Virtual power plant formation control system and formation control method Download PDF

Info

Publication number
JP7615644B2
JP7615644B2 JP2020202231A JP2020202231A JP7615644B2 JP 7615644 B2 JP7615644 B2 JP 7615644B2 JP 2020202231 A JP2020202231 A JP 2020202231A JP 2020202231 A JP2020202231 A JP 2020202231A JP 7615644 B2 JP7615644 B2 JP 7615644B2
Authority
JP
Japan
Prior art keywords
energy resources
power plant
attribute information
energy
virtual power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020202231A
Other languages
Japanese (ja)
Other versions
JP2022089658A (en
Inventor
泰道 伊豆野
玄洋 三川
剛裕 中村
典浩 大久保
淳一 石丸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2020202231A priority Critical patent/JP7615644B2/en
Publication of JP2022089658A publication Critical patent/JP2022089658A/en
Application granted granted Critical
Publication of JP7615644B2 publication Critical patent/JP7615644B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、バーチャルパワープラントの形成制御システムおよびその形成制御方法に関する。 The present invention relates to a virtual power plant formation control system and a formation control method thereof.

近年、より安定的で無駄の少ない電力システムを実現するために、需要家が保有する分散型電源や蓄電設備などの様々なエネルギーリソースを統合制御し、あたかも一つの発電所であるかのように機能させるバーチャルパワープラント(Virtual Power Plant、VPP)の開発が進められている(特許文献1を参照)。
バーチャルパワープラントを形成することにより、電力の需給バランスの調整を、従来のように火力発電所等の大規模発電所の出力を調整することで行う代わりに、上げDR(Demand Response)や下げDR等のデマンドレスポンスによって行うことが可能になる。
In recent years, in order to realize a more stable and less wasteful power system, development has been progressing on virtual power plants (VPPs) that integrate and control various energy resources owned by consumers, such as distributed power sources and power storage facilities, and function as if they were a single power plant (see Patent Document 1).
By forming a virtual power plant, it becomes possible to adjust the balance of supply and demand for electricity through demand response such as up-demand response (DR) and down-demand response (DR), instead of adjusting the output of large-scale power plants such as thermal power plants as has been done in the past.

特開2020-108301号公報JP 2020-108301 A

ここで、都市エリアでバーチャルパワープラントを形成する場合と、都市エリアの周辺となる周辺エリアでバーチャルパワープラントを形成する場合と、を比べると、都市エリアでは、発電設備や蓄電設備などの様々な種類のエネルギーリソースが豊富に集まっているため、効率的にバーチャルパワープラントが形成できる場合が多いのに対し、周辺エリアでは特定の種類のエネルギーリソース(例えば太陽光発電設備など)に偏っていることが多いため、バーチャルパワープラントが形成しにくいことが多い。
そのため、周辺エリアに設けられているエネルギーリソースは、バーチャルパワープラントの対象として有効に活用されていないのが現状である。
Comparing the formation of a virtual power plant in an urban area with the formation of a virtual power plant in a surrounding area surrounding the urban area, urban areas are often able to form a virtual power plant efficiently because they are rich in various types of energy resources such as power generation facilities and storage facilities, whereas surrounding areas are often biased toward certain types of energy resources (such as solar power generation facilities), making it difficult to form a virtual power plant.
As a result, the current situation is that energy resources available in the surrounding area are not being effectively utilized as targets for virtual power plants.

そこで、本発明は、都市エリアや周辺エリアに関わらず、遍在する様々なエネルギーリソースを効率的に活用してバーチャルパワープラントを形成し、電力の需給量のバランスをより一層確実なものとするバーチャルパワープラントの形成制御システムおよびその形成制御方法を提供することを目的とする。 The present invention aims to provide a system and method for controlling the formation of a virtual power plant that efficiently utilizes various energy resources that are ubiquitous, regardless of whether the plant is in an urban area or a surrounding area, to form a virtual power plant and ensure a better balance between the supply and demand of electricity.

前述した課題を解決する主たる本発明は、複数の需要家が所有する、都市エリア及び周辺エリアを含む管理エリア内の各地に分散している複数のエネルギーリソースをネットワークを介して統合制御し、あたかも1つの発電所として機能させるバーチャルパワープラントの形成制御システムであって、前記複数の需要家の電力使用状況を示す情報を含む属性情報が記憶される属性記憶部と、説明変数である前記属性情報と、目的変数である前記属性情報の分類結果との相関関係を学習する学習モデルが記憶される学習モデル記憶部と、前記学習モデルを用いて、前記属性情報に対する前記分類結果を予測する学習部と、下げDR又は上げDRが発生した際に、前記複数のエネルギーリソースの中から、前記学習部による予測結果に基づいて前記下げDR又は前記上げDRに応答可能とされる分類結果に該当する複数のエネルギーリソースを選択的に統合し統合した前記エネルギーリソースを制御する統合制御部と、を備える。
本発明の他の特徴については、添付図面及び本明細書の記載により明らかとなる。
The main present invention for solving the above-mentioned problems is a virtual power plant formation control system that integrates and controls multiple energy resources owned by multiple consumers and distributed throughout a management area including urban areas and surrounding areas via a network, and functions as if they were a single power plant, and includes an attribute memory unit in which attribute information including information indicating the power usage status of the multiple consumers is stored, a learning model memory unit in which a learning model that learns the correlation between the attribute information, which is an explanatory variable, and the classification result of the attribute information, which is an objective variable, is stored, a learning unit that predicts the classification result for the attribute information using the learning model, and an integration control unit that, when a down DR or up DR occurs, selectively integrates from among the multiple energy resources, multiple energy resources that correspond to the classification result that is capable of responding to the down DR or up DR based on the prediction result by the learning unit, and controls the integrated energy resources.
Other features of the present invention will become apparent from the accompanying drawings and the description of this specification.

本発明によれば、都市エリアや周辺エリアに関わらず、遍在する様々なエネルギーリソースを効率的に活用してバーチャルパワープラントを形成し、電力の需給量のバランスをより一層確実なものとすることが可能となる。 According to the present invention, it is possible to create a virtual power plant by efficiently utilizing various energy resources that are ubiquitous, regardless of whether they are in an urban area or a surrounding area, and to more reliably balance the supply and demand of electricity.

本実施形態に係るバーチャルパワープラントの形成を説明する全体図である。FIG. 1 is an overall view for explaining the formation of a virtual power plant according to an embodiment of the present invention. アグリゲータサーバの機能を示すブロック図である。FIG. 2 is a block diagram showing the functions of an aggregator server. 属性記憶部に記憶される属性情報Aのテーブルデータの一例を示す図である。11 is a diagram showing an example of table data of attribute information A stored in an attribute storage unit; FIG. 属性記憶部に記憶される属性情報Bのテーブルデータの一例を示す図である。13 is a diagram showing an example of table data of attribute information B stored in an attribute storage unit; FIG. 属性記憶部に記憶される属性情報Cのテーブルデータの一例を示す図である。11 is a diagram showing an example of table data of attribute information C stored in an attribute storage unit; FIG. 電力系統の一例を示す図である。FIG. 1 is a diagram illustrating an example of a power system. バーチャルパワープラントを形成する際の統合制御部の動作の一例を示すフローチャートである。10 is a flowchart showing an example of an operation of an integrated control unit when forming a virtual power plant. デマンドレスポンスの応答の流れを自動化した際の一例を示すフローチャートである。11 is a flowchart showing an example of an automated demand response flow.

本明細書および添付図面の記載により、少なくとも以下の事項が明らかとなる。 The present specification and accompanying drawings make clear at least the following:

図1は、本実施形態に係るバーチャルパワープラントの形成を説明する全体図である。バーチャルパワープラントはアグリゲータによって事業運営が行われる。本実施形態では、アグリゲータは、リソースアグリゲータ及びアグリゲーションコーディネータを総称しており、リソースアグリゲータ及びアグリゲーションコーディネータのいずれか一方、あるいは両方を指す場合がある。リソースアグリゲータは、エネルギーリソースを保有する各需要家との契約に基づき、エネルギーリソースの制御を行う。アグリゲーションコーディネータは、各リソースアグリゲータが制御した電力量を束ね、一般送配電事業者や小売電気事業者と電力取引を行う。また本実施形態では、一般送配電事業者及び小売電気事業者を電気事業者と総称する。そのため、電気事業者は、一般送配電事業者及び小売電気事業者のいずれか一方、あるいは両方を指す場合がある。
本実施形態では、例えば、アグリゲータによって、バーチャルパワープラントを形成する対象となる管理エリア10が決定されていることとする。この管理エリア10には、複数の需要家が所有する創エネルギー、蓄エネルギー、省エネルギー等の様々な複数のエネルギーリソースが分散して設置されている。また、管理エリア10の規模は、市区町村程度の比較的小規模のものであってもよいし、都道府県を跨ぐような比較的大規模のものであってもよい。
FIG. 1 is an overall diagram for explaining the formation of a virtual power plant according to the present embodiment. The virtual power plant is operated by an aggregator. In this embodiment, the aggregator is a general term for a resource aggregator and an aggregation coordinator, and may refer to either the resource aggregator or the aggregation coordinator, or both. The resource aggregator controls the energy resources based on a contract with each consumer who owns the energy resources. The aggregation coordinator aggregates the amount of power controlled by each resource aggregator, and trades power with a general power transmission and distribution business operator and a retail electricity business operator. In this embodiment, the general power transmission and distribution business operator and the retail electricity business operator are collectively referred to as an electricity business operator. Therefore, the electricity business operator may refer to either the general power transmission and distribution business operator and the retail electricity business operator, or both.
In this embodiment, for example, it is assumed that a management area 10 in which a virtual power plant is to be formed is determined by an aggregator. A plurality of energy resources owned by a plurality of consumers, such as energy generation, energy storage, and energy saving resources, are distributed and installed in this management area 10. The scale of the management area 10 may be a relatively small one such as a city, ward, town, or village, or a relatively large one spanning prefectures.

本実施形態では、管理エリア10は、例えば、都市エリア10Aおよび当該都市エリア10Aの周辺のエリアである周辺エリア10Bとに大別されていることとする。都市エリア10Aには、経済活動を行うための商業施設や工業施設等が密集しており、多くのエネルギーリソース20が集中的に設置されている。一方、周辺エリア10Bには、経済活動を行うための施設に比べて住宅が多い傾向になっており、エネルギーリソース20は都市エリア10Aに比べて少ない数ではあるがまばらに設置されていることとする。尚、都市エリア10Aに分散している複数のエネルギーリソースを20Aとし、周辺エリア10Bに分散している複数のエネルギーリソースを20Bとする。これらのエネルギーリソース20A、20Bは、電力網(不図示)に連系されているが、後述するアグリゲータサーバ50からの指示に従って、IoT等のネットワーク30を介して通信可能に選択的に統合されることとなる。 In this embodiment, the management area 10 is roughly divided into, for example, an urban area 10A and a surrounding area 10B surrounding the urban area 10A. In the urban area 10A, commercial facilities and industrial facilities for economic activities are densely concentrated, and many energy resources 20 are installed in a concentrated manner. On the other hand, in the surrounding area 10B, there tends to be more residential buildings than facilities for economic activities, and the energy resources 20 are installed sparsely, although in smaller numbers than in the urban area 10A. Note that the multiple energy resources distributed in the urban area 10A are referred to as 20A, and the multiple energy resources distributed in the surrounding area 10B are referred to as 20B. These energy resources 20A and 20B are connected to a power grid (not shown), but are selectively integrated to be able to communicate via a network 30 such as IoT according to instructions from an aggregator server 50 described later.

バーチャルパワープラントは、都市エリア10Aや周辺エリア10Bに関わらず、管理エリア10内のエネルギーリソース20A、20Bの中から、複数の需要家やエネルギーリソース20A、20Bについての属性情報に応じた情報に該当するエネルギーリソース20A、20B(例えば図1においてVPPと記載した太枠内)を、ネットワーク30を介して統合することによって形成される。このようにして形成されたバーチャルパワープラントは、電力の供給量に対して需要家による電力の需要量がバランスすることに貢献するように、その時点の電力の供給量に応じて発生する上げDR、下げDR等のデマンドレスポンスに応じて、電力の需要量を意図的に増加または減少させる動作を行う。つまり、バーチャルパワープラントは、仮想的な発電所として機能する。ここで、本実施形態では、上記の属性情報を説明変数とし、上記の属性情報の分類結果を目的変数とし、これらの属性情報と分類結果との相関関係を学習した学習モデルを用意し、この学習モデルを用いて予測された属性情報の分類結果(属性情報に応じた情報)に従って、エネルギーリソース20A、20Bを選択的に統合してバーチャルパワープラントを形成する。 The virtual power plant is formed by integrating, via the network 30, the energy resources 20A and 20B (for example, within the bold frame marked VPP in FIG. 1) that correspond to the information corresponding to the attribute information of a plurality of consumers and the energy resources 20A and 20B from among the energy resources 20A and 20B in the management area 10, regardless of the urban area 10A or the surrounding area 10B. The virtual power plant formed in this way intentionally increases or decreases the demand for electricity in response to demand responses such as up-DR and down-DR that occur according to the supply amount of electricity at that time, so as to contribute to balancing the demand amount of electricity by consumers with the supply amount of electricity. In other words, the virtual power plant functions as a virtual power plant. Here, in this embodiment, the attribute information is used as an explanatory variable, the classification result of the attribute information is used as an objective variable, and a learning model that learns the correlation between these attribute information and the classification result is prepared, and the energy resources 20A and 20B are selectively integrated according to the classification result of the attribute information predicted using this learning model (information corresponding to the attribute information) to form the virtual power plant.

エネルギーリソース20A、20Bは、ネットワーク30を通してバーチャルパワープラントを形成することができるように、GW(ゲートウェイ:gateway)、HEMS(Home Energy Management System)、BEMS(Building Energy Management System)、FEMS(Factory Energy Management System)等の通信を中継する中継システム40(電力マネジメントシステムとも言う)と接続され、更に、この中継システム40およびネットワーク30を介して、エネルギーリソース20A、20Bの統合ひいてはバーチャルパワープラントの形成を行うためのアグリゲータサーバ50と通信可能に接続されている。 The energy resources 20A and 20B are connected to a relay system 40 (also called a power management system) that relays communications between a GW (gateway), HEMS (Home Energy Management System), BEMS (Building Energy Management System), FEMS (Factory Energy Management System), etc., so that a virtual power plant can be formed through the network 30. Furthermore, the energy resources 20A and 20B are communicatively connected to an aggregator server 50 that integrates the energy resources 20A and 20B and thereby forms a virtual power plant, via the relay system 40 and the network 30.

デマンドレスポンスとは、電力の供給量と需要家による電力の需要量とがバランスするように、バーチャルパワープラントを形成する複数のエネルギーリソース20A、20Bによる電力の需要量を制御して電力需要パターンを変化させるための需要応答指令のことである。デマンドレスポンスには、上げDRと下げDRがある。上げDRとは、電力の供給量よりも電力の需要量が少ないときに、バーチャルパワープラント内の複数のエネルギーリソース20A、20Bによる電力の需要量(消費量)を増加させるための指令のことである。例えば、電力系統に連系されている太陽光発電システムによる電力の供給量が晴天の影響を受けて供給過多になる虞がある場合、上げDRを発生し、例えば、バーチャルパワープラントを形成するエネルギーリソース20A、20Bに蓄電池(蓄エネルギーリソース)が含まれている場合、蓄電池の需要を増加させることによって、供給過多となる電力量を蓄電池に充電させる。一方、下げDRとは、電力の供給量よりも電力の需要量が多いときに、バーチャルパワープラント内の複数のエネルギーリソース20A、20Bによる電力の需要量を減少させる指令のことである。例えば、猛暑でエアコン等の稼働の需要が多く、電力の供給量が不足する虞がある場合、下げDRを発生し、バーチャルパワープラント内の何れかのエネルギーリソース20A、20Bの需要量を減少させる。このように、バーチャルパワープラント内の複数のエネルギーリソース20A、20Bの需要パターンを変化させることによって、電力の需給量をバランスさせることに貢献することが可能となる。 Demand response is a demand response command for changing the power demand pattern by controlling the power demand of the multiple energy resources 20A and 20B forming the virtual power plant so that the power supply and the power demand by the consumer are balanced. There are two types of demand response: up DR and down DR. Up DR is a command for increasing the power demand (consumption) of the multiple energy resources 20A and 20B in the virtual power plant when the power demand is less than the power supply. For example, when there is a risk that the power supply of a solar power generation system connected to the power grid will be oversupplied due to the influence of fine weather, an up DR is generated. For example, when the energy resources 20A and 20B forming the virtual power plant include a storage battery (storage energy resource), the demand for the storage battery is increased to charge the storage battery with the amount of power that would be oversupplied. On the other hand, down DR is a command for decreasing the power demand of the multiple energy resources 20A and 20B in the virtual power plant when the power demand is greater than the power supply. For example, if there is a high demand for air conditioners and the like during a heatwave and there is a risk of a shortage in the supply of electricity, a down DR is generated to reduce the demand for one of the energy resources 20A, 20B in the virtual power plant. In this way, changing the demand pattern for multiple energy resources 20A, 20B in the virtual power plant can contribute to balancing the supply and demand of electricity.

エネルギーリソース20A、20Bの1つの種類である創エネルギーリソースとは、電気を創出するリソースのことであり、例えば、太陽光発電システム、コジェネレーションシステム、再生可能エネルギー熱(地中熱・太陽熱・雪氷熱等)利用システム、燃料電池自動車等が一例として挙げられる。また、エネルギーリソース20A、20Bの他の1つの種類である蓄エネルギーリソースとは、電気エネルギーを蓄えるリソースのことであり、例えば、家庭用蓄電池、系統用蓄電池、ヒートポンプ給湯器等が一例として挙げられる。また、エネルギーリソース20A、20Bの他の1つの種類である省エネルギーリソースとは、電気の節電を行うリソースのことであり、例えば、業務・産業用EMS(Energy Management System)、IoT化された照明器具、空調設備、冷凍機器等が一例として挙げられる。バーチャルパワープラントは、これらの複数のエネルギーリソース20A、20Bに含まれる創エネルギーリソース、蓄エネルギーリソース、省エネルギーリソースを、複数の需要家や複数のエネルギーリソース20A、20Bの属性に基づいて選択的に統合することによって形成される。 The energy generating resource, which is one type of the energy resources 20A and 20B, is a resource that generates electricity, and examples thereof include a photovoltaic power generation system, a cogeneration system, a system that utilizes renewable energy heat (geothermal heat, solar heat, snow and ice heat, etc.), and a fuel cell vehicle. The energy storage resource, which is another type of the energy resources 20A and 20B, is a resource that stores electric energy, and examples thereof include a home storage battery, a system storage battery, and a heat pump water heater. The energy saving resource, which is another type of the energy resources 20A and 20B, is a resource that saves electricity, and examples thereof include a business/industrial EMS (Energy Management System), lighting equipment that has been converted to IoT, air conditioning equipment, and refrigeration equipment. The virtual power plant is formed by selectively integrating the energy generating resources, energy storage resources, and energy saving resources included in these multiple energy resources 20A and 20B based on the attributes of multiple consumers and the multiple energy resources 20A and 20B.

アグリゲータサーバ50は、アグリゲータによって管理されるサーバである。上述したように、アグリゲータは、リソースアグリゲータとアグリゲーションコーディネータとを総称しているため、リソースアグリゲータによって管理されるサーバ(リソースアグリゲータサーバとも記す)と、アグリゲーションコーディネータによって管理されるサーバ(アグリゲーションコーディネータサーバとも記す)と、が存在するが、本実施形態では、リソースアグリゲータサーバとアグリゲーションコーディネータサーバとを総称してアグリゲータサーバ50としている。アグリゲータサーバ50は、ハードウエアとしてはコンピュータによって構成され、当該コンピュータのソフトウエア処理によってアグリゲータサーバ50としての各種機能を実現する。 The aggregator server 50 is a server managed by an aggregator. As described above, aggregator is a general term for a resource aggregator and an aggregation coordinator, so there are servers managed by resource aggregators (also referred to as resource aggregator servers) and servers managed by aggregation coordinators (also referred to as aggregation coordinator servers). In this embodiment, the resource aggregator servers and aggregation coordinator servers are collectively referred to as aggregator servers 50. The aggregator server 50 is configured as hardware using a computer, and various functions as the aggregator server 50 are realized by software processing on the computer.

電気事業者サーバ60は、電気事業者によって管理されるサーバである。上述したように、電気事業者は一般送配電事業者及び小売電気事業者を総称しているため、一般送配電事業者によって管理されるサーバ(一般送配電事業者サーバとも記す)と、小売電気事業者によって管理されるサーバ(小売電気事業者サーバとも記す)と、が含まれるが、本実施形態では一般送配電事業者サーバと小売電気事業者サーバとを総称して電気事業者サーバ60としている。電気事業者サーバ60は、アグリゲータサーバ50にデマンドレスポンスを発生したり、アグリゲータサーバ50からデマンドレスポンスに従ってエネルギーリソース20A、20Bの動作を制御した結果を受け取ったりする。電気事業者サーバ60は、ハードウエアとしてはコンピュータによって構成され、当該コンピュータのソフトウエア処理によって電気事業者サーバ60としての各種機能を実現する。 The electric utility server 60 is a server managed by an electric utility. As described above, electric utility refers collectively to general electricity transmission and distribution business operators and retail electricity business operators, and therefore includes a server managed by the general electricity transmission and distribution business operator (also referred to as the general electricity transmission and distribution business operator server) and a server managed by the retail electricity business operator (also referred to as the retail electricity business operator server). In this embodiment, the general electricity transmission and distribution business operator server and the retail electricity business operator server are collectively referred to as the electric utility server 60. The electric utility server 60 generates a demand response to the aggregator server 50, and receives the results of controlling the operation of the energy resources 20A and 20B according to the demand response from the aggregator server 50. The electric utility server 60 is configured as hardware by a computer, and various functions as the electric utility server 60 are realized by software processing of the computer.

アグリゲータサーバ50は、エネルギーリソース20A、20Bを所有する複数の需要家や、エネルギーリソース20A、20Bに関して予め定められた属性から学習モデルによって分類された予測結果に基づいて、都市エリア10Aや周辺エリア10Bに関わらず、管理エリア10内に設置されている複数のエネルギーリソース20A、20Bを、ネットワーク30を介して選択的に統合し、これによってバーチャルパワープラントを形成させる。 The aggregator server 50 selectively integrates multiple energy resources 20A, 20B installed within the management area 10, regardless of whether it is an urban area 10A or a surrounding area 10B, via the network 30 based on prediction results classified by a learning model from multiple consumers who own the energy resources 20A, 20B and from predetermined attributes related to the energy resources 20A, 20B, thereby forming a virtual power plant.

図2は、アグリゲータサーバ50の機能を示すブロック図である。
アグリゲータサーバ50は、バーチャルパワープラントを形成するための手段として、属性記憶部510、学習モデル記憶部520、学習部530、統合制御部540を含んで構成されている。アグリゲータサーバ50は、ハードウエアとしては電気事業者サーバ60と同様にコンピュータによって構成され、当該コンピュータのソフトウエア処理によって、上記の属性記憶部510、学習モデル記憶部520、学習部530、統合制御部540の機能を実現する。
FIG. 2 is a block diagram showing the functions of the aggregator server 50. As shown in FIG.
The aggregator server 50 includes, as means for forming a virtual power plant, an attribute storage unit 510, a learning model storage unit 520, a learning unit 530, and an integrated control unit 540. The aggregator server 50 is configured as hardware by a computer similar to the electric utility server 60, and realizes the functions of the attribute storage unit 510, the learning model storage unit 520, the learning unit 530, and the integrated control unit 540 through software processing of the computer.

属性記憶部510には、学習部530が学習モデル記憶部520に記憶されている学習モデルを用いて所定の分類結果を得る際に必要となる属性情報が予め記憶されている。属性情報は、例えば、管理エリア10に分散して設置されている複数のエネルギーリソース20A、20Bに関して、これらのエネルギーリソース20A、20Bを所有する複数の需要家の電力使用状況を示す属性情報A、複数のエネルギーリソース20A、20Bが接続されている電力系統を示す属性情報B、複数のエネルギーリソース20A、20Bの地理的な位置を示す属性情報Cを含んでいる。尚、属性記憶部510は、例えば、ハードディスクや半導体不揮発性メモリ等のハードウエアを用いて構成され、ソフトウエア処理によって属性情報の参照や更新等の機能が可能となっている。 The attribute storage unit 510 stores in advance attribute information required when the learning unit 530 obtains a predetermined classification result using the learning model stored in the learning model storage unit 520. For example, the attribute information includes, for a plurality of energy resources 20A, 20B distributed and installed in the management area 10, attribute information A indicating the power usage status of a plurality of consumers who own these energy resources 20A, 20B, attribute information B indicating the power system to which the plurality of energy resources 20A, 20B are connected, and attribute information C indicating the geographical positions of the plurality of energy resources 20A, 20B. The attribute storage unit 510 is configured using hardware such as a hard disk or a semiconductor non-volatile memory, and is capable of functions such as referring to and updating the attribute information by software processing.

図3Aは属性記憶部510に記憶される属性情報Aのテーブルデータの一例を示している。図3Bは属性記憶部510に記憶される属性情報Bのテーブルデータの一例を示している。図3Cは属性記憶部510に記憶される属性情報Cのテーブルデータの一例を示している。 Figure 3A shows an example of table data of attribute information A stored in the attribute storage unit 510. Figure 3B shows an example of table data of attribute information B stored in the attribute storage unit 510. Figure 3C shows an example of table data of attribute information C stored in the attribute storage unit 510.

属性情報Aは、例えば、エネルギーリソース20A、20Bを所有する複数の需要家それぞれの、1日における所定時間毎の電力消費量(電力消費カーブ)を電力使用状況として捉えた情報である。所定時間は、例えば15分単位でも1時間単位でもよい。また、この1日は、例えば平日と休日・祝日とに分けてもよく、この場合、平日における所定時間毎の電力消費量は、例えば月曜~金曜までの電力消費量を所定時間ごとに平均した値とすることができ、一方、休日・祝日における所定時間毎の電力消費量は、例えば土曜、日曜、祝日の電力需要量を所定時間毎に平均した値とすることができる。1日の所定時間毎の電力消費量を平日と休日・祝日とで分ける場合、この情報を例えば1週間単位で更新して属性記憶部510に記憶させればよい。これにより、複数の需要家の最新の電力使用状況を示す情報を、バーチャルパワープラントの統合に効果的に用いることが可能となる。例えば、複数の需要家をX1~Xnとし、各需要家X1~Xnの平日の電力使用状況を示す情報をW11~W1nとし、各需要家X1~Xnの休日・祝日の電力使用状況を示す情報をW21~W2nとする。 The attribute information A is, for example, information that captures the power consumption (power consumption curve) for each predetermined time in one day of each of multiple consumers who own energy resources 20A and 20B as the power usage status. The predetermined time may be, for example, 15 minutes or one hour. In addition, this one day may be divided into, for example, weekdays and holidays and public holidays. In this case, the power consumption for each predetermined time on weekdays may be, for example, the average value of the power consumption from Monday to Friday for each predetermined time, while the power consumption for each predetermined time on public holidays and public holidays may be, for example, the average value of the power demand for Saturday, Sunday, and public holidays for each predetermined time. When the power consumption for each predetermined time in one day is divided into weekdays and holidays and public holidays, this information may be updated, for example, on a weekly basis and stored in the attribute storage unit 510. This makes it possible to effectively use information indicating the latest power usage status of multiple consumers for the integration of virtual power plants. For example, let multiple consumers be X1 to Xn, and let information showing the power usage status of each consumer X1 to Xn on weekdays be W11 to W1n, and information showing the power usage status of each consumer X1 to Xn on weekends and holidays be W21 to W2n.

図4は電力系統の一例を示す図であり、例えば、図4に記載された全エリアが管理エリア10に相当するものとする。図4には、例えば、2つの変電所H1、H2、変電所H1、H2にそれぞれ接続された母線K1、K2、母線K1から分岐する配電線F1、F2、母線K2から分岐する配電線F3、F4が示されている。例えば、配電線F1、F2には都市エリア10Aが跨るように形成され、この都市エリア10A内では複数のエネルギーリソース20A(白丸印)が分散し且つ密集して設置されていることとする。更に、配電線F3、F4には周辺エリア10Bが跨るように形成され、この周辺エリア10B内では複数のエネルギーリソース20B(白三角印)が分散して設置されていることとする。 Figure 4 shows an example of a power system, and all areas shown in Figure 4 correspond to the management area 10. Figure 4 shows, for example, two substations H1 and H2, buses K1 and K2 connected to the substations H1 and H2, distribution lines F1 and F2 branching off from the bus K1, and distribution lines F3 and F4 branching off from the bus K2. For example, the distribution lines F1 and F2 are formed so as to span an urban area 10A, and multiple energy resources 20A (white circles) are installed in a dispersed and dense manner within this urban area 10A. Furthermore, the distribution lines F3 and F4 are formed so as to span a surrounding area 10B, and multiple energy resources 20B (white triangles) are installed in a dispersed manner within this surrounding area 10B.

属性情報Bは、例えば、複数のエネルギーリソース20A、20Bが接続されている配電線F1~F4を示す情報である。例えば、配電線F1、F2に跨る都市エリア10A内に分散している複数のエネルギーリソースを20A1~20Anとすると、複数のエネルギーリソース20A1~20Anは、接続される配電線F1、F2の情報および該当するエネルギーリソース20A1~20Anを所有する需要家X1~Xnを示す情報とともに対応付けられて、属性情報Bとして属性記憶部510に記憶される。また、配電線F2~F4に跨る周辺エリア10B内に分散している複数のエネルギーリソースを20B1~20Bnとすると、複数のエネルギーリソース20B1~20Bnは、接続される配電線F2~F4の情報および該当するエネルギーリソース20B1~20Bnを所有する需要家X1~Xnを示す情報とともに対応付けられて、属性情報Bとして属性記憶部510に記憶される。ここで、需要家X1~Xnを示す情報は、属性情報Aにおける需要家X1~Xnと同一の情報でもよいし、属性情報Aにおける需要家X1~Xnに対応する情報でもよい。つまり、属性情報A、Bにおける需要家X1~Xnが一致する情報であれば如何なる情報を用いてもよい。 The attribute information B is, for example, information indicating the distribution lines F1 to F4 to which the multiple energy resources 20A and 20B are connected. For example, if the multiple energy resources distributed in the urban area 10A across the distribution lines F1 and F2 are 20A1 to 20An, the multiple energy resources 20A1 to 20An are associated with information on the distribution lines F1 and F2 to which they are connected and information indicating the consumers X1 to Xn who own the corresponding energy resources 20A1 to 20An, and are stored in the attribute storage unit 510 as attribute information B. Also, if the multiple energy resources distributed in the surrounding area 10B across the distribution lines F2 to F4 are 20B1 to 20Bn, the multiple energy resources 20B1 to 20Bn are associated with information on the distribution lines F2 to F4 to which they are connected and information indicating the consumers X1 to Xn who own the corresponding energy resources 20B1 to 20Bn, and are stored in the attribute storage unit 510 as attribute information B. Here, the information indicating consumers X1 to Xn may be the same information as consumers X1 to Xn in attribute information A, or may be information corresponding to consumers X1 to Xn in attribute information A. In other words, any information may be used as long as consumers X1 to Xn in attribute information A and B match.

属性情報Cは、複数のエネルギーリソース20A、20Bがそれぞれ都市エリア10Aおよび周辺エリア10Bに設置されている地理的な位置を示す情報である。図4の都市エリア10A内で分散している複数のエネルギーリソース20A1~20Anは、当該複数のエネルギーリソース20A1~20Anの地理的な位置を示す情報および該当する複数のエネルギーリソース20A1~20Anを所有する需要家X1~Xnを示す情報とともに対応付けられて、属性情報Cとして属性記憶部510に記憶される。同様に、図4の周辺エリア10B内で分散している複数のエネルギーリソース20B1~20Bnは、当該複数のエネルギーリソース20B1~20Bnの地理的な位置を示す情報および該当する複数のエネルギーリソース20B1~20Bnを所有する需要家X1~Xnを示す情報とともに対応付けられて、属性情報Cとして属性記憶部510に記憶される。ここで、需要家X1~Xnを示す情報は、属性情報Aにおける需要家X1~Xnと同一の情報でもよいし、属性情報Aにおける需要家X1~Xnに対応する情報でもよい。つまり、属性情報A、Cにおける需要家X1~Xnが一致する情報であれば如何なる情報を用いてもよい。また、複数のエネルギーリソース20A、20Bの地理的な位置を示す情報は、例えば、該当するエネルギーリソース20A、20Bの設置位置を示す住所情報や経度緯度情報とすることができるが、本実施形態では住所情報であることとする。例えば、エネルギーリソース20A1~20Anの住所情報をAD11~AD1nとし、エネルギーリソース20B1~20Bnの住所情報をAD21~AD2nとする。 Attribute information C is information indicating the geographical positions where the multiple energy resources 20A, 20B are installed in the urban area 10A and the surrounding area 10B, respectively. The multiple energy resources 20A1-20An distributed in the urban area 10A in FIG. 4 are associated with information indicating the geographical positions of the multiple energy resources 20A1-20An and information indicating the consumers X1-Xn who own the corresponding multiple energy resources 20A1-20An, and are stored in the attribute storage unit 510 as attribute information C. Similarly, the multiple energy resources 20B1-20Bn distributed in the surrounding area 10B in FIG. 4 are associated with information indicating the geographical positions of the multiple energy resources 20B1-20Bn and information indicating the consumers X1-Xn who own the corresponding multiple energy resources 20B1-20Bn, and are stored in the attribute storage unit 510 as attribute information C. Here, the information indicating the consumers X1 to Xn may be the same as the consumers X1 to Xn in the attribute information A, or may be information corresponding to the consumers X1 to Xn in the attribute information A. In other words, any information may be used as long as the consumers X1 to Xn in the attribute information A and C match. In addition, the information indicating the geographical positions of the multiple energy resources 20A and 20B may be, for example, address information or longitude and latitude information indicating the installation positions of the corresponding energy resources 20A and 20B, but in this embodiment, it is address information. For example, the address information of the energy resources 20A1 to 20An is AD11 to AD1n, and the address information of the energy resources 20B1 to 20Bn is AD21 to AD2n.

学習モデル記憶部520には、属性情報A~Cを説明変数とし、様々な分類結果を目的変数として、属性情報A~Cと様々な分類結果との間の相関関係を、特徴量を抽出することによって機械学習した学習モデルが予め記憶されている。学習モデルとしては、属性情報A~Cのそれぞれから様々な分類結果を得るモデルであってもよいし、属性情報A~Cの2つ以上の組み合わせから様々な分類結果を得るモデルであってもよい。 The learning model storage unit 520 pre-stores a learning model that uses attribute information A to C as explanatory variables and various classification results as objective variables, and that uses machine learning to extract features to determine correlations between attribute information A to C and various classification results. The learning model may be a model that obtains various classification results from each of attribute information A to C, or a model that obtains various classification results from a combination of two or more pieces of attribute information A to C.

学習部530は、学習モデル記憶部520に記憶されている学習モデルを用いて、入力される属性情報A~Cが該当すべき分類を予測する。例えば、管理エリア10内において、平日の12時から15時までの電力消費量を低減させる分類を考えた場合、学習部530は、学習モデルを用いて、例えば属性情報Aから上記の分類に該当するエネルギーリソース20A、20Bを予測する。また、学習部530は、分類の予測結果の精度を高めるために、学習モデルを用いて、例えば属性情報A、Bから上記の分類に該当するエネルギーリソース20A、20Bを予測するようにしてもよい。更に、学習部530は、エネルギーリソース20A、20Bの地理的な条件を加味する場合、学習モデルを用いて、例えば属性情報Cよりも属性情報A、Bを優先する形で、上記の分類に該当するエネルギーリソース20A、20Bを予測するようにしてもよい。 The learning unit 530 uses the learning model stored in the learning model storage unit 520 to predict the classification to which the input attribute information A to C should fall. For example, when considering a classification for reducing power consumption from 12:00 to 15:00 on weekdays in the management area 10, the learning unit 530 uses the learning model to predict the energy resources 20A and 20B that fall into the above classification from, for example, the attribute information A. In addition, in order to improve the accuracy of the classification prediction result, the learning unit 530 may use the learning model to predict the energy resources 20A and 20B that fall into the above classification from, for example, the attribute information A and B. Furthermore, when taking into account the geographical conditions of the energy resources 20A and 20B, the learning unit 530 may use the learning model to predict the energy resources 20A and 20B that fall into the above classification by prioritizing the attribute information A and B over the attribute information C.

統合制御部540は、都市エリア10A内に分散する複数のエネルギーリソース20Aおよび周辺エリア10Bに分散する複数のエネルギーリソース20Bの中から、学習部530の予測結果に従って、デマンドレスポンスに応答する場合に最適と判断される複数のエネルギーリソース20A、20Bを、ネットワーク30を介して選択的に統合し、バーチャルパワープラントを形成させる。 The integrated control unit 540 selectively integrates, via the network 30, from among the multiple energy resources 20A distributed within the urban area 10A and the multiple energy resources 20B distributed in the surrounding area 10B, the multiple energy resources 20A and 20B that are determined to be optimal when responding to a demand response according to the prediction results of the learning unit 530, to form a virtual power plant.

統合制御部540は、上記のように属性情報Cよりも属性情報A、Bの方を優先した学習部530の予測結果に従って、複数のエネルギーリソース20A、20Bを選択的に統合する。 The integrated control unit 540 selectively integrates the multiple energy resources 20A and 20B according to the prediction results of the learning unit 530, which prioritizes attribute information A and B over attribute information C as described above.

ここで、属性情報Aには、各需要家X1~Xnの1日における所定時間毎の電力消費量を示す情報が含まれている。そこで、統合制御部540は、属性情報Aを用いた学習部530の予測結果に従って、類似した電力消費を行う需要家X1~Xnを選択して、選択された需要家X1~Xnが所有するエネルギーリソース20A、20Bをネットワーク30を介して統合する。一例として、下げDRによって、例えば平日の12時から15時までの電力の需要量を下げる必要がある場合、統合制御部540は、属性情報Aを用いた学習部530の予測結果に従って、平日の12時から15時までの間の電力の消費量が一定以上に大きくなる電力使用状況を示す分類に含まれる情報W11~W1nのみを選択し、この選択された電力使用状況を示す情報W11~W1nに該当する需要家X1~Xnが所有するエネルギーリソース20A、20Bをネットワーク30を介して統合する。そして、統合制御部540は、統合して形成されたバーチャルパワープラント内で、平日の12時から15時の間、下げDRに従って、エネルギーリソース20A、20Bによる電力消費量を効率的に低減させることができる。このように、属性情報Aは、デマンドレスポンスに応じてバーチャルパワープラントを構成するエネルギーリソース20A、20Bの需要をどのように制御するのかに関して、その需要を予測するための有益な情報となる。また、属性情報Aを用いた学習部530の予測結果から選択された需要家X1~Xnは類似した電力使用状況にあることから、バーチャルパワープラントが1回のデマンドレスポンスで効率的に動作するために用いる情報としては、優先度が高い情報となる。 Here, the attribute information A includes information indicating the power consumption of each of the consumers X1 to Xn for each predetermined time in a day. Therefore, the integrated control unit 540 selects the consumers X1 to Xn that consume similar power according to the prediction result of the learning unit 530 using the attribute information A, and integrates the energy resources 20A and 20B owned by the selected consumers X1 to Xn via the network 30. As an example, when it is necessary to reduce the power demand from 12:00 to 15:00 on weekdays by a lowering DR, the integrated control unit 540 selects only the information W11 to W1n included in the classification indicating the power usage situation in which the power consumption from 12:00 to 15:00 on weekdays becomes greater than a certain amount according to the prediction result of the learning unit 530 using the attribute information A, and integrates the energy resources 20A and 20B owned by the consumers X1 to Xn that correspond to the information W11 to W1n indicating the selected power usage situation via the network 30. The integrated control unit 540 can then efficiently reduce the amount of power consumed by the energy resources 20A and 20B in the integrated virtual power plant between 12:00 and 15:00 on weekdays in accordance with the down DR. In this way, the attribute information A is useful information for predicting how to control the demand of the energy resources 20A and 20B that constitute the virtual power plant in response to demand response. In addition, the consumers X1 to Xn selected from the prediction results of the learning unit 530 using the attribute information A have similar power usage conditions, and therefore are high-priority information used by the virtual power plant to operate efficiently in one demand response.

属性情報Bは、複数のエネルギーリソース20A、20Bが配電線F1~F4のうちどの配電線に接続されているのかを示す情報である。配電線F1、F2は、共通の母線K1から分岐する電力線であることから、相関が強く、また、配電線F1、F2の系統間距離は、他の電力系統(例えば配電線F3、F4)と比べて比較的短い。同様に、配電線F3、F4は、共通の母線K2から分岐する電力線であることから、相関が強く、また、配電線F3、F4の系統間距離は、他の電力系統(例えば配電線F1、F2)と比べて比較的短い。このことから、配電線F1、F2(または配電線F3、F4)に接続された複数のエネルギーリソース20A、20Bは、同様の自然環境(天候や災害等)の影響を受ける可能性が高い。また、配電線F1~F4のうち何れか1つの配電線に共通に接続されるエネルギーリソース20A、20Bについても同様のことが言える。よって、配電線F1、F2の少なくとも一方や、配電線F3、F4の少なくとも一方に接続されたエネルギーリソース20A、20Bは、類似した電力使用状況を呈する可能性が高くなることから、バーチャルパワープラントが1回のデマンドレスポンスで効率的に動作するために用いる情報としては、優先度が高い情報となる。 Attribute information B is information indicating which of the power distribution lines F1 to F4 the multiple energy resources 20A and 20B are connected to. The power distribution lines F1 and F2 are power lines branching off from a common bus K1, so they are strongly correlated, and the distance between the power distribution lines F1 and F2 is relatively short compared to other power systems (e.g., power distribution lines F3 and F4). Similarly, the power distribution lines F3 and F4 are power lines branching off from a common bus K2, so they are strongly correlated, and the distance between the power distribution lines F3 and F4 is relatively short compared to other power systems (e.g., power distribution lines F1 and F2). For this reason, the multiple energy resources 20A and 20B connected to the power distribution lines F1 and F2 (or power distribution lines F3 and F4) are likely to be affected by similar natural environments (weather, disasters, etc.). The same can be said about the energy resources 20A and 20B that are commonly connected to any one of the power distribution lines F1 to F4. Therefore, the energy resources 20A and 20B connected to at least one of the power distribution lines F1 and F2 and at least one of the power distribution lines F3 and F4 are likely to have similar power usage conditions, and therefore have a high priority as information used by the virtual power plant to operate efficiently in one demand response.

属性情報Cは、複数のエネルギーリソース20A、20Bの地理的な位置を示す情報であって、デマンドレスポンスの条件によっては、地理的に近い位置に分散しているエネルギーリソース20A、20B(例えば配電線F1、F2に接続されているエネルギーリソース20A、20B)や、地理的に遠い位置に分散しているエネルギーリソース20A、20B(例えば配電線F1、F4に接続されているエネルギーリソース20A、20B)を、バーチャルパワープラントを形成するための情報として用いることができる。電力の供給量に対して需要家が消費する電力の需要量をバランスさせることを目的として、少ない回数のデマンドレスポンスでバーチャルパワープラントを効率的に動作させる場合、本実施形態では、属性情報Cよりも属性情報A、Bを優先的に用いることとする。 The attribute information C is information indicating the geographical positions of the multiple energy resources 20A, 20B, and depending on the demand response conditions, the energy resources 20A, 20B distributed in geographically close locations (e.g., the energy resources 20A, 20B connected to the distribution lines F1, F2) or the energy resources 20A, 20B distributed in geographically distant locations (e.g., the energy resources 20A, 20B connected to the distribution lines F1, F4) can be used as information for forming a virtual power plant. In order to balance the amount of power demand consumed by consumers against the amount of power supply, the virtual power plant is operated efficiently with a small number of demand responses, and in this embodiment, the attribute information A and B are used preferentially over the attribute information C.

尚、本実施形態では、説明変数として学習部530に入力される情報として属性情報A~Cを用いているが、属性情報はこれに限定されるものではない。属性情報A~Cのほかに、例えば、エネルギーリソース20A、20Bが分際している地域の気象予測情報やイベント情報、ハザード情報等を、複数のエネルギーリソース20A、20Bを統合するための情報として適宜使用するようにしてもよい。 In this embodiment, the attribute information A to C is used as the information input to the learning unit 530 as an explanatory variable, but the attribute information is not limited to this. In addition to the attribute information A to C, for example, weather forecast information, event information, hazard information, etc. for the area in which the energy resources 20A, 20B are divided may be used as appropriate as information for integrating the multiple energy resources 20A, 20B.

図5は、バーチャルパワープラントを形成する際の統合制御部540の動作の一例を示すフローチャートである。尚、説明の便宜上、バーチャルパワープラントの形成に際して、属性記憶部510に記憶されている属性情報A、Bが学習部530に入力されることとする。また、デマンドレスポンスは例えば下げDRであって、上記のように平日の12時から15時までの電力消費量を一定量下げる指令であることとする。 Figure 5 is a flowchart showing an example of the operation of the integrated control unit 540 when forming a virtual power plant. For ease of explanation, it is assumed that the attribute information A and B stored in the attribute memory unit 510 are input to the learning unit 530 when forming a virtual power plant. In addition, the demand response is, for example, a down DR, which is a command to reduce the amount of power consumption by a certain amount from 12:00 to 15:00 on weekdays as described above.

先ず、統合制御部540は、電気事業者サーバ60からデマンドレスポンスを受信したか否かを判定する(ステップS10)。統合制御部540は、デマンドレスポンスを受信していない場合(ステップS10:NO)、デマンドレスポンスを受信するまで、ステップS10の判定動作を繰り返し実行する。一方、統合制御部540は、デマンドレスポンスを受信した場合(ステップS10:YES)、学習部530が学習モデル記憶部520に記憶されている学習モデルを用いて得られた分類結果の中から、上記の下げDRに応答可能とされる分類結果に該当する複数のエネルギーリソース20A、20Bを選択する(ステップS20)。 First, the integrated control unit 540 determines whether or not a demand response has been received from the electric utility server 60 (step S10). If the integrated control unit 540 has not received a demand response (step S10: NO), it repeats the determination operation of step S10 until a demand response is received. On the other hand, if the integrated control unit 540 has received a demand response (step S10: YES), it selects a plurality of energy resources 20A, 20B that correspond to the classification result that is capable of responding to the above-mentioned lowering DR from among the classification results obtained by the learning unit 530 using the learning model stored in the learning model storage unit 520 (step S20).

次に、統合制御部540は、選択されたエネルギーリソース20A、20Bを、ネットワーク30を介して統合して、バーチャルパワープラントを形成させる。例えば、図4に示すように、配電線F2に接続されたエネルギーリソース20A、20Bの中で、太線で囲まれたエリア内のエネルギーリソース20A、20Bが、統合制御部540によって統合されてバーチャルパワープラントとなる。このバーチャルパワープラントは、都市エリア10Aに含まれるエネルギーリソース20Aと、周辺エリア10Bに含まれるエネルギーリソース20Bとを選択的に統合して形成されている(ステップS50)。 Next, the integrated control unit 540 integrates the selected energy resources 20A, 20B via the network 30 to form a virtual power plant. For example, as shown in FIG. 4, among the energy resources 20A, 20B connected to the power distribution line F2, the energy resources 20A, 20B in the area surrounded by a thick line are integrated by the integrated control unit 540 to form a virtual power plant. This virtual power plant is formed by selectively integrating the energy resource 20A included in the urban area 10A and the energy resource 20B included in the surrounding area 10B (step S50).

図6は、デマンドレスポンスの応答の流れを自動化した際の一例を示すフローチャートである。 Figure 6 is a flowchart showing an example of an automated demand response process.

先ず、電気事業者サーバ60から、上記の下げDRを示すデマンドレスポンスが発生する(ステップS100)。 First, a demand response indicating the above-mentioned reduced DR is generated from the electric utility server 60 (step S100).

次に、アグリゲータサーバ50では、平日にこの下げDRを受信すると(ステップS110)、図5に示す手順で、属性情報A、Bに基づいて、下げDRに応じることが可能なエネルギーリソース20A、20Bをネットワーク30を介して統合してバーチャルパワープラントを形成する(ステップS120)。ここで、図5では、バーチャルパワープラントの形成に際して属性情報A、Bに基づく学習部530の分類結果を用いた手順を示したが、下げDRの条件によっては、下げDRにより確実に応じるために属性情報A~Cに基づく学習部530の分類結果を用いてもよい。例えば、バーチャルパワープラントを更に地理的に絞り込んで形成したい場合など、属性情報Cは有益な情報となる。このように、アグリゲータサーバ50は、属性情報A、B、Cの少なくともいずれかを用いてバーチャルパワープラントを形成する。例えば、アグリゲータサーバ50は、DRの条件によっては、属性情報Bを用いずに、属性情報Aのみを用いてバーチャルパワープラントを形成してもよいし、属性情報AとCを用いてバーチャルパワープラントを形成してもよい。 Next, when the aggregator server 50 receives this lowered DR on a weekday (step S110), it integrates the energy resources 20A and 20B that can respond to the lowered DR via the network 30 based on the attribute information A and B in the procedure shown in FIG. 5 to form a virtual power plant (step S120). Here, in FIG. 5, the procedure using the classification results of the learning unit 530 based on the attribute information A and B when forming the virtual power plant is shown, but depending on the conditions of the lowered DR, the classification results of the learning unit 530 based on the attribute information A to C may be used to more reliably respond to the lowered DR. For example, the attribute information C is useful information when it is desired to further narrow down the geographical area of the virtual power plant. In this way, the aggregator server 50 forms a virtual power plant using at least one of the attribute information A, B, and C. For example, depending on the conditions of the DR, the aggregator server 50 may form a virtual power plant using only the attribute information A without using the attribute information B, or may form a virtual power plant using the attribute information A and C.

バーチャルパワープラントの形成が完了すると、統合制御部540では、下げDRに従って、平日の12時から15時までの間、バーチャルパワープラントを形成する複数のエネルギーリソース20A、20Bに対して、電力消費量を一定量削減するための指示を行う。この指示は、エネルギーリソース20A、20Bに接続されている中継システム40に与えられ、これによってエネルギーリソース20A、20Bによる電力消費量の削減量が一定量に達するように制御される(ステップS130)。例えば、エネルギーリソース20A、20Bが照明機器や空調機器の場合、これらの機器の出力を抑えるための制御が自動で行われる。 When the formation of the virtual power plant is completed, the integrated control unit 540 instructs the multiple energy resources 20A, 20B that form the virtual power plant to reduce their power consumption by a certain amount between 12:00 and 15:00 on weekdays in accordance with the reduction DR. This instruction is given to the relay system 40 connected to the energy resources 20A, 20B, which controls the reduction in power consumption by the energy resources 20A, 20B to reach a certain amount (step S130). For example, if the energy resources 20A, 20B are lighting equipment or air conditioning equipment, control is automatically performed to suppress the output of these equipment.

バーチャルパワープラント内での電力消費量を削減する期間(平日の12時~15時)が経過すると、統合制御部540は、バーチャルパワープラント内で電力消費量の削減を行ったエネルギーリソース20A、20Bに接続されている中継システム40から、電力消費に係る削減量を示す実績データを取得して集計し、この集計データを電気事業者サーバ60に送信する(ステップS140)。 When the period for reducing power consumption within the virtual power plant (12:00-15:00 on weekdays) has elapsed, the integrated control unit 540 acquires and compiles actual data indicating the amount of reduction in power consumption from the relay systems 40 connected to the energy resources 20A, 20B that have reduced their power consumption within the virtual power plant, and transmits this compiled data to the electric utility server 60 (step S140).

電気事業者サーバ60では、統合制御部540から集計データを取得すると、アグリゲータサーバ50に対して、この集計データが示す電力消費の削減量に応じた報酬を支払うための処理を行う(ステップS150)。尚、アグリゲータは、アグリゲータサーバ50を通して、電力消費の削減量に応じた報酬の受け取り処理が完了したことを確認した後、バーチャルパワープラント内のエネルギーリソース20A、20Bを所有する需要家に上記の報酬を支払うことで、一連のネガワット取引を終了する。もちろん、デマンドレスポンスに応じた場合に需要家に報酬が支払われるかどうかは需要家の契約内容によって変わるものであり、本実施形態は一例に過ぎない。 When the electric power company server 60 acquires the aggregated data from the integrated control unit 540, it performs a process to pay the aggregator server 50 a remuneration according to the amount of reduction in power consumption indicated by the aggregated data (step S150). After confirming through the aggregator server 50 that the process of receiving the remuneration according to the amount of reduction in power consumption has been completed, the aggregator pays the above-mentioned remuneration to the consumer who owns the energy resources 20A and 20B in the virtual power plant, thereby completing the series of negawatt transactions. Of course, whether or not a remuneration is paid to the consumer in response to a demand response depends on the contents of the consumer's contract, and this embodiment is merely one example.

以上説明したように、複数の需要家X1~Xnが所有する、各地に分散している複数のエネルギーリソース20A、20Bをネットワーク30を介して統合制御し、あたかも1つの発電所として機能させるバーチャルパワープラントの形成制御システムであって、複数の需要家X1~Xnの電力使用状況を示す情報Aを含む属性情報が記憶される属性記憶部510と、説明変数である属性情報と、目的変数である当該属性情報の分類結果との相関関係を学習する学習モデルが記憶される学習モデル記憶部520と、学習モデルを用いて、属性情報に対する分類結果を予測する学習部530と、複数のエネルギーリソース20A、20Bの中から、学習部530による予測結果に基づいて複数のエネルギーリソース20A、20Bを選択的に統合し、デマンドレスポンスに応じて、統合した複数のエネルギーリソース20A、20Bを制御する統合制御部540と、を備える。 As described above, the virtual power plant formation control system integrates and controls multiple energy resources 20A, 20B owned by multiple consumers X1 to Xn and distributed in various locations via a network 30, and functions as if they were a single power plant. The system includes an attribute storage unit 510 that stores attribute information including information A indicating the power usage status of the multiple consumers X1 to Xn, a learning model storage unit 520 that stores a learning model that learns the correlation between the attribute information, which is an explanatory variable, and the classification result of the attribute information, which is an objective variable, a learning unit 530 that predicts the classification result for the attribute information using the learning model, and an integration control unit 540 that selectively integrates the multiple energy resources 20A, 20B from the multiple energy resources 20A, 20B based on the prediction result by the learning unit 530, and controls the integrated multiple energy resources 20A, 20B in response to demand response.

また、上記の属性情報は、複数のエネルギーリソース20A、20Bが接続されている電力系統を示す情報を更に含む。 The attribute information further includes information indicating the power system to which the multiple energy resources 20A and 20B are connected.

また、上記の属性情報は、複数のエネルギーリソース20A、20Bの地理的な位置を示す情報を更に含む。 The attribute information further includes information indicating the geographical locations of the multiple energy resources 20A and 20B.

また、統合制御部540は、学習部530による予測結果の中で、複数のエネルギーリソース20A、20Bの地理的な位置を示す情報に関する予測結果よりも、複数の需要家X1~Xnの電力使用状況を示す情報および複数のエネルギーリソース20A、20Bが接続されている電力系統を示す情報に関する予測結果を優先して、複数のエネルギーリソース20A、20Bを選択的に統合する。 The integrated control unit 540 also prioritizes prediction results from the learning unit 530 regarding information indicating the power usage status of the multiple consumers X1 to Xn and information indicating the power grid to which the multiple energy resources 20A and 20B are connected, over prediction results regarding information indicating the geographical locations of the multiple energy resources 20A and 20B, and selectively integrates the multiple energy resources 20A and 20B.

また、複数のエネルギーリソース20A、20Bは、創エネルギーリソース、蓄エネルギーリソース、省エネルギーリソースを含み、統合制御部540は、学習部530の予測結果に基づいて、複数のエネルギーリソース20A、20Bの中から、創エネルギーリソース、蓄エネルギーリソース、省エネルギーリソースの何れかを選択的に統合する。 The multiple energy resources 20A, 20B include energy generation resources, energy storage resources, and energy saving resources, and the integrated control unit 540 selectively integrates any one of the energy generation resources, energy storage resources, and energy saving resources from among the multiple energy resources 20A, 20B based on the prediction results of the learning unit 530.

そして、本実施形態によれば、学習部530によって例えば人工知能(Artificial Intelligence)のような機械学習機能によって、属性情報A~Cをデマンドレスポンスに応答可能な複数のグループに精度よく分類することができ、都市エリア10Aや周辺エリア10Bに関わらず、遍在する様々なエネルギーリソース20A、20Bを効率的に活用してバーチャルパワープラントを形成し、電力の需給量のバランスをより一層確実なものとすることが可能となる。 In this embodiment, the learning unit 530 can use a machine learning function, such as artificial intelligence, to accurately classify attribute information A to C into multiple groups that can respond to demand response. This makes it possible to efficiently utilize various ubiquitous energy resources 20A, 20B to form a virtual power plant regardless of the urban area 10A or the surrounding area 10B, thereby making it possible to more reliably balance the supply and demand of electricity.

尚、上記の実施形態は、本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得るとともに、本発明にはその等価物も含まれる。本実施形態では、バーチャルパワープラントが下げDRに従って消費電力量を削減するように動作したが、これに限定されない。バーチャルパワープラントは、上げDRに従って消費電力量を増加させるように動作することも可能である。つまり、アグリゲータサーバ50における統合制御部540は、上げDRおよび下げDRの何れにも効率的に対応できるように、バーチャルパワープラントを形成して制御することが可能である。 The above embodiment is intended to facilitate understanding of the present invention, and is not intended to limit the present invention. The present invention may be modified or improved without departing from the spirit thereof, and the present invention also includes equivalents. In this embodiment, the virtual power plant operates to reduce the amount of power consumption according to the lowering DR, but is not limited to this. The virtual power plant can also operate to increase the amount of power consumption according to the increasing DR. In other words, the integrated control unit 540 in the aggregator server 50 can form and control the virtual power plant so that it can efficiently respond to both the increasing DR and the decreasing DR.

10 管理エリア
10A 都市エリア
10B 周辺エリア
20A、20B エネルギーリソース
30 ネットワーク
40 中継システム
50 アグリゲータサーバ
60 電気事業者サーバ
510 属性記憶部
520 学習モデル記憶部
530 学習部
540 統合制御部
REFERENCE SIGNS LIST 10 Management area 10A Urban area 10B Surrounding area 20A, 20B Energy resource 30 Network 40 Relay system 50 Aggregator server 60 Electricity supplier server 510 Attribute storage unit 520 Learning model storage unit 530 Learning unit 540 Integrated control unit

Claims (10)

複数の需要家が所有する、都市エリア及び周辺エリアを含む管理エリア内の各地に分散している複数のエネルギーリソースをネットワークを介して統合制御し、あたかも1つの発電所として機能させるバーチャルパワープラントの形成制御システムであって、
前記複数の需要家の電力使用状況を示す情報を含む属性情報が記憶される属性記憶部と、
説明変数である前記属性情報と、目的変数である前記属性情報の分類結果との相関関係を学習する学習モデルが記憶される学習モデル記憶部と、
前記学習モデルを用いて、前記属性情報に対する前記分類結果を予測する学習部と、
下げDR又は上げDRが発生した際に、前記複数のエネルギーリソースの中から、前記学習部による予測結果に基づいて前記下げDR又は前記上げDRに応答可能とされる分類結果に該当する複数のエネルギーリソースを選択的に統合し統合した前記エネルギーリソースを制御する統合制御部と、
を備えたバーチャルパワープラントの形成制御システム。
A virtual power plant formation control system that integrates and controls a plurality of energy resources owned by a plurality of consumers and distributed throughout a management area including an urban area and surrounding areas via a network, and functions as if they were a single power plant,
an attribute storage unit that stores attribute information including information indicating power usage status of the plurality of consumers;
a learning model storage unit that stores a learning model that learns a correlation between the attribute information, which is an explanatory variable, and a classification result of the attribute information, which is a target variable;
a learning unit that predicts the classification result for the attribute information by using the learning model;
an integrated control unit that selectively integrates, from among the plurality of energy resources, a plurality of energy resources that correspond to a classification result that is capable of responding to the lowering DR or the raising DR based on a prediction result by the learning unit when a lowering DR or an raising DR occurs , and controls the integrated energy resources;
A formation control system for a virtual power plant equipped with
前記属性情報は、前記複数のエネルギーリソースが接続されている電力系統を示す情報を更に含む
請求項1に記載のバーチャルパワープラントの形成制御システム。
The virtual power plant formation control system according to claim 1 , wherein the attribute information further includes information indicating a power grid to which the plurality of energy resources are connected.
前記属性情報は、前記複数のエネルギーリソースの地理的な位置を示す情報を更に含む
請求項2に記載のバーチャルパワープラントの形成制御システム。
The virtual power plant formation control system according to claim 2 , wherein the attribute information further includes information indicating geographical locations of the plurality of energy resources.
前記統合制御部は、前記学習部による予測結果の中で、前記複数のエネルギーリソースの地理的な位置を示す情報に関する予測結果よりも、前記複数の需要家の電力使用状況を示す情報および前記複数のエネルギーリソースが接続されている電力系統を示す情報に関する予測結果を優先して、前記エネルギーリソースを選択的に統合する
請求項3に記載のバーチャルパワープラントの形成制御システム。
4. The virtual power plant formation control system of claim 3, wherein the integrated control unit selectively integrates the energy resources by prioritizing prediction results by the learning unit regarding information indicating the power usage status of the multiple consumers and information indicating the power grid to which the multiple energy resources are connected over prediction results regarding information indicating the geographical locations of the multiple energy resources.
前記複数のエネルギーリソースは、創エネルギーリソース、蓄エネルギーリソース、省エネルギーリソースを含み、
前記統合制御部は、前記学習部の予測結果に基づいて、前記複数のエネルギーリソースの中から、前記創エネルギーリソース、前記蓄エネルギーリソース、前記省エネルギーリソースの何れかを選択的に統合する
請求項1~4の何れか一項に記載のバーチャルパワープラントの形成制御システム。
The plurality of energy resources include an energy generating resource, an energy storing resource, and an energy saving resource,
The virtual power plant formation control system according to any one of claims 1 to 4, wherein the integrated control unit selectively integrates the energy generating resource, the energy storing resource, and the energy saving resource from among the plurality of energy resources based on the prediction result of the learning unit.
複数の需要家が所有する、都市エリア及び周辺エリアを含む管理エリア内の各地に分散している複数のエネルギーリソースをネットワークを介して統合制御し、あたかも1つの発電所として機能させるバーチャルパワープラントの形成制御方法であって、
説明変数である、前記複数の需要家の電力使用状況を示す情報を含む属性情報と、目的変数である前記属性情報の分類結果との相関関係を学習する学習モデルを用いて、前記属性情報に対する前記分類結果を予測し、
下げDR又は上げDRが発生した際に、前記複数のエネルギーリソースの中から、前記学習モデルによる予測結果に基づいて前記下げDR又は前記上げDRに応答可能とされる分類結果に該当する複数のエネルギーリソースを選択的に統合し統合した前記エネルギーリソースを制御する
バーチャルパワープラントの形成制御方法。
A method for forming and controlling a virtual power plant in which a plurality of energy resources owned by a plurality of consumers and distributed throughout a management area including an urban area and surrounding areas are integrated and controlled via a network to function as if they were a single power plant, comprising:
predicting the classification result for the attribute information using a learning model that learns a correlation between attribute information including information indicating the power usage status of the plurality of consumers, which is an explanatory variable, and a classification result of the attribute information, which is a target variable;
A method for controlling the formation of a virtual power plant, comprising : when a down DR or an up DR occurs, selectively integrating from among the plurality of energy resources, a plurality of energy resources that correspond to a classification result that is capable of responding to the down DR or the up DR based on a prediction result by the learning model , and controlling the integrated energy resources.
前記属性情報は、前記複数のエネルギーリソースが接続されている電力系統を示す情報を更に含む
請求項6に記載のバーチャルパワープラントの形成制御方法。
The method for controlling formation of a virtual power plant according to claim 6 , wherein the attribute information further includes information indicating a power grid to which the plurality of energy resources are connected.
前記属性情報は、前記複数のエネルギーリソースの地理的な位置を示す情報を更に含む
請求項7に記載のバーチャルパワープラントの形成制御方法。
The method for controlling formation of a virtual power plant according to claim 7 , wherein the attribute information further includes information indicating geographical positions of the plurality of energy resources.
前記学習モデルによる予測結果の中で、前記複数のエネルギーリソースの地理的な位置を示す情報に関する予測結果よりも、前記複数の需要家の電力使用状況を示す情報および前記複数のエネルギーリソースが接続されている電力系統を示す情報に関する予測結果を優先して、前記エネルギーリソースを選択的に統合する
請求項8に記載のバーチャルパワープラントの形成制御方法。
9. The method for controlling the formation of a virtual power plant according to claim 8, further comprising the step of selectively integrating the energy resources by prioritizing prediction results relating to information indicating the power usage status of the plurality of consumers and information indicating the power grid to which the plurality of energy resources are connected over prediction results relating to information indicating the geographical locations of the plurality of energy resources among the prediction results of the learning model.
前記複数のエネルギーリソースは、創エネルギーリソース、蓄エネルギーリソース、省エネルギーリソースを含み、
前記学習モデルの予測結果に基づいて、前記複数のエネルギーリソースの中から、前記創エネルギーリソース、前記蓄エネルギーリソース、前記省エネルギーリソースの何れかを選択的に統合する
請求項6~9の何れか一項に記載のバーチャルパワープラントの形成制御方法。
The plurality of energy resources include an energy generating resource, an energy storing resource, and an energy saving resource,
The method for controlling the formation of a virtual power plant according to any one of claims 6 to 9, further comprising selectively integrating the energy generating resource, the energy storing resource, and the energy saving resource from among the plurality of energy resources based on a prediction result of the learning model.
JP2020202231A 2020-12-04 2020-12-04 Virtual power plant formation control system and formation control method Active JP7615644B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020202231A JP7615644B2 (en) 2020-12-04 2020-12-04 Virtual power plant formation control system and formation control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020202231A JP7615644B2 (en) 2020-12-04 2020-12-04 Virtual power plant formation control system and formation control method

Publications (2)

Publication Number Publication Date
JP2022089658A JP2022089658A (en) 2022-06-16
JP7615644B2 true JP7615644B2 (en) 2025-01-17

Family

ID=81989335

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020202231A Active JP7615644B2 (en) 2020-12-04 2020-12-04 Virtual power plant formation control system and formation control method

Country Status (1)

Country Link
JP (1) JP7615644B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120338439B (en) * 2025-06-16 2025-09-09 南京星赫能源科技有限公司 Virtual power plant energy management method and system based on air conditioner load

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016084313A1 (en) 2014-11-27 2016-06-02 日本電気株式会社 Power demand adjustment system, demand adjustment device, group generation device, and group generation method
JP2018143046A (en) 2017-02-28 2018-09-13 株式会社ダイヘン Virtual power plant
WO2020027202A1 (en) 2018-07-31 2020-02-06 本田技研工業株式会社 Power prediction system, power prediction device, power prediction method, program, and storage medium
JP2020108301A (en) 2018-12-28 2020-07-09 株式会社WaaS製作所 Virtual power system, program, management server and information terminal

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6989364B2 (en) * 2016-12-02 2022-01-05 積水化学工業株式会社 Power management equipment, power management methods and programs
JP2020054053A (en) * 2018-09-25 2020-04-02 株式会社東芝 Information processing apparatus and information processing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016084313A1 (en) 2014-11-27 2016-06-02 日本電気株式会社 Power demand adjustment system, demand adjustment device, group generation device, and group generation method
JP2018143046A (en) 2017-02-28 2018-09-13 株式会社ダイヘン Virtual power plant
WO2020027202A1 (en) 2018-07-31 2020-02-06 本田技研工業株式会社 Power prediction system, power prediction device, power prediction method, program, and storage medium
JP2020108301A (en) 2018-12-28 2020-07-09 株式会社WaaS製作所 Virtual power system, program, management server and information terminal

Also Published As

Publication number Publication date
JP2022089658A (en) 2022-06-16

Similar Documents

Publication Publication Date Title
CA3159151C (en) An optimized load shaping system, method & apparatus for optimizing production and consumption of energy
US10373082B2 (en) Integration of commercial building operations with electric system operations and markets
JP6178045B2 (en) Energy management system, energy management method, program, and server device
Ozturk et al. An intelligent home energy management system to improve demand response
EP2503344B1 (en) Energy Consumption Management
Katipamula et al. Small-and medium-sized commercial building monitoring and controls needs: A scoping study
US11530833B2 (en) Systems and methods for controlling and predicting heat load disturbances
Lauro et al. Model predictive control for building active demand response systems
JP7595310B2 (en) RECOMMENDED ACTION OUTPUT SYSTEM, RECOMMENDED ACTION OUTPUT METHOD, AND PROGRAM
EP3343720A1 (en) Management server, management method, and management system
Ramdaspalli et al. Transactive control for efficient operation of commercial buildings
EP4123864A1 (en) A system for controlling energy supply and/or consumption from an energy network
JP2018153011A (en) Power control system
Rodriguez-Garcia et al. Power distribution system planning for mitigating overheating risk inequity
Malik et al. Integration of automated demand response and energy efficiency to enable a smart grid infrastructure
Rottondi et al. An energy management system for a smart office environment
JP7615644B2 (en) Virtual power plant formation control system and formation control method
Minoli et al. The emerging “energy Internet of Things”
JP7643020B2 (en) Virtual power plant formation control system and formation control method
US20230170697A1 (en) Techniques for predictive control of energy use in a structure
JP7600654B2 (en) Integrated control system for virtual power plant and integrated control method thereof
Zairi et al. A review on home energy management systems
Baruah et al. Integrating sensor networks to facilitate efficient energy management for smart grids
JP2014068426A (en) Energy demand-and supply balance maintenance system
JP7615645B2 (en) Integrated control system for virtual power plant and integrated control method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231109

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240830

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240917

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241011

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241203

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241216

R150 Certificate of patent or registration of utility model

Ref document number: 7615644

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150