Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7612160B2 - Rubble dumping device - Google Patents
[go: Go Back, main page]

JP7612160B2 - Rubble dumping device - Google Patents

Rubble dumping device Download PDF

Info

Publication number
JP7612160B2
JP7612160B2 JP2021116118A JP2021116118A JP7612160B2 JP 7612160 B2 JP7612160 B2 JP 7612160B2 JP 2021116118 A JP2021116118 A JP 2021116118A JP 2021116118 A JP2021116118 A JP 2021116118A JP 7612160 B2 JP7612160 B2 JP 7612160B2
Authority
JP
Japan
Prior art keywords
bucket
rubble
riprap
movable plate
dumping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021116118A
Other languages
Japanese (ja)
Other versions
JP2023012605A (en
Inventor
克昌 竹内
泰樹 西川
高史 大出
真悟 久富
孝太 瀬頭
正吾 桃田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toray Engineering Co Ltd
Original Assignee
Toyo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyo Construction Co Ltd filed Critical Toyo Construction Co Ltd
Priority to JP2021116118A priority Critical patent/JP7612160B2/en
Publication of JP2023012605A publication Critical patent/JP2023012605A/en
Application granted granted Critical
Publication of JP7612160B2 publication Critical patent/JP7612160B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Description

本発明は、例えば、海底に敷設されたケーブル上に防護用の捨石を投入する装置に関する。 The present invention relates to a device for dumping protective rubble onto, for example, a cable laid on the seabed.

特許文献1には、クレーン船のクレーンを操作して海底に据え付けたシュート架台から海面に標識を突出させ、該標識を案内に、投石バケット船の揺動アーム及びバケットを操作して捨石を投入する水中捨石投入装置が開示されている。この水中捨石投入装置は、防波堤や護岸の基礎となる捨石マウンドの造成に適用される。 Patent Document 1 discloses an underwater rubble dumping device that operates the crane of a crane ship to project a marker onto the sea surface from a chute platform installed on the seabed, and then operates the swinging arm and bucket of a rock-throwing bucket ship to dump rubble using the marker as a guide. This underwater rubble dumping device is used to create rubble mounds that serve as the foundations for breakwaters and revetments.

ところで、海底に敷設された海底送電線及び通信ケーブル(以下「ケーブル」と称する)の防護工法として、ケーブル上に防護用の捨石を設置する捨石被覆工法が知られている。この捨石被覆工法は、海底への埋設が困難な岩礁地帯や大深度にケーブルを埋設する場合に適用される。以下、水深70m、潮流の流速7knの海域への捨石被覆工法の適用を想定して説明する。 The riprap covering method, in which protective riprap is placed on top of cables, is known as a method for protecting undersea power transmission lines and communication cables (hereafter referred to as "cables") laid on the seabed. This riprap covering method is applied when burying cables in rocky areas or at great depths where burying them on the seabed is difficult. The following explanation assumes the application of the riprap covering method to an area with a water depth of 70 m and a tidal current speed of 7 kn.

従来、捨石被覆工法として、グラブ浚渫船やクレーン船等の作業船から、捨石(砕石)を掴んだグラブバケットを海底まで下降させ、ケーブル上でバケットを開放させる施工法がある。この施工法では、1サイクル(グラブバケットの海底への引き下げ開始から、捨石投入を経て、グラブバケットの引き上げ完了まで)でケーブル上に投入される捨石の量が少ないため、施工能率が低く、工期が長期化することが問題であった。 Conventionally, a riprap covering method involves lowering a grab bucket holding riprap (crushed rock) to the seabed from a work vessel such as a grab dredger or crane ship, and then releasing the bucket on the cable. With this method, the amount of riprap dumped onto the cable in one cycle (from the start of lowering the grab bucket to the seabed, through dumping the riprap, to the completion of lifting the grab bucket) is small, resulting in low construction efficiency and long construction times.

一方、トレミー管を用いた捨石被覆工法では、潮流の影響によりトレミー管をケーブル上に正確に位置決めするのが困難であり、施工の精度が課題となる。また、海底まで延伸させたトレミー管は、揺動による破損の虞がある。 On the other hand, with the rubble covering method using tremie pipes, it is difficult to accurately position the tremie pipes on the cable due to the influence of tidal currents, making construction precision an issue. In addition, tremie pipes that are extended to the seabed are at risk of being damaged by rocking.

特開平6-49846号公報Japanese Patent Application Publication No. 6-49846

本発明は、施工を能率化することが可能な捨石投入装置を提供することを課題とする。 The objective of the present invention is to provide a rubble dumping device that can streamline construction.

本発明の捨石投入装置は、海底に敷設されたケーブル上に捨石を投入する捨石投入装置であって、捨石が投入される箱形のバケットと、前記バケット内に設けられ、該バケット内を横方向に区画する可動板と、前記バケット内に設けられ、前記可動板に対して平行に配置される垂直板と前記垂直板の下端縁から前記可動板まで傾斜して延びる下り勾配の傾斜板とを有し、前記可動板により区画された空間を横並びの隣接する室に区画する隔壁と、船舶上に設けられ、前記可動板を上下方向へ駆動する揚重装置と、を備え、各室の下端部は、前記可動板により閉塞され、前記揚重装置により前記可動板を下端位置から上端位置まで上昇させる過程で、順次開放されるように配置されていることを特徴とする。
The riprap dumping device of the present invention is a riprap dumping device that dumps riprap onto a cable laid on the seabed, and is characterized in that it comprises a box-shaped bucket into which riprap is dumped, a movable plate provided within the bucket and dividing the interior of the bucket horizontally, a vertical plate provided within the bucket and arranged parallel to the movable plate, and a downwardly sloping plate extending at an angle from the lower edge of the vertical plate to the movable plate, a bulkhead that divides the space divided by the movable plate into adjacent chambers arranged side by side , and a lifting device provided on a ship and driving the movable plate in the vertical direction, and is arranged so that the lower end of each chamber is blocked by the movable plate and is opened sequentially as the lifting device raises the movable plate from the lower end position to the upper end position.

本発明によれば、捨石被覆工法を適用した施工を能率化することができる。 The present invention makes it possible to streamline construction using the rubble covering method.

本実施形態に係る捨石投入装置の正面図である。FIG. 2 is a front view of the rubble dumping device according to the present embodiment. 本実施形態に係る捨石投入装置の右側面図である。FIG. 2 is a right side view of the rubble dumping device according to the present embodiment. 本実施形態に係る捨石投入装置の平面図である。FIG. 2 is a plan view of the rubble dumping device according to the present embodiment. 本実施形態の説明図であって、バケットの構造を概念的に示す正面図である。FIG. 2 is an explanatory diagram of the present embodiment, and is a front view conceptually showing the structure of the bucket. 本実施形態の説明図であって、バケットの構造を概念的に示す斜視図である。FIG. 2 is an explanatory diagram of the present embodiment, being a perspective view conceptually showing the structure of a bucket. 本実施形態に係る捨石投入装置による施工の概念図である。FIG. 2 is a conceptual diagram of construction using the riprap dumping device according to this embodiment. 本実施形態に係る捨石投入装置を適用した施工の説明図である。FIG. 2 is an explanatory diagram of construction using the riprap dumping device according to this embodiment. 捨石被覆工法を適用した施工状況及び艤装を示す図である。FIG. 1 is a diagram showing the construction status and outfitting when the rubble covering method is applied.

本発明の一実施形態を添付した図を参照して説明する。
以下、海底60に敷設されたケーブル61(海底送電線、通信ケーブル等、図7参照)上に捨石10(砕石)を設置する捨石被覆工法に適用される捨石投入装置1を説明する。ここで、図3における平面V1は、後述するバケット2内を左右対称に分割する対称面(以下「垂直面V1」と称する)である。また、図3における平面V2は、バケット2内を前後対称に分割する対称面(以下「垂直面V2」と称する)である。
An embodiment of the present invention will now be described with reference to the accompanying drawings.
Hereinafter, a description will be given of a riprap dumping device 1 that is applied to a riprap covering method for placing riprap 10 (crushed rock) on a cable 61 (submarine power transmission line, communication cable, etc., see FIG. 7) laid on the seabed 60. Here, a plane V1 in FIG. 3 is a symmetrical plane (hereinafter referred to as "vertical plane V1") that divides the inside of a bucket 2, which will be described later, symmetrically in the left-right direction. Also, a plane V2 in FIG. 3 is a symmetrical plane (hereinafter referred to as "vertical plane V2") that divides the inside of the bucket 2 symmetrically in the front-rear direction.

図1乃至図3に示されるように、捨石投入装置1は、バックホウ等により投入される捨石10(図7参照)が収容される箱形のバケット2を有する。バケット2は、アングル材、パイプ材、及びフラットバー等の鋼材により構成されたフレーム3(枠構造)を有する。バケット2の底部9の四隅には、バケット2を接地面(船舶55の甲板、海底60等)から一定高さ浮かせた状態で支持する脚部19が設けられる。なお、バケット2の四方の側壁、即ち、前側壁4、後側壁5、左側壁6、及び右側壁7には、フレーム3の隙間から捨石がバケット2外へ流出することを抑止し、且つ外部から捨石10を視認可能なエキスパンドメタルが適用される。 As shown in Figs. 1 to 3, the rubble dumping device 1 has a box-shaped bucket 2 that contains rubble 10 (see Fig. 7) dumped by a backhoe or the like. The bucket 2 has a frame 3 (frame structure) made of steel materials such as angle bars, pipes, and flat bars. At the four corners of the bottom 9 of the bucket 2, legs 19 are provided to support the bucket 2 at a certain height above the ground surface (the deck of a ship 55, the seabed 60, etc.). The four side walls of the bucket 2, i.e., the front wall 4, rear wall 5, left side wall 6, and right side wall 7, are made of expanded metal, which prevents the rubble from leaking out of the bucket 2 through the gaps in the frame 3 and allows the rubble 10 to be seen from the outside.

バケット2内には、左右方向へ間隔をあけて対向する一対の可動板11L,11Rが設けられる。可動板11L,11Rは、垂直面V1(図3参照)を対称面として面対称をなす。また、可動板11L,11Rと垂直面V1とは平行をなす。可動板11L,11Rは、左右両側の縦に延びる端縁部が、バケット2の前側壁4及び後側壁5に設けられた複数対のガイドローラ30により案内されて上下方向へ移動可能である。 A pair of movable plates 11L, 11R are provided inside the bucket 2, facing each other with a gap in the left-right direction. The movable plates 11L, 11R are symmetrical with respect to the vertical plane V1 (see FIG. 3). The movable plates 11L, 11R are parallel to the vertical plane V1. The movable plates 11L, 11R are movable in the up-down direction, with their vertically extending edge portions on both the left and right sides guided by multiple pairs of guide rollers 30 provided on the front wall 4 and rear wall 5 of the bucket 2.

可動板11L,11Rの上端部12L,12Rには、前後に突出する突出部13L,13Rが設けられる。可動板11L,11Rは、各々の突出部13L,13Rがバケット2の上端側の開口周縁部8に係止される(引っ掛けられる)ことで、フレーム3により吊持される(吊り下げられる)。なお、可動板11L,11R間の、対向する突出部13L,13R間には、フラットバー14,14が架設される。即ち、可動板11L,11Rの上端部12L,12Rは、左右方向へ延びる前後一対のフラットバー14,14により連結される。 The upper ends 12L, 12R of the movable plates 11L, 11R are provided with protrusions 13L, 13R that protrude forward and backward. The movable plates 11L, 11R are suspended (hanging) by the frame 3 with each protrusion 13L, 13R engaged (hooked) with the opening periphery 8 on the upper end side of the bucket 2. Flat bars 14, 14 are installed between the opposing protrusions 13L, 13R between the movable plates 11L, 11R. In other words, the upper ends 12L, 12R of the movable plates 11L, 11R are connected by a pair of front and rear flat bars 14, 14 that extend in the left-right direction.

可動板11L,11Rの上端部12L,12Rの前後方向中央には、ブラケット15L,15Rが設けられる。ブラケット15L,15Rには、前後方向へ延びる軸部材16L,16Rを介してソケット17L,17Rの下端部が接続される。即ち、ソケット17L,17Rは、軸部材16L,16Rを中心に回動可能である。ソケット17L,17Rの上部には、ワイヤロープ18L,18Rの一端側が接続される。そして、ワイヤロープ18L,18Rの他端側を船舶55上のクレーン56(図8参照)に設けられた楊重装置(駆動装置、図示省略)により巻き取ることで、可動板11L,11Rが引き上げられる。 Bracket 15L, 15R is provided at the center in the front-rear direction of upper end 12L, 12R of movable plate 11L, 11R. Lower end of socket 17L, 17R is connected to bracket 15L, 15R via shaft member 16L, 16R extending in the front-rear direction. In other words, socket 17L, 17R can rotate around shaft member 16L, 16R. One end side of wire rope 18L, 18R is connected to the upper part of socket 17L, 17R. Then, movable plate 11L, 11R is pulled up by winding up the other end side of wire rope 18L, 18R by lifting device (driving device, not shown) provided on crane 56 (see FIG. 8) on ship 55.

図1乃至図5を参照すると、可動板11Lとバケット2の左側壁6との間には、可動板11Lと左側壁6との間の空間を、外側(左側)の第1室21と内側(右側)の第2室22とに区画する隔壁25L(固定板)が設けられる。隔壁25Lは、可動板11L及びバケット2の左側壁6に対して平行に配置される垂直板26Lと、垂直板26Lの下端縁から可動板11Lまで延びて45度の斜度で傾斜する傾斜板27Lと、を有する。これにより、バケット2内に、可動板11L、隔壁25L、前側壁4、及び後側壁5により、第2室22Lが画定される。なお、傾斜板27Lの斜度(傾斜角度)は45度に限定されない。 Referring to Figures 1 to 5, a partition wall 25L (fixed plate) is provided between the movable plate 11L and the left side wall 6 of the bucket 2, dividing the space between the movable plate 11L and the left side wall 6 into a first chamber 21 on the outside (left side) and a second chamber 22 on the inside (right side). The partition wall 25L has a vertical plate 26L arranged parallel to the movable plate 11L and the left side wall 6 of the bucket 2, and an inclined plate 27L that extends from the lower edge of the vertical plate 26L to the movable plate 11L and inclines at an inclination of 45 degrees. As a result, the second chamber 22L is defined within the bucket 2 by the movable plate 11L, the partition wall 25L, the front side wall 4, and the rear side wall 5. Note that the inclination (inclination angle) of the inclined plate 27L is not limited to 45 degrees.

バケット2内には、隔壁25Lの下方に設置され、傾斜板27Lに対して平行をなす傾斜板29Lが設けられる。即ち、傾斜板29Lは、45度の斜度で傾斜する。傾斜板29Lは、バケット2の左側壁6から可動板11Lの下端まで延びる。これにより、バケット2内に、左側壁6、隔壁25L、傾斜板29L、前側壁4、及び後側壁5により、第1室21Lが画定される。 In the bucket 2, an inclined plate 29L is provided below the partition wall 25L and parallel to the inclined plate 27L. That is, the inclined plate 29L is inclined at an angle of 45 degrees. The inclined plate 29L extends from the left side wall 6 of the bucket 2 to the lower end of the movable plate 11L. As a result, a first chamber 21L is defined in the bucket 2 by the left side wall 6, partition wall 25L, inclined plate 29L, front wall 4, and rear wall 5.

一方、可動板11L,11R間には、垂直面V1上に配置、即ち、可動板11L,11Rに対して平行をなす中央隔壁31(固定板)が設けられる。中央隔壁31は、バケット2の上端(開口周縁部8)からバケット2の高さの中間位置まで延びる。中央隔壁31は、垂直板32と、垂直板32の下端縁から可動板11Lまで延びて45度の斜度で傾斜する傾斜板33Lと、を有する。これにより、バケット2内に、可動板11L、中央隔壁31、前側壁4、及び後側壁5により、第3室23Lが画定される。なお、中央隔壁31は、垂直板32の下端縁から可動板11Rまで延びて45度の斜度で傾斜する傾斜板33Rを有する。即ち、中央隔壁31は、垂直面V2による断面が逆Y形に形成される。 A central partition 31 (fixed plate) is provided between the movable plates 11L and 11R, disposed on the vertical plane V1, i.e., parallel to the movable plates 11L and 11R. The central partition 31 extends from the upper end (opening periphery 8) of the bucket 2 to the middle position of the height of the bucket 2. The central partition 31 has a vertical plate 32 and an inclined plate 33L that extends from the lower edge of the vertical plate 32 to the movable plate 11L and inclines at an inclination of 45 degrees. As a result, the third chamber 23L is defined within the bucket 2 by the movable plate 11L, the central partition 31, the front wall 4, and the rear wall 5. The central partition 31 has an inclined plate 33R that extends from the lower edge of the vertical plate 32 to the movable plate 11R and inclines at an inclination of 45 degrees. That is, the cross section of the central partition 31 by the vertical plane V2 is formed in an inverted Y shape.

ここで、傾斜板29Lの下端縁から隔壁25Lの傾斜板27Lの下端縁までの距離、即ち、第1室21Lの捨石放出口35L(下端部)の開口高さH1(図4参照)は、隔壁25Lの傾斜板27Lの下端縁から中央隔壁31の傾斜板33Lの下端縁までの距離、即ち、第2室22Lの捨石放出口36L(下端部)の開口高さH2(図4参照)と同一(H1=H2)に設定される。さらに、第1室21Lの幅W1、第2室22Lの幅W2、及び第3室23Lの幅W3(共に図4参照)も略同一に設定される。 Here, the distance from the lower end edge of the inclined plate 29L to the lower end edge of the inclined plate 27L of the partition 25L, i.e., the opening height H1 (see FIG. 4) of the rubble discharge port 35L (lower end) of the first chamber 21L is set to be the same (H1=H2) as the distance from the lower end edge of the inclined plate 27L of the partition 25L to the lower end edge of the inclined plate 33L of the central partition 31, i.e., the opening height H2 (see FIG. 4) of the rubble discharge port 36L (lower end) of the second chamber 22L. Furthermore, the width W1 of the first chamber 21L, the width W2 of the second chamber 22L, and the width W3 of the third chamber 23L (all see FIG. 4) are also set to be approximately the same.

第1室21Lには、第1室21Lの容量を第3室23Lの容量に合わせるための第1投入量調整手段41Lが設けられる。第1投入量調整手段41Lは、垂直面V2(図3参照)を対称面として面対称をなすように配置された一対の隔壁42,42を有する。前側の隔壁42は、バケット2の前側壁4の上端近傍から垂直面V2に向かって45度の下り傾斜で傾斜する傾斜板43と、傾斜板43の下端縁から傾斜板29Lまで延びる垂直板44と、を有する。なお、説明の重複を避けるため、後側の隔壁42の説明は省略する。 The first chamber 21L is provided with a first input amount adjustment means 41L for adjusting the capacity of the first chamber 21L to the capacity of the third chamber 23L. The first input amount adjustment means 41L has a pair of partitions 42, 42 arranged symmetrically with respect to the vertical plane V2 (see FIG. 3). The front partition 42 has an inclined plate 43 that slopes downward at 45 degrees from near the upper end of the front wall 4 of the bucket 2 toward the vertical plane V2, and a vertical plate 44 that extends from the lower edge of the inclined plate 43 to the inclined plate 29L. In order to avoid duplication, a description of the rear partition 42 will be omitted.

一方、第2室22Lには、第2室22Lの容量を第1室21L及び第3室23Lの容量に合わせるための第2投入量調整手段45Lが設けられる。第2投入量調整手段45Lは、垂直面V2(図3参照)を対称面として面対称をなすように配置された一対の隔壁46,46を有する。前側の隔壁46は、バケット2の前側壁4の上端近傍から垂直面V2に向かって45度の下り傾斜で傾斜する傾斜板47と、傾斜板47の下端縁から隔壁25Lの傾斜板27Lまで延びる垂直板48と、を有する。なお、説明の重複を避けるため、後側の隔壁46の説明は省略する。 On the other hand, the second chamber 22L is provided with a second input amount adjustment means 45L for adjusting the capacity of the second chamber 22L to the capacity of the first chamber 21L and the third chamber 23L. The second input amount adjustment means 45L has a pair of partitions 46, 46 arranged to be symmetrical with respect to the vertical plane V2 (see FIG. 3). The front partition 46 has an inclined plate 47 that slopes downward at 45 degrees from near the upper end of the front wall 4 of the bucket 2 toward the vertical plane V2, and a vertical plate 48 that extends from the lower edge of the inclined plate 47 to the inclined plate 27L of the partition 25L. In order to avoid duplication, the description of the rear partition 46 is omitted.

なお、バケット2は、垂直面V1を対称面として左右対称に構成されている。よって、バケット2における垂直面V1の右側の構成については、図面に対応する符号を付与するのみとし、重複する説明を省略する。 The bucket 2 is configured symmetrically with respect to the vertical plane V1. Therefore, the configuration on the right side of the vertical plane V1 in the bucket 2 will only be given the reference numerals corresponding to those in the drawings, and duplicate explanations will be omitted.

図6を参照すると、捨石投入装置1のフレーム3には、トランスポンダ51、海底60を照らす4台の水中ライト52(図6に3台のみ表示)、及び2台の水中カメラ53(図6に1台のみ表示)が設けられる。トランスポンダ51は、捨石投入装置1の位置、進路、及び速度等の情報を、船舶55(図8参照)上に設置された受信装置(図示省略)へ提供(信号を発信)する。また、水中カメラ53の撮像信号は、船舶上に設置されたモニタ(図示省略)へ画像として出力される。 Referring to FIG. 6, the frame 3 of the riprap dumping device 1 is provided with a transponder 51, four underwater lights 52 (only three are shown in FIG. 6) that illuminate the seabed 60, and two underwater cameras 53 (only one is shown in FIG. 6). The transponder 51 provides (transmits a signal) information on the position, course, speed, etc. of the riprap dumping device 1 to a receiving device (not shown) installed on the ship 55 (see FIG. 8). The image signal of the underwater camera 53 is output as an image to a monitor (not shown) installed on the ship.

なお、フレーム3には、複数本(図6に2本のみ表示)のワイヤロープ20の一端側が接続される。ワイヤロープ20の他端側を船舶55上のクレーン56(図8参照)に設けられた楊重装置(駆動装置、図示省略)により繰り出すことで捨石投入装置1が引き下げられ、他方、ワイヤロープ20の他端側を楊重装置により巻き取ることで捨石投入装置1が引き上げられる。 One end of multiple wire ropes 20 (only two are shown in FIG. 6) is connected to the frame 3. The other end of the wire rope 20 is paid out by a lifting device (drive device, not shown) provided on a crane 56 (see FIG. 8) on the ship 55, thereby lowering the rubble dumping device 1, and the other end of the wire rope 20 is wound up by the lifting device, thereby lifting the rubble dumping device 1.

次に、前述した捨石投入装置1により、海底60に敷設されたケーブル61(図7参照)上に捨石10(砕石)を投入するときの施工手順を説明する。
なお、図8に示されるように、現場海域で施工を行う船舶55には、クレーン56が搭載されている。また、船舶55には、必要量(例えば2日分)の捨石10、ホイールローダ57、及びバックホウ58が舶載されている。
Next, a construction procedure for dumping riprap 10 (crushed stone) onto a cable 61 (see FIG. 7) laid on the seabed 60 using the riprap dumping device 1 will be described.
As shown in Fig. 8, a ship 55 that performs construction work in the sea area at the site is equipped with a crane 56. The ship 55 also carries a necessary amount (e.g., two days' worth) of riprap 10, a wheel loader 57, and a backhoe 58.

まず、バックホウ58により、船舶55の甲板上に載置された捨石投入装置1のバケット2の各室、即ち、第1室21L,21R、第2室22L,22R、及び第3室23L,23Rに捨石10を投入する。次に、クレーン56により捨石投入装置1を吊り上げ、クレーン56に搭載された楊重装置(図示省略)によりワイヤロープ20を繰り出して捨石投入装置1を海底60へ沈める。そして、トランスポンダ51、水中カメラ53、ROV59(Remote Operated Vehicle)等の監視手段を用いて、捨石投入装置1を海底60のケーブル61上の第1位置(図7参照)に位置決めさせる。なお、捨石投入装置1の脚部19を海底60に接地させないで、浮かせた状態でもよい。 First, the backhoe 58 dumps the riprap 10 into each chamber of the bucket 2 of the riprap dumping device 1 placed on the deck of the ship 55, i.e., the first chambers 21L, 21R, the second chambers 22L, 22R, and the third chambers 23L, 23R. Next, the crane 56 lifts the riprap dumping device 1, and the wire rope 20 is paid out by a lifting device (not shown) mounted on the crane 56 to sink the riprap dumping device 1 to the seabed 60. Then, the riprap dumping device 1 is positioned at a first position (see FIG. 7) on the cable 61 of the seabed 60 using monitoring means such as the transponder 51, underwater camera 53, and ROV 59 (Remote Operated Vehicle). The legs 19 of the riprap dumping device 1 may be floating without being grounded on the seabed 60.

次に、水中カメラ53、ROV59等の監視手段により状況を確認しながら、クレーン56に搭載された楊重装置によりワイヤロープ18L,18Rを巻き取って可動板11L,11Rを一定高さまで引き上げ、バケット2の第1室21L,21Rの捨石放出口35L,35R(下端部)を開放させる。これにより、図7に示されるように、第1室21L,21R内の捨石10が捨石放出口35L,35Rからケーブル61上へ投入される。投入完了後、楊重装置によりワイヤロープ18L,18Rを繰り出して可動板11L,11Rを下端位置まで引き下げる。 Next, while checking the situation with monitoring means such as the underwater camera 53 and ROV 59, the lifting device mounted on the crane 56 winds up the wire ropes 18L, 18R to raise the movable plates 11L, 11R to a certain height, and opens the rubble discharge ports 35L, 35R (lower end) of the first chambers 21L, 21R of the bucket 2. As a result, as shown in FIG. 7, the rubble 10 in the first chambers 21L, 21R is dumped onto the cable 61 from the rubble discharge ports 35L, 35R. After dumping is complete, the lifting device reels out the wire ropes 18L, 18R to pull the movable plates 11L, 11R down to the lower end position.

次に、水中カメラ53、ROV59等の監視手段により状況を確認しながら、クレーン56を操作して捨石投入装置1を第2位置(図7参照)に位置決めさせる。ここで、第2位置に位置決めされた捨石投入装置1は、第1位置に位置決めされた捨石投入装置1に対して一定長さ(例えば0.5m)だけ重なるように位置決めされる。 Next, while checking the situation using monitoring means such as the underwater camera 53 and ROV 59, the crane 56 is operated to position the riprap dumping device 1 at the second position (see FIG. 7). Here, the riprap dumping device 1 positioned at the second position is positioned so that it overlaps the riprap dumping device 1 positioned at the first position by a certain length (e.g., 0.5 m).

次に、水中カメラ53、ROV59等の監視手段により状況を確認しながら、クレーン56に搭載された楊重装置によりワイヤロープ18L,18Rを巻き取って可動板11L,11Rを一定高さまで引き上げ、バケット2の第2室22L,22Rの捨石放出口36L,36R(下端部)を開放させる。これにより、図7に示されるように、第2室22L,22R内の捨石10が捨石放出口36L,36Rからケーブル61上へ投入される。投入完了後、楊重装置によりワイヤロープ18L,18Rを繰り出して可動板11L,11Rを下端位置まで引き下げる。 Next, while checking the situation with monitoring means such as an underwater camera 53 and an ROV 59, the wire ropes 18L, 18R are wound up by the lifting device mounted on the crane 56 to raise the movable plates 11L, 11R to a certain height, and the rubble discharge ports 36L, 36R (lower end) of the second chambers 22L, 22R of the bucket 2 are opened. As a result, as shown in FIG. 7, the rubble 10 in the second chambers 22L, 22R is dumped onto the cable 61 from the rubble discharge ports 36L, 36R. After dumping is complete, the wire ropes 18L, 18R are paid out by the lifting device to pull the movable plates 11L, 11R down to the lower end position.

次に、水中カメラ53、ROV59等の監視手段により状況を確認しながら、クレーン56を操作して捨石投入装置1を第3位置(図7参照)に位置決めさせる。ここで、第3位置に位置決めされた捨石投入装置1は、第2位置に位置決めされた捨石投入装置1に対して一定長さ(例えば0.5m)だけ重なるように位置決めされる。 Next, while checking the situation using monitoring means such as the underwater camera 53 and ROV 59, the crane 56 is operated to position the riprap dumping device 1 at the third position (see FIG. 7). Here, the riprap dumping device 1 positioned at the third position is positioned so that it overlaps the riprap dumping device 1 positioned at the second position by a certain length (e.g., 0.5 m).

次に、水中カメラ53、ROV59等の監視手段により状況を確認しながら、クレーン56に搭載された楊重装置によりワイヤロープ18L,18Rを巻き取って可動板11L,11Rを上端位置まで引き上げる。これにより、バケット2の第3室23L,23Rの下端部は、第1室21L,21Rの捨石放出口35L,35Rの開口高さH1及び第2室22L,22Rの捨石放出口36L,36Rの開口高さH2(本実施形態では「H1=H2」)と同じ高さ、即ち、傾斜板33L,33Rの下端縁からH1(H2)の高さだけ開口する。これにより、第3室23L,23R内の捨石10は、第2室22L,22Rを経由して、第2室22L,22Rの捨石放出口36L,36Rから、図7に示されるように、ケーブル61上へ投入される。 Next, while checking the situation with monitoring means such as an underwater camera 53 and an ROV 59, the wire ropes 18L, 18R are wound up by the lifting device mounted on the crane 56 to pull up the movable plates 11L, 11R to the upper end position. As a result, the lower end of the third chamber 23L, 23R of the bucket 2 opens to the same height as the opening height H1 of the rubble discharge ports 35L, 35R of the first chambers 21L, 21R and the opening height H2 of the rubble discharge ports 36L, 36R of the second chambers 22L, 22R ("H1 = H2" in this embodiment), that is, the height H1 (H2) from the lower edge of the inclined plates 33L, 33R. As a result, the rubble 10 in the third chambers 23L, 23R is thrown onto the cable 61 from the rubble discharge ports 36L, 36R of the second chambers 22L, 22R via the second chambers 22L, 22R, as shown in FIG. 7.

投入完了後、楊重装置によりワイヤロープ18L,18Rを繰り出して可動板11L,11Rを下端位置まで下降させ、さらに、クレーン56に搭載された楊重装置によりワイヤロープ20を巻き取って捨石投入装置1を海底60から引き上げる。海底60から引き上げられた捨石投入装置1は、クレーン56により船舶55の甲板上に載置され、バックホウ58により、バケット2の各室、即ち、第1室21L,21R、第2室22L,22R、及び第3室23L,23Rに捨石10が投入される。 After dumping is complete, the lifting device pays out the wire ropes 18L, 18R to lower the movable plates 11L, 11R to their lower end positions, and then the lifting device mounted on the crane 56 winds up the wire rope 20 to pull the rubble dumping device 1 up from the seabed 60. The rubble dumping device 1 pulled up from the seabed 60 is placed on the deck of the ship 55 by the crane 56, and the rubble 10 is dumped into each chamber of the bucket 2, i.e., the first chambers 21L, 21R, the second chambers 22L, 22R, and the third chambers 23L, 23R, by the backhoe 58.

ここで、従来のグラブバケットを用いた捨石被覆工法では、1サイクル(グラブバケットの海底への引き下げ開始から、捨石投入を経て、グラブバケットの引き上げ完了まで)で投入可能な捨石の量が少ないため、施工能率が低く、工期が長期化することが問題であった。 Here, the problem with the conventional rubble covering method using a grab bucket is that the amount of rubble that can be dumped in one cycle (from the start of lowering the grab bucket to the seabed, through dumping the rubble, to the completion of lifting the grab bucket) is small, resulting in low construction efficiency and long construction periods.

これに対し、本実施形態では、捨石10を収容する箱形のバケット2と、バケット2内を左右方向に区画する一対の可動板11L,11Rと、バケット2の左側壁6と可動板11Lとの間を左右方向に隣接する第1室21Lと第2室22Lとに区画する隔壁25Lと、バケット2の右側壁7と可動板11Rとの間を左右方向に隣接する第1室21Rと第2室22Rとに区画する隔壁25Rと、対向する可動板11L,11R間を左右方向に隣接する第3室23Lと第3室23Rとに区画する中央隔壁31と、を備え、可動板11L,11Rが下端位置から上端位置まで移動する過程で、第1室21L,21R、第2室22L,22R、及び第3室23L,23Rの下端部が順次開口し、これにより、第1室21L,21R、第2室22L,22R、及び第3室23L,23Rに収容された捨石10が、海底60のケーブル61上に順次投入されるように捨石投入装置1を構成した。
これにより、本実施形態では、第1室21L,21R内の捨石10の投入完了後、及び第2室22L,22R内の捨石10の投入完了後、捨石投入装置1を海底60のケーブル61に沿って移動させることで、1サイクル(捨石投入装置1の海底60への引き下げ開始から、捨石10の投入を経て、捨石投入装置1の海底60からの引き上げ完了まで)で、捨石10の投入を3回行うことができる。換言すれば、1サイクルで投入可能な捨石10の量を従来の3倍に引き上げることができる。その結果、捨石被覆工法の施工能率を向上させることが可能であり、工期を大幅に短縮することができる。
また、従来のトレミー管を用いた捨石被覆工法では、潮流の影響によりトレミー管をケーブル上に正確に位置決めするのが困難であり、施工の精度が課題であった。
これに対し、本実施形態では、水中カメラ53、ROV59等の監視手段により、状況を確認しながら捨石投入装置1の位置決めを行うので、施工の精度を高めることができる。
さらに、本実施形態では、可動板11L,11Rを開閉させる操作は、従来のグラブバケットを開閉させる操作と略同一であるので、オペレータへの負担が増大することを防止することができる。
In contrast, in this embodiment, a box-shaped bucket 2 for accommodating riprap 10, a pair of movable plates 11L, 11R for dividing the interior of the bucket 2 in the left-right direction, a partition wall 25L for dividing the space between the left side wall 6 of the bucket 2 and the movable plate 11L into a first chamber 21L and a second chamber 22L adjacent to each other in the left-right direction, a partition wall 25R for dividing the space between the right side wall 7 of the bucket 2 and the movable plate 11R into a first chamber 21R and a second chamber 22R adjacent to each other in the left-right direction, and a partition wall 25R for dividing the space between the opposing movable plates 11L, 11R in the left-right direction. The rubble dumping device 1 is configured to have a central partition 31 that divides the first chamber 21L, 21R, the second chamber 22L, 22R, and the third chamber 23L, 23R into adjacent chambers 23L and 23R, and to sequentially open the lower ends of the first chambers 21L, 21R, the second chambers 22L, 22R, and the third chambers 23L, 23R as the movable plates 11L, 11R move from the lower end position to the upper end position, thereby allowing the rubble dumping device 1 to be sequentially dumped onto the cable 61 on the seabed 60, the rubble 10 contained in the first chambers 21L, 21R, the second chambers 22L, 22R, and the third chambers 23L, 23R.
As a result, in this embodiment, after the riprap 10 in the first chambers 21L and 21R has been completely dumped, and after the riprap 10 in the second chambers 22L and 22R has been completely dumped, the riprap dumping device 1 can be moved along the cable 61 on the seabed 60 to dump the riprap 10 three times in one cycle (from the start of lowering the riprap dumping device 1 to the seabed 60, through dumping the riprap 10, to the completion of pulling the riprap dumping device 1 up from the seabed 60). In other words, the amount of riprap 10 that can be dumped in one cycle can be increased to three times that of the conventional method. As a result, it is possible to improve the construction efficiency of the riprap covering method, and to significantly shorten the construction period.
Furthermore, with the conventional riprap covering method using tremie pipes, it was difficult to accurately position the tremie pipes on the cable due to the influence of tidal currents, making construction accuracy an issue.
In contrast, in this embodiment, the riprap dumping device 1 is positioned while checking the situation using monitoring means such as an underwater camera 53 and an ROV 59, thereby improving the accuracy of construction.
Furthermore, in this embodiment, the operation of opening and closing the movable plates 11L, 11R is substantially the same as the operation of opening and closing a conventional grab bucket, so that an increase in the burden on the operator can be prevented.

1 捨石投入装置、2 バケット、11L,11R 可動板、21L,21R 第1室、22L,22R 第2室、23L,23R 第3室、25L,25R 隔壁(固定板)、31 中央隔壁(固定板) 1 Rubble stone feeding device, 2 Bucket, 11L, 11R Movable plate, 21L, 21R 1st chamber, 22L, 22R 2nd chamber, 23L, 23R 3rd chamber, 25L, 25R Partition wall (fixed plate), 31 Central partition wall (fixed plate) )

Claims (3)

海底に敷設されたケーブル上に捨石を投入する捨石投入装置であって、
捨石が投入される箱形のバケットと、
前記バケット内に設けられ、該バケット内を横方向に区画する可動板と、
前記バケット内に設けられ、前記可動板に対して平行に配置される垂直板と前記垂直板の下端縁から前記可動板まで傾斜して延びる下り勾配の傾斜板とを有し、前記可動板により区画された空間を横並びの隣接する室に区画する隔壁と、
船舶上に設けられ、前記可動板を上下方向へ駆動する揚重装置と、を備え、
各室の下端部は、前記可動板により閉塞され、前記揚重装置により前記可動板を下端位置から上端位置まで上昇させる過程で、順次開放されるように配置されていることを特徴とする捨石投入装置。
A riprap dumping device for dumping riprap onto a cable laid on the seabed, comprising:
A box-shaped bucket into which rubble is dumped,
A movable plate provided in the bucket and dividing the inside of the bucket in a lateral direction;
a partition wall provided in the bucket, the partition wall having a vertical plate arranged parallel to the movable plate and a downwardly inclined plate extending from a lower end edge of the vertical plate to the movable plate, the partition wall dividing a space defined by the movable plate into adjacent chambers arranged side by side;
A lifting device is provided on the ship and drives the movable plate in a vertical direction.
A rubble dumping device characterized in that the lower end of each chamber is closed by the movable plate and is arranged to be opened sequentially as the lifting device raises the movable plate from the lower end position to the upper end position.
前記バケットには、各室に収容される捨石の容量を同一に調整する容量調整板が設けられることを特徴とする請求項に記載の捨石投入装置。 2. The rubble dumping device according to claim 1 , wherein the bucket is provided with a capacity adjustment plate for adjusting the capacity of rubble contained in each chamber to be the same. 施工状況を監視する監視手段を備えることを特徴とする請求項1又は2に記載の捨石投入装置。 3. The rubble dumping device according to claim 1 or 2 , further comprising a monitoring means for monitoring the construction status.
JP2021116118A 2021-07-14 2021-07-14 Rubble dumping device Active JP7612160B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021116118A JP7612160B2 (en) 2021-07-14 2021-07-14 Rubble dumping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021116118A JP7612160B2 (en) 2021-07-14 2021-07-14 Rubble dumping device

Publications (2)

Publication Number Publication Date
JP2023012605A JP2023012605A (en) 2023-01-26
JP7612160B2 true JP7612160B2 (en) 2025-01-14

Family

ID=85128883

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021116118A Active JP7612160B2 (en) 2021-07-14 2021-07-14 Rubble dumping device

Country Status (1)

Country Link
JP (1) JP7612160B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007063959A (en) 2005-09-02 2007-03-15 Daiho Constr Co Ltd Rubble throwing system and rubble throwing method
WO2019190318A1 (en) 2018-03-26 2019-10-03 Van Oord Dredging And Marine Contractors B.V. Hoisting system with releasable locking of hoist elements to a winch system
JP2020183672A (en) 2019-05-09 2020-11-12 深田サルベージ建設株式会社 Method for constructing stone foundation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007063959A (en) 2005-09-02 2007-03-15 Daiho Constr Co Ltd Rubble throwing system and rubble throwing method
WO2019190318A1 (en) 2018-03-26 2019-10-03 Van Oord Dredging And Marine Contractors B.V. Hoisting system with releasable locking of hoist elements to a winch system
JP2020183672A (en) 2019-05-09 2020-11-12 深田サルベージ建設株式会社 Method for constructing stone foundation

Also Published As

Publication number Publication date
JP2023012605A (en) 2023-01-26

Similar Documents

Publication Publication Date Title
JP6646694B2 (en) Dredging system and dredger for crushed stone foundation laid deep in the open sea
JP7612160B2 (en) Rubble dumping device
RU2507431C2 (en) Production method of excavation and laying works at routing of underwater pipelines, and device for its implementation
US7143532B2 (en) Marine backhoe dredge
CN216475273U (en) An automatic soil feeding double chain trencher
CN1060550C (en) Barge-supported skid-type beach sea trenching device
JP5866723B2 (en) Thin layer method and leveling tool used for the method
US2153557A (en) Combination dredging, drilling, and pile-driving equipment
JP3194190B2 (en) Open shield machine
WO2018159711A1 (en) Hydraulic shovel
JP2022161633A (en) Dredging control system and dredging method
US2496101A (en) Deepwater dredge
JP2018111922A (en) Excavator
JP2025012859A (en) Rubble dumping device
US1840550A (en) Back digger swinging dipper type
JP2026513328A (en) A construction method for barges and immersed tunnels that integrates the leveling of the crushed stone foundation and the installation of the immersed tunnel section.
CN210684834U (en) Underwater ditcher
US743751A (en) Dredger.
US2061440A (en) Hydraulic dredge swinger
JP2014037670A (en) Dredge method
WO2021171139A1 (en) Dragline with robotic bucket for dredging and excavating
US963561A (en) Excavating apparatus.
JP2585195B2 (en) Underwater work machine
US2109730A (en) Dredger
JP2026003713A (en) Caisson Installation System

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240403

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20241031

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241106

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241115

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241127

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241217

R150 Certificate of patent or registration of utility model

Ref document number: 7612160

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150