JP7613673B2 - Rail vehicles - Google Patents

Rail vehicles Download PDF

Info

Publication number
JP7613673B2
JP7613673B2 JP2022188316A JP2022188316A JP7613673B2 JP 7613673 B2 JP7613673 B2 JP 7613673B2 JP 2022188316 A JP2022188316 A JP 2022188316A JP 2022188316 A JP2022188316 A JP 2022188316A JP 7613673 B2 JP7613673 B2 JP 7613673B2
Authority
JP
Japan
Prior art keywords
current
supply
leakage current
ground
difference
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022188316A
Other languages
Japanese (ja)
Other versions
JP2023078110A (en
Inventor
恒陽 内藤
浩 新村
正樹 下村
徳仁 水谷
学 松本
敦 鈴木
健二 榊原
頼数 頭本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sobrain
Original Assignee
Sobrain
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sobrain filed Critical Sobrain
Publication of JP2023078110A publication Critical patent/JP2023078110A/en
Application granted granted Critical
Publication of JP7613673B2 publication Critical patent/JP7613673B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Propulsion And Braking For Vehicles (AREA)

Description

本発明は、漏洩電流の検出精度を向上できる鉄道車両に関するものである。 The present invention relates to a railway vehicle that can improve the accuracy of detecting leakage current.

鉄道車両は、例えば架線からパンタグラフを介して供給される電力をVVVFインバータやSIV等の変換装置で変換して出力し、その出力された電力で電動機などを作動させる電気回路を備えている。特許文献1では、パンタグラフからの電力の入力位置に変流器(電流検出器)を設置して、その入力位置の電流値を変流器で計測する。この計測した電流値の単位時間当たりの変化量が閾値を超えた場合に、所定値以上の漏洩電流(地絡電流)が鉄道車両の電気回路に生じたと判断することが特許文献1に開示されている。 A railway vehicle is equipped with an electric circuit that converts and outputs the electric power supplied from, for example, an overhead line via a pantograph using a conversion device such as a VVVF inverter or SIV, and operates an electric motor or the like with the output electric power. In Patent Document 1, a current transformer (current detector) is installed at the input position of the electric power from the pantograph, and the current value at the input position is measured by the current transformer. Patent Document 1 discloses that if the amount of change per unit time of the measured current value exceeds a threshold value, it is determined that a leakage current (ground fault current) of a predetermined value or more has occurred in the electric circuit of the railway vehicle.

特開2012-223020号公報JP 2012-223020 A

しかしながら、パンタグラフからの電力の入力位置における電流値は、漏洩電流の発生だけでなく、鉄道車両の走行状態や架線の電圧などによっても変化するため、特許文献1に開示された方法では、発生した漏洩電流の値を算出することが困難であり、漏洩電流の検出精度が低いという問題点があった。また、漏洩電流が生じた場所によっては、特許文献1に開示された方法で漏洩電流を検出できない可能性もある。 However, because the current value at the input point of power from the pantograph changes not only due to the occurrence of leakage current but also due to the running state of the railway vehicle and the voltage of the overhead lines, the method disclosed in Patent Document 1 has difficulty in calculating the value of the generated leakage current, and there is a problem in that the detection accuracy of the leakage current is low. Furthermore, depending on the location where the leakage current occurs, the method disclosed in Patent Document 1 may not be able to detect the leakage current.

本発明は上述した問題点を解決するためになされたものであり、漏洩電流の検出精度を向上できる鉄道車両を提供することを目的とする。 The present invention has been made to solve the above-mentioned problems, and aims to provide a railway vehicle that can improve the accuracy of detecting leakage current.

この目的を達成するために本発明の鉄道車両は、架線から電力の供給を受けるパンタグラフと、車両走行用の電力を発生させる三相4線式以外の車載電源との内の少なくとも一方が搭載されてレール上を走行するものであって、前記レール上を転動する複数の車輪と、その車輪に接続されて接地される接地線と、前記パンタグラフ又は前記車載電源から電力が供給される供給線と、その供給線および前記接地線を含む電気回路に接続されて前記供給線からの電力によって作動する電気機器と、前記電気回路に生じる漏洩電流を監視する監視装置と、を備え、その監視装置は、前記供給線の電流値を計測する供給側計測器と、前記接地線の電流値を計測する接地側計測器と、を備えている。 To achieve this objective, the railway vehicle of the present invention is equipped with at least one of a pantograph that receives power from an overhead line and an on-board power source other than a three-phase four-wire type that generates power for running the vehicle and runs on rails, and is equipped with a plurality of wheels that roll on the rails, a ground wire that is connected to the wheels and grounded, a supply line to which power is supplied from the pantograph or the on-board power source, electrical equipment that is connected to an electrical circuit including the supply line and the ground wire and operates with power from the supply line, and a monitoring device that monitors leakage current occurring in the electrical circuit, and the monitoring device is equipped with a supply side meter that measures the current value of the supply line and a ground side meter that measures the current value of the ground wire.

なお、パンタグラフから供給線へ供給される電力は、直流電力でも良く交流電力でも良い。三相4線式以外の車載電源としては、蓄電池や、燃料電池を含む直流発電機、単相交流発電機、三相3線式の交流発電機が挙げられる。更に、車載電源は、発電機および蓄電池の少なくとも一方と、その発電機や蓄電池から入力された電力を変換・調整して出力する調整装置とを備えても良い。また、鉄道車両には、パンタグラフ又は車載電源のいずれか一方のみを搭載しても良く、パンタグラフ及び車載電源の両方を搭載しても良い。パンタグラフ及び車載電源の両方を搭載する場合、供給線への電力供給をパンタグラフと車載電源とで切り換え可能としても良い。接地線は、鉄道車両に搭載されるものであり、レールとは異なる。供給線および接地線を含む電気回路とは、例えば、この鉄道車両に連結された別の車両を介して形成される電気回路でも良い。 The power supplied from the pantograph to the supply line may be either DC or AC. On-board power sources other than three-phase, four-wire types include storage batteries, DC generators including fuel cells, single-phase AC generators, and three-phase, three-wire AC generators. The on-board power source may include at least one of a generator and a storage battery, and an adjustment device that converts and adjusts the power input from the generator or the storage battery and outputs it. The railcar may be equipped with only either a pantograph or an on-board power source, or may be equipped with both a pantograph and an on-board power source. When equipped with both a pantograph and an on-board power source, the power supply to the supply line may be switchable between the pantograph and the on-board power source. The ground wire is installed on the railcar and is different from the rail. The electric circuit including the supply line and the ground wire may be, for example, an electric circuit formed via another vehicle connected to the railcar.

また本発明の鉄道車両は、レール上を走行するものであって、前記レール上を転動する複数の車輪と、その車輪に接続されて接地される接地線と、その接地線に中性線が接続される三相4線式の電源であって車両走行用の電力を発生させる車載電源と、その車載電源から電力が供給される3本の供給線と、それらの供給線を含む電気回路に接続されて前記供給線からの電力によって作動する電気機器と、前記電気回路に生じて前記中性線を通る漏洩電流を監視する監視装置と、を備え、その監視装置は、3本の前記供給線の電流値をそれぞれ個別に計測する3つの供給側計測器を備えている。 The railway vehicle of the present invention runs on rails and includes a number of wheels that roll on the rails, a ground wire connected to the wheels and grounded, an on-board power supply that is a three-phase, four-wire power supply with a neutral wire connected to the ground wire and generates power for running the vehicle, three supply lines to which power is supplied from the on-board power supply, electrical equipment connected to an electrical circuit including the supply lines and operated by power from the supply lines, and a monitoring device that monitors leakage current generated in the electrical circuit and passing through the neutral wire, and the monitoring device includes three supply-side meters that individually measure the current values of the three supply lines.

請求項1記載の鉄道車両によれば、パンタグラフ又は車載電源から電力が供給される供給線と、車輪を介して接地される接地線とを含む電気回路に電気機器が接続され、供給線からの電力によって電気機器が作動する。この電気回路に生じる漏洩電流を監視する監視装置は、供給側計測器により供給線の電流値を計測し、接地側計測器により接地線の電流値を計測する。 According to the railway vehicle described in claim 1, electrical equipment is connected to an electrical circuit including a supply line to which power is supplied from a pantograph or an on-board power source, and a ground line to which ground is connected via the wheels, and the electrical equipment is operated by power from the supply line. A monitoring device that monitors leakage current occurring in this electrical circuit measures the current value of the supply line with a supply-side meter and measures the current value of the ground line with a ground-side meter.

例えば、電気回路に漏洩電流が生じず、供給線(供給側計測器の計測位置)を通った電流の全てが、接地線(接地側計測器の計測位置)を通る場合には、鉄道車両の走行状態や架線の電圧の変化に関わらず、供給側計測器の電流値と接地側計測器の電流値とが基本的に一致する。そのため、供給側計測器の電流値と接地側計測器の電流値との差分から、接地側計測器を迂回するように発生した漏洩電流の値を精度良く算出できる。よって、監視装置は、供給線および接地線の両方の電流値を計測することにより、漏洩電流の検出精度を向上できる。 For example, if no leakage current occurs in the electrical circuit and all of the current that passes through the supply line (measurement position of the supply-side meter) passes through the ground line (measurement position of the ground-side meter), the current value of the supply-side meter and the current value of the ground-side meter will basically match, regardless of the running state of the railway vehicle or changes in the voltage of the overhead line. Therefore, the value of the leakage current that has occurred to bypass the ground-side meter can be accurately calculated from the difference between the current value of the supply-side meter and the current value of the ground-side meter. Therefore, by measuring the current values of both the supply line and the ground line, the monitoring device can improve the accuracy of leakage current detection.

なお、「監視装置は、供給線および接地線の両方の電流値を計測することにより、漏洩電流の検出精度を向上できる」とは、監視装置自体で漏洩電流の値を精度良く算出(検出)する場合に限らず、鉄道車両の外部のサーバ等で漏洩電流の値を精度良く算出できるように、その算出に利用する電流値を監視装置で計測しておくことを含む。 Note that "the monitoring device can improve the detection accuracy of the leakage current by measuring the current values of both the supply line and the ground line" does not only mean that the monitoring device itself accurately calculates (detects) the leakage current value, but also means that the monitoring device measures the current value used in the calculation so that the leakage current value can be accurately calculated on a server or the like outside the railway vehicle.

請求項2記載の鉄道車両によれば、請求項1記載の鉄道車両の奏する効果に加え、次の効果を奏する。鉄道車両のレール方向の両端部には、別車両に連結可能な一対の連結部がそれぞれ設けられている。この一対の連結部の間に供給線の供給引通線が引き通され、供給線の供給上流線が供給引通線とパンタグラフ又は車載電源とを繋ぐ。供給側計測器は、供給上流線の電流値を計測する。これにより、供給引通線が別車両に接続されて別車両からの電流が供給引通線に流れる場合などでも、この鉄道車両に搭載されたパンタグラフ又は車載電源から供給線へ供給される電力の電流値を正確に検出できる。 The railway vehicle of claim 2 achieves the following effect in addition to the effect achieved by the railway vehicle of claim 1. A pair of coupling parts that can be coupled to another vehicle is provided at each end of the railway vehicle in the rail direction. A supply pull-through line of the supply line is laid between the pair of coupling parts, and an upstream supply line of the supply line connects the supply pull-through line to a pantograph or an on-board power supply. The supply side meter measures the current value of the upstream supply line. As a result, even in cases where the supply pull-through line is connected to another vehicle and current from the other vehicle flows through the supply pull-through line, the current value of the power supplied to the supply line from the pantograph or on-board power supply mounted on this railway vehicle can be accurately detected.

請求項3記載の鉄道車両によれば、請求項1記載の鉄道車両の奏する効果に加え、次の効果を奏する。鉄道車両のレール方向の両端部には、別車両に連結可能な一対の連結部がそれぞれ設けられている。接地線は、一対の連結部の間に引き通されて電気機器が接続される接地引通線と、接地引通線から分岐する集約線と、複数の車輪を同電位とするようにこれらの車輪と集約線とを連結する接地端子部と、を備えている。接地側計測器は、集約線の電流値を計測する。これにより、例えば集約線を迂回せずに流れる電流(漏洩電流以外の電流)を、集約線で合流した後であって複数の車輪へ分流される前に接地側計測器でまとめて検出できる。 According to the railway vehicle described in claim 3, in addition to the effect of the railway vehicle described in claim 1, the following effect is achieved. A pair of coupling parts that can be coupled to another vehicle is provided at each end of the railway vehicle in the rail direction. The ground wire includes a ground lead wire that is routed between the pair of coupling parts and to which electrical equipment is connected, a collection wire that branches off from the ground lead wire, and a ground terminal part that connects the wheels and the collection wire so that the wheels are at the same potential. The ground side measuring instrument measures the current value of the collection wire. As a result, for example, a current that flows without bypassing the collection wire (current other than leakage current) can be detected collectively by the ground side measuring instrument after it joins at the collection wire and before it is diverted to the multiple wheels.

請求項4記載の鉄道車両によれば、請求項1記載の鉄道車両の奏する効果に加え、次の効果を奏する。供給側計測器の電流値と接地側計測器の電流値との差分を漏洩電流として算出する場合、その差分は、供給線と接地線との間の電位差に影響を受ける。これに対し、監視装置は、供給線と接地線との間の電位差を電位差計測部で計測し、電位関連付手段によって、その電位差の計測時の供給側計測器および接地側計測器の電流値に、電位差計測部で計測した電位差を関連付ける。これにより、供給側計測器および接地側計測器の電流値の差分を電位差に基づき補正して、漏洩電流の値を算出できるので、漏洩電流の検出精度をより向上できる。 The railway vehicle of claim 4 achieves the following effect in addition to the effect of the railway vehicle of claim 1. When the difference between the current value of the supply side meter and the current value of the ground side meter is calculated as the leakage current, the difference is affected by the potential difference between the supply line and the ground line. In response to this, the monitoring device measures the potential difference between the supply line and the ground line with a potential difference measurement unit, and uses a potential association means to associate the potential difference measured by the potential difference measurement unit with the current values of the supply side meter and the ground side meter at the time the potential difference was measured. This makes it possible to calculate the value of the leakage current by correcting the difference in the current values of the supply side meter and the ground side meter based on the potential difference, thereby further improving the accuracy of leakage current detection.

なお、「A」(例えば供給側計測器および接地側計測器の電流値)に、「B」(例えば電位差計測部で計測した電位差)を関連付けるとは、例えば、「A」と「B」とを互いに関連付けた状態で同一のメモリに記憶しても良く、「A」及び「B」を別々のメモリに記憶して「A」及び「B」の計測日時に基づき両者を関連付けても良い。更に、「A」及び「B」を用いて特定の値を算出することを、「A」に「B」を関連付けるとしても良い。 Note that associating "A" (e.g., the current value of the supply-side meter and the ground-side meter) with "B" (e.g., the potential difference measured by a potential difference measurement unit) may mean, for example, storing "A" and "B" in a mutually associated state in the same memory, or storing "A" and "B" in separate memories and associating the two based on the measurement dates and times of "A" and "B." Furthermore, calculating a specific value using "A" and "B" may also be considered as associating "B" with "A."

請求項5記載の鉄道車両によれば、請求項1記載の鉄道車両の奏する効果に加え、次の効果を奏する。監視装置は、鉄道車両の走行状態(電気機器の制御状態や時刻、進行方向、走行速度、走行位置、外気の温度、湿度など)を取得手段で取得し、状態関連付手段によって、その取得時の供給側計測器および接地側計測器の電流値に、その取得した走行状態を関連付ける。これにより、例えば、供給側計測器の電流値と接地側計測器の電流値との差分から算出した漏洩電流の値が、特定の走行状態に限って大きくなる場合には、その特定の走行状態で電流が流れる部分に漏洩電流が発生していると推定できる。よって、漏洩電流の発生の原因を解析し易くできる。 According to the railway vehicle of claim 5, in addition to the effect of the railway vehicle of claim 1, the following effect is achieved. The monitoring device acquires the running state of the railway vehicle (control state of electrical equipment, time, direction of travel, running speed, running position, outside temperature, humidity, etc.) using the acquisition means, and associates the acquired running state with the current values of the supply side meter and the ground side meter at the time of acquisition using the state association means. As a result, for example, if the value of the leakage current calculated from the difference between the current value of the supply side meter and the current value of the ground side meter becomes large only in a specific running state, it can be estimated that a leakage current is occurring in the part where current flows in that specific running state. This makes it easier to analyze the cause of the leakage current.

請求項6記載の鉄道車両によれば、請求項1記載の鉄道車両の奏する効果に加え、次の効果を奏する。送信部は、供給側計測器および接地側計測器で計測した電流値に関するデータを鉄道車両の外部へ送信する。これにより、供給側計測器の電流値と接地側計測器の電流値とからの漏洩電流の算出や、算出された漏洩電流に対する解析を鉄道車両の外部で実行できる。これらの算出や解析を監視装置で実行させる場合と比べ、監視装置を小型化およびコストダウンし易くできる。 The railway vehicle of claim 6 achieves the following effect in addition to the effect of the railway vehicle of claim 1. The transmitter transmits data on the current values measured by the supply side meter and the ground side meter to the outside of the railway vehicle. This makes it possible to calculate the leakage current from the current value of the supply side meter and the current value of the ground side meter, and to analyze the calculated leakage current, outside the railway vehicle. Compared to when these calculations and analyses are performed by a monitoring device, it is easier to make the monitoring device smaller and less expensive.

なお、「X」(例えば、供給側計測器および接地側計測器で計測した電流値)に関するデータとは、「X」のデータ自体でも良く、「X」を用いて算出した値(例えば、電流値の差分や複数の差分の平均値)のデータでも良い。 Note that data relating to "X" (e.g., current values measured by a supply-side meter and a ground-side meter) may be the data for "X" itself, or it may be data for a value calculated using "X" (e.g., the difference in current values or the average value of multiple differences).

請求項7記載の鉄道車両によれば、請求項6記載の鉄道車両の奏する効果に加え、次の効果を奏する。監視装置は、供給側計測器の電流値と接地側計測器の電流値との差分を差分算出手段で算出する。送信判断手段では、差分算出手段で算出された差分に基づき、その差分に関するデータを送信部から鉄道車両の外部へ送信するかを判断する。その送信判断手段で送信すると判断した場合に、送信許可手段では、差分に関するデータを送信部から鉄道車両の外部へ送信可能とする。これにより、例えば、差分に関するデータのうち、漏洩電流の解析に有効なデータを選定して外部へ送信できるので、鉄道車両から外部への送信頻度や送信量を抑制できる。また、仮に外部への送信までにデータを監視装置に一時記憶する場合には、その一時記憶するデータ量を少なくでき、監視装置を小型化およびコストダウンし易くできる。 According to the railway vehicle of claim 7, in addition to the effect of the railway vehicle of claim 6, the following effect is achieved. The monitoring device uses a difference calculation means to calculate the difference between the current value of the supply side meter and the current value of the ground side meter. The transmission decision means decides whether to transmit data related to the difference from the transmission unit to the outside of the railway vehicle based on the difference calculated by the difference calculation means. When the transmission decision means decides to transmit, the transmission permission means allows the data related to the difference to be transmitted from the transmission unit to the outside of the railway vehicle. This makes it possible, for example, to select data useful for analyzing leakage current from the data related to the difference and transmit it to the outside, thereby reducing the frequency and amount of transmission from the railway vehicle to the outside. Also, if data is temporarily stored in the monitoring device before being transmitted to the outside, the amount of data temporarily stored can be reduced, making it easier to miniaturize and reduce the cost of the monitoring device.

請求項8記載の鉄道車両は、請求項1から7のいずれかに記載の鉄道車両を電力供給車とする車両編成内において、その電力供給車から電力の供給を受けてレール上を走行する鉄道車両である。本鉄道車両は、連結部によって電力供給車に直接または別の車両を介し連結され、連結部を介して電力供給車から供給される電力で電気機器を作動させる。その電気機器を接地させるために、自車接地線は、レール上を転動する車輪と電気機器とを連結する。この場合、電力供給車の供給線(供給側計測器の計測位置)を通る電流は、その電力供給車の接地線(接地側計測器の計測位置)を通る電流と、本鉄道車両の自車接地線を通る電流と、本鉄道車両または電力供給車に生じる漏洩電流とに分かれる。 The railway vehicle described in claim 8 is a railway vehicle that runs on rails receiving power from a power supply car in a train consisting of a railway vehicle described in any one of claims 1 to 7 as a power supply car. This railway vehicle is connected to the power supply car by a coupling section either directly or via another vehicle, and operates electrical equipment with power supplied from the power supply car via the coupling section. In order to ground the electrical equipment, the vehicle's own grounding wire connects the wheels rolling on the rails to the electrical equipment. In this case, the current passing through the supply line of the power supply car (measurement position of the supply side measuring instrument) is divided into a current passing through the grounding wire of the power supply car (measurement position of the grounding side measuring instrument), a current passing through the vehicle's own grounding wire of this railway vehicle, and a leakage current generated in this railway vehicle or the power supply car.

自車接地側計測器は、自車接地線の電流値を計測する。これにより、自車接地側計測器の電流値と、電力供給車の供給側計測器および接地側計測器の電流値とに基づき、本鉄道車両または電力供給車に生じる漏洩電流の値を精度良く算出できる。 The vehicle's ground side meter measures the current value of the vehicle's ground wire. This makes it possible to accurately calculate the value of the leakage current occurring in the railway vehicle or power supply vehicle based on the current value of the vehicle's ground side meter and the current values of the power supply vehicle's supply side meter and ground side meter.

請求項9記載の鉄道車両によれば、この鉄道車両に搭載されて車両走行用の電力を発生させる車載電源は、車輪を介して接地される接地線に中性線が接続された三相4線式の電源である。この車載電源から3本の供給線に電力が供給され、それらの供給線を含む電気回路に電気機器が接続され、供給線からの電力によって電気機器が作動する。この電気回路に生じて中性線を通る漏洩電流を監視する監視装置は、3つの供給側計測器により3本の供給線の電流値をそれぞれ個別に計測する。 According to the railway vehicle described in claim 9, the on-board power supply installed in the railway vehicle and generating power for running the vehicle is a three-phase, four-wire power supply in which a neutral wire is connected to a ground wire that is grounded via the wheels. Power is supplied from this on-board power supply to three supply lines, and electrical equipment is connected to an electrical circuit including these supply lines, and the electrical equipment is operated by power from the supply lines. A monitoring device that monitors the leakage current generated in this electrical circuit and passing through the neutral wire measures the current values of the three supply lines individually using three supply-side measuring instruments.

この電気回路に漏洩電流が生じていなければ、基本的に、鉄道車両の走行状態に関わらず、3つの供給側計測器の電流値の合計(差分)が0となる。一方、供給側計測器を迂回するように中性線に漏洩電流が流れた場合、3つの供給側計測器の電流値の合計が漏洩電流の値となり、漏洩電流の値を精度良く算出できる。よって、監視装置は、3本の供給線の電流値を計測することにより、漏洩電流の検出精度を向上できる。 If no leakage current occurs in this electrical circuit, the sum (difference) of the current values of the three supply side meters will basically be zero, regardless of the running state of the railway vehicle. On the other hand, if leakage current flows through the neutral conductor, bypassing the supply side meters, the sum of the current values of the three supply side meters becomes the leakage current value, and the leakage current value can be calculated with high accuracy. Therefore, by measuring the current values of the three supply lines, the monitoring device can improve the accuracy of leakage current detection.

第1実施形態における鉄道車両の電気回路を模式的に示した回路図である。FIG. 2 is a circuit diagram showing a schematic diagram of an electric circuit of the railway vehicle in the first embodiment. (a)は供給側変流器および接地側変流器で計測される電流値の経時変化を示すグラフであり、(b)は漏洩電流の値の経時変化を示すグラフである。1A is a graph showing the change over time in the current values measured in the supply-side current transformer and the ground-side current transformer, and FIG. 1B is a graph showing the change over time in the leakage current value. 鉄道車両の電気的構成を示したブロック図である。FIG. 2 is a block diagram showing the electrical configuration of the railway vehicle. 制御装置のCPUで実行されるメイン処理のフローチャートである。4 is a flowchart of a main process executed by a CPU of the control device. 漏洩電流監視装置の電気的構成を示したブロック図である。FIG. 2 is a block diagram showing the electrical configuration of the leakage current monitoring device. (a)は走行状態リングバッファの内容を模式的に示した図であり、(b)はピーク検出メモリの内容を模式的に示した図であり、(c)は短期変化検出メモリの内容を模式的に示した図である。(a) is a diagram showing a schematic representation of the contents of the driving condition ring buffer, (b) is a diagram showing a schematic representation of the contents of the peak detection memory, and (c) is a diagram showing a schematic representation of the contents of the short-term change detection memory. 漏洩電流監視装置のCPUで実行されるメイン処理のフローチャートである。4 is a flowchart of a main process executed by a CPU of the leakage current monitoring device. ピーク検出処理のフローチャートである。13 is a flowchart of a peak detection process. アベレージ検出処理のフローチャートである。13 is a flowchart of an average detection process. サイクル収集処理のフローチャートである。13 is a flowchart of a cycle collection process. 第2実施形態における鉄道車両の電気回路を模式的に示した回路図である。FIG. 11 is a circuit diagram showing a schematic diagram of an electric circuit of a railway vehicle according to a second embodiment. 第3実施形態における鉄道車両の電気回路を模式的に示した回路図である。FIG. 11 is a circuit diagram showing a schematic diagram of an electric circuit of a railway vehicle according to a third embodiment. 第4実施形態における鉄道車両の電気回路を模式的に示した回路図である。FIG. 13 is a circuit diagram showing a schematic diagram of an electric circuit of a railway vehicle according to a fourth embodiment.

以下、好ましい実施形態について、添付図面を参照して説明する。まず図1を参照して第1実施形態における鉄道車両10の概要を説明する。図1は、鉄道車両10の電気回路を模式的に示した回路図である。 The preferred embodiment will now be described with reference to the accompanying drawings. First, an overview of a railway vehicle 10 in a first embodiment will be described with reference to FIG. 1. FIG. 1 is a circuit diagram that shows a schematic diagram of the electrical circuit of the railway vehicle 10.

鉄道車両10は、直流電車であって、金属製の車体12と、その車体12を支持してレール2上を転動する複数の車輪13と、車体12のレール方向(前後方向)の両端にそれぞれ設けた連結部14と、を主に備えている。更に、鉄道車両10は、動力としての複数の電動機22を備え、電動機22で車輪13を回転させてレール2上を自走する動力車である。 The railway vehicle 10 is a direct current electric train, and mainly comprises a metal car body 12, a number of wheels 13 that support the car body 12 and roll on the rails 2, and coupling parts 14 provided on both ends of the car body 12 in the rail direction (front-rear direction). Furthermore, the railway vehicle 10 is a powered vehicle that is equipped with a number of electric motors 22 as a power source, and runs on the rails 2 by rotating the wheels 13 with the electric motors 22.

連結部14は、鉄道車両10と別の車両とを機械的に連結して車両間の引張力や圧縮力を伝達する連結器と、鉄道車両10と別の車両とを電気的に連結する電気連結器と、を含む。なお、本実施形態では、鉄道車両10が別の車両と連結されていない場合について説明する。 The coupling unit 14 includes a coupler that mechanically couples the railcar 10 to another vehicle to transmit tensile and compressive forces between the vehicles, and an electrical coupler that electrically couples the railcar 10 to another vehicle. Note that in this embodiment, a case will be described in which the railcar 10 is not coupled to another vehicle.

レール2の上方には架線4が架け渡されている。この架線4には、接地されたレール2に対し変電所6で起電力を生じさせることにより、高電圧(本実施形態では1500V)の直流電流が流れる。金属製の車輪13がレール2を介して接地されているので、鉄道車両10の車体12の上部に設けたパンタグラフ17を上昇させて架線4に接触させることにより、変電所6と架線4と鉄道車両10内部の電気回路とレール2とによって閉回路が形成される。これにより、架線4からパンタグラフ17を介して鉄道車両10の電気回路に直流電力が供給される。 An overhead line 4 is suspended above the rails 2. A high-voltage (1500 V in this embodiment) direct current flows through this overhead line 4 by generating an electromotive force at the substation 6 with respect to the grounded rails 2. Because the metal wheels 13 are grounded via the rails 2, a closed circuit is formed by the substation 6, the overhead line 4, the electrical circuit inside the railcar 10, and the rails 2 when the pantograph 17 on the top of the body 12 of the railcar 10 is raised and brought into contact with the overhead line 4. This allows direct current power to be supplied from the overhead line 4 via the pantograph 17 to the electrical circuit of the railcar 10.

鉄道車両10の電気回路は、パンタグラフ17から車両走行用の電力の供給を受ける供給線18と、その供給線18から入力された電力を変換して出力するVVVFインバータ20及びSIV(静止型インバータ)30と、VVVFインバータ20及びSIV30を接地させる接地線40と、を主に備えている。 The electrical circuit of the railway vehicle 10 mainly comprises a supply line 18 that receives power for running the vehicle from a pantograph 17, a VVVF inverter 20 and an SIV (static inverter) 30 that convert and output the power input from the supply line 18, and a ground wire 40 that grounds the VVVF inverter 20 and the SIV 30.

接地線40は、車輪13に接続されて接地される部位である。接地線40は、鉄道車両10の両端の連結部14間に引き通される接地引通線41と、その接地引通線41から分岐する集約線42と、この集約線42と複数の車輪13とを連結する接地端子部43と、を備えている。 The ground wire 40 is connected to the wheels 13 and is grounded. The ground wire 40 includes a ground lead-in wire 41 that is routed between the coupling parts 14 at both ends of the railway vehicle 10, a central line 42 that branches off from the ground lead-in wire 41, and a ground terminal part 43 that connects the central line 42 to the wheels 13.

接地引通線41は、VVVFインバータ20及びSIV30を含む複数の電気機器がそれぞれ接続される部位であり、別の車両に設けた接地引通線に連結部14を介して接続可能に構成されている。 The grounding line 41 is a portion to which multiple electrical devices including the VVVF inverter 20 and the SIV 30 are connected, and is configured to be connectable to a grounding line provided in another vehicle via the connecting portion 14.

集約線42は、複数の電気機器が接続された接地引通線41と、複数の車輪13が接続された接地端子部43との間の電流をまとめるための1本の電線である。なお、接地引通線41と接地端子部43との間を複数の電線で連結し、その複数の電線を1束にまとめたものを集約線42としても良い。 The aggregated wire 42 is a single electric wire for consolidating the current between the grounding wire 41, to which multiple electrical devices are connected, and the grounding terminal portion 43, to which multiple wheels 13 are connected. Note that the aggregated wire 42 may be formed by connecting the grounding wire 41 and the grounding terminal portion 43 with multiple electric wires and bundling the multiple electric wires into a single bundle.

接地端子部43は、鉄道車両10に設けた全ての車輪13を同電位とするための部位である。接地端子部43と複数の車輪13とを繋ぐ各電線の抵抗値を同一とすることで、それらの複数の車輪13が同電位となる。これにより、複数の車輪13を流れる電流値をそれぞれ均一化でき、不均等による迷走電流の発生を抑制できる。 The ground terminal portion 43 is a portion for making all the wheels 13 installed on the railway vehicle 10 have the same potential. By making the resistance value of each electric wire connecting the ground terminal portion 43 and the multiple wheels 13 the same, the multiple wheels 13 have the same potential. This makes it possible to equalize the current values flowing through the multiple wheels 13, thereby suppressing the generation of stray currents due to uneven currents.

また、接地端子部43に車体12が電気的に接続されることで、車体12が集約線42を介さずに接地される。なお、接地端子部43と車体12との間に抵抗器(図示せず)を介することで、レール2から車体12へと吸い上げる迷走電流の発生を抑制できる。 In addition, the car body 12 is electrically connected to the ground terminal portion 43, so that the car body 12 is grounded without going through the aggregated wire 42. By placing a resistor (not shown) between the ground terminal portion 43 and the car body 12, the generation of stray currents that are drawn up from the rail 2 to the car body 12 can be suppressed.

VVVFインバータ20及びSIV30はいずれも、供給線18から入力される直流電力を交流電力に変換・調整して出力する変換装置である。VVVFインバータ20及びSIV30の入力側には、分岐した供給線18が接続される正極端子と、接地引通線41から分岐した接地側電線45が接続される負極端子とがそれぞれ設けられている。 Both the VVVF inverter 20 and the SIV 30 are conversion devices that convert and adjust the DC power input from the supply line 18 into AC power and output it. On the input side of the VVVF inverter 20 and the SIV 30, there is provided a positive terminal to which the branched supply line 18 is connected, and a negative terminal to which the ground side electric wire 45 branched from the ground lead line 41 is connected.

接地側電線45と接地引通線41との間には、手動操作に応じて電路を開閉する手動開閉器(S)46aが設けられる。これにより、手動開閉器46aが閉じていれば、接地側電線45が接地され、接地線40の一部を構成する。 A manual switch (S) 46a that opens and closes the electrical circuit in response to manual operation is provided between the ground side electric wire 45 and the ground lead wire 41. As a result, when the manual switch 46a is closed, the ground side electric wire 45 is grounded and forms part of the ground wire 40.

なお、後述する手動開閉器46b~46gは、配置が異なる以外は手動開閉器46aと同一に構成される。以下、手動開閉器46a~46gを区別せずに説明する場合、手動開閉器46と称す。 Note that manual switches 46b to 46g, which will be described later, are configured identically to manual switch 46a, except for their different locations. Hereinafter, when manual switches 46a to 46g are described without distinction, they will be referred to as manual switch 46.

手動開閉器46を設けることにより、従来通りの定期検査で鉄道車両10の各部の絶縁抵抗を計測(漏洩電流を検出)できる。具体的に定期検査では、パンタグラフ17を下降させて架線4から供給線18への電力の供給を遮断した状態で、全ての手動開閉器46を手動で開き、供給線18やVVVFインバータ20、SIV30等の検査対象を接地線40から切り離す。その後、検査対象と、接地線40や車体12等の接地部とに接続した絶縁抵抗の計測器(図示せず)によって、接地部に電圧を印加し、その電圧印加に基づいて検査対象に生じる漏洩電流を検出し、接地部に対する検査対象の絶縁抵抗を計測する。 By providing the manual switches 46, the insulation resistance of each part of the railway vehicle 10 can be measured (leakage current can be detected) by performing a conventional periodic inspection. Specifically, in a periodic inspection, the pantograph 17 is lowered to cut off the power supply from the overhead line 4 to the supply line 18, and all manual switches 46 are manually opened to disconnect the inspection objects such as the supply line 18, VVVF inverter 20, and SIV 30 from the ground wire 40. After that, a voltage is applied to the ground by an insulation resistance measuring instrument (not shown) connected to the inspection object and the ground part of the ground wire 40 or the car body 12, and the leakage current generated in the inspection object based on the applied voltage is detected, and the insulation resistance of the inspection object relative to the ground part is measured.

なお、この定期検査以外では、手動開閉器46は閉じており、パンタグラフ17が架線4に接触することで、鉄道車両10は通電状態となる。この通電時にVVVFインバータ20及びSIV30が作動する。 Except for this periodic inspection, the manual switch 46 is closed and the pantograph 17 comes into contact with the overhead line 4, bringing the railway vehicle 10 into a powered state. When powered, the VVVF inverter 20 and the SIV 30 operate.

VVVFインバータ20は、供給線18から入力された直流電力を三相交流電力へ変換する装置であり、その三相交流電力を電動機用電線24へ出力する。この電動機用電線24が途中で分岐して複数の電動機22にそれぞれ接続され、電動機用電線24から供給される三相交流電力により電動機22が作動する。 The VVVF inverter 20 is a device that converts the DC power input from the supply line 18 into three-phase AC power, and outputs the three-phase AC power to the electric motor wire 24. The electric motor wire 24 branches out along the way and is connected to a number of electric motors 22, which are operated by the three-phase AC power supplied from the electric motor wire 24.

VVVFインバータ20は、出力する交流電力の電圧および周波数を可変制御可能に構成されている。この交流電力の電圧および周波数の制御に応じて、電動機22の回転数およびトルクが制御され、鉄道車両10の走行速度が制御される。また、VVVFインバータ20は、電動機22を発電機として作動させる回生ブレーキ時に、電動機22で生じた交流電力を直流電力に変換する。この回生ブレーキ時には、レール2から接地線40、VVVFインバータ20、供給線18を介して架線4へ直流電流が流れる。 The VVVF inverter 20 is configured to be able to variably control the voltage and frequency of the AC power it outputs. In response to the control of the voltage and frequency of this AC power, the rotation speed and torque of the electric motor 22 are controlled, and the running speed of the railway vehicle 10 is controlled. Furthermore, during regenerative braking, in which the electric motor 22 is operated as a generator, the VVVF inverter 20 converts the AC power generated by the electric motor 22 into DC power. During this regenerative braking, a DC current flows from the rail 2 to the overhead line 4 via the ground line 40, the VVVF inverter 20, and the supply line 18.

電動機用電線24は、3本の電線24u,24v,24wが1組になって構成される。電動機22は、三相交流電力により作動する三相誘導電動機であり、3本の電線24u,24v,24wのうち2本ずつがそれぞれ接続される3本のコイルが内蔵されている。 The electric motor wires 24 are composed of a set of three electric wires 24u, 24v, and 24w. The electric motor 22 is a three-phase induction motor that operates on three-phase AC power and has three built-in coils to which two of the three electric wires 24u, 24v, and 24w are connected.

SIV30は、供給線18から入力された直流電力を三相交流電力へ変換する装置であり、その三相交流電力を第1低圧交流電路32へ出力する。SIV30は、固定電圧(本実施形態では440V)および固定周波数の交流電力を出力する。また、SIV30には、絶縁トランス(図示せず)が内蔵されている。これにより、SIV30の入力側と出力側とが絶縁される。このSIV30の出力側には、手動開閉器46bを介し接地引通線41に接続される電線31が設けられている。 The SIV 30 is a device that converts DC power input from the supply line 18 into three-phase AC power, and outputs the three-phase AC power to the first low-voltage AC circuit 32. The SIV 30 outputs AC power of a fixed voltage (440 V in this embodiment) and a fixed frequency. The SIV 30 also includes an isolation transformer (not shown). This insulates the input side from the output side of the SIV 30. The output side of the SIV 30 is provided with an electric wire 31 that is connected to the grounding line 41 via a manual switch 46b.

第1低圧交流電路32は、鉄道車両10の両端の連結部14間に引き通され、連結部14を介して別の車両へ電力を供給可能に構成されている。更に、第1低圧交流電路32は、3本の電線32u,32v,32wが1組になって構成される。 The first low-voltage AC circuit 32 is laid between the coupling parts 14 at both ends of the railway vehicle 10 and is configured to be able to supply power to another vehicle via the coupling parts 14. Furthermore, the first low-voltage AC circuit 32 is configured as a set of three electric wires 32u, 32v, and 32w.

第1低圧交流電路32(電線32u,32v,32w)には、三相交流電力によって作動する複数の三相交流機器15(電気機器の一種)が接続されている。各図面では、複数の三相交流機器15のうち1つを代表して示している。三相交流機器15としては、鉄道車両10の客室の温度を調整する空調機器や、電動空気圧縮機、換気装置、冷却用送風機などが例示される。 A number of three-phase AC devices 15 (a type of electrical equipment) that operate on three-phase AC power are connected to the first low-voltage AC circuit 32 (electrical wires 32u, 32v, 32w). In each drawing, one of the multiple three-phase AC devices 15 is shown as a representative. Examples of three-phase AC devices 15 include air conditioning equipment that adjusts the temperature in the passenger compartment of the railway vehicle 10, an electric air compressor, a ventilation system, and a cooling fan.

第1低圧交流電路32には、絶縁トランス34を介して第2低圧交流電路36が接続される。絶縁トランス34は、第1低圧交流電路32に接続される1次巻線と、第2低圧交流電路36に接続される2次巻線とを同一の鉄心に巻きつけたものであり、1次巻線と2次巻線とが絶縁されている。絶縁トランス34は、第1低圧交流電路32から入力された交流電力の電圧を変圧して第2低圧交流電路36に出力する。 The second low-voltage AC circuit 36 is connected to the first low-voltage AC circuit 32 via an isolation transformer 34. The isolation transformer 34 has a primary winding connected to the first low-voltage AC circuit 32 and a secondary winding connected to the second low-voltage AC circuit 36 wound around the same iron core, and the primary winding and secondary winding are insulated from each other. The isolation transformer 34 transforms the voltage of the AC power input from the first low-voltage AC circuit 32 and outputs it to the second low-voltage AC circuit 36.

第2低圧交流電路36は、第1低圧交流電路32と同様に、鉄道車両10の両端の連結部14間に引き通され、連結部14を介して別の車両へ電力を供給可能に構成されている。更に、第2低圧交流電路36は、3本の電線36r,36n,36tが1組になって構成される。 The second low-voltage AC circuit 36, like the first low-voltage AC circuit 32, is laid between the coupling parts 14 at both ends of the railway vehicle 10 and is configured to be able to supply power to another vehicle via the coupling parts 14. Furthermore, the second low-voltage AC circuit 36 is configured as a set of three electric wires 36r, 36n, and 36t.

電線36nは、手動開閉器46cを介し接地引通線41に接続される。そのため、手動開閉器46cが閉じていれば、電線36nが接地され、接地引通線41が電線36n(第2低圧交流電路36の一部)としても機能する。絶縁トランス34は、この電線36nに対する電線36rの電位差と、電線36nに対する電線36tの電位差とがそれぞれ100Vとなるように単相の交流電力をそれぞれ出力する。即ち、絶縁トランス34は、三相交流を単相3線式の交流に変換して出力する。 The electric wire 36n is connected to the grounding line 41 via the manual switch 46c. Therefore, when the manual switch 46c is closed, the electric wire 36n is grounded, and the grounding line 41 also functions as the electric wire 36n (part of the second low-voltage AC circuit 36). The insulating transformer 34 outputs single-phase AC power so that the potential difference between the electric wire 36r and the electric wire 36t and the electric wire 36n are each 100V. In other words, the insulating transformer 34 converts the three-phase AC to single-phase three-wire AC and outputs it.

電線36r,36tと接地引通線41(電線36n)との間には、接地引通線41側に手動開閉器46dを介して複数の単相交流機器16(電気機器の一種)が接続される。各図面では、複数の単相交流機器16のうち1つを代表して示し、例えば図1では、電線36rと接地引通線41との間に接続される1つの単相交流機器16を代表して示している。単相交流機器16は、絶縁トランス34で変換された単相の交流電力によって作動する機器であり、鉄道車両10の客室を照らす照明や、ヒータなどが例示される。 A number of single-phase AC devices 16 (a type of electrical equipment) are connected between the electric wires 36r, 36t and the grounding wire 41 (electric wire 36n) on the grounding wire 41 side via a manual switch 46d. In each drawing, one of the multiple single-phase AC devices 16 is shown as a representative, and for example, in FIG. 1, one single-phase AC device 16 connected between the electric wire 36r and the grounding wire 41 is shown as a representative. The single-phase AC device 16 is a device that operates with single-phase AC power converted by the isolation transformer 34, and examples of the single-phase AC device 16 include lighting that illuminates the passenger compartment of the railway vehicle 10 and heaters.

また、電線36r,36tと接地引通線41との間には、電線36r,36t側に整流器(図示せず)を介し、接地引通線41側に手動開閉器46eを介して、複数の直流機器19(電気機器の一種)が接続される。各図面では、複数の直流機器19のうち1つを代表して示し、例えば図1では、電線36tと接地引通線41との間に接続される1つの直流機器19を代表して示している。 In addition, multiple DC devices 19 (a type of electrical equipment) are connected between the electric wires 36r, 36t and the grounding wire 41 via a rectifier (not shown) on the electric wires 36r, 36t side and via a manual switch 46e on the grounding wire 41 side. In each drawing, one of the multiple DC devices 19 is shown as a representative, and for example, in Figure 1, one DC device 19 connected between the electric wire 36t and the grounding wire 41 is shown as a representative.

なお、直流機器19は、絶縁トランス34からの交流電力を整流器で変換した直流電力によって作動する機器であり、扉の開閉装置やブレーキ制御装置などが例示される。但し、ブレーキ制御装置は、非常時に備えて蓄電池(図示せず)で作動するように構成されている。 The DC equipment 19 is equipment that operates on DC power obtained by converting AC power from the isolation transformer 34 using a rectifier, and examples of such equipment include door opening and closing devices and brake control devices. However, the brake control device is configured to operate on a storage battery (not shown) in case of an emergency.

以上説明した鉄道車両10の電気回路には、各部の絶縁抵抗の劣化などによって漏洩電流が生じることがある。この漏洩電流を監視するための漏洩電流監視装置80が鉄道車両10に搭載されている。漏洩電流監視装置80は、供給線18が通される供給側変流器87と、接地線40が通される接地側変流器88と、供給線18と接地線40との間の電位差を計測する電位差検出部89と、を備えている。 In the electrical circuits of the railway vehicle 10 described above, leakage current may occur due to deterioration of the insulation resistance of each part. A leakage current monitoring device 80 for monitoring this leakage current is installed on the railway vehicle 10. The leakage current monitoring device 80 includes a supply side current transformer 87 through which the supply line 18 passes, a ground side current transformer 88 through which the ground line 40 passes, and a potential difference detection unit 89 that measures the potential difference between the supply line 18 and the ground line 40.

供給側変流器(供給側計測器)87及び接地側変流器(接地側計測器)88はいずれも、計測対象となる電線が貫通する環状の変流器から構成された計測器であり、その貫通部分を流れる電流値を計測する。より具体的に、変流器とは、通電により電線の貫通部分に生じた磁界を計測し、その磁界に基づいて電流の値を計測(算出)するものである。本実施形態における供給側変流器87及び接地側変流器88は、直流の電流値を計測可能に構成されているが、その構成は既知であるため説明を省略する。 The supply side current transformer (supply side measuring instrument) 87 and the ground side current transformer (ground side measuring instrument) 88 are both measuring instruments consisting of an annular current transformer through which the electric wire to be measured passes, and measure the value of the current flowing through the pass-through part. More specifically, a current transformer measures the magnetic field generated at the pass-through part of the electric wire by the passage of current, and measures (calculates) the value of the current based on the magnetic field. The supply side current transformer 87 and the ground side current transformer 88 in this embodiment are configured to be able to measure the value of a direct current, but as their configuration is known, a description thereof will be omitted.

供給側変流器87は、供給線18のうちVVVFインバータ20側とSIV30側とへ分岐する前の部位が通され、その部位の電流値A1を計測する。これにより、1つの供給側変流器87で、パンタグラフ17から鉄道車両10内部の電気回路へ供給される電流値A1の略全量を計測できる。 The supply side current transformer 87 is passed through the portion of the supply line 18 before it branches off to the VVVF inverter 20 side and the SIV 30 side, and measures the current value A1 at that portion. This allows one supply side current transformer 87 to measure substantially the entire amount of the current value A1 supplied from the pantograph 17 to the electrical circuit inside the railway vehicle 10.

なお、供給線18のうちVVVFインバータ20側とSIV30側とへ分岐した部分に、それぞれ供給側変流器87を配置しても良い。この場合には、2つの供給側変流器87の電流値の合計が、パンタグラフ17から鉄道車両10内部の電気回路へ供給される電流値A1の略全量となる。 In addition, a supply side current transformer 87 may be placed on each of the portions of the supply line 18 that branch off to the VVVF inverter 20 side and the SIV 30 side. In this case, the sum of the current values of the two supply side current transformers 87 is approximately the entire current value A1 supplied from the pantograph 17 to the electrical circuit inside the railway vehicle 10.

接地側変流器88は、接地線40の集約線42が通され、その集約線42の電流値A2を計測する。これにより、例えば、集約線42を迂回せずに流れる電流(漏洩電流以外の電流)を、集約線42で合流した後であって複数の車輪13へ分流される前に接地側変流器88でまとめて検出できる。 The ground side current transformer 88 passes through the aggregated wire 42 of the ground wire 40 and measures the current value A2 of the aggregated wire 42. This allows, for example, the current that flows without bypassing the aggregated wire 42 (current other than leakage current) to be detected collectively by the ground side current transformer 88 after it joins with the aggregated wire 42 and before it is diverted to the multiple wheels 13.

電位差検出部89は、既知の電圧計であり、供給側変流器87が配置された位置の供給線18と、接地側変流器88が配置された位置の集約線42との間の電位差(電圧)V1を計測する。即ち、電位差検出部89は、パンタグラフ17と接地端子部43との間の電位差V1を計測しているとも言える。 The potential difference detection unit 89 is a known voltmeter that measures the potential difference (voltage) V1 between the supply line 18 at the position where the supply side current transformer 87 is located and the aggregated line 42 at the position where the ground side current transformer 88 is located. In other words, it can be said that the potential difference detection unit 89 measures the potential difference V1 between the pantograph 17 and the ground terminal unit 43.

更に本実施形態では、接地端子部43とレール2(各車輪13)との間の電位差を0[V]と仮定する。この場合、電位差検出部89は、パンタグラフ17とレール2との間の電位差を計測しているとも言える。 Furthermore, in this embodiment, the potential difference between the ground terminal portion 43 and the rail 2 (each wheel 13) is assumed to be 0 [V]. In this case, it can be said that the potential difference detection unit 89 measures the potential difference between the pantograph 17 and the rail 2.

このような漏洩電流監視装置80による漏洩電流の監視方法について、図1に加え図2を参照して説明する。図2(a)は、供給側変流器87で計測された電流値A1と、接地側変流器88で計測された電流値A2との経時変化を示すグラフである。図2(b)は、鉄道車両10の電気回路で生じた漏洩電流の値の経時変化を示すグラフである。 The method of monitoring leakage current using such leakage current monitoring device 80 will be described with reference to FIG. 2 in addition to FIG. 1. FIG. 2(a) is a graph showing the change over time of current value A1 measured by supply side current transformer 87 and current value A2 measured by ground side current transformer 88. FIG. 2(b) is a graph showing the change over time of the value of leakage current generated in the electrical circuit of railway vehicle 10.

図2(a)及び図2(b)のグラフの縦軸はいずれも、電流値[A]である。図2(a)及び図2(b)のグラフの横軸はいずれも、時間[s]である。また、図2(a)のグラフには、供給側変流器87の電流値A1の経時変化が実線で示され、接地側変流器88の電流値A2の経時変化が破線で示されている。なお、図2(a)において、実際には重なる部分の実線と破線とを、グラフの見易さの観点から若干ずらして示している。 The vertical axis of the graphs in both Fig. 2(a) and Fig. 2(b) is the current value [A]. The horizontal axis of the graphs in both Fig. 2(a) and Fig. 2(b) is the time [s]. In addition, in the graph in Fig. 2(a), the change over time of the current value A1 of the supply side current transformer 87 is shown by a solid line, and the change over time of the current value A2 of the ground side current transformer 88 is shown by a dashed line. Note that in Fig. 2(a), the solid and dashed lines in the overlapping portions are shown slightly shifted from one another in order to make the graph easier to read.

鉄道車両10の電気回路に全く漏洩電流が生じていない場合には、基本的に、供給側変流器87(供給線18)を通った電流の全部が、接地側変流器88(集約線42)を通る。そのため、漏洩電流が生じていない時間において、図2(a)のグラフでは、供給側変流器87及び接地側変流器88の電流値A1,A2が同一となり、図2(b)のグラフでは、漏洩電流の値が0[A]となる。 When no leakage current is occurring in the electric circuit of the railway vehicle 10, essentially all of the current that passes through the supply side current transformer 87 (supply line 18) passes through the ground side current transformer 88 (aggregated line 42). Therefore, during a time when no leakage current is occurring, the current values A1 and A2 of the supply side current transformer 87 and the ground side current transformer 88 are the same in the graph of FIG. 2(a), and the leakage current value is 0 [A] in the graph of FIG. 2(b).

一方、例えば電動機22から車体12への漏洩電流のみが生じてその他の漏洩電流が生じていない場合には、電動機22の漏洩電流が車体12を通り、集約線42を迂回して接地端子部43からレール2へ流れる。即ち、供給側変流器87を通った電流が、接地側変流器88(集約線42)を通る正常なルートと、集約線42を通らない漏洩電流のルートとに分かれる。そのため電動機22の漏洩電流のみが生じた時間において、図2(a)のグラフでは、供給側変流器87の電流値A1よりも接地側変流器88の電流値A2が下がり、図2(b)のグラフでは、それらの電流値の差分が漏洩電流の値となって示される。 On the other hand, for example, when only leakage current from the electric motor 22 to the car body 12 occurs and no other leakage current occurs, the leakage current of the electric motor 22 passes through the car body 12, bypasses the aggregated wire 42, and flows from the ground terminal 43 to the rail 2. That is, the current that passes through the supply side current transformer 87 is divided into a normal route that passes through the ground side current transformer 88 (aggregated wire 42) and a leakage current route that does not pass through the aggregated wire 42. Therefore, in the graph of FIG. 2(a), at the time when only leakage current of the electric motor 22 occurs, the current value A2 of the ground side current transformer 88 is lower than the current value A1 of the supply side current transformer 87, and in the graph of FIG. 2(b), the difference between these current values is shown as the leakage current value.

なお、鉄道車両10に架線4から供給される電圧は、同一の架線4に接続された別の車両からの影響や、変電所6から鉄道車両10までの距離などによって変化する。その変化によってパンタグラフ17と接地端子部43との間の電位差(電位差検出部89の電位差)V1が変化し、その電位差V1に反比例して、図2(a)のように供給側変流器87及び接地側変流器88の電流値がそれぞれ変動する。図2(a)には、電流値のグラフの上側に、その電流値の取得時における電位差V1が示されている。 The voltage supplied to the railway vehicle 10 from the overhead line 4 varies depending on the influence of other vehicles connected to the same overhead line 4, the distance from the substation 6 to the railway vehicle 10, and other factors. This variation causes a change in the potential difference V1 between the pantograph 17 and the ground terminal unit 43 (the potential difference of the potential difference detection unit 89), and the current values of the supply side current transformer 87 and the ground side current transformer 88 vary inversely proportional to this potential difference V1, as shown in Figure 2(a). In Figure 2(a), the potential difference V1 at the time the current value was obtained is shown above the current value graph.

よって、供給側変流器87の電流値A1の変動だけ、又は、接地側変流器88の電流値A2の変動だけから漏洩電流を精度良く検出することは困難である。しかし、上述の通り、電流値A1と電流値A2との差分を監視することで、電位差V1が変動しても、電動機22に生じた漏洩電流の値を精度良く算出でき、漏洩電流の検出精度を向上できる。 Therefore, it is difficult to accurately detect leakage current from only the fluctuations in current value A1 of the supply side current transformer 87 or only the fluctuations in current value A2 of the ground side current transformer 88. However, as described above, by monitoring the difference between current value A1 and current value A2, the value of the leakage current generated in the motor 22 can be accurately calculated even if the potential difference V1 fluctuates, and the detection accuracy of the leakage current can be improved.

また、漏洩電流も電位差V1に反比例して変動するため、図2(b)のグラフには、その電位差V1が1500[V]である場合に補正(換算)した漏洩電流の値(差分Ad)を示している。具体的に、電位差V1が1500[V]である場合には、電流値A1,A2の差分を、そのまま補正後の漏洩電流の値とする。電位差V1が1800[V]である場合には、電流値A1,A2の差分を1.2倍し、補正後の漏洩電流の値とする。電位差V1が1300[V]である場合には、電流値A1,A2の差分を約0.87倍し、補正後の漏洩電流の値とする。よって、漏洩電流の値が閾値を超えたかを判断するとき、その判断が電位差V1の変動に影響を受けることを抑制できる。 In addition, since the leakage current also varies inversely proportionally to the potential difference V1, the graph in FIG. 2(b) shows the corrected (converted) leakage current value (difference Ad) when the potential difference V1 is 1500 [V]. Specifically, when the potential difference V1 is 1500 [V], the difference between the current values A1 and A2 is used as is as the corrected leakage current value. When the potential difference V1 is 1800 [V], the difference between the current values A1 and A2 is multiplied by 1.2 to obtain the corrected leakage current value. When the potential difference V1 is 1300 [V], the difference between the current values A1 and A2 is multiplied by approximately 0.87 to obtain the corrected leakage current value. Therefore, when determining whether the leakage current value has exceeded the threshold value, the determination can be prevented from being affected by the variation in the potential difference V1.

なお、図2(a)及び図2(b)を用いて電動機22の漏洩電流のみが生じた場合について説明したが、漏洩電流の生じた位置に応じて漏洩電流のルートが変化し、供給側変流器87の電流値A1や接地側変流器88の電流値A2の変動の仕方も変化する。例えば、漏洩電流の発生の有無に関わらず電流値A2が電位差V1に反比例し、漏洩電流の発生時に電流値A1のみが電流値A2に対して漏洩電流の分だけ上昇することが考えられる。 2(a) and 2(b) are used to explain the case where only leakage current occurs in the motor 22, but the route of the leakage current changes depending on the position where the leakage current occurs, and the way in which the current value A1 of the supply side current transformer 87 and the current value A2 of the ground side current transformer 88 fluctuate also changes. For example, it is conceivable that regardless of whether leakage current occurs, the current value A2 is inversely proportional to the potential difference V1, and when leakage current occurs, only the current value A1 increases relative to the current value A2 by the amount of the leakage current.

供給線18やVVVFインバータ20、SIV30の入力側から車体12への漏洩電流のみが生じた場合は、電動機22の漏洩電流のみが生じた場合と同様に、漏洩電流が車体12から集約線42を迂回して接地端子部43からレール2へ流れる。そのため、これらの場合も、上述した通り電流値A1,A2の差分から、供給線18等で生じた漏洩電流の値を精度良く算出でき、漏洩電流監視装置80による漏洩電流の検出精度を向上できる。 When only leakage current occurs from the input side of the supply line 18, VVVF inverter 20, or SIV 30 to the car body 12, the leakage current bypasses the aggregated line 42 and flows from the car body 12 to the ground terminal 43 and to the rail 2, just as when only leakage current occurs in the electric motor 22. Therefore, in these cases as well, the value of the leakage current occurring in the supply line 18, etc. can be accurately calculated from the difference between the current values A1 and A2 as described above, and the accuracy of detection of the leakage current by the leakage current monitoring device 80 can be improved.

また、電位差V1に対し電流値A1,A2の両方が反比例して変動すると共に、電流値A1に対し電流値A2が下がった場合には、その電流値A2が下がった時点で、電動機22や供給線18、VVVFインバータ20、SIV30から車体12への漏洩電流が生じたと、漏洩電流監視装置80の計測結果から推定できる。 In addition, if both current values A1 and A2 fluctuate inversely proportional to potential difference V1 and current value A2 drops relative to current value A1, it can be inferred from the measurement results of leakage current monitoring device 80 that leakage current has occurred from motor 22, supply line 18, VVVF inverter 20, or SIV 30 to vehicle body 12 at the point when current value A2 drops.

SIV30から出力される三相交流は、第1低圧交流電路32を介し三相交流機器15を通ってSIV30に戻る。但し、この三相交流の一部は、三相交流機器15の種類にもよるが、接地引通線41及び電線31を通ってSIV30に戻ることもある。これら三相交流機器15や第1低圧交流電路32と車体12との間で漏洩電流が生じた場合、その交流の漏洩電流は、SIV30へ戻るように接地端子部43、集約線42、電線31を通る。また、漏洩電流によってSIV30の出力側を通る電流値が増加すると、SIV30に内蔵された絶縁トランスの巻線比に応じ、SIV30の入力側を通る(供給線18から接地線40へ流れる)電流値も増加する。 The three-phase AC output from the SIV 30 returns to the SIV 30 through the three-phase AC device 15 via the first low-voltage AC circuit 32. However, depending on the type of the three-phase AC device 15, some of the three-phase AC may return to the SIV 30 through the grounding lead-in wire 41 and the electric wire 31. If a leakage current occurs between the three-phase AC device 15 or the first low-voltage AC circuit 32 and the vehicle body 12, the AC leakage current passes through the ground terminal 43, the aggregated wire 42, and the electric wire 31 to return to the SIV 30. In addition, if the current value passing through the output side of the SIV 30 increases due to the leakage current, the current value passing through the input side of the SIV 30 (flowing from the supply line 18 to the grounding wire 40) also increases according to the winding ratio of the isolation transformer built into the SIV 30.

同様に、絶縁トランス34の出力側における単相交流機器16や第2低圧交流電路36と、車体12との間で漏洩電流が生じた場合、その漏洩電流は、絶縁トランス34へ戻るように接地端子部43、集約線42、電線36nを通る。更に、漏洩電流によって絶縁トランス34の出力側を通る電流値が増加すると、絶縁トランス34の入力側およびSIV30の出力側の電流値が増加し、SIV30の入力側を通る電流値も増加する。 Similarly, if leakage current occurs between the single-phase AC device 16 or the second low-voltage AC circuit 36 on the output side of the isolation transformer 34 and the vehicle body 12, the leakage current passes through the ground terminal 43, the aggregated wire 42, and the electric wire 36n so as to return to the isolation transformer 34. Furthermore, if the current value passing through the output side of the isolation transformer 34 increases due to the leakage current, the current value on the input side of the isolation transformer 34 and the output side of the SIV 30 increases, and the current value passing through the input side of the SIV 30 also increases.

このように、SIV30の出力側または絶縁トランス34の出力側の電気回路で漏洩電流が生じた場合、電位差V1の増加とは無関係に電流値A1,A2の両方が同じだけ上昇した上で、交流の漏洩電流により電流値A2が増減を繰り返す。よってこの場合にも、電流値A1と電流値A2との差分Adから、漏洩電流の値を精度良く算出でき、漏洩電流の検出精度を向上できる。また、漏洩電流監視装置80の計測結果から、このような電流値A1,A2の変動がみられた場合には、SIV30の出力側または絶縁トランス34の出力側の電気回路で漏洩電流が生じたと推定できる。 In this way, if leakage current occurs in the electrical circuit on the output side of SIV30 or the output side of isolation transformer 34, both current values A1 and A2 increase by the same amount regardless of the increase in potential difference V1, and current value A2 repeatedly increases and decreases due to the AC leakage current. Therefore, even in this case, the value of leakage current can be accurately calculated from the difference Ad between current value A1 and current value A2, improving the accuracy of leakage current detection. Furthermore, if such fluctuations in current values A1 and A2 are observed from the measurement results of leakage current monitoring device 80, it can be assumed that leakage current has occurred in the electrical circuit on the output side of SIV30 or the output side of isolation transformer 34.

更に、漏洩電流監視装置80は、架線4から供給線18へ電流が流れる電力供給時の漏洩電流だけでなく、供給線18から架線4へ電流が流れる回生ブレーキ時の漏洩電流も検出できる。回生ブレーキ時の電流の向きは、電力供給時の直流電力の向きが逆になるだけなので、漏洩電流監視装置80は、電力供給時と略同一の方法で回生ブレーキ時の漏洩電流を検出できる。更に、電流の向きから漏洩電流が電力供給時または回生ブレーキ時のいずれで発生したかを、漏洩電流監視装置80の検出結果から解析できる。 Furthermore, the leakage current monitoring device 80 can detect not only leakage current during power supply when current flows from the overhead line 4 to the supply line 18, but also leakage current during regenerative braking when current flows from the supply line 18 to the overhead line 4. Since the direction of current during regenerative braking is simply the opposite of the direction of DC power during power supply, the leakage current monitoring device 80 can detect leakage current during regenerative braking in approximately the same manner as during power supply. Furthermore, based on the direction of the current, it can be analyzed from the detection results of the leakage current monitoring device 80 to determine whether the leakage current occurred during power supply or regenerative braking.

次に図3~図10を参照して、漏洩電流監視装置80を搭載した鉄道車両10の各部の制御についてより詳しく説明する。図3は、鉄道車両10の電気的構成を示したブロック図である。 Next, the control of each part of the railway vehicle 10 equipped with the leakage current monitoring device 80 will be described in more detail with reference to Figures 3 to 10. Figure 3 is a block diagram showing the electrical configuration of the railway vehicle 10.

図3に示すように、鉄道車両10の制御装置60は、CPU61と、ハードディスクドライブ(HDD)62と、CPU61のプログラムの実行時に各種のワークデータやフラグ等を書き換え可能に記憶するためのメモリであるRAM63とを有し、これらはバスライン64を介して、入出力ポート65にそれぞれ接続されている。 As shown in FIG. 3, the control device 60 of the railway vehicle 10 has a CPU 61, a hard disk drive (HDD) 62, and a RAM 63, which is a memory for rewritably storing various work data, flags, etc. when the CPU 61 executes a program, and these are each connected to an input/output port 65 via a bus line 64.

入出力ポート65には、更に、VVVFインバータ20と、SIV30と、コントローラ66と、三相交流機器15と、単相交流機器16と、直流機器19と、位置検出装置67と、速度センサ68と、温度センサ69と、湿度センサ70と、漏洩電流監視装置80と、インターネット等を介して外部サーバ90との間で情報を送受信する無線通信装置71と、がそれぞれ接続されている。 Further connected to the input/output port 65 are a VVVF inverter 20, an SIV 30, a controller 66, a three-phase AC device 15, a single-phase AC device 16, a DC device 19, a position detection device 67, a speed sensor 68, a temperature sensor 69, a humidity sensor 70, a leakage current monitoring device 80, and a wireless communication device 71 that transmits and receives information to and from an external server 90 via the Internet or the like.

CPU61は、バスライン64により接続された各部を制御する演算装置である。HDD62は、CPU61により実行されるプログラムや各種データ等を格納した書き換え可能な不揮発性のメモリであり、制御プログラム62aが設けられる。CPU61によって制御プログラム62aが実行されると、図4のメイン処理が実行される。 The CPU 61 is a computing device that controls each part connected by the bus line 64. The HDD 62 is a rewritable non-volatile memory that stores the programs executed by the CPU 61 and various data, and is provided with a control program 62a. When the control program 62a is executed by the CPU 61, the main processing of FIG. 4 is executed.

コントローラ66は、VVVFインバータ20やブレーキを制御するために、鉄道車両10の運転台に搭載されて運転士が操作する機器である。コントローラ66は、VVVFインバータ20の制御により電動機22を駆動させる力行(P1,P2・・・)と、電動機22を駆動させずに惰性で鉄道車両10を走行させる惰行(N)と、鉄道車両を減速させるブレーキ(B1,B2・・・)と、を切り換える。 The controller 66 is a device mounted in the cab of the railcar 10 and operated by the driver to control the VVVF inverter 20 and the brakes. The controller 66 switches between powering (P1, P2...) in which the electric motor 22 is driven by controlling the VVVF inverter 20, coasting (N) in which the railcar 10 runs by inertia without driving the electric motor 22, and braking (B1, B2...) to decelerate the railcar.

位置検出装置67は、鉄道車両10の走行位置を検出する装置であり、本実施形態ではGPSを利用して鉄道車両10の現在位置を取得するGPS受信機から構成される。位置検出装置67は、GPS受信機に限定されるものではなく、他の位置検出装置を採用することは当然可能である。他の位置検出装置としては、車両のモニタ情報や、軌道側から発せられる信号を受信するアンテナ(トランスポンダ式)、地上の信号装置の地上子位置情報の信号を用いて位置検出する信号受信機、車輪13の回転数を積算して基点からの走行距離を取得する距離計などが例示される。 The position detection device 67 is a device that detects the traveling position of the railway vehicle 10, and in this embodiment, it is composed of a GPS receiver that uses GPS to obtain the current position of the railway vehicle 10. The position detection device 67 is not limited to a GPS receiver, and it is of course possible to adopt other position detection devices. Examples of other position detection devices include an antenna (transponder type) that receives monitor information about the vehicle and signals emitted from the track side, a signal receiver that detects the position using signals from ground coil position information of ground signal devices, and a distance meter that obtains the traveling distance from a base point by integrating the number of rotations of the wheels 13.

速度センサ68は、鉄道車両10の走行速度を検出するためのセンサである。なお、位置検出装置67の位置情報から鉄道車両10の走行速度を算出するようにして、位置検出装置67に速度センサ68の機能を兼ねさせても良い。温度センサ69は、鉄道車両10の周囲の温度(気温)を検出するためのセンサである。湿度センサ70は、鉄道車両10の周囲の湿度を検出するためのセンサである。なお、温度センサ69や湿度センサ70を鉄道車両10に搭載しなくても良い。 The speed sensor 68 is a sensor for detecting the traveling speed of the railcar 10. The position detection device 67 may also function as the speed sensor 68 by calculating the traveling speed of the railcar 10 from the position information of the position detection device 67. The temperature sensor 69 is a sensor for detecting the temperature (air temperature) around the railcar 10. The humidity sensor 70 is a sensor for detecting the humidity around the railcar 10. The temperature sensor 69 and the humidity sensor 70 do not need to be installed on the railcar 10.

次に図4を参照して、鉄道車両10の制御装置60のCPU61で実行されるメイン処理を説明する。図4は、制御装置60のメイン処理のフローチャートである。制御装置60のメイン処理は、パンタグラフ17が上昇して鉄道車両10に架線4から電力が供給され、制御装置60の電源が投入されると実行される。 Next, referring to FIG. 4, the main processing executed by the CPU 61 of the control device 60 of the railway vehicle 10 will be described. FIG. 4 is a flowchart of the main processing of the control device 60. The main processing of the control device 60 is executed when the pantograph 17 rises, power is supplied to the railway vehicle 10 from the overhead line 4, and the control device 60 is powered on.

図4に示すように、メイン処理はまず、各種の走行状態データを取得する(S11)。この走行状態データとは、コントローラ66の操作状態、位置検出装置67で検出した鉄道車両10の走行位置、速度センサ68で検出した鉄道車両10の走行速度、温度センサ69で検出した温度、湿度センサ70で検出した湿度が挙げられる。なお、これらのデータに限らず、鉄道車両10の進行方向、三相交流機器15や単相交流機器16、直流機器19等の使用の有無、その使用時の情報(例えば空調機器の設定温度)、これらの各データを取得した時刻を走行状態データとしても良い。 As shown in FIG. 4, the main process first acquires various running state data (S11). This running state data includes the operation state of the controller 66, the running position of the railcar 10 detected by the position detection device 67, the running speed of the railcar 10 detected by the speed sensor 68, the temperature detected by the temperature sensor 69, and the humidity detected by the humidity sensor 70. In addition to these data, the running state data may also include the direction of travel of the railcar 10, whether or not three-phase AC equipment 15, single-phase AC equipment 16, DC equipment 19, etc. are in use, information on their use (for example, the set temperature of air conditioning equipment), and the time when each of these data was acquired.

S11の処理後、取得した走行状態データを漏洩電流監視装置80へ送信する(S12)。これは、漏洩電流監視装置80で計測される電流値A1,A2に関するデータと、その電流値A1,A2の計測時の走行状態データとを一緒に外部サーバ90へ送信するためである。なお、図示しないが、実際にはS11,S12の処理は、20m秒毎に実行されるように制御されている。 After the process of S11, the acquired driving state data is transmitted to the leakage current monitoring device 80 (S12). This is to transmit data on the current values A1 and A2 measured by the leakage current monitoring device 80 together with the driving state data at the time the current values A1 and A2 were measured to the external server 90. Although not shown, the processes of S11 and S12 are actually controlled to be executed every 20 ms.

S12の処理後、無線通信装置71を介して鉄道車両10と外部サーバ90とが通信可能であるかを確認する(S13)。外部サーバ90と通信可能であれば(S13:Yes)、漏洩電流監視装置80から電流値A1,A2に関するデータを外部サーバ90へ送信するために、外部サーバ90への送信許可信号を漏洩電流監視装置80へ送信する(S14)。 After the process of S12, it is confirmed whether the railway vehicle 10 and the external server 90 can communicate with each other via the wireless communication device 71 (S13). If communication with the external server 90 is possible (S13: Yes), a transmission permission signal to the external server 90 is transmitted to the leakage current monitoring device 80 in order to transmit data related to the current values A1 and A2 from the leakage current monitoring device 80 to the external server 90 (S14).

次いで、その他の処理を実行し(S15)、S11以下の処理を繰り返し実行する。なお、S15の処理としては、鉄道車両10を走行させるための各種処理が挙げられる。また、S13の処理において、外部サーバ90と通信可能でなければ(S13:No)、S14の処理をスキップしてS15の処理を実行する。 Next, other processes are executed (S15), and the processes from S11 onwards are executed repeatedly. The processes of S15 include various processes for running the railway vehicle 10. Also, in the process of S13, if communication with the external server 90 is not possible (S13: No), the process of S14 is skipped and the process of S15 is executed.

次に図5を参照して漏洩電流監視装置80における制御について説明する。図5は、漏洩電流監視装置80の電気的構成を示したブロック図である。図5に示すように、漏洩電流監視装置80は、CPU81と、フラッシュROM82と、RAM83とを有し、これらはバスライン84を介して、入出力ポート85にそれぞれ接続されている。入出力ポート85には、更に、鉄道車両10の入出力ポート65に接続されるインターフェイス(I/F)86と、供給側変流器87と、接地側変流器88と、電位差検出部89と、がそれぞれ接続されている。 Next, the control in the leakage current monitoring device 80 will be described with reference to FIG. 5. FIG. 5 is a block diagram showing the electrical configuration of the leakage current monitoring device 80. As shown in FIG. 5, the leakage current monitoring device 80 has a CPU 81, a flash ROM 82, and a RAM 83, which are each connected to an input/output port 85 via a bus line 84. The input/output port 85 is further connected to an interface (I/F) 86 connected to the input/output port 65 of the railway vehicle 10, a supply side current transformer 87, a ground side current transformer 88, and a potential difference detection unit 89.

CPU81は、バスライン84により接続された各部を制御する演算装置である。フラッシュROM82は、CPU81により実行されるプログラムや固定値データ等を格納した書き換え可能な不揮発性のメモリであり、監視プログラム82aと、固有番号メモリ82bと、ピーク検出メモリ82cと、短期変化検出メモリ82dと、長期変化検出メモリ82eと、サイクル収集メモリ82fと、が設けられる。CPU81により監視プログラム82aが実行されると、図7のメイン処理が実行される。 The CPU 81 is a calculation device that controls each part connected by the bus line 84. The flash ROM 82 is a rewritable non-volatile memory that stores programs executed by the CPU 81, fixed value data, etc., and is provided with a monitoring program 82a, a unique number memory 82b, a peak detection memory 82c, a short-term change detection memory 82d, a long-term change detection memory 82e, and a cycle collection memory 82f. When the CPU 81 executes the monitoring program 82a, the main processing of FIG. 7 is executed.

固有番号メモリ82bは、漏洩電流監視装置80の固有番号が記憶されるメモリである。この固有番号は、漏洩電流監視装置80による電流値A1,A2の計測対象(漏洩電流監視装置80が搭載された鉄道車両10)を示す情報の一部である。外部サーバ90は、漏洩電流監視装置80から、電流値A1,A2に関するデータと、この固有番号とを受信することで、計測対象の鉄道車両10を特定できるように構成されている。 The unique number memory 82b is a memory in which the unique number of the leakage current monitoring device 80 is stored. This unique number is part of the information indicating the measurement target of the current values A1 and A2 by the leakage current monitoring device 80 (the railway vehicle 10 on which the leakage current monitoring device 80 is mounted). The external server 90 is configured to receive data on the current values A1 and A2 and this unique number from the leakage current monitoring device 80, thereby being able to identify the railway vehicle 10 that is the measurement target.

ピーク検出メモリ82c、短期変化検出メモリ82d、長期変化検出メモリ82e、サイクル収集メモリ82fはいずれも、供給側変流器87及び接地側変流器88で計測した電流値A1,A2に関するデータを、外部サーバ90へ送信するまで記憶しておくためのメモリである。即ち、これらの各メモリ82c~82fには、外部サーバ90への送信が許可されたデータが記憶される。 The peak detection memory 82c, the short-term change detection memory 82d, the long-term change detection memory 82e, and the cycle collection memory 82f are all memories for storing data on the current values A1 and A2 measured by the supply side current transformer 87 and the ground side current transformer 88 until they are transmitted to the external server 90. In other words, each of these memories 82c to 82f stores data that is permitted to be transmitted to the external server 90.

RAM83は、CPU81のプログラムの実行時に各種のワークデータやフラグ等を書き換え可能に記憶するためのメモリであり、走行状態リングバッファ83aと、差分リングバッファ83bと、平均値リングバッファ83cと、電位差リングバッファ83dと、が設けられる。 RAM 83 is a memory for rewritably storing various work data, flags, etc. when the CPU 81 executes a program, and is provided with a driving state ring buffer 83a, a difference ring buffer 83b, an average value ring buffer 83c, and a potential difference ring buffer 83d.

図6(a)を参照して走行状態リングバッファ83aの内容を詳しく説明する。走行状態リングバッファ83aは、鉄道車両10で20m秒毎に取得した(制御装置60から20m秒毎に受信した)走行状態データの過去10分間分を記憶するメモリである。そのため、走行状態リングバッファ83aは、No.1~30000で対応付けられた各メモリと、それらのメモリのうち最新の走行状態データが記憶された位置がどれかを記憶するメモリ(図示せず)と、が設けられている。 The contents of the running state ring buffer 83a will be described in detail with reference to FIG. 6(a). The running state ring buffer 83a is a memory that stores the past 10 minutes of running state data acquired by the railway vehicle 10 every 20 ms (received from the control device 60 every 20 ms). For this reason, the running state ring buffer 83a is provided with memories associated with each other by No. 1 to 30,000, and a memory (not shown) that stores the location of the most recent running state data among those memories.

No.1~30000で対応付けられた各メモリとは、各種の走行状態データが記憶されるメモリであって、コントローラ66の操作状態が記憶される制御メモリと、位置検出装置67による鉄道車両10の走行位置が記憶される位置メモリと、速度センサ68による鉄道車両10の走行速度が記憶される速度メモリと、温度センサ69による温度が記憶される温度メモリと、湿度センサ70による湿度が記憶される湿度メモリと、を備える。 The memories associated with No. 1 to 30000 are memories in which various running state data is stored, and include a control memory in which the operating state of the controller 66 is stored, a position memory in which the running position of the railcar 10 detected by the position detection device 67 is stored, a speed memory in which the running speed of the railcar 10 detected by the speed sensor 68 is stored, a temperature memory in which the temperature detected by the temperature sensor 69 is stored, and a humidity memory in which the humidity detected by the humidity sensor 70 is stored.

走行状態リングバッファ83aは、No.1からNo.30000まで順に最新の走行状態データが各メモリに記憶され、No.30000に最新の走行状態データが記憶されたら、再度No.1から順に最新の走行状態データで上書きされる。このように走行状態データが順番に記憶されるので、走行状態リングバッファ83aは、最新の走行状態データが記憶された位置を現在時刻として、それぞれの走行状態データが記憶された時刻(走行状態データを取得・受信した時刻)が分かるように構成されている。なお、走行状態データの取得時の時刻を記憶するメモリを走行状態リングバッファ83aに設けても良い。 The driving state ring buffer 83a stores the latest driving state data in each memory in order from No. 1 to No. 30000, and when the latest driving state data is stored in No. 30000, it is overwritten with the latest driving state data again, starting from No. 1. Since the driving state data is stored in order in this way, the driving state ring buffer 83a is configured to know the time when each driving state data was stored (the time when the driving state data was acquired/received) by using the position where the latest driving state data was stored as the current time. Note that a memory for storing the time when the driving state data was acquired may be provided in the driving state ring buffer 83a.

図5に戻って説明する。差分リングバッファ83bは、電流値A1,A2に基づく差分Adの過去1分間分を記憶するメモリである。差分Adは、供給側変流器87で計測した電流値A1と、接地側変流器88で計測した電流値A2との差分を、電位差検出部89で計測した電位差V1に基づき補正した値であり、1m秒毎に算出される。 Returning to FIG. 5, the differential ring buffer 83b is a memory that stores the difference Ad based on the current values A1 and A2 for the past minute. The difference Ad is a value obtained by correcting the difference between the current value A1 measured by the supply-side current transformer 87 and the current value A2 measured by the ground-side current transformer 88 based on the potential difference V1 measured by the potential difference detection unit 89, and is calculated every 1 ms.

平均値リングバッファ83cは、1分間の差分Adの平均値を過去10分間分記憶するメモリである。なお、1分間の差分Adの平均値は1分毎に算出される。電位差リングバッファ83dは、電位差検出部89で1m秒毎に計測した電位差V1を10分間分記憶するメモリである。これらの各リングバッファ83b~83dは、記憶するデータの内容と記憶容量とが異なるだけで、走行状態リングバッファ83aと同一に構成されている。 The average value ring buffer 83c is a memory that stores the average value of the difference Ad for one minute for the past ten minutes. The average value of the difference Ad for one minute is calculated every minute. The potential difference ring buffer 83d is a memory that stores the potential difference V1 measured every 1 ms by the potential difference detection unit 89 for ten minutes. Each of these ring buffers 83b to 83d is configured in the same way as the driving state ring buffer 83a, except for the content of the data stored and the storage capacity.

次に図7~図10を参照して、漏洩電流監視装置80のCPU81で実行されるメイン処理を説明する。図7は、漏洩電流監視装置80のメイン処理のフローチャートである。図8は、ピーク検出処理S28のフローチャートである。図9は、アベレージ検出処理S29のフローチャートである。図10は、サイクル収集処理S30のフローチャートである。 Next, the main processing executed by the CPU 81 of the leakage current monitoring device 80 will be described with reference to Figures 7 to 10. Figure 7 is a flowchart of the main processing of the leakage current monitoring device 80. Figure 8 is a flowchart of the peak detection process S28. Figure 9 is a flowchart of the average detection process S29. Figure 10 is a flowchart of the cycle collection process S30.

漏洩電流監視装置80のメイン処理は、パンタグラフ17が上昇して鉄道車両10に架線4から電力が供給され、漏洩電流監視装置80の電源が投入された後、1m秒毎に実行される。ピーク検出処理S28、アベレージ検出処理S29及びサイクル収集処理S30は、この漏洩電流監視装置80のメイン処理中に実行される。 The main processing of the leakage current monitoring device 80 is executed every 1 ms after the pantograph 17 is raised, power is supplied to the railway vehicle 10 from the overhead line 4, and the leakage current monitoring device 80 is powered on. The peak detection process S28, the average detection process S29, and the cycle collection process S30 are executed during the main processing of the leakage current monitoring device 80.

図7に示すように、メイン処理はまず、図4のS12の処理で制御装置60から送信された走行状態データを漏洩電流監視装置80が受信した場合、その走行状態データを走行状態リングバッファ83aに記憶する(S21)。なお、図示しないが、制御装置60から漏洩電流監視装置80が走行状態データを受信していない場合には、S21の処理をスキップする。 As shown in FIG. 7, the main process first stores the driving state data transmitted from the control device 60 in the process of S12 in FIG. 4 in the driving state ring buffer 83a (S21) when the leakage current monitoring device 80 receives the driving state data. Note that, although not shown, if the leakage current monitoring device 80 has not received driving state data from the control device 60, the process of S21 is skipped.

S21の処理後、供給側変流器87で計測された電流値A1を取得し(S22)、接地側変流器88で計測された電流値A2を取得する(S23)。次いで、電位差検出部89で計測された電位差V1を取得し、その電位差V1を電位差リングバッファ83dに記憶する(S24)。なお、これら一連のS22~S24の処理では、同一タイミングに計測した電流値A1、電流値A2及び電位差V1を取得する。これは、その計測時に生じた漏洩電流を正確に算出するためである。但し、S22~S24の処理で取得する電流値A1、電流値A2及び電位差V1を計測するタイミングを互いに異ならせても良い。 After the process of S21, the current value A1 measured by the supply side current transformer 87 is obtained (S22), and the current value A2 measured by the ground side current transformer 88 is obtained (S23). Next, the potential difference V1 measured by the potential difference detection unit 89 is obtained, and the potential difference V1 is stored in the potential difference ring buffer 83d (S24). In this series of processes from S22 to S24, the current value A1, current value A2, and potential difference V1 measured at the same timing are obtained. This is to accurately calculate the leakage current that occurred during the measurement. However, the timings at which the current value A1, current value A2, and potential difference V1 are measured in the processes from S22 to S24 may be different from each other.

S24の処理後、電位差V1の基準値である基準電位差Vsを1500[V]に設定する(S25)。なお、基準電位差Vsは、この鉄道車両10に架線4を介して電力を供給する変電所6での起電力に応じて設定すれば良く、例えば変電所6での起電力が25000Vである場合には、S25の処理において基準電位差Vsを25000Vに設定する。 After the process of S24, the reference potential difference Vs, which is the reference value of the potential difference V1, is set to 1500 [V] (S25). The reference potential difference Vs may be set according to the electromotive force at the substation 6 that supplies power to the railway vehicle 10 via the overhead line 4. For example, if the electromotive force at the substation 6 is 25,000 V, the reference potential difference Vs is set to 25,000 V in the process of S25.

S25の処理後、これらの各値に基づき、電流値A1と電流値A2との差分を基準電位差Vs時の値に補正した差分Ad=(A1-A2)・V1/Vsを算出する(S26)。次いで、算出した差分Adを差分リングバッファ83bの最新位置に一時的に記憶する(S27)。その後、一時的に記憶した差分Adに基づき、その差分Adに関するデータを外部サーバ90へ送信可能に記憶するかを判断するピーク検出処理S28、アベレージ検出処理S29、サイクル収集処理S30を順に実行する。 After the process of S25, the difference Ad = (A1 - A2) · V1/Vs is calculated by correcting the difference between the current value A1 and the current value A2 to the value at the reference potential difference Vs based on these values (S26). Next, the calculated difference Ad is temporarily stored in the latest position of the difference ring buffer 83b (S27). After that, based on the temporarily stored difference Ad, peak detection process S28, average detection process S29, and cycle collection process S30 are executed in order to determine whether data related to the difference Ad should be stored so that it can be transmitted to the external server 90.

図8のピーク検出処理S28について、図2(b)を参照しながら説明する。ピーク検出処理S28は、差分リングバッファ83bに一時的に記憶した差分Ad(漏洩電流の値)が異常を疑われる値や、注意・警告を必要とする値である場合、外部サーバ90で解析するために、その差分Adをピーク検出メモリ82cに記憶しておくための処理である。 The peak detection process S28 in FIG. 8 will be described with reference to FIG. 2(b). The peak detection process S28 is a process for storing the difference Ad (leakage current value) temporarily stored in the difference ring buffer 83b in the peak detection memory 82c for analysis by the external server 90 when the difference Ad (leakage current value) is a value suspected of being abnormal or a value requiring attention or warning.

ピーク検出処理S28では、まず、差分リングバッファ83bの最新位置に記憶された差分Adが閾値未満から閾値以上になったかを、即ち、前回位置の差分Adが閾値未満で最新位置の差分Adが閾値以上であるかを判断する(S41)。なお、この閾値としては例えば1mAが挙げられる。差分Adが閾値以上である場合には、漏洩電流監視装置80による監視対象の電気回路に異常な漏洩電流が発生していると疑われる。但し、異常な漏洩電流の発生を予防するために注意・警告を報知できるよう、異常と判断する値よりも小さい値を閾値として設定しても良い。また1mAよりも大きい値を閾値として設定しても良い。 In the peak detection process S28, first, it is determined whether the difference Ad stored in the latest position of the difference ring buffer 83b has changed from less than the threshold to more than the threshold, i.e., whether the difference Ad at the previous position is less than the threshold and the difference Ad at the latest position is more than the threshold (S41). An example of this threshold is 1 mA. If the difference Ad is more than the threshold, it is suspected that an abnormal leakage current is occurring in the electric circuit monitored by the leakage current monitoring device 80. However, in order to prevent the occurrence of abnormal leakage current, a value smaller than the value that is determined to be abnormal may be set as the threshold. A value greater than 1 mA may also be set as the threshold.

S41の処理で、最新位置の差分Adが閾値未満から閾値以上になった場合には(S41:Yes)、ピーク検出メモリ82cへ記憶する範囲を指定するためのスタート位置S(図2(b)参照)が未設定かを確認する(S42)。なお、差分Adが閾値未満のままで15秒以上経過していれば、スタート位置Sは未設定となっている(クリアされている)。 In the process of S41, if the difference Ad of the latest position changes from less than the threshold to equal to or greater than the threshold (S41: Yes), it is checked whether the start position S (see FIG. 2(b)) for specifying the range to be stored in the peak detection memory 82c has not been set (S42). Note that if the difference Ad remains less than the threshold for 15 seconds or more, the start position S is not set (cleared).

スタート位置Sが未設定である場合(S42:Yes)、差分リングバッファ83bの複数のメモリ位置のうち、差分Adが閾値以上になった最新位置から15秒前の位置をスタート位置Sに設定し(S43)、ピーク検出処理S28を終了する。 If the start position S has not been set (S42: Yes), the start position S is set to the position 15 seconds before the most recent position where the difference Ad became equal to or greater than the threshold value among the multiple memory positions in the difference ring buffer 83b (S43), and the peak detection process S28 is terminated.

S41の処理で、最新位置の差分Adが閾値未満から閾値以上になっていない場合には(S41:No)、差分リングバッファ83bの最新位置に記憶された差分Adが閾値以上から閾値未満になったかを判断する(S45)。差分Adが閾値以上から閾値未満になった場合には(S45:Yes)、既にスタート位置SがS43の処理で設定済みであるため、そのスタート位置Sに対応するエンド位置E(図2(b)参照)を設定し(S46)、ピーク検出処理S28を終了する。 In the process of S41, if the difference Ad of the latest position has not changed from less than the threshold to more than the threshold (S41: No), it is determined whether the difference Ad stored in the latest position of the difference ring buffer 83b has changed from more than the threshold to less than the threshold (S45). If the difference Ad has changed from more than the threshold to less than the threshold (S45: Yes), since the start position S has already been set in the process of S43, the end position E (see FIG. 2(b)) corresponding to the start position S is set (S46), and the peak detection process S28 is terminated.

具体的にS46の処理では、差分リングバッファ83bの複数のメモリ位置のうち、差分Adが閾値未満になった最新位置から15秒後の位置をエンド位置Eに設定する。差分リングバッファ83bのうちスタート位置Sからエンド位置Eまでがピーク検出メモリ82cへ記憶する範囲である。 Specifically, in the process of S46, of the multiple memory positions in the difference ring buffer 83b, the position 15 seconds after the most recent position where the difference Ad became less than the threshold is set as the end position E. The range of the difference ring buffer 83b from the start position S to the end position E is the range to be stored in the peak detection memory 82c.

最新位置の差分Adが閾値をまたがない場合(S41:No且つS45:No)、差分リングバッファ83bのエンド位置Eに新たに差分Adが記憶されたかを確認する(S47)。即ち、S47の処理では、差分Adが閾値未満になってから閾値未満のままで15秒経過したかを確認する。 If the difference Ad of the latest position does not cross the threshold (S41: No and S45: No), it is checked whether a new difference Ad has been stored in the end position E of the difference ring buffer 83b (S47). That is, in the process of S47, it is checked whether 15 seconds have passed since the difference Ad fell below the threshold while remaining below the threshold.

S47の処理で、エンド位置Eに新たに差分Adが記憶された場合には(S47:Yes)、ピーク検出メモリ82cへ記憶する範囲の差分Adが揃ったので、スタート位置Sからエンド位置Eまでの差分Adをピーク検出メモリ82cへ記憶する(S48)。更にS48の処理では、それらの差分Adに対応する時刻の走行状態データ及び電位差V1を、差分Adに関連付けてピーク検出メモリ82cに記憶する。 If a new difference Ad is stored at the end position E in the process of S47 (S47: Yes), all the differences Ad in the range to be stored in the peak detection memory 82c are now stored in the peak detection memory 82c (S48). Furthermore, in the process of S48, the driving state data and the potential difference V1 at the time corresponding to these differences Ad are stored in the peak detection memory 82c in association with the differences Ad.

具体的に図6(b)に示すように、ピーク検出メモリ82cは、時刻が記憶される時刻メモリと、差分Adが記憶される差分メモリと、制御メモリと、位置メモリと、速度メモリと、温度メモリと、湿度メモリと、電位差V1が記憶される電位差メモリと、を備えている。なお、制御メモリから湿度メモリは、図6(a)の走行状態リングバッファ83aで上述したものと同様である。 Specifically, as shown in FIG. 6(b), the peak detection memory 82c includes a time memory in which the time is stored, a difference memory in which the difference Ad is stored, a control memory, a position memory, a speed memory, a temperature memory, a humidity memory, and a potential difference memory in which the potential difference V1 is stored. Note that the control memory to the humidity memory are the same as those described above for the driving state ring buffer 83a in FIG. 6(a).

時刻メモリに記憶されている時刻は、差分Adを算出した時刻(電流値A1,A2を取得した時刻)であり、コントローラの操作状態などの走行状態データを取得した時刻でもあり、電位差V1を取得した時刻でもある。即ち、これらの各値は、時刻によって互いに関連付けられてピーク検出メモリ82cに記憶されている。 The time stored in the time memory is the time when the difference Ad was calculated (the time when the current values A1 and A2 were obtained), the time when the driving state data such as the operation state of the controller was obtained, and the time when the potential difference V1 was obtained. That is, each of these values is associated with each other by time and stored in the peak detection memory 82c.

これにより、異常が疑われる程の差分Ad(漏洩電流の値)となった原因を走行状態データから解析することができる。例えば、ブレーキをかけたときに限って差分Adが閾値を超えていれば、そのブレーキ関係の電気回路に異常があると推定できる。 This makes it possible to analyze the cause of a difference Ad (leakage current value) that is large enough to suspect an abnormality from the driving state data. For example, if the difference Ad exceeds the threshold only when the brakes are applied, it can be assumed that there is an abnormality in the electrical circuit related to the brakes.

図8に戻って説明する。S48の処理後は、S41~S43の処理で新たなスタート位置Sを設定できるように、スタート位置S及びエンド位置Eの設定をクリアし(S49)、ピーク検出処理S28を終了する。 Returning to FIG. 8, the explanation will be given below. After the process of S48, the settings of the start position S and the end position E are cleared (S49) so that a new start position S can be set in the processes of S41 to S43, and the peak detection process S28 is terminated.

ここで、S43の処理でスタート位置Sを設定し、差分Adが閾値未満になって(S45:Yes)、S46の処理でエンド位置Eを設定した後、エンド位置Eに差分Adが記憶される前に、最新位置の差分Adが閾値未満から閾値以上になった場合(S41:Yes)について説明する。 Here, we will explain the case where the start position S is set in the process of S43, the difference Ad becomes less than the threshold value (S45: Yes), the end position E is set in the process of S46, and then the difference Ad of the latest position becomes equal to or greater than the threshold value (S41: Yes) before the difference Ad is stored in the end position E.

この場合、S42の処理で、スタート位置Sもエンド位置Eも既に設定されているので(S42:No)、S43の処理でスタート位置Sを再設定することなく、エンド位置Eだけを再設定可能となるようにクリアし(S44、図2(b)一点鎖線を参照)、ピーク検出処理S28を終了する。その後、再び、最新の差分Adが閾値以上から閾値未満になれば(S45:No)、エンド位置Eが再設定され(S46)、S47,S48の処理によってスタート位置Sからエンド位置Eまでの差分Adをピーク検出メモリ82cに記憶できる。 In this case, since both the start position S and the end position E have already been set in the process of S42 (S42: No), the start position S is not reset in the process of S43, and only the end position E is cleared so that it can be reset (S44, see the dashed line in FIG. 2(b)), and the peak detection process S28 ends. After that, if the latest difference Ad again goes from being equal to or greater than the threshold to being less than the threshold (S45: No), the end position E is reset (S46), and the difference Ad from the start position S to the end position E can be stored in the peak detection memory 82c by the processes of S47 and S48.

このように、差分Adが閾値以上になる部分が短時間に連続している場合であっても、連続した複数の閾値以上の範囲と、その範囲の前後15秒間とにおける差分Adをピーク検出メモリ82cに記憶できる。即ち、差分Adが閾値以上になった複数の範囲のうちの一部がピーク検出メモリ82cに記憶されない事態を回避できる。また、差分Adが閾値以上になった複数の範囲に対し、個別にスタート位置S及びエンド位置Eを設定する場合と比べ、ピーク検出処理S28を簡素化できると共に、ピーク検出メモリ82cに重複してデータが記憶されることを抑制できる。 In this way, even if there are successive portions in which the difference Ad is equal to or greater than the threshold value over a short period of time, the difference Ad for multiple consecutive ranges that are equal to or greater than the threshold value and the difference Ad for 15 seconds before and after the ranges can be stored in the peak detection memory 82c. In other words, it is possible to avoid a situation in which some of the multiple ranges in which the difference Ad is equal to or greater than the threshold value are not stored in the peak detection memory 82c. Furthermore, compared to a case in which the start position S and end position E are set individually for multiple ranges in which the difference Ad is equal to or greater than the threshold value, the peak detection process S28 can be simplified and duplicate data can be prevented from being stored in the peak detection memory 82c.

S47の処理で、エンド位置Eに新たに差分Adが記憶されなかった場合には(S47:No)、差分リングバッファ83bへ次に差分Adを記憶する位置がスタート位置Sであるかを確認する(S50)。次に記憶する位置がスタート位置Sではない場合(S50:No)、ピーク検出処理S28を終了する。 If no new difference Ad is stored at the end position E in the process of S47 (S47: No), it is confirmed whether the position at which the difference Ad is to be stored next in the difference ring buffer 83b is the start position S (S50). If the position to be stored next is not the start position S (S50: No), the peak detection process S28 is terminated.

一方、次に記憶する位置がスタート位置Sである場合には(S50:Yes)、次回以降の差分リングバッファ83bへの新たな差分Adの記憶によって、ピーク検出メモリ82cに記憶すべき差分Adが古いものから順に消えてしまう。そのため、古い差分Adが消える直前に(S50:Yes)、差分リングバッファ83bに記憶されている全ての差分Adと、それらの差分Adに対応する時刻の走行状態データ及び電位差V1と、を互いに関連付けてピーク検出メモリ82cに記憶する(S51)。 On the other hand, if the next position to be stored is the start position S (S50: Yes), the storage of new differences Ad in the difference ring buffer 83b from the next time onwards will cause the differences Ad to be stored in the peak detection memory 82c to be erased, starting with the oldest. Therefore, just before the old differences Ad are erased (S50: Yes), all differences Ad stored in the difference ring buffer 83b and the driving state data and potential difference V1 at the times corresponding to those differences Ad are associated with each other and stored in the peak detection memory 82c (S51).

S51の処理後のピーク検出処理S28において、エンド位置Eに新たに差分Adが記憶された場合(S47:Yes)、S48の処理では、S51の処理の直後に差分リングバッファ83bに記憶された差分Adを新たなスタート位置Sとして、S51の処理後の差分Adをピーク検出メモリ82cに記憶する。よって、S50,S51の処理により、差分リングバッファ83bを大容量化しなくても、閾値以上となった差分Adと、その前後15秒間の差分Adとを全てピーク検出メモリ82cに記憶できる。 If a new difference Ad is stored at the end position E in the peak detection process S28 after the process of S51 (S47: Yes), the process of S48 uses the difference Ad stored in the difference ring buffer 83b immediately after the process of S51 as the new start position S, and stores the difference Ad after the process of S51 in the peak detection memory 82c. Therefore, by the processes of S50 and S51, it is possible to store all of the difference Ad that is equal to or greater than the threshold value and the difference Ad for 15 seconds before and after it in the peak detection memory 82c without increasing the capacity of the difference ring buffer 83b.

次に図9を参照してアベレージ検出処理S29を説明する。アベレージ検出処理S29は、ノイズ等によって瞬間的に大きくなる差分Adの影響を排除しつつ、差分Adの短期的または長期的な増加傾向を外部サーバ90で解析するために、1分間の差分Adの平均値を短期変化検出メモリ82dや長期変化検出メモリ82eに記憶しておくための処理である。 Next, the average detection process S29 will be described with reference to FIG. 9. The average detection process S29 is a process for storing the average value of the difference Ad over one minute in the short-term change detection memory 82d or the long-term change detection memory 82e in order to analyze the short-term or long-term increase trend of the difference Ad by the external server 90 while eliminating the influence of the difference Ad that momentarily increases due to noise, etc.

図9に示すように、アベレージ検出処理S29では、まず、前回の平均値の算出から1分経過したか、即ち過去1分間の差分Adを記憶する差分リングバッファ83bの値が全て更新されたかを確認する(S61)。なお、漏洩電流監視装置80の電源が投入された直後には、差分リングバッファ83bの各メモリに無効な値が記憶され、投入直後のS61の処理では、全ての無効な値が差分Adで更新されたかを確認する。S61の処理で、前回の平均値の算出または電源の投入から1分経過していない場合には(S61:No)、アベレージ検出処理S29を終了し、1分経過を待つ。 As shown in FIG. 9, in the average detection process S29, first, it is confirmed whether one minute has passed since the previous calculation of the average value, i.e., whether all values in the difference ring buffer 83b that stores the difference Ad for the past one minute have been updated (S61). Note that immediately after the power supply to the leakage current monitoring device 80 is turned on, invalid values are stored in each memory of the difference ring buffer 83b, and in the process of S61 immediately after turning on, it is confirmed whether all invalid values have been updated with the difference Ad. If in the process of S61, one minute has not passed since the previous calculation of the average value or since the power supply was turned on (S61: No), the average detection process S29 is terminated and one minute is awaited.

一方、前回の平均値の算出または電源の投入から1分経過した場合には(S61:Yes)、差分リングバッファ83bの値が全て更新されたので、差分リングバッファ83bに記憶された直近1分間の差分Adを平均して平均値を算出し、その平均値を平均値リングバッファ83cに記憶する(S62)。 On the other hand, if one minute has passed since the previous calculation of the average value or the power was turned on (S61: Yes), all values in the difference ring buffer 83b have been updated, so the differences Ad for the most recent minute stored in the difference ring buffer 83b are averaged to calculate an average value, and this average value is stored in the average value ring buffer 83c (S62).

次いで、平均値リングバッファ83cに記憶されている2分~1分前の平均値(1分前のS62の処理で算出した平均値であって、2分~1分前に算出された複数の差分Adを平均した平均値)に対する直近1分間の平均値の変化率を短期変化率として算出する(S63)。具体的に、(短期変化率)=((直近1分間の平均値)-(2分~1分前の平均値))/(2分~1分前の平均値)で算出される。 Next, the rate of change of the average value for the most recent minute relative to the average value from 2 to 1 minute ago stored in the average value ring buffer 83c (the average value calculated in the process of S62 1 minute ago, which is the average of the multiple differences Ad calculated from 2 to 1 minute ago) is calculated as the short-term change rate (S63). Specifically, it is calculated as (short-term change rate) = ((average value for the most recent minute) - (average value from 2 to 1 minute ago)) / (average value from 2 to 1 minute ago).

この算出した短期変化率が変化閾値以上であるかを確認する(S64)。なお、変化閾値は、ノイズを排除するために例えば1.1とするが、1以上の数であれば適宜変更しても良い。 It is then confirmed whether the calculated short-term change rate is equal to or greater than the change threshold (S64). Note that the change threshold is set to, for example, 1.1 to eliminate noise, but may be changed as long as it is a number equal to or greater than 1.

S64の処理で、短期変化率が変化閾値以上であった場合には(S64:Yes)、平均値リングバッファ83cに記憶されている直近2分間の平均値(直近2分間のS62の処理でそれぞれ算出した全ての平均値)と、それらの平均値に対応する時刻の走行状態データ及び電位差V1と、を互いに関連付けて短期変化検出メモリ82dに記憶し(S65)、S66の処理へ移行する。 If the short-term change rate is equal to or greater than the change threshold in the process of S64 (S64: Yes), the average values for the most recent two minutes stored in the average value ring buffer 83c (all average values calculated in the process of S62 for the most recent two minutes) are associated with the driving condition data and potential difference V1 at the time corresponding to these average values and stored in the short-term change detection memory 82d (S65), and the process proceeds to S66.

なお、直近2分間の平均値に対応する時刻の走行状態データとは、走行状態リングバッファ83aに記憶されている直近2分間の走行状態データである。直近2分間の平均値に対応する時刻の電位差V1とは、電位差リングバッファ83dに記憶されている直近2分間の電位差V1である。また、図6(c)に示すように、短期変化検出メモリ82dは、図6(b)のピーク検出メモリ82cの差分メモリを、差分Adの平均値が記憶される平均値メモリに置換したものである。なお、平均値メモリには、平均値の算出に用いた最古の差分Adを算出した時刻に対応付けるように、平均値が記憶される。 The driving condition data at the time corresponding to the average value for the most recent two minutes is the driving condition data for the most recent two minutes stored in the driving condition ring buffer 83a. The potential difference V1 at the time corresponding to the average value for the most recent two minutes is the potential difference V1 for the most recent two minutes stored in the potential difference ring buffer 83d. As shown in FIG. 6(c), the short-term change detection memory 82d is obtained by replacing the difference memory of the peak detection memory 82c in FIG. 6(b) with an average value memory in which the average value of the difference Ad is stored. The average value is stored in the average value memory so as to correspond to the time when the oldest difference Ad used to calculate the average value was calculated.

S64の処理で、短期変化率が変化閾値未満であった場合には(S64:No)、S65の処理をスキップして、S66の処理へ移行する。これにより、短期変化率が減少している場合や、ノイズ等により短期変化率が若干増加しているだけの場合を排除して、短期的な平均値の増加傾向を解析できる。 If the short-term change rate is less than the change threshold in the process of S64 (S64: No), the process of S65 is skipped and the process proceeds to S66. This makes it possible to analyze the increasing trend of the short-term average value while eliminating cases where the short-term change rate is decreasing or where the short-term change rate is only slightly increased due to noise, etc.

S66の処理では、平均値リングバッファ83cに記憶されている10分~9分前の平均値(9分前のS62の処理で算出した平均値であって、10分~9分前に算出された複数の差分Adを平均した平均値)に対する直近1分間の平均値の変化率を長期変化率として算出する(S66)。具体的に、(長期変化率)=((直近1分間の平均値)-(10分~9分前の平均値))/(10分~9分前の平均値)で算出される。 In the process of S66, the rate of change of the average value for the most recent minute relative to the average value from 10 to 9 minutes ago stored in the average value ring buffer 83c (the average value calculated in the process of S62 9 minutes ago, which is the average of the multiple differences Ad calculated from 10 to 9 minutes ago) is calculated as the long-term rate of change (S66). Specifically, it is calculated as (long-term rate of change) = ((average value for the most recent minute) - (average value from 10 to 9 minutes ago)) / (average value from 10 to 9 minutes ago).

この算出した長期変化率が変化閾値以上であるかを確認する(S67)。長期変化率が変化閾値以上であった場合には(S67:Yes)、平均値リングバッファ83cに記憶されている直近10分間の平均値(直近10分間のS62の処理でそれぞれ算出した全ての平均値)と、それらの平均値に対応する時刻の走行状態データ及び電位差V1と、を互いに関連付けて長期変化検出メモリ82eに記憶し(S68)、アベレージ検出処理S29を終了する。 It is then confirmed whether the calculated long-term change rate is equal to or greater than the change threshold (S67). If the long-term change rate is equal to or greater than the change threshold (S67: Yes), the average values for the most recent 10 minutes stored in the average value ring buffer 83c (all average values calculated in the process of S62 for the most recent 10 minutes) are associated with the driving condition data and potential difference V1 at the time corresponding to these average values and stored in the long-term change detection memory 82e (S68), and the average detection process S29 is terminated.

直近10分間の平均値に対応する時刻の走行状態データとは、走行状態リングバッファ83aに記憶されている直近10分間の走行状態データである。直近10分間の平均値に対応する時刻の電位差V1とは、電位差リングバッファ83dに記憶されている直近10分間の電位差V1である。また、長期変化検出メモリ82eは、短期変化検出メモリ82dと同一に構成される。 The driving condition data at the time corresponding to the average value for the last 10 minutes is the driving condition data for the last 10 minutes stored in the driving condition ring buffer 83a. The potential difference V1 at the time corresponding to the average value for the last 10 minutes is the potential difference V1 for the last 10 minutes stored in the potential difference ring buffer 83d. In addition, the long-term change detection memory 82e is configured in the same way as the short-term change detection memory 82d.

S67の処理で、長期変化率が変化閾値未満であった場合には(S67:No)、S68の処理をスキップして、アベレージ検出処理S29を終了する。これにより、長期変化率が減少している場合や、ノイズ等により長期変化率が若干増加しているだけの場合を排除して、長期的な平均値の増加傾向を解析できる。 If the long-term rate of change is less than the change threshold in the process of S67 (S67: No), the process of S68 is skipped and the average detection process S29 is terminated. This makes it possible to analyze the long-term increasing trend of the average value while eliminating cases where the long-term rate of change is decreasing or where the long-term rate of change is only slightly increased due to noise, etc.

次に図10を参照してサイクル収集処理S30を説明する。サイクル収集処理S30は、数か月や数年などの超長期的な差分Adの変動を解析するために、異常が無くても定期的に差分Adをサイクル収集メモリ82fに記憶しておくための処理である。 Next, the cycle collection process S30 will be described with reference to FIG. 10. The cycle collection process S30 is a process for periodically storing the difference Ad in the cycle collection memory 82f even if there is no abnormality, in order to analyze fluctuations in the difference Ad over an extremely long period, such as several months or years.

図10に示すように、サイクル収集処理S30では、まず、定期的な収集タイミングが到来したかを確認する(S71)。定期的な収集タイミングは、本実施形態では1時間毎に設定されるが、その収集タイミングは適宜変更しても良い。 As shown in FIG. 10, in the cycle collection process S30, first, it is confirmed whether the regular collection timing has arrived (S71). In this embodiment, the regular collection timing is set to every hour, but the collection timing may be changed as appropriate.

定期的な収集タイミングが到来していない場合には(S71:No)、サイクル収集処理S30を終了し、収集タイミングの到来を待つ。一方、定期的な収集タイミングが到来した場合には(S71:Yes)、差分リングバッファ83bに記憶されている全て(直近1分間)の差分Adと、それらの差分Adに対応する時刻の走行状態データ及び電位差V1と、を互いに関連付けてサイクル収集メモリ82fに記憶し(S72)、サイクル収集処理S30を終了する。 If the regular collection timing has not arrived (S71: No), the cycle collection process S30 is terminated and the arrival of the collection timing is awaited. On the other hand, if the regular collection timing has arrived (S71: Yes), all the differences Ad (for the last minute) stored in the difference ring buffer 83b and the driving state data and potential difference V1 at the time corresponding to those differences Ad are associated with each other and stored in the cycle collection memory 82f (S72), and the cycle collection process S30 is terminated.

なお、S72の処理において、差分Adに対応する時刻の走行状態データとは、走行状態リングバッファ83aに記憶されている直近1分間の走行状態データである。同様に、差分Adに対応する時刻の電位差V1とは、電位差リングバッファ83dに記憶されている直近1分間の電位差V1である。 In the process of S72, the driving state data at the time corresponding to the difference Ad is the driving state data for the most recent minute stored in the driving state ring buffer 83a. Similarly, the potential difference V1 at the time corresponding to the difference Ad is the potential difference V1 for the most recent minute stored in the potential difference ring buffer 83d.

定期的に差分Adを取得することで、数か月や数年などの超長期的な漏洩電流の増加傾向を解析できる。例えば具体的に、過去の差分Adの実測値の経時変化を最小二乗法で近似し、今後の差分Adの予測値の経時変化を算出することができる。この予測値の経時変化から、差分Adが閾値(例えば1mA)を上回る日時の目安を解析できるので、鉄道車両10のメンテナンス等のスケジュールを計画することができると共に、交換が必要な機器や部品の発注などを計画することができる。 By periodically acquiring the difference Ad, it is possible to analyze the very long-term increase trend of the leakage current over several months or years. For example, the change over time of the actual measured value of the difference Ad in the past can be approximated using the least squares method, and the change over time of the predicted value of the difference Ad in the future can be calculated. From the change over time of this predicted value, it is possible to analyze the approximate date and time when the difference Ad will exceed a threshold value (e.g., 1 mA). This makes it possible to plan schedules for maintenance of the railway vehicle 10, as well as to plan the ordering of equipment and parts that require replacement.

図7に戻って説明する。サイクル収集処理S30の後は、制御装置60から送信許可信号を受信したかを確認する(S31)。図4のS14の処理で制御装置60が送信した送信許可信号を漏洩電流監視装置80が受信した場合には(S31:Yes)、無線通信装置71を介して鉄道車両10(漏洩電流監視装置80)と外部サーバ90との通信が可能であるため、ピーク検出メモリ82c、短期変化検出メモリ82d、長期変化検出メモリ82e、サイクル収集メモリ82fにそれぞれ記憶されている未送信のデータと、固有番号メモリ82bに記憶されている固有番号と、を外部サーバ90へ送信する(S32)。 Returning to FIG. 7, the explanation is given below. After the cycle collection process S30, it is confirmed whether a transmission permission signal has been received from the control device 60 (S31). If the leakage current monitoring device 80 receives the transmission permission signal transmitted by the control device 60 in the process of S14 in FIG. 4 (S31: Yes), communication between the railcar 10 (leakage current monitoring device 80) and the external server 90 is possible via the wireless communication device 71, so the untransmitted data stored in the peak detection memory 82c, short-term change detection memory 82d, long-term change detection memory 82e, and cycle collection memory 82f, as well as the unique number stored in the unique number memory 82b, are transmitted to the external server 90 (S32).

これらの各メモリ82c~82fに記憶されている各データは、電流値A1,A2に基づいた差分Ad自体を含むデータや、差分Adの平均値を含むデータであって、外部サーバ90への送信が許可されたデータである。よって、各メモリ82c~82fに各データを記憶するかを判断する図8のS41~S47,S50の処理、図9のS63,S64,S66,S67の処理、図10のS71の処理は、各データを外部サーバ90へ送信するかを判断する処理と言える。特に、図8のS41~S47,S50の処理、図9のS63,S64,S66,S67の処理は、差分Ad自体または差分Adの平均値に基づき、その差分Adに関するデータを外部サーバ90へ送信するかを判断する処理と言える。また、図8のS48,S51の処理は、図9のS65,S68の処理、図10のS72の処理は、外部サーバ90へ送信すると判断された各データを外部サーバ90へ送信可能とする処理と言える。 The data stored in each of these memories 82c to 82f includes the difference Ad itself based on the current values A1 and A2, and includes the average value of the difference Ad, and is permitted to be transmitted to the external server 90. Therefore, the processes of S41 to S47, S50 in FIG. 8, S63, S64, S66, S67 in FIG. 9, and S71 in FIG. 10, which determine whether to store each data in each of the memories 82c to 82f, can be said to be processes that determine whether to transmit each data to the external server 90. In particular, the processes of S41 to S47, S50 in FIG. 8, and S63, S64, S66, S67 in FIG. 9 can be said to be processes that determine whether to transmit data related to the difference Ad to the external server 90 based on the difference Ad itself or the average value of the difference Ad. In addition, the processes of S48 and S51 in FIG. 8, S65 and S68 in FIG. 9, and S72 in FIG. 10 can be said to be processes that enable each data item determined to be sent to the external server 90 to be sent to the external server 90.

これにより、例えば、差分Adに関するデータから、漏洩電流に対する解析に有効なデータを選定して外部サーバ90へ送信できるので、鉄道車両10から外部サーバ90への送信頻度や送信量を抑制できる。更に、外部サーバ90への送信までにデータを一時記憶しておくとき、そのデータ量を少なくできるので、漏洩電流監視装置80を小型化およびコストダウンし易くできる。 As a result, for example, data effective for analyzing leakage current can be selected from the data related to the difference Ad and transmitted to the external server 90, thereby reducing the frequency and amount of transmission from the railway vehicle 10 to the external server 90. Furthermore, when data is temporarily stored before transmission to the external server 90, the amount of data can be reduced, making it easier to miniaturize and reduce costs for the leakage current monitoring device 80.

S32の処理後、その他の処理を実行し(S33)、漏洩電流監視装置80のメイン処理を終了する。また、S31の処理で、制御装置60から送信許可信号を受信していない場合には(S31:No)、S32の処理をスキップし、S33の処理を実行して漏洩電流監視装置80のメイン処理を終了する。なおS33の処理としては、基準電位差Vsを変更する処理や、ピーク検出処理S28で用いる閾値を変更する処理、外部サーバ90から受信した信号に基づく処理などが挙げられる。例えば、ピーク検出処理S28で用いる閾値を変更する操作を外部サーバ90で行い、その変更の信号を外部サーバ90から無線通信装置71を介して漏洩電流監視装置80が受信した場合、S33の処理では、受信した信号に応じて閾値を変更する処理を実行する。 After the process of S32, other processes are executed (S33), and the main process of the leakage current monitoring device 80 is terminated. Also, if the transmission permission signal is not received from the control device 60 in the process of S31 (S31: No), the process of S32 is skipped, the process of S33 is executed, and the main process of the leakage current monitoring device 80 is terminated. The process of S33 may include a process of changing the reference potential difference Vs, a process of changing the threshold value used in the peak detection process S28, and a process based on a signal received from the external server 90. For example, if the external server 90 performs an operation to change the threshold value used in the peak detection process S28 and the leakage current monitoring device 80 receives the change signal from the external server 90 via the wireless communication device 71, the process of S33 executes a process of changing the threshold value according to the received signal.

次に、外部サーバ90での処理について説明する。外部サーバ90は、S32の処理で漏洩電流監視装置80から送信された各メモリ82c~82fの各データと固有番号とを受信した場合、固有番号(計測対象の鉄道車両10)毎に外部サーバ90に設けた各メモリに各データを記憶する。なお、外部サーバ90の各メモリは、漏洩電流監視装置80の各メモリ82c~82fと略同一である。 Next, the processing in the external server 90 will be described. When the external server 90 receives the data and unique number of each memory 82c to 82f transmitted from the leakage current monitoring device 80 in the processing of S32, it stores each data in each memory provided in the external server 90 for each unique number (railroad vehicle 10 to be measured). Note that each memory of the external server 90 is substantially the same as each memory 82c to 82f of the leakage current monitoring device 80.

外部サーバ90では、漏洩電流監視装置80から受信した各データを用いて漏洩電流の発生原因などの解析が実行される。この解析には、AIによるデータ解析を用いることが好ましい。具体的に、図6(b)に示すピーク検出メモリ82cの内容や、図6(c)に示す短期変化検出メモリ82dの内容が外部サーバ90に記憶されている場合を例示して、外部サーバ90での解析について説明する。 The external server 90 performs an analysis of the cause of leakage current generation, etc., using each piece of data received from the leakage current monitoring device 80. For this analysis, it is preferable to use AI-based data analysis. Specifically, the analysis in the external server 90 will be explained using an example in which the contents of the peak detection memory 82c shown in FIG. 6(b) and the contents of the short-term change detection memory 82d shown in FIG. 6(c) are stored in the external server 90.

図6(b)に示すように、差分メモリの値(漏洩電流の値)が0.5mAから閾値以上の1.2mAに増加した時、制御メモリの値であるコントローラ66の操作状態が「N」から「B1」に変化すると共に、位置メモリの値である鉄道車両10の位置が「X1,Y1」から「X2,Y2」に変化している。よって、外部サーバ90では、漏洩電流の値の増加が、コントローラ66が「B1」である場合、又は、鉄道車両10の位置が「X2,Y2」である場合に起因していると推定できる。 As shown in FIG. 6(b), when the difference memory value (leakage current value) increases from 0.5 mA to 1.2 mA, which is above the threshold, the operation state of the controller 66, which is the value of the control memory, changes from "N" to "B1", and the position of the railway vehicle 10, which is the value of the position memory, changes from "X1, Y1" to "X2, Y2". Therefore, the external server 90 can infer that the increase in the leakage current value is caused by the controller 66 being at "B1" or the position of the railway vehicle 10 being at "X2, Y2".

更に、この後、鉄道車両10の位置が「X2,Y2」から殆ど動かず、コントローラ66の状態が「B1」から「N」等の別の状態に変化したときに、漏洩電流の値が閾値未満になったと仮定する。この場合、外部サーバ90では、コントローラ66が「B1」である場合に限って通電される電気回路に、漏洩電流の値の増加の原因があると推定できる。 Furthermore, assume that thereafter, when the position of the railway vehicle 10 hardly moves from "X2, Y2" and the state of the controller 66 changes from "B1" to another state such as "N", the value of the leakage current falls below the threshold value. In this case, the external server 90 can infer that the increase in the value of the leakage current is caused by an electric circuit that is energized only when the controller 66 is "B1".

一方、コントローラ66の状態が「B1」のままで、鉄道車両10の位置が「X2,Y2」から大きく動いたときに、漏洩電流の値が閾値未満になれば、漏洩電流の値の増加の原因が鉄道車両10の位置であると推定できる。例えば、「X2,Y2」の位置に融雪除去設備などの地上設備があった場合、その地上設備が漏洩電流の値の増加の原因であると推定できる。 On the other hand, if the state of the controller 66 remains at "B1" and the position of the railway vehicle 10 moves significantly from "X2, Y2", and the leakage current value falls below the threshold value, it can be presumed that the increase in the leakage current value is caused by the position of the railway vehicle 10. For example, if there is ground equipment such as snow melting removal equipment at the position of "X2, Y2", it can be presumed that the ground equipment is the cause of the increase in the leakage current value.

また、図6(c)に示すように、差分Adの1分間の平均値は、コントローラ66の状態が「P2」である場合に限って、その前の状態の「N」や「B1」よりも増加している。ここから、外部サーバ90では、コントローラ66が「P2」である場合に限って通電される電気回路の漏洩電流が増加傾向にあり、その回路の絶縁抵抗の劣化が進行していると推定できる。 Also, as shown in FIG. 6(c), the one-minute average value of the difference Ad increases only when the state of the controller 66 is "P2" compared to the previous states of "N" and "B1". From this, it can be inferred that in the external server 90, the leakage current of the electric circuit that is energized only when the controller 66 is "P2" is on the rise, and that the insulation resistance of the circuit is deteriorating.

また、漏洩電流の値の増加の原因は、コントローラ66の操作状態や鉄道車両10の位置に限らず、その他の走行状態データや電位差V1によっても推定が可能である。例えば、速度メモリの値である鉄道車両10の走行速度と、コントローラ66の操作状態とから、VVVFインバータ20の制御状態を特定できる。これにより、VVVFインバータ20の特定の制御状態で漏洩電流が増加する場合、その特定の制御状態に限って通電される電気回路に漏洩電流の値の増加の原因があると推定できる。 The cause of the increase in the leakage current value is not limited to the operation state of the controller 66 or the position of the railway vehicle 10, but can also be estimated from other running state data and the potential difference V1. For example, the control state of the VVVF inverter 20 can be identified from the running speed of the railway vehicle 10, which is the value of the speed memory, and the operation state of the controller 66. As a result, if the leakage current increases in a specific control state of the VVVF inverter 20, it can be estimated that the increase in the leakage current value is caused by an electric circuit that is energized only in that specific control state.

また、鉄道車両10の各部の絶縁抵抗値は、温度や湿度によって変動する。そのため、絶縁抵抗値に依存する漏洩電流の値も温度や湿度によって変動する。そのため、温度メモリの値である鉄道車両10の周囲の温度から、漏洩電流の値の変動が温度に依存したものか、それ以外の変化に依存したものかを推定できる。同様に、湿度メモリの値である鉄道車両10の周囲の湿度から、漏洩電流の値の変動が湿度に依存したものか、それ以外の変化に依存したものかを推定できる。 In addition, the insulation resistance value of each part of the railway vehicle 10 varies with temperature and humidity. Therefore, the value of the leakage current, which depends on the insulation resistance value, also varies with temperature and humidity. Therefore, from the temperature around the railway vehicle 10, which is the value of the temperature memory, it can be estimated whether the variation in the value of the leakage current is dependent on temperature or on other changes. Similarly, from the humidity around the railway vehicle 10, which is the value of the humidity memory, it can be estimated whether the variation in the value of the leakage current is dependent on humidity or on other changes.

以上のように、漏洩電流監視装置80は、差分Ad(漏洩電流の値)や差分Adの平均値のデータに、走行状態データや電位差V1を関連付けた状態で外部サーバ90へ送信するので、漏洩電流の発生の原因を解析し易くできる。更に、漏洩電流に対する解析を漏洩電流監視装置80で実行する場合と比べ、漏洩電流監視装置80を小型化およびコストダウンし易くできる。 As described above, the leakage current monitoring device 80 transmits data on the difference Ad (leakage current value) and the average value of the difference Ad to the external server 90 in association with the driving condition data and the potential difference V1, making it easier to analyze the cause of leakage current generation. Furthermore, compared to when the leakage current analysis is performed by the leakage current monitoring device 80, the leakage current monitoring device 80 can be made smaller and less expensive.

次に図11を参照して第2実施形態について説明する。第1実施形態では、1両編成の鉄道車両10に漏洩電流監視装置80が搭載される場合について説明した。これに対し、第2実施形態では、互いに連結された鉄道車両100a,100b,100cによる車両編成に漏洩電流監視装置110が設けられる場合について説明する。なお、第1実施形態と同一の部分については、同一の符号を付して以下の説明を省略する。 Next, the second embodiment will be described with reference to FIG. 11. In the first embodiment, a case where a leakage current monitoring device 80 is installed in a railway vehicle 10 consisting of one car is described. In contrast, in the second embodiment, a case where a leakage current monitoring device 110 is provided in a train consisting of railway vehicles 100a, 100b, and 100c coupled together is described. Note that the same parts as in the first embodiment are given the same reference numerals and the following description is omitted.

図11は、第2実施形態における鉄道車両100a,100b,100cの電気回路を模式的に示した回路図である。なお、図11では、電動機用電線24、第1低圧交流電路32を単線図として示し、第2低圧交流電路36の2本の電線36r,36tを1本に省略して示している。 Figure 11 is a circuit diagram that shows a schematic of the electric circuit of the railway cars 100a, 100b, and 100c in the second embodiment. In Figure 11, the electric motor wire 24 and the first low-voltage AC circuit 32 are shown as single-line diagrams, and the two electric wires 36r and 36t of the second low-voltage AC circuit 36 are shown as one wire.

鉄道車両100a~100cはいずれも、車体12と車輪13と連結部14とを主に備えている。鉄道車両100a~100cは、連結部14同士を連結して車両編成を構成している。鉄道車両100a~100cにそれぞれ設けられた接地引通線41は、連結部14を介して互いに接続されている。 Each of the railway cars 100a to 100c mainly comprises a car body 12, wheels 13, and coupling parts 14. The railway cars 100a to 100c are configured into a train set by coupling the coupling parts 14 together. The grounding wires 41 provided on each of the railway cars 100a to 100c are connected to each other via the coupling parts 14.

鉄道車両100a~100cはいずれも、車体12の両端の連結部14間に引き通されて互いに接続される供給引通線18a(供給線の一部)を備えている。鉄道車両100a,100cは、それぞれパンタグラフ17が搭載され、そのパンタグラフ17と供給引通線18aとを繋ぐ供給上流線18b(供給線の一部)が設けられている。鉄道車両100bは、パンタグラフ17が搭載されておらず、鉄道車両100a,100cから電力の供給を受けて走行する。 All of the railway cars 100a to 100c are equipped with a supply train line 18a (part of the supply line) that is routed between the coupling parts 14 at both ends of the car body 12 and connected to each other. Each of the railway cars 100a and 100c is equipped with a pantograph 17, and is provided with an upstream supply line 18b (part of the supply line) that connects the pantograph 17 to the supply train line 18a. The railway car 100b is not equipped with a pantograph 17, and runs on power supplied from the railway cars 100a and 100c.

鉄道車両100cは、供給引通線18aから電力が供給されるVVVFインバータ20と、VVVFインバータ20の出力側に電動機用電線24を介して接続される電動機22と、を備えたレール2上を自走可能な動力車である。VVVFインバータ20の入力側の正極端子には、供給引通線18aから分岐した電線が接続され、VVVFインバータ20の負極端子には、接地引通線41から分岐した接地側電線45が接続される。 The railway vehicle 100c is a powered vehicle capable of self-propelling on rails 2, and is equipped with a VVVF inverter 20 to which power is supplied from a supply lead-in line 18a, and an electric motor 22 connected to the output side of the VVVF inverter 20 via an electric motor wire 24. An electric wire branching off from the supply lead-in line 18a is connected to the positive terminal on the input side of the VVVF inverter 20, and a ground side electric wire 45 branching off from the ground lead-in line 41 is connected to the negative terminal of the VVVF inverter 20.

鉄道車両100a,100bは、電動機22を持たず鉄道車両100cに付随して走行する付随車である。なお、鉄道車両100a,100bに電動機22を搭載し、その電動機22と鉄道車両100cのVVVFインバータ20とを電動機用電線24で接続しても良い。 Railroad cars 100a and 100b are trailer cars that do not have electric motors 22 and run alongside railroad car 100c. It is also possible to mount electric motors 22 on railroad cars 100a and 100b and connect the electric motors 22 to the VVVF inverter 20 of railroad car 100c with electric motor wires 24.

鉄道車両100bは、供給引通線18aから電力が供給されるSIV30と、そのSIV30の出力側に接続される第1低圧交流電路32と、第1低圧交流電路32に1次巻線が接続される絶縁トランス34と、その絶縁トランス34の2次巻線に接続される第2低圧交流電路36と、を備えている。SIV30の入力側の正極端子には、供給引通線18aから分岐した電線が接続され、SIV30の負極端子には、接地引通線41から分岐した接地側電線45が接続される。 The railway vehicle 100b includes an SIV 30 to which power is supplied from a supply lead-in line 18a, a first low-voltage AC circuit 32 connected to the output side of the SIV 30, an isolation transformer 34 whose primary winding is connected to the first low-voltage AC circuit 32, and a second low-voltage AC circuit 36 connected to the secondary winding of the isolation transformer 34. An electric wire branched off from the supply lead-in line 18a is connected to the positive terminal on the input side of the SIV 30, and a ground side electric wire 45 branched off from a ground lead-in line 41 is connected to the negative terminal of the SIV 30.

鉄道車両100a,100cには、鉄道車両100bの第1低圧交流電路32に連結部14を介して接続される第1低圧交流電路32と、鉄道車両100bの第2低圧交流電路36に連結部14を介して接続される第2低圧交流電路36と、がそれぞれ設けられている。鉄道車両100a~100cの第1低圧交流電路32には、複数の三相交流機器15が接続され、第2低圧交流電路36には単相交流機器16及び直流機器19が接続されている。 Railway vehicles 100a and 100c are each provided with a first low-voltage AC circuit 32 connected to the first low-voltage AC circuit 32 of railway vehicle 100b via a coupling portion 14, and a second low-voltage AC circuit 36 connected to the second low-voltage AC circuit 36 of railway vehicle 100b via a coupling portion 14. A plurality of three-phase AC devices 15 are connected to the first low-voltage AC circuit 32 of railway vehicles 100a to 100c, and single-phase AC devices 16 and DC devices 19 are connected to the second low-voltage AC circuit 36.

このような鉄道車両100a~100cによる車両編成は、電気回路に生じる漏洩電流を監視する漏洩電流監視装置110を備えている。本実施形態では、漏洩電流監視装置110の本体(CPU71等)は、鉄道車両100aに搭載されている。なお、漏洩電流監視装置110の本体を鉄道車両100b,100cに搭載しても良く、漏洩電流監視装置110の本体を鉄道車両100a~100cにそれぞれ搭載して、それらの本体を互いに通信可能に構成しても良い。 A train consisting of such railway cars 100a to 100c is equipped with a leakage current monitoring device 110 that monitors leakage currents occurring in the electric circuits. In this embodiment, the main body of the leakage current monitoring device 110 (CPU 71, etc.) is mounted on the railway car 100a. The main body of the leakage current monitoring device 110 may be mounted on railway cars 100b and 100c, or the main body of the leakage current monitoring device 110 may be mounted on each of the railway cars 100a to 100c, and these main bodies may be configured to be able to communicate with each other.

漏洩電流監視装置110は、鉄道車両100a,100cの供給上流線18bがそれぞれ通される供給側変流器(供給側計測器)87a,87cと、鉄道車両100a,100b,100cの集約線42がそれぞれ通される接地側変流器(接地側計測器)88a,88b,88cと、鉄道車両100aの供給上流線18bと集約線42との間の電位差を計測する電位差検出部89と、を備えている。漏洩電流監視装置110は、第1実施形態における漏洩電流監視装置80に対し、供給側変流器87a,87c及び接地側変流器88a~88cの数が増えた点以外は、漏洩電流監視装置80と略同一に構成されている。 The leakage current monitoring device 110 includes supply side current transformers (supply side measuring instruments) 87a, 87c through which the upstream supply lines 18b of the railcars 100a, 100c are passed, ground side current transformers (ground side measuring instruments) 88a, 88b, 88c through which the aggregated lines 42 of the railcars 100a, 100b, 100c are passed, and a potential difference detector 89 that measures the potential difference between the upstream supply line 18b of the railcar 100a and the aggregated line 42. The leakage current monitoring device 110 is configured substantially the same as the leakage current monitoring device 80 in the first embodiment, except that the number of supply side current transformers 87a, 87c and ground side current transformers 88a to 88c has been increased.

供給側変流器87a,87cは、供給上流線18bが通されて供給上流線18bの電流値を計測する。これにより、例えば鉄道車両100aのパンタグラフ17からの電流と、鉄道車両100cのパンタグラフ17からの電流とが、それぞれ鉄道車両100bの供給引通線18aを流れる場合でも、鉄道車両100a,100cそれぞれにパンタグラフ17から供給される電力の電流値を供給側変流器87a,87cで正確に検出できる。 The supply side current transformers 87a and 87c measure the current value of the supply upstream line 18b through which the supply upstream line 18b passes. As a result, even if, for example, a current from the pantograph 17 of the railcar 100a and a current from the pantograph 17 of the railcar 100c each flow through the supply line 18a of the railcar 100b, the supply side current transformers 87a and 87c can accurately detect the current value of the power supplied from the pantograph 17 to each of the railcars 100a and 100c.

鉄道車両100a~100cによる車両編成では、鉄道車両100a,100cのパンタグラフ17からの電流であって供給側変流器87a,87cを通る電流が、鉄道車両100aの集約線42(接地側変流器88a)を通る電流と、鉄道車両100bの集約線42(接地側変流器88b)を通る電流と、鉄道車両100cの集約線42(接地側変流器88c)を通る電流と、鉄道車両100a~100cに生じて集約線42を迂回する漏洩電流と、に分かれる。 In a train consisting of railway cars 100a to 100c, the current from the pantographs 17 of railway cars 100a and 100c passing through the supply side current transformers 87a and 87c is divided into a current passing through the collective line 42 (ground side current transformer 88a) of railway car 100a, a current passing through the collective line 42 (ground side current transformer 88b) of railway car 100b, a current passing through the collective line 42 (ground side current transformer 88c) of railway car 100c, and a leakage current that occurs in railway cars 100a to 100c and bypasses the collective line 42.

これらの電流のうち、漏洩電流監視装置110は、鉄道車両100a,100cのパンタグラフ17からの電流を供給側変流器87a,87cで計測でき、鉄道車両100a~100cの集約線42を通る電流を接地側変流器88a~88cで計測できる。よって、これらの電流値から、集約線42を迂回する漏洩電流を精度良く算出でき、第1実施形態と同様に漏洩電流の検出精度を向上できる。 Of these currents, the leakage current monitoring device 110 can measure the current from the pantograph 17 of the railway cars 100a, 100c using the supply side current transformers 87a, 87c, and can measure the current passing through the aggregated wire 42 of the railway cars 100a-100c using the ground side current transformers 88a-88c. Therefore, from these current values, the leakage current bypassing the aggregated wire 42 can be calculated with high accuracy, and the detection accuracy of the leakage current can be improved as in the first embodiment.

具体的に、漏洩電流監視装置110において、差分Ad(漏洩電流の値)の算出に用いる電流値A1は、供給側変流器87aの電流値と供給側変流器87cの電流値との合計である。また、差分Adの算出に用いる電流値A2は、接地側変流器88a~88cそれぞれの電流値の合計である。 Specifically, in the leakage current monitoring device 110, the current value A1 used to calculate the difference Ad (leakage current value) is the sum of the current value of the supply side current transformer 87a and the current value of the supply side current transformer 87c. In addition, the current value A2 used to calculate the difference Ad is the sum of the current values of the ground side current transformers 88a to 88c.

更に、漏洩電流監視装置110は、差分Adだけでなく、供給側変流器87a,87cそれぞれの電流値と、接地側変流器88a~88cのそれぞれの電流値とを外部サーバ90へ送信しても良い。これにより、各電流値に基づき、鉄道車両100a~100cのうちいずれの車両に漏洩電流が発生しているかを解析できる可能性がある。 Furthermore, the leakage current monitoring device 110 may transmit not only the difference Ad but also the current values of each of the supply side current transformers 87a, 87c and each of the ground side current transformers 88a to 88c to the external server 90. This may enable an analysis to determine in which of the railway cars 100a to 100c a leakage current is occurring, based on each current value.

また、鉄道車両100a~100cによる車両編成では、例えば、鉄道車両100aの接地引通線41から鉄道車両100bの接地引通線41へ流れる電流が、連結部14を通らずに、集約線42、車輪13及びレール2を通ってしまうことがある。このような電流を循環による迷走電流と言う。この循環による迷走電流は集約線42を通るので、接地側変流器88a~88cの電流値から迷走電流の発生を解析できる。同様に、循環以外の迷走電流も、集約線42を通るものであれば、接地側変流器88a~88cの電流値から迷走電流の発生を解析できる。 In addition, in a train consisting of railway cars 100a to 100c, for example, current flowing from the grounding lead-in wire 41 of railway car 100a to the grounding lead-in wire 41 of railway car 100b may pass through the aggregated wire 42, the wheels 13, and the rails 2 without passing through the coupling part 14. This type of current is called a stray current due to circulation. Since this stray current due to circulation passes through the aggregated wire 42, the occurrence of the stray current can be analyzed from the current values of the ground side current transformers 88a to 88c. Similarly, if a stray current other than a circulating current passes through the aggregated wire 42, the occurrence of the stray current can be analyzed from the current values of the ground side current transformers 88a to 88c.

次に図12を参照して第3実施形態について説明する。第1,2実施形態では、直流電車である鉄道車両10,100a~100cに漏洩電流監視装置80,110が搭載される場合について説明した。これに対し、第3実施形態では、交流電車である鉄道車両150に漏洩電流監視装置80が搭載される場合について説明する。なお、第1,2実施形態と同一の部分については、同一の符号を付して以下の説明を省略する。 Next, a third embodiment will be described with reference to FIG. 12. In the first and second embodiments, the leakage current monitoring device 80, 110 is mounted on the railway cars 10, 100a to 100c, which are DC electric trains. In contrast, in the third embodiment, the leakage current monitoring device 80 is mounted on the railway car 150, which is an AC electric train. Note that the same parts as in the first and second embodiments are given the same reference numerals and the following description will be omitted.

図12は、第3実施形態における鉄道車両150の電気回路を模式的に示した回路図である。鉄道車両150は、交流電車であって、車体12と車輪13と連結部14とを主に備えている。 Figure 12 is a circuit diagram that shows a schematic of the electrical circuit of a railway vehicle 150 in the third embodiment. The railway vehicle 150 is an AC electric train, and mainly includes a car body 12, wheels 13, and a coupling portion 14.

レール2の上方に架け渡される架線140には、接地されたレール2に対し変電所141で起電力を生じさせることで、高電圧(本実施形態では25000V)の単相交流電流が流れる。パンタグラフ17を上昇させて架線140に接触させることで、架線140からパンタグラフ17を介して鉄道車両150の供給上流線18b及び供給引通線18aに車両走行用の交流電力が供給される。 A high-voltage (25,000 V in this embodiment) single-phase AC current flows through the overhead wire 140 that is suspended above the rail 2 by generating an electromotive force at the substation 141 with respect to the grounded rail 2. By raising the pantograph 17 to contact the overhead wire 140, AC power for running the vehicle is supplied from the overhead wire 140 via the pantograph 17 to the supply upstream line 18b and supply lead line 18a of the railway vehicle 150.

供給引通線18aから分岐した電線と、接地引通線41から分岐した接地側電線45とは、主変圧器151の1次巻線で連結される。主変圧器151は、入力された電圧を変圧して出力すると共に入力側と出力側とを絶縁する絶縁トランスであって、入力側の1次巻線に対して出力側に2次巻線と3次巻線とが設けられている。 The electric wire branching off from the supply lead wire 18a and the ground side electric wire 45 branching off from the ground lead wire 41 are connected by the primary winding of the main transformer 151. The main transformer 151 is an insulating transformer that transforms and outputs the input voltage and insulates the input side from the output side, and has a secondary winding and a tertiary winding on the output side relative to the primary winding on the input side.

主変圧器151の2次巻線には、主変圧器151から出力された交流電力を直流電力へ変換するAC/DCコンバータ152が接続される。このAC/DCコンバータ152の出力側にはVVVFインバータ20が接続される。VVVFインバータ20から電動機用電線24を介して電動機22へ交流電力が供給される。 An AC/DC converter 152 that converts the AC power output from the main transformer 151 into DC power is connected to the secondary winding of the main transformer 151. The output side of this AC/DC converter 152 is connected to the VVVF inverter 20. AC power is supplied from the VVVF inverter 20 to the motor 22 via the motor wire 24.

主変圧器151の3次巻線には、第1低圧交流電路32が接続される。第1低圧交流電路32には絶縁トランス34の1次巻線が接続され、その絶縁トランス34の2次巻線に第2低圧交流電路36が接続されている。この第3実施形態における第1低圧交流電路32は、第1,2実施形態における三相の第1低圧交流電路32に対し、単相である点以外は同一に構成されるので、同一の符号を付して説明を省略する。第1低圧交流電路32には、440Vの単相交流で作動する空調機器などの単相交流機器15aが設けられる。 A first low-voltage AC circuit 32 is connected to the tertiary winding of the main transformer 151. A primary winding of an isolation transformer 34 is connected to the first low-voltage AC circuit 32, and a second low-voltage AC circuit 36 is connected to the secondary winding of the isolation transformer 34. The first low-voltage AC circuit 32 in this third embodiment is configured in the same way as the three-phase first low-voltage AC circuit 32 in the first and second embodiments, except that it is single-phase, so the same reference numerals are used and a description is omitted. A single-phase AC device 15a such as an air conditioner that operates on 440V single-phase AC is provided on the first low-voltage AC circuit 32.

同様に、第3実施形態における第2低圧交流電路36は、第1,2実施形態における第2低圧交流電路36に対し、電線の本数が異なる点以外は同一に構成されるので、同一の符号を付して説明を省略する。第2低圧交流電路36には、100Vの単相交流で作動する複数の単相交流機器16と、整流器(図示せず)を介して複数の直流機器19とが設けられる。 Similarly, the second low-voltage AC circuit 36 in the third embodiment is configured in the same way as the second low-voltage AC circuit 36 in the first and second embodiments except for the number of electric wires, so the same reference numerals are used and the description is omitted. The second low-voltage AC circuit 36 is provided with a plurality of single-phase AC devices 16 that operate on 100V single-phase AC, and a plurality of DC devices 19 via a rectifier (not shown).

また、第3実施形態における絶縁トランス34は、第1低圧交流電路32から入力された440Vの単相交流を100Vの単相交流に変換して第2低圧交流電路36へ出力するものである。なお、絶縁トランス34を省略し、第2低圧交流電路36に接続する4次巻線を主変圧器151に設け、主変圧器151で変圧した100Vの単相交流を第2低圧交流電路36へ出力しても良い。 In addition, the isolation transformer 34 in the third embodiment converts the 440V single-phase AC input from the first low-voltage AC circuit 32 into a 100V single-phase AC and outputs it to the second low-voltage AC circuit 36. Note that the isolation transformer 34 may be omitted, and a quaternary winding connected to the second low-voltage AC circuit 36 may be provided in the main transformer 151, and the 100V single-phase AC transformed by the main transformer 151 may be output to the second low-voltage AC circuit 36.

このような鉄道車両150は、電気回路に生じる漏洩電流を監視する漏洩電流監視装置80を備えている。漏洩電流監視装置80の供給側変流器87は、供給上流線18bが通されて供給上流線18bの電流値を計測する。漏洩電流監視装置80の接地側変流器88は、集約線42が通されて集約線42の電流値を計測する。第3実施形態における供給側変流器87及び接地側変流器88は、交流の電流値を計測可能に構成されているが、その構成は既知であるため説明を省略する。また、漏洩電流監視装置80の電位差検出部89は、供給上流線18bと集約線42との間の電位差を計測する。 Such a railway vehicle 150 is equipped with a leakage current monitoring device 80 that monitors leakage current occurring in the electric circuit. The supply side current transformer 87 of the leakage current monitoring device 80 has the supply upstream line 18b passing through it and measures the current value of the supply upstream line 18b. The ground side current transformer 88 of the leakage current monitoring device 80 has the aggregated line 42 passing through it and measures the current value of the aggregated line 42. The supply side current transformer 87 and the ground side current transformer 88 in the third embodiment are configured to be able to measure AC current values, but since their configurations are known, their explanations will be omitted. In addition, the potential difference detection unit 89 of the leakage current monitoring device 80 measures the potential difference between the supply upstream line 18b and the aggregated line 42.

鉄道車両150では、例えば供給引通線18aから車体12への漏洩電流が生じてその他の漏洩電流が生じていない場合、その漏洩電流は、集約線42(接地側変流器88)を迂回するように車体12、接地端子部43、レール2を流れる。この漏洩電流のルートは、向きが異なるだけで第1実施形態と略同一である。 In the railway vehicle 150, for example, when leakage current occurs from the supply line 18a to the car body 12 but no other leakage current occurs, the leakage current flows through the car body 12, the ground terminal section 43, and the rail 2, bypassing the aggregated line 42 (ground side current transformer 88). The route of this leakage current is substantially the same as in the first embodiment, except for the direction.

また、主変圧器151の出力側または絶縁トランス34の出力側の電気回路で車体12との間に漏洩電流が生じた場合も、第1実施形態と同様のルートで漏洩電流が流れる。具体的に、その漏洩電流は、主変圧器151や絶縁トランス34へ戻るように車体12、接地端子部43、集約線42を通る。 In addition, if a leakage current occurs between the vehicle body 12 and the electrical circuit on the output side of the main transformer 151 or the output side of the isolation transformer 34, the leakage current flows through a route similar to that of the first embodiment. Specifically, the leakage current passes through the vehicle body 12, the ground terminal portion 43, and the aggregated wire 42 so as to return to the main transformer 151 or the isolation transformer 34.

よって、漏洩電流監視装置80は、供給側変流器87の電流値A1と、接地側変流器88の電流値A2とを計測することにより、第1実施形態と同様に漏洩電流の検出精度を向上できる。更に、第1実施形態と同様に、電流値A1,A2の変動の仕方から漏洩電流が生じた部分を推定できる。 Therefore, the leakage current monitoring device 80 can improve the detection accuracy of the leakage current as in the first embodiment by measuring the current value A1 of the supply side current transformer 87 and the current value A2 of the ground side current transformer 88. Furthermore, as in the first embodiment, the part where the leakage current occurs can be estimated from the way in which the current values A1 and A2 fluctuate.

なお、交流電車である鉄道車両150の電気回路に生じる漏洩電流には、対地静電容量に起因する漏洩電流Igcと、絶縁抵抗に直接関与している対地絶縁抵抗に起因する漏洩電流Igrと、が含まれている。漏洩電流Igcは、計測対象の電線の長さに応じて容量が増大するだけでなく、電気機器に使用されているインバータやノイズフィルター等に起因する高調波歪み電流によっても容量が増大する。 The leakage current generated in the electrical circuit of the railway vehicle 150, which is an AC electric train, includes leakage current Igc caused by capacitance to the ground, and leakage current Igr caused by insulation resistance to the ground, which is directly related to insulation resistance. The leakage current Igc not only increases in capacity according to the length of the electric wire being measured, but also increases in capacity due to harmonic distortion currents caused by inverters, noise filters, etc. used in electrical equipment.

電位差検出部89で電圧のクロスポイントを検出することによって、その検出結果と電流値A1,A2の差分とから漏洩電流Igrを算出できる。なお、漏洩電流Igrの算出には、既知の方法を用いればよく、例えば特許第4945727号公報に開示されている方法を用いればよい。 By detecting the voltage cross point with the potential difference detection unit 89, the leakage current Igr can be calculated from the detection result and the difference between the current values A1 and A2. Note that the leakage current Igr can be calculated using a known method, such as the method disclosed in Japanese Patent No. 4945727.

よって、第3実施形態における漏洩電流監視装置80の図7のメイン処理では、S24~S26の処理に代えて、補正後の差分Adとして漏洩電流Igrを算出する処理を実行する。 Therefore, in the main process of FIG. 7 of the leakage current monitoring device 80 in the third embodiment, instead of the processes of S24 to S26, a process is executed to calculate the leakage current Igr as the corrected difference Ad.

次に図13を参照して第4実施形態について説明する。第1~3実施形態では、架線4,140からパンタグラフ17を介して鉄道車両10,100a~100c,150に電力が供給される場合について説明した。これに対し、第4実施形態では、パンタグラフ17の代わりに発電機161を搭載した鉄道車両160について説明する。なお、第1~3実施形態と同一の部分については、同一の符号を付して以下の説明を省略する。 Next, the fourth embodiment will be described with reference to FIG. 13. In the first to third embodiments, the case where power is supplied to the railway cars 10, 100a to 100c, 150 from the overhead line 4, 140 via the pantograph 17 has been described. In contrast, in the fourth embodiment, a railway car 160 equipped with a generator 161 instead of the pantograph 17 will be described. Note that the same parts as in the first to third embodiments are given the same reference numerals and the following description will be omitted.

図13は、第4実施形態における鉄道車両160の電気回路を模式的に示した回路図である。鉄道車両160は、車体12と、車輪13と、連結部14(図示せず)と、VVVFインバータ20と、SIV30と、接地線40と、車両走行用の電力を発生させる発電機161及び蓄電池165と、発電機161及び蓄電池165からの電力を調整して出力する調整装置166と、を主に備えている。 Figure 13 is a circuit diagram showing a schematic diagram of an electrical circuit of a railway vehicle 160 in the fourth embodiment. The railway vehicle 160 mainly comprises a car body 12, wheels 13, a coupling portion 14 (not shown), a VVVF inverter 20, an SIV 30, a grounding wire 40, a generator 161 and a storage battery 165 that generate power for running the vehicle, and an adjustment device 166 that adjusts and outputs the power from the generator 161 and the storage battery 165.

発電機161は、三相交流電力を発生させる三相4線式の発電機である。発電機161には、三相交流電力が供給される3本1組の供給線162,163,164が接続される。また、発電機161の中性点から延びる中性線161aは、手動開閉器46fを介して接地線40の接地引通線41に接続される。これにより、手動開閉器46fが閉じていれば、発電機161の中性点が接地される。 The generator 161 is a three-phase, four-wire generator that generates three-phase AC power. A set of three supply lines 162, 163, and 164 that supply three-phase AC power is connected to the generator 161. In addition, the neutral line 161a extending from the neutral point of the generator 161 is connected to the grounding line 41 of the grounding line 40 via the manual switch 46f. As a result, when the manual switch 46f is closed, the neutral point of the generator 161 is grounded.

蓄電池165は、直流電力を充放電する電池である。蓄電池165の正極には、正極線165aが接続され、蓄電池165の負極には、負極線165bが接続されている。蓄電池165で生じた電流は、正極線165aから各部へ供給され、負極線165bから帰ってくる。 The storage battery 165 is a battery that charges and discharges DC power. A positive electrode wire 165a is connected to the positive electrode of the storage battery 165, and a negative electrode wire 165b is connected to the negative electrode of the storage battery 165. The current generated by the storage battery 165 is supplied to each part from the positive electrode wire 165a and returns from the negative electrode wire 165b.

調整装置166は、供給線162,163,164が接続され、発電機161からの三相交流電力を直流電力に変換して出力する装置である。更に、調整装置166は、正極線165a及び負極線165bが接続され、蓄電池165からの直流電力を、発電機161からの交流電力を変換した直流電力と共に出力する。例えば、調整装置166は、出力する電力が、発電機161からの交流電力を変換しただけでは足らない場合、その不足分を補うために蓄電池165から直流電力の供給を受けるよう制御する。 The adjustment device 166 is connected to the supply lines 162, 163, and 164, and is a device that converts the three-phase AC power from the generator 161 into DC power and outputs it. Furthermore, the adjustment device 166 is connected to the positive pole line 165a and the negative pole line 165b, and outputs the DC power from the storage battery 165 together with the DC power obtained by converting the AC power from the generator 161. For example, when the power to be output is insufficient simply by converting the AC power from the generator 161, the adjustment device 166 controls the supply of DC power from the storage battery 165 to make up for the shortage.

このような調整装置166、発電機161及び蓄電池165をまとめて、鉄道車両160に搭載された1つの車載電源とみなしても良い。また、発電機161又は蓄電池165のそれぞれを鉄道車両160に搭載された車載電源とみなしても良い。 The adjustment device 166, the generator 161, and the storage battery 165 may be collectively regarded as a single on-board power source mounted on the railway vehicle 160. Also, each of the generator 161 or the storage battery 165 may be regarded as an on-board power source mounted on the railway vehicle 160.

調整装置166の出力側には、VVVFインバータ20及びSIV30へ直流電力を供給するための供給線18と、VVVFインバータ20及びSIV30から直流電力が帰ってくる接地側電線45と、が接続されている。供給線18がVVVFインバータ20及びSIV30の入力側の正極端子に接続され、接地側電線45がVVVFインバータ20及びSIV30の入力側の負極端子に接続される。接地側電線45から分岐した分岐線45aは、手動開閉器46gを介して接地引通線41に接続される。これにより、手動開閉器46gが閉じていれば、接地側電線45が接地され、接地線40の一部を構成する。 The output side of the adjustment device 166 is connected to a supply line 18 for supplying DC power to the VVVF inverter 20 and the SIV 30, and a ground side electric wire 45 to which DC power returns from the VVVF inverter 20 and the SIV 30. The supply line 18 is connected to the positive terminal of the input side of the VVVF inverter 20 and the SIV 30, and the ground side electric wire 45 is connected to the negative terminal of the input side of the VVVF inverter 20 and the SIV 30. A branch line 45a branching from the ground side electric wire 45 is connected to the ground lead line 41 via a manual switch 46g. As a result, when the manual switch 46g is closed, the ground side electric wire 45 is grounded and forms part of the ground line 40.

このような鉄道車両160は、発電機161と調整装置166との間で生じる漏洩電流を監視する漏洩電流監視装置170と、調整装置166の下流側で生じる漏洩電流を監視する漏洩電流監視装置180と、を備えている。 Such a railway vehicle 160 is equipped with a leakage current monitoring device 170 that monitors the leakage current occurring between the generator 161 and the regulating device 166, and a leakage current monitoring device 180 that monitors the leakage current occurring downstream of the regulating device 166.

漏洩電流監視装置170は、3本の供給線162,163,164がそれぞれ通されて、供給線162,163,164の電流値をそれぞれ個別に計測する3つの供給側変流器171,172,173を備えている。供給側変流器(供給側計測器)171~173はいずれも、計測対象となる電線が貫通する環状の変流器から構成された計測器であり、その貫通部分を流れる電流値を計測する。発電機161と調整装置166との間で漏洩電流が生じていない場合、基本的に、3つの供給側変流器171~173の電流値の合計(差分)が0[A]となる。 The leakage current monitoring device 170 includes three supply side current transformers 171, 172, 173 through which the three supply lines 162, 163, 164 pass, and which measure the current values of the supply lines 162, 163, 164 individually. Each of the supply side current transformers (supply side measuring instruments) 171 to 173 is a measuring instrument composed of a ring-shaped current transformer through which the electric wire to be measured passes, and measures the current value flowing through the passed part. If no leakage current is occurring between the generator 161 and the adjustment device 166, the sum (difference) of the current values of the three supply side current transformers 171 to 173 is basically 0 [A].

一方、供給側変流器171~173の下流であって発電機161と調整装置166との間で車体12への漏洩電流が生じた場合、その漏洩電流は、車体12、接地線40、中性線161aを流れる。よって、供給側変流器171~173の電流値の合計を漏洩電流の値として精度良く算出できる。従って、漏洩電流監視装置170は、供給側変流器171~173の電流値を監視することで、発電機161と調整装置166との間で生じる漏洩電流の検出精度を向上できる。 On the other hand, if leakage current to the vehicle body 12 occurs downstream of the supply side current transformers 171-173 between the generator 161 and the adjustment device 166, the leakage current flows through the vehicle body 12, the ground wire 40, and the neutral wire 161a. Therefore, the sum of the current values of the supply side current transformers 171-173 can be accurately calculated as the value of the leakage current. Therefore, by monitoring the current values of the supply side current transformers 171-173, the leakage current monitoring device 170 can improve the detection accuracy of the leakage current occurring between the generator 161 and the adjustment device 166.

なお、3本の供給線162~164を1つの変流器に通すことで、供給線162~164を流れる電流値の合計を計測することは可能である。しかし、供給線162~164同士が離れている場合には、大径の変流器や変形自在な変流器を用いる必要があるため、使用可能な変流器の自由度が小さくなる。更に、大径の変流器や変形自在な変流器では、電流値の検出精度が低下する。 It is possible to measure the total current value flowing through the supply lines 162-164 by passing the three supply lines 162-164 through one current transformer. However, if the supply lines 162-164 are separated from each other, it is necessary to use a large-diameter current transformer or a freely deformable current transformer, which reduces the flexibility of the current transformer that can be used. Furthermore, with a large-diameter current transformer or a freely deformable current transformer, the accuracy of detecting the current value decreases.

これに対し本実施形態では、3本の供給線162~164を個別に供給側変流器171~173に通すので、供給線162~164同士が離れていたとしても、供給側変流器171~173の自由度の低下を抑制できる。更に、供給側変流器171~173を小径で固定形状にし易いので、電流値の検出精度を向上できる。 In contrast, in this embodiment, the three supply lines 162-164 are passed through the supply side current transformers 171-173 individually, so even if the supply lines 162-164 are separated from each other, the degree of freedom of the supply side current transformers 171-173 can be prevented from decreasing. Furthermore, since the supply side current transformers 171-173 can be easily made small in diameter and have a fixed shape, the detection accuracy of the current value can be improved.

また、中性線161aの電流値を変流器で計測することでも、中性線161aを流れる漏洩電流を検出できる。但し、中性線161aには、漏洩電流以外にも、鉄道車両160の電気回路の各部から接地線40を介して電流が生じることがあり、発電機161と調整装置166との間で生じる漏洩電流の検出精度が低下するおそれがある。 The leakage current flowing through the neutral conductor 161a can also be detected by measuring the current value of the neutral conductor 161a with a current transformer. However, in addition to the leakage current, currents may also be generated in the neutral conductor 161a from various parts of the electrical circuit of the railway vehicle 160 via the ground wire 40, and this may reduce the accuracy of detecting the leakage current occurring between the generator 161 and the adjustment device 166.

これに対し本実施形態では、中性線161aの電流値ではなく、3本の供給線162~164の電流値の合計によって漏洩電流の値を算出するので、発電機161と調整装置166との間で生じる漏洩電流の検出精度を向上できる。 In contrast, in this embodiment, the leakage current value is calculated by the sum of the current values of the three supply lines 162 to 164, rather than the current value of the neutral line 161a, thereby improving the detection accuracy of the leakage current occurring between the generator 161 and the adjustment device 166.

なお、漏洩電流監視装置170の具体的な制御方法は、電位差V1を取得せず、供給側変流器171~173の電流値の合計を差分Ad(漏洩電流の値)とする以外は、第1実施形態の漏洩電流監視装置80と略同一である。 The specific control method of the leakage current monitoring device 170 is substantially the same as that of the leakage current monitoring device 80 of the first embodiment, except that the potential difference V1 is not acquired, and the sum of the current values of the supply side current transformers 171 to 173 is taken as the difference Ad (the value of the leakage current).

漏洩電流監視装置180は、供給線18が通される供給側変流器181と、接地側電線45が通される接地側変流器182と、正極線165aが通される蓄電池用変流器183と、を備えている。供給側変流器(供給側計測器)181、接地側変流器(供給側計測器)182及び蓄電池用変流器183はいずれも、計測対象となる電線が貫通する環状の変流器から構成された計測器であり、その貫通部分を流れる電流値を計測する。供給側変流器181は、供給線18のうちVVVFインバータ20側とSIV30側とへ分岐する前の部位が通され、その部位の電流値A1を計測する。 The leakage current monitoring device 180 includes a supply side current transformer 181 through which the supply line 18 passes, a ground side current transformer 182 through which the ground side electric wire 45 passes, and a battery current transformer 183 through which the positive electrode wire 165a passes. The supply side current transformer (supply side measuring instrument) 181, the ground side current transformer (supply side measuring instrument) 182, and the battery current transformer 183 are all measuring instruments composed of annular current transformers through which the electric wire to be measured passes, and measure the current value flowing through the passed part. The supply side current transformer 181 passes through the portion of the supply line 18 before it branches to the VVVF inverter 20 side and the SIV 30 side, and measures the current value A1 of that portion.

接地側変流器182は、接地側電線45のうち、VVVFインバータ20側とSIV30側とへ分岐する前の部位であって、分岐線45aへの分岐に対しVVVFインバータ20及びSIV30側の部位が通され、その部位の電流値A2を計測する。 The ground side current transformer 182 is the portion of the ground side electric wire 45 before it branches into the VVVF inverter 20 side and the SIV 30 side, through which the VVVF inverter 20 and SIV 30 side portions pass when branching into the branch line 45a, and measures the current value A2 at that portion.

調整装置166の下流側で漏洩電流が生じていない場合、調整装置166から供給線18を介しVVVFインバータ20及びSIV30へ電流が流れ、VVVFインバータ20及びSIV30から接地側電線45を介し調整装置166へ電流が帰る。よって、この場合には基本的に、供給側変流器181の電流値A1と、接地側変流器182の電流値A2との差分Adが0[A]となる。 If no leakage current occurs downstream of the adjustment device 166, current flows from the adjustment device 166 to the VVVF inverter 20 and SIV 30 via the supply line 18, and current returns from the VVVF inverter 20 and SIV 30 to the adjustment device 166 via the ground side electric wire 45. Therefore, in this case, the difference Ad between the current value A1 of the supply side current transformer 181 and the current value A2 of the ground side current transformer 182 is basically 0 [A].

一方、調整装置166の下流側であって、例えば電動機22で漏洩電流が生じた場合、その漏洩電流は、車体12、接地線40、分岐線45aを通り、接地側変流器182を迂回して接地側電線45に合流し、調整装置166に帰る。これにより、供給側変流器181の電流値A1と、接地側変流器182の電流値A2との差分Adを漏洩電流の値として精度良く算出できる。従って、漏洩電流監視装置180は、供給側変流器181及び接地側変流器182の電流値A1,A2を監視することで、調整装置166の下流側で生じる漏洩電流の検出精度を向上できる。 On the other hand, if leakage current occurs downstream of the adjustment device 166, for example in the electric motor 22, the leakage current passes through the vehicle body 12, the ground wire 40, and the branch wire 45a, bypasses the ground side current transformer 182, merges with the ground side electric wire 45, and returns to the adjustment device 166. This allows the difference Ad between the current value A1 of the supply side current transformer 181 and the current value A2 of the ground side current transformer 182 to be calculated with high accuracy as the leakage current value. Therefore, the leakage current monitoring device 180 can improve the detection accuracy of leakage current occurring downstream of the adjustment device 166 by monitoring the current values A1 and A2 of the supply side current transformer 181 and the ground side current transformer 182.

蓄電池用変流器183は、蓄電池165から延びる正極線165aの電流値を計測する。供給線18には、蓄電池165からの電流と、発電機161からの電流とが流れるので、供給側変流器181の電流値A1と蓄電池用変流器183の電流値とから、電流値A1のうち蓄電池165分と発電機161分とを算出できる。これにより、蓄電池165からの電流に基づいた漏洩電流の発生や、発電機161からの電流に基づいた漏洩電流の発生を検出できる。 The battery current transformer 183 measures the current value of the positive electrode wire 165a extending from the battery 165. Since current from the battery 165 and current from the generator 161 flow through the supply line 18, the current value A1 for the battery 165 and the current value for the generator 161 can be calculated from the current value A1 of the supply side current transformer 181 and the current value of the battery current transformer 183. This makes it possible to detect the occurrence of leakage current based on the current from the battery 165 or the occurrence of leakage current based on the current from the generator 161.

なお、漏洩電流監視装置170の具体的な制御方法は、電位差V1を取得せず、電流値A1と電流値A2との差分を、電位差V1で補正せずに差分Ad(漏洩電流の値)とする点と、蓄電池用変流器183の電流値をピーク検出メモリ82c等に記憶する点以外は、第1実施形態の漏洩電流監視装置80と略同一である。 The specific control method of the leakage current monitoring device 170 is substantially the same as that of the leakage current monitoring device 80 of the first embodiment, except that the potential difference V1 is not acquired, and the difference between the current value A1 and the current value A2 is set to the difference Ad (the value of the leakage current) without being corrected by the potential difference V1, and the current value of the storage battery current transformer 183 is stored in the peak detection memory 82c or the like.

以上、実施形態に基づき本発明を説明したが、本発明は上述した実施形態に何ら限定されるものではなく、本発明の趣旨を逸脱しない範囲内で種々の改良変更が可能であることは容易に推測できるものである。例えば、架線4,140の電圧やSIV30からの出力電圧の数値などを適宜変更しても良い。互いに連結される鉄道車両100a~100cの数を適宜変更しても良く、複数台の鉄道車両が連結された車両編成の一部を鉄道車両10,150,160としても良い。 The present invention has been described above based on the embodiments, but the present invention is not limited to the above-mentioned embodiments, and it can be easily imagined that various improvements and modifications are possible within the scope of the present invention. For example, the voltage of the overhead lines 4, 140 and the value of the output voltage from the SIV 30 may be changed as appropriate. The number of railcars 100a-100c that are coupled together may be changed as appropriate, and part of a train formation in which multiple railcars are coupled together may be railcars 10, 150, 160.

電流値A1,A2を取得する間隔や、走行状態データを取得する間隔、差分Adの平均値を算出する間隔、その平均値の算出に用いる差分Adの範囲、各リングバッファ83a~83dの記憶容量などを適宜変更しても良い。図9のアベレージ検出処理S29で短期変化率および長期変化率の算出に用いる変化前の平均値を適宜変更しても良い。例えば、5分~4分前の平均値(5分~4分前に算出された複数の差分Adを平均した平均値)に対する直近1分間の平均値の変化率を短期変化率や長期変化率としても良い。 The interval for acquiring the current values A1 and A2, the interval for acquiring the driving state data, the interval for calculating the average value of the difference Ad, the range of the difference Ad used to calculate the average value, the storage capacity of each ring buffer 83a to 83d, etc. may be changed as appropriate. The average value before the change used to calculate the short-term change rate and the long-term change rate in the average detection process S29 in FIG. 9 may be changed as appropriate. For example, the rate of change of the average value over the most recent minute relative to the average value 5 to 4 minutes ago (the average value obtained by averaging multiple difference Ad calculated 5 to 4 minutes ago) may be used as the short-term change rate and the long-term change rate.

また、鉄道車両10,100a~100c,150,160の各部の詳細な電気回路を適宜変更しても良い。鉄道車両10,100a~100c,150は、直流電車または交流電車のいずれか一方だけでなく、走行する路線に応じて直流電車と交流電車とを切り換え可能にしても良い。この場合、鉄道車両10,100a~100c,150に架線4,140から供給される電力に応じて、直流を検出可能な供給側変流器および接地側変流器と、交流を検出可能な供給側変流器および接地側変流器と、を切り換え可能に構成する。 In addition, the detailed electrical circuits of each part of the railway vehicles 10, 100a-100c, 150, 160 may be modified as appropriate. The railway vehicles 10, 100a-100c, 150 may be configured to be able to switch between DC and AC trains depending on the line they are traveling on, rather than just being either DC or AC trains. In this case, the supply side current transformer and ground side current transformer capable of detecting DC and the supply side current transformer and ground side current transformer capable of detecting AC are configured to be able to be switched depending on the power supplied to the railway vehicles 10, 100a-100c, 150 from the overhead lines 4, 140.

上記実施形態では、漏洩電流監視装置80,110,170,180によって鉄道車両10,100a~100c,150,160の電気回路の漏洩電流を監視する場合について説明したが、これに限られない。鉄道車両10,100a~100c,150,160以外の電気回路の漏洩電流を漏洩電流監視装置80,110,170,180によって監視しても良い。例えば、鉄道車両10,100a~100c,150,160以外の電気回路として、各家庭や施設、工場などの屋内配線または電気設備、自動車や航空機、船舶、電化製品の電気回路などが挙げられる。 In the above embodiment, the leakage current monitoring devices 80, 110, 170, 180 are used to monitor the leakage current of the electrical circuits of the railroad cars 10, 100a-100c, 150, 160, but this is not limited to the above. The leakage current of electrical circuits other than the railroad cars 10, 100a-100c, 150, 160 may be monitored by the leakage current monitoring devices 80, 110, 170, 180. For example, electrical circuits other than the railroad cars 10, 100a-100c, 150, 160 include indoor wiring or electrical equipment in homes, facilities, factories, etc., electrical circuits in automobiles, aircraft, ships, and electrical appliances.

上記実施形態では、鉄道車両10,100a~100c,150,160がレール2上を走行する場合について説明したが、これに限られない。例えば、レールに吊り下げられる鉄道車両に本発明を適用しても良い。また、直流電車において、VVVFインバータ20による制御の代わりに、供給線18からの直流電力を分圧により調整して出力する抵抗制御によって、直流用の電動機を作動させても良い。 In the above embodiment, the railcars 10, 100a-100c, 150, and 160 run on rails 2, but the present invention is not limited to this. For example, the present invention may be applied to a railcar suspended from a rail. Also, in a DC train, instead of control by the VVVF inverter 20, the DC motor may be operated by resistance control that adjusts the DC power from the supply line 18 by voltage division and outputs it.

上記実施形態では、三相4線式の交流の発電機161が鉄道車両160に搭載される場合について説明したが、これに限られない。発電機161を単相交流発電機、三相3線式の交流発電機に変更し、それらからの交流電力を調整装置166で直流電力に変換するようにしても良い。また、燃料電池を含む直流発電機に発電機161を変更し、調整装置166による電力の変換機能を省略しても良い。また、発電機を搭載せずに蓄電池165のみで走行する鉄道車両に本発明を適用しても良い。更に、各種の発電機や蓄電池165とパンタグラフ17との両方を搭載し、それらからの電力供給を切り換え可能な鉄道車両に本発明を適用しても良い。 In the above embodiment, a three-phase, four-wire AC generator 161 is mounted on the railcar 160, but this is not limiting. The generator 161 may be changed to a single-phase AC generator or a three-phase, three-wire AC generator, and the AC power from the generator 161 may be converted to DC power by the adjustment device 166. The generator 161 may also be changed to a DC generator including a fuel cell, and the power conversion function by the adjustment device 166 may be omitted. The present invention may also be applied to a railcar that runs on only the storage battery 165 without a generator. Furthermore, the present invention may also be applied to a railcar that is equipped with both various types of generators or storage batteries 165 and a pantograph 17, and is capable of switching the power supply from them.

また、SIV30とSIV30よりも上流側とを車載電源とし、その車載電源から電力が供給される3本の電線32u,32v,32wを個別に3つの変流器に通しても良い。3本の電線32u,32v,32wのうち接地線40に接続されていないものが供給線であり、その供給線が通る変流器が供給側変流器である。3本の電線32u,32v,32wのうち接地線40に接続されたものがある場合、その接続されたものが接地線の一部であり、その接地線の一部が通る変流器が接地側変流器である。同様に、VVVFインバータ20や絶縁トランス34、主変圧器151、AC/DCコンバータと、それらよりも上流側とを車載電源とし、車載電源の下流側(出力側)の各電線を適宜、供給側変流器や接地側変流器に通しても良い。 Also, the SIV 30 and the upstream side of the SIV 30 may be an on-board power source, and the three electric wires 32u, 32v, and 32w to which power is supplied from the on-board power source may be passed through three current transformers individually. Of the three electric wires 32u, 32v, and 32w, the one that is not connected to the ground wire 40 is a supply line, and the current transformer through which the supply line passes is a supply-side current transformer. If any of the three electric wires 32u, 32v, and 32w is connected to the ground wire 40, the connected one is a part of the ground wire, and the current transformer through which the part of the ground wire passes is a ground-side current transformer. Similarly, the VVVF inverter 20, the isolation transformer 34, the main transformer 151, the AC/DC converter, and the upstream side of these may be an on-board power source, and each electric wire on the downstream side (output side) of the on-board power source may be passed through a supply-side current transformer or a ground-side current transformer as appropriate.

上記第4実施形態では、漏洩電流監視装置170,180が、電位差V1を計測する電位差検出部89を備えない場合について説明したが、これに限られない。例えば、供給線18と接地線40との間の電位差V1を計測する電位差検出部89を漏洩電流監視装置180に設け、電位差V1で補正した差分Adを算出しても良い。 In the above fourth embodiment, a case has been described in which the leakage current monitoring devices 170, 180 do not include a potential difference detection unit 89 that measures the potential difference V1, but this is not limited to the above. For example, the leakage current monitoring device 180 may be provided with a potential difference detection unit 89 that measures the potential difference V1 between the supply line 18 and the ground line 40, and the difference Ad corrected by the potential difference V1 may be calculated.

同様に、三相交流が流れる供給線162,163,164の相間から電圧のクロスポイントを検出する電位差検出部89を漏洩電流監視装置170に設け、補正後の差分Adとして漏洩電流Igrを算出しても良い。なお、漏洩電流Igrを算出するために、電圧のクロスポイントを検出する対象が三相3線式の場合、電位差検出部89は、接地されていない2相間の電圧のクロスポイントを検出すれば良い。 Similarly, the leakage current monitoring device 170 may be provided with a potential difference detection unit 89 that detects voltage cross points between the phases of the supply lines 162, 163, and 164 through which three-phase AC flows, and the leakage current Igr may be calculated as the corrected difference Ad. Note that, in order to calculate the leakage current Igr, if the target for detecting voltage cross points is a three-phase, three-wire system, the potential difference detection unit 89 may simply detect the voltage cross points between two ungrounded phases.

また、第1~3実施形態における漏洩電流監視装置80,110の電位差検出部89を省略しても良い。架線4の電圧を計測する電圧計が鉄道車両10,100a~100c,150に搭載されている場合、その電圧計を電位差検出部89として用いても良い。 The potential difference detection unit 89 of the leakage current monitoring device 80, 110 in the first to third embodiments may be omitted. If a voltmeter that measures the voltage of the overhead line 4 is installed on the railway vehicle 10, 100a to 100c, 150, the voltmeter may be used as the potential difference detection unit 89.

上記実施形態では、接地端子部43とレール2(各車輪13)との間の電位差を0[V]と仮定する場合について説明したが、これに限られない。接地端子部43とレール2(各車輪13)との間の電位差V2を計測する第2電位差検出部を漏洩電流監視装置80,110,170,180に設けても良い。例えば、この電位差V2と、電位差検出部89による電位差V1とによって、電流値A1,A2の差分を補正しても良い。 In the above embodiment, the case where the potential difference between the ground terminal portion 43 and the rail 2 (each wheel 13) is assumed to be 0 [V] has been described, but this is not limited to the above. A second potential difference detection unit that measures the potential difference V2 between the ground terminal portion 43 and the rail 2 (each wheel 13) may be provided in the leakage current monitoring device 80, 110, 170, 180. For example, the difference between the current values A1 and A2 may be corrected using this potential difference V2 and the potential difference V1 by the potential difference detection unit 89.

上記実施形態では、漏洩電流監視装置80,110,170,180において、供給側変流器87,87a,87c,171~173,181及び接地側変流器88,88a~88c,182の電流値に基づき差分Ad(漏洩電流の値)を算出する場合について説明したが、これに限られない。例えば、漏洩電流監視装置80,110,170,180で差分Adを算出せずに、外部サーバ90で差分Adを算出しても良い。即ち、漏洩電流監視装置80,110,170,180は、供給側変流器87,87a,87c,171~173,181及び接地側変流器88,88a~88c,182の電流値や、電位差検出部89による電位差V1を外部サーバ90へ送信するだけのものでも良い。また、外部サーバ90を設けず、差分Ad及び走行状態データに基づく解析を漏洩電流監視装置80,110,170,180で行うようにしても良い。 In the above embodiment, the leakage current monitoring device 80, 110, 170, 180 calculates the difference Ad (leakage current value) based on the current values of the supply side current transformers 87, 87a, 87c, 171-173, 181 and the ground side current transformers 88, 88a-88c, 182, but this is not limited to the above. For example, the leakage current monitoring device 80, 110, 170, 180 may not calculate the difference Ad, but may calculate the difference Ad in the external server 90. In other words, the leakage current monitoring device 80, 110, 170, 180 may only transmit the current values of the supply side current transformers 87, 87a, 87c, 171-173, 181 and the ground side current transformers 88, 88a-88c, 182 and the potential difference V1 by the potential difference detection unit 89 to the external server 90. Also, without providing an external server 90, analysis based on the difference Ad and driving condition data may be performed by the leakage current monitoring devices 80, 110, 170, and 180.

上記実施形態では、外部サーバ90への送信が許可されたデータが記憶される各メモリ82c~82fに、差分Adに関するデータとして差分Ad自体や差分Adの平均値を記憶する場合について説明したが、これに限られない。差分Adに関するデータとして電流値A1,A2を各メモリ82c~82fに記憶し、差分Adに基づき選定した電流値A1,A2を外部サーバ90へ送信するようにしても良い。 In the above embodiment, the memory 82c to 82f in which data permitted to be transmitted to the external server 90 is stored stores the difference Ad itself or the average value of the difference Ad as data related to the difference Ad, but this is not limited to the above. The current values A1 and A2 may be stored in the memory 82c to 82f as data related to the difference Ad, and the current values A1 and A2 selected based on the difference Ad may be transmitted to the external server 90.

また、外部サーバ90と漏洩電流監視装置80,110,170,180とが無線通信装置71を介して通信可能である場合、差分Adに基づいて外部サーバ90への送信を許可すると判断したデータを、各メモリ82c~82fに記憶せず、外部サーバ90へ直接送信しても良い。 In addition, when the external server 90 and the leakage current monitoring devices 80, 110, 170, and 180 are capable of communicating with each other via the wireless communication device 71, data that is determined to be permitted to be transmitted to the external server 90 based on the difference Ad may be transmitted directly to the external server 90 without being stored in each of the memories 82c to 82f.

各メモリ82c~82fを鉄道車両10,100a~100c,150,160のHDD62に設け、各メモリ82c~82fのデータを鉄道車両10,100a~100c,150,160から外部サーバ90へ送信しても良い。更に、走行状態リングバッファ83aを鉄道車両10,100a~100c,150,160のHDD62やRAM63に設けても良い。 Each of the memories 82c to 82f may be provided in the HDD 62 of the railway vehicles 10, 100a to 100c, 150, and 160, and data in each of the memories 82c to 82f may be transmitted from the railway vehicles 10, 100a to 100c, 150, and 160 to the external server 90. Furthermore, the running state ring buffer 83a may be provided in the HDD 62 or RAM 63 of the railway vehicles 10, 100a to 100c, 150, and 160.

また、各メモリ82c~82fに、差分Ad自体や差分Adの平均値と一緒に走行状態データを記憶しなくても良い。この場合、走行状態リングバッファ83aに記憶された走行状態データと、各メモリ82c~82fに記憶されたデータとは、各データの計測時刻(算出時刻)により関連付けられている。そのため、各メモリ82c~82fに記憶されたデータを外部サーバ90へ送信するとき、そのデータの計測時刻と同一時刻に計測(所得)された走行状態データを外部サーバ90へ送信すれば良い。 In addition, it is not necessary to store the driving condition data together with the difference Ad itself or the average value of the difference Ad in each of the memories 82c to 82f. In this case, the driving condition data stored in the driving condition ring buffer 83a and the data stored in each of the memories 82c to 82f are associated with each other by the measurement time (calculation time) of each data. Therefore, when transmitting the data stored in each of the memories 82c to 82f to the external server 90, it is sufficient to transmit to the external server 90 the driving condition data measured (acquired) at the same time as the measurement time of the data.

上記実施形態では、漏洩電流監視装置80,110,170,180のCPU81において、供給側変流器87,87a,87c,171~173,181及び接地側変流器88,88a~88c,182の電流値をデジタル化して取得する場合について例示したが、これに限られない。例えば、供給側変流器87,87a,87c,171~173,181及び接地側変流器88,88a~88c,182の電流値をアナログ信号のまま合成し、それらの電流値の差分(合計)をデジタル化してCPU81に取得させても良い。また、供給側変流器87,87a,87c,171~173,181及び接地側変流器88,88a~88c,182の電流値や、電位差検出部89による電位差V1をデジタル化する場合には、そのデジタル化する変換器と、入出力ポート85とを無線で通信しても良い。 In the above embodiment, the current values of the supply side current transformers 87, 87a, 87c, 171-173, 181 and the ground side current transformers 88, 88a-88c, 182 are digitized and acquired in the CPU 81 of the leakage current monitoring device 80, 110, 170, 180, but this is not limited to the above. For example, the current values of the supply side current transformers 87, 87a, 87c, 171-173, 181 and the ground side current transformers 88, 88a-88c, 182 may be combined as analog signals, and the difference (sum) between these current values may be digitized and acquired by the CPU 81. In addition, when digitizing the current values of the supply side current transformers 87, 87a, 87c, 171-173, 181 and the ground side current transformers 88, 88a-88c, 182, and the potential difference V1 detected by the potential difference detector 89, the digitizing converter may communicate wirelessly with the input/output port 85.

上記実施形態では、漏洩電流監視装置80,110,170,180でピーク検出処理S28、アベレージ検出処理S29及びサイクル収集処理S30を実行する場合について説明したが、これに限られない。例えば、ピーク検出処理S28、アベレージ検出処理S29及びサイクル収集処理S30の少なくとも1を実行し、その他の処理を実行しなくても良い。 In the above embodiment, the leakage current monitoring devices 80, 110, 170, and 180 are described as executing the peak detection process S28, the average detection process S29, and the cycle collection process S30, but this is not limited to the above. For example, at least one of the peak detection process S28, the average detection process S29, and the cycle collection process S30 may be executed, and the other processes may not be executed.

上記実施形態では、ピーク検出処理S28において、スタート位置Sからエンド位置Eまでの差分Adをピーク検出メモリ82cに記憶する場合について説明したが、これに限られない。例えば、差分リングバッファ83bの最新位置の差分Adが閾値未満から閾値以上になった場合に、15秒前から最新位置までの差分Adをピーク検出メモリ82cに記憶し、差分Adが閾値以上から閾値未満になってから15秒経過するまで、新たに算出された最新位置の差分Adを毎回のピーク検出処理S28でピーク検出メモリ82cに記憶するように制御しても良い。 In the above embodiment, the case where the difference Ad from the start position S to the end position E is stored in the peak detection memory 82c in the peak detection process S28 has been described, but this is not limited to the above. For example, when the difference Ad of the latest position in the difference ring buffer 83b changes from less than the threshold to equal to or greater than the threshold, the difference Ad from 15 seconds ago to the latest position may be stored in the peak detection memory 82c, and the newly calculated difference Ad of the latest position may be stored in the peak detection memory 82c in each peak detection process S28 until 15 seconds have passed since the difference Ad changed from equal to or greater than the threshold to less than the threshold.

上記第1~3実施形態では、集約線42を接地側変流器88,88a~88cに通す場合について説明したが、これに限られない。例えば、接地側電線45を接地側変流器88,88a~88cに通し、VVVFインバータ20及びSIV30の入力側の漏洩電流のみを検出できるようにしても良い。 In the above first to third embodiments, the case where the aggregated wire 42 is passed through the ground side current transformers 88, 88a to 88c has been described, but this is not limited to the above. For example, the ground side electric wire 45 may be passed through the ground side current transformers 88, 88a to 88c, so that only the leakage current on the input side of the VVVF inverter 20 and the SIV 30 can be detected.

上記第4実施形態において、集約線42が通る変流器を漏洩電流監視装置170,180に追加しても良い。例えば、集約線42が通る変流器によって、集約線42を通る迷走電流を検出できるので、その迷走電流の影響を排除して漏洩電流を解析できる。 In the fourth embodiment, a current transformer through which the aggregated line 42 passes may be added to the leakage current monitoring devices 170 and 180. For example, a current transformer through which the aggregated line 42 passes can detect stray current passing through the aggregated line 42, so that the effect of the stray current can be eliminated to analyze the leakage current.

上記第1,2実施形態では、絶縁トランス34が第1低圧交流電路32の三相交流を単相3線式の交流に変換して第2低圧交流電路36へ出力する場合について説明したが、これに限られない。例えば、三相交流を三相4線式の交流に変換(変圧)するように絶縁トランス34を構成し、接地線40に繋がる1本の中性線(電線36n)と、接地線40に繋がらない3本の電線(電線36r,36t及び追加の電線)それぞれとの間から100Vの単相交流を取り出すように第2低圧交流電路36を構成しても良い。 In the above first and second embodiments, the isolation transformer 34 converts the three-phase AC of the first low-voltage AC circuit 32 into single-phase three-wire AC and outputs it to the second low-voltage AC circuit 36, but this is not limited to the above. For example, the isolation transformer 34 may be configured to convert (transform) the three-phase AC into three-phase four-wire AC, and the second low-voltage AC circuit 36 may be configured to extract 100V single-phase AC between one neutral wire (wire 36n) connected to the ground wire 40 and each of the three wires (wires 36r, 36t and an additional wire) that are not connected to the ground wire 40.

また、第1低圧交流電路32の三相交流から単相交流を取り出し、その取り出した単相交流を絶縁トランス34で変圧して第2低圧交流電路36へ出力しても良い。具体的に例えば、絶縁トランス34の1次巻線で第1低圧交流電路32の電線32vと接地線40とを繋ぎ、絶縁トランス34の2次巻線で第2低圧交流電路36の電線36rと接地線40(電線36n)とを繋いでも良い。 Also, single-phase AC may be extracted from the three-phase AC of the first low-voltage AC circuit 32, and the extracted single-phase AC may be transformed by the isolation transformer 34 and output to the second low-voltage AC circuit 36. Specifically, for example, the primary winding of the isolation transformer 34 may connect the wire 32v of the first low-voltage AC circuit 32 and the ground wire 40, and the secondary winding of the isolation transformer 34 may connect the wire 36r of the second low-voltage AC circuit 36 and the ground wire 40 (wire 36n).

上記第3実施形態では、主変圧器151の3次巻線に第1低圧交流電路32が接続される場合について説明したが、これに限られない。主変圧器151の3次巻線を省略して、鉄道車両150に上記第1,2実施形態におけるSIV30を搭載し、SIV30に第1低圧交流電路32を接続しても良い。この場合、AC/DCコンバータ152の出力側とVVVFインバータ20の入力側とを繋ぐ正負の電線をそれぞれ分岐させ、その分岐した正負の電線をそれぞれSIV30の入力側に接続する。 In the third embodiment, the first low-voltage AC circuit 32 is connected to the tertiary winding of the main transformer 151, but this is not limited to the above. The tertiary winding of the main transformer 151 may be omitted, and the SIV 30 in the first and second embodiments may be mounted on the railway vehicle 150, and the first low-voltage AC circuit 32 may be connected to the SIV 30. In this case, the positive and negative electric wires connecting the output side of the AC/DC converter 152 and the input side of the VVVF inverter 20 are each branched, and the branched positive and negative electric wires are each connected to the input side of the SIV 30.

上記実施形態では、供給側変流器87,87a,87c,171~173,181、接地側変流器88,88a~88c,182及び蓄電池用変流器183のそれぞれは、計測対象となる電線が貫通する環状の変流器から構成されて、その貫通部分を流れる電流の値を計測する計測器である場合について説明した。しかし、これらの変流器を、計測対象の電線を流れる電流の値を計測可能な他の計測器に代えても良い。他の計測器としては、通電により電線に生じた磁界を計測し、その磁界に基づいて電流の値を計測する非環状のものが例示される。また、他の計測器としては、1本の電線の電流を個別に計測するものに限られるが、シャント抵抗を用いたものが例示される。 In the above embodiment, the supply side current transformers 87, 87a, 87c, 171-173, 181, the ground side current transformers 88, 88a-88c, 182, and the storage battery current transformer 183 are each configured as annular current transformers through which the electric wire to be measured passes, and are measuring instruments that measure the value of the current flowing through the passing part. However, these current transformers may be replaced with other measuring instruments that can measure the value of the current flowing through the electric wire to be measured. An example of the other measuring instruments is a non-annular one that measures the magnetic field generated in the electric wire when current is passed through it, and measures the value of the current based on that magnetic field. Another example of the other measuring instruments is limited to those that measure the current of one electric wire individually, but an example is one that uses a shunt resistor.

2 レール
4,140 架線
10,100b,150,160 鉄道車両
100a,100c 鉄道車両(電力供給車)
13 車輪
14 連結部
15 三相交流機器(電気機器の一種)
16 単相交流機器(電気機器の一種)
17 パンタグラフ
18,162,163,164 供給線
18a 供給引通線
18b 供給上流線
19 直流機器(電気機器の一種)
20 VVVFインバータ(電気機器の一種)
22 電動機(電気機器の一種)
30 SIV(電気機器の一種)
34 絶縁トランス(電気機器の一部)
40 接地線
41 接地引通線
42 集約線
43 接地端子部
71 無線通信装置(送信部)
80,110,170,180 漏洩電流監視装置(監視装置)
87,87a,87c,171,172,173,181 供給側変流器(供給側計測器)
88,88a,88b,88c,182 接地側変流器(接地側計測器)
89 電位差検出部
151 主変圧器(電気機器の一種)
152 AC/DCコンバータ(電気機器の一種)
161 発電機(車載電源)
161a 中性線
165 蓄電池(車載電源)
166 調整装置(電気機器の一種)
S26,S48,S51,S65,S68,S72 電位関連付手段
S21 取得手段
S48,S51,S65,S68,S72 状態関連付手段
S26 差分算出手段
S41~S47,S50,S63,S64,S66,S67 送信判断手段
S48,S51,S65,S68 送信許可手段

2 Rail 4, 140 Overhead line 10, 100b, 150, 160 Railway vehicle 100a, 100c Railway vehicle (power supply vehicle)
13 Wheel 14 Connection portion 15 Three-phase AC device (a type of electrical device)
16. Single-phase AC equipment (a type of electrical equipment)
17 Pantograph 18, 162, 163, 164 Supply line 18a Supply lead-in line 18b Supply upstream line 19 DC equipment (a type of electrical equipment)
20 VVVF inverter (a type of electrical device)
22 Electric motor (a type of electrical equipment)
30 SIV (a type of electrical equipment)
34 Isolation transformer (part of electrical equipment)
40 Ground wire 41 Ground lead-through wire 42 Aggregated wire 43 Ground terminal portion 71 Wireless communication device (transmitter)
80, 110, 170, 180 Leakage current monitor (monitoring device)
87, 87a, 87c, 171, 172, 173, 181 Supply side current transformer (supply side measuring instrument)
88, 88a, 88b, 88c, 182 Earth side current transformer (earth side measuring instrument)
89 Potential difference detection unit 151 Main transformer (a type of electrical equipment)
152 AC/DC converter (a type of electrical equipment)
161 Generator (on-board power supply)
161a Neutral wire 165 Storage battery (onboard power supply)
166 Adjustment device (a type of electrical equipment)
S26, S48, S51, S65, S68, S72 Potential correlation means S21 Acquisition means S48, S51, S65, S68, S72 State correlation means S26 Difference calculation means S41 to S47, S50, S63, S64, S66, S67 Transmission decision means S48, S51, S65, S68 Transmission permission means

Claims (9)

架線から電力の供給を受けるパンタグラフと、車両走行用の電力を発生させる三相4線式以外の車載電源との内の少なくとも一方が搭載されてレール上を走行する鉄道車両であって、
前記レール上を転動する複数の車輪と、
その車輪に接続されて接地される接地線と、
前記パンタグラフ又は前記車載電源から電力が供給される供給線と、
その供給線および前記接地線を含む電気回路に接続されて前記供給線からの電力によって作動する電気機器と、
前記電気回路に生じる漏洩電流を監視する監視装置と、を備え、
その監視装置は、
前記供給線の電流値を計測する供給側計測器と、
前記接地線の電流値を計測する接地側計測器と、
を備えていることを特徴とする鉄道車両。
A railway vehicle that is equipped with at least one of a pantograph that receives power from an overhead line and an on-board power source other than a three-phase four-wire power source that generates power for running the vehicle and runs on rails,
A plurality of wheels that roll on the rail;
A ground wire connected to the wheel and grounded;
a supply line to which power is supplied from the pantograph or the on-board power supply;
an electric device connected to an electric circuit including the supply line and the ground line and operated by power from the supply line;
A monitoring device for monitoring a leakage current occurring in the electric circuit,
The monitoring device is
a supply side meter that measures a current value of the supply line;
A ground side measuring instrument that measures a current value of the ground wire;
A railway vehicle comprising:
前記鉄道車両のレール方向の両端部にそれぞれ設けられて別車両に連結可能な一対の連結部を備え、
前記供給線は、
一対の前記連結部の間に引き通されて前記別車両に接続可能な供給引通線と、
その供給引通線と前記パンタグラフ又は前記車載電源とを繋ぐ供給上流線と、を備え、
前記供給側計測器は、前記供給上流線の電流値を計測することを特徴とする請求項1記載の鉄道車両。
a pair of coupling parts provided at both ends of the rail vehicle in a rail direction and capable of being coupled to another vehicle;
The supply line is
A supply line that is passed between the pair of coupling parts and can be connected to the other vehicle;
and an upstream supply line connecting the supply line and the pantograph or the on-board power source,
2. The railway vehicle according to claim 1, wherein the supply side measuring instrument measures a current value of the upstream supply line.
前記鉄道車両のレール方向の両端部にそれぞれ設けられて別車両に連結可能な一対の連結部を備え、
前記接地線は、
一対の前記連結部の間に引き通されて前記別車両に接続可能であると共に前記電気機器が接続される接地引通線と、
その接地引通線から分岐する集約線と、
複数の前記車輪を同電位とするようにこれらの車輪と前記集約線とを連結する接地端子部と、を備え、
前記接地側計測器は、前記集約線の電流値を計測することを特徴とする請求項1記載の鉄道車両。
a pair of coupling parts provided at both ends of the rail vehicle in a rail direction and capable of being coupled to another vehicle;
The ground wire is
a grounding line that is routed between the pair of coupling portions and is connectable to the other vehicle and to which the electrical equipment is connected;
A central line branching off from the grounding line;
a ground terminal portion that connects the wheels to the collective line so that the wheels are at the same potential;
2. The railway vehicle according to claim 1, wherein the ground side measuring instrument measures a current value of the aggregated line.
前記監視装置は、
前記供給線と前記接地線との間の電位差を計測する電位差計測部と、
その電位差計測部で計測した電位差をその計測時の前記供給側計測器および前記接地側計測器の電流値に関連付ける電位関連付手段と、
を備えることを特徴とする請求項1記載の鉄道車両。
The monitoring device includes:
a potential difference measuring unit that measures a potential difference between the supply line and the ground line;
a potential correlation means for correlating the potential difference measured by the potential difference measuring unit with the current values of the supply-side measuring instrument and the ground-side measuring instrument at the time of measurement;
2. The railway vehicle according to claim 1, further comprising:
前記監視装置は、
前記鉄道車両の走行状態を取得する取得手段と、
その取得手段で取得した走行状態をその取得時の前記供給側計測器および前記接地側計測器の電流値に関連付ける状態関連付手段と、
を備えることを特徴とする請求項1記載の鉄道車両。
The monitoring device includes:
An acquisition means for acquiring a running state of the railway vehicle;
a state relating means for relating the driving state obtained by the obtaining means to the current values of the supply side meter and the ground side meter at the time of obtaining the driving state;
2. The railway vehicle according to claim 1, further comprising:
前記供給側計測器および前記接地側計測器で計測した電流値に関するデータを前記鉄道車両の外部へ送信する送信部を備えることを特徴とする請求項1記載の鉄道車両。 The railway vehicle according to claim 1, further comprising a transmission unit that transmits data on the current values measured by the supply side meter and the ground side meter to the outside of the railway vehicle. 前記監視装置は、
前記供給側計測器の電流値と前記接地側計測器の電流値との差分を算出する差分算出手段と、
その差分算出手段で算出された差分に基づき、その差分に関するデータを前記送信部から前記鉄道車両の外部へ送信するかを判断する送信判断手段と、
その送信判断手段で送信すると判断した場合に、前記差分に関するデータを前記送信部から前記鉄道車両の外部へ送信可能とする送信許可手段と、
を備えることを特徴とする請求項6記載の鉄道車両。
The monitoring device includes:
a difference calculation means for calculating a difference between a current value of the supply side measuring device and a current value of the ground side measuring device;
a transmission determination means for determining whether or not to transmit data relating to the difference calculated by the difference calculation means from the transmitter to an outside of the railway vehicle;
a transmission permission means for allowing data relating to the difference to be transmitted from the transmitting unit to an outside of the railway vehicle when the transmission determination means determines that the data should be transmitted;
7. The railway vehicle according to claim 6, further comprising:
請求項1から7のいずれかに記載の鉄道車両を電力供給車とする車両編成内において、その電力供給車から電力の供給を受けてレール上を走行する鉄道車両であって、
前記レール上を転動する複数の車輪と、
前記電力供給車に直接または別の車両を介して連結される連結部と、
その連結部を介して前記電力供給車から供給される電力によって作動する電気機器と、
その電気機器を前記車輪に連結して接地させる自車接地線と、
その自車接地線の電流値を計測する自車接地側計測器と、を備えていることを特徴とする鉄道車両。
A railway vehicle that runs on a rail receiving power from the power supply car according to any one of claims 1 to 7 in a train configuration,
A plurality of wheels that roll on the rail;
A coupling part coupled to the power supply vehicle directly or via another vehicle;
an electric device operated by power supplied from the power supply vehicle through the connection part;
A vehicle grounding wire that connects the electrical equipment to the wheel and grounds it;
and a vehicle ground side measuring instrument that measures a current value of the vehicle ground wire.
レール上を走行する鉄道車両であって、
前記レール上を転動する複数の車輪と、
その車輪に接続されて接地される接地線と、
その接地線に中性線が接続される三相4線式の電源であって車両走行用の電力を発生させる車載電源と、
その車載電源から電力が供給される3本の供給線と、
それらの供給線を含む電気回路に接続されて前記供給線からの電力によって作動する電気機器と、
前記電気回路に生じて前記中性線を通る漏洩電流を監視する監視装置と、を備え、
その監視装置は、3本の前記供給線の電流値をそれぞれ個別に計測する3つの供給側計測器を備えていることを特徴とする鉄道車両。

A railway vehicle that runs on rails,
A plurality of wheels that roll on the rail;
A ground wire connected to the wheel and grounded;
an on-board power supply that is a three-phase, four-wire power supply having a neutral wire connected to the ground wire and that generates power for running the vehicle;
Three supply lines to which power is supplied from the on-board power supply;
an electric device connected to an electric circuit including the supply lines and operated by power from the supply lines;
a monitoring device for monitoring a leakage current occurring in the electric circuit and passing through the neutral conductor;
The monitoring device of the railway vehicle is characterized in that it includes three supply-side measuring instruments that individually measure the current values of the three supply lines.

JP2022188316A 2021-11-25 2022-11-25 Rail vehicles Active JP7613673B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021191478 2021-11-25
JP2021191478 2021-11-25

Publications (2)

Publication Number Publication Date
JP2023078110A JP2023078110A (en) 2023-06-06
JP7613673B2 true JP7613673B2 (en) 2025-01-15

Family

ID=86622857

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022188316A Active JP7613673B2 (en) 2021-11-25 2022-11-25 Rail vehicles

Country Status (1)

Country Link
JP (1) JP7613673B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117148040A (en) * 2023-09-04 2023-12-01 国网山东省电力公司聊城供电公司 Leakage locating device for 0.4kV low-voltage overhead lines based on least squares method
JP2025157963A (en) * 2024-04-03 2025-10-16 パナソニックIpマネジメント株式会社 Leakage current detection device, circuit breaker, distribution board, and program

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012223020A (en) 2011-04-12 2012-11-12 Toshiba Corp Electric vehicle system
JP2020190477A (en) 2019-05-22 2020-11-26 株式会社日立製作所 Body potential measurement system and body potential measurement method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07333279A (en) * 1994-06-14 1995-12-22 Meidensha Corp Leakage test equipment
JP3403847B2 (en) * 1995-03-09 2003-05-06 財団法人鉄道総合技術研究所 Method and apparatus for measuring insulation resistance
JP2003048465A (en) * 2001-08-08 2003-02-18 Mitsubishi Electric Corp Leakage current detector for railway feeder circuits
JP4297333B2 (en) * 2003-06-27 2009-07-15 大同信号株式会社 Railway line insulation resistance measuring method and apparatus

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012223020A (en) 2011-04-12 2012-11-12 Toshiba Corp Electric vehicle system
JP2020190477A (en) 2019-05-22 2020-11-26 株式会社日立製作所 Body potential measurement system and body potential measurement method

Also Published As

Publication number Publication date
JP2023078110A (en) 2023-06-06

Similar Documents

Publication Publication Date Title
JP7613673B2 (en) Rail vehicles
JP4188135B2 (en) Method and system for monitoring and regulating power consumed by a transportation system
JP4896279B1 (en) Train information management apparatus and train information management method
RU2706607C1 (en) Method of controlling integrity of rail threads by the ratio of current values in rails
US12145634B2 (en) Traction assembly including a locomotive and a tender and associated method
WO2010026622A1 (en) Charging system of stringing-less traffic system
SA518390841B1 (en) Device and method for loading a rail vehicle in a stop and then operating it without an overhead line
CN208035975U (en) circuits for vehicles
EP3919315A1 (en) Wireless charging and feeding system during driving of electric vehicle and industrial equipment
JP7198627B2 (en) Rail vehicle and power control method for rail vehicle
CN103204173A (en) Railway Signal System Using Electrification
CN102085814A (en) Train control system and railway control system
KR101743725B1 (en) section over and stop-protection system for train in power supply and insulation section
CN110997447B (en) Method and device for monitoring a drive system of a rail vehicle
KR20110139551A (en) Electric power measurement energy management device of railway electric vehicle
KR20080040271A (en) Three-Phase Amorphous Induction Feed Systems for Electric Railway Cars
AU2016234948B2 (en) Improved power supply system for an overhead contact line
JP7632825B2 (en) Rail vehicles
CN112238793B (en) Phase detection when passing through a disconnection point in a rail vehicle power supply
CN111307257B (en) Method and system for measuring weight of hump sliding vehicle
KR20140134026A (en) Storage battery monitoring system for railway vehicles and the railway vehicles
EP3718853A1 (en) Method, system and vehicle for localizing defective parts of power supply systems in railways applications
CN111619408B (en) Power rail power supply system and power supply control method thereof
RU2540223C1 (en) Automated antislipping protective device for electric stock wheel sets
Dimitrov Research on energy consumption of rolling stocks and approaches to its digitalization

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240823

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20240827

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241119

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241217

R150 Certificate of patent or registration of utility model

Ref document number: 7613673

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150