JP7612478B2 - Power Supply System - Google Patents
[go: Go Back, main page]

JP7612478B2 - Power Supply System - Google Patents

Power Supply System Download PDF

Info

Publication number
JP7612478B2
JP7612478B2 JP2021051307A JP2021051307A JP7612478B2 JP 7612478 B2 JP7612478 B2 JP 7612478B2 JP 2021051307 A JP2021051307 A JP 2021051307A JP 2021051307 A JP2021051307 A JP 2021051307A JP 7612478 B2 JP7612478 B2 JP 7612478B2
Authority
JP
Japan
Prior art keywords
earthquake
power generation
intensity
unit
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021051307A
Other languages
Japanese (ja)
Other versions
JP2022149246A (en
Inventor
壮哉 白木
義彦 小山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP2021051307A priority Critical patent/JP7612478B2/en
Publication of JP2022149246A publication Critical patent/JP2022149246A/en
Application granted granted Critical
Publication of JP7612478B2 publication Critical patent/JP7612478B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/50Fuel cells

Landscapes

  • Fuel Cell (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、燃料ガスの供給により発電を行う燃料電池を有する発電部と、前記発電部の発電を制御する運転制御部とを備え、
前記運転制御部が、前記発電部の発電を停止する際に、降温工程を含む通常停止用手順に沿って前記発電部の発電を停止させる通常停止処理と、緊急停止用手順に沿って前記発電部の発電を停止する緊急停止処理とのうちの何れか一方を実行する電力供給システムに関する。
The present invention provides a fuel cell system including a power generation unit having a fuel cell that generates power by supplying a fuel gas, and an operation control unit that controls the power generation of the power generation unit,
The present invention relates to a power supply system in which, when stopping power generation of the power generation unit, the operation control unit executes either a normal stop process that stops power generation of the power generation unit in accordance with a normal stop procedure including a cooling process, or an emergency stop process that stops power generation of the power generation unit in accordance with an emergency stop procedure.

電力供給システムとして、特許文献1には、水素含有ガスと空気との電気化学反応により発電する燃料電池を有する発電部を備え、発電部に燃料ガスを供給する設備、燃料電池に空気を供給する送風機、燃料電池の出力電力を調整するインバータ、これらを制御する制御部を備えた燃料電池システムが示されている。 As an example of a power supply system, Patent Document 1 shows a fuel cell system that includes a power generation unit having a fuel cell that generates electricity through an electrochemical reaction between hydrogen-containing gas and air, equipment for supplying fuel gas to the power generation unit, a blower for supplying air to the fuel cell, an inverter for adjusting the output power of the fuel cell, and a control unit for controlling these.

この燃料電池システムでは、燃料電池での発電時に発生する熱を利用するコージェネレーションシステムとして構成され、燃料電池は、固体酸化物を電解質層とするセルを複数積層して構成されている。発電部は、燃料ガスと改質用水蒸気とを改質反応させることにより水素を主成分とする改質ガスを生成する改質器を有し、この改質器や、これに付随する機器類の異常を検出する異常検出センサを備えている。 This fuel cell system is configured as a cogeneration system that utilizes heat generated during power generation in the fuel cell, and the fuel cell is configured by stacking multiple cells with a solid oxide electrolyte layer. The power generation unit has a reformer that generates reformed gas containing hydrogen as the main component by causing a reforming reaction between fuel gas and reforming steam, and is equipped with an abnormality detection sensor that detects abnormalities in the reformer and associated equipment.

更に、制御部は、操作部から通常停止指令が入力された場合に、降温工程を含む通常停止用手順に沿って通常停止処理を実行し、異常検出センサで異常が検出された場合には緊急停止指令が入力されたとして、降温工程を経ることなく緊急停止処理により発電を停止するように構成されている。 Furthermore, when a normal stop command is input from the operation unit, the control unit executes normal stop processing according to a normal stop procedure including a temperature drop process, and when an abnormality is detected by the abnormality detection sensor, the control unit is configured to determine that an emergency stop command has been input and to stop power generation by emergency stop processing without going through the temperature drop process.

特開2015-191863号公報JP 2015-191863 A

電力供給システムは、例えば、一般家庭等に設置されて、都市ガスが燃料ガスとして供給されて運転されることが多い。そして、地震の発生により燃料ガスの供給が停止することがある。そのような場合には、燃料ガスの供給が停止していることが検出されて、緊急停止処理が行われることになる。 Power supply systems are often installed in, for example, ordinary homes and are operated using city gas as fuel gas. However, the supply of fuel gas may be stopped due to an earthquake. In such a case, the stop of the fuel gas supply is detected and an emergency shutdown process is performed.

しかしながら、緊急停止処理にて発電部の発電が停止されると、特許文献1にも記載の如く、通常停止処理にて発電部の発電を停止する場合に較べて、燃料電池を備える発電部の劣化が大きくなる。従って、発電効率の早期低下を回避するために、緊急停止処理にて発電部の発電を停止することを極力回避することが望まれている。 However, as described in Patent Document 1, when power generation of the power generation unit is stopped by the emergency stop process, the power generation unit equipped with a fuel cell is more deteriorated than when power generation of the power generation unit is stopped by the normal stop process. Therefore, in order to avoid early deterioration of power generation efficiency, it is desirable to avoid stopping power generation of the power generation unit by the emergency stop process as much as possible.

本発明は、上記実情に鑑みて為されたものであって、その目的は、地震の発生に拘わらず発電部の劣化を極力抑制できる電力供給システムを提供する点にある。 The present invention was made in consideration of the above situation, and its purpose is to provide a power supply system that can minimize deterioration of the power generation unit regardless of the occurrence of an earthquake.

本発明の電力供給システムは、燃料ガスの供給により発電を行う燃料電池を有する発電部と、前記発電部の発電を制御する運転制御部とを備え、
前記運転制御部が、前記発電部の発電を停止する際に、降温工程を含む通常停止用手順に沿って前記発電部の発電を停止させる通常停止処理と、緊急停止用手順に沿って前記発電部の発電を停止する緊急停止処理とのうちの何れか一方を実行するものであって、その特徴構成は、
前記発電部の設置位置を示す発電部位置情報及び地震の発生に関する地震情報に基づいて、前記設置位置に、設定大きさの地震が設定時間内に到来することが予測される地震到来予測状態であることを判別する地震到来判別部が設けられ、
前記運転制御部が、前記地震到来判別部にて前記地震到来予測状態であることが判別されると、前記通常停止処理を実行する点にある。
The power supply system of the present invention includes a power generation unit having a fuel cell that generates power by supplying a fuel gas, and an operation control unit that controls the power generation of the power generation unit,
When the operation control unit stops power generation of the power generation unit, the operation control unit executes either a normal stop process for stopping power generation of the power generation unit according to a normal stop procedure including a temperature decreasing process, or an emergency stop process for stopping power generation of the power generation unit according to an emergency stop procedure, and the characteristic configuration thereof is as follows:
an earthquake arrival determination unit is provided which determines, based on power generation unit location information indicating the installation location of the power generation unit and earthquake information regarding the occurrence of an earthquake, that the installation location is in an earthquake arrival predicted state in which an earthquake of a set magnitude is predicted to occur within a set time;
The operation control unit executes the normal stop process when the earthquake occurrence determination unit determines that the earthquake occurrence is predicted.

すなわち、地震到来判別部が、発電部の設置位置を示す発電部位置情報及び地震の発生に関する地震情報に基づいて、発電部の設置位置に、設定大きさの地震が設定時間内に到来することが予測される地震到来予測状態であることを判別することになる。
そして、地震到来判別部にて地震到来予測状態が判別されると、運転制御部が、地震が到来する前に、事前に、通常停止処理を実行する。
In other words, the earthquake arrival discrimination unit determines, based on the power generation unit location information indicating the installation location of the power generation unit and earthquake information regarding the occurrence of an earthquake, that an earthquake of a set magnitude is predicted to occur at the installation location of the power generation unit within a set time.
When the earthquake arrival determination unit determines that an earthquake is predicted to occur, the operation control unit executes normal shutdown processing in advance before the earthquake occurs.

このように、運転制御部が、地震が到来する前に、事前に、通常停止処理を開始することになるから、地震が到来して燃料ガスの供給が停止されるまでの間は、降温工程を含む通常停止用手順に沿って発電部の発電を停止させることができるのであり、その結果、地震の発生に拘わらず発電部の劣化を極力抑制できるのである。 In this way, the operation control unit will start the normal shutdown process before an earthquake occurs, so power generation in the power generation unit can be stopped in accordance with the normal shutdown procedure, including the cooling process, until the earthquake occurs and the supply of fuel gas is stopped. As a result, deterioration of the power generation unit can be minimized regardless of the occurrence of an earthquake.

要するに、本発明の電力供給システムの特徴構成によれば、地震の発生に拘わらず発電部の劣化を極力抑制できる。 In short, the characteristic configuration of the power supply system of the present invention can minimize deterioration of the power generation unit regardless of the occurrence of an earthquake.

本発明の電力供給システムの更なる特徴構成は、前記燃料ガスの供給停止を検出する供給停止検出部が設けられ、
前記運転制御部が、前記通常停止処理の実行中に、前記供給停止検出部にて前記燃料ガスの供給停止が検出されると、前記通常停止処理を停止して前記緊急停止処理を実行する点にある。
A further characteristic configuration of the power supply system of the present invention is provided with a supply stop detection unit that detects a supply stop of the fuel gas,
When the supply stop detection unit detects a stop of the supply of the fuel gas while the normal stop process is being performed, the operation control unit stops the normal stop process and executes the emergency stop process.

すなわち、運転制御部が、地震が到来する前に、事前に、通常停止処理を開始することになるが、通常停止処理が終了する前に、供給停止検出部にて燃料ガスの供給停止が検出されると、通常停止処理を停止して緊急停止処理が実行されることになる。 In other words, the operation control unit will start the normal shutdown process before an earthquake strikes, but if the supply stoppage detection unit detects a fuel gas supply stoppage before the normal shutdown process is completed, the normal shutdown process will be stopped and emergency shutdown process will be executed.

したがって、地震が到来する前に事前に開始した通常停止処理が終了する前に、燃料ガスの供給が停止されても、発電部を緊急停止処理にて停止することができるから、発電部が故障する等の大きなトラブル発生に至ることを未然に防止しながら、発電部の発電を適切に停止できる。 Therefore, even if the supply of fuel gas is stopped before the normal shutdown process that was started before the earthquake is completed, the power generation unit can be stopped by emergency shutdown processing, so power generation by the power generation unit can be appropriately stopped while preventing major problems such as breakdown of the power generation unit from occurring.

要するに、本発明の電力供給システムの更なる特徴構成によれば、地震が到来する前に事前に開始した通常停止処理が終了する前に、燃料ガスの供給が停止されても、発電部の発電を適切に停止できる。 In short, according to a further characteristic configuration of the power supply system of the present invention, even if the supply of fuel gas is stopped before the normal shutdown process that was started before the earthquake arrives is completed, power generation by the power generation unit can be properly stopped.

本発明の電力供給システムの更なる特徴構成は、前記地震到来判別部が、前記地震情報として、地震が発生した地震発生地域と震度とを示す震度報知式地震発生情報を取得したときに、前記設置位置が前記地震発生地域に含まれ、かつ、前記震度が設定判別震度以上の場合には、前記地震到来予測状態であると判別する点にある。 A further characteristic feature of the power supply system of the present invention is that when the earthquake occurrence determination unit acquires earthquake occurrence information with seismic intensity notification indicating the region where an earthquake has occurred and the seismic intensity as the earthquake information, if the installation location is included in the region where an earthquake has occurred and the seismic intensity is equal to or greater than a set determination seismic intensity, it determines that the earthquake is predicted to occur.

すなわち、地震情報として、気象庁等から地震が発生した地震発生地域と震度とを示す震度報知式地震発生情報が発信される。
そして、地震到来判別部が、震度報知式地震発生情報を取得したときに、発電部の設置位置が地震発生地域に含まれ、かつ、震度が設定判別震度以上の場合には、地震到来予測状態であると判別することになり、運転制御部が通常停止処理を開始することになる。
That is, as earthquake information, the Japan Meteorological Agency and other organizations transmit earthquake occurrence information with seismic intensity reporting, which indicates the region where the earthquake occurred and the seismic intensity.
When the earthquake arrival determination unit acquires intensity notification earthquake occurrence information, if the location of the power generation unit is included in the earthquake occurrence area and the seismic intensity is equal to or higher than the set determination intensity, it will determine that an earthquake is predicted to occur, and the operation control unit will initiate normal shutdown processing.

また、地震到来判別部が、震度報知式地震発生情報を取得したときに、発電部の設置位置が地震発生地域に含まれない場合や、震度が設定判別震度未満の場合には、地震到来予測状態であると判別しないため、運転制御部が、不必要に通常停止処理を開始しないことになる。 In addition, when the earthquake occurrence determination unit acquires seismic intensity notification earthquake occurrence information, if the location of the power generation unit is not included in the earthquake occurrence area or if the seismic intensity is less than the set determination seismic intensity, it will not determine that an earthquake is predicted to occur, and the operation control unit will not unnecessarily start normal shutdown processing.

つまり、発電部の設置位置が地震発生地域に含まれ、かつ、震度が設定判別震度以上の場合には、発電部への燃料ガス(都市ガス等)の供給が停止される可能性が高いとして、通常停止処理が適切に開始されるものの、発電部の設置位置が地震発生地域に含まれない場合や、震度が設定判別震度未満の場合には、不必要に通常停止処理が開始されない。 In other words, if the location of the power generation unit is included in the earthquake-prone area and the seismic intensity is equal to or greater than the set seismic intensity, there is a high possibility that the supply of fuel gas (city gas, etc.) to the power generation unit will be stopped, and normal shutdown processing will be appropriately initiated. However, if the location of the power generation unit is not included in the earthquake-prone area or if the seismic intensity is less than the set seismic intensity, normal shutdown processing will not be initiated unnecessarily.

要するに、本発明の電力供給システムの更なる特徴構成によれば、発電部への燃料ガスの供給が停止される可能性が高い場合には、適切に通常停止処理を開始させるようにしながらも、通常停止処理を不必要に開始させないようにすることができる。 In short, according to a further characteristic configuration of the power supply system of the present invention, when there is a high possibility that the supply of fuel gas to the power generation unit will be stopped, the normal shutdown process can be appropriately initiated, while preventing the normal shutdown process from being initiated unnecessarily.

本発明の電力供給システムの更なる特徴構成は、前記地震到来判別部が、設定期間内に、前記設置位置が前記地震発生地域に含まれ、かつ、前記震度が前記設定判別震度よりも低い設定予備判別震度以上の前記震度報知式地震発生情報を設定回数取得したときに、前記地震到来予測状態であると判別する点にある。 A further characteristic feature of the power supply system of the present invention is that the earthquake arrival determination unit determines that the system is in the earthquake arrival prediction state when, within a set period of time, the installation location is included in the earthquake occurrence area and the seismic intensity notification earthquake occurrence information is acquired a set number of times in which the seismic intensity is equal to or greater than a set preliminary seismic intensity that is lower than the set seismic intensity.

すなわち、地震到来判別部が、設定期間内(例えば、24時間内)に、発電部の設置位置が地震発生地域に含まれ、かつ、震度が設定判別震度よりも低い設定予備判別震度以上の震度報知式地震発生情報を設定回数(例えば、3回以上)取得したときには、地震到来予測状態であると判別することになり、運転制御部が、通常停止処理を開始することになる。 In other words, when the earthquake occurrence determination unit acquires a set number of times (e.g., three or more) of seismic intensity notification earthquake occurrence information in which the location of the power generation unit is included in an earthquake occurrence area and the seismic intensity is equal to or greater than the set preliminary seismic intensity, which is lower than the set seismic intensity, within a set period (e.g., within 24 hours), it determines that an earthquake is predicted to occur, and the operation control unit starts normal shutdown processing.

つまり、気象庁等から、発電部の設置位置が地震発生地域に含まれ、かつ、震度が設定判別震度よりも低い設定予備判別震度以上の震度報知式地震発生情報が、設定回数(例えば、3回以上)発信されると、例えば、ガス会社が燃料ガス(都市ガス等)の供給を停止する等、燃料ガスの供給が停止される可能性が高いため、通常停止処理を開始させることができる。 In other words, if the location of the power generation unit is included in an earthquake-prone area and the seismic intensity notification earthquake occurrence information is transmitted a set number of times (e.g., three or more times) from the Japan Meteorological Agency or other organizations, and the seismic intensity is equal to or greater than the set preliminary seismic intensity, which is lower than the set seismic intensity, there is a high possibility that the supply of fuel gas (city gas, etc.) will be stopped, for example, by a gas company, and so on, so normal shutdown processing can be initiated.

要するに、本発明の電力供給システムの更なる特徴構成によれば、震度が大きな地震が発生していなくても、発電部への燃料ガスの供給が停止される可能性が高い場合には、適切に通常停止処理を開始させることができる。 In short, according to a further characteristic configuration of the power supply system of the present invention, even if an earthquake with a high seismic intensity does not occur, if there is a high possibility that the supply of fuel gas to the power generation unit will be stopped, normal shutdown processing can be appropriately initiated.

本発明の電力供給システムの更なる特徴構成は、前記地震到来判別部が、前記地震情報として、震源と地震の強度を示す強度報知式地震発生情報を取得したときに、前記設置位置が前記震源から設定距離以内であり、かつ、前記強度が設定判別値以上の場合には前記地震到来予測状態であると判別する点にある。 A further characteristic feature of the power supply system of the present invention is that when the earthquake arrival determination unit acquires, as the earthquake information, intensity reporting earthquake occurrence information indicating the epicenter and the intensity of the earthquake, it determines that the earthquake is predicted to arrive if the installation position is within a set distance from the epicenter and the intensity is equal to or greater than a set determination value.

すなわち、地震情報として、気象庁等から震源と地震の強度を示す強度報知式地震発生情報が発信される。
そして、地震到来判別部が、強度報知式地震発生情報を取得したときに、発電部の設置位置が震源から設定距離以内であり、かつ、地震の強度が設定判別値以上の場合には、地震到来予測状態であると判別することになり、運転制御部が通常停止処理を開始することになる。
That is, as earthquake information, the Japan Meteorological Agency and other organizations issue intensity-based earthquake occurrence information indicating the epicenter and intensity of the earthquake.
When the earthquake arrival discrimination unit acquires intensity notification earthquake occurrence information, if the installation location of the power generation unit is within a set distance from the epicenter and the intensity of the earthquake is equal to or greater than the set discrimination value, it will determine that an earthquake is predicted to occur, and the operation control unit will initiate normal shutdown processing.

また、地震到来判別部が、強度報知式地震発生情報を取得したときに、発電部の設置位置が震源から設定距離よりも離れている場合や、地震の強度が設定判別値未満の場合には、地震到来予測状態であると判別しないため、運転制御部が、不必要に通常停止処理を開始しないことになる。 In addition, when the earthquake arrival discrimination unit acquires intensity notification earthquake occurrence information, if the installation location of the power generation unit is farther away from the epicenter than the set distance or if the earthquake's intensity is less than the set discrimination value, it will not determine that an earthquake is predicted to arrive, and the operation control unit will not unnecessarily start normal shutdown processing.

つまり、発電部の設置位置が震源から設定距離以内であり、かつ、地震の強度が設定判別値以上の場合には、発電部への燃料ガス(都市ガス等)の供給が停止される可能性が高いとして、通常停止処理が適切に開始されるものの、発電部の設置位置が震源から設定距離よりも離れている場合や、地震の強度が設定判別値未満の場合には、不必要に通常停止処理が開始されない。 In other words, if the installation location of the power generation unit is within a set distance from the epicenter and the intensity of the earthquake is equal to or greater than the set discrimination value, it is highly likely that the supply of fuel gas (city gas, etc.) to the power generation unit will be stopped, and normal shutdown processing will be appropriately initiated. However, if the installation location of the power generation unit is farther away from the epicenter than the set distance or if the intensity of the earthquake is less than the set discrimination value, normal shutdown processing will not be initiated unnecessarily.

要するに、本発明の電力供給システムの更なる特徴構成によれば、発電部への燃料ガスの供給が停止される可能性が高い場合には、適切に通常停止処理を開始させるようにしながらも、通常処理を不必要に開始させないようにすることができる。 In short, according to a further characteristic configuration of the power supply system of the present invention, when there is a high possibility that the supply of fuel gas to the power generation unit will be stopped, it is possible to appropriately start normal shutdown processing while preventing normal processing from being started unnecessarily.

本発明の電力供給システムの更なる特徴構成は、前記地震到来判別部が、設定期間内に、前記設置位置が前記震源から設定距離以内であり、かつ、前記強度が設定判別値よりも低い設定予備判別強度以上の前記強度報知式地震発生情報を設定回数取得したときに、前記地震到来予測状態であると判別する点にある。 A further characteristic feature of the power supply system of the present invention is that the earthquake arrival determination unit determines that the system is in an earthquake arrival prediction state when, within a set period of time, the installation location is within a set distance from the epicenter and the intensity reporting earthquake occurrence information is acquired a set number of times with the intensity being equal to or greater than a set preliminary determination intensity that is lower than a set determination value.

すなわち、地震到来判別部が、設定期間内(例えば、24時間内)に、発電部の設置位置が震源から設定距離以内であり、かつ、地震の強度が設定判別値よりも低い設定予備判別強度以上の強度報知式地震発生情報を設定回数(例えば、3回以上)取得したときには、地震到来予測状態であると判別することになり、運転制御部が、通常停止処理を開始することになる。 In other words, when the earthquake occurrence discrimination unit receives a set number of times (e.g., three or more) of intensity-alert earthquake occurrence information indicating that the installation location of the power generation unit is within a set distance from the epicenter and the intensity of the earthquake is equal to or greater than the set preliminary discrimination intensity, which is lower than the set discrimination value, within a set period (e.g., within 24 hours), it will determine that an earthquake is predicted to occur, and the operation control unit will start normal shutdown processing.

つまり、気象庁等から、発電部の設置位置が震源から設定距離以内であり、かつ、地震の強度が設定判別値よりも低い設定予備判別強度以上の強度報知式地震発生情報が、設定回数(例えば、3回以上)発信されると、例えば、ガス会社が燃料ガス(都市ガス等)の供給を停止する等、燃料ガスの供給が停止される可能性が高いため、通常停止処理を開始させることができる。 In other words, if the Japan Meteorological Agency or other such organization issues a set number of intensity-alert earthquake occurrence information (e.g., three or more times) indicating that the location of the power generation unit is within a set distance from the epicenter and the earthquake's intensity is equal to or exceeds a set preliminary discrimination intensity that is lower than the set discrimination value, then normal shutdown processing can be initiated, since there is a high possibility that the supply of fuel gas will be stopped, for example, by a gas company stopping the supply of fuel gas (city gas, etc.).

要するに、本発明の電力供給システムの更なる特徴構成によれば、強度が大きな地震が発生していなくても、発電部への燃料ガスの供給が停止される可能性が高い場合には、適切に通常停止処理を開始させることができる。 In short, according to a further characteristic configuration of the power supply system of the present invention, even if a large earthquake does not occur, if there is a high possibility that the supply of fuel gas to the power generation unit will be stopped, normal shutdown processing can be appropriately initiated.

電力供給システムの構成を示す図である。FIG. 1 is a diagram illustrating a configuration of a power supply system. 運転制御装置の構成を示す図である。FIG. 2 is a diagram showing the configuration of an operation control device. 発電停止制御のフローチャートである。4 is a flowchart of power generation stop control.

以下、本発明の実施形態を図面に基づいて説明する。
〔電力供給システムの概要〕
図1に示すように、外部から燃料ガスとして供給される都市ガス(以下、燃料ガスと称することもある)によって発電する発電モジュールM(発電部の一例)と、発電された電力を交流に変換する電力変換部1と、発電モジュールMでの発電時に発生する排熱を回収する排熱回収熱交換部2と、排熱回収熱交換部2で回収した排熱で水を加熱して温湯として貯える貯湯槽3と、システム全体を制御する運転制御装置C(運転制御部の一例)と、を備えてコージェネ型の電力供給システムAが構成されている。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[Outline of the power supply system]
As shown in FIG. 1, a cogeneration type power supply system A is configured to include a power generation module M (an example of a power generation unit) that generates electricity using city gas (hereinafter sometimes referred to as fuel gas) supplied from outside as fuel gas, a power conversion unit 1 that converts the generated electricity into alternating current, a waste heat recovery heat exchange unit 2 that recovers exhaust heat generated during power generation in the power generation module M, a hot water storage tank 3 that heats water with the exhaust heat recovered in the exhaust heat recovery heat exchange unit 2 and stores it as hot water, and an operation control device C (an example of an operation control unit) that controls the entire system.

この電力供給システムAは、一般家庭等の家屋の屋外に配置されるものであり、屋内のリモートコントローラ4にて操作できるように構成されている。また、貯湯槽3に蓄えられた温湯が屋内に供給できるように構成され、発電された電力が、電力変換部1で交流に変換されて家屋の内部の電気機器に供給されるように構成されている。 This power supply system A is placed outside a house such as an ordinary home, and is configured to be operated by an indoor remote controller 4. It is also configured to supply hot water stored in a hot water tank 3 indoors, and the generated electricity is converted to AC in a power conversion unit 1 and supplied to electrical equipment inside the house.

〔電力供給システムの具体構成〕
図1に示すように、発電モジュールMは、気化器5と、改質器6と、複数のセルを積層したセルスタック7(燃料電池の一例)と、都市ガスの一部を燃焼させるバーナ8とをケース9に収容することでホットモジュールとして構成されている。セルスタック7を構成する複数のセルは、固体酸化物形燃料電池が用いられている。
[Specific configuration of the power supply system]
1, the power generation module M is configured as a hot module by housing a vaporizer 5, a reformer 6, a cell stack 7 (an example of a fuel cell) in which multiple cells are stacked, and a burner 8 for burning a portion of the city gas in a case 9. The multiple cells that make up the cell stack 7 are solid oxide fuel cells.

電力供給システムAは、都市ガスが供給されるガス供給流路11に対して電磁式の燃料バルブ12と、ガス圧センサ13と、ガスブロア14と、脱硫器15とを、この順序で配置してガス供給系を構成しており、脱硫器15を通過した都市ガスは発電モジュールMの気化器5に供給される。
ちなみに、ガス圧センサ13は、都市ガスの供給圧力が設定圧力以下に低下したことを検出すると、都市ガス(燃料ガス)の供給停止であるとする供給停止検出部として機能することになる。
The power supply system A has a gas supply system in which an electromagnetic fuel valve 12, a gas pressure sensor 13, a gas blower 14, and a desulfurizer 15 are arranged in this order along a gas supply passage 11 to which city gas is supplied, and the city gas that passes through the desulfurizer 15 is supplied to the vaporizer 5 of the power generation module M.
Incidentally, when the gas pressure sensor 13 detects that the supply pressure of city gas has dropped below a set pressure, it functions as a supply stop detection unit that determines that the supply of city gas (fuel gas) has been stopped.

このように構成されるガス供給流路11では、電磁式の燃料バルブ12の制御により都市ガスの供給と遮断との切り換えが可能であり、ガス圧センサ13で都市ガスの圧力を検出が可能である。また、ガスブロア14は電動モータによって駆動されるブロアを有しており、電動モータの制御により都市ガスの供給と遮断との切り換えが可能である。 In the gas supply flow path 11 configured in this manner, the supply of city gas can be switched on and off by controlling the electromagnetic fuel valve 12, and the pressure of the city gas can be detected by the gas pressure sensor 13. In addition, the gas blower 14 has a blower driven by an electric motor, and the supply of city gas can be switched on and off by controlling the electric motor.

電力供給システムAは、改質水タンク17に貯留した改質水を送る改質水流路18に対して改質水ポンプ19を備えて改質水供給系を構成しており、改質水流路18からの改質水は気化器5に供給される。 The power supply system A is provided with a reforming water pump 19 for a reforming water flow path 18 that sends reforming water stored in a reforming water tank 17, and the reforming water from the reforming water flow path 18 is supplied to the vaporizer 5.

電力供給システムAは、発電モジュールMのケースに空気を供給する空気供給流路21を有し、この空気供給流路21に空気を送るエアブロア22を備えている。 The power supply system A has an air supply passage 21 that supplies air to the case of the power generation module M, and is equipped with an air blower 22 that sends air to this air supply passage 21.

発電モジュールMでは、バーナ8で都市ガスの一部を燃焼させることによりケース9の内部空間に高温環境を作り出しており、この高温環境において改質器6も高温化されている。このため、発電モジュールMは、ガス供給流路11から気化器5を介して改質器6に都市ガスが供給され、改質水流路18から気化器5を介して改質器6に供給される水が水蒸気化して、この改質器6において都市ガスと混合して化学反応する結果、水素を多く含む燃料ガスに改質される。 In the power generation module M, a high-temperature environment is created in the internal space of the case 9 by burning a portion of the city gas with the burner 8, and the reformer 6 is also heated to a high temperature in this high-temperature environment. Therefore, in the power generation module M, city gas is supplied from the gas supply passage 11 to the reformer 6 via the vaporizer 5, and water supplied from the reforming water passage 18 to the reformer 6 via the vaporizer 5 is converted to steam, which mixes with the city gas in the reformer 6 and undergoes a chemical reaction, resulting in reforming into a fuel gas containing a large amount of hydrogen.

また、燃料ガスは、セルスタック7を構成する各々のセルのアノード極に供給され、空気供給流路21から共有された空気は、セルスタック7を構成する各々のセルのカソード極に供給される。これにより電気化学反応により発電が行われ、電力変換部1に送り出される。また、発電モジュールMのケース9から高温の排ガスを送り出す排ガス流路23が形成され、この排ガス流路23に排熱回収熱交換部2が備えられている。 Fuel gas is supplied to the anode of each cell that constitutes the cell stack 7, and shared air from the air supply passage 21 is supplied to the cathode of each cell that constitutes the cell stack 7. This generates electricity through an electrochemical reaction, and the electricity is sent to the power conversion unit 1. In addition, an exhaust gas passage 23 is formed to send out high-temperature exhaust gas from the case 9 of the power generation module M, and this exhaust gas passage 23 is equipped with an exhaust heat recovery heat exchange unit 2.

貯湯槽3に蓄えられた水(温湯)を、排熱回収熱交換部2に供給し貯湯槽3に戻す循環流路25が形成され、この循環流路25に水を循環させる循環ポンプ26を備えている。また、貯湯槽3に対して水(基本的に水道水)を供給する水供給流路27を備え、貯湯槽3に蓄えられた水(温湯)を外部に送り出す温湯流路28に電磁式の温湯バルブ29を備えている。 A circulation flow path 25 is formed to supply the water (hot water) stored in the hot water tank 3 to the exhaust heat recovery heat exchange section 2 and return it to the hot water tank 3, and a circulation pump 26 is provided to circulate water through this circulation flow path 25. In addition, a water supply flow path 27 is provided to supply water (basically tap water) to the hot water tank 3, and an electromagnetic hot water valve 29 is provided on the hot water flow path 28 that sends the water (hot water) stored in the hot water tank 3 to the outside.

図面には示していないが、貯湯槽3の水温を検出する水温センサを備えており、水温センサで検出される水温が設定値未満に低下した場合に、循環ポンプ26を駆動して水温の上昇を図る制御が運転制御装置Cで実行される。 Although not shown in the drawing, a water temperature sensor is provided to detect the water temperature in the hot water tank 3, and when the water temperature detected by the water temperature sensor falls below a set value, the operation control device C drives the circulation pump 26 to increase the water temperature.

〔運転制御装置について〕
運転制御装置Cは、マイクロプロセッサや、DSP(Digital Signal Processor)等を備えることにより、予め記憶されたプログラムに従って処理を実行する。
[Regarding operation control devices]
The operation control device C is equipped with a microprocessor, a DSP (Digital Signal Processor), etc., and executes processing according to a program stored in advance.

図2に示すように、運転制御装置Cは、ソフトウエアで構成される発電制御部31と、温湯制御部32と、起動制御部33と、停止制御部34と、地震到来判別部35とを備えている。更に、運転制御装置Cは、記憶部36と、位置情報取得部37と、受信部38とを備えている。 As shown in FIG. 2, the operation control device C includes a power generation control unit 31, a hot water control unit 32, a start control unit 33, a stop control unit 34, and an earthquake occurrence determination unit 35, all of which are implemented by software. Furthermore, the operation control device C includes a memory unit 36, a location information acquisition unit 37, and a receiving unit 38.

尚、発電制御部31と、温湯制御部32と、起動制御部33と、停止制御部34との夫々におけるソフトウエアによる制御の一部をハードウエアで行わせるようにハードウエアと組み合わせても構成しても良い。 In addition, the power generation control unit 31, the hot water control unit 32, the start control unit 33, and the stop control unit 34 may be configured to be combined with hardware so that some of the software control is performed by the hardware.

図2には、後述する発電停止制御に関連する情報を取得する対象と、制御情報の出力対象との概要を示している。つまり、運転制御装置Cは、リモートコントローラ4からの情報が入力すると共に、ガス圧センサ13と、起動スイッチ40と、停止スイッチ41と、GPS受信ユニット42とからの情報が入力する。 Figure 2 shows an overview of the targets from which information related to the power generation stop control described below is acquired and the targets from which control information is output. In other words, the operation control device C receives information from the remote controller 4, as well as information from the gas pressure sensor 13, the start switch 40, the stop switch 41, and the GPS receiving unit 42.

また、この運転制御装置Cは、燃料バルブ12と、ガスブロア14と、改質水ポンプ19と、エアブロア22と、ディスプレイ43(情報出力部の一例)とに制御情報を出力する。受信部38は、通信ネットワークとしてのインターネットINを介して地震発生に関する情報を発信する地震情報サーバ45に接続されている。
ちなみに、地震情報サーバ45は、気象庁のサーバや、気象庁が発信する地震に関する情報を取得して、当該情報を発信するガス会社の管理サーバである。
The operation control device C also outputs control information to the fuel valve 12, the gas blower 14, the reforming water pump 19, the air blower 22, and a display 43 (an example of an information output unit). The receiving unit 38 is connected to an earthquake information server 45 that transmits information related to the occurrence of an earthquake via the Internet IN as a communication network.
Incidentally, the earthquake information server 45 is a server of the Japan Meteorological Agency or a management server of a gas company that acquires information on earthquakes transmitted by the Japan Meteorological Agency and transmits the information.

発電制御部31は、発電モジュールMに対する都市ガスの供給量、改質水の供給量、空気の供給量、ケース9の内部の温度等を決めることにより発電を制御する。温湯制御部32は、貯湯槽3に貯留される温湯(水)の温度を制御し、出湯を制御する。 The power generation control unit 31 controls power generation by determining the amount of city gas supplied to the power generation module M, the amount of reformed water supplied, the amount of air supplied, the temperature inside the case 9, etc. The hot water control unit 32 controls the temperature of the hot water (water) stored in the hot water tank 3 and controls the hot water supply.

起動制御部33は、起動スイッチ40の操作に基づき、停止状態にある発電モジュールMで発電を開始させる。停止制御部34は、発電モジュールMを停止させる制御を実行する。停止制御部34の制御形態は後述する。 The start control unit 33 starts power generation in the power generation module M that is in a stopped state based on the operation of the start switch 40. The stop control unit 34 executes control to stop the power generation module M. The control form of the stop control unit 34 will be described later.

記憶部36は、EEPROM等の不揮発性メモリを備えている。位置情報取得部37は、GPS受信ユニット42で受信された複数の測位衛星の情報に基づき発電モジュールM(電力供給システムA)が設置されている位置情報を取得する。このように取得される位置情報は、経度情報と緯度情報であるが、この経度情報と緯度情報とに併せて、住居表示の情報、あるいは、地番の情報を位置情報として記憶部36に記憶される。 The memory unit 36 includes a non-volatile memory such as an EEPROM. The location information acquisition unit 37 acquires location information of the power generation module M (power supply system A) based on information from multiple positioning satellites received by the GPS receiving unit 42. The location information acquired in this manner is longitude information and latitude information, and in addition to this longitude information and latitude information, address information or land address information is stored in the memory unit 36 as location information.

受信部38は、インターネットIN(通信ネットワーク)からの情報を取得する。ディスプレイ43(情報出力部)は、人が認識できる形で情報を出力する情報出力部の一例であり、電力供給システムAの筐体の外面に露出する状態で備えられるものを想定しており情報を表示する。 The receiving unit 38 acquires information from the Internet IN (communications network). The display 43 (information output unit) is an example of an information output unit that outputs information in a form that can be recognized by humans, and is assumed to be provided in an exposed state on the outer surface of the housing of the power supply system A, and displays information.

地震到来判別部35は、発電モジュールMの設置位置を示す発電部位置情報及び地震の発生に関する地震情報に基づいて、発電モジュールMの設置位置に、設定大きさの地震が設定時間内に到来することが予測される地震到来判予測状態であることを判別する。 The earthquake arrival determination unit 35 determines, based on the power generation unit location information indicating the installation location of the power generation module M and earthquake information regarding the occurrence of an earthquake, that an earthquake of a set magnitude is predicted to occur within a set time at the installation location of the power generation module M.

図2では、起動スイッチ40と、停止スイッチ41と、ディスプレイ43とが運転制御装置Cに対して直接接続する構成を示しているが、これらをリモートコントローラ4に備えるように構成しても良い。 In FIG. 2, the start switch 40, the stop switch 41, and the display 43 are shown as being directly connected to the operation control device C, but they may also be configured to be provided in the remote controller 4.

〔停止制御の概要〕
一般家庭等でガスの使用量を計量するガスメータは、大きい震度の地震を感知して自動的にガス供給を停止する機能を有している。このように地震の発生時にガスメータで都市ガスの供給が停止した場合には、ガス圧センサ13で検出される都市ガスの圧力が大きく低下するため、これに連携して停止制御部34が緊急停止処理を行う。
[Outline of stop control]
Gas meters that measure the amount of gas used in ordinary homes have a function to detect earthquakes of high seismic intensity and automatically stop the gas supply. When the gas meter stops the city gas supply in this way when an earthquake occurs, the city gas pressure detected by the gas pressure sensor 13 drops significantly, and the stop control unit 34 performs emergency stop processing in cooperation with this.

この緊急停止処理は、ガス圧の低下が検出された場合に、迅速な停止を優先する緊急停止用手順に沿って発電モジュールMでの発電を停止するものである。この緊急停止処理では、ガス圧の低下が検出されと、直ちに、ガスブロア14を停止し、改質水ポンプ19を停止し、エアブロア22を停止する処理を行うことにより、発電モジュールMのケース9の内部の温度を自然放熱によって低下させることになる。 This emergency shutdown process stops power generation in the power generation module M in accordance with emergency shutdown procedures that prioritize rapid shutdown when a drop in gas pressure is detected. When a drop in gas pressure is detected, this emergency shutdown process immediately stops the gas blower 14, the reforming water pump 19, and the air blower 22, thereby lowering the temperature inside the case 9 of the power generation module M through natural heat dissipation.

発電時において発電モジュールMのケース9の内部の温度は、改質及び発電を可能にする高い温度に維持され、セルスタック7を構成するセルの燃料極と空気極との温度も高い温度に維持されている。しかしながら、緊急停止処理によって、都市ガスの供給が停止した場合には、温度が管理されない状態で温度が低下することにより、燃料極と空気極とが劣化し、発電効率の低下に繋がるものである。 During power generation, the temperature inside the case 9 of the power generation module M is maintained at a high temperature that enables reforming and power generation, and the temperatures of the fuel electrodes and air electrodes of the cells that make up the cell stack 7 are also maintained at high temperatures. However, if the supply of city gas is stopped by emergency shutdown processing, the temperature will drop without being managed, causing the fuel electrodes and air electrodes to deteriorate, leading to a decrease in power generation efficiency.

このような理由から、停止制御部34は、発電モジュールM(発電部)の保護を優先する降温工程を含む通常停止用手順に沿って発電モジュールMでの発電を停止させる通常停止処理を行えるように構成されている。 For this reason, the stop control unit 34 is configured to perform normal stop processing to stop power generation in the power generation module M in accordance with a normal stop procedure that includes a temperature reduction process that prioritizes protection of the power generation module M (power generation unit).

つまり、通常停止処理では停止制御部34が、ガスブロア14と、改質水ポンプ19と、エアブロア22とを制御することで、都市ガスと、改質水と、空気との供給量を、時間を掛けて徐々に低下させており、自然放熱より低速での温度低下(降温工程)を実現している。このような通常停止処理を可能にするため、発電モジュールMには複数の温度センサ(図示せず)を備えており、停止制御部34は、このような通常停止用手順に従う制御を可能にするプログラムを有している。 In other words, in normal shutdown processing, the shutdown control unit 34 controls the gas blower 14, the reforming water pump 19, and the air blower 22 to gradually reduce the supply of city gas, reforming water, and air over time, achieving a slower temperature drop (cooling down process) than natural heat dissipation. To enable such normal shutdown processing, the power generation module M is equipped with multiple temperature sensors (not shown), and the shutdown control unit 34 has a program that enables control in accordance with such normal shutdown procedures.

通常停止処理は、緊急停止処理と比較して処理の完了までに長い時間を必要とするものであり、降温工程により、発電モジュールMの温度を管理する状況で設定温度まで低下させ、この温度低下を確認した後に、都市ガスと、改質水と、空気との供給を完全に停止させることにより燃料極と空気極との劣化を抑制している。尚、通常停止処理において、放熱時に温度を複数段階で低下させるためエアブロア22を停止させるタイミングを送らせても良い。 Normal shutdown processing requires a longer time to complete than emergency shutdown processing, and the temperature of the power generation module M is lowered to a set temperature under controlled conditions through a temperature reduction process. After this temperature drop is confirmed, the supply of city gas, reforming water, and air is completely stopped to prevent deterioration of the fuel electrode and air electrode. In addition, in normal shutdown processing, the timing of stopping the air blower 22 may be delayed in order to lower the temperature in multiple stages during heat dissipation.

ちなみに、緊急停止処理にて発電モジュールMを停止させた場合においてセルスタック7等に与える負荷は、例えば、通常停止処理にて発電モジュールMを停止させる場合おいてセルスタック7等に与える負荷の10倍程度になる虞があり、緊急停止処理にて発電モジュールMを停止させることは極力回避することが望ましい。
このため、詳細は後述するが、地震到来判別部35が地震到来予測状態であることを判別すると、停止制御部34が、通常停止処理を実行することになる。そして、停止制御部34は、当該通常停止処理を実行しているときに、地震の到来等により、ガス圧センサ13にて燃料ガスの供給が検出されると、通常停止処理を停止して緊急停止処理を実行することになる。
Incidentally, when the power generation module M is stopped by emergency stop processing, the load placed on the cell stack 7, etc. may be, for example, about 10 times the load placed on the cell stack 7, etc. when the power generation module M is stopped by normal stop processing, and it is therefore desirable to avoid stopping the power generation module M by emergency stop processing as much as possible.
For this reason, when the earthquake arrival determination unit 35 determines that an earthquake is predicted, the stop control unit 34 executes normal stop processing, which will be described in detail later. Then, when the stop control unit 34 is executing the normal stop processing and the gas pressure sensor 13 detects a supply of fuel gas due to an earthquake or the like, the stop control unit 34 stops the normal stop processing and executes emergency stop processing.

〔地震到来判別部の詳細〕
地震到来判別部35は、地震情報として、地震が発生した地震発生地域と震度とを示す震度報知式地震発生情報を取得したときに、発電モジュールMの設置位置が地震発生地域に含まれ、かつ、震度が設定判別震度以上(例えば、震度4以上)の場合には、地震到来予測状態であると判別するように構成されている。
[Details of earthquake arrival detection unit]
The earthquake arrival determination unit 35 is configured to determine that an earthquake is predicted to occur when it receives earthquake intensity notification type earthquake occurrence information indicating the earthquake occurrence area and seismic intensity where an earthquake occurred as earthquake information, if the installation location of the power generation module M is included in the earthquake occurrence area and the seismic intensity is equal to or higher than the set determination seismic intensity (for example, seismic intensity 4 or higher).

また、地震到来判別部35は、設定期間内(例えば、24時間内)に、発電モジュールMの設置位置が地震発生地域に含まれ、かつ、震度が設定判別震度(例えば、震度4)よりも低い設定予備判別震度以上(例えば、震度2以上)の震度報知式地震発生情報を設定回数(例えば、3回以上)取得したときに、地震到来予測状態であると判別するように構成されている。 The earthquake arrival determination unit 35 is also configured to determine that an earthquake is predicted to occur when, within a set period (e.g., within 24 hours), the installation location of the power generation module M is included in an earthquake-prone area, and when seismic intensity notification earthquake occurrence information is acquired a set number of times (e.g., three or more times) with a seismic intensity equal to or higher than a set preliminary seismic intensity (e.g., seismic intensity 2 or higher) that is lower than a set seismic intensity (e.g., seismic intensity 4).

また、地震到来判別部35は、地震情報として、発生した地震の震源と地震の強度を示す強度報知式地震発生情報を取得したときに、発電モジュールMの設置位置が震源から設定距離以内(例えば、半径20Km以内)であり、かつ、強度が設定判別値以上(例えば、マグニチュード5以上)の場合には地震到来予測状態であると判別するように構成されている。 The earthquake arrival determination unit 35 is also configured to determine that an earthquake is predicted to occur when it receives earthquake occurrence information indicating the epicenter and intensity of an earthquake that has occurred as earthquake information, if the installation position of the power generation module M is within a set distance from the epicenter (e.g., within a radius of 20 km) and the intensity is equal to or greater than a set determination value (e.g., magnitude 5 or greater).

また、地震到来判別部35は、設定期間内(例えば、24時間内)に、発電モジュールMの設置位置が震源から設定距離以内(例えば、半径20Km以内)であり、かつ、強度が設定判別値(例えば、マグニチュード5)よりも低い設定予備判別強度以上(例えば、マグニチュード3以上)の強度報知式地震発生情報を設定回数(例えば、3回以上)取得したときに、地震到来予測状態であると判別するように構成されている。 The earthquake arrival discrimination unit 35 is also configured to determine that an earthquake is predicted to occur when, within a set period (e.g., within a 24-hour period), the installation position of the power generation module M is within a set distance (e.g., within a radius of 20 km) from the epicenter and intensity notification earthquake occurrence information with an intensity equal to or greater than a set preliminary discrimination intensity (e.g., magnitude 3 or greater) that is lower than a set discrimination value (e.g., magnitude 5) is acquired a set number of times (e.g., three or more times).

つまり、地震到来判別部35は、震度報知式地震発生情報及び強度報知式地震発生情報を取得したときに、上述の4つの条件のいずれかが満たされると、地震到来予測状態であると判別するように構成されている。 In other words, the earthquake arrival determination unit 35 is configured to determine that an earthquake is predicted to occur if any of the above four conditions are satisfied when the earthquake intensity notification type earthquake occurrence information and the earthquake strength notification type earthquake occurrence information are acquired.

〔停止制御部の制御作動の詳細〕
次に、ガス圧センサ13が燃料ガスの供給停止を検出した場合及び地震到来判別部35が地震到来予測状態であると判別した場合における停止制御部34の制御作動について、
図3のフローチャートに基づいて説明する。
[Details of control operation of the stop control unit]
Next, the control operation of the stop control unit 34 when the gas pressure sensor 13 detects a fuel gas supply stop and when the earthquake occurrence determination unit 35 determines that an earthquake is predicted to occur is as follows:
The following description will be given based on the flow chart of FIG.

先ず、ガス圧センサ13が燃料ガスの供給停止を検出した燃料ガス供給停止状態であるか否かが判別され(#1)、燃料ガス供給停止状態である場合には、緊急停止処理が実行される(#2)。 First, it is determined whether the gas pressure sensor 13 has detected a fuel gas supply stoppage and whether the fuel gas supply has been stopped (#1). If the fuel gas supply has been stopped, emergency stop processing is executed (#2).

#1の処理にて、燃料ガス供給停止状態でないと判別した場合には、続いて、地震到来判別部35にて地震到来予測状態が判別されているか否かを判別し(#3)、地震到来予測状態でない場合には、#1の処理に移行する。 If it is determined in process #1 that the fuel gas supply is not stopped, the earthquake occurrence determination unit 35 then determines whether an earthquake is predicted (#3), and if it is not, the process proceeds to process #1.

#3の処理にて、地震到来予測状態であると判別されている場合には、通常停止処理を実行する(#4)。続いて、開始した通常停止処理により発電モジュールMの停止を完了した停止完了であるか否かを判別し(#5)、停止完了でない場合には、続いて、ガス圧センサ13が燃料ガスの供給停止を検出した燃料ガス供給停止状態であるか否かを判別し(#6)、燃料ガス供給停止状態でない場合には、#4の処理に移行することになる。 If it is determined in the process of #3 that an earthquake is predicted, normal shutdown processing is executed (#4). Next, it is determined whether or not the shutdown of the power generation module M has been completed by the started normal shutdown processing (#5). If the shutdown is not complete, it is determined whether or not the gas pressure sensor 13 has detected a fuel gas supply stoppage and the fuel gas supply has been stopped (#6). If the fuel gas supply is not stopped, the process moves to #4.

#6の処理にて、燃料ガス供給停止状態であると判別した場合には、#2の緊急停止処理が実行され、また、#5の処理にて、発電モジュールMの停止を完了した停止完了であると判別した場合には、停止制御の処理を終了する。 If it is determined in process #6 that the fuel gas supply has been stopped, the emergency stop process in #2 is executed, and if it is determined in process #5 that the power generation module M has been completely stopped, the stop control process is terminated.

つまり、#4の通常停止処理が開始されると、通常停止処理により発電モジュールMが停止されるまで、#4の通常停止処理が実行されることになるが、通常停止処理を実行しているときに、燃料ガス供給停止状態であることが判別されると、#2の緊急停止処理により、発電モジュールMが緊急停止されることになる。 In other words, when the normal shutdown process of #4 is started, the normal shutdown process of #4 will be executed until the power generation module M is stopped by the normal shutdown process, but if it is determined that the fuel gas supply is stopped while the normal shutdown process is being executed, the power generation module M will be stopped in an emergency by the emergency shutdown process of #2.

〔別実施形態〕
次に、別実施形態を列記する
(a)上記実施形態では、運転制御部としての運転制御装置Cにて、地震到来判別部35を構成する場合を例示したが、地震到来判別部35を、運転制御装置Cとは別の制御部として構成して、地震到来判別部35の判別結果を運転制御装置Cに通信する形態で実施してもよい。
[Another embodiment]
Next, other embodiments are listed. (a) In the above embodiment, an example was given of the case where the earthquake arrival discrimination unit 35 is configured in the operation control device C as an operation control unit. However, the earthquake arrival discrimination unit 35 may be configured as a control unit separate from the operation control device C, and the discrimination result of the earthquake arrival discrimination unit 35 may be communicated to the operation control device C.

(b)上記実施形態では、ガス供給流路11を流動する燃料ガスのガス圧を検出するガス圧センサ13にて、燃料ガスの供給停止を検出する場合を例示したが、ガス供給流路11を流動する燃料ガスの流量を検出する流量センサを設けて、燃料ガスの供給停止を、燃料ガスの流量が設定流量以下になることにより検出させるようにしてもよい。 (b) In the above embodiment, the gas pressure sensor 13 that detects the gas pressure of the fuel gas flowing through the gas supply flow passage 11 is used to detect the stop of the fuel gas supply. However, a flow rate sensor that detects the flow rate of the fuel gas flowing through the gas supply flow passage 11 may be provided, and the stop of the fuel gas supply may be detected when the flow rate of the fuel gas falls below a set flow rate.

(c)上記実施形態では、地震到来判別部35が、地震の発生に関する地震情報として、実際に地震が発生した後に報知される震度報知式地震発生情報や強度報知式地震発生情報に基づいて、地震到来予測状態を判別する場合を例示したが、地震の発生に関する地震情報として、地震が発生する前に予知した強度報知式地震発生情報が報知される場合には、その情報に基づいて地震到来予測状態を判別する形態で実施してもよい。 (c) In the above embodiment, an example was given of the case where the earthquake arrival discrimination unit 35 discerns the predicted state of an earthquake based on the earthquake intensity notification type earthquake occurrence information or the earthquake intensity notification type earthquake occurrence information that is reported after an earthquake actually occurs as earthquake information related to the occurrence of an earthquake. However, in cases where the earthquake intensity notification type earthquake occurrence information that is predicted before an earthquake occurs is reported as earthquake information related to the occurrence of an earthquake, the embodiment may be implemented in a form in which the predicted state of an earthquake arrival is discerned based on that information.

(d)上記実施形態では、発電部としての発電モジュールMの設置位置を示す発電部位置情報を、GPS受信ユニット42を用いて取得する場合を例示したが、例えば、設置位置としての住所を手動にて予め入力して記憶させるようにする等、設置位置を示す発電部位置情報を入力する形態は種々変更できる。 (d) In the above embodiment, the power generation unit location information indicating the installation position of the power generation module M as the power generation unit is obtained using the GPS receiving unit 42, but the form of inputting the power generation unit location information indicating the installation position can be changed in various ways, for example, by manually inputting and storing an address as the installation position in advance.

(e)上記実施形態では、燃料ガスとして都市ガスを例示したが、燃料ガスとしては種々の炭化水素系ガスを適用できる。 (e) In the above embodiment, city gas was used as an example of the fuel gas, but various hydrocarbon gases can be used as the fuel gas.

尚、上記実施形態(別実施形態を含む)で開示される構成は、矛盾が生じない限り、他の実施形態で開示される構成と組み合わせて適用することが可能であり、また、本明細書において開示された実施形態は例示であって、本発明の実施形態はこれに限定されず、本発明の目的を逸脱しない範囲内で適宜改変することが可能である。 The configurations disclosed in the above embodiment (including other embodiments) can be applied in combination with configurations disclosed in other embodiments, provided no contradictions arise. Furthermore, the embodiments disclosed in this specification are merely examples, and the present invention is not limited to these embodiments. They can be modified as appropriate within the scope of the purpose of the present invention.

本発明は、燃料ガスの供給により発電を行う発電部を備えている電力供給システムに利用することができる。 The present invention can be used in a power supply system that has a power generation unit that generates electricity by supplying fuel gas.

7 燃料電池
35 地震到来判別部
C 運転制御部
M 発電部
7 Fuel cell 35 Earthquake arrival determination unit C Operation control unit M Power generation unit

Claims (6)

燃料ガスの供給により発電を行う燃料電池を有する発電部と、前記発電部の発電を制御する運転制御部とを備え、
前記運転制御部が、前記発電部の発電を停止する際に、降温工程を含む通常停止用手順に沿って前記発電部の発電を停止させる通常停止処理と、緊急停止用手順に沿って前記発電部の発電を停止する緊急停止処理とのうちの何れか一方を実行する電力供給システムであって、
前記発電部の設置位置を示す発電部位置情報及び地震の発生に関する地震情報に基づいて、前記設置位置に、設定大きさの地震が設定時間内に到来することが予測される地震到来予測状態であることを判別する地震到来判別部が設けられ、
前記運転制御部が、前記地震到来判別部にて前記地震到来予測状態であることが判別されると、前記通常停止処理を実行する電力供給システム。
a power generation unit having a fuel cell that generates power by supplying a fuel gas; and an operation control unit that controls the power generation of the power generation unit,
a power supply system in which, when stopping power generation of the power generation unit, the operation control unit executes either a normal stop process for stopping power generation of the power generation unit according to a normal stop procedure including a temperature decreasing process or an emergency stop process for stopping power generation of the power generation unit according to an emergency stop procedure,
an earthquake arrival determination unit is provided which determines, based on power generation unit location information indicating the installation location of the power generation unit and earthquake information regarding the occurrence of an earthquake, that the installation location is in an earthquake arrival predicted state in which an earthquake of a set magnitude is predicted to occur within a set time;
The power supply system, wherein the operation control unit executes the normal shutdown process when the earthquake occurrence determination unit determines that the system is in the earthquake occurrence predicted state.
前記燃料ガスの供給停止を検出する供給停止検出部が設けられ、
前記運転制御部が、前記通常停止処理の実行中に、前記供給停止検出部にて前記燃料ガスの供給停止が検出されると、前記通常停止処理を停止して前記緊急停止処理を実行する請求項1に記載の電力供給システム。
a supply stop detection unit that detects a stop of the supply of the fuel gas,
The power supply system according to claim 1 , wherein when the supply stop detection unit detects a stop in the supply of the fuel gas while the normal stop process is being performed, the operation control unit stops the normal stop process and performs the emergency stop process.
前記地震到来判別部が、前記地震情報として、地震が発生した地震発生地域と震度とを示す震度報知式地震発生情報を取得したときに、前記設置位置が前記地震発生地域に含まれ、かつ、前記震度が設定判別震度以上の場合には、前記地震到来予測状態であると判別する請求項1又は2に記載の電力供給システム。 The power supply system according to claim 1 or 2, wherein when the earthquake occurrence determination unit acquires earthquake occurrence information with seismic intensity notification, which indicates the region where an earthquake has occurred and the seismic intensity as the earthquake information, if the installation location is included in the region where an earthquake has occurred and the seismic intensity is equal to or greater than a set determination seismic intensity, the system determines that the earthquake is in a predicted state. 前記地震到来判別部が、設定期間内に、前記設置位置が前記地震発生地域に含まれ、かつ、前記震度が前記設定判別震度よりも低い設定予備判別震度以上の前記震度報知式地震発生情報を設定回数取得したときに、前記地震到来予測状態であると判別する請求項3に記載の電力供給システム。 The power supply system according to claim 3, wherein the earthquake arrival determination unit determines that the system is in the earthquake arrival prediction state when, within a set period, the installation location is included in the earthquake occurrence area and the seismic intensity notification earthquake occurrence information is acquired a set number of times in which the seismic intensity is equal to or greater than a set preliminary seismic intensity that is lower than the set seismic intensity. 前記地震到来判別部が、前記地震情報として、震源と地震の強度を示す強度報知式地震発生情報を取得したときに、前記設置位置が前記震源から設定距離以内であり、かつ、前記強度が設定判別値以上の場合には前記地震到来予測状態であると判別する請求項1~4のいずれか1項に記載の電力供給システム。 The power supply system according to any one of claims 1 to 4, wherein the earthquake arrival determination unit, when acquiring intensity reporting earthquake occurrence information indicating the epicenter and intensity of the earthquake as the earthquake information, determines that the installation position is within a set distance from the epicenter and that the intensity is equal to or greater than a set determination value, and determines that the system is in the earthquake arrival prediction state. 前記地震到来判別部が、設定期間内に、前記設置位置が前記震源から設定距離以内であり、かつ、前記強度が設定判別値よりも低い設定予備判別強度以上の前記強度報知式地震発生情報を設定回数取得したときに、前記地震到来予測状態であると判別する請求項5に記載の電力供給システム。 The power supply system of claim 5, wherein the earthquake arrival determination unit determines that the system is in an earthquake prediction state when, within a set period, the installation location is within a set distance from the epicenter and the intensity reporting earthquake occurrence information is obtained a set number of times, the intensity of which is equal to or greater than a set preliminary determination intensity that is lower than a set determination value.
JP2021051307A 2021-03-25 2021-03-25 Power Supply System Active JP7612478B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021051307A JP7612478B2 (en) 2021-03-25 2021-03-25 Power Supply System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021051307A JP7612478B2 (en) 2021-03-25 2021-03-25 Power Supply System

Publications (2)

Publication Number Publication Date
JP2022149246A JP2022149246A (en) 2022-10-06
JP7612478B2 true JP7612478B2 (en) 2025-01-14

Family

ID=83462932

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021051307A Active JP7612478B2 (en) 2021-03-25 2021-03-25 Power Supply System

Country Status (1)

Country Link
JP (1) JP7612478B2 (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006066244A (en) 2004-08-27 2006-03-09 Tokyo Gas Co Ltd Fuel cell system and control method
JP2008084730A (en) 2006-09-28 2008-04-10 Aisin Seiki Co Ltd Fuel cell system
JP2008300296A (en) 2007-06-01 2008-12-11 Toyota Motor Corp Fuel cell system
WO2012074005A1 (en) 2010-11-30 2012-06-07 京セラ株式会社 Fuel cell system and operating method therefor
JP2015191863A (en) 2014-03-28 2015-11-02 大阪瓦斯株式会社 Control method for fuel cell system and fuel cell system
JP2016162635A (en) 2015-03-03 2016-09-05 パナソニックIpマネジメント株式会社 Solid oxide fuel cell system
JP2016213162A (en) 2015-05-14 2016-12-15 パナソニックIpマネジメント株式会社 Fuel battery system
JP2017135774A (en) 2016-01-25 2017-08-03 田淵電機株式会社 Power conditioner and control method of them
JP2020078113A (en) 2018-11-05 2020-05-21 株式会社Nttドコモ Control device
JP2022149245A (en) 2021-03-25 2022-10-06 大阪瓦斯株式会社 power supply system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006066244A (en) 2004-08-27 2006-03-09 Tokyo Gas Co Ltd Fuel cell system and control method
JP2008084730A (en) 2006-09-28 2008-04-10 Aisin Seiki Co Ltd Fuel cell system
JP2008300296A (en) 2007-06-01 2008-12-11 Toyota Motor Corp Fuel cell system
WO2012074005A1 (en) 2010-11-30 2012-06-07 京セラ株式会社 Fuel cell system and operating method therefor
JP2015191863A (en) 2014-03-28 2015-11-02 大阪瓦斯株式会社 Control method for fuel cell system and fuel cell system
JP2016162635A (en) 2015-03-03 2016-09-05 パナソニックIpマネジメント株式会社 Solid oxide fuel cell system
JP2016213162A (en) 2015-05-14 2016-12-15 パナソニックIpマネジメント株式会社 Fuel battery system
JP2017135774A (en) 2016-01-25 2017-08-03 田淵電機株式会社 Power conditioner and control method of them
JP2020078113A (en) 2018-11-05 2020-05-21 株式会社Nttドコモ Control device
JP2022149245A (en) 2021-03-25 2022-10-06 大阪瓦斯株式会社 power supply system

Also Published As

Publication number Publication date
JP2022149246A (en) 2022-10-06

Similar Documents

Publication Publication Date Title
US9917322B2 (en) Electrical power distribution system and method for a grid-tied reversible solid oxide fuel cell system
JP2012196019A (en) Cogeneration system
KR101371986B1 (en) Fuel sell system of apartment house
JP2007323843A (en) Operation method of fuel cell and fuel cell system
JP2022160677A (en) Power management server, power management system and power management method
JP2025081777A (en) Fuel cell system and equipment management method
JP5988758B2 (en) Power management system, power management method, power control device, and fuel cell device
JP5988757B2 (en) Power management system, power management method, power control device, and fuel cell device
JP2002281568A (en) Cogeneration system
JP7612478B2 (en) Power Supply System
CN110945695A (en) Fuel cell system, equipment management method, management device, and equipment management system
EP3633777B1 (en) Equipment management method and equipment management device
JP7504051B2 (en) Power Supply System
JP7248492B2 (en) cogeneration system
JP6420409B2 (en) Power management system, power management method, power control device, and hot water supply unit
JP6121605B2 (en) Power management system, power management method, power control device, and fuel cell device
JP7356946B2 (en) Power monitoring and control device, power monitoring and control program
JP6152498B2 (en) Power management system, power management method, power management device, and fuel cell device
JP6088699B2 (en) Power management system, power management method, power control device, and fuel cell device
KR102428513B1 (en) Hot water utilization system of multi-connected fuel cell
JP7756037B2 (en) Power monitoring and control device
JP6672418B2 (en) Power management system, power management method, power management device, and fuel cell device
JP6514384B2 (en) POWER MANAGEMENT SYSTEM, POWER MANAGEMENT METHOD, POWER CONTROL DEVICE, AND FUEL CELL DEVICE
JP6314268B2 (en) Power management system, power management method, power control apparatus, and distributed power supply
JP5978374B2 (en) Power management system, power management method, power control device, and fuel cell device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231207

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240607

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240806

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240919

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241203

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241225

R150 Certificate of patent or registration of utility model

Ref document number: 7612478

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150