Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7614252B2 - Concrete box for open shield construction - Google Patents
[go: Go Back, main page]

JP7614252B2 - Concrete box for open shield construction - Google Patents

Concrete box for open shield construction Download PDF

Info

Publication number
JP7614252B2
JP7614252B2 JP2023084399A JP2023084399A JP7614252B2 JP 7614252 B2 JP7614252 B2 JP 7614252B2 JP 2023084399 A JP2023084399 A JP 2023084399A JP 2023084399 A JP2023084399 A JP 2023084399A JP 7614252 B2 JP7614252 B2 JP 7614252B2
Authority
JP
Japan
Prior art keywords
concrete box
concrete
open shield
reaction force
boxes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2023084399A
Other languages
Japanese (ja)
Other versions
JP2024168020A (en
Inventor
誠 植村
賢治郎 植村
正一 日浦
幸玄 小谷
武史 加藤
進太郎 村澤
龍太郎 近田
元晶 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2023084399A priority Critical patent/JP7614252B2/en
Publication of JP2024168020A publication Critical patent/JP2024168020A/en
Application granted granted Critical
Publication of JP7614252B2 publication Critical patent/JP7614252B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、市街地に上下水道、地下道等の地下構造物を施工するオープンシールド工法およびそれに使用するコンクリート函体に関するものである。 The present invention relates to an open shield method for constructing underground structures such as water supply and sewerage systems and underground tunnels in urban areas, and to the concrete box used for this method.

オープンシールド工法は、開削工法(オープンカット工法)とシールド工法の長所を生かした合理性に富む工法である。図13~図15にその概略を示す。 The open shield method is a highly efficient method that combines the advantages of the open cut method and the shield method. An outline of the method is shown in Figures 13 to 15.

図中1はオープンシールド機で、図17に示すように左右の側壁板とこれら側壁板に連結する底板とから成る上面を開口したフロント部1aおよび、前記フロント部1aと同様に左右の側板、底版から成り上面を開口したテール部1bで構成されるシールド機である。 In the figure, 1 is an open shield machine, which is composed of a front section 1a with an open top, consisting of left and right side wall panels and a bottom plate connected to these side wall panels, as shown in Figure 17, and a tail section 1b with an open top, consisting of left and right side panels and a bottom plate similar to the front section 1a.

前記オープンシールド機1の左右の先端刃口には前方に向けて伸長するスライド土留板6を装着し、また、フロント部1a後端からテール部に向けて伸長する推進ジャッキ3を後方に向け上下に並べて配設されている。 Sliding retaining plates 6 that extend forward are attached to the left and right cutting edges of the open shield machine 1, and propulsion jacks 3 that extend from the rear end of the front section 1a toward the tail section are arranged in a row facing backward, one above the other.

前記オープンシールド機1はフロント部1a後端にテール機1bが嵌入して相互の嵌合部で中折れ部2を形成して曲線施工が可能とした。 The open shield machine 1 has a front section 1a and a tail section 1b that fits into the rear end of the front section 1a, forming a bent section 2 at the mating section, making curved construction possible.

図中1はフロント部であり、フロント部前方の刃口部の切羽地山を、前方に配置した掘削機7で、図18,図19の図示のとおり法面を形成しながら掘削し、前記掘削機7の後方に配置した残土搬出用ダンプトラックに掘削土を積み込み搬出する。掘削に伴ってスライド土留板6を前方に伸長し、法面をつけた地山側部の緩みを防止する。 In the figure, 1 is the front part, and the ground at the cutting edge in front of the front part is excavated by an excavator 7 placed in front while forming a slope as shown in Figures 18 and 19. The excavated soil is loaded onto a dump truck for transporting the remaining soil placed behind the excavator 7 and transported. As the excavation progresses, the sliding retaining plate 6 is extended forward to prevent loosening of the sloped side of the ground.

オープンシールド機1の推進は、前記掘削機7による切羽地山の掘削しながら、オープンシールド機1に装着したシールドジャッキ3をプレスバー8に当接して前記シールドジャッキ3伸長し、後方のコンクリート函体にオープンシールド機1の推進反力をとって、前方へ推進させる。推進に伴って、オープンシールド機1の後方ではシールド機の板厚分相当の空隙が地山に発生するため、コンクリート函体4に予め設置してあるグラウトホールよりその空隙へ裏込注入材17を二次注入として充填する。 The open shield machine 1 is advanced by extending the shield jack 3 attached to the open shield machine 1 by contacting it with the press bar 8 while the excavator 7 is excavating the ground at the face, and advancing it forward by using the thrust reaction force of the open shield machine 1 against the concrete box behind it. As the machine advances, a gap equivalent to the thickness of the shield machine plate is generated in the ground behind the open shield machine 1, so that the gap is filled with backfill injection material 17 as a secondary injection from grout holes previously installed in the concrete box 4.

1函体長分、オープンシールド機が掘進後、シールドジャッキ3を縮め、プレスバー8をテール部1b内から撤去し、コンクリート函体4を据え付けるスペースができる。コンクリート函体4をテール部内に据え付ける前に、後方の敷設済みコンクリート函体4と、さらにその後方のコンクリート函体4とをPC鋼棒14を図20の図示のように挿入・緊結する。 After the open shield machine has excavated one box length, the shield jack 3 is retracted and the press bar 8 is removed from inside the tail section 1b, creating space to install the concrete box 4. Before installing the concrete box 4 inside the tail section, PC steel rods 14 are inserted and fastened to the rear concrete box 4 that has already been laid and the concrete box 4 further behind it, as shown in Figure 20.

これにより、敷設函体全体をほぼ一体化構造にすることができる。したがって、前記オープンシールド機1の推進反力は、後方の敷設済みの複数のコンクリート函体4へスムーズに伝達されることになる。 This allows the entire construction box to have an almost integrated structure. Therefore, the thrust reaction force of the open shield machine 1 is smoothly transmitted to the multiple concrete boxes 4 already laid behind it.

前記作業の後、図13に示すように、オープンシールド機1の後方に配置した揚重機13によりコンクリート函体4をテール部内へ吊り下ろし、据え付ける。据え付け後、前記コンクリート函体4の前方の端面にプレスバー8を当接するように設置する。そして、据え付けたコンクリート函体4とテール部1b内面との間のテールクリアランス(隙間)へ裏込注入材17を一次注入として充填する。充填後、再度オープンシールド機1を掘進させる。 After the above work, as shown in FIG. 13, the concrete box 4 is lowered into the tail section by the lifting machine 13 located behind the open shield machine 1 and installed. After installation, the press bar 8 is installed so that it abuts against the front end face of the concrete box 4. Then, the tail clearance (gap) between the installed concrete box 4 and the inner surface of the tail section 1b is filled with backfill injection material 17 as the primary injection. After filling, the open shield machine 1 is excavated again.

なお、オープンシールド機1のテール部1bのすぐ後方の敷設済みコンクリート函体上部の埋め戻し作業は、前記オープンシールド機1の掘進作業と並行して行う。 The backfilling work on the upper part of the laid concrete box immediately behind the tail section 1b of the open shield machine 1 is carried out in parallel with the excavation work of the open shield machine 1.

以上の作業を繰り返しながら、コンクリート函体4を地中に埋設していく。なお、前記オープンシールド機1は発進立坑10で組立て、その後、進行方向前方鏡切後に支圧壁12に推進反力をとりながら推進するが、この作業と初期掘進等や到達立坑への到達作業は通常のシールド工法とほぼ同様の作業であり、詳細は省略する。 The above steps are repeated to bury the concrete box 4 in the ground. The open shield machine 1 is assembled at the starting shaft 10, and then, after cutting the front end in the direction of travel, it is advanced while receiving a thrust reaction force from the bearing wall 12. However, this work, as well as the initial excavation and the work of reaching the destination shaft, are almost the same as those in normal shield construction methods, so details will be omitted.

コンクリート函体4は鉄筋コンクリート製で、図16に示すように左側版4a、右側版4bと頂版4cと底版4dとからなる一体のもので、接続端面は、オープンシールド機1の推進反力がプレスバー8を介して当接するコンクリート函体4の両側版全体へ均等に分散伝達できるように平滑面となっている。グラウトホール24が設けてある。またハンチ部には明示はしていないが、PC鋼棒14の挿入孔があり、そこへPC鋼棒を挿入する。なお、前後面は開口として開放されている。 The concrete box 4 is made of reinforced concrete, and as shown in Figure 16, is a one-piece structure consisting of a left slab 4a, a right slab 4b, a top slab 4c, and a bottom slab 4d. The connecting end faces are smooth so that the thrust reaction force of the open shield machine 1 can be evenly distributed and transmitted to the entire slabs on both sides of the concrete box 4 that it abuts against via the press bar 8. Grout holes 24 are provided. Although not shown, the haunch portion has insertion holes for the PC steel rods 14, into which the PC steel rods are inserted. The front and rear faces are open as openings.

コンクリート函体4に関しては、下記特許文献は曲線施工など特にコンクリート函体の接合端面に推力が不均一に加わる場合であっても、作業効率を悪化させることなく、また、コンクリート函体の破損も生じることなく、コンクリート函体同士のズレ及び目開きを防止でき、更に、コンクリート函体に推力が加わることがなくなった後には金物類などの部品を容易に取り外して再利用できるコンクリート函体の接続方法として提案されたものである。
特開2009-114642号公報
Regarding the concrete box 4, the following patent document proposes a method of connecting concrete boxes that can prevent the concrete boxes from shifting or opening up, without compromising work efficiency or damaging the concrete boxes, even in cases where thrust is applied unevenly to the joint end faces of the concrete boxes, such as in curved construction, and furthermore, allows parts such as metal fittings to be easily removed and reused after thrust is no longer applied to the concrete boxes.
JP 2009-114642 A

この特許文献1は図17に示すように、コンクリート函体4の外周面または内周面に埋め込むアンカーボルト121の上端を、固定金具120に螺子止めすることにより固定金具120の起立部124をコンクリート函体4表面に起立させ、全ネジボルト122の螺子端部を起立部124に貫通させて隣接するコンクリート函体4を跨いで架渡し、これを螺子止めすることにより、全ネジボルト122と固定金具120とアンカーボルト121とを互いに着脱自在として両コンクリート函体4を連結固定する。 As shown in FIG. 17, in this patent document 1, the upper end of an anchor bolt 121 embedded in the outer or inner surface of a concrete box body 4 is screwed to a fixing bracket 120 so that the upright portion 124 of the fixing bracket 120 stands on the surface of the concrete box body 4, and the screw end of a fully threaded bolt 122 is passed through the upright portion 124 to span adjacent concrete boxes 4, and by screwing it in place, the fully threaded bolt 122, the fixing bracket 120, and the anchor bolt 121 are detachably attached to each other, and the two concrete boxes 4 are connected and fixed.

なお、コンクリート函体(ボックスカルバート)の接合に同様な連結金具(ターンバックル等)を使用したものは、下記特許文献にも見られる。
実開昭49-113221号公報 実開昭49-113221号公報
The use of similar connecting fittings (turnbuckles, etc.) to join concrete boxes (box culverts) can also be seen in the following patent documents:
Japanese Utility Model Application Publication No. 49-113221 Japanese Utility Model Application Publication No. 49-113221

これら特許文献はコンクリート函体同士のズレ及び目開きを防止できることを目的としたものであり、コンクリート函体で、その接続端面が凹形側に別のコンクリート函体の接続端面が凸形側を嵌めこんでコンクリート函体同士を接続する、所謂“印籠型”のコンクリート函体の場合は、その勘合部で推進反力の受圧面積が前記の接続端面が平滑面であるコンクリート函体より小さいため、その箇所に作用する応力が大きくなり、篏合部でのコンクリートの割れやクラックが生じやすい。 These patent documents aim to prevent misalignment and gaps between concrete boxes, but in the case of a so-called "ink bottle type" concrete box, in which the connecting end face of one concrete box is concave and the connecting end face of another concrete box is fitted into each other to connect the concrete boxes, the pressure-receiving area of the mating part for the thrust reaction force is smaller than that of a concrete box with a smooth connecting end face, so the stress acting on that part is large, and the concrete is prone to splitting and cracking at the joint.

さらに近年、採用が増加している耐震性能を有する個々の函体に可撓性を持たせた、印籠型の開削用コンクリート函体もそのままではオープンシールド機後方のコンクリート函体に推進反力がスムーズに伝達できないので、敷設は困難である。 Furthermore, in recent years, the use of inro-shaped concrete boxes for open-cut tunnels, which have been increasingly adopted with individual boxes that have earthquake resistance and are flexible, is difficult to install because the thrust reaction force cannot be smoothly transmitted to the concrete box behind the open shield machine in its current state.

しかし、印籠型の開削用コンクリート函体はその凹部側の端面に別のコンクリート函体の凸部の端面を嵌め込むに当たって、所定の目地間隔を確保できるように、凹部端面先端部と凸部端面先端部が当接せず、一定の間隔を保持している状態となるよう製作される。 However, when fitting the end face of the convex part of another concrete box into the end face of the concave side of the inro-shaped cut-and-cover concrete box, the tip of the end face of the concave part and the tip of the end face of the convex part do not come into contact with each other, and a certain distance is maintained so that a specified joint distance can be secured.

そのため、特に凹部端面での鉛直方向の寸法精度や鉛直面の平滑状態までは考慮されていない。したがって、前記鉛直方向や面凹凸などの平滑状態によっては、鋼製枠体プレスバーと凹部の製作精度等によっては鋼製枠体プレスバーに一部に非接触となる部分が生じて接触箇所に推進反力による局部応力が発生・集中し、接触箇所にクラックやコンクリートの割れが生じてしまう場合が想定される。 As a result, no consideration is given to the dimensional accuracy in the vertical direction, particularly at the end face of the recess, or the smoothness of the vertical surface. Therefore, depending on the smoothness in the vertical direction and surface unevenness, and the manufacturing accuracy of the steel frame press bar and the recess, etc., it is possible that some parts of the steel frame press bar will not be in contact, causing local stress due to the thrust reaction force to occur and concentrate at the contact points, resulting in cracks or cracks in the concrete at the contact points.

つまり、オープンシールド機推進反力がコンクリート函体の凹部接触部全体に均等にその反力が分散されず、クラック等が生じる可能性が大きくなる。 In other words, the thrust reaction force of the open shield machine is not evenly distributed over the entire area where it contacts the recess in the concrete box, increasing the possibility of cracks occurring.

本発明の目的は前記従来例の不都合を解消し、推進反力が大きく受ける条件で使用され、壁厚が小さく接続端面が平滑面であるオープンシールド工法用のコンクリート函体だけでなく、通常の印籠型の開削用コンクリート函体や耐震性能を有する個々の函体に可撓性を持たせたコンクリート函体でもコンクリート函体の接続端面やその近傍にクラックや割れなどが生ずることなく敷設できる、オープンシールド工法用コンクリート函体を提供することにある。 The object of the present invention is to provide a concrete box for open shield construction that can be installed without cracks or breaks on or near the connecting end faces of the concrete box, not only for open shield construction concrete boxes with thin walls and smooth connecting end faces that are used under conditions where a large thrust reaction force is received, but also for ordinary inro-shaped concrete boxes for open excavation and concrete boxes with individual boxes that have flexibility and earthquake resistance.

前記目的を達成するため請求項1記載の本発明は、コンクリート函体間の頂版および、側版、底版、の内面のジョイント部に所定の目地間隔を保持して、それぞれ、上下方向、水平方向に複数の溝形鋼材またはH型鋼材をジョイント部の接続部材として横架しインサートボルトで固定することを要旨とするものである。 In order to achieve the above objective, the gist of the present invention described in claim 1 is that a predetermined joint spacing is maintained at the joints on the inner surfaces of the top, side and bottom plates between the concrete boxes, and multiple channel steel members or H-shaped steel members are laid horizontally in the vertical and horizontal directions as connecting members for the joints and fixed with insert bolts.

請求項1記載の本発明によれば、先頭のコンクリート函体とその後方に敷設する複数のコンクリート函体間のジョイント部に、所定の目地間隔を保持して複数の溝形鋼材またはH型鋼材をジョイント部の接続部材として横架しインサートボルトで固定するので、オープンシール機1の推進反力はコンクリート函体ジョイント部接続端面には作用せず、前記接続部材を介して順次、後方の敷設したコンクリート函体ヘ伝達される。 According to the present invention described in claim 1, multiple channel steel members or H-shaped steel members are laid horizontally as connecting members of the joint between the leading concrete box and multiple concrete boxes laid behind it, maintaining a predetermined joint spacing, and are fixed with insert bolts. Therefore, the thrust reaction force of the open seal machine 1 does not act on the connecting end surface of the concrete box joint, but is transmitted sequentially to the concrete boxes laid behind via the connecting members.

したがって、大きな推進反力が作用すると想定される条件に対して比較的壁厚の小さい接続端面が平滑なコンクリート函体や、印籠型の開削用コンクリート函体でも側壁端面部のクラックや割れなどの心配がなく、かつ、所定の目地間隔を保持するように接続部材をインサートボルトで固定するので、オープンシールド機1を用いてそれらのコンクリート函体を安全かつ確実に敷設することができる。 Therefore, even for concrete boxes with relatively thin walls and smooth connecting end surfaces under conditions where a large thrust reaction force is expected to act, or inro-shaped concrete boxes for open-cut construction, there is no need to worry about cracks or breaks in the side wall end surfaces, and because the connecting members are fixed with insert bolts to maintain the specified joint spacing, these concrete boxes can be laid safely and reliably using the open shield machine 1.

以上述べたように、オープンシールド機の掘進に伴う推進反力は従来のオープンシールド工法のように敷設したコンクリート函体の接続端面に伝達することなくなく、反力伝達部材や接続部材とそれらを固定するインサートボルトを介して敷設コンクリート函体に伝達することができる。 As described above, the thrust reaction force caused by the open shield machine's tunneling is not transmitted to the connection end surface of the laid concrete box as in conventional open shield construction methods, but can be transmitted to the laid concrete box via the reaction force transmission members, connection members, and the insert bolts that secure them.

したがって、コンクリート函体端面やその近傍のクラックや割れが生じることなく、所定の目地間隔を保持して、かつ、大きな推進反力が作用すると想定される条件に対して比較的壁厚の小さい接続端面が平滑なコンクリート函体や印籠型の開削用コンクリート函体を、安全かつ確実に敷設することが可能となる。 As a result, it is possible to safely and reliably lay concrete boxes or inro-shaped cut-and-cover concrete boxes with smooth connection end faces and relatively thin walls under conditions where a large thrust reaction force is expected to act, without causing cracks or breaks on the end faces of the concrete boxes or in their vicinity, while maintaining the specified joint spacing.

本発明のオープンシールド工法用コンクリート函体の1実施形態を示す横断平面図である。1 is a cross-sectional plan view showing one embodiment of a concrete box for an open shield construction method according to the present invention. FIG. 図1のA-A線矢視図である。2 is a cross-sectional view taken along line AA in FIG. 1. 本発明のオープンシールド工法用コンクリート函体の1実施形態を示す縦断側面図である。1 is a vertical cross-sectional side view showing one embodiment of a concrete box for an open shield construction method according to the present invention. FIG. 図3のB-B線矢視図である。4 is a view taken along line BB in FIG. 3. 本発明のオープンシールド工法用コンクリート函体の1実施形態を示す拡大横断平面図である。FIG. 1 is an enlarged cross-sectional plan view showing one embodiment of a concrete box body for an open shield construction method according to the present invention. 本発明のオープンシールド工法用コンクリート函体の1実施形態を示す縦断正面図である。1 is a longitudinal sectional front view showing one embodiment of a concrete box body for an open shield construction method according to the present invention. FIG. 図6のA部拡大図である。FIG. 7 is an enlarged view of part A in FIG. 6 . 本発明のオープンシールド工法用コンクリート函体の他の実施形態を示す横断平面図である。FIG. 2 is a cross-sectional plan view showing another embodiment of a concrete box for an open shield construction method according to the present invention. 本発明のオープンシールド工法用コンクリート函体の他の実施形態を示す縦断正面図である。FIG. 4 is a longitudinal sectional front view showing another embodiment of a concrete box body for an open shield construction method according to the present invention. 図9のA部拡大図である。FIG. 10 is an enlarged view of part A in FIG. 9 . 座屈防止材の取付状況を示す平面図である。FIG. 4 is a plan view showing the installation status of the buckling prevention material. 座屈防止材の取付状況を示す正面図である。FIG. 4 is a front view showing the installation status of the buckling prevention material. オープンシールド工法の施工状況を示す斜視図である。FIG. 2 is a perspective view showing the construction status of the open shield method. オープンシールド工法の概要を示す平面図である。FIG. 1 is a plan view showing an overview of the open shield method. オープンシールド工法の概要を示す縦断図である。FIG. 2 is a longitudinal section showing an overview of the open shield method. オープンシールド工法用のコンクリート函体の斜視図である。FIG. 2 is a perspective view of a concrete box for the open shield construction method. 従来例を示す縦断側面図である。FIG. 11 is a vertical sectional side view showing a conventional example.

以下に述べる本発明の実施形態について説明する。図1は本発明のオープンシールド工法用コンクリート函体の1実施形態を示す横断平面図で、図中1はオープンシールド機で、これは先に説明した通りである。 The following describes an embodiment of the present invention. Figure 1 is a cross-sectional plan view showing one embodiment of a concrete box for the open shield construction method of the present invention, in which 1 is an open shield machine, as previously described.

図中18は反力伝達部材、21は接続部材で、反力伝達部材18は押角8(プレスバー)の後面の当接する平面状部材と、その後面から後方へ突き出し前記先頭のコンクリート函体29の両側壁の内面に当接する平面部材から成り、リブ材で補強されている。 In the figure, 18 is a reaction force transmission member, 21 is a connection member, and the reaction force transmission member 18 is made up of a planar member that abuts against the rear surface of the push bar 8 (press bar), and a planar member that protrudes rearward from that rear surface and abuts against the inner surface of both side walls of the leading concrete box 29, and is reinforced with ribs.

先頭のコンクリート函体29の内面に当接する平面状部材には固定用ボルト20を通す孔が複数あけてあり、また前記先頭のコンクリート函体29には予め、インサート19が埋め込まれてあり、前記固定用ボルト20を挿入して反力伝達部材18を固定する。 The planar member that abuts against the inner surface of the leading concrete box 29 has multiple holes through which the fixing bolts 20 pass, and the leading concrete box 29 has an insert 19 embedded in advance, into which the fixing bolts 20 are inserted to fix the reaction force transmission member 18.

そして、反力伝達部材18は前記先頭のコンクリート函体29の両側版の上下方向に複数配置され、ボルト等で上下方向に連結されている。 The reaction force transmission members 18 are arranged in multiple positions on both sides of the leading concrete box 29 in the vertical direction, and are connected in the vertical direction by bolts or the like.

反力伝達部材18の押角8(プレスバー)の後面の当接する平面状部材の前面は、前記先頭のコンクリート函体29の前方の側版端面より前方へ位置するように前記反力伝達部材18が固定さる。 The reaction force transmission member 18 is fixed so that the front surface of the planar member that abuts against the rear surface of the push bar 8 of the reaction force transmission member 18 is positioned forward of the front side plate end surface of the leading concrete box 29.

オープンシールド機1の推進において、シールドジャッキ3が伸長し、押角8を後方へ向けて押し付けると、前記押角8の後面は前記反力伝達部材18の前記平面状部材に押し当てられる。 When the open shield machine 1 is propelled, the shield jack 3 extends and pushes the push angle 8 backward, causing the rear surface of the push angle 8 to be pressed against the planar member of the reaction force transmission member 18.

したがって、前記オープンシールド機1の推進による推進反力は、先頭のコンクリート函体29の両側版端面には伝達されず、前記反力伝達部材18を介して前記先頭のコンクリート函体29の内面の両側版の固定ボルト20とインサート19からそのコンクリート函体内部ヘ伝達されることになる。 Therefore, the thrust reaction force caused by the thrust of the open shield machine 1 is not transmitted to the end faces of the slabs on both sides of the leading concrete box 29, but is transmitted to the inside of the leading concrete box 29 through the fixing bolts 20 and inserts 19 on the inner surface of the leading concrete box 29 via the reaction force transmission member 18.

本発明のコンクリート函体4は、コンクリート函体間の頂版および、側版、底版、の内面のジョイント部に所定の目地間隔を保持して、それぞれ、上下方向、水平方向に複数の溝形鋼材またはH型鋼材をジョイント部の接続部材21として横架しインサートボルトで固定する。 The concrete box 4 of the present invention maintains a specified joint spacing at the joints on the inner surfaces of the top, side, and bottom plates between the concrete boxes, and multiple channel steel members or H-shaped steel members are hung vertically and horizontally as connecting members 21 at the joints and fixed with insert bolts.

前記接続部材21は固定用ボルト20を挿入する孔が設けられていて、コンクリート函体内面の各面の横架される所定の位置に予め設置されたインサート19に固定用ボルト20を挿入して堅固に固定される。 The connecting member 21 has holes for inserting the fixing bolts 20, and is firmly fixed by inserting the fixing bolts 20 into the inserts 19 that are pre-installed at predetermined positions across each side of the inner surface of the concrete box.

図4~図7は接続部材21として溝形鋼材を用いた例であり、オープンシールド機1の推進に伴う推進反力は、先行のコンクリート函体29に設置された反力伝達部材18を介して前記反力伝達部材18を固定した固定用ボルト20とインサート19から、前記先頭のコンクリート函体29の内部から後方へ向けて伝達され、さらに各ジョイント部に横架・固定された接続部材21を介して順次、後方へ伝達される。 Figures 4 to 7 show an example in which a channel steel material is used as the connecting member 21. The thrust reaction force associated with the thrust of the open shield machine 1 is transmitted from inside the leading concrete box 29 to the rear via the reaction force transmission member 18 installed in the leading concrete box 29, the fixing bolts 20 and inserts 19 that secure the reaction force transmission member 18, and then transmitted rearward in sequence via the connecting members 21 that are cross-hung and fixed to each joint section.

以上より、前記推進反力は各コンクリート函体間のジョイント部の接続端面には伝達されないので、接続端面部でのクラックや割れの生じる危険はない。また、印籠型の開削用函体でも安全に敷設することが可能となる。 As a result, the thrust reaction force is not transmitted to the connection end faces of the joints between the concrete boxes, so there is no risk of cracks or breakage occurring at the connection end faces. In addition, it is possible to safely lay even ingot-shaped cut-and-cover boxes.

なお、前記の各図では頂板、側板、底版の内面のジョイント部すべてに接続部材21が横架されているが、推進反力の大きさ等によっては、接続部材21の設置数を調整するか、あるいは接続部材の設置箇所を両側版と底版にするなど変更しても良い。 In the above figures, the connecting members 21 are installed horizontally at all the joints on the inner surface of the top plate, side plates, and bottom plate, but depending on the magnitude of the thrust reaction force, the number of connecting members 21 installed may be adjusted, or the installation locations of the connecting members may be changed to both side plates and the bottom plate.

図8から図10は接続部材22としてH型鋼材を用いた例である。推進反力の伝達メカニズム等は、前述の接続部材21を設置した場合と同様であるため、説明は省略する。 Figures 8 to 10 show an example in which H-shaped steel is used as the connection member 22. The mechanism for transmitting the thrust reaction force is the same as when the connection member 21 described above is installed, so a detailed explanation is omitted.

推進反力が大きな場合に各コンクリート函体4間のジョイント部に設置した接続部材22自体に局部座屈が生じる恐れがある場合に、図11、図12に示すように、水圧ジャッキまたは強力サポートによるサポート23で前記接続部材22を抑えることにより局部座屈が生じないようにすることができる。 When the thrust reaction force is large and there is a risk of local buckling occurring in the connecting member 22 itself installed at the joint between each concrete box body 4, local buckling can be prevented by holding down the connecting member 22 with a hydraulic jack or a strong support 23, as shown in Figures 11 and 12.

前記サポートはオープンシールド機1掘進時の函体ジョイント部のズレ止めも兼ねることができる。 The support can also serve to prevent the box joint from shifting when the open shield machine 1 is excavating.

1…オープンシールド機 1a…フロント部
1b…テール部 2…中折れ部
3…推進ジャッキ(シールドジャッキ)
4…コンクリート函体 4a…左側版
4b…右側版 4c…頂版
4d…底版 4f…ハンチ部
6…スライド土留板
7…掘削機 8…プレスバー(押角)
9…止水バー 10…発進立坑
11…鋼矢板 12…支圧壁
13…揚重機 14…PC鋼棒
15…埋戻土 16…残土搬出用ダンプトラック
17…裏込注入材 18…反力伝達部材
19…インサート 20…固定用ボルト
21…接続部材(溝形鋼) 22…接続部材(H型鋼材)
23…サポート(水圧ジャッキまたは強力サポート)
24…グラウトホール 25…埋戻し用重機
27…連結用ボルト・ナット 30…目地
1...Open shield machine 1a...Front part 1b...Tail part 2...Bent part 3...Propulsion jack (shield jack)
4...Concrete box body 4a...Left side plate 4b...Right side plate 4c...Top plate 4d...Bottom plate 4f...Hunch portion 6...Slide retaining plate 7...Excavator 8...Press bar (press angle)
9: Water stop bar 10: Starting shaft 11: Steel sheet pile 12: Bearing wall 13: Lifting machine 14: PC steel bar 15: Backfill soil 16: Dump truck for removing residual soil 17: Backfill injection material 18: Reaction force transmission member 19: Insert 20: Fixing bolt 21: Connection member (channel steel) 22: Connection member (H-shaped steel)
23...Support (hydraulic jack or strong support)
24...Grout hole 25...Backfilling heavy equipment 27...Connecting bolts and nuts 30...Joint

Claims (1)

コンクリート函体間の内面のジョイント部に所定の目地間隔を保持して、それぞれ、上下方向、水平方向に複数の溝形鋼材またはH型鋼材をジョイント部の接続部材として横架しインサートボルトで固定することを特徴としたオープンシールド工法用コンクリート函体。
A concrete box for open shield construction, characterized in that a specified joint spacing is maintained at the joints on the inner surface between the concrete boxes, and multiple channel steel members or H-shaped steel members are laid horizontally in the vertical and horizontal directions as connecting members for the joints and secured in place with insert bolts.
JP2023084399A 2023-05-23 2023-05-23 Concrete box for open shield construction Active JP7614252B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023084399A JP7614252B2 (en) 2023-05-23 2023-05-23 Concrete box for open shield construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2023084399A JP7614252B2 (en) 2023-05-23 2023-05-23 Concrete box for open shield construction

Publications (2)

Publication Number Publication Date
JP2024168020A JP2024168020A (en) 2024-12-05
JP7614252B2 true JP7614252B2 (en) 2025-01-15

Family

ID=93706777

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2023084399A Active JP7614252B2 (en) 2023-05-23 2023-05-23 Concrete box for open shield construction

Country Status (1)

Country Link
JP (1) JP7614252B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017106239A (en) 2015-12-10 2017-06-15 植村 誠 Friction-cut plate joining method
JP2017106189A (en) 2015-12-08 2017-06-15 植村 誠 Friction cut plate joining method
JP2018053467A (en) 2016-09-27 2018-04-05 植村 誠 Open shield method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017106189A (en) 2015-12-08 2017-06-15 植村 誠 Friction cut plate joining method
JP2017106239A (en) 2015-12-10 2017-06-15 植村 誠 Friction-cut plate joining method
JP2018053467A (en) 2016-09-27 2018-04-05 植村 誠 Open shield method

Also Published As

Publication number Publication date
JP2024168020A (en) 2024-12-05

Similar Documents

Publication Publication Date Title
KR101324173B1 (en) Construction method for underground tunnel using guiding shape steel
KR20170102397A (en) The Tunnel construction method to use retangular pipe
JP2009114643A (en) Connecting structure of underground structure
KR101507598B1 (en) Hydraulic pressure type excavation apparatus
JP7614252B2 (en) Concrete box for open shield construction
JP5399292B2 (en) Element propulsion method and blade element used for element propulsion method
KR101351784B1 (en) Underground structure construction method using the cutting channel
JP6039734B1 (en) Open shield method
JP7651612B2 (en) Concrete box for open shield construction
JP2541846Y2 (en) Concrete box for underground structure
JP4537358B2 (en) Connection method of concrete box
JP4672700B2 (en) Tightening method for underground structures
KR101123036B1 (en) Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel
JP2022175684A (en) earth retaining wall
JP6629822B2 (en) Support for laying box connection
JP2025124128A (en) Method for fixing and releasing concrete box for open shield construction
JP2025124129A (en) Method for fixing and releasing concrete box for open shield construction
JP6353431B2 (en) Friction cut plate joining method
JP4394097B2 (en) Connection method of concrete box
JP2020094444A (en) Method for removing open shield machine
JPH0723084U (en) Concrete box for underground structure
CN210238532U (en) Open-cut tunnel groove supporting structure
JPH05239833A (en) Open shield method and concrete box used for it
JP2025124131A (en) Open shield machine
JPH10159488A (en) Concrete box for underground embedment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240709

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241224

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241226

R150 Certificate of patent or registration of utility model

Ref document number: 7614252

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150