JP7626686B2 JP2021134257A JP2021134257A JP7626686B2 JP 7626686 B2 JP7626686 B2 JP 7626686B2 JP 2021134257 A JP2021134257 A JP 2021134257A JP 2021134257 A JP2021134257 A JP 2021134257A JP 7626686 B2 JP7626686 B2 JP 7626686B2
Authority
JP
Japan
Prior art keywords
concrete
crack suppression
suppression member
strain
optical fiber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021134257A
Other languages
Japanese (ja)
Other versions
JP2023028511A (en
Inventor
聖 小林
剛 取違
泰明 山野
健 水野
進太郎 小嶋
陽兵 平
昇 坂田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2021134257A priority Critical patent/JP7626686B2/en
Publication of JP2023028511A publication Critical patent/JP2023028511A/en
Application granted granted Critical
Publication of JP7626686B2 publication Critical patent/JP7626686B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

本開示は、コンクリート構造物の構築のときにひび割れ抑制部材の要否を判定する判定方法、及びコンクリート構造物の構築方法に関する。 This disclosure relates to a method for determining whether or not a crack suppression member is required when constructing a concrete structure, and a method for constructing a concrete structure.

コンクリート構造物におけるコンクリートのひび割れを予測及び推定する方法が知られている。例えば、特許文献1には、壁状の鉄筋コンクリート構造物の最大ひび割れ幅の推定方法が記載されている。鉄筋コンクリート構造物は、フーチングの上に築造された複数の壁状体である。複数の壁状体の間には目地材が配置されている。この種の構造物に対し、最大ひび割れの推定が行われる。 Methods for predicting and estimating cracks in concrete structures are known. For example, Patent Document 1 describes a method for estimating the maximum crack width of a wall-shaped reinforced concrete structure. The reinforced concrete structure is made up of multiple wall-like bodies built on a footing. Joint material is placed between the multiple wall-like bodies. For this type of structure, the maximum crack is estimated.

この推定方法では、まず既設の外部拘束を受ける複数の構造物からひび割れの実測データを収集する。次に、ひび割れの実測データから、構造物の壁の単位長さ当たりに発生するひび割れ幅の合計を示す推定単位ひび割れ幅と、構造物の壁の単位長さ当たりに発生するひび割れの本数を示す推定単位ひび割れ本数を算出する。算出された推定単位ひび割れ幅及び推定単位ひび割れ本数から当該構造物の最大ひび割れ幅が推定される。 In this estimation method, first, measured crack data is collected from multiple existing structures that are subject to external restraints. Next, from the measured crack data, an estimated unit crack width, which indicates the total crack width that occurs per unit length of the structure's wall, and an estimated unit crack number, which indicates the number of cracks that occur per unit length of the structure's wall, are calculated. The maximum crack width of the structure is estimated from the calculated estimated unit crack width and estimated unit crack number.

特許文献2には、最大ひび割れ幅の予測方法が記載されている。この予測方法が対象とする構造物は鉄筋コンクリート構造物であり、鉄筋とコンクリートの表面との間にはひび割れ分散材が配設される。この予測方法では、平均鉄筋ひずみ、分配係数、ひび割れ分散材の純かぶり、ひび割れ分散材のあき、鉄筋の純かぶり、及び鉄筋のあき、をパラメータとして最大ひび割れ幅が算出される。 Patent Document 2 describes a method for predicting maximum crack width. The structure targeted by this prediction method is a reinforced concrete structure, in which a crack dispersion material is placed between the reinforcing bars and the surface of the concrete. In this prediction method, the maximum crack width is calculated using the average reinforcing bar strain, distribution coefficient, net cover of the crack dispersion material, gap of the crack dispersion material, net cover of the reinforcing bars, and gap of the reinforcing bars as parameters.

特開2009-19472号公報JP 2009-19472 A 特開2015-117954号公報JP 2015-117954 A

前述したように、コンクリートのひび割れを予測及び推定する方法では、ひび割れの実測データから構造物の最大ひび割れ幅が推定される。しかしながら、この方法では、最大ひび割れ幅は推定されるが、ひび割れを抑制するための具体的手段及び具体的方法が求められない場合がある。 As mentioned above, in the method of predicting and estimating cracks in concrete, the maximum crack width of a structure is estimated from actual crack measurement data. However, while this method estimates the maximum crack width, it may not require specific means or methods for suppressing cracks.

前述した最大ひび割れ幅の予測方法では、ひび割れ分散材を用いて最大ひび割れ幅が算出される。しかしながら、特許文献2には、ひび割れ分散材等のひび割れ抑制部材を配置することは記載されているものの、ひび割れ抑制部材をコンクリート構造物のどの位置に配置すればよいか、及びひび割れ抑制部材の要否そのものについては不明である。従って、ひび割れ抑制部材の配置を適切に行ってコンクリート構造物のひび割れを合理的に抑制することが求められている。 In the above-mentioned method for predicting maximum crack width, the maximum crack width is calculated using a crack dispersion material. However, although Patent Document 2 describes the placement of crack suppression members such as crack dispersion materials, it is unclear where in the concrete structure the crack suppression members should be placed, or whether or not the crack suppression members are even necessary. Therefore, there is a demand for the crack suppression members to be placed appropriately in order to rationally suppress cracks in concrete structures.

本開示は、ひび割れ抑制部材の配置を適切に行ってコンクリート構造物のひび割れを合理的に抑制できるひび割れ抑制部材の要否の判定方法、及びコンクリート構造物の構築方法を提供することを目的とする。 The present disclosure aims to provide a method for determining the necessity of crack suppression members that can be appropriately positioned to rationally suppress cracks in concrete structures, and a method for constructing concrete structures.

本開示に係るひび割れ抑制部材の要否の判定方法は、コンクリートの内部に埋設されるひび割れ抑制部材の要否を判定する判定方法であって、コンクリート打設域の複数の位置に光ファイバセンサを配置してコンクリート打設域にコンクリートを打設する工程と、コンクリートの打設後に光ファイバセンサが複数の位置の歪み量を測定する工程と、複数の位置の歪み量の差分の大きさからひび割れ抑制部材の要否を判定する工程と、を備える。 The method of determining whether or not a crack suppression member is required according to the present disclosure is a method of determining whether or not a crack suppression member embedded inside concrete is required, and includes the steps of placing optical fiber sensors at multiple positions in the concrete pouring area and pouring concrete into the concrete pouring area, measuring the amount of strain at the multiple positions using the optical fiber sensors after pouring the concrete, and determining whether or not a crack suppression member is required based on the magnitude of the difference in the amount of strain at the multiple positions.

この判定方法では、コンクリート打設域の複数の位置に光ファイバセンサが配置され当該複数の位置にコンクリートが打設される。光ファイバセンサは、コンクリートの打設後に経過時間(詳細には、コンクリート打設後の経過時間)と当該複数の位置の歪み量とを測定する。このように光ファイバセンサが複数の位置の歪み量を測定することにより、光ファイバの長さ方向に沿って当該複数の位置の歪み量を高精度に測定することができる。コンクリートのひび割れを抑制するひび割れ抑制部材の要否は、光ファイバセンサによって測定された複数の位置の歪み量の差分の大きさから判定される。従って、複数の位置における歪み量の差分からひび割れ抑制部材の要否が判定されるので、ひび割れ抑制部材の配置を適切に行うことができる。よって、ひび割れ抑制部材の配置を適切に行ってコンクリート構造物のひび割れを合理的に抑制することができる。 In this determination method, optical fiber sensors are placed at multiple positions in the concrete pouring area, and concrete is poured at the multiple positions. The optical fiber sensors measure the time that has elapsed since the concrete was poured (more specifically, the time that has elapsed since the concrete was poured) and the amount of strain at the multiple positions. By having the optical fiber sensor measure the amount of strain at multiple positions in this way, the amount of strain at the multiple positions can be measured with high accuracy along the length of the optical fiber. The need for a crack suppression member that suppresses cracks in the concrete is determined from the magnitude of the difference in the amount of strain at the multiple positions measured by the optical fiber sensor. Therefore, since the need for a crack suppression member is determined from the difference in the amount of strain at the multiple positions, the crack suppression member can be appropriately positioned. Therefore, cracks in the concrete structure can be rationally suppressed by appropriately positioning the crack suppression member.

コンクリートは、底版上に立設して鉛直方向に延びる部分を有し、複数の位置は、当該部分の厚さ方向の中央部と、当該部分の厚さ方向の表層部とを含んでもよい。この場合、鉛直方向に延びる部分の厚さ方向の中央部、及び当該部分の厚さ方向の表層部のそれぞれに光ファイバセンサが配置され、光ファイバセンサが中央部及び表層部の歪みを測定する。従って、中央部の歪みと表層部の歪みとの差分からひび割れ抑制部材の要否を判定することができる。 The concrete has a portion that stands on the base slab and extends vertically, and the multiple positions may include a central portion in the thickness direction of the portion and a surface layer portion in the thickness direction of the portion. In this case, optical fiber sensors are placed in the central portion in the thickness direction of the portion extending vertically and in the surface layer portion in the thickness direction of the portion, respectively, and the optical fiber sensors measure the strain in the central portion and the surface layer portion. Therefore, the need for a crack suppression member can be determined from the difference in strain between the central portion and the surface layer portion.

この判定方法は、コンクリートの打設後に光ファイバセンサが複数の位置の温度を測定する工程と、測定した温度に応じてコンクリートの温度を制御する工程とを備えてもよい。この場合、光ファイバセンサによる温度の測定結果を用いてコンクリートの温度を制御できるので、温度制御によってひび割れを生じにくくすることができる。 This determination method may include a step of measuring the temperature at multiple positions using an optical fiber sensor after the concrete is poured, and a step of controlling the temperature of the concrete in accordance with the measured temperature. In this case, the temperature measurement results from the optical fiber sensor can be used to control the temperature of the concrete, making it possible to make cracks less likely to occur through temperature control.

本開示の一側面に係るコンクリート構造物の構築方法は、第1区間及び第2区間に順次コンクリートを打設して構造物を構築するコンクリート構造物の構築方法であって、第1区間の複数の位置に光ファイバセンサを配置して第1コンクリートを打設する工程と、第1コンクリートの打設後に光ファイバセンサが複数の位置の歪み量を測定する工程と、複数の位置の歪み量の差分の大きさから、ひび割れ抑制部材の要否を判定する工程と、ひび割れ抑制部材の要否を判定する工程においてひび割れ抑制部材が必要であると判定された場合に、第2区間にひび割れ抑制部材を配置して第2コンクリートを打設する工程と、を備える。 A method for constructing a concrete structure according to one aspect of the present disclosure is a method for constructing a concrete structure by sequentially pouring concrete into a first section and a second section, and includes the steps of placing optical fiber sensors at multiple positions in the first section and pouring the first concrete, measuring the amount of strain at the multiple positions using the optical fiber sensors after pouring the first concrete, determining whether or not a crack suppression member is required based on the magnitude of the difference in the amount of strain at the multiple positions, and, if it is determined in the step of determining whether or not a crack suppression member is required that a crack suppression member is required, placing the crack suppression member in the second section and pouring the second concrete.

この構築方法では、コンクリートが打設される複数の区間のうちの第1区間に光ファイバセンサが配置されて第1コンクリートが打設される。そして、光ファイバセンサが第1区間の複数の位置の歪み量を測定し、複数の歪み量の差分の大きさからひび割れ抑制部材の配置の要否が判定される。従って、第1区間においてひび割れ抑制部材の要否を合理的に判定できる。また、第1区間においてひび割れ抑制部材が必要であると判定された場合には、第2区間にひび割れ抑制部材が配置されて第2コンクリートが打設される。従って、第2区間では、ひび割れ抑制部材を適切に配置して構造物のひび割れを合理的に抑制できる。 In this construction method, an optical fiber sensor is placed in a first section of multiple sections in which concrete is poured, and the first concrete is poured. The optical fiber sensor then measures the amount of strain at multiple positions in the first section, and the need for placing a crack suppression member is determined from the magnitude of the difference between the multiple strain amounts. Therefore, it is possible to rationally determine whether or not a crack suppression member is needed in the first section. Furthermore, if it is determined that a crack suppression member is needed in the first section, a crack suppression member is placed in the second section and the second concrete is poured. Therefore, in the second section, cracks in the structure can be rationally suppressed by appropriately placing the crack suppression member.

本開示の別の側面に係るコンクリート構造物の構築方法は、第1区間及び第2区間に順次コンクリートを打設して構造物を構築するコンクリート構造物の構築方法であって、第1区間の複数の位置に光ファイバセンサを配置して第1コンクリートを打設する工程と、第1コンクリートの打設後に光ファイバセンサが複数の位置の歪み量を測定する工程と、予めひび割れ抑制部材を第1コンクリートの内部に配置する工程と、複数の位置の歪み量の差分の大きさから、ひび割れ抑制部材の効果を判定する工程と、ひび割れ抑制部材の効果を判定する工程においてひび割れ抑制部材の位置の修正が必要であると判定された場合に、第2区間の修正された位置にひび割れ抑制部材を配置して第2コンクリートを打設する工程と、を備える。 A method for constructing a concrete structure according to another aspect of the present disclosure is a method for constructing a concrete structure by sequentially pouring concrete into a first section and a second section, and includes the steps of placing optical fiber sensors at multiple positions in the first section and pouring the first concrete, measuring the amount of strain at the multiple positions using the optical fiber sensors after pouring the first concrete, placing a crack suppression member inside the first concrete in advance, determining the effectiveness of the crack suppression member based on the magnitude of the difference in the amount of strain at the multiple positions, and, if it is determined in the step of determining the effect of the crack suppression member that it is necessary to correct the position of the crack suppression member, placing the crack suppression member at the corrected position in the second section and pouring the second concrete.

この構築方法では、第1区間に光ファイバセンサが配置されて第1コンクリートが打設されると共に、ひび割れ抑制部材を予め第1コンクリートの内部に配置する。コンクリート打設後の経過時間と共に、光ファイバセンサは、第1区間の複数の位置の歪み量を測定し、複数の歪み量の差分の大きさからひび割れ抑制部材の効果が判定される。そして、ひび割れ抑制部材の効果の判定の結果、ひび割れ抑制部材の位置の修正が必要であると判定された場合に、第2区間の修正された位置にひび割れ抑制部材が配置されて第2コンクリートが打設される。従って、修正された位置にひび割れ抑制部材が配置されることにより、ひび割れ抑制部材をより効果的な位置に配置できるので、ひび割れを合理的に抑制できる。 In this construction method, an optical fiber sensor is placed in the first section and the first concrete is poured, while a crack suppression member is placed inside the first concrete in advance. As time passes after the concrete is poured, the optical fiber sensor measures the amount of strain at multiple positions in the first section, and the effectiveness of the crack suppression member is determined from the magnitude of the difference between the multiple strain amounts. Then, if it is determined that the position of the crack suppression member needs to be corrected as a result of the determination of the effectiveness of the crack suppression member, the crack suppression member is placed in the corrected position in the second section and the second concrete is poured. Therefore, by placing the crack suppression member in the corrected position, the crack suppression member can be placed in a more effective position, thereby rationally suppressing cracks.

本開示によれば、ひび割れ抑制部材の配置を適切に行ってコンクリート構造物のひび割れを合理的に抑制できる。 According to the present disclosure, cracks in concrete structures can be rationally suppressed by appropriately positioning crack suppression members.

(a)は、実施形態に係る判定方法及び構築方法が適用される一例としてのコンクリート構造物を示す側面図である。(b)は、(a)のコンクリート構造物の一部を示す斜視図である。(c)は、コンクリート構造物の断面を模式的に示す図である。1A is a side view showing a concrete structure as an example to which a determination method and a construction method according to an embodiment are applied, FIG. 1B is a perspective view showing a part of the concrete structure of FIG. 1A, and FIG. 1C is a schematic diagram showing a cross section of the concrete structure. 実施形態に係る判定方法及び構築方法の工程を示すフローチャートである。1 is a flowchart illustrating steps of a determination method and a construction method according to an embodiment. (a)は、光ファイバセンサを配置してコンクリートを打設する工程を説明するための図である。(b)は、光ファイバセンサの配置を説明するためのコンクリートの断面を模式的に示す図である。1A is a diagram for explaining a process of placing an optical fiber sensor and pouring concrete, and FIG. 1B is a diagram for illustrating a cross section of concrete for explaining the placement of the optical fiber sensor. (a)、(b)、(c)及び(d)は、光ファイバセンサによる歪み量の測定結果の例を示すグラフである。6A, 6B, 6C, and 6D are graphs showing examples of the measurement results of the amount of strain measured by the optical fiber sensor. 実施形態で得られたコンクリート打設後の経過時間ごとの複数の位置の歪み量の差分の結果を示すグラフである。13 is a graph showing the results of the difference in the amount of distortion at multiple positions for each elapsed time after pouring concrete, obtained in an embodiment. (a)及び(c)は、コンクリート構造物に対する鉄筋又はひび割れ抑制部材の配置を模式的に示す断面図である。(b)及び(d)は、(a)又は(c)のように鉄筋が配置されたコンクリ-ト構造物におけるひび割れのシミュレーション結果を示す図である。(a) and (c) are cross-sectional views showing the arrangement of reinforcing bars or crack suppression members in a concrete structure, and (b) and (d) are diagrams showing the results of a simulation of cracks in a concrete structure in which reinforcing bars are arranged as in (a) or (c). (a)及び(c)は、コンクリート構造物に対する鉄筋及びひび割れ抑制部材の配置を模式的に示す断面図である。(b)及び(d)は、(a)又は(c)のように鉄筋及びひび割れ抑制部材が配置されたコンクリ-ト構造物におけるひび割れのシミュレーション結果を示す図である。(a) and (c) are cross-sectional views showing the arrangement of reinforcing bars and crack suppression members in a concrete structure, and (b) and (d) are diagrams showing the results of a simulation of cracks in a concrete structure in which reinforcing bars and crack suppression members are arranged as in (a) or (c). 第2実施形態に係るコンクリート構造物の構築方法の工程を示すフローチャートである。10 is a flowchart showing steps of a method for constructing a concrete structure according to a second embodiment. 光ファイバセンサを配置して打設されたコンクリートの温度を制御する態様を示す図である。FIG. 1 is a diagram showing an embodiment in which an optical fiber sensor is arranged to control the temperature of poured concrete. コンクリートの温度の制御方法における工程の例を示すフローチャートである。1 is a flowchart showing an example of steps in a method for controlling the temperature of concrete.

以下では、図面を参照しながら本開示に係る判定方法及び構築方法の実施形態について説明する。図面の説明において、同一又は相当する要素には同一の符号を付し、重複する説明を適宜省略する。また、図面は、理解の容易化のため、一部を簡略化又は誇張して描いている場合があり、寸法比率等は図面に記載のものに限定されない。 Below, an embodiment of the determination method and construction method according to the present disclosure will be described with reference to the drawings. In the description of the drawings, the same or corresponding elements are given the same reference numerals, and duplicated descriptions will be omitted as appropriate. In addition, the drawings may be partially simplified or exaggerated to facilitate understanding, and the dimensional ratios and the like are not limited to those shown in the drawings.

(第1実施形態)
図1(a)は、第1実施形態に係る判定方法及び構築方法が適用される一例としてのコンクリート構造物1を示している。図1(b)は、コンクリート構造物1の一部を示す斜視図である。図1(a)及び図1(b)に示されるように、例えば、コンクリート構造物1はボックスカルバートである。コンクリート構造物1は、第1方向D1及び第2方向D2に延在する底版2と、底版2の第1方向D1の中央部分において第3方向D3に立設する部分3とを有する。例えば、第1方向D1及び第2方向D2は水平方向であり、第3方向D3は鉛直方向である。
First Embodiment
Fig. 1(a) shows a concrete structure 1 as an example to which the determination method and construction method according to the first embodiment are applied. Fig. 1(b) is a perspective view showing a part of the concrete structure 1. As shown in Fig. 1(a) and Fig. 1(b), for example, the concrete structure 1 is a box culvert. The concrete structure 1 has a base slab 2 extending in a first direction D1 and a second direction D2, and a part 3 erected in a third direction D3 at a central part of the base slab 2 in the first direction D1. For example, the first direction D1 and the second direction D2 are horizontal directions, and the third direction D3 is a vertical direction.

例えば、コンクリート構造物1は、底版2と部分3との境界部分Bに底版2から部分3に向かって斜めに延びる傾斜面4を有する。コンクリート構造物1は、第1方向D1に並ぶ一対の傾斜面4を有する。各傾斜面4は、底版2の上面2bと部分3の側面3bとの間において、第1方向D1及び第3方向D3の双方に対して斜めに延在している。 For example, the concrete structure 1 has an inclined surface 4 that extends obliquely from the base slab 2 toward the portion 3 at the boundary portion B between the base slab 2 and the portion 3. The concrete structure 1 has a pair of inclined surfaces 4 aligned in the first direction D1. Each inclined surface 4 extends obliquely between the top surface 2b of the base slab 2 and the side surface 3b of the portion 3 with respect to both the first direction D1 and the third direction D3.

コンクリート構造物1は、例えば、複数の打ち継ぎ目5を有する。打ち継ぎ目5は、部分3の第3方向D3の中央、及び境界部分B(傾斜面4の上部)のそれぞれに設けられる。コンクリート構造物1は、底版2、部分3の下部(上下一対の打ち継ぎ目5の間の部分)、及び部分3の上部が、この順で打設されて構築される。また、コンクリート構造物1は、第2方向D2に沿って並ぶコンクリート打設域Aである第1区間A1及び第2区間A2を有する。第1区間A1と第2区間A2の間にも打ち継ぎ目5が設けられており、例えば、第1区間A1、第2区間A2の順でコンクリートが打設される。 The concrete structure 1 has, for example, a plurality of pouring joints 5. The pouring joints 5 are provided at the center of the portion 3 in the third direction D3 and at the boundary portion B (the upper portion of the inclined surface 4). The concrete structure 1 is constructed by pouring the base slab 2, the lower portion of the portion 3 (the portion between the pair of upper and lower pouring joints 5), and the upper portion of the portion 3 in that order. The concrete structure 1 also has a first section A1 and a second section A2, which are concrete pouring areas A aligned along the second direction D2. A pouring joint 5 is also provided between the first section A1 and the second section A2, and concrete is poured, for example, in the order of the first section A1 and the second section A2.

図1(c)は、第1方向D1及び第3方向D3に延びる平面に沿ってコンクリート構造物1を切断したときの断面図である。図1(c)に示されるように、コンクリート構造物1は、複数の主筋6と、複数の配力筋7と、コンクリート8とを備える。主筋6及び配力筋7はコンクリート8に埋設されており、主筋6は第3方向D3に延在し、配力筋7は第2方向D2に延在している。 Figure 1(c) is a cross-sectional view of the concrete structure 1 cut along a plane extending in the first direction D1 and the third direction D3. As shown in Figure 1(c), the concrete structure 1 comprises a plurality of main reinforcements 6, a plurality of distribution reinforcements 7, and concrete 8. The main reinforcements 6 and the distribution reinforcements 7 are embedded in the concrete 8, with the main reinforcements 6 extending in the third direction D3 and the distribution reinforcements 7 extending in the second direction D2.

コンクリート構造物1は、更に、ひび割れ抑制部材10を備える。ひび割れ抑制部材10は、コンクリート8のひび割れを抑制するために設けられる。コンクリート8には、例えば、コンクリートの水和反応による発熱が外気によって冷やされることによりひび割れが生じることがあるが、主筋6及び配力筋7の腐食を抑制するためにはコンクリート8のひび割れ幅を抑制することが必要である。 The concrete structure 1 further includes a crack suppression member 10. The crack suppression member 10 is provided to suppress cracks in the concrete 8. Cracks may occur in the concrete 8, for example, when heat generated by the hydration reaction of the concrete is cooled by the outside air, but in order to suppress corrosion of the main reinforcement bars 6 and the distribution bars 7, it is necessary to suppress the width of the cracks in the concrete 8.

ひび割れ抑制部材10は、コンクリート8のひび割れに抵抗することによってコンクリート8におけるひび割れ幅の拡大を抑制する。ひび割れ抑制部材10は、例えば、ひび割れ抑制鉄筋である。一例として、ひび割れ抑制部材10は、第3方向D3に沿って延びる複数の第1鉄筋12と、第2方向D2に沿って延びる複数の第2鉄筋13とを含んでいる。 The crack suppression member 10 suppresses the expansion of crack width in the concrete 8 by resisting cracks in the concrete 8. The crack suppression member 10 is, for example, a crack suppression rebar. As an example, the crack suppression member 10 includes a plurality of first rebars 12 extending along the third direction D3 and a plurality of second rebars 13 extending along the second direction D2.

ひび割れ抑制部材10は、例えば、底版2と部分3との境界部分Bにおける第1方向D1の中央部8cに配置される。この中央部8c(部材中央)はコンクリート8の表層部8b(かぶり)と比較して応力が卓越しやすい箇所であると考えられるため、中央部8cにひび割れ抑制部材10を配置するとコンクリート8のひび割れを効果的に抑制できる。 The crack suppression member 10 is placed, for example, in the central portion 8c in the first direction D1 at the boundary portion B between the base slab 2 and the portion 3. This central portion 8c (center of the member) is considered to be a location where stress is more likely to predominate than the surface portion 8b (cover) of the concrete 8, so placing the crack suppression member 10 in the central portion 8c can effectively suppress cracks in the concrete 8.

しかしながら、必ずしも上記のようにひび割れ抑制部材10を配置すればよいわけではなく、ひび割れ抑制部材10をどのように配置すればよいかについてはコンクリート構造物1の種類等によって異なる場合がある。よって、ひび割れ抑制部材10をどこにどの程度配置すれば効果的かが不明であるという現状があった。本実施形態に係るひび割れ抑制部材10の要否の判定方法、及びコンクリート構造物1の構築方法では、コンクリート8の歪み量を計測する光ファイバセンサ11(図3(a)参照)を用いてひび割れ抑制部材10の要否を判定し、ひび割れ抑制部材10を合理的且つ経済的に配置してコンクリート8のひび割れを抑制することが可能である。 However, it is not always sufficient to place the crack suppression members 10 as described above, and the manner in which the crack suppression members 10 should be placed may differ depending on the type of concrete structure 1, etc. Therefore, it is currently unclear where and to what extent the crack suppression members 10 should be placed to be effective. In the method for determining whether or not a crack suppression member 10 is required and the method for constructing a concrete structure 1 according to this embodiment, the need for a crack suppression member 10 is determined using an optical fiber sensor 11 (see FIG. 3(a)) that measures the amount of strain in the concrete 8, and the crack suppression members 10 can be placed rationally and economically to suppress cracks in the concrete 8.

本実施形態に係るコンクリート構造物1の構築方法、及びひび割れ抑制部材10の要否の判定方法について図2及び図3(a)を参照しながら説明する。図2は、コンクリート構造物1の構築方法の工程の例を示すフローチャートである。図3(a)は、コンクリート構造物1の第1区間A1、第2区間A2及び光ファイバセンサ11の配置の例を模式的に示す図である。本実施形態では、コンクリート構造物1を構築しながらひび割れ抑制部材10の要否を判定する。 The method for constructing the concrete structure 1 according to this embodiment and the method for determining whether or not a crack suppression member 10 is required will be described with reference to Figures 2 and 3(a). Figure 2 is a flowchart showing an example of the steps of the method for constructing the concrete structure 1. Figure 3(a) is a schematic diagram showing an example of the arrangement of the first section A1, the second section A2, and the optical fiber sensor 11 of the concrete structure 1. In this embodiment, the need for a crack suppression member 10 is determined while the concrete structure 1 is being constructed.

図2及び図3(a)に示されるように、まず、第1区間A1の複数の位置のそれぞれに光ファイバセンサ11を配置する(光ファイバセンサを配置する工程、ステップS1)。図3(a)では、光ファイバセンサ11を実線で模式的に示しているが、光ファイバセンサ11の端部には計測器が配置されている。この計測器は、例えば、光ファイバセンサ11を用いてレイリー計測によって打設されたコンクリート8の歪みを計測する。 As shown in Figures 2 and 3(a), first, optical fiber sensors 11 are placed at each of multiple positions in the first section A1 (step of placing optical fiber sensors, step S1). In Figure 3(a), the optical fiber sensor 11 is shown diagrammatically by a solid line, and a measuring instrument is placed at the end of the optical fiber sensor 11. This measuring instrument measures the strain of the poured concrete 8 by, for example, Rayleigh measurement using the optical fiber sensor 11.

しかしながら、この計測器は、光ファイバセンサ11を用いて、ブリルアン計測によって歪みを計測してもよい。計測器が光ファイバセンサ11に計測光を入力すると、光ファイバセンサ11において後方散乱光が生じる。この後方散乱光のスペクトル(周波数ごとの強度)は、歪みによって変化する。後方散乱光の強度は計測光の強度よりも小さい。レイリー計測では、後方散乱光のスペクトルの変化を計測することによって、光ファイバセンサ11に生じる歪みを検出する。後方散乱光を用いたレイリー計測は、精度が高く、光のロスに強いという利点がある。光ファイバセンサ11では、例えば、1μの歪みといった精度でコンクリート8の歪みの検知が可能である。 However, this measuring instrument may use the optical fiber sensor 11 to measure the strain by Brillouin measurement. When the measuring instrument inputs measurement light to the optical fiber sensor 11, backscattered light is generated in the optical fiber sensor 11. The spectrum (intensity per frequency) of this backscattered light changes depending on the strain. The intensity of the backscattered light is smaller than the intensity of the measurement light. In Rayleigh measurement, the strain generated in the optical fiber sensor 11 is detected by measuring the change in the spectrum of the backscattered light. The Rayleigh measurement using backscattered light has the advantage of being highly accurate and resistant to light loss. The optical fiber sensor 11 can detect the strain in the concrete 8 with an accuracy of, for example, 1 μm.

図3(b)は、光ファイバセンサ11の配置例を拡大した図である。図3(a)及び図3(b)に示されるように、部分3の上側の打ち継ぎ目5より上方及び下方のそれぞれに複数の光ファイバセンサ11が配置される。部分3の打ち継ぎ目5より上方及び下方のそれぞれにおいて、光ファイバセンサ11は、部分3の第1方向D1(厚さ方向)の中央部8c、部分3の第1方向D1の表層部8b、及び、中央部8cから鉛直上方に離間した位置に設けられる離間部8dのそれぞれに配置される。 Figure 3(b) is an enlarged view of an example of the arrangement of the optical fiber sensors 11. As shown in Figures 3(a) and 3(b), a plurality of optical fiber sensors 11 are arranged above and below the upper joint 5 of the part 3. Above and below the joint 5 of the part 3, the optical fiber sensors 11 are arranged in the central part 8c in the first direction D1 (thickness direction) of the part 3, the surface layer 8b in the first direction D1 of the part 3, and the spaced part 8d located vertically above the central part 8c.

各光ファイバセンサ11は、表層部8b、中央部8c及び離間部8dのそれぞれにおいて第2方向D2に延びるように配置される。本実施形態では、更に、表層部8bと中央部8cの間にも光ファイバセンサ11が配置される。これにより、打ち継ぎ目5の付近(打ち継ぎ目5の上部)において3つの光ファイバセンサ11が第1方向D1に沿って並ぶように配置されるので、打ち継ぎ目5におけるコンクリート8の歪みをより高精度に検知できる。以上、光ファイバセンサ11の配置の例について説明した。しかしながら、光ファイバセンサ11の配置態様及び本数は、図3(a)及び図3(b)の例に限られず適宜変更可能である。 Each optical fiber sensor 11 is arranged to extend in the second direction D2 in each of the surface layer 8b, the central portion 8c, and the spaced portion 8d. In this embodiment, an optical fiber sensor 11 is also arranged between the surface layer 8b and the central portion 8c. As a result, the three optical fiber sensors 11 are arranged in line along the first direction D1 near the joint 5 (above the joint 5), so that the strain of the concrete 8 at the joint 5 can be detected with higher accuracy. Above, an example of the arrangement of the optical fiber sensors 11 has been described. However, the arrangement and number of the optical fiber sensors 11 are not limited to the examples in Figures 3(a) and 3(b) and can be changed as appropriate.

以上のように第1区間A1に光ファイバセンサ11を配置した後には、第1区間A1にコンクリート8を打設する(第1コンクリートを打設する工程、ステップS2)。このとき、底版2へのコンクリート8を打設し、その後、所定時間経過後に、部分3の下部へのコンクリート8の打設、及び部分3の上部へのコンクリート8の打設、を順次行う。なお、底版2のコンクリートが硬化した後に部分3のコンクリートが打設されるので、底版2に拘束される部分3のコンクリートの内部には歪(ひずみ)と歪(ひずみ)の偏りが生じる。底版2は、必ずしもコンクリート構造物である必要はなく、岩盤又は地盤であってもよい。 After arranging the optical fiber sensor 11 in the first section A1 as described above, concrete 8 is poured in the first section A1 (first concrete pouring process, step S2). At this time, concrete 8 is poured into the base slab 2, and then, after a predetermined time has passed, concrete 8 is poured into the lower part of portion 3 and then into the upper part of portion 3, in that order. Note that since the concrete of portion 3 is poured after the concrete of base slab 2 has hardened, distortion and distortion bias occur inside the concrete of portion 3 that is restrained by base slab 2. Base slab 2 does not necessarily have to be a concrete structure, and may be bedrock or ground.

第1区間A1へのコンクリート8の打設が完了した後には、打設後の時間の経過と共に、複数の光ファイバセンサ11によって第1区間A1におけるコンクリート8の歪み量を測定する(歪み量を測定する工程)。このとき、例えば、コンクリート8の表層部8bの歪み量、及びコンクリート8の中央部8cの歪み量、を複数の位置の歪み量として測定する。 After the concrete 8 has been poured into the first section A1, the amount of strain in the concrete 8 in the first section A1 is measured by the multiple optical fiber sensors 11 over time after pouring (process of measuring the amount of strain). At this time, for example, the amount of strain in the surface layer 8b of the concrete 8 and the amount of strain in the central portion 8c of the concrete 8 are measured as the amount of strain at multiple positions.

図4(a)はコンクリート8の打設から1日後、図4(b)はコンクリート8の打設から5日後、図4(c)はコンクリート8の打設から7日後、図4(d)はコンクリート8の打設から28日後、における表層部8bと中央部8cの歪み量のデータを示している。図4(a)~図4(d)は、光ファイバセンサ11によって測定された歪み量のデータを示している。図4(a)~図4(d)の各グラフにおいて、縦軸はひずみ(単位:μ)を示しており、横軸はコンクリート8の第2方向D2の端部からの距離(単位:m)を示している。 Figure 4(a) shows data on the amount of strain in the surface layer 8b and the central layer 8c one day after pouring the concrete 8, Figure 4(b) shows data on the amount of strain five days after pouring the concrete 8, Figure 4(c) shows data on the amount of strain seven days after pouring the concrete 8, and Figure 4(d) shows data on the amount of strain 28 days after pouring the concrete 8. Figures 4(a) to 4(d) show data on the amount of strain measured by the optical fiber sensor 11. In each graph of Figures 4(a) to 4(d), the vertical axis shows strain (unit: μ), and the horizontal axis shows the distance (unit: m) from the end of the concrete 8 in the second direction D2.

図4(a)~図4(d)に示されるように、コンクリート8の打設から1日経過した時点では、表層部8bの歪み量と、中央部8cの歪み量との差が小さい。これに対し、5日経過した時点では、これらの歪み量の差が大きくなり、表層部8bにおける歪み量よりも中央部8cにおける歪み量(絶対値)が大きくなった。これにより、表層部8bよりも中央部8cで先にコンクリート8の歪みが生じていることが分かる。 As shown in Figures 4(a) to 4(d), one day after the concrete 8 was poured, the difference between the amount of strain in the surface layer 8b and the amount of strain in the central portion 8c was small. In contrast, after five days, the difference between these amounts of strain became larger, and the amount of strain (absolute value) in the central portion 8c was greater than the amount of strain in the surface layer 8b. This shows that the concrete 8 was strained earlier in the central portion 8c than in the surface layer 8b.

コンクリート8の打設から7日経過した時点では、中央部8cにおける歪み量と、表層部8bにおける歪み量との差がより大きくなった。しかしながら、コンクリート8の打設から28日経過した時点では、中央部8cにおける歪み量と、表層部8bにおける歪み量との差が小さくなった。 Seven days after the concrete 8 was poured, the difference between the amount of strain in the central portion 8c and the amount of strain in the surface layer 8b became larger. However, 28 days after the concrete 8 was poured, the difference between the amount of strain in the central portion 8c and the amount of strain in the surface layer 8b became smaller.

図4(a)~図4(d)におけるピークはひび割れが生じた箇所を示している。図4(a)~図4(d)のピークの位置はひび割れが生じた箇所と一致している。図4(b)~図4(d)に示されるように、中央部8cで先にひび割れが生じ、表層部8bでは中央部8cよりも後にひび割れが生じていることが分かる。具体的には、コンクリート8の打設から5日経過した時点では、中央部8cでひび割れが生じたものの表層部8bではひび割れが生じなかった。これに対し、コンクリート8の打設から7日経過した時点では、中央部8c及び表層部8bの両方でひび割れが生じた。これにより、中央部8cから表層部8bに向かってひび割れが進行していることが分かる。なお、ひび割れは、歪み量が大きい箇所、歪み量の絶対値が大きい箇所、又は、歪み量の変化量が大きい箇所に生じる。 The peaks in Figures 4(a) to 4(d) indicate the locations where cracks have occurred. The positions of the peaks in Figures 4(a) to 4(d) correspond to the locations where cracks have occurred. As shown in Figures 4(b) to 4(d), it can be seen that cracks occurred first in the central portion 8c, and later in the surface layer portion 8b. Specifically, five days after the concrete 8 was poured, cracks occurred in the central portion 8c, but not in the surface layer portion 8b. In contrast, seven days after the concrete 8 was poured, cracks occurred in both the central portion 8c and the surface layer portion 8b. This shows that cracks progress from the central portion 8c to the surface layer portion 8b. Note that cracks occur in locations where the amount of strain is large, where the absolute value of the amount of strain is large, or where the amount of change in the amount of strain is large.

図5は、図4(a)~図4(d)のコンクリート8の変位が15.45mの箇所におけるコンクリート8の打設後の日数と歪み量との関係を示すグラフである。図5に示されるように、コンクリート8の打設から4日経過した後に、中央部8cにひび割れが生じ、中央部8cの歪み量が増大している。 Figure 5 is a graph showing the relationship between the number of days after pouring of concrete 8 and the amount of strain at the location of the displacement of concrete 8 of 15.45 m in Figures 4(a) to 4(d). As shown in Figure 5, four days after pouring of concrete 8, cracks have appeared in central portion 8c, and the amount of strain in central portion 8c has increased.

一方、表層部8bでは、コンクリート8の打設から6日経つまでは歪み量にほとんど変化がなく、6日経過後にひび割れが生じ、歪み量が増大した。以上より、コンクリート8の中央部8cで先に歪み量の増大及びひび割れが生じ、表層部8bでは中央部8cよりも後(2日遅れ)に歪み量の増大及びひび割れが生じた。 On the other hand, in the surface layer 8b, there was almost no change in the amount of strain until six days after the concrete 8 was poured, after which cracks appeared and the amount of strain increased. From the above, the increase in the amount of strain and cracks appeared first in the central portion 8c of the concrete 8, and the increase in the amount of strain and cracks appeared later (two days later) in the surface layer 8b than in the central portion 8c.

以上、表層部8bにおける歪み量、及び中央部8cにおける歪み量を測定し、これらを測定することによってひび割れ抑制部材10の要否を判定する(ひび割れ抑制部材の要否を判定する工程、ステップS4)。例えば前述したように、時間の経過と共に表層部8bの歪みと中央部8cの歪みを比較し、表層部8bの歪みと中央部8cの歪みとの差分(以下では単に「差分」という)が所定の閾値以上となる場合には、中央部8cと表層部8bの間(より具体的には中央部8c、又は中央部8cにより近い位置)に、ひび割れ抑制部材10の追加、又はひび割れ抑制部材10の位置の修正(移動)が必要であると判定する。一方、表層部8bの歪みと中央部8cの歪みを比較して差分が所定の閾値より小さい場合はひび割れ抑制部材10の追加が必要でないと判定する。 As described above, the amount of distortion in the surface layer 8b and the amount of distortion in the central portion 8c are measured, and the necessity of the crack suppression member 10 is judged by measuring these (step S4 for judging the necessity of the crack suppression member). For example, as described above, the distortion in the surface layer 8b is compared with the distortion in the central portion 8c over time, and if the difference between the distortion in the surface layer 8b and the distortion in the central portion 8c (hereinafter simply referred to as the "difference") is equal to or greater than a predetermined threshold, it is judged that the crack suppression member 10 needs to be added between the central portion 8c and the surface layer 8b (more specifically, the central portion 8c or a position closer to the central portion 8c) or that the position of the crack suppression member 10 needs to be corrected (moved). On the other hand, if the difference between the distortion in the surface layer 8b and the distortion in the central portion 8c is compared and is smaller than a predetermined threshold, it is judged that the addition of the crack suppression member 10 is not necessary.

ステップS4(ひび割れ抑制部材の要否を判定する工程)について、本実施形態では、表層部8bの歪みと中央部8cの歪みを比較して、中央部8cの歪みが大きくなり、その後遅れて表層部8bの歪みが大きくなる。中央部8cの歪みが大きくなった時点では表層部8bの歪み量は小さく差分が生じる。本実施形態では、差分が所定の閾値以上である場合に、ひび割れ抑制部材10の追加又は位置の修正(移動)が必要であると判定する。その他のケースとして、表層部8bの歪みが大きくなり、同時に、又はその後遅れて中央部8cの歪みが大きくなる場合は、表層部8b、又は表層部8bにより近い位置にひび割れ抑制部材10の追加又は位置の修正(移動)が必要であると判定する。 In step S4 (a process for determining whether or not a crack suppression member is required), in this embodiment, the distortion of the surface layer 8b is compared with the distortion of the central portion 8c, and the distortion of the central portion 8c increases, followed by a delay in the distortion of the surface layer 8b. At the time when the distortion of the central portion 8c increases, the amount of distortion of the surface layer 8b is small, resulting in a difference. In this embodiment, if the difference is equal to or greater than a predetermined threshold value, it is determined that the addition of the crack suppression member 10 or the correction (movement) of its position is required. In other cases, if the distortion of the surface layer 8b increases and, at the same time or with a delay, the distortion of the central portion 8c increases, it is determined that the addition of the crack suppression member 10 or the correction (movement) of its position is required to the surface layer 8b or to a position closer to the surface layer 8b.

ステップS4において、ひび割れ抑制部材10が必要でないと判定された場合には、コンクリート8を打設し(ステップS6)、その後、一連の工程が完了する。一方、ひび割れ抑制部材10の追加又は位置の修正が必要であると判定された場合には、第2区間A2の所定の位置(例えば表層部8bと中央部8cの間の位置)にひび割れ抑制部材10を追加配置し、又は位置の修正を行う(ひび割れ抑制部材を配置する工程、ステップS5)。そして、第2区間A2にコンクリート8を打設し(第2コンクリートを打設する工程、ステップS6)、一連の工程が完了する。 If it is determined in step S4 that the crack suppression member 10 is not required, concrete 8 is poured (step S6), and the series of processes is then completed. On the other hand, if it is determined that the crack suppression member 10 is required to be added or its position is corrected, the crack suppression member 10 is added or its position is corrected at a predetermined position in the second section A2 (for example, a position between the surface layer 8b and the central portion 8c) (process of placing the crack suppression member, step S5). Then, concrete 8 is poured in the second section A2 (process of pouring the second concrete, step S6), and the series of processes is completed.

次に、本実施形態に係るひび割れ抑制部材10の判定方法、及びコンクリート構造物1の構築方法から得られる作用効果について説明する。この判定方法では、コンクリート打設域Aの複数の位置に光ファイバセンサ11が配置されコンクリート打設域Aにコンクリート8が打設される。光ファイバセンサ11は、コンクリート8の打設後に当該複数の位置の歪み量を測定する。このように光ファイバセンサ11が複数の位置の歪み量を測定することにより、光ファイバの長さ方向に沿って当該複数の位置の歪み量を高精度に測定することができる。 Next, the effects obtained from the method for assessing the crack suppression member 10 according to this embodiment and the method for constructing the concrete structure 1 will be described. In this assessment method, optical fiber sensors 11 are placed at multiple positions in the concrete pouring area A, and concrete 8 is poured into the concrete pouring area A. The optical fiber sensors 11 measure the amount of strain at the multiple positions after the concrete 8 is poured. By measuring the amount of strain at multiple positions in this way using the optical fiber sensors 11, the amount of strain at the multiple positions can be measured with high accuracy along the length of the optical fiber.

コンクリート8のひび割れを抑制するひび割れ抑制部材10の要否は、光ファイバセンサ11によって測定された複数の位置の歪み量の差分の大きさから判定される。従って、複数の位置における歪み量の差分からひび割れ抑制部材10の要否が判定されるので、ひび割れ抑制部材10の配置を適切に行うことができる。よって、ひび割れ抑制部材10の配置を適切に行ってコンクリート構造物1のひび割れを合理的に抑制することができる。 The need for a crack suppression member 10 to suppress cracks in the concrete 8 is determined from the magnitude of the difference in the amount of strain at multiple positions measured by the optical fiber sensor 11. Therefore, since the need for a crack suppression member 10 is determined from the difference in the amount of strain at multiple positions, the crack suppression member 10 can be appropriately positioned. Therefore, by appropriately positioning the crack suppression member 10, cracks in the concrete structure 1 can be rationally suppressed.

本実施形態において、コンクリート8は、水平方向に延びる底版2と、底版2から鉛直方向に延びる部分3とを有する。上記の複数の位置は、部分3の厚さ方向の中央部8cと、部分3の厚さ方向の表層部8bとを含んでいる。よって、部分3の厚さ方向の中央部8c、及び部分3の厚さ方向の表層部8bのそれぞれに光ファイバセンサ11が配置され、光ファイバセンサ11が中央部8c及び表層部8bの歪みを測定する。従って、中央部8cの歪みと表層部8bの歪みとの差分からひび割れ抑制部材10の要否を判定することができる。 In this embodiment, the concrete 8 has a base slab 2 extending horizontally and a portion 3 extending vertically from the base slab 2. The above-mentioned multiple positions include a central portion 8c in the thickness direction of the portion 3 and a surface layer portion 8b in the thickness direction of the portion 3. Thus, optical fiber sensors 11 are disposed in the central portion 8c in the thickness direction of the portion 3 and the surface layer portion 8b in the thickness direction of the portion 3, respectively, and the optical fiber sensors 11 measure the strain in the central portion 8c and the surface layer portion 8b. Therefore, the need for a crack suppression member 10 can be determined from the difference between the strain in the central portion 8c and the strain in the surface layer portion 8b.

本実施形態において、中央部8c及び表層部8bは、底版2と部分3との境界部分Bに設けられており、上記の複数の位置は、中央部8cから鉛直方向に離間した位置に設けられる離間部8dを更に含んでいる。よって、中央部8cから鉛直方向に離間した離間部8dに光ファイバセンサ11が配置される。離間部8dに配置された光ファイバセンサ11によってコンクリート8のひび割れの進行を予測できる。また、中央部8cから離間部8dへのひび割れの進行を確認することで、ひび割れ抑制部材10が必要となる高さを決定することができる。 In this embodiment, the central portion 8c and the surface portion 8b are provided at the boundary portion B between the base slab 2 and the portion 3, and the above-mentioned multiple positions further include a spaced portion 8d provided at a position spaced vertically from the central portion 8c. Thus, the optical fiber sensor 11 is disposed at the spaced portion 8d spaced vertically from the central portion 8c. The optical fiber sensor 11 disposed at the spaced portion 8d can predict the progression of cracks in the concrete 8. In addition, by checking the progression of cracks from the central portion 8c to the spaced portion 8d, the height at which the crack suppression member 10 is required can be determined.

本実施形態に係るコンクリート構造物1の構築方法では、コンクリート8が打設される複数の区間のうちの第1区間A1に光ファイバセンサ11が配置されてコンクリート8が打設される。そして、光ファイバセンサ11が第1区間A1の複数の位置の歪み量を測定し、複数の歪み量の差分の大きさからひび割れ抑制部材10の配置の要否が判定される。従って、第1区間A1においてひび割れ抑制部材10の要否を合理的に判定できる。また、第1区間A1においてひび割れ抑制部材10が必要であると判定された場合には、第2区間A2にひび割れ抑制部材10が配置されてコンクリート8が打設される。従って、第2区間A2では、ひび割れ抑制部材10を適切に配置して構造物のひび割れを合理的に抑制できる。 In the method for constructing a concrete structure 1 according to this embodiment, an optical fiber sensor 11 is placed in a first section A1 of the multiple sections in which concrete 8 is poured, and concrete 8 is poured. Then, the optical fiber sensor 11 measures the amount of strain at multiple positions in the first section A1, and the need for placing a crack suppression member 10 is determined from the magnitude of the difference between the multiple strain amounts. Therefore, the need for a crack suppression member 10 in the first section A1 can be reasonably determined. Furthermore, if it is determined that a crack suppression member 10 is necessary in the first section A1, the crack suppression member 10 is placed in the second section A2 and concrete 8 is poured. Therefore, in the second section A2, crack suppression members 10 can be appropriately placed to reasonably suppress cracks in the structure.

次に、ひび割れ抑制部材10を配置する場合、及びひび割れ抑制部材10を配置しない場合におけるコンクリート8のひび割れのシミュレーション結果について図6(a)~図6(d)及び図7(a)~図7(d)を参照しながら説明する。図6(a)はひび割れ抑制部材10を配置していないコンクリート、図6(b)は図6(a)のシミューレション結果、図6(c)は複数のひび割れ抑制部材10を表層部8b(一対の配力筋7の間)に配置したコンクリート、図6(d)は図6(c)のシミュレーション結果、を示している。図7(a)は複数のひび割れ抑制部材10を表層部8bと中央部8cの間に配置したコンクリート、図7(b)は図7(a)のシミュレーション結果、図7(c)は複数のひび割れ抑制部材10を中央部8cに配置したコンクリート、図7(d)は図7(c)のシミュレーション結果、を示している。各シミュレーション結果において、ひび割れは太い実線で示されている。 Next, the results of a simulation of cracks in concrete 8 when the crack suppression member 10 is placed and when the crack suppression member 10 is not placed will be described with reference to Figures 6(a) to 6(d) and Figures 7(a) to 7(d). Figure 6(a) shows concrete without the crack suppression member 10, Figure 6(b) shows the simulation result of Figure 6(a), Figure 6(c) shows concrete with multiple crack suppression members 10 placed in the surface layer 8b (between a pair of reinforcing bars 7), and Figure 6(d) shows the simulation result of Figure 6(c). Figure 7(a) shows concrete with multiple crack suppression members 10 placed between the surface layer 8b and the central portion 8c, Figure 7(b) shows the simulation result of Figure 7(a), Figure 7(c) shows concrete with multiple crack suppression members 10 placed in the central portion 8c, and Figure 7(d) shows the simulation result of Figure 7(c). In each simulation result, cracks are shown as thick solid lines.

図6(a)~図6(d)及び図7(a)~図7(d)に示されるように、ひび割れ抑制部材10を配置しない場合(図6(b))と比較して、ひび割れ抑制部材10を配置した場合(図6(d)、図7(b)及び図7(d))の方がひび割れを抑制できていることが分かる。 As shown in Figures 6(a) to 6(d) and Figures 7(a) to 7(d), it can be seen that cracks are more effectively suppressed when the crack-suppressing member 10 is placed (Figures 6(d), 7(b) and 7(d)) compared to when the crack-suppressing member 10 is not placed (Figure 6(b)).

更に、表層部8bに複数のひび割れ抑制部材10を配置する場合(図6(d))よりも、表層部8bと中央部8cの間に複数のひび割れ抑制部材10を配置する場合(図7(b))の方がひび割れを更に抑制できることが分かった。一方、本シミュレーションにおいて、中央部8cに複数のひび割れ抑制部材10を配置する場合(図7(d))には、表層部8bと中央部8cの間に複数のひび割れ抑制部材10を配置する場合(図7(b))よりも、ひび割れが増えることが分かった。 Furthermore, it was found that cracks can be further suppressed when multiple crack suppression members 10 are placed between the surface layer 8b and the central portion 8c (Fig. 7(b)) than when multiple crack suppression members 10 are placed on the surface layer 8b (Fig. 6(d)). On the other hand, in this simulation, it was found that when multiple crack suppression members 10 are placed on the central portion 8c (Fig. 7(d)), more cracks occur than when multiple crack suppression members 10 are placed between the surface layer 8b and the central portion 8c (Fig. 7(b)).

以上より、コンクリート8がある程度の厚みを有する場合(第1方向D1の長さがある程度長い場合)には、中央部8cにひび割れ抑制部材10を配置するよりも、中央部8cと表層部8bの間にひび割れ抑制部材10を配置した方がひび割れを抑制できることが分かった。このように、事前に光ファイバセンサ11でコンクリート8の表層部8b及び中央部8c等の歪み量を測定し、それらの差分を求めることによって、どの箇所にひび割れ抑制部材10を配置すればよいかを把握することができる。 From the above, it has been found that when the concrete 8 has a certain thickness (when the length in the first direction D1 is relatively long), placing the crack suppression member 10 between the central portion 8c and the surface layer 8b is more effective at suppressing cracks than placing the crack suppression member 10 in the central portion 8c. In this way, by measuring the amount of strain in the surface layer 8b and central portion 8c, etc. of the concrete 8 in advance using the optical fiber sensor 11 and calculating the difference between the amounts, it is possible to determine where the crack suppression member 10 should be placed.

(第2実施形態)
続いて、第2実施形態に係るコンクリート構造物の構築方法について図8を参照しながら説明する。図8は、第2実施形態に係るコンクリート構造物1の構築方法の工程を示すフローチャートである。以下では、第1実施形態の内容と重複する内容については同一の符号を付して説明を適宜省略する。
Second Embodiment
Next, a method for constructing a concrete structure according to the second embodiment will be described with reference to Fig. 8. Fig. 8 is a flow chart showing steps of the method for constructing a concrete structure 1 according to the second embodiment. In the following, the same reference numerals are used to designate the same contents as those in the first embodiment, and the description thereof will be omitted as appropriate.

まず、第1区間A1の複数の位置(例えば表層部8b及び中央部8c)に光ファイバセンサ11を配置し(光ファイバセンサを配置する工程、ステップS21)、第1区間A1に予めひび割れ抑制部材10を配置する(予めひび割れ抑制部材を配置する工程)。以下では、図7(c)に示されるように、コンクリート8の中央部8cにひび割れ抑制部材10を予め配置した例について説明する。 First, optical fiber sensors 11 are placed at multiple positions in the first section A1 (e.g., the surface layer 8b and the central portion 8c) (step of placing optical fiber sensors, step S21), and crack suppression members 10 are placed in advance in the first section A1 (step of placing crack suppression members in advance). Below, an example in which the crack suppression members 10 are placed in advance in the central portion 8c of the concrete 8 as shown in Figure 7(c) is described.

上記のように光ファイバセンサ11及びひび割れ抑制部材10を配置した後に、第1区間A1においてコンクリート8を打設し(第1コンクリートを打設する工程、ステップS23)、前述と同様、光ファイバセンサ11がコンクリート8の歪み量を測定する(歪み量を測定する工程、ステップS24)。そして、複数の位置の歪み量の差分(表層部8bの歪み量と中央部8cの歪み量との差分)の大きさから、ひび割れ抑制部材10の効果を判定し(ステップS25)、ひび割れ抑制部材10の位置の修正の要否を判定する(ステップS26)。 After the optical fiber sensor 11 and the crack suppression member 10 are positioned as described above, concrete 8 is poured in the first section A1 (step of pouring the first concrete, step S23), and the optical fiber sensor 11 measures the amount of strain in the concrete 8 as described above (step of measuring the amount of strain, step S24). Then, the effect of the crack suppression member 10 is judged from the magnitude of the difference in the amount of strain at multiple positions (the difference between the amount of strain at the surface layer 8b and the amount of strain at the center portion 8c) (step S25), and it is determined whether or not the position of the crack suppression member 10 needs to be adjusted (step S26).

例えば中央部8cにひび割れ抑制部材10を配置した場合には、図7(d)に示されるように、ひび割れをあまり抑制できていないので、ステップS26において修正が必要と判定する(ステップS26においてYES)。この場合、第2区間A2では修正した位置(例えば表層部8bと中央部8cとの間の位置)にひび割れ抑制部材10を配置して(ステップS27)、コンクリート8を打設する(第2コンクリートを打設する工程、ステップS29)。 For example, if the crack suppression member 10 is placed in the central portion 8c, as shown in FIG. 7(d), cracks are not suppressed very well, so it is determined in step S26 that correction is necessary (YES in step S26). In this case, in the second section A2, the crack suppression member 10 is placed in the corrected position (for example, a position between the surface layer 8b and the central portion 8c) (step S27), and concrete 8 is poured (step of pouring second concrete, step S29).

一方、ステップS26において修正が不要であると判定する場合(ステップS26においてNO)、例えば、第2区間A2では第1区間A1と同じ位置にひび割れ抑制部材10を配置して(ステップS28)、コンクリート8を打設する(ステップS29)。以上の工程を経た後に、コンクリート構造物1の構築が完了する。 On the other hand, if it is determined in step S26 that no correction is required (NO in step S26), for example, in the second section A2, the crack suppression member 10 is placed in the same position as in the first section A1 (step S28), and concrete 8 is poured (step S29). After going through the above steps, the construction of the concrete structure 1 is completed.

以上、第2実施形態に係るコンクリート構造物1の構築方法では、第1区間A1に光ファイバセンサ11が配置されてコンクリート8が打設される前に、ひび割れ抑制部材10を予めコンクリート8の内部に配置する。光ファイバセンサ11は、コンクリート8の打設後における第1区間A1の複数の位置の歪み量を測定し、複数の歪み量の差分の大きさからひび割れ抑制部材10の効果が判定される。 As described above, in the method for constructing a concrete structure 1 according to the second embodiment, the optical fiber sensor 11 is placed in the first section A1, and before the concrete 8 is poured, the crack suppression member 10 is placed inside the concrete 8 in advance. The optical fiber sensor 11 measures the amount of strain at multiple positions in the first section A1 after the concrete 8 is poured, and the effectiveness of the crack suppression member 10 is determined from the magnitude of the difference between the multiple amounts of strain.

そして、ひび割れ抑制部材10の効果の判定の結果、ひび割れ抑制部材10の位置の修正が必要であると判定された場合に、第2区間A2の修正された位置にひび割れ抑制部材10が配置されてコンクリート8が打設される。従って、修正された位置にひび割れ抑制部材10が配置されることにより、ひび割れ抑制部材10をより効果的な位置に配置できるので、ひび割れを合理的に抑制できる。 If it is determined that the crack suppression member 10 needs to be corrected as a result of judging the effectiveness of the crack suppression member 10, the crack suppression member 10 is placed in the corrected position in the second section A2 and concrete 8 is poured. Therefore, by placing the crack suppression member 10 in the corrected position, the crack suppression member 10 can be placed in a more effective position, thereby rationally suppressing cracks.

(第3実施形態)
次に、第3実施形態に係る構築方法について図9及び図10を参照しながら説明する。図9は、第3実施形態に係るコンクリート構造物1の監視を模式的に示す図である。図10は、第3実施形態に係るコンクリート構造物1の構築方法の工程を示すフローチャートである。図9及び図10に示されるように、第3実施形態に係る構築方法では、コンクリート構造物1の温度を制御する。
Third Embodiment
Next, a construction method according to a third embodiment will be described with reference to Fig. 9 and Fig. 10. Fig. 9 is a diagram that illustrates monitoring of a concrete structure 1 according to the third embodiment. Fig. 10 is a flow chart that illustrates steps of the construction method for a concrete structure 1 according to the third embodiment. As shown in Fig. 9 and Fig. 10, in the construction method according to the third embodiment, the temperature of the concrete structure 1 is controlled.

例えば、コンクリート構造物1から離れた遠隔地に監視室Rが設けられる。監視室Rは、光ファイバセンサ11から計測データを取得する計測データ取得部R1と、コンクリート8の温度を調整する温度調整部R2とを有する。第3実施形態では、コンクリート構造物1に複数本のパイプPが埋設されており、温度調整部R2によって水温を調整する機器に水温が指示され、当該機器からパイプPに冷水又は温水が供給される。このパイプPへの冷水又は温水の供給により、コンクリート8の温度が調整される。 For example, a monitoring room R is provided in a remote location away from the concrete structure 1. The monitoring room R has a measurement data acquisition unit R1 that acquires measurement data from the optical fiber sensor 11, and a temperature adjustment unit R2 that adjusts the temperature of the concrete 8. In the third embodiment, multiple pipes P are buried in the concrete structure 1, and the temperature adjustment unit R2 indicates the water temperature to a device that adjusts the water temperature, and cold water or hot water is supplied from the device to the pipes P. The temperature of the concrete 8 is adjusted by supplying cold water or hot water to the pipes P.

次に、コンクリート構造物1の構築方法について説明する。まず、光ファイバセンサ11を配置する(光ファイバセンサを配置する工程、ステップS11)。このとき、例えば、光ファイバセンサ11と共に複数本のパイプPを配置する。そして、コンクリート8を打設する(コンクリートを打設する工程、ステップS12)。 Next, a method for constructing the concrete structure 1 will be described. First, the optical fiber sensor 11 is placed (step of placing the optical fiber sensor, step S11). At this time, for example, multiple pipes P are placed together with the optical fiber sensor 11. Then, concrete 8 is poured (step of pouring concrete, step S12).

次に、光ファイバセンサ11によってコンクリート8の温度を測定する(コンクリートの温度を測定する工程、ステップS13)。このとき、例えば計測データ取得部R1が光ファイバセンサ11に計測光を入力し、当該計測光の入力によって光ファイバセンサ11から生じた後方散乱光が計測データ取得部R1に入力される。 Next, the temperature of the concrete 8 is measured by the optical fiber sensor 11 (process of measuring the temperature of the concrete, step S13). At this time, for example, the measurement data acquisition unit R1 inputs measurement light to the optical fiber sensor 11, and the backscattered light generated from the optical fiber sensor 11 by the input of the measurement light is input to the measurement data acquisition unit R1.

計測データ取得部R1は入力された後方散乱光のスペクトルの変化を計測して光ファイバセンサ11の周囲のコンクリートの温度を計測する。なお、計測データ取得部R1はコンクリートの温度と共に歪みを計測してもよい。計測されたコンクリートの温度(及び歪み)は、例えば、監視室Rのコンピュータに記憶される。 The measurement data acquisition unit R1 measures the change in the spectrum of the input backscattered light to measure the temperature of the concrete around the optical fiber sensor 11. The measurement data acquisition unit R1 may also measure the strain along with the temperature of the concrete. The measured temperature (and strain) of the concrete is stored, for example, in a computer in the monitoring room R.

そして、計測されたコンクリートの温度に基づいて、温度調整部R2がコンクリート8の温度を調整する(コンクリートの温度を制御する工程、ステップS14)。具体的には、温度調整部R2が水温を調整する機器に水温を指示し、当該機器からパイプPに冷水又は温水を供給し、供給後のコンクリートの温度を光ファイバセンサ11が測定する。この冷水又は温水の供給と光ファイバセンサ11による測定とを繰り返すことにより、コンクリート構造物1の温度を制御する。以上の工程を経て一連の工程が完了する。 Then, based on the measured concrete temperature, the temperature adjustment unit R2 adjusts the temperature of the concrete 8 (process of controlling the temperature of the concrete, step S14). Specifically, the temperature adjustment unit R2 indicates the water temperature to a device that adjusts the water temperature, which supplies cold or hot water to the pipe P, and the optical fiber sensor 11 measures the temperature of the concrete after supply. The supply of this cold or hot water and measurement by the optical fiber sensor 11 are repeated to control the temperature of the concrete structure 1. The series of processes is completed through the above steps.

以上、第3実施形態に係る構築方法では、コンクリートの打設後に光ファイバセンサ11が複数の位置の温度を測定する工程と、測定した温度に応じてコンクリート8の温度を制御する工程とを備える。よって、光ファイバセンサ11による温度の測定結果を用いてコンクリートの温度を制御できるので、温度制御によってひび割れを生じにくくすることができる。 As described above, the construction method according to the third embodiment includes a process in which the optical fiber sensor 11 measures the temperature at multiple positions after the concrete is poured, and a process in which the temperature of the concrete 8 is controlled in accordance with the measured temperature. Therefore, the temperature measurement results by the optical fiber sensor 11 can be used to control the temperature of the concrete, so that the occurrence of cracks can be reduced by temperature control.

以上、本開示に係るコンクリート構造物の構築方法、及びひび割れ抑制部材の要否の判定方法の種々の実施形態について説明した。しかしながら、本開示に係る構築方法及び判定方法は、前述した種々の実施形態に限られず、特許請求の範囲に記載した要旨の範囲内において適宜変更可能である。すなわち、構築方法及び判定方法の工程の内容及び順序は、前述の実施形態に限られず適宜変更可能である。本開示に係る構築方法及び判定方法は、前述した第1実施形態、第2実施形態及び第3実施形態のうちの2つ以上が組み合わされたものであってもよい。 Various embodiments of the method for constructing a concrete structure and the method for determining whether or not a crack suppression member is required according to the present disclosure have been described above. However, the construction method and the determination method according to the present disclosure are not limited to the various embodiments described above, and can be modified as appropriate within the scope of the gist of the claims. In other words, the content and order of the steps of the construction method and the determination method are not limited to the embodiments described above, and can be modified as appropriate. The construction method and the determination method according to the present disclosure may be a combination of two or more of the first, second, and third embodiments described above.

例えば、前述の実施形態では、ひび割れ抑制部材10がひび割れ抑制鉄筋である例について説明した。しかしながら、本開示に係るひび割れ抑制部材は、ひび割れ抑制鉄筋以外のものであってもよい。例えば、本開示に係るひび割れ抑制部材は、耐アルカリ性ガラス繊維で構成されたひび割れ低減用ネット等の網状部材であってもよいし、穴あき帯状鋼板であってもよいし、コンクリート8よりも強度が高い繊維補強コンクリートであってもよく、適宜変更可能である。 For example, in the above embodiment, an example was described in which the crack suppression member 10 was a crack suppression rebar. However, the crack suppression member according to the present disclosure may be something other than a crack suppression rebar. For example, the crack suppression member according to the present disclosure may be a mesh member such as a crack reduction net made of alkali-resistant glass fiber, a perforated steel strip, or fiber-reinforced concrete that is stronger than concrete 8, and may be modified as appropriate.

前述の実施形態では、コンクリート構造物1がボックスカルバートである例について説明した。しかしながら、本開示に係る判定方法及び構築方法が適用されるコンクリート構造物は、ボックスカルバートに限定されない。例えば、コンクリート構造物はケーソン基礎であってもよく、本開示に係る判定方法及び構築方法は種々のコンクリート構造物に適用させることが可能である。 In the above embodiment, an example was described in which the concrete structure 1 was a box culvert. However, the concrete structure to which the assessment method and construction method according to the present disclosure are applicable is not limited to a box culvert. For example, the concrete structure may be a caisson foundation, and the assessment method and construction method according to the present disclosure can be applied to various concrete structures.

1…コンクリート構造物、2…底版、2b…上面、3…部分、3b…側面、4…傾斜面、5…打ち継ぎ目、6…主筋、7…配力筋、8…コンクリート(第1コンクリート、第2コンクリート)、8b…表層部、8c…中央部、8d…離間部、10…ひび割れ抑制部材、11…光ファイバセンサ、12…第1鉄筋、13…第2鉄筋、A…コンクリート打設域、A1…第1区間、A2…第2区間、B…境界部分、D1…第1方向、D2…第2方向、D3…第3方向、P…パイプ、R…監視室、R1…計測データ取得部、R2…温度調整部。 1...concrete structure, 2...base plate, 2b...top surface, 3...part, 3b...side surface, 4...inclined surface, 5...construction joint, 6...main reinforcement, 7...strength distribution reinforcement, 8...concrete (first concrete, second concrete), 8b...surface portion, 8c...center portion, 8d...separation portion, 10...crack suppression member, 11...optical fiber sensor, 12...first reinforcing bar, 13...second reinforcing bar, A...concrete casting area, A1...first section, A2...second section, B...boundary portion, D1...first direction, D2...second direction, D3...third direction, P...pipe, R...monitoring room, R1...measurement data acquisition unit, R2...temperature adjustment unit.

Claims (2)

第1区間及び第2区間に順次コンクリートを打設して構造物を構築するコンクリート構造物の構築方法であって、
前記第1区間の複数の位置に光ファイバセンサを配置して第1コンクリートを打設する工程と、
前記第1コンクリートの打設後に前記光ファイバセンサが前記複数の位置の歪み量を測定する工程と、
前記複数の位置の歪み量の差分の大きさから、ひび割れ抑制部材の要否を判定する工程と、
前記ひび割れ抑制部材の要否を判定する工程において前記ひび割れ抑制部材が必要であると判定された場合に、前記第2区間に前記ひび割れ抑制部材を配置して第2コンクリートを打設する工程と、
を備える構築方法。
A method for constructing a concrete structure by sequentially pouring concrete into a first section and a second section, comprising the steps of:
placing optical fiber sensors at a plurality of positions in the first section and pouring a first concrete;
A step of measuring the amount of strain at the multiple positions by the optical fiber sensor after the first concrete is poured;
A step of determining whether or not a crack suppression member is required based on the magnitude of the difference in the amount of strain at the multiple positions;
When it is determined that the crack suppression member is necessary in the step of determining whether the crack suppression member is necessary, a step of placing the crack suppression member in the second section and pouring a second concrete;
A method of construction comprising:
第1区間及び第2区間に順次コンクリートを打設して構造物を構築するコンクリート構造物の構築方法であって、
前記第1区間の複数の位置に光ファイバセンサを配置して第1コンクリートを打設する工程と、
前記第1コンクリートの打設後に前記光ファイバセンサが前記複数の位置の歪み量を測定する工程と、
予めひび割れ抑制部材を第1コンクリートの内部に配置する工程と、
前記複数の位置の歪み量の差分の大きさから、前記ひび割れ抑制部材の効果を判定する工程と、
前記ひび割れ抑制部材の効果を判定する工程において前記ひび割れ抑制部材の位置の修正が必要であると判定された場合に、前記第2区間の前記修正された位置に前記ひび割れ抑制部材を配置して第2コンクリートを打設する工程と、
を備える構築方法。
A method for constructing a concrete structure by sequentially pouring concrete into a first section and a second section, comprising the steps of:
placing optical fiber sensors at a plurality of positions in the first section and pouring a first concrete;
A step of measuring the amount of strain at the multiple positions by the optical fiber sensor after the first concrete is poured;
A step of previously disposing a crack suppression member inside the first concrete;
A step of determining an effect of the crack suppression member based on a magnitude of a difference in the amount of strain at the plurality of positions;
When it is determined that the position of the crack suppression member needs to be corrected in the step of determining the effect of the crack suppression member, a step of placing the crack suppression member at the corrected position in the second section and pouring a second concrete;
A method of construction comprising:
JP2021134257A 2021-08-19 2021-08-19 How to build it Active JP7626686B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021134257A JP7626686B2 (en) 2021-08-19 2021-08-19 How to build it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021134257A JP7626686B2 (en) 2021-08-19 2021-08-19 How to build it

Publications (2)

Publication Number Publication Date
JP2023028511A JP2023028511A (en) 2023-03-03
JP7626686B2 true JP7626686B2 (en) 2025-02-04

Family

ID=85331100

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021134257A Active JP7626686B2 (en) 2021-08-19 2021-08-19 How to build it

Country Status (1)

Country Link
JP (1) JP7626686B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000186944A (en) 1998-12-21 2000-07-04 Takenaka Komuten Co Ltd Structure with self-detecting function or self-repairing function and structural member thereof
JP2001066117A (en) 1999-08-30 2001-03-16 Railway Technical Res Inst Method and apparatus for detecting cracks in tunnel and peeling of reinforcing material
JP2016188850A (en) 2015-03-27 2016-11-04 太平洋セメント株式会社 Crack detection method and crack sensor for concrete
JP2019066388A (en) 2017-10-03 2019-04-25 一般財団法人電力中央研究所 Diagnosis method of concrete structure
JP2022111720A (en) 2021-01-20 2022-08-01 太平洋セメント株式会社 Distortion monitoring method and prestressed concrete structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000186944A (en) 1998-12-21 2000-07-04 Takenaka Komuten Co Ltd Structure with self-detecting function or self-repairing function and structural member thereof
JP2001066117A (en) 1999-08-30 2001-03-16 Railway Technical Res Inst Method and apparatus for detecting cracks in tunnel and peeling of reinforcing material
JP2016188850A (en) 2015-03-27 2016-11-04 太平洋セメント株式会社 Crack detection method and crack sensor for concrete
JP2019066388A (en) 2017-10-03 2019-04-25 一般財団法人電力中央研究所 Diagnosis method of concrete structure
JP2022111720A (en) 2021-01-20 2022-08-01 太平洋セメント株式会社 Distortion monitoring method and prestressed concrete structure

Also Published As

Publication number Publication date
JP2023028511A (en) 2023-03-03

Similar Documents

Publication Publication Date Title
US20230384180A1 (en) Reinforcement and bearing capacity calculation method for self-stressed bridge deck link slab
JP6553347B2 (en) Concrete curing method
Hedebratt et al. Full-scale test of a pile supported steel fibre concrete slab
Abbas et al. Experimental studies on corrugated steel-concrete composite slab
JP2015135040A (en) Repair and reinforcement structure for reinforced concrete building
JP2009144410A (en) Closing method of PC bridge
JP2019015084A (en) Concrete filling confirming method
Bolina et al. Experimental analysis on the structural continuity effect in steel decking concrete slabs subjected to fire
JP6280145B2 (en) Repair and reinforcement structure for reinforced concrete structures
JP7626686B2 (en) How to build it
JP7075961B2 (en) How to measure internal stress or temperature of concrete structure
Nilimaa et al. Thermal crack risk of concrete structures: Evaluation of theoretical models for tunnels and bridges
Micallef et al. Cracking in walls with combined base and end restraint
JP5049242B2 (en) Prestress calculation method and concrete structure construction method
William et al. Early age cracking of reinforced concrete bridge decks
CN103104097A (en) Recursive flowing water construction method of canceling temperature post-cast strip by overlength concrete base plate structure
JP2025047626A (en) Structure Design Method
Juraszek Fibre optic system based on FBG sensors for the monitoring of modern structures
KR20160000005A (en) reinforcing expansion joint for wide concrete slab by using steel plate and reinforcing method of construction using the same for wide concrete slab
KR102095150B1 (en) Reinforcement System for Concrete Structures
KR100602832B1 (en) Amentment method of differential shortenint of vertical member in reinforced-concrete structures
Fang et al. BOTDA based investigation on the effects of closure strips in bottom plate during the construction of navigation lock
Baskaran et al. A new approach to testing reinforced concrete flat slabs
Nguyen et al. Experimental and theoretical analyses for flexural performance of reinforced concrete beams using ultra‐high‐performance concrete permanent formwork panels embedded with reinforcement grids
CN119021405B (en) Construction method of extra-long concrete floor slab

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231211

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240726

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240813

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240906

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250107

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250123

R150 Certificate of patent or registration of utility model

Ref document number: 7626686

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150