、符号104は溝路100の側部、符号105は溝路100の底部である。なお、溝路100の側部104や底部105は鉄筋コンクリート造であってもよい。すなわち、図1においては図示を省略しているが、硬化コンクリートCHの内部には建築構造用鉄筋が配筋されていてもよい。 The channel 100 according to the first embodiment is constructed using the channel construction unit 1 shown in FIG. 1. The channel 100 is not particularly limited, but may be a water channel such as a drainage channel or a side gutter. It may also be a channel for preventing oil or liquid hazardous materials from flowing out to the outside, or a channel for installing piping and wiring. The channel 100 is defined by, for example, side surfaces 101, 101 formed in opposition to each other in the longitudinal direction, and a bottom surface 102 connecting the lower ends of the side surfaces 101, 101, and an upper opening 103 is formed at the top. The side surfaces 101, 101 of the channel 100 are formed by the surfaces of side panel panels 2 that are substantially elongated and arranged in opposition to each other along the longitudinal direction of the channel 100. Also, the symbol CH shown in FIG. 2 is hardened concrete (concrete after hardening). Also, the symbol 104 is a side portion of the channel 100, and the symbol 105 is a bottom portion of the channel 100. The sides 104 and bottom 105 of the channel 100 may be made of reinforced concrete. In other words, although not shown in FIG. 1, the hardened concrete CH may have reinforcing bars for architectural construction arranged inside it.

図2に示すように、溝路100における側板パネル2の上端側領域2Aには、受枠ユニット4が装着されている。受枠ユニット4は、溝路構築ユニット1に含まれる部材であり、その詳細については後述するが、溝路100の上部開口103の周囲に形成される開口縁に沿って延設される長尺の受枠本体41を有している。受枠本体41は、溝路100の上部開口103を覆う蓋体106の外縁側領域106Aを保持するための枠部材である。なお、蓋体106の構造は特に限定されず、例えば格子状のグレーチング蓋等であってもよい。 As shown in FIG. 2, a frame unit 4 is attached to the upper end region 2A of the side panel 2 in the channel 100. The frame unit 4 is a member included in the channel construction unit 1, and will be described in detail later. It has a long frame body 41 that extends along the opening edge formed around the upper opening 103 of the channel 100. The frame body 41 is a frame member for holding the outer edge region 106A of the cover body 106 that covers the upper opening 103 of the channel 100. The structure of the cover body 106 is not particularly limited, and may be, for example, a lattice-shaped grating cover.

図3は、実施形態1に係る溝路構築ユニット1の平面配置例を示す図である。図3においては、施工箇所への溝路構築ユニット1の設置が完了した状態を示している。施工箇所への溝路構築ユニット1の設置が完了した状態において、溝路構築ユニット1で囲まれた平面領域内に、溝路形成予定区域R1が形成される。溝路形成予定区域R1は、溝路100が形成されるべき区域(溝路100が形成される予定の区域)である。一方、溝路構築ユニット1の平面外側領域には、溝路100の側部104を形成するためのフレッシュコンクリート(硬化前のコンクリートであり、「生コン」とも呼ばれる)が充填されるべき領域(以下、「側部コンクリート充填予定区域」という)R2が規定されている。 Figure 3 is a diagram showing an example of the planar arrangement of the trench construction unit 1 according to the first embodiment. Figure 3 shows the state in which the installation of the trench construction unit 1 at the construction site is completed. When the installation of the trench construction unit 1 at the construction site is completed, a trench formation planned area R1 is formed within the planar area surrounded by the trench construction unit 1. The trench formation planned area R1 is the area in which the trench 100 is to be formed (the area in which the trench 100 is to be formed). Meanwhile, in the planar outer area of the trench construction unit 1, an area R2 (hereinafter referred to as the "side concrete filling planned area") in which fresh concrete (concrete before hardening, also called "fresh concrete") to form the side 104 of the trench 100 is to be filled is specified.

なお、図3においては、溝路構築ユニット1によって平面視概略L形状の溝路形成予定区域R1が画定されているが、溝路形成予定区域R1の形状は特に限定されず、例えば一方向に延在する直線状の溝路やその他の形状を有する溝路であってもよい。なお、図1に示すように、溝路形成予定区域R1の下方には、下地200との間に底部コンクリート充填予定区域R3が規定されている。この底部コンクリート充填予定区域R3は、溝路100の底部105を形成するためのフレッシュコンクリートが充填されるべき(充填される予定の)区域である。図1に示す一点鎖線は、溝路形成予定区域R1及び底部コンクリート充填予定区域R3の境界を示す。なお、下地200は、溝路100を構築する溝路構築ユニット1を設置したり、溝路100を構築するコンクリートを支持するための土台であり、コンクリート製の基盤であってもよいし、デッキプレート等といった鋼板製の下地であってもよい。また、図1は、図3に示すA-A矢視方向から溝路構築ユニット1を眺めた状態を模式的に示している。 In FIG. 3, the groove construction unit 1 defines the groove formation area R1, which is roughly L-shaped in plan view, but the shape of the groove formation area R1 is not particularly limited, and may be, for example, a straight groove extending in one direction or a groove having another shape. As shown in FIG. 1, below the groove formation area R1, a bottom concrete filling area R3 is defined between the base 200 and the groove formation area R1. This bottom concrete filling area R3 is an area where fresh concrete should be filled (is to be filled) to form the bottom 105 of the groove 100. The dashed line shown in FIG. 1 indicates the boundary between the groove formation area R1 and the bottom concrete filling area R3. The base 200 is a foundation for installing the groove construction unit 1 for constructing the groove 100 and for supporting the concrete for constructing the groove 100, and may be a concrete base or a steel plate base such as a deck plate. FIG. 1 also shows a schematic view of the channel construction unit 1 as viewed from the direction of the arrows A-A shown in FIG. 3.

次に、実施形態1に係る溝路構築ユニット1について詳しく説明する。実施形態1に係
る溝路構築ユニット1は、型枠支保工を使用せずに溝路100を構築するためのユニットであって、
溝路100の側面101を形成するための矩形板状の側板パネル2であって、一方の面に溝路側面形成面21が形成されると共に他方の面に堰板面22が形成される1又は複数の側板パネル2と、
溝路100の側部104を形成するためのコンクリートが充填される側部コンクリート充填予定区域R2に位置決め固定される1又は複数の定着用部材3と、
溝路100の上部開口103を覆う蓋106体を保持するための長尺の受枠本体41と、当該受枠本体41と一体に設けられると共に定着用部材3に接合されることで受枠本体41を規定位置に固定するための定着部42と、側板パネル2の上端側領域2Aを保持可能なパネル上端側保持部44を有する、1又は複数の受枠ユニット4等を備えている。
Next, the trench construction unit 1 according to the embodiment 1 will be described in detail. The trench construction unit 1 according to the embodiment 1 is a unit for constructing a trench 100 without using a formwork support,
One or more rectangular side panel panels 2 for forming a side surface 101 of the channel 100, each of which has a channel side surface forming surface 21 formed on one surface and a dam surface 22 formed on the other surface;
One or more anchoring members 3 that are positioned and fixed in a side concrete filling area R2 in which concrete is to be filled to form the side 104 of the channel 100;
The frame unit 4 includes one or more frame units 4 having a long frame body 41 for holding a lid 106 that covers the upper opening 103 of the groove 100, a fixing portion 42 that is integral with the frame body 41 and is joined to the fixing member 3 to fix the frame body 41 in a specified position, and a panel upper end holding portion 44 that can hold the upper end region 2A of the side panel 2.

受枠ユニット4は、上述した受枠本体41と、当該受枠本体41と一体に取り付けられた定着部42を含むユニット体である。図3に示す例では、複数の受枠ユニット4が長尺方向に順次連結され、全体として環状に連結されている。図3に示す例では、6個の受枠ユニット4(6本の受枠本体41)が連結されているが、勿論、受枠ユニット4の数は特に限定されない。図3に示す符号P1は、複数の受枠本体41(受枠ユニット4)が相互に連結される連結箇所を示している。図3から明らかなように、受枠ユニット4の受枠本体41は、直線的な平面形状を有する直線タイプに限定されず、全体としてL字形状、コ字形状等、種々の平面形状を有していてもよい。また、受枠本体41の長尺方向における長さ寸法は特に限定されない。 The frame unit 4 is a unit body including the frame body 41 and the fixing portion 42 attached integrally to the frame body 41. In the example shown in FIG. 3, a plurality of frame units 4 are sequentially connected in the longitudinal direction, and are connected in a ring shape as a whole. In the example shown in FIG. 3, six frame units 4 (six frame bodies 41) are connected, but of course the number of frame units 4 is not particularly limited. The symbol P1 shown in FIG. 3 indicates the connection points where the plurality of frame bodies 41 (frame units 4) are connected to each other. As is clear from FIG. 3, the frame body 41 of the frame unit 4 is not limited to a linear type having a linear planar shape, and may have various planar shapes such as an L-shape or a U-shape as a whole. In addition, the length dimension in the longitudinal direction of the frame body 41 is not particularly limited.

受枠ユニット4の定着部42は、受枠本体41における1又は複数箇所に取り付けられており、図1に示すように定着用部材3に接合可能に構成されている。定着用部材3は、例えば、下地200に定着されると共に当該下地200から上方に向かって立設された寸切ボルト(「長ねじボルト」、「全ねじボルト」という場合がある)である。ここでは、下地200をコンクリート基盤(床版コンクリート、土間コンクリート、捨て(均し)コンクリート等)とした場合を例に説明すると、コンクリート基盤に穿孔した孔にあと施工アンカーを挿入し、当該あと施工アンカー(例えば、金属系アンカーや接着系アンカー等)を介して定着用部材3(寸切ボルト)を既設のコンクリート基盤に定着してもよい。下地200に定着された定着用部材3は、図1に示すように、側部コンクリート充填予定区域R2に配設される。受枠ユニット4の定着部42は、下地200に定着された定着用部材3に接合可能に構成されており、定着部42が定着用部材3に接合されることによって、定着部42と一体の受枠本体41を規定位置に位置決め固定することができる。 The fixing portion 42 of the frame unit 4 is attached to one or more locations on the frame body 41, and is configured to be joined to the fixing member 3 as shown in FIG. 1. The fixing member 3 is, for example, a cut bolt (sometimes called a "long thread bolt" or "full thread bolt") that is fixed to the base 200 and stands upward from the base 200. Here, in the case where the base 200 is a concrete base (floor concrete, concrete floor, leveling concrete, etc.), a post-installed anchor may be inserted into a hole drilled in the concrete base, and the fixing member 3 (cut bolt) may be fixed to the existing concrete base via the post-installed anchor (for example, a metal anchor or an adhesive anchor). The fixing member 3 fixed to the base 200 is disposed in the side concrete filling planned area R2 as shown in FIG. 1. The fixing portion 42 of the frame unit 4 is configured to be joinable to the fixing member 3 fixed to the base 200, and by joining the fixing portion 42 to the fixing member 3, the frame body 41 integrated with the fixing portion 42 can be positioned and fixed at a specified position.

図4は、図3に示すB-B位置における受枠ユニット4の横断面図である。ここでいう受枠ユニット4の横断面とは、受枠ユニット4の長手方向(長尺方向)に直交する方向の断面である。図5は、実施形態1に係る受枠ユニット4における受枠本体41の斜視図である。図6は、実施形態1に係る受枠ユニット4における定着部42を示す図である。図6において、(a)は定着部42の側面図、(b)は定着部42の平面図(矢視C)、(c)は定着部42の正面図(矢視D)である。 Figure 4 is a cross-sectional view of the frame unit 4 at position B-B shown in Figure 3. The cross-sectional view of the frame unit 4 here refers to a cross-section perpendicular to the longitudinal direction (longitudinal direction) of the frame unit 4. Figure 5 is a perspective view of the frame body 41 in the frame unit 4 according to the first embodiment. Figure 6 is a diagram showing the fixing portion 42 in the frame unit 4 according to the first embodiment. In Figure 6, (a) is a side view of the fixing portion 42, (b) is a plan view of the fixing portion 42 (arrow C), and (c) is a front view of the fixing portion 42 (arrow D).

受枠本体41は、例えばステンレス鋼板等の金属板を板金加工することによって形成されている。受枠本体41は、構築後における溝路100の上部開口103を覆う蓋体106の外縁側領域106Aを載置するための載置面411Aを上面側に有する蓋体載置板部411、蓋体載置板部411の内端縁411Bから下方に垂設された第1挟持片412、蓋体載置板部411の外端縁411Cから上方に立設された立上り部413等を含んで構成されている。なお、符号411Dは、蓋体載置板部411における載置面411Aと反対側に位置する下面である。蓋体載置板部411における載置面411A及び下面411Dは、平坦面として形成されている。また、図3に示すように、受枠ユニット4が規定位
置に設置された状態において、受枠本体41は溝路形成予定区域R1と側部コンクリート充填予定区域R2との境界部に沿って延在しており、より具体的には、第1挟持片412が溝路形成予定区域R1側に位置し、立上り部413が側部コンクリート充填予定区域R2側に位置するように受枠本体41が配置されている。
The receiving frame body 41 is formed by sheet metal processing of a metal plate such as a stainless steel plate. The receiving frame body 41 includes a lid body mounting plate portion 411 having a mounting surface 411A on the upper surface side for mounting the outer edge side area 106A of the lid body 106 that covers the upper opening 103 of the groove 100 after construction, a first clamping piece 412 suspended downward from the inner end edge 411B of the lid body mounting plate portion 411, and a rising portion 413 erected upward from the outer end edge 411C of the lid body mounting plate portion 411. The reference symbol 411D indicates a lower surface located on the opposite side to the mounting surface 411A of the lid body mounting plate portion 411. The mounting surface 411A and the lower surface 411D of the lid body mounting plate portion 411 are formed as flat surfaces. Furthermore, as shown in Figure 3, when the receiving frame unit 4 is installed in the specified position, the receiving frame main body 41 extends along the boundary between the area R1 where a trench is planned to be formed and the area R2 where the side concrete is planned to be filled, and more specifically, the receiving frame main body 41 is positioned so that the first clamping piece 412 is located on the side of the area R1 where a trench is planned to be formed, and the rising portion 413 is located on the side of the area R2 where the side concrete is planned to be filled.

受枠ユニット4の定着部42は、例えば、受枠本体41に対して溶接等、適宜の接合手法によって一体に接合されている。図3に示すように、受枠ユニット4の定着部42は、受枠本体41における1又は複数箇所に設けられている。図6に示す例では、定着部42は、側面視概略L形状を有する金属板によって形成されている。定着部42は、例えば、鋼板等を板金加工することによって形成することができる。定着部42は、定着用部材3に接合可能な固定片421と、当該固定片421に連設される第2挟持片422を含んで構成されている。図6に示す例では、定着部42における第2挟持片422は、側面視において概略V字形状を有している。但し、定着部42の形状は特に限定されない。 The fixing portion 42 of the frame unit 4 is integrally joined to the frame body 41 by an appropriate joining method such as welding. As shown in FIG. 3, the fixing portion 42 of the frame unit 4 is provided at one or more locations on the frame body 41. In the example shown in FIG. 6, the fixing portion 42 is formed of a metal plate having a roughly L-shape in side view. The fixing portion 42 can be formed, for example, by sheet metal processing of a steel plate or the like. The fixing portion 42 is configured to include a fixing piece 421 that can be joined to the fixing member 3 and a second clamping piece 422 that is connected to the fixing piece 421. In the example shown in FIG. 6, the second clamping piece 422 in the fixing portion 42 has a roughly V-shape in side view. However, the shape of the fixing portion 42 is not particularly limited.

図6の(a)に示す例では、定着部42における固定片421は平坦な金属板であり、この固定片421に対して第2挟持片422が屈曲した状態で接続されている。本実施形態においては、例えば固定片421の上面421Aを受枠本体41の蓋体載置板部411における下面411Dに添わせた状態で固定片421が蓋体載置板部411に隅肉溶接等によって接合されており、これによって定着部42と受枠本体41とが一体の受枠ユニット4が形成されている。 In the example shown in FIG. 6(a), the fixed piece 421 in the fixing portion 42 is a flat metal plate, and the second clamping piece 422 is connected to the fixed piece 421 in a bent state. In this embodiment, for example, the fixed piece 421 is joined to the lid body mounting plate portion 411 by fillet welding or the like with the upper surface 421A of the fixed piece 421 aligned with the lower surface 411D of the lid body mounting plate portion 411 of the receiving frame main body 41, thereby forming the receiving frame unit 4 in which the fixed portion 42 and the receiving frame main body 41 are integrated.

また、図6の(b)に示すように、定着部42における固定片421には、定着部42を定着用部材3と接合するための接合孔423が設けられている。接合孔423は、固定片421を板厚方向に貫通して形成されている。図6の(b)に示す例では、固定片421における接合孔423が四角形状を有しているが、接合孔423の形状や大きさは特に限定されない。 As shown in FIG. 6B, the fixing piece 421 of the fixing portion 42 has a joining hole 423 for joining the fixing portion 42 to the fixing member 3. The joining hole 423 is formed penetrating the fixing piece 421 in the plate thickness direction. In the example shown in FIG. 6B, the joining hole 423 in the fixing piece 421 has a rectangular shape, but the shape and size of the joining hole 423 are not particularly limited.

上記のように構成された受枠ユニット4は、図4に示すように、受枠本体41の蓋体載置板部411における第1挟持片412と、定着部42における第2挟持片422が間隔をおいて対向配置されており、これらの間に第1嵌合溝43が形成されている。なお、第1嵌合溝43は一方向に延伸すると共に下方に向かって開口する細溝として形成されており、第1嵌合溝43は受枠本体41の長尺方向と平行に延在している。 As shown in FIG. 4, the frame unit 4 configured as described above has a first clamping piece 412 on the lid mounting plate portion 411 of the frame body 41 and a second clamping piece 422 on the fixing portion 42 arranged opposite each other with a gap therebetween, and a first fitting groove 43 is formed between them. The first fitting groove 43 is formed as a narrow groove that extends in one direction and opens downward, and extends parallel to the longitudinal direction of the frame body 41.

受枠ユニット4におけるパネル上端側保持部44は、受枠本体41側の第1挟持片412と定着部42側の第2挟持片422の組み合わせによって形成されている。言い換えると、受枠ユニット4のパネル上端側保持部44は、受枠本体41側の第1挟持片412と定着部42側の第2挟持片422を含んで形成されており、第1挟持片412及び第2挟持片422の間に形成される第1嵌合溝43に、側板パネル2の上端側領域2Aを差し込み、嵌合させることができる。パネル上端側保持部44は、第1嵌合溝43に嵌合された側板パネル2の上端側領域2Aを把持することで、側板パネル2の上端側領域2Aを固定保持することが可能である(図1を参照)。 The panel upper end holding portion 44 in the frame unit 4 is formed by a combination of the first clamping piece 412 on the frame body 41 side and the second clamping piece 422 on the fixing portion 42 side. In other words, the panel upper end holding portion 44 of the frame unit 4 is formed including the first clamping piece 412 on the frame body 41 side and the second clamping piece 422 on the fixing portion 42 side, and the upper end side region 2A of the side panel 2 can be inserted and fitted into the first fitting groove 43 formed between the first clamping piece 412 and the second clamping piece 422. The panel upper end holding portion 44 can hold the upper end side region 2A of the side panel 2 fixedly by gripping the upper end side region 2A of the side panel 2 fitted into the first fitting groove 43 (see FIG. 1).

図7は、実施形態1に係る側板パネル2の斜視図である。側板パネル2は、溝路100の側面101(側壁)を形成するための矩形ボードであり、側部コンクリート充填予定区域R2にフレッシュコンクリートを充填(打設)する際の捨て型枠(埋設型枠)としても利用され、側部コンクリートの硬化後は取り外されることなく溝路100の側面101(側壁)を形成する部材として存置される。図1及び図7に示すように、側板パネル2は、一方の面に溝路側面形成面21が形成されると共に他方の面(溝路側面形成面21と反対側の面)に堰板面22が形成されている。また、図7に示す符号2Bは側板パネル2の下端側領域、符号2Cは側板パネル2の下端面である。 Figure 7 is a perspective view of the side panel 2 according to the first embodiment. The side panel 2 is a rectangular board for forming the side 101 (side wall) of the channel 100, and is also used as a throwaway formwork (buried formwork) when filling (casting) fresh concrete in the side concrete filling area R2. After the side concrete hardens, it is left as a member for forming the side 101 (side wall) of the channel 100 without being removed. As shown in Figures 1 and 7, the side panel 2 has a channel side forming surface 21 formed on one side and a dam surface 22 formed on the other side (the surface opposite to the channel side forming surface 21). Also, the symbol 2B in Figure 7 indicates the lower end region of the side panel 2, and the symbol 2C indicates the lower end surface of the side panel 2.

本実施形態において、側板パネル2は、例えば、平板状の繊維強化セメント板によって形成されている。側板パネル2は、その長手方向の寸法は例えば30~242cmであり、短手方向の寸法は例えば2~242cmである。また、側板パネル2の製造コスト及び運搬コストの抑制、並びに、側板パネル2の組付け作業のしやすさの観点から、長手方向の寸法は30~200cmが好ましく、短手方向の寸法は2~50cm(特に、2~40cm)が好ましい。 In this embodiment, the side panel 2 is formed, for example, from a flat fiber-reinforced cement board. The side panel 2 has a longitudinal dimension of, for example, 30 to 242 cm, and a transverse dimension of, for example, 2 to 242 cm. From the standpoint of reducing the manufacturing and transportation costs of the side panel 2 and facilitating the assembly work of the side panel 2, the longitudinal dimension is preferably 30 to 200 cm, and the transverse dimension is preferably 2 to 50 cm (particularly, 2 to 40 cm).

側板パネル2を形成する平板状の繊維強化セメント板としては、例えば、スレートボード、珪酸カルシウム板、スラグ石膏板等が挙げられる。スレートボードは、主原料として、例えば、セメント、繊維(但し石綿を除く)、及び混和材を含む。珪酸カルシウム板は、主原料として、例えば、石灰質原料、珪酸質原料、繊維(但し石綿を除く)、及び混和材を含む。スラグ石膏板は、主原料として、例えば、スラグ、石膏、繊維(但し石綿を除く)、及び混和材を含む。これら繊維強化セメント板については、JIS A 5430に規格が定められている。耐水性の観点からは、側板パネル2を形成する繊維強化セメント板としては、スレートボード及び珪酸カルシウム板が好ましい。また、スレートボードの市販品としては、例えば、エーアンドエーマテリアル株式会社製の「セルフレックス」が挙げられる。珪酸カルシウム板の市販品としては、例えば、エーアンドエーマテリアル株式会社製の「ハイラックM」が挙げられる。スラグ石膏板の市販品としては、例えば、吉野石膏株式会社製の「タイガーボード」が挙げられる。 Examples of the flat fiber-reinforced cement boards forming the side panel 2 include slate boards, calcium silicate boards, and slag gypsum boards. Slate boards include, for example, cement, fiber (excluding asbestos), and admixtures as main raw materials. Calcium silicate boards include, for example, calcareous raw materials, siliceous raw materials, fiber (excluding asbestos), and admixtures as main raw materials. Slag gypsum boards include, for example, slag, gypsum, fiber (excluding asbestos), and admixtures as main raw materials. Standards for these fiber-reinforced cement boards are set out in JIS A 5430. From the viewpoint of water resistance, slate boards and calcium silicate boards are preferred as fiber-reinforced cement boards forming the side panel 2. In addition, examples of commercially available slate boards include "Selflex" manufactured by A&A Material Co., Ltd. Examples of commercially available calcium silicate boards include "Hilac M" manufactured by A&A Material Co., Ltd. An example of a commercially available slag gypsum board is "Tiger Board" manufactured by Yoshino Gypsum Co., Ltd.

側板パネル2の厚さは、好ましくは3mm以上、より好ましくは5mm以上、更に好ましくは6mm以上である。このような構成は、側板パネル2の強度の確保の観点から好ましく、ひいては、側板パネル2の運搬時及び組付け作業時、並びにコンクリート打設の際の、側板パネル2の破損や撓みを抑制する観点から好ましい。また、側板パネル2の厚さは、好ましくは30mm以下、より好ましくは20mm以下、更に好ましくは10mm以下である。このような構成は、側板パネル2の軽量化の観点から好ましく、ひいては、側板パネル2の製造コスト及び運搬コストの抑制、並びに、側板パネル2の組付け作業のしやすさの観点から好ましい。 The thickness of the side panel 2 is preferably 3 mm or more, more preferably 5 mm or more, and even more preferably 6 mm or more. This configuration is preferable from the viewpoint of ensuring the strength of the side panel 2, and is preferable from the viewpoint of suppressing damage and bending of the side panel 2 during transportation and assembly work of the side panel 2, and during concrete pouring. In addition, the thickness of the side panel 2 is preferably 30 mm or less, more preferably 20 mm or less, and even more preferably 10 mm or less. This configuration is preferable from the viewpoint of reducing the weight of the side panel 2, and is preferable from the viewpoint of suppressing the manufacturing cost and transportation cost of the side panel 2, and from the viewpoint of ease of assembly work of the side panel 2.

ここで、側板パネル2の堰板面22は接着改良面として形成されていてもよい。この接着改良面は、例えば硬化コンクリートとの接合に適した面であり、硬化コンクリートとの接着性を向上させるための処理が施された面である。接着改良面を設けることで硬化コンクリートとの接合高度を高めることができ、側板パネル2が硬化コンクリートの表面から剥離しにくくすることができる。側板パネル2の接着改良面は、例えば、モルタル硬化物層表面、凹凸成形面、機械的粗化面、または、これらの組み合わせであってもよい。側板パネル2の量産化や経済性の観点からは、側板パネル2の接着改良面としてはモルタル硬化物層表面が好ましい。 Here, the dam surface 22 of the side panel 2 may be formed as an adhesion-improved surface. This adhesion-improved surface is, for example, a surface suitable for bonding with hardened concrete, and is a surface that has been treated to improve adhesion with hardened concrete. By providing an adhesion-improved surface, it is possible to increase the bonding strength with hardened concrete, and to make it difficult for the side panel 2 to peel off from the surface of the hardened concrete. The adhesion-improved surface of the side panel 2 may be, for example, a hardened mortar layer surface, an unevenly molded surface, a mechanically roughened surface, or a combination of these. From the viewpoint of mass production and economic efficiency of the side panel 2, the hardened mortar layer surface is preferable as the adhesion-improved surface of the side panel 2.

側板パネル2におけるモルタル硬化物層表面は、上述の繊維強化セメント板における表面にモルタルを塗布した後に硬化させることによって形成することができる。当該モルタルとしては、例えば、ポリマーセメントモルタル、エポキシ樹脂モルタル、カチオン系モルタル等が挙げられる。 The surface of the mortar hardened layer in the side panel 2 can be formed by applying mortar to the surface of the above-mentioned fiber-reinforced cement board and then hardening it. Examples of such mortar include polymer cement mortar, epoxy resin mortar, and cationic mortar.

ポリマーセメントモルタルは、例えば、セメントと、細骨材と、水と、ポリマーディスパージョンまたは再乳化形粉末樹脂との混合物であるモルタルである。ポリマーディスパージョンとしては、エチレン酢酸ビニル樹脂(EVA)及びアクリル樹脂等が挙げられる。ポリマーディスパージョンとして用いることが可能なエチレン酢酸ビニル樹脂の市販品としては、例えば、ダイセルミライズ株式会社製の「セルマイティ10」が挙げられる。ポリマーディスパージョンとして用いることが可能なアクリル樹脂の市販品としては、例
えば、旭化成株式会社製の「スーパーペトロック400」等が挙げられる。
The polymer cement mortar is, for example, a mortar that is a mixture of cement, fine aggregate, water, and a polymer dispersion or a re-emulsified powdered resin. Examples of the polymer dispersion include ethylene vinyl acetate resin (EVA) and acrylic resin. Examples of commercially available ethylene vinyl acetate resins that can be used as polymer dispersions include "Cellmighty 10" manufactured by Daicel Miraize Co., Ltd. Examples of commercially available acrylic resins that can be used as polymer dispersions include "Super Petrock 400" manufactured by Asahi Kasei Corporation.

カチオン系モルタルは、例えば、セメントと、細骨材と、水と、カチオン系ポリマーディスパージョンまたはカチオン系再乳化形粉末樹脂との混合物であるモルタルである。カチオン系ポリマーディスパージョンとしては、カチオン系スチレンブタジエンゴム、カチオン系アクリル樹脂等が挙げられる。カチオン系ポリマーディスパージョンとして用いることが可能なカチオン系スチレンブタジエンゴムの市販品としては、ダイセルミライズ株式会社製の「セルタル」等が挙げられる。カチオン系ポリマーディスパージョンとして用いることが可能なカチオン系アクリル樹脂の市販品としては、ダイセルミライズ株式会社製の「セルカチオン」等が挙げられる。 Cationic mortar is, for example, a mortar that is a mixture of cement, fine aggregate, water, and a cationic polymer dispersion or a cationic re-emulsified powdered resin. Examples of cationic polymer dispersions include cationic styrene-butadiene rubber and cationic acrylic resin. Commercially available cationic styrene-butadiene rubber that can be used as a cationic polymer dispersion includes "Celtal" manufactured by Daicel Miraize Co., Ltd. Commercially available cationic acrylic resin that can be used as a cationic polymer dispersion includes "Celcation" manufactured by Daicel Miraize Co., Ltd.

エポキシ樹脂モルタルは、例えば、エポキシ樹脂と細骨材との混合物であるモルタルである。エポキシ樹脂モルタルの市販品としては、例えばコニシ株式会社製の「Kモルタル」等が挙げられる。 Epoxy resin mortar is, for example, a mortar that is a mixture of epoxy resin and fine aggregate. Commercially available epoxy resin mortars include "K Mortar" manufactured by Konishi Co., Ltd.

上述のモルタル中の細骨材としては、例えば、珪砂、川砂、黒曜石パーライト、真珠岩パーライト、炭酸カルシウム粉等が挙げられる。モルタル中には、一種類の細骨材が含まれていてもよいし、二種類以上の細骨材が含まれていてもよい。 Examples of fine aggregates in the mortar include silica sand, river sand, obsidian perlite, perlite, calcium carbonate powder, etc. The mortar may contain one type of fine aggregate, or two or more types of fine aggregates.

側板パネル2における接着改良面がモルタル硬化物層表面である場合、そのモルタル硬化物層の厚さは、コンクリートに対する高い接着強度を確保するという観点からは、好ましくは0.5mm以上、より好ましくは1mm以上、更に好ましくは1.5mm以上である。また、側板パネル2に関する軽量化及び作業性の改善の観点や、側板パネル2の製造コスト及び運搬コストの抑制の観点からは、当該モルタル硬化物層の厚さは、好ましくは10mm以下、より好ましくは5mm以下、更に好ましくは3mm以下である。 When the adhesion-improved surface of the side panel 2 is the surface of the hardened mortar layer, the thickness of the hardened mortar layer is preferably 0.5 mm or more, more preferably 1 mm or more, and even more preferably 1.5 mm or more, from the viewpoint of ensuring high adhesive strength to concrete. Also, from the viewpoint of reducing the weight of the side panel 2 and improving workability, and from the viewpoint of reducing the manufacturing and transportation costs of the side panel 2, the thickness of the hardened mortar layer is preferably 10 mm or less, more preferably 5 mm or less, and even more preferably 3 mm or less.

側板パネル2における接着改良面が凹凸成形面である場合、例えば、側板パネル2を形成するための繊維強化セメント板の作製過程で、所定の凹凸形状を有する型板等など型部材を使用して繊維強化セメント板をプレス成形または押出成形することにより、凹凸成形面を形成することができる。 When the adhesion improvement surface of the side panel 2 is an unevenly molded surface, for example, during the process of producing a fiber-reinforced cement board to form the side panel 2, the unevenly molded surface can be formed by press-molding or extrusion-molding the fiber-reinforced cement board using a mold member such as a template having a predetermined uneven shape.

側板パネル2における接着改良面が機械的粗化面である場合、例えば、側板パネル2を形成するための繊維強化セメント板の表面に対してサンディングまたはチッピングなど機械的な粗面化処理を行って当該表面を目粗しすることにより、機械的粗化面を形成することができる。 When the adhesion improvement surface of the side panel 2 is a mechanically roughened surface, for example, the surface of the fiber-reinforced cement board used to form the side panel 2 can be roughened by subjecting the surface to a mechanical roughening treatment such as sanding or chipping, thereby forming a mechanically roughened surface.

また、側板パネル2の溝路側面形成面21は化粧面(仕上面)として形成されていてもよい。この場合、側板パネル2の溝路側面形成面21は、繊維強化セメント板の表面に塗工された仕上げ塗材によって形成されていてもよい。側板パネル2の溝路側面形成面21を形成する仕上げ塗材としては、例えば、厚膜型エポキシ樹脂系や水性硬質ウレタン系の仕上げ塗材であってもよい。厚膜型エポキシ樹脂系の仕上げ塗材としては、株式会社エービーシー商会製の「ケミクリートE」等が挙げられる。また、水性硬質ウレタン系の仕上げ塗材としては、耐熱耐低温性、耐摩耗性、耐水性、抗菌性などに優れた株式会社エービーシー商会製の「タフクリートMH」等が挙げられる。側板パネル2の溝路側面形成面21を化粧面(仕上面)として形成することで、溝路構築ユニット1を使用して溝路を構築した後、側板パネル2の溝路形成面21に改めて仕上げ材を塗工する必要がなく、作業効率の観点から好ましい。 The groove side forming surface 21 of the side panel 2 may be formed as a decorative surface (finished surface). In this case, the groove side forming surface 21 of the side panel 2 may be formed by a finishing coating material applied to the surface of the fiber-reinforced cement board. The finishing coating material for forming the groove side forming surface 21 of the side panel 2 may be, for example, a thick-film epoxy resin-based or water-based hard urethane-based finishing coating material. An example of a thick-film epoxy resin-based finishing coating material is "Chemicrete E" manufactured by ABC Shokai Co., Ltd. An example of a water-based hard urethane-based finishing coating material is "Toughcrete MH" manufactured by ABC Shokai Co., Ltd., which has excellent heat resistance, low temperature resistance, abrasion resistance, water resistance, antibacterial properties, etc. By forming the groove side forming surface 21 of the side panel 2 as a decorative surface (finished surface), it is not necessary to apply a finishing material to the groove forming surface 21 of the side panel 2 again after constructing the groove using the groove construction unit 1, which is preferable from the viewpoint of work efficiency.

以上のような側板パネル2としては、特開平8-312092号公報に記載のもの(但し、石綿は含有していないもの)、及び、ダイセルミライズ株式会社製の「セル・ケ
コミパネル」、「セル・スリムステップボード」が、特に好ましい。
As the side panel 2 as described above, the one described in JP-A-8-312092 (however, it does not contain asbestos) and the "Cell Kekomi Panel" and "Cell Slim Step Board" manufactured by Daicel Miraize Co., Ltd. are particularly preferred.

次に、図1に示すパネル下端側保持部材5の詳細構造について説明する。パネル下端側保持部材5は、底部コンクリート充填予定区域R3に位置決め固定される部材であり、側板パネル2の下端側領域2Bを固定保持することが可能である。また、パネル下端側保持部材5は、規定位置に設置された側板パネル2の下端側領域2Bが溝路形成予定区域R1側にずれることを抑制するパネル下端側ずれ止め部材に相当する。これにより、後続するフレッシュコンクリート打設工程において側部コンクリート充填予定区域R2に打設されるコンクリートの圧力が側板パネル2に作用しても、側板パネル2の下端側領域2Bが溝路形成予定区域R1側にずれることを抑制できる。 Next, the detailed structure of the panel lower end retaining member 5 shown in FIG. 1 will be described. The panel lower end retaining member 5 is a member that is positioned and fixed in the bottom concrete filling area R3, and is capable of fixing and holding the lower end area 2B of the side panel 2. The panel lower end retaining member 5 corresponds to a panel lower end anti-slip member that prevents the lower end area 2B of the side panel 2 installed in a specified position from shifting toward the groove formation area R1. This makes it possible to prevent the lower end area 2B of the side panel 2 from shifting toward the groove formation area R1 even if the pressure of the concrete poured in the side concrete filling area R2 acts on the side panel 2 in the subsequent fresh concrete pouring process.

図8は、実施形態1に係るパネル下端側保持部材5の斜視図である。パネル下端側保持部材5は、下地200に固定可能な台座部51と、側板パネル2の下端側領域2Bを嵌合可能な第2嵌合溝52を有するパネル受部53と、台座部51及びパネル受部53を接続する軸部54を有する。図8には、一組のパネル下端側保持部材5と、当該一組のパネル下端側保持部材5を連結するための連結棒部材55とが図示されている。 Figure 8 is a perspective view of the panel lower end holding member 5 according to the first embodiment. The panel lower end holding member 5 has a base portion 51 that can be fixed to the base 200, a panel receiving portion 53 having a second fitting groove 52 into which the lower end region 2B of the side panel 2 can be fitted, and a shaft portion 54 that connects the base portion 51 and the panel receiving portion 53. Figure 8 shows a pair of panel lower end holding members 5 and a connecting rod member 55 for connecting the pair of panel lower end holding members 5.

パネル下端側保持部材5の台座部51は、下地200に安定して載置可能な平坦な下面を有する土台部材であり、例えば釘等の固定具を挿通可能な固定孔51Aが設けられている。台座部51における固定孔51Aの数は特に限定されないが、台座部51の複数箇所に固定孔51Aが設けられていることが好ましい。例えば、下地200がコンクリート基盤である場合、固定孔51Aを通じてコンクリート釘等をコンクリート基盤に打ち込むことによって台座部51をコンクリート基盤に固定することができる。 The base portion 51 of the panel lower end holding member 5 is a base member having a flat underside that can be stably placed on the base 200, and is provided with fixing holes 51A through which fixing tools such as nails can be inserted. The number of fixing holes 51A in the base portion 51 is not particularly limited, but it is preferable that the base portion 51 has fixing holes 51A in multiple locations. For example, if the base 200 is a concrete base, the base portion 51 can be fixed to the concrete base by driving concrete nails or the like into the concrete base through the fixing holes 51A.

パネル下端側保持部材5の軸部54は、例えば寸切ボルトによって形成されており、台座部51及びパネル受部53を相互に接続している。パネル下端側保持部材5の台座部51には、軸部54の下端側を連結可能な連結部51Bが形成されている。例えば、連結部51Bは、軸部54をねじ込み可能なスリーブ体として構成されていてもよく、当該スリーブ体の内周面側に軸部54を螺着可能なメスねじ部を有していてもよい。 The shaft 54 of the panel lower end holding member 5 is formed, for example, by a cut bolt, and connects the base 51 and the panel receiving portion 53 to each other. The base 51 of the panel lower end holding member 5 is formed with a connecting portion 51B that can connect the lower end side of the shaft 54. For example, the connecting portion 51B may be configured as a sleeve body into which the shaft 54 can be screwed, and may have a female threaded portion on the inner peripheral surface side of the sleeve body into which the shaft 54 can be screwed.

パネル受部53の上部には、側板パネル2の下端側領域2Bを嵌合可能な第2嵌合溝52が形成されており、第2嵌合溝52に嵌合した側板パネル2の下端側領域2Bを把持することが可能である。図8に示すように、パネル受部53の第2嵌合溝52は一方向に延伸すると共に上方に向かって開口する細溝として形成されている。また、パネル受部53の下端面には、軸部54の上端側を螺着可能なナット(図示せず)が取り付けられており、当該ナットに軸部54の上端側を螺着することでパネル受部53及び軸部54が相互に連結されている。パネル下端側保持部材5は、パネル受部53のナットに対する軸部54の螺着量を変更することで、台座部51から第2嵌合溝52までの高さを自由に変更することができる。このような高さ調整機構を有するパネル下端側保持部材5によれば、台座部51を下地200に固定した状態で、第2嵌合溝52の高さを自在に調整することができる。 A second fitting groove 52 is formed in the upper part of the panel receiving part 53, into which the lower end region 2B of the side panel 2 can be fitted, and the lower end region 2B of the side panel 2 fitted into the second fitting groove 52 can be gripped. As shown in FIG. 8, the second fitting groove 52 of the panel receiving part 53 is formed as a narrow groove that extends in one direction and opens upward. In addition, a nut (not shown) into which the upper end side of the shaft part 54 can be screwed is attached to the lower end surface of the panel receiving part 53, and the panel receiving part 53 and the shaft part 54 are connected to each other by screwing the upper end side of the shaft part 54 into the nut. The panel lower end side holding member 5 can freely change the height from the base part 51 to the second fitting groove 52 by changing the amount of screwing of the shaft part 54 into the nut of the panel receiving part 53. With this type of height adjustment mechanism, the panel lower end holding member 5 can freely adjust the height of the second fitting groove 52 while the base portion 51 is fixed to the base 200.

更に、パネル下端側保持部材5のパネル受部53には、連結棒部材55の端部を挿入することで保持可能な装着孔57を有する連結用スリーブ56が設けられている。連結棒部材55は、例えば細長い丸鋼などの硬質棒部材によって形成されている。図8に示す例では、連結棒部材55は、一方向に延伸する幅決め部551と、当該幅決め部551の両端から屈曲して延在する一対の装着用端部552を含んで構成されている。連結棒部材55は、例えば丸鋼の両端を概略コの字形状に折り曲げ加工することによって形成されていてもよい。 Furthermore, the panel receiving portion 53 of the panel lower end holding member 5 is provided with a connecting sleeve 56 having an attachment hole 57 into which an end of a connecting rod member 55 can be inserted and held. The connecting rod member 55 is formed of a hard rod member such as an elongated round steel. In the example shown in FIG. 8, the connecting rod member 55 includes a width determining portion 551 extending in one direction and a pair of attachment ends 552 that bend and extend from both ends of the width determining portion 551. The connecting rod member 55 may be formed, for example, by bending both ends of a round steel into a roughly U-shape.

図8に示すように、連結棒部材55は、幅決め部551の両端に設けられた一対の装着用端部552を、異なる一組のパネル下端側保持部材5の連結用スリーブ56における装着孔57に装着する態様で用いられる。すなわち、異なる一組のパネル下端側保持部材5は、一本の連結棒部材55を共有する態様で各々の連結用スリーブ56における装着孔57に連結棒部材55の装着用端部552を装着する。これにより、一組のパネル下端側保持部材5同士を、共有する連結棒部材55を介して相互に連結できる。 As shown in FIG. 8, the connecting rod member 55 is used in such a manner that a pair of mounting ends 552 provided at both ends of the width determining portion 551 are mounted in mounting holes 57 in the connecting sleeves 56 of a different set of panel lower end side holding members 5. In other words, the different sets of panel lower end side holding members 5 share a single connecting rod member 55, and the mounting ends 552 of the connecting rod member 55 are mounted in the mounting holes 57 in the connecting sleeves 56. This allows the set of panel lower end side holding members 5 to be connected to each other via the shared connecting rod member 55.

更に、本実施形態に係るパネル下端側保持部材5は、連結用スリーブ56の装着孔57に装着される連結棒部材55の向きをガイド(規制)するためのガイド部58を有している。図8に示すように、パネル下端側保持部材5のガイド部58は、連結用スリーブ56における装着孔57の上方に設けられた一対の対向する規制壁58A,58Aを備えている。図8に示すように、連結用スリーブ56における装着孔57に連結棒部材55の装着用端部552を装着した状態では、対向配置された規制壁58A,58A間に形成された隙間58Bに幅決め部551が位置付けられている。この状態において、連結用スリーブ56の装着孔57に挿入された装着用端部552が装着孔57内において軸方向に回転しようとしても、隙間58Bに位置付けられている幅決め部551が規制壁58Aと干渉することで、装着用端部552の回転を規制することができる。このようにして、本実施形態に係るパネル下端側保持部材5は、連結用スリーブ56に対して連結棒部材55を予め規定された向きのみに装着できる。 Furthermore, the panel lower end side holding member 5 according to this embodiment has a guide portion 58 for guiding (regulating) the orientation of the connecting rod member 55 mounted in the mounting hole 57 of the connecting sleeve 56. As shown in FIG. 8, the guide portion 58 of the panel lower end side holding member 5 has a pair of opposing regulating walls 58A, 58A provided above the mounting hole 57 in the connecting sleeve 56. As shown in FIG. 8, when the mounting end 552 of the connecting rod member 55 is mounted in the mounting hole 57 in the connecting sleeve 56, the width determining portion 551 is positioned in the gap 58B formed between the opposing regulating walls 58A, 58A. In this state, even if the mounting end 552 inserted into the mounting hole 57 of the connecting sleeve 56 tries to rotate in the axial direction within the mounting hole 57, the width determining portion 551 positioned in the gap 58B interferes with the regulating wall 58A, thereby restricting the rotation of the mounting end 552. In this way, the panel lower end holding member 5 according to this embodiment can only attach the connecting rod member 55 to the connecting sleeve 56 in a predefined orientation.

図8に示すパネル下端側保持部材5の例では、パネル受部53における第2嵌合溝52の延在方向に対して規制壁58A,58Aが直交方向に延在している。その結果、連結用スリーブ56の装着孔57に連結棒部材55が装着された際に、第2嵌合溝52の延在方向と幅決め部551の延在方向とがなす角度(以下、「連結部材装着角度」という)を直角に設定することができる。そして、パネル受部53における第2嵌合溝52の延在方向と規制壁58A,58Aの延在方向とがなす角度を適宜変更することで、連結部材装着角度を自由に変更することができる。本実施形態においては、構築すべき溝路100の仕様に応じて、異なる連結部材装着角度を有する複数種類のパネル下端側保持部材5を用意しておいてもよい。パネル受部53の連結部材装着角度としては、例えば、45°、90°、135°などが挙げられるが、これらの角度には特に限定されない。なお、パネル下端側保持部材5におけるパネル受部53に連結棒部材55の一端側を連結する態様は上記態様に限定されず、種々の態様を採用することができる。 In the example of the panel lower end side holding member 5 shown in FIG. 8, the restricting walls 58A, 58A extend perpendicularly to the extending direction of the second fitting groove 52 in the panel receiving portion 53. As a result, when the connecting rod member 55 is attached to the mounting hole 57 of the connecting sleeve 56, the angle between the extending direction of the second fitting groove 52 and the extending direction of the width determining portion 551 (hereinafter referred to as the "connecting member mounting angle") can be set at a right angle. Then, by appropriately changing the angle between the extending direction of the second fitting groove 52 in the panel receiving portion 53 and the extending direction of the restricting walls 58A, 58A, the connecting member mounting angle can be freely changed. In this embodiment, multiple types of panel lower end side holding members 5 having different connecting member mounting angles may be prepared according to the specifications of the groove 100 to be constructed. Examples of the connecting member mounting angle of the panel receiving portion 53 include 45°, 90°, and 135°, but are not particularly limited to these angles. The manner in which one end of the connecting rod member 55 is connected to the panel receiving portion 53 of the panel lower end holding member 5 is not limited to the above manner, and various manners can be adopted.

《溝路構築方法》
本実施形態においては、以上のように構成される溝路構築ユニット1を使用して溝路100が構築される。以下、溝路構築ユニット1を用いた溝路100の構築方法(施工方法)について説明する。
<<How to build a channel>>
In this embodiment, the trench 100 is constructed using the trench construction unit 1 configured as above. A construction method (construction method) of the trench 100 using the trench construction unit 1 will be described below.

まず、定着部材設置工程においては、所定の本数の定着用部材3を用意し、溝路100の側部104を形成するためのコンクリートが充填される側部コンクリート充填予定区域R2に、用意した定着用部材3を位置決め固定する。ここでは、定着用部材3として寸切ボルトを用いる場合を例に説明するが、もちろん定着用部材3は寸切ボルトに限定されず、異形棒鋼やアングル材等、受枠ユニット4の定着部42を接合することで受枠ユニット4を保持できる限りにおいて種々の部材を採用することができる。 First, in the anchoring member installation process, a predetermined number of anchoring members 3 are prepared, and the prepared anchoring members 3 are positioned and fixed in the side concrete filling area R2 where concrete will be filled to form the side 104 of the groove 100. Here, an example is described in which cut bolts are used as the anchoring members 3, but of course the anchoring members 3 are not limited to cut bolts, and various materials such as deformed steel bars and angle bars can be used as long as they can hold the receiving frame unit 4 by joining the fixing portion 42 of the receiving frame unit 4.

図9は、実施形態1に係る定着部材設置工程の状況を説明する図である。なお、図9には、図3に示すE-E位置に対応する定着部材設置工程の状況を示している。図9に示す例では、コンクリート基盤200Aの所定箇所に定着用部材3(例えば、寸切ボルト)を立設させている。例えば、下地としてのコンクリート基盤200Aの所定箇所に穿孔した後、孔内へのあと施工アンカー(例えば、金属系アンカー)の挿入及び打ち込みを行うこ
とであと施工アンカーを孔内に固定する。そして、あと施工アンカーのメスねじ部に定着用部材3(例えば、寸切ボルト)を螺着させることによって定着用部材3(例えば、寸切ボルト)をコンクリート基盤200Aに立設させてもよい。コンクリート基盤200Aは、例えば捨て(均し)コンクリートであってもよいし、床版コンクリートであっても良く、特に限定されない。図10は、実施形態1に係る定着部材設置工程が完了した状況を示す図であり、コンクリート基盤200Aの規定位置に必要な本数の定着用部材3(例えば、寸切ボルト)を位置決め固定し、コンクリート基盤200から上方に向けて立設させる。なお、図10において、現時点でまだ設置されていない受枠ユニット4については破線で示している。また、構築すべき溝路100が鉄筋コンクリート構造である場合には、側部コンクリート充填予定区域R2及び底部コンクリート充填予定区域R3に建築構造用鉄筋を配筋した後、コンクリート基盤200Aに定着用部材3を定着してもよい。或いは、コンクリート基盤200Aに定着用部材3を定着した後、側部コンクリート充填予定区域R2及び底部コンクリート充填予定区域R3に建築構造用鉄筋を配筋してもよい。
FIG. 9 is a diagram for explaining the state of the fixing member installation step according to the first embodiment. Note that FIG. 9 shows the state of the fixing member installation step corresponding to the E-E position shown in FIG. 3. In the example shown in FIG. 9, the fixing member 3 (e.g., a cut-to-size bolt) is erected at a predetermined position of the concrete base 200A. For example, after drilling a hole at a predetermined position of the concrete base 200A as a base, a post-installed anchor (e.g., a metal anchor) is inserted and driven into the hole to fix the post-installed anchor in the hole. Then, the fixing member 3 (e.g., a cut-to-size bolt) may be screwed into the female thread of the post-installed anchor to erect the fixing member 3 (e.g., a cut-to-size bolt) on the concrete base 200A. The concrete base 200A may be, for example, a waste (leveling) concrete or a slab concrete, and is not particularly limited. FIG. 10 is a diagram showing a state where the anchoring member installation process according to the first embodiment is completed, in which the necessary number of anchoring members 3 (e.g., cut-to-length bolts) are positioned and fixed at the specified positions of the concrete base 200A, and are erected upward from the concrete base 200. In FIG. 10, the frame units 4 that have not yet been installed at the present time are shown by dashed lines. In addition, when the channel 100 to be constructed is a reinforced concrete structure, the anchoring members 3 may be fixed to the concrete base 200A after the architectural structural steel bars are arranged in the side concrete filling planned area R2 and the bottom concrete filling planned area R3. Alternatively, after the anchoring members 3 are fixed to the concrete base 200A, the architectural structural steel bars may be arranged in the side concrete filling planned area R2 and the bottom concrete filling planned area R3.

次に、受枠設置工程においては、所定の数の受枠ユニット4を用意し、当該受枠ユニット4における定着部42を、コンクリート基盤200Aに立設する定着用部材3に接合することで、受枠ユニット4における受枠本体41を規定位置に設置する。 Next, in the frame installation process, a predetermined number of frame units 4 are prepared, and the fixing parts 42 of the frame units 4 are joined to the fixing members 3 erected on the concrete base 200A, thereby installing the frame main bodies 41 of the frame units 4 in the specified positions.

図11は、実施形態1に係る受枠設置工程の状況を説明する図である。図11に示す例では、一組のナット6を用いて、受枠ユニット4における定着部42を定着用部材3に接合している。例えば、一方のナット6を螺着させた状態の定着用部材3を、定着部42における固定片421に形成された接合孔423(図6を参照)に通した後、その定着用部材3に他方のナット6を螺着させることによって、受枠ユニット4における定着部42を定着用部材3に接合してもよい。これにより、受枠ユニット4における受枠本体41を規定位置に設置することができる。その際、受枠ユニット4における定着部42を定着用部材3に接合する際、定着部42の高さを測量しながら規定高さに調整することで、受枠ユニット4を精度よく規定位置に設置することができる。なお、ここでは、ナット6を用いて受枠ユニット4における定着部42を定着用部材3に接合する例を説明したがこれには限定されない。例えば、受枠ユニット4における定着部42を定着用部材3に溶接等によって接合してもよい。また、定着用部材3に異形棒鋼やアングル材等を用いる場合には、当該異形棒鋼やアングル材等に受枠ユニット4の定着部42を溶接等によって接合してもよい。 11 is a diagram for explaining the state of the frame installation process according to the first embodiment. In the example shown in FIG. 11, the fixing portion 42 in the frame unit 4 is joined to the fixing member 3 using a pair of nuts 6. For example, the fixing member 3 with one nut 6 screwed thereon may be passed through the joining hole 423 (see FIG. 6) formed in the fixing piece 421 in the fixing portion 42, and then the other nut 6 may be screwed to the fixing member 3 to join the fixing portion 42 in the frame unit 4 to the fixing member 3. This allows the frame body 41 in the frame unit 4 to be installed at a specified position. At that time, when joining the fixing portion 42 in the frame unit 4 to the fixing member 3, the height of the fixing portion 42 is measured and adjusted to a specified height, so that the frame unit 4 can be installed at a specified position with high precision. Note that here, an example of joining the fixing portion 42 in the frame unit 4 to the fixing member 3 using nuts 6 has been described, but this is not limited thereto. For example, the fixing portion 42 in the frame unit 4 may be joined to the fixing member 3 by welding or the like. In addition, if deformed steel bars or angle bars are used for the fixing member 3, the fixing portion 42 of the frame unit 4 may be joined to the deformed steel bars or angle bars by welding or the like.

受枠設置工程が完了すると、図3に示されるように全ての受枠ユニット4が規定位置に設置され、長手方向に隣接する受枠本体41同士が相互に連結(接合)された状態となる。その際、各受枠ユニット4は、パネル上端側保持部44(第1嵌合溝43)が溝路形成予定区域R1側に配置されるように設置される。また、各受枠本体41及び第1嵌合溝43の延在方向は、溝路形成予定区域R1及び側部コンクリート充填予定区域R2の境界方向と平行になるように配向される。 When the frame installation process is completed, all frame units 4 are installed in the specified positions as shown in Figure 3, and adjacent frame bodies 41 in the longitudinal direction are connected (joined) to each other. At this time, each frame unit 4 is installed so that the panel upper end retaining portion 44 (first fitting groove 43) is positioned on the side of the planned trench formation area R1. In addition, the extension direction of each frame body 41 and first fitting groove 43 is oriented so as to be parallel to the boundary direction between the planned trench formation area R1 and the side concrete filling area R2.

なお、本実施形態における各受枠本体41は、その長手方向における一端側に、受枠本体41同士を連結するためのジョイントピース45が設けられており、このジョイントピース45を介して受枠本体41同士を相互に接合できるように構成されている。図12は、実施形態1に係る受枠本体41の一端側に設けられるジョイントピース45を説明する図である。図12には、受枠本体41の一端側に配置されたジョイントピース45とその近傍の斜視図が示されている。 In this embodiment, each frame body 41 is provided with a joint piece 45 at one end in the longitudinal direction for connecting the frame bodies 41 together, and is configured so that the frame bodies 41 can be joined together via this joint piece 45. Figure 12 is a diagram illustrating the joint piece 45 provided at one end of the frame body 41 according to embodiment 1. Figure 12 shows a perspective view of the joint piece 45 arranged at one end of the frame body 41 and its vicinity.

ジョイントピース45は、側面視が概略L字形状を有するアングル材であり、受枠本体41の裏面側に添わせた状態で溶接等によって一体に接合されている。図12に示すように、ジョイントピース45は、受枠本体41の一端側から長尺方向外側に向かって突出し
ており、この突出領域における上面は別の受枠本体41の端部を載置する載置面45Aとして形成されている。ここで、受枠本体41の長手方向における端部のうち、ジョイントピース45が設けられている方の端部を第1端部と呼び、ジョイントピース45が設けられていない方の端部を第2端部と呼ぶ。本実施形態においては、各受枠本体41を長手方向に相互連結する際、一方の受枠本体41における第1端部と他方の受枠本体41における第2端部が突き合わされた状態で接合される。
The joint piece 45 is an angle material having a generally L-shape in a side view, and is joined to the back side of the frame body 41 by welding or the like. As shown in FIG. 12, the joint piece 45 protrudes from one end side of the frame body 41 toward the outside in the longitudinal direction, and the upper surface of this protruding area is formed as a mounting surface 45A on which the end of another frame body 41 is placed. Here, among the longitudinal ends of the frame body 41, the end on which the joint piece 45 is provided is called the first end, and the end on which the joint piece 45 is not provided is called the second end. In this embodiment, when the frame bodies 41 are interconnected in the longitudinal direction, the first end of one frame body 41 and the second end of the other frame body 41 are joined in a butted state.

これによれば、相互に連結される一方の受枠本体41における第1端部に設けられたジョイントピース45の載置面45Aに、他方の受枠本体41における第2端部を載置した状態で第1端部と第2端部を突き合わせることができ、この状態で他方の受枠本体41における第2端部にジョイントピース45を溶接等によって接合することで、容易に受枠本体41同士を一体に連結することができる。但し、受枠ユニット4の受枠本体41に設けられているジョイントピース45は必須の構成ではなく、ジョイントピース45が設けられていなくてもよい。この場合、受枠本体41の端面同士を互いに突き合せた状態で溶接等によって接合し、受枠本体41同士を相互に連結してもよい。 According to this, the second end of one of the frame bodies 41 can be placed on the mounting surface 45A of the joint piece 45 provided at the first end of one of the frame bodies 41 to be connected to each other, and the first end and the second end can be butted together. In this state, the joint piece 45 can be joined to the second end of the other frame body 41 by welding or the like, so that the frame bodies 41 can be easily connected together. However, the joint piece 45 provided on the frame body 41 of the frame unit 4 is not a required configuration, and the joint piece 45 does not have to be provided. In this case, the end faces of the frame bodies 41 can be butted together and joined by welding or the like to connect the frame bodies 41 to each other.

なお、図3に示すように、各受枠ユニット4において、受枠本体41に設置される定着部42の数は少なくとも1つ以上であればよいが、受枠本体41の形状や長さに応じてバランス良く定着部42を配置し、各定着部42を定着用部材3に接合することで支持することが好ましい。例えば、受枠本体41が平面視においてL字形状やコ字形状など、直線タイプ以外の受枠本体41には複数の定着部42を設けることが好ましく、これによって受枠本体41を安定した姿勢に固定することができる。また、図3に示すように、複数の受枠本体41が順次連結された状態において、受枠本体41の長手方向に沿った定着部42の配置間隔が概ね等間隔(例えば、500mm程度)となるように各受枠本体41に設けられる定着部42の数や位置が決定されていると好ましい。なお、各受枠本体41同士の連結端部には上記の通りジョイントピース45が配置されるため、定着部42がジョイントピース45と干渉しないように、受枠本体41の端部を除いた位置に定着部42を配置することが好ましい。 As shown in FIG. 3, the number of fixing parts 42 installed on the frame body 41 in each frame unit 4 may be at least one, but it is preferable to arrange the fixing parts 42 in a well-balanced manner according to the shape and length of the frame body 41 and support each fixing part 42 by joining it to the fixing member 3. For example, it is preferable to provide multiple fixing parts 42 on a frame body 41 other than a linear type, such as an L-shaped or U-shaped frame body 41 in a plan view, so that the frame body 41 can be fixed in a stable position. In addition, as shown in FIG. 3, it is preferable that the number and positions of the fixing parts 42 provided on each frame body 41 are determined so that the arrangement intervals of the fixing parts 42 along the longitudinal direction of the frame body 41 are approximately equal (for example, about 500 mm) when multiple frame bodies 41 are connected in sequence. As described above, the joint pieces 45 are placed at the connecting ends of each frame body 41, so it is preferable to place the fixing parts 42 at positions other than the ends of the frame body 41 so that they do not interfere with the joint pieces 45.

上記の受枠設置工程が完了すると、次に、ずれ止め部材設置工程において、側板パネル2の下端側領域2Bが溝路形成予定区域R1側にずれることを抑制するためのパネル下端側ずれ止め部材(パネル下端側保持部材5)を設置する。本実施形態においては、底部コンクリート充填予定区域R3に位置決め固定されるパネル下端側保持部材5がパネル下端側ずれ止め部材に相当する。 After the above-mentioned receiving frame installation process is completed, the next step is the installation of a slip-stop member, in which a panel bottom-side slip-stop member (panel bottom-side retaining member 5) is installed to prevent the bottom end region 2B of the side panel 2 from slipping toward the planned groove formation area R1. In this embodiment, the panel bottom-side retaining member 5, which is positioned and fixed in the bottom concrete filling area R3, corresponds to the panel bottom-side slip-stop member.

図13は、実施形態1に係るずれ止め部材設置工程の状況を説明する図である。ずれ止め部材設置工程においては、必要な数のパネル下端側保持部材5を用意し、コンクリート基盤200A上の所定の位置に各パネル下端側保持部材5を立設させる。より詳しくは、コンクリート基盤200A上において、パネル下端側保持部材5を設置する位置を位置出し後、所定の位置にパネル下端側保持部材5の台座部51を固定する。台座部51の固定は、上述の通り、固定孔51Aを通じてコンクリート釘等をコンクリート基盤200Aに打ち込むことによってなされる。 Figure 13 is a diagram illustrating the status of the slip-stop member installation process according to the first embodiment. In the slip-stop member installation process, the required number of panel lower end holding members 5 are prepared, and each panel lower end holding member 5 is erected at a predetermined position on the concrete base 200A. More specifically, after the positions for installing the panel lower end holding members 5 on the concrete base 200A are determined, the base portion 51 of the panel lower end holding member 5 is fixed at the predetermined position. The base portion 51 is fixed by driving a concrete nail or the like into the concrete base 200A through the fixing hole 51A, as described above.

図13に示すように、コンクリート基盤200A上に立設する各パネル下端側保持部材5は、溝路形成予定区域R1の下方に規定される底部コンクリート充填予定区域R3内に配設され、この状態においてパネル受部53の第2嵌合溝52は上方に向かって開口している。また、コンクリート基盤200Aに設置された各パネル下端側保持部材5は、パネル受部53の第2嵌合溝52が側部コンクリート充填予定区域R2と底部コンクリート充填予定区域R3の境界方向に沿って延在するように配向されている。後述するように、本実施形態においては、各側板パネル2は、上端側領域2Aを受枠ユニット4における第1
嵌合溝43に嵌合し、下端側領域2Bをパネル下端側保持部材5におけるパネル受部53の第2嵌合溝52に嵌合させることで規定位置に保持される。したがって、コンクリート基盤200A上に立設する各パネル下端側保持部材5は、各受枠ユニット4における受枠本体41の概略鉛直下方に配置される。なお、コンクリート基盤200A上に立設する各パネル下端側保持部材5において、パネル受部53における第2嵌合溝52の高さは上述した高さ調整機構を用いて所定の高さに調整される。
As shown in Figure 13, each panel lower end retaining member 5 erected on the concrete foundation 200A is disposed within the bottom concrete planned filling area R3 defined below the planned groove formation area R1, and in this state the second fitting groove 52 of the panel receiving portion 53 opens upward. Also, each panel lower end retaining member 5 installed on the concrete foundation 200A is oriented so that the second fitting groove 52 of the panel receiving portion 53 extends along the boundary direction between the side concrete planned filling area R2 and the bottom concrete planned filling area R3. As will be described later, in this embodiment, each side panel 2 has its upper end region 2A in contact with the first area 2A of the receiving frame unit 4.
The lower end region 2B is fitted into the fitting groove 43, and is held in a specified position by fitting the lower end region 2B into the second fitting groove 52 of the panel receiving portion 53 of the panel lower end holding member 5. Therefore, each panel lower end holding member 5 erected on the concrete foundation 200A is disposed approximately vertically below the receiving frame main body 41 of each receiving frame unit 4. Note that, in each panel lower end holding member 5 erected on the concrete foundation 200A, the height of the second fitting groove 52 in the panel receiving portion 53 is adjusted to a predetermined height using the height adjustment mechanism described above.

また、図13に示すように、各パネル下端側保持部材5におけるパネル受部53の連結用スリーブ56は、底部コンクリート充填予定区域R3の内側を向いて配置される。このようにすることで、底部コンクリート充填予定区域R3において互いに対向するパネル下端側保持部材5同士を、互いのパネル受部53における連結用スリーブ56に装着する連結棒部材55を共有することによって連結できる。勿論、連結棒部材55における幅決め部551は、構築すべき溝路100の形状、寸法に応じて予め適切な長さに調整しておくことができる。 Also, as shown in FIG. 13, the connecting sleeve 56 of the panel receiving portion 53 of each panel lower end holding member 5 is arranged facing the inside of the bottom concrete filling area R3. In this way, the panel lower end holding members 5 facing each other in the bottom concrete filling area R3 can be connected by sharing the connecting rod members 55 attached to the connecting sleeves 56 of each other's panel receiving portions 53. Of course, the width determining portion 551 of the connecting rod member 55 can be adjusted in advance to an appropriate length depending on the shape and dimensions of the trench 100 to be constructed.

本実施形態において、パネル下端側保持部材5が設置される位置や数は特に限定されないが、側部コンクリート充填予定区域R2と底部コンクリート充填予定区域R3の境界方向に沿って間隔を置いて配置されるパネル下端側保持部材5同士の間隔が過度に大きくならないようにバランス良くパネル下端側保持部材5を配置することが好ましく、例えばパネル下端側保持部材5同士の間隔を500mm程度に設定すると好適である。 In this embodiment, the positions and number of the panel bottom end retaining members 5 are not particularly limited, but it is preferable to arrange the panel bottom end retaining members 5 in a balanced manner so that the distance between the panel bottom end retaining members 5 arranged at intervals along the boundary direction between the side concrete filling area R2 and the bottom concrete filling area R3 is not excessively large. For example, it is preferable to set the distance between the panel bottom end retaining members 5 to about 500 mm.

次に、溝路100の側面101を形成するための1又は複数の側板パネル2を用意し、用意した側板パネル2をパネル設置工程において設置する。図14は、実施形態1に係るパネル設置工程の状況を説明する図である。図14に示すように、パネル設置工程においては、用意した各側板パネル2の上端側領域2Aをパネル上端側保持部44の第1嵌合溝43に嵌合し(差し込み)、下端側領域2Bをパネル下端側保持部材5におけるパネル受部53の第2嵌合溝52に嵌合させる(差し込む)ことにより、パネル上端側保持部44及びパネル下端側保持部材5によって側板パネル2を保持する。その際、本実施形態においては、側板パネル2毎に、その上端側領域2Aを少なくとも1箇所以上で保持できるようにパネル上端側保持部44を配置し、その下端側領域2Bを少なくとも1箇所以上で保持できるようにパネル下端側保持部材5を配置するようにした。これにより、各側板パネル2を規定位置へと堅固に固定できる。なお、各側板パネル2は、堰板面22を側部コンクリート充填予定区域R2側に向け、溝路側面形成面21を溝路形成予定区域R1側に向けた状態でパネル上端側保持部44及びパネル下端側保持部材5によって固定保持される。 Next, one or more side panel panels 2 for forming the side surface 101 of the groove 100 are prepared, and the prepared side panel 2 is installed in the panel installation process. FIG. 14 is a diagram for explaining the state of the panel installation process according to the first embodiment. As shown in FIG. 14, in the panel installation process, the upper end region 2A of each prepared side panel 2 is fitted (inserted) into the first fitting groove 43 of the panel upper end holding portion 44, and the lower end region 2B is fitted (inserted) into the second fitting groove 52 of the panel receiving portion 53 in the panel lower end holding member 5, thereby holding the side panel 2 by the panel upper end holding portion 44 and the panel lower end holding member 5. At that time, in this embodiment, the panel upper end holding portion 44 is arranged so that the upper end region 2A of each side panel 2 can be held at at least one place, and the panel lower end holding member 5 is arranged so that the lower end region 2B of each side panel 2 can be held at at least one place. This allows each side panel 2 to be firmly fixed to a specified position. Each side panel 2 is fixed and held by the panel upper end holding part 44 and the panel lower end holding member 5 with the dam plate surface 22 facing the side concrete filling area R2 and the channel side surface forming surface 21 facing the channel formation area R1.

なお、図14に示す符号L1は、後述するコンクリート打設工程において、側部コンクリート充填予定区域R2にフレッシュコンクリートを充填(打設)する際のコンクリート天端高さ(以下、「側部コンクリート天端高さ」という)である。また、符号L2は、底部コンクリート充填予定区域R3にフレッシュコンクリートを充填(打設)する際のコンクリート天端高さ(以下、「底部コンクリート天端高さ」という)である。各側板パネル2の設置が完了すると、図1に示す状態、すなわち施工箇所への溝路構築ユニット1の設置が完了し、側部コンクリート充填予定区域R2及び底部コンクリート充填予定区域R3にフレッシュコンクリートを充填する準備が整う。 The reference symbol L1 in FIG. 14 is the concrete top height when fresh concrete is filled (cast) in the side concrete filling area R2 in the concrete pouring process described below (hereinafter referred to as the "side concrete top height"). The reference symbol L2 is the concrete top height when fresh concrete is filled (cast) in the bottom concrete filling area R3 (hereinafter referred to as the "bottom concrete top height"). When the installation of each side panel 2 is complete, the state shown in FIG. 1 is reached, that is, the installation of the channel construction unit 1 at the construction site is complete, and the side concrete filling area R2 and the bottom concrete filling area R3 are ready to be filled with fresh concrete.

次に、コンクリート打設工程において、側部コンクリート充填予定区域R2及び底部コンクリート充填予定区域R3にフレッシュコンクリートを充填する。ここでは、側部コンクリート充填予定区域R2及び底部コンクリート充填予定区域R3に対してフレッシュコンクリートを同時充填(同時打設)する。すなわち、図14で説明したように、側部コンクリート充填予定区域R2においては側部コンクリート天端高さL1まで、底部コンクリ
ート充填予定区域R3においては底部コンクリート天端高さL2までフレッシュコンクリートを充填(打設)する。ここでいう同時充填(同時打設)は、側部コンクリート充填予定区域R2及び底部コンクリート充填予定区域R3へのコンクリート充填を厳密には同時に行う必要は無い。例えば、まず底部コンクリート充填予定区域R3に対してフレッシュコンクリートの充填を行い、これに継続(連続)して側部コンクリート充填予定区域R2に対するフレッシュコンクリートの充填を行うようにしてもよい。
Next, in the concrete pouring process, fresh concrete is filled into the side concrete filling planned area R2 and the bottom concrete filling planned area R3. Here, fresh concrete is simultaneously filled (poured) into the side concrete filling planned area R2 and the bottom concrete filling planned area R3. That is, as described in FIG. 14, fresh concrete is filled (poured) into the side concrete filling planned area R2 up to the side concrete top height L1, and into the bottom concrete filling planned area R3 up to the bottom concrete top height L2. The simultaneous filling (poured) here does not necessarily mean that the concrete filling into the side concrete filling planned area R2 and the bottom concrete filling planned area R3 is carried out strictly at the same time. For example, the bottom concrete filling planned area R3 may be filled with fresh concrete first, and then the side concrete filling planned area R2 may be filled with fresh concrete continuously (continuously).

なお、コンクリート打設工程に際しては、側部コンクリート充填予定区域R2へのフレッシュコンクリートの充填を行う直前に、各側板パネル2における堰板面22の表面を湿らして堰板面22の吸水調整を行うことが好ましい。これにより、フレッシュコンクリートの充填時において、フレッシュコンクリートに含まれる水分が側板パネル2を構成する繊維強化セメント素地に過剰に吸収され、いわゆるドライアウトの状態に至ることを抑制できる。また、受枠本体41における蓋体載置板部411の載置面411Aや立上り部413等、側部コンクリート天端高さL1よりも高い位置に配置される仕上面については、コンクリート打設工程に先立って養生テープ等を使用して養生しておくことが好ましい。これにより、上記仕上面にフレッシュコンクリートが付着することを抑制できる。そして、コンクリート打設工程においては、突き棒、棒状バイブレータ等を使用したフレッシュコンクリートの締固めや、コテ等よるコンクリート天端の表面仕上げを必要に応じて適切に行った上で、所定の養生を経てコンクリートを硬化させる。これにより、図2に示したような溝路100を構築することができる。なお、構築した溝路100の底部105には、必要に応じてレベリング材やモルタルなどを打設して水勾配を付けてもよい。 In addition, in the concrete pouring process, it is preferable to wet the surface of the dam plate surface 22 of each side panel 2 to adjust the water absorption of the dam plate surface 22 immediately before filling the side concrete-filling planned area R2 with fresh concrete. This prevents the moisture contained in the fresh concrete from being excessively absorbed by the fiber-reinforced cement base material constituting the side panel 2 during filling of the fresh concrete, leading to a so-called dry-out state. In addition, it is preferable to use a curing tape or the like to cure the finishing surfaces that are located at a position higher than the side concrete top height L1, such as the mounting surface 411A and the rising portion 413 of the lid body mounting plate portion 411 of the receiving frame main body 41. This prevents the fresh concrete from adhering to the above-mentioned finishing surfaces. In the concrete pouring process, the fresh concrete is compacted using a tamping rod, a rod-shaped vibrator, or the like, and the surface of the concrete top is finished using a trowel or the like as necessary, and the concrete is then hardened after a predetermined curing. This allows the construction of a groove 100 as shown in FIG. 2. If necessary, a leveling material or mortar may be poured into the bottom 105 of the constructed channel 100 to create a water gradient.

以上のように、本実施形態に係る溝路構築ユニット1によれば、溝路100の側面101を形成するための側板パネル2と、溝路100の側部104が形成される側部コンクリート充填予定区域R2に位置決め固定される定着用部材3と、溝路100の上部開口103を覆う蓋106体を保持するための長尺の受枠本体41と、当該受枠本体41と一体に設けられると共に定着用部材3に接合されることで受枠本体41を規定位置に固定するための定着部42と、側板パネル2の上端側領域2Aを保持可能なパネル上端側保持部44を有する、受枠ユニット4を備える。そして、上記溝路構築ユニット1を用いた溝路構築方法によれば、側部コンクリート充填予定区域R2に定着用部材3を位置決め固定し、側部コンクリート充填予定区域R2に位置決め固定された定着用部材3に受枠ユニット4における定着部42を接合することで受枠本体41を規定位置に設置することができる。そして、側板パネル2の上端側領域2Aを受枠ユニット4のパネル上端側保持部44に保持し、側板パネル2を規定位置に固定した状態で側部コンクリート充填予定区域R2にフレッシュコンクリートを充填することで、側板パネル2の堰板面22をコンクリート充填時の堰板として利用しつつ溝路100を構築することができる。 As described above, the channel construction unit 1 according to this embodiment includes a side panel 2 for forming the side surface 101 of the channel 100, an anchoring member 3 positioned and fixed to the side concrete filling area R2 where the side 104 of the channel 100 is formed, a long frame body 41 for holding a lid 106 that covers the upper opening 103 of the channel 100, an anchoring portion 42 that is integral with the frame body 41 and is joined to the anchoring member 3 to fix the frame body 41 in a specified position, and a panel upper end side holding portion 44 that can hold the upper end side area 2A of the side panel 2. According to the channel construction method using the channel construction unit 1, the anchoring member 3 is positioned and fixed to the side concrete filling area R2, and the anchoring portion 42 in the frame unit 4 is joined to the anchoring member 3 positioned and fixed to the side concrete filling area R2, so that the frame body 41 can be installed in a specified position. Then, the upper end region 2A of the side panel 2 is held by the panel upper end holding portion 44 of the frame unit 4, and fresh concrete is filled into the side concrete filling area R2 with the side panel 2 fixed in the specified position, thereby constructing the channel 100 while using the dam surface 22 of the side panel 2 as a dam when filling the concrete.

そして、溝路構築ユニット1の側板パネル2は、溝路100の構築後においては溝路100の側面101を形成するため、側部コンクリート充填予定区域R2に充填したコンクリートが硬化した後に、その硬化コンクリートから側板パネル2を取り外す必要が無い。上述した側板パネル2の固定構造によれば、型枠支保工を使用せずに溝路100を構築することができる。これらによれば、溝路100を構築する際の作業性に優れ、また、作業工程を簡略化することが可能である。その結果、溝路100を構築するために要する労力・時間・コストを削減することができる。更に、本実施形態においては、いわゆるセパレータを用いて側板パネル2を固定する必要が無いため、いわゆる型枠大工以外の作業員でも簡易に溝路100を施工することができる。但し、付加的に、或いはパネル下端側保持部材5に代えてセパレータを用いて側板パネル2同士を固定することが阻害されるものではない。 The side panel 2 of the channel construction unit 1 forms the side surface 101 of the channel 100 after the channel 100 is constructed, so that after the concrete filled in the side concrete filling area R2 hardens, there is no need to remove the side panel 2 from the hardened concrete. According to the fixing structure of the side panel 2 described above, the channel 100 can be constructed without using formwork supports. As a result, the workability when constructing the channel 100 is excellent, and the work process can be simplified. As a result, the labor, time, and cost required to construct the channel 100 can be reduced. Furthermore, in this embodiment, since there is no need to fix the side panel 2 using a so-called separator, even workers other than so-called formwork carpenters can easily construct the channel 100. However, this does not prevent the side panel 2 from being fixed to each other using a separator in addition to or instead of the panel lower end side retaining member 5.

また、本実施形態に係る溝路構築ユニット1は、更に、側板パネル2の下端側領域2B
が溝路形成予定区域R1側にずれることを抑制するパネル下端側ずれ止め部材としてのパネル下端側保持部材5を備え、少なくともコンクリート打設工程に先行してパネル下端側保持部材5を設置するようにした。これによれば、側部コンクリート充填予定区域R2へのフレッシュコンクリートの充填時に堰板を兼ねる側板パネル2をより一層堅固に保持することができるため、施工品質を向上させることができる。
In addition, the channel construction unit 1 according to this embodiment further includes a lower end region 2B of the side panel 2.
The panel lower end holding member 5 is provided as a panel lower end side slip prevention member that prevents the side panel 2 from slipping toward the groove formation planned area R1, and the panel lower end holding member 5 is installed at least prior to the concrete pouring process. This allows the side panel panel 2, which also serves as a dam plate, to be held even more firmly when fresh concrete is filled into the side concrete filling planned area R2, improving the construction quality.

特に、パネル下端側保持部材5は、溝路形成予定区域R1の下方に位置する底部コンクリート充填予定区域R3に位置決め固定され、側板パネル2の下端側領域2Bを保持する構造を採用するようにした。このようなパネル下端側保持部材5によれば、受枠ユニット4側のパネル上端側保持部44と協働して側板パネル2の上端側領域2A及び下端側領域2Bの双方を保持することができる。そのため、コンクリート打設時に側板パネル2に大きな側圧が作用しても安定して側板パネル2を規定位置に保持することができる。 In particular, the panel lower end holding member 5 is positioned and fixed in the bottom concrete filling planned area R3 located below the planned groove formation area R1, and is structured to hold the lower end area 2B of the side panel 2. Such a panel lower end holding member 5 can cooperate with the panel upper end holding portion 44 on the receiving frame unit 4 side to hold both the upper end area 2A and the lower end area 2B of the side panel 2. Therefore, even if a large lateral pressure acts on the side panel 2 when pouring concrete, the side panel 2 can be stably held in the specified position.

更に、受枠ユニット4側のパネル上端側保持部44として、第1嵌合溝に嵌合された側板パネル2の上端側領域2Aを把持する構造を採用し、パネル下端側保持部材5として第2嵌合溝に嵌合された側板パネル2の下端側領域2Bを把持する構造を採用したので、側板パネル2を設置する際の作業性が非常に優れたものとなる。 Furthermore, the panel upper end holding portion 44 on the receiving frame unit 4 side is structured to hold the upper end region 2A of the side panel 2 fitted into the first fitting groove, and the panel lower end holding member 5 is structured to hold the lower end region 2B of the side panel 2 fitted into the second fitting groove, making the workability when installing the side panel 2 extremely excellent.

また、本実施形態に係る溝路構築方法では、側部コンクリート充填予定区域R2及び底部コンクリート充填予定区域R3に対して、フレッシュコンクリートを同時充填するようにしたので、溝路100の底部105と側部104を同時期に構築することができ、施工に要する施工期間の短縮に資することができる。 In addition, in the trench construction method according to this embodiment, fresh concrete is simultaneously filled into the side concrete filling area R2 and the bottom concrete filling area R3, so that the bottom 105 and side 104 of the trench 100 can be constructed at the same time, which helps to shorten the construction period required for construction.

また、本実施形態においては、底部コンクリート充填予定区域R3にコンクリート打設を行う際の底部コンクリート天端高さL2が、パネル下端側保持部材5によって保持されている側板パネル2の下端面2Cよりも相対的に高い位置に設定されている。これによれば、コンクリート打設工程において、パネル下端側保持部材5によって保持されている側板パネル2の下端面2Cがフレッシュコンクリートに埋設されるように底部コンクリート充填予定区域R3にフレッシュコンクリートを充填することができる。このようにすれば、底部コンクリート充填予定区域R3から側部コンクリート充填予定区域R2へと順次、フレッシュコンクリートを打ち上げてゆく際、底部コンクリート充填予定区域R3に充填されたフレッシュコンクリートに側板パネル2の下端面2Cが少なくとも埋没しているため、側部コンクリート充填予定区域R2に充填したフレッシュコンクリートが底部コンクリート充填予定区域R3側に漏出することを抑制できる。そのため、側部コンクリート充填予定区域R2から底部コンクリート充填予定区域R3側に漏出したコンクリートが硬化した後、溝路100における所期の入隅形状と比較して余分な余剰形状部位が形成されてしまうことを抑制できる。したがって、当該余剰形状部位を削り取る作業(斫り作業)やそれに付随する補修作業が発生することを未然に防ぐことができ、溝路100を構築するために要する労力・時間・コストを削減できる。 In addition, in this embodiment, the bottom concrete top height L2 when pouring concrete in the bottom concrete filling planned area R3 is set to a position relatively higher than the lower end surface 2C of the side panel 2 held by the panel lower end side holding member 5. According to this, in the concrete pouring process, fresh concrete can be filled in the bottom concrete filling planned area R3 so that the lower end surface 2C of the side panel 2 held by the panel lower end side holding member 5 is buried in the fresh concrete. In this way, when fresh concrete is poured sequentially from the bottom concrete filling planned area R3 to the side concrete filling planned area R2, the lower end surface 2C of the side panel 2 is at least buried in the fresh concrete filled in the bottom concrete filling planned area R3, so that the fresh concrete filled in the side concrete filling planned area R2 can be prevented from leaking to the bottom concrete filling planned area R3 side. Therefore, after the concrete leaked from the side concrete filling planned area R2 to the bottom concrete filling planned area R3 side hardens, it is possible to prevent the formation of an excess shape portion compared to the intended inside corner shape in the groove 100. This prevents the need to scrape off the excess shaping (chip-off work) and the associated repair work, reducing the labor, time, and cost required to construct the channel 100.

更に、上記の底部コンクリート天端高さL2は、底部コンクリート充填予定区域R3に位置決め固定されているパネル下端側保持部材5の上端(より詳しくはパネル受部53の上端)よりも相対的に高い位置に設定されていてもよい。これによれば、コンクリート打設工程において、側板パネル2の下端側領域2Bを保持しているパネル下端側保持部材5の全体をコンクリート内に埋没させることができる。これにより、溝路100の構築後において、溝路100内にパネル受部53の一部が露出した状態で存置されることを抑制できる。したがって、溝路100の構築、溝路100内に露出するパネル受部53の一部を削り取る作業(斫り作業)やそれに付随する補修作業が発生することを未然に防ぐことができ、溝路100を構築するために要する労力・時間・コストを削減できる。 Furthermore, the bottom concrete top height L2 may be set at a position relatively higher than the upper end of the panel lower end holding member 5 (more specifically, the upper end of the panel receiving portion 53) that is positioned and fixed in the bottom concrete filling area R3. This allows the entire panel lower end holding member 5 that holds the lower end region 2B of the side panel 2 to be buried in the concrete during the concrete pouring process. This prevents a portion of the panel receiving portion 53 from being left exposed in the groove 100 after the groove 100 is constructed. This prevents the construction of the groove 100, the work of scraping off a portion of the panel receiving portion 53 exposed in the groove 100 (chip-off work), and the associated repair work from occurring, thereby reducing the labor, time, and cost required to construct the groove 100.

<変形例>
ここで、上記実施形態の変形例について説明する。上記実施形態においては、定着用部材3をコンクリート基盤200Aに定着させる例について説明したが、この構成に代えて、コンクリート基盤200A上に配筋された鉄筋や側部コンクリート充填予定区域R2に配置された鉄骨などの鉄部材に定着用部材3が溶接されていてもよいし、上記鉄筋や鉄骨などに対して連結金具を介して連結されていてもよい。また、パネル下端側保持部材5についても同様に、コンクリート基盤200A上に配筋された鉄筋や側部コンクリート充填予定区域R2に配置された鉄骨などの鉄部材に対して、パネル下端側保持部材5の軸部54を溶接、或いは連結金具を介して固定することで設置してもよい。このような連結金具としては、例えば、岡部株式会社から販売されている商品名「セパグリップ」、共栄製作所株式会社から販売されている商品名「エスケーユニバ」および「ドマスター」、日本仮設株式会社から販売されている商品名「テツカブト(ナット付)」、株式会社国元商会から販売されている商品名「KSガッツ」、乾産業株式会社から販売されている商品名「セパジメ」、コンドーテック株式会社から販売されている商品名「ワイヤクリップ KMクリップ」等が例示できる。
<Modification>
Here, a modified example of the above embodiment will be described. In the above embodiment, an example in which the fixing member 3 is fixed to the concrete base 200A has been described, but instead of this configuration, the fixing member 3 may be welded to a steel member such as a reinforcing bar arranged on the concrete base 200A or a steel frame arranged in the side concrete filling planned area R2, or may be connected to the reinforcing bar or steel frame via a connecting metal fitting. Similarly, the panel lower end side holding member 5 may be installed by welding the shaft portion 54 of the panel lower end side holding member 5 to a steel member such as a reinforcing bar arranged on the concrete base 200A or a steel frame arranged in the side concrete filling planned area R2, or by fixing the shaft portion 54 via a connecting metal fitting. Examples of such connecting fittings include "Sepa Grip" sold by Okabe Co., Ltd., "SK Univa" and "Domaster" sold by Kyoei Seisakusho Co., Ltd., "Tetsukabuto (with nut)" sold by Nippon Temporary Construction Co., Ltd., "KS Guts" sold by Kunimoto Shokai Co., Ltd., "Sepajime" sold by Inui Sangyo Co., Ltd., and "Wire Clip KM Clip" sold by Kondotec Co., Ltd.

また、溝路100を構築するコンクリートを支持する下地200がコンクリート基盤200Aではなく、デッキプレート等といった鋼板製下地の場合には、寸切ボルトや鉄筋棒などの定着用部材3を溶接によって鋼板製下地に固定してもよい。また、デッキプレート用の吊り金具を介してデッキプレート下地にパネル下端側保持部材5を固定してもよい。また、パネル下端側保持部材5についても同様に、下地200がデッキプレート等といった鋼板製下地の場合には、パネル下端側保持部材5の軸部54を溶接によって鋼板製下地に固定しても良く、また、デッキプレート用の吊り金具を介してパネル下端側保持部材5の軸部54をデッキプレート下地に固定してもよい。 In addition, when the base 200 supporting the concrete that constructs the channel 100 is not a concrete base 200A but a steel base such as a deck plate, the fixing members 3 such as cut bolts and reinforcing bars may be fixed to the steel base by welding. Also, the panel lower end holding member 5 may be fixed to the deck plate base via a hanging bracket for the deck plate. Similarly, when the base 200 is a steel base such as a deck plate, the shaft 54 of the panel lower end holding member 5 may be fixed to the steel base by welding, or the shaft 54 of the panel lower end holding member 5 may be fixed to the deck plate base via a hanging bracket for the deck plate.

また、上述した溝路構築方法に係る各工程は、可能な限りその順序を入れ替えることができ、また一部の工程を省略したり、別の工程を付加することができる。例えば、本実施形態に係る溝路構築方法は、上記受枠設置工程に先行してずれ止め部材設置工程を行ってもよい。また、受枠設置工程に後続して各側板パネル2の上端側領域2Aを受枠ユニット4における第1嵌合溝43に嵌合させた後、コンクリート基盤200A上に各パネル下端側保持部材5を設置すると共に各側板パネル2の下端側領域2Bを各パネル下端側保持部材5の第2嵌合溝52に嵌合させてもよい。 The order of each step in the above-mentioned channel construction method can be changed as much as possible, some steps can be omitted, and other steps can be added. For example, the channel construction method according to this embodiment may perform a slip-stop member installation step prior to the frame installation step. After the frame installation step, the upper end region 2A of each side panel 2 may be fitted into the first fitting groove 43 in the frame unit 4, and then the panel lower end holding member 5 may be installed on the concrete base 200A, and the lower end region 2B of each side panel 2 may be fitted into the second fitting groove 52 of the panel lower end holding member 5.

また、コンクリート打設工程に先立って、対向する受枠本体41同士の間に幅止め材を必要に応じて架設し、対向する受枠本体41同士を相互連結してもよい。図15は、幅止め材8を説明する図である。幅止め材8は、例えば、対向する受枠本体41A,41B間に架設可能な長さを有する短冊形状の鋼板であり、対向する受枠本体41A,41B間に渡って架設されている。また、幅止め材8は、一方の端部8Aが受枠本体41Aに溶接され、他方の端部8Bが受枠本体41Bに溶接されており、これによって対向する受枠本体41A,41B同士が幅止め材8を介して連結されている。なお、幅止め材8の形状は特に限定されず、例えば金属製のアングル材であってもよいし、適宜の形状を有する形鋼や鉄筋棒鋼であってもよい。また、幅止め材8の端部8A,8Bが受枠本体41A,41Bに溶接される部位は特定の箇所に限定されないが、受枠本体41A,41Bの蓋体載置板部411における載置面411Aや立上り部413などに端部8A,8Bを溶接してもよい。このような幅止め材8を付加的に適用することで、コンクリート打設時のコンクリート圧力、振動、衝撃などに起因して受枠本体41A,41Bが規定位置からずれることを、より好適に抑制することができる。勿論、上記幅止め材8は後述する実施形態2に対しても適用できる。 In addition, prior to the concrete pouring process, a width stopper may be installed between the opposing frame bodies 41 as necessary to connect the opposing frame bodies 41 to each other. FIG. 15 is a diagram illustrating the width stopper 8. The width stopper 8 is, for example, a rectangular steel plate having a length that can be installed between the opposing frame bodies 41A and 41B, and is installed across the opposing frame bodies 41A and 41B. In addition, one end 8A of the width stopper 8 is welded to the frame body 41A, and the other end 8B is welded to the frame body 41B, thereby connecting the opposing frame bodies 41A and 41B to each other via the width stopper 8. The shape of the width stopper 8 is not particularly limited, and may be, for example, a metal angle bar, or a shaped steel or reinforcing bar having an appropriate shape. In addition, the ends 8A, 8B of the width stopper 8 are welded to the frame bodies 41A, 41B at locations that are not limited to specific locations, but the ends 8A, 8B may be welded to the mounting surface 411A or the rising portion 413 of the lid mounting plate portion 411 of the frame bodies 41A, 41B. By additionally applying such width stopper 8, it is possible to more effectively prevent the frame bodies 41A, 41B from shifting from their specified positions due to concrete pressure, vibration, impact, etc., during concrete pouring. Of course, the width stopper 8 can also be applied to the second embodiment described below.

図16~図25は、実施形態1の変形例に係る溝路構築ユニット1を説明する図である
。図16は、実施形態1の変形例に係る溝路構築ユニット1の平面配置例を示す図である。図17は、図16のF-F矢視方向から溝路構築ユニット1を眺めた状態を模式的に示す図である。本変形例において、上述までの溝路構築ユニット1と共通する構成については同一の符号を付すことにより詳細な説明を割愛する。また、本変形例の説明においても、下地200上に配筋される建築構造用鉄筋の図示を省略する。
16 to 25 are diagrams illustrating a channel construction unit 1 according to a modified example of embodiment 1. FIG. 16 is a diagram illustrating an example of a planar arrangement of a channel construction unit 1 according to a modified example of embodiment 1. FIG. 17 is a diagram illustrating the channel construction unit 1 as viewed from the F-F arrow direction in FIG. 16. In this modified example, the same reference numerals are used to designate components common to the channel construction unit 1 described above, and detailed descriptions thereof will be omitted. Also, in the description of this modified example, illustrations of architectural structural reinforcing bars arranged on the base 200 will be omitted.

図16に示す符号Pは、図3と同様、複数の受枠本体41(受枠ユニット4)が相互に連結される連結箇所を示す。図16に示す例では、一対のコの字形状を有する受枠ユニット4(受枠本体41)が連結部材9を介して環状に連結されている。勿論、溝路構築ユニット1に含まれる受枠本体41(受枠ユニット4)の数、形状、大きさなどは特に限定さされない。 As in FIG. 3, the symbol P in FIG. 16 indicates the connection points where multiple frame bodies 41 (frame units 4) are interconnected. In the example shown in FIG. 16, a pair of U-shaped frame units 4 (frame bodies 41) are connected in an annular shape via a connecting member 9. Of course, the number, shape, size, etc. of the frame bodies 41 (frame units 4) included in the groove construction unit 1 are not particularly limited.

図17に示すように、本変形例においても、各受枠ユニット4におけるパネル上端側保持部44(第1嵌合溝43)に側板パネル2の上端側領域2Aが嵌合されることで当該上端側領域2Aが保持される構成となっている。本変形例に係る溝路構築ユニット1は、上述したパネル下端側保持部材5に代えてパネル下端側保持部材10を有しており、当該パネル下端側保持部材10によって側板パネル2の下端側領域2Bを保持している。 As shown in FIG. 17, in this modified example, the upper end region 2A of the side panel 2 is held by fitting the upper end region 2A into the panel upper end holding portion 44 (first fitting groove 43) of each receiving frame unit 4. The groove path construction unit 1 in this modified example has a lower end panel holding member 10 instead of the lower end panel holding member 5 described above, and the lower end region 2B of the side panel 2 is held by the lower end panel holding member 10.

図18は、図16に示すG-G位置における受枠ユニット4の横断面図である。本変形例における受枠ユニット4は、図3で説明したい態様と形状が若干異なっているが基本構造は同様であり、蓋体106を保持するための長尺の受枠本体41、当該受枠本体41と一体に設けられると共に定着用部材3に接合されることで受枠本体41を規定位置に固定するための定着部42、側板パネル2の上端側領域2Aを保持可能なパネル上端側保持部44等を含んで構成されている。受枠本体41や定着部42は、例えば、ステンレス鋼板等を板金加工することによって形成してもよい。 Figure 18 is a cross-sectional view of the frame unit 4 at position G-G shown in Figure 16. The frame unit 4 in this modified example has a slightly different shape from the embodiment described in Figure 3, but has the same basic structure, and is composed of a long frame body 41 for holding the lid body 106, a fixing portion 42 that is integral with the frame body 41 and is joined to the fixing member 3 to fix the frame body 41 in a specified position, and a panel upper end holding portion 44 that can hold the upper end region 2A of the side panel 2. The frame body 41 and the fixing portion 42 may be formed, for example, by sheet metal processing of a stainless steel plate or the like.

図19は、実施形態1の変形例に係る受枠ユニット4における定着部42を示す図である。図19において、(a)は定着部42の側面図、(b)は定着部42の平面図(矢視H)である。なお、図19に示す定着部42は、受枠本体41に接合される前の状態を示している。 Figure 19 is a diagram showing the fixing portion 42 in the frame unit 4 according to a modified example of embodiment 1. In Figure 19, (a) is a side view of the fixing portion 42, and (b) is a plan view (arrow H) of the fixing portion 42. Note that the fixing portion 42 shown in Figure 19 shows the state before it is joined to the frame main body 41.

図19に示すように、受枠ユニット4における定着部42は、ベース部420と、ベース部420の一方側に連設される固定片421と、ベース部420の他方側に連設される第2挟持片422等を含んで構成されている。ベース部420は、当該ベース部420に連設される固定片421や第2挟持片422に比べて左右の幅方向に張り出した一対の接合片420A,420Aを有している。ベース部420は、受枠本体41の蓋体載置板部411における下面411Dに添わせた状態で当該蓋体載置板部411に接合される。例えば、ベース部420は、一対の接合片420A,420Aを受枠本体41の蓋体載置板部411にスポット溶接することで蓋体載置板部411に接合されてもよい。本変形例においては、ベース部420における接合片420A,420Aが左右幅方向に張り出した態様となっているため、スポット溶接機の電極部が受枠本体41や定着部42における他の部位に接触することを容易に回避することができ、作業性に優れている。 19, the fixing portion 42 in the receiving frame unit 4 includes a base portion 420, a fixed piece 421 connected to one side of the base portion 420, and a second clamping piece 422 connected to the other side of the base portion 420. The base portion 420 has a pair of joint pieces 420A, 420A that protrude in the left and right width direction compared to the fixed piece 421 and the second clamping piece 422 connected to the base portion 420. The base portion 420 is joined to the lid body mounting plate portion 411 in a state where it is placed against the lower surface 411D of the lid body mounting plate portion 411 of the receiving frame main body 41. For example, the base portion 420 may be joined to the lid body mounting plate portion 411 by spot welding the pair of joint pieces 420A, 420A to the lid body mounting plate portion 411 of the receiving frame main body 41. In this modified example, the joint pieces 420A, 420A on the base portion 420 protrude in the left and right width directions, so the electrode portion of the spot welding machine can be easily prevented from coming into contact with the receiving frame body 41 or other parts of the fixing portion 42, providing excellent workability.

固定片421は、側面視で概略L字形状を有しており、定着部42を定着用部材3と接合するための接合孔423が設けられている。また、定着部42における第2挟持片422は、側面視において概略V字形状を有している。 The fixing piece 421 has a generally L-shape in side view, and is provided with a joining hole 423 for joining the fixing part 42 to the fixing member 3. The second clamping piece 422 in the fixing part 42 has a generally V-shape in side view.

上記のように構成された本変形例に係る受枠ユニット4においても、受枠本体41の蓋体載置板部411における第1挟持片412と、定着部42における第2挟持片422が間隔をおいて対向配置されており、これらの間に第1嵌合溝43が形成されている。第1
嵌合溝43は、一方向に延伸すると共に下方に向かって開口する細溝として形成されており、受枠本体41の長尺方向と平行に延在している。なお、本変形例において、受枠ユニット4のパネル上端側保持部44は、第2挟持片422の下端に比べて第1挟持片412の下端が上方の位置に配置されているため、側板パネル2の上端側領域2Aを第1嵌合溝43に嵌合させて取り付けやすい構造となっている。
In the receiving frame unit 4 according to this modified example configured as described above, the first clamping piece 412 in the lid body mounting plate portion 411 of the receiving frame main body 41 and the second clamping piece 422 in the fixing portion 42 are disposed opposite to each other with a gap therebetween, and a first fitting groove 43 is formed between them.
The fitting groove 43 is formed as a narrow groove that extends in one direction and opens downward, and extends parallel to the longitudinal direction of the receiving frame main body 41. In this modified example, the panel upper end holding portion 44 of the receiving frame unit 4 is arranged such that the lower end of the first clamping piece 412 is located higher than the lower end of the second clamping piece 422, so that the upper end region 2A of the side panel 2 can be easily fitted into the first fitting groove 43 for installation.

次に、隣接する受枠ユニット4(受枠本体41)同士を連結する連結部材9について説明する。図20は、実施形態1の変形例に係る連結部材9を介して受枠本体41の端部領域同士が連結された連結部を上方から眺めた図である。図21は、実施形態1の変形例に係る受枠本体41の連結部を正面から眺めた図(矢視I)、図22は、実施形態1の変形例に係る受枠本体41の連結部を側方から眺めた図(矢視J)である。なお、本変形例に
おいて、受枠本体41の端部領域には上述したジョイントピース45は設けられていない。
Next, the connecting member 9 that connects adjacent receiving frame units 4 (receiving frame main body 41) will be described. Figure 20 is a view of the connecting portion in which the end regions of the receiving frame main body 41 are connected to each other via the connecting member 9 according to a modification of embodiment 1, viewed from above. Figure 21 is a view (arrow I) of the connecting portion of the receiving frame main body 41 according to a modification of embodiment 1 viewed from the front, and Figure 22 is a view (arrow J) of the connecting portion of the receiving frame main body 41 according to a modification of embodiment 1 viewed from the side. In this modification, the above-mentioned joint piece 45 is not provided in the end region of the receiving frame main body 41.

連結部材9は、受枠本体41の各端部領域に接合されたブラケット91、相互に連結される受枠本体41の端部に設けられたブラケット91同士に跨ってこれらを連結するためのジョイントピース92、ねじ93等を含んで構成されている。 The connecting member 9 includes brackets 91 joined to each end region of the frame body 41, joint pieces 92 for connecting the brackets 91 provided at the ends of the frame body 41 that are connected to each other, screws 93, etc.

図23は、実施形態1の変形例に係るジョイントピース92によって連結される前のブラケット91を説明する図である。ブラケット91は、受枠本体41の各端部領域に設けられており、図23に示す例では矩形状を有する平鋼板によって構成されている。図23に示すように、ブラケット91は、受枠本体41の端部領域において、その上面を蓋体載置板部411の下面411Dに添わせた状態で溶接などによって接合されている。また、ブラケット91は、蓋体載置板部411から受枠本体41の背面側に向かって張り出しており、その張出し領域911にジョイントピース92が載置されるように構成されている。また、図23に示す符号911Aは、張出し領域911を貫通して設けられた固定孔である。本変形例において、固定孔911Aの内壁面には、ねじ93を螺着可能なねじ溝が形成されている。 23 is a diagram illustrating a bracket 91 before being connected by a joint piece 92 according to a modified example of the first embodiment. The bracket 91 is provided at each end region of the receiving frame body 41, and in the example shown in FIG. 23, is made of a flat steel plate having a rectangular shape. As shown in FIG. 23, the bracket 91 is joined by welding or the like in the end region of the receiving frame body 41 with its upper surface aligned with the lower surface 411D of the lid body mounting plate portion 411. The bracket 91 also protrudes from the lid body mounting plate portion 411 toward the back side of the receiving frame body 41, and is configured so that the joint piece 92 is placed on the protruding region 911. Also, the reference numeral 911A shown in FIG. 23 is a fixing hole provided through the protruding region 911. In this modified example, a thread groove into which the screw 93 can be screwed is formed on the inner wall surface of the fixing hole 911A.

ジョイントピース92は、連結すべき一対の受枠本体41の端部領域に配置された一対のブラケット91における張出し領域911に跨るようにして配置可能な形状および大きさを有しており、図23に示す例では矩形状を有する平鋼板によって構成されている。ジョイントピース92には、一対のねじ挿通孔92Aが形成されている。例えば、ねじ挿通孔92Aは、ねじ93の軸部よりも大きな直径を有しており、ねじ93の軸部を遊嵌することができる。また、ジョイントピース92は、一対のブラケット91における張出し領域911の上面に跨って配置した際に、一対のねじ挿通孔92Aが各張出し領域911における固定孔911Aと平面位置が一致するようになっている。 The joint piece 92 has a shape and size that allows it to be placed across the overhanging regions 911 of a pair of brackets 91 that are arranged in the end regions of a pair of frame bodies 41 to be connected, and in the example shown in FIG. 23, it is made of a rectangular flat steel plate. A pair of screw insertion holes 92A are formed in the joint piece 92. For example, the screw insertion holes 92A have a diameter larger than the shaft portion of the screw 93, and the shaft portion of the screw 93 can be loosely fitted into the screw insertion holes 92A. In addition, when the joint piece 92 is placed across the upper surfaces of the overhanging regions 911 of the pair of brackets 91, the pair of screw insertion holes 92A are arranged so that the planar positions of the pair of screw insertion holes 92A coincide with the fixing holes 911A in each overhanging region 911.

上記のように構成された連結部材9を用いて受枠本体41同士を連結(接合)する際には、互いに連結すべき一対の受枠本体41のブラケット91同士を図23に示すように突き合せ、その状態から一対のブラケット91における張出し領域911の上面に跨るようにしてジョイントピース92を載置する。そして、ジョイントピース92のねじ挿通孔92Aにねじ93を挿通させた状態で、一対のブラケット91における各固定孔911Aにねじ93を螺着し、固定する。これにより、連結部材9を用いて受枠本体41同士を連結することができる。 When connecting (joining) the frame bodies 41 together using the connecting member 9 configured as described above, the brackets 91 of the pair of frame bodies 41 to be connected to each other are butted together as shown in FIG. 23, and in this state, the joint piece 92 is placed so as to straddle the upper surfaces of the protruding regions 911 of the pair of brackets 91. Then, with the screws 93 inserted into the screw insertion holes 92A of the joint piece 92, the screws 93 are screwed into the fixing holes 911A of the pair of brackets 91 and fixed. In this way, the frame bodies 41 can be connected to each other using the connecting member 9.

次に、パネル下端側保持部材10について説明する。図24は、実施形態1の変形例に係る一般用パネル下端側保持部材10Aを説明する図である。図25は、実施形態1の変形例に係るエンド用パネル下端側保持部材10Bを説明する図である。(a)は平面図、(b)は側面図、(c)は端面図である。一般用パネル下端側保持部材10Aおよびエン
ド用パネル下端側保持部材10Bは、例えば、鋼板等を板金加工することによって形成することができる。
Next, the panel lower end holding member 10 will be described. Fig. 24 is a diagram for explaining a general-use panel lower end holding member 10A according to a modified example of the first embodiment. Fig. 25 is a diagram for explaining an end panel lower end holding member 10B according to a modified example of the first embodiment. (a) is a plan view, (b) is a side view, and (c) is an end view. The general-use panel lower end holding member 10A and the end panel lower end holding member 10B can be formed, for example, by sheet metal processing of a steel plate or the like.

まず、一般用パネル下端側保持部材10Aおよびエンド用パネル下端側保持部材10Bは矩形平面形状を有し、長手方向に沿って延在する一対のベース部11と、当該一対のベース部11の間に配置されると共に長手方向に延在する隆起部12を備える。ベース部11は矩形状の平坦な平板プレートである。隆起部12は、各ベース部11から立ち上がる一対の立上部121と、各立上部121の上端同士を接続する頂壁部122を有している。 First, the general-use panel lower end holding member 10A and the end-use panel lower end holding member 10B have a rectangular planar shape and include a pair of base portions 11 extending along the longitudinal direction, and a raised portion 12 disposed between the pair of base portions 11 and extending along the longitudinal direction. The base portion 11 is a rectangular, flat plate. The raised portion 12 has a pair of rising portions 121 rising from each base portion 11, and a top wall portion 122 connecting the upper ends of the rising portions 121.

一般用パネル下端側保持部材10Aは、隆起部12の両端側にそれぞれ第1固定用孔13が形成されている。各第1固定用孔13は、定着用部材3を挿通可能な大きさを有している。また、図24に示すように、隆起部12のうち、一対の第1固定用孔13の内側にはそれぞれ保持溝14が形成されている。保持溝14は、側板パネル2の下端側領域2Bを保持するための溝であり、隆起部12の一部を切り欠くことで形成されると共に一般用パネル下端側保持部材10A(隆起部12)の幅方向に沿って延在している。保持溝14の幅は、側板パネル2における下端側領域2Bの厚さと等しいか、僅かに大きな寸法に形成されており、当該下端側領域2Bをがたつくことなく保持できるように構成されている。また、図24に示す符号15は、各ベース部11の長手方向に間隔おいて形成された第2固定用孔である。第2固定用孔15は、各ベース部11を厚さ方向に貫通するように形成されている。以上のように構成される一般用パネル下端側保持部材10Aは、第1固定用孔13および第2固定用孔15を選択的に用いて、或いは併用することによって、取り付け対象に対して固定することができる。 The general-use panel lower end holding member 10A has first fixing holes 13 formed on both ends of the raised portion 12. Each first fixing hole 13 has a size that allows the fixing member 3 to be inserted therethrough. In addition, as shown in FIG. 24, a holding groove 14 is formed on the inside of each pair of first fixing holes 13 in the raised portion 12. The holding groove 14 is a groove for holding the lower end region 2B of the side panel 2, and is formed by cutting out a part of the raised portion 12 and extends along the width direction of the general-use panel lower end holding member 10A (raised portion 12). The width of the holding groove 14 is formed to be equal to or slightly larger than the thickness of the lower end region 2B of the side panel 2, and is configured to hold the lower end region 2B without rattling. Also, the reference numeral 15 shown in FIG. 24 denotes second fixing holes formed at intervals in the longitudinal direction of each base portion 11. The second fixing holes 15 are formed so as to penetrate each base portion 11 in the thickness direction. The general-purpose panel lower end side holding member 10A configured as described above can be fixed to the mounting object by selectively using the first fixing holes 13 and the second fixing holes 15 or by using them together.

一方、エンド用パネル下端側保持部材10Bは、隆起部12における一端側に単一の第1固定用孔13が形成されており、隆起部12における他端側に単一の保持溝14を有している。エンド用パネル下端側保持部材10Bにおいても、保持溝14は、エンド用パネル下端側保持部材10B(隆起部12)の幅方向に沿って延在している。エンド用パネル下端側保持部材10Bに各ベース部11においても、複数の第2固定用孔15がベース部11の長手方向に間隔を置いて形成されている。以上のように構成されるエンド用パネル下端側保持部材10Bは、第1固定用孔13および第2固定用孔15を選択的に用いて、或いは併用することによって、取り付け対象に対して固定することができる。 On the other hand, the end panel lower end holding member 10B has a single first fixing hole 13 formed at one end side of the raised portion 12 and a single holding groove 14 at the other end side of the raised portion 12. In the end panel lower end holding member 10B, the holding groove 14 also extends along the width direction of the end panel lower end holding member 10B (raised portion 12). In each base portion 11 of the end panel lower end holding member 10B, multiple second fixing holes 15 are also formed at intervals in the longitudinal direction of the base portion 11. The end panel lower end holding member 10B configured as described above can be fixed to the attachment object by selectively using the first fixing hole 13 and the second fixing hole 15 or by using them together.

上記のように構成される実施形態1の変形例に係る溝路構築ユニット1は、各側板パネル2の上端側領域2Aを受枠ユニット4におけるパネル上端側保持部44によって保持し、各側板パネル2の下端側領域2Bをパネル下端側保持部材10(一般用パネル下端側保持部材10A、エンド用パネル下端側保持部材10B)における保持溝14によって保持することで、各側板パネル2を規定位置に固定することができる。 The groove construction unit 1 according to the modified example of embodiment 1 configured as described above holds the upper end region 2A of each side panel 2 by the panel upper end holding portion 44 in the receiving frame unit 4, and holds the lower end region 2B of each side panel 2 by the holding groove 14 in the panel lower end holding member 10 (general panel lower end holding member 10A, end panel lower end holding member 10B), thereby fixing each side panel 2 in a specified position.

本変形例に係る溝路構築ユニット1を用いた溝路100の構築方法(施工方法)は、図26に示すように、下地200に定着された定着用部材3(寸切ボルト)に、ナット6A、6を用いてパネル下端側保持部材10、受枠ユニット4をそれぞれ定着用部材3に接合する。定着用部材3(寸切ボルト)に対する受枠ユニット4の接合方法は既述の通りである。また、パネル下端側保持部材10は、底部コンクリート充填予定区域R3に設置される。 As shown in FIG. 26, the construction method (construction method) of the channel 100 using the channel construction unit 1 according to this modified example is to join the panel lower end retaining member 10 and the frame unit 4 to the fixing member 3 (cut bolt) fixed to the base 200 using nuts 6A and 6. The method of joining the frame unit 4 to the fixing member 3 (cut bolt) is as described above. The panel lower end retaining member 10 is installed in the bottom area R3 to be filled with concrete.

図26においては、下地200に定着された一対の定着用部材3(寸切ボルト)に対して、一般用パネル下端側保持部材10Aの両端に形成された第1固定用孔13(図24を参照)をそれぞれ挿通させ、当該一般用パネル下端側保持部材10Aの隆起部12を上下のナット6Aによって挟み込むことによって固定される。これにより、一般用パネル下端
側保持部材10Aは、一対の定着用部材3間に掛け渡された状態で固定することができる。その際、一般用パネル下端側保持部材10Aを定着用部材3に固定する上下のナット6Aの高さを調整することで、一般用パネル下端側保持部材10Aを規定高さに水平な姿勢で容易に固定することができる。なお、上記説明から明らかなように、一般用パネル下端側保持部材10Aは、溝路100の長手方向に対向状に形成される一対の側面を形成するために対向配置される一対の側板パネル2の下端側領域2Bを保持するために使用され、隆起部12の両端側に形成された各保持溝14にそれぞれ下端側領域2Bを嵌合保持することができる。
In Fig. 26, a pair of fixing members 3 (cut bolts) fixed to a base 200 are inserted into first fixing holes 13 (see Fig. 24) formed at both ends of a general-use panel lower-end holding member 10A, and the raised portion 12 of the general-use panel lower-end holding member 10A is clamped between upper and lower nuts 6A to fix the general-use panel lower-end holding member 10A. This allows the general-use panel lower-end holding member 10A to be fixed in a state in which it is suspended between the pair of fixing members 3. At this time, by adjusting the height of the upper and lower nuts 6A that fix the general-use panel lower-end holding member 10A to the fixing members 3, the general-use panel lower-end holding member 10A can be easily fixed in a horizontal position at a specified height. As is clear from the above explanation, the general-purpose panel lower end retaining member 10A is used to retain the lower end regions 2B of a pair of side panel panels 2 that are arranged opposite each other to form a pair of side surfaces formed opposite each other in the longitudinal direction of the groove 100, and the lower end regions 2B can be fitted and retained in each of the retaining grooves 14 formed on both ends of the raised portion 12.

一方、図25で説明したエンド用パネル下端側保持部材10Bは、溝路100の端面を形成するための側板パネル2の下端側領域2Bを保持するために用いられ、単一の保持溝14に当該下端側領域2Bを嵌合保持することができる。図26においては、一般用パネル下端側保持部材10Aを一対の定着用部材3間に横架させる態様が示しているが、図16に示すように、エンド用パネル下端側保持部材10Bについても定着用部材3(寸切ボルト)にナット6Aを用いて固定することができる。エンド用パネル下端側保持部材10Bについても、一般用パネル下端側保持部材10Aと同様、水平な姿勢に固定され、その設置高さが規定の高さに調整される。なお、パネル下端側保持部材10(一般用パネル下端側保持部材10A、エンド用パネル下端側保持部材10B)は、その保持溝14の延在方向が所期の方向に一致するように設置することができる。 On the other hand, the end panel lower end side holding member 10B described in FIG. 25 is used to hold the lower end side region 2B of the side panel 2 for forming the end face of the groove 100, and the lower end side region 2B can be fitted and held in a single holding groove 14. In FIG. 26, the general-purpose panel lower end side holding member 10A is shown to be horizontally laid between a pair of fixing members 3, but as shown in FIG. 16, the end panel lower end side holding member 10B can also be fixed to the fixing member 3 (cut bolt) using a nut 6A. The end panel lower end side holding member 10B is also fixed in a horizontal position, like the general-purpose panel lower end side holding member 10A, and its installation height is adjusted to a specified height. In addition, the panel lower end side holding member 10 (general-purpose panel lower end side holding member 10A, end panel lower end side holding member 10B) can be installed so that the extension direction of the holding groove 14 matches the desired direction.

なお、下地200に定着された定着用部材3に固定された各受枠ユニット4の受枠本体41同士は、図20乃至23で説明した連結部材9を用いて相互に連結される。また、本変形例においては、底部コンクリート充填予定区域R3に設置されると共に側板パネル2の下端側領域2Bを保持するパネル下端側保持部材10(一般用パネル下端側保持部材10A、エンド用パネル下端側保持部材10B)が側板パネル2の下端側領域2Bが溝路形成予定区域R1側にずれることを抑制するパネル下端側ずれ止め部材に相当する。 The frame bodies 41 of each frame unit 4 fixed to the fixing members 3 fixed to the base 200 are connected to each other using the connecting members 9 described in Figures 20 to 23. In this modified example, the panel lower end holding members 10 (general panel lower end holding members 10A, end panel lower end holding members 10B) that are installed in the bottom concrete filling area R3 and hold the lower end area 2B of the side panel 2 correspond to the panel lower end anti-slip members that prevent the lower end area 2B of the side panel 2 from shifting toward the groove formation area R1.

以上のように、ずれ止め部材設置工程および受枠設置工程が完了すると、図16に示されるように全ての受枠ユニット4が規定位置に設置され、長手方向に隣接する受枠本体41同士が相互に連結(接合)された状態となる。その際、各受枠ユニット4は、パネル上端側保持部44(第1嵌合溝43)が溝路形成予定区域R1側に配置されるように設置される。また、各受枠本体41、第1嵌合溝43、保持溝14の延在方向は、溝路形成予定区域R1及び側部コンクリート充填予定区域R2の境界方向と平行になるように配向される。 As described above, when the anti-slip member installation process and the frame installation process are completed, all frame units 4 are installed in the specified positions as shown in FIG. 16, and adjacent frame bodies 41 in the longitudinal direction are connected (joined) to each other. At this time, each frame unit 4 is installed so that the panel upper end retaining portion 44 (first fitting groove 43) is positioned on the side of the planned groove formation area R1. In addition, the extension direction of each frame body 41, first fitting groove 43, and retaining groove 14 is oriented so that it is parallel to the boundary direction between the planned groove formation area R1 and the side concrete filling area R2.

その後、パネル設置工程において、各側板パネル2の上端側領域2Aをパネル上端側保持部44の第1嵌合溝43に嵌合し(差し込み)、下端側領域2Bをパネル下端側保持部材10(一般用パネル下端側保持部材10A、エンド用パネル下端側保持部材10B)における保持溝14に嵌合させる(差し込む)ことにより、各側板パネル2の上下を固定する(図17を参照)。本変形例においても、側板パネル2毎に、その上端側領域2Aを少なくとも1箇所以上で保持できるようにパネル上端側保持部44を配置し、その下端側領域2Bを少なくとも1箇所以上で保持できるようにパネル下端側保持部材10(一般用パネル下端側保持部材10A、エンド用パネル下端側保持部材10B)が配置される。これにより、各側板パネル2を規定位置へと堅固に固定できる。なお、各側板パネル2は、堰板面22を側部コンクリート充填予定区域R2側に向け、溝路側面形成面21を溝路形成予定区域R1側に向けた状態でパネル上端側保持部44及びパネル下端側保持部材5によって固定保持される。その後、既述の実施形態と同様、コンクリート打設工程において側部コンクリート充填予定区域R2及び底部コンクリート充填予定区域R3にフレッシュコンクリートを充填することによって溝路100を構築することができる。なお、側部コンクリート充填予定区域R2及び底部コンクリート充填予定区域R3に対するコンクリート
の打設は、フレッシュコンクリートを同時充填(同時打設)してもよいし、同時充填(同時打設)を行わなくてもよい。
Then, in the panel installation process, the upper end region 2A of each side panel 2 is fitted (inserted) into the first fitting groove 43 of the panel upper end holding portion 44, and the lower end region 2B is fitted (inserted) into the holding groove 14 of the panel lower end holding member 10 (general panel lower end holding member 10A, end panel lower end holding member 10B), thereby fixing the top and bottom of each side panel 2 (see FIG. 17). In this modification, the panel upper end holding portion 44 is also arranged so that the upper end region 2A of each side panel 2 can be held at least at one or more points, and the panel lower end holding member 10 (general panel lower end holding member 10A, end panel lower end holding member 10B) is arranged so that the lower end region 2B of each side panel 2 can be held at least at one or more points. This allows each side panel 2 to be firmly fixed to a specified position. Each side panel 2 is fixed and held by the panel upper end holding part 44 and the panel lower end holding member 5 with the dam plate surface 22 facing the side concrete filling planned area R2 and the channel side forming surface 21 facing the channel formation planned area R1. Thereafter, as in the above-mentioned embodiment, the channel 100 can be constructed by filling the side concrete filling planned area R2 and the bottom concrete filling planned area R3 with fresh concrete in the concrete pouring process. The concrete pouring into the side concrete filling planned area R2 and the bottom concrete filling planned area R3 may or may not involve simultaneous filling (simultaneous pouring) of fresh concrete.

また、本変形例におけるパネル下端側保持部材10(一般用パネル下端側保持部材10A、エンド用パネル下端側保持部材10B)は、第2固定用孔15を用いて規定位置に設置してもよい。例えば、下地200に打ち込んだ適宜のボルト等を第2固定用孔15に挿通させて、ナット等を用いて締結することでパネル下端側保持部材10(一般用パネル下端側保持部材10A、エンド用パネル下端側保持部材10B)を固定してもよい。その際、パネル下端側保持部材10における第1固定用孔13および第2固定用孔15を選択的に用いて、或いは併用することによって、パネル下端側保持部材10を固定してもよい。また、例えば、下地200がデッキプレート等といった鋼板製下地の場合には、鋼板製下地に溶接によって固定したボルト等に対して、第1固定用孔13又は第2固定用孔15を選択的に用い、若しくはこれらを併用してパネル下端側保持部材10を固定してもよい。また、ボンドやモルタルなどの接着材を用いて、パネル下端側保持部材10を鋼板製下地に対して固定してもよい。ここで、パネル下端側保持部材10はベース部11に第2固定用孔15が設けられているため、ボンドやモルタルなどの接着材を第2固定用孔15に入り込ませた状態(第2固定用孔15を通じてベース部11の下面側から上面側に接着材が盛り上がった状態)で硬化させることができ、これによって堅固にベース部11を鋼板製下地に固定できる。 In addition, the panel lower end side holding member 10 (general panel lower end side holding member 10A, end panel lower end side holding member 10B) in this modified example may be installed at a specified position using the second fixing hole 15. For example, the panel lower end side holding member 10 (general panel lower end side holding member 10A, end panel lower end side holding member 10B) may be fixed by inserting an appropriate bolt or the like driven into the base 200 into the second fixing hole 15 and fastening it using a nut or the like. In this case, the panel lower end side holding member 10 may be fixed by selectively using the first fixing hole 13 and the second fixing hole 15 in the panel lower end side holding member 10 or by using them in combination. In addition, for example, when the base 200 is a steel plate base such as a deck plate, the panel lower end side holding member 10 may be fixed to a bolt or the like fixed to the steel plate base by welding by selectively using the first fixing hole 13 or the second fixing hole 15 or by using them in combination. The panel lower end holding member 10 may also be fixed to the steel plate substrate using an adhesive such as glue or mortar. Here, the panel lower end holding member 10 has a second fixing hole 15 in the base portion 11, so that the adhesive such as glue or mortar can be hardened in a state where it is inserted into the second fixing hole 15 (a state where the adhesive is raised from the lower surface side to the upper surface side of the base portion 11 through the second fixing hole 15), thereby firmly fixing the base portion 11 to the steel plate substrate.

<実施形態2>
《溝路構築ユニット及び溝路》
次に、実施形態2について説明する。図27は、実施形態2に係る溝路構築ユニット1Aを説明する図である。図28は、実施形態2に係る溝路構築ユニット1Aによって構築された溝路100Aを説明する図である。なお、本実施形態に係る溝路構築ユニット1Aの説明では、実施形態1に係る溝路構築ユニット1との相違点を中心に説明し、溝路構築ユニット1と共通する構成については同一の符号を付すことにより詳細な説明を割愛する。
<Embodiment 2>
<<Ditch Construction Unit and Ditch>>
Next, a description will be given of embodiment 2. Fig. 27 is a diagram illustrating a groove construction unit 1A according to embodiment 2. Fig. 28 is a diagram illustrating a groove 100A constructed by the groove construction unit 1A according to embodiment 2. In the description of the groove construction unit 1A according to this embodiment, differences from the groove construction unit 1 according to embodiment 1 will be mainly described, and detailed descriptions of configurations common to the groove construction unit 1 will be omitted by assigning the same reference numerals.

図28に示す符号107は、コンクリート床版である。コンクリート床版107の一部は溝路100Aの底部105を形成している。そして、溝路100Aの側部104は、コンクリート床版107の上部に積層配置されている。 The reference numeral 107 in FIG. 28 denotes a concrete floor slab. A part of the concrete floor slab 107 forms the bottom 105 of the channel 100A. The side 104 of the channel 100A is layered on top of the concrete floor slab 107.

次に、実施形態2に係る溝路構築ユニット1Aについて説明する。実施形態2に係る溝路構築ユニット1Aは、型枠支保工を使用せずに溝路100Aを構築するためのユニットであって、予め構築されたコンクリート床版107の上方に溝路100Aの側部104を積層して構築することを特徴とする。なお、図27に示す符号107Aは、コンクリート床版107の上面である。 Next, the trench construction unit 1A according to the second embodiment will be described. The trench construction unit 1A according to the second embodiment is a unit for constructing the trench 100A without using formwork supports, and is characterized in that the side portion 104 of the trench 100A is stacked above a pre-constructed concrete slab 107. The reference numeral 107A in FIG. 27 indicates the upper surface of the concrete slab 107.

実施形態2に係る溝路構築ユニット1Aは、図27に示すように、1又は複数の側板パネル2と、側部コンクリート充填予定区域R2に位置決め固定される1又は複数の定着用部材3と、1又は複数の受枠ユニット4と、1又は複数のパネル下端側ずれ止め部材7等を備えている。側板パネル2、定着用部材3、受枠ユニット4については実施形態1の構成と同様である。パネル下端側ずれ止め部材7は、規定位置に設置された側板パネル2の下端側領域2Bが溝路形成予定区域R1側にずれることを抑制する部材であり、ここでは端太材によって形成されている。 As shown in FIG. 27, the channel construction unit 1A according to the second embodiment includes one or more side panel panels 2, one or more fixing members 3 positioned and fixed in the side concrete filling planned area R2, one or more frame units 4, and one or more panel bottom end anti-slip members 7. The side panel 2, fixing members 3, and frame units 4 are configured similarly to those in the first embodiment. The panel bottom end anti-slip members 7 are members that prevent the bottom end region 2B of the side panel 2 installed at a specified position from shifting toward the channel formation planned area R1, and are formed here from thick end material.

《溝路構築方法》
以下、実施形態2に係る溝路構築ユニット1Aを用いて溝路100Aを構築する溝路構築方法について説明する。
<<How to build a channel>>
A trench construction method for constructing the trench 100A using the trench construction unit 1A according to the second embodiment will be described below.

実施形態2に係る溝路構築方法は、実施形態1で説明した定着部材設置工程に先行して、施工箇所にコンクリート床版107を予め構築する床版構築工程を含む。すなわち、図27に示されるように、一部が溝路100Aの底部105を形成するコンクリート床版107を構築する。コンクリート床版107は、例えば鉄筋コンクリート造であってもよいが、これには限定されない。 The channel construction method according to the second embodiment includes a slab construction process in which a concrete slab 107 is constructed in advance at the construction site prior to the anchor member installation process described in the first embodiment. That is, as shown in FIG. 27, a concrete slab 107 is constructed, a portion of which forms the bottom 105 of the channel 100A. The concrete slab 107 may be made of reinforced concrete, for example, but is not limited to this.

床版構築工程が完了すると、次に、定着部材設置工程において所定の本数の定着用部材3を用意し、溝路100Aの側部104を形成するためのコンクリートが充填される側部コンクリート充填予定区域R2に、用意した定着用部材3を位置決め固定する。なお、定着部材設置工程を行う際には、コンクリート床版107のコンクリートは既に硬化している。上記のように、コンクリート床版107を下地とした定着用部材3の位置決め固定が完了すると、受枠設置工程において所定の数の受枠ユニット4を用意する。そして、受枠ユニット4における定着部42を、側部コンクリート充填予定区域R2に位置決め固定された定着用部材3に接合することで、受枠ユニット4における受枠本体41を規定位置に設置する。 After the deck construction process is completed, a predetermined number of fixing members 3 are prepared in the fixing member installation process, and the prepared fixing members 3 are positioned and fixed in the side concrete filling area R2 where concrete to form the side 104 of the groove 100A will be filled. Note that when the fixing member installation process is performed, the concrete of the concrete deck 107 has already hardened. As described above, after the positioning and fixing of the fixing members 3 using the concrete deck 107 as a base is completed, a predetermined number of frame units 4 are prepared in the frame installation process. Then, the fixing parts 42 of the frame units 4 are joined to the fixing members 3 positioned and fixed in the side concrete filling area R2, and the frame main body 41 of the frame unit 4 is installed in the specified position.

図29は、実施形態2に係る定着部材設置工程及び受枠設置工程が完了した状況を示す図である。本実施形態においては、定着用部材3が、側部コンクリート充填予定区域R2の下方に位置する既設のコンクリート床版107を下地として立設される。コンクリート床版107に対する定着用部材3は、実施形態1と同様に、例えばあと施工アンカーを介してなされる。また、受枠設置工程は、実施形態1と同様、受枠ユニット4における定着部42を定着用部材3に接合することで、受枠ユニット4における受枠本体41を規定位置に設置することができる。また、本実施形態の受枠設置工程においても、各受枠ユニット4における受枠本体41は、規定位置に設置された状態で相互に連結(接合)される。また、溝路100Aが鉄筋コンクリート構造である場合には、コンクリート床版107の上部に規定される側部コンクリート充填予定区域R2に建築構造用鉄筋が配筋されることになるが、図29においては配筋の図示を省略している。 Figure 29 is a diagram showing the state in which the anchoring member installation process and the frame installation process according to the second embodiment are completed. In this embodiment, the anchoring member 3 is erected on the existing concrete floor slab 107 located below the side concrete filling planned area R2 as a base. The anchoring member 3 for the concrete floor slab 107 is installed, for example, via a post-installed anchor, as in the first embodiment. Also, in the frame installation process, as in the first embodiment, the anchoring portion 42 in the frame unit 4 is joined to the anchoring member 3, so that the frame body 41 in the frame unit 4 can be installed in a specified position. Also, in the frame installation process of this embodiment, the frame bodies 41 in each frame unit 4 are connected (joined) to each other while installed in a specified position. Also, when the channel 100A is a reinforced concrete structure, architectural structural steel bars are arranged in the side concrete filling planned area R2 defined above the concrete floor slab 107, but the illustration of the reinforcing bars is omitted in Figure 29.

次に、溝路100Aの側面101を形成するための1又は複数の側板パネル2を用意し、用意した側板パネル2をパネル設置工程において設置する。図30は、実施形態2に係るパネル設置工程の状況を説明する図である。実施形態2に係るパネル設置工程では、側板パネル2の下端面2Cがコンクリート床版107の上面107Aに当接するように前記側板パネル2の上端側領域2Aを受枠ユニット4におけるパネル上端側保持部44の第1嵌合溝43に嵌合することで当該パネル上端側保持部44に固定する。すなわち、溝路構築ユニット1Aにおけるパネル上端側保持部44は、側板パネル2の下端面2Cがコンクリート床版107の上面107Aに当接した状態となるように側板パネル2の上端側領域2Aを保持する。 Next, one or more side panels 2 for forming the side surface 101 of the channel 100A are prepared, and the prepared side panels 2 are installed in the panel installation process. FIG. 30 is a diagram for explaining the state of the panel installation process according to the second embodiment. In the panel installation process according to the second embodiment, the upper end region 2A of the side panel 2 is fixed to the panel upper end holding portion 44 by fitting it into the first fitting groove 43 of the panel upper end holding portion 44 in the receiving frame unit 4 so that the lower end surface 2C of the side panel 2 abuts against the upper surface 107A of the concrete floor slab 107. That is, the panel upper end holding portion 44 in the channel construction unit 1A holds the upper end region 2A of the side panel 2 so that the lower end surface 2C of the side panel 2 abuts against the upper surface 107A of the concrete floor slab 107.

パネル設置工程において各側板パネル2の設置が完了すると、次に、位置ずれ抑止部材設置工程においては、コンクリート床版107の上面107Aのうちの側板パネル2における溝路側面形成面21で囲まれた領域(以下、「パネル内側領域」という)R4に1又は複数のパネル下端側ずれ止め部材7を設置する。このパネル内側領域R4は、コンクリート床版107における上面107Aのうち、溝路形成予定区域R1の下方に位置する領域ということができる。 When the installation of each side panel 2 is completed in the panel installation process, the next step is to install one or more panel bottom end anti-slip members 7 in the region R4 (hereinafter referred to as the "panel inner region") surrounded by the channel side forming surface 21 of the side panel 2 on the upper surface 107A of the concrete floor slab 107. This panel inner region R4 can be said to be the region of the upper surface 107A of the concrete floor slab 107 that is located below the planned channel formation area R1.

図31は、実施形態2に係る位置ずれ抑止部材設置工程が完了した状況の概略上面図である。パネル下端側ずれ止め部材7は、例えば角材である。図31に示すように、例えば複数のパネル下端側ずれ止め部材7を組み上げ、側板パネル2の溝路側面形成面21に添わせて設置することで、側部コンクリート充填予定区域R2へのフレッシュコンクリート
の充填時に側板パネル2の下端側領域2Bが溝路形成予定区域R1側に位置ずれすることを抑制できる。なお、位置ずれ抑止部材設置工程が完了した状況の概略側面図は、図27に示す状況と実質的に等しい。また、図31に示すパネル下端側ずれ止め部材7(角材)の配置態様は例示的なものであり、他の配置態様を採用できるのは勿論である。また、側板パネル2における下端側領域2Bが溝路形成予定区域R1側に位置ずれすることを抑制できる限りにおいて、パネル下端側ずれ止め部材7は種々の構成を採用することができる。
FIG. 31 is a schematic top view of the state where the positional deviation prevention member installation process according to the second embodiment is completed. The panel lower end side slip prevention member 7 is, for example, a square timber. As shown in FIG. 31, for example, by assembling a plurality of panel lower end side slip prevention members 7 and installing them along the groove side forming surface 21 of the side plate panel 2, it is possible to suppress the lower end side region 2B of the side plate panel 2 from being displaced toward the groove formation planned area R1 when fresh concrete is filled into the side concrete filling planned area R2. Note that the schematic side view of the state where the positional deviation prevention member installation process is completed is substantially the same as the state shown in FIG. 27. In addition, the arrangement mode of the panel lower end side slip prevention member 7 (square timber) shown in FIG. 31 is illustrative, and it is of course possible to adopt other arrangement modes. In addition, as long as it is possible to suppress the lower end side region 2B of the side plate panel 2 from being displaced toward the groove formation planned area R1, various configurations can be adopted for the panel lower end side slip prevention member 7.

上記位置ずれ抑止部材設置工程が完了すると、次に、コンクリート打設工程において側部コンクリート充填予定区域R2にフレッシュコンクリートが充填される。その結果、図28に示されるような溝路100Aを構築することができる。 Once the above-mentioned process of installing the displacement prevention member is completed, fresh concrete is then filled into the side concrete filling area R2 in the concrete pouring process. As a result, a channel 100A as shown in FIG. 28 can be constructed.

上述した実施形態2に係る溝路構築ユニット1A及びこれを用いた溝路構築方法においては、溝路100Aの底部105を形成するコンクリート床版107を予め構築してから、溝路構築ユニット1Aを使用して溝路100Aの側部104を構築する。すなわち、本実施形態においては、溝路100Aを2段階に分けて構築している。本実施形態においては、溝路100Aの側部104を施工する際には、既に底部105が構築されているため、側板パネル2を下地から浮かせた状態で保持する必要が無い。すなわち、実施形態1で説明したパネル下端側保持部材5を下地(例えば、コンクリート基盤)に設置する必要が無く、コンクリート床版107に定着した定着用部材3と接合された受枠ユニット4のパネル上端側保持部44によって側板パネル2の上端側領域2Aを保持すると共に、側板パネル2の下端面2Cをコンクリート床版107の上面107Aに突き合せた状態とすることで側板パネル2を簡易に設置できる。 In the above-described channel construction unit 1A according to the second embodiment and the channel construction method using the same, the concrete floor slab 107 forming the bottom 105 of the channel 100A is constructed in advance, and then the side 104 of the channel 100A is constructed using the channel construction unit 1A. That is, in this embodiment, the channel 100A is constructed in two stages. In this embodiment, when constructing the side 104 of the channel 100A, since the bottom 105 has already been constructed, there is no need to hold the side panel 2 in a state where it is raised above the base. That is, there is no need to install the panel lower end side holding member 5 described in the first embodiment on the base (e.g., concrete foundation), and the upper end side region 2A of the side panel 2 is held by the panel upper end side holding part 44 of the frame unit 4 joined to the fixing member 3 fixed to the concrete floor slab 107, and the lower end surface 2C of the side panel 2 is butted against the upper surface 107A of the concrete floor slab 107, so that the side panel 2 can be easily installed.

そして、パネル下端側ずれ止め部材7の設置時においても、溝路100Aの底部105が既に構築されているため、コンクリート床版107における上面107Aのパネル内側領域R4にパネル下端側ずれ止め部材7を載置することが可能であるため、その作業性が優れている。 In addition, even when installing the panel bottom end anti-slip member 7, the bottom 105 of the groove 100A has already been constructed, so the panel bottom end anti-slip member 7 can be placed on the panel inner region R4 of the upper surface 107A of the concrete floor slab 107, resulting in excellent workability.

次に、実施形態2の変形例について説明する。図27で説明した溝路構築ユニット1Aにおいてはパネル下端側ずれ止め部材7を用いて規定位置に設置された側板パネル2の下端側領域2Bが溝路形成予定区域R1側にずれることを抑制するようにしたが、パネル下端側ずれ止め部材7に代えて、上述したパネル下端側保持部材10(一般用パネル下端側保持部材10A、エンド用パネル下端側保持部材10B)を用いてもよい。 Next, a modified example of the second embodiment will be described. In the groove construction unit 1A described in FIG. 27, the panel lower end anti-slip member 7 is used to prevent the lower end region 2B of the side panel 2 installed in a specified position from shifting toward the groove formation planned area R1. However, instead of the panel lower end anti-slip member 7, the above-mentioned panel lower end holding member 10 (general-use panel lower end holding member 10A, end-use panel lower end holding member 10B) may be used.

図32は、実施形態2の変形例に係る溝路構築ユニット1Aを説明する図である。図32に示す例では、一般用パネル下端側保持部材10Aがコンクリート床版107における上面107A上に設置されている。なお、図32においては一般用パネル下端側保持部材10Aの設置例を示しているが、エンド用パネル下端側保持部材10Bについても同様にコンクリート床版107における上面107A上に設置することができる。本変形例においては、実施形態1の変形例と同様、パネル下端側保持部材10(一般用パネル下端側保持部材10A、エンド用パネル下端側保持部材10B)の隆起部12に設けられている保持溝14に側板パネル2の下端側領域2Bを嵌合することで当該下端側領域2Bを固定保持し、後続のコンクリート打設時に下端側領域2Bの位置ずれが起こることを抑制できる。そして、コンクリート打設工程において側部コンクリート充填予定区域R2にフレッシュコンクリートが充填されると、コンクリート床版107の上部に溝路100Aの側部104が積層されることで、溝路100Aが構築される。 Figure 32 is a diagram illustrating a groove construction unit 1A according to a modified example of embodiment 2. In the example shown in Figure 32, the general-use panel lower end side holding member 10A is installed on the upper surface 107A of the concrete floor slab 107. Note that, although Figure 32 shows an example of installation of the general-use panel lower end side holding member 10A, the end panel lower end side holding member 10B can also be installed on the upper surface 107A of the concrete floor slab 107 in the same manner. In this modified example, as in the modified example of embodiment 1, the lower end side region 2B of the side panel panel 2 is fixed and held by fitting the lower end side region 2B into the holding groove 14 provided in the raised portion 12 of the panel lower end side holding member 10 (general-use panel lower end side holding member 10A, end panel lower end side holding member 10B), and the positional deviation of the lower end side region 2B during subsequent concrete pouring can be suppressed. Then, when fresh concrete is filled into the side concrete filling area R2 during the concrete pouring process, the side 104 of the channel 100A is stacked on top of the concrete slab 107, thereby constructing the channel 100A.

ここで、実施形態2のように、溝路100Aの底部105を形成するコンクリート床版107を先行して構築後に側部104を構築する場合には、図33に示すようなパネル下
端側保持部材10(一般用パネル下端側保持部材10A、エンド用パネル下端側保持部材10B)を採用し、その第2固定用孔15を用いてコンクリート床版107の上面107Aにパネル下端側保持部材10を固定してもよい。図33はパネル下端側保持部材10(一般用パネル下端側保持部材10A、エンド用パネル下端側保持部材10B)の変形例を示す図である。図33の(a)に示す一般用パネル下端側保持部材10Aは、図24で説明した一般用パネル下端側保持部材10Aの長手方向における両端側が切り落とされることで短尺化されており、第1固定用孔13が設けられていない。また、図33の(b)に示すエンド用パネル下端側保持部材10Bは、図25で説明したエンド用パネル下端側保持部材10Bの長手方向における一端側が切り落とされることで短尺化されており、第1固定用孔13が設けられていない。
Here, as in the second embodiment, when the side portion 104 is constructed after the concrete floor slab 107 forming the bottom portion 105 of the groove 100A is constructed in advance, the panel lower end side holding member 10 (general panel lower end side holding member 10A, end panel lower end side holding member 10B) as shown in FIG. 33 may be adopted and the panel lower end side holding member 10 may be fixed to the upper surface 107A of the concrete floor slab 107 using the second fixing hole 15. FIG. 33 is a diagram showing a modified example of the panel lower end side holding member 10 (general panel lower end side holding member 10A, end panel lower end side holding member 10B). The general panel lower end side holding member 10A shown in FIG. 33(a) is shortened by cutting off both ends in the longitudinal direction of the general panel lower end side holding member 10A described in FIG. 24, and the first fixing hole 13 is not provided. In addition, the end panel lower end holding member 10B shown in (b) of Figure 33 has been shortened by cutting off one end side in the longitudinal direction of the end panel lower end holding member 10B described in Figure 25, and does not have a first fixing hole 13.

図34は、図33に示すパネル下端側保持部材10(一般用パネル下端側保持部材10A)の設置例を説明する図である。図34に示す一般用パネル下端側保持部材10Aは、その両端側に第1固定用孔13が設けられておらず、短尺化されていることから、一般用パネル下端側保持部材10Aの端部をコンクリート床版107に立設する定着用部材3と干渉させることなく、定着用部材3を用いずに一般用パネル下端側保持部材10Aを設置できる。例えば、図34に示す符号BDは、コンクリート床版107の上面107Aに設けられたボンドやモルタルなどの接着材である。一般用パネル下端側保持部材10Aの位置合わせおよびレベル合わせを行った状態で、ベース部11を接着材BDによってコンクリート床版107の上面107A上に固定することができる。その際、一般用パネル下端側保持部材10Aにおけるベース部11には第2固定用孔15が設けられているため、接着材BDが第2固定用孔15に入り込ませた状態(第2固定用孔15を通じてベース部11の下面側から上面側に接着材BDが盛り上がった状態)で硬化させることができ、これによって堅固にベース部11をコンクリート床版107へと固定できる。勿論、図34においては一般用パネル下端側保持部材10Aの設置対応を例に説明したが、接着材BDを用いて図33に示すエンド用パネル下端側保持部材10Bをコンクリート床版107に固定することができる。 Figure 34 is a diagram for explaining an example of installation of the panel lower end side holding member 10 (general panel lower end side holding member 10A) shown in Figure 33. The general panel lower end side holding member 10A shown in Figure 34 does not have the first fixing holes 13 on both ends and is shortened, so that the end of the general panel lower end side holding member 10A can be installed without using the fixing member 3 without interfering with the fixing member 3 erected on the concrete floor slab 107. For example, the symbol BD shown in Figure 34 is an adhesive such as bond or mortar provided on the upper surface 107A of the concrete floor slab 107. After the general panel lower end side holding member 10A has been aligned and leveled, the base part 11 can be fixed to the upper surface 107A of the concrete floor slab 107 by the adhesive BD. In this case, since the base portion 11 of the general-use panel lower end holding member 10A has a second fixing hole 15, the adhesive BD can be hardened in a state where it is inserted into the second fixing hole 15 (the adhesive BD rises from the lower surface side to the upper surface side of the base portion 11 through the second fixing hole 15), thereby firmly fixing the base portion 11 to the concrete floor slab 107. Of course, in FIG. 34, the installation of the general-use panel lower end holding member 10A is explained as an example, but the end panel lower end holding member 10B shown in FIG. 33 can be fixed to the concrete floor slab 107 using the adhesive BD.

なお、図32乃至34で説明した変形例においては、側部コンクリート充填予定区域R2へのコンクリート打設後において、溝路100の底部105にはパネル下端側保持部材10が外部に露出した状態となっている。そのため、溝路100の底部105に、レベリング材やモルタルなどを打設し、パネル下端側保持部材10を埋設させてもよい。 In the modified example described in Figures 32 to 34, after concrete is poured into the side concrete filling area R2, the panel lower end retaining member 10 is exposed to the outside at the bottom 105 of the groove 100. Therefore, a leveling material or mortar may be poured into the bottom 105 of the groove 100 to bury the panel lower end retaining member 10.

なお、上述の各実施形態および変形例において、受枠ユニット4における受枠本体41に対して定着部42を溶接等によって一体に接合する態様を例に説明したが、勿論、ボルト等を介して定着部42が受枠本体41に接合されてもよい。図35は、受枠ユニット4の変形例を説明する図である。図35に示す受枠ユニット4は、概略L形断面を有する長尺の受枠本体41に対してアングル材414および定着部42が取り付けられることによって構成されている。 In the above-mentioned embodiments and modifications, the fixing portion 42 is integrally joined to the frame body 41 of the frame unit 4 by welding or the like, but the fixing portion 42 may of course be joined to the frame body 41 via bolts or the like. Figure 35 is a diagram illustrating a modification of the frame unit 4. The frame unit 4 shown in Figure 35 is constructed by attaching an angle bar 414 and the fixing portion 42 to a long frame body 41 having a roughly L-shaped cross section.

受枠本体41は、載置面411Aを上面側に有する蓋体載置板部411と、当該蓋体載置板部411における外端縁411Cから上方に向けて立設された立上り部413を含んで構成されている。また、アングル材414はL形横断面を有し、蓋体載置板部411の下面411Dに対して溶接等によって接合される添え板部415と、当該添え板部415から下方に向かって延設された第1挟持片412を含んで構成されている。図35に示すように、アングル材414の第1挟持片412は、蓋体載置板部411の内端縁411Bに位置付けられており、当該内端縁411Bから下方に垂設されている。 The frame body 41 is configured to include a lid body mounting plate portion 411 having a mounting surface 411A on the upper surface side, and a rising portion 413 that stands upward from the outer edge 411C of the lid body mounting plate portion 411. The angle bar 414 has an L-shaped cross section and includes a support plate portion 415 that is joined to the lower surface 411D of the lid body mounting plate portion 411 by welding or the like, and a first clamping piece 412 that extends downward from the support plate portion 415. As shown in FIG. 35, the first clamping piece 412 of the angle bar 414 is positioned at the inner edge 411B of the lid body mounting plate portion 411 and hangs downward from the inner edge 411B.

また、受枠本体41の下面411Dには、寸切ボルト424が溶接等によって直付けされている。寸切ボルト424は、蓋体載置板部411の下面411Dにおいて内端縁41
1Bおよび外端縁411Cの間に位置する部位から垂直下方に向けて延設されている。そして、固定片421と、当該固定片421に連設される第2挟持片422を含んで構成されたL型横断面を有する定着部42が一対の座金425、ナット426を用いて締結されている。
Further, a cut bolt 424 is directly attached to the lower surface 411D of the receiving frame main body 41 by welding or the like.
1B and the outer edge 411C. A fixing portion 42 having an L-shaped cross section and including a fixing piece 421 and a second clamping piece 422 connected to the fixing piece 421 is fastened to the fixing portion 422 by a pair of washers 425 and a nut 426.

定着部42の固定片421には、寸切ボルト424を挿通するための挿通孔427が当該固定片421を貫通して設けられており、この挿通孔427に寸切ボルト424を挿通し、且つ、一対の座金425によって固定片421が挟み込まれた状態で寸切ボルト424にナット426を螺着するによって定着部42が受枠本体41に固定される。その際、定着部42は、第2挟持片422が第1挟持片412と間隔をおいて対向配置されるように受枠本体41に固定される。定着部42の固定片421に形成された挿通孔427は、例えば固定片421の前後方向に長軸を有する長穴として形成されていてもよい。これにより、受枠本体41の前後方向に沿って、受枠本体41に対する定着部42の取り付け位置を調整することができる。但し、挿通孔427は上記のような態様に限らず、円形孔であってもよい。なお、定着部42の固定片421には、上述した定着用部材3を挿通可能な接合孔423が設けられており、接合孔423を用いて定着用部材3に定着部42を接合することができる。なお、図35で説明した受枠ユニット4は、上述までの各実施形態および変形例の何れにも適用できる。 The fixing piece 421 of the fixing part 42 has an insertion hole 427 through which the cut bolt 424 is inserted, and the fixing part 42 is fixed to the receiving frame body 41 by inserting the cut bolt 424 into the insertion hole 427 and screwing a nut 426 onto the cut bolt 424 while the fixing piece 421 is sandwiched between a pair of washers 425. At that time, the fixing part 42 is fixed to the receiving frame body 41 so that the second clamping piece 422 faces the first clamping piece 412 at a distance. The insertion hole 427 formed in the fixing piece 421 of the fixing part 42 may be formed as an elongated hole having a long axis in the front-rear direction of the fixing piece 421, for example. This allows the mounting position of the fixing part 42 relative to the receiving frame body 41 to be adjusted along the front-rear direction of the receiving frame body 41. However, the insertion hole 427 is not limited to the above-mentioned form and may be a circular hole. The fixing piece 421 of the fixing portion 42 has a joining hole 423 through which the fixing member 3 described above can be inserted, and the fixing portion 42 can be joined to the fixing member 3 using the joining hole 423. The receiving frame unit 4 described in FIG. 35 can be applied to any of the embodiments and modified examples described above.

以上、本開示に係る溝路構築ユニット及びこれを用いた溝路構築方法の実施形態について説明したが、本明細書に開示された各々の態様は、本明細書に開示された他のいかなる特徴とも組み合わせることができる。 The above describes embodiments of the trench construction unit and trench construction method using the same according to the present disclosure, but each aspect disclosed herein can be combined with any other feature disclosed herein.

1 :溝路構築ユニット
2 :側板パネル
3 :定着用部材
4 :受枠ユニット
5 :パネル下端側保持部材
41 :受枠本体
42 :定着部
43 :第1嵌合溝
44 :パネル上端側保持部
51 :台座部
52 :第2嵌合溝
53 :パネル受部
54 :軸部
55 :連結棒部材
100 :溝路
1: Channel construction unit 2: Side panel 3: Fixing member 4: Frame unit 5: Panel lower end side holding member 41: Frame main body 42: Fixing portion 43: First fitting groove 44: Panel upper end side holding portion 51: Base portion 52: Second fitting groove 53: Panel receiving portion 54: Shaft portion 55: Connecting rod member 100: Channel

Claims (13)

型枠支保工を使用せずに溝路を構築する溝路構築方法であって、
一方の面に溝路側面形成面が形成されると共に他方の面に堰板面が形成された、溝路の側面を形成するための1又は複数の側板パネルを用意する工程と、
溝路の側部を形成するためのフレッシュコンクリートが充填される側部コンクリート充填予定区域に1又は複数の定着用部材を位置決め固定する定着部材設置工程と、
溝路の上部開口を覆う蓋体を保持するための長尺の受枠本体と、当該受枠本体に設けられると共に前記定着用部材に接合されることで前記受枠本体を規定位置に固定するための定着部と、前記側板パネルの上端側領域を保持可能なパネル上端側保持部と、を有する、1又は複数の受枠ユニットを用意し、前記受枠ユニットにおける前記定着部を前記定着用部材に接合し、前記受枠本体を規定位置に設置する受枠設置工程と、
前記堰板面を前記側部コンクリート充填予定区域側に向けた状態で前記側板パネルの上端側領域を前記パネル上端側保持部に保持するパネル設置工程と、
前記側部コンクリート充填予定区域にフレッシュコンクリートを充填するコンクリート打設工程と、
を含み、
前記受枠本体は、前記蓋体の外縁側領域を載置する載置面を上面側に有する蓋体載置板部と、当該蓋体載置板部の内端縁から下方に垂設された第1挟持片と、を有し、
前記定着部は、前記定着用部材に接合可能な固定片と、前記第1挟持片との間に第1嵌合溝が形成されるように当該第1挟持片と対向配置される第2挟持片と、を有し、
前記パネル上端側保持部は、前記第1挟持片及び前記第2挟持片を含んで構成され、前記第1嵌合溝に嵌合された前記側板パネルの上端側領域を把持可能であり、
前記パネル設置工程においては、前記側板パネルの上端側領域を前記第1嵌合溝に嵌合させる、
溝路構築方法。
A method for constructing a trench without using formwork supports, comprising:
preparing one or more side panels for forming the side of the channel, the side panels having a channel side forming surface formed on one side and a dam surface formed on the other side;
An anchoring member installation process for positioning and fixing one or more anchoring members in a side concrete filling area to be filled with fresh concrete to form a side of the channel;
a receiving frame installation process for preparing one or more receiving frame units each having a long receiving frame body for holding a cover that covers an upper opening of a groove channel, a fixing portion provided on the receiving frame body and joined to the fixing member for fixing the receiving frame body at a specified position, and a panel upper end holding portion capable of holding an upper end region of the side panel, and joining the fixing portion in the receiving frame unit to the fixing member to install the receiving frame body at a specified position;
a panel installation process in which an upper end region of the side panel panel is held by the panel upper end holding portion in a state in which the dam plate surface is directed toward the side concrete filling area;
A concrete pouring process of filling fresh concrete into the side concrete filling area;
Including,
The receiving frame main body has a lid body mounting plate portion having a mounting surface on an upper surface side on which an outer edge region of the lid body is placed, and a first clamping piece suspended downward from an inner end edge of the lid body mounting plate portion,
the fixing portion has a fixing piece that can be joined to the fixing member, and a second clamping piece that is disposed opposite the first clamping piece so that a first fitting groove is formed between the first clamping piece and a second clamping piece,
the panel upper end side holding portion is configured to include the first clamping piece and the second clamping piece and is capable of gripping an upper end side region of the side panel fitted into the first fitting groove,
In the panel installation step, an upper end region of the side panel is fitted into the first fitting groove.
How to build a trench.
少なくとも前記コンクリート打設工程に先行して、前記側板パネルの下端側領域が溝路形成予定区域側にずれることを抑制するパネル下端側ずれ止め部材を設置するずれ止め部
材設置工程を、更に含む、
請求項に記載の溝路構築方法。
The method further includes a step of installing a panel lower end side anti-slip member that prevents the lower end region of the side panel from shifting toward the groove formation area at least prior to the concrete pouring step.
2. A method for constructing a trench according to claim 1 .
前記パネル下端側ずれ止め部材は、前記溝路形成予定区域の下方に位置すると共に溝路の底部を形成するためのフレッシュコンクリートが充填される底部コンクリート充填予定区域に位置決め固定され、前記側板パネルの下端側領域を保持可能なパネル下端側保持部材である、
請求項に記載の溝路構築方法。
The panel lower end side slip prevention member is a panel lower end side holding member that is located below the groove formation planned area and is positioned and fixed to the bottom concrete filling planned area where fresh concrete for forming the bottom of the groove will be filled, and is capable of holding the lower end side region of the side panel.
3. A method for constructing a trench according to claim 2 .
前記パネル下端側ずれ止め部材は、前記側板パネルの下端側領域を嵌合可能な第2嵌合溝を有するパネル受部を有する、
請求項に記載の溝路構築方法。
The panel lower end side anti-slip member has a panel receiving portion having a second fitting groove into which the lower end side region of the side plate panel can be fitted.
4. A method for constructing a trench according to claim 3 .
前記コンクリート打設工程において、前記側部コンクリート充填予定区域及び前記底部コンクリート充填予定区域にフレッシュコンクリートを同時充填する、
請求項又はに記載の溝路構築方法。
In the concrete pouring step, fresh concrete is simultaneously filled into the side concrete filling area and the bottom concrete filling area.
5. A method for constructing a trench according to claim 3 or 4 .
前記コンクリート打設工程において、前記パネル下端側保持部材によって保持されている前記側板パネルの下端面がフレッシュコンクリートに埋設されるように前記底部コンクリート充填予定区域にフレッシュコンクリートを充填する、
請求項に記載の溝路構築方法。
In the concrete pouring step, fresh concrete is poured into the bottom concrete filling area so that the lower end surface of the side panel panel held by the panel lower end side holding member is embedded in the fresh concrete.
6. A method for constructing a trench according to claim 5 .
前記定着部材設置工程に先行して、一部が溝路の底部を形成するコンクリート床版を予め構築する床版構築工程を更に含み、
前記パネル設置工程において、前記側板パネルの下端面が前記コンクリート床版の上面に当接するように前記側板パネルの上端側領域を前記パネル上端側保持部に固定し、
前記ずれ止め部材設置工程においては、前記コンクリート床版の上面のうちの前記側板パネルにおける前記溝路側面形成面で囲まれた領域に前記パネル下端側ずれ止め部材を設置する、
請求項に記載の溝路構築方法。
The method further includes a floor slab construction step of pre-constructing a concrete floor slab, a portion of which forms a bottom of the channel, prior to the anchoring member installation step;
In the panel installation step, an upper end region of the side panel is fixed to the panel upper end holding portion so that a lower end surface of the side panel abuts against an upper surface of the concrete floor slab;
In the step of installing the anti- slip member, the panel lower end anti-slip member is installed in an area of the upper surface of the concrete floor slab that is surrounded by the channel side surface of the side plate panel.
3. A method for constructing a trench according to claim 2 .
型枠支保工を使用せずに溝路を構築する溝路構築ユニットであって、
溝路の側面を形成するための側板パネルであって、一方の面に溝路側面形成面が形成されると共に他方の面に堰板面が形成される1又は複数の側板パネルと、
溝路の側部を形成するためのフレッシュコンクリートが充填される側部コンクリート充填予定区域に位置決め固定される1又は複数の定着用部材と、
溝路の上部開口を覆う蓋体を保持するための長尺の受枠本体と、当該受枠本体に設けられると共に前記定着用部材に接合されることで前記受枠本体を規定位置に固定するための定着部と、前記側板パネルの上端側領域を保持可能なパネル上端側保持部と、を有する、1又は複数の受枠ユニットと、
を備え
前記受枠本体は、前記蓋体の外縁側領域を載置する載置面を上面側に有する蓋体載置板部と、当該蓋体載置板部の内端縁から下方に垂設された第1挟持片と、を有し、
前記定着部は、前記定着用部材に接合可能な固定片と、前記第1挟持片との間に第1嵌合溝が形成されるように当該第1挟持片と対向配置される第2挟持片と、を有し、
前記パネル上端側保持部は、前記第1挟持片及び前記第2挟持片を含んで構成され、前記第1嵌合溝に嵌合された前記側板パネルの上端側領域を把持可能である、
溝路構築ユニット。
A trench construction unit for constructing a trench without using formwork supports,
one or more side panel panels for forming a side surface of the channel, the side panel panels having a channel side surface forming surface formed on one surface and a dam surface formed on the other surface;
One or more anchoring members are positioned and fixed in a side concrete filling area where fresh concrete for forming a side of the channel is to be filled;
one or more frame units each having a long frame body for holding a lid body that covers an upper opening of a groove channel, a fixing portion provided on the frame body and joined to the fixing member for fixing the frame body in a specified position, and a panel upper end holding portion capable of holding an upper end region of the side panel;
Equipped with
The receiving frame main body has a lid body mounting plate portion having a mounting surface on an upper surface side on which an outer edge side region of the lid body is placed, and a first clamping piece suspended downward from an inner end edge of the lid body mounting plate portion,
the fixing portion has a fixing piece that can be joined to the fixing member, and a second clamping piece that is disposed opposite the first clamping piece so that a first fitting groove is formed between the first clamping piece and a second clamping piece,
The panel upper end side holding portion is configured to include the first clamping piece and the second clamping piece and is capable of gripping an upper end side region of the side panel fitted into the first fitting groove.
Ditch construction unit.
前記側板パネルの下端側領域が溝路形成予定区域側にずれることを抑制するパネル下端
側ずれ止め部材を、更に備える、
請求項に記載の溝路構築ユニット。
Further provided is a panel lower end side anti-slip member for preventing the lower end region of the side panel from shifting toward the groove formation area,
A channel construction unit according to claim 8 .
前記パネル下端側ずれ止め部材は、前記溝路形成予定区域の下方に位置すると共に溝路の底部を形成するためのフレッシュコンクリートが充填される底部コンクリート充填予定区域に位置決め固定され、前記側板パネルの下端側領域を保持可能なパネル下端側保持部材である、
請求項に記載の溝路構築ユニット。
The panel lower end side slip prevention member is a panel lower end side holding member that is located below the groove formation planned area and is positioned and fixed to the bottom concrete filling planned area where fresh concrete for forming the bottom of the groove will be filled, and is capable of holding the lower end side region of the side panel.
A channel construction unit according to claim 9 .
前記パネル下端側保持部材は、前記側板パネルの下端側領域を嵌合可能な第2嵌合溝を有するパネル受部を有する、
請求項10に記載の溝路構築ユニット。
The panel lower end side holding member has a panel receiving portion having a second fitting groove into which the lower end side region of the side plate panel can be fitted.
A channel construction unit according to claim 10 .
前記底部コンクリート充填予定区域におけるコンクリート天端設定高さは、前記パネル下端側保持部材によって保持されている前記側板パネルの下端面よりも相対的に高い位置に設定されている、
請求項10又は11に記載の溝路構築ユニット。
The concrete top setting height in the bottom concrete filling area is set to a position relatively higher than the lower end surface of the side panel panel held by the panel lower end side holding member.
A channel construction unit according to claim 10 or 11 .
前記溝路構築ユニットは、予め構築されたコンクリート床版であってその一部が溝路の底部を形成するコンクリート床版の上方に溝路の側部を構築するためのユニットであって、
前記パネル上端側保持部は、前記側板パネルの下端面が前記コンクリート床版の上面に当接した状態となるように前記側板パネルの上端側領域を保持し、
前記パネル下端側ずれ止め部材は、前記コンクリート床版の上面のうちの前記側板パネルにおける前記溝路側面形成面で囲まれた領域に設置される、
請求項に記載の溝路構築ユニット。
The channel construction unit is a unit for constructing the side of a channel above a pre-constructed concrete slab, a part of which forms the bottom of the channel,
The panel upper end holding portion holds the upper end region of the side panel so that the lower end surface of the side panel is in contact with the upper surface of the concrete floor slab,
The panel lower end side anti-slip member is installed in an area of the upper surface of the concrete floor slab surrounded by the groove side surface of the side plate panel,
A channel construction unit according to claim 9 .
JP2021015145A 2021-02-02 2021-02-02 Channel construction unit and channel construction method Active JP7610216B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021015145A JP7610216B2 (en) 2021-02-02 2021-02-02 Channel construction unit and channel construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021015145A JP7610216B2 (en) 2021-02-02 2021-02-02 Channel construction unit and channel construction method

Publications (2)

Publication Number Publication Date
JP2022118552A JP2022118552A (en) 2022-08-15
JP7610216B2 true JP7610216B2 (en) 2025-01-08

Family

ID=82840115

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021015145A Active JP7610216B2 (en) 2021-02-02 2021-02-02 Channel construction unit and channel construction method

Country Status (1)

Country Link
JP (1) JP7610216B2 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007107234A (en) 2005-10-12 2007-04-26 Daiichi Kizai Kk Side ditch equipment for drainage
JP2008267046A (en) 2007-04-23 2008-11-06 Chubu Corporation Anchoring metal piece
JP2010285845A (en) 2009-06-15 2010-12-24 Yoshiyuki Ishiwatari Formwork holding device and concrete foundation forming method
JP2013245527A (en) 2012-05-29 2013-12-09 Doraafutaito Kogyo Kk Drain ditch structure constructed on slab, and concrete form fixing member
JP5572360B2 (en) 2009-10-20 2014-08-13 株式会社アイ・テック Floor slab form for side groove cover, floor slab for side groove cover and method for forming floor slab for side groove cover
JP2017066804A (en) 2015-10-01 2017-04-06 株式会社地耐協 Mold support member, mold holding tool, and mold unit and installation method thereof
US20180363284A1 (en) 2017-06-20 2018-12-20 Aco Limited Threshold drain system and method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007107234A (en) 2005-10-12 2007-04-26 Daiichi Kizai Kk Side ditch equipment for drainage
JP2008267046A (en) 2007-04-23 2008-11-06 Chubu Corporation Anchoring metal piece
JP2010285845A (en) 2009-06-15 2010-12-24 Yoshiyuki Ishiwatari Formwork holding device and concrete foundation forming method
JP5572360B2 (en) 2009-10-20 2014-08-13 株式会社アイ・テック Floor slab form for side groove cover, floor slab for side groove cover and method for forming floor slab for side groove cover
JP2013245527A (en) 2012-05-29 2013-12-09 Doraafutaito Kogyo Kk Drain ditch structure constructed on slab, and concrete form fixing member
JP2017066804A (en) 2015-10-01 2017-04-06 株式会社地耐協 Mold support member, mold holding tool, and mold unit and installation method thereof
US20180363284A1 (en) 2017-06-20 2018-12-20 Aco Limited Threshold drain system and method

Also Published As

Publication number Publication date
JP2022118552A (en) 2022-08-15

Similar Documents

Publication Publication Date Title
CN110409813B (en) Non-dismantling forming beam template containing reinforcement cage, template structure and building process
CN110409811B (en) Non-dismantling forming column template containing reinforcement cage, template structure and building process
JP3569878B2 (en) Jig for connecting precast concrete slabs
WO2020004540A1 (en) Formwork unit and method for constructing concrete structure
JP2023126964A (en) Formwork units and concrete structure construction methods
JP6552863B2 (en) How to beat the outer wall
CN108331237A (en) A kind of construction method of constructional column building block and building structure column
KR101606439B1 (en) Spacer for fixing between truss girder and deck plate combine
JP7610216B2 (en) Channel construction unit and channel construction method
CN113482007B (en) Waist beam supporting structure and construction method thereof
US8627623B2 (en) Modular foundation system and method
JP2017048547A (en) Fitting structure and fitting method of grating
JP2010240905A (en) Method for manufacturing ribbed cement panel, ribbed cement panel, and method for manufacturing structure
KR20100016979A (en) Horizontal extension apparatus, structure and method using the same
US20110258953A1 (en) Slab edge casing and method therefor
JP2006219838A (en) Reinforcing bar reinforcement, method of reinforcing concrete frame using reinforcing bar support, and reinforcing structure of concrete frame
JPH07233620A (en) Floor structure
JP7455931B1 (en) Precast board manufacturing method and precast board
CN109267699B (en) Assembled beam slab and construction method
JP7792083B2 (en) Unit structure and unit structure construction method
CN223061906U (en) A prefabricated fixing seat for side positioning and installation of brick wall railings
KR102805389B1 (en) the deck plate in half PC slab and the half PC slab using the same and the manufacturing method thereof
CN219528475U (en) Assembled building conversion layer reinforcing bar positioner
JP7575306B2 (en) Method for constructing concrete structure with step structure and formwork unit
CN220790699U (en) Brick wall reinforcement device and method for controlling the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240122

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240723

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240726

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240913

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241119

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241212

R150 Certificate of patent or registration of utility model

Ref document number: 7610216

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150