Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7623919B2 - DATA PROCESSING APPARATUS AND DATA PROCESSING METHOD - Google Patents
[go: Go Back, main page]

JP7623919B2 - DATA PROCESSING APPARATUS AND DATA PROCESSING METHOD - Google Patents

DATA PROCESSING APPARATUS AND DATA PROCESSING METHOD Download PDF

Info

Publication number
JP7623919B2
JP7623919B2 JP2021157105A JP2021157105A JP7623919B2 JP 7623919 B2 JP7623919 B2 JP 7623919B2 JP 2021157105 A JP2021157105 A JP 2021157105A JP 2021157105 A JP2021157105 A JP 2021157105A JP 7623919 B2 JP7623919 B2 JP 7623919B2
Authority
JP
Japan
Prior art keywords
update
pipe
renewal
water pipes
period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021157105A
Other languages
Japanese (ja)
Other versions
JP2023047914A (en
Inventor
享志 西川
ゆかり 今出
Original Assignee
株式会社管総研
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社管総研 filed Critical 株式会社管総研
Priority to JP2021157105A priority Critical patent/JP7623919B2/en
Publication of JP2023047914A publication Critical patent/JP2023047914A/en
Application granted granted Critical
Publication of JP7623919B2 publication Critical patent/JP7623919B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、水道管の更新データを処理するためのデータ処理装置、データ処理方法、および、当該装置または方法において用いられる属性データの構造に関する。 The present invention relates to a data processing device and a data processing method for processing water pipe update data, and the structure of attribute data used in the device or method.

特許文献1には、水道事業者が水道管の更新計画を立案する為の水道管更新管理システムが開示されている。当該水道管更新管理システムは、水道管の更新の優先度を示す評価情報を算出し、当該評価情報が紐づけられた水道管の情報の一覧を出力する。 Patent Document 1 discloses a water pipe renewal management system that enables water utilities to create water pipe renewal plans. The water pipe renewal management system calculates evaluation information that indicates the priority of water pipe renewal, and outputs a list of water pipe information linked to the evaluation information.

特開2018-63471号公報JP 2018-63471 A

更新計画に基づく水道管の更新は、更新の計画を示す図(更新計画図)および表(更新計画表)、並びに更新の実績を示す図(更新実績図)および表(更新実績表)を作成して管理される。更新が計画通りに進捗しない場合には、計画者が更新計画図と更新実績図とを対比すると共に、更新計画表と更新実績表とを対比し、計画者が手作業で進捗の集計および計画の見直しを行う。このため、集計にミスが生じる可能性があった。また、計画の見直しが計画者の技量に依存するため、一律の管理が困難であった。 Water pipe replacement based on a replacement plan is managed by creating a diagram (renewal plan diagram) and table (renewal plan table) showing the replacement plan, as well as a diagram (renewal performance diagram) and table (renewal performance table) showing the performance of the replacement. If the replacement does not progress as planned, the planner compares the replacement plan diagram with the replacement performance diagram, as well as the replacement plan table with the replacement performance table, and manually tallys up the progress and reviews the plan. This can lead to errors in the tally. Also, because reviewing the plan depends on the skill of the planner, uniform management is difficult.

本発明の一態様は、水道管の更新を適切に管理可能なデータ処理装置などを実現することを目的とする。 One aspect of the present invention aims to realize a data processing device that can appropriately manage water pipe renewal.

上記の課題を解決するために、本発明の一態様に係るデータ処理装置は、複数の水道管のそれぞれについて、敷設場所、管種、口径、管路長、更新予定期間および敷設状態を少なくとも示す属性データに基づき、当該複数の水道管の前記敷設場所を示すマップ上に前記複数の水道管の前記更新予定期間が示された更新計画図を作成する更新計画図作成部と、前記属性データに基づき、前記更新予定期間毎かつ前記管種および前記口径毎に、当該更新予定期間に更新される前記複数の水道管の前記管路長の合計が示された更新計画表を作成する更新計画表作成部と、前記複数の水道管のいずれかについて前記敷設状態が変更された場合、当該変更を前記属性データに反映するとともに、当該反映された属性データに基づき前記敷設状態が変更された後の前記管路長を前記更新計画表に入力して前記更新計画表を改訂する更新計画表改訂部と、を備える。 In order to solve the above problem, a data processing device according to one aspect of the present invention includes an update plan creation unit that creates an update plan showing the planned update periods of the multiple water pipes on a map showing the installation locations of the multiple water pipes based on attribute data showing at least the installation location, pipe type, diameter, pipeline length, planned update period, and installation state for each of the multiple water pipes; an update plan table creation unit that creates an update plan table showing the total pipeline length of the multiple water pipes to be updated during the planned update period for each planned update period and for each pipe type and diameter based on the attribute data; and an update plan table revision unit that, when the installation state of any of the multiple water pipes is changed, reflects the change in the attribute data and revises the update plan table by inputting the pipeline length after the installation state is changed based on the reflected attribute data.

上記の構成によれば、データ処理装置においては、更新計画図作成部が属性データに基づいて更新計画図を作成する。また、更新計画表作成部が属性データに基づいて更新計画表を作成する。更新計画表改訂部は、更新計画図に示された水道管の敷設状態が変更された場合に、敷設状態が変更された水道管の管路長に基づいて更新計画表を自動的に改訂する。したがって、ユーザによる更新実績の集計ミスが防止されるとともに、ユーザに依存しない一律の管理が行われるようになる。すなわち、水道管の更新を適切に管理できる。 According to the above configuration, in the data processing device, the update plan drawing creation unit creates an update plan drawing based on the attribute data. Also, the update plan table creation unit creates an update plan table based on the attribute data. When the installation state of the water pipe shown in the update plan drawing is changed, the update plan table revision unit automatically revises the update plan table based on the pipe length of the water pipe whose installation state has been changed. This prevents users from making mistakes in compiling the update record, and allows uniform management that is independent of the user. In other words, water pipe updates can be managed appropriately.

また、本発明の一態様に係るデータ処理装置において、前記更新計画表改訂部は、前記敷設状態が変更された水道管の前記管路長を、前記管種および前記口径毎に集計するとともに前記更新計画表に入力して前記更新計画表を改訂するものであってもよい。 In addition, in a data processing device according to one aspect of the present invention, the update plan table revision unit may compile the pipeline lengths of the water pipes whose installation state has been changed for each pipe type and diameter, and input the pipeline lengths into the update plan table to revise the update plan table.

上記の構成によれば、変更された管路長を管種および口径毎に入力することで、管路長を基準とした進捗を容易に把握できる。 With the above configuration, the progress based on the pipeline length can be easily understood by inputting the changed pipeline length for each pipe type and diameter.

また、本発明の一態様に係るデータ処理装置は、前記敷設状態が変更された後の前記属性データに基づき、前記更新計画図に対して前記水道管に係る敷設状態の変更を反映させた更新実績図を作成する更新実績図作成部をさらに備え、前記属性データは、前記敷設状態が変更された時期を示す敷設状態変更時期をさらに含み、前記更新実績図作成部は、前記属性データにおける前記敷設状態が変更された前記水道管について、変更後の敷設状態によらず、前記敷設状態変更時期に応じた表示態様で表示するものである。 The data processing device according to one aspect of the present invention further includes an update performance diagram creation unit that creates an update performance diagram that reflects the change in the installation status of the water pipe in the update plan diagram based on the attribute data after the installation status has been changed, and the attribute data further includes an installation status change time that indicates the time when the installation status was changed, and the update performance diagram creation unit displays the water pipe whose installation status in the attribute data has been changed in a display mode according to the installation status change time, regardless of the installation status after the change.

上記の構成によれば、ユーザは、敷設状態が変更された水道管を、変更後の敷設状態を問わず、敷設状態が変更された年度毎に把握できる。 According to the above configuration, the user can know the water pipes whose installation status has been changed by the year in which the installation status was changed, regardless of the installation status after the change.

また、本発明の一態様に係るデータ処理装置において、前記更新実績図作成部は、前記敷設状態が更新済の状態に変更された前記水道管の表示態様を、前記敷設状態が未更新の状態の水道管の表示態様と異ならせることにより、前記更新実績図を作成するものであってもよい。 In addition, in a data processing device according to one aspect of the present invention, the update history diagram creation unit may create the update history diagram by making the display mode of the water pipe whose installation state has been changed to an updated state different from the display mode of the water pipe whose installation state has not been updated.

上記の構成によれば、更新実績図において、更新前の水道管および更新済の水道管を一見して容易に視認できる。 With the above configuration, the water pipes before and after the renewal can be easily identified at a glance in the renewal performance diagram.

また、本発明の一態様に係るデータ処理装置において、任意の更新予定期間を第1更新予定期間とし、当該第1更新予定期間よりも後の更新予定期間を第2更新予定期間とした場合、前記更新計画表作成部は、(i)前記第1更新予定期間において更新予定とされた前記水道管について前記管種および前記口径毎の前記管路長の合計と、(ii)前記第1更新予定期間における更新実績に含まれる前記管種および前記口径毎の前記管路長の合計と、の差分に基づいて、前記第2更新予定期間において更新予定である前記水道管について前記管種および前記口径毎に前記管路長の合計を修正するものであってもよい。 In addition, in a data processing device according to one aspect of the present invention, when an arbitrary planned update period is set as a first planned update period and an update period subsequent to the first planned update period is set as a second planned update period, the update plan table creation unit may revise the total pipe length for each pipe type and caliber for the water pipes scheduled for update in the second planned update period based on the difference between (i) the total pipe length for each pipe type and caliber for the water pipes scheduled for update in the first planned update period and (ii) the total pipe length for each pipe type and caliber included in the update record for the first planned update period.

上記の構成によれば、第1更新予定期間よりも後の第2更新予定期間において更新予定である水道管について、管種および口径毎に管路長の合計を把握することができ、水道管の更新計画の修正に係る作業を省力化することができる。 According to the above configuration, for water pipes scheduled for renewal in a second renewal schedule period that is later than the first renewal schedule period, the total pipe length can be ascertained for each pipe type and diameter, thereby reducing the work involved in revising water pipe renewal plans.

また、本発明の一態様に係るデータ処理装置は、前記水道管の管路長に、当該水道管の前記管種および前記口径に応じた係数を乗じることで、前記水道管の敷設に要する予算を算出する予算算出部をさらに備えてもよい。 The data processing device according to one aspect of the present invention may further include a budget calculation unit that calculates the budget required to lay the water pipe by multiplying the pipeline length of the water pipe by a coefficient corresponding to the pipe type and the diameter of the water pipe.

上記の構成によれば、水道管の更新に要する予算を算出する作業を省力化することができる。 The above configuration can reduce the labor required to calculate the budget required for water pipe renewal.

また、本発明の一態様に係るデータ処理方法は、複数の水道管のそれぞれについて、敷設場所、管種、口径、管路長、更新予定期間および敷設状態を少なくとも示す属性データに基づき、当該複数の水道管の前記敷設場所を示すマップ上に前記複数の水道管の前記更新予定期間が示された更新計画図を作成する更新計画図作成ステップと、前記属性データに基づき、前記更新予定期間毎かつ前記管種および前記口径毎に、当該更新予定期間に更新される前記複数の水道管の前記管路長の合計が示された更新計画表を作成する更新計画表作成ステップと、前記複数の水道管のいずれかについて前記敷設状態が変更された場合に、当該変更を前記属性データに反映するとともに、当該反映された属性データに基づき前記敷設状態が変更された後の前記管路長を前記更新計画表に入力して前記更新計画表を改訂する更新計画表改訂ステップと、を含む。 In addition, a data processing method according to one aspect of the present invention includes an update plan drawing step of drawing an update plan drawing showing the planned update periods of the multiple water pipes on a map showing the locations of the multiple water pipes based on attribute data showing at least the installation location, pipe type, diameter, pipeline length, planned update period, and installation state for each of the multiple water pipes; an update plan table drawing step of drawing an update plan table showing the total pipeline length of the multiple water pipes to be updated during the planned update period for each planned update period and for each pipe type and diameter based on the attribute data; and an update plan table revising step of reflecting the change in the attribute data when the installation state of any of the multiple water pipes is changed, and revising the update plan table by inputting the pipeline length after the installation state is changed based on the reflected attribute data into the update plan table.

上記の構成によれば、上記のデータ処理装置と同様の効果を奏する。 The above configuration provides the same effects as the above data processing device.

また、本発明の一態様に係る属性データは、複数の水道管それぞれについて敷設場所を示すマップ上に、前記複数の水道管のそれぞれに係る更新予定期間が示された更新計画図を作成するデータ処理装置に用いられる水道管の属性データであって、前記属性データは、複数の水道管のそれぞれについて、敷設場所、管種、口径、管路長、更新予定期間および敷設状態を少なくとも示すものであり、前記データ処理装置の更新計画表作成部が、前記更新予定期間毎かつ前記管種および前記口径毎に、当該更新予定期間に更新される前記複数の水道管の前記管路長の合計が示された更新計画表を作成する処理に用いられ、前記データ処理装置の更新計画表改訂部が、前記複数の水道管のいずれかについて前記敷設状態が変更された場合に、前記敷設状態が変更された後の前記管路長を前記更新計画表に入力して前記更新計画表を改訂する処理に用いられる。 In addition, the attribute data according to one aspect of the present invention is attribute data of water pipes used in a data processing device that creates an update plan showing the planned update period for each of a plurality of water pipes on a map showing the installation location of each of the plurality of water pipes, the attribute data indicating at least the installation location, pipe type, diameter, pipeline length, planned update period, and installation status for each of the plurality of water pipes, the update plan table creation unit of the data processing device is used in a process of creating an update plan table showing the total pipeline length of the plurality of water pipes to be updated during the planned update period for each planned update period and for each pipe type and diameter, and the update plan table revision unit of the data processing device is used in a process of revising the update plan table by inputting the pipeline length after the installation status has been changed into the update plan table when the installation status of any of the plurality of water pipes has been changed.

また、本発明の一態様に係る属性データは、さらに、前記敷設状態が変更された時期を示す敷設状態変更時期を含み、前記データ処理装置の更新実績図作成部が、前記更新計画図に対して前記水道管に係る敷設状態の変更が反映された更新実績図であって、前記敷設状態が変更された前記水道管については変更後の敷設状態によらず、前記敷設状態変更時期に応じた表示態様で表示する更新実績図を作成する処理に用いられる。 The attribute data according to one embodiment of the present invention further includes a laying condition change time indicating the time when the laying condition was changed, and is used by the update performance chart creation unit of the data processing device in a process of creating an update performance chart in which the change in the laying condition of the water pipe is reflected in the update plan chart, and the water pipe whose laying condition has been changed is displayed in a display mode according to the laying condition change time, regardless of the changed laying condition.

本発明の一態様に係るデータ処理装置、データ処理方法および属性データによれば、水道管の更新を適切に管理できる。 The data processing device, data processing method, and attribute data according to one aspect of the present invention allow for proper management of water pipe updates.

データ処理装置の、要部の構成の例を示すブロック図である。1 is a block diagram showing an example of a configuration of a main part of a data processing device; 更新計画図の例を示す図である。FIG. 13 is a diagram showing an example of an update plan. 属性データの表示の例を示す図である。FIG. 13 is a diagram showing an example of display of attribute data. 更新計画表の例を示す図である。FIG. 13 is a diagram illustrating an example of an update plan table. 更新実績図の例を示す図である。FIG. 13 is a diagram showing an example of an update record diagram. 制御部による処理の例を示すフローチャートである。13 is a flowchart illustrating an example of a process performed by a control unit.

〔実施形態〕
以下、本発明の一実施形態について、詳細に説明する。
[Embodiment]
Hereinafter, one embodiment of the present invention will be described in detail.

図1は、本発明の実施形態に係るデータ処理装置1の、要部の構成の例を示すブロック図である。図1に示すように、データ処理装置1は、制御部10、入力受付部20、表示部30、および記憶部40を備える。 FIG. 1 is a block diagram showing an example of the configuration of the main parts of a data processing device 1 according to an embodiment of the present invention. As shown in FIG. 1, the data processing device 1 includes a control unit 10, an input receiving unit 20, a display unit 30, and a storage unit 40.

制御部10は、データ処理装置1の動作を制御する。制御部10は、更新計画図作成部11、更新計画表作成部12、および更新計画表改訂部13を備える。また、制御部10は、更新実績図作成部14および費用算出部15(予算算出部)をさらに備える。 The control unit 10 controls the operation of the data processing device 1. The control unit 10 includes an update plan drawing creation unit 11, an update plan table creation unit 12, and an update plan table revision unit 13. The control unit 10 further includes an update performance drawing creation unit 14 and a cost calculation unit 15 (budget calculation unit).

更新計画図作成部11は、複数の水道管のそれぞれについての属性データに基づき、更新計画図を作成する。属性データは、複数の水道管のそれぞれについての、敷設場所、管種、口径、管路長、更新予定期間および敷設状態を少なくとも示す。このうち、敷設状態は、水道管が更新前であるか、更新済であるか、または撤去済であるかを示す。更新計画図は、当該複数の水道管の敷設場所を示すマップ上に、当該複数の水道管の更新予定期間が示されたものである。 The renewal plan creation unit 11 creates a renewal plan based on attribute data for each of the multiple water pipes. The attribute data indicates at least the installation location, pipe type, diameter, pipeline length, planned renewal period, and installation status for each of the multiple water pipes. Of these, the installation status indicates whether the water pipe is before renewal, has been renewed, or has been removed. The renewal plan shows the planned renewal period for the multiple water pipes on a map showing the installation locations of the multiple water pipes.

図2は、更新計画図の例を示す図である。更新計画図においては、複数の水道管が、更新予定期間毎に異なる表示態様で示される。例えば、更新計画図においては、複数の水道管が、更新予定期間毎に異なる色で示される。ただし、図2においては便宜上、色の違いを模様の違いで示している。図2に示す例では、更新予定期間は年度である。具体的には、略南北に延在する水道管P1、および略東西に延在する水道管P2の更新予定期間が2021年度であることが示されている。なお、更新予定期間が2022年度以降である水道管については、図2に示す例では凡例にのみ表れている。 Figure 2 is a diagram showing an example of an update plan diagram. In the update plan diagram, multiple water pipes are displayed in different display modes for each planned update period. For example, in the update plan diagram, multiple water pipes are displayed in different colors for each planned update period. However, for convenience in FIG. 2, the difference in color is shown by a different pattern. In the example shown in FIG. 2, the planned update period is a fiscal year. Specifically, the planned update period for water pipe P1 extending approximately north-south and water pipe P2 extending approximately east-west is shown to be fiscal year 2021. Note that in the example shown in FIG. 2, water pipes with a planned update period of fiscal year 2022 or later are only shown in the legend.

ただし、更新計画図においては、複数の水道管が、更新予定期間毎に異なる線種または模様で示されていてもよい。また、更新予定期間は年度ではなく、半年、または2年といった任意の期間であってもよい。 However, in the renewal plan drawing, multiple water pipes may be shown with different line types or patterns for each planned renewal period. In addition, the planned renewal period does not have to be an annual period, but may be any period such as six months or two years.

図3は、属性データの表示の例を示す図である。また、図3は、データ処理装置1に用いられる属性データの構造を示す図でもある。図2に示したような更新計画図において、ユーザがいずれかの水道管を選択すると、図3に示すような、属性データを示すウインドウが表示される。図3に示すウインドウにおいて、欄C11に示されている「ユニークキー」および欄C12に示されている「FID_KEY」は、個々の水道管に固有のデータである。「ユニークキー」および「FID_KEY」は、水道管の図形属性と紐づけられている。図形属性には、地図上における水道管の敷設場所を示す座標データが含まれている。すなわち、属性データにおいて、「ユニークキー」および「FID_KEY」は、水道管の敷設場所を示す。 Figure 3 is a diagram showing an example of the display of attribute data. Figure 3 is also a diagram showing the structure of attribute data used in the data processing device 1. When a user selects any water pipe in the update plan diagram shown in Figure 2, a window showing attribute data is displayed as shown in Figure 3. In the window shown in Figure 3, the "unique key" shown in column C11 and the "FID_KEY" shown in column C12 are data unique to each water pipe. The "unique key" and "FID_KEY" are linked to the graphic attributes of the water pipe. The graphic attributes include coordinate data indicating the location of the water pipe on the map. That is, in the attribute data, the "unique key" and "FID_KEY" indicate the location of the water pipe.

図3に示すウインドウにおいて、欄C13に示されている「管種」は、水道管の管種を示す。欄C14に示されている「口径」は、水道管の口径を示す。欄C15に示されている「平面延長」は、水道管の管路長を示す。 In the window shown in FIG. 3, the "Pipe type" shown in column C13 indicates the type of water pipe. The "Diameter" shown in column C14 indicates the diameter of the water pipe. The "Plane extension" shown in column C15 indicates the pipe length of the water pipe.

また、図3に示すウインドウにおいて、欄C16に示されている「当初計画年」が、属性データにおける更新予定期間の年度を示す。欄C17に示されている「最新更新年」は、水道管が更新された年度を示す。欄C18に示されている「更新実績年」は、水道管が撤去された年度を示す。「最新更新年」および「更新実績年」における値の入力の状態が、水道管の敷設状態を示す。 In addition, in the window shown in FIG. 3, the "Initial Planned Year" shown in column C16 indicates the year of the planned update period in the attribute data. The "Last Updated Year" shown in column C17 indicates the year in which the water pipe was updated. The "Actual Update Year" shown in column C18 indicates the year in which the water pipe was removed. The state of input values in the "Last Updated Year" and "Actual Update Year" indicates the installation state of the water pipe.

「当初計画年」には、更新計画が最初に作成された時点での更新予定期間を示す値が入力される。「最新更新年」には、初期値として、「当初計画年」の値と同じ値が入力される。年度が移行したとき、更新されていない水道管については、「最新更新年」の値が新しい年度を示す値に更新される。したがって、「最新更新年」の値が現在の年度を示している場合には、水道管の敷設状態は更新前である。一方、年度が移行したとき、更新されている水道管については、「最新更新年」の値が更新されない。したがって、「最新更新年」の値が現在の年度よりも前の年度を示している場合には、水道管の敷設状態は更新済である。「更新実績年」には、水道管が撤去された場合にのみ値が入力される。したがって、「更新実績年」に値が入力されている場合には、水道管の敷設状態は撤去済である。これらの属性データの更新については、作業者が行ってもよい。また、これらの属性データの更新を行う機能を制御部10が別途有していてもよい。 In the "initial planning year", a value indicating the planned renewal period at the time when the renewal plan was first created is input. In the "last renewal year", the same value as the value of the "initial planning year" is input as the initial value. When the fiscal year changes, for water pipes that have not been renewed, the value of the "last renewal year" is updated to a value indicating the new fiscal year. Therefore, when the value of the "last renewal year" indicates the current fiscal year, the installation state of the water pipe is before renewal. On the other hand, when the fiscal year changes, the value of the "last renewal year" is not updated for water pipes that have been renewed. Therefore, when the value of the "last renewal year" indicates a fiscal year prior to the current fiscal year, the installation state of the water pipe has been updated. In the "actual renewal year", a value is input only when the water pipe has been removed. Therefore, when a value is input in the "actual renewal year", the installation state of the water pipe has been removed. The updating of these attribute data may be performed by an operator. In addition, the control unit 10 may have a separate function for updating these attribute data.

また、敷設状態が更新済である場合における「最新更新年」および敷設状態が撤去済である「更新実績年」は、敷設状態が変更された時期を示す。したがって、図3に示した例において、属性データは敷設状態が変更された時期を示す敷設状態変更時期を含むと言える。 In addition, "Last update year" when the installation status has been updated, and "Year of previous update" when the installation status has been removed, indicate the time when the installation status was changed. Therefore, in the example shown in Figure 3, it can be said that the attribute data includes the installation status change time, which indicates the time when the installation status was changed.

更新計画表作成部12は、複数の水道管のそれぞれについて、上述の図3に示す構成の属性データに基づき、更新計画表を作成する。更新計画表は、水道管の更新予定期間毎、かつ管種および口径毎に、当該更新予定期間に更新される複数の水道管の管路長の合計が示されたものであり、以下により具体的に説明する。 The renewal plan table creation unit 12 creates a renewal plan table for each of the multiple water pipes based on the attribute data configured as shown in FIG. 3 above. The renewal plan table shows the total pipeline length of the multiple water pipes to be renewed during each planned renewal period for each water pipe type and diameter, and will be described in more detail below.

図4は、更新計画表の例を示す図である。図4に示す例において、領域R1は、工種、管種、および口径を示す領域である。図4に示す例では、管種を「品種」と称している。また、図4に示す例では、口径を「形状寸法」と称している。領域R1において、水道管の更新の工種別は、「配水管敷設」として示されている。また、図4に示す例においては、水道管の更新の他、消火栓設備または給水栓の更新といった、水道管の更新以外の工種別についても示されている。管種は、水道管の材質または方式に由来する種類を示すものである。管種には、ダクタイル鉄管またはポリエチレン管といった分類が存在する。 Figure 4 is a diagram showing an example of a renewal plan table. In the example shown in Figure 4, area R1 is an area showing the type of work, pipe type, and diameter. In the example shown in Figure 4, the pipe type is called "product type." Also, in the example shown in Figure 4, the diameter is called "shape and dimension." In area R1, the type of work for water pipe renewal is shown as "water distribution pipe installation." Also, in the example shown in Figure 4, in addition to water pipe renewal, types of work other than water pipe renewal, such as renewal of fire hydrant equipment or water supply hydrants, are also shown. Pipe type indicates the type derived from the material or method of the water pipe. Pipe types include classifications such as ductile iron pipe and polyethylene pipe.

領域R2は、管種および口径毎の水道管の管路長、および当該管路長の更新に要する予算(以下では「水道管の予算」または「予算」と称する場合がある)を示す領域である。また、領域R2は、上述した水道管の更新以外の工種別についての数量および予算も併せて示す領域である。簡単のため、図4においては、領域R2のうち、水道管の管路長または数量を示す領域について、単に「数量」と称している。領域R2における水道管の管路長は、更新計画の期間全体で更新される管路長の、管種および口径毎の総計である。また、領域R2における水道管の予算は、更新計画の期間全体で更新に要する予算の、管種および口径毎の総計である。水道管の予算は、水道管の管路長に所定の係数を乗じて算出される。所定の係数は工種毎、かつ管種および口径毎に予め設定されている。 Region R2 indicates the length of the water pipes for each pipe type and caliber, and the budget required for updating the length of the pipes (hereinafter, sometimes referred to as the "water pipe budget" or "budget"). Region R2 also indicates the quantity and budget for each type of work other than the above-mentioned water pipe renewal. For simplicity, in FIG. 4, the region indicating the length or quantity of the water pipes in region R2 is simply referred to as "quantity". The length of the water pipes in region R2 is the total of the pipe lengths to be renewed over the entire period of the renewal plan, for each pipe type and caliber. The budget of the water pipes in region R2 is the total of the budget required for renewal over the entire period of the renewal plan, for each pipe type and caliber. The budget of the water pipes is calculated by multiplying the length of the water pipes by a predetermined coefficient. The predetermined coefficient is preset for each type of work and for each pipe type and caliber.

領域R3は、水道管の管路長、および水道管の予算を、管種および口径毎に示す領域である。領域R3における水道管の予算は、上述した領域R2における水道管の予算と同様にして算出される。更新計画表作成部12は、複数の水道管について、属性データにおける更新予定期間毎、かつ管種および口径毎に、属性データにおける管路長の和、および当該和に基づいて算出される予算を入力する。例えば、領域R3における欄C21は、2021年度における、口径が200mmであるダクタイル鉄管についての管路長を示す欄である。また、領域R3における欄C22は、2021年度における、口径が200mmであるダクタイル鉄管についての予算を示す欄である。 Area R3 is an area showing the pipeline length of the water pipe and the budget for the water pipe for each pipe type and caliber. The budget for the water pipe in area R3 is calculated in the same manner as the budget for the water pipe in area R2 described above. The renewal plan table creation unit 12 inputs the sum of the pipeline lengths in the attribute data for multiple water pipes for each planned renewal period in the attribute data and for each pipe type and caliber, and the budget calculated based on the sum. For example, column C21 in area R3 is a column showing the pipeline length for a ductile iron pipe with a caliber of 200 mm in fiscal year 2021. Column C22 in area R3 is a column showing the budget for a ductile iron pipe with a caliber of 200 mm in fiscal year 2021.

また、領域R3では、更新予定の水道管の管路長を示す欄の下側に、実際に更新された管路長を示す欄が設けられている。さらに、更新予定の水道管の予算を示す欄の下側に、実際の更新に要した費用を示す欄が設けられている。例えば、領域R3における欄C23は、2021年度に実際に更新された、口径が200mmであるダクタイル鉄管についての管路長を示す欄である。また、領域R3における欄C24は、2021年度に実際に更新された、口径が200mmであるダクタイル鉄管についての更新に要した費用を示す欄である。実際に更新された管路長および要した費用を示す欄は、更新の進捗に応じて、後述する更新計画表改訂部13により改訂される。このため、更新予定の管路長および予算と、実際に更新された管路長および要した費用とを、更新予定期間毎、かつ管種および口径毎に容易に比較できる。 In addition, in region R3, a column showing the actually updated pipeline length is provided below the column showing the pipeline length of the water pipe to be updated. Furthermore, a column showing the actual cost required for the update is provided below the column showing the budget for the water pipe to be updated. For example, column C23 in region R3 is a column showing the pipeline length for a ductile iron pipe with a diameter of 200 mm that was actually updated in fiscal year 2021. Also, column C24 in region R3 is a column showing the cost required for the update of a ductile iron pipe with a diameter of 200 mm that was actually updated in fiscal year 2021. The column showing the actually updated pipeline length and the cost required is revised by the update plan table revision unit 13 described later according to the progress of the update. Therefore, the pipeline length and budget to be updated and the actually updated pipeline length and the cost required can be easily compared for each planned update period and for each pipe type and diameter.

また、更新計画表作成部12は、更新の進捗に応じて更新計画表を修正してもよい。具体的には、任意の更新予定期間を第1更新予定期間とし、当該第1更新予定期間よりも後の更新予定期間を第2更新予定期間とする。このとき、更新計画表作成部12は、(i)第1更新予定期間において更新予定とされた水道管について管種および口径毎の管路長の合計と、(ii)第1更新予定期間における更新実績に含まれる管種および口径毎の管路長の合計と、の差分を算出する。ここでいう「第1更新予定期間における更新実績に含まれる」とは、属性データにおける敷設状態変更時期、すなわち上述した「最新更新年」または「更新実績年」が第1更新予定期間であることを意味する。そして、更新計画表作成部12は、算出した差分に基づいて、第2更新予定期間において更新予定である水道管について、管種および口径毎に管路長の合計を修正する。すなわち、更新計画表作成部12は、属性データにおいて、更新予定期間が第1更新予定期間であり、かつ「最新更新年」および「更新実績年」に値が入力されていない水道管について、管種および口径毎に管路長の合計を算出する。さらに、更新計画表作成部12は、算出した合計を、管種および口径が同じであり、かつ更新予定期間が第2更新予定期間である水道管の、管路長の合計に加算する。このため、ユーザは第1更新予定期間よりも後の第2更新予定期間において更新予定である水道管について、管種および口径毎に管路長の合計を把握することができる。したがって、水道管の更新計画の修正に係る作業を省力化することができる。 The update plan table creation unit 12 may also revise the update plan table according to the progress of the update. Specifically, an arbitrary scheduled update period is set as the first scheduled update period, and a scheduled update period after the first scheduled update period is set as the second scheduled update period. At this time, the update plan table creation unit 12 calculates the difference between (i) the total pipe length for each pipe type and diameter for the water pipes scheduled for update in the first scheduled update period, and (ii) the total pipe length for each pipe type and diameter included in the update record in the first scheduled update period. Here, "included in the update record in the first scheduled update period" means that the time of change in the laying state in the attribute data, that is, the above-mentioned "latest update year" or "update record year", is the first scheduled update period. Then, the update plan table creation unit 12 revise the total pipe length for each pipe type and diameter for the water pipes scheduled for update in the second scheduled update period based on the calculated difference. That is, the renewal plan table creation unit 12 calculates the total pipe length for each pipe type and diameter for water pipes whose attribute data indicates that the planned renewal period is the first planned renewal period and that no values have been entered in the "Latest renewal year" and "Renewal performance year". Furthermore, the renewal plan table creation unit 12 adds the calculated total to the total pipe length for water pipes whose pipe type and diameter are the same and whose planned renewal period is the second planned renewal period. This allows the user to grasp the total pipe length for each pipe type and diameter for water pipes that are scheduled to be renewed in the second planned renewal period, which is later than the first planned renewal period. This makes it possible to reduce the work involved in revising the renewal plan for water pipes.

例えば、いずれかの管種および口径について、2021年度における更新実績に含まれる管路長の合計が、2021年度において更新予定とされた管路長の合計よりも5m短かったとする。この場合、更新計画表作成部12は、2021年度よりも後の年度、例えば2026年度以降において更新予定である、当該管種および口径の管路長に5mを加算する。更新計画表作成部12は、単一の年度において更新予定である管路長に5mを加算してもよい。また、更新計画表作成部12は、複数の年度のそれぞれにおいて更新予定である管路長に、合計が5mになるように加算してもよい。 For example, for a certain pipe type and caliber, the total pipeline length included in the renewal results for fiscal year 2021 is 5 m shorter than the total pipeline length scheduled for renewal in fiscal year 2021. In this case, the renewal plan table creation unit 12 adds 5 m to the pipeline length of that pipe type and caliber that is scheduled to be renewed in a year after fiscal year 2021, for example, fiscal year 2026 or later. The renewal plan table creation unit 12 may add 5 m to the pipeline length that is scheduled to be renewed in a single fiscal year. The renewal plan table creation unit 12 may also add to the pipeline length that is scheduled to be renewed in each of multiple fiscal years so that the total comes to 5 m.

更新計画表改訂部13は、複数の水道管のいずれかについて敷設状態が変更された場合、当該変更を属性データに反映する。また、更新計画表改訂部13は、敷設状態の変更が反映された属性データに基づき、敷設状態が変更された後の管路長を更新計画表に入力して更新計画表を改訂する。 When the installation state of any of the multiple water pipes is changed, the update plan table revising unit 13 reflects the change in the attribute data. In addition, the update plan table revising unit 13 revises the update plan table by inputting the pipeline length after the installation state has been changed into the update plan table based on the attribute data reflecting the change in the installation state.

例えば図2に示した更新計画図に示されている水道管P1を2021年度に更新した場合、ユーザは、更新計画図において水道管P1を選択して図3に示した属性データのウインドウを表示させる。ユーザは、当該ウインドウにおいて、「最新更新年」の欄に2021との値を入力する。このとき、更新計画表改訂部13は、入力された値を水道管P1の属性データに反映する。さらに、更新計画表改訂部13は、図4に示した更新計画表における水道管P1の管種および口径の、2021年度の欄に記載されている管路長に、水道管P1の管路長を加算する。 For example, if the water pipe P1 shown in the renewal plan diagram shown in FIG. 2 is renewed in fiscal year 2021, the user selects the water pipe P1 in the renewal plan diagram to display the attribute data window shown in FIG. 3. In the window, the user inputs the value 2021 in the "Last renewal year" field. At this time, the renewal plan table revising unit 13 reflects the input value in the attribute data of the water pipe P1. Furthermore, the renewal plan table revising unit 13 adds the pipe length of the water pipe P1 to the pipe length entered in the fiscal year 2021 field for the pipe type and caliber of the water pipe P1 in the renewal plan diagram shown in FIG. 4.

具体的には、更新計画表改訂部13は、敷設状態が変更された水道管の管路長を、管種および口径毎に集計するとともに更新計画表に入力して更新計画表を改訂する。このため、ユーザは、水道管の更新計画の進捗状況を、管路長を基準として容易に把握できる。 Specifically, the renewal plan table revising unit 13 tally up the pipe lengths of water pipes whose installation status has been changed by pipe type and diameter, and inputs the results into the renewal plan table to revise the renewal plan table. This allows the user to easily grasp the progress of the water pipe renewal plan based on the pipe length.

更新実績図作成部14は、敷設状態が変更された後の属性データに基づき、更新実績図を作成する。更新実績図は、更新計画図に対して水道管に係る敷設状態の変更を反映させたものである。更新実績図作成部14は、更新実績図において、敷設状態が変更された水道管について、変更後の敷設状態によらず、敷設状態変更時期に応じた表示態様で表示する。具体的には、更新実績図作成部14は、属性データにおける敷設状態変更時期を参照して、更新実績図における水道管の表示態様を決定する。例えば、更新実績図作成部14は、2021年に更新された水道管と、2021年に撤去された水道管とを、同じ色で表示する。したがって、ユーザは、敷設状態が変更された水道管を、敷設状態が更新済および撤去済のいずれに変更されたかを問わず、敷設状態が変更された年度毎に把握できる。 The update performance diagram creation unit 14 creates an update performance diagram based on the attribute data after the laying state has been changed. The update performance diagram is a diagram that reflects the change in the laying state of the water pipe in the update plan diagram. The update performance diagram creation unit 14 displays the water pipe whose laying state has been changed in the update performance diagram in a display mode according to the time of the laying state change, regardless of the laying state after the change. Specifically, the update performance diagram creation unit 14 determines the display mode of the water pipe in the update performance diagram by referring to the time of the laying state change in the attribute data. For example, the update performance diagram creation unit 14 displays the water pipe that was updated in 2021 and the water pipe that was removed in 2021 in the same color. Therefore, the user can grasp the water pipe whose laying state has been changed for each year in which the laying state was changed, regardless of whether the laying state was changed to updated or removed.

また、更新実績図作成部14は、敷設状態が更新済の状態に変更された水道管の表示態様を、敷設状態が未更新の状態の水道管の表示態様と異ならせることにより、更新実績図を作成する。このため、ユーザは、更新実績図において、更新前の水道管および更新済の水道管を容易に視認できる。 The update history diagram creation unit 14 creates the update history diagram by making the display mode of water pipes whose installation state has been changed to an updated state different from the display mode of water pipes whose installation state has not been updated. This allows the user to easily visually identify the water pipes before the update and the water pipes that have been updated in the update history diagram.

図5は、更新実績図の例を示す図である。図5に示す例では、更新実績図作成部14は、敷設状態が更新済の状態に変更された水道管の色を、敷設状態が未更新の状態の水道管の色と異ならせることにより更新実績図を作成する。 Figure 5 is a diagram showing an example of an update performance diagram. In the example shown in Figure 5, the update performance diagram creation unit 14 creates the update performance diagram by making the color of water pipes whose installation state has been changed to an updated state different from the color of water pipes whose installation state has not been updated.

図5に示す例では、水道管P1、および、水道管P2の一部である水道管P21が更新されている。一方で、水道管P2の、水道管P21とは別の一部である水道管P22については更新されていない。このため、更新実績図では、水道管P1・P21と、水道管P22とが、互いに異なる色で示される。ただし、図5に示す例では便宜上、水道管P1・P21と、水道管P22とが、互いに異なる模様で示されている。また、図5に示す例では、更新が完了した水道管の管路長を口径毎に示す領域R4が更新実績図に設けられている。更新が完了した水道管に、互いに管種が異なる複数の水道管が含まれている場合には、管種毎の管路長についても領域R4に示される。 In the example shown in FIG. 5, water pipe P1 and water pipe P21, which is a part of water pipe P2, have been updated. On the other hand, water pipe P22, which is a part of water pipe P2 other than water pipe P21, has not been updated. For this reason, water pipes P1 and P21 and water pipe P22 are shown in different colors in the update performance diagram. However, in the example shown in FIG. 5, water pipes P1 and P21 and water pipe P22 are shown in different patterns for the sake of convenience. In addition, in the example shown in FIG. 5, an area R4 is provided in the update performance diagram that shows the pipe length of water pipes for which updates have been completed by diameter. If the water pipes for which updates have been completed include multiple water pipes of different pipe types, the pipe length for each pipe type is also shown in area R4.

また、更新実績図作成部14は、更新実績図において、敷設状態が撤去済である水道管を非表示とすることができる。敷設状態が撤去済である水道管を更新実績図作成部14が非表示とした場合、更新実績図を、現存する水道管のみを表示する通常のマップとして使用することができる。 The update history map creation unit 14 can also hide water pipes whose installation status is "removed" in the update history map. When the update history map creation unit 14 hides water pipes whose installation status is "removed," the update history map can be used as a normal map that displays only existing water pipes.

費用算出部15は、更新予定の水道管の管路長に、当該水道管の管種および口径に応じた係数を乗じることで、水道管の敷設に要する予算を算出する。費用算出部15は、算出した予算を更新計画表作成部12へ出力する。更新計画表作成部12は、費用算出部15が算出した予算を、更新計画表に反映する。したがって、水道管の更新に要する予算を算出する作業を省力化することができる。 The cost calculation unit 15 calculates the budget required for laying the water pipe by multiplying the pipeline length of the water pipe to be updated by a coefficient corresponding to the pipe type and diameter of the water pipe. The cost calculation unit 15 outputs the calculated budget to the update plan table creation unit 12. The update plan table creation unit 12 reflects the budget calculated by the cost calculation unit 15 in the update plan table. This makes it possible to reduce the labor required for calculating the budget required for updating the water pipe.

また、費用算出部15は、更新された水道管の管路長に、当該水道管の管種および口径に応じた係数を乗じることで、水道管の敷設に要した費用を算出する。費用算出部15は、算出した費用を更新計画表改訂部13へ出力する。更新計画表改訂部13は、費用算出部15が算出した費用を、更新計画表の改訂に反映する。したがって、ユーザは、更新計画の進捗状況を、管路長の面からだけでなく、費用の面からも容易に把握できる。 The cost calculation unit 15 also calculates the cost required to lay the water pipe by multiplying the updated pipeline length of the water pipe by a coefficient corresponding to the pipe type and diameter of the water pipe. The cost calculation unit 15 outputs the calculated cost to the update plan table revising unit 13. The update plan table revising unit 13 reflects the cost calculated by the cost calculation unit 15 in the revision of the update plan table. Therefore, the user can easily grasp the progress of the update plan not only in terms of pipeline length but also in terms of cost.

入力受付部20は、データ処理装置1に対するユーザの入力を受け付ける入力装置である。入力受付部20は、タッチパネル、マウス、およびキーボードのうち1以上であってよい。表示部30は、画像によりユーザに対して情報を出力する出力装置である。表示部30は、液晶ディスプレイまたは有機EL(Electro Luminescence)ディスプレイであってよい。 The input reception unit 20 is an input device that receives user input to the data processing device 1. The input reception unit 20 may be one or more of a touch panel, a mouse, and a keyboard. The display unit 30 is an output device that outputs information to the user by means of images. The display unit 30 may be a liquid crystal display or an organic EL (Electro Luminescence) display.

記憶部40は、データ処理装置1における処理に必要な情報を記憶する記憶装置である。記憶部40は、例えば上述した属性データを記憶する。ただし、データ処理装置1は必ずしも記憶部40を備える必要はなく、記憶部40と同等の情報を記憶した外部の記憶装置と通信可能に構成されていてもよい。 The storage unit 40 is a storage device that stores information necessary for processing in the data processing device 1. The storage unit 40 stores, for example, the attribute data described above. However, the data processing device 1 does not necessarily need to include the storage unit 40, and may be configured to be able to communicate with an external storage device that stores information equivalent to that of the storage unit 40.

また、データ処理装置1は、上述した更新計画表および/または更新実績図を帳票として外部に出力する出力部をさらに備えていてもよい。出力部は、更新計画表および/または更新実績図を実際の帳票として出力してもよく、電子データとして出力してもよい。 The data processing device 1 may further include an output unit that outputs the above-mentioned update plan table and/or update performance diagram to the outside as a form. The output unit may output the update plan table and/or update performance diagram as an actual form, or may output them as electronic data.

図6は、制御部10による処理(データ処理方法)の例を示すフローチャートである。図6に示す例では、最初に更新計画図作成部11が更新計画図を作成する(S1、更新計画図作成ステップ)。また、更新計画表作成部12が更新計画表を作成する(S2、更新計画表作成ステップ)。更新計画図および更新計画表は必ずしもこの順で作成される必要はなく、並行して、または逆順で作成されてもよい。 Figure 6 is a flowchart showing an example of processing (data processing method) by the control unit 10. In the example shown in Figure 6, first the update plan drawing creation unit 11 creates an update plan drawing (S1, update plan drawing creation step). In addition, the update plan table creation unit 12 creates an update plan table (S2, update plan table creation step). The update plan drawing and the update plan table do not necessarily need to be created in this order, and may be created in parallel or in the reverse order.

更新計画表改訂部13は、いずれかの水道管についての敷設状態が変更されたか否かを判定する(S3)。敷設状態が変更されていない場合(S3でNO)、更新計画表改訂部13は、敷設状態が変更されるまで上記の判定を繰り返す。敷設状態が変更された場合(S3でYES)、更新計画表改訂部13は、敷設状態の変更を属性データに反映させる(S4、更新計画表改訂ステップ)。さらに、更新計画表改訂部13は、更新計画表を改定する(S5、更新計画表改訂ステップ)。さらに、更新実績図作成部14は、更新実績図を作成する(S6)。 The update plan table revising unit 13 judges whether the installation state of any water pipe has been changed (S3). If the installation state has not been changed (NO in S3), the update plan table revising unit 13 repeats the above judgment until the installation state is changed. If the installation state has been changed (YES in S3), the update plan table revising unit 13 reflects the change in the installation state in the attribute data (S4, update plan table revising step). Furthermore, the update plan table revising unit 13 revises the update plan table (S5, update plan table revising step). Furthermore, the update performance diagram creating unit 14 creates an update performance diagram (S6).

費用算出部15は、ステップS2において、更新予定期間毎、かつ管種および口径毎の予算を算出する。更新計画表作成部12は、費用算出部15が算出した予算を更新計画表に反映する。また、費用算出部15は、ステップS5において、敷設状態が変更された水道管の更新または撤去に要した費用を算出する。更新計画表改訂部13は、費用算出部15が算出した費用を更新計画表に反映する。 In step S2, the cost calculation unit 15 calculates the budget for each planned renewal period and for each pipe type and diameter. The renewal plan table creation unit 12 reflects the budget calculated by the cost calculation unit 15 in the renewal plan table. In addition, in step S5, the cost calculation unit 15 calculates the cost required to renew or remove the water pipe whose installation state has been changed. The renewal plan table revision unit 13 reflects the cost calculated by the cost calculation unit 15 in the renewal plan table.

以上のとおり、データ処理装置1によれば、更新計画図に示された水道管の敷設状態をユーザが変更した場合に、敷設状態が変更された水道管の管路長に基づいて更新計画表改訂部13が更新計画表を自動的に改訂する。したがって、ユーザによる更新実績の集計ミスが防止されるとともに、ユーザに依存しない一律の管理が行われるようになる。すなわち、水道管の更新を適切に管理可能となる。 As described above, according to the data processing device 1, when a user changes the installation status of a water pipe shown in the update plan drawing, the update plan table revision unit 13 automatically revises the update plan table based on the pipe length of the water pipe whose installation status has been changed. This prevents users from making mistakes in compiling the update results, and enables uniform management that is independent of the user. In other words, it becomes possible to properly manage the updates of water pipes.

また、このような構成によれば、水道管の更新を適切に管理できるため、住みやすい街づくりに貢献できる。これにより、持続可能な開発目標(SDGs)の目標13「住み続けられるまちづくりを」の達成に貢献できる。 In addition, this configuration allows for proper management of water pipe renewal, which contributes to creating livable cities. This will contribute to achieving Goal 13 of the Sustainable Development Goals (SDGs), "Making cities and towns sustainable."

なお、データ処理装置1は、更新実績図作成部14および/または費用算出部15を備えなくてもよい。データ処理装置1が更新実績図作成部14および/または費用算出部15を備えない場合であっても、上述したとおり、更新計画表改訂部13が更新計画表を自動的に改訂することで、水道管の更新を適切に管理可能となる。 The data processing device 1 does not have to include the update performance map creation unit 14 and/or the cost calculation unit 15. Even if the data processing device 1 does not include the update performance map creation unit 14 and/or the cost calculation unit 15, the update plan table revising unit 13 automatically revises the update plan table as described above, thereby making it possible to appropriately manage the renewal of water pipes.

〔ソフトウェアによる実現例〕
データ処理装置1(以下、「装置」と呼ぶ)の機能は、当該装置としてコンピュータを機能させるためのプログラムであって、当該装置の各制御ブロック(特に制御部10に含まれる各部)としてコンピュータを機能させるためのプログラムにより実現することができる。
[Software implementation example]
The functions of the data processing device 1 (hereinafter referred to as the "device") can be realized by a program for causing a computer to function as the device, and a program for causing a computer to function as each control block of the device (particularly each part included in the control unit 10).

この場合、上記装置は、上記プログラムを実行するためのハードウェアとして、少なくとも1つの制御装置(例えばプロセッサ)と少なくとも1つの記憶装置(例えばメモリ)を有するコンピュータを備えている。この制御装置と記憶装置により上記プログラムを実行することにより、上記各実施形態で説明した各機能が実現される。 In this case, the device includes a computer having at least one control device (e.g., a processor) and at least one storage device (e.g., a memory) as hardware for executing the program. The control device and storage device execute the program, thereby realizing each of the functions described in each of the above embodiments.

上記プログラムは、一時的ではなく、コンピュータ読み取り可能な、1または複数の記録媒体に記録されていてもよい。この記録媒体は、上記装置が備えていてもよいし、備えていなくてもよい。後者の場合、上記プログラムは、有線または無線の任意の伝送媒体を介して上記装置に供給されてもよい。 The program may be recorded on one or more computer-readable recording media, not on a temporary basis. The recording media may or may not be included in the device. In the latter case, the program may be provided to the device via any wired or wireless transmission medium.

また、上記各制御ブロックの機能の一部または全部は、論理回路により実現することも可能である。例えば、上記各制御ブロックとして機能する論理回路が形成された集積回路も本発明の範疇に含まれる。この他にも、例えば量子コンピュータにより上記各制御ブロックの機能を実現することも可能である。 In addition, some or all of the functions of each of the above control blocks can be realized by a logic circuit. For example, an integrated circuit in which a logic circuit that functions as each of the above control blocks is formed is also included in the scope of the present invention. In addition, it is also possible to realize the functions of each of the above control blocks by, for example, a quantum computer.

また、上記各実施形態で説明した各処理は、AI(Artificial Intelligence:人工知能)に実行させてもよい。この場合、AIは上記制御装置で動作するものであってもよいし、他の装置(例えばエッジコンピュータまたはクラウドサーバ等)で動作するものであってもよい。 The processes described in each of the above embodiments may be executed by AI (Artificial Intelligence). In this case, the AI may run on the control device, or on another device (such as an edge computer or a cloud server).

本発明は上述した各実施形態に限定されるものではなく、請求項に示した範囲で種々の変更が可能であり、異なる実施形態にそれぞれ開示された技術的手段を適宜組み合わせて得られる実施形態についても本発明の技術的範囲に含まれる。 The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope of the claims. The technical scope of the present invention also includes embodiments obtained by appropriately combining the technical means disclosed in different embodiments.

1 データ処理装置
11 更新計画図作成部
12 更新計画表作成部
13 更新計画表改訂部
14 更新実績図作成部
15 費用算出部(予算算出部)
Reference Signs List 1 Data processing device 11 Renewal plan drawing creation unit 12 Renewal plan table creation unit 13 Renewal plan table revision unit 14 Renewal performance drawing creation unit 15 Cost calculation unit (budget calculation unit)

Claims (7)

複数の水道管のそれぞれについて、敷設場所、管種、口径、管路長、更新予定期間および敷設状態を少なくとも示す属性データに基づき、当該複数の水道管の前記敷設場所を示すマップ上に前記複数の水道管の前記更新予定期間が示された更新計画図を作成する更新計画図作成部と、
前記属性データに基づき、前記更新予定期間毎かつ前記管種および前記口径毎に、当該更新予定期間に更新される前記複数の水道管の前記管路長の合計が示された更新計画表を作成する更新計画表作成部と、
前記複数の水道管のいずれかについて前記敷設状態が変更された場合、当該変更を前記属性データに反映するとともに、当該反映された属性データに基づき前記敷設状態が変更された後の前記管路長を前記更新計画表に入力して前記更新計画表を改訂する更新計画表改訂部と、を備える、データ処理装置。
an update plan drawing creating unit that creates an update plan drawing showing the planned update periods of the plurality of water pipes on a map showing the installation locations of the plurality of water pipes based on attribute data showing at least the installation location, pipe type, diameter, pipeline length, planned update period, and installation state of each of the plurality of water pipes;
An update schedule creation unit that creates an update schedule indicating the total pipe length of the plurality of water pipes to be updated during the update schedule period for each of the planned update periods and for each of the pipe types and diameters based on the attribute data;
and an update plan table revising unit that, when the installation state of any of the plurality of water pipes is changed, reflects the change in the attribute data and revises the update plan table by inputting the pipeline length after the installation state is changed based on the reflected attribute data.
前記更新計画表改訂部は、前記敷設状態が変更された水道管の前記管路長を、前記管種および前記口径毎に集計するとともに前記更新計画表に入力して前記更新計画表を改訂するものである、請求項1に記載のデータ処理装置。 The data processing device according to claim 1, wherein the renewal plan table revision unit compiles the pipe lengths of the water pipes whose installation state has been changed for each pipe type and diameter, and inputs the pipe lengths into the renewal plan table to revise the renewal plan table. 前記敷設状態が変更された後の前記属性データに基づき、前記更新計画図に対して前記水道管に係る敷設状態の変更を反映させた更新実績図を作成する更新実績図作成部をさらに備え、
前記属性データは、前記敷設状態が変更された時期を示す敷設状態変更時期をさらに含み、
前記更新実績図作成部は、前記属性データにおける前記敷設状態が変更された前記水道管について、変更後の敷設状態によらず、前記敷設状態変更時期に応じた表示態様で表示するものである、請求項1または2に記載のデータ処理装置。
A renewal performance diagram creation unit creates a renewal performance diagram in which the renewal plan diagram reflects the change in the laying condition of the water pipe based on the attribute data after the laying condition has been changed,
The attribute data further includes a laying state change time indicating a time when the laying state was changed,
3. The data processing device according to claim 1, wherein the update performance diagram creation unit displays the water pipe whose installation state in the attribute data has been changed in a display mode according to the time when the installation state was changed, regardless of the installation state after the change.
前記更新実績図作成部は、前記敷設状態が更新済の状態に変更された前記水道管の表示態様を、前記敷設状態が未更新の状態の水道管の表示態様と異ならせることにより、前記更新実績図を作成するものである、請求項3に記載のデータ処理装置。 The data processing device according to claim 3, wherein the update history diagram creation unit creates the update history diagram by making the display mode of the water pipes whose installation state has been changed to an updated state different from the display mode of the water pipes whose installation state has not been updated. 任意の更新予定期間を第1更新予定期間とし、当該第1更新予定期間よりも後の更新予定期間を第2更新予定期間とした場合、
前記更新計画表作成部は、(i)前記第1更新予定期間において更新予定とされた前記水道管について前記管種および前記口径毎の前記管路長の合計と、(ii)前記第1更新予定期間における更新実績に含まれる前記管種および前記口径毎の前記管路長の合計と、の差分に基づいて、前記第2更新予定期間において更新予定である前記水道管について前記管種および前記口径毎に前記管路長の合計を修正するものである、請求項1から4のいずれか1項に記載のデータ処理装置。
If an arbitrary scheduled renewal period is set as a first scheduled renewal period and a scheduled renewal period after the first scheduled renewal period is set as a second scheduled renewal period,
5. The data processing device according to claim 1, wherein the update plan table creation unit modifies the sum of the pipeline lengths for the pipe types and the diameters for the water pipes scheduled for update in the second planned update period based on a difference between (i) the sum of the pipeline lengths for the pipe types and the diameters for the water pipes scheduled for update in the first planned update period and (ii) the sum of the pipeline lengths for the pipe types and the diameters included in the update results for the first planned update period.
前記水道管の管路長に、当該水道管の前記管種および前記口径に応じた係数を乗じることで、前記水道管の敷設に要する予算を算出する予算算出部をさらに備える、請求項1から5のいずれか1項に記載のデータ処理装置。 The data processing device according to any one of claims 1 to 5, further comprising a budget calculation unit that calculates the budget required for laying the water pipe by multiplying the pipeline length of the water pipe by a coefficient corresponding to the pipe type and the diameter of the water pipe. データ処理装置が行うデータ処理方法であって、
複数の水道管のそれぞれについて、敷設場所、管種、口径、管路長、更新予定期間および敷設状態を少なくとも示す属性データに基づき、当該複数の水道管の前記敷設場所を示すマップ上に前記複数の水道管の前記更新予定期間が示された更新計画図を作成する更新計画図作成ステップと、
前記属性データに基づき、前記更新予定期間毎かつ前記管種および前記口径毎に、当該更新予定期間に更新される前記複数の水道管の前記管路長の合計が示された更新計画表を作成する更新計画表作成ステップと、
前記複数の水道管のいずれかについて前記敷設状態が変更された場合に、当該変更を前記属性データに反映するとともに、当該反映された属性データに基づき前記敷設状態が変更された後の前記管路長を前記更新計画表に入力して前記更新計画表を改訂する更新計画表改訂ステップと、を含む、データ処理方法。
A data processing method performed by a data processing device, comprising:
An update plan drawing step of drawing an update plan drawing showing the planned update periods of the plurality of water pipes on a map showing the installation locations of the plurality of water pipes based on attribute data showing at least the installation location, pipe type, diameter, pipeline length, planned update period, and installation state of each of the plurality of water pipes;
An update schedule creation step of creating an update schedule showing the total pipe length of the plurality of water pipes to be updated during the update schedule period for each of the planned update periods and for each of the pipe types and diameters based on the attribute data;
and an update plan table revising step of, when the installation state of any of the plurality of water pipes is changed, reflecting the change in the attribute data, and revising the update plan table by inputting the pipeline length after the installation state has been changed based on the reflected attribute data.
JP2021157105A 2021-09-27 2021-09-27 DATA PROCESSING APPARATUS AND DATA PROCESSING METHOD Active JP7623919B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021157105A JP7623919B2 (en) 2021-09-27 2021-09-27 DATA PROCESSING APPARATUS AND DATA PROCESSING METHOD

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021157105A JP7623919B2 (en) 2021-09-27 2021-09-27 DATA PROCESSING APPARATUS AND DATA PROCESSING METHOD

Publications (2)

Publication Number Publication Date
JP2023047914A JP2023047914A (en) 2023-04-06
JP7623919B2 true JP7623919B2 (en) 2025-01-29

Family

ID=85779345

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021157105A Active JP7623919B2 (en) 2021-09-27 2021-09-27 DATA PROCESSING APPARATUS AND DATA PROCESSING METHOD

Country Status (1)

Country Link
JP (1) JP7623919B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7488540B1 (en) * 2024-03-28 2024-05-22 フジ地中情報株式会社 AI buried pipeline renewal planning system, AI buried pipeline renewal planning method, and AI buried pipeline renewal planning program

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001325310A (en) 2000-05-16 2001-11-22 Jekku:Kk Sewerage installation design support system and recording medium
JP2002092084A (en) 2000-09-14 2002-03-29 Pasuko:Kk Road construction information collecting and disclosing system and its method
JP2017045222A (en) 2015-08-26 2017-03-02 株式会社日立製作所 Update plan planning apparatus and update plan planning method
JP6165952B1 (en) 2016-10-11 2017-07-19 フジ地中情報株式会社 Water pipe update management system
JP2021099551A (en) 2019-12-19 2021-07-01 Jfeエンジニアリング株式会社 Construction progress management method and apparatus using positional information in line structure construction
JP2021140427A (en) 2020-03-04 2021-09-16 Wota株式会社 Information processing device, method, and program

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001325310A (en) 2000-05-16 2001-11-22 Jekku:Kk Sewerage installation design support system and recording medium
JP2002092084A (en) 2000-09-14 2002-03-29 Pasuko:Kk Road construction information collecting and disclosing system and its method
JP2017045222A (en) 2015-08-26 2017-03-02 株式会社日立製作所 Update plan planning apparatus and update plan planning method
JP6165952B1 (en) 2016-10-11 2017-07-19 フジ地中情報株式会社 Water pipe update management system
JP2021099551A (en) 2019-12-19 2021-07-01 Jfeエンジニアリング株式会社 Construction progress management method and apparatus using positional information in line structure construction
JP2021140427A (en) 2020-03-04 2021-09-16 Wota株式会社 Information processing device, method, and program

Also Published As

Publication number Publication date
JP2023047914A (en) 2023-04-06

Similar Documents

Publication Publication Date Title
JP6025154B2 (en) System, method and program for managing a project
US20190205484A1 (en) Systems and methods for construction planning
CN104699887A (en) Augmented reality updating of 3d cad models
WO2011058606A1 (en) Construction process creation system and construction process creation method
US12373613B2 (en) Construction knowledge graph
JP2005301894A (en) Work progress management method, work progress management device, and program
JP6869166B2 (en) Production planning equipment and production planning method
JP5342507B2 (en) Carry-in planning support system
US20260093376A1 (en) Mobile Viewer Object Statusing
JP7623919B2 (en) DATA PROCESSING APPARATUS AND DATA PROCESSING METHOD
CN111429097B (en) BIM-based automatic field progress and model matching method and system
US20220374802A1 (en) Automated analysis of objects for construction planning
JP3143004B2 (en) Design work management support device
JP6836530B2 (en) Computer system and system configuration management method
US11681835B2 (en) Rapid positioning drawing system and method
JP6934997B2 (en) Information processing systems, information processing devices, and programs
CN100533375C (en) Automatic layout method and automatic layout device
US8321547B2 (en) System and method for planning communication systems
JP2006119917A (en) Process management support system, process management support method, and process management support program
JP2009169628A (en) Construction device, construction method and program for monitoring control system
JP2011107906A (en) Process management system
JP2009163452A (en) Information processor, information processing method and program
JPH06332909A (en) Plan managing system
JP2025147809A (en) Production management system, production simulation device, production simulation method, and production simulation program
JP2018128919A (en) Work plan creation system, work plan creation method and work plan creation program

Legal Events

Date Code Title Description
A625 Written request for application examination (by other person)

Free format text: JAPANESE INTERMEDIATE CODE: A625

Effective date: 20231214

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240924

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241022

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241202

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250107

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250117

R150 Certificate of patent or registration of utility model

Ref document number: 7623919

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150