JP7628248B2 - Precast concrete base material for forming a mat foundation, a molding device for molding the precast concrete base material, a method for molding the precast concrete base material using the molding device, and a method for forming a mat foundation using the precast concrete base material - Google Patents
[go: Go Back, main page]

JP7628248B2 - Precast concrete base material for forming a mat foundation, a molding device for molding the precast concrete base material, a method for molding the precast concrete base material using the molding device, and a method for forming a mat foundation using the precast concrete base material - Google Patents

Precast concrete base material for forming a mat foundation, a molding device for molding the precast concrete base material, a method for molding the precast concrete base material using the molding device, and a method for forming a mat foundation using the precast concrete base material Download PDF

Info

Publication number
JP7628248B2
JP7628248B2 JP2021066725A JP2021066725A JP7628248B2 JP 7628248 B2 JP7628248 B2 JP 7628248B2 JP 2021066725 A JP2021066725 A JP 2021066725A JP 2021066725 A JP2021066725 A JP 2021066725A JP 7628248 B2 JP7628248 B2 JP 7628248B2
Authority
JP
Japan
Prior art keywords
precast concrete
concrete foundation
mold
molding
foundation material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021066725A
Other languages
Japanese (ja)
Other versions
JP2022161709A (en
Inventor
三男 佐々木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MUGEN.LLC
Original Assignee
MUGEN.LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MUGEN.LLC filed Critical MUGEN.LLC
Priority to JP2021066725A priority Critical patent/JP7628248B2/en
Publication of JP2022161709A publication Critical patent/JP2022161709A/en
Application granted granted Critical
Publication of JP7628248B2 publication Critical patent/JP7628248B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Description

本発明は、ベタ基礎形成用のプレキャストコンクリート基礎材、かかるプレキャストコンクリート基礎材を成形するための成形装置、かかる成形装置を用いて上記プレキャストコンクリート基礎材を成形する方法、及び上記プレキャストコンクリート基礎材を用いてベタ基礎を形成する方法に関する。 The present invention relates to a precast concrete foundation material for forming a mat foundation, a molding device for forming such a precast concrete foundation material, a method for forming the precast concrete foundation material using such a molding device, and a method for forming a mat foundation using the precast concrete foundation material.

例えば下記特許文献1及び2に示すとおり、従前より、プレキャストコンクリート基礎材を用いてベタ基礎を形成することは周知であった。ベタ基礎は土間部及び立ち上がり部を備えており、土間部及び立ち上がり部は共に内部に鉄筋が配筋されたコンクリート製である。特許文献1及び2に示されたプレキャストコンクリート基礎材は、建築現場において予め形成された捨てコンクリートの上面外周縁部に配置され、主にベタ基礎の立ち上がり部を構成する。上記捨てコンクリート上には鉄筋が配筋されており、配置されたプレキャストコンクリート基礎材の内側にコンクリートを打設して鉄筋を埋設することでベタ基礎の土間部は形成される。上述したとおりのプレキャストコンクリート基礎材は鉄筋を予め含んだ状態で工場にて成形され、鉄筋が外部に突出した状態のまま工場から建築現場に搬送される。 For example, as shown in Patent Documents 1 and 2 below, it has been well known to form a slab foundation using precast concrete foundation materials. A slab foundation has a floor section and a rising section, both of which are made of concrete with reinforcing bars arranged inside. The precast concrete foundation materials shown in Patent Documents 1 and 2 are placed on the outer periphery of the upper surface of the basal concrete that has been formed in advance at the construction site, and mainly form the rising section of the slab foundation. Reinforcing bars are arranged on the basal concrete, and the floor section of the slab foundation is formed by pouring concrete inside the placed precast concrete foundation material and burying the reinforcing bars. The precast concrete foundation materials as described above are formed in a factory with the reinforcing bars already included, and are transported from the factory to the construction site with the reinforcing bars protruding to the outside.

特開2010-70903号公報JP 2010-70903 A 特開2011-64047号公報JP 2011-64047 A

而して、上記特許文献1及び2に示すとおりのプレキャストコンクリート基礎材にあっては、鉄筋が外部に突出した状態のまま工場から建築現場まで搬送されることに起因して、外部に突出した鉄筋が搬送時に周囲の作業者或いは建築資材等を損傷させてしまう虞がある。更に、基礎材の重量が重く基礎材を移動させるためには大型のクレーンが必要となることから作業性が好ましくない。また、上記特許文献1及び2に示すとおりのプレキャストコンクリート基礎材を用いてベタ基礎を形成する方法にあっては、建築現場においてプレキャストコンクリート基礎材を配置するよりも前に予め広範囲にわたって捨てコンクリートを打設する必要があることから工期が長期化してしまう。そして、上記特許文献1及び2に示すとおりのプレキャストコンクリート基礎材を用いて形成したベタ基礎にあっては、立ち上がり部は工場で形成されたプレキャストコンクリートであるものの土間部は建築現場で打設されたコンクリートであることから、両者は一体成形されたわけではなく、両者の境界部分にはクラックが生じやすい。かようなクラックが生じると耐震強度が低下してしまう。 In the case of the precast concrete foundation materials shown in Patent Documents 1 and 2, the reinforcing bars are transported from the factory to the construction site with the reinforcing bars protruding outward, and there is a risk that the protruding reinforcing bars may damage surrounding workers or construction materials during transportation. Furthermore, the weight of the foundation material is heavy, and a large crane is required to move the foundation material, which makes the workability unfavorable. In addition, in the method of forming a mat foundation using the precast concrete foundation materials shown in Patent Documents 1 and 2, it is necessary to pour basing concrete over a wide area before placing the precast concrete foundation material at the construction site, which lengthens the construction period. And in the mat foundation formed using the precast concrete foundation materials shown in Patent Documents 1 and 2, the rising part is made of precast concrete formed in the factory, but the dirt floor part is made of concrete poured at the construction site, so the two are not molded together, and cracks are likely to occur at the boundary between the two. If such cracks occur, the seismic strength will decrease.

本発明は上記事実に鑑みてなされたものであり、その主たる技術的課題は、軽量で安全に搬送することができるにも拘らず充分な耐震強度を維持できる、新規のベタ基礎形成用プレキャストコンクリート基礎材を提供することである。 The present invention was made in light of the above facts, and its main technical objective is to provide a new precast concrete foundation material for forming slab foundations that is lightweight and can be transported safely, yet maintains sufficient earthquake resistance.

本発明によれば、上記主たる技術的課題を達成するプレキャストコンクリート基礎材として、ベタ基礎を形成するためのプレキャストコンクリート基礎材であって、所要形状の底壁と、該底壁の側縁から上方に起立して平面視において該所要形状と同一形状の溝を形成する起立壁とを有し、該起立壁の下端部には該溝に連通する開口窓が形成されており、該起立壁によって形成される該溝の上面及び端面は開放されており、
該溝にコンクリートを打設することでベタ基礎の立ち上がり部が形成される、ことを特徴とするプレキャストコンクリート基礎材が提供される。
According to the present invention, a precast concrete foundation material that achieves the above-mentioned main technical object is a precast concrete foundation material for forming a mat foundation, which has a bottom wall of a required shape and upright walls that rise upward from the side edges of the bottom wall and form a groove of the same shape as the required shape in a plan view, an opening window that communicates with the groove is formed at the lower end of the upright wall, and the upper surface and end surfaces of the groove formed by the upright walls are open,
A precast concrete foundation material is provided, characterized in that the rising portion of the slab foundation is formed by pouring concrete into the groove .

好ましくは、該所要形状は、直線形状、L字形状、T字形状、又は十字形状である。該底壁の上面には有底穴が形成されているのがよい。好適には、該底壁には上下方向に貫通する貫通穴が形成されており、該貫通穴を規定する該底壁の内周面には雌螺条が形成されているのがよい。この場合には、該貫通穴は該底壁の重心位置に形成されているのがよい。 Preferably, the required shape is a straight line, an L-shape, a T-shape, or a cross shape. A bottomed hole is preferably formed in the upper surface of the bottom wall. Preferably, a through hole penetrating the bottom wall in the vertical direction is formed, and a female thread is formed on the inner peripheral surface of the bottom wall that defines the through hole. In this case, the through hole is preferably formed at the center of gravity of the bottom wall.

本発明に従って構成されるプレキャストコンクリート基礎材は、固定の基台と、該基台に装着された内側金型及び外側金型とを備え、該内側金型は該基台の上面から上方に突出し、該外側金型はヒンジ手段を介して該基台に接続された複数個の板状外側金型片から構成されており、複数個の該外側金型片は夫々、内側面が該内側金型の外側面に近接した成形位置と該内側金型の外側面から離隔した離型位置との間を旋回自在であって、該外側金型片が該成形位置に位置するときには、上下方向において該外側金型片の上端位置は該内側金型の上端位置よりも上方に位置し、該外側金型片の内側面の所要部位には、該成形位置にあるときに該内側金型の外側面と面接触する膨出部が形成されている成形装置から成形することができる。この場合には、該膨出部は、該外側金型片が該成形位置にあるときに該内側金型の外側面と面接触する膨出端面、及び該膨出端面の外周縁から延出して該外側金型片の内側面に接続される膨出外周面を有し、該膨出外周面は、該外側金型片の該内側面から該外側面に向かう方向に広がって延びているのが好ましい。該内側金型の縦断面形状は上方に向かって先細り形状となっているのがよい。 A precast concrete base material constructed according to the present invention comprises a fixed base and an inner mold and an outer mold attached to the base, the inner mold protruding upward from the upper surface of the base, and the outer mold consisting of a plurality of plate-shaped outer mold pieces connected to the base via hinge means, and each of the plurality of outer mold pieces can freely rotate between a molding position in which the inner surface is close to the outer surface of the inner mold and a demolding position separated from the outer surface of the inner mold, and when the outer mold piece is located at the molding position, the upper end position of the outer mold piece is located above the upper end position of the inner mold in the vertical direction, and a bulge portion is formed at a required portion of the inner surface of the outer mold piece that comes into surface contact with the outer surface of the inner mold when it is at the molding position. In this case, the bulging portion has a bulging end surface that is in surface contact with the outer surface of the inner mold when the outer mold piece is in the molding position, and a bulging outer peripheral surface that extends from the outer peripheral edge of the bulging end surface and connects to the inner surface of the outer mold piece, and the bulging outer peripheral surface preferably extends in a direction from the inner surface of the outer mold piece toward the outer surface. The vertical cross-sectional shape of the inner mold is preferably tapered upward.

上記成形装置を用いて本発明に従って構成されるプレキャストコンクリート基礎材を製造する方法としては、全ての該外側金型片が該成形位置にあるときに該外側金型の内側に未硬化状態のコンクリートを打設してプレキャストコンクリート基礎材成形体を形成する基礎材成形体打設工程と、該プレキャストコンクリート基礎材成形体が硬化した後に全ての該外側金型片を該成形位置から該離型位置に旋回せしめる離型準備工程と、該離型準備工程の後に該プレキャストコンクリート基礎材成形体を該内側金型から離型させる離型工程を含む方法がある。かかる方法にあっては、該離型準備工程において、該貫通穴及び該雌螺条を形成し、該貫通穴に上方からボルトを螺進せしめて該ボルトの先端で該内側金型の上面を押すのがよい。また、該離型準備工程において、該貫通穴及び該雌螺条を形成し、該貫通穴に上方からアイボルトを螺着するのが好ましい。 The method for manufacturing a precast concrete foundation material constructed according to the present invention using the above-mentioned molding device includes a foundation material forming body casting step in which unhardened concrete is poured inside the outer mold when all the outer mold pieces are in the molding position to form a precast concrete foundation material formed body, a demolding preparation step in which all the outer mold pieces are rotated from the molding position to the demolding position after the precast concrete foundation material formed body has hardened, and a demolding step in which the precast concrete foundation material formed body is demolded from the inner mold after the demolding preparation step. In such a method, it is preferable to form the through hole and the female thread in the demolding preparation step, screw a bolt into the through hole from above, and press the upper surface of the inner mold with the tip of the bolt. It is also preferable to form the through hole and the female thread in the demolding preparation step, and screw an eye bolt into the through hole from above.

本発明に従って構成されるプレキャストコンクリート基礎材を用いてベタ基礎を形成する方法としては、捨てコンクリート上に複数個の該プレキャストコンクリート基礎材を所要とおりに連続して配列して該溝を無端状に接続する基礎材配列工程と、該基礎材配列工程の後に該開口窓にスラブ筋の端部を挿入して該スラブ筋を配筋する配筋工程と、該配筋工程の後に該溝の上面から未硬化状態のコンクリートを打設する基礎打設工程とを含むのがよい。該配筋工程の後であって且つ該基礎打設工程の前には、アンカーボルトを該プレキャストコンクリート基礎材の上端部に配設するアンカーボルト配設工程を遂行し、該アンカーボルトは該プレキャストコンクリート基礎材の上端部に跨設された支持具によって支持されるのが好適である。 A method for forming a mat foundation using a precast concrete foundation material constructed according to the present invention preferably includes a foundation material arrangement step in which a plurality of the precast concrete foundation materials are arranged continuously as required on the basal concrete to connect the groove endlessly, a reinforcement arrangement step in which the ends of the slab reinforcement are inserted into the openings after the foundation material arrangement step to arrange the slab reinforcement, and a foundation pouring step in which unhardened concrete is poured from the top surface of the groove after the reinforcement arrangement step. After the reinforcement arrangement step and before the foundation pouring step, an anchor bolt arrangement step is carried out in which an anchor bolt is arranged at the upper end of the precast concrete foundation material, and the anchor bolt is preferably supported by a support straddling the upper end of the precast concrete foundation material.

本発明に従って構成されるプレキャストコンクリート基礎材にあっては、建築現場において溝にコンクリートを打設することでベタ基礎の立ち上がり部が形成される。つまり、ベタ基礎の立ち上がり部はプレキャストコンクリート基礎材を成形する工場ではなく建築現場で完成することから、プレキャストコンクリート基礎材自身の重量は軽い。従って、本発明に従って構成されたプレキャストコンクリート基礎材によれば、これを移動させるのに必ずしも大型のクレーンは必要でなく、従って基礎工事の作業性が良好となる。更に、起立壁の下端部には上記溝に連通する開口窓が形成されているため、建築現場においてプレキャストコンクリート基礎材を所要とおりに配置した後に、開口窓にスラブ筋の端部を挿入することでスラブ筋を配筋することができる。従って、鉄筋を含んだ状態でプレキャストコンクリート基礎材を成形する必要はなく、搬送時に外部に鉄筋が突出することはない。それ故に、本発明に従って構成されたプレキャストコンクリート基礎材は、安全に搬送することができる。更に、本発明に従って構成されるプレキャストコンクリート基礎材を用いてベタ基礎を形成する方法によれば、建築現場で打設する捨てコンクリートはプレキャストコンクリート基礎材が配置される場所のみで充分であることから工期を短縮させることができる。そしてまた、本発明に従って構成されるプレキャストコンクリート基礎材を用いて形成されたベタ基礎にあっては、土間部及び立ち上がり部はつなぎ目なく一体的に形成されることから、土間部と立ち上がり部との境界部分にクラックが生じにくく充分な耐震強度を維持できる。 In the precast concrete foundation material constructed according to the present invention, the rising part of the slab foundation is formed by pouring concrete into the groove at the construction site. In other words, since the rising part of the slab foundation is completed at the construction site, not at the factory where the precast concrete foundation material is formed, the weight of the precast concrete foundation material itself is light. Therefore, according to the precast concrete foundation material constructed according to the present invention, a large crane is not necessarily required to move it, and therefore the workability of the foundation construction is good. Furthermore, since an opening window that communicates with the above-mentioned groove is formed at the lower end of the standing wall, after the precast concrete foundation material is arranged as required at the construction site, the slab reinforcement can be arranged by inserting the end of the slab reinforcement into the opening window. Therefore, there is no need to form the precast concrete foundation material with the reinforcing bar included, and the reinforcing bar does not protrude to the outside during transportation. Therefore, the precast concrete foundation material constructed according to the present invention can be transported safely. Furthermore, according to the method of forming a mat foundation using the precast concrete foundation material constructed according to the present invention, the construction period can be shortened because the basin concrete poured at the construction site is sufficient only in the area where the precast concrete foundation material is placed. Furthermore, in the mat foundation formed using the precast concrete foundation material constructed according to the present invention, the floor area and the rising area are formed integrally without any joints, so cracks are unlikely to occur at the boundary between the floor area and the rising area, and sufficient seismic strength can be maintained.

本発明に従って構成されたプレキャストコンクリート基礎材の好適実施形態の一つである直線形状プレキャストコンクリート基礎材の単体図。FIG. 1 is a view showing a linear precast concrete foundation member, which is one of preferred embodiments of the precast concrete foundation member constructed according to the present invention. 本発明に従って構成されたプレキャストコンクリート基礎材の好適実施形態の一つであるL字形状プレキャストコンクリート基礎材の単体図。FIG. 1 is a view showing a single L-shaped precast concrete foundation, which is one of the preferred embodiments of the precast concrete foundation constructed according to the present invention. 本発明に従って構成されたプレキャストコンクリート基礎材の好適実施形態の一つであるT字形状プレキャストコンクリート基礎材の単体図。FIG. 1 is a view showing a single T-shaped precast concrete foundation, which is one of the preferred embodiments of the precast concrete foundation constructed according to the present invention. 本発明に従って構成されたプレキャストコンクリート基礎材の好適実施形態の一つである十字形状プレキャストコンクリート基礎材の単体図。FIG. 1 is a single view of a cross-shaped precast concrete foundation, which is one of the preferred embodiments of the precast concrete foundation constructed according to the present invention. 本発明に従って構成されたプレキャストコンクリート基礎材の好適実施形態の一つである十字形状プレキャストコンクリート基礎材の単体図。FIG. 1 is a single view of a cross-shaped precast concrete foundation, which is one of the preferred embodiments of the precast concrete foundation constructed according to the present invention. 本発明に従って構成されるプレキャストコンクリート基礎材を成形するための成形装置の構造を示す図。1 is a diagram showing the structure of a molding device for molding a precast concrete foundation material constructed according to the present invention. 図5に示す成形装置を用いてプレキャストコンクリート基礎材を成形する方法を示す図。6 is a diagram showing a method of forming a precast concrete foundation material using the forming device shown in FIG. 5 . 図1乃至図4に示す各種プレキャストコンクリート基礎材を用いて基礎材配列工程を完了した直後の状態の一例を示す平面図。FIG. 5 is a plan view showing an example of a state immediately after the completion of a foundation material arrangement process using the various precast concrete foundation materials shown in FIGS. 図7の一部を拡大して示す斜視図。FIG. 8 is an enlarged perspective view of a portion of FIG. 7 . 配筋工程を完了した直後の状態の一部を拡大して示す斜視図。FIG. 4 is an enlarged perspective view showing a portion of the structure immediately after the reinforcement process is completed. 図9に示す状態の基礎構造を模式的に示す図。FIG. 10 is a diagram showing a basic structure in the state shown in FIG. 9 . アンカーボルト配設工程を完了した直後の状態の基礎構造を模式的に示す図。FIG. 13 is a schematic diagram showing the foundation structure immediately after the anchor bolt installation process is completed. 基礎打設工程を完了した直後の状態の基礎構造を模式的に示す図。FIG. 2 is a schematic diagram showing the foundation structure immediately after the foundation pouring process is completed.

後に図面を参照しながら説明するとおり、本発明に従って構成されるプレキャストコンクリート基礎材は所要形状の底壁とこの底壁の側縁から上方に起立する起立壁とを有しており、後述する成形装置により成形することができる。以下、本発明に従って構成されたプレキャストコンクリート基礎材の好適実施形態を示す添付図面を参照して、更に詳細に説明する。 As will be explained later with reference to the drawings, the precast concrete foundation material constructed according to the present invention has a bottom wall of the required shape and upright walls that rise upward from the side edges of the bottom wall, and can be formed by a forming device described below. A more detailed explanation will be given below with reference to the attached drawings showing a preferred embodiment of the precast concrete foundation material constructed according to the present invention.

図1には、上記所要形状が直線形状である場合のプレキャストコンクリート基礎材が示されている。図1に示されるプレキャストコンクリート基礎材を直線形状プレキャストコンクリート基礎材としてその全体を符号2aで示し、後述する他の形状のプレキャストコンクリート基礎材と区別する。図1(a)乃至(d)は直線形状プレキャストコンクリート基礎材2aの斜視図、平面図、右側面図、A-A線断面図を夫々示すものである。直線形状プレキャストコンクリート基礎材2aは直線形状の底壁4aと、底壁4aの両側縁から上方に起立する起立壁6a-1及び6a-2とを有している。底壁4aの上面及び下面は共に平坦であり、底壁4aの上面には4つの有底穴8aが長手方向に間隔をおいて形成されている。また、底壁4aには上下方向に貫通する貫通穴10aも形成されており、貫通穴10aを規定する底壁4aの内周面には雌螺条12aが形成されている。貫通穴10aは底壁4aの重心位置に形成され、4つの有底穴8aは長手方向に見た貫通穴10aの両側に2つずつ形成され、有底穴8a及び貫通穴10aは夫々長手方向に延びる同一の直線上に等間隔をおいて配置されている。起立壁6a-1及び6a-2は夫々長手方向に延びる底壁4aの両側縁から上方に起立しており、起立壁6a-1及び6a-2の間には上面及び端面が開放されて長手方向に直線状に延びる溝14aが形成されている。溝14aは直線形状であって上記所要形状と同一である。図1(c)に示すとおり、起立壁6a-1及び6a-2の外側面16aは共に底壁4aの上面から実質上垂直に延出しているが、起立壁6a-1及び6a-2の内側面18aは底壁4aの上面から上方に向かって幾分外側に向かって傾斜して延出しており、起立壁6a-1及び6a-2の肉厚は基端から延出端に向かって漸次低減せしめられている。そして、起立壁の基端部には溝14aに連通する開口窓20aが形成されている。図1(b)及び(c)に示すとおり、図示の実施形態においては、開口窓20aは起立壁の内側面から外側面に向かって拡大せしめられている。その理由については後に言及する。図1に示す形態の直線形状プレキャストコンクリート基礎材2aにあっては、開口窓20aは起立壁6a-1にのみ形成されており起立壁6a-2には形成されていないが、後述するとおり、開口窓20aが2つの起立壁6a-1及び6a-2の基端部に形成される場合もある。 Figure 1 shows a precast concrete foundation material when the required shape is a straight line shape. The precast concrete foundation material shown in Figure 1 is designated by the reference symbol 2a as a straight line precast concrete foundation material, and is to be distinguished from precast concrete foundation materials of other shapes described later. Figures 1(a) to (d) respectively show a perspective view, a plan view, a right side view, and a cross-sectional view along line A-A of the straight line precast concrete foundation material 2a. The straight line precast concrete foundation material 2a has a straight line bottom wall 4a and upright walls 6a-1 and 6a-2 that stand upward from both side edges of the bottom wall 4a. The upper and lower surfaces of the bottom wall 4a are both flat, and four bottomed holes 8a are formed at intervals in the longitudinal direction on the upper surface of the bottom wall 4a. In addition, a through hole 10a that penetrates the bottom wall 4a in the vertical direction is also formed, and a female thread 12a is formed on the inner peripheral surface of the bottom wall 4a that defines the through hole 10a. The through hole 10a is formed at the center of gravity of the bottom wall 4a, and the four bottomed holes 8a are formed, two on each side of the through hole 10a when viewed in the longitudinal direction, and the bottomed holes 8a and the through holes 10a are arranged at equal intervals on the same straight line extending in the longitudinal direction. The upright walls 6a-1 and 6a-2 stand upward from both side edges of the bottom wall 4a extending in the longitudinal direction, and a groove 14a is formed between the upright walls 6a-1 and 6a-2, with its top surface and end surfaces open and extending linearly in the longitudinal direction. The groove 14a has a linear shape and is the same as the required shape described above. As shown in Fig. 1(c), the outer side surfaces 16a of the upright walls 6a-1 and 6a-2 both extend substantially vertically from the upper surface of the bottom wall 4a, while the inner side surfaces 18a of the upright walls 6a-1 and 6a-2 extend from the upper surface of the bottom wall 4a at a slight incline toward the outside, and the thickness of the upright walls 6a-1 and 6a-2 is gradually reduced from the base end toward the extended end. An opening window 20a that communicates with the groove 14a is formed at the base end of the upright wall. As shown in Fig. 1(b) and (c), in the illustrated embodiment, the opening window 20a is expanded from the inner side surface of the upright wall toward the outer side surface. The reason for this will be mentioned later. In the linear precast concrete foundation 2a shown in FIG. 1, the opening window 20a is formed only in the standing wall 6a-1 and not in the standing wall 6a-2, but as described below, the opening window 20a may be formed at the base end of the two standing walls 6a-1 and 6a-2.

図2には、上記所要形状がL字形状である場合のプレキャストコンクリート基礎材が示されている。図2に示されるプレキャストコンクリート基礎材をL字形状プレキャストコンクリート基礎材としてその全体を符号2bで示す。図2(a)乃至(d)はL字形状プレキャストコンクリート基礎材2bの斜視図、平面図、右側面図、A-A線断面図を夫々示すものである。L字形状プレキャストコンクリート基礎材2bは、上記所要形状がL字形状であることを除いて上述した直線形状プレキャストコンクリート基礎材2aと実質上同一の構成であるため、同一の構成については同一の番号に符号bをつけてその詳細な説明については省略する。L字形状プレキャストコンクリート基礎材2bは、平面視において共にL字形状である2つの起立壁6b-1及び6b-2を有し、開口窓20bは2つの起立壁6b-1及び6b-2のいずれか一方の下端部にのみ形成される。図2に示す形態のL字形状プレキャストコンクリート基礎材2bにあっては、開口窓20bは起立壁6b-1に形成されているが、後述するとおり、開口窓20bが起立壁6b-2に形成される場合もある。 Figure 2 shows a precast concrete foundation material when the required shape is an L-shape. The precast concrete foundation material shown in Figure 2 is an L-shaped precast concrete foundation material and is generally indicated by the reference symbol 2b. Figures 2(a) to (d) respectively show a perspective view, a plan view, a right side view, and a cross-sectional view along the line A-A of the L-shaped precast concrete foundation material 2b. The L-shaped precast concrete foundation material 2b has substantially the same configuration as the linear precast concrete foundation material 2a described above except that the required shape is an L-shape, so the same configuration is assigned the reference symbol b to the same number and detailed description thereof is omitted. The L-shaped precast concrete foundation material 2b has two standing walls 6b-1 and 6b-2 that are both L-shaped in plan view, and the opening window 20b is formed only at the lower end of one of the two standing walls 6b-1 and 6b-2. In the L-shaped precast concrete foundation 2b shown in FIG. 2, the opening window 20b is formed in the standing wall 6b-1, but as described below, the opening window 20b may also be formed in the standing wall 6b-2.

図3には、上記所要形状がT字形状である場合のプレキャストコンクリート基礎材が示されている。図3に示されるプレキャストコンクリート基礎材をT字形状プレキャストコンクリート基礎材としてその全体を符号2cで示す。図3(a)乃至(d)はT字形状プレキャストコンクリート基礎材2cの斜視図、平面図、正面図、A-A線断面図を夫々示すものである。T字形状プレキャストコンクリート基礎材2cは、上記所要形状がT字形状であることを除いて上述した直線形状プレキャストコンクリート基礎材2aと実質上同一の構成であるため、同一の構成については同一の番号に符号cをつけてその詳細な説明については省略する。T字形状プレキャストコンクリート基礎材2cは、平面視において直線状である1つの起立壁6c-1と、L字形状である2つの起立壁6c-2及び6c-3とを有し、図3(b)において一点鎖線で示されるとおり、起立壁6c-2及び6c-3の下端部にのみ開口窓20cが形成されている。図3に示す形態のT字形状プレキャストコンクリート基礎材2cにあっては、開口窓20cは起立壁6c-1に形成されていないが、後述するとおり、開口窓20cが起立壁6c-1にも形成されている場合もある。 Figure 3 shows a precast concrete foundation material when the required shape is a T-shape. The precast concrete foundation material shown in Figure 3 is a T-shaped precast concrete foundation material and is generally indicated by the reference symbol 2c. Figures 3(a) to (d) respectively show a perspective view, a plan view, a front view, and a cross-sectional view along the line A-A of the T-shaped precast concrete foundation material 2c. The T-shaped precast concrete foundation material 2c has substantially the same configuration as the linear precast concrete foundation material 2a described above except that the required shape is a T-shape, so the same configuration is given the reference symbol c with the same numbers and detailed description thereof is omitted. The T-shaped precast concrete foundation material 2c has one standing wall 6c-1 that is linear in plan view and two standing walls 6c-2 and 6c-3 that are L-shaped, and an opening window 20c is formed only at the lower end of the standing walls 6c-2 and 6c-3 as shown by the dashed line in Figure 3(b). In the T-shaped precast concrete foundation 2c shown in FIG. 3, the opening window 20c is not formed in the standing wall 6c-1, but as described below, there are cases where the opening window 20c is also formed in the standing wall 6c-1.

図4-1及び図4-2には、上記所要形状が十字形状である場合のプレキャストコンクリート基礎材が示されている。図4に示されるプレキャストコンクリート基礎材を十字形状プレキャストコンクリート基礎材としてその全体を符号2dで示す。図4-1(a)乃至図4-2(d)は十字形状プレキャストコンクリート基礎材2dの斜視図、平面図、正面図、A-A線断面図を夫々示すものである。十字形状プレキャストコンクリート基礎材2dは、上記所要形状が十字形状であることを除いて上述した直線形状プレキャストコンクリート基礎材2aと実質上同一の構成であるため、同一の構成については同一の番号に符号dをつけてその詳細な説明については省略する。十字形状プレキャストコンクリート基礎材2dは、平面視においてL字形状である4つの起立壁6d-1乃至6d-4を有し、図4-1(b)において一点鎖線で示されるとおり、全ての起立壁6d-1乃至6d-4の下端部に開口窓20dが形成されている。開口窓20dは起立壁6d-1乃至6d-4の各辺に1つずつ形成されている。 Figures 4-1 and 4-2 show a precast concrete foundation material when the required shape is a cross shape. The precast concrete foundation material shown in Figure 4 is a cross-shaped precast concrete foundation material and is indicated as a whole by the reference symbol 2d. Figures 4-1(a) to 4-2(d) respectively show a perspective view, a plan view, a front view, and a cross-sectional view along line A-A of the cross-shaped precast concrete foundation material 2d. The cross-shaped precast concrete foundation material 2d has substantially the same configuration as the linear precast concrete foundation material 2a described above except that the required shape is a cross shape, so the same configuration is given the reference symbol d with the same number and detailed description thereof is omitted. The cross-shaped precast concrete foundation material 2d has four standing walls 6d-1 to 6d-4 that are L-shaped in plan view, and as shown by the dashed line in Figure 4-1(b), an opening window 20d is formed at the lower end of all the standing walls 6d-1 to 6d-4. One opening window 20d is formed on each side of the upright walls 6d-1 to 6d-4.

図5には、本発明に従って構成されるプレキャストコンクリート基礎材を成形するための成形装置の一例として、図1に示す直線形状プレキャストコンクリート基礎材2aを成形するための成形装置の構造が示されている。全体を番号22aで示す成形装置は実質上水平な面上に固定される基台24aと、この基台24aに装着される内側金型26a及び外側金型28aとを有している。基台24aは紙面奥行方向に直線状に延在しており、その断面形状は略矩形形状である。基台24aの上面の紙面左右方向の両側側縁部には紙面奥行方向に直線状に延びる凹溝30aが形成されており、凹溝30aの紙面左右方向に見た外側面は開放されている。内側金型26aは適宜の固定手段によって基台24aの上面に固定されている。内側金型26aも紙面奥行方向に直線状に直線状に延在しており、基台24aの上面から上方に突出して上面は平坦に閉塞せしめられている。図示の実施形態においては、内側金型26aの縦断面形状は上方に向かって先細りする中空の台形形状である。外側金型28aは、凹溝30aに設けられたヒンジ手段32aを介して基台24aに接続された2個の板状外側金型片34aから構成され、2個の外側金型片34aは共に紙面奥行方向に直線状に延在している。図5に示されるとおり、2個の外側金型片34aは夫々紙面奥行方向に直線状に延在する内側金型26aの両側に1つずつ配置されている。そして、2つの外側金型片34aは共に、内側面が内側金型26aの外側面に近接した成形位置(図5において実線で示す位置)及び内側金型26aの外側面から離隔した離型位置(図5において二点鎖線で示す位置)の間を旋回自在である。外側金型片34aが成形位置に位置するときには、外側金型片34aは基台24aの上面に対して実質上垂直に起立し、外側金型片34aの上端は内側金型26aの上端よりも上方に位置する。このことから、全ての外側金型片34aが成形位置に位置するときには、外側金型28aの内側には、外側金型片34aの内側面と内側金型26aの外側面と基台24aの上面とによって規定される起立壁形成空間部36aと、外側金型28aの内側であって且つ内側金型26aよりも上方に規定される底壁形成空間部38aとが画成される。凹溝30aの存在に起因して、上記離型位置において外側金型片34aの内側面は内側金型26aの外側面から充分に離隔せしめられる。外側金型片34の内側面の所要部位には、成形位置にあるときに内側金型26の外側面と面接触する膨出部39が形成されている。膨出部39は、外側金型片34が成形位置にあるときに内側金型26の外側面と面接触する矩形形状の膨出端面39a、及び膨出端面39aの外周縁から延出して外側金型片34の内側面に接続される膨出外周面39bを有し、膨出外周面39bは外側金型片34の内側面から外側面に向かう方向に広がって延びている。図示は省略するが、成形装置22aは内側金型26a及び外側金型片34aの端面、紙面奥行方向の両側端面と当接して直線形状プレキャストコンクリート基礎材2aの長手方向の両側端面を規定する、基台24aに対して固定或いは旋回自在な端金型も備えている。 Figure 5 shows the structure of a molding device for molding the linear precast concrete foundation material 2a shown in Figure 1 as an example of a molding device for molding a precast concrete foundation material constructed according to the present invention. The molding device, generally designated by the number 22a, has a base 24a fixed on a substantially horizontal surface, and an inner mold 26a and an outer mold 28a attached to the base 24a. The base 24a extends linearly in the depth direction of the paper, and its cross-sectional shape is approximately rectangular. A groove 30a extending linearly in the depth direction of the paper is formed on both side edges in the left-right direction of the upper surface of the base 24a, and the outer surface of the groove 30a viewed in the left-right direction of the paper is open. The inner mold 26a is fixed to the upper surface of the base 24a by an appropriate fixing means. The inner mold 26a also extends linearly in the depth direction of the paper, protrudes upward from the upper surface of the base 24a, and its upper surface is closed flat. In the illustrated embodiment, the vertical cross-sectional shape of the inner mold 26a is a hollow trapezoid tapered toward the top. The outer mold 28a is composed of two plate-shaped outer mold pieces 34a connected to the base 24a via hinge means 32a provided in the groove 30a, and the two outer mold pieces 34a both extend linearly in the depth direction of the paper. As shown in Fig. 5, the two outer mold pieces 34a are arranged on both sides of the inner mold 26a that extends linearly in the depth direction of the paper. Both of the two outer mold pieces 34a can freely rotate between a molding position (position shown by a solid line in Fig. 5) where the inner surface is close to the outer surface of the inner mold 26a and a demolding position (position shown by a two-dot chain line in Fig. 5) where the inner surface is separated from the outer surface of the inner mold 26a. When the outer mold piece 34a is in the molding position, the outer mold piece 34a stands upright substantially perpendicular to the upper surface of the base 24a, and the upper end of the outer mold piece 34a is located above the upper end of the inner mold 26a. Therefore, when all the outer mold pieces 34a are in the molding position, the inner side of the outer mold piece 34a is defined by the inner side of the outer mold piece 34a, the outer side of the inner mold 26a, and the upper surface of the base 24a, and the inner side of the outer mold 28a is defined above the inner mold 26a. Due to the presence of the groove 30a, the inner side of the outer mold piece 34a is sufficiently separated from the outer side of the inner mold 26a at the above-mentioned mold release position. At a required portion of the inner side of the outer mold piece 34, a bulge 39 is formed that comes into surface contact with the outer side of the inner mold 26 when in the molding position. The bulging portion 39 has a rectangular bulging end surface 39a that comes into surface contact with the outer surface of the inner mold 26 when the outer mold piece 34 is in the molding position, and a bulging outer peripheral surface 39b that extends from the outer peripheral edge of the bulging end surface 39a and connects to the inner surface of the outer mold piece 34, and the bulging outer peripheral surface 39b extends in a direction from the inner surface of the outer mold piece 34 toward the outer surface. Although not shown, the molding device 22a also has end molds that are fixed or rotatable relative to the base 24a and come into contact with the end surfaces of the inner mold 26a and the outer mold piece 34a and both end surfaces in the depth direction of the paper to define both end surfaces in the longitudinal direction of the linear precast concrete foundation material 2a.

次に、図6を参照して成形装置22aによって直線形状プレキャストコンクリート基礎材2aを成形する工程について説明する。最初に、図6(a)に示すとおり、全ての外側金型片34aが成形位置にあるときに外側金型28aの内側に未硬化状態のコンクリートを打設して直線形状プレキャストコンクリート基礎材成形体2a´を形成する(基礎材成形体打設工程)。図5も参照して説明すると、未硬化状態のコンクリートは上記した起立壁形成空間部36aのみならず底壁形成空間部38aにも打設される。起立壁形成空間部36a及び底壁形成空間部38aに打設されて硬化したコンクリートは夫々後に直線形状プレキャストコンクリート基礎材2aの起立壁6a及び底壁4aとなる。そのため、底壁形成空間部38aに打設されて硬化したコンクリートにおいて、後に底壁4aとなる部分を底壁4a´とする。図6(a)に示すとおり、直線形状プレキャストコンクリート基礎材成形体2a´は底壁4a´が上方に位置する状態で成形される。また、外側金型片34の内側面の所要部位には、成形位置にあるときに内側金型26の外側面と面接触する膨出部39が形成されていることに起因して、膨出部39が形成された部分にコンクリートは存在せず、かかる部分に直線形状プレキャストコンクリート基礎材成形体2a´の開口窓20a´が形成される。所望ならば、予め中実棒状の鉄筋がメッシュ状に組まれた周知のメッシュ筋を起立壁形成空間部36a及び底壁形成空間部38aに配設した後に未硬化状態のコンクリートを打設してもよい。この場合には、既に硬化したコンクリート片(図示せず)を予め基台24a上に配置しておき、メッシュ筋は上記コンクリート片上に配設される。 Next, referring to FIG. 6, the process of forming the linear precast concrete foundation material 2a by the forming device 22a will be described. First, as shown in FIG. 6(a), when all the outer mold pieces 34a are in the forming position, unhardened concrete is poured inside the outer mold 28a to form a linear precast concrete foundation material molded body 2a' (foundation material molded body pouring process). Referring also to FIG. 5, the unhardened concrete is poured not only into the above-mentioned standing wall forming space 36a but also into the bottom wall forming space 38a. The concrete poured into the standing wall forming space 36a and the bottom wall forming space 38a and hardened will later become the standing wall 6a and the bottom wall 4a of the linear precast concrete foundation material 2a, respectively. Therefore, in the concrete poured into the bottom wall forming space 38a and hardened, the part that will later become the bottom wall 4a is called the bottom wall 4a'. As shown in FIG. 6(a), the linear precast concrete foundation material molded body 2a' is molded with the bottom wall 4a' positioned upward. In addition, a bulge 39 is formed at a required portion of the inner surface of the outer mold piece 34, which is in surface contact with the outer surface of the inner mold 26 when in the molding position. This causes no concrete to exist in the portion where the bulge 39 is formed, and an opening window 20a' of the linear precast concrete foundation molding 2a' is formed in this portion. If desired, unhardened concrete may be poured after well-known mesh reinforcement, in which solid rod-shaped reinforcing bars are arranged in a mesh shape, is placed in the upright wall forming space 36a and the bottom wall forming space 38a. In this case, hardened concrete pieces (not shown) are placed on the base 24a in advance, and the mesh reinforcement is placed on the concrete pieces.

次いで、直線形状プレキャストコンクリート基礎材成形体2a´が硬化した後に、図6(b)に示すとおり、全ての外側金型片34aを成形位置から離型位置に旋回せしめ、直線形状プレキャストコンクリート基礎材成形体2a´を露呈せしめる(離型準備工程)。このとき、外側金型片34に形成された膨出部39が直線形状プレキャストコンクリート基礎材成形体2a´から離型せしめられる。図示の実施形態においては、外側金型片34に形成された膨出部39の膨出外周面39bが外側金型片34の内側面から外側面に向かう方向に広がって延びているため、膨出部39は充分容易に起立壁6´から離型せしめられる。図示の実施形態においては、離型準備工程において更に、底壁4a´の所要位置に貫通穴10a´及び雌螺条12a´を形成し(図6(c))、貫通穴10a´に上方から適宜のボルト40を上方から見て時計方向に回転することで螺進せしめて(図6(d))その先端で内側金型26aの上面を押す。このとき、図6(e)に示すとおり、ボルト40の先端が内側金型26aの上面と当接することでボルト40の下方への移動は阻止されるが、ボルト40の先端が内側金型26aの上面と当接したままボルト40が上記螺進を継続すると、ボルト40に形成された雄螺条41と貫通穴10a´に形成された雌螺条12a´との螺合によって直線形状プレキャストコンクリート基礎材成形体2a´は内側金型26aに対して上方に移動せしめられる。つまり、直線形状プレキャストコンクリート基礎材成形体2a´は一時的に内側金型26aから離型せしめられる。 Next, after the linear precast concrete foundation molding 2a' has hardened, as shown in FIG. 6(b), all the outer mold pieces 34a are rotated from the molding position to the demolding position to expose the linear precast concrete foundation molding 2a' (mold-release preparation process). At this time, the bulge 39 formed on the outer mold piece 34 is demolded from the linear precast concrete foundation molding 2a'. In the illustrated embodiment, the bulge outer peripheral surface 39b of the bulge 39 formed on the outer mold piece 34 spreads and extends in the direction from the inner surface of the outer mold piece 34 toward the outer surface, so that the bulge 39 can be easily demolded from the upright wall 6'. In the illustrated embodiment, the mold release preparation step further includes forming a through hole 10a' and a female thread 12a' at a required position of the bottom wall 4a' (FIG. 6(c)), and screwing an appropriate bolt 40 into the through hole 10a' from above by rotating it clockwise as viewed from above (FIG. 6(d)), and pressing the upper surface of the inner mold 26a with its tip. At this time, as shown in FIG. 6(e), the tip of the bolt 40 abuts against the upper surface of the inner mold 26a, preventing the bolt 40 from moving downward. However, if the bolt 40 continues to screw while the tip of the bolt 40 abuts against the upper surface of the inner mold 26a, the male thread 41 formed on the bolt 40 and the female thread 12a' formed in the through hole 10a' are screwed together, causing the linear precast concrete foundation molding 2a' to move upward relative to the inner mold 26a. In other words, the linear precast concrete foundation molding 2a' is temporarily released from the inner mold 26a.

直線形状プレキャストコンクリート基礎材成形体2a´が一時的に内側金型26aから離型せしめられた後に、図6(f)に示すとおり、ボルト40を上方から見て反時計方向に回転して直線形状プレキャストコンクリート基礎材成形体2a´を内側金型26aに対して降下させ、両者を再び当接させる。その後に、ボルト40を更に反時計方向に回転させて、ボルト40を貫通穴10a´から螺脱せしめる。次いで、図6(g)に示すとおり、貫通穴10a´に上方からアイボルト42を螺着し、アイボルト42に適宜のワイヤー44を巻き付けて図示しないクレーンでアイボルト42を介して直線形状プレキャストコンクリート基礎材成形体2a´を上方に吊り上げて内側金型26aから離型せしめる(離型工程)。このとき、直線形状プレキャストコンクリート基礎材成形体2a´は離型準備工程において内側金型26aから既に一度離型していることから、離型工程において直線形状プレキャストコンクリート基礎材成形体2a´は内側金型26aから円滑に離型される。 After the linear precast concrete foundation molding 2a' is temporarily released from the inner mold 26a, as shown in Fig. 6(f), the bolt 40 is rotated counterclockwise as viewed from above to lower the linear precast concrete foundation molding 2a' toward the inner mold 26a, and the two are abutted again. After that, the bolt 40 is further rotated counterclockwise to unscrew the bolt 40 from the through hole 10a'. Next, as shown in Fig. 6(g), an eye bolt 42 is screwed into the through hole 10a' from above, an appropriate wire 44 is wound around the eye bolt 42, and the linear precast concrete foundation molding 2a' is lifted upward via the eye bolt 42 by a crane (not shown) to release it from the inner mold 26a (release process). At this time, since the linear precast concrete foundation molded body 2a' has already been released once from the inner mold 26a in the mold release preparation process, the linear precast concrete foundation molded body 2a' is smoothly released from the inner mold 26a in the mold release process.

以上、直線形状プレキャストコンクリート基礎材2aを成形するための成形装置22a及びこれを用いて直線形状プレキャストコンクリート基礎材2aを製造する方法について説明したが、他の形状のプレキャストコンクリート基礎材(2b乃至2d)を製造するための成形装置及びかかる成形装置を用いて夫々の形状のプレキャストコンクリート基礎材を製造する方法についても同様にして構成されることから詳細な説明については省略する。念のため付言すると、底壁が所要形状である他の形状のプレキャストコンクリート基礎材2b乃至2dを成形するための成形装置にあっては、内側金型は平面視において上記所要形状と同一であり、外側金型を構成する板状外側金型片は上記所要形状が有する辺に応じて配設される。 The above describes the molding device 22a for molding the linear precast concrete base material 2a and the method for manufacturing the linear precast concrete base material 2a using the molding device, but the molding devices for manufacturing precast concrete base materials of other shapes (2b to 2d) and the method for manufacturing precast concrete base materials of each shape using the molding device are configured in the same way, so detailed explanations will be omitted. Just to be clear, in the molding device for molding precast concrete base materials of other shapes 2b to 2d whose bottom walls have the required shape, the inner mold is the same as the required shape in a plan view, and the plate-shaped outer mold pieces that make up the outer mold are arranged according to the sides of the required shape.

次に、図7乃至図12を参照して、図1乃至図4に示す各種プレキャストコンクリート基礎材2a乃至2dを用いてベタ基礎を形成する工程について説明する。図示は省略するが、まず、建築現場において所要とおりに周知の根切り及び割栗地業をした後に土間46の外周縁部に捨てコンクリート48を打設する。その後に、図7及び図8に示すとおり、捨てコンクリート48上に複数個の各種プレキャストコンクリート基礎材2a乃至2dを連続して配列してプレキャストコンクリート基礎材2a乃至2dの溝14a乃至14dを無端状に接続する(基材配列工程)。図8は容易に理解できるよう一部を省略して示している。捨てコンクリート48とプレキャストコンクリート基礎材2a乃至2dとの間には周知の調整モルタル50が配設されるのが良い。また、プレキャストコンクリート基礎材2a乃至2dを移動する際には、図8に示されるとおり、底板4a乃至4dに形成された貫通穴10a乃至10dに上面から(溝14a乃至14dの内側から)アイボルト42を螺着せしめ、かかるアイボルト42を適宜のクレーンで吊るのが好ましい。このとき、貫通穴10a乃至10dは底壁4a乃至4dの重心位置に形成されていることから、プレキャストコンクリート基礎材2a乃至2dを実質上水平な状態で安定して吊ることができる。基礎配列工程にあっては、各種プレキャストコンクリート基礎材2a乃至2dに形成された開口窓20a乃至20dはいずれも土間46側に配置され、土間46の反対側つまり平面視において建築物の外側には配置されない。それ故に、図7において符号2Aで示されるプレキャストコンクリート基礎材にあっては図1に示すプレキャストコンクリート基礎材2aとは異なり、開口窓20aは起立壁6a-1だけでなく起立壁6a-2にも形成されている。また、図7において符号2Bで示されるプレキャストコンクリート基礎材にあっては図2に示すプレキャストコンクリート2bとは異なり、開口窓20bは起立壁6b-1ではなく起立壁6b-2に形成されている。更に、図7において符号2Cで示されるプレキャストコンクリート基礎材にあっては図3に示すプレキャストコンクリート2cとは異なり、開口窓20cは起立壁6c-2及び6c-3だけでなく、起立壁6c-1にも形成されている。 Next, referring to Figures 7 to 12, the process of forming a mat foundation using the various precast concrete foundation materials 2a to 2d shown in Figures 1 to 4 will be described. Although not shown, first, after performing the well-known root cutting and splitting work as required at the construction site, basing concrete 48 is poured on the outer edge of the earthen floor 46. Then, as shown in Figures 7 and 8, a plurality of various precast concrete foundation materials 2a to 2d are continuously arranged on the basing concrete 48 to connect the grooves 14a to 14d of the precast concrete foundation materials 2a to 2d endlessly (base material arrangement process). Figure 8 is partially omitted for easy understanding. It is preferable to arrange the well-known adjustment mortar 50 between the basing concrete 48 and the precast concrete foundation materials 2a to 2d. In addition, when moving the precast concrete foundation members 2a to 2d, as shown in Fig. 8, it is preferable to screw the eye bolts 42 into the through holes 10a to 10d formed in the bottom plates 4a to 4d from above (from the inside of the grooves 14a to 14d) and hang the eye bolts 42 with an appropriate crane. At this time, since the through holes 10a to 10d are formed at the center of gravity of the bottom walls 4a to 4d, the precast concrete foundation members 2a to 2d can be hung stably in a substantially horizontal state. In the foundation arrangement process, the opening windows 20a to 20d formed in the various precast concrete foundation members 2a to 2d are all arranged on the side of the earth floor 46, and are not arranged on the opposite side of the earth floor 46, that is, on the outside of the building in a plan view. Therefore, in the precast concrete foundation member indicated by the symbol 2A in Fig. 7, unlike the precast concrete foundation member 2a shown in Fig. 1, the opening windows 20a are formed not only in the standing wall 6a-1 but also in the standing wall 6a-2. In addition, in the precast concrete foundation material indicated by the symbol 2B in FIG. 7, unlike the precast concrete 2b shown in FIG. 2, the opening window 20b is formed in the standing wall 6b-2, not in the standing wall 6b-1. Furthermore, in the precast concrete foundation material indicated by the symbol 2C in FIG. 7, unlike the precast concrete 2c shown in FIG. 3, the opening window 20c is formed not only in the standing walls 6c-2 and 6c-3, but also in the standing wall 6c-1.

基礎材配列工程の後に、図9及び図10に示すとおり、中実棒状の鉄筋を配筋する配筋工程を遂行する。図9は容易に理解できるよう一部を省略して示している。配筋工程では、開口窓20a乃至20dにスラブ筋52の端部54を挿入してスラブ筋52を配筋する。図10を参照することによって理解されるとおり、スラブ筋52の端部54は屈曲せしめられており、かかる端部54が溝14a乃至14d内に位置せしめられる。配筋工程にあっては更に、プレキャストコンクリート基礎材2a乃至2dの有底穴8a乃至8dの夫々に縦筋56を配筋すると共に、縦筋56に適宜の締結手段によって締結される横筋58をも配筋する。 After the foundation material arrangement process, as shown in Figures 9 and 10, a reinforcing bar arrangement process is carried out in which solid rod-shaped reinforcing bars are arranged. Figure 9 is partially omitted for easy understanding. In the reinforcing bar arrangement process, the ends 54 of the slab bars 52 are inserted into the openings 20a to 20d to arrange the slab bars 52. As can be understood by referring to Figure 10, the ends 54 of the slab bars 52 are bent, and the ends 54 are positioned in the grooves 14a to 14d. In the reinforcing bar arrangement process, vertical bars 56 are arranged in each of the bottomed holes 8a to 8d of the precast concrete foundation materials 2a to 2d, and horizontal bars 58 are also arranged to be fastened to the vertical bars 56 by appropriate fastening means.

上記配筋工程の後にアンカーボルト60をプレキャストコンクリート基礎材2a乃至2dの上端部に配設するアンカーボルト配設工程を遂行する。アンカーボルト60はプレキャストコンクリート基礎材2a乃至2dの上端部に間隔をおいて複数配設され、図11に示すとおり、夫々のアンカーボルト60の下端部は周知の締結具62によって横筋58に締結される。所望ならば、アンカーボルト60の下端部は縦筋56に締結されてもよい。図11では、容易に理解できるよう縦筋56は省略している。一方、アンカーボルト60の上端部は支持具64によって支持される。支持具64は下方が開放されたコの字形状の板材であって、プレキャストコンクリート基礎材2a乃至2dの上端部に跨設される。支持具64の中央には上下方向に貫通する貫通穴が形成されており、この貫通穴にアンカーボルト60が挿通されることで支持具64がアンカーボルト60の倒れを防止する。かようにして配設されたアンカーボルト60は、プレキャストコンクリート基礎材2a乃至2dの上端を超えて上方に延出する。 After the above-mentioned reinforcing bar arrangement process, an anchor bolt arrangement process is performed in which anchor bolts 60 are arranged at the upper ends of the precast concrete foundation members 2a to 2d. A plurality of anchor bolts 60 are arranged at intervals at the upper ends of the precast concrete foundation members 2a to 2d, and as shown in FIG. 11, the lower ends of each anchor bolt 60 are fastened to the horizontal bars 58 by well-known fasteners 62. If desired, the lower ends of the anchor bolts 60 may be fastened to the vertical bars 56. In FIG. 11, the vertical bars 56 are omitted for easy understanding. Meanwhile, the upper ends of the anchor bolts 60 are supported by a support 64. The support 64 is a U-shaped plate material with an open bottom, and is installed across the upper ends of the precast concrete foundation members 2a to 2d. A through hole is formed in the center of the support 64 penetrating in the vertical direction, and the support 64 prevents the anchor bolt 60 from falling over by inserting the anchor bolt 60 into this through hole. The anchor bolts 60 thus arranged extend upward beyond the upper ends of the precast concrete foundation members 2a to 2d.

そして、上記アンカーボルト配設工程の後(つまり配筋工程の後)に各種プレキャストコンクリート基礎材2a乃至2dに形成された溝14a乃至14dの上面の任意の位置から未硬化状態のコンクリートを打設する基礎打設工程を遂行する。かくすると、未硬化状態のコンクリートは溝14a乃至14dから開口窓20a乃至20dを通過して土間46に流出し、スラブ筋52は埋設される。未硬化状態のコンクリートは、土間46にあっては開口窓20a乃至20dの上端位置を超える高さ位置まで、プレキャストコンクリート基礎材2a乃至2dにあっては溝14a乃至14dの上端位置まで夫々打設され、かくして縦筋56及び横筋58も埋設される。打設されたコンクリートが硬化することで、図12に示すとおり、ベタ基礎66の土間部68と立ち上がり部70とは繋ぎ目が存在することなく一体的に形成される。打設されたコンクリートが硬化した後に、支持具64はアンカーボルト60から除去される。 After the anchor bolt installation process (i.e., after the reinforcement process), a foundation pouring process is carried out in which unhardened concrete is poured from any position on the top surface of the grooves 14a to 14d formed in the various precast concrete foundation materials 2a to 2d. In this way, the unhardened concrete flows from the grooves 14a to 14d through the opening windows 20a to 20d and flows out onto the floor 46, and the slab reinforcement 52 is buried. The unhardened concrete is poured up to a height position exceeding the upper end position of the opening windows 20a to 20d in the floor 46, and up to the upper end position of the grooves 14a to 14d in the precast concrete foundation materials 2a to 2d, respectively, and thus the vertical reinforcement 56 and the horizontal reinforcement 58 are also buried. As the poured concrete hardens, the floor portion 68 and the rising portion 70 of the mat foundation 66 are integrally formed without any joints, as shown in FIG. 12. After the poured concrete has hardened, the support 64 is removed from the anchor bolt 60.

本発明に従って構成されるプレキャストコンクリート基礎材2a乃至2dにあっては、建築現場において溝14a乃至14dにコンクリートを打設することでベタ基礎66の立ち上がり部70が形成される。つまり、ベタ基礎66の立ち上がり部70はプレキャストコンクリート基礎材2a乃至2dを成形する工場ではなく建築現場で完成することから、プレキャストコンクリート基礎材2a乃至2d自身の重量は軽い。従って、本発明に従って構成されたプレキャストコンクリート基礎材2a乃至2dによれば、これを移動させるのに必ずしも大型のクレーンは必要でなく、従って基礎工事の作業性が良好となる。更に、起立壁6a乃至6dの下端部には上記溝14a乃至14dに連通する開口窓20a乃至20dが形成されているため、建築現場においてプレキャストコンクリート基礎材2a乃至2dを所要とおりに配置した後に、開口窓20a乃至20dにスラブ筋52の端部54を挿入することでスラブ筋52を配筋することができる。従って、鉄筋を含んだ状態でプレキャストコンクリート基礎材を成形する必要はなく、搬送時に外部に鉄筋が突出することはない。それ故に、本発明に従って構成されたプレキャストコンクリート基礎材は、安全に搬送することができる。更に、本発明に従って構成されるプレキャストコンクリート基礎材2a乃至2dを用いてベタ基礎66を形成する方法によれば、建築現場で打設する捨てコンクリートはプレキャストコンクリート基礎材2a乃至2dが配置される場所のみで充分であることから工期を短縮させることができる。そしてまた、本発明に従って構成されるプレキャストコンクリート基礎材2a乃至2dを用いて形成されたベタ基礎66にあっては、土間部68及び立ち上がり部70はつなぎ目なく一体的に形成されることから、土間部68と立ち上がり部70との境界部分にクラックが生じにくく充分な耐震強度を維持できる。 In the precast concrete foundations 2a to 2d constructed according to the present invention, the rising portion 70 of the mat foundation 66 is formed by pouring concrete into the grooves 14a to 14d at the construction site. In other words, the rising portion 70 of the mat foundation 66 is completed at the construction site, not at a factory where the precast concrete foundations 2a to 2d are formed, so the weight of the precast concrete foundations 2a to 2d themselves is light. Therefore, according to the precast concrete foundations 2a to 2d constructed according to the present invention, a large crane is not necessarily required to move them, and therefore the workability of the foundation construction is improved. Furthermore, since the opening windows 20a to 20d that communicate with the grooves 14a to 14d are formed at the lower ends of the upright walls 6a to 6d, the slab reinforcement 52 can be arranged by inserting the ends 54 of the slab reinforcement 52 into the opening windows 20a to 20d after the precast concrete foundations 2a to 2d are arranged as required at the construction site. Therefore, there is no need to form the precast concrete foundation material with the reinforcing bars included, and the reinforcing bars do not protrude to the outside during transportation. Therefore, the precast concrete foundation material constructed according to the present invention can be safely transported. Furthermore, according to the method of forming the mat foundation 66 using the precast concrete foundation materials 2a to 2d constructed according to the present invention, the construction period can be shortened because the sacrificial concrete poured at the construction site is sufficient only in the places where the precast concrete foundation materials 2a to 2d are placed. Furthermore, in the mat foundation 66 formed using the precast concrete foundation materials 2a to 2d constructed according to the present invention, the earthen floor portion 68 and the rising portion 70 are formed integrally without any joints, so that cracks are unlikely to occur at the boundary between the earthen floor portion 68 and the rising portion 70, and sufficient seismic strength can be maintained.

2a乃至2d:プレキャストコンクリート基礎材
4a乃至4d:底板
6a-1乃至6d-4:起立壁
14a乃至14d:溝
20a乃至20d:開口窓
22a:成形装置
24a:基台
26a:内側金型
28a:外側金型
32a:ヒンジ手段
34a:外側金型片
50:土間
52:スラブ筋
56:縦筋
58:横筋
60:ベタ基礎
62:(ベタ基礎の)土間部
64:(ベタ基礎の)立ち上がり部
2a to 2d: Precast concrete foundation material 4a to 4d: Bottom plate 6a-1 to 6d-4: Standing wall 14a to 14d: Groove 20a to 20d: Opening window 22a: Forming device 24a: Base 26a: Inner mold 28a: Outer mold 32a: Hinge means 34a: Outer mold piece 50: Floor 52: Slab reinforcement 56: Vertical reinforcement 58: Horizontal reinforcement 60: Mat foundation 62: Floor portion (of mat foundation) 64: Rising portion (of mat foundation)

Claims (13)

ベタ基礎を形成するためのプレキャストコンクリート基礎材であって、所要形状の底壁と、該底壁の側縁から上方に起立して平面視において該所要形状と同一形状の溝を形成する起立壁とを有し、該起立壁の下端部には該溝に連通する開口窓が形成されており、該起立壁によって形成される該溝の上面及び端面は開放されており、
該溝にコンクリートを打設することでベタ基礎の立ち上がり部が形成される、ことを特徴とするプレキャストコンクリート基礎材。
A precast concrete foundation material for forming a mat foundation, comprising a bottom wall of a required shape and upright walls rising upward from the side edges of the bottom wall to form a groove of the same shape as the required shape in a plan view, an opening window communicating with the groove is formed at the lower end of the upright wall, and the upper surface and end surfaces of the groove formed by the upright walls are open,
This precast concrete foundation material is characterized in that the rising portion of the slab foundation is formed by pouring concrete into the groove .
該所要形状は、直線形状、L字形状、T字形状、又は十字形状である、請求項1に記載のプレキャストコンクリート基礎材。 The precast concrete foundation material according to claim 1, wherein the required shape is a straight line, an L-shape, a T-shape, or a cross shape. 該底壁の上面には有底穴が形成されている、請求項1又は2に記載のプレキャストコンクリート基礎材。 The precast concrete foundation material according to claim 1 or 2, in which a bottomed hole is formed in the upper surface of the bottom wall. 該底壁には上下方向に貫通する貫通穴が形成されており、該貫通穴を規定する該底壁の内周面には雌螺条が形成されている、請求項1乃至3のいずれかに記載のプレキャストコンクリート基礎材。 The precast concrete foundation material according to any one of claims 1 to 3, wherein the bottom wall has a through hole penetrating in the vertical direction, and the inner peripheral surface of the bottom wall that defines the through hole has a female thread formed thereon. 該貫通穴は該底壁の重心位置に形成されている、請求項4に記載のプレキャストコンクリート基礎材。 The precast concrete foundation material according to claim 4, wherein the through hole is formed at the center of gravity of the bottom wall. 請求項1乃至5のいずれかに記載のプレキャストコンクリート基礎材を成形するための成形装置であって、
固定の基台と、該基台に装着された内側金型及び外側金型とを備え、
該内側金型は該基台の上面から上方に突出し、
該外側金型はヒンジ手段を介して該基台に接続された複数個の板状外側金型片から構成されており、複数個の該外側金型片は夫々、内側面が該内側金型の外側面に近接した成形位置と該内側金型の外側面から離隔した離型位置との間を旋回自在であって、該外側金型片が該成形位置に位置するときには、上下方向において該外側金型片の上端位置は該内側金型の上端位置よりも上方に位置し、該外側金型片の内側面の所要部位には、該成形位置にあるときに該内側金型の外側面と面接触する膨出部が形成されている、成形装置。
A molding device for molding the precast concrete foundation material according to any one of claims 1 to 5,
The mold has a fixed base and an inner mold and an outer mold attached to the base,
The inner mold protrudes upward from an upper surface of the base,
The outer mold is composed of a plurality of plate-shaped outer mold pieces connected to the base via hinge means, and each of the plurality of outer mold pieces is freely rotatable between a molding position in which its inner surface is close to the outer surface of the inner mold and a demolding position in which it is separated from the outer surface of the inner mold, and when the outer mold pieces are positioned at the molding position, the upper end position of the outer mold pieces is positioned higher in the vertical direction than the upper end position of the inner mold, and a bulge portion is formed at a required portion of the inner surface of the outer mold piece that comes into surface contact with the outer surface of the inner mold when in the molding position.
該膨出部は、該外側金型片が該成形位置にあるときに該内側金型の外側面と面接触する膨出端面、及び該膨出端面の外周縁から延出して該外側金型片の内側面に接続される膨出外周面を有し、該膨出外周面は該外側金型片の該内側面から該外側面に向かう方向に広がって延びている、請求項6に記載の成形装置。 The molding device according to claim 6, wherein the bulging portion has a bulging end surface that is in surface contact with the outer surface of the inner mold when the outer mold piece is in the molding position, and a bulging outer peripheral surface that extends from the outer peripheral edge of the bulging end surface and connects to the inner surface of the outer mold piece, and the bulging outer peripheral surface extends in a direction from the inner surface of the outer mold piece toward the outer surface. 該内側金型の縦断面形状は上方に向かって先細り形状となっている、請求項6又は7に記載の成形装置。 The molding device according to claim 6 or 7, wherein the vertical cross-sectional shape of the inner mold is tapered upward. 請求項6乃至8のいずれかに記載の成形装置を用いて請求項1乃至5のいずれかに記載のプレキャストコンクリート基礎材を製造する方法であって、
全ての該外側金型片が該成形位置にあるときに該外側金型の内側に未硬化状態のコンクリートを打設してプレキャストコンクリート基礎材成形体を形成する基礎材成形体打設工程と、
該プレキャストコンクリート基礎材成形体が硬化した後に全ての該外側金型片を該成形位置から該離型位置に旋回せしめる離型準備工程と、
該離型準備工程の後に該プレキャストコンクリート基礎材成形体を該内側金型から離型させる離型工程を含む方法。
A method for producing the precast concrete foundation material according to any one of claims 1 to 5 using the molding device according to any one of claims 6 to 8,
a base forming body pouring step of pouring unhardened concrete into the inside of the outer mold when all of the outer mold pieces are in the molding position to form a precast concrete base forming body;
a demolding preparation step of rotating all of the outer mold pieces from the molding position to the demolding position after the precast concrete foundation body has hardened;
The method further comprises a demolding step of demolding the precast concrete base body from the inner mold after the demolding preparation step.
請求項9に記載の方法で請求項4又は5に記載のプレキャストコンクリート基礎材を製造する場合には、該離型準備工程において、該貫通穴及び該雌螺条を形成し、該貫通穴に上方からボルトを螺進せしめて該ボルトの先端で該内側金型の上面を押す方法。 When the precast concrete base material according to claim 4 or 5 is manufactured by the method according to claim 9, in the mold release preparation step, the through hole and the female thread are formed, a bolt is threaded into the through hole from above, and the tip of the bolt presses the upper surface of the inner mold. 請求項9又は10に記載の方法で請求項4又は5に記載のプレキャストコンクリート基礎材を製造する場合には、該離型準備工程において、該貫通穴及び該雌螺条を形成し、該貫通穴に上方からアイボルトを螺着する方法。 When the precast concrete base material according to claim 4 or 5 is manufactured by the method according to claim 9 or 10, the through hole and the female thread are formed in the mold release preparation step, and an eye bolt is screwed into the through hole from above. 請求項1乃至5のいずれかに記載のプレキャストコンクリート基礎材を用いてベタ基礎を形成する方法であって、
捨てコンクリート上に複数個の該プレキャストコンクリート基礎材を所要とおりに連続して配列して該溝を無端状に接続する基礎材配列工程と、
該基礎材配列工程の後に該開口窓にスラブ筋の端部を挿入して該スラブ筋を配筋する配筋工程と、
該配筋工程の後に該溝の上面から未硬化状態のコンクリートを打設する基礎打設工程とを含む方法。
A method for forming a mat foundation using the precast concrete foundation material according to any one of claims 1 to 5, comprising the steps of:
a base member arranging step of arranging a plurality of the precast concrete base members continuously as required on the basal concrete to connect the groove endlessly;
a reinforcing bar arrangement process for inserting an end of a slab reinforcing bar into the opening window after the foundation material arrangement process;
and a foundation pouring step of pouring unhardened concrete from the top surface of the groove after the reinforcement step.
該配筋工程の後であって且つ該基礎打設工程の前には、アンカーボルトを該プレキャストコンクリート基礎材の上端部に配設するアンカーボルト配設工程を遂行し、該アンカーボルトは該プレキャストコンクリート基礎材の上端部に跨設された支持具によって支持される、請求項12に記載の方法。
13. The method according to claim 12, further comprising the steps of: after the reinforcing bar arrangement step and before the foundation casting step, performing an anchor bolt arrangement step of arranging an anchor bolt at an upper end of the precast concrete foundation material; and the anchor bolt being supported by a support device straddling the upper end of the precast concrete foundation material.
JP2021066725A 2021-04-09 2021-04-09 Precast concrete base material for forming a mat foundation, a molding device for molding the precast concrete base material, a method for molding the precast concrete base material using the molding device, and a method for forming a mat foundation using the precast concrete base material Active JP7628248B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021066725A JP7628248B2 (en) 2021-04-09 2021-04-09 Precast concrete base material for forming a mat foundation, a molding device for molding the precast concrete base material, a method for molding the precast concrete base material using the molding device, and a method for forming a mat foundation using the precast concrete base material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021066725A JP7628248B2 (en) 2021-04-09 2021-04-09 Precast concrete base material for forming a mat foundation, a molding device for molding the precast concrete base material, a method for molding the precast concrete base material using the molding device, and a method for forming a mat foundation using the precast concrete base material

Publications (2)

Publication Number Publication Date
JP2022161709A JP2022161709A (en) 2022-10-21
JP7628248B2 true JP7628248B2 (en) 2025-02-10

Family

ID=83659002

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021066725A Active JP7628248B2 (en) 2021-04-09 2021-04-09 Precast concrete base material for forming a mat foundation, a molding device for molding the precast concrete base material, a method for molding the precast concrete base material using the molding device, and a method for forming a mat foundation using the precast concrete base material

Country Status (1)

Country Link
JP (1) JP7628248B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7406283B1 (en) 2023-02-21 2023-12-27 株式会社 野田設計 Formwork for solid foundations and construction method for solid foundations for small-scale houses

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001207460A (en) 2000-01-27 2001-08-03 Aso Shoji Kk Foundation construction method for building
JP2003096792A (en) 2001-09-25 2003-04-03 Yamagata Shinko Kk Mat foundation construction block and construction method of mat foundation
JP2006283449A (en) 2005-04-01 2006-10-19 Yamagata Shinko Kk Building foundation
JP2009220432A (en) 2008-03-17 2009-10-01 Ebata Kk Secondary concrete product and formwork for producing the same
JP2010070903A (en) 2008-09-16 2010-04-02 Aizawa Koatsu Concrete Kk Precast concrete foundation material and method for connecting the same
JP2010285845A (en) 2009-06-15 2010-12-24 Yoshiyuki Ishiwatari Formwork holding device and concrete foundation forming method
JP2013044209A (en) 2011-08-26 2013-03-04 Atsuyoshi Mantani Kit made of pca for forming rising part of matt foundation
JP2015021314A (en) 2013-07-19 2015-02-02 クリ英ター永和株式会社 Solid foundation method using pc unit, and pc unit
JP2018123537A (en) 2017-01-31 2018-08-09 株式会社グランデージ Method of constructing mat foundation, tubular formwork and mat foundation structure

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5629479Y2 (en) * 1977-07-29 1981-07-14
JPH0743177Y2 (en) * 1989-03-15 1995-10-04 日建工業株式会社 Mounting structure of concrete cloth foundation and precast concrete wall slab
JP2544478Y2 (en) * 1991-05-02 1997-08-20 株式会社福井鉄工所 Stepping hole forming tool for concrete block
JPH0526309U (en) * 1991-09-18 1993-04-06 有限会社稲佐鉄工所 Automatic opening and closing formwork
JPH0742165A (en) * 1993-08-04 1995-02-10 Sekisui Chem Co Ltd Beam for building foundation and construction method of building foundation using this beam
JPH09268570A (en) * 1996-03-28 1997-10-14 Natl House Ind Co Ltd Pc foundation
JPH11240004A (en) * 1998-02-24 1999-09-07 Purosupii:Kk Detachment device for cotter of cast concrete trimming die
US6578333B1 (en) * 2000-08-30 2003-06-17 Richard J. Gagliano Integrated precast footings

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001207460A (en) 2000-01-27 2001-08-03 Aso Shoji Kk Foundation construction method for building
JP2003096792A (en) 2001-09-25 2003-04-03 Yamagata Shinko Kk Mat foundation construction block and construction method of mat foundation
JP2006283449A (en) 2005-04-01 2006-10-19 Yamagata Shinko Kk Building foundation
JP2009220432A (en) 2008-03-17 2009-10-01 Ebata Kk Secondary concrete product and formwork for producing the same
JP2010070903A (en) 2008-09-16 2010-04-02 Aizawa Koatsu Concrete Kk Precast concrete foundation material and method for connecting the same
JP2010285845A (en) 2009-06-15 2010-12-24 Yoshiyuki Ishiwatari Formwork holding device and concrete foundation forming method
JP2013044209A (en) 2011-08-26 2013-03-04 Atsuyoshi Mantani Kit made of pca for forming rising part of matt foundation
JP2015021314A (en) 2013-07-19 2015-02-02 クリ英ター永和株式会社 Solid foundation method using pc unit, and pc unit
JP2018123537A (en) 2017-01-31 2018-08-09 株式会社グランデージ Method of constructing mat foundation, tubular formwork and mat foundation structure

Also Published As

Publication number Publication date
JP2022161709A (en) 2022-10-21

Similar Documents

Publication Publication Date Title
KR101950872B1 (en) Precast concrete beam using removable concrete mold and construction method therefor
KR101556545B1 (en) Method for constructing using a double wall Precast Concrete
WO2000065166A1 (en) Steel-frame structure and method of construction by using the same
JP7628248B2 (en) Precast concrete base material for forming a mat foundation, a molding device for molding the precast concrete base material, a method for molding the precast concrete base material using the molding device, and a method for forming a mat foundation using the precast concrete base material
KR101801270B1 (en) Building construction method using exposed concrete wall
KR101590180B1 (en) Precast concrete slab having lightweight body and ribs provided with wide head and, manufacturing methods of the same
KR101668521B1 (en) A construction method of concrete
KR101482523B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
JP2021038588A (en) Roof structure and its construction method
KR102120426B1 (en) The prefabricated double wall precast concrete
KR102002429B1 (en) Sandwich precast concrete wall and construction method using the same
JP2013170420A (en) Foundation forming method of architectural structure and foundation of architectural structure
CN214497993U (en) Assembled formwork wall board
JPH11268026A (en) Lifting tool for concrete block release
JP5618550B2 (en) Reinforcing bar placement in reinforced concrete forming
CN212707306U (en) Concrete prefabricated component bottom formwork convenient to assemble and hoist
CN209920144U (en) A manufacturing mold for the concrete base of the hollow floor assembly box
JP3778392B2 (en) Basic block
CN112780013A (en) Assembled formwork wall board
KR101899860B1 (en) Construction method of concrete building wall
CN218398747U (en) A top mold for a prefabricated column mold
JP4229461B2 (en) How to construct a retaining wall with punching form
KR101831427B1 (en) Rebar-inserted Cap for Removing Form
KR102242175B1 (en) Mold for prefabricated double wall precast concrete
CN103469952A (en) Reinforced concrete hollow floor and construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240308

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20240308

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240912

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240917

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241112

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250121

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250121

R150 Certificate of patent or registration of utility model

Ref document number: 7628248

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150