JP7619456B2 - ポールの不平衡荷重を算出する装置、方法及びプログラム - Google Patents
ポールの不平衡荷重を算出する装置、方法及びプログラム Download PDFInfo
- Publication number
- JP7619456B2 JP7619456B2 JP2023529409A JP2023529409A JP7619456B2 JP 7619456 B2 JP7619456 B2 JP 7619456B2 JP 2023529409 A JP2023529409 A JP 2023529409A JP 2023529409 A JP2023529409 A JP 2023529409A JP 7619456 B2 JP7619456 B2 JP 7619456B2
- Authority
- JP
- Japan
- Prior art keywords
- cable
- pole
- unbalanced load
- tension
- length
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Electric Cable Installation (AREA)
Description
ケーブルの布設条件を変化させたときの、そのケーブルが布設されているポールを対象ポールと考え、
対象ポールに布設されている各ケーブルの張力及び対象ポールの不平衡荷重を計算する。
本実施形態例を実行するための機能ブロック図を、図14に示す。本実施形態に係る装置は、不平衡荷重算出部12と、ケーブル布設条件算出部13と、を備える。本実施形態に係る装置が実行する方法を、図1に示す。本実施形態に係る装置は、不平衡荷重算出部12がポールに作用する不平衡荷重を計算し(S11)、ケーブル布設条件算出部13が不平衡荷重を解消するためのケーブル布設条件(実長、スパン長、弛度等)を決定し(S12)、上記のケーブル布設条件(実長、スパン長、弛度等)を実現するための実施方法を決定する(S13)。本開示の装置はコンピュータとプログラムによっても実現でき、プログラムを記録媒体に記録することも、ネットワークを通して提供することも可能である。以下、詳細に説明する。
(数3)
(ΣTn)+F=0 (3)
(数4)
F=f(Δ) (4)
ここで、Δはポール91の変形を表すもので、例えば、ポール91の頭部変位83等で表現できる(図4)。頭部変位83は、例えば、ポール91の鉛直軸81とケーブル布設位置82の水平距離で求めることができる。
布設条件(実長L、スパン長S、弛度d等)の変更後のケーブル張力T及び不平衡荷重の決定フローを図5に示す。ケーブル布設条件(実長、スパン長、弛度等)を変えた時のケーブルの張力は、変更後の実長L、スパン長S、弛度dを用いて、式(1)または式(2)から計算できる(図5ステップb)。
一方、ケーブル92の張力が変わることにより、不平衡荷重が変化するため、ポール91の反力Fも変化し(F’)、式(3)から計算できる(図5ステップc)。
(数5)
(ΣTn)+F≦A (5)
(数6)
不平衡荷重=(ΣTn’) (6)
(数7)
(ポールの不平衡荷重)=g(変更後のケーブル布設条件)≦B (7)
(数8)
(不平衡荷重解消後のケーブル布設条件)=h(ポールの不平衡荷重) (8)
「高張力スパンの実長の変更」による不平衡荷重の解消を考える。ケーブル92の実長と張力は反比例するため(式(2)および図8)、「高張力スパンの実長を延長」することにより、不平衡荷重の解消が可能となる。そのため、式(8)で計算した結果にまで、実長を増加させることで不平衡荷重が解消できる。
ポール91の位置変更による、不平衡荷重の解消を考える。式(8)で計算したケーブル布設条件(実長、スパン長、弛度等)を実現する位置に、ポール91を移設することで、不平衡荷重の解消実現できる(図9)。また本工法はケーブル余長、土地所有者との用地折衝、変更後位置の地盤等条件を満たせば実施できる。
弛度の変更による、不平衡荷重の解消を考える。ポール91のケーブル固定箇所にて、ケーブル92の余長がある場合に、式(8)で計算したケーブル布設条件(実長、スパン長、弛度等)のように、ケーブル92の余長を使って、弛度を変更することで、不平衡荷重の解消を実現できる(図10)。また本工法は、ポール91とケーブル92の接続部(=架渉位置)に他の金物等の付属物72による支障がなく、ポール91とケーブル92の接続形態が「引き通し」(図13(b))であり、ケーブル92に余長がある場合に実施できる。ポール91とケーブル92の接続形態が「引き通し」の場合、ケーブル92の支持体72は、ポール91の左右で分断されておらず、他の付属物73を介してポール91に固定されている。
(i)架渉位置の状態、
(ii)ポール91とケーブル92の接続形態(引き通し、引き留め)、
(iii)周辺用地の折衝状態、
等の諸条件により異なる。
(数9)
(不平衡荷重解消のための最適なケーブル布設条件及び実施方法)
=k(ポールの不平衡荷重、工法の実施条件)) (9)
ケーブル92の布設条件に基づいて、ケーブルの張力Tを、式(1)又は式(2)を用いて計算するステップS1と、
求められたケーブル92の張力Tに基づいて、ポール91の反力Fおよび変形量Δを、式(3)及び式(4)を用いて計算するステップS2と、
求められたポール91の変形量Δに基づいて、ケーブル92の張力Tを再計算するステップS3と、
ステップS2で求められたポール91の反力FとステップS3で求められたケーブル92の張力Tとに基づいて、つり合い式(5)の収束判定を行うステップS4と、
ステップS4で未収束と判定された場合には、ステップS2~S4を繰り返し実行し、収束と判定された場合に、求められたケーブルの張力に基づいてポールの不平衡荷重を計算するステップS5と、
を有する。これにより、本開示は、ケーブル92の布設条件を変化させたときのポール91の不平衡荷重の変化を計算することができ、不平衡荷重を解消するケーブル92の布設条件を求めることが可能となる。
本実施形態例を実行するための機能ブロック図を、図15に示す。不平衡荷重解消のために、ケーブル布設条件(実長、スパン長、弛度等)を変更するとき、隣接ポールに布設されているケーブルの張力も変わることになるため、その影響を、実施形態例1のステップS12のフローを以下のように置き換えて考えることができる。
(数10)
(ポール91-3に布設されるケーブルの張力:T1’、T2’)
=g(ポール91-3及び91-4間の変更後のケーブル布設条件) (10)
(数11)
(ポールXの不平衡荷重)=j(変更後のケーブル布設条件) (11)
(数12)
(不平衡荷重解消後のケーブル布設条件)
=h(ポールXの不平衡荷重) (12)
本開示によれば、不平衡荷重が発生しているポール91に接続されているケーブル92の布設条件(実長、スパン長、弛度等)を変化させたときに、ポール91に発生する不平衡荷重がどのように変化するかを計算することが可能となる。
72:支持体
73:付属物
91:ポール
92:ケーブル
Claims (3)
- 対象ポールとケーブルとの接続部に長さの異なる部材を割り入れたときの前記ケーブルの実長、及び前記対象ポールが変形することによる反力を用いて、長さの異なる前記部材を割り入れたときの前記ケーブルの張力を計算し、
計算で得られた前記ケーブルの張力を用いて、前記対象ポールの不平衡荷重を計算し、
計算で得られた複数の不平衡荷重のうちの適切な不平衡荷重のときの前記ケーブルの実長を、前記対象ポールに接続する前記ケーブルの実長に選定する、
装置。 - 装置が、対象ポールとケーブルとの接続部に長さの異なる部材を割り入れたときの前記ケーブルの実長、及び前記対象ポールが変形することによる反力を用いて、長さの異なる前記部材を割り入れたときの前記ケーブルの張力を計算し、
装置が、計算で得られた前記ケーブルの張力を用いて、前記対象ポールの不平衡荷重を計算し、
装置が、計算で得られた複数の不平衡荷重のうちの適切な不平衡荷重のときの前記ケーブルの実長を、前記対象ポールに接続する前記ケーブルの実長に選定する、
方法。 - 対象ポールとケーブルとの接続部に長さの異なる部材を割り入れたときの前記ケーブルの実長、及び前記対象ポールが変形することによる反力を用いて、長さの異なる前記部材を割り入れたときの前記ケーブルの張力を計算する手順と、
計算で得られた前記ケーブルの張力を用いて、前記対象ポールの不平衡荷重を計算する手順と、
計算で得られた複数の不平衡荷重のうちの適切な不平衡荷重のときの前記ケーブルの実長を、前記対象ポールに接続する前記ケーブルの実長に選定する手順と、
をコンピュータに実行させるためのプログラム。
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2021/024155 WO2022269905A1 (ja) | 2021-06-25 | 2021-06-25 | ポールの不平衡荷重を算出する装置、方法及びプログラム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPWO2022269905A1 JPWO2022269905A1 (ja) | 2022-12-29 |
| JP7619456B2 true JP7619456B2 (ja) | 2025-01-22 |
Family
ID=84544371
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2023529409A Active JP7619456B2 (ja) | 2021-06-25 | 2021-06-25 | ポールの不平衡荷重を算出する装置、方法及びプログラム |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JP7619456B2 (ja) |
| WO (1) | WO2022269905A1 (ja) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2025120801A1 (ja) * | 2023-12-07 | 2025-06-12 | 日本電信電話株式会社 | 架渉部材 |
| JP7777707B1 (ja) * | 2025-02-20 | 2025-11-28 | Innovation Farm株式会社 | 電柱監視システム |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006353031A (ja) | 2005-06-17 | 2006-12-28 | Nippon Telegr & Teleph Corp <Ntt> | 電柱設計方法および電柱設計装置 |
| JP2010279202A (ja) | 2009-05-29 | 2010-12-09 | Chugoku Electric Power Co Inc:The | 電柱ストレス管理システム |
| WO2016151680A1 (ja) | 2015-03-20 | 2016-09-29 | 東京電力ホールディングス株式会社 | 柱状構造物のたわみ量測定方法、及び柱状構造物の性能判定方法 |
-
2021
- 2021-06-25 JP JP2023529409A patent/JP7619456B2/ja active Active
- 2021-06-25 WO PCT/JP2021/024155 patent/WO2022269905A1/ja not_active Ceased
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006353031A (ja) | 2005-06-17 | 2006-12-28 | Nippon Telegr & Teleph Corp <Ntt> | 電柱設計方法および電柱設計装置 |
| JP2010279202A (ja) | 2009-05-29 | 2010-12-09 | Chugoku Electric Power Co Inc:The | 電柱ストレス管理システム |
| WO2016151680A1 (ja) | 2015-03-20 | 2016-09-29 | 東京電力ホールディングス株式会社 | 柱状構造物のたわみ量測定方法、及び柱状構造物の性能判定方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| JPWO2022269905A1 (ja) | 2022-12-29 |
| WO2022269905A1 (ja) | 2022-12-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7619456B2 (ja) | ポールの不平衡荷重を算出する装置、方法及びプログラム | |
| Aboshosha et al. | Engineering method for estimating the reactions of transmission line conductors under downburst winds | |
| CN105005659B (zh) | 电缆敷设方法及系统 | |
| EP2194623A1 (en) | Power transmission line dip measurement method | |
| KR101552589B1 (ko) | 지상라이다를 이용한 가공철탑전선의 이도, 실장 관측 및 산출방법 | |
| US9459600B2 (en) | Method and automation system for processing information extractable from an engineering drawing file using information modeling and correlations to generate output data | |
| CA3089317C (en) | Utility structure modeling and design | |
| KR101470981B1 (ko) | 지상 라이다를 이용한 가공송전 철탑의 변위 측정과 분석 방법 | |
| US10296677B2 (en) | Fibre optic network design method | |
| CN111145349B (zh) | 基于三维gis的输电线路跨越施工方案校验与可视化方法 | |
| CN107657093A (zh) | 一种电缆敷设牵引力及侧压力计算方法 | |
| US9590860B2 (en) | Fiber optic network design method | |
| JP7238979B2 (ja) | 設備状態解析装置、設備状態解析方法、及びプログラム | |
| CN120784877B (zh) | 基于磁环均流器的并联电力电缆均流优化方法及装置 | |
| JP6298752B2 (ja) | 影響評価装置、影響評価方法、及び影響評価プログラム | |
| JP2016133356A (ja) | 弛度シミュレータおよびコンピュータプログラム | |
| CN113239557B (zh) | 一种基于模拟电荷法的adss光缆挂点位置确定方法 | |
| CN103022945A (zh) | 一种输电线路耐张塔跳线安装方法 | |
| KR20160143288A (ko) | 교량의 ms 케이블 균등긴장 제어 방법 및 장치 | |
| KR100836257B1 (ko) | 건물 내부의 이동통신 서비스 품질 제공 방법 및 장치 | |
| JP6011650B2 (ja) | 架空送電線の風音評価方法 | |
| JP2022011096A (ja) | 解析処理システム、解析処理方法及びプログラム | |
| KR20040100682A (ko) | 송변전용 강관 및 앵글철탑 설계 방법 | |
| KR101928081B1 (ko) | 송전선의 이도 측정 장치 및 방법 | |
| CA2894341C (en) | A fibre optic network design method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20231013 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20241001 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20241128 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20241210 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20241223 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7619456 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |