JP7628566B2 - Visualization system and method for ground improvement work - Google Patents
[go: Go Back, main page]

JP7628566B2 - Visualization system and method for ground improvement work - Google Patents

Visualization system and method for ground improvement work Download PDF

Info

Publication number
JP7628566B2
JP7628566B2 JP2023044781A JP2023044781A JP7628566B2 JP 7628566 B2 JP7628566 B2 JP 7628566B2 JP 2023044781 A JP2023044781 A JP 2023044781A JP 2023044781 A JP2023044781 A JP 2023044781A JP 7628566 B2 JP7628566 B2 JP 7628566B2
Authority
JP
Japan
Prior art keywords
construction
model
ground improvement
cylinder
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2023044781A
Other languages
Japanese (ja)
Other versions
JP2024134465A (en
Inventor
藤子 吉村
岩往 宮田
光雄 城井
和俊 今泉
勝紀 新田
賢 澤村
晃宏 津田
大珠 多賀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP2023044781A priority Critical patent/JP7628566B2/en
Publication of JP2024134465A publication Critical patent/JP2024134465A/en
Application granted granted Critical
Publication of JP7628566B2 publication Critical patent/JP7628566B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

本発明は、情報や状況がリアルタイムに変化する中で、情報や状況を、見やすく可視化し、監視者や作業者に的確に把握させることが可能な地盤改良工事の可視化システム及び可視化方法に関する。 The present invention relates to a visualization system and visualization method for ground improvement work that can easily visualize information and situations that change in real time, allowing supervisors and workers to accurately understand them.

土木建築工事の施工状況を可視化する技術として、特許文献1~4が知られている。 Patent documents 1 to 4 are known as technologies for visualizing the construction status of civil engineering and construction work.

特許文献1の「土木建築工事における施工管理装置」は、土木建築工事において、作業員の負担を軽減するとともに、正確かつ適切な情報に基づいて迅速に施工管理を行うことを課題とし、施工対象となる施工面の設計形状データを記憶した設計形状データ記憶手段と、施工過程において形成した施工面の現形状データを取得する現形状データ取得手段と、設計形状データ及び現形状データとの比較に基づいて、設計形状データと現形状データとの一致度からなる施工状態管理情報を作成する施工状態管理情報作成手段と、作業者が装着した透過型ウェアラブル端末を用いて、施工過程における施工面と関連付くようにして、施工状態管理情報を表示させる表示制御手段とを備えるようにしている。
特許文献2の「トンネル切羽面の変位監視装置」は、トンネルの掘削工事において、作業者や監視員の感覚に頼らずに、正確かつ適切な情報に基づいて迅速に切羽面の変位を報知することを課題とし、形成した切羽面の初期形状データを取得する初期形状データ取得手段と、取得した切羽面の初期形状データを記憶する初期形状データ記憶手段と、切羽面の現形状データを取得する現形状データ取得手段と、記憶した切羽面の初期形状データと、取得した現形状データとの比較に基づいて、初期形状データと現形状データとの差違を示す切羽面変位情報を作成する切羽面変位情報作成手段と、作業者が装着した透過型ウェアラブル端末を用いて、切羽面と関連付くようにして、切羽面変位情報を表示させる表示制御手段とを備えるようにしている。
The "construction management device for civil engineering and construction work" of Patent Document 1 aims to reduce the burden on workers in civil engineering and construction work and to perform rapid construction management based on accurate and appropriate information, and is equipped with a design shape data storage means for storing design shape data of the construction surface to be constructed, a current shape data acquisition means for acquiring current shape data of the construction surface formed during the construction process, a construction status management information creation means for creating construction status management information consisting of the degree of agreement between the design shape data and the current shape data based on a comparison between the design shape data and the current shape data, and a display control means for displaying the construction status management information in association with the construction surface in the construction process using a transparent wearable terminal worn by the worker.
The "tunnel face displacement monitoring device" of Patent Document 2 has the objective of quickly reporting displacement of a tunnel face based on accurate and appropriate information, without relying on the senses of workers or supervisors during tunnel excavation work, and is equipped with initial shape data acquisition means for acquiring initial shape data of the formed face, initial shape data storage means for storing the acquired initial shape data of the face, current shape data acquisition means for acquiring current shape data of the face, face displacement information creation means for creating face displacement information indicating the difference between the initial shape data and the current shape data based on a comparison between the stored initial shape data of the face and the acquired current shape data, and display control means for displaying the face displacement information in association with the face using a transparent wearable terminal worn by the worker.

特許文献3の「トンネル切羽監視方法」は、トンネル切羽を常に監視してトンネル切羽の状況をリアルタイムで把握でき、トンネル切羽の肌落ちや崩落・崩壊による労働災害を抑制するトンネル切羽監視方法を提供することを課題とし、レーザー距離計等を用いた切羽挙動把握手段により、リアルタイムな計測データの変化に基づくトンネル切羽の押し出し量を監視しつつ、予め設定した前記計測データの変化にかかる管理基準値を超えたとき、グリーンレーザー等の高速レーザー照射ユニットにより前記トンネル切羽における前記管理基準値を超えた計測点周辺のマーキングを行うと同時に、ウェアラブル端末にトンネル切羽のリアルタイムな変化状況を可視化させて、常にトンネル切羽の肌落ちや崩落・崩壊を予見するための監視を行うようにしている。 The "tunnel face monitoring method" of Patent Document 3 aims to provide a tunnel face monitoring method that can constantly monitor the tunnel face to grasp the state of the tunnel face in real time and prevent industrial accidents due to the tunnel face falling, collapse, or collapse. A face behavior grasping means using a laser rangefinder or the like monitors the amount of extrusion of the tunnel face based on changes in real-time measurement data, and when a preset management standard value for the change in the measurement data is exceeded, a high-speed laser irradiation unit such as a green laser marks the area around the measurement point at the tunnel face where the management standard value is exceeded. At the same time, the real-time changes in the tunnel face are visualized on the wearable device, allowing constant monitoring to predict the tunnel face falling, collapse, or collapse.

特許文献4の「地盤施工機における制御方法および地盤施工機」は、地盤中に地盤改良体を造成するための地盤施工機における制御方法であって、ロッドを前記地盤改良体の下端位置まで下降させる手順と、前記ロッドを前記地盤改良体の下端位置から、順次上昇させて所定間隔毎の目標位置に停止させる手順と、前記ロッドの目標位置での停止時に、停止指令から実際に前記ロッドが停止するまでの移動距離を前回制動距離として記憶する手順と、前記ロッドの次の目標位置での停止時に、次の目標位置から前記前回制動距離だけ手前の位置で停止指令を出力する手順とを備え、その際、地盤施工機の機外からの操作やモニターのための端末は、タブレット端末等の携帯端末、スマートグラスと呼ばれる人体装着型コンピュータ、AR(拡張現実)モニターなどが利用できるというものである。 The "Ground Construction Machine Control Method and Ground Construction Machine" of Patent Document 4 is a control method for a ground construction machine for constructing a ground improvement body in the ground, which includes the steps of lowering a rod to the lower end position of the ground improvement body, sequentially raising the rod from the lower end position of the ground improvement body and stopping it at target positions at predetermined intervals, storing the distance traveled from the stop command to the actual stop of the rod as the previous braking distance when the rod stops at the target position, and outputting a stop command at a position the previous braking distance before the next target position when the rod stops at the next target position. In this case, the terminal for operating and monitoring the ground construction machine from outside the machine can be a mobile terminal such as a tablet terminal, a body-worn computer called smart glasses, an AR (augmented reality) monitor, etc.

特開2018-104933号公報JP 2018-104933 A 特開2018-104934号公報JP 2018-104934 A 特開2019-199708号公報JP 2019-199708 A 特開2020-084502号公報JP 2020-084502 A

背景技術は、施工状態管理情報や、切羽面変位情報、切羽の変化状況などを、ウェアラブル端末等に可視化して表示するようにしている。 The background technology visualizes and displays construction status management information, face displacement information, and changes in the face status on a wearable device, etc.

これら背景技術では、各種情報や変化の状況を可視化するといっても、監視者や作業者にとって、見やすいものであるか否かという意味では、不十分なものであった。 Although these background technologies visualize various types of information and changing conditions, they are insufficient in terms of whether they are easy for supervisors and workers to see.

とりわけ、情報や状況がリアルタイムに変化するという中で、可視化されるこれら情報や状況が、監視者等によって、見誤ることなく的確に把握されるということが重要であり、このため、見やすく可視化する方策の案出が望まれていた。 In particular, with information and situations changing in real time, it is important that the visualized information and situations can be accurately understood by observers and others without misunderstanding, and for this reason, there was a need to devise a method for visualizing the information in an easy-to-read manner.

本発明は上記従来の課題に鑑みて創案されたものであって、情報や状況がリアルタイムに変化する中で、情報や状況を、見やすく可視化し、監視者や作業者に的確に把握させることが可能な地盤改良工事の可視化システム及び可視化方法を提供することを目的とする。 The present invention was devised in consideration of the above-mentioned problems with the conventional technology, and aims to provide a visualization system and visualization method for ground improvement work that can easily visualize information and situations that change in real time, allowing supervisors and workers to accurately understand them.

本発明にかかる地盤改良工事の可視化システムは、地盤改良機械による地盤改良体を造成する地盤改良工事の施工状況を、通信端末のディスプレイに画像表示する地盤改良工事の可視化システムであって、上記通信端末は、上記地盤改良体の造成位置、該地盤改良体の造成始端位置から造成終端位置までの造成高さ及び該地盤改良体の外径寸法を含む設計情報を記憶する設計情報記憶部及び地盤改良工事の進行に従って変化する上記地盤改良体の造成始端位置からの施工済み造成高さを含む、上記地盤改良機械から入力される施工情報を記憶する施工情報記憶部から情報を受信する受信部と、該受信部で受信した上記設計情報記憶部からの上記地盤改良体の上記外径寸法を、シリンダ径で表し、上記施工済み造成高さを、上記造成始端位置からのシリンダの長さで表す、3次元のシリンダ造成モデルを格納したモデル記憶部と、該モデル記憶部から上記シリンダ造成モデルを読み出すと共に、上記受信部で受信した上記施工情報記憶部からの上記施工済み造成高さに応じて、リアルタイムに、上記地盤改良体の当該外径寸法及び当該施工済み造成高さの該シリンダ造成モデルを生成するモデル生成部と、上記受信部で受信した上記設計情報記憶部からの上記造成位置に対応付けて、上記モデル生成部で生成された上記シリンダ造成モデルを上記ディスプレイに画像表示する表示処理部とを含むことを特徴とする。 The visualization system for ground improvement work according to the present invention is a visualization system for ground improvement work that displays an image of the construction status of a ground improvement work in which a ground improvement body is created by a ground improvement machine on the display of a communication terminal, and the communication terminal includes a design information storage unit that stores design information including the construction position of the ground improvement body, the construction height from the construction start position to the construction end position of the ground improvement body, and the outer diameter dimensions of the ground improvement body, and a receiving unit that receives information from a construction information storage unit that stores construction information input from the ground improvement machine, including the constructed construction height from the construction start position of the ground improvement body that changes as the ground improvement work progresses, and a receiving unit that receives information from the design information storage unit that stores the construction information of the ground improvement body from the design information storage unit received by the receiving unit. The device is characterized by including a model storage unit that stores a three-dimensional cylinder construction model in which the outer diameter is expressed as a cylinder diameter and the completed construction height is expressed as the length of the cylinder from the construction start position, a model generation unit that reads out the cylinder construction model from the model storage unit and generates a cylinder construction model of the outer diameter of the ground improvement body and the completed construction height in real time according to the completed construction height from the construction information storage unit received by the receiving unit, and a display processing unit that displays an image of the cylinder construction model generated by the model generation unit on the display in correspondence with the construction position from the design information storage unit received by the receiving unit.

前記通信端末は、撮影手段を備え、前記表示処理部は、前記造成位置に対応付けて、前記シリンダ造成モデルを、上記撮影手段で撮影された該造成位置の画像に重ね合わせて、前記ディスプレイに画像表示することを特徴とする。 The communication terminal is equipped with an imaging means, and the display processing unit corresponds to the construction location, superimposes the cylinder construction model on an image of the construction location photographed by the imaging means, and displays the image on the display.

前記施工情報記憶部には、前記地盤改良体の造成に先立って前記造成位置に予め形成される削孔の削孔始端位置からの施工済み深度及び削孔径を含む施工情報が記憶され、前記モデル記憶部には、前記受信部で受信した上記設計情報記憶部からの上記削孔径を、シリンダ径で表し、上記施工済み深度を、上記削孔始端位置からのシリンダの長さで表す、3次元のスケルトンシリンダ削孔モデルが格納され、上記モデル生成部は、上記モデル記憶部から上記スケルトンシリンダ削孔モデルを読み出すと共に、上記受信部で受信した上記施工情報記憶部からの上記施工済み深度に応じて、上記削孔径及び当該施工済み深度の該スケルトンシリンダ削孔モデルを生成し、該スケルトンシリンダ削孔モデルを前記シリンダ造成モデルに重ねて表示する施工管理モデルをリアルタイムに生成し、前記表示処理部は、上記モデル生成部で生成された上記施工管理モデルを、上記造成位置に対応付けて、上記ディスプレイに画像表示することを特徴とする。 The construction information storage unit stores construction information including the completed depth and drilling diameter from the drilling start position of the drilling hole formed in advance at the construction position prior to the construction of the ground improvement body, and the model storage unit stores a three-dimensional skeleton cylinder drilling model in which the drilling diameter from the design information storage unit received by the receiving unit is expressed as a cylinder diameter and the completed depth is expressed as a cylinder length from the drilling start position. The model generation unit reads out the skeleton cylinder drilling model from the model storage unit and generates the skeleton cylinder drilling model of the drilling diameter and the completed depth according to the completed depth from the construction information storage unit received by the receiving unit, and generates a construction management model in real time that displays the skeleton cylinder drilling model superimposed on the cylinder construction model, and the display processing unit associates the construction management model generated by the model generation unit with the construction position and displays it as an image on the display.

本発明にかかる地盤改良工事の可視化方法は、地盤改良機械による地盤改良体を造成する地盤改良工事の施工状況を、通信端末のディスプレイに画像表示する地盤改良工事の可視化方法であって、上記地盤改良体の造成位置、該地盤改良体の造成始端位置から造成終端位置までの造成高さ及び該地盤改良体の外径寸法を含む設計情報を上記通信端末に入力し、地盤改良工事の進行に従って変化する上記地盤改良体の上記造成始端位置からの施工済み造成高さを含む、上記地盤改良機械から入力される施工情報を上記通信端末に入力して、該通信端末により、該地盤改良体の上記外径寸法を、シリンダ径で表し、該施工済み造成高さを、該造成始端位置からのシリンダの長さで表す、3次元のシリンダ造成モデルをリアルタイムに生成させ、上記通信端末の上記ディスプレイに、上記造成位置に対応付けて、上記シリンダ造成モデルを画像表示させることを特徴とする。 The visualization method of ground improvement work according to the present invention is a method for visualizing a construction status of a ground improvement work in which a ground improvement body is constructed by a ground improvement machine, and the construction status is displayed as an image on the display of a communication terminal. The visualization method is characterized in that design information including the construction position of the ground improvement body, the construction height from the construction start position to the construction end position of the ground improvement body, and the outer diameter of the ground improvement body are input to the communication terminal, construction information input from the ground improvement machine including the completed construction height from the construction start position of the ground improvement body that changes as the ground improvement work progresses is input to the communication terminal, a three-dimensional cylinder construction model is generated in real time by the communication terminal, in which the outer diameter of the ground improvement body is expressed as a cylinder diameter and the completed construction height is expressed as a cylinder length from the construction start position, and the cylinder construction model is displayed as an image on the display of the communication terminal in association with the construction position.

前記通信端末は、撮影手段を備え、上記通信端末により、前記造成位置に対応付けて、上記撮影手段で撮影された該造成位置の画像に重ね合わせて、前記シリンダ造成モデルを前記ディスプレイに画像表示させることを特徴とする。 The communication terminal is equipped with an image capture means, and the communication terminal causes the cylinder construction model to be displayed on the display in association with the construction location and superimposed on an image of the construction location captured by the image capture means.

前記通信端末に、前記地盤改良体の造成に先立って前記造成位置に予め形成される削孔の削孔始端位置からの施工済み深度及び削孔径を含む設計情報を入力し、上記通信端末により、上記削孔径を、シリンダ径で表し、上記施工済み深度を、上記削孔始端位置からのシリンダの長さで表す、3次元のスケルトンシリンダ削孔モデルを生成させると共に、該スケルトンシリンダ削孔モデルを前記シリンダ造成モデルに重ねて表示する施工管理モデルをリアルタイムに生成させ、上記通信端末の上記ディスプレイに、上記造成位置に対応付けて、上記施工管理モデルを画像表示させることを特徴とする。 The communication terminal is input with design information including the completed depth from the drilling start position and the drilling diameter of the hole to be formed in advance at the construction position prior to the construction of the ground improvement body, and the communication terminal generates a three-dimensional skeleton cylinder drilling model in which the drilling diameter is expressed as a cylinder diameter and the completed depth is expressed as a cylinder length from the drilling start position, and a construction management model is generated in real time in which the skeleton cylinder drilling model is superimposed on the cylinder construction model, and the construction management model is displayed as an image on the display of the communication terminal in association with the construction position.

本発明にかかる地盤改良工事の可視化システム及び可視化方法にあっては、情報や状況がリアルタイムに変化する中で、情報や状況を、見やすく可視化し、監視者や作業者に的確に把握させることができる。 The visualization system and visualization method for ground improvement work of the present invention can easily visualize information and situations that change in real time, allowing supervisors and workers to accurately understand them.

本発明に係る地盤改良工事の可視化システム及び可視化方法の好適な一実施形態が適用される土木建築工事の実施状況の例を示す説明図である。FIG. 1 is an explanatory diagram showing an example of the implementation status of civil engineering and construction work to which a preferred embodiment of a visualization system and visualization method for ground improvement work according to the present invention is applied. 図1に示した土木建築工事の実施状況の例を縦断面で示した説明図である。FIG. 2 is an explanatory diagram showing an example of the implementation status of the civil engineering and construction work shown in FIG. 1 in a vertical cross section. 図1に示した土木建築工事の実施状況の例を平面視で示した説明図である。FIG. 2 is an explanatory diagram showing an example of the implementation status of the civil engineering and construction work shown in FIG. 1 in a plan view. 本発明に係る地盤改良工事の可視化システムの構成図である。FIG. 1 is a configuration diagram of a visualization system for ground improvement work according to the present invention. 図4に示した地盤改良工事の可視化システムで生成・表示されるベクトルモデル及び危険度管理モデルの説明図である。5 is an explanatory diagram of a vector model and a risk management model generated and displayed by the visualization system for ground improvement work shown in FIG. 4 . 図4に示した地盤改良工事の可視化システムで生成・表示されるスケルトンシリンダ削孔モデル、シリンダ造成モデル及び施工管理モデルの説明図である。5 is an explanatory diagram of a skeleton cylinder drilling model, a cylinder construction model, and a construction management model that are generated and displayed by the visualization system for ground improvement work shown in FIG. 4 .

以下に、本発明にかかる地盤改良工事の可視化システム及び可視化方法の好適な一実施形態を、添付図面を参照して詳細に説明する。 Below, a preferred embodiment of the ground improvement work visualization system and visualization method of the present invention will be described in detail with reference to the attached drawings.

図1~図3には、既設構造物1の近隣で、土木建築工事を行っている様子の一例が示されている。 Figures 1 to 3 show an example of civil engineering and construction work being carried out near an existing structure 1.

図示例は、隣接する既設構造物1の間の空所領域R(地表Sから地盤の設計深さ(地下2階の床レベルL2)に達する領域)に対して、地盤改良工事(地盤改良体造成工事とも言う。以下同じ)を施工する場合である。 The illustrated example shows a case where ground improvement work (also called ground improvement body construction work; the same applies below) is carried out in the void area R between adjacent existing structures 1 (the area extending from the ground surface S to the ground's design depth (floor level L2 of the second basement floor)).

各既設構造物1の地下部分には、ボックスカルバート等により、地下道や水路、鉄道線路などの地下空間Uが存在している。 In the underground portion of each existing structure 1, there exists an underground space U, such as an underground passage, waterway, and railway track, due to box culverts, etc.

図示例の地盤改良工事は、空所領域Rの地表Sに搬入した地盤改良機械2を使用し、地下空間Uで挟まれた空所領域Rの地盤に対し、削孔3を形成し、この削孔3の形成によって発生する原地盤の土とセメント系固化材とを混合することで、地盤中に柱状の地盤改良体4を造成するものである。 The ground improvement work in the illustrated example involves using a ground improvement machine 2 brought to the ground surface S of the void area R to drill holes 3 in the ground of the void area R sandwiched between the underground space U, and then mixing the original ground soil resulting from the drilling of the holes 3 with a cement-based solidification material to create a columnar ground improvement body 4 in the ground.

地盤改良機械2は、地盤改良体4を造成するにあたって実施される削孔工事のための削孔機械を兼ねている。 The ground improvement machine 2 also serves as a drilling machine for the drilling work carried out in constructing the ground improvement body 4.

地盤改良工事により既設構造物1に生じ得る様々な挙動を監視作業では、既設構造物1に生じる沈下変位や隆起変位を監視するために、変位計5が用いられる。 When monitoring various behaviors that may occur in the existing structure 1 due to ground improvement work, a displacement meter 5 is used to monitor the subsidence and uplift displacements that occur in the existing structure 1.

図示例では、変位計5は、監視員Pが監視を行うことができる地下空間U内に、既設構造物1に対して施工設計上設定した複数の計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,…)それぞれに配置して、設けられる。 In the illustrated example, the displacement meters 5 are installed within the underground space U where the monitor P can perform monitoring, and are positioned at each of a number of measurement positions (..., Xn-1 , Xn , Xn+1 , Xn +2 , ..., Yn -1 , Yn , Yn+1 , Yn +2 , ..., Zn -1 , Zn , Zn +1 , Zn +2 , ...) set for the existing structure 1 in the construction design.

各変位計5は、各計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,… )それぞれに生じる変位量と変位方向とを計測するように構成される。 Each displacement meter 5 is configured to measure the amount and direction of displacement occurring at each measurement position (..., Xn -1 , Xn , Xn + 1 , Xn +2 , ..., Yn -1 , Yn, Yn+1, Yn+2, ..., Zn -1 , Zn , Zn +1 , Zn +2 , ...).

本実施形態に係る地盤改良工事の可視化システムは、図4に示すように、地盤改良工事における施工状況の情報を取得するために地盤改良機械2に備えられる各種センサと、上述した変位計5と、地盤改良工事の設計情報を予め記憶しておく設計情報記憶部6a及び地盤改良機械2の各種センサや変位計5によって得られる地盤改良工事の施工情報がリアルタイムで記憶される施工情報記憶部6bを少なくとも備えるクラウドサーバーなどのサーバー6と、画像を表示するディスプレイ7を有し、Wi-Fi通信などの通信網を介してサーバー6から情報を取得する通信端末8とを含んで構成される。地盤改良工事の可視化方法は、この可視化システムを用いて実行される。 As shown in FIG. 4, the visualization system for ground improvement work according to this embodiment includes various sensors provided on the ground improvement machine 2 to acquire information on the construction status of the ground improvement work, the displacement meter 5 described above, a server 6 such as a cloud server that includes at least a design information storage unit 6a that stores design information for the ground improvement work in advance and a construction information storage unit 6b that stores construction information for the ground improvement work obtained by the various sensors and the displacement meter 5 of the ground improvement machine 2 in real time, and a communication terminal 8 that has a display 7 for displaying images and acquires information from the server 6 via a communication network such as Wi-Fi communication. The visualization method for ground improvement work is executed using this visualization system.

サーバー6の設計情報記憶部6aには、変位計5が配置される計測位置(…,Xn-1, Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,…)、危険度レベル管理値、削孔3の施工位置(…,An-1,An,An+1,An+2,…)、削孔3の施工深度、削孔径、地盤改良体4の造成位置(削孔3の施工位置と同じ)、地盤改良体4の造成高さ(「造成長」とも言う。以下同じ)、地盤改良体4の外径寸法を含む設計情報が予め記憶される。 The design information memory unit 6a of the server 6 pre-stores design information including the measurement positions where the displacement meters 5 will be placed (..., Xn-1 , Xn, Xn+1 , Xn + 2 , ..., Yn-1 , Yn, Yn+1, Yn+2 , ..., Zn -1 , Zn , Zn +1 , Zn +2 , ...), risk level control value, construction positions of drilling holes 3 (..., An -1 , An , An+1 , An +2 , ...), construction depth of drilling holes 3, drilling diameter, construction position of ground improvement body 4 (same as the construction position of drilling hole 3), construction height of ground improvement body 4 (also called "construction height"; same below), and the outer diameter dimensions of the ground improvement body 4.

サーバー6の施工情報記憶部6bには、地盤改良機械2の各種センサや変位計5から入力される、変位計5で計測された既存構造物1の変位量と変位方向、地盤改良機械2の回転ロッドの下降量で検知される削孔3の施工済み深度(施工している深度であってもよい。以下同じ)、地盤改良体4の施工済み造成高さがリアルタイムで記憶される。 The construction information storage unit 6b of the server 6 stores in real time the amount and direction of displacement of the existing structure 1 measured by the displacement meter 5, the completed depth of the drilled hole 3 detected by the amount of descent of the rotating rod of the ground improvement machine 2 (this may be the depth being constructed; the same applies below), and the completed construction height of the ground improvement body 4, which are input from various sensors and the displacement meter 5 of the ground improvement machine 2.

施工済み深度については、施工情報記憶部6bに、「削孔」か、後述する「造成」かのフラグと、地盤改良機械2が備える作業用の回転ロッドの回転数を記憶しておくようにし、これらデータを、後述の受信部8aで受信する通信端末8の演算機能で、初期状態での回転ロッドの回転数から、まず施工開始深度を求めておき、その後、リアルタイムに受信する回転ロッドの回転数の、初期状態での回転数に対する差分によって、施工済み深度を算出するようにしてもよい。これは、後述する造成高さを算出する場合も同様である。 Regarding the completed depth, the construction information storage unit 6b stores a flag indicating whether it is "drilling" or "construction" (described later) and the number of rotations of the rotating rod for work provided on the ground improvement machine 2, and the calculation function of the communication terminal 8, which receives this data at the receiving unit 8a (described later), first determines the construction start depth from the number of rotations of the rotating rod in the initial state, and then calculates the completed depth from the difference between the number of rotations of the rotating rod received in real time and the number of rotations in the initial state. This is also the case when calculating the construction height (described later).

通信端末8は、本実施形態では、透過型ウェアラブル端末が用いられる。透過型ウェアラブル端末は周知であって、透過型のグラスにディスプレイ7が組み込まれ、グラスを通して目視される領域に、ディスプレイ7に表示される画像が重ね合わされて、監視者Pに視認されるように構成される。 In this embodiment, a see-through wearable terminal is used as the communication terminal 8. See-through wearable terminals are well known, and are configured such that a display 7 is incorporated into see-through glasses, and an image displayed on the display 7 is superimposed on the area visible through the glasses, so that it can be seen by the observer P.

通信端末8は、ディスプレイ7のほか、図4に示すように、少なくとも、受信部8a、モデル演算部8b、表示処理部8c、表示指示部8dを含んで構成される。 The communication terminal 8 includes, in addition to the display 7, at least a receiving unit 8a, a model calculation unit 8b, a display processing unit 8c, and a display instruction unit 8d, as shown in FIG. 4.

受信部8aは、サーバー6から、設計情報記憶部6a及び施工情報記憶部6bから上述した各種情報を受信するように構成される。 The receiving unit 8a is configured to receive the various information described above from the server 6, the design information storage unit 6a, and the construction information storage unit 6b.

モデル演算部8bは、モデル記憶部8eと、モデル生成部8fとから構成される。モデル記憶部8eには、図5及び図6に示すように、3次元のベクトルモデル9、当該ベクトルモデル9に付与される表示色、3次元のスケルトンシリンダモデル10、3次元のスケルトンシリンダ削孔モデル11、並びに、3次元のシリンダ造成モデル12が予め記憶されている。 The model calculation unit 8b is composed of a model storage unit 8e and a model generation unit 8f. As shown in Figures 5 and 6, the model storage unit 8e prestores a three-dimensional vector model 9, a display color assigned to the vector model 9, a three-dimensional skeleton cylinder model 10, a three-dimensional skeleton cylinder drilling model 11, and a three-dimensional cylinder construction model 12.

モデル生成部8fは、モデル記憶部8eから各種モデルを読み出すと共に、受信部8aで受信した設計情報記憶部6a及び施工情報記憶部6bからの情報に応じて、ベクトルモデル9、色つきベクトルモデル9、危険度管理モデル13、スケルトンシリンダ削孔モデル11、シリンダ造成モデル12、並びに、施工管理モデル14を、いずれも3次元形態で生成する。 The model generation unit 8f reads out various models from the model storage unit 8e, and generates a vector model 9, a colored vector model 9, a risk management model 13, a skeleton cylinder drilling model 11, a cylinder construction model 12, and a construction management model 14, all in three-dimensional form, according to the information received by the receiving unit 8a from the design information storage unit 6a and the construction information storage unit 6b.

表示処理部8cは、モデル生成部8fで生成されたベクトルモデル9、色つきベクトルモデル9、危険度管理モデル13、スケルトンシリンダ削孔モデル11、シリンダ造成モデル12、並びに、施工管理モデル14を、管理者Pに操作される表示指示部8dの指示に応じて、ディスプレイ7に画像表示する。 The display processing unit 8c displays the vector model 9, colored vector model 9, risk management model 13, skeleton cylinder drilling model 11, cylinder construction model 12, and construction management model 14 generated by the model generation unit 8f as images on the display 7 in response to instructions from the display instruction unit 8d operated by the manager P.

通信端末8のディスプレイ7に表示される画像は、計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,… )や削孔の施工位置(…,An-1,An,An+1,An+2,…)、地盤改良体の造成位置に対応付けて、当該ディスプレイ7に表示される。 The image displayed on the display 7 of the communication terminal 8 is displayed on the display 7 in correspondence with the measurement positions (..., Xn -1 , Xn , Xn + 1 , Xn + 2 , ..., Yn -1 , Yn , Yn+1, Yn+2, ..., Zn -1 , Zn , Zn+1 , Zn +2 , ...), the drilling positions (..., An-1 , An , An +1 , An +2 , ...), and the construction positions of the ground improvement body.

表示画像が計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,…)等に「対応付けて」ディスプレイ7に表示されるとは、監視者Pの位置から見た計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,…)等に、モデル生成部8fで生成した各種のモデルの画像が視認されるようにする、という意味である。 The display images are displayed on the display 7 "associated with" the measurement positions (..., Xn -1 , Xn , Xn + 1 , Xn +2 , ..., Yn- 1, Yn, Yn+1, Yn +2 , ..., Zn -1 , Zn , Zn +1 , Zn +2 , ...) etc., meaning that images of various models generated by the model generation unit 8f can be viewed at the measurement positions (..., Xn - 1 , Xn , Xn + 1 , Xn + 2 , ..., Yn -1, Yn, Yn+1, Yn+2, ..., Zn -1 , Zn , Zn +1 , Zn +2 , ...) etc. as seen from the position of the observer P.

対応付けのためには、監視者Pの位置と設計情報である計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,…)等の位置的相関をとるようにすれば良く、施工現場に設置された、位置情報を含むマーカーを、監視者Pが撮影するなどして取得した位置情報や、GNSSを用いた位置情報から位置解析を行うようにすれば良い。
To achieve this correspondence, it is necessary to establish a positional correlation between the position of the supervisor P and the measurement positions (..., Xn -1 , Xn , Xn+1 , Xn +2 , ..., Yn -1 , Yn, Yn +1, Yn+2, ..., Zn -1 , Zn , Zn +1 , Zn +2 , ...), which are the design information, and then perform position analysis from position information obtained by the supervisor P taking a photograph of a marker containing position information installed at the construction site, or from position information using GNSS.

≪監視作業について≫
既存構造物1の挙動を監視する作業について詳述する。通信端末8は、この監視作業については、受信部8aが、サーバー6にアクセスして、既設構造物1に生じる変位を計測する計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,…)を含む設計情報を記憶する設計情報記憶部6a及び変位計5から入力される、変位計5で計測された計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,…)に生じる変位量及び変位方向を含む施工情報を記憶する施工情報記憶部6bから情報を受信するように構成される。
<<Regarding monitoring work>>
The operation of monitoring the behavior of the existing structure 1 will now be described in detail. For this monitoring operation, the communication terminal 8 is configured such that the receiving unit 8a accesses the server 6 to receive information from the design information memory unit 6a which stores design information including measurement positions (..., Xn-1 , Xn , Xn +1 , Xn +2 , ..., Yn -1 , Yn, Yn +1 , Yn +2 , ..., Zn-1 , Zn , Zn +1 , Zn +2 , ...) at which displacements occurring in the existing structure 1 are measured, and the construction information memory unit 6b which stores construction information input from the displacement meter 5, including the amount and direction of displacement occurring at the measurement positions (..., Xn - 1 , Xn , Xn + 1 , Xn + 2 , ..., Yn- 1 , Yn, Yn + 1 , Yn+2, ..., Zn - 1, Zn, Zn+1, Zn +2 , ...) measured by the displacement meter 5.

監視作業について、通信端末8のモデル記憶部8eは、図5に示すように、変位量を、軸部9aの長さの変化で表し、変位方向を、軸部9aの端部の尖頭部9bの向きで表す、3次元のベクトルモデル9を格納している。このベクトルモデル9は、不透明な像として形成され、表示される。 For monitoring operations, the model storage unit 8e of the communication terminal 8 stores a three-dimensional vector model 9 in which the amount of displacement is represented by the change in length of the shaft portion 9a, and the direction of displacement is represented by the orientation of the pointed tip 9b at the end of the shaft portion 9a, as shown in FIG. 5. This vector model 9 is formed and displayed as an opaque image.

通信端末8のモデル生成部8fは、モデル記憶部8eからベクトルモデル9を読み出す。また、モデル生成部8fは、受信部8aで受信した施工情報記憶部6bからの変位量及び変位方向に応じて、ベクトルモデル9をリアルタイムに生成する。 The model generation unit 8f of the communication terminal 8 reads the vector model 9 from the model storage unit 8e. The model generation unit 8f also generates the vector model 9 in real time according to the amount of displacement and the direction of displacement from the construction information storage unit 6b received by the receiving unit 8a.

すなわち、変位計5で計測された変位量を軸部9aの長さとし、変位方向に尖頭部9bの向きを合わせたベクトルモデル9をリアルタイムに生成するように構成される。 In other words, the amount of displacement measured by the displacement meter 5 is set as the length of the shaft 9a, and a vector model 9 is generated in real time with the direction of the pointed tip 9b aligned with the direction of the displacement.

図5に示したベクトルモデル9は、いずれも尖頭部9bの向きが上向きであって、変位方向が上方向、すなわち隆起方向であることを示している。 In the vector models 9 shown in Figure 5, the pointed heads 9b are all facing upward, indicating that the displacement direction is upward, i.e., the protruding direction.

変位方向が沈下方向である場合には、変位方向が下方向であって、尖頭部9bの向きが下向きとされる。 When the displacement direction is a sinking direction, the displacement direction is downward, and the pointed head 9b faces downward.

また、軸部9aの長さが左寄りのベクトルモデル9では短くて、変位量が小さいことを示しており、右側へ向かえば向かうほど、ベクトルモデル9の軸部9aの長さが長くて、変位量が大きいことを示している。 In addition, the length of the shaft 9a is shorter in the vector model 9 on the left side, indicating a smaller amount of displacement, and the further to the right the shaft 9a of the vector model 9 is longer, indicating a larger amount of displacement.

表示処理部8cは、表示指示部8dからの指示に応じて、設計情報記憶部6aから受信部8aが受信した計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1, Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,… )に対応付けて、モデル生成部8fで生成されたベクトルモデル9をリアルタイムでディスプレイ7に画像表示するように構成される。 The display processing unit 8c is configured to, in response to instructions from the display instruction unit 8d, display an image of the vector model 9 generated by the model generation unit 8f in real time on the display 7, in association with the measurement positions (..., Xn - 1 , Xn , Xn +1 , Xn +2 , ..., Yn -1 , Yn , Yn + 1 , Yn+2, ..., Zn-1, Zn, Zn+1, Zn +2 , ...) received by the receiving unit 8a from the design information memory unit 6a.

これにより、図1に示すように、監視位置にいる監視者Pは、通信端末8であるウェアラブル端末のディスプレイ7を通じ、グラスを通して目視される計測位置(…, Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2, …)と、当該計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,…)に対応付けて表示されるベクトルモデル9とを同時に視認することができる。 As a result, as shown in FIG. 1, a monitor P at a monitoring position can simultaneously view, through the display 7 of a wearable terminal, which is a communication terminal 8, the measurement positions viewed through the glasses (..., Xn -1 , Xn , Xn +1 , Xn+2 , ..., Yn -1 , Yn , Yn+1, Yn+2, ..., Zn -1 , Zn , Zn +1 , Zn +2 , ...) and a vector model 9 displayed in correspondence with the measurement positions (..., Xn- 1 , Xn , Xn +1 , Xn +2 , ..., Yn -1 , Yn , Yn+1 , Yn+2, ..., Zn-1, Zn, Zn+1, Zn +2 , ...).

これにより、監視者Pは、既存構造物1の沈下や隆起の挙動について、当該挙動が生じている位置と変位量及び変位方向を的確に把握することができる。 This allows the monitor P to accurately grasp the location where the subsidence or uplift behavior of the existing structure 1 is occurring, as well as the amount and direction of displacement.

ベクトルモデル9は、監視者Pが表示指示部8dを操作することにより、見やすいように任意に、拡大したり縮小したりして表示することができる。 The vector model 9 can be enlarged or reduced as desired for easy viewing by the observer P operating the display instruction unit 8d.

監視作業では、既存構造物1に生じる沈下変位や隆起変位がリアルタイムに変化する中で、当該変位を、見やすく可視化することができ、監視者Pに的確に把握させることができる。 During monitoring work, the subsidence and uplift displacements occurring in the existing structure 1 can be easily visualized as they change in real time, allowing the monitor P to accurately grasp the displacements.

ベクトルモデル9の軸部9aの長さと尖頭部9bの向きによって既存構造物1の挙動を十分に監視者Pに視認させることが可能であるが、少なくとも変位量については、さらに、見て確認しやすくするために、危険度レベル管理値を用いることが好ましい。 The length of the shaft 9a and the orientation of the pointed tip 9b of the vector model 9 allow the observer P to adequately visually confirm the behavior of the existing structure 1, but it is preferable to use a risk level management value to make it easier to visually confirm at least the amount of displacement.

変位量に関する危険度レベル管理値は、設計段階で複数設定され、設計情報記憶部6aに予め記憶される。 Multiple risk level management values for the amount of displacement are set at the design stage and pre-stored in the design information storage unit 6a.

これらの危険度管理値は、設計情報として、設計情報記憶部6aから通信端末8の受信部8aに受信される。 These risk management values are received as design information from the design information storage unit 6a to the receiver 8a of the communication terminal 8.

危険度レベル管理値とは、図5中、ベクトルモデル9の軸部9aの長さ方向に、変位量がゼロのゼロ基準、変位量が小さい範囲である第1管理値、変位量が比較的大きい範囲である第2管理値、変位量の安全管理上の限界を示す管理限界値として示されているように、変位量の大きさを段階的にレベル分けする値を言う。 The risk level control value is a value that classifies the magnitude of the displacement into stages, as shown in FIG. 5 as a zero reference where the displacement is zero, a first control value which is a range where the displacement is small, a second control value which is a range where the displacement is relatively large, and a control limit value which indicates the safety management limit of the displacement, along the length of the shaft 9a of the vector model 9.

モデル記憶部8eには、危険度レベル管理値それぞれに対して、異なる表示色が予め設定される。 In the model memory unit 8e, a different display color is pre-set for each risk level management value.

モデル生成部8fは、受信部8aで受信した設計情報記憶部6aからの危険度レベル管理値及び施工情報記憶部6bからの変位量に応じて、モデル記憶部8eから表示色を読み出す。 The model generation unit 8f reads out the display color from the model storage unit 8e according to the risk level management value from the design information storage unit 6a and the displacement amount from the construction information storage unit 6b received by the receiving unit 8a.

そして、モデル生成部8fは、変位量に対応する危険度レベル管理値の表示色でベクトルモデル9をリアルタイムに生成する。 Then, the model generation unit 8f generates a vector model 9 in real time using a display color of the risk level management value corresponding to the amount of displacement.

すなわち、モデル生成部8fは、危険度レベル管理値に対する変位量を判定し、当該危険度レベル管理値に対応する表示色をモデル記憶部8eから読み出して、色つきのベクトルモデル9を生成する。 That is, the model generation unit 8f determines the amount of displacement relative to the risk level control value, reads the display color corresponding to the risk level control value from the model storage unit 8e, and generates a colored vector model 9.

例えば図5に示すように、第1管理値までの変位量については、「青色(図中、「・」で示す)」表示で、第2管理値までの変位量については、「緑色(図中、「○」で示す)」表示で、管理限界値までの変位量については、「黄色(図中、「△」で示す)」表示で、ベクトルモデル9を生成し、管理限界値を超える変位量については、「赤色(図中、「×」で示す)」表示で、ベクトルモデル9を生成するようになっている。 For example, as shown in FIG. 5, the vector model 9 is generated with the amount of deviation up to the first control value displayed in "blue (indicated by "・" in the figure)," the amount of deviation up to the second control value displayed in "green (indicated by "○" in the figure)," and the amount of deviation up to the control limit displayed in "yellow (indicated by "△" in the figure)," and the vector model 9 is generated with the amount of deviation exceeding the control limit displayed in "red (indicated by "×" in the figure)."

このようにすることで、監視者Pに、ベクトルモデル9の色分けで区別して、既存構造物1に生じている変位量を視認させることができ、当該変位量を、見やすく可視化することができて、監視者Pに的確に把握させることができる。 In this way, the supervisor P can visually identify the amount of displacement occurring in the existing structure 1 by distinguishing it by color of the vector model 9, and the amount of displacement can be visualized in an easy-to-see manner, allowing the supervisor P to accurately grasp it.

さらに、モデル生成部8fは、変位量が危険度レベル管理値の大きい危険側に移行すると、ベクトルモデル9を、移行した危険度レベル管理値の表示色でディスプレイ7に所定時間表示する指示を表示処理部8cに出力するように構成し、注意喚起することが好ましい。 Furthermore, it is preferable that when the amount of displacement shifts to the higher danger side of the danger level management value, the model generation unit 8f outputs to the display processing unit 8c an instruction to display the vector model 9 on the display 7 for a predetermined period of time in the display color of the shifted danger level management value, thereby calling attention.

例えば、図5中、第2管理値を超えて、緑色のベクトルモデル9が黄色のベクトルモデル9に変わったときには、変位量が小さくなって第2管理値未満となっても、モデル生成部8fは、所定時間、黄色のベクトルモデル9をディスプレイ7に表示させる指示を表示処理部8cに出力する。 For example, in FIG. 5, when the second management value is exceeded and the green vector model 9 changes to a yellow vector model 9, even if the amount of displacement decreases and falls below the second management value, the model generation unit 8f outputs an instruction to the display processing unit 8c to display the yellow vector model 9 on the display 7 for a predetermined time.

第1管理値を超えて、青色のベクトルモデル9が緑色のベクトルモデル9に変わったときも、管理限界値を超えて、黄色のベクトルモデル9が赤色のベクトルモデル9に変わったときも同様である。 The same is true when the first control value is exceeded and the blue vector model 9 changes to a green vector model 9, and when the control limit value is exceeded and the yellow vector model 9 changes to a red vector model 9.

これにより、変位量が大きくなる傾向にあることを監視者Pに把握させることができ、監視者Pが、既設構造物1に生じている変位状況について誤認してしまうことを抑制できる。 This allows the supervisor P to understand that the amount of displacement is tending to increase, and prevents the supervisor P from misunderstanding the displacement situation occurring in the existing structure 1.

さらに、監視者Pに、危険度レベル管理値を分かりやすく視認させるために、ベクトルモデル9に対して危険度レベル管理値を重ねて表示することが好ましい。 Furthermore, in order to allow the supervisor P to easily visually recognize the risk level management value, it is preferable to display the risk level management value superimposed on the vector model 9.

この場合、モデル記憶部8eには、図5に示すように、危険度レベル管理値の管理限界値を上限として、第1管理値及び第2管理値などの複数の危険度レベル管理値を段階的に表す3次元のスケルトンシリンダモデル10が格納される。 In this case, the model storage unit 8e stores a three-dimensional skeleton cylinder model 10 that represents multiple risk level control values, such as a first control value and a second control value, in stages, with the upper limit set to the control limit value of the risk level control value, as shown in FIG. 5.

3次元のスケルトンシリンダモデル10は、図示したように、外形輪郭線で透明なシリンダを表示すると共に、当該シリンダの高さ方向に変位量をとって、変位量がゼロ基準、第1管理値、第2管理値及び管理限界値である位置に、スケルトンシリンダモデル10の周方向に沿って目盛り線10aを段階的に表示することで構成される。 As shown in the figure, the three-dimensional skeleton cylinder model 10 is configured by displaying a transparent cylinder with an outline line, and by displaying graduated scale lines 10a in the circumferential direction of the skeleton cylinder model 10 at positions where the displacement amount is the zero reference, the first control value, the second control value, and the control limit value, taking the displacement amount in the height direction of the cylinder.

そして、モデル生成部8fは、モデル記憶部8eからスケルトンシリンダモデル10を読み出し、当該スケルトンシリンダモデル10に、上記の色つきのベクトルモデル9(表示色が付されない単なるベクトルモデル9であっても良い)を重ねて表示して危険度管理モデル13を生成する。 Then, the model generation unit 8f reads out the skeleton cylinder model 10 from the model storage unit 8e, and overlays the above-mentioned colored vector model 9 (which may be a simple vector model 9 without a display color) on the skeleton cylinder model 10 to generate a risk management model 13.

危険度管理モデル13は、スケルトンシリンダモデル10にベクトルモデル9を重ねて表示するもので、例えば、スケルトンシリンダモデル10の透明なシリンダの内部に、不透明なベクトルモデル9を表示することで構成される。 The risk management model 13 displays a vector model 9 overlaid on a skeleton cylinder model 10, and is configured, for example, by displaying an opaque vector model 9 inside the transparent cylinder of the skeleton cylinder model 10.

この危険度管理モデル13も、受信部8aがリアルタイムで受信する施工情報記憶部6bからの変位量及び変位方向に応じてリアルタイムに生成される。 This risk management model 13 is also generated in real time according to the amount and direction of displacement from the construction information storage unit 6b that the receiver 8a receives in real time.

表示処理部8cは、モデル生成部8fで生成された当該危険度管理モデル13を、図1に示すように、計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,…)に対応付けて、ディスプレイ7に画像表示するように構成される。 The display processing unit 8c is configured to display the risk management model 13 generated by the model generation unit 8f as an image on the display 7, in correspondence with the measurement positions (..., Xn -1 , Xn , Xn +1 , Xn +2 , ..., Yn - 1, Yn, Yn +1 , Yn +2 , ..., Zn -1 , Zn , Zn +1 , Zn +2 , ...) as shown in FIG.

これにより、監視者Pは、スケルトンシリンダモデル10に付した目盛り線10aと、表示色が付されいないベクトルモデル9もしくは色つきのベクトル9とを見比べることにより、既存構造物1に生じている変位量を、危険度レベル管理値に対する相関をもって把握することができて、監視業務を、過度の負担なくかつ適正・的確に遂行することができる。 By comparing the scale lines 10a on the skeleton cylinder model 10 with the vector model 9 without display color or the colored vectors 9, the supervisor P can grasp the amount of displacement occurring in the existing structure 1 in correlation with the risk level control value, and can carry out monitoring duties properly and accurately without excessive burdens.

上述したベクトルモデル9に代えて、変位計5で計測された変位量の数値を表示するだけでもよい。また、この表示は、管理限界値を超えた場合を対象とし、併せて、アラーム音を発するようにしてもよい。
Instead of the above-mentioned vector model 9, it is also possible to simply display the numerical value of the amount of displacement measured by the displacement meter 5. This display may also be intended for cases where the control limit value is exceeded, and an alarm may also be sounded.

≪削孔工事について≫
図1~図3に示したように、近隣の既存構造物1に変位が生じる場合がある、空所領域Rでの地盤改良工事における削孔工事の可視化について詳述する。
<About drilling work>
As shown in Figures 1 to 3, the visualization of drilling work in ground improvement work in a void area R, which may cause displacement of an existing nearby structure 1, will be described in detail.

通信端末8は、この削孔工事については、受信部8aが、サーバー6にアクセスして、削孔3の施工位置(…,An-1,An,An+1,An+2,…)、削孔始端位置から削孔終端位置までの施工深度及び削孔径を含む設計情報を記憶する設計情報記憶部6a及び削孔工事の進行に従って変化する削孔3の削孔始端位置からの施工済み深度を含む、地盤改良機械2から入力される施工情報を記憶する施工情報記憶部6bから情報を受信するように構成される。 For this drilling work, the communication terminal 8 is configured so that the receiving unit 8a accesses the server 6 to receive information from the design information memory unit 6a which stores design information including the construction position of the drilling hole 3 (..., A n-1 , A n , A n+1 , A n+2 , ...), the construction depth from the drilling start position to the drilling end position and the drilling diameter, and from the construction information memory unit 6b which stores construction information input from the ground improvement machine 2, including the constructed depth from the drilling start position of the drilling hole 3 which changes as the drilling work progresses.

削孔始端位置は通常、地表S側であり、削孔終端位置は、地盤内奥の深部となり、削孔始端位置から削孔終端位置までの深さが設計上の施工深度(施工長もしくは削孔長とも言う。以下同じ)である。 The starting point of drilling is usually on the ground surface S side, and the end point of drilling is deep inside the ground, and the depth from the starting point of drilling to the end point of drilling is the designed construction depth (also called the construction length or drilling length; the same applies below).

また、施工済み深度は、地盤改良機械2により、削孔スクリューの削孔始端位置からの到達深さによって検知される。 The completed depth is also detected by the ground improvement machine 2 based on the depth reached from the starting point of the drilling screw.

削孔工事について、通信端末8のモデル記憶部8eは、図6(a)及び(b)に示すように、設計情報である削孔径(地盤改良工事にかかる造成の径であってもよい。以下同じ)をシリンダの径(直径)で表し、施工情報である施工済み深度を、削孔始端位置からのシリンダの長さで表す、3次元のスケルトンシリンダ削孔モデル11を格納している。 As shown in Figures 6(a) and (b), for drilling work, the model storage unit 8e of the communication terminal 8 stores a three-dimensional skeleton cylinder drilling model 11 in which the drilling diameter (which may be the diameter of the construction for ground improvement work, the same applies below), which is design information, is represented by the diameter (diameter) of the cylinder, and the completed depth, which is construction information, is represented by the length of the cylinder from the drilling start position.

3次元のスケルトンシリンダ削孔モデル11は、縦横の格子11aを付した外形輪郭線で透明なシリンダを表示することで構成される。 The three-dimensional skeleton cylinder drilling model 11 is constructed by displaying a transparent cylinder with an outline line with vertical and horizontal grids 11a.

通信端末8のモデル生成部8fは、モデル記憶部8eからスケルトンシリンダ削孔モデル11を読み出す。 The model generation unit 8f of the communication terminal 8 reads out the skeleton cylinder drilling model 11 from the model storage unit 8e.

また、モデル生成部8fは、受信部8aで受信した施工情報記憶部6bからの施工済み深度に応じて、スケルトンシリンダ削孔モデル11をリアルタイムに生成する。 The model generation unit 8f also generates a skeleton cylinder drilling model 11 in real time according to the completed construction depth from the construction information storage unit 6b received by the receiving unit 8a.

図6(a)及び(b)に示した変化で理解されるように、このスケルトンシリンダ削孔モデル11は、上方位置の削孔始端位置から削孔終端位置となる下方へ向けて、リアルタイムで施工済み深度まで表示される。 As can be seen from the changes shown in Figures 6(a) and (b), this skeleton cylinder drilling model 11 is displayed in real time from the drilling start position at the top toward the drilling end position at the bottom up to the completed depth.

施工が完了した削孔3は、削孔始端位置から削孔終端位置までの深さである施工深度のスケルトンシリンダ削孔モデル11によって表示される。 The completed drilling 3 is displayed by a skeleton cylinder drilling model 11 with the drilling depth, which is the depth from the drilling start position to the drilling end position.

図示例は、設計上の削孔3の施工深度が、地表Sから地下2階の床レベルL2までの場合を示している。 The illustrated example shows a case where the designed construction depth of drilling hole 3 is from the ground surface S to floor level L2 of the second basement floor.

表示処理部8cは、表示指示部8dからの指示に応じて、設計情報記憶部2aから受信部8aが受信した削孔位置(…,An-1,An,An+1,An+2,…)に対応付けて、モデル生成部8fで生成されたスケルトンシリンダ削孔モデル11をリアルタイムでディスプレイ7に画像表示するように構成される。 The display processing unit 8c is configured to display, in real time, an image of the skeleton cylinder drilling model 11 generated by the model generation unit 8f on the display 7 in correspondence with the drilling positions (..., A n-1 , A n , A n+1 , A n+2 , ...) received by the receiving unit 8a from the design information memory unit 2a in response to instructions from the display instruction unit 8d.

これにより、図1に示すように、監視位置にいる監視者Pは、通信端末8であるウェアラブル端末のディスプレイ7を通じ、グラスを通して目視される地下空間Uの壁面UW等に、当該壁面UW等よりも内奥の削孔位置(…,An-1,An,An+1,An+2,…)に対応付けて、施工中の削孔3もしくは施工が完了した削孔3を、スケルトンシリンダ削孔モデル11によって視認することができる。 As a result, as shown in Figure 1, a monitor P at a monitoring position can, through the display 7 of a wearable terminal, which is a communication terminal 8, visually identify the hole 3 being drilled or the hole 3 that has been completed, by correlating it with the wall surface UW, etc. of the underground space U visible through the glasses, and the drilling positions (..., A n-1 , A n , A n+1 , A n+2 , ...) that are deeper inside the wall surface UW, etc. of the underground space U.

すなわち、スケルトンシリンダ削孔モデル11によって削孔3をリアルタイムにディスプレイ7に表示させることにより、削孔3の施工状況を可視化することができ、これにより、監視者Pに、削孔3の施工状態を的確に把握させることができる。 In other words, by displaying the hole drilling 3 on the display 7 in real time using the skeleton cylinder hole drilling model 11, the construction status of the hole drilling 3 can be visualized, thereby allowing the supervisor P to accurately grasp the construction status of the hole drilling 3.

スケルトンシリンダ削孔モデル11は、実物大で表示されるが、監視者Pが表示指示部8dを操作することにより、見やすいように任意に、実物大に拡大したり、縮小したりして表示できるようにしてもよい。 The skeleton cylinder drilling model 11 is displayed at actual size, but the monitor P may operate the display instruction unit 8d to enlarge or reduce the model to actual size as desired for easier viewing.

以上説明したように、本実施形態にあっては、削孔工事について、工事作業の進行に従って削孔状況がリアルタイムに変化する中で、施工済み深度などの施工情報に基づいて生成されるスケルトンシリンダ削孔モデル11を通信端末8のディスプレイ7に表示させることにより、削孔状況を見やすく可視化することができて、監視者Pに的確に把握させることができる。
As described above, in this embodiment, as the drilling situation changes in real time as the construction work progresses, the skeleton cylinder drilling model 11 generated based on construction information such as the completed depth is displayed on the display 7 of the communication terminal 8, thereby making the drilling situation easily visible and allowing the supervisor P to accurately grasp it.

≪地盤改良工事(地盤改良体造成工事)について≫
次に、本実施形態に係る地盤改良工事の可視化システム及び可視化方法について説明する。図1~図3に示したように、近隣の既存構造物1に変位が生じる場合がある、空所領域Rでの地盤改良工事を例にとって詳述する。
<About ground improvement work (ground improvement body construction work)>
Next, the visualization system and visualization method for ground improvement work according to the present embodiment will be described. As shown in Figures 1 to 3, a detailed description will be given of a ground improvement work in a void region R, which may cause displacement of an existing nearby structure 1.

本実施形態に係る地盤改良工事の可視化システムでは、通信端末8は、受信部8aが、サーバー6にアクセスして、地盤改良体4の造成位置(削孔位置(…,An-1,An,An+1,An+2,…)と同じ)、地盤改良体4の造成始端位置から造成終端位置までの造成高さ及び地盤改良体4の外径寸法を含む設計情報を記憶する設計情報記憶部6a及び地盤改良工事の進行に従って変化する地盤改良体4の造成始端位置からの施工済み造成高さを含む、地盤改良機械2から入力される施工情報を記憶する施工情報記憶部6bから情報を受信するように構成される。 In the ground improvement work visualization system of this embodiment, the communication terminal 8 is configured so that the receiving unit 8a accesses the server 6 to receive information from the design information memory unit 6a which stores design information including the construction position of the ground improvement body 4 (same as the drilling position (..., A n-1 , A n , A n+ 1 , A n+2 , ...)), the construction height from the construction start position to the construction end position of the ground improvement body 4, and the outer diameter dimensions of the ground improvement body 4, and the construction information memory unit 6b which stores construction information input from the ground improvement machine 2, including the completed construction height from the construction start position of the ground improvement body 4, which changes as the ground improvement work progresses.

地盤改良体4の造成位置は、設計上、削孔3の施工位置(…,An-1,An,An+1,An+2,…)に一致する。造成始端位置は通常、削孔3の削孔終端位置であり、造成終端位置は、造成始端位置よりも地表Sに近接する位置となり、造成始端位置から造成終端位置までの高さが設計上の造成高さである。 In terms of design, the construction position of the ground improvement body 4 coincides with the construction position (..., A n-1 , A n , A n+1 , A n+2 , ...) of the drilling hole 3. The construction start position is usually the drilling end position of the drilling hole 3, the construction end position is a position closer to the ground surface S than the construction start position, and the height from the construction start position to the construction end position is the construction height in terms of design.

また、施工済み造成高さは、地盤改良機械2により、原地盤の土とセメント系固化材を撹拌混合する撹拌スクリューの造成始端位置からの到達高さによって検知される。 The completed construction height is detected by the ground improvement machine 2 based on the height reached by the mixing screw, which mixes the original soil and cement-based solidification material, from the starting point of construction.

本実施形態に係る地盤改良工事の可視化システムでは、通信端末8のモデル記憶部8eは、図6(d)及び(e)に示すように、設計情報である地盤改良体4の外径寸法をシリンダの径(直径)で表し、施工情報である施工済み造成高さを、造成始端位置からのシリンダの長さで表す、3次元のシリンダ造成モデル12を格納している。3次元のシリンダ造成モデル12は、不透明なシリンダ体で形成され、表示される。 In the visualization system for ground improvement work according to this embodiment, the model memory unit 8e of the communication terminal 8 stores a three-dimensional cylinder construction model 12, as shown in Figs. 6(d) and (e), in which the outer diameter of the ground improvement body 4, which is design information, is represented by the diameter (diameter) of the cylinder, and the completed construction height, which is construction information, is represented by the length of the cylinder from the construction start position. The three-dimensional cylinder construction model 12 is formed and displayed as an opaque cylinder body.

通信端末8のモデル生成部8fは、モデル記憶部8eからシリンダ造成モデル12を読み出す。また、モデル生成部8fは、受信部8aで受信した施工情報記憶部6bからの施工済み造成高さに応じて、シリンダ造成モデル12をリアルタイムに生成する。 The model generation unit 8f of the communication terminal 8 reads out the cylinder construction model 12 from the model storage unit 8e. The model generation unit 8f also generates the cylinder construction model 12 in real time according to the completed construction height from the construction information storage unit 6b received by the receiving unit 8a.

上述したように、施工済み造成高さについても、施工情報記憶部6bに、「削孔」か、後述する「造成」かのフラグと、地盤改良機械2が備える作業用の回転ロッドの回転数を記憶しておくようにし、通信端末8の演算機能により、受信部8aでリアルタイムに受信する回転ロッドの回転数の、初期状態での回転数に対する差分によって、施工済み造成高さを算出してもよい。 As described above, for the completed construction height, the construction information storage unit 6b stores a flag indicating whether it is "drilling" or "construction" (described later) and the number of rotations of the rotating rod for work provided on the ground improvement machine 2, and the calculation function of the communication terminal 8 can calculate the completed construction height by the difference between the number of rotations of the rotating rod received in real time by the receiving unit 8a and the number of rotations in the initial state.

図6(d)及び(e)に示した変化で理解されるように、このシリンダ造成モデル12は、下方位置の造成始端位置から造成終端位置となる上方へ向けて、リアルタイムで施工済み造成高さまで表示される。 As can be seen from the changes shown in Figures 6(d) and (e), this cylinder construction model 12 is displayed in real time from the construction start position at the lower position to the construction end position at the upper position up to the completed construction height.

施工が完了した地盤改良体4は、造成始端位置から造成終端位置までの高さ(施工済み造成高さ=造成高さ)のシリンダ造成モデル12によって表示される。 The completed ground improvement body 4 is displayed by a cylindrical construction model 12 with the height from the construction start point to the construction end point (constructed construction height = construction height).

図示例は、設計上の地盤改良体4の造成高さが、地下2階の床レベルL2から地下1階の床レベルL1までの場合を示している。 The illustrated example shows a case where the designed construction height of the ground improvement body 4 is from floor level L2 of the second basement floor to floor level L1 of the first basement floor.

本実施形態では、モデル生成部8fは、シリンダ造成モデル12を、上述した削孔工事における3次元のスケルトンシリンダ削孔モデル11に重ねて表示することで、施工管理モデル14を生成するように構成される。 In this embodiment, the model generation unit 8f is configured to generate a construction management model 14 by displaying the cylinder construction model 12 superimposed on the three-dimensional skeleton cylinder drilling model 11 in the above-mentioned drilling work.

施工管理モデル14は、スケルトンシリンダ削孔モデル11に、シリンダ造成モデル12を重ねて表示するもので、例えば、スケルトンシリンダ削孔モデル11の透明なシリンダの内部に、不透明なシリンダ造成モデル12を表示することで構成される。 The construction management model 14 displays the cylinder construction model 12 superimposed on the skeleton cylinder drilling model 11, and is configured, for example, by displaying the opaque cylinder construction model 12 inside the transparent cylinder of the skeleton cylinder drilling model 11.

本実施形態では、図6(c)に示したように、削孔工事から地盤改良体4の造成工事に移る際に、地盤改良機械2から施工情報記憶部6bに記憶される地盤改良体4の造成開始の信号が受信部8aに入力されると、モデル生成部8fは、スケルトンシリンダ削孔モデル11の高さを、設計上の造成始端位置(削孔終端位置)からの地盤改良体4の造成高さに切り替えるようになっている。 In this embodiment, as shown in FIG. 6(c), when moving from drilling work to construction work of the ground improvement body 4, when a signal indicating the start of construction of the ground improvement body 4 stored in the construction information memory unit 6b from the ground improvement machine 2 is input to the receiving unit 8a, the model generating unit 8f switches the height of the skeleton cylinder drilling model 11 to the construction height of the ground improvement body 4 from the designed construction start position (drilling end position).

この施工管理モデル14であっても、モデル生成部8fは、受信部8aが受信する施工情報記憶部6bからの施工済み造成高さに応じてリアルタイムに生成する。 Even with this construction management model 14, the model generation unit 8f generates it in real time according to the completed construction height from the construction information storage unit 6b received by the receiving unit 8a.

表示処理部8cは、表示指示部8dからの指示に応じて、設計情報記憶部8aから受信部8aが受信した造成位置(…,An-1,An,An+1,An+2,…)に対応付けて、モデル生成部8fで生成された施工管理モデル14をリアルタイムでディスプレイ7に画像表示するように構成される。 The display processing unit 8c is configured to display an image of the construction management model 14 generated by the model generation unit 8f on the display 7 in real time, in correspondence with the construction positions (..., A n-1 , A n , A n+1 , A n+2 , ...) received by the receiving unit 8a from the design information memory unit 8a in response to instructions from the display instruction unit 8d.

もちろん、表示処理部8cは、シンプルに、シリンダ造成モデル12をディスプレイに画像表示するようにしても良い。 Of course, the display processing unit 8c may simply display the cylinder construction model 12 on the display.

これにより、図1に示すように、監視位置にいる監視者Pは、通信端末8であるウェアラブル端末のディスプレイ7を通じ、グラスを通して目視される地下空間Uの壁面UW等に、当該壁面UW等よりも内奥の造成位置(…,An-1,An,An+1,An+2,…)に対応付けて、施工中の地盤改良体4もしくは施工が完了した地盤改良体4を、施工管理モデル14あるいはシリンダ造成モデル12によって視認することができる。 As a result, as shown in Figure 1, a monitor P at a monitoring position can, through the display 7 of a wearable terminal, which is a communication terminal 8, visually identify the ground improvement body 4 under construction or the ground improvement body 4 whose construction has been completed, by correlating it with the construction positions (..., A n-1 , A n , A n+1 , A n+2 , ...) deeper inside the wall surfaces UW, etc. of the underground space U visible through the glasses, through the construction management model 14 or the cylinder construction model 12.

すなわち、施工管理モデル14あるいはシリンダ造成モデル12によって地盤改良体4をリアルタイムにディスプレイ7に表示させることにより、地盤改良体4の施工状況を可視化することができ、これにより、監視者Pに、地盤改良体4の施工状態を的確に把握させることができる。 In other words, by displaying the ground improvement body 4 in real time on the display 7 using the construction management model 14 or the cylinder construction model 12, the construction status of the ground improvement body 4 can be visualized, thereby allowing the supervisor P to accurately grasp the construction status of the ground improvement body 4.

施工管理モデル14の画像表示によれば、削孔3を表示するスケルトンシリンダ削孔モデル11を対比対象として、地盤改良体4の造成状況を判断することができる。 The image display of the construction management model 14 allows the construction status of the ground improvement body 4 to be judged by comparing it with the skeleton cylinder drilling model 11 that displays the drilling 3.

シリンダ造成モデル12の場合であってももちろん、地盤改良体4の造成状況を判断することができる。 Of course, even in the case of the cylinder construction model 12, it is possible to judge the construction status of the ground improvement body 4.

シリンダ造成モデル12及び施工管理モデル14のいずれも、実物大で表示されるが、監視者Pが表示指示部8dを操作することにより、見やすいように任意に、実物大に拡大したり、縮小したりして表示できるようにしてもよい。 Both the cylinder construction model 12 and the construction management model 14 are displayed at life-size, but the supervisor P may operate the display instruction unit 8d to enlarge or reduce them to life-size as desired for easier viewing.

以上説明したように、本実施形態に係る地盤改良工事の可視化システム及び可視化方法にあっては、工事作業の進行に従って事犯改良体4の造成状況がリアルタイムに変化する中で、施工済み造成高さなどの施工情報に基づいて生成されるシリンダ造成モデル12あるいは施工管理モデル14を通信端末8のディスプレイ7に表示させることにより、地盤改良体4の造成状況を見やすく可視化することができて、監視者Pに的確に把握させることができる。
As described above, in the visualization system and visualization method for ground improvement work of this embodiment, as the construction status of the ground improvement body 4 changes in real time as the construction work progresses, the cylinder construction model 12 or the construction management model 14 generated based on construction information such as the completed construction height is displayed on the display 7 of the communication terminal 8, thereby making it possible to easily visualize the construction status of the ground improvement body 4 and allowing the supervisor P to accurately grasp it.

以上の説明では、通信端末8が透過型ウェアラブル端末である場合について説明したが、通信端末8としては、撮影装置を備えたディスプレイ付きのタブレット型などの通信端末8xを用いるようにしても良い。 In the above explanation, the communication terminal 8 is a see-through wearable terminal, but the communication terminal 8 may be a tablet-type communication terminal 8x with a display and a photographing device.

この場合には、撮影装置で計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,…)や削孔位置(…,An-1,An,An+1,An+2,…)、造成位置の画像を動画などで撮影するようにし、表示処理部8cにより、当該計測位置(…,Xn-1,Xn,Xn+1,Xn+2,…,Yn-1,Yn,Yn+1,Yn+2,…,Zn-1,Zn,Zn+1,Zn+2,…)等に対応付けて、撮影を行っている画像に重ね合わせて、モデル生成部8fで生成される上記のベクトルモデル9、色つきベクトルモデル9、危険度管理モデル13、スケルトンシリンダ削孔モデル11、シリンダ造成モデル12、並びに、施工管理モデル14を、ディスプレイ7に画像表示するように構成すればよい。 In this case, the imaging device captures images of the measurement positions (..., Xn -1 , Xn , Xn +1 , Xn +2 ,..., Yn -1 , Yn , Yn +1 , Yn +2 ,..., Zn -1 , Zn , Zn +1 , Zn +2 ,...), the drilling positions (..., An -1 , An , An+1 , An +2 ,...) and the construction positions as videos or the like, and the display processing unit 8c displays the measurement positions (..., Xn -1 , Xn , Xn+1 , Xn +2 ,..., Yn-1, Yn , Yn + 1 , Yn +2 ,..., Zn -1 , Zn , Zn+1 , Zn +2 The above-mentioned vector model 9, colored vector model 9, risk management model 13, skeleton cylinder drilling model 11, cylinder construction model 12, and construction management model 14 generated by the model generation unit 8f can be displayed as images on the display 7 by corresponding them to the images (e.g., ...) and superimposing them on the image being captured.

このようにすれば、撮影装置を備えたディスプレイ付きのタブレット型などの通信端末8xであっても、上述した実施形態と同様の作用効果を奏することができる。 In this way, even if the communication terminal 8x is a tablet-type terminal with a display and a camera, it is possible to achieve the same effects as those of the above-described embodiment.

2 地盤改良機械
3 削孔
4 地盤改良体
6a 設計情報記憶部
6b 施工情報記憶部
7 ディスプレイ
8 通信端末
8a 受信部
8c 表示処理部
8e モデル記憶部
8f モデル生成部
8x タブレット型などの通信端末
11 3次元のスケルトンシリンダ削孔モデル
12 3次元のシリンダ造成モデル
14 施工管理モデル
A 地盤改良体の造成位置
2 Ground improvement machine 3 Drilling 4 Ground improvement body 6a Design information storage unit 6b Construction information storage unit 7 Display 8 Communication terminal 8a Receiving unit 8c Display processing unit 8e Model storage unit 8f Model generation unit 8x Communication terminal such as tablet type 11 Three-dimensional skeleton cylinder drilling model 12 Three-dimensional cylinder construction model 14 Construction management model A Construction position of ground improvement body

Claims (4)

地盤改良機械による地盤改良体を造成する地盤改良工事の施工状況を、通信端末のディスプレイに画像表示する地盤改良工事の可視化システムであって、
上記通信端末は、
該通信端末の位置情報を取得する位置情報取得手段と、
上記地盤改良体の造成位置、該地盤改良体の造成始端位置から造成終端位置までの造成高さ及び該地盤改良体の外径寸法を含む設計情報を記憶する設計情報記憶部及び地盤改良工事の進行に従って変化する上記地盤改良体の造成始端位置からの施工済み造成高さを含む、上記地盤改良機械から入力される施工情報を記憶する施工情報記憶部から情報を受信する受信部と、
該受信部で受信した上記設計情報記憶部からの上記地盤改良体の上記外径寸法を、シリンダ径で表し、上記施工済み造成高さを、上記造成始端位置からのシリンダの長さで表す、3次元のシリンダ造成モデルを格納したモデル記憶部と、
該モデル記憶部から上記シリンダ造成モデルを読み出すと共に、上記受信部で受信した上記施工情報記憶部からの上記施工済み造成高さに応じて、リアルタイムに、上記地盤改良体の当該外径寸法及び当該施工済み造成高さの該シリンダ造成モデルを生成するモデル生成部と、
上記受信部で受信した上記設計情報記憶部からの上記造成位置に対応付けて、上記モデル生成部で生成された上記シリンダ造成モデルを上記ディスプレイに画像表示する表示処理部とを含み、
上記通信端末は、透過型のグラスに上記ディスプレイが組み込まれた透過型ウェアラブル端末であり、
上記表示処理部は、取得した位置情報及び上記造成位置に基づいて、上記グラスを通して目視される上記造成位置の画像に重ね合わせて、当該造成位置に対応付けられた上記シリンダ造成モデルを上記ディスプレイに画像表示し、
前記施工情報記憶部には、前記地盤改良体の造成に先立って前記造成位置に予め形成される削孔の削孔始端位置からの施工済み深度及び削孔径を含む施工情報が記憶され、
前記モデル記憶部には、前記受信部で受信した上記設計情報記憶部からの上記削孔径を、シリンダ径で表し、上記施工済み深度を、上記削孔始端位置からのシリンダの長さで表す、3次元のスケルトンシリンダ削孔モデルが格納され、
上記モデル生成部は、上記モデル記憶部から上記スケルトンシリンダ削孔モデルを読み出すと共に、上記受信部で受信した上記施工情報記憶部からの上記施工済み深度に応じて、上記削孔径及び当該施工済み深度の該スケルトンシリンダ削孔モデルを生成し、該スケルトンシリンダ削孔モデルを前記シリンダ造成モデルに重ねて表示する施工管理モデルをリアルタイムに生成し、
前記表示処理部は、上記モデル生成部で生成された上記シリンダ造成モデルを、上記造成位置に対応付けて、上記ディスプレイに画像表示し、
上記スケルトンシリンダ削孔モデルは、縦横の格子を付した外形輪郭線で透明なシリンダを表示することで構成されることを特徴とする地盤改良工事の可視化システム。
A visualization system for ground improvement work that displays an image of the construction status of a ground improvement work to create a ground improvement body by a ground improvement machine on a display of a communication terminal,
The communication terminal is
A location information acquisition means for acquiring location information of the communication terminal;
a receiving unit that receives information from a design information storage unit that stores design information including the construction position of the ground improvement body, the construction height from the construction start position to the construction end position of the ground improvement body, and the outer diameter dimensions of the ground improvement body, and a construction information storage unit that stores construction information input from the ground improvement machine, including the completed construction height from the construction start position of the ground improvement body that changes as the ground improvement work progresses;
A model storage unit that stores a three-dimensional cylinder construction model in which the outer diameter dimension of the ground improvement body from the design information storage unit received by the receiving unit is expressed as a cylinder diameter, and the completed construction height is expressed as the length of the cylinder from the construction start position;
A model generation unit that reads out the cylinder construction model from the model storage unit and generates the cylinder construction model of the outer diameter dimension and the completed construction height of the ground improvement body in real time according to the completed construction height from the construction information storage unit received by the receiving unit;
a display processing unit that displays the cylinder construction model generated by the model generation unit on the display in association with the construction position from the design information storage unit received by the receiving unit;
the communication terminal is a see-through wearable terminal in which the display is incorporated in see-through glasses,
The display processing unit displays the cylinder construction model associated with the construction position on the display by superimposing the cylinder construction model on an image of the construction position viewed through the glass based on the acquired position information and the construction position,
The construction information storage unit stores construction information including a depth and a diameter of a hole formed in advance at the construction position from a drilling start position of the hole formed in advance at the construction position prior to the construction of the ground improvement body,
The model storage unit stores a three-dimensional skeleton cylinder drilling model in which the drilling diameter from the design information storage unit received by the receiving unit is expressed as a cylinder diameter and the completed depth is expressed as a cylinder length from the drilling start position,
The model generation unit reads out the skeleton cylinder drilling model from the model storage unit, and generates a skeleton cylinder drilling model of the drilling diameter and the completed depth according to the completed depth from the construction information storage unit received by the receiving unit, and generates a construction management model in real time that displays the skeleton cylinder drilling model superimposed on the cylinder construction model,
The display processing unit displays the cylinder construction model generated by the model generation unit on the display in association with the construction position,
The above-mentioned skeleton cylinder drilling model is a visualization system for ground improvement work, characterized in that it is constructed by displaying a transparent cylinder with an outline line with vertical and horizontal grids .
地盤改良機械による地盤改良体を造成する地盤改良工事の施工状況を、通信端末のディスプレイに画像表示する地盤改良工事の可視化システムであって、
上記通信端末は、
該通信端末の位置情報を取得する位置情報取得手段と、
上記地盤改良体の造成位置、該地盤改良体の造成始端位置から造成終端位置までの造成高さ及び該地盤改良体の外径寸法を含む設計情報を記憶する設計情報記憶部及び地盤改良工事の進行に従って変化する上記地盤改良体の造成始端位置からの施工済み造成高さを含む、上記地盤改良機械から入力される施工情報を記憶する施工情報記憶部から情報を受信する受信部と、
該受信部で受信した上記設計情報記憶部からの上記地盤改良体の上記外径寸法を、シリンダ径で表し、上記施工済み造成高さを、上記造成始端位置からのシリンダの長さで表す、3次元のシリンダ造成モデルを格納したモデル記憶部と、
該モデル記憶部から上記シリンダ造成モデルを読み出すと共に、上記受信部で受信した上記施工情報記憶部からの上記施工済み造成高さに応じて、リアルタイムに、上記地盤改良体の当該外径寸法及び当該施工済み造成高さの該シリンダ造成モデルを生成するモデル生成部と、
上記受信部で受信した上記設計情報記憶部からの上記造成位置に対応付けて、上記モデル生成部で生成された上記シリンダ造成モデルを上記ディスプレイに画像表示する表示処理部とを含み、
前記通信端末は、撮影手段を備え、
前記表示処理部は、取得した位置情報及び上記造成位置に基づいて、上記撮影手段で撮影された該造成位置の画像に重ね合わせて、前記造成位置に対応付けられた前記シリンダ造成モデルを前記ディスプレイに画像表示し、
前記施工情報記憶部には、前記地盤改良体の造成に先立って前記造成位置に予め形成される削孔の削孔始端位置からの施工済み深度及び削孔径を含む施工情報が記憶され、
前記モデル記憶部には、前記受信部で受信した上記設計情報記憶部からの上記削孔径を、シリンダ径で表し、上記施工済み深度を、上記削孔始端位置からのシリンダの長さで表す、3次元のスケルトンシリンダ削孔モデルが格納され、
上記モデル生成部は、上記モデル記憶部から上記スケルトンシリンダ削孔モデルを読み出すと共に、上記受信部で受信した上記施工情報記憶部からの上記施工済み深度に応じて、上記削孔径及び当該施工済み深度の該スケルトンシリンダ削孔モデルを生成し、該スケルトンシリンダ削孔モデルを前記シリンダ造成モデルに重ねて表示する施工管理モデルをリアルタイムに生成し、
前記表示処理部は、上記モデル生成部で生成された上記シリンダ造成モデルを、上記造成位置に対応付けて、上記ディスプレイに画像表示し、
上記スケルトンシリンダ削孔モデルは、縦横の格子を付した外形輪郭線で透明なシリンダを表示することで構成されることを特徴とする地盤改良工事の可視化システム。
A visualization system for ground improvement work that displays an image of the construction status of a ground improvement work to create a ground improvement body by a ground improvement machine on a display of a communication terminal,
The communication terminal is
A location information acquisition means for acquiring location information of the communication terminal;
a receiving unit that receives information from a design information storage unit that stores design information including the construction position of the ground improvement body, the construction height from the construction start position to the construction end position of the ground improvement body, and the outer diameter dimensions of the ground improvement body, and a construction information storage unit that stores construction information input from the ground improvement machine, including the completed construction height from the construction start position of the ground improvement body that changes as the ground improvement work progresses;
A model storage unit that stores a three-dimensional cylinder construction model in which the outer diameter dimension of the ground improvement body from the design information storage unit received by the receiving unit is expressed as a cylinder diameter, and the completed construction height is expressed as the length of the cylinder from the construction start position;
A model generation unit that reads out the cylinder construction model from the model storage unit and generates the cylinder construction model of the outer diameter dimension and the completed construction height of the ground improvement body in real time according to the completed construction height from the construction information storage unit received by the receiving unit;
a display processing unit that displays the cylinder construction model generated by the model generation unit on the display in association with the construction position from the design information storage unit received by the receiving unit;
The communication terminal includes an imaging means,
The display processing unit displays the cylinder construction model associated with the construction position on the display by superimposing the cylinder construction model on the image of the construction position photographed by the photographing means based on the acquired position information and the construction position ,
The construction information storage unit stores construction information including a depth and a diameter of a hole formed in advance at the construction position from a drilling start position of the hole formed in advance at the construction position prior to the construction of the ground improvement body,
The model storage unit stores a three-dimensional skeleton cylinder drilling model in which the drilling diameter from the design information storage unit received by the receiving unit is expressed as a cylinder diameter and the completed depth is expressed as a cylinder length from the drilling start position,
The model generation unit reads out the skeleton cylinder drilling model from the model storage unit, and generates a skeleton cylinder drilling model of the drilling diameter and the completed depth according to the completed depth from the construction information storage unit received by the receiving unit, and generates a construction management model in real time that displays the skeleton cylinder drilling model superimposed on the cylinder construction model,
The display processing unit displays the cylinder construction model generated by the model generation unit on the display in association with the construction position,
The above-mentioned skeleton cylinder drilling model is a visualization system for ground improvement work, characterized in that it is constructed by displaying a transparent cylinder with an outline line with vertical and horizontal grids .
地盤改良機械による地盤改良体を造成する地盤改良工事の施工状況を、通信端末のディスプレイに画像表示する地盤改良工事の可視化方法であって、A visualization method for ground improvement work, which displays an image of a construction status of a ground improvement work for constructing a ground improvement body by a ground improvement machine on a display of a communication terminal, comprising:
上記通信端末の位置情報を取得し、Acquire location information of the communication terminal;
上記地盤改良体の造成位置、該地盤改良体の造成始端位置から造成終端位置までの造成高さ及び該地盤改良体の外径寸法を含む設計情報を上記通信端末に入力し、Design information including the construction position of the ground improvement body, the construction height from the construction start end position to the construction end position of the ground improvement body, and the outer diameter dimension of the ground improvement body is input into the communication terminal,
地盤改良工事の進行に従って変化する上記地盤改良体の上記造成始端位置からの施工済み造成高さを含む、上記地盤改良機械から入力される施工情報を上記通信端末に入力して、該通信端末により、該地盤改良体の上記外径寸法を、シリンダ径で表し、該施工済み造成高さを、該造成始端位置からのシリンダの長さで表す、3次元のシリンダ造成モデルをリアルタイムに生成させ、Construction information input from the ground improvement machine, including the completed construction height from the construction start position of the ground improvement body, which changes as the ground improvement work progresses, is input to the communication terminal, and a three-dimensional cylindrical construction model is generated in real time by the communication terminal, in which the outer diameter dimension of the ground improvement body is expressed as a cylinder diameter and the completed construction height is expressed as the cylinder length from the construction start position;
上記通信端末の上記ディスプレイに、上記造成位置に対応付けて、上記シリンダ造成モデルを画像表示させ、Displaying an image of the cylinder construction model on the display of the communication terminal in association with the construction position;
上記通信端末は、透過型のグラスに上記ディスプレイが組み込まれた透過型ウェアラブル端末であり、the communication terminal is a see-through wearable terminal in which the display is incorporated in see-through glasses,
上記通信端末により、取得した位置情報及び上記造成位置に基づいて、上記グラスを通して目視される上記造成位置の画像に重ね合わせて、当該造成位置に対応付けられた上記シリンダ造成モデルを上記ディスプレイに画像表示し、The communication terminal displays the cylinder construction model associated with the construction position on the display by superimposing it on an image of the construction position viewed through the glass based on the acquired position information and the construction position,
前記通信端末に、前記地盤改良体の造成に先立って前記造成位置に予め形成される削孔の削孔始端位置からの施工済み深度及び削孔径を含む設計情報を入力し、Input design information including a depth and a diameter of a hole to be drilled from a start point of drilling of a hole to be formed in advance at the development position prior to the construction of the ground improvement body into the communication terminal;
上記通信端末により、上記削孔径を、シリンダ径で表し、上記施工済み深度を、上記削孔始端位置からのシリンダの長さで表す、3次元のスケルトンシリンダ削孔モデルを生成させると共に、該スケルトンシリンダ削孔モデルを前記シリンダ造成モデルに重ねて表示する施工管理モデルをリアルタイムに生成させ、The communication terminal generates a three-dimensional skeleton cylinder drilling model in which the drilling diameter is expressed by a cylinder diameter and the completed depth is expressed by the length of the cylinder from the drilling start position, and generates in real time a construction management model in which the skeleton cylinder drilling model is displayed superimposed on the cylinder construction model.
上記通信端末の上記ディスプレイに、上記造成位置に対応付けて、上記シリンダ造成モデルを画像表示させ、Displaying an image of the cylinder construction model on the display of the communication terminal in association with the construction position;
上記スケルトンシリンダ削孔モデルは、縦横の格子を付した外形輪郭線で透明なシリンダを表示することで構成されることを特徴とする地盤改良工事の可視化方法。A method for visualizing ground improvement work, characterized in that the skeleton cylinder drilling model is constructed by displaying a transparent cylinder with an outer contour line with vertical and horizontal grids.
地盤改良機械による地盤改良体を造成する地盤改良工事の施工状況を、通信端末のディスプレイに画像表示する地盤改良工事の可視化方法であって、A visualization method for ground improvement work, which displays an image of a construction status of a ground improvement work for constructing a ground improvement body by a ground improvement machine on a display of a communication terminal, comprising:
上記通信端末の位置情報を取得し、Acquire location information of the communication terminal;
上記地盤改良体の造成位置、該地盤改良体の造成始端位置から造成終端位置までの造成高さ及び該地盤改良体の外径寸法を含む設計情報を上記通信端末に入力し、Design information including the construction position of the ground improvement body, the construction height from the construction start end position to the construction end position of the ground improvement body, and the outer diameter dimension of the ground improvement body is input into the communication terminal,
地盤改良工事の進行に従って変化する上記地盤改良体の上記造成始端位置からの施工済み造成高さを含む、上記地盤改良機械から入力される施工情報を上記通信端末に入力して、該通信端末により、該地盤改良体の上記外径寸法を、シリンダ径で表し、該施工済み造成高さを、該造成始端位置からのシリンダの長さで表す、3次元のシリンダ造成モデルをリアルタイムに生成させ、Construction information input from the ground improvement machine, including the completed construction height from the construction start position of the ground improvement body, which changes as the ground improvement work progresses, is input to the communication terminal, and a three-dimensional cylindrical construction model is generated in real time by the communication terminal, in which the outer diameter dimension of the ground improvement body is expressed as a cylinder diameter and the completed construction height is expressed as the cylinder length from the construction start position;
上記通信端末の上記ディスプレイに、上記造成位置に対応付けて、上記シリンダ造成モデルを画像表示させ、Displaying an image of the cylinder construction model on the display of the communication terminal in association with the construction position;
前記通信端末は、撮影手段を備え、The communication terminal includes an imaging means,
上記通信端末により、取得した位置情報及び上記造成位置に基づいて、上記撮影手段で撮影された該造成位置の画像に重ね合わせて、前記造成位置に対応付けられた前記シリンダ造成モデルを前記ディスプレイに画像表示させ、The communication terminal displays the cylinder construction model corresponding to the construction position on the display by superimposing it on the image of the construction position photographed by the photographing means based on the acquired position information and the construction position,
前記通信端末に、前記地盤改良体の造成に先立って前記造成位置に予め形成される削孔の削孔始端位置からの施工済み深度及び削孔径を含む設計情報を入力し、Input design information including a depth and a diameter of a hole to be drilled from a start point of drilling of a hole to be formed in advance at the development position prior to the construction of the ground improvement body into the communication terminal;
上記通信端末により、上記削孔径を、シリンダ径で表し、上記施工済み深度を、上記削孔始端位置からのシリンダの長さで表す、3次元のスケルトンシリンダ削孔モデルを生成させると共に、該スケルトンシリンダ削孔モデルを前記シリンダ造成モデルに重ねて表示する施工管理モデルをリアルタイムに生成させ、The communication terminal generates a three-dimensional skeleton cylinder drilling model in which the drilling diameter is expressed by a cylinder diameter and the completed depth is expressed by the length of the cylinder from the drilling start position, and generates in real time a construction management model in which the skeleton cylinder drilling model is displayed superimposed on the cylinder construction model.
上記通信端末の上記ディスプレイに、上記造成位置に対応付けて、上記シリンダ造成モデルを画像表示させ、Displaying an image of the cylinder construction model on the display of the communication terminal in association with the construction position;
上記スケルトンシリンダ削孔モデルは、縦横の格子を付した外形輪郭線で透明なシリンダを表示することで構成されることを特徴とする地盤改良工事の可視化方法。A method for visualizing ground improvement work, characterized in that the skeleton cylinder drilling model is constructed by displaying a transparent cylinder with an outer contour line with vertical and horizontal grids.
JP2023044781A 2023-03-20 2023-03-20 Visualization system and method for ground improvement work Active JP7628566B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023044781A JP7628566B2 (en) 2023-03-20 2023-03-20 Visualization system and method for ground improvement work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2023044781A JP7628566B2 (en) 2023-03-20 2023-03-20 Visualization system and method for ground improvement work

Publications (2)

Publication Number Publication Date
JP2024134465A JP2024134465A (en) 2024-10-03
JP7628566B2 true JP7628566B2 (en) 2025-02-10

Family

ID=92909911

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2023044781A Active JP7628566B2 (en) 2023-03-20 2023-03-20 Visualization system and method for ground improvement work

Country Status (1)

Country Link
JP (1) JP7628566B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013242175A (en) 2012-05-18 2013-12-05 Railway Technical Research Institute Optimum arrangement method of measuring apparatus in measurement of earth retaining wall in excavation work
JP2015011368A (en) 2013-06-26 2015-01-19 国立大学法人佐賀大学 Display control device
JP2018111982A (en) 2017-01-11 2018-07-19 株式会社不動テトラ Construction management system for ground improvement
JP2022176523A (en) 2021-05-17 2022-11-30 五洋建設株式会社 Bending drilling management device and management method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013242175A (en) 2012-05-18 2013-12-05 Railway Technical Research Institute Optimum arrangement method of measuring apparatus in measurement of earth retaining wall in excavation work
JP2015011368A (en) 2013-06-26 2015-01-19 国立大学法人佐賀大学 Display control device
JP2018111982A (en) 2017-01-11 2018-07-19 株式会社不動テトラ Construction management system for ground improvement
JP2022176523A (en) 2021-05-17 2022-11-30 五洋建設株式会社 Bending drilling management device and management method

Also Published As

Publication number Publication date
JP2024134465A (en) 2024-10-03

Similar Documents

Publication Publication Date Title
CN111272220B (en) Tunnel state detection monitoring management system
JP3653196B2 (en) Construction support information system using virtual reality.
US11216664B2 (en) Method and device for augmenting a person&#39;s view of a mining vehicle on a mining worksite in real-time
KR101944823B1 (en) Underground Facilities Detection System Using Augmented Reality and Virtual Reality
JP4362452B2 (en) Work equipment construction support system
CN110397474B (en) Method and system for monitoring and early warning mine water damage and simulating disaster spreading
JP7375156B2 (en) Measuring system, measuring method and interval determination method
JP2008298432A (en) Display method of tunnel wall surface displacement, and program thereof
Behzadan et al. Interactive augmented reality visualization for improved damage prevention and maintenance of underground infrastructure
CN115758552A (en) Building construction monitoring method and monitoring and early warning system based on FEA and BIM
CN115314637A (en) Processing system and processing method for construction site panoramic image and electronic equipment
KR101995898B1 (en) Method for calculating dip of aerial transmission line using electric wire survey and program
JP7330008B2 (en) Excavation management apparatus and method
JP3842771B2 (en) Method for displaying cross-section measurement results and program thereof
JP7628566B2 (en) Visualization system and method for ground improvement work
JP7628565B2 (en) Visualization system and method for drilling work
JP6863730B2 (en) Tunnel face construction management device and construction management method
JP7628564B2 (en) Monitoring system and monitoring method for existing structures
JP7760743B2 (en) Surveying systems and methods
JP2017048646A (en) Construction management device and construction management method of tunnel working face
JP2018091721A (en) Underground pipe management device, method for managing underground pipe, and underground pipe management program
JP2021089208A (en) Excavation support system
KR102240634B1 (en) Method for preventing damage of underground facilties from excavating in construction field using gpas-ar system
JP3344902B2 (en) Remote operation support image system for construction mobile
JP7802146B1 (en) How to check shaft condition

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20230519

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20230519

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20240620

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240620

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240917

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20241115

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241115

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250114

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250129

R150 Certificate of patent or registration of utility model

Ref document number: 7628566

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150