Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7613428B2 - Rail twist correction device, rail twist correction method, and rail manufacturing method - Google Patents
[go: Go Back, main page]

JP7613428B2 - Rail twist correction device, rail twist correction method, and rail manufacturing method - Google Patents

Rail twist correction device, rail twist correction method, and rail manufacturing method Download PDF

Info

Publication number
JP7613428B2
JP7613428B2 JP2022119763A JP2022119763A JP7613428B2 JP 7613428 B2 JP7613428 B2 JP 7613428B2 JP 2022119763 A JP2022119763 A JP 2022119763A JP 2022119763 A JP2022119763 A JP 2022119763A JP 7613428 B2 JP7613428 B2 JP 7613428B2
Authority
JP
Japan
Prior art keywords
rail
die
holder
plate
twist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022119763A
Other languages
Japanese (ja)
Other versions
JP2024017246A (en
Inventor
健一郎 井上
祐太 木川
健一郎 藤本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2022119763A priority Critical patent/JP7613428B2/en
Publication of JP2024017246A publication Critical patent/JP2024017246A/en
Application granted granted Critical
Publication of JP7613428B2 publication Critical patent/JP7613428B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Description

本発明は、レールのねじれ矯正装置、ねじれ矯正方法、及びレールの製造方法に関する。 The present invention relates to a rail twist correction device, a twist correction method, and a rail manufacturing method.

一般に、レールは熱間圧延により製造される。レールの熱間圧延では、矩形断面のブルームを素材として、孔型圧延によって断面形状を形成し、製品形状とする。
ここで、熱間圧延されたレールは、その熱間圧延後に、ローラー矯正機によってレールの曲がり、反りなどを矯正して真直なレールとする。そして、ローラー矯正機による矯正後にレールに形状不良がある場合には、冷間でプレス矯正を行いその形状不良を矯正するようにしている。
従来、レールの反りを矯正するものとして、例えば、特許文献1に示すレールの矯正方法が知られている。
Generally, rails are manufactured by hot rolling, in which a rectangular cross-section bloom is used as the material, and the cross-sectional shape is formed by caliber rolling into the product shape.
Here, after hot rolling, the rail is straightened by a roller straightener to straighten the rail for bending and warping. If the rail has a shape defect after straightening by the roller straightener, the rail is subjected to cold press straightening to correct the shape defect.
Conventionally, a method for straightening a warp in a rail is known, for example, as disclosed in Japanese Patent Application Laid-Open No. 2003-233696.

特許文献1に示すレールの矯正方法は、レールを冷却した後、レールの長手方向に引張り力を付与し、全断面の70%以上が降伏した状態で、レールの頭部が外側または内側となる曲げモーメントを付与するものである。
特許文献1に示すレールの矯正方法によれば、これにより、形状の曲がりや反りが小さく、残留応力の非常に低い、耐摩耗性と耐破壊性に優れたレールを製造することができる。
The rail straightening method shown in Patent Document 1 involves cooling the rail, applying a tensile force to the rail in the longitudinal direction, and applying a bending moment such that the head of the rail faces outward or inward when 70% or more of the entire cross section has yielded.
According to the rail straightening method disclosed in Patent Document 1, it is possible to manufacture rails with little bending or warping, very low residual stress, and excellent wear resistance and fracture resistance.

特開2011-79008号公報JP 2011-79008 A

ところで、レールを製品形状に熱間圧延して冷却した後においては、その形状不良として反りや曲がりの他、ねじれと呼ばれる形状不良が発生している場合がある。
ここで、レールの一般的な形状について、図11を参照して説明する。レール100は、左右の幅方向(図11における矢印xで示す方向)、上下方向(図11における矢印zで示す方向)、及び長手方向(図11において紙面に対して直交する方向、図12における矢印yで示す方向)に延びる。レール100は、頭部101と、腹部102と、足部103とを備えている。足部103は、左右の幅方向に細長く延び、底面103aを備えている。腹部102は、足部103の幅方向中央部の上面から上方に向けて細長く延びている。また、頭部101は、腹部102の上部に設けられ、左右の幅方向に直線状に延びる頭頂面101aを備えている。また、頭部101は、頭頂面101aの幅方向左側から下方に延びる幅方向左側の頭側面101bと、頭頂面101aの幅方向右側から下方に延びる幅方向右側の頭側面101cとを備えている。また、幅方向左側の頭側面101bから腹部102の左側面に向けて左側の顎下面101dが設けられ、幅方向右側の頭側面101cから腹部102の右側面に向けて右側の顎下面101eが設けられている。
After a rail is hot-rolled into a product shape and then cooled, shape defects such as warping, bending, and also twisting may occur.
Here, a general shape of a rail will be described with reference to FIG. 11. The rail 100 extends in the width direction (the direction indicated by the arrow x in FIG. 11), the up-down direction (the direction indicated by the arrow z in FIG. 11), and the longitudinal direction (the direction perpendicular to the paper surface in FIG. 11, the direction indicated by the arrow y in FIG. 12). The rail 100 includes a head 101, a body 102, and a foot 103. The foot 103 extends in an elongated manner in the width direction, and includes a bottom surface 103a. The body 102 extends in an elongated manner upward from the upper surface of the center of the width direction of the foot 103. The head 101 is provided on the upper part of the body 102, and includes a top surface 101a that extends linearly in the width direction. The head 101 also has a left head side surface 101b extending downward from the left side of the parietal surface 101a in the width direction, and a right head side surface 101c extending downward from the right side of the parietal surface 101a in the width direction. A left submandibular surface 101d is provided from the left head side surface 101b in the width direction toward the left side surface of the abdomen 102, and a right submandibular surface 101e is provided from the right head side surface 101c in the width direction toward the right side surface of the abdomen 102.

そして、レールのねじれについては、図12に示すように、レール100の長手方向に沿ってレール100がねじれ、正面側(レール100の頭部101と腹部102と足部103とが見える側)から見てレール100の足部103の幅方向一方側(図12では左方側)の先端103bが徐々に浮き上がってしまう現象をいう。
レールのねじれ量については、図13に示すように、定盤110の平坦な基準平面111にレール100を足部103の底面103a側を下にして静置する。このときの、レール100の足部103の幅方向一方側(図13では右方側)の先端103cの底面と基準平面111との「すきま」δの大きさをレール100の「ねじれ量」δと定義する。このレール100の「ねじれ量」については、通常、レール100の長手方向先端側領域と長手方向後端側領域の2カ所について管理するのが一般的である。
Regarding rail twist, this refers to a phenomenon in which the rail 100 twists along the longitudinal direction of the rail 100, as shown in Figure 12, and the tip 103b of the foot portion 103 of the rail 100 on one widthwise side (the left side in Figure 12) gradually rises up when viewed from the front side (the side where the head portion 101, the body portion 102, and the foot portion 103 of the rail 100 are visible).
Regarding the amount of twist of the rail, as shown in Fig. 13, the rail 100 is placed on a flat reference plane 111 of a surface plate 110 with the bottom surface 103a of the foot portion 103 facing down. The size of the "gap" δ between the bottom surface of the tip 103c of the foot portion 103 on one widthwise side (the right side in Fig. 13) of the rail 100 and the reference plane 111 is defined as the "amount of twist" δ of the rail 100. This "amount of twist" of the rail 100 is generally controlled at two locations, the longitudinal leading end region and the longitudinal trailing end region of the rail 100.

しかしながら、特許文献1に示すレールの矯正方法においては、前述したように、レールの反りを矯正するものであって、レールのねじれを矯正するものではない。従って、レールのねじれを矯正するために、特許文献1に示す矯正方法を適用しても、レールのねじれ矯正が適切になされない。
従って、本発明はこの従来の課題を解決するためになされたものであり、その目的は、レールのねじれを的確に矯正することができるレールのねじれ矯正装置、ねじれ矯正方法、及びレールの製造方法を提供することにある。
However, as described above, the rail straightening method disclosed in Patent Document 1 is for straightening the warp of the rail, but is not for straightening the twist of the rail. Therefore, even if the straightening method disclosed in Patent Document 1 is applied to straighten the twist of the rail, the twist of the rail is not properly straightened.
Therefore, the present invention has been made to solve the above-mentioned problems in the conventional art, and an object of the present invention is to provide a device for straightening twist of a rail, a method for straightening twist of a rail, and a method for manufacturing a rail, which are capable of accurately straightening twist of a rail.

上記課題を解決するために、本発明の一態様に係るレールのねじれ矯正装置は、長手方向に延びるレールのねじれを矯正するレールのねじれ矯正装置であって、前記レールの長手方向の一側において、前記レールの足部を押圧する第1の金型及び前記レールの頭部を押圧する第2の金型と、前記レールの長手方向の他側において、前記レールの頭部を押圧する第3の金型及び前記レールの足部を押圧する第4の金型を備え、前記第1の金型及び前記第3の金型は前記レールの幅方向の一側に配置され、前記第2の金型及び前記第4の金型は前記レールの幅方向の他側に配置されることを要旨とする。
また、本発明の別の態様に係るレールのねじれ矯正方法は、長手方向に延びるレールのねじれを矯正するレールのねじれ矯正方法であって、前記レールの長手方向の一側において、前記レールの幅方向の一側に配置された第1の金型で前記レールの足部を押圧するとともに、前記レールの幅方向の他側に配置された第2の金型で前記レールの頭部を押圧し、前記レールの長手方向の他側において、前記レールの幅方向の一側に配置された第3の金型で前記レールの頭部を押圧するとともに、前記レールの幅方向の他側に配置された第4の金型で前記レールの足部を押圧することを要旨とする。
In order to solve the above-mentioned problems, a rail twist straightening device according to one embodiment of the present invention is a rail twist straightening device that corrects twists in a rail extending in the longitudinal direction, and comprises, on one side of the longitudinal direction of the rail, a first die that presses the foot portion of the rail and a second die that presses the head portion of the rail, and, on the other side of the longitudinal direction of the rail, a third die that presses the head portion of the rail and a fourth die that presses the foot portion of the rail, wherein the first die and the third die are disposed on one side of the width direction of the rail, and the second die and the fourth die are disposed on the other side of the width direction of the rail.
Furthermore, a method for straightening a rail's twist according to another aspect of the present invention is a method for straightening a twist of a rail extending in the longitudinal direction, which comprises the steps of: on one side of the longitudinal direction of the rail, pressing a foot portion of the rail with a first die arranged on one side of the width direction of the rail, and pressing a head portion of the rail with a second die arranged on the other side of the width direction of the rail; and on the other side of the longitudinal direction of the rail, pressing the head portion of the rail with a third die arranged on one side of the width direction of the rail, and pressing a foot portion of the rail with a fourth die arranged on the other side of the width direction of the rail.

また、本発明の別の態様に係るレールの製造方法は、前述のレールのねじれ矯正方法によってレールのねじれを矯正するねじれ矯正工程を含むことを要旨とする。 The rail manufacturing method according to another aspect of the present invention includes a twist correction process for correcting the twist of the rail by the above-mentioned rail twist correction method.

本発明に係るレールのねじれ矯正装置、ねじれ矯正方法、及びレールの製造方法によれば、レールのねじれを的確に矯正することができる。 The rail twist correction device, twist correction method, and rail manufacturing method of the present invention allow for accurate correction of rail twists.

本発明の第1実施形態に係るレールのねじれ矯正装置の平面図である。FIG. 1 is a plan view of a rail twist straightening device according to a first embodiment of the present invention. 図1におけるA-A’に沿う断面図である。This is a cross-sectional view taken along line A-A' in Figure 1. 図1におけるB-B’に沿う断面図である。This is a cross-sectional view taken along line B-B' in Figure 1. 図1に示すねじれ矯正装置における第2の金型の第2のホルダに対する嵌合状態を説明するための図である。1. FIG. 4 is a diagram for explaining a fitting state of a second die to a second holder in the twist straightening device shown in FIG. 第1変形例に係るレールのねじれ矯正装置の平面図である。FIG. 11 is a plan view of a rail twist straightening device according to a first modified example. 第2変形例に係るレールのねじれ矯正装置の平面図である。FIG. 11 is a plan view of a rail twist straightening device according to a second modified example. 本発明の第2実施形態に係るレールのねじれ矯正装置において、図1におけるA-A’に沿う断面図と同様の断面図である。2 is a cross-sectional view similar to the cross-sectional view taken along line A-A' in FIG. 1, showing a rail twist straightening device according to a second embodiment of the present invention. 本発明の第2実施形態に係るレールのねじれ矯正装置において、図1におけるB-B’に沿う断面図と同様の断面図である。2 is a cross-sectional view similar to the cross-sectional view taken along line B-B' in FIG. 1, showing a rail twist straightening device according to a second embodiment of the present invention. 本発明の第3実施形態に係るレールのねじれ矯正装置において、図1におけるA-A’に沿う断面図と同様の断面図である。1 , in a rail twist straightening device according to a third embodiment of the present invention. FIG. 本発明の第3実施形態に係るレールのねじれ矯正装置において、図1におけるB-B’に沿う断面図と同様の断面図である。FIG. 11 is a cross-sectional view similar to the cross-sectional view taken along line B-B' in FIG. 1, showing a rail twist straightening device according to a third embodiment of the present invention. レールの各部位を説明するための正面図である。FIG. 4 is a front view for explaining each part of the rail. レールのねじれを説明するための図である。FIG. 13 is a diagram for explaining twisting of a rail. レールのねじれ量を説明するための図である。FIG. 13 is a diagram for explaining the amount of twist of a rail.

以下、本発明の実施の形態を図面を参照して説明する。以下に示す実施形態は、本発明の技術的思想を具体化するための装置や方法を例示するものであって、本発明の技術的思想は、構成部品の材質、形状、構造、配置等を下記の実施形態に特定するものではない。
また、図面は模式的なものである。そのため、厚みと平面寸法との関係、比率等は現実のものとは異なることに留意すべきであり、図面相互間においても互いの寸法の関係や比率が異なる部分が含まれている。
(第1実施形態)
図1には、本発明の第1実施形態に係るレールのねじれ矯正装置の平面が示されている。
Hereinafter, embodiments of the present invention will be described with reference to the drawings. The embodiments shown below are merely examples of devices and methods for embodying the technical concept of the present invention, and the technical concept of the present invention is not limited to the following embodiments in terms of the materials, shapes, structures, arrangements, etc. of the components.
In addition, the drawings are schematic, and therefore, it should be noted that the relationship between thickness and planar dimensions, ratios, etc. may differ from the actual relationship between thickness and planar dimensions, and the drawings may include parts in which the relationship between dimensions and ratios differ from one another.
First Embodiment
FIG. 1 shows a plan view of a rail twist straightening device according to a first embodiment of the present invention.

図1に示すレールのねじれ矯正装置1は、製品形状に熱間圧延して冷却した後の図11に示すレール100のねじれを矯正するものである。ねじれ矯正装置1は、レール100の長手方向(矢印yで示す方向)の一側(図1では上側)において、レール100の足部103を押圧する第1の金型10及びレール100の頭部101を押圧する第2の金型20を備えている。
また、ねじれ矯正装置1は、レール100の長手方向の他側(図1では下側)において、レール100の頭部101を押圧する第3の金型30及びレール100の足部103を押圧する第4の金型40を備えている。
The rail twist straightening device 1 shown in Fig. 1 is for straightening twists in a rail 100 shown in Fig. 11 after hot rolling into a product shape and cooling. The twist straightening device 1 is equipped with a first die 10 for pressing a foot portion 103 of the rail 100 and a second die 20 for pressing a head portion 101 of the rail 100 on one side (the upper side in Fig. 1) of the longitudinal direction of the rail 100 (the direction indicated by the arrow y).
In addition, the twist straightening device 1 is equipped with a third die 30 that presses the head portion 101 of the rail 100 and a fourth die 40 that presses the foot portion 103 of the rail 100 on the other side of the longitudinal direction of the rail 100 (the lower side in Figure 1).

そして、第1の金型10及び第3の金型30はレール100の幅方向(矢印xで示す方向)の一側(図1では左側)に配置され、第2の金型20及び第4の金型40はレール100の幅方向の他側(図1では右側)に配置されている。
レール100は、本実施形態においては、レール100の長手方向の先端(図1においては上端)を先頭にしてテーブルローラ(図示せず)により搬送されて第3の金型30及び第4の金型40を配置した側(図1では下方側)からねじれ矯正装置1に装入される。
そして、レール100の長手方向先端側領域において、レール100の長手方向の一側で、第1の金型10によってレール100の足部103を押圧し、かつ、第2の金型20によってレール100の頭部101を押圧する。また、レール100の長手方向の他側で、第3の金型10によってレール100の頭部101を押圧し、かつ、第4の金型40によってレール100の足部103を押圧する。これにより、レール100の長手方向先端側領域においてレール100のねじれの矯正を行う。
The first mold 10 and the third mold 30 are arranged on one side (left side in Figure 1) of the width direction of the rail 100 (direction indicated by arrow x), and the second mold 20 and the fourth mold 40 are arranged on the other side (right side in Figure 1) of the width direction of the rail 100.
In this embodiment, the rail 100 is transported by table rollers (not shown) with the longitudinal tip of the rail 100 (the upper end in FIG. 1) at the leading edge, and is loaded into the twist straightening device 1 from the side where the third die 30 and the fourth die 40 are arranged (the lower side in FIG. 1).
Then, in the longitudinal tip end region of the rail 100, the foot 103 of the rail 100 is pressed by the first die 10 on one longitudinal side of the rail 100, and the head 101 of the rail 100 is pressed by the second die 20. Moreover, on the other longitudinal side of the rail 100, the head 101 of the rail 100 is pressed by the third die 10, and the foot 103 of the rail 100 is pressed by the fourth die 40. This corrects the twist of the rail 100 in the longitudinal tip end region of the rail 100.

また、長手方向先端側領域においてねじれが矯正されたレール100を、テーブルローラによって長手方向(図1では下方側から上方側の方向)に順送りする。そして、レール100の長手方向後端側領域において、レール100の長手方向の一側で、第1の金型10によってレール100の足部103を押圧し、かつ、第2の金型20によってレール100の頭部101を押圧する。また、レール100の長手方向の他側で、第3の金型10によってレール100の頭部101を押圧し、かつ、第4の金型40によってレール100の足部103を押圧する。これにより、レール100の長手方向後端側領域においてレール100のねじれの矯正を行う。 The rail 100, whose twist has been corrected in the longitudinal tip region, is fed in the longitudinal direction (from the lower side to the upper side in FIG. 1) by the table roller. Then, in the longitudinal rear end region of the rail 100, the first die 10 presses the foot 103 of the rail 100 on one side of the longitudinal direction of the rail 100, and the second die 20 presses the head 101 of the rail 100. Also, on the other longitudinal side of the rail 100, the third die 10 presses the head 101 of the rail 100, and the fourth die 40 presses the foot 103 of the rail 100. This corrects the twist of the rail 100 in the longitudinal rear end region of the rail 100.

このように、第1実施形態に係るレールのねじれ矯正装置1によって、レール100の長手方向先端側領域及び長手方向後端側領域においてレール100のねじれの矯正を行うのは次の理由による。即ち、レール100の長手方向先端側領域及び長手方向後端側領域においては、レール100にねじれが生じた場合には、レール100の他の領域に比較してそのねじれ量が顕著になるからである。
ここで、第1の金型10及び第2の金型20は、レール100の長手方向の一側における第1位置aでレール100の幅方向において対向するように配置される。また、第3の金型30及び第4の金型40は、レール100の長手方向の他側における第2位置bでレール100の幅方向において対向するように配置されている。第1位置aと第2位置bとの間の距離は、本実施形態では1~2m程度に設定される。
The reason why the rail 100 is straightened in the longitudinal leading end region and the longitudinal rear end region by the rail twist straightening device 1 according to the first embodiment is as follows: That is, when a twist occurs in the rail 100, the amount of twist becomes more significant in the longitudinal leading end region and the longitudinal rear end region of the rail 100 compared to other regions of the rail 100.
Here, the first die 10 and the second die 20 are arranged to face each other in the width direction of the rail 100 at a first position a on one side in the longitudinal direction of the rail 100. Moreover, the third die 30 and the fourth die 40 are arranged to face each other in the width direction of the rail 100 at a second position b on the other side in the longitudinal direction of the rail 100. The distance between the first position a and the second position b is set to about 1 to 2 m in this embodiment.

第1の金型10について具体的に述べると、図1及び図2に示すように、レール100のねじれ矯正の際に、レール100の長手方向の一側における第1位置aにおいて、レール100の足部103の幅方向左側の先端103bを押圧する。
第1の金型10は、図1及び図2に示すように、第1のホルダ11の内側に保持され、第1のホルダ11は、第1のプレート15に対し幅方向内側に配置されて第1のプレート15の内側面に対して上下動自在に設置されている。第1の金型10を保持する第1のホルダ11が第1のプレート15に対して上下動自在に配置されている。これにより、第1の金型10がレール100の足部103を押圧した際にその反力で第1のホルダ11が第1のプレート15に対して上下動する。このため、第1のホルダ11の落下を防止する後述の落下防止プレート12及び接続ボルト13等の部材に負荷がかからず、それら部材の損傷を防止することができる。
Specifically, with regard to the first die 10, as shown in Figures 1 and 2, when correcting twist in the rail 100, the tip 103b on the left side in the width direction of the foot portion 103 of the rail 100 is pressed at a first position a on one side of the longitudinal direction of the rail 100.
1 and 2, the first die 10 is held inside the first holder 11, and the first holder 11 is disposed on the inside in the width direction with respect to the first plate 15 and is installed so as to be vertically movable with respect to the inner surface of the first plate 15. The first holder 11 that holds the first die 10 is disposed so as to be vertically movable with respect to the first plate 15. As a result, when the first die 10 presses the foot 103 of the rail 100, the first holder 11 moves vertically with respect to the first plate 15 due to the reaction force. Therefore, no load is applied to members such as a fall prevention plate 12 and a connection bolt 13, which will be described later, that prevent the first holder 11 from falling, and damage to these members can be prevented.

また、第1のホルダ11の上面には、第1のプレート15上に載置されて第1のホルダ11の落下を防止する落下防止プレート12が接続ボルト13により固定されている。これにより、第1のホルダ11の第1のプレート15からの落下を防止することができる。
但し、第1のホルダ11に固定された落下防止プレート12と、第1のプレート15の上面とが、第1のホルダ11の上下方向位置を保持する弾性体としての金属バネ14によって連結されている。
これにより、第1のホルダ11が第1のプレート15に対して上下動した際に、金属バネ14によって第1のホルダ11の上下動を吸収しつつ第1のホルダ11の上下方向の移動範囲を所定距離に限定できる。これにより、第1の金型10のレール100の足部103に対する上下方向位置の範囲を限定でき、第1の金型10のレール100の足部103に対する適切な押圧を担保することができる。
Further, a fall prevention plate 12 that is placed on the first plate 15 and prevents the first holder 11 from falling is fixed to the upper surface of the first holder 11 by a connecting bolt 13. This makes it possible to prevent the first holder 11 from falling off the first plate 15.
However, the fall prevention plate 12 fixed to the first holder 11 and the upper surface of the first plate 15 are connected by a metal spring 14 serving as an elastic body that maintains the vertical position of the first holder 11.
As a result, when the first holder 11 moves up and down relative to the first plate 15, the vertical movement range of the first holder 11 can be limited to a predetermined distance while the vertical movement of the first holder 11 is absorbed by the metal spring 14. As a result, the range of the vertical position of the first mold 10 relative to the foot portion 103 of the rail 100 can be limited, and appropriate pressing of the first mold 10 against the foot portion 103 of the rail 100 can be ensured.

第1のホルダ11に固定された落下防止プレート12が第1のプレート15の上面に金属バネ14によって連結されていないとする。すると、第1のホルダ11が第1のプレート15に対して上下動した際に、第1の金型10のレール100の足部103に対する上下方向位置の範囲を限定できず、第1の金型10のレール100の足部103に対する適切な押圧を担保することができない場合がある。
金属バネ14は、圧縮バネ、引張バネのいずれでもよく、第1のホルダ11及び第1の金型10の重量にもよるが、そのバネ定数は100~1000N/mm程度、そのストロークは上下方向に±10mm程度が好適である。
Suppose that the fall prevention plate 12 fixed to the first holder 11 is not connected to the upper surface of the first plate 15 by the metal spring 14. In that case, when the first holder 11 moves up and down relative to the first plate 15, the range of the up-down position of the first mold 10 relative to the foot 103 of the rail 100 cannot be limited, and appropriate pressure on the foot 103 of the rail 100 of the first mold 10 cannot be guaranteed.
The metal spring 14 may be either a compression spring or a tension spring, and although it depends on the weight of the first holder 11 and the first mold 10, it is preferable that the spring constant is about 100 to 1000 N/mm and the stroke is about ±10 mm in the vertical direction.

また、第2の金型20について具体的に述べる。第2の金型20は、図1及び図2に示すように、レール100のねじれ矯正の際に、レール100の長手方向の一側における第1位置aにおいて、レール100の頭部101の幅方向右側の頭側面101cを押圧する。
第2の金型20は、図1及び図2に示すように、第2のホルダ21の内側に保持され、第2のホルダ21は、第2のプレート25に対し幅方向内側に配置されて第2のプレート25の内側面に対して上下動自在に設置されている。第2の金型20を保持する第2のホルダ21が第2のプレート25に対して上下動自在に配置されている。これにより、第2の金型20がレール100の頭部101を押圧した際にその反力で第2のホルダ21が第2のプレート25に対して上下動する。このため、第2のホルダ21の落下を防止する後述の落下防止プレート22及び接続ボルト23等の部材に負荷がかからず、それら部材の損傷を防止することができる。
Next, the second die 20 will be specifically described. As shown in Figures 1 and 2, the second die 20 presses the head side surface 101c on the right side in the width direction of the head 101 of the rail 100 at a first position a on one side in the longitudinal direction of the rail 100 during twist straightening of the rail 100.
1 and 2, the second die 20 is held inside the second holder 21, and the second holder 21 is disposed on the inside in the width direction of the second plate 25 and is installed so as to be vertically movable relative to the inner surface of the second plate 25. The second holder 21 that holds the second die 20 is disposed so as to be vertically movable relative to the second plate 25. As a result, when the second die 20 presses the head 101 of the rail 100, the second holder 21 moves vertically relative to the second plate 25 due to the reaction force. Therefore, no load is applied to members such as a fall prevention plate 22 and a connection bolt 23, which will be described later, that prevent the second holder 21 from falling, and damage to these members can be prevented.

第2のホルダ21による第2の金型20の保持について、図4を参照して説明する。第2の金型20は、平面側から見てT字形に形成されている。第2の金型20は、上下方向に延びる矩形状の金型本体20aと、金型本体20aの側面において金型本体20aの幅方向両側から幅方向(図4における上下方向)に突出する突出部20bとを備えている。なお、図4では金型本体20aの形状を矩形で示しているが、金型本体20aの形状は矩形に限るものではなく、角部に丸みを付与することや、先端部を円弧状の形状にすることもできる。
第2のホルダ21の内側面には、T字形の第2の金型20が嵌合されるアリ溝が形成される。このアリ溝は、金型本体20aが嵌合される第1溝部21a及び突出部20bが嵌合される第2溝部21bを有する。アリ溝は、第2のホルダ21において上下方向に貫通するように形成されている。T字形の第2の金型20は、第2のホルダ21の内側面に形成されたアリ溝に第2のホルダ21の上方あるいは下方から嵌合される。そして、第2の金型を嵌合したアリ溝に第2のホルダ21の下方からスペーサー(図示せず)を挿入する。これにより、既にアリ溝に嵌合された第2の金型20の下方への抜け止めを行うとともに第2の金型20の上下方向の位置決めを行う。この際に、第2の金型20の上下方向の位置は、レール100の頭部101の幅方向右側の頭側面101cを押圧できる位置とする。これにより、第2のホルダ21に第2の金型20が保持される。なお、スペーサーの上下方向位置を、レール100のサイズに応じて適宜変更することで、第2の金型20の上下方向の位置を調整することができる。アリ溝に嵌合された第2の金型20の上方への抜け止めは、必ずしも必要ではなく、金型20の自重で上下方向の位置を決めてもいいし、金型20の上方にスペーサーを配置して抜け止めとしてもよい。
The holding of the second mold 20 by the second holder 21 will be described with reference to FIG. 4. The second mold 20 is formed in a T-shape when viewed from the top. The second mold 20 includes a rectangular mold body 20a extending in the vertical direction and a protruding portion 20b protruding in the width direction (vertical direction in FIG. 4) from both sides of the mold body 20a in the width direction on the side of the mold body 20a. Note that, although the shape of the mold body 20a is shown as a rectangle in FIG. 4, the shape of the mold body 20a is not limited to a rectangle, and the corners may be rounded or the tip may be formed into an arc shape.
A dovetail groove into which the T-shaped second die 20 is fitted is formed on the inner surface of the second holder 21. This dovetail groove has a first groove portion 21a into which the die body 20a is fitted and a second groove portion 21b into which the protrusion 20b is fitted. The dovetail groove is formed so as to penetrate the second holder 21 in the vertical direction. The T-shaped second die 20 is fitted into the dovetail groove formed on the inner surface of the second holder 21 from above or below the second holder 21. Then, a spacer (not shown) is inserted from below the second holder 21 into the dovetail groove into which the second die is fitted. This prevents the second die 20 already fitted into the dovetail groove from falling out downward and positions the second die 20 in the vertical direction. At this time, the vertical position of the second die 20 is set to a position where it can press the head side surface 101c on the right side in the width direction of the head 101 of the rail 100. As a result, the second mold 20 is held by the second holder 21. The vertical position of the second mold 20 can be adjusted by appropriately changing the vertical position of the spacer according to the size of the rail 100. It is not necessarily required to prevent the second mold 20 engaged in the dovetail groove from slipping out upward, and the vertical position may be determined by the weight of the mold 20 itself, or a spacer may be disposed above the mold 20 to prevent it from slipping out.

第1の金型10、第3の金型30、及び第4の金型40も、第2の金型20と同様の態様を有する。すなわち、金型形状としては、矩形形状のほか、角部に丸みを有する形状や、先端部が円弧状となる形状にすることもできる。また、これらの金型の大きさをそろえる必要も特にない。また、第1のホルダ11による第1の金型10の保持、第3のホルダ31による第3の金型30の保持、及び第4のホルダ41による第4の金型40の保持についても、この第2のホルダ21による第2の金型20の保持と同様の手法がとられる。なお、第1のホルダ11による第1の金型10の保持に際し、第1の金型10の上下方向の位置は、レール100の足部103の幅方向左側の先端103bを押圧できる位置とする。また、第3のホルダ31による第3の金型30の保持に際し、第3の金型30の上下方向の位置は、レール100の頭部101の幅方向左側の頭側面101bを押圧できる位置とする。更に、第4の金型40の上下方向の位置は、レール100の足部103の幅方向右側の先端103cを押圧できる位置とする。 The first mold 10, the third mold 30, and the fourth mold 40 have the same configuration as the second mold 20. That is, the mold shape can be a rectangular shape, a shape with rounded corners, or a shape with an arc-shaped tip. There is no need to make the sizes of these molds the same. The first holder 11 holds the first mold 10, the third holder 31 holds the third mold 30, and the fourth holder 41 holds the fourth mold 40 in the same manner as the second holder 21 holds the second mold 20. When the first holder 11 holds the first mold 10, the first mold 10 is positioned in the up-down direction so that it can press the tip 103b on the left side of the width direction of the foot 103 of the rail 100. In addition, when the third holder 31 holds the third die 30, the vertical position of the third die 30 is set to a position where it can press the head side surface 101b on the left side in the width direction of the head 101 of the rail 100. Furthermore, the vertical position of the fourth die 40 is set to a position where it can press the tip 103c on the right side in the width direction of the foot 103 of the rail 100.

また、第2のホルダ21の上面には、第2のプレート25上に載置されて第2のホルダ21の落下を防止する落下防止プレート22が接続ボルト23により固定されている。これにより、第2のホルダ21の第2のプレート25からの落下を防止することができる。
但し、第2のホルダ21に固定された落下防止プレート22と、第2のプレート25の上面とが、第1のホルダ11と同様に、第2のホルダ21の上下方向位置を保持する弾性体としての金属バネ24によって連結されている。
これにより、第2のホルダ21が第2のプレート25に対して上下動した際に、金属バネ24によって第2のホルダ21の上下動を吸収しつつ第2のホルダ21の上下方向の移動範囲を所定距離に限定できる。これにより、第2の金型20のレール100の頭部101に対する上下方向位置の範囲を限定でき、第2の金型20のレール100の頭部101に対する適切な押圧を担保することができる。
Further, a fall prevention plate 22 that is placed on the second plate 25 and prevents the second holder 21 from falling is fixed to the upper surface of the second holder 21 by a connecting bolt 23. This makes it possible to prevent the second holder 21 from falling off the second plate 25.
However, the fall prevention plate 22 fixed to the second holder 21 and the upper surface of the second plate 25 are connected by a metal spring 24 as an elastic body that maintains the vertical position of the second holder 21, similar to the first holder 11.
As a result, when the second holder 21 moves up and down relative to the second plate 25, the vertical movement range of the second holder 21 can be limited to a predetermined distance while the vertical movement of the second holder 21 is absorbed by the metal spring 24. As a result, the range of the vertical position of the second die 20 relative to the head 101 of the rail 100 can be limited, and appropriate pressing of the second die 20 against the head 101 of the rail 100 can be ensured.

金属バネ24は、金属バネ14と同様に、圧縮バネ、引張バネのいずれでもよく、第2のホルダ21及び第2の金型20の重量にもよるが、そのバネ定数は100~1000N/mm程度、そのストロークは上下方向に±10mm程度が好適である。
更に、第3の金型30について具体的に述べる。第3の金型30は、図1及び図3に示すように、レール100のねじれ矯正の際に、レール100の長手方向の他側における第2位置bにおいて、レール100の頭部101の幅方向左側の頭側面101bを押圧する。
第3の金型30は、図1及び図3に示すように、第3のホルダ31に保持され、第3のホルダ31は、第3のプレート35に対し幅方向内側に配置されて第3のプレート35の内側面に対して上下動自在に設置されている。第3の金型30を保持する第3のホルダ31が第3のプレート35に対して上下動自在に配置されている。これにより、第3の金型30がレール100の頭部101を押圧した際にその反力で第3のホルダ31が第3のプレート35に対して上下動する。このため、第3のホルダ31の落下を防止する後述の落下防止プレート32及び接続ボルト33等の部材に負荷がかからず、それら部材の損傷を防止することができる。
The metal spring 24, like the metal spring 14, may be either a compression spring or a tension spring, and depending on the weight of the second holder 21 and the second mold 20, it is preferable that the spring constant be approximately 100 to 1000 N/mm and that the stroke be approximately ±10 mm in the vertical direction.
Further, the third die 30 will be specifically described. As shown in Figures 1 and 3, the third die 30 presses the head side surface 101b on the left side in the width direction of the head 101 of the rail 100 at the second position b on the other side in the longitudinal direction of the rail 100 during twist correction of the rail 100.
1 and 3, the third die 30 is held by a third holder 31, which is disposed on the inside in the width direction relative to the third plate 35 and is installed so as to be vertically movable relative to the inner surface of the third plate 35. The third holder 31 that holds the third die 30 is disposed so as to be vertically movable relative to the third plate 35. As a result, when the third die 30 presses the head 101 of the rail 100, the third holder 31 moves vertically relative to the third plate 35 due to the reaction force. Therefore, no load is applied to members such as a fall prevention plate 32 and a connection bolt 33, which will be described later, that prevent the third holder 31 from falling, and damage to these members can be prevented.

また、第3のホルダ31の上面には、第3のプレート35上に載置されて第3のホルダ31の落下を防止する落下防止プレート32が接続ボルト33により固定されている。これにより、第3のホルダ31の第3のプレート35からの落下を防止することができる。
但し、第3のホルダ31に固定された落下防止プレート32と、第3のプレート35の上面とが、第1のホルダ11と同様に、第3のホルダ31の上下方向位置を保持する弾性体としての金属バネ34によって連結されている。
これにより、第3のホルダ31が第3のプレート35に対して上下動した際に、金属バネ34によって第3のホルダ31の上下動を吸収しつつ第3のホルダ31の上下方向の移動範囲を所定距離に限定できる。これにより、第3の金型30のレール100の頭部101に対する上下方向位置の範囲を限定でき、第3の金型30のレール100の頭部101に対する適切な押圧を担保することができる。
Further, a fall prevention plate 32 that is placed on the third plate 35 and prevents the third holder 31 from falling is fixed to the upper surface of the third holder 31 by a connecting bolt 33. This makes it possible to prevent the third holder 31 from falling off the third plate 35.
However, the fall prevention plate 32 fixed to the third holder 31 and the upper surface of the third plate 35 are connected by a metal spring 34, which acts as an elastic body that maintains the vertical position of the third holder 31, in the same manner as the first holder 11.
As a result, when the third holder 31 moves up and down relative to the third plate 35, the vertical movement range of the third holder 31 can be limited to a predetermined distance while the vertical movement of the third holder 31 is absorbed by the metal spring 34. As a result, the range of the vertical position of the third die 30 relative to the head 101 of the rail 100 can be limited, and appropriate pressing of the third die 30 against the head 101 of the rail 100 can be ensured.

金属バネ34は、金属バネ14と同様に、圧縮バネ、引張バネのいずれでもよく、第3のホルダ31及び第3の金型30の重量にもよるが、そのバネ定数は100~1000N/mm程度、そのストロークは上下方向に±10mm程度が好適である。
また、第4の金型40について具体的に述べる。第4の金型40は、図1及び図3に示すように、レール100のねじれ矯正の際に、レール100の長手方向の他側における第2位置bにおいて、レール100の足部103の幅方向右側の先端103cを押圧する。
第4の金型40は、図1及び図3に示すように、第4のホルダ41に保持され、第4のホルダ41は、第4のプレート45に対し幅方向内側に配置されて第4のプレート45の内側面に対して上下動自在に設置されている。第4の金型40を保持する第4のホルダ41が第4のプレート45に対して上下動自在に配置されている。これにより、第4の金型40がレール100の足部103を押圧した際にその反力で第4のホルダ41が第4のプレート45に対して上下動する。このため、第4のホルダ41の落下を防止する後述の落下防止プレート42及び接続ボルト43等の部材に負荷がかからず、それら部材の損傷を防止することができる。
The metal spring 34, like the metal spring 14, may be either a compression spring or a tension spring, and depending on the weight of the third holder 31 and the third mold 30, it is preferable that the spring constant be approximately 100 to 1000 N/mm and that the stroke be approximately ±10 mm in the vertical direction.
Next, the fourth die 40 will be specifically described. As shown in Figures 1 and 3, the fourth die 40 presses the tip 103c on the right side in the width direction of the foot portion 103 of the rail 100 at the second position b on the other side in the longitudinal direction of the rail 100 when straightening the twist of the rail 100.
1 and 3, the fourth die 40 is held by a fourth holder 41, and the fourth holder 41 is disposed on the inner side of the fourth plate 45 in the width direction and is installed so as to be vertically movable with respect to the inner surface of the fourth plate 45. The fourth holder 41 that holds the fourth die 40 is disposed so as to be vertically movable with respect to the fourth plate 45. As a result, when the fourth die 40 presses the foot 103 of the rail 100, the reaction force causes the fourth holder 41 to move vertically with respect to the fourth plate 45. Therefore, no load is applied to members such as a fall prevention plate 42 and a connection bolt 43, which will be described later, that prevent the fourth holder 41 from falling, and damage to these members can be prevented.

また、第4のホルダ41の上面には、第4のプレート45上に載置されて第4のホルダ41の落下を防止する落下防止プレート42が接続ボルト43により固定されている。これにより、第4のホルダ41の第4のプレート45からの落下を防止することができる。
但し、第4のホルダ41に固定された落下防止プレート42と、第4のプレート45の上面とが、第1のホルダ11と同様に、第4のホルダ41の上下方向位置を保持する弾性体としての金属バネ44によって連結されている。
これにより、第4のホルダ41が第4のプレート45に対して上下動した際に、金属バネ44によって第4のホルダ41の上下動を吸収しつつ第4のホルダ41の上下方向の移動範囲を所定距離に限定できる。これにより、第4の金型40のレール100の足部103に対する上下方向位置の範囲を限定でき、第4の金型40のレール100の足部103に対する適切な押圧を担保することができる。
Further, a fall prevention plate 42 that is placed on the fourth plate 45 and prevents the fourth holder 41 from falling is fixed to the upper surface of the fourth holder 41 by a connecting bolt 43. This makes it possible to prevent the fourth holder 41 from falling off the fourth plate 45.
However, the fall prevention plate 42 fixed to the fourth holder 41 and the upper surface of the fourth plate 45 are connected by a metal spring 44, which acts as an elastic body that maintains the vertical position of the fourth holder 41, in the same manner as the first holder 11.
As a result, when the fourth holder 41 moves up and down relative to the fourth plate 45, the vertical movement range of the fourth holder 41 can be limited to a predetermined distance while the vertical movement of the fourth holder 41 is absorbed by the metal spring 44. As a result, the range of the vertical position of the fourth die 40 relative to the foot portion 103 of the rail 100 can be limited, and appropriate pressing of the fourth die 40 against the foot portion 103 of the rail 100 can be ensured.

金属バネ44は、金属バネ14と同様に、圧縮バネ、引張バネのいずれでもよく、第4のホルダ41及び第4の金型40の重量にもよるが、そのバネ定数は100~1000N/mm程度、そのストロークは上下方向に±10mm程度が好適である。
なお、図1に示すように、第1のプレート15及び第3のプレート35は、固定側プレート50として一体に形成されている。また、第2のプレート25及び第4のプレート45は、移動側プレート60として一体に形成されている。移動側プレート60には、該移動側プレート60を固定側プレート50に近づける方向、及び固定側プレート50に近づいた移動側プレート60を固定側プレート50から離れる方向に移動させる圧下シリンダ70が接続されている。
The metal spring 44, like the metal spring 14, may be either a compression spring or a tension spring, and depending on the weight of the fourth holder 41 and the fourth mold 40, it is preferable that the spring constant be approximately 100 to 1000 N/mm and that the stroke be approximately ±10 mm in the vertical direction.
1, the first plate 15 and the third plate 35 are integrally formed as a fixed-side plate 50. The second plate 25 and the fourth plate 45 are integrally formed as a moving-side plate 60. A pressing cylinder 70 is connected to the moving-side plate 60, which moves the moving-side plate 60 in a direction to approach the fixed-side plate 50 and moves the moving-side plate 60 away from the fixed-side plate 50 after approaching the fixed-side plate 50.

そして、第1の金型10によるレール100の足部103(幅方向左側の先端103b)への押圧、及び第2の金型20によるレール100の頭部101(幅方向右側の頭側面101c)への押圧は、レール100のねじれを矯正する際に、圧下シリンダ70によって移動側プレート60が固定側プレート50に近づく方向に移動した際に達成される。つまり、レール100のねじれを矯正する際に、圧下シリンダ70によって第2の金型20が、第1の金型10に近づく方向に移動する。これにより、第1の金型10によるレール100の足部103への押圧、及び第2の金型20によるレール100の頭部101への押圧が達成される。 The first die 10 presses the foot 103 (the tip 103b on the left side in the width direction) of the rail 100, and the second die 20 presses the head 101 (the head side surface 101c on the right side in the width direction) of the rail 100 when the moving side plate 60 moves in a direction approaching the fixed side plate 50 by the pressing cylinder 70 when correcting the twist of the rail 100. In other words, when correcting the twist of the rail 100, the pressing cylinder 70 moves the second die 20 in a direction approaching the first die 10. This achieves the pressing of the foot 103 of the rail 100 by the first die 10, and the pressing of the head 101 of the rail 100 by the second die 20.

また、圧下シリンダ70によって移動側プレート60が固定側プレート50に近づく方向に移動した際に、第3の金型30によるレール100の頭部101(幅方向左側の頭側面101b)への押圧、及び第4の金型40によるレール100の足部103(幅方向右側の先端103c)への押圧も同時に達成される。つまり、レール100のねじれを矯正する際に、圧下シリンダ70によって第4の金型40が、第3の金型30に近づく方向に移動する。これにより、第3の金型30によるレール100の頭部101への押圧、及び第4の金型40によるレール100の足部103への押圧が同時に達成される。
つまり、圧下シリンダ70によって移動側プレート60が固定側プレート50に近づく方向に移動する。すると、移動側プレート60を構成する第2のプレート25に設置されている第2のホルダ21及び第2の金型20も固定側プレート50(第1の金型10)に近づく方向(幅方向他側(右側)から幅方向一側(左側)への方向)に移動する。これにより、第1の金型10によるレール100の足部103(幅方向左側の先端103b)への押圧、及び第2の金型20によるレール100の頭部101(幅方向右側の頭側面101c)への押圧が達成される。また、圧下シリンダ70によって移動側プレート60が固定側プレート50に近づく方向に移動する。すると、第4のプレート45に設置されている第4のホルダ41及び第4の金型40も同時に固定側プレート50(第3の金型30)に近づく方向に移動する。これにより、第3の金型30によるレール100の頭部101(幅方向左側の頭側面101b)への押圧、及び第4の金型40によるレール100の足部103(幅方向右側の先端103c)への押圧が達成される。
In addition, when the movable plate 60 is moved in a direction approaching the fixed plate 50 by the pressing cylinder 70, the third die 30 presses the head 101 (head side surface 101b on the left side in the width direction) of the rail 100, and the fourth die 40 presses the foot 103 (tip 103c on the right side in the width direction) of the rail 100 at the same time. In other words, when correcting the twist of the rail 100, the fourth die 40 moves in a direction approaching the third die 30 by the pressing cylinder 70. As a result, the third die 30 presses the head 101 of the rail 100, and the fourth die 40 presses the foot 103 of the rail 100 at the same time.
That is, the pressing cylinder 70 moves the moving side plate 60 in a direction approaching the fixed side plate 50. Then, the second holder 21 and the second die 20 installed on the second plate 25 constituting the moving side plate 60 also move in a direction approaching the fixed side plate 50 (first die 10) (from the other side (right side) in the width direction to one side (left side) in the width direction). This achieves pressing the foot 103 (the tip 103b on the left side in the width direction) of the rail 100 by the first die 10, and pressing the head 101 (the head side surface 101c on the right side in the width direction) of the rail 100 by the second die 20. Also, the pressing cylinder 70 moves the moving side plate 60 in a direction approaching the fixed side plate 50. Then, the fourth holder 41 and the fourth die 40 installed on the fourth plate 45 also move in a direction approaching the fixed side plate 50 (third die 30) at the same time. This results in the third die 30 pressing the head 101 (head side surface 101b on the left side in the width direction) of the rail 100, and the fourth die 40 pressing the foot 103 (tip 103c on the right side in the width direction) of the rail 100.

また、固定側プレート50に移動側プレート60が近付いた状態で圧下シリンダ70によって移動側プレート60が固定側プレート50から離れる方向に移動する。すると、移動側プレート60を構成する第2のプレート25に設置されている第2のホルダ21及び第2の金型20も固定側プレート50(第1の金型10)から離れる方向(幅方向一側(左側)から幅方向他側(右側)への方向)に移動する。これにより、第1の金型10によるレール100の足部103(幅方向左側の先端103b)への押圧状態、及び第2の金型20によるレール100の頭部101(幅方向右側の頭側面101c)への押圧状態が解除される。また、固定側プレート50に移動側プレート60が近付いた状態で圧下シリンダ70によって移動側プレート60が固定側プレート50から離れる方向に移動する。すると、第4のプレート45に設置されている第4のホルダ41及び第4の金型40も同時に固定側プレート50(第3の金型30)から離れる方向に移動する。これにより、第3の金型30によるレール100の頭部101(幅方向左側の頭側面101b)への押圧状態、及び第4の金型40によるレール100の足部103(幅方向右側の先端103c)への押圧状態が解除される。 In addition, when the moving side plate 60 approaches the fixed side plate 50, the pressing cylinder 70 moves the moving side plate 60 in a direction away from the fixed side plate 50. Then, the second holder 21 and the second die 20 installed on the second plate 25 constituting the moving side plate 60 also move in a direction away from the fixed side plate 50 (first die 10) (from one side (left) in the width direction to the other side (right) in the width direction). This releases the first die 10 from pressing the foot 103 (tip 103b on the left side in the width direction) of the rail 100, and the second die 20 from pressing the head 101 (head side surface 101c on the right side in the width direction) of the rail 100. In addition, when the moving side plate 60 approaches the fixed side plate 50, the pressing cylinder 70 moves the moving side plate 60 in a direction away from the fixed side plate 50. Then, the fourth holder 41 and the fourth die 40 installed on the fourth plate 45 also move simultaneously in a direction away from the fixed side plate 50 (third die 30). This releases the third die 30 from pressing the head 101 (head side surface 101b on the left side in the width direction) of the rail 100, and the fourth die 40 from pressing the foot 103 (tip 103c on the right side in the width direction) of the rail 100.

次に、図1乃至図3に示すレールのねじれ矯正装置1を用いてレール100のねじれを矯正する方法について説明する。
先ず、レール100のねじれを矯正するに際し、製品形状に熱間圧延されて冷却されたレール100は、足部103の底面103aを下側にしてテーブルローラ(図示せず)により搬送される。そして、レール100は、本実施形態においては、レール100の長手方向の先端(図1においては上端)を先頭にしてテーブルローラ(図示せず)により搬送されて第3の金型30及び第4の金型40を配置した側(図1では下方側)からねじれ矯正装置1に装入される。そして、レール100の長手方向先端側領域がねじれ矯正装置1の第1の金型10及び第3の金型30と第2の金型20及び第4の金型40との間に位置する。
Next, a method for straightening the twist of the rail 100 using the rail twist straightening device 1 shown in Figs. 1 to 3 will be described.
First, when the twist of the rail 100 is corrected, the rail 100, which has been hot-rolled into a product shape and cooled, is transported by table rollers (not shown) with the bottom surface 103a of the foot portion 103 facing downward. In this embodiment, the rail 100 is transported by table rollers (not shown) with the longitudinal tip of the rail 100 (upper end in FIG. 1) at the head, and is loaded into the twist straightening device 1 from the side where the third die 30 and the fourth die 40 are arranged (lower side in FIG. 1). The longitudinal tip side region of the rail 100 is located between the first die 10 and the third die 30 and the second die 20 and the fourth die 40 of the twist straightening device 1.

これにより、第1の金型10及び第3の金型30は、レール100の長手方向先端側領域において、レール100の幅方向(矢印xで示す方向)の一側(図1では左側)に配置される。また、第2の金型20及び第4の金型40はレール100の幅方向の他側(図1では右側)に配置される。また、第1の金型10及び第2の金型20は、レール100の長手方向先端側領域において、レール100の長手方向の一側(図1では上側)における第1位置aでレール100の幅方向において対向するように配置される。また、第3の金型30及び第4の金型40は、レール100の長手方向の他側(図1では下側)における第2位置bでレール100の幅方向において対向するように配置される。 As a result, the first mold 10 and the third mold 30 are arranged on one side (left side in FIG. 1) of the width direction (direction indicated by arrow x) of the rail 100 in the longitudinal tip side region of the rail 100. The second mold 20 and the fourth mold 40 are arranged on the other side (right side in FIG. 1) of the width direction of the rail 100. The first mold 10 and the second mold 20 are arranged to face each other in the width direction of the rail 100 at a first position a on one side of the longitudinal direction of the rail 100 (upper side in FIG. 1) in the longitudinal tip side region of the rail 100. The third mold 30 and the fourth mold 40 are arranged to face each other in the width direction of the rail 100 at a second position b on the other side of the longitudinal direction of the rail 100 (lower side in FIG. 1).

次いで、圧下シリンダ70によって移動側プレート60を固定側プレート50に近づく方向に移動させる。
これにより、移動側プレート60を構成する第2のプレート25に設置されている第2のホルダ21及び第2の金型20が固定側プレート50に近づく方向(幅方向他側(右側)から幅方向一側(左側)への方向)に移動する。これにより、レール100の長手方向の一側(図1では上側)において、レール100の幅方向の一側(左側)に配置された第1の金型10でレール100の足部103(幅方向左側の先端103b)を押圧する。また、同時に、レール100の幅方向の他側(右側)に配置された第2の金型20でレール100の頭部101(幅方向右側の頭側面101c)を押圧する。
Next, the movable plate 60 is moved in a direction approaching the fixed plate 50 by the pressing cylinder 70 .
As a result, the second holder 21 and second die 20 mounted on the second plate 25 constituting the movable side plate 60 move in a direction approaching the fixed side plate 50 (from the other side (right side) in the width direction to one side (left side) in the width direction). As a result, on one side of the longitudinal direction of the rail 100 (the upper side in FIG. 1 ), the first die 10 arranged on one side (left side) in the width direction of the rail 100 presses the foot 103 (tip 103b on the left side in the width direction) of the rail 100. At the same time, the second die 20 arranged on the other side (right side) in the width direction of the rail 100 presses the head 101 (head side surface 101c on the right side in the width direction) of the rail 100.

また、移動側プレート60を構成する第4のプレート45に設置されている第4のホルダ41及び第4の金型40も固定側プレート50に近づく方向(幅方向他側(右側)から幅方向一側(左側)への方向)に移動する。これにより、レール100の長手方向の他側(図1では下側)において、レール100の幅方向の一側(左側)に配置された第3の金型30でレール100の頭部101(幅方向左側の頭側面101b)を押圧する。また、同時に、レール100の幅方向の他側(右側)に配置された第4の金型40でレール100の足部103(幅方向右側の先端103c)を押圧する。
これにより、レール100の長手方向先端側領域において、レール100のねじれが矯正される。
The fourth holder 41 and fourth die 40 mounted on the fourth plate 45 constituting the movable plate 60 also move in a direction approaching the fixed plate 50 (from the other widthwise side (right side) to one widthwise side (left side)). As a result, on the other longitudinal side (lower side in FIG. 1 ) of the rail 100, the third die 30 arranged on one widthwise side (left side) of the rail 100 presses the head 101 (head side surface 101b on the left side in the widthwise direction) of the rail 100. At the same time, the fourth die 40 arranged on the other widthwise side (right side) of the rail 100 presses the foot 103 (tip 103c on the right side in the widthwise direction) of the rail 100.
This corrects the twist of the rail 100 in the longitudinal tip region of the rail 100 .

次いで、圧下シリンダ70によって移動側プレート60を固定側プレート50から離れる方向に移動させる。
これにより、移動側プレート60を構成する第2のプレート25に設置されている第2のホルダ21及び第2の金型20が固定側プレート50から離れる方向(幅方向一側(左側)から幅方向他側(右側)への方向)に移動する。これにより、第1の金型10によるレール100の足部103(幅方向左側の先端103b)に対する押圧状態が解除される。また、同時に、第2の金型20によるレール100の頭部101(幅方向右側の頭側面101c)に対する押圧状態が解除される。
Next, the moving plate 60 is moved in a direction away from the fixed plate 50 by the pressing cylinder 70 .
As a result, the second holder 21 and second die 20 installed on the second plate 25 that constitutes the movable side plate 60 move in a direction away from the fixed side plate 50 (from one side (left) in the width direction to the other side (right) in the width direction). This releases the first die 10 from pressing against the foot 103 (tip 103b on the left side in the width direction) of the rail 100. At the same time, the second die 20 releases the pressing against the head 101 (head side surface 101c on the right side in the width direction) of the rail 100.

また、移動側プレート60を構成する第4のプレート45に設置されている第4のホルダ41及び第4の金型40も固定側プレート50から離れる方向(幅方向一側(左側)から幅方向他側(右側)への方向)に移動する。これにより、第3の金型30によるレール100の頭部101(幅方向左側の頭側面101b)に対する押圧状態が解除される。また、同時に、第4の金型40によるレール100の足部103(幅方向右側の先端103c)に対する押圧状態が解除される。
次いで、長手方向先端側領域においてねじれが矯正されたレール100は、テーブルローラによって長手方向(図1では下方側から上方側へ向かう方向)に順送りされる。そして、レール100の長手方向後端側領域がねじれ矯正装置1の第1の金型10及び第3の金型30と第2の金型20及び第4の金型40との間に位置する。
Additionally, the fourth holder 41 and fourth die 40 installed on the fourth plate 45 constituting the movable side plate 60 also move in a direction away from the fixed side plate 50 (from one side (left) in the width direction to the other side (right) in the width direction). This releases the third die 30 from pressing the head 101 (head side surface 101b on the left side in the width direction) of the rail 100. At the same time, the fourth die 40 releases the fourth die 40 from pressing the foot 103 (tip 103c on the right side in the width direction) of the rail 100.
Next, the rail 100, whose twist has been corrected in the longitudinal tip region, is fed forward in the longitudinal direction (from the lower side to the upper side in FIG. 1 ) by the table rollers. Then, the longitudinal rear end region of the rail 100 is positioned between the first and third dies 10 and the second and fourth dies 20 and 40 of the twist straightening device 1.

これにより、第1の金型10及び第3の金型30は、レール100の長手方向後端側領域において、レール100の幅方向(矢印xで示す方向)の一側(図1では左側)に配置される。また、第2の金型20及び第4の金型40はレール100の幅方向の他側(図1では右側)に配置される。また、第1の金型10及び第2の金型20は、レール100の長手方向後端側領域において、レール100の長手方向の一側(図1では上側)における第1位置aでレール100の幅方向において対向するように配置される。また、第3の金型30及び第4の金型40は、レール100の長手方向の他側(図1では下側)における第2位置bでレール100の幅方向において対向するように配置される。 As a result, the first mold 10 and the third mold 30 are arranged on one side (left side in FIG. 1) of the width direction (direction indicated by arrow x) of the rail 100 in the longitudinal rear end region of the rail 100. The second mold 20 and the fourth mold 40 are arranged on the other side (right side in FIG. 1) of the width direction of the rail 100. The first mold 10 and the second mold 20 are arranged to face each other in the width direction of the rail 100 at a first position a on one side (upper side in FIG. 1) of the longitudinal direction of the rail 100 in the longitudinal rear end region of the rail 100. The third mold 30 and the fourth mold 40 are arranged to face each other in the width direction of the rail 100 at a second position b on the other side (lower side in FIG. 1) of the longitudinal direction of the rail 100.

次いで、圧下シリンダ70によって移動側プレート60を固定側プレート50に近づく方向に移動させる。
これにより、移動側プレート60を構成する第2のプレート20に設置されている第2のホルダ21及び第2の金型20が固定側プレート50に近づく方向(幅方向他側(右側)から幅方向一側(左側)への方向)に移動する。これにより、レール100の長手方向の一側(図1では上側)において、レール100の幅方向の一側(左側)に配置された第1の金型10でレール100の足部103(幅方向左側の先端103b)を押圧する。また、同時に、レール100の幅方向の他側(右側)に配置された第2の金型20でレール100の頭部101(幅方向右側の頭側面101c)を押圧する。
Next, the movable plate 60 is moved in a direction approaching the fixed plate 50 by the pressing cylinder 70 .
As a result, the second holder 21 and second die 20 installed on the second plate 20 constituting the movable side plate 60 move in a direction approaching the fixed side plate 50 (from the other side (right side) in the width direction to one side (left side) in the width direction). As a result, on one side of the longitudinal direction of the rail 100 (the upper side in FIG. 1 ), the first die 10 arranged on one side (left side) in the width direction of the rail 100 presses the foot 103 (the tip 103b on the left side in the width direction) of the rail 100. At the same time, the second die 20 arranged on the other side (right side) in the width direction of the rail 100 presses the head 101 (head side surface 101c on the right side in the width direction) of the rail 100.

また、移動側プレート60を構成する第4のプレート40に設置されている第4のホルダ41及び第4の金型40も固定側プレート50に近づく方向(幅方向他側(右側)から幅方向一側(左側)への方向)に移動する。これにより、レール100の長手方向の他側(図1では下側)において、レール100の幅方向の一側(左側)に配置された第3の金型30でレール100の頭部101(幅方向左側の頭側面101b)を押圧する。また、同時に、レール100の幅方向の他側(右側)に配置された第4の金型40でレール100の足部103(幅方向右側の先端103c)を押圧する。
これにより、レール100の長手方向後端領域において、レール100のねじれが矯正される。
The fourth holder 41 and fourth die 40 installed on the fourth plate 40 constituting the movable plate 60 also move in a direction approaching the fixed plate 50 (from the other widthwise side (right side) to one widthwise side (left side)). As a result, on the other longitudinal side (lower side in FIG. 1 ) of the rail 100, the third die 30 arranged on one widthwise side (left side) of the rail 100 presses the head 101 (head side surface 101b on the left side in the widthwise direction) of the rail 100. At the same time, the fourth die 40 arranged on the other widthwise side (right side) of the rail 100 presses the foot 103 (tip 103c on the right side in the widthwise direction) of the rail 100.
This straightens out any twist in the rail 100 at the longitudinal rear end region of the rail 100 .

そして、圧下シリンダ70によって移動側プレート60を固定側プレート50から離れる方向に移動させて、第1の金型10によるレール100の足部103(幅方向左側の先端103b)に対する押圧状態を解除する。また、同時に、第2の金型20によるレール100の頭部101(幅方向右側の頭側面101c)に対する押圧状態を解除する。また、同時に、第3の金型30によるレール100の頭部101(幅方向左側の頭側面101b)に対する押圧状態を解除する。また、同時に、第4の金型40によるレール100の足部103(幅方向右側の先端103c)に対する押圧状態を解除する。
これにより、レールのねじれ矯正装置1を用いてのレール100のねじれの矯正が終了する。
Then, the pressing cylinder 70 moves the movable plate 60 in a direction away from the fixed plate 50, and the first die 10 releases the pressure applied to the foot 103 (the tip 103b on the left side in the width direction) of the rail 100. At the same time, the second die 20 releases the pressure applied to the head 101 (the head side surface 101c on the right side in the width direction) of the rail 100. At the same time, the third die 30 releases the pressure applied to the head 101 (the head side surface 101b on the left side in the width direction) of the rail 100. At the same time, the fourth die 40 releases the pressure applied to the foot 103 (the tip 103c on the right side in the width direction) of the rail 100.
This completes the straightening of the twist of the rail 100 using the rail twist straightening device 1.

そして、レール100の製造方法は、このレールのねじれ矯正装置1を用いてのねじれ矯正方法によってレール100のねじれを矯正するねじれ矯正工程を含んでいる。
このように、第1実施形態に係るレールのねじれ矯正装置1によれば、レール100の長手方向(矢印yで示す方向)の一側(図1では上側)において、レール100の足部103を押圧する第1の金型10及びレール100の頭部101を押圧する第2の金型20を備えている。また、ねじれ矯正装置1は、レール100の長手方向の他側(図1では下側)において、レール100の頭部101を押圧する第3の金型30及びレール100の足部103を押圧する第4の金型40を備えている。そして、第1の金型10及び第3の金型30はレール100の幅方向(矢印xで示す方向)の一側(図1では左側)に配置される。また、第2の金型20及び第4の金型40はレール100の幅方向の他側(図1では右側)に配置される。
The manufacturing method of the rail 100 includes a twist straightening step of straightening the twist of the rail 100 by a twist straightening method using the rail twist straightening device 1.
Thus, the twist straightening device 1 of the first embodiment includes a first die 10 for pressing the foot 103 of the rail 100 and a second die 20 for pressing the head 101 of the rail 100 on one side (upper side in FIG. 1) of the longitudinal direction (direction indicated by arrow y) of the rail 100. The twist straightening device 1 also includes a third die 30 for pressing the head 101 of the rail 100 and a fourth die 40 for pressing the foot 103 of the rail 100 on the other side (lower side in FIG. 1) of the longitudinal direction of the rail 100. The first die 10 and the third die 30 are disposed on one side (left side in FIG. 1) of the width direction (direction indicated by arrow x) of the rail 100. The second die 20 and the fourth die 40 are disposed on the other side (right side in FIG. 1) of the width direction of the rail 100.

これにより、レール100のねじれを的確に矯正することができる。
また、第1実施形態に係るレールのねじれ矯正装置1によれば、第1の金型10及び第2の金型20は、レール100の長手方向(矢印yで示す方向)の一側(図1では上側)における第1位置aでレール100の幅方向(矢印xで示す方)において対向するように配置されている。また、第3の金型30及び第4の金型40は、レール100の長手方向の他側(図1では下側)における第2位置bでレール100の幅方向において対向するように配置されている。
これにより、第1~第4の金型10~40を適切な位置に配置し、効率よくレール100のねじれを矯正することができる。
This allows the twisting of the rail 100 to be accurately corrected.
Furthermore, according to the rail twist straightening device 1 of the first embodiment, the first die 10 and the second die 20 are arranged to face each other in the width direction (indicated by arrow x) of the rail 100 at a first position a on one side (upper side in Fig. 1) of the longitudinal direction (direction indicated by arrow y) of the rail 100. Moreover, the third die 30 and the fourth die 40 are arranged to face each other in the width direction of the rail 100 at a second position b on the other side (lower side in Fig. 1) of the longitudinal direction of the rail 100.
This allows the first to fourth dies 10 to 40 to be positioned at appropriate positions, making it possible to efficiently correct any twisting of the rail 100.

また、第1実施形態に係るレールのねじれ矯正装置1によれば、第1~第4の金型10~40は、それぞれ第1~第4のホルダ11~41に保持されている。そして、第1~第4のホルダ11~41は、それぞれ第1~第4のプレート15~45に対して上下動自在に設置されている。
これにより、第1の金型10がレール100の足部103を押圧した際にその反力で第1のホルダ11が第1のプレート15に対して上下動する。このため、第1のホルダ11の落下を防止する落下防止プレート12及び接続ボルト13等の部材に負荷がかからず、それら部材の損傷を防止することができる。また、第2の金型20がレール100の頭部101を押圧した際にその反力で第2のホルダ21が第2のプレート25に対して上下動する。このため、第2のホルダ21の落下を防止する後述の落下防止プレート22及び接続ボルト23等の部材に負荷がかからず、それら部材の損傷を防止することができる。更に、第3の金型30がレール100の頭部101を押圧した際にその反力で第3のホルダ31が第3のプレート35に対して上下動する。このため、第3のホルダ31の落下を防止する後述の落下防止プレート32及び接続ボルト33等の部材に負荷がかからず、それら部材の損傷を防止することができる。また、第4の金型40がレール100の足部103を押圧した際にその反力で第4のホルダ41が第4のプレート45に対して上下動する。このため、第4のホルダ41の落下を防止する落下防止プレート42及び接続ボルト43等の部材に負荷がかからず、それら部材の損傷を防止することができる。
Moreover, according to the rail twist straightening device 1 according to the first embodiment, the first to fourth dies 10 to 40 are held by the first to fourth holders 11 to 41, respectively. The first to fourth holders 11 to 41 are installed so as to be movable up and down relative to the first to fourth plates 15 to 45, respectively.
As a result, when the first die 10 presses the foot 103 of the rail 100, the reaction force causes the first holder 11 to move up and down relative to the first plate 15. Therefore, no load is applied to the fall prevention plate 12 and the connection bolt 13, which prevent the first holder 11 from falling, and damage to these members can be prevented. Furthermore, when the second die 20 presses the head 101 of the rail 100, the reaction force causes the second holder 21 to move up and down relative to the second plate 25. Therefore, no load is applied to the fall prevention plate 22 and the connection bolt 23, which prevent the second holder 21 from falling, which will be described later, and damage to these members can be prevented. Furthermore, when the third die 30 presses the head 101 of the rail 100, the reaction force causes the third holder 31 to move up and down relative to the third plate 35. Therefore, no load is applied to components such as the fall prevention plate 32 and the connection bolt 33, which will be described later, which prevent the third holder 31 from falling, and damage to these components can be prevented. Also, when the fourth die 40 presses the foot 103 of the rail 100, the reaction force causes the fourth holder 41 to move up and down relative to the fourth plate 45. Therefore, no load is applied to components such as the fall prevention plate 42 and the connection bolt 43, which prevent the fourth holder 41 from falling, and damage to these components can be prevented.

また、第1実施形態に係るレールのねじれ矯正装置1によれば、第1~第4のホルダ11~41は、それぞれの上面に第1~第4のプレート15~45上に載置されて第1~第4のホルダ11~41の落下を防止する落下防止プレート12~42を備えている。
これにより、第1~第4のホルダ11~41のそれぞれの、第1~第4のプレート15~45からの落下を防止することができる。
また、第1実施形態に係るレールのねじれ矯正装置1によれば、第1~第4のホルダ11~41のそれぞれの落下防止プレート12~42と、第1~第4のプレート15~45の上面とが、第1~第4のホルダ11~41のそれぞれの上下方向位置を保持する弾性体としての金属バネ14~44によって連結されている。
Furthermore, according to the rail twist straightening device 1 of the first embodiment, the first to fourth holders 11 to 41 are provided with anti-drop plates 12 to 42 on their upper surfaces, which are placed on the first to fourth plates 15 to 45 and prevent the first to fourth holders 11 to 41 from falling.
This makes it possible to prevent the first to fourth holders 11 to 41 from falling off the first to fourth plates 15 to 45, respectively.
Furthermore, according to the rail twist straightening device 1 of the first embodiment, the fall prevention plates 12 to 42 of each of the first to fourth holders 11 to 41 are connected to the upper surfaces of the first to fourth plates 15 to 45 by metal springs 14 to 44 which serve as elastic bodies that maintain the vertical positions of each of the first to fourth holders 11 to 41.

これにより、第1のホルダ11が第1のプレート15に対して上下動した際に、金属バネ14によって第1のホルダ11の上下動を吸収しつつ第1のホルダ11の上下方向の移動範囲を所定距離に限定できる。これにより、第1の金型10のレール100の足部103に対する上下方向位置の範囲を限定でき、第1の金型10のレール100の足部103に対する適切な押圧を担保することができる。また、第2のホルダ21が第2のプレート25に対して上下動した際に、金属バネ24によって第2のホルダ21の上下動を吸収しつつ第2のホルダ21の上下方向の移動範囲を所定距離に限定できる。これにより、第2の金型20のレール100の頭部101に対する上下方向位置の範囲を限定でき、第2の金型20のレール100の頭部101に対する適切な押圧を担保することができる。また、第3のホルダ31が第3のプレート35に対して上下動した際に、金属バネ34によって第3のホルダ31の上下動を吸収しつつ第3のホルダ31の上下方向の移動範囲を所定距離に限定できる。これにより、第3の金型30のレール100の頭部101に対する上下方向位置の範囲を限定でき、第3の金型30のレール100の頭部101に対する適切な押圧を担保することができる。更に、第4のホルダ41が第4のプレート45に対して上下動した際に、金属バネ44によって第4のホルダ41の上下動を吸収しつつ第4のホルダ41の上下方向の移動範囲を所定距離に限定できる。これにより、第4の金型40のレール100の足部103に対する上下方向位置の範囲を限定でき、第4の金型40のレール100の足部103に対する適切な押圧を担保することができる。 As a result, when the first holder 11 moves up and down relative to the first plate 15, the metal spring 14 can absorb the up and down movement of the first holder 11 while limiting the up and down movement range of the first holder 11 to a predetermined distance. As a result, the range of the up and down position of the first mold 10 relative to the foot 103 of the rail 100 can be limited, and appropriate pressing against the foot 103 of the rail 100 of the first mold 10 can be ensured. Also, when the second holder 21 moves up and down relative to the second plate 25, the metal spring 24 can absorb the up and down movement of the second holder 21 while limiting the up and down movement range of the second holder 21 to a predetermined distance. As a result, the range of the up and down position of the second mold 20 relative to the head 101 of the rail 100 can be limited, and appropriate pressing against the head 101 of the rail 100 of the second mold 20 can be ensured. In addition, when the third holder 31 moves up and down relative to the third plate 35, the metal spring 34 can absorb the vertical movement of the third holder 31 while limiting the vertical movement range of the third holder 31 to a predetermined distance. This allows the range of the vertical position of the third mold 30 relative to the head 101 of the rail 100 to be limited, and appropriate pressure can be ensured against the head 101 of the rail 100 of the third mold 30. Furthermore, when the fourth holder 41 moves up and down relative to the fourth plate 45, the metal spring 44 can absorb the vertical movement of the fourth holder 41 while limiting the vertical movement range of the fourth holder 41 to a predetermined distance. This allows the range of the vertical position of the fourth mold 40 relative to the foot 103 of the rail 100 to be limited, and appropriate pressure can be ensured against the foot 103 of the rail 100 of the fourth mold 40.

また、第1実施形態に係るレールのねじれ矯正装置1によれば、第1のプレート15及び第3のプレート35は、固定側プレート50として一体に形成され、第2のプレート25及び第4のプレート45は、圧下シリンダ70によって移動する移動側プレート60として一体に形成されている。
そして、第1の金型10によるレール100の足部103への押圧、及び第2の金型20によるレール100の頭部101への押圧は、レール100のねじれを矯正する際に、圧下シリンダ70によって移動側プレート60(第2の金型2)が固定側プレート50(第1の金型10)に近づく方向に移動した際に達成される。また、第3の金型30によるレール100の頭部101への押圧、及び第4の金型40によるレール100の足部103への押圧も、レール100のねじれを矯正する際に、圧下シリンダ70によって移動側プレート60(第4の金型40)が固定側プレート50(第3の金型30)に近づく方向に移動した際に達成される。また、第1の金型10によるレール100の足部103への押圧の解除、及び第2の金型20によるレール100の頭部101への押圧の解除は、圧下シリンダ70によって移動側プレート60(第2の金型20)が固定側プレート50(第1の金型10)から離れる方向に移動した際に達成される。また、第3の金型30によるレール100の頭部101への押圧の解除、及び第4の金型40によるレール100の足部103への押圧の解除も、圧下シリンダ70によって移動側プレート60(第4の金型40)が固定側プレート50(第3の金型30)から離れる方向に移動した際に達成される。
Furthermore, according to the rail twist straightening device 1 of the first embodiment, the first plate 15 and the third plate 35 are integrally formed as a fixed side plate 50, and the second plate 25 and the fourth plate 45 are integrally formed as a movable side plate 60 that is moved by the pressing cylinder 70.
The first die 10 presses the foot 103 of the rail 100, and the second die 20 presses the head 101 of the rail 100 when the pressing cylinder 70 moves the movable plate 60 (second die 2) in a direction approaching the fixed plate 50 (first die 10) during the correction of twist of the rail 100. The third die 30 presses the head 101 of the rail 100, and the fourth die 40 presses the foot 103 of the rail 100 when the pressing cylinder 70 moves the movable plate 60 (fourth die 40) in a direction approaching the fixed plate 50 (third die 30) during the correction of twist of the rail 100. The release of the pressure applied to the foot 103 of the rail 100 by the first die 10 and the release of the pressure applied to the head 101 of the rail 100 by the second die 20 are achieved when the pressing cylinder 70 moves the moving side plate 60 (second die 20) in a direction away from the fixed side plate 50 (first die 10). The release of the pressure applied to the head 101 of the rail 100 by the third die 30 and the release of the pressure applied to the foot 103 of the rail 100 by the fourth die 40 are also achieved when the pressing cylinder 70 moves the moving side plate 60 (fourth die 40) in a direction away from the fixed side plate 50 (third die 30).

このため、レール100のねじれを矯正する際に、第1の金型10、第2の金型20、第3の金型30、及び第4の金型40をそれぞれ独立して動かす必要はなく、圧下シリンダ70によって移動側プレート60を移動させるのみでレール100のねじれを矯正することができる。
また、第1実施形態に係るレールのねじれ矯正方法によれば、レール100の長手方向(矢印yで示す方向)の一側(図1における上側)において、レール100の幅方向(矢印xで示す方向)の一側(図1における左側)に配置された第1の金型10でレール100の足部103を押圧する。また、レール100の幅方向の他側(図1における右側)に配置された第2の金型20でレール100の頭部101を押圧する。また、レール100の長手方向の他側(図1における下側)において、レール100の幅方向の一側(図1における左側)に配置された第3の金型30でレール100の頭部101を押圧する。また、レール100の幅方向の他側(図1における右側)に配置された第4の金型40でレール100の足部103を押圧する。
Therefore, when correcting the twist of the rail 100, there is no need to move the first die 10, the second die 20, the third die 30, and the fourth die 40 independently, and the twist of the rail 100 can be corrected simply by moving the moving side plate 60 with the pressing cylinder 70.
According to the method for straightening a rail twist according to the first embodiment, the foot 103 of the rail 100 is pressed by the first die 10 arranged on one side (upper side in FIG. 1) of the rail 100 in the width direction (direction indicated by arrow x) at one side (upper side in FIG. 1) of the rail 100 in the longitudinal direction (direction indicated by arrow y). The head 101 of the rail 100 is pressed by the second die 20 arranged on the other side (right side in FIG. 1) of the rail 100 in the width direction. The head 101 of the rail 100 is pressed by the third die 30 arranged on one side (left side in FIG. 1) of the rail 100 in the width direction at the other side (lower side in FIG. 1) of the rail 100 in the longitudinal direction. The foot 103 of the rail 100 is pressed by the fourth die 40 arranged on the other side (right side in FIG. 1) of the rail 100 in the width direction.

これにより、レール100のねじれを的確に矯正することができる。
(第1変形例)
次に、第1変形例に係るレールのねじれ矯正装置について、図5を参照して説明する。図5は、第1変形例に係るレールのねじれ矯正装置の平面図である。図5において、図1に示す部材と同一の部材については同一の符号を付し、その説明を省略することがある。
図5に示す第1変形例に係るレールのねじれ矯正装置1は、図1に示す第1実施形態に係るレールのねじれ矯正装置1と同様に、製品形状に熱間圧延して冷却した後の図11に示すレール100のねじれを矯正するものである。ねじれ矯正装置1は、レール100の長手方向(矢印yで示す方向)の一側(図5では上側)において、レール100の足部103を押圧する第1の金型10及びレール100の頭部101を押圧する第2の金型20を備えている。
This allows the twisting of the rail 100 to be accurately corrected.
(First Modification)
Next, a rail twist straightening device according to a first modified example will be described with reference to Fig. 5. Fig. 5 is a plan view of the rail twist straightening device according to the first modified example. In Fig. 5, the same members as those shown in Fig. 1 are given the same reference numerals, and their description may be omitted.
The rail twist straightening device 1 according to the first modified example shown in Fig. 5, like the rail twist straightening device 1 according to the first embodiment shown in Fig. 1, is adapted to straighten twists in a rail 100 shown in Fig. 11 after hot rolling into a product shape and cooling. The twist straightening device 1 includes a first die 10 for pressing a foot portion 103 of the rail 100 and a second die 20 for pressing a head portion 101 of the rail 100 on one side (the upper side in Fig. 5) of the longitudinal direction of the rail 100 (the direction indicated by the arrow y).

また、第1変形例に係るレールのねじれ矯正装置1は、第1実施形態に係るねじれ矯正装置1と同様に、レール100の長手方向の他側(図5では下側)において、レール100の頭部101を押圧する第3の金型30及びレール100の足部103を押圧する第4の金型40を備えている。
そして、第1の金型10及び第3の金型30はレール100の幅方向(矢印xで示す方向)の一側(図5では左側)に配置され、第2の金型20及び第4の金型40はレール100の幅方向の他側(図5では右側)に配置されている。
ここで、第1実施形態に係るねじれ矯正装置1においては、第1の金型10及び第2の金型20は、レール100の長手方向の一側における第1位置aでレール100の幅方向において対向するように配置されている。また、第3の金型30及び第4の金型40は、レール100の長手方向の他側における第2位置bでレール100の幅方向において対向するように配置されている。
In addition, the rail twist straightening device 1 of the first modified example, like the twist straightening device 1 of the first embodiment, is equipped with a third die 30 that presses the head portion 101 of the rail 100 and a fourth die 40 that presses the foot portion 103 of the rail 100 on the other longitudinal side of the rail 100 (the lower side in Figure 5).
The first mold 10 and the third mold 30 are arranged on one side (left side in Figure 5) of the width direction of the rail 100 (direction indicated by arrow x), and the second mold 20 and the fourth mold 40 are arranged on the other side (right side in Figure 5) of the width direction of the rail 100.
Here, in the twist straightening device 1 according to the first embodiment, the first die 10 and the second die 20 are arranged to face each other in the width direction of the rail 100 at a first position a on one side in the longitudinal direction of the rail 100. Moreover, the third die 30 and the fourth die 40 are arranged to face each other in the width direction of the rail 100 at a second position b on the other side in the longitudinal direction of the rail 100.

これに対して、第1変形例に係るねじれ矯正装置1においては、第1の金型10は、レール100の長手方向の第1位置aからやや第2位置b側に配置され、第2金型20は、レール100の長手方向の第1位置aからやや第2位置b側と反対側に配置されている点で相違している。
また、第1変形例に係るねじれ矯正装置1においては、第3の金型30は、レール100の長手方向の第2位置bからやや第1位置a側と反対側に配置され、第4金型40は、レール100の長手方向の第2位置bからやや第1位置a側に配置されている点で相違している。
In contrast, in the twist straightening device 1 of the first modified example, the first die 10 is positioned slightly toward the second position b from the first position a in the longitudinal direction of the rail 100, and the second die 20 is positioned slightly on the opposite side to the second position b from the first position a in the longitudinal direction of the rail 100, which is different.
Furthermore, the twist straightening device 1 of the first modified example differs in that the third die 30 is positioned slightly opposite the first position a from the second position b in the longitudinal direction of the rail 100, and the fourth die 40 is positioned slightly toward the first position a from the second position b in the longitudinal direction of the rail 100.

このように、第1変形例に係るねじれ矯正装置1のような第1の金型10、第2の金型20、第3の金型30、及び第4の金型40の配置にしても、製品形状に熱間圧延して冷却した後のレール100のねじれを的確に矯正することができる。
つまり、第1の金型10及び第2の金型20は、レール100の長手方向の一側における第1位置aでレール100の幅方向において対向するように配置されている必要は必ずしもない。また、第3の金型30及び第4の金型40は、レール100の長手方向の他側における第2位置bでレール100の幅方向において対向するように配置されている必要は必ずしもない。レール100のサイズやねじれの状況にもよるが、これらの長手方向の対向位置のずれ量は、レール100の高さ寸法の2倍は許容される。
(第2変形例)
次に、第2変形例に係るレールのねじれ矯正装置について、図6を参照して説明する。図6は、第2変形例に係るレールのねじれ矯正装置の平面図である。図6において、図1に示す部材と同一の部材については同一の符号を付し、その説明を省略することがある。
In this way, even with the arrangement of the first die 10, the second die 20, the third die 30, and the fourth die 40 as in the twist straightening device 1 of the first modified example, the twist of the rail 100 after it has been hot rolled into the product shape and cooled can be accurately corrected.
In other words, the first die 10 and the second die 20 do not necessarily have to be arranged to face each other in the width direction of the rail 100 at the first position a on one side in the longitudinal direction of the rail 100. Moreover, the third die 30 and the fourth die 40 do not necessarily have to be arranged to face each other in the width direction of the rail 100 at the second position b on the other side in the longitudinal direction of the rail 100. Although it depends on the size and twisting state of the rail 100, the amount of deviation of these facing positions in the longitudinal direction is allowed to be twice the height dimension of the rail 100.
(Second Modification)
Next, a rail twist straightening device according to a second modified example will be described with reference to Fig. 6. Fig. 6 is a plan view of the rail twist straightening device according to the second modified example. In Fig. 6, the same members as those shown in Fig. 1 are given the same reference numerals, and their description may be omitted.

図6に示す第2変形例に係るレールのねじれ矯正装置1は、図1に示す第1実施形態に係るレールのねじれ矯正装置1と同様に、製品形状に熱間圧延して冷却した後の図11に示すレール100のねじれを矯正するものである。ねじれ矯正装置1は、レール100の長手方向(矢印yで示す方向)の一側(図6では上側)において、レール100の足部103を押圧する第1の金型10A、10B及びレール100の頭部101を押圧する第2の金型20を備えている。
また、第2変形例に係るレールのねじれ矯正装置1は、第1実施形態に係るねじれ矯正装置1と同様に、レール100の長手方向の他側(図6では下側)において、レール100の頭部101を押圧する第3の金型30及びレール100の足部103を押圧する第4の金型40A、40Bを備えている。
The rail twist straightening device 1 according to the second modified example shown in Fig. 6, like the rail twist straightening device 1 according to the first embodiment shown in Fig. 1, is adapted to straighten twists in a rail 100 shown in Fig. 11 after hot rolling into a product shape and cooling. The twist straightening device 1 includes first dies 10A, 10B for pressing a foot portion 103 of the rail 100 and a second die 20 for pressing a head portion 101 of the rail 100 on one side (the upper side in Fig. 6) of the longitudinal direction of the rail 100 (the direction indicated by the arrow y).
In addition, the rail twist straightening device 1 of the second modified example, like the twist straightening device 1 of the first embodiment, is equipped with a third die 30 for pressing the head portion 101 of the rail 100 and fourth dies 40A, 40B for pressing the foot portion 103 of the rail 100 on the other longitudinal side of the rail 100 (the lower side in Figure 6).

そして、第1の金型10A、10B及び第3の金型30はレール100の幅方向(矢印xで示す方向)の一側(図6では左側)に配置され、第2の金型20及び第4の金型40A、40Bはレール100の幅方向の他側(図6では右側)に配置されている。
ここで、第1実施形態に係るねじれ矯正装置1においては、第1の金型10及び第2の金型20は、レール100の長手方向の一側における第1位置aでレール100の幅方向において対向するように配置されている。また、第3の金型30及び第4の金型40は、レール100の長手方向の他側における第2位置bでレール100の幅方向において対向するように配置されている。
The first molds 10A, 10B and the third mold 30 are arranged on one side (left side in Figure 6) of the width direction of the rail 100 (direction indicated by arrow x), and the second mold 20 and the fourth molds 40A, 40B are arranged on the other side (right side in Figure 6) of the width direction of the rail 100.
Here, in the twist straightening device 1 according to the first embodiment, the first die 10 and the second die 20 are arranged to face each other in the width direction of the rail 100 at a first position a on one side in the longitudinal direction of the rail 100. Moreover, the third die 30 and the fourth die 40 are arranged to face each other in the width direction of the rail 100 at a second position b on the other side in the longitudinal direction of the rail 100.

これに対して、第2変形例に係るねじれ矯正装置1においては、第2の金型20は、レール100の長手方向の一側における第1位置aに配置されている。しかし、第1の金型10A、10Bは、レール100の長手方向の第1位置aに対して第2位置b側と反対側に配置された第1の金型10Aと、レール100の長手方向の第1位置aに対して第2位置b側に配置された第1の金型10Bとの2つの金型で構成されている点で第1実施形態に係るねじれ矯正装置1と相違している。
また、第2変形例に係るねじれ矯正装置1においては、第3の金型30は、レール100の長手方向の他側における第2位置bに配置されている。しかし、第4の金型40A、40Bは、レール100の長手方向の第2位置bに対して第1位置a側に配置された第4の金型40Aと、レール100の長手方向の第2位置bに対して第1位置a側と反対側に配置された第4の金型40Bとの2つの金型で構成されている点で第1実施形態に係るねじれ矯正装置1と相違している。
In contrast to this, in the twist straightening device 1 according to the second modified example, the second die 20 is disposed at a first position a on one side in the longitudinal direction of the rail 100. However, the first dies 10A and 10B are different from the twist straightening device 1 according to the first embodiment in that they are composed of two dies, that is, the first die 10A disposed on the opposite side to the second position b with respect to the first position a in the longitudinal direction of the rail 100, and the first die 10B disposed on the second position b side with respect to the first position a in the longitudinal direction of the rail 100.
Moreover, in the twist straightening device 1 according to the second modification, the third die 30 is disposed at the second position b on the other side in the longitudinal direction of the rail 100. However, the fourth dies 40A, 40B are different from the twist straightening device 1 according to the first embodiment in that they are composed of two dies, that is, the fourth die 40A disposed on the first position a side with respect to the second position b in the longitudinal direction of the rail 100, and the fourth die 40B disposed on the opposite side to the first position a side with respect to the second position b in the longitudinal direction of the rail 100.

このように、第2変形例に係るねじれ矯正装置1のような第1の金型10A、10B、第2の金型20、第3の金型30、及び第4の金型40A、40Bの配置にしても、製品形状に熱間圧延して冷却した後のレール100のねじれを的確に矯正することができる。
つまり、第1の金型、第2の金型、第3の金型、及び第4の金型の個数は1つでなくとも2つ以上であってもよい。
なお、図6において、符号11Aは第1の金型10Aを保持する第1ホルダ、12Aは第1のホルダ11Aに備えられた落下防止プレート、13Aは落下防止プレート12Aを第1のホルダ11Aに接続するための接続ボルト、14Aは落下防止プレート12Aと第1のプレート15とを連結する金属バネである。
In this way, even with the arrangement of the first dies 10A, 10B, the second die 20, the third die 30, and the fourth dies 40A, 40B as in the twist straightening device 1 of the second modified example, the twist of the rail 100 after it has been hot rolled into the product shape and cooled can be accurately corrected.
In other words, the number of the first mold, the second mold, the third mold, and the fourth mold may not be one, but may be two or more.
In Figure 6, symbol 11A denotes a first holder that holds the first mold 10A, 12A denotes a fall prevention plate provided on the first holder 11A, 13A denotes a connecting bolt for connecting the fall prevention plate 12A to the first holder 11A, and 14A denotes a metal spring that connects the fall prevention plate 12A and the first plate 15.

また、図6において、符号11Bは第1の金型10Bを保持する第1のホルダ、12Bは第1のホルダ11Bに備えられた落下防止プレート、13Bは落下防止プレート12Bを第1のホルダ11Bに接続するための接続ボルト、14Bは落下防止プレート12Bと第1のプレート15とを連結する金属バネである。
更に、図6において、符号41Aは第4の金型40Aを保持する第4のホルダ、42Aは第4のホルダ41Aに備えられた落下防止プレート、43Aは落下防止プレート42Aを第1のホルダ41Aに接続するための接続ボルト、44Aは落下防止プレート42Aと第4のプレート45とを連結する金属バネである。
In addition, in Figure 6, symbol 11B is a first holder that holds the first mold 10B, 12B is a fall prevention plate provided on the first holder 11B, 13B is a connecting bolt for connecting the fall prevention plate 12B to the first holder 11B, and 14B is a metal spring that connects the fall prevention plate 12B and the first plate 15.
Furthermore, in Figure 6, symbol 41A is a fourth holder that holds the fourth mold 40A, 42A is a fall prevention plate provided on the fourth holder 41A, 43A is a connecting bolt for connecting the fall prevention plate 42A to the first holder 41A, and 44A is a metal spring that connects the fall prevention plate 42A and the fourth plate 45.

また、図6において、符号41Bは第4の金型40Bを保持する第4のホルダ、42Bは第4のホルダ41Bに備えられた落下防止プレート、43Bは落下防止プレート42Bを第1のホルダ41Bに接続するための接続ボルト、44Bは落下防止プレート42Bと第4のプレート45とを連結する金属バネである。
(第2実施形態)
次に、本発明の第2実施形態に係るレールのねじれ矯正装置について、図7及び図8を参照して説明する。図7は本発明の第2実施形態に係るレールのねじれ矯正装置において、図1におけるA-A’に沿う断面図と同様の断面図である。図8は、本発明の第2実施形態に係るレールのねじれ矯正装置において、図1におけるB-B’に沿う断面図と同様の断面図である。なお、図7及び図8において、図2及び図3に示す部材と同一の部材については同一の符号を付し、その説明を省略することがある。
In addition, in Figure 6, symbol 41B is a fourth holder that holds the fourth mold 40B, 42B is a fall prevention plate provided on the fourth holder 41B, 43B is a connecting bolt for connecting the fall prevention plate 42B to the first holder 41B, and 44B is a metal spring that connects the fall prevention plate 42B and the fourth plate 45.
Second Embodiment
Next, a rail twist straightening device according to a second embodiment of the present invention will be described with reference to Figures 7 and 8. Figure 7 is a cross-sectional view similar to the cross-sectional view taken along line A-A' in Figure 1, of a rail twist straightening device according to the second embodiment of the present invention. Figure 8 is a cross-sectional view similar to the cross-sectional view taken along line B-B' in Figure 1, of a rail twist straightening device according to the second embodiment of the present invention. In Figures 7 and 8, the same members as those shown in Figures 2 and 3 are designated by the same reference numerals, and their description may be omitted.

図7及び図8に示す第2実施形態に係るレールのねじれ矯正装置1は、図1乃至図3に示す第1実施形態に係るレールのねじれ矯正装置1と基本構成は同様である。しかし、第2実施形態に係るレールのねじれ矯正装置1は、第1~第4のホルダ11~41のそれぞれと、第1~第4のプレート15~45のそれぞれとの間にコロ16、26、36、46が設けられている点で第1実施形態に係るねじれ矯正装置1と相違している。
具体的に述べると、図7において、第1のホルダ11は、第1のプレート15に対し幅方向内側に配置されて第1のプレート15の内側面に対して上下動自在に設置されている。そして、更に、第1のホルダ11と、第1のプレート15の内側面との間に、複数のコロ16が設けられている。これら複数のコロ16は、図示しない保持器によってそれぞれがばらばらにならないように転動自在に保持されている。この保持器は、第1のプレート15の内側面に固定される。
The rail twist straightening device 1 according to the second embodiment shown in Figures 7 and 8 has the same basic configuration as the rail twist straightening device 1 according to the first embodiment shown in Figures 1 to 3. However, the rail twist straightening device 1 according to the second embodiment differs from the twist straightening device 1 according to the first embodiment in that rollers 16, 26, 36, and 46 are provided between the first to fourth holders 11 to 41 and the first to fourth plates 15 to 45, respectively.
7, the first holder 11 is disposed on the inside in the width direction of the first plate 15 and is installed so as to be movable up and down relative to the inner surface of the first plate 15. Furthermore, a plurality of rollers 16 are provided between the first holder 11 and the inner surface of the first plate 15. These rollers 16 are held by a cage (not shown) so as to be able to roll freely and not to come apart. This cage is fixed to the inner surface of the first plate 15.

第1のホルダ11が第1のプレート15の内側面に対して上下動自在に設置されていても、状況により第1のホルダ11が第1のプレート15の内側面に対して円滑に上下動できない場合がある。これに対して、第1のホルダ11と、第1のプレート15の内側面との間に、複数のコロ16を設けることにより、第1のホルダ11が第1のプレート15の内側面に対して円滑に上下動することが可能となる。
これにより、第1の金型10がレール100の足部103を押圧した際にその反力で第1のホルダ11が第1のプレート15に対して円滑に上下動し、第1のホルダ11の落下を防止する落下防止プレート12及び接続ボルト13等の部材に負荷がかからず、それら部材の損傷を確実に防止することができる。
Even if the first holder 11 is installed so as to be freely movable up and down relative to the inner surface of the first plate 15, depending on the situation, the first holder 11 may not be able to move up and down smoothly relative to the inner surface of the first plate 15. In response to this, by providing a plurality of rollers 16 between the first holder 11 and the inner surface of the first plate 15, it becomes possible for the first holder 11 to move up and down smoothly relative to the inner surface of the first plate 15.
As a result, when the first mold 10 presses the foot 103 of the rail 100, the reaction force causes the first holder 11 to move smoothly up and down relative to the first plate 15, and no load is placed on components such as the fall prevention plate 12 and connecting bolt 13 that prevent the first holder 11 from falling, reliably preventing damage to these components.

また、同様に、第2のホルダ21は、第2のプレート25に対し幅方向内側に配置されて第2のプレート25の内側面に対して上下動自在に設置されている。そして、更に、第2のホルダ21と、第2のプレート25の内側面との間に、複数のコロ26が設けられている。これら複数のコロ26は、同様に、図示しない保持器によってそれぞれがばらばらにならないように転動自在に保持されている。この保持器は、第2のプレート25の内側面に固定される。
第2のホルダ21と、第2のプレート25の内側面との間に、複数のコロ26を設けることにより、第2のホルダ21が第2のプレート25の内側面に対して円滑に上下動することが可能となる。
Similarly, the second holder 21 is disposed on the inside of the second plate 25 in the width direction and is installed so as to be vertically movable with respect to the inner surface of the second plate 25. Furthermore, a plurality of rollers 26 are provided between the second holder 21 and the inner surface of the second plate 25. These rollers 26 are similarly held by a retainer (not shown) so as to be able to roll freely and not come apart. This retainer is fixed to the inner surface of the second plate 25.
By providing a plurality of rollers 26 between the second holder 21 and the inner surface of the second plate 25, the second holder 21 can move smoothly up and down relative to the inner surface of the second plate 25.

これにより、第2の金型20がレール100の頭部101を押圧した際にその反力で第2のホルダ21が第2のプレート25に対して円滑に上下動し、第2のホルダ21の落下を防止する落下防止プレート22及び接続ボルト23等の部材に負荷がかからず、それら部材の損傷を確実に防止することができる。
また、図8に示すように、第3のホルダ31は、第3のプレート35に対し幅方向内側に配置されて第3のプレート35の内側面に対して上下動自在に設置されている。そして、更に、第3のホルダ31と、第3のプレート35の内側面との間に、複数のコロ36が設けられている。これら複数のコロ36は、同様に、図示しない保持器によってそれぞれがばらばらにならないように転動自在に保持されている。この保持器は、第3のプレート35の内側面に固定される。
As a result, when the second die 20 presses against the head 101 of the rail 100, the reaction force causes the second holder 21 to move smoothly up and down relative to the second plate 25, and no load is placed on components such as the fall prevention plate 22 and the connecting bolt 23, which prevent the second holder 21 from falling, so that damage to these components can be reliably prevented.
8, the third holder 31 is disposed on the inner side of the third plate 35 in the width direction and is installed so as to be movable up and down relative to the inner surface of the third plate 35. Furthermore, a plurality of rollers 36 are provided between the third holder 31 and the inner surface of the third plate 35. These rollers 36 are similarly held by a cage (not shown) so as to be able to roll freely and not to come apart. This cage is fixed to the inner surface of the third plate 35.

第3のホルダ31と、第3のプレート35の内側面との間に、複数のコロ36を設けることにより、第3のホルダ31が第3のプレート35の内側面に対して円滑に上下動することが可能となる。
これにより、第3の金型30がレール100の頭部101を押圧した際にその反力で第3のホルダ31が第3のプレート35に対して円滑に上下動し、第3のホルダ31の落下を防止する落下防止プレート32及び接続ボルト33等の部材に負荷がかからず、それら部材の損傷を確実に防止することができる。
更に、同様に、第4のホルダ41は、第4のプレート45に対し幅方向内側に配置されて第4のプレート45の内側面に対して上下動自在に設置されている。そして、更に、第4のホルダ41と、第4のプレート45の内側面との間に、複数のコロ46が設けられている。これら複数のコロ46は、図示しない保持器によってそれぞれがばらばらにならないように転動自在に保持されている。この保持器は、第4のプレート45の内側面に固定される。
By providing a plurality of rollers 36 between the third holder 31 and the inner surface of the third plate 35, the third holder 31 can move smoothly up and down relative to the inner surface of the third plate 35.
As a result, when the third die 30 presses the head 101 of the rail 100, the reaction force causes the third holder 31 to move smoothly up and down relative to the third plate 35, and no load is placed on components such as the fall prevention plate 32 and the connecting bolt 33, which prevent the third holder 31 from falling, so that damage to these components can be reliably prevented.
Similarly, the fourth holder 41 is disposed on the inner side of the fourth plate 45 in the width direction and is installed so as to be movable up and down relative to the inner surface of the fourth plate 45. Furthermore, a plurality of rollers 46 are provided between the fourth holder 41 and the inner surface of the fourth plate 45. These rollers 46 are held by a retainer (not shown) so as to be able to roll freely and not to come apart. This retainer is fixed to the inner surface of the fourth plate 45.

第4のホルダ41と、第4のプレート45の内側面との間に、複数のコロ46を設けることにより、第4のホルダ41が第4のプレート45の内側面に対して円滑に上下動することが可能となる。
これにより、第4の金型40がレール100の足部103を押圧した際にその反力で第4のホルダ41が第4のプレート45に対して円滑に上下動し、第4のホルダ41の落下を防止する落下防止プレート42及び接続ボルト43等の部材に負荷がかからず、それら部材の損傷を確実に防止することができる。
また、第2実施形態に係るレールのねじれ矯正装置1によっても、レール100のねじれを的確に矯正することができる。
(第3実施形態)
次に、本発明の第2実施形態に係るレールのねじれ矯正装置について、図9及び図10を参照して説明する。図9は本発明の第2実施形態に係るレールのねじれ矯正装置において、図1におけるA-A’に沿う断面図と同様の断面図である。図10は、本発明の第2実施形態に係るレールのねじれ矯正装置において、図1におけるB-B’に沿う断面図と同様の断面図である。なお、図9及び図10において、図2及び図3に示す部材と同一の部材については同一の符号を付し、その説明を省略することがある。
By providing a plurality of rollers 46 between the fourth holder 41 and the inner surface of the fourth plate 45 , the fourth holder 41 can move smoothly up and down relative to the inner surface of the fourth plate 45 .
As a result, when the fourth die 40 presses against the foot 103 of the rail 100, the reaction force causes the fourth holder 41 to move smoothly up and down relative to the fourth plate 45, and no load is placed on components such as the fall prevention plate 42 and the connecting bolt 43, which prevent the fourth holder 41 from falling, so that damage to these components can be reliably prevented.
Moreover, the rail twist straightening device 1 according to the second embodiment can also accurately straighten the twist of the rail 100.
Third Embodiment
Next, a rail twist straightening device according to a second embodiment of the present invention will be described with reference to Figures 9 and 10. Figure 9 is a cross-sectional view similar to the cross-sectional view taken along line A-A' in Figure 1, of a rail twist straightening device according to the second embodiment of the present invention. Figure 10 is a cross-sectional view similar to the cross-sectional view taken along line B-B' in Figure 1, of a rail twist straightening device according to the second embodiment of the present invention. In Figures 9 and 10, the same members as those shown in Figures 2 and 3 are denoted by the same reference numerals, and their description may be omitted.

図9及び図10に示す第2実施形態に係るレールのねじれ矯正装置1は、図1乃至図3に示す第1実施形態に係るレールのねじれ矯正装置1と基本構成は同様である。しかし、第3実施形態に係るレールのねじれ矯正装置1は、第1~第4のホルダ11~41のそれぞれに固定された落下防止プレート12~42が、第1~第4のプレート15~45の上面に直接載置されている点で第1実施形態に係るねじれ矯正装置1と相違している。つまり、第3実施形態に係るねじれ矯正装置1においては、第1~第4のホルダ11~41のそれぞれの落下防止プレート12~42と、第1~第4のプレート15~45の上面とが、弾性体としての金属バネ14~44によって連結されていいない。 The rail twist straightening device 1 according to the second embodiment shown in Figs. 9 and 10 has the same basic configuration as the rail twist straightening device 1 according to the first embodiment shown in Figs. 1 to 3. However, the rail twist straightening device 1 according to the third embodiment differs from the twist straightening device 1 according to the first embodiment in that the fall prevention plates 12 to 42 fixed to the first to fourth holders 11 to 41, respectively, are placed directly on the upper surfaces of the first to fourth plates 15 to 45. In other words, in the twist straightening device 1 according to the third embodiment, the fall prevention plates 12 to 42 of the first to fourth holders 11 to 41, respectively, and the upper surfaces of the first to fourth plates 15 to 45 are not connected by the metal springs 14 to 44 as elastic bodies.

この第3実施形態に係るレールのねじれ矯正装置1によっても、レール100のねじれを的確に矯正することができる。
以上、本発明の実施形態について説明してきたが、本発明はこれに限定されずに種々の変更、改良を行うことができる。
例えば、レール100のねじれの矯正に際しては、レール100の長手方向先端領域及び長手方向後端領域におけるねじれの矯正のみならず、レール100のねじれ具合やねじれ箇所に応じて、ねじれ矯正装置1を用いてレール100の長手方向の適宜領域におけるねじれの矯正を行うようにしてもよい。
The rail twist straightening device 1 according to the third embodiment can also accurately straighten the twist of the rail 100.
Although the embodiment of the present invention has been described above, the present invention is not limited to this and various modifications and improvements can be made.
For example, when correcting the twist of the rail 100, it is possible to use the twist correction device 1 to correct not only the twist in the longitudinal leading end region and the longitudinal trailing end region of the rail 100, but also to correct the twist in an appropriate region in the longitudinal direction of the rail 100 depending on the degree and location of the twist of the rail 100.

また、レール100のねじれの矯正に際しては、レール100の長手方向先端領域及び長手方向後端領域におけるねじれの矯正をそれぞれ1回ずつ行っているが、ねじれの程度に応じそれぞれ複数回行っても良い。
また、レール100を、レール100の長手方向の先端(図1においては下端)を先頭にしてテーブルローラ(図示せず)により搬送されて第1の金型10及び第2の金型20を配置した側(図1では上方側)からねじれ矯正装置1に装入するようにしてもよい。
また、第1実施形態及び第2実施形態に係るレールの矯正装置1において、弾性体として金属バネ14~44を用いた例を説明したが、金属バネに限らず、ゴム部材であってもよい。
In addition, when straightening the twist of the rail 100, the twist is straightened once each in the longitudinal leading end region and the longitudinal trailing end region of the rail 100, but it may be performed multiple times in each region depending on the degree of twist.
In addition, the rail 100 may be transported by table rollers (not shown) with the longitudinal end of the rail 100 (the lower end in FIG. 1) at the leading edge, and loaded into the twist straightening device 1 from the side where the first die 10 and the second die 20 are arranged (the upper side in FIG. 1).
Furthermore, in the rail straightening device 1 according to the first and second embodiments, examples have been described in which the metal springs 14 to 44 are used as the elastic bodies, but the elastic bodies are not limited to metal springs and may be rubber members.

また、各第1~第4のホルダ11~41による各第1~第4の金型10~40の保持については、T字形の各第1~第4の金型10~40を各第1~第4のホルダ11~41のアリ溝に嵌合する場合に限られない。
また、レール100のねじれの矯正を行う方向に合わせて、固定側プレート50側に設けられた第1の金型10及び第3の金型30と、移動側プレート60側に設けられた第2の金型20及び第4の金型40とを付け替えるようにしてもよい。
また、第3実施形態に係るレールのねじれ矯正装置1において、第1~第4のホルダ11~41のそれぞれを、第1~第4のプレート15~45のそれぞれに対して固定するようにしてもよい。
Furthermore, the holding of each of the first to fourth dies 10 to 40 by each of the first to fourth holders 11 to 41 is not limited to the case where each of the T-shaped first to fourth dies 10 to 40 is fitted into the dovetail grooves of each of the first to fourth holders 11 to 41.
In addition, the first die 10 and the third die 30 provided on the fixed side plate 50 side and the second die 20 and the fourth die 40 provided on the movable side plate 60 side may be interchanged depending on the direction in which the twist of the rail 100 is to be corrected.
In the rail twist straightening device 1 according to the third embodiment, the first to fourth holders 11 to 41 may be fixed to the first to fourth plates 15 to 45, respectively.

1mあたりの質量162kgのサイズのレールのねじれ矯正を実施した。レールの長さは25mである。
実施例1~3では、金属バネ14~44及びコロ16~46を用いていない図9及び図10に示す第3実施形態のレールのねじれ矯正装置1を用いて前述のレールのねじれ矯正を実施した。
また、実施例4~6では、金属バネ14~44を用い、コロ16~46を用いていない図1乃至図3に示す第1実施形態のレールのねじれ矯正装置1を用いて前述のレールのねじれ矯正を実施した。
The twist straightening was carried out on a rail with a mass of 162 kg per meter and a length of 25 m.
In Examples 1 to 3, the above-mentioned rail twist straightening was carried out using the rail twist straightening device 1 of the third embodiment shown in Figs. 9 and 10, which does not use the metal springs 14 to 44 and the rollers 16 to 46.
In addition, in Examples 4 to 6, the above-mentioned rail twist straightening was carried out using the rail twist straightening device 1 of the first embodiment shown in Figures 1 to 3, which uses metal springs 14 to 44 and does not use rollers 16 to 46.

更に、実施例7~8では、金属バネ14~44及びコロ16~46を用いた図7及び図8に示す第2実施形態のレールのねじれ矯正装置1を用いて前述のレールのねじれ矯正を実施した。
ねじれ矯正の結果を表1に示す。
Furthermore, in Examples 7 and 8, the above-mentioned rail twist straightening was carried out using the rail twist straightening device 1 of the second embodiment shown in Figs.
The results of the twist straightening are shown in Table 1.

Figure 0007613428000001
Figure 0007613428000001

表1において、矯正前ねじれ量と矯正後ねじれ量を比較すると、実施例1~8のいずれにおいても、矯正後ねじれ量が矯正前ねじれ量に対し、レールの先端側及び後端側のいずれにおいても減少し、矯正後のねじれ量の管理値5mm以内になったことがわかる。
従って、第1乃至第3実施形態に係るレールのねじれ矯正装置1によってレールのねじれ矯正を的確に行えることが確認された。
なお、金属バネ14~44及びコロ16~46を用いていない実施例1~3の第3実施形態のレールのねじれ矯正装置1を用いてレールのねじれ矯正を実施した場合よりも、金属バネ14~44を用い、コロ16~46を用いていない実施例4~6の第1実施形態のレールのねじれ矯正装置1を用いてレールのねじれ矯正を実施した場合の方が、ねじれ量の改善度合いが大きいことが確認された。
In Table 1, when comparing the amount of torsion before straightening and the amount of torsion after straightening, it can be seen that in all of Examples 1 to 8, the amount of torsion after straightening was reduced compared to the amount of torsion before straightening at both the front end and rear end sides of the rail, and the amount of torsion after straightening was within the control value of 5 mm.
Therefore, it was confirmed that the rail twist straightening device 1 according to the first to third embodiments can accurately straighten the rail twist.
It was confirmed that the degree of improvement in the amount of twist was greater when rail twist straightening was performed using the rail twist straightening device 1 of the first embodiment in Examples 4 to 6, which uses the metal springs 14 to 44 and does not use the rollers 16 to 46, than when rail twist straightening was performed using the rail twist straightening device 1 of the third embodiment in Examples 1 to 3, which does not use the metal springs 14 to 44 and the rollers 16 to 46.

また、金属バネ14~44を用い、コロ16~46を用いていない実施例4~6の第1実施形態のレールのねじれ矯正装置1を用いてレールのねじれ矯正を実施した場合よりも、金属バネ14~44及びコロ16~46を用いた実施例7~8の第2実施形態のレールのねじれ矯正装置1を用いてレールのねじれ矯正を実施した場合の方が、ねじれ量の改善度合いが大きいことが確認された。
なお、実施例3においては、第1~第4のホルダ11~41が、第1~第4のプレート15~45に対して上下動自在に配置されているものの、第1~第4のホルダ11~41が第1~第4のプレート15~45に対して円滑に上下動できず、落下防止プレート12~42の変形が確認された。
It was also confirmed that the degree of improvement in the amount of twist was greater when rail torsion straightening was performed using the rail torsion straightening device 1 of the second embodiment in Examples 7 and 8, which used the metal springs 14 to 44 and the rollers 16 to 46, than when rail torsion straightening was performed using the rail torsion straightening device 1 of the first embodiment in Examples 4 to 6, which used the metal springs 14 to 44 but did not use the rollers 16 to 46.
In addition, in Example 3, although the first to fourth holders 11 to 41 are arranged so as to be freely movable up and down relative to the first to fourth plates 15 to 45, the first to fourth holders 11 to 41 cannot move up and down smoothly relative to the first to fourth plates 15 to 45, and deformation of the fall prevention plates 12 to 42 was confirmed.

1 レールのねじれ矯正装置
10 第1の金型
10A 第1の金型
10B 第1の金型
11 第1のホルダ
11A 第1のホルダ
11B 第1のホルダ
12 落下防止プレート
12A 落下防止プレート
12B 落下防止プレート
13 接続ボルト
13A 接続ボルト
13B 接続ボルト
14 金属バネ
14A 金属バネ
14B 金属バネ
15 第1のプレート
16 コロ
20 第2の金型
20a 金型本体
20b 突出部
21 第2のホルダ
21a 第1溝部
21b 第2溝部
22 落下防止プレート
23 接続ボルト
24 金属バネ
25 第2のプレート
26 コロ
30 第3の金型
31 第3のホルダ
32 落下防止プレート
33 接続ボルト
34 金属バネ
35 第3のプレート
36 コロ
40 第4の金型
40A 第4の金型
40B 第4の金型
41 第4のホルダ
41A 第4のホルダ
41B 第4のホルダ
42 落下防止プレート
42A 落下防止プレート
42B 落下防止プレート
43 接続ボルト
43A 接続ボルト
43B 接続ボルト
44 金属バネ
44A 金属バネ
44B 金属バネ
45 第4のプレート
46 コロ
50 固定側プレート
60 移動側プレート
70 圧下シリンダ
100 レール
101 頭部
101a 頭頂面
101b 幅方向左側の頭側面
101c 幅方向右側の頭側面
102 腹部
103 足部
103a 底面
103b 幅方向左側の先端
103c 幅方向右側の先端
a 第1位置
b 第2位置
LIST OF SYMBOLS 1 Rail twist correction device 10 First die 10A First die 10B First die 11 First holder 11A First holder 11B First holder 12 Fall prevention plate 12A Fall prevention plate 12B Fall prevention plate 13 Connection bolt 13A Connection bolt 13B Connection bolt 14 Metal spring 14A Metal spring 14B Metal spring 15 First plate 16 Roller 20 Second die 20a Die body 20b Protruding portion 21 Second holder 21a First groove portion 21b Second groove portion 22 Fall prevention plate 23 Connection bolt 24 Metal spring 25 Second plate 26 Roller 30 Third die 31 Third holder 32 Fall prevention plate 33 Connection bolt 34 Metal spring 35 Third plate 36 Roller 40 Fourth die 40A Fourth die 40B Fourth die 41 Fourth holder 41A Fourth holder 41B Fourth holder 42 Fall prevention plate 42A Fall prevention plate 42B Fall prevention plate 43 Connecting bolt 43A Connecting bolt 43B Connecting bolt 44 Metal spring 44A Metal spring 44B Metal spring 45 Fourth plate 46 Roller 50 Fixed side plate 60 Movable side plate 70 Pressing down cylinder 100 Rail 101 Head 101a Top surface 101b Head side surface on the left side in the width direction 101c Head side surface on the right side in the width direction 102 Body 103 Foot 103a Bottom surface 103b Tip on the left side in the width direction 103c Tip on the right side in the width direction a 1st position b 2nd position

Claims (8)

長手方向に延びるレールのねじれを矯正するレールのねじれ矯正装置であって、
前記レールの長手方向の一側において、前記レールの足部を押圧する第1の金型及び前記レールの頭部を押圧する第2の金型と、
前記レールの長手方向の他側において、前記レールの頭部を押圧する第3の金型及び前記レールの足部を押圧する第4の金型を備え、
前記第1の金型及び前記第3の金型は前記レールの幅方向の一側に配置され、前記第2の金型及び前記第4の金型は前記レールの幅方向の他側に配置されることを特徴とするレールのねじれ矯正装置。
A rail twist straightening device for straightening a twist of a rail extending in a longitudinal direction, comprising:
a first die for pressing a foot portion of the rail and a second die for pressing a head portion of the rail, on one side of the rail in a longitudinal direction;
a third die for pressing the head portion of the rail and a fourth die for pressing the foot portion of the rail on the other side in the longitudinal direction of the rail,
The device for straightening twist of a rail, characterized in that the first die and the third die are arranged on one side of the rail in a width direction, and the second die and the fourth die are arranged on the other side of the rail in the width direction.
前記第1の金型、第2の金型、第3の金型、及び第4の金型は、それぞれ第1のホルダ、第2のホルダ、第3のホルダ、及び第4のホルダに保持され、前記第1のホルダ、第2のホルダ、第3のホルダ、及び第4のホルダは、それぞれ第1のプレート、第2のプレート、第3のプレート、及び第4のプレートに対して上下動自在に設置されていることを特徴とする請求項1に記載のレールのねじれ矯正装置。 The rail twist correction device according to claim 1, characterized in that the first die, the second die, the third die, and the fourth die are held by a first holder, a second holder, a third holder, and a fourth holder, respectively, and the first holder, the second holder, the third holder, and the fourth holder are installed so as to be movable up and down relative to the first plate, the second plate, the third plate, and the fourth plate, respectively. 前記第1のホルダ、第2のホルダ、第3のホルダ、及び第4ホルダは、それぞれの上面に前記第1のプレート、第2のプレート、第3のプレート、及び第4のプレート上に載置されて前記第1のホルダ、第2のホルダ、第3のホルダ、及び第4のホルダの落下を防止する落下防止プレートを備えていることを特徴とする請求項2に記載のレールのねじれ矯正装置。 The rail twist correction device according to claim 2, characterized in that the first holder, the second holder, the third holder, and the fourth holder are provided with a fall prevention plate on the upper surface thereof, which is placed on the first plate, the second plate, the third plate, and the fourth plate, and prevents the first holder, the second holder, the third holder, and the fourth holder from falling. 前記第1のホルダ、第2のホルダ、第3のホルダ、及び第4のホルダのそれぞれの前記落下防止プレートと、前記第1のプレート、第2のプレート、第3のプレート、及び第4のプレートの上面とが、前記第1のホルダ、第2のホルダ、第3のホルダ、及び第4のホルダのぞれぞれの上下方向位置を保持する弾性体によって連結されていることを特徴とする請求項3に記載のレールのねじれ矯正装置。 The rail twist correction device according to claim 3, characterized in that the fall prevention plates of the first holder, the second holder, the third holder, and the fourth holder, respectively, and the upper surfaces of the first plate, the second plate, the third plate, and the fourth plate are connected by an elastic body that maintains the vertical position of the first holder, the second holder, the third holder, and the fourth holder, respectively. 前記第1のホルダ、第2のホルダ、第3のホルダ、及び第4のホルダのそれぞれと、前記第1のプレート、第2のプレート、第3のプレート、及び第4プレートのそれぞれとの間にコロが設けられていることを特徴とする請求項4に記載のレールのねじれ矯正装置。 The rail twist correction device according to claim 4, characterized in that rollers are provided between the first holder, the second holder, the third holder, and the fourth holder, respectively, and the first plate, the second plate, the third plate, and the fourth plate, respectively. 前記第1の金型による前記レールの足部への押圧、前記第2の金型による前記レールの頭部への押圧、前記第3の金型による前記レールの頭部への押圧、及び前記第4の金型による前記レールの足部への押圧は、前記レールのねじれを矯正する際に、圧下シリンダによって前記第2の金型及び前記第4の金型のそれぞれが前記第1の金型及び前記第3の金型のそれぞれに近づく方向に移動した際に達成され、前記第1の金型による前記レールの足部への押圧の解除、前記第2の金型による前記レールの頭部への押圧の解除、前記第3の金型による前記レールの頭部への押圧の解除、及び前記第4の金型による前記レールの足部への押圧の解除は、前記圧下シリンダによって前記第2の金型及び前記第4の金型のそれぞれが前記第1の金型及び前記第3の金型のそれぞれから離れる方向に移動した際に達成されることを特徴とする請求項1乃至5のうちいずれか一項に記載のレールのねじれ矯正装置。 The device for straightening twisted rails according to any one of claims 1 to 5, characterized in that the pressing of the first die against the foot of the rail, the pressing of the second die against the head of the rail, the pressing of the third die against the head of the rail, and the pressing of the fourth die against the foot of the rail are achieved when the second die and the fourth die are moved by the pressing cylinder in a direction approaching the first die and the third die, respectively, when straightening the twisted rails, and the release of the pressing of the first die against the foot of the rail, the release of the pressing of the second die against the head of the rail, the release of the pressing of the third die against the head of the rail, and the release of the pressing of the fourth die against the foot of the rail are achieved when the second die and the fourth die are moved by the pressing cylinder in a direction away from the first die and the third die, respectively. 長手方向に延びるレールのねじれを矯正するレールのねじれ矯正方法であって、
前記レールの長手方向の一側において、前記レールの幅方向の一側に配置された第1の金型で前記レールの足部を押圧するとともに、前記レールの幅方向の他側に配置された第2の金型で前記レールの頭部を押圧し、
前記レールの長手方向の他側において、前記レールの幅方向の一側に配置された第3の金型で前記レールの頭部を押圧するとともに、前記レールの幅方向の他側に配置された第4の金型で前記レールの足部を押圧することを特徴とするレールのねじれ矯正方法。
A method for straightening a twist of a rail extending in a longitudinal direction, comprising the steps of:
At one side of the rail in the longitudinal direction, a first die arranged on one side of the rail in the width direction presses a foot portion of the rail, and a second die arranged on the other side of the rail in the width direction presses a head portion of the rail,
A method for straightening twist of a rail, comprising the steps of pressing a head portion of the rail with a third die arranged on one side of the rail in the width direction, and pressing a foot portion of the rail with a fourth die arranged on the other side of the rail in the width direction.
請求項7に記載のレールのねじれ矯正方法によってレールのねじれを矯正するねじれ矯正工程を含むことを特徴とするレールの製造方法。 A method for manufacturing a rail, comprising a twist straightening step for straightening the twist of the rail by the method for straightening the twist of the rail described in claim 7.
JP2022119763A 2022-07-27 2022-07-27 Rail twist correction device, rail twist correction method, and rail manufacturing method Active JP7613428B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022119763A JP7613428B2 (en) 2022-07-27 2022-07-27 Rail twist correction device, rail twist correction method, and rail manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022119763A JP7613428B2 (en) 2022-07-27 2022-07-27 Rail twist correction device, rail twist correction method, and rail manufacturing method

Publications (2)

Publication Number Publication Date
JP2024017246A JP2024017246A (en) 2024-02-08
JP7613428B2 true JP7613428B2 (en) 2025-01-15

Family

ID=89807926

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022119763A Active JP7613428B2 (en) 2022-07-27 2022-07-27 Rail twist correction device, rail twist correction method, and rail manufacturing method

Country Status (1)

Country Link
JP (1) JP7613428B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003154410A (en) 2001-09-06 2003-05-27 Nippon Steel Corp Straightening method and straightening device for shaped steel with excellent cross-sectional dimensions and straightness over its entire length
JP2009045646A (en) 2007-08-20 2009-03-05 Aoki Denki Kogyo Kk Rotation straightening apparatus and rotation straightening method
JP2012218055A (en) 2011-04-12 2012-11-12 Nippon Steel Corp Rail straightening device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52147137U (en) * 1976-04-30 1977-11-08
JP5273005B2 (en) * 2009-10-06 2013-08-28 新日鐵住金株式会社 Rail straightening method and straightening apparatus
JP6547706B2 (en) * 2016-07-29 2019-07-24 Jfeスチール株式会社 Straightening method and straightening apparatus for straight steel sheet pile

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003154410A (en) 2001-09-06 2003-05-27 Nippon Steel Corp Straightening method and straightening device for shaped steel with excellent cross-sectional dimensions and straightness over its entire length
JP2009045646A (en) 2007-08-20 2009-03-05 Aoki Denki Kogyo Kk Rotation straightening apparatus and rotation straightening method
JP2012218055A (en) 2011-04-12 2012-11-12 Nippon Steel Corp Rail straightening device

Also Published As

Publication number Publication date
JP2024017246A (en) 2024-02-08

Similar Documents

Publication Publication Date Title
US9132462B2 (en) Bending press system
JP6007597B2 (en) Bending straightening device for section steel and method for straightening section bending
EP2878392A1 (en) Press-forming mold and method for manufacturing press-formed product
JP2008030090A (en) Bending correction method for shape steel and straightening apparatus for shape steel
KR101421978B1 (en) Guide device for a strip rolling mill
US10500625B2 (en) Method for manufacturing metal component with three-dimensional edge and die sets for manufacturing the same
EP3112041B1 (en) Press-forming method and press-forming device
US11633770B2 (en) Bending method
WO2018180712A1 (en) Press mold device and production method for press-molded articles
WO2018180711A1 (en) Press mold device and production method for press-molded articles
JP7613428B2 (en) Rail twist correction device, rail twist correction method, and rail manufacturing method
US20190217372A1 (en) Method for producing forged crankshaft
US11707774B2 (en) Bending method
KR102325649B1 (en) Steel plate manufacturing equipment and steel plate manufacturing method
US9056345B2 (en) Method and profiling installation for roll forming a sheet metal
JP2570950B2 (en) Straightness correction device for section steel
JP2008212967A (en) Metal plate leading edge width warpage correction method and correction device
JP4687327B2 (en) Press straightening method for U-shaped steel sheet pile with arms
US12214399B2 (en) Method for manufacturing pressed component, and shape correction die
JP6287868B2 (en) Straightening device for shape steel and method for producing shape steel
JP7192832B2 (en) Press straightening device, press straightening method, and steel sheet pile manufacturing method
JP7472939B2 (en) Manufacturing method of press-molded products, press-molding die
JP2014014853A (en) A curvature correcting method for a shaped steel
JP7276278B2 (en) Straightening device for hat-shaped steel sheet pile, straightening method, and method for manufacturing hat-shaped steel sheet pile
CN116528996A (en) Straightening device and straightening method for steel sheet pile and manufacturing method for steel sheet pile

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240226

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20241016

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241126

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241209

R150 Certificate of patent or registration of utility model

Ref document number: 7613428

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150