JP7620813B2 - Work management system, work evaluation method, and work evaluation program - Google Patents
Work management system, work evaluation method, and work evaluation program Download PDFInfo
- Publication number
- JP7620813B2 JP7620813B2 JP2021031836A JP2021031836A JP7620813B2 JP 7620813 B2 JP7620813 B2 JP 7620813B2 JP 2021031836 A JP2021031836 A JP 2021031836A JP 2021031836 A JP2021031836 A JP 2021031836A JP 7620813 B2 JP7620813 B2 JP 7620813B2
- Authority
- JP
- Japan
- Prior art keywords
- work
- information
- error
- worker
- evaluation value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06398—Performance of employee with respect to a job function
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本開示は、作業管理システム、作業評価方法および作業評価プログラムに関する。 This disclosure relates to a work management system, a work evaluation method, and a work evaluation program.
例えば特許文献1では、生産中に生産トラブルが発生した際に、作業者の作業を起因とする作業ミスが特定される。これにより、その作業を行った作業者に対して作業の抑制を行うことができる。 For example, in Patent Document 1, when a production problem occurs during production, the work error caused by the worker's work is identified. This makes it possible to restrict the work of the worker who performed that work.
しかしながら、発生した生産トラブルなどのエラーがどの作業者のどの作業と関連しているのか不明確な場合があり、原因の特定に時間を要したり、高度な分析装置が必要となったりするおそれがある。 However, it is sometimes unclear which worker and which task an error, such as a production problem, is related to, and identifying the cause can take time or require the use of advanced analytical equipment.
そこで、本開示は、発生したエラーの原因を容易に判定できる作業管理システムなどを提供する。 Therefore, this disclosure provides a work management system that can easily determine the cause of an error that has occurred.
本開示の一態様に係る作業管理システムは、少なくともひとりの作業者が行った生産装置に対する複数の作業に関する作業情報と、前記複数の作業に関連する前記少なくともひとりの作業者の識別情報と、前記生産装置で発生したエラーを示すエラー情報とを取得する取得部と、取得した前記エラー情報と、当該エラー情報より以前に取得した前記作業情報と前記識別情報とに基づいて、前記エラーに関連する作業評価値を算出する算出部と、を備える。 A work management system according to one aspect of the present disclosure includes an acquisition unit that acquires work information related to a plurality of tasks performed on a production device by at least one worker, identification information of the at least one worker related to the plurality of tasks, and error information indicating an error that has occurred on the production device, and a calculation unit that calculates a work evaluation value related to the error based on the acquired error information, the work information acquired prior to the error information, and the identification information.
なお、これらの包括的または具体的な側面は、システム、装置、方法、記録媒体、または、コンピュータプログラムで実現されてもよく、システム、装置、方法、記録媒体、および、コンピュータプログラムの任意な組み合わせで実現されてもよい。 These comprehensive or specific aspects may be realized by a system, an apparatus, a method, a recording medium, or a computer program, or may be realized by any combination of a system, an apparatus, a method, a recording medium, and a computer program.
本開示に係る作業管理システムなどによれば、発生したエラーの原因を容易に判定できる。 The work management system and other systems disclosed herein can easily determine the cause of an error that has occurred.
本開示の作業管理システムは、少なくともひとりの作業者が行った生産装置に対する複数の作業に関する作業情報と、前記複数の作業に関連する前記少なくともひとりの作業者の識別情報と、前記生産装置で発生したエラーを示すエラー情報とを取得する取得部と、取得した前記エラー情報と、当該エラー情報より以前に取得した前記作業情報と前記識別情報とに基づいて、前記エラーに関連する作業評価値を算出する算出部と、を備える。 The work management system disclosed herein includes an acquisition unit that acquires work information related to a plurality of tasks performed on a production device by at least one worker, identification information of the at least one worker related to the plurality of tasks, and error information indicating an error that has occurred on the production device, and a calculation unit that calculates a work evaluation value related to the error based on the acquired error information, the work information acquired prior to the error information, and the identification information.
これによれば、エラーが発生した場合、エラーの発生時よりも以前に取得された、エラーとの関連性が高いと考えられる作業情報および識別情報に基づいて、エラーに関連する作業評価値が算出される。例えば、作業評価値は、作業ごとあるいは作業者ごとに算出され、作業評価値に基づいて、エラーの原因となった作業または作業者を判定することができる。したがって、発生したエラーの原因を容易に判定できる。 According to this, when an error occurs, a task evaluation value related to the error is calculated based on task information and identification information acquired before the error occurred and considered to be highly relevant to the error. For example, the task evaluation value is calculated for each task or worker, and the task or worker that caused the error can be determined based on the task evaluation value. Therefore, the cause of the error that occurred can be easily determined.
また、前記算出部は、前記作業情報と前記エラーとの関連性から設定される係数に基づいて、前記作業評価値を算出してもよい。 The calculation unit may also calculate the work evaluation value based on a coefficient that is set based on the correlation between the work information and the error.
これによれば、エラーとの関連性が高い作業は、エラーの原因である可能性が高い。このため、エラーとの関連性が高い作業またはその作業を行った作業者がエラーの原因として判定されやすくなるような係数が設定され、当該係数に基づいて作業評価値が算出されることで、発生したエラーの原因を正確に判定できる。 According to this, tasks that are highly related to errors are highly likely to be the cause of the error. For this reason, a coefficient is set that makes it easier to determine that tasks that are highly related to errors, or the worker who performed the task, are the cause of the error, and a task evaluation value is calculated based on this coefficient, making it possible to accurately determine the cause of the error that has occurred.
また、前記算出部は、前記作業情報に含まれる作業対処時刻と前記エラー情報に含まれるエラー発生時刻とから設定される係数に基づいて、前記作業評価値を算出してもよい。 The calculation unit may also calculate the work evaluation value based on a coefficient set from the work handling time included in the work information and the error occurrence time included in the error information.
これによれば、作業対処時刻がエラー発生時刻に近い作業は、エラーの原因である可能性が高い。このため、作業対処時刻がエラー発生時刻に近い作業またはその作業を行った作業者がエラーの原因として判定されやすくなるような係数が設定され、当該係数に基づいて作業評価値が算出されることで、発生したエラーの原因を正確に判定できる。 According to this, a task that was addressed close to the time the error occurred is highly likely to be the cause of the error. For this reason, a coefficient is set that makes it more likely that a task that was addressed close to the time the error occurred, or the worker who performed that task, will be determined to be the cause of the error, and a task evaluation value is calculated based on this coefficient, making it possible to accurately determine the cause of the error that occurred.
また、前記算出部は、前記作業者の勤務期間に対応して設定される係数に基づいて、前記作業評価値を算出してもよい。 The calculation unit may also calculate the work evaluation value based on a coefficient set corresponding to the worker's working period.
これによれば、勤務期間が短い作業者が行った作業は、エラーの原因である可能性が高い。このため、勤務期間が短い作業者またはその作業者が行った作業がエラーの原因として判定されやすくなるような係数が設定され、当該係数に基づいて作業評価値が算出されることで、発生したエラーの原因を正確に判定できる。 According to this, work performed by workers with short employment periods is highly likely to be the cause of an error. For this reason, a coefficient is set that makes it easier to determine that workers with short employment periods, or the work they performed, are the cause of an error, and a work evaluation value is calculated based on this coefficient, making it possible to accurately determine the cause of an error that has occurred.
また、さらに、算出した前記作業評価値に基づいて、前記少なくともひとりの作業者に対する評価を示す作業評価情報を作成する作成部を備えていてもよい。 The system may further include a creation unit that creates work evaluation information indicating an evaluation of the at least one worker based on the calculated work evaluation value.
これによれば、作業者に対して自身の行った作業の評価を確認させることができ、今後の作業の改善を図ることができる。 This allows workers to check the evaluation of the work they have done, allowing them to improve their work in the future.
また、前記作業評価情報は、前記少なくともひとりの作業者の作業スキルを示す作業スキル情報を更新させる情報を含んでいてもよい。 The work evaluation information may also include information for updating work skill information indicating the work skills of the at least one worker.
これによれば、更新された作業スキル情報を用いて作業評価値が算出されることで、発生したエラーの原因を正確に判定できる。 In this way, the work evaluation value is calculated using the updated work skill information, making it possible to accurately determine the cause of the error that occurred.
また、前記作業評価情報は、前記エラーに関連する作業に対する教育情報を含んでいてもよい。 The task evaluation information may also include training information for the task related to the error.
これによれば、作業者に対して教育などを行うことができ、今後の作業の改善を図ることができる。 This allows for training of workers and allows for improvements to be made to their work in the future.
本開示の作業評価方法は、少なくともひとりの作業者が行った生産装置に対する複数の作業に関する作業情報と、前記複数の作業に関連する前記少なくともひとりの作業者の識別情報と、前記生産装置で発生したエラーを示すエラー情報とを取得し、取得した前記エラー情報と、当該エラー情報より以前に取得した前記作業情報と前記識別情報とに基づいて、前記エラーに関連する作業評価値を算出することを含む。 The work evaluation method disclosed herein includes acquiring work information related to a plurality of tasks performed on a production device by at least one worker, identification information of the at least one worker related to the plurality of tasks, and error information indicating an error that has occurred on the production device, and calculating a work evaluation value related to the error based on the acquired error information and the work information and identification information acquired prior to the error information.
これによれば、発生したエラーの原因を容易に判定できる作業評価方法を提供できる。 This provides a work evaluation method that can easily determine the cause of any errors that occur.
また、前記算出では、前記作業情報と前記エラーとの関連性から設定される係数に基づいて、前記作業評価値を算出してもよい。 In addition, the calculation may calculate the work evaluation value based on a coefficient that is set based on the correlation between the work information and the error.
これによれば、エラーとの関連性が高い作業は、エラーの原因である可能性が高い。このため、エラーとの関連性が高い作業またはその作業を行った作業者がエラーの原因として判定されやすくなるような係数が設定され、当該係数に基づいて作業評価値が算出されることで、発生したエラーの原因を正確に判定できる。 According to this, tasks that are highly related to errors are highly likely to be the cause of the error. For this reason, a coefficient is set that makes it easier to determine that tasks that are highly related to errors, or the worker who performed the task, are the cause of the error, and a task evaluation value is calculated based on this coefficient, making it possible to accurately determine the cause of the error that has occurred.
また、前記算出では、前記作業情報に含まれる作業対処時刻と前記エラー情報に含まれるエラー発生時刻とから設定される係数に基づいて、前記作業評価値を算出してもよい。 In addition, the calculation may be performed by calculating the work evaluation value based on a coefficient set from the work handling time included in the work information and the error occurrence time included in the error information.
これによれば、作業対処時刻がエラー発生時刻に近い作業は、エラーの原因である可能性が高い。このため、作業対処時刻がエラー発生時刻に近い作業またはその作業を行った作業者がエラーの原因として判定されやすくなるような係数が設定され、当該係数に基づいて作業評価値が算出されることで、発生したエラーの原因を正確に判定できる。 According to this, a task that was addressed close to the time the error occurred is highly likely to be the cause of the error. For this reason, a coefficient is set that makes it more likely that a task that was addressed close to the time the error occurred, or the worker who performed that task, will be determined to be the cause of the error, and a task evaluation value is calculated based on this coefficient, making it possible to accurately determine the cause of the error that occurred.
また、前記算出では、前記作業者の勤務期間に対応して設定される係数に基づいて、前記作業評価値を算出してもよい。 In addition, the calculation may be performed based on a coefficient set in accordance with the worker's working period.
これによれば、勤務期間が短い作業者が行った作業は、エラーの原因である可能性が高い。このため、勤務期間が短い作業者またはその作業者が行った作業がエラーの原因として判定されやすくなるような係数が設定され、当該係数に基づいて作業評価値が算出されることで、発生したエラーの原因を正確に判定できる。 According to this, work performed by workers with short employment periods is highly likely to be the cause of an error. For this reason, a coefficient is set that makes it easier to determine that workers with short employment periods, or the work they performed, are the cause of an error, and a work evaluation value is calculated based on this coefficient, making it possible to accurately determine the cause of an error that has occurred.
また、さらに、算出した前記作業評価値に基づいて、前記少なくともひとりの作業者に対する評価を示す作業評価情報を作成することを含んでいてもよい。 The method may further include creating work evaluation information indicating an evaluation of the at least one worker based on the calculated work evaluation value.
これによれば、作業者に対して自身の行った作業の評価を確認させることができ、今後の作業の改善を図ることができる。 This allows workers to check the evaluation of the work they have done, allowing them to improve their work in the future.
また、前記作業評価情報は、前記少なくともひとりの作業者の作業スキルを示す作業スキル情報を更新させる情報を含んでいてもよい。 The work evaluation information may also include information for updating work skill information indicating the work skills of the at least one worker.
これによれば、更新された作業スキル情報を用いて作業評価値が算出されることで、発生したエラーの原因を正確に判定できる。 In this way, the work evaluation value is calculated using the updated work skill information, making it possible to accurately determine the cause of the error that occurred.
また、前記作業評価情報は、前記エラーに関連する作業に対する教育情報を含んでいてもよい。 The task evaluation information may also include training information for the task related to the error.
これによれば、作業者に対して教育などを行うことができ、今後の作業の改善を図ることができる。 This allows for training of workers and allows for improvements to be made to their work in the future.
本開示の作業評価プログラムは、上記の作業評価方法をコンピュータにより実行させるプログラムである。 The work evaluation program disclosed herein is a program that causes a computer to execute the above work evaluation method.
これによれば、発生したエラーの原因を容易に判定できる作業評価プログラムを提供できる。 This makes it possible to provide a task evaluation program that can easily determine the cause of any errors that occur.
なお、以下で説明する実施の形態は、いずれも包括的または具体的な例を示すものである。以下の実施の形態で示される数値、形状、材料、構成要素、構成要素の配置位置および接続形態、ステップ、ステップの順序などは、一例であり、本開示を限定する主旨ではない。 The embodiments described below are all comprehensive or specific examples. The numerical values, shapes, materials, components, the arrangement and connection of the components, steps, and order of steps shown in the following embodiments are merely examples and are not intended to limit the present disclosure.
(実施の形態)
以下、図1から図4を用いて実施の形態について説明する。
(Embodiment)
Hereinafter, an embodiment will be described with reference to FIG. 1 to FIG.
図1は、実施の形態に係る作業管理システム10の一例を示す構成図である。なお、図1には、作業管理システム10の他に、作業管理システム10と有線または無線により通信可能に接続される生産装置20および携帯端末30も示している。
Figure 1 is a configuration diagram showing an example of a
生産装置20は、フィーダおよびノズルなどを有する実装装置ならびに印刷装置などの装置であり、作業部21、識別部22、入力部23、通信部24および記憶部25を備える。
The
作業部21は、生産装置20において作業を行う構成要素であり、例えば、作業者の作業を介して実装または印刷などを行う。生産装置20に対して行われた作業に関する作業情報(例えば設備ログなど)は、記憶部25に記憶される。なお、作業情報は、作業内容が作業者に直接入力されることで、記憶部25に記憶されてもよい。また、生産装置20でエラーが発生した場合、生産装置20で発生したエラーを示すエラー情報が記憶部25に記憶される。なお、作業中の作業者がカメラなどにより撮影されることにより得られる画像もしくは映像、または、作業中の作業者が装着しているスマートグラスでの撮影により得られる画像もしくは映像によって作業内容が識別されて、作業内容を示す識別結果が作業情報として記憶部25に記憶されてもよい。
The
識別部22は、生産装置20に対して作業を行う作業者を識別する構成要素であり、例えば、指紋認証、虹彩認証または顔認証などにより作業者を識別する。識別された作業者の識別情報は、記憶部25に記憶される。
The
入力部23は、作業者の生産装置20に対する入力作業が行われる構成要素であり、例えば、タッチパネルなどである。例えば、画面操作により入力作業が行われる。なお、キーボードなどにより入力作業が行われてもよい。また、入力部23を介して、作業者の識別情報が直接入力されて、記憶部25に記憶されてもよい。
The
通信部24は、作業管理システム10と有線または無線により通信するための通信インタフェースである。通信部24は、作業情報および識別情報を定期的に作業管理システム10へ送信し、エラーが発生したときにエラー情報を作業管理システム10へ送信する。
The
携帯端末30は、作業者が扱う端末である。例えば、作業情報または識別情報が携帯端末30に入力され、携帯端末30から作業管理システム10へ作業情報または識別情報が送信されてもよい。
The
作業管理システム10は、少なくともひとりの作業者が行った生産装置20に対する複数の作業を管理するシステムである。複数の作業は、ひとりの作業者が行った複数の作業であってもよいし、複数の作業者が行った複数の作業であってもよい。後者の場合、複数の作業者には、ひとつの作業のみを行う作業者が含まれていてもよい。
The
ここで、作業者が行う作業の例について説明する。 Here we explain some examples of the work that workers do.
作業者は、例えば、スプライシング作業、オートロードフィーダへの部品供給作業、フィーダ配置作業、半田ならし作業、空テープボックスの清掃作業、認識エラーの対応作業、吸着エラーの対応作業および搬送エラーの対応作業などの作業を生産フロアにおいて行う。 On the production floor, workers perform tasks such as splicing, supplying parts to autoload feeders, arranging feeders, smoothing out solder, cleaning empty tape boxes, dealing with recognition errors, dealing with suction errors, and dealing with transport errors.
スプライシング作業は、収納された部品が供給されて残り僅かとなっている古いリールのテープに新たなリールのテープを繋いで、新たなリールによって古いリールから引き続き部品供給を行うための作業である。具体的には、作業者は、新たなリールのテープの先端と、古いリールのテープの後端とをハサミで切断する。そして、作業者は、新たなリールのテープの先端と、古いリールのテープの後端とを上記切れ目において当接し、貼り付けテープを貼り付けて、繋ぎ合わせる。 The splicing process involves joining the tape from a new reel to the tape from an old reel that has been supplied with stored components and is running low on tape, so that the new reel can continue to supply components from the old reel. Specifically, the worker cuts off the leading end of the tape from the new reel and the trailing end of the tape from the old reel with scissors. The worker then brings the leading end of the tape from the new reel and the trailing end of the tape from the old reel together at the cut, and applies an adhesive tape to join them together.
オートロードフィーダへの部品供給作業は、生産装置に取り付けられるオートロードフィーダにリールのテープを補給する作業である。具体的には、作業者は、リールのテープの先端を部品が収納されている部分まで切断する。次に、作業者は、オートロードフィーダのテープ挿入口のシャッターを開くためのスイッチを操作してシャッターを開き、テープ挿入口へ先端を切断したリールのテープを挿入する。そして、作業者は、テープのセットが完了すると、自動搬送を開始するためのスイッチを操作して、自動搬送を開始する。 The task of supplying parts to an autoload feeder involves replenishing the autoload feeder, which is attached to production equipment, with tape from a reel. Specifically, the worker cuts off the end of the tape from the reel to the section where the parts are stored. Next, the worker operates a switch to open the shutter of the tape insertion port of the autoload feeder, opening the shutter, and inserts the reel tape with the end cut off into the tape insertion port. Once the tape has been set, the worker operates a switch to start automatic transport, which begins automatic transport.
フィーダ配置作業は、生産装置にテープフィーダを取り付ける作業である。具体的には、作業者は、テープフィーダを、生産装置に取り付けられる台車に取り付ける。そして、作業者は、リールを、テープフィーダが取り付けられた台車に取り付ける。 The feeder placement work is the work of attaching a tape feeder to a production device. Specifically, the worker attaches the tape feeder to a cart that is attached to the production device. The worker then attaches a reel to the cart to which the tape feeder is attached.
半田ならし作業は、スクリーン印刷装置などで使用される半田を撹拌する作業である。半田は冷蔵庫などで保存されて硬くなっているため、冷蔵庫などから出した半田を使用前に撹拌する必要がある。作業者は、半田の種類にもよるが、約5~10分ほど半田を撹拌して良好な柔らかさにする。 Solder seasoning involves stirring the solder used in screen printing equipment and similar devices. Solder is stored in a refrigerator and becomes hard, so it is necessary to stir the solder after taking it out of the refrigerator before use. Depending on the type of solder, the worker stirs the solder for about 5 to 10 minutes until it becomes soft enough.
空テープボックスの清掃作業は、生産装置に取り付けられる台車に取り付けられ、部品が供給されて空になった空テープが溜められる空テープボックスを清掃する作業である。具体的には、作業者は、空テープが溜まった空テープボックスを台車から取り外して、空テープを廃棄することで空テープボックスを清掃する。そして、作業者は、清掃した空テープボックスを台車に取り付ける。 The task of cleaning empty tape boxes involves cleaning the empty tape boxes that are attached to a cart that is attached to the production equipment and in which empty tape that has been emptied after parts have been supplied is stored. Specifically, the worker removes the empty tape box that has accumulated empty tape from the cart and cleans the empty tape box by discarding the empty tape. The worker then attaches the cleaned empty tape box to the cart.
認識エラーの対応作業は、生産装置に設けられたカメラの認識エラーが発生した際に行う作業である。例えば、カメラで撮影された部品が認識画像において正しい位置もしくは向きとなっていない場合、または、カメラのカバーガラスが汚れている場合などに、認識エラーが発生する。このような場合に、作業者は、認識エラーの対応作業として、カメラの位置、傾きもしくは設定の調整、部品を保持するノズルの位置もしくは傾きの調整、ノズルの汚れの除去、または、カメラのカバーガラスの汚れの拭き取りなどを行う。また、例えば、生産装置に予め設定された基板の認識マークの設定が誤っている場合、または、基板停止位置がずれている場合などに、認識エラー(具体的には、基板の認識マークの認識エラー)が発生する。このような場合に、作業者は、認識エラーの対応作業として、認識マークの設定の修正、または基板位置の調整などを行う。 The work to deal with a recognition error is the work to be done when a recognition error occurs in the camera installed in the production device. For example, a recognition error occurs when a part photographed by the camera is not in the correct position or orientation in the recognition image, or when the cover glass of the camera is dirty. In such cases, the worker will deal with the recognition error by adjusting the position, inclination, or settings of the camera, adjusting the position or inclination of the nozzle that holds the part, removing dirt from the nozzle, or wiping off dirt from the cover glass of the camera. In addition, a recognition error (specifically, a recognition error of the recognition mark of the board) will occur, for example, when the setting of the recognition mark of the board preset in the production device is incorrect, or when the board stopping position is misaligned. In such cases, the worker will deal with the recognition error by correcting the setting of the recognition mark or adjusting the position of the board.
吸着エラーの対応作業は、ノズルの吸着エラーが発生した際に行う作業である。例えば、作業者は、吸着エラーが発生した場合に、吸着エラーの対応作業として、ノズルの部品吸着位置の設定が正しいか確認し、正しくない場合には設定を修正する。また、例えば、作業者は、吸着エラーが発生した場合に、吸着エラーの対応作業として、吸着速度の設定を適切な速度に調整する。 The response work for a pickup error is the work carried out when a nozzle pickup error occurs. For example, when a pickup error occurs, the worker's response work for the pickup error is to check whether the setting for the nozzle's component pickup position is correct, and to correct the setting if it is not correct. Also, for example, when a pickup error occurs, the worker's response work for the pickup error is to adjust the pickup speed setting to an appropriate speed.
基板搬送エラーの対応作業は、基板搬送エラーが発生した際に行う作業である。例えば、基板を搬送するベルトまたは搬送される基板のガイドが汚れている場合に、基板搬送エラーが発生する。このような場合に、作業者は、基板搬送エラーの対応作業として、ベルトまたはガイドを清掃する。また、例えば、コンベアの基板検出センサーが、基板を検出していないのに検出状態になる場合に、基板搬送エラーが発生する。このような場合に、作業者は、基板搬送エラーの対応作業として、基板検出センサーが汚れていないかを確認し、汚れている場合には汚れを拭き取る。 The work to deal with board transport errors is the work done when a board transport error occurs. For example, a board transport error occurs when the belt that transports the board or the guide for the transported board is dirty. In such a case, the worker cleans the belt or guide as a work to deal with the board transport error. Also, for example, a board transport error occurs when the board detection sensor of the conveyor detects a board even though it has not detected one. In such a case, the worker checks whether the board detection sensor is dirty and wipes off the dirt if it is dirty as a work to deal with the board transport error.
作業管理システム10は、生産装置20が設けられた生産フロアに配置されたコンピュータであってもよいし、生産フロアの外部に配置されたサーバなどのコンピュータであってもよい。なお、作業管理システム10は、1つの筐体内に設けられた装置であってもよいし、2つ以上の筐体に分けられ、2つ以上のコンピュータによって実現されるシステムであってもよい。作業管理システム10が2つ以上のコンピュータによって実現される場合には、作業管理システム10を構成する構成要素は、2つ以上のコンピュータに分散して配置されてもよい。
The
作業管理システム10は、取得部11、算出部12、作成部13、表示部14、通信部15および記憶部16を備える。作業管理システム10は、プロセッサ、ROM(Read Only Memory)およびRAM(Random Access Memory)などのメモリ、通信インタフェースならびにユーザインタフェースなどを含むコンピュータにより実現される。取得部11、算出部12および作成部13は、プロセッサがメモリに記憶されたプログラムに従って動作することにより実現される。表示部14は、ディスプレイなどのユーザインタフェースである。通信部15は、生産装置20および携帯端末30と有線または無線により通信するための通信インタフェースである。プログラムが記憶されたメモリは、記憶部16であってもよいし、記憶部16とは別のメモリであってもよい。
The
取得部11は、少なくともひとりの作業者が行った生産装置20に対する複数の作業に関する作業情報と、複数の作業に関連する少なくともひとりの作業者の識別情報と、生産装置20で発生したエラーを示すエラー情報とを取得する。
The
算出部12は、取得したエラー情報と、当該エラー情報より以前に取得した作業情報と識別情報とに基づいて、エラーに関連する作業評価値を算出する。
The
作成部13は、算出した作業評価値に基づいて、少なくともひとりの作業者に対する評価を示す作業評価情報を作成する。
The
表示部14は、作業評価値または作業評価情報を表示する。
The
通信部15は、生産装置20から作業情報、識別情報およびエラー情報を受信し、携帯端末30から作業情報および識別情報を受信し、携帯端末30へ作業評価情報を送信する。
The
記憶部16は、作業スキル情報および評価値算出アルゴリズムを記憶する。算出部12は、評価値算出アルゴリズムを用いて作業評価値を算出する。なお、算出部12は、作業スキル情報を用いて作業評価値を算出してもよい。
The
取得部11、算出部12および作成部13の詳細について、図2を用いて説明する。
The details of the
図2は、実施の形態に係る作業管理システム10の動作の一例を示すフローチャートである。
Figure 2 is a flowchart showing an example of the operation of the
まず、取得部11は、作業情報および識別情報を取得する(ステップS11)。具体的には、取得部11は、生産装置20または携帯端末30から定期的に作業情報および識別情報を取得する。
First, the
次に、取得部11は、生産装置20でエラーが発生した場合に、生産装置20からエラー情報を取得する(ステップS12)。ステップS12以降の処理は、取得部11がエラー情報を取得した場合に行われる。
Next, when an error occurs in the
次に、算出部12は、取得したエラー情報と、当該エラー情報より以前に取得した作業情報と識別情報とに基づいて、エラーに関連する作業評価値を算出する(ステップS13)。ここで、取得したエラー情報より以前に取得した作業情報および識別情報の一例について、図3を用いて説明する。
Next, the
図3は、取得したエラー情報より以前に取得した作業情報および識別情報の一例を説明するための図である。図3では、横軸を時間軸としており、「0」において、生産装置20で部品の認識エラーが発生し、取得部11は、認識エラーを示すエラー情報を取得したとする。例えば、認識エラーが発生する前にスプライシング作業が行われており、具体的には、吸着位置ティーチ、フィーダ確認、ノズル確認、部品/リール確認およびデータ確認が作業者A、BおよびCにより行われていたことを示す情報が、エラー情報より以前に取得した作業情報および識別情報に含まれている。
Figure 3 is a diagram for explaining an example of work information and identification information acquired prior to the acquired error information. In Figure 3, the horizontal axis represents time, and at "0" a part recognition error occurs in the
算出部12は、エラー情報より以前に取得した作業情報および識別情報として、吸着位置ティーチについての作業情報および吸着位置ティーチを行った作業者の識別情報、フィーダ確認についての作業情報およびフィーダ確認を行った作業者の識別情報、ノズル確認についての作業情報およびノズル確認を行った作業者の識別情報、部品/リール確認についての作業情報および部品/リール確認を行った作業者の識別情報、ならびに、データ確認についての作業情報およびデータ確認を行った作業者の識別情報を用いて、作業評価値を算出する。また、算出部12は、エラー情報より以前として、例えば、エラー発生の直前15分前間の作業情報および識別情報を用いて、作業評価値を算出する。
The
図3に示されるように、10分から15分前に、作業者Cにより部品/リール確認が行われ、作業者Bによりデータ確認が行われ、5分から10分前に、作業者Aによりフィーダ確認が行われ、作業者Bによりノズル確認が行われ、0分から5分前に作業者Aにより吸着位置ティーチが行われていることが、エラー情報より以前に取得した作業情報および識別情報から判定することができる。算出部12は、これらの作業情報および識別情報と、評価値算出アルゴリズムを用いて作業評価値を算出する。具体的には、算出部12は、図4に示されるように、作業評価値を算出する。
As shown in FIG. 3, it can be determined from the work information and identification information acquired prior to the error information that between 10 and 15 minutes ago, worker C checked the parts/reel, worker B checked the data, between 5 and 10 minutes ago, worker A checked the feeder, worker B checked the nozzle, and between 0 and 5 minutes ago, worker A taught the suction position. The
図4は、作業評価値の一例を示すグラフである。例えば、図4では、作業者ごとの作業評価値の算出方法を示しており、作業評価値が大きい作業者がエラーの原因である可能性が高いことを示している。 Figure 4 is a graph showing an example of a task evaluation value. For example, Figure 4 shows a method for calculating the task evaluation value for each worker, and indicates that a worker with a high task evaluation value is more likely to be the cause of an error.
例えば、算出部12は、作業者の勤務期間に対応して設定される勤務実績係数に基づいて、作業評価値を算出する。勤務実績係数は、例えば、作業者の勤務期間が短いほど大きな値となる。具体的には、作業評価値の算出の対象となっている作業(ここではスプライシング作業)についての勤務期間が、2年から3年の場合、勤務実績係数は0.2に設定され、1年から2年の場合、勤務実績係数は0.4に設定され、0.5年から1年の場合、勤務実績係数は0.6に設定され、0.1年から0.5年の場合、勤務実績係数は0.8に設定され、0.1年未満の場合、勤務実績係数は1.0に設定される。勤務期間が短いほど、作業に慣れておらずエラーを発生させやすいため、算出される作業評価値が大きくなりやすい。ここでは、作業者Aの勤務期間は2年から3年であり、勤務実績係数は0.2となっている。作業者Bの勤務期間は0.5年から1年であり、勤務実績係数は0.6となっている。作業者Cの勤務期間は0.1年未満であり、勤務実績係数は1.0となっている。
For example, the
また、例えば、算出部12は、作業情報に含まれる作業対処時刻とエラー情報に含まれるエラー発生時刻とから設定される時間係数に基づいて、作業評価値を算出する。時間係数は、例えば、作業対処時刻がエラー発生時刻に近いほど大きな値となる。具体的には、作業評価値の算出の対象となっている作業(ここではスプライシング作業における各作業)の作業対処時刻が、エラー発生時刻の10分から15分前の場合、時間係数は1.3に設定され、5分から10分前の場合、時間係数は1.4に設定され、0分から5分前の場合、時間係数は1.5に設定される。作業対処時刻がエラー発生時刻に近い作業ほど、エラーを発生させた原因である可能性が高いため、算出される作業評価値が大きくなりやすい。なお、ひとりの作業者が複数の作業をしていた場合、各作業についての時間係数の和がその作業者の時間係数となる。ここでは、作業者Aは、0分から5分前に吸着位置ティーチを行い、5分から10分前にフィーダ確認を行っていることから、時間係数は2.9(1.5+1.4)となっている。作業者Bは、5分から10分前にノズル確認を行い、10分から15分前にデータ確認を行っていることから、時間係数は2.7(1.4+1.3)となっている。作業者Cは、10分から15分前に部品/リール確認を行っていることから、時間係数は1.3となっている。
For example, the
また、例えば、算出部12は、作業情報とエラーとの関連性から設定される起因係数に基づいて、作業評価値を算出する。起因係数は、例えば、作業内容がエラーとの関連性が高いほど大きな値となる。具体的には、認識エラーに対して作業内容が、吸着位置ティーチの場合、起因係数は1.0に設定され、フィーダ確認の場合、起因係数は1.0に設定され、ノズル確認の場合、起因係数は1.0に設定され、部品/リール確認の場合、起因係数は4.0に設定され、データ確認の場合、起因係数は1.0に設定される。エラーとの関連性が高い作業ほど、エラーを発生させた原因である可能性が高いため、算出される作業評価値が大きくなりやすい。なお、ひとりの作業者が複数の作業をしていた場合、各作業についての起因係数の平均がその作業者の起因係数となる。ここでは、作業者Aは、吸着位置ティーチおよびフィーダ確認を行っていることから、起因係数は1.0((1.0+1.0)/2)となっている。また、作業者Bは、ノズル確認およびデータ確認を行っていることから、起因係数は1.0((1.0+1.0)/2)となっている。また、作業者Cは、部品/リール確認を行っていることから、起因係数は4.0となっている。また、起因係数は、エラー毎に予め定められた係数を用いて、実際のエラーの原因に基づいて更新されてもよい。例えば、起因係数は、計算式や機械学習を用いて、エラーの原因となる作業の起因係数が大きくなるように算出される。実際のエラーの原因は、作業者の入力またはエラーが解消された作業から推定され、推定された実際のエラーの原因が起因係数の更新に用いられる。
For example, the
そして、算出部12は、作業者ごとの勤務実績係数、時間係数および起因係数について、各係数の積を行うことで、作業評価値を算出する。具体的には、算出部12は、作業者Aの作業評価値として、0.2×2.9×1.0=0.58と算出し、作業者Bの作業評価値として、0.6×2.7×1.0=1.62と算出し、作業者Cの作業評価値として、1.0×1.3×4.0=5.2と算出する。算出部12は、算出した作業評価値を出力する。例えば、算出部12は、算出した作業評価値を作成部13へ出力する。なお、算出部12は、算出した作業評価値を表示部14へ出力して作業評価値が表示されてもよいし、通信部15を介して携帯端末30などへ出力して作業評価値が携帯端末30などを介して作業者などに確認されてもよい。
The
図2での説明に戻り、次に、作成部13は、算出部12が算出した作業評価値に基づいて、少なくともひとりの作業者に対する評価を示す作業評価情報を作成する(ステップS14)。
Returning to the explanation in FIG. 2, the
例えば、作業評価情報は、作業者の作業の良し悪しまたは作業レベルの高低などの情報を含む。具体的には、作成部13は、図4に示される作業評価値に基づいて、作業者Aの作業評価が良い(あるいは作業レベルが高い)、作業者Bの作業評価が普通(あるいは作業レベルが普通)、作業者Cの作業評価が悪い(あるいは作業レベルが低い)といった作業評価情報を作成する。
For example, the work evaluation information includes information on the quality or poor quality of a worker's work or the high or low level of the work. Specifically, based on the work evaluation values shown in FIG. 4, the
また、例えば、作業評価情報は、少なくともひとりの作業者の作業スキルを示す作業スキル情報を更新させる情報を含む。具体的には、作成部13は、図4に示される作業評価値に基づいて、作業者Aの作業スキルを上げるように、または、作業者Cの作業スキルを下げるように、記憶部16に記憶された作業スキル情報を更新させる作業評価情報を作成する。作業スキル情報は、作業評価値の算出に用いられてもよく、例えば、勤務実績係数が作業スキル情報に基づいて設定されてもよい。具体的には、作業スキルの低い作業者の勤務実績係数が低くなるように設定されてもよい。
Also, for example, the work evaluation information includes information for updating work skill information indicating the work skills of at least one worker. Specifically, the
また、例えば、作業評価情報は、エラーに関連する作業に対する教育情報を含む。具体的には、作成部13は、図4に示される作業評価値に基づいて、エラーに最も関連する作業を行った作業者Cに対して、教育訓練またはOJT(On the Job Training)を行わせるための教育情報を作成する。なお、同じ作業者だけが教育の対象として選定され続けないように、作業評価値の算出時にランダムな係数がかけられてもよい。
For example, the work evaluation information also includes training information for the work related to the error. Specifically, the
そして、作成部13は、作成した作業評価情報を出力する(ステップS15)。例えば、作成部13は、表示部14へ、または、通信部15を介して携帯端末30などへ作業評価情報を出力する。これにより、作業者は、作業評価または作業レベルを確認でき、あるいは、作業評価値が高い作業者(エラーの原因と考えられる作業者)に対して教育訓練またはOJTなどを行わせることができる。なお、作業評価値が高い作業者が複数選定されて、複数の作業者に対して教育訓練またはOJTなどが行われてもよい。
Then, the
なお、ここでは、作業者ごとの作業評価値が算出される例について説明したが、作業ごとの作業評価値が算出されてもよい。例えば、図3に示される例では、吸着位置ティーチの作業評価値は、勤務実績係数0.2、時間係数1.5、起因係数1.0から、0.3と算出される。また、フィーダ確認の作業評価値は、勤務実績係数0.2、時間係数1.4、起因係数1.0から、0.28と算出される。また、ノズル確認の作業評価値は、勤務実績係数0.6、時間係数1.4、起因係数1.0から、0.84と算出される。また、部品/リール確認の作業評価値は、勤務実績係数1.0、時間係数1.3、起因係数4.0から、5.2となる。また、データ確認の作業評価値は、勤務実績係数0.6、時間係数1.3、起因係数1.0から、0.78となる。これらの作業評価値から、エラーに最も関連する作業は、部品/リール確認となり、例えば、部品/リール確認を行った作業者Cに対して教育訓練またはOJTなどが行われる。 Here, an example in which a task evaluation value is calculated for each worker has been described, but a task evaluation value for each task may be calculated. For example, in the example shown in FIG. 3, the task evaluation value of the pickup position teach is calculated as 0.3 from a work performance coefficient of 0.2, a time coefficient of 1.5, and an attribution coefficient of 1.0. The task evaluation value of the feeder check is calculated as 0.28 from a work performance coefficient of 0.2, a time coefficient of 1.4, and an attribution coefficient of 1.0. The task evaluation value of the nozzle check is calculated as 0.84 from a work performance coefficient of 0.6, a time coefficient of 1.4, and an attribution coefficient of 1.0. The task evaluation value of the part/reel check is 5.2 from a work performance coefficient of 1.0, a time coefficient of 1.3, and an attribution coefficient of 4.0. The task evaluation value of the data check is calculated as 0.78 from a work performance coefficient of 0.6, a time coefficient of 1.3, and an attribution coefficient of 1.0. From these task evaluation values, the task most related to the error is part/reel checking, and for example, training or on-the-job training is provided to worker C who performed the part/reel checking.
また、ここでは、認識エラーに対する作業評価値の算出について説明したが、認識エラーに限らず、発生する様々なエラーごとに作業評価値が算出される。 Although the calculation of the task evaluation value for recognition errors has been described here, task evaluation values are calculated for various errors that occur, not just recognition errors.
なお、教育訓練またはOJTが行われるタイミングは、作業評価情報が出力されたタイミングと同じでもよいし、教育情報が作成され、生産開始または終了時刻等の所定の時刻に作業者に教育情報が出力されるタイミングでもよい。また、生産を管理する班長や監督者に作業評価情報が出力され、班長や監督者の判断のもと教育訓練またはOJTが行われてもよい。 The timing of the education and training or OJT may be the same as the timing when the work evaluation information is output, or may be when the education information is created and output to the worker at a specified time such as the start or end time of production. The work evaluation information may also be output to a team leader or supervisor who manages production, and the education and training or OJT may be performed at the discretion of the team leader or supervisor.
以上説明したように、エラーが発生した場合、エラーの発生時よりも以前に取得された、エラーとの関連性が高いと考えられる作業情報および識別情報に基づいて、エラーに関連する作業評価値が算出される。例えば、作業評価値は、作業ごとあるいは作業者ごとに算出され、作業評価値に基づいて、エラーの原因となった作業または作業者を判定することができる。したがって、発生したエラーの原因を容易に判定でき、作業の高位平準化が可能となる。 As described above, when an error occurs, a task evaluation value related to the error is calculated based on task information and identification information acquired before the error occurred and considered to be highly relevant to the error. For example, the task evaluation value is calculated for each task or worker, and the task or worker that caused the error can be determined based on the task evaluation value. Therefore, the cause of the error that occurred can be easily determined, enabling high-level task leveling.
(その他の実施の形態)
以上、本開示の作業管理システム10について、実施の形態に基づいて説明したが、本開示は、上記実施の形態に限定されるものではない。本開示の趣旨を逸脱しない限り、当業者が思いつく各種変形を本実施の形態に施したもの、および、異なる実施の形態における構成要素を組み合わせて構築される形態も、本開示の範囲内に含まれる。
Other Embodiments
Although the
例えば、上記実施の形態では、作業評価値の算出に勤務実績係数、時間係数および起因係数が用いられる例について説明したが、これらの係数が全て用いられなくてもよく、あるいは、別の係数などが用いられてもよい。 For example, in the above embodiment, an example was described in which a work performance coefficient, a time coefficient, and an attribution coefficient were used to calculate the work evaluation value, but it is not necessary to use all of these coefficients, or other coefficients may be used.
例えば、上記実施の形態では、作業管理システム10は、作成部13を備える例について説明したが、作成部13を備えていなくてもよい。つまり、作業評価情報が作成されなくてもよい。
For example, in the above embodiment, the
例えば、本開示は、作業管理システム10として実現できるだけでなく、作業管理システム10を構成する各構成要素が行うステップ(処理)を含む作業評価方法として実現できる。
For example, the present disclosure can be realized not only as a
作業評価方法は、図2に示されるように、少なくともひとりの作業者が行った生産装置に対する複数の作業に関する作業情報と、複数の作業に関連する少なくともひとりの作業者の識別情報と、生産装置で発生したエラーを示すエラー情報とを取得し(ステップS11、ステップS12)、取得したエラー情報と、当該エラー情報より以前に取得した作業情報と識別情報とに基づいて、エラーに関連する作業評価値を算出する(ステップS13)ことを含む。 As shown in FIG. 2, the work evaluation method includes acquiring work information related to multiple tasks performed on a production device by at least one worker, identification information of at least one worker related to the multiple tasks, and error information indicating an error that occurred on the production device (steps S11 and S12), and calculating a work evaluation value related to the error based on the acquired error information and the work information and identification information acquired prior to the error information (step S13).
例えば、作業評価方法におけるステップは、コンピュータ(コンピュータシステム)によって実行されてもよい。そして、本開示は、作業評価方法に含まれるステップを、コンピュータに実行させるためのプログラムとして実現できる。さらに、本開示は、そのプログラムを記録したCD-ROMなどである非一時的なコンピュータ読み取り可能な記録媒体として実現できる。 For example, the steps in the task evaluation method may be executed by a computer (computer system). The present disclosure can be realized as a program for causing a computer to execute the steps included in the task evaluation method. Furthermore, the present disclosure can be realized as a non-transitory computer-readable recording medium, such as a CD-ROM, on which the program is recorded.
例えば、本開示が、プログラム(ソフトウェア)で実現される場合には、コンピュータのCPU、メモリおよび入出力回路などのハードウェア資源を利用してプログラムが実行されることによって、各ステップが実行される。つまり、CPUがデータをメモリまたは入出力回路などから取得して演算したり、演算結果をメモリまたは入出力回路などに出力したりすることによって、各ステップが実行される。 For example, when the present disclosure is realized as a program (software), each step is performed by executing the program using hardware resources such as a computer's CPU, memory, and input/output circuits. In other words, each step is performed by the CPU acquiring data from memory or input/output circuits, etc., performing calculations, and outputting the results of the calculations to memory or input/output circuits, etc.
また、上記実施の形態の作業管理システム10に含まれる各構成要素は、専用または汎用の回路として実現されてもよい。
Furthermore, each component included in the
また、上記実施の形態の作業管理システム10に含まれる各構成要素は、集積回路(IC:Integrated Circuit)であるLSI(Large Scale Integration)として実現されてもよい。
In addition, each component included in the
また、集積回路はLSIに限られず、専用回路または汎用プロセッサで実現されてもよい。プログラム可能なFPGA(Field Programmable Gate Array)、または、LSI内部の回路セルの接続および設定が再構成可能なリコンフィギュラブル・プロセッサが、利用されてもよい。 In addition, the integrated circuit is not limited to an LSI, and may be realized by a dedicated circuit or a general-purpose processor. A programmable FPGA (Field Programmable Gate Array) or a reconfigurable processor in which the connections and settings of circuit cells inside the LSI can be reconfigured may be used.
さらに、半導体技術の進歩または派生する別技術によりLSIに置き換わる集積回路化の技術が登場すれば、当然、その技術を用いて、作業管理システム10に含まれる各構成要素の集積回路化が行われてもよい。
Furthermore, if an integrated circuit technology that can replace LSIs emerges due to advances in semiconductor technology or other derived technologies, it is natural that each component included in the
その他、実施の形態に対して当業者が思いつく各種変形を施して得られる形態や、本開示の趣旨を逸脱しない範囲で各実施の形態における構成要素および機能を任意に組み合わせることで実現される形態も本開示に含まれる。 In addition, this disclosure also includes forms obtained by applying various modifications to the embodiments that a person skilled in the art may conceive, and forms realized by arbitrarily combining the components and functions of each embodiment within the scope of the spirit of this disclosure.
本開示は、例えば、生産フロアの管理に利用できる。 This disclosure can be used, for example, to manage production floors.
10 作業管理システム
11 取得部
12 算出部
13 作成部
14 表示部
15 通信部
16 記憶部
20 生産装置
21 作業部
22 識別部
23 入力部
24 通信部
25 記憶部
30 携帯端末
REFERENCE SIGNS
Claims (15)
取得した前記エラー情報と、当該エラー情報より以前に取得した前記作業情報と前記識別情報とに基づいて、前記エラーに関連する作業評価値を算出する算出部と、を備える作業管理システム。 an acquisition unit that acquires task information relating to a plurality of tasks performed by at least one worker on a production device, identification information of the at least one worker related to the plurality of tasks, and error information indicating an error that has occurred in the production device;
A work management system comprising: a calculation unit that calculates a work evaluation value related to the error based on the acquired error information, the work information acquired prior to the error information, and the identification information.
少なくともひとりの作業者が行った生産装置に対する複数の作業に関する作業情報と、前記複数の作業に関連する前記少なくともひとりの作業者の識別情報と、前記生産装置で発生したエラーを示すエラー情報とを取得し、
取得した前記エラー情報と、当該エラー情報より以前に取得した前記作業情報と前記識別情報とに基づいて、前記エラーに関連する作業評価値を算出することを含む作業評価方法。 1. A computer-implemented task evaluation method, comprising:
Acquire task information relating to a plurality of tasks performed by at least one worker on a production device, identification information of the at least one worker related to the plurality of tasks, and error information indicating an error that has occurred in the production device;
An activity evaluation method comprising: calculating an activity evaluation value related to the error based on the acquired error information, the activity information acquired prior to the error information, and the identification information.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021031836A JP7620813B2 (en) | 2021-03-01 | 2021-03-01 | Work management system, work evaluation method, and work evaluation program |
| CN202210131259.4A CN114997553A (en) | 2021-03-01 | 2022-02-11 | Work management system, work evaluation method, and recording medium |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021031836A JP7620813B2 (en) | 2021-03-01 | 2021-03-01 | Work management system, work evaluation method, and work evaluation program |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2022133032A JP2022133032A (en) | 2022-09-13 |
| JP7620813B2 true JP7620813B2 (en) | 2025-01-24 |
Family
ID=83023426
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021031836A Active JP7620813B2 (en) | 2021-03-01 | 2021-03-01 | Work management system, work evaluation method, and work evaluation program |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JP7620813B2 (en) |
| CN (1) | CN114997553A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2025187052A1 (en) * | 2024-03-08 | 2025-09-12 | 株式会社Fuji | Work management device |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004138555A (en) | 2002-10-18 | 2004-05-13 | Seiko Epson Corp | Measurement support method, manufacturing support system, measurement support device, and program of measurement support method |
| JP2006343952A (en) | 2005-06-08 | 2006-12-21 | Fujitsu Ltd | Manufacturing management apparatus, manufacturing management method, and manufacturing management program |
| JP2008181341A (en) | 2007-01-24 | 2008-08-07 | Fuji Electric Holdings Co Ltd | Manufacturing failure factor analysis support device |
| JP2019101923A (en) | 2017-12-06 | 2019-06-24 | 横河電機株式会社 | Production support system, production support method, and program |
-
2021
- 2021-03-01 JP JP2021031836A patent/JP7620813B2/en active Active
-
2022
- 2022-02-11 CN CN202210131259.4A patent/CN114997553A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004138555A (en) | 2002-10-18 | 2004-05-13 | Seiko Epson Corp | Measurement support method, manufacturing support system, measurement support device, and program of measurement support method |
| JP2006343952A (en) | 2005-06-08 | 2006-12-21 | Fujitsu Ltd | Manufacturing management apparatus, manufacturing management method, and manufacturing management program |
| JP2008181341A (en) | 2007-01-24 | 2008-08-07 | Fuji Electric Holdings Co Ltd | Manufacturing failure factor analysis support device |
| JP2019101923A (en) | 2017-12-06 | 2019-06-24 | 横河電機株式会社 | Production support system, production support method, and program |
Also Published As
| Publication number | Publication date |
|---|---|
| CN114997553A (en) | 2022-09-02 |
| JP2022133032A (en) | 2022-09-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107003659B (en) | Job management device | |
| JP6272325B2 (en) | Mounting management device, mounting processing device, mounting system, mounting management method and mounting processing method | |
| JP7403041B2 (en) | Production control device and production planning method | |
| CN104684270B (en) | System and method of operation for monitoring and predicting failure of SMT equipment | |
| CN113518998B (en) | Counting system, counting device, machine learning device, counting method, parts configuration method, and recording medium | |
| CN105578864B (en) | Electronic component mounting system | |
| KR20190105093A (en) | Apparatus for inspecting parts mounted on a printed circuit board, a method of operating the same, and a computer readable recording medium | |
| CN109446016B (en) | A method, device and system for testing AR function of augmented reality technology | |
| JP7620813B2 (en) | Work management system, work evaluation method, and work evaluation program | |
| JP6130402B2 (en) | Mounting data management device, mounting control device, mounting data management method and program thereof | |
| CN114077896A (en) | Cause inference device, cause inference system and program | |
| CN113939838A (en) | Work management device and program | |
| US20200413583A1 (en) | Information processing device and information processing method | |
| JP2007194253A (en) | Mounting system | |
| CN111797993B (en) | Evaluation method and device of deep learning model, electronic equipment and storage medium | |
| JP7668447B2 (en) | Worker management system, worker management method and program | |
| JP7630099B2 (en) | Equipment migration support device and equipment migration support method | |
| CN114066131A (en) | Factor Estimation Device, Factor Estimation System, and Program | |
| CN108595332A (en) | Method for testing software and device | |
| JP2014120654A (en) | Mounting management device, inspection management device, mounting system, mounting management method and program therefor, and inspection management method and program therefor | |
| JP4212342B2 (en) | Board-to-board work line | |
| JP4690205B2 (en) | Mounting system | |
| JP2020149714A (en) | Work processing support method | |
| US20220171377A1 (en) | Mounted board manufacturing system | |
| JP7637925B2 (en) | Work management system, work management method and program |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240117 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240821 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240924 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20241122 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20241203 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20241223 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7620813 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |