Climbing crane and construction method using climbing crane Download PDFInfo
- Publication number
- JP7626641B2 JP7626641B2 JP2021048391A JP2021048391A JP7626641B2 JP 7626641 B2 JP7626641 B2 JP 7626641B2 JP 2021048391 A JP2021048391 A JP 2021048391A JP 2021048391 A JP2021048391 A JP 2021048391A JP 7626641 B2 JP7626641 B2 JP 7626641B2
- Authority
- JP
- Japan
- Prior art keywords
- weight
- crane
- mast
- climbing crane
- climbing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Jib Cranes (AREA)
Description
本発明は、クライミングクレーン及びクライミングクレーンを用いた工事方法に関する。 The present invention relates to a climbing crane and a construction method using a climbing crane.
建造物を建造する工事にあたって、例えば特許文献1に記載のクライミングクレーンが用いられている。このようなクライミングクレーンは、建造中の建造物の高さに応じて、マストを継ぎ足す(順次立設する)ことで、適切な高さで工事を実施することができる。 For example, a climbing crane as described in Patent Document 1 is used in the construction of a structure. This type of climbing crane can carry out construction at an appropriate height by adding masts (erecting them one by one) according to the height of the structure being constructed.
ところで、クライミングクレーンの転倒を防止するために、クレーンのジブが延在する側と逆側にウェイトを設置して、全体の均衡を保つことが行われている。しかし、マストを継ぎ足していくと、クライミングクレーン全体の重心が高くなり、特に日本等の地震の多い地域では、万が一の転倒のリスクが大きくなる。 To prevent climbing cranes from tipping over, weights are placed on the side opposite to where the crane's jib extends to maintain overall balance. However, adding more masts raises the center of gravity of the entire climbing crane, which increases the risk of it tipping over, especially in earthquake-prone areas such as Japan.
本発明では上記事情を鑑み、マストの高床化に伴う転倒のリスクを低減可能なクライミングクレーン等を提供することとした。 In consideration of the above circumstances, the present invention aims to provide a climbing crane etc. that can reduce the risk of tipping over due to the raised mast.
本発明の一態様によれば、クライミングクレーンが提供される。このクライミングクレーンは、クレーン本体と、マストと、基礎構造部とを備える。クレーン本体は、ジブと、カウンターフレームとを備える。ジブは、前後に延在するとともに、起伏可能に構成される。カウンターフレームは、ジブの延在する側と逆側に設けられ、少なくとも1つのウェイトを設置可能に構成される。マストは、クレーン本体を支持するように構成される。クレーン本体の高さを調節可能に、上下方向に順次立設されるように構成される。基礎構造部は、マストを支持するように構成される。ウェイトを設置可能なベースフレームを備える。マストの高さに応じて、カウンターフレームとベースフレームとの間でウェイトを移載可能に構成される。 According to one aspect of the present invention, a climbing crane is provided. This climbing crane comprises a crane body, a mast, and a foundation structure. The crane body comprises a jib and a counter frame. The jib extends forward and backward and is configured to be able to be raised and lowered. The counter frame is provided on the side opposite to the side on which the jib extends and is configured to be able to accommodate at least one weight. The mast is configured to support the crane body. It is configured to be erected in the vertical direction in sequence so that the height of the crane body can be adjusted. The foundation structure is configured to support the mast. It comprises a base frame on which a weight can be installed. It is configured to be able to transfer the weight between the counter frame and the base frame depending on the height of the mast.
このような態様によれば、クライミングクレーンの、マストの高床化に伴う転倒のリスクを低減可能することができる。 This type of configuration can reduce the risk of a climbing crane tipping over due to the raised mast.
以下、図面を用いて本発明の実施形態について説明する。以下に示す実施形態中で示した各種特徴事項は、互いに組み合わせ可能である。 The following describes embodiments of the present invention with reference to the drawings. The various features shown in the following embodiments can be combined with each other.
ところで、本実施形態に登場するソフトウェアを実現するためのプログラムは、コンピュータが読み取り可能な非一時的な記録媒体(Non-Transitory Computer-Readable Medium)として提供されてもよいし、外部のサーバからダウンロード可能に提供されてもよいし、外部のコンピュータで当該プログラムを起動させてクライアント端末でその機能を実現(いわゆるクラウドコンピューティング)するように提供されてもよい。 The program for realizing the software appearing in this embodiment may be provided as a non-transitory computer-readable recording medium, or may be provided so that it can be downloaded from an external server, or may be provided so that the program is started on an external computer and its functions are realized on a client terminal (so-called cloud computing).
また、本実施形態において「部」とは、例えば、広義の回路によって実施されるハードウェア資源と、これらのハードウェア資源によって具体的に実現されうるソフトウェアの情報処理とを合わせたものも含みうる。また、本実施形態においては様々な情報を取り扱うが、これら情報は、例えば電圧・電流を表す信号値の物理的な値、0または1で構成される2進数のビット集合体としての信号値の高低、または量子的な重ね合わせ(いわゆる量子ビット)によって表され、広義の回路上で通信・演算が実行されうる。 In this embodiment, a "unit" may also include, for example, a combination of hardware resources implemented by a circuit in the broad sense and software information processing that can be specifically realized by these hardware resources. In addition, this embodiment handles various types of information, which may be represented, for example, by physical values of signal values representing voltage and current, high and low signal values as a binary bit collection consisting of 0 or 1, or quantum superposition (so-called quantum bits), and communication and calculations may be performed on a circuit in the broad sense.
また、広義の回路とは、回路(Circuit)、回路類(Circuitry)、プロセッサ(Processor)、およびメモリ(Memory)等を少なくとも適当に組み合わせることによって実現される回路である。すなわち、特定用途向け集積回路(Application Specific Integrated Circuit:ASIC)、プログラマブル論理デバイス(例えば、単純プログラマブル論理デバイス(Simple Programmable Logic Device:SPLD)、複合プログラマブル論理デバイス(Complex Programmable Logic Device:CPLD)、およびフィールドプログラマブルゲートアレイ(Field Programmable Gate Array:FPGA))等を含むものである。 In the broad sense, a circuit is a circuit realized by at least appropriately combining a circuit, circuitry, a processor, and memory. In other words, it includes application specific integrated circuits (ASICs), programmable logic devices (e.g., simple programmable logic devices (SPLDs), complex programmable logic devices (CPLDs), and field programmable gate arrays (FPGAs)), etc.
1.全体構成
1.1 基本構成
まず、本実施形態に係るクライミングクレーン1の基本構成を説明する。図1は、クライミングクレーン1の低床時の態様を示す模式図である。
1. Overall Configuration 1.1 Basic Configuration First, a basic configuration of a climbing crane 1 according to this embodiment will be described. Fig. 1 is a schematic diagram showing the state of the climbing crane 1 when the platform is in the low position.
クライミングクレーン1は、建造物の高さの増加に伴ってそれ自身の機構によってクライミングを行うものである。図1に示されるように、クライミングクレーン1は、マスト2と、クレーン本体3と、基礎構造部5とを備える。換言すると、クライミングクレーン1は、基礎構造部5の上にマスト2を有し、その頂部にクレーン本体3が設置されている。 The climbing crane 1 climbs by its own mechanism as the height of the structure increases. As shown in FIG. 1, the climbing crane 1 comprises a mast 2, a crane body 3, and a foundation structure 5. In other words, the climbing crane 1 has a mast 2 on top of the foundation structure 5, and the crane body 3 is installed on top of the mast 2.
(マスト2)
マスト2は、後述のクレーン本体3を支持するように構成される。特に、クライミングクレーン1においては、マスト2は、クレーン本体3の高さを調節可能に、建造中の建造物の高さに合わせて、上下方向に順次立設されるように構成されるとよい。
(Mast 2)
The mast 2 is configured to support the crane body 3, which will be described later. In particular, in the climbing crane 1, the mast 2 is preferably configured to be sequentially erected in the vertical direction so that the height of the crane body 3 can be adjusted in accordance with the height of the structure being constructed.
(クレーン本体3)
クレーン本体3は、旋回体31と、ジブ32と、巻上ウィンチ33と、巻上ロープ34と、フック35とを備えている。旋回体31は、マスト2の頂部に設けた旋回ベアリング(図示せず)に回転自在に支持される。ジブ32は、旋回体31に支持され、前後に延在するとともに、起伏可能に構成される。巻上ウィンチ33は、旋回体31に固定され、巻上ロープ34を巻上又は巻下可能に構成される。巻上ロープ34の先端には、フック35が設けられている。
(Crane body 3)
The crane body 3 includes a rotating body 31, a jib 32, a hoisting winch 33, a hoisting rope 34, and a hook 35. The rotating body 31 is rotatably supported by a slewing bearing (not shown) provided at the top of the mast 2. The jib 32 is supported by the rotating body 31, extends forward and backward, and is configured to be capable of being raised and lowered. The hoisting winch 33 is fixed to the rotating body 31, and is configured to be able to hoist or lower the hoisting rope 34. A hook 35 is provided at the end of the hoisting rope 34.
(カウンターフレーム4)
さらに、クレーン本体3は、カウンターフレーム4を備えている。カウンターフレーム4は、ジブ32の延在する側と逆側(ここでは、旋回体31に設置)に設けられ、少なくとも1つのウェイト7を設置可能に構成される。
(Counter frame 4)
Furthermore, the crane body 3 includes a counter frame 4. The counter frame 4 is provided on the side opposite to the side where the jib 32 extends (here, installed on the rotating body 31), and is configured so that at least one weight 7 can be installed thereon.
図2は、図1に示されたカウンターフレーム4の細部を説明するための部分拡大図である。図2に示されるように、カウンターフレーム4は、下側延在部41と、ウェイト支持機構42と、立設部43と、上側延在部44と、揚重機構45とを備える。下側延在部41は、旋回体31に接続され、ジブ32の延在側と逆側に延在するように構成されている。ウェイト支持機構42は、下側延在部41に設けられ、複数のウェイト7を支持可能に構成されている。立設部43は、下側延在部41に対して略垂直に上向きに立設され、その先端に上側延在部44が設けられる。上側延在部44は、下側延在部41よりも上方に位置し、下側延在部41と同じくジブ32の延在側と逆側に延在するように構成されている。揚重機構45は、上側延在部44において、これに対して下向きに設けられ、フック451を上下に移動させることができる。 2 is a partially enlarged view for explaining the details of the counter frame 4 shown in FIG. 1. As shown in FIG. 2, the counter frame 4 includes a lower extension portion 41, a weight support mechanism 42, a standing portion 43, an upper extension portion 44, and a lifting mechanism 45. The lower extension portion 41 is connected to the rotating body 31 and is configured to extend on the opposite side to the extension side of the jib 32. The weight support mechanism 42 is provided on the lower extension portion 41 and is configured to be able to support a plurality of weights 7. The standing portion 43 is erected upward approximately perpendicular to the lower extension portion 41, and the upper extension portion 44 is provided at its tip. The upper extension portion 44 is located above the lower extension portion 41 and is configured to extend on the opposite side to the extension side of the jib 32, like the lower extension portion 41. The lifting mechanism 45 is mounted on the upper extension 44 facing downward, and can move the hook 451 up and down.
(基礎構造部5)
基礎構造部5は、マスト2を支持するように構成される。より詳細には、マスト2の基端(下側)には、基礎構造部5が固定されており、基礎構造部5はクレーン本体3を、マスト2を介して間接的に支えるための架台となっている。なお、基礎構造部5は、地盤Gに対して固定具無しに接地することで、マスト2を支持するように構成されてもよい。これについて以下補足する。
(Foundation structure 5)
The foundation structure 5 is configured to support the mast 2. More specifically, the foundation structure 5 is fixed to the base end (lower side) of the mast 2, and serves as a platform for indirectly supporting the crane body 3 via the mast 2. Note that the foundation structure 5 may be configured to support the mast 2 by being grounded to the ground G without any fasteners. A further explanation of this is provided below.
一般的にクライミングクレーン1は、コンクリート基礎から突出したアンカーボルトと、基礎構造部5とをボルト締結することで転倒不能に設置されるが、環境を維持するために等、設置場所によっては、コンクリート基礎を用いることができず、水平レベルを出した地盤Gに直接設置する場合がある。その場合、基礎構造部5を地盤Gに直接設置してしまうと、地盤Gの地耐力が不足するケースがある。したがって、クライミングクレーン1が発生する鉛直荷重を分散させ、それによって地盤Gの地耐力が不足しない構造を採用することが好ましい。 Generally, the climbing crane 1 is installed so that it cannot tip over by bolting the anchor bolts protruding from the concrete foundation to the foundation structure 5. However, depending on the installation location, concrete foundations cannot be used and the crane may be installed directly on a level ground G in order to maintain the environment. In such cases, if the foundation structure 5 is installed directly on the ground G, the bearing capacity of the ground G may be insufficient. Therefore, it is preferable to adopt a structure that distributes the vertical load generated by the climbing crane 1, thereby ensuring that the bearing capacity of the ground G is not insufficient.
さらに、基礎構造部5は、ウェイト7を設置可能なベースフレーム51を備えている。ベースフレーム51に取り付けられるウェイト7は、前述のカウンターフレーム4に取り付けられるウェイト7と同一のものである。ウェイト7は、例えばベースフレーム51における取付領域52に取り付けられる。なお、取り付けるための機構は特に限定されず、カウンターフレーム4におけるウェイト支持機構42が適宜採用されるとよい。換言すると、ウェイト支持機構42は、カウンターフレーム4及びベースフレーム51の少なくとも一方に設けられる。 The foundation structure 5 further includes a base frame 51 on which a weight 7 can be installed. The weight 7 attached to the base frame 51 is the same as the weight 7 attached to the counter frame 4 described above. The weight 7 is attached, for example, to an attachment area 52 in the base frame 51. Note that the attachment mechanism is not particularly limited, and the weight support mechanism 42 in the counter frame 4 may be appropriately adopted. In other words, the weight support mechanism 42 is provided on at least one of the counter frame 4 and the base frame 51.
1.2 工事を管理するコンピュータ6
続いて、コンピュータ6について説明する。図3は、クライミングクレーン1の高床時の態様を示す模式図である。図4は、コンピュータ6のハードウェア構成を示すブロック図である。
1.2 Computer for managing construction 6
Next, a description will be given of the computer 6. Fig. 3 is a schematic diagram showing the state of the climbing crane 1 when the platform is raised. Fig. 4 is a block diagram showing the hardware configuration of the computer 6.
本実施形態では、図3に示されるように、クライミングクレーン1がマスト2を継ぎ足して高床化すると、ウェイト7がカウンターフレーム4から取り外されるとともに、基礎構造部5におけるベースフレーム51の取付領域52に移載される。つまり、クライミングクレーン1は、マスト2の高さに基づいて、カウンターフレーム4とベースフレーム51との間でウェイト7を移載可能に構成されている。このように、ウェイト7を移載することによって、マスト2の高床化に伴う転倒のリスクを低減可能することができる。さらに好ましくは、カウンターフレーム4は、クレーン本体3に対して着脱可能に構成される。図3に示されるように、カウンターフレーム4がクレーン本体3における旋回体31から取り外されている。高床時にカウンターフレーム4ごと取り外すことで、さらに転倒のリスクを低減することができる。このような、態様に関して、コンピュータ6が使用されている。 In this embodiment, as shown in FIG. 3, when the climbing crane 1 is raised by extending the mast 2, the weight 7 is removed from the counter frame 4 and transferred to the mounting area 52 of the base frame 51 in the foundation structure 5. In other words, the climbing crane 1 is configured to be able to transfer the weight 7 between the counter frame 4 and the base frame 51 based on the height of the mast 2. In this way, by transferring the weight 7, it is possible to reduce the risk of tipping over due to the raising of the mast 2. More preferably, the counter frame 4 is configured to be detachable from the crane body 3. As shown in FIG. 3, the counter frame 4 is detached from the rotating body 31 in the crane body 3. By removing the counter frame 4 when the floor is raised, it is possible to further reduce the risk of tipping over. In relation to such an embodiment, a computer 6 is used.
コンピュータ6は、例えばクライミングクレーン1に搭載され、工事の進捗や工程を管理するように構成されている。コンピュータ6は、例えば、専用の制御装置であり、図4に示されるように、通信部61と、記憶部62と、制御部63とを有し、これらの構成要素が通信バス60を介して電気的に接続されている。各構成要素についてさらに説明する。 The computer 6 is mounted, for example, on the climbing crane 1 and is configured to manage the progress and process of construction. The computer 6 is, for example, a dedicated control device, and as shown in FIG. 4, has a communication unit 61, a memory unit 62, and a control unit 63, and these components are electrically connected via a communication bus 60. Each component will be further described below.
通信部61は、コンピュータ6から種々の電気信号を外部の構成要素に送信可能に構成される。また、通信部61は、外部の構成要素からコンピュータ6への種々の電気信号を受信可能に構成される。さらに好ましくは、通信部61がネットワーク通信機能を有し、これによりインターネット等のネットワークを介して、外部機器との間で種々の情報を通信可能に実施してもよい。例えば、通信部61は、クライミングクレーン1の一部に設けられた不図示のセンサから、現在の高度に関するデータを取得するとよい。 The communication unit 61 is configured to be able to transmit various electrical signals from the computer 6 to external components. The communication unit 61 is also configured to be able to receive various electrical signals from the external components to the computer 6. More preferably, the communication unit 61 has a network communication function, which allows communication of various information with external devices via a network such as the Internet. For example, the communication unit 61 may obtain data regarding the current altitude from a sensor (not shown) provided in a part of the climbing crane 1.
記憶部62は、前述の記載により定義される様々な情報を記憶する。これは、例えば、制御部63によって実行されるクライミングクレーン1に係る種々のプログラム等を記憶するソリッドステートドライブ(Solid State Drive:SSD)等のストレージデバイスとして、あるいは、プログラムの演算に係る一時的に必要な情報(引数、配列等)を記憶するランダムアクセスメモリ(Random Access Memory:RAM)等のメモリとして実施されうる。記憶部62は、制御部63によって実行されるクライミングクレーン1に係る種々のプログラムや変数等を記憶している。特に好ましくは、クライミングクレーン1を用いて行う工事計画に関する情報が記憶されている。 The memory unit 62 stores various information defined by the above description. This can be implemented, for example, as a storage device such as a solid state drive (SSD) that stores various programs related to the climbing crane 1 executed by the control unit 63, or as a memory such as a random access memory (RAM) that stores temporarily required information (arguments, arrays, etc.) related to the program's calculations. The memory unit 62 stores various programs and variables related to the climbing crane 1 executed by the control unit 63. It is particularly preferable that information related to the construction plan to be carried out using the climbing crane 1 is stored.
制御部63は、例えば不図示の中央処理装置(Central Processing Unit:CPU)である。制御部63は、記憶部62に記憶された所定のプログラムを読み出すことによって、クライミングクレーン1に係る種々の機能を実現する。すなわち、記憶部62に記憶されているソフトウェアによる情報処理が、ハードウェアの一例である制御部63によって具体的に実現される。なお、制御部63は単一であることに限定されず、機能ごとに複数の制御部63を有するように実施してもよい。またそれらの組合せであってもよい。 The control unit 63 is, for example, a central processing unit (CPU) not shown. The control unit 63 realizes various functions related to the climbing crane 1 by reading out a specific program stored in the memory unit 62. In other words, information processing by the software stored in the memory unit 62 is specifically realized by the control unit 63, which is an example of hardware. Note that the control unit 63 is not limited to being a single unit, and it may be implemented with multiple control units 63 for each function. It may also be a combination of these.
好ましくは、制御部63は、マスト2の高さに応じて、カウンターフレーム4とベースフレーム51との間でウェイト7を移載するように、揚重機構45を制御可能に構成されている。これについて具体的に説明する。本実施形態では、制御部63は、予め記憶部62に記憶された専用プログラムに基づいて、工事の進捗を管理している。また、制御部63は、揚重機構45におけるフック451の揚重動作を制御することができる。制御部63は、通信部61が取得した現在の高度に関する情報と、記憶部62に記憶された工事計画に関する情報とに基づいて、必要なマスト2の高さを見積もることができる。この高さが閾値を超える場合は、制御部63は、カウンターフレーム4におけるウェイト支持機構42に支持されたウェイト7を、ベースフレーム51における取付領域52に移載するように、揚重機構45を制御するとよい。 Preferably, the control unit 63 is configured to be able to control the lifting mechanism 45 to transfer the weight 7 between the counter frame 4 and the base frame 51 according to the height of the mast 2. This will be specifically described. In this embodiment, the control unit 63 manages the progress of the construction work based on a dedicated program previously stored in the memory unit 62. The control unit 63 can also control the lifting operation of the hook 451 in the lifting mechanism 45. The control unit 63 can estimate the required height of the mast 2 based on information on the current altitude acquired by the communication unit 61 and information on the construction plan stored in the memory unit 62. If this height exceeds the threshold value, the control unit 63 may control the lifting mechanism 45 to transfer the weight 7 supported by the weight support mechanism 42 in the counter frame 4 to the mounting area 52 in the base frame 51.
1.3 ウェイト7の移載
続いて、ウェイト7と、この移載について説明する。
1.3 Transfer of the weight 7 Next, the weight 7 and its transfer will be described.
図5は、ウェイト7の形状を示す模式図である。図6は、ウェイト7を支持するウェイト支持機構42の形状を示す模式図である。図7は、揚重機構45を用いてウェイト7を揚重する態様を示す模式図であり、特に、被懸吊部73a,73bの2点で懸吊されている態様が示されている。図8は、揚重機構45を用いてウェイト7を揚重する態様を示す模式図であり、特に、被懸吊部73a,73b,73c,74dの4点で懸吊されている態様が示されている。まず、図5に示されるように、ウェイト7は、略平板の形状を有し、主面71と、側面72とを備えている。 Figure 5 is a schematic diagram showing the shape of the weight 7. Figure 6 is a schematic diagram showing the shape of the weight support mechanism 42 that supports the weight 7. Figure 7 is a schematic diagram showing how the weight 7 is lifted using the lifting mechanism 45, and in particular how it is suspended at two points, the suspended parts 73a and 73b. Figure 8 is a schematic diagram showing how the weight 7 is lifted using the lifting mechanism 45, and in particular how it is suspended at four points, the suspended parts 73a, 73b, 73c, and 74d. First, as shown in Figure 5, the weight 7 has a generally flat plate shape and includes a main surface 71 and a side surface 72.
主面71は、四隅が切り取られた形状を有し、切り取られた領域711から突出するように、被懸吊部73が視認されている。側面72の一部には、側面721が含まれる。四隅に位置する側面721には、4つの被懸吊部73である被懸吊部73a,73b,73c,73dがそれぞれ設けられている。つまり換言すると、ウェイト7には略平板の各頂点において被懸吊部73が設けられている。そして、それぞれの被懸吊部73には、挿通孔74が設けられ、これをワイヤW(図7及び図8参照)が挿通可能に構成されている。つまり、揚重機構45は、被懸吊部73を直接又は間接に懸吊することでウェイト7を揚重し、カウンターフレーム4とベースフレーム51との間でウェイト7を移載するように構成されている。 The main surface 71 has a shape with four corners cut out, and the suspended parts 73 are visible as protruding from the cut-out areas 711. A part of the side surface 72 includes the side surface 721. The side surfaces 721 located at the four corners are provided with the four suspended parts 73, namely, suspended parts 73a, 73b, 73c, and 73d. In other words, the weight 7 is provided with suspended parts 73 at each vertex of a substantially flat plate. Each suspended part 73 is provided with an insertion hole 74, which is configured to allow the wire W (see Figures 7 and 8) to pass through. In other words, the lifting mechanism 45 is configured to lift the weight 7 by directly or indirectly suspending the suspended parts 73, and to transfer the weight 7 between the counter frame 4 and the base frame 51.
さらに、ウェイト7は、略平板の側面72(側部)に突起75を有している。突起75は、被懸吊部73の延在方向とは略垂直方向に延在し、具体的には、一対の突起75L,75Rとして構成されている。図6に示されるように、ウェイト7を支持するウェイト支持機構42は、複数の凹部421を有する。図6の例では、4つの凹部421が設けられており、これらに、4つのウェイト7それぞれの突起75を入り込ませて、ウェイト7が支持されている。換言すると、ウェイト7における突起75が凹部421に入り込むことで、ウェイト7がウェイト支持機構42に支持される。もちろん、固定されずに単に凹部421に突起75が入り込んで支持されてもよいし、突起75が凹部421に、ある程度強固に嵌合されて支持されてもよい。また、図6に示される突起75は、突起75L,75Rの一方であるが、不図示である他方も同様に支持されている。このような構成によって、略平板状のウェイト7を立てた状態で、クライミングクレーン1のおもりとして設置することができる。 Furthermore, the weight 7 has a protrusion 75 on the side surface 72 (side portion) of the approximately flat plate. The protrusion 75 extends in a direction approximately perpendicular to the extension direction of the suspended portion 73, and is specifically configured as a pair of protrusions 75L and 75R. As shown in FIG. 6, the weight support mechanism 42 that supports the weight 7 has a plurality of recesses 421. In the example of FIG. 6, four recesses 421 are provided, and the protrusions 75 of the four weights 7 are inserted into these recesses to support the weights 7. In other words, the weights 7 are supported by the weight support mechanism 42 by the protrusions 75 of the weights 7 entering the recesses 421. Of course, the protrusions 75 may simply enter the recesses 421 without being fixed and supported, or the protrusions 75 may be fitted into the recesses 421 to a certain extent and supported. Also, the protrusion 75 shown in FIG. 6 is one of the protrusions 75L and 75R, but the other one (not shown) is supported in the same way. With this configuration, the roughly flat weight 7 can be set upright as a weight for the climbing crane 1.
また、ウェイト7を立てた状態で、ウェイト支持機構42に支持させるため、好ましくは、揚重機構45が、略平板状のウェイト7を立てた状態で揚重可能に構成されるとよい。 In order to support the weight 7 in an upright position on the weight support mechanism 42, it is preferable that the lifting mechanism 45 is configured to be capable of lifting the approximately flat weight 7 in an upright position.
具体的には、図7に示されるように、被懸吊部73a,73bの2つにワイヤWを挿通させて、揚重機構45におけるフック451を用いて、ウェイト7をカウンターフレーム4からベースフレーム51に移載することができる。このように、2点で支えることで、略平板状のウェイト7が立った状態で移載されるため、移載時にウェイト7の姿勢を変更することなく、効率的な作業を実現することができる。 Specifically, as shown in FIG. 7, the weight 7 can be transferred from the counter frame 4 to the base frame 51 by inserting the wire W through the two suspended portions 73a, 73b and using the hook 451 in the lifting mechanism 45. By supporting the weight 7 at two points in this way, the weight 7, which is substantially flat, is transferred in an upright position, allowing for efficient work without changing the position of the weight 7 during transfer.
一方、図8に示されるように、被懸吊部73a,73b,73c,73dの4つにワイヤWを挿通させて、揚重機構45’におけるフック451’を用いて、ウェイト7を揚重することもできる。なお、図8における揚重機構45’は、クライミングクレーン1に搭載された揚重機構45とは異なる外部の機構であってよく、フック451’は、揚重機構45’における懸吊部材であってよい。例えば、ウェイト7を、管理している工場からトラックの荷台等に積み込む際、安定化のため、略平板状のウェイト7を寝かせて搬送することが好ましい。このため、図8に示されるように、4点で支えることで、略平板状のウェイト7が寝かされた状態で揚重され、トラックの荷台等に搭載されるとよい。 On the other hand, as shown in FIG. 8, the weight 7 can be lifted using the hook 451' in the lifting mechanism 45' by inserting the wire W through the four suspended parts 73a, 73b, 73c, and 73d. The lifting mechanism 45' in FIG. 8 may be an external mechanism different from the lifting mechanism 45 mounted on the climbing crane 1, and the hook 451' may be a suspension member in the lifting mechanism 45'. For example, when loading the weight 7 from a managed factory onto the bed of a truck, it is preferable to transport the approximately flat weight 7 lying down for stabilization. For this reason, as shown in FIG. 8, the approximately flat weight 7 is lifted in a lying state by supporting it at four points, and then loaded onto the bed of a truck.
すなわち、ウェイト7は、懸吊される被懸吊部73の組合せに基づいて、揚重の際に維持姿勢を可変に構成されている。このような態様によれば、状況やニーズに応じて、揚重の際のウェイト7の維持姿勢を決定することができる。 In other words, the weight 7 is configured so that the posture it maintains during lifting can be changed based on the combination of the suspended parts 73 that are suspended. In this manner, the posture that the weight 7 maintains during lifting can be determined according to the situation and needs.
1.4 構成のまとめ
以上をまとめると、クライミングクレーン1は、クレーン本体3と、マスト2と、基礎構造部5とを備える。クレーン本体3は、ジブ32と、カウンターフレーム4とを備える。ジブ32は、前後に延在するとともに、起伏可能に構成される。カウンターフレーム4は、ジブ32の延在する側と逆側に設けられ、少なくとも1つのウェイト7を設置可能に構成される。マスト2は、クレーン本体3を支持するように構成される。マスト2は、クレーン本体3の高さを調節可能に、上下方向に順次立設されるように構成される。基礎構造部5は、マスト2を支持するように構成される。基礎構造部5は、ウェイト7を設置可能なベースフレーム51を備える。クライミングクレーン1は、マスト2の高さに基づいて、カウンターフレーム4とベースフレーム51との間でウェイト7を移載可能に構成される。
1.4 Summary of the Configuration In summary, the climbing crane 1 comprises a crane body 3, a mast 2, and a foundation structure 5. The crane body 3 comprises a jib 32 and a counter frame 4. The jib 32 extends forward and backward and is configured to be able to be raised and lowered. The counter frame 4 is provided on the side opposite to the side on which the jib 32 extends, and is configured to be able to install at least one weight 7. The mast 2 is configured to support the crane body 3. The mast 2 is configured to be erected successively in the vertical direction so that the height of the crane body 3 can be adjusted. The foundation structure 5 is configured to support the mast 2. The foundation structure 5 comprises a base frame 51 on which the weight 7 can be installed. The climbing crane 1 is configured to be able to transfer the weight 7 between the counter frame 4 and the base frame 51 based on the height of the mast 2.
このような構成によれば、クライミングクレーン1の、マスト2の高床化に伴う転倒のリスクを低減可能することができる。なお、ベースフレーム51にウェイト7を設置する場合は、カウンターフレーム4に設置する場合と比べて、クライミングクレーン1の転倒モーメントを効果的に減らすことができず、より質量の大きなウェイト7が必要である。本構成では、低床時にカウンターフレーム4に設けられていたウェイト7を、そのまま転用することができるため、低床時/高床時ともにベースフレーム51に設置しているウェイト7と合わせることで、わざわざ別途に質量の大きなウェイト7を準備する必要がなくなり、好適である。すなわち、予め準備するウェイト7の個数を少なくすることができ、効率面でもコスト面でも向上が図られる。 This configuration can reduce the risk of the climbing crane 1 tipping over due to the elevation of the mast 2. When the weight 7 is installed on the base frame 51, the tipping moment of the climbing crane 1 cannot be reduced as effectively as when it is installed on the counter frame 4, and a weight 7 with a larger mass is required. With this configuration, the weight 7 installed on the counter frame 4 when the floor is low can be reused as is, and by combining it with the weight 7 installed on the base frame 51 when the floor is low and high, there is no need to take the trouble of preparing a separate weight 7 with a large mass, which is preferable. In other words, the number of weights 7 to be prepared in advance can be reduced, improving both efficiency and cost.
2.クライミングクレーン1を用いた工事方法
本節では、前述のクライミングクレーン1を用いた工事方法について説明する。図9は、工事方法の流れを示すフローチャートである。以下、図9に示される各ステップに沿って説明をする。
2. Construction method using the climbing crane 1 In this section, a construction method using the above-mentioned climbing crane 1 will be described. Figure 9 is a flowchart showing the flow of the construction method. Below, an explanation will be given along with each step shown in Figure 9.
まず、建造中の建築物に対して、クライミングクレーン1を用いて工事を進行させる(ステップS001)。工事が進むにつれて建造物の高さが高層化するため、これに合わせて適宜マスト2を継ぎ足していくこととなる。そのため、必要なマスト2の高さをコンピュータ6を用いて適宜見積もる(ステップS002)。 First, the construction work is carried out on the building under construction using the climbing crane 1 (step S001). As the construction work progresses, the building becomes taller, so the mast 2 must be added accordingly. Therefore, the required height of the mast 2 is estimated appropriately using the computer 6 (step S002).
このとき、前述したマスト2の高さが基準値を超えているかを検討し(ステップS003)、超えていない場合(ステップS003におけるNOの場合)は、見積もった高さとなるようにマスト2を継ぎ足して(ステップS004)、工事を継続する。一方、超えている場合(ステップS003におけるYESの場合)は、地震等の際にクライミングクレーン1が転倒するリスクを考慮し、カウンターフレーム4に設けられたウェイト7を、揚重機構45を用いて揚重して取り外す(ステップS005:第1の取外し工程)。取り外されたウェイト7は、ベースフレーム51が位置する下方に向かって運搬される。 At this time, it is checked whether the height of the mast 2 described above exceeds the standard value (step S003), and if it does not (NO in step S003), the mast 2 is extended to the estimated height (step S004) and construction continues. On the other hand, if it does exceed the standard (YES in step S003), taking into consideration the risk of the climbing crane 1 tipping over in the event of an earthquake, etc., the weight 7 attached to the counter frame 4 is lifted and removed using the lifting mechanism 45 (step S005: first removal process). The removed weight 7 is transported downward to where the base frame 51 is located.
続いて、ステップS005において取り外されたウェイト7をベースフレーム51における取付領域52に取り付ける(ステップS006:取付工程)。これにより、地震等の際にクライミングクレーン1が転倒するリスクが低減される。 Next, the weight 7 removed in step S005 is attached to the attachment area 52 of the base frame 51 (step S006: attachment process). This reduces the risk of the climbing crane 1 tipping over in the event of an earthquake or the like.
続いて、全てのウェイト7がカウンターフレーム4から取り外された状態において、旋回体31からカウンターフレーム4を取り外す(ステップS007:第2の取外し工程)。これにより、クライミングクレーン1の占める領域を小さくし、より省スペースに工事を進行させることができる。なお、このステップS007を省略してもよい。 Next, with all weights 7 removed from the counter frame 4, the counter frame 4 is removed from the rotating body 31 (step S007: second removal process). This reduces the area occupied by the climbing crane 1, allowing construction work to be carried out in a more space-saving manner. Note that this step S007 may be omitted.
続いて、ステップS002において見積もった高さとなるようにマスト2を継ぎ足す(ステップS008:高床化工程)。その後、さらに工事を進行させていく(ステップS009)。 Next, the mast 2 is extended to reach the height estimated in step S002 (step S008: raising the floor process). After that, the construction work continues (step S009).
以上をまとめると、工事方法は、クライミングクレーン1を用いた工事方法である。この工事方法は、次の各工程を備える。第1の取外し工程では、ウェイト7をカウンターフレーム4から取り外す。取付工程では、取り外したウェイト7をベースフレーム51に取り付ける。第2の取外し工程では、クライミングクレーン1のクレーン本体3からカウンターフレーム4を取り外す。高床化工程では、マスト2の高さを高床化させるように、マスト2を順次立設する。 In summary, the construction method is a construction method using a climbing crane 1. This construction method includes the following steps. In the first removal step, the weight 7 is removed from the counter frame 4. In the installation step, the removed weight 7 is installed on the base frame 51. In the second removal step, the counter frame 4 is removed from the crane body 3 of the climbing crane 1. In the raising step, the mast 2 is sequentially erected so as to raise the height of the mast 2.
このような方法によれば、クライミングクレーン1の、マスト2の高床化に伴う転倒のリスクを低減可能することができる。なお、ベースフレーム51にウェイト7を設置する場合は、カウンターフレーム4に設置する場合と比べて、クライミングクレーン1の転倒モーメントを効果的に減らすことができず、より質量の大きなウェイト7が必要である。本方法では、低床時にカウンターフレーム4に設けられていたウェイト7を、そのまま転用するため、低床時/高床時ともにベースフレーム51に設置しているウェイト7と合わせることで、わざわざ別途に質量の大きなウェイト7を準備する必要がなくなり、好適である。すなわち、予め準備するウェイト7の個数を少なくすることができ、効率面でもコスト面でも向上が図られる。 This method can reduce the risk of the climbing crane 1 tipping over due to the elevation of the mast 2. When the weight 7 is installed on the base frame 51, the tipping moment of the climbing crane 1 cannot be effectively reduced compared to when it is installed on the counter frame 4, and a weight 7 with a larger mass is required. In this method, the weight 7 installed on the counter frame 4 when the floor is low is reused as is, and by combining it with the weight 7 installed on the base frame 51 when the floor is low and high, it is not necessary to take the trouble of preparing a separate weight 7 with a large mass, which is preferable. In other words, the number of weights 7 to be prepared in advance can be reduced, improving both efficiency and cost.
3.その他
本実施形態に係るクライミングクレーン1を、次のような態様で実施してもよい。
3. Others The climbing crane 1 according to this embodiment may be implemented in the following manner.
(1)本実施形態では、マスト2を高床化させるにあたって、カウンターフレーム4に設けられたウェイト7をベースフレーム51に移載することについて説明したが、マスト2を低床化させるにあたって、ベースフレーム51に設けられたウェイト7をカウンターフレーム4に移載してもよい。かかる場合、この工事方法は、次の各工程を備える。取外し工程では、ウェイト7をベースフレーム51から取り外す。取付工程では、取り外したウェイト7をカウンターフレーム4に取り付ける。低床化工程では、マスト2の高さを低床化させるように、マスト2を順次解体する。 (1) In this embodiment, the weight 7 provided on the counter frame 4 is transferred to the base frame 51 to raise the height of the mast 2. However, the weight 7 provided on the base frame 51 may be transferred to the counter frame 4 to lower the height of the mast 2. In such a case, the construction method includes the following steps. In the removal step, the weight 7 is removed from the base frame 51. In the installation step, the removed weight 7 is installed on the counter frame 4. In the lowering step, the mast 2 is dismantled in sequence to lower the height of the mast 2.
(2)本実施形態では、コンピュータ6による判断によって、ウェイト7を移載するか否かを決定しているが、かかる判断及び決定を、ユーザがマニュアルで実施してもよい。また、制御部63による揚重機構45の制御を自動化してもよいし、ユーザがマニュアルで操作してもよい。 (2) In this embodiment, the computer 6 determines whether or not to transfer the weight 7, but such determination and decision may be performed manually by the user. In addition, the control of the lifting mechanism 45 by the control unit 63 may be automated, or may be operated manually by the user.
(3)ウェイト7を移載する際に、揚重機構45に代えて、クレーン車等、外部の揚重機構45’を用いて実施してもよい。 (3) When transferring the weight 7, an external lifting mechanism 45', such as a crane truck, may be used instead of the lifting mechanism 45.
(4)さらに、次に記載の各態様で提供されてもよい。
前記クライミングクレーンにおいて、前記カウンターフレームは、前記クレーン本体に対して着脱可能に構成される、もの。
前記クライミングクレーンにおいて、前記基礎構造部は、地盤に対して固定具無しに接地することで、前記マストを支持するように構成される、もの。
前記クライミングクレーンにおいて、前記ウェイトは、略平板の形状を有し、前記略平板の各頂点において被懸吊部が設けられ、懸吊される前記被懸吊部の組合せに基づいて、揚重の際に維持姿勢を可変に構成される、もの。
前記クライミングクレーンにおいて、ウェイト支持機構をさらに備え、前記ウェイト支持機構は、前記カウンターフレーム及び前記ベースフレームの少なくとも一方に設けられ、複数の凹部を有し、前記ウェイトは、前記略平板の側部に突起を有し、前記突起が前記凹部に入り込むことで、前記ウェイト支持機構に支持される、もの。
前記クライミングクレーンにおいて、揚重機構をさらに備え、前記揚重機構は、前記被懸吊部を直接又は間接に懸吊することで前記ウェイトを揚重し、前記カウンターフレームと前記ベースフレームとの間で前記ウェイトを移載するように構成される、もの。
前記クライミングクレーンにおいて、制御部をさらに備え、前記制御部は、前記マストの高さに応じて、前記カウンターフレームと前記ベースフレームとの間で前記ウェイトを移載するように、前記揚重機構を制御可能に構成される、もの。
クライミングクレーンを用いた工事方法であって、次の各工程を備え、第1の取外し工程では、ウェイトをカウンターフレームから取り外し、取付工程では、取り外した前記ウェイトをベースフレームに取り付け、高床化工程では、マストの高さを高床化させるように、前記マストを順次立設する、方法。
前記工事方法において、第2の取外し工程では、前記クライミングクレーンのクレーン本体から前記カウンターフレームを取り外す、方法。
前記工事方法において、前記クライミングクレーンは、前記クライミングクレーンである、方法。
もちろん、この限りではない。
(4) It may further be provided in any of the following aspects:
In the climbing crane, the counter frame is configured to be detachable from the crane body.
In the climbing crane, the foundation structure is configured to support the mast by being grounded on the ground without any fasteners.
In the climbing crane, the weight has an approximately flat plate shape, with suspended parts provided at each vertex of the approximately flat plate, and the maintained posture during lifting can be changed based on the combination of the suspended parts that are suspended.
The climbing crane further comprises a weight support mechanism, the weight support mechanism being provided on at least one of the counter frame and the base frame and having a plurality of recesses, and the weight has a protrusion on a side of the approximately flat plate, and the protrusion fits into the recess, thereby being supported by the weight support mechanism.
The climbing crane further includes a lifting mechanism configured to lift the weight by directly or indirectly suspending the suspended part and to transfer the weight between the counter frame and the base frame.
The climbing crane further includes a control unit, the control unit being configured to be able to control the lifting mechanism so as to transfer the weight between the counter frame and the base frame depending on the height of the mast.
A construction method using a climbing crane, comprising the following steps: a first removal step, removing a weight from a counter frame; an attachment step, attaching the removed weight to a base frame; and a raising step, sequentially erecting the mast so as to raise the height of the mast.
In the construction method, the second removal step is to remove the counter frame from the crane body of the climbing crane.
In the construction method, the climbing crane is the climbing crane.
Of course, this is not the case.
最後に、本発明に係る種々の実施形態を説明したが、これらは、例として提示したものであり、発明の範囲を限定することは意図していない。当該新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。当該実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。 Finally, although various embodiments of the present invention have been described, these are presented as examples and are not intended to limit the scope of the invention. The novel embodiments can be embodied in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. The embodiments and their modifications are within the scope and spirit of the invention, and are included in the scope of the invention and its equivalents as set forth in the claims.
1 :クライミングクレーン
2 :マスト
3 :クレーン本体
32 :ジブ
4 :カウンターフレーム
42 :ウェイト支持機構
421 :凹部
45 :揚重機構
5 :基礎構造部
51 :ベースフレーム
63 :制御部
7 :ウェイト
72 :側面
73 :被懸吊部
73a :被懸吊部
73b :被懸吊部
73c :被懸吊部
73d :被懸吊部
75 :突起
75L :突起
75R :突起
G :地盤
1: Climbing crane 2: Mast 3: Crane body 32: Jib 4: Counter frame 42: Weight support mechanism 421: Recess 45: Lifting mechanism 5: Foundation structure 51: Base frame 63: Control unit 7: Weight 72: Side 73: Suspended part 73a: Suspended part 73b: Suspended part 73c: Suspended part 73d: Suspended part 75: Protrusion 75L: Protrusion 75R: Protrusion G: Ground
Claims (10)
クレーン本体と、マストと、基礎構造部とを備え、
前記クレーン本体は、ジブと、カウンターフレームとを備え、
前記ジブは、前後に延在するとともに、起伏可能に構成され、
前記カウンターフレームは、前記ジブの延在する側と逆側に設けられ、少なくとも1つのウェイトを設置可能に構成され、
前記マストは、
前記クレーン本体を支持するように構成され、
前記クレーン本体の高さを調節可能に、上下方向に順次立設されるように構成され、
前記基礎構造部は、
前記マストを支持するように構成され、
前記ウェイトを設置可能なベースフレームを備え、
前記マストの高さに応じて、前記カウンターフレームと前記ベースフレームとの間で前記ウェイトを移載可能に構成される、もの。 A climbing crane,
The crane comprises a crane body, a mast, and a foundation structure,
The crane body includes a jib and a counter frame.
The jib extends forward and backward and is configured to be able to be raised and lowered.
The counter frame is provided on the side opposite to the side on which the jib extends and is configured to be able to install at least one weight,
The mast is
configured to support the crane body,
The height of the crane body is adjustable so that it is installed vertically in sequence.
The foundation structure includes:
configured to support the mast;
A base frame on which the weight can be installed is provided,
The weight is configured to be transferable between the counter frame and the base frame depending on the height of the mast.
前記カウンターフレームは、前記クレーン本体に対して着脱可能に構成される、もの。 2. The climbing crane according to claim 1,
The counter frame is configured to be detachable from the crane body.
前記基礎構造部は、地盤に対して固定具無しに接地することで、前記マストを支持するように構成される、もの。 The climbing crane according to claim 1 or 2,
The foundation structure is configured to support the mast by being grounded on the ground without any fasteners.
前記ウェイトは、
略平板の形状を有し、前記略平板の各頂点において被懸吊部が設けられ、
懸吊される前記被懸吊部の組合せに基づいて、揚重の際に維持姿勢を可変に構成される、もの。 In the climbing crane according to any one of claims 1 to 3,
The weight is
The device has a generally flat plate shape, and a suspended portion is provided at each vertex of the generally flat plate.
The posture maintained during lifting can be varied based on the combination of the suspended parts that are suspended.
ウェイト支持機構をさらに備え、
前記ウェイト支持機構は、
前記カウンターフレーム及び前記ベースフレームの少なくとも一方に設けられ、
複数の凹部を有し、
前記ウェイトは、
前記略平板の側部に突起を有し、
前記突起が前記凹部に入り込むことで、前記ウェイト支持機構に支持される、もの。 A climbing crane according to claim 4,
A weight support mechanism is further provided,
The weight support mechanism includes:
At least one of the counter frame and the base frame is provided with a
A plurality of recesses are provided.
The weight is
A protrusion is provided on a side of the substantially flat plate,
The protrusion fits into the recess and is thereby supported by the weight support mechanism.
揚重機構をさらに備え、
前記揚重機構は、前記被懸吊部を直接又は間接に懸吊することで前記ウェイトを揚重し、前記カウンターフレームと前記ベースフレームとの間で前記ウェイトを移載するように構成される、もの。 The climbing crane according to claim 4 or 5,
Further comprising a lifting mechanism;
The lifting mechanism is configured to lift the weight by directly or indirectly suspending the suspended part, and to transfer the weight between the counter frame and the base frame.
制御部をさらに備え、
前記制御部は、前記マストの高さに応じて、前記カウンターフレームと前記ベースフレームとの間で前記ウェイトを移載するように、前記揚重機構を制御可能に構成される、もの。 7. The climbing crane according to claim 6,
A control unit is further provided.
The control unit is configured to be able to control the lifting mechanism to transfer the weight between the counter frame and the base frame depending on the height of the mast.
次の各工程を備え、
第1の取外し工程では、ウェイトをカウンターフレームから取り外し、
取付工程では、取り外した前記ウェイトをベースフレームに取り付け、
高床化工程では、マストの高さを高床化させるように、前記マストを順次立設する、方法。 A construction method using a climbing crane, comprising:
The following processes are included:
In the first removal step, the weight is removed from the counter frame;
In the attachment step, the removed weight is attached to a base frame,
In the step of raising the floor level, the masts are sequentially erected so as to raise the height of the masts.
第2の取外し工程では、前記クライミングクレーンのクレーン本体から前記カウンターフレームを取り外す、方法。 The construction method according to claim 8,
In a second removal step, the counter frame is removed from the crane body of the climbing crane.
前記クライミングクレーンは、請求項1~請求項7の何れか1つに記載のクライミングクレーンである、方法。 In the construction method according to any one of claims 8 and 9,
8. A method according to claim 1, wherein the climbing crane is a climbing crane according to any one of claims 1 to 7.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021048391A JP7626641B2 (en) | 2021-03-23 | 2021-03-23 | Climbing crane and construction method using climbing crane |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021048391A JP7626641B2 (en) | 2021-03-23 | 2021-03-23 | Climbing crane and construction method using climbing crane |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2022147229A JP2022147229A (en) | 2022-10-06 |
| JP7626641B2 true JP7626641B2 (en) | 2025-02-04 |
Family
ID=83463845
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021048391A Active JP7626641B2 (en) | 2021-03-23 | 2021-03-23 | Climbing crane and construction method using climbing crane |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7626641B2 (en) |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000053376A (en) | 1998-08-17 | 2000-02-22 | Ohbayashi Corp | Elevating/lowering device for small crane |
| US20060283826A1 (en) | 2003-09-15 | 2006-12-21 | Jean-Marc Yeral | Lifting appliance |
| JP2008162749A (en) | 2006-12-28 | 2008-07-17 | Koshihara:Kk | Jib crane |
| CN103832936A (en) | 2013-12-17 | 2014-06-04 | 朝阳凌云建筑机械有限公司 | Lifting moment balance system of tower crane |
| JP2020007154A (en) | 2014-01-27 | 2020-01-16 | マニタウォック クレイン カンパニーズ, エルエルシーManitowoc Crane Companies, Llc | Lifting crane with improved movable counterweight |
| CN210528311U (en) | 2019-09-09 | 2020-05-15 | 湖南建工集团有限公司 | Movable tower crane with damper |
| CN111232849A (en) | 2020-01-20 | 2020-06-05 | 中国十七冶集团有限公司 | Tower crane dismantling method |
| CN212450361U (en) | 2020-04-17 | 2021-02-02 | 四川华晶建筑工程有限公司 | Tower crane is used in major structure construction |
-
2021
- 2021-03-23 JP JP2021048391A patent/JP7626641B2/en active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000053376A (en) | 1998-08-17 | 2000-02-22 | Ohbayashi Corp | Elevating/lowering device for small crane |
| US20060283826A1 (en) | 2003-09-15 | 2006-12-21 | Jean-Marc Yeral | Lifting appliance |
| JP2008162749A (en) | 2006-12-28 | 2008-07-17 | Koshihara:Kk | Jib crane |
| CN103832936A (en) | 2013-12-17 | 2014-06-04 | 朝阳凌云建筑机械有限公司 | Lifting moment balance system of tower crane |
| JP2020007154A (en) | 2014-01-27 | 2020-01-16 | マニタウォック クレイン カンパニーズ, エルエルシーManitowoc Crane Companies, Llc | Lifting crane with improved movable counterweight |
| CN210528311U (en) | 2019-09-09 | 2020-05-15 | 湖南建工集团有限公司 | Movable tower crane with damper |
| CN111232849A (en) | 2020-01-20 | 2020-06-05 | 中国十七冶集团有限公司 | Tower crane dismantling method |
| CN212450361U (en) | 2020-04-17 | 2021-02-02 | 四川华晶建筑工程有限公司 | Tower crane is used in major structure construction |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2022147229A (en) | 2022-10-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10106956B2 (en) | Counterweight system for an industrial machine | |
| WO2007082222A1 (en) | Pumping tower support system and method of use | |
| JP7626641B2 (en) | Climbing crane and construction method using climbing crane | |
| JP2013010578A (en) | Method and jig for lifting of structure by crane | |
| JP7811472B2 (en) | Crane system and construction method | |
| CN215666805U (en) | Counterweight device and crane | |
| JP7746112B2 (en) | Climbing crane and construction method | |
| CN219136153U (en) | Heavy-duty steel member in-situ transfer support | |
| JP3272683B2 (en) | Counterweight self-removal device | |
| AU2007100972A4 (en) | Improvements to transportable lifting devices | |
| CN113003447A (en) | Counterweight device and crane | |
| CN221140821U (en) | Hanging bracket | |
| CN213537081U (en) | A transfer device for power distribution cabinet production | |
| JP7388883B2 (en) | Crane basic structure | |
| CN219098500U (en) | Mould hoist device | |
| CN213015273U (en) | a scaffold | |
| JP2546737Y2 (en) | Lifting device for multi-story parking facilities | |
| CN220811511U (en) | Vertical material conveying device in elevator hoistway | |
| JP2024008329A (en) | Crane and construction method | |
| CN114934447B (en) | Multi-span suspension bridge tower zone beam section system conversion method | |
| JP4914130B2 (en) | Climbing crane | |
| US20230010511A1 (en) | Method for adapting the load curve of a crane to its configuration | |
| JP2022124658A (en) | Batch installation method for suspended loads, cradle, and batch installation system for suspended loads | |
| JP3313285B2 (en) | Cargo handling vehicle with traveling device | |
| JP2026067065A (en) | Tower crane and cross base transport method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| RD01 | Notification of change of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7421 Effective date: 20240312 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240313 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20240312 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20241125 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250107 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250123 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7626641 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |