Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7617874B2 - Hub system and communication control method - Google Patents
[go: Go Back, main page]

JP7617874B2 - Hub system and communication control method - Google Patents

Hub system and communication control method Download PDF

Info

Publication number
JP7617874B2
JP7617874B2 JP2022105712A JP2022105712A JP7617874B2 JP 7617874 B2 JP7617874 B2 JP 7617874B2 JP 2022105712 A JP2022105712 A JP 2022105712A JP 2022105712 A JP2022105712 A JP 2022105712A JP 7617874 B2 JP7617874 B2 JP 7617874B2
Authority
JP
Japan
Prior art keywords
power data
power
data
communication
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022105712A
Other languages
Japanese (ja)
Other versions
JP2024005509A (en
Inventor
富士雄 江口
学 井上
将来 上浦
恒樹 山内
丈博 名嘉
尚信 篠田
直樹 小林
和貴 櫛田
研 西澤
雅人 渡辺
ルミ子 原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Tokyo Electric Power Co Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Mitsubishi Heavy Industries Ltd
Tokyo Electric Power Co Holdings Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc, Mitsubishi Heavy Industries Ltd, Tokyo Electric Power Co Holdings Inc filed Critical Tokyo Electric Power Co Inc
Priority to JP2022105712A priority Critical patent/JP7617874B2/en
Publication of JP2024005509A publication Critical patent/JP2024005509A/en
Application granted granted Critical
Publication of JP7617874B2 publication Critical patent/JP7617874B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本開示は、ハブシステム及び通信制御方法に関する。 This disclosure relates to a hub system and a communication control method.

特許文献1には、サーバと機器の間での電力に関するデータのやり取りを仲介する通信装置が開示されている。一般に太陽光発電や蓄電池などの分散リソース(DER:Distributed Energy Resources:)やPCS(Power Conditioning System:電力制御システム)などの周辺装置との通信に用いる通信プロトコルは、分散リソース(DER)や周辺装置のメーカに依存しており、それらの装置と通信を行って、分散リソース(DER)が発電等した電力に関するデータを取得しようとした場合、メーカ独自の通信プロトコルを標準プロトコルに変換するエッジ端末の設置が必要とされる。また、分散リソース(DER)等と通信を行うのではなく、分散リソース(DER)のメーカが運営するデータセンタのサーバ等(所謂クラウド)と通信を行って、データを取得しなければならない場合がある。 Patent Document 1 discloses a communication device that mediates the exchange of power-related data between a server and equipment. In general, the communication protocols used for communication with distributed resources (DER: Distributed Energy Resources) such as solar power generation and storage batteries and peripheral devices such as PCS (Power Conditioning System) depend on the manufacturers of the distributed resources (DER) and peripheral devices. When communicating with such devices to obtain data related to power generated by the distributed resources (DER), an edge terminal that converts the manufacturer's proprietary communication protocol into a standard protocol is required. In addition, instead of communicating with the distributed resources (DER) and the like, there are cases where data must be obtained by communicating with servers (so-called clouds) in a data center operated by the distributed resources (DER) manufacturer.

電力に関するデータのやり取りにおいて、通信装置は、非同期でデータ転送を行うことが多い。送信側の装置は受信側の装置の状況にかかわらずデータを通信装置へ送信し、送信したデータは、一旦、通信装置によって保存される。受信側の装置は、都合の良いとき(例えば、処理のピーク時以外)に通信装置からデータを取得する。非同期なメッセージングシステムでは、データの配信がFIFO(First In First Out)で行われることが多いが、その場合、データの時刻同期は行われない。 When exchanging data related to power, communication devices often transfer data asynchronously. The sending device sends data to the communication device regardless of the status of the receiving device, and the sent data is temporarily stored by the communication device. The receiving device retrieves the data from the communication device when it is convenient (e.g., outside peak processing times). In asynchronous messaging systems, data is often delivered on a FIFO (First In First Out) basis, in which case the data is not time-synchronized.

特開2018-201282号公報JP 2018-201282 A

分散リソース(DER)の電力取引に係る情報処理を行うプラットフォームを考えた場合、多数の分散リソース(DER)に係る電力に関するデータ(例えば、発電電力)を収集し、一元管理する必要がある。その場合、通信プロトコルや通信先(分散リソース(DER)等の装置と通信するか、クラウドと通信するか)の違いを吸収して、様々な装置から多様なデータを収集し、管理できる必要がある。例えば、データ管理に関しては、各装置から収集したデータの時刻同期が必要となる。 When considering a platform that processes information related to distributed resource (DER) power trading, it is necessary to collect and centrally manage data related to electricity (e.g., generated power) related to a large number of distributed resources (DER). In that case, it is necessary to absorb differences in communication protocols and communication destinations (whether communicating with devices such as distributed resources (DER) or with the cloud) and collect and manage a variety of data from various devices. For example, when it comes to data management, time synchronization of the data collected from each device is required.

本開示は、上記課題を解決するハブシステム及び通信制御方法を提供する。 This disclosure provides a hub system and a communication control method that solves the above problems.

本開示のハブシステムは、分散リソースが発電又は充放電する電力に関する電力データを送受信する通信部と、前記電力データと前記電力データの計測時刻を示す時刻情報とを対応付けてデータベースに保存する制御部と、前記データベースと、を備え、前記通信部は、前記電力データの送受信先である他装置が通信に用いる通信プロトコルに応じた通信手段を備える。さらに、前記電力データの送受信に際し、前記電力データに係る前記分散リソースの識別情報とパスワードによって認証を行う認証部、を備え、前記認証部は、最初に前記他装置から前記識別情報と所定の初期パスワードを取得すると、前記分散リソースごとに固有のパスワードを生成し、前記通信部は、生成された前記固有のパスワードを前記他装置へ送信してもよい。又は前記制御部は、前記電力データを送受信したこと及び送受信した時刻、前記電力データを前記データベースへ保存したこと及び保存時刻をログファイルへ記録してもよい The hub system of the present disclosure includes a communication unit that transmits and receives power data related to power generated or charged/discharged by a distributed resource, a control unit that associates the power data with time information indicating a measurement time of the power data and stores the data in a database, and the database, and the communication unit includes a communication means corresponding to a communication protocol used for communication by another device that is a destination of the power data. The hub system further includes an authentication unit that performs authentication using identification information and a password of the distributed resource related to the power data when transmitting and receiving the power data, and when the authentication unit first obtains the identification information and a predetermined initial password from the other device, the authentication unit may generate a unique password for each distributed resource, and the communication unit may transmit the generated unique password to the other device. Alternatively, the control unit may record in a log file the fact that the power data has been transmitted and received and the time of transmission and reception, and the fact that the power data has been stored in the database and the time of storage .

本開示の通信制御方法によれば、ハブシステムが、分散リソースが発電又は充放電する電力に関する電力データを送受信する他装置が通信に用いる通信プロトコルに応じた通信手段を用いて、前記他装置から前記電力データを受信し、前記電力データと前記電力データの計測時刻を示す時刻情報とを対応付けてデータベースに保存する。前記電力データの送受信に際し、前記電力データに係る前記分散リソースの識別情報とパスワードによって認証を行い、最初に前記他装置から前記識別情報と所定の初期パスワードを取得すると、前記分散リソースごとに固有のパスワードを生成し、生成された前記固有のパスワードを前記他装置へ送信してもよい。前記電力データを送受信したこと及び送受信した時刻、前記電力データを前記データベースへ保存したこと及び保存時刻をログファイルへ記録してもよい。
According to the communication control method of the present disclosure, a hub system receives power data from another device, which transmits and receives power data related to power generated or charged/discharged by a distributed resource, using a communication means corresponding to a communication protocol used by the other device for communication , and stores the power data in a database in association with time information indicating a measurement time of the power data. When transmitting and receiving the power data, authentication is performed using identification information and a password of the distributed resource related to the power data, and when the identification information and a predetermined initial password are first obtained from the other device, a unique password may be generated for each distributed resource, and the generated unique password may be transmitted to the other device. The transmission and reception of the power data and the time of transmission and reception, and the storage of the power data in the database and the time of storage may be recorded in a log file.

本開示のハブシステム及び通信制御方法によれば、通信プロトコルが異なる複数の装置から電力に関するデータを収集し、各データの時刻を管理することができる。 The hub system and communication control method disclosed herein can collect power-related data from multiple devices with different communication protocols and manage the time of each piece of data.

実施形態に係るハブシステムの一例を示す図である。FIG. 1 is a diagram illustrating an example of a hub system according to an embodiment. 実施形態に係る電力データの保存および抽出処理について説明する図である。5A to 5C are diagrams illustrating a power data storage and extraction process according to an embodiment. 実施形態に係るハブシステムの動作を示す第1のフローチャートである。4 is a first flowchart showing the operation of the hub system according to the embodiment. 実施形態に係るハブシステムの動作を示す第2のフローチャートである。11 is a second flowchart showing the operation of the hub system according to the embodiment. 実施形態のハブシステムのハードウェア構成の一例を示す図である。FIG. 2 illustrates an example of a hardware configuration of a hub system according to an embodiment.

<実施形態>
以下、本開示のハブシステムについて、図1~図5を参照しながら説明する。
(構成)
図1は、実施形態に係るハブシステムの一例を示す図である。
ハブシステム10は、多数の分散リソース(DER)が発電又は充放電等する電力又は電力量など分散リソース(DER)の電力に関するデータ(電力データと称する。電力データには、分散リソース(DER)にて発電や充放電等される電力量や、電力、電圧、電流、力率の瞬時値などのうちの何れか又は複数(全部でもよい)と、これらの値を計測した計測時刻が含まれる。力率は、電力に対し有効電力と無効電力を分けるための計算に使用する。)を収集および保存し、他システムへ電力データの提供を行うIoT(Internet of Things)ハブシステムである。分散リソース(DER)とは、例えば、PV(photovoltaics:太陽光発電設備)、ESS(Energy Storage System:電力貯蔵システム)、小型火力発電装置などである。ハブシステム10は、通信部11と、制御部12と、時刻同期部13と、認証登録部14と、データ処理部15と、データベース16と、を備える。
<Embodiment>
The hub system of the present disclosure will now be described with reference to FIGS.
(composition)
FIG. 1 is a diagram illustrating an example of a hub system according to an embodiment.
The hub system 10 is an IoT (Internet of Things) hub system that collects and stores data on the power of distributed resources (DERs), such as the power or amount of power generated or charged/discharged by a large number of distributed resources (DERs) (referred to as power data. The power data includes any or more (or all) of the amount of power generated or charged/discharged by the distributed resources (DERs), the instantaneous values of power, voltage, current, and power factor, and the measurement time when these values were measured. The power factor is used in a calculation to separate active power and reactive power for power.) and provides the power data to other systems. The distributed resources (DERs) are, for example, photovoltaics (PV: photovoltaic power generation equipment), energy storage systems (ESS: energy storage systems), small thermal power generation devices, and the like. The hub system 10 includes a communication unit 11, a control unit 12, a time synchronization unit 13, an authentication registration unit 14, a data processing unit 15, and a database 16.

通信部11は、通信モジュールやデバイスドライバ、クラウドドライバ(クラウドとの通信に用いるドライバ等の各種ソフトウェアのこと。クラウドドライバには、例えば、WebAPIが含まれる。)、API等を備え、これらを使用して、他装置・他システムとの通信やデータの入出力を行う。通信部11は、メーカ独自の通信プロトコルに対応した通信モジュール、標準的な通信プロトコルに対応した通信モジュールなど、様々な種類の通信モジュール(ソフトウェア)や通信デバイス(ハードウェア)およびその通信デバイスの動作に必要なデバイスドライバを有しており、分散リソース(DER)の種類やメーカを限定せずに、多種多様な分散リソース(DER)およびその周辺装置と通信可能に構成されている。図1の例では、ハブシステム10は、上位システム1、クラウド4a,4b、エッジ端末9a,9b、ユニットコントローラ7bなどと通信可能な通信モジュールや通信デバイスおよびその通信デバイスのデバイスドライバを備えており、クラウド4a等の他装置とデータの送受信を行う。なお、通信モジュール等は、ハブシステム10と通信を行う他装置に応じて追設が可能であってもよい。また、通信モジュール、通信デバイス、デバイスドライバ、クラウドドライバ、API等は通信手段の一例である。 The communication unit 11 includes a communication module, a device driver, a cloud driver (various software such as a driver used for communication with the cloud. The cloud driver includes, for example, a Web API), an API, etc., and uses these to communicate with other devices and systems and input and output data. The communication unit 11 has various types of communication modules (software) and communication devices (hardware), such as a communication module compatible with a manufacturer's unique communication protocol and a communication module compatible with a standard communication protocol, and device drivers required for the operation of the communication devices. It is configured to be able to communicate with a wide variety of distributed resources (DERs) and their peripheral devices without limiting the type or manufacturer of the distributed resources (DERs). In the example of FIG. 1, the hub system 10 includes a communication module and a communication device that can communicate with the upper system 1, clouds 4a, 4b, edge terminals 9a, 9b, unit controller 7b, etc., and a device driver for the communication device, and transmits and receives data to and from other devices such as the cloud 4a. The communication module, etc. may be added depending on the other devices that communicate with the hub system 10. Additionally, communication modules, communication devices, device drivers, cloud drivers, APIs, etc. are examples of communication means.

例えば、PV2aは、PCS3aと接続され、PCS3aは、PV2aが発電した電力を交流電力に変換して負荷へ供給するとともに、PV2aが発電した電力の大きさを含む電力データをPV2aのメーカが運営するクラウド4aへ送信する。電力データには、例えば、PV2aの識別情報とPV2aによって発電された電力等(電力量、電力、電圧、電流、力率など、以下同様)の情報が含まれる。同様に、PCS3bは、PV2bに関する電力データをクラウド4aへ送信する。PCS3cは、PV2cに関する電力データをクラウド4aへ送信する。クラウド4aは、PCS3a~3cから送信される時々刻々の電力データを取得して自システムに保存するとともに、電力データに時刻情報(例えば、PCS3aから電力データを受信した時刻を、その電力データに含まれる電力等の計測時刻として付加する。)とPV2a~2cの認証用のパスワードを付加してハブシステム10へ送信する。通信部11は、クラウド4aから送信される電力データを取得し、取得した電力データを制御部12へ出力する。 For example, PV2a is connected to PCS3a, and PCS3a converts the power generated by PV2a into AC power and supplies it to the load, while transmitting power data including the magnitude of the power generated by PV2a to cloud 4a operated by the manufacturer of PV2a. The power data includes, for example, identification information of PV2a and information on the power generated by PV2a (power amount, power, voltage, current, power factor, etc., the same below). Similarly, PCS3b transmits power data related to PV2b to cloud 4a. PCS3c transmits power data related to PV2c to cloud 4a. Cloud 4a acquires the power data transmitted from PCS3a to 3c from time to time and stores it in its own system, and adds time information (for example, the time when the power data was received from PCS3a is added as the measurement time of the power, etc. contained in the power data) and authentication passwords for PV2a to 2c to the power data and transmits it to the hub system 10. The communication unit 11 acquires the power data transmitted from the cloud 4a and outputs the acquired power data to the control unit 12.

ESS5aは、PCS3dと接続され、PCS3dは、ESS5aが負荷との間で充放電する電力に関して、直流電力と交流電力の変換を行ったり、充放電される電力の大きさを含む電力データをESS5aのメーカが運営するクラウド4bへ送信したりする。同様に、PCS3eは、ESS5bの充放電に関する電力データをクラウド4bへ送信する。電力データには、例えば、ESS5aの識別情報と充放電された電力等の情報が含まれる。クラウド4bは、ESS5a,5bから送信される時々刻々の充放電に関する電力データを取得して自システムに保存するとともに、電力データに時刻情報(例えば、PCS3dから電力データを受信した時刻を、その電力データに含まれる電力等の計測時刻として付加する。)とESS5a,5bの認証用のパスワードを付加してハブシステム10へ送信する。通信部11は、クラウド4bから送信される電力データを取得し、取得した電力データを制御部12へ出力する。 ESS5a is connected to PCS3d, and PCS3d converts the power that ESS5a charges and discharges between the load and the load into DC power and AC power, and transmits power data including the magnitude of the power being charged and discharged to cloud 4b operated by the manufacturer of ESS5a. Similarly, PCS3e transmits power data related to the charging and discharging of ESS5b to cloud 4b. The power data includes, for example, identification information of ESS5a and information such as the power charged and discharged. Cloud 4b acquires the power data related to the charging and discharging from ESS5a and 5b at every moment and stores it in its own system, and adds time information (for example, the time when the power data was received from PCS3d is added as the measurement time of the power, etc. included in the power data) and the authentication password of ESS5a and 5b to the power data and transmits it to the hub system 10. Communication unit 11 acquires the power data transmitted from cloud 4b and outputs the acquired power data to control unit 12.

発電設備6aは、ユニットコントローラ7aによって制御される。ユニットコントローラ7aは、発電設備6aによって発電される電力等の情報、電力等の計測時刻と、発電設備6aの識別情報などを含む電力データをエッジ端末9aへ送信する。エッジ端末9aは、発電設備6aから送信される時々刻々の電力データを取得し、発電設備6aの認証用のパスワードを付加した電力データをハブシステム10へ送信する。通信部11は、エッジ端末9aから送信される電力データを取得し、取得した電力データを制御部12へ出力する。 The power generation equipment 6a is controlled by a unit controller 7a. The unit controller 7a transmits power data including information on the power generated by the power generation equipment 6a, the time of measurement of the power, and identification information of the power generation equipment 6a to the edge terminal 9a. The edge terminal 9a acquires the power data transmitted from the power generation equipment 6a at every moment, and transmits the power data to which an authentication password for the power generation equipment 6a is added to the hub system 10. The communication unit 11 acquires the power data transmitted from the edge terminal 9a, and outputs the acquired power data to the control unit 12.

発電設備6bは、ユニットコントローラ7bによって制御される。ユニットコントローラ7bは、発電設備6bによって発電された電力等の情報、電力等の計測時刻と、発電設備6bの識別情報および認証用のパスワードを含む電力データをハブシステム10へ送信する。通信部11は、ユニットコントローラ7bから送信される電力データを取得し、取得した電力データを制御部12へ出力する。 The power generation equipment 6b is controlled by a unit controller 7b. The unit controller 7b transmits power data to the hub system 10, including information on the power generated by the power generation equipment 6b, the measurement time of the power, etc., and the identification information and authentication password of the power generation equipment 6b. The communication unit 11 acquires the power data transmitted from the unit controller 7b and outputs the acquired power data to the control unit 12.

スマートメータ8は、エッジ端末9bと接続され、エッジ端末9bは、スマートメータ8から電力データを取得し、電力データをエッジ端末9bへ送信する。電力データには、スマートメータ8が計測した電力等と、電力等の計測時刻と、スマートメータ8の識別情報などが含まれる。エッジ端末9bは、スマートメータ8から送信される時々刻々の電力データを取得し、認証用のパスワードを付加した電力データをハブシステム10へ送信する。通信部11は、エッジ端末9bから送信される電力データを取得し、取得した電力データを制御部12へ出力する。 The smart meter 8 is connected to the edge terminal 9b, and the edge terminal 9b acquires power data from the smart meter 8 and transmits the power data to the edge terminal 9b. The power data includes the power etc. measured by the smart meter 8, the time when the power etc. was measured, and the identification information of the smart meter 8. The edge terminal 9b acquires the power data transmitted from the smart meter 8 every moment, and transmits the power data with an authentication password added to the hub system 10. The communication unit 11 acquires the power data transmitted from the edge terminal 9b, and outputs the acquired power data to the control unit 12.

このほかにも、通信部11は、他装置・他システムから情報を取得することができる。例えば、通信部11は、日本卸電力取引所において決定された電力価格、気象データ、需要家の負荷、配線系統のデータなどを取得してもよい。また、通信部11は、上位システム1から、電力データを要求する情報を取得する。通信部11は、この要求に応じた電力データを上位システム1へ送信する。上位システム1とは、例えば、配電系統領域内の電力取引に利用される分散リソース市場取引装置である。分散リソース市場取引装置は、市場の運営者(DMO)によって運営される基盤システム(プラットフォーム)である。この電力取引市場では、ある配電系統を管理する配電系統運用者(DSO)と、市場参加者との間で電力の取引が行われる。市場参加者は、当該配電系統に連系される分散リソース(DER)の所有者、または、複数の分散リソース(DER)を束ねて管理するアグリゲータ等である。分散リソース市場取引装置(上位システム1)は、取引に係る電力データ(例えば、どれぐらいの電力量を取引するか等)をハブシステム10へ要求する。ハブシステム10は、通信部11を通じて、この要求を受信し、要求された電力データを分散リソース市場取引装置(上位システム1)へ送信する。 In addition, the communication unit 11 can acquire information from other devices and systems. For example, the communication unit 11 may acquire the power price determined at the Japan Electric Power Exchange, weather data, consumer load, wiring system data, etc. The communication unit 11 also acquires information requesting power data from the upper system 1. The communication unit 11 transmits the power data corresponding to this request to the upper system 1. The upper system 1 is, for example, a distributed resource market trading device used for power trading within a distribution system area. The distributed resource market trading device is a base system (platform) operated by a market operator (DMO). In this power trading market, power is traded between a distribution system operator (DSO) that manages a certain distribution system and market participants. The market participants are owners of distributed resources (DERs) connected to the distribution system, or aggregators that bundle and manage multiple distributed resources (DERs), etc. The distributed resource market trading device (host system 1) requests power data related to the transaction (e.g., how much power to trade, etc.) from the hub system 10. The hub system 10 receives this request through the communication unit 11 and transmits the requested power data to the distributed resource market trading device (host system 1).

制御部12は、電力データの入出力や保存などを行う。例えば、制御部12は、通信部11が取得した電力データを、例えば、APIを使用してデータベース16に書き込んで保存する。その際、制御部12は、他装置(図1のクラウド4a、4b、エッジ端末9a、9b、ユニットコントローラ7b等)から取得した電力データと時刻情報を対応付けて、データベース16に記録する。時刻情報には、電力データに含まれる電力等の計測時刻を用いることができる。また、電力データは、分散リソース(DER)のメーカごとに異なるデータ形式(データフォーマット)で送信される場合がある。これに対し、制御部12は、様々なデータ形式を所定のデータ形式に変換する。例えば、制御部12は、複数のデータ形式を記憶している。また、電力データの一部には、データ形式を表すコード情報が含まれている。そして、制御部12は、このコード情報に基づいてデータ形式を特定し、特定したデータ形式に則って電力データを解析する。制御部12は、電力データを解析すると必要なデータだけを抜き出して、所定の統一されたデータ形式に変換し、変換後の電力データと時刻情報を対応付けてデータベース16に記録する(例えば、変換後のデータ形式に時刻の項目があれば、その項目に計測時刻を設定して記録する。)。なお、ユーザは、任意のデータ形式をハブシステム10に登録することができてもよい。 The control unit 12 performs input/output and storage of power data. For example, the control unit 12 writes and stores the power data acquired by the communication unit 11 in the database 16 using, for example, an API. At that time, the control unit 12 associates the power data acquired from other devices (such as the clouds 4a and 4b, edge terminals 9a and 9b, and unit controller 7b in FIG. 1) with time information and records them in the database 16. The measurement time of the power, etc. included in the power data can be used as the time information. In addition, the power data may be transmitted in a data format (data format) that differs depending on the manufacturer of the distributed resource (DER). In response to this, the control unit 12 converts various data formats into a predetermined data format. For example, the control unit 12 stores multiple data formats. In addition, part of the power data includes code information that indicates the data format. Then, the control unit 12 identifies the data format based on this code information and analyzes the power data in accordance with the identified data format. When the control unit 12 analyzes the power data, it extracts only the necessary data, converts it into a specified unified data format, and records the converted power data in the database 16 in association with time information (for example, if the converted data format has a time item, the measurement time is set in that item and recorded). The user may be able to register any data format in the hub system 10.

通信部11が、上位システム1から電力データを要求する情報を取得すると、制御部12は、データ処理部15を使用して、要求された電力データをデータベース16から抽出する。制御部12は、データ処理部15によって抽出された電力データを、通信部11を介して上位システム1へ送信する。 When the communication unit 11 acquires information requesting power data from the higher-level system 1, the control unit 12 uses the data processing unit 15 to extract the requested power data from the database 16. The control unit 12 transmits the power data extracted by the data processing unit 15 to the higher-level system 1 via the communication unit 11.

制御部12は、イベントのログデータを記録するロギング機能を有している。イベントとは、例えば、電力データの送受信、保存、抽出などである。例えば、通信部11がクラウド4aから電力データを受信すると、制御部12は、取得時刻、取得したデータ件数、データの取得元の識別情報(この例の場合、クラウド4aの識別情報)などをデータベース16が記憶するイベントログファイルに追記する。クラウド4aから取得した電力データのデータベース16への保存が完了すると、制御部12は、その完了時刻、保存したデータの送信元の識別情報(この例の場合、クラウド4aの識別情報)などをデータベース16のイベントログファイルに追記する。上位システム1から電力データの要求を取得すると、制御部12は、要求があった時刻、要求の取得元の識別情報(この例の場合、上位システム1の識別情報)、要求の内容などをデータベース16のイベントログファイルに追記する。上位システム1の要求に対して、要求された電力データの上位システム1への送信が完了すると、制御部12は、その完了時刻、送信したデータ数、送信先の識別情報(この例の場合、上位システム1の識別情報)などをデータベース16のイベントログファイルに追記する。 The control unit 12 has a logging function for recording event log data. An event is, for example, transmission and reception, storage, extraction, etc. of power data. For example, when the communication unit 11 receives power data from the cloud 4a, the control unit 12 adds the acquisition time, the number of acquired data items, identification information of the data acquisition source (in this example, the identification information of the cloud 4a), etc. to the event log file stored in the database 16. When the storage of the power data acquired from the cloud 4a in the database 16 is completed, the control unit 12 adds the completion time, identification information of the transmission source of the stored data (in this example, the identification information of the cloud 4a), etc. to the event log file of the database 16. When a request for power data is received from the upper system 1, the control unit 12 adds the time of the request, identification information of the request acquisition source (in this example, the identification information of the upper system 1), the content of the request, etc. to the event log file of the database 16. When the transmission of the requested power data to the upper system 1 is completed in response to a request from the upper system 1, the control unit 12 adds the completion time, the amount of data transmitted, the identification information of the transmission destination (in this example, the identification information of the upper system 1), etc. to the event log file of the database 16.

時刻同期部13は、ハブシステム10のシステム時刻を調整および管理する。例えば、時刻同期部13は、外部のNTPサーバに現在の時刻を問い合わせて、ハブシステム10のシステム時刻をNTPサーバの時刻に同期させる。また、時刻同期部13は、時刻合わせをクラウド4a,4bと行う。例えば、時刻同期部13は、定期的にクラウド4a,4bに時刻の確認信号を送信する。これに対し、クラウド4a,4bは、自身の時刻の情報を時刻同期部13へ返信する。例えば、クラウド4aの時刻が狂っている場合、時刻同期部13はクラウド4aに時刻の修正を指示する指令信号を送信する。クラウド4aは、この指令信号に基づいて時刻合わせを行う。クラウド4bについても同様である。これにより、ハブシステム10とクラウド4a,4bの時刻が同期し、電力データに含まれる時刻情報の正確性が担保される。 The time synchronization unit 13 adjusts and manages the system time of the hub system 10. For example, the time synchronization unit 13 queries an external NTP server for the current time and synchronizes the system time of the hub system 10 with the time of the NTP server. The time synchronization unit 13 also adjusts the time with the clouds 4a and 4b. For example, the time synchronization unit 13 periodically transmits a time confirmation signal to the clouds 4a and 4b. In response, the clouds 4a and 4b return their own time information to the time synchronization unit 13. For example, if the time of the cloud 4a is incorrect, the time synchronization unit 13 transmits a command signal to the cloud 4a to correct the time. The cloud 4a adjusts the time based on this command signal. The same is true for the cloud 4b. This synchronizes the time of the hub system 10 and the clouds 4a and 4b, ensuring the accuracy of the time information included in the power data.

認証登録部14は、ハブシステム10に接続される分散リソース(DER)(図1の例ではPV2a~2c、ESS5a~5b、発電装置6a~6b)の認証および登録を行う。ハブシステム10に接続される分散リソース(DER)の各々には、分散リソース(DER)の種類ごとに予め固有の識別情報が割り当てられている。そして、例えば、PV2aから最初に電力データを、PCS3a、クラウド4aを介して、ハブシステム10へ送信する場合、クラウド4aは、PV2aの識別情報と、全ての分散リソース(DER)に共通の所定の初期パスワードとをハブシステム10へ送信し、PV2aの登録を要求する。認証登録部14は、PV2aの識別情報と初期パスワードによって認証を行う。PV2aの識別情報が、予めデータベース16に登録されていて、この識別情報と初期パスワードによって認証が行われてもよい。PV2aの認証に成功すると、認証登録部14は、データベース16に新規の分散リソース(DER)としてPV2aの情報(例えば、識別情報、種類や名称、メーカ名、分散リソース(DER)の設置場所の位置情報など)を登録する。また、PV2aの登録が完了すると、認証登録部14は、PV2aに固有のパスワードを新たに発行し、通信部11を介してクラウド4aへ固有パスワードを通知する。クラウド4aは、PV2aの識別情報とパスワードを対応付けて記憶する。一方、制御部12は、認証登録部14によって発行された固有パスワードをPV2aの識別情報と対応付けてデータベース16に記録する。次回以降、PV2aの電力データをクラウド4aからハブシステム10へ送信する際には、電力データとともにPV2aの固有のパスワードが送信される。認証登録部14は、クラウド4aから送信されたPV2aの識別情報と固有パスワードによって認証を行い、認証が成功した場合に限り、電力データの受信を許可する。 The authentication registration unit 14 authenticates and registers the distributed resources (DER) (PVs 2a-2c, ESSs 5a-5b, and power generation devices 6a-6b in the example of FIG. 1) connected to the hub system 10. Each of the distributed resources (DER) connected to the hub system 10 is assigned unique identification information in advance for each type of distributed resource (DER). For example, when power data is first transmitted from PV 2a to the hub system 10 via PCS 3a and cloud 4a, cloud 4a transmits the identification information of PV 2a and a predetermined initial password common to all distributed resources (DER) to the hub system 10 and requests registration of PV 2a. The authentication registration unit 14 performs authentication using the identification information and initial password of PV 2a. The identification information of PV 2a may be registered in the database 16 in advance, and authentication may be performed using this identification information and initial password. If the authentication of PV2a is successful, the authentication registration unit 14 registers information about PV2a (e.g., identification information, type and name, manufacturer name, location information of the installation location of the distributed resource (DER) and the like) in the database 16 as a new distributed resource (DER). In addition, when the registration of PV2a is completed, the authentication registration unit 14 issues a new unique password to PV2a and notifies the unique password to the cloud 4a via the communication unit 11. The cloud 4a stores the identification information and password of PV2a in association with each other. Meanwhile, the control unit 12 records the unique password issued by the authentication registration unit 14 in the database 16 in association with the identification information of PV2a. From the next time onwards, when power data of PV2a is transmitted from the cloud 4a to the hub system 10, the unique password of PV2a is transmitted together with the power data. The authentication registration unit 14 performs authentication using the identification information and unique password of the PV 2a transmitted from the cloud 4a, and allows the reception of the power data only if the authentication is successful.

データ処理部15は、データベース16に保存されたデータの処理を行う。例えば、上位システム1から、分散リソース(DER)の識別情報と電力データの計測時刻を抽出条件として指定した電力データの要求があると、制御部12は、APIを使用してデータ処理部15へこの抽出条件を満たす電力データを抽出するように指示する。データ処理部15は、抽出条件に基づいて、データベース16から電力データを抽出する。上記例の場合、データ処理部15は、指定された分散リソース(DER)の識別情報を有し、指定された電力等の電力データの計測時刻に該当する時刻情報が付加された電力データを、データベース16から抽出する。 The data processing unit 15 processes data stored in the database 16. For example, when there is a request for power data from the higher-level system 1 specifying the identification information of a distributed resource (DER) and the measurement time of the power data as extraction conditions, the control unit 12 uses the API to instruct the data processing unit 15 to extract power data that satisfies the extraction conditions. The data processing unit 15 extracts power data from the database 16 based on the extraction conditions. In the above example, the data processing unit 15 extracts power data from the database 16 that has the identification information of the specified distributed resource (DER) and is accompanied by time information corresponding to the measurement time of the power data, such as the specified power.

データベース16は、クラウド4a,4b、エッジ端末9a,9b等から取得した電力データ、各分散リソース(DER)の識別情報および固有のパスワード、イベントログファイルなどを記憶する。 The database 16 stores power data acquired from the clouds 4a, 4b, edge terminals 9a, 9b, etc., identification information and unique passwords for each distributed resource (DER), event log files, etc.

次に図2を参照して、電力データの保存と抽出について説明する。非同期通信を行う場合、データの処理方式がFIFOであれば、データの取得順にデータが送信される為、送受信のタイミングがずれると、受信側は所望のデータを受け取ることができない可能性がある。これに対し、本実施形態では、受信した電力データをデータベース16にて保存し、他装置から電力データの要求があると、要求に応じた電力データをデータベース16から抽出し、他装置へ提供する。これにより、非同期であっても、他装置が所望する電力データを提供することができる。 Next, the storage and extraction of power data will be described with reference to FIG. 2. When performing asynchronous communication, if the data processing method is FIFO, data is sent in the order in which it was acquired, and if the timing of transmission and reception is off, the receiving side may not be able to receive the desired data. In contrast, in this embodiment, the received power data is stored in database 16, and when another device requests power data, the power data corresponding to the request is extracted from database 16 and provided to the other device. This makes it possible to provide the power data desired by the other device even in asynchronous communication.

図2は、電力データの保存および抽出処理について説明する図である。
制御部12は、通信部11を介して、クラウド4aから、計測時刻00:00:00が付加された電力等を含む電力データ1A~3Aを取得し、計測時刻00:05:00が付加された電力等を含む電力データ1B~3Bを取得し、計測時刻00:10:00が付加された電力等を含む電力データ1C~3Cを取得する。制御部12は、電力データに含まれる電力等の値とそれぞれの計測時刻を対応付けてデータベース16へ記録する。つまり、電力データ1A~3Aの電力等には、時刻00:00:00が対応付けられ、電力データ1B~3Bの電力等には、時刻00:05:00が対応付けられ、電力データ1C~3Cの電力等には、時刻00:10:00が対応付けられてデータベース16に記録される。同様に、制御部12は、通信部11を介してクラウド4Bから、計測時刻00:05:00が付加された電力等を含む電力データ4~6を取得すると、各データの電力等に時刻00:05:00を対応付けてデータベース16へ記録する。また、制御部12は、通信部11を介してエッジ端末9aから、計測時刻00:05:00と、この時刻に計測された電力等を含む電力データ7~9を取得すると、電力データ7~9の電力等と時刻00:05:00を対応付けてデータベース16へ記録する。
FIG. 2 is a diagram for explaining the process of storing and extracting power data.
The control unit 12 acquires, from the cloud 4a via the communication unit 11, power data 1A-3A including power etc. to which a measurement time 00:00:00 has been added, power data 1B-3B including power etc. to which a measurement time 00:05:00 has been added, and power data 1C-3C including power etc. to which a measurement time 00:10:00 has been added. The control unit 12 associates the values of power etc. included in the power data with the respective measurement times and records them in the database 16. That is, the power etc. of the power data 1A-3A are associated with the time 00:00:00, the power etc. of the power data 1B-3B are associated with the time 00:05:00, and the power etc. of the power data 1C-3C are associated with the time 00:10:00, and are recorded in the database 16. Similarly, when the control unit 12 acquires the power data 4 to 6 including power etc. to which the measurement time 00:05:00 has been added from the cloud 4B via the communication unit 11, the control unit 12 associates the power etc. of each data with the time 00:05:00 and records them in the database 16. Furthermore, when the control unit 12 acquires the power data 7 to 9 including the measurement time 00:05:00 and the power etc. measured at this time from the edge terminal 9a via the communication unit 11, the control unit 12 associates the power etc. of the power data 7 to 9 with the time 00:05:00 and records them in the database 16.

次に、上位システム1は、データ種類と時刻を抽出条件として指定して、抽出条件を満たす電力データをハブシステム10へ要求する。制御部12は、通信部11を介してこの要求を取得すると、APIを使って、抽出条件をデータ処理部15へ通知し、電力データの抽出を指示する。例えば、要求された計測時刻が00:05:00で、要求されたデータ種類に該当するのが、電力データ1A、1B、1C、5、9だとすると、データ処理部15は、データベース16から電力データ1B,5,9を抽出して、抽出したデータを通信部11へ出力する。通信部11は、電力データ1b、5、9を上位システム1へ送信する。また、これらの処理に関して、制御部12は、各処理のログを、イベントログファイルに記録する。 Next, the upper system 1 specifies the data type and time as extraction conditions, and requests the hub system 10 for power data that meets the extraction conditions. When the control unit 12 receives this request via the communication unit 11, it uses the API to notify the data processing unit 15 of the extraction conditions and instructs it to extract power data. For example, if the requested measurement time is 00:05:00 and the requested data type corresponds to power data 1A, 1B, 1C, 5, and 9, the data processing unit 15 extracts power data 1B, 5, and 9 from the database 16 and outputs the extracted data to the communication unit 11. The communication unit 11 transmits power data 1b, 5, and 9 to the upper system 1. Furthermore, with regard to these processes, the control unit 12 records the logs of each process in an event log file.

ここで、電力データを記録する際に時刻情報を付加する(対応付ける)意味について説明する。
(1)例えば配電領域内で電力市場取引を行う場合、電力取引の精算は、電力供給者(分散リソース(DER)の所有者)が取引約定日の約定時間帯(供給開示時刻から供給終了時刻までの時間帯)において実際に供給した電力(例えば、スマートメータ等で時々刻々と計測した電力の実測値)と毎時の供給電力の計画値との比較に基づいて計算する。このような計算を行う為には、供給電力の実測値データに計測時刻の情報を付加することが必要となる。特に、配電領域における市場運営者(DMO)が複数の市場参加者(分散リソース(DER)の所有者)と電力取引を行う場合には、各分散リソース(DER)に紐づく様々な計測時刻における供給電力の実測値データの各々が、それぞれ異なる通信遅れ時間をもって順不同で送受信されるため、供給電力の実測値データに計測時刻の情報を付加することが不可欠となる。
Here, the meaning of adding (associating) time information when recording power data will be described.
(1) For example, when electricity market trading is performed within a distribution area, the settlement of the electricity trading is calculated based on a comparison between the electricity actually supplied by the electricity supplier (the owner of distributed resources (DER)) during the contract time period (the time period from the supply disclosure time to the supply end time) on the transaction contract date (for example, the actual measured value of electricity measured every moment by a smart meter, etc.) and the planned value of the hourly supply electricity. In order to perform such a calculation, it is necessary to add information on the measurement time to the actual measured value data of the supplied electricity. In particular, when a market operator (DMO) in a distribution area trades electricity with multiple market participants (owners of distributed resources (DER)), each of the actual measured value data of the supplied electricity at various measurement times associated with each distributed resource (DER) is transmitted and received in random order with a different communication delay time, so it is essential to add information on the measurement time to the actual measured value data of the supplied electricity.

(2)配電系統領域内における分散リソース市場取引装置(上位システム1)では、配電系統における所定の地点ごとの電力量(kWh)と合わせ、電圧(V)や電流(A)といった電力の瞬時値データを取得する。分散リソース市場取引装置(上位システム1)では、それらデータを取得して、配電系統の各地点における電圧値や電流値が系統の許容範囲に入っているか(地点ごとに異常がないか)を確認する。どの地点の電圧等が異常なのかを知るためには、各地点における同じ時刻で取得した当該電圧等のデータを比較して計算等する(同時刻における各地点の状況を見比べる)必要があるため、電圧等のデータの計測時刻を付加することが不可欠となる。 (2) A distributed resource market trading device (upper system 1) within the distribution system area acquires instantaneous power data such as voltage (V) and current (A) along with the amount of power (kWh) at each specified point in the distribution system. The distributed resource market trading device (upper system 1) acquires this data and checks whether the voltage and current values at each point in the distribution system are within the system's tolerance range (whether there are any abnormalities at each point). In order to know which point has an abnormality in voltage, etc., it is necessary to compare the voltage, etc. data acquired at each point at the same time and perform calculations, etc. (compare the conditions at each point at the same time), so it is essential to add the measurement time of the voltage, etc. data.

(動作)
<データ登録>
次にクラウド4aとハブシステム10の通信を例に、ハブシステム10の動作について説明する。図3は、ハブシステム10の動作を示す第1のフローチャートである。
PV2aの電力データをハブシステム10へ送信するのが初回であるとする。クラウド4aがPCS3aからPV2aの電力データを受信する(ステップS1)。クラウド4aは、PV2aの識別情報と所定の初期パスワードとをハブシステム10へ送信し、PV2aの登録を要求する(ステップS2)。
(Operation)
<Data registration>
Next, the operation of the hub system 10 will be described by taking as an example the communication between the cloud 4a and the hub system 10. FIG.
Assume that this is the first time that the power data of the PV 2a is transmitted to the hub system 10. The cloud 4a receives the power data of the PV 2a from the PCS 3a (step S1). The cloud 4a transmits identification information of the PV 2a and a predetermined initial password to the hub system 10, and requests registration of the PV 2a (step S2).

ハブシステム10では、通信部11が登録の要求を受信し、制御部12が認証登録部14にPV2aの識別情報と初期パスワードとを送信して認証を要求する。認証登録部14は、PV2aの認証を行って、認証結果を制御部12へ通知する。認証が成功した場合、制御部12は、PV2aをデータベース16へ登録する(ステップS3)。また、認証登録部14は、PV2aの固有のパスワードを発行する(ステップS3)。制御部12は、認証登録部14が発行した固有のパスワードを取得し、通信部11を介して、クラウド4aへPV2aの固有のパスワードを送信する(ステップS4)。 In the hub system 10, the communication unit 11 receives the registration request, and the control unit 12 requests authentication by sending the identification information and initial password of PV2a to the authentication registration unit 14. The authentication registration unit 14 authenticates PV2a and notifies the control unit 12 of the authentication result. If the authentication is successful, the control unit 12 registers PV2a in the database 16 (step S3). The authentication registration unit 14 also issues a unique password for PV2a (step S3). The control unit 12 obtains the unique password issued by the authentication registration unit 14, and sends the unique password of PV2a to the cloud 4a via the communication unit 11 (step S4).

制御部12は、上記の処理に関して、例えば、(1)クラウド4aからの登録要求の受信、(2)PV2aの登録、(3)クラウド4aへのPV2aの固有パスワードの送信といった各イベントをイベントログファイルへ追記する。 The control unit 12 adds each event related to the above processing, such as (1) receiving a registration request from cloud 4a, (2) registering PV2a, and (3) sending the unique password of PV2a to cloud 4a, to an event log file.

クラウド4aは、PV2a固有のパスワードをPV2aの識別情報と対応付けて記憶する(ステップS5)。クラウド4aは、PV2aの電力データに時刻情報と固有パスワードを付加して、ハブシステム10へ送信する(ステップS6)。 The cloud 4a stores the password unique to PV2a in association with the identification information of PV2a (step S5). The cloud 4a adds the time information and the unique password to the power data of PV2a and transmits it to the hub system 10 (step S6).

ハブシステム10では、通信部11が電力データを受信し、制御部12が認証登録部14にPV2aの識別情報と固有パスワードとを送信して認証を要求する。認証登録部14は、PV2aの認証を行って(ステップS7)、認証の成否を制御部12へ通知する。認証に成功すると、制御部12は、クラウド4aから送信された電力データを所定のデータ形式に変換して、電力等の計測値と時刻情報とを対応付けてデータベース16へ書き込み保存する(ステップS8)。制御部12は、通信部11を介して、クラウド4aへ電力データの保存完了などの処理結果を通知する(ステップS9)。 In the hub system 10, the communication unit 11 receives the power data, and the control unit 12 transmits the identification information and unique password of PV 2a to the authentication registration unit 14 to request authentication. The authentication registration unit 14 authenticates PV 2a (step S7) and notifies the control unit 12 of the success or failure of the authentication. If the authentication is successful, the control unit 12 converts the power data transmitted from the cloud 4a into a specified data format, associates the measured values such as power with time information, and writes and stores them in the database 16 (step S8). The control unit 12 notifies the cloud 4a of the processing results, such as the completion of saving the power data, via the communication unit 11 (step S9).

制御部12は、上記の処理ステップS5~S9に関して、例えば、(1)クラウド4aからの電力データの受信、(2)認証の成否、(3)電力データの保存といった各イベントをイベントログファイルへ追記する。 The control unit 12 adds each event, such as (1) receiving power data from the cloud 4a, (2) success or failure of authentication, and (3) saving of power data, to the event log file for the above processing steps S5 to S9.

なお、上記の説明では、初回の登録処理と電力データの保存処理とを2回に分けて実行する場合を例に説明を行ったが、ステップS2の登録要求時に電力データを送信し、固有パスワードの発行とともに電力データを保存するようにしてもよい。 In the above explanation, an example was given in which the initial registration process and the power data storage process are executed in two separate steps, but the power data may be sent when the registration request is made in step S2, and the power data may be stored together with the issuance of a unique password.

電力データの送信2回目以降の処理について簡単に説明する。クラウド4aがPCS3aからPV2aの電力データを受信する(ステップS10)。クラウド4aは、電力データに時刻情報とPV2aの固有パスワードを付加してハブシステム10へ送信する(ステップS11)。 The process of transmitting power data for the second time and thereafter will be briefly described. The cloud 4a receives the power data of the PV 2a from the PCS 3a (step S10). The cloud 4a adds time information and the unique password of the PV 2a to the power data and transmits it to the hub system 10 (step S11).

ハブシステム10では、通信部11が電力データを受信し、認証登録部14がPV2aの識別情報と固有パスワードを用いて認証を行う(ステップS12)。認証に成功すると、制御部12は、クラウド4aから送信された電力データを所定のデータ形式に変換して、電力等の計測値と時刻情報とを対応付けてデータベース16へ保存する(ステップS13)。制御部12は、通信部11を介して、クラウド4aへ電力データの保存完了などの処理結果を通知する(ステップS14)。制御部12は、例えば、(1)クラウド4aからの電力データの受信、(2)認証の成否、(3)電力データの保存といった各イベントの発生をイベントログファイルへ追記する。 In the hub system 10, the communication unit 11 receives the power data, and the authentication registration unit 14 performs authentication using the identification information and unique password of the PV 2a (step S12). If the authentication is successful, the control unit 12 converts the power data sent from the cloud 4a into a predetermined data format, associates the measured values such as power with time information, and stores them in the database 16 (step S13). The control unit 12 notifies the cloud 4a of the processing results such as the completion of saving the power data via the communication unit 11 (step S14). The control unit 12 adds the occurrence of each event such as (1) receiving power data from the cloud 4a, (2) success or failure of authentication, and (3) saving of the power data to an event log file.

<データ抽出>
次に上位システム1とハブシステム10の通信を例にハブシステム10の動作について説明する。図4は、ハブシステム10の動作を示す第2のフローチャートである。
上位システム1が、ハブシステム10へ抽出条件を指定して、電力データを要求する(ステップS21)。抽出条件には、例えば、電力データの電力量、電力、電圧、電流、力率などに対応付けられた時刻情報(計測時刻)に対する条件(例えば、対応付けられた時刻がXX:XX:XX~YY:YY:YYの範囲にあること等)、分散リソース(DER)の種類、電力の大きさ、分散リソース(DER)の位置情報などが含まれていてもよい。また、電力データの要求には、上位システム1の識別情報および固有パスワードが含まれる。
<Data Extraction>
Next, the operation of the hub system 10 will be described taking as an example the communication between the host system 1 and the hub system 10. FIG.
The upper system 1 requests power data by specifying extraction conditions to the hub system 10 (step S21). The extraction conditions may include, for example, conditions for time information (measurement time) associated with the amount of power, power, voltage, current, power factor, etc. of the power data (for example, the associated time is in the range of XX:XX:XX to YY:YY:YY), the type of distributed resource (DER), the amount of power, location information of the distributed resource (DER), etc. The request for power data also includes identification information and a unique password of the upper system 1.

ハブシステム10では、通信部11が要求を受信し、制御部12が認証登録部14に上位システム1の識別情報と固有パスワードとを送信して認証を要求する。認証登録部14は、上位システム1の認証を行う(ステップS22)。認証に成功すると、制御部12は、抽出条件をデータ処理部15へ通知し、電力データの抽出を指示する。データ処理部15は、抽出条件を満たす電力データをデータベース16から抽出し(ステップS23)、制御部12へ出力する。制御部12は、通信部11を介して、抽出された電力データを上位システム1へ送信する(ステップS24)。 In the hub system 10, the communication unit 11 receives the request, and the control unit 12 requests authentication by sending the identification information of the higher-level system 1 and a unique password to the authentication registration unit 14. The authentication registration unit 14 authenticates the higher-level system 1 (step S22). If the authentication is successful, the control unit 12 notifies the data processing unit 15 of the extraction conditions and instructs it to extract power data. The data processing unit 15 extracts power data that satisfies the extraction conditions from the database 16 (step S23) and outputs the data to the control unit 12. The control unit 12 transmits the extracted power data to the higher-level system 1 via the communication unit 11 (step S24).

制御部12は、上記の処理に関して、例えば、(1)上位システム1から要求の受信、(2)認証の成否、(3)電力データの抽出、(4)抽出した電力データの送信といった各イベントをイベントログファイルへ追記する。 The control unit 12 adds each event related to the above processing, such as (1) receiving a request from the higher-level system 1, (2) success or failure of authentication, (3) extraction of power data, and (4) transmission of the extracted power data, to an event log file.

(効果)
以上説明したように、本実施形態によれば、通信プロトコルやデータ形式が異なる複数の他装置から、それらの違いを吸収して電力データを収集および保存し、各電力データの時刻を管理することができる。また、抽出条件に基づいて、電力データを抽出して他装置へ送信することができる。多様な分散リソース(DER)やその周辺装置および他システムと連携して、電力データの送受信を行うことができるので、例えば、分散リソース(DER)に係る電力取引の情報処理を行うプラットフォームに適用して利用することができる。また、分散リソース(DER)等と通信を行う際には、識別情報と固有パスワードによる認証を行うので、データの安全性を確保することができる。また、初回登録時に、固有パスワードを自動的に発行し、管理することができるので、ハブシステム10に登録される分散リソース(DER)の数が膨大になっても、パスワード管理の手間を軽減することができる。また、イベントログファイルに電力データの送受信などの履歴を記録しておくことができるので、ハブシステム10の利用状況や各分散リソース(DER)の稼働状況を把握したり、事故発生時の原因究明に役立てたりすることができる。
(effect)
As described above, according to the present embodiment, it is possible to collect and store power data from a plurality of other devices having different communication protocols and data formats, absorbing the differences between them, and to manage the time of each piece of power data. In addition, it is possible to extract power data based on extraction conditions and transmit it to other devices. Since it is possible to transmit and receive power data in cooperation with various distributed resources (DERs), their peripheral devices, and other systems, it is possible to apply and use it as a platform for processing information on power trading related to distributed resources (DERs). Furthermore, when communicating with distributed resources (DERs), etc., authentication is performed using identification information and a unique password, so that data security can be ensured. Furthermore, since a unique password can be automatically issued and managed at the time of initial registration, it is possible to reduce the effort of password management even if the number of distributed resources (DERs) registered in the hub system 10 becomes enormous. Furthermore, since it is possible to record the history of transmission and reception of power data in an event log file, it is possible to grasp the usage status of the hub system 10 and the operating status of each distributed resource (DER), and to use it to investigate the cause of an accident.

なお上記の実施形態では、図1の構成を例に説明を行ったが、ハブシステム10の構成は、図1の例に限定されない、例えば、時刻同期部13、認証登録部14、データ処理部15は、制御部12と同じコンピュータに実装されてもよい。その場合、制御部12と時刻同期部13、認証登録部14、データ処理部15の通信にはAPIは必ずしも必要なく、他の手段でデータのやり取りを行ってもよい。あるいは、制御部12と、時刻同期部13、認証登録部14、データ処理部15の全部または一部は、一体的に構成されていてもよい。 In the above embodiment, the configuration of FIG. 1 has been described as an example, but the configuration of the hub system 10 is not limited to the example of FIG. 1. For example, the time synchronization unit 13, the authentication registration unit 14, and the data processing unit 15 may be implemented in the same computer as the control unit 12. In that case, an API is not necessarily required for communication between the control unit 12 and the time synchronization unit 13, the authentication registration unit 14, and the data processing unit 15, and data exchange may be performed by other means. Alternatively, the control unit 12 and all or part of the time synchronization unit 13, the authentication registration unit 14, and the data processing unit 15 may be configured as an integrated unit.

図5は、ハブシステム10のハードウェア構成の一例を示す図である。
コンピュータ900は、CPU901、主記憶装置902、補助記憶装置903、入出力インタフェース904、通信インタフェース905を備える。
上述のハブシステム10は、1台又は複数台のコンピュータ900に実装される。そして、上述した各機能は、プログラムの形式で補助記憶装置903に記憶されている。CPU901は、プログラムを補助記憶装置903から読み出して主記憶装置902に展開し、当該プログラムに従って上記処理を実行する。また、CPU901は、プログラムに従って、記憶領域を主記憶装置902に確保する。また、CPU901は、プログラムに従って、処理中のデータを記憶する記憶領域を補助記憶装置903に確保する。
FIG. 5 is a diagram illustrating an example of a hardware configuration of the hub system 10. As shown in FIG.
The computer 900 includes a CPU 901 , a main memory device 902 , an auxiliary memory device 903 , an input/output interface 904 , and a communication interface 905 .
The above-mentioned hub system 10 is implemented in one or more computers 900. Each of the above-mentioned functions is stored in the auxiliary storage device 903 in the form of a program. The CPU 901 reads the program from the auxiliary storage device 903, loads it in the main storage device 902, and executes the above-mentioned processing in accordance with the program. The CPU 901 also reserves a storage area in the main storage device 902 in accordance with the program. The CPU 901 also reserves a storage area in the auxiliary storage device 903 for storing data being processed in accordance with the program.

なお、ハブシステム10の全部または一部の機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより各機能部による処理を行ってもよい。ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。また、「コンピュータシステム」は、WWWシステムを利用している場合であれば、ホームページ提供環境(あるいは表示環境)も含むものとする。また、「コンピュータ読み取り可能な記録媒体」とは、CD、DVD、USB等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。また、このプログラムが通信回線によってコンピュータ900に配信される場合、配信を受けたコンピュータ900が当該プログラムを主記憶装置902に展開し、上記処理を実行しても良い。また、上記プログラムは、前述した機能の一部を実現するためのものであっても良く、さらに前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであってもよい。 A program for implementing all or part of the functions of the hub system 10 may be recorded on a computer-readable recording medium, and the program recorded on the recording medium may be read into the computer system and executed to perform processing by each functional unit. The term "computer system" here includes hardware such as the OS and peripheral devices. In addition, if a WWW system is used, the term "computer system" also includes the home page providing environment (or display environment). In addition, the term "computer-readable recording medium" refers to portable media such as CDs, DVDs, and USBs, and storage devices such as hard disks built into the computer system. In addition, if the program is distributed to the computer 900 via a communication line, the computer 900 that receives the program may expand the program into the main storage device 902 and execute the above processing. In addition, the program may be for implementing part of the functions described above, and may further be capable of implementing the above functions in combination with a program already recorded in the computer system.

以上のとおり、本開示に係るいくつかの実施形態を説明したが、これら全ての実施形態は、例として提示したものであり、発明の範囲を限定することを意図していない。これらの実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で種々の省略、置き換え、変更を行うことができる。これらの実施形態及びその変形は、発明の範囲や要旨に含まれると同様に、特許請求の範囲に記載された発明とその均等の範囲に含まれる。 As described above, several embodiments of the present disclosure have been described, but all of these embodiments are presented as examples and are not intended to limit the scope of the invention. These embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. These embodiments and their modifications are included in the scope of the invention and its equivalents as described in the claims, as well as in the scope and gist of the invention.

<付記>
実施形態に記載のハブシステム及び通信制御方法は、例えば以下のように把握される。
<Additional Notes>
The hub system and the communication control method described in the embodiment can be understood, for example, as follows.

(1)第1の態様に係るハブシステムは、分散リソース(DER(Distributed Energy Resources))が発電又は充放電する電力に関する電力データ(電力量、電力、電圧、電流、力率など)を送受信する通信部と、前記電力データと、前記電力データの計測時刻を示す時刻情報(電力量、電力、電圧、電流、力率などの測定時刻、電力などの瞬時値は各値の計測時刻、電力量の場合は計測の開始時刻および/又は終了時刻など)と、を対応付けてデータベースに登録する制御部と、前記データベースと、を備え、前記通信部は、前記電力データの送受信先である他装置が通信に用いる通信プロトコルに応じた通信手段(通信モジュール、通信デバイスおよびデバイスドライバ、API、WebAPI(クラウドドライバ)など)を備える。
これにより、通信プロトコルが異なる複数の他装置から分散リソース(DER)が発電等した電力に関する電力データを収集し、各データの時刻を管理することができる。また、電力データをデータベースに保存しておくことができる。
(1) A hub system according to a first aspect includes a communication unit that transmits and receives power data (electric energy, power, voltage, current, power factor, etc.) related to power generated or charged/discharged by distributed resources (DERs (Distributed Energy Resources)), a control unit that associates the power data with time information indicating the measurement time of the power data (measurement time of electric energy, power, voltage, current, power factor, etc.; for instantaneous values of power, etc., the measurement time of each value; in the case of electric energy, the measurement start time and/or end time, etc.) and registers the data in a database, and the database, wherein the communication unit includes a communication means (a communication module, a communication device and device driver, an API, a Web API (cloud driver), etc.) corresponding to a communication protocol used for communication by another device to which the power data is transmitted or received.
This makes it possible to collect power data related to power generated by the distributed resources (DER) from multiple other devices with different communication protocols and manage the time of each piece of data. Also, the power data can be stored in a database.

(2)第2の態様に係るハブシステムは、(1)のハブシステムであって、前記通信部は、前記他装置から、前記時刻情報を含む抽出条件が指定された前記電力データを要求する情報を受信し、前記制御部(制御部12とデータ処理部15)は、前記抽出条件を満たす前記電力データを前記データベースから抽出し、前記通信部は、抽出された前記電力データを前記他装置へ送信する。
これにより、データベースに保存した電力データの中から必要なデータを抽出し、他装置にて活用することができる。電力データをデータベースに保存し、任意に抽出可能とすることで、電力データが分散リソース(DER)側から送信されてから時間が経っても、所望の電力データを参照することができる。
(2) A hub system according to a second aspect is a hub system as in (1), wherein the communication unit receives information from the other device requesting the power data for which extraction conditions including the time information are specified, the control unit (control unit 12 and data processing unit 15) extracts the power data that satisfies the extraction conditions from the database, and the communication unit transmits the extracted power data to the other device.
This allows necessary data to be extracted from the power data stored in the database and used by other devices. By storing the power data in the database and making it possible to extract it at will, desired power data can be referenced even if some time has passed since the power data was transmitted from the distributed resource (DER) side.

(3)第3の態様に係るハブシステムは、(1)~(2)のハブシステムであって、前記制御部は、前記電力データを所定のデータ形式に変換して前記データベースに登録する。
通信プロトコルのみならず、電力データのデータ形式についてもメーカ独自のフォーマットに対応することで、電力データの一元管理が容易になる。
(3) A hub system according to a third aspect is the hub system of (1) to (2), wherein the control unit converts the power data into a predetermined data format and registers the data in the database.
By supporting not only the communication protocol but also the data format of the power data according to the manufacturer's proprietary format, it becomes easier to centrally manage the power data.

(4)第4の態様に係るハブシステムは、(1)~(3)のハブシステムであって、前記電力データの送受信に際し、前記電力データに係る前記分散リソースの識別情報とパスワードによって認証を行う認証部、をさらに備える。
これにより、無制限に他装置が接続されることを防ぎ、認証が成功した分散リソース(DER)に関する電力データのみを収集、保存および提供することができる。
(4) A hub system according to a fourth aspect is a hub system according to any one of (1) to (3), further comprising an authentication unit that performs authentication using identification information and a password of the distributed resource related to the power data when transmitting and receiving the power data.
This prevents other devices from being connected without restriction, and makes it possible to collect, store, and provide power data only regarding distributed resources (DERs) that have been successfully authenticated.

(5)第5の態様に係るハブシステムは、(4)のハブシステムであって、前記認証部は、最初に前記他装置から前記識別情報と所定の初期パスワードを取得すると、前記分散リソースごとに固有のパスワードを発行し、前記通信部は、発行された前記固有のパスワードを前記他装置へ送信する。
これにより、分散リソース(DER)ごとにパスワードを設定する手間を省くことができる。
(5) A hub system according to a fifth aspect is a hub system as defined in (4), wherein when the authentication unit first obtains the identification information and a predetermined initial password from the other device, the authentication unit issues a unique password for each of the distributed resources, and the communication unit transmits the issued unique password to the other device.
This eliminates the need to set a password for each distributed resource (DER).

(6)第6の態様に係るハブシステムは、(1)~(5)のハブシステムであって、前記制御部は、前記電力データを送受信したこと及び送受信した時刻、前記電力データを前記データベースへ保存したこと及び保存時刻をログファイルへ記録する。
これにより、電力データの受信、保存、送信の証跡を残すことができる。
(6) A hub system according to a sixth aspect is a hub system according to any one of (1) to (5), wherein the control unit records in a log file the transmission and reception of the power data and the time of transmission and reception, the storage of the power data in the database and the time of storage.
This allows for a trail of the receipt, storage, and transmission of power data.

(7)第7の態様に係る通信制御方法では、ハブシステムが、分散リソースが発電又は充放電する電力に関する電力データを送受信する他装置が通信に用いる通信プロトコルに応じた通信手段(通信モジュール、通信デバイスおよびデバイスドライバ、API、WebAPI(クラウドドライバ)など)を用いて、前記他装置から前記電力データを受信し、前記電力データと、前記電力データの計測時刻を示す時刻情報と、を対応付けてデータベースに保存する。 (7) In the communication control method according to the seventh aspect, the hub system receives power data from another device that transmits and receives power data related to the power generated or charged/discharged by the distributed resource using a communication means (such as a communication module, a communication device and device driver, an API, a Web API (cloud driver), etc.) corresponding to a communication protocol used by the other device for communication, and stores the power data in a database in association with time information indicating the measurement time of the power data.

1・・・上位システム
2a~2c・・・PV
3a~3e・・・PCS
4a、4b・・・クラウド
5a~5b・・・ESS
6a~6b・・・発電装置
7a~7b・・・ユニットコントローラ
8・・・スマートメータ
9a~9b・・・エッジ端末
10・・・ハブシステム
11・・・通信部
12・・・制御部
13・・・時刻同期部
14・・・認証登録部
15・・・データ処理部
16・・・データベース
900・・・コンピュータ
901・・・CPU
902・・・主記憶装置
903・・・補助記憶装置
904・・・入出力インタフェース
905・・・通信インタフェース
1... Upper system 2a to 2c... PV
3a-3e...PCS
4a, 4b... Cloud 5a-5b... ESS
Reference numerals 6a to 6b: power generation devices 7a to 7b: unit controller 8: smart meters 9a to 9b: edge terminal 10: hub system 11: communication unit 12: control unit 13: time synchronization unit 14: authentication registration unit 15: data processing unit 16: database 900: computer 901: CPU
902: Main memory device 903: Auxiliary memory device 904: Input/output interface 905: Communication interface

Claims (4)

分散リソースが発電又は充放電する電力に関する電力データを送受信する通信部と、
前記電力データと、前記電力データの計測時刻を示す時刻情報と、を対応付けてデータベースに保存する制御部と、
前記データベースと、
前記電力データの送受信に際し、前記電力データに係る前記分散リソースの識別情報とパスワードによって認証を行う認証部と、
を備え、
前記通信部は、前記電力データの送受信先である他装置が通信に用いる通信プロトコルに応じた通信手段を備え、
前記認証部は、最初に前記他装置から前記識別情報と所定の初期パスワードを取得すると、前記分散リソースごとに固有のパスワードを生成し、
前記通信部は、生成された前記固有のパスワードを前記他装置へ送信する、
ハブシステム。
a communication unit that transmits and receives power data related to power generated or charged/discharged by the distributed resources;
a control unit that associates the power data with time information indicating a measurement time of the power data and stores the associated data in a database;
The database;
an authentication unit that performs authentication using identification information and a password of the distributed resource related to the power data when transmitting and receiving the power data;
Equipped with
the communication unit includes a communication means corresponding to a communication protocol used for communication by another device to which the power data is transmitted or received,
the authentication unit generates a unique password for each of the distributed resources when first acquiring the identification information and a predetermined initial password from the other device;
The communication unit transmits the generated unique password to the other device.
Hub system.
分散リソースが発電又は充放電する電力に関する電力データを送受信する通信部と、
前記電力データと、前記電力データの計測時刻を示す時刻情報と、を対応付けてデータベースに保存する制御部と、
前記データベースと、
を備え、
前記通信部は、前記電力データの送受信先である他装置が通信に用いる通信プロトコルに応じた通信手段を備え、
前記制御部は、前記電力データを送受信したこと及び送受信した時刻、前記電力データを前記データベースへ保存したこと及び保存時刻をログファイルへ記録する、
ハブシステム。
a communication unit that transmits and receives power data related to power generated or charged/discharged by the distributed resources;
a control unit that associates the power data with time information indicating a measurement time of the power data and stores the associated data in a database;
The database;
Equipped with
the communication unit includes a communication means corresponding to a communication protocol used for communication by another device to which the power data is transmitted or received,
The control unit records, in a log file, the fact that the power data has been transmitted and received, the time of transmission and reception, and the fact that the power data has been stored in the database, and the time of storage.
Hub system.
ハブシステムが、
分散リソースが発電又は充放電する電力に関する電力データを送受信する他装置が通信に用いる通信プロトコルに応じた通信手段を用いて、前記他装置から前記電力データを受信し、
前記電力データと前記電力データの計測時刻を示す時刻情報とを対応付けてデータベースに保存し、
前記電力データの送受信に際し、前記電力データに係る前記分散リソースの識別情報とパスワードによって認証を行い、
前記認証に関し、最初に前記他装置から前記識別情報と所定の初期パスワードを取得すると、前記分散リソースごとに固有のパスワードを生成し、生成された前記固有のパスワードを前記他装置へ送信する、
通信制御方法。
The hub system is
receiving power data from another device, the power data being related to power generated or charged/discharged by the distributed resource, using a communication means corresponding to a communication protocol used by the other device for communication;
storing the power data in a database in association with time information indicating a time when the power data was measured;
When transmitting and receiving the power data, authentication is performed using identification information and a password of the distributed resource related to the power data;
Regarding the authentication, when the identification information and a predetermined initial password are first obtained from the other device, a unique password is generated for each of the distributed resources, and the unique password generated is transmitted to the other device.
Communications control method.
ハブシステムが、
分散リソースが発電又は充放電する電力に関する電力データを送受信する他装置が通信に用いる通信プロトコルに応じた通信手段を用いて、前記他装置から前記電力データを受信し、
前記電力データと前記電力データの計測時刻を示す時刻情報とを対応付けてデータベースに保存し、
前記電力データを送受信したこと及び送受信した時刻、前記電力データを前記データベースへ保存したこと及び保存時刻をログファイルへ記録する、
通信制御方法。
The hub system is
receiving power data from another device, the power data being related to power generated or charged/discharged by the distributed resource, using a communication means corresponding to a communication protocol used by the other device for communication;
storing the power data in a database in association with time information indicating a time when the power data was measured;
recording in a log file the fact that the power data has been transmitted and received, the time of transmission and reception, and the fact that the power data has been stored in the database, and the time of storage;
Communications control method.
JP2022105712A 2022-06-30 2022-06-30 Hub system and communication control method Active JP7617874B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022105712A JP7617874B2 (en) 2022-06-30 2022-06-30 Hub system and communication control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022105712A JP7617874B2 (en) 2022-06-30 2022-06-30 Hub system and communication control method

Publications (2)

Publication Number Publication Date
JP2024005509A JP2024005509A (en) 2024-01-17
JP7617874B2 true JP7617874B2 (en) 2025-01-20

Family

ID=89540763

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022105712A Active JP7617874B2 (en) 2022-06-30 2022-06-30 Hub system and communication control method

Country Status (1)

Country Link
JP (1) JP7617874B2 (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008269084A (en) 2007-04-17 2008-11-06 Hitachi Ltd Log analysis method and apparatus
JP2009055713A (en) 2007-08-27 2009-03-12 Toshiba Corp Power fluctuation prediction system
JP4461192B1 (en) 2009-04-10 2010-05-12 株式会社東芝 Electronic device and communication control method
JP2012182519A (en) 2011-02-28 2012-09-20 Tokyo Electric Power Co Inc:The Communication unit and meter-reading terminal device
JP2016100683A (en) 2014-11-19 2016-05-30 Necプラットフォームズ株式会社 Information processing system, information processing method, and information processing program
JP2017034752A (en) 2015-07-29 2017-02-09 東京電力ホールディングス株式会社 Supervisory control system
JP2017034751A (en) 2015-07-29 2017-02-09 東京電力ホールディングス株式会社 Supervisory control system
JP2017108527A (en) 2015-12-09 2017-06-15 中国電力株式会社 Bank reverse power flow predicting device and method
WO2018025383A1 (en) 2016-08-04 2018-02-08 株式会社日立製作所 Evidence collection system and method
JP2018201282A (en) 2017-05-26 2018-12-20 東芝ライテック株式会社 Communication device and communication system
WO2021071923A1 (en) 2019-10-11 2021-04-15 Landis+Gyr Innovations, Inc. Metering and communications for distributed energy resource devices
JP2021083290A (en) 2019-11-22 2021-05-27 出光興産株式会社 Power control method, power control system, and program
WO2021255826A1 (en) 2020-06-16 2021-12-23 日本電信電話株式会社 Home apparatus management device, method and program
JP2022027241A (en) 2020-07-31 2022-02-10 株式会社リコー Information processing system, maintenance method, and program

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008269084A (en) 2007-04-17 2008-11-06 Hitachi Ltd Log analysis method and apparatus
JP2009055713A (en) 2007-08-27 2009-03-12 Toshiba Corp Power fluctuation prediction system
JP4461192B1 (en) 2009-04-10 2010-05-12 株式会社東芝 Electronic device and communication control method
JP2012182519A (en) 2011-02-28 2012-09-20 Tokyo Electric Power Co Inc:The Communication unit and meter-reading terminal device
JP2016100683A (en) 2014-11-19 2016-05-30 Necプラットフォームズ株式会社 Information processing system, information processing method, and information processing program
JP2017034752A (en) 2015-07-29 2017-02-09 東京電力ホールディングス株式会社 Supervisory control system
JP2017034751A (en) 2015-07-29 2017-02-09 東京電力ホールディングス株式会社 Supervisory control system
JP2017108527A (en) 2015-12-09 2017-06-15 中国電力株式会社 Bank reverse power flow predicting device and method
WO2018025383A1 (en) 2016-08-04 2018-02-08 株式会社日立製作所 Evidence collection system and method
JP2018201282A (en) 2017-05-26 2018-12-20 東芝ライテック株式会社 Communication device and communication system
WO2021071923A1 (en) 2019-10-11 2021-04-15 Landis+Gyr Innovations, Inc. Metering and communications for distributed energy resource devices
JP2021083290A (en) 2019-11-22 2021-05-27 出光興産株式会社 Power control method, power control system, and program
WO2021255826A1 (en) 2020-06-16 2021-12-23 日本電信電話株式会社 Home apparatus management device, method and program
JP2022027241A (en) 2020-07-31 2022-02-10 株式会社リコー Information processing system, maintenance method, and program

Also Published As

Publication number Publication date
JP2024005509A (en) 2024-01-17

Similar Documents

Publication Publication Date Title
US8806256B2 (en) Power consumption monitor and method therefor
CN104376081A (en) Data application processing system, handhold terminal and on-site checking data processing system
KR102699858B1 (en) Charging load management device for managing charging load of electronic vehicle charging device and operation method thereof
CN113793139B (en) Payment abnormality processing method, processing device, storage medium and electronic device
JPWO2020122039A1 (en) Data management methods, data management systems and programs
CN111628358A (en) USB expansion device with double power supplies and double power supply method
US20150201101A1 (en) Information processing system and power supply controlling method
KR20220068860A (en) Electric vehicle charger control system linked with energy management system
JP6797450B1 (en) Electric power trading support system, electric power trading support method and program
JP7617874B2 (en) Hub system and communication control method
US12145465B2 (en) Method, apparatus and computer program for supplying power through grouping of charging module for electric vehicle
JP2013196347A (en) Information processing device and information processing program
KR20210023446A (en) Apparatus and Method For Communicating With Electric Vehicle Charger
US20220194254A1 (en) Methods and systems for determining electric vehicle electricity consumption cost
CN113874246B (en) Method and system for charging electric vehicles (EVs) using blockchain
JP5853978B2 (en) Information processing apparatus and information processing program
CN120828693A (en) Method and device for distributing charging current of electric vehicle and electric vehicle
US8649912B2 (en) Method and system for workload balancing to assist in power grid load management
CN115470054A (en) A server memory function testing method, system, device and storage medium
AU2023204652B2 (en) Power control device, power control method, and power control program
KR20210051997A (en) Electronic device and method for establishing exchange between electric vehicles
JP4488427B2 (en) Printing system, printing management server, printing control method, program, and computer-readable storage medium
CN109066658A (en) A kind of method of electric energy transfer and relevant device
CN208445567U (en) A management board and device for monitoring power disturbance
TW565801B (en) Cluster computer having distributed load balancing system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230531

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240409

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240423

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240619

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240813

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241007

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241210

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250107

R150 Certificate of patent or registration of utility model

Ref document number: 7617874

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150