JP7613074B2 - Power distribution automation system - Google Patents
[go: Go Back, main page]

JP7613074B2 - Power distribution automation system - Google Patents

Power distribution automation system Download PDF

Info

Publication number
JP7613074B2
JP7613074B2 JP2020201664A JP2020201664A JP7613074B2 JP 7613074 B2 JP7613074 B2 JP 7613074B2 JP 2020201664 A JP2020201664 A JP 2020201664A JP 2020201664 A JP2020201664 A JP 2020201664A JP 7613074 B2 JP7613074 B2 JP 7613074B2
Authority
JP
Japan
Prior art keywords
power distribution
area
control
monitoring
distribution system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020201664A
Other languages
Japanese (ja)
Other versions
JP2022089335A (en
Inventor
剛志 齋藤
雄介 前島
優晴 水迫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2020201664A priority Critical patent/JP7613074B2/en
Publication of JP2022089335A publication Critical patent/JP2022089335A/en
Application granted granted Critical
Publication of JP7613074B2 publication Critical patent/JP7613074B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、配電系統を監視、制御する配電自動化システムに関し、特に、複数の営業所の管理エリアにまたがる配電系統を適正に監視、制御可能な配電自動化システムに関する。 The present invention relates to a distribution automation system that monitors and controls a power distribution system, and in particular to a distribution automation system that can properly monitor and control a power distribution system that spans the management areas of multiple sales offices.

従来から、配電系統の監視や開閉器の制御などを行い、停電が発生すると配電系統上の停電エリアを特定したり、監視、制御の結果に基づいて、停電の発生や給電の復旧などの停電情報を生成したりする配電自動化システムが設置、運用されている。この配電自動化システムでは、従来、営業所ごとに監視、制御などが行われ、例えば、A営業所の監視制御卓では管理エリアA内の配電系統のみを監視、制御することができ、B営業所の監視制御卓では管理エリアB内の配電系統のみを監視、制御することができるようになっていた。 Conventionally, distribution automation systems have been installed and operated to monitor distribution systems and control switches, identify the outage area on the distribution system when a power outage occurs, and generate outage information such as the occurrence of a power outage and the restoration of power supply based on the results of monitoring and control. Conventionally, in this distribution automation system, monitoring and control were performed for each sales office, and for example, the monitoring and control desk at sales office A could monitor and control only the distribution system within management area A, and the monitoring and control desk at sales office B could monitor and control only the distribution system within management area B.

このため、例えば、管理エリアAと管理エリアBとの境界に設置されている開閉器ABが、A営業所の監視制御卓では非遠隔制御扱いであり、B営業所の監視制御卓では遠隔制御扱いであるとする。この場合、管理エリアAで事故が発生した際に、A営業所の監視制御卓からは開閉器ABを遠隔制御することができず、B営業所・管理エリアBから自動逆送することができない。一方、B営業所の監視制御卓では、開閉器ABを遠隔制御可能ではあるが、管理エリアAでの事故を監視、認識することができないため、A営業所・管理エリアAへ自動逆送することができない。 For this reason, for example, assume that switch AB installed on the boundary between management areas A and B is treated as non-remotely controlled at the monitoring and control console of sales office A, but as remotely controlled at the monitoring and control console of sales office B. In this case, when an accident occurs in management area A, switch AB cannot be remotely controlled from the monitoring and control console of sales office A, and automatic reverse transmission is not possible from sales office B/management area B. On the other hand, although the monitoring and control console of sales office B can remotely control switch AB, it cannot monitor or recognize the accident in management area A, and therefore cannot automatically reverse transmission to sales office A/management area A.

このため、営業所境界付近の配電線においても電力系統監視を遠方監視できる、という配電系統操作装置が知られている(例えば、特許文献1参照。)。この装置は、自営業所管轄内の配電系統設備データと配電系統表示データを保有すると共に、隣接する他営業所管轄内の配電系統設備データと配電系統表示データを保有し、自営業所に設置された配電系統制御装置と、隣接する他営業所に設置された配電系統制御装置とを伝送路を介して接続し、相互に自営業所管轄内配電系統状態情報を送信し合う。また、必要な制御が隣接する配電系統に含まれる場合には、操作依頼出力手段により隣接する配電系統操作装置に操作依頼し、この操作依頼を受けて当該配電系統の該当機器を制御するものである。 For this reason, a power distribution system operation device is known that can remotely monitor the power system even on distribution lines near the boundary of a business office (see, for example, Patent Document 1). This device holds distribution system equipment data and distribution system display data within the jurisdiction of the business office itself, as well as distribution system equipment data and distribution system display data within the jurisdiction of other adjacent business offices, and connects the distribution system control device installed in the business office itself to the distribution system control device installed in the other adjacent business office via a transmission line, and transmits distribution system status information within the jurisdiction of the business office itself to each other. Furthermore, if the required control is included in the adjacent distribution system, an operation request output means is used to request an operation to the adjacent distribution system operation device, and in response to this operation request, the device controls the relevant equipment of the distribution system.

特開平06-165380号公報Japanese Patent Application Publication No. 06-165380

しかしながら、特許文献1に記載の配電系統操作装置では、各営業所において自営業所と隣接営業所の配電系統設備データおよび配電系統表示データを保有しなければならず、設備負担が大きく費用も嵩む。また、必要な制御が隣接する配電系統に含まれる場合に、隣接する配電系統操作装置に操作依頼すれば、隣接する配電系統の状況などを詳細かつ適正に把握していなくても、該当機器を間接的に制御することができてしまう。この結果、不適切・不必要な制御が行われるおそれがある。 However, with the distribution system operation device described in Patent Document 1, each office must hold distribution system equipment data and distribution system display data for its own office and adjacent offices, which imposes a large burden on the equipment and increases costs. Furthermore, when the required control is included in an adjacent distribution system, if an operation is requested from the adjacent distribution system operation device, the relevant equipment can be indirectly controlled even without detailed and accurate knowledge of the status of the adjacent distribution system. As a result, there is a risk that inappropriate or unnecessary control will be performed.

そこで本発明は、簡易な構成で、複数の管理エリアにまたがる配電系統を適正に監視、制御可能にする配電自動化システムを提供することを目的とする。 The present invention aims to provide a power distribution automation system that can properly monitor and control a power distribution system that spans multiple management areas with a simple configuration.

上記課題を解決するために、請求項1の発明は、配電系統が複数の管理エリアに分割され、隣接する複数の管理エリアを1つの総括エリアとし、該総括エリアの配電系統状態を記憶する系統状態記憶装置と、配電系統内の設備を制御可能な監視制御装置と、を備え、前記監視制御装置は、前記総括エリア内の全配電系統状態を監視可能で、権限を付与された管理エリアの配電系統内の設備を制御可能となっており隣接する総括エリアの前記系統状態記憶装置の配電系統状態を相互に授受可能で、一方の総括エリアの前記監視制御装置は、他方の総括エリアの配電系統状態のうち前記一方の総括エリアの制御に必要な配電系統状態を監視可能となっている、ことを特徴とする配電自動化システムである。 In order to solve the above problem, the invention of claim 1 is a power distribution automation system comprising: a power distribution system divided into a plurality of management areas , a plurality of adjacent management areas being treated as one generalization area; a system status memory device that stores the power distribution system status of the generalization area; and a monitoring and control device capable of controlling equipment in the power distribution system, wherein the monitoring and control device is capable of monitoring the status of the entire power distribution system in the generalization area and is capable of controlling equipment in the power distribution system of an authorized management area, and the power distribution system status of the system status memory device of adjacent generalization areas can be mutually exchanged, and the monitoring and control device of one generalization area is capable of monitoring the power distribution system status of the other generalization area that is necessary for controlling the one generalization area .

請求項2の発明は、請求項1に記載の配電自動化システムにおいて、前記監視制御装置には、複数の管理エリアの権限を付与可能となっている、ことを特徴とする。 The invention of claim 2 is characterized in that in the power distribution automation system described in claim 1, the monitoring and control device can be given authority for multiple management areas.

請求項3の発明は、請求項1または2に記載の配電自動化システムにおいて、隣接する管理エリアの境界を変更可能となっている、ことを特徴とする。 The invention of claim 3 is characterized in that in the power distribution automation system described in claim 1 or 2, the boundaries between adjacent management areas can be changed.

請求項1に記載の発明によれば、監視制御装置は、総括エリア内の全配電系統状態を監視可能で、権限を付与された管理エリアの配電系統内の設備を制御可能なため、複数の管理エリアにまたがる配電系統を適正に監視、制御することが可能となる。すなわち、監視制御装置は、権限を付与された管理エリアのみではなく、隣接する管理エリアの配電系統状態も監視可能なため、例えば、隣接する管理エリアでの事故発生を監視、認識した場合に、権限を付与された管理エリアの設備を制御することで、隣接する管理エリアへ自動逆送することが可能となる。しかも、監視制御装置は、権限を付与された管理エリアのみを制御可能で、権限を付与されていない管理エリアを制御できないため、不適切・不必要な制御が行われるのを防止、抑制することが可能となる。このようにして、複数の管理エリアにまたがる配電系統を適正に監視、制御することが可能となり、電力供給の信頼度、安定性が向上する。 According to the invention described in claim 1, the monitoring and control device can monitor the state of all distribution systems in the general area and can control the equipment in the distribution system of the management area to which it is authorized, so that it is possible to properly monitor and control the distribution system that spans multiple management areas. In other words, since the monitoring and control device can monitor the state of the distribution system not only in the management area to which it is authorized but also in adjacent management areas, for example, when it monitors and recognizes the occurrence of an accident in an adjacent management area, it is possible to automatically reverse the transmission to the adjacent management area by controlling the equipment in the management area to which it is authorized. Moreover, since the monitoring and control device can only control the management area to which it is authorized and cannot control the management area to which it is not authorized, it is possible to prevent and suppress inappropriate and unnecessary control. In this way, it is possible to properly monitor and control the distribution system that spans multiple management areas, improving the reliability and stability of the power supply.

また、複数の管理エリアを含む総括エリアの全配電系統状態が1つの系統状態記憶装置に記憶され、監視制御装置が全配電系統状態を監視可能となっている。つまり、管理エリアごとにこの管理エリアと隣接する管理エリアの配電系統状態を記憶する(管理エリアごとに系統状態記憶装置を備える)必要がないため、構成が簡易で、設備負担・費用を軽減することが可能となる。 In addition , the status of all distribution systems in a general area including multiple management areas is stored in one system status storage device, and the monitoring and control device can monitor the status of all distribution systems. In other words, since it is not necessary to store the status of the distribution systems in each management area and its adjacent management areas (to provide a system status storage device for each management area), the configuration is simple and it is possible to reduce the burden and cost of facilities.

請求項2に記載の発明によれば、複数の管理エリアの権限を監視制御装置に付与可能なため、1つの監視制御装置で複数の管理エリアの設備を制御でき、設備費や人員を削減することができる。しかも、緊急時や系統状態などに応じて、1つの監視制御装置で複数の管理エリアの設備を制御することで、矛盾する制御や不適切・不必要な制御などを防止、抑制することが可能となる。つまり、複数の管理エリアにまたがる配電系統をより適正に監視、制御することが可能となる。 According to the invention described in claim 2, since the authority for multiple management areas can be granted to the monitoring control device, one monitoring control device can control the equipment in multiple management areas, which reduces equipment costs and personnel. Moreover, by controlling the equipment in multiple management areas with one monitoring control device in response to emergencies, system conditions, etc., it becomes possible to prevent and suppress conflicting control, and inappropriate/unnecessary control. In other words, it becomes possible to more appropriately monitor and control the power distribution system that spans multiple management areas.

請求項3に記載の発明によれば、隣接する管理エリアの境界を変更可能なため、各営業所が管理する管理エリアの範囲が実際に変わった場合などに、それに合わせて本配電自動化システム上の管理エリアの境界を変更する。これにより、変更後の管理エリアに対応する配電系統状態を監視制御装置で適正に監視したり、変更後の管理エリアの設備を監視制御装置で適正に制御したりすることができる。このように、各営業所が管理する管理エリアの範囲が実際に変わったりしても、複数の管理エリアにまたがる配電系統を適正に監視、制御することが可能となる。 According to the invention described in claim 3, since the boundaries of adjacent management areas can be changed, when the range of the management area managed by each sales office actually changes, the boundaries of the management areas on this distribution automation system are changed accordingly. This makes it possible to properly monitor the state of the distribution system corresponding to the changed management area with the monitoring and control device, and to properly control the equipment in the changed management area with the monitoring and control device. In this way, even if the range of the management area managed by each sales office actually changes, it becomes possible to properly monitor and control the distribution system that spans multiple management areas.

請求項に記載の発明によれば、一方の総括エリアの監視制御装置で他方の総括エリアの配電系統状態が監視可能なため、隣接する総括エリア間においても配電系統を適正に監視、制御することが可能となる。すなわち、1つの総括エリア内だけではなく、隣接する複数の総括エリアにまたがる配電系統を適正に監視、制御することが可能となる。しかも、他方の総括エリアの配電系統状態のうち一方の総括エリアの制御に必要な配電系統状態のみが監視可能となっており、他方の総括エリアの全配電系統状態を授受する必要がないため、送受信量および記憶量を削減することができ、構成が簡易となる。一方、一方の総括エリアの制御に必要な配電系統状態は監視可能なため、配電系統を適正に監視、制御することが可能となる。 According to the invention described in claim 1 , since the monitoring control device of one generalization area can monitor the power distribution system state of the other generalization area, it is possible to properly monitor and control the power distribution system even between adjacent generalization areas. In other words, it is possible to properly monitor and control not only a power distribution system within one generalization area, but also a power distribution system that spans multiple adjacent generalization areas. Moreover, only the power distribution system state necessary for controlling one generalization area can be monitored among the power distribution system states of the other generalization area, and there is no need to transmit and receive the entire power distribution system state of the other generalization area, so that the amount of transmission and reception and the amount of storage can be reduced and the configuration is simplified. On the other hand, since the power distribution system state necessary for controlling one generalization area can be monitored, it is possible to properly monitor and control the power distribution system.

この発明の実施の形態に係る配電自動化システムにおいて、権限によってどの管理エリアを監視、制御できるかを示す第1の説明図である。FIG. 1 is a first explanatory diagram showing which management areas can be monitored and controlled depending on authority in the power distribution automation system according to the embodiment of the present invention. この発明の実施の形態に係る配電自動化システムを示す概略構成図である。1 is a schematic configuration diagram showing a power distribution automation system according to an embodiment of the present invention. この発明の実施の形態に係る配電自動化システムにおける配電系統の分割状態を示す図である。FIG. 2 is a diagram showing a divided state of a power distribution system in the power distribution automation system according to the embodiment of the present invention. 図2の配電自動化システムにおいて、権限によってどの管理エリアを監視、制御できるかを示す第2の説明図である。FIG. 3 is a second explanatory diagram showing which management areas can be monitored and controlled depending on the authority in the power distribution automation system of FIG. 2 . 図2の配電自動化システムにおいて、管理エリアの境界を変更した場合に、権限によってどの管理エリアを監視、制御できるかを示す第3の説明図である。FIG. 11 is a third explanatory diagram showing which management areas can be monitored and controlled depending on the authority when the boundaries of the management areas are changed in the power distribution automation system of FIG. 2 . 図2の配電自動化システムにおいて、権限によってどの総括エリアを監視、制御できるかを示す第4の説明図である。FIG. 4 is a fourth explanatory diagram showing which generalized areas can be monitored and controlled depending on the authority in the power distribution automation system of FIG. 2 .

以下、この発明を図示の実施の形態に基づいて説明する。 The present invention will be described below based on the illustrated embodiment.

図1~図6は、この発明の実施の形態を示し、図2は、この実施の形態に係る配電自動化システム1を示す概略構成図である。この配電自動化システム1は、配電系統を監視、制御するシステムであり、複数の営業所A、B、C…の管理エリア101、102、201…にまたがる配電系統を監視、制御する。 Figures 1 to 6 show an embodiment of the present invention, and Figure 2 is a schematic diagram showing a power distribution automation system 1 according to this embodiment. This power distribution automation system 1 is a system that monitors and controls a power distribution system, and monitors and controls the power distribution system across management areas 101, 102, 201, etc. of multiple sales offices A, B, C, etc.

ここで、図3に示すように、配電系統全体が複数の管理エリア101、102、201…に分割され、1つの管理エリア101、102、201…または隣接する複数の管理エリア101、102、201…が1つの総括エリア100、200…として関連づけられている。この実施の形態では、管理エリア101と管理エリア102とを含むエリアが総括エリア100とされ、管理エリア201を含むエリアが総括エリア200とされている場合について、主として説明する。 As shown in FIG. 3, the entire power distribution system is divided into a number of management areas 101, 102, 201, etc., and one management area 101, 102, 201, etc. or adjacent management areas 101, 102, 201, etc. are associated as one general area 100, 200, etc. In this embodiment, the case where an area including management area 101 and management area 102 is set as general area 100, and an area including management area 201 is set as general area 200 will be mainly described.

配電自動化システム1は、後述する監視、制御構成が従来と異なり、従来と同等の構成については詳述を省略するが、概略次のような構成となっている。すなわち、図2に示すように、配電自動化サーバ2と各遠制親局(配電遠制装置)3とが通信自在に接続され、配電自動化サーバ2と監視制御卓(監視制御装置)4とが通信自在に接続されている。また、各電柱Pに取り付けられた遠制子局41が遠制親局3と通信自在に接続され、遠制子局41によって電柱P上の遠制開閉器42が開閉制御されるようになっている。 The power distribution automation system 1 differs from the conventional one in the monitoring and control configuration described below, and detailed description of the equivalent configuration to the conventional one will be omitted, but the system is roughly configured as follows. That is, as shown in FIG. 2, the power distribution automation server 2 and each remote control master station (power distribution remote control device) 3 are connected so as to be able to communicate with each other, and the power distribution automation server 2 and the monitoring and control console (monitoring and control device) 4 are connected so as to be able to communicate with each other. In addition, the remote control slave stations 41 attached to each utility pole P are connected so as to be able to communicate with the remote control master station 3, and the remote control slave stations 41 control the opening and closing of the remote control switches 42 on the utility poles P.

そして、配電線の運用状態(配電系統状態)を常時監視し、例えば、配電線事故による停電が発生すると、遠制開閉器42等を制御しながら停電を引き起こした事故箇所を特定し、監視制御卓4からの操作や自動によって事故区間以外の配電線への配電(自動逆送)を行う。このようにして、遠制開閉器42等の開閉によって停電エリアが確定され、遠制開閉器42等を境にして停電エリアと非停電エリアとが分かれることになる。また、変電所事故(特高事故、瞬時電圧低下など)による停電が発生すると、監視制御卓4からの操作や自動によって、停電が発生した地域に対して周辺の配電線からの配電(自動逆送)を行ったりするものである。 The system constantly monitors the operational status of the distribution lines (distribution system status), and when a power outage occurs due to a distribution line accident, for example, the location of the accident that caused the power outage is identified while controlling the remote control switches 42, etc., and power is distributed (automatic reverse transmission) to distribution lines other than the accident section by operation from the monitoring control desk 4 or automatically. In this way, the power outage area is determined by opening and closing the remote control switches 42, etc., and the power outage area and non-powered area are separated by the remote control switches 42, etc. In addition, when a power outage occurs due to a substation accident (extra-high voltage accident, momentary voltage drop, etc.), power is distributed (automatic reverse transmission) from surrounding distribution lines to the area where the power outage occurred by operation from the monitoring control desk 4 or automatically.

ここで、運転制御センターに配電自動化サーバ2が設置され、各営業所A、B、C…に遠制親局3が設置されている。この実施の形態では、総括エリア100においては、営業所Aが運転制御センターつまり総括営業所であり、営業所Bが一般営業所とする。そして、総括営業所Aの遠制親局3が管理エリア101の遠制子局41と接続され、一般営業所Bの遠制親局3が管理エリア102の遠制子局41と接続されている。また、図2では、2つの監視制御卓4が総括営業所Aに配設されている場合について図示しているが、後述するように、一方の監視制御卓4を総括営業所Aに配設し、他方の監視制御卓4を一般営業所Bに配設してもよい。 Here, a power distribution automation server 2 is installed in the operation control center, and a remote control master station 3 is installed in each of the sales offices A, B, C, etc. In this embodiment, in the general area 100, the sales office A is the operation control center, i.e., the general sales office, and the sales office B is a general sales office. The remote control master station 3 of the general sales office A is connected to the remote control slave station 41 in the management area 101, and the remote control master station 3 of the general sales office B is connected to the remote control slave station 41 in the management area 102. In addition, while FIG. 2 illustrates a case in which two monitoring and control consoles 4 are installed in the general sales office A, one monitoring and control console 4 may be installed in the general sales office A and the other monitoring and control console 4 may be installed in the general sales office B, as described later.

また、総括エリア200においては、上記のように、管理エリア201のみを含むため、後述する図6に示すように、管理エリア201つまり総括エリア200を監視、制御する営業所Cが総括営業所となり、配電自動化サーバ2と遠制親局3が設置されている。 In addition, as described above, the general area 200 includes only the management area 201, so as shown in FIG. 6 described later, sales office C, which monitors and controls the management area 201, i.e., the general area 200, becomes the general sales office, and a distribution automation server 2 and a remote control master station 3 are installed there.

次に、本配電自動化システム1の特徴的な監視、制御構成について説明する。 Next, we will explain the characteristic monitoring and control configuration of this power distribution automation system 1.

まず、各総括エリア100、200…の配電系統状態を記憶する系統状態記憶装置(データベース)21を総括エリア100、200…ごと(総括営業所A、C…ごと)に備える。すなわち、配電系統図上で上記のような管理エリア101、102、201…や総括エリア100、200…が分割、設定され、各総括エリア100、200…に対して監視した配電系統状態が、逐次リアルタイムに総括エリア100、200…ごとに各系統状態記憶装置21に記憶される。 First, a system status storage device (database) 21 that stores the distribution system status of each general area 100, 200... is provided for each general area 100, 200... (for each general sales office A, C...). That is, the above-mentioned management areas 101, 102, 201... and general areas 100, 200... are divided and set on the distribution system diagram, and the distribution system status monitored for each general area 100, 200... is stored sequentially in real time in each system status storage device 21 for each general area 100, 200....

例えば、総括エリア100の場合、図1に示すように、管理エリア101、102を含む総括エリア100の配電系統状態が、総括営業所Aに配設された系統状態記憶装置21に記憶される。同様に、総括エリア200の場合、図6に示すように、管理エリア201を含む総括エリア200の配電系統状態が、総括営業所Cに配設された系統状態記憶装置21に記憶される。 For example, in the case of general area 100, as shown in FIG. 1, the power distribution system status of general area 100 including management areas 101 and 102 is stored in a system status storage device 21 installed in general sales office A. Similarly, in the case of general area 200, as shown in FIG. 6, the power distribution system status of general area 200 including management area 201 is stored in a system status storage device 21 installed in general sales office C.

ここで、系統状態記憶装置21は、配設された総括営業所A、C…の配電自動化サーバ2とアクセス自在に接続され、配電自動化サーバ2やその他の装置からの入力によって、配電系統図上での管理エリア101、102、201…を任意に分割、設定できるようになっている。従って、配電自動化サーバ2などからの入力によって、隣接する管理エリア101、102、201…の境界を変更可能となっている。例えば、管理エリア101、102、201…の境界を示す開閉器(遠制、非遠制を含む)を任意に設定、変更できるようになっている。また、どの管理エリア101、102、201…をどの総括エリア100、200…に所属させるかを、配電自動化サーバ2などからの入力によって可能となっている。 The system status storage device 21 is connected to the distribution automation server 2 of the general sales offices A, C, etc., and can be freely accessed, and can arbitrarily divide and set the management areas 101, 102, 201, etc. on the distribution system diagram by input from the distribution automation server 2 or other devices. Therefore, the boundaries between adjacent management areas 101, 102, 201, etc. can be changed by input from the distribution automation server 2, etc. For example, the switches (including remote control and non-remote control) that indicate the boundaries between the management areas 101, 102, 201, etc. can be arbitrarily set and changed. Also, it is possible to determine which management areas 101, 102, 201, etc. belong to which general area 100, 200, etc. by input from the distribution automation server 2, etc.

監視制御卓4は、配電系統状態を監視・モニタリング可能で配電系統内の設備を制御可能な装置であり、1つの総括エリア100、200…に対して少なくとも1台の監視制御卓4を備える。この監視制御卓4は、設定されたいずれかの総括エリア100、200…つまり総括営業所A、C…に所属する。ここで、監視制御卓4を総括営業所A、C…のみに配設してもよいし、一般営業所B…にも配設してもよい。例えば、図1に示すように、総括営業所Aに2台の監視制御卓4を配設し、一般営業所Bに1台の監視制御卓4を配設してもよい。 The monitoring and control console 4 is a device capable of monitoring and supervising the state of the power distribution system and controlling the equipment within the power distribution system, and at least one monitoring and control console 4 is provided for each general area 100, 200, etc. This monitoring and control console 4 belongs to one of the set general areas 100, 200, etc., that is, to general sales offices A, C, etc. Here, the monitoring and control console 4 may be provided only in general sales offices A, C, etc., or may also be provided in general sales office B, etc. For example, as shown in Figure 1, two monitoring and control consoles 4 may be provided in general sales office A and one monitoring and control console 4 may be provided in general sales office B.

この監視制御卓4は、所属する総括営業所A、C…の配電自動化サーバ2と通信自在に接続され、所属する総括エリア100、200…内の全配電系統状態を監視可能となっている。すなわち、どの営業所A、B、C…に配設されていても、所属する総括営業所A、C…が管理する総括エリア100、200…の全配電系統状態を、系統状態記憶装置21から読み出しモニタに表示して監視できるようになっている。例えば、上記の図1の場合、総括営業所Aに配設された監視制御卓4も一般営業所Bに配設された監視制御卓4も同じ画面、つまり、総括エリア100内の全配電系統状態(例えば、図1の変電所Aから変電所Bまでの全状態)がモニタに表示されて監視することができる。 This monitoring and control console 4 is connected to the distribution automation server 2 of the general sales office A, C, etc. to which it belongs, and is capable of monitoring the status of all distribution systems in the general area 100, 200, etc. to which it belongs. In other words, no matter which sales office A, B, C, etc. it is located in, it is possible to read out the status of all distribution systems in the general area 100, 200, etc. managed by the general sales office A, C, etc. to which it belongs from the system status storage device 21 and display it on a monitor for monitoring. For example, in the case of Figure 1 above, the monitoring and control console 4 located in the general sales office A and the monitoring and control console 4 located in the general sales office B can be monitored on the same screen, that is, the status of all distribution systems in the general area 100 (for example, the entire status from substation A to substation B in Figure 1) can be displayed on the monitor.

また、監視制御卓4は、権限を付与された管理エリア101、102、201…の配電系統内の設備を制御可能となっている。すなわち、どの監視制御卓4によってどの管理エリア101、102、201…を制御可能とするかを、各監視制御卓4や配電自動化サーバ2などから設定可能となっている。この際、ソフトウエアでインターロックをかけて、所定の監視制御卓4からは所定の管理エリア101、102、201…しか制御できないようにしてもよいし、オペレータに権限を与え、間接的に監視制御卓4に権限を付与してもよい。例えば、オペレータが任意の監視制御卓4で所定のIDやパスワードなどを入力することで、所定の管理エリア101、102、201…を制御できるようにしてもよい。 The monitoring and control console 4 can control the equipment in the distribution system of the management areas 101, 102, 201, etc. for which it has been granted authority. In other words, which management areas 101, 102, 201, etc. can be controlled by which monitoring and control console 4 can be set from each monitoring and control console 4 or the distribution automation server 2. In this case, a software interlock may be set so that only a specific management area 101, 102, 201, etc. can be controlled from a specific monitoring and control console 4, or authority may be given to an operator, and authority may be indirectly given to the monitoring and control console 4. For example, an operator may be able to control a specific management area 101, 102, 201, etc. by inputting a specific ID or password into any monitoring and control console 4.

この結果、例えば、上記の図1の場合、総括営業所Aに配設された一方の監視制御卓4(4-1)は、管理エリア101の設備のみを制御可能で、管理エリア102の設備は制御できない。一方、総括営業所Aに配設された他方の監視制御卓4(4-2)と一般営業所Bに配設された監視制御卓4(4-3)は、管理エリア102の設備のみを制御可能で、管理エリア101の設備は制御できないようになっている。 As a result, for example, in the case of Figure 1 above, one of the monitoring control consoles 4 (4-1) located at the general sales office A can only control the equipment in the management area 101, and cannot control the equipment in the management area 102. On the other hand, the other monitoring control console 4 (4-2) located at the general sales office A and the monitoring control console 4 (4-3) located at the general sales office B can only control the equipment in the management area 102, and cannot control the equipment in the management area 101.

さらに、監視制御卓4には、複数の管理エリア101、102、201…の権限を付与可能となっている。すなわち、上記と同様にインターロックなどによって、1台の監視制御卓4に対して複数の管理エリア101、102、201…の権限を付与して、1台の監視制御卓4で複数の管理エリア101、102、201…の配電系統内の設備を制御可能となっている。ただし、監視制御卓4が所属する総括エリア100、200…内に限り、所属する総括エリア100、200…を超えて制御することはできない。例えば、図1と同様に監視制御卓4が配設されている場合に、図4に示すように、総括営業所Aに配設された一方の監視制御卓4(4-1)に2つの管理エリア101、102の権限を付与して、一方の監視制御卓4(4-1)で2つの管理エリア101、102の設備を制御できるようにする。 Furthermore, the monitoring control console 4 can be given authority for multiple management areas 101, 102, 201.... That is, by using an interlock or the like as described above, one monitoring control console 4 can be given authority for multiple management areas 101, 102, 201..., and one monitoring control console 4 can control the equipment in the power distribution system of multiple management areas 101, 102, 201.... However, the monitoring control console 4 can only control within the general area 100, 200... to which it belongs, and cannot control beyond the general area 100, 200... to which it belongs. For example, when the monitoring control consoles 4 are arranged as in FIG. 1, as shown in FIG. 4, one monitoring control console 4 (4-1) arranged in the general sales office A can be given authority for the two management areas 101, 102, and one monitoring control console 4 (4-1) can control the equipment in the two management areas 101, 102.

また、上記のようにして、隣接する管理エリア101、102、201…の境界が変更された場合、これに伴って、各監視制御卓4で制御可能な設備も変わる。例えば、上記図1のように各監視制御卓4に権限が付与され、図5に示すように、管理エリア101と管理エリア102との境界を示す遠制開閉器42が管理エリア102・変電所B側に移行した(管理エリア101が管理エリア102側に拡張した)とする。この場合、総括営業所Aの他方の監視制御卓4(4-2)と一般営業所Bの監視制御卓4(4-3)は、変更前は変電所B側の3つの遠制開閉器42(42-1、42-2、42-3)を制御できるが、変更後は1つの遠制開閉器42(42-1)のみを制御できる。これに対して、総括営業所Aの一方の監視制御卓4(4-1)は、変更前は変電所B側の3つの遠制開閉器42(42-1、42-2、42-3)を制御できないが、変更後は2つの遠制開閉器42(42-2、42-3)を制御できることになる。 In addition, when the boundaries between adjacent management areas 101, 102, 201, etc. are changed as described above, the equipment that can be controlled by each monitoring control console 4 also changes accordingly. For example, assume that authority is granted to each monitoring control console 4 as shown in FIG. 1 above, and the remote control switch 42 indicating the boundary between management areas 101 and 102 is shifted to the management area 102/substation B side (management area 101 is expanded toward management area 102) as shown in FIG. 5. In this case, the other monitoring control console 4 (4-2) of general sales office A and the monitoring control console 4 (4-3) of general sales office B can control the three remote control switches 42 (42-1, 42-2, 42-3) on the substation B side before the change, but after the change they can only control one remote control switch 42 (42-1). In contrast, one of the monitoring and control consoles 4 (4-1) at the head office A was unable to control the three remote control switches 42 (42-1, 42-2, 42-3) on the substation B side before the change, but after the change it will be able to control two remote control switches 42 (42-2, 42-3).

また、隣接する総括エリア100、200…の系統状態記憶装置21の配電系統状態を相互に授受可能で、一方の総括エリア100、200…の監視制御卓4は、他方の総括エリア100、200…の配電系統状態のうち一方の総括エリア100、200…の制御に必要な配電系統状態を監視可能となっている。すなわち、隣接する総括エリア100、200…の配電自動化サーバ2同士が通信自在に接続され、相互に、一方の配電自動化サーバ2は、自総括エリア100、200…の制御に必要な他方の総括エリア100、200…の配電系統状態を、逐次リアルタイムに他方の配電自動化サーバ2の系統状態記憶装置21から授受・受信して、系統状態記憶装置21に記憶する。そして、常時あるいは必要に応じて、他方の総括エリア100、200…の配電系統状態を監視制御卓4のモニタに表示して監視できるようになっている。 The power distribution system status of the system status storage device 21 of the adjacent generalized areas 100, 200... can be exchanged between them, and the monitoring and control console 4 of one generalized area 100, 200... can monitor the power distribution system status of the other generalized area 100, 200... that is necessary for the control of one generalized area 100, 200.... In other words, the power distribution automation servers 2 of the adjacent generalized areas 100, 200... are connected to each other so that they can communicate with each other, and one power distribution automation server 2 sequentially exchanges and receives the power distribution system status of the other generalized area 100, 200... that is necessary for the control of its own generalized area 100, 200... from the system status storage device 21 of the other power distribution automation server 2 in real time, and stores it in the system status storage device 21. The power distribution system status of the other generalized area 100, 200... can be displayed and monitored on the monitor of the monitoring and control console 4 at all times or as needed.

ここで、自総括エリア100、200…の制御に必要な他方の総括エリア100、200…の配電系統状態とは、配電系統の構成や状態などによるが、この実施の形態では、他方の総括エリア100、200…(特に、隣接部周辺)が充電されているか否かを示すダミー電源の状態と、他方の総括エリア100、200…との境界に設置されている開閉器(遠制、非遠制を含む)の状態と、を含む簡易配電系統状態である。例えば、図6に示すように、総括エリア100(例えば、総括営業所A)の監視制御卓4には、自総括エリア100の全配電系統状態100Sと、隣接総括エリア200のダミー電源と境界の開閉器(例えば、遠制開閉器42)の状態を示す簡易配電系統状態200S´が表示され、監視可能となる。同様に、総括エリア200(総括営業所C)の監視制御卓4には、自総括エリア200の全配電系統状態200Sと、隣接総括エリア100のダミー電源と境界の開閉器(例えば、遠制開閉器42)の状態を示す簡易配電系統状態100S´が表示され、監視可能となる。 Here, the power distribution system state of the other generalized area 100, 200... necessary for controlling the own generalized area 100, 200... depends on the configuration and state of the power distribution system, but in this embodiment, it is a simplified power distribution system state including the state of the dummy power source indicating whether the other generalized area 100, 200... (especially the surrounding area of the adjacent area) is charged or not, and the state of the switch (including remote control and non-remote control) installed on the boundary with the other generalized area 100, 200.... For example, as shown in FIG. 6, the monitoring control desk 4 of the generalized area 100 (e.g., general sales office A) displays the entire power distribution system state 100S of the own generalized area 100 and the simplified power distribution system state 200S' indicating the state of the dummy power source and the boundary switch (e.g., remote control switch 42) of the adjacent generalized area 200, and can be monitored. Similarly, the monitoring control console 4 in the general area 200 (general sales office C) displays the overall power distribution system status 200S of the local general area 200 and a simplified power distribution system status 100S' showing the status of the dummy power source and boundary switch (e.g., remote control switch 42) of the adjacent general area 100, making it possible to monitor them.

このような構成の配電自動化システム1によれば、監視制御卓4は、所属する総括エリア100、200…内の全配電系統状態を監視可能で、権限を付与された管理エリア101、102、201…の配電系統内の設備を制御可能なため、複数の管理エリア101、102、201…にまたがる配電系統を適正に監視、制御することが可能となる。すなわち、例えば、図1に示す一般営業所Bの監視制御卓4は、権限を付与された管理エリア102のみではなく、隣接する管理エリア101の配電系統状態も監視することが可能である。このため、例えば、隣接する管理エリア101での事故発生を監視、認識した場合に、権限を付与された管理エリア102の設備(例えば、管理エリア101との境界に位置する遠制開閉器42)を制御することで、隣接する管理エリア101へ自動逆送することが可能となる。 According to the power distribution automation system 1 configured as described above, the monitoring and control console 4 can monitor the status of all the power distribution systems in the general area 100, 200, etc. to which it belongs, and can control the equipment in the power distribution systems of the management areas 101, 102, 201, etc. to which it has been granted authority, making it possible to properly monitor and control the power distribution system that spans multiple management areas 101, 102, 201, etc. That is, for example, the monitoring and control console 4 of the general sales office B shown in FIG. 1 can monitor not only the power distribution system status of the management area 102 to which it has been granted authority, but also the power distribution system status of the adjacent management area 101. Therefore, for example, when an accident in the adjacent management area 101 is monitored and recognized, it is possible to automatically reverse the power transmission to the adjacent management area 101 by controlling the equipment of the management area 102 to which it has been granted authority (for example, the remote control switch 42 located on the border with the management area 101).

しかも、監視制御卓4は、権限を付与された管理エリア101、102、201…のみを制御可能で、権限を付与されていない管理エリア101、102、201…を制御できないため、不適切・不必要な制御が行われるのを防止、抑制することが可能となる。このようにして、複数の管理エリア101、102、201…にまたがる配電系統を適正に監視、制御することが可能となり、電力供給の信頼度、安定性が向上する。 Moreover, the monitoring and control console 4 can only control the management areas 101, 102, 201... for which it has been granted authority, and cannot control the management areas 101, 102, 201... for which it has not been granted authority, making it possible to prevent and suppress inappropriate or unnecessary control. In this way, it becomes possible to properly monitor and control the power distribution system that spans multiple management areas 101, 102, 201..., improving the reliability and stability of the power supply.

また、1つの管理エリア101、102、201…または複数の管理エリア101、102、201…を含む総括エリア100、200…の全配電系統状態が1つの系統状態記憶装置21に記憶され、各監視制御卓4が所属する総括エリア100、200…の全配電系統状態を監視可能・共有可能となっている。例えば、図1において、1つの総括エリア100に対して1つの系統状態記憶装置21を備え、総括営業所Aの監視制御卓4と一般営業所Bの監視制御卓4はともに、総括エリア100の全配電系統状態を監視可能・共有可能となっている。このように、管理エリア101、102、201…(営業所A、B、C…)ごとに、この管理エリア101、102、201…と隣接する管理エリア101、102、201…の配電系統状態を記憶する(管理エリア101、102、201…ごとに系統状態記憶装置21を備える)必要がないため、構成が簡易で、設備負担・費用を軽減することが可能となる。 In addition, the status of the entire distribution system in one management area 101, 102, 201... or in a general area 100, 200... including multiple management areas 101, 102, 201... is stored in one system status storage device 21, and the status of the entire distribution system in the general area 100, 200... to which each monitoring control console 4 belongs can be monitored and shared. For example, in FIG. 1, one system status storage device 21 is provided for one general area 100, and both the monitoring control console 4 of general sales office A and the monitoring control console 4 of general sales office B can monitor and share the status of the entire distribution system in the general area 100. In this way, for each management area 101, 102, 201... (offices A, B, C...), there is no need to store the power distribution system status of the management area 101, 102, 201... and the adjacent management areas 101, 102, 201... (providing a system status storage device 21 for each management area 101, 102, 201...), making it possible to simplify the configuration and reduce the burden and costs of equipment.

また、図4に示すように、複数の管理エリア101、102の権限を1台の監視制御卓4に付与可能なため、1台の監視制御卓4で複数の管理エリア101、102の設備を制御でき、設備費や人員を削減することができる。しかも、緊急時や系統構成、状態などに応じて、1台の監視制御卓4(一人のオペレータ)で複数の管理エリア101、102の設備を制御することで、矛盾する制御や不適切・不必要な制御などを防止、抑制することが可能となる。つまり、複数の管理エリア101、102にまたがる配電系統をより適正に監視、制御することが可能となる。 As shown in FIG. 4, authority for multiple management areas 101 and 102 can be granted to one monitoring control console 4, so that one monitoring control console 4 can control the equipment in multiple management areas 101 and 102, reducing equipment costs and personnel. Furthermore, by controlling the equipment in multiple management areas 101 and 102 with one monitoring control console 4 (one operator) in an emergency, depending on the system configuration, status, etc., it becomes possible to prevent and suppress conflicting control, and inappropriate or unnecessary control. In other words, it becomes possible to more appropriately monitor and control the power distribution system that spans multiple management areas 101 and 102.

さらに、図5に示すように、隣接する管理エリア101、102の境界を変更可能なため、各営業所A、Bが管理する管理エリア101、102の範囲が実際に変わった場合などに、それに合わせて本配電自動化システム1上の管理エリア101、102の境界を変更する。これにより、変更後の管理エリア101、102に対応する配電系統状態を監視制御卓4で適正に監視したり、変更後の管理エリア101、102の設備を監視制御卓4で適正に制御したりすることができる。このように、各営業所A、Bが管理する管理エリア101、102の範囲が実際に変わったりしても、複数の管理エリア101、102にまたがる配電系統を適正に監視、制御することが可能となる。 Furthermore, as shown in FIG. 5, the boundaries of adjacent management areas 101, 102 can be changed, so that when the range of the management areas 101, 102 managed by each of sales offices A and B actually changes, the boundaries of the management areas 101, 102 on this distribution automation system 1 are changed accordingly. This makes it possible to properly monitor the state of the distribution system corresponding to the changed management areas 101, 102 using the monitoring and control console 4, and to properly control the equipment in the changed management areas 101, 102 using the monitoring and control console 4. In this way, even if the range of the management areas 101, 102 managed by each of sales offices A and B actually changes, it becomes possible to properly monitor and control the distribution system spanning multiple management areas 101, 102.

また、図6に示すように、一方の総括エリア100、200の監視制御卓4で他方の総括エリア100、200の配電系統状態が監視可能なため、隣接する総括エリア100、200間においても配電系統を適正に監視、制御することが可能となる。すなわち、1つの総括エリア100、200内だけではなく、隣接する複数の総括エリア100、200にまたがる配電系統を適正に監視、制御することが可能となる。しかも、他方の総括エリア100、200の配電系統状態のうち一方の総括エリア100、200の制御に必要な配電系統状態のみ、つまり、ダミー電源と境界の開閉器との状態を示す簡易配電系統状態100S´、200S´のみが監視可能となっている。すなわち、他方の総括エリア100、200の全配電系統状態を授受する必要がないため、送受信量および記憶量を削減することができ、構成が簡易となる。一方、一方の総括エリア100、200の制御に必要な配電系統状態つまり簡易配電系統状態100S´、200S´は監視可能なため、配電系統を適正に監視、制御することが可能となる。 As shown in FIG. 6, since the monitoring and control console 4 of one generalized area 100, 200 can monitor the power distribution system status of the other generalized area 100, 200, it is possible to properly monitor and control the power distribution system even between adjacent generalized areas 100, 200. In other words, it is possible to properly monitor and control the power distribution system not only within one generalized area 100, 200 but also across multiple adjacent generalized areas 100, 200. Moreover, only the power distribution system status necessary for controlling one generalized area 100, 200 among the power distribution system statuses of the other generalized areas 100, 200, that is, only the simplified power distribution system statuses 100S', 200S' indicating the status of the dummy power source and the boundary switch, can be monitored. In other words, since there is no need to exchange the entire power distribution system status of the other generalized area 100, 200, the amount of transmission and reception and the amount of storage can be reduced, and the configuration is simplified. On the other hand, the power distribution system state required for controlling one of the generalized areas 100, 200, i.e., the simplified power distribution system state 100S', 200S', can be monitored, making it possible to properly monitor and control the power distribution system.

以上、この発明の実施の形態について説明したが、具体的な構成は、上記の実施の形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計の変更等があっても、この発明に含まれる。例えば、配電系統の分割構成や総括エリア100、200…の構成などは、上記のものに限らず、例えば、総括エリアが3つ以上の隣接する管理エリアで構成されていてもよい。この場合、連鎖的に隣接する管理エリアであってもよく、いずれかの管理エリアと隣接していればよく、すべての管理エリアに隣接する必要はない。 Although the embodiment of the present invention has been described above, the specific configuration is not limited to the above embodiment, and design changes that do not deviate from the gist of the present invention are also included in the present invention. For example, the division configuration of the power distribution system and the configuration of the generalized areas 100, 200, etc. are not limited to those described above, and for example, a generalized area may be composed of three or more adjacent management areas. In this case, the management areas may be adjacent in a chain, and it is sufficient that the management area is adjacent to one of the management areas, and it is not necessary that the management area is adjacent to all management areas.

1 配電自動化システム
2 配電自動化サーバ
21 系統状態記憶装置
3 遠制親局(配電遠制装置)
4 監視制御卓(監視制御装置)
41 遠制子局
42 遠制開閉器
101、102、201 管理エリア
100、200 総括エリア
1 Power distribution automation system 2 Power distribution automation server 21 System status storage device 3 Remote control master station (power distribution remote control device)
4. Monitoring and control console (monitoring and control device)
41 Remote control slave station 42 Remote control switch 101, 102, 201 Control area 100, 200 General area

Claims (3)

配電系統が複数の管理エリアに分割され、隣接する複数の管理エリアを1つの総括エリアとし、該総括エリアの配電系統状態を記憶する系統状態記憶装置と、
配電系統内の設備を制御可能な監視制御装置と、
を備え、前記監視制御装置は、前記総括エリア内の全配電系統状態を監視可能で、権限を付与された管理エリアの配電系統内の設備を制御可能となっており
隣接する総括エリアの前記系統状態記憶装置の配電系統状態を相互に授受可能で、
一方の総括エリアの前記監視制御装置は、他方の総括エリアの配電系統状態のうち前記一方の総括エリアの制御に必要な配電系統状態を監視可能となっている、
ことを特徴とする配電自動化システム。
a system status storage device in which a power distribution system is divided into a plurality of management areas , a plurality of adjacent management areas are regarded as one generalized area, and a power distribution system status of the generalized area is stored;
A monitoring and control device capable of controlling equipment in a power distribution system;
The monitoring and control device is capable of monitoring the state of the entire power distribution system in the general area and controlling the equipment in the power distribution system of the management area to which the authority is given,
The power distribution system status of the system status storage device of the adjacent general area can be mutually exchanged,
The monitoring and control device of one generalization area is capable of monitoring a power distribution system state necessary for controlling the one generalization area among the power distribution system states of the other generalization area.
A power distribution automation system comprising:
前記監視制御装置には、複数の管理エリアの権限を付与可能となっている、
ことを特徴とする請求項1に記載の配電自動化システム。
The monitoring control device can be given authority over a plurality of management areas.
2. The power distribution automation system according to claim 1 .
隣接する管理エリアの境界を変更可能となっている、
ことを特徴とする請求項1または2のいずれか1項に記載の配電自動化システム。
The boundaries of adjacent management areas can be changed.
3. The power distribution automation system according to claim 1 or 2.
JP2020201664A 2020-12-04 2020-12-04 Power distribution automation system Active JP7613074B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020201664A JP7613074B2 (en) 2020-12-04 2020-12-04 Power distribution automation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020201664A JP7613074B2 (en) 2020-12-04 2020-12-04 Power distribution automation system

Publications (2)

Publication Number Publication Date
JP2022089335A JP2022089335A (en) 2022-06-16
JP7613074B2 true JP7613074B2 (en) 2025-01-15

Family

ID=81989079

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020201664A Active JP7613074B2 (en) 2020-12-04 2020-12-04 Power distribution automation system

Country Status (1)

Country Link
JP (1) JP7613074B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115642692A (en) * 2022-09-22 2023-01-24 浙江中控信息产业股份有限公司 Peripheral hardware power supply link bypass operation monitoring device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003284262A (en) 2002-03-26 2003-10-03 Aichi Electric Co Ltd Distribution line monitoring and control equipment
US20110035067A1 (en) 2008-03-10 2011-02-10 Abb Research Ltd System and method for controlling a distribution of electrical power
JP2017034752A (en) 2015-07-29 2017-02-09 東京電力ホールディングス株式会社 Supervisory control system
JP2017108511A (en) 2015-12-08 2017-06-15 株式会社東芝 Monitoring device, monitoring method, monitoring program, and monitoring system
CN111144704A (en) 2019-12-03 2020-05-12 积成电子股份有限公司 High-strength concurrent scheduling method for dealing with power distribution network disasters

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06225456A (en) * 1992-11-13 1994-08-12 Toshiba Corp Power distribution system operating apparatus
JP3441273B2 (en) * 1995-10-20 2003-08-25 株式会社東芝 Power system monitoring and control system
JP2003284263A (en) * 2002-03-26 2003-10-03 Aichi Electric Co Ltd Distribution line automation system
JP5616311B2 (en) * 2011-10-31 2014-10-29 株式会社日立製作所 System stabilization system and system stabilization method
WO2013183151A1 (en) * 2012-06-07 2013-12-12 株式会社 東芝 Bus connection program and device
JP2016136824A (en) * 2015-01-23 2016-07-28 株式会社東芝 Power system monitoring control system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003284262A (en) 2002-03-26 2003-10-03 Aichi Electric Co Ltd Distribution line monitoring and control equipment
US20110035067A1 (en) 2008-03-10 2011-02-10 Abb Research Ltd System and method for controlling a distribution of electrical power
JP2017034752A (en) 2015-07-29 2017-02-09 東京電力ホールディングス株式会社 Supervisory control system
JP2017108511A (en) 2015-12-08 2017-06-15 株式会社東芝 Monitoring device, monitoring method, monitoring program, and monitoring system
CN111144704A (en) 2019-12-03 2020-05-12 积成电子股份有限公司 High-strength concurrent scheduling method for dealing with power distribution network disasters

Also Published As

Publication number Publication date
JP2022089335A (en) 2022-06-16

Similar Documents

Publication Publication Date Title
EP2448087B1 (en) Reliable electrical distribution system with alternate power source
EP0108363A2 (en) Train service administration and control system
CN109257564A (en) A kind of electric equipment operation condition monitoring system
JP7613074B2 (en) Power distribution automation system
WO2016177014A1 (en) Method for implementing circuit redundancy network protection for smart substation
KR102076428B1 (en) SYSTEM OF MONITORING AND CONTROL FOR SUPERVISORY CONTROL AND DATA ACQUISITION USING 154kV CLASS IoT CENTRAL MONITORING AND CONTROL PANEL
KR101960324B1 (en) Integration Remote Equipment Managing System
CN112202594A (en) Nuclear power station server fault emergency processing system and method
JP2015036287A (en) External interface device control system and external interface device control method
KR101589708B1 (en) Management method for planned power outage of power distribution line
KR102076429B1 (en) METHOD OF MONITORING AND CONTROL FOR SUPERVISORY CONTROL AND DATA ACQUISITION USING 345kV CLASS IoT CENTRAL MONITORING AND CONTROL PANEL
JP2018201304A (en) Blackout information service system
JP2007148611A (en) Integrated water treatment facility operation management system
JP2010200092A (en) System and method for reliability discrimination in redundant configuration communication line
RU2751354C1 (en) System for technical diagnostics and monitoring adk-scb
JP2015099542A (en) Supervisory control device, terminal device, supervisory control method, supervisory control program, supervisory control system
JP2011239520A (en) Power failure work request supporting system
JP2000032661A (en) Risk management apparatus for power equipment data
JP2005114516A (en) Information providing apparatus and information providing method for nuclear power plant
JP2016206763A (en) Monitoring control system
JP2009106121A (en) Monitoring control system
Robins Standby power systems, remote control and monitoring
JP2004348411A (en) Centralized monitoring and control system integrated distributed power distribution equipment
JP2004199211A (en) Remote monitoring control method and remote monitoring control system
JPH01265304A (en) Duplex operation method for functionally distributed systems

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231109

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240821

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240903

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241004

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241126

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241209

R150 Certificate of patent or registration of utility model

Ref document number: 7613074

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150