JP7629843B2 - Control device and control method for watertight opening and closing device - Google Patents
Control device and control method for watertight opening and closing device Download PDFInfo
- Publication number
- JP7629843B2 JP7629843B2 JP2021206224A JP2021206224A JP7629843B2 JP 7629843 B2 JP7629843 B2 JP 7629843B2 JP 2021206224 A JP2021206224 A JP 2021206224A JP 2021206224 A JP2021206224 A JP 2021206224A JP 7629843 B2 JP7629843 B2 JP 7629843B2
- Authority
- JP
- Japan
- Prior art keywords
- compression process
- horizontal
- vertical
- predetermined value
- horizontal compression
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Specific Sealing Or Ventilating Devices For Doors And Windows (AREA)
- Operating, Guiding And Securing Of Roll- Type Closing Members (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Special Wing (AREA)
Description
本発明は、大雨時などにおいて、ビル、工場、倉庫、車庫等の建物の出入口などの開口部、または地下鉄の駅や地下街の出入口などの開口部を水密状態に閉鎖する止水装置の制御装置及び制御方法に係り、特に、複数の止水パネルを用いて構成された止水開閉体装置の制御に好適な止水開閉体装置の制御装置及び制御方法に関する。 The present invention relates to a control device and a control method for a watertight device that closes openings such as entrances and exits of buildings, factories, warehouses, garages, etc., or openings such as entrances and exits of subway stations and underground shopping malls in a watertight state during heavy rain, etc., and in particular to a control device and a control method for a watertight opening and closing body device that is suitable for controlling a watertight opening and closing body device configured using multiple watertight panels.
地下鉄の駅や地下街などの地下施設へ通じる地上の出入口や、建物の出入口などには、大雨などによる水が地下施設または建物内部へ流入することを防止するための止水装置が設けられる。
このような止水装置として、特許文献1に記載の防水扉が提案されている。
2. Description of the Related Art Water stop devices are installed at ground level entrances to underground facilities such as subway stations and underground shopping malls, as well as at building entrances, to prevent water from heavy rain or other events from flowing into the underground facilities or inside the buildings.
As such a waterproofing device, a waterproof door is proposed as described in Patent Document 1.
特許文献1に記載の防水扉は、扉体を垂直方向に圧迫する第1の圧迫手段と、水平方向に圧迫する第2の圧迫手段とを備え、第1の圧迫手段の圧迫動作後に第2の圧迫手段の圧迫動作を行うものである。 The waterproof door described in Patent Document 1 is equipped with a first compression means that compresses the door body vertically and a second compression means that compresses the door body horizontally, and the second compression means performs a compression operation after the first compression means performs a compression operation.
特許文献1に記載のものは、扉体を垂直方向に圧迫し、その後に水平方向に圧迫しているので、複数の扉体を垂直方向に圧迫した場合、各扉体の水平方向に存在する間隙によって複数の扉体が個々に傾きを生じ扉体の接触個所で屈折したように接触する可能性があり、その後に水平方向に圧迫することによって屈折した接触部に不測の応力を架けることとなり好ましくない場合がある。 In the device described in Patent Document 1, the door body is compressed vertically and then horizontally. Therefore, when multiple door bodies are compressed vertically, the horizontal gaps between each door body can cause the multiple door bodies to tilt individually, and the door bodies may come into contact in a bent manner at the contact points. Subsequent compression in the horizontal direction can result in undesirable unexpected stress being applied to the bent contact points.
本発明は、上述の点に鑑みてなされたものであり、複数の止水パネルを垂直方向及び水平方向に圧迫する際に、止水パネル同士及び止水パネルとガイドレールとの間の水密性を向上させることのできる止水開閉体装置の制御装置及び制御方法を提供することにある。 The present invention has been made in consideration of the above points, and aims to provide a control device and control method for a watertight opening and closing device that can improve the watertightness between the watertight panels and between the watertight panels and the guide rails when compressing multiple watertight panels vertically and horizontally.
本発明の止水開閉体装置の制御装置の第1の特徴は、開口部の周縁部から複数のパネル手段をガイド手段に沿って移動させることによって前記開口部を開閉する止水開閉手段と、前記止水開閉手段によって前記開口部が閉鎖された後に前記複数のパネル手段に対して水平移動方向へ圧迫力を加える第1水平圧迫処理を実行する水平圧迫手段と、前記複数のパネル手段に対して垂直移動方向へ圧迫力を加える第1垂直圧迫処理を実行する垂直圧迫手段とを備え、前記複数のパネル手段と前記ガイド手段との間の水密性及び垂直方向でそれぞれ接触する前記複数のパネル手段間の水密性を高めるように、前記水平圧迫手段及び前記垂直圧迫手段を制御する止水開閉体装置の制御装置において、前記第1水平圧迫処理を実行後に前記第1垂直圧迫処理を実行し、前記第1水平圧迫処理停止後に第2水平圧迫処理を実行することにある。 The first feature of the control device for a watertight opening/closing body device of the present invention is that it comprises a watertight opening/closing means for opening and closing an opening by moving a plurality of panel means along a guide means from the periphery of the opening, a horizontal compression means for performing a first horizontal compression process for applying a compression force to the plurality of panel means in a horizontal movement direction after the opening is closed by the watertight opening/closing means, and a vertical compression means for performing a first vertical compression process for applying a compression force to the plurality of panel means in a vertical movement direction, and the control device for a watertight opening/closing body device controls the horizontal compression means and the vertical compression means so as to increase the watertightness between the plurality of panel means and the guide means and between the plurality of panel means that are in contact with each other in the vertical direction, and executes the first vertical compression process after executing the first horizontal compression process, and executes the second horizontal compression process after the first horizontal compression process is stopped.
止水開閉手段は、ビル、工場、倉庫、車庫などの建物などの構造物における、出入口や窓部、あるいは内部の通路や空間などの開口部を電動で開閉移動する複数のパネル手段で構成される。複数のパネル手段は、建物などの開口部の周縁部の一つである上部に収納され、まぐさなどを通過してガイド手段に沿って開口部を移動(下降)し、開口部を電動で開閉する。これ以外にも、止水開閉手段が開口部の下部に収納されて、上昇方式にて電動で開閉移動したり、止水開閉手段が側部に収納されて、スライド方式にて電動で移動したりすることもある。また、止水開閉手段には、閉鎖によって開口部を全閉できるものも全閉できないものも含む。 The watertight opening and closing means is composed of multiple panel means that electrically open and close openings such as entrances and windows, or internal passageways and spaces in structures such as buildings, factories, warehouses, and garages. The multiple panel means are stored in the upper part, which is one of the peripheral parts of the opening in a building, etc., and move (lower) through the opening along the guide means, passing through a lintel or the like, to electrically open and close the opening. In addition, the watertight opening and closing means may be stored in the lower part of the opening and electrically open and close using an upward movement method, or the watertight opening and closing means may be stored in the side and electrically move using a sliding method. Additionally, the watertight opening and closing means includes both those that can completely close the opening when closed and those that cannot.
水平圧迫手段は、止水開閉手段によって開口部が閉鎖された後又はこの閉鎖後に止水開始ボタンが操作された後に複数のパネル手段に対して水平移動方向へ圧迫力を加える。水平圧迫手段が水平移動方向へ圧迫力を加える処理を水平圧迫処理という。この水平圧迫処理によって複数のパネル手段はガイド手段の内壁面に圧迫されて接触するようになり水密性が高まるようになっている。一方、垂直圧迫手段は、止水開閉手段によって開口部が閉鎖された後に複数のパネル手段に対して垂直移動方向へ圧迫力を加える。垂直圧迫手段が垂直移動方向へ圧迫力を加える処理を垂直圧迫処理という。この垂直圧迫処理によってそれぞれ垂直方向で圧迫されて接触する複数のパネル手段間の水密性が高まるようになっている。 The horizontal compression means applies a compression force to the multiple panel means in the horizontal movement direction after the opening is closed by the watertight opening/closing means or after the watertight start button is operated after this closure. The process in which the horizontal compression means applies a compression force in the horizontal movement direction is called the horizontal compression process. This horizontal compression process causes the multiple panel means to be compressed against the inner wall surface of the guide means and come into contact with each other, thereby improving watertightness. On the other hand, the vertical compression means applies a compression force to the multiple panel means in the vertical movement direction after the opening is closed by the watertight opening/closing means. The process in which the vertical compression means applies a compression force in the vertical movement direction is called the vertical compression process. This vertical compression process improves watertightness between the multiple panel means that are compressed vertically and come into contact with each other.
この発明は、水平圧迫手段による第1水平圧迫処理を実行し、その後に第1垂直圧迫処理を実行し、第1水平圧迫処理を停止した後にさらに第2水平圧迫処理を実行するようにしたものである。複数のパネル手段に対して第1水平圧迫処理を実行することによって、複数のパネル手段はガイド手段の内壁面に圧迫されて接触するようになり、複数のパネル手段とガイド手段との間に存在していた間隙は消滅し、複数のパネル手段が個々に傾きを生じることもなくなり、複数のパネル手段はガイド手段の内壁面に沿って一直線を維持することになる。この第1水平圧迫処理の後に第1垂直圧迫処理を実行することによって一直線を維持している複数のパネル手段に対して垂直圧迫手段から垂直移動方向への圧迫力が加わるようになるので、垂直方向で効率的に圧迫されて接触するようになり複数のパネル手段間の水密性を高めることができるようになる。この発明では、第1垂直圧迫処理によって複数のパネル手段が垂直移動方向へ移動するようになるので、第1垂直圧迫処理の後に第2水平圧迫処理を実行するようにしている。第2水平圧迫処理によって垂直方向に移動した複数のパネル手段はガイド手段の内壁面に効率的に圧迫されて接触するようになり水密性が格段に高まる。 In this invention, a first horizontal compression process is performed by a horizontal compression means, a first vertical compression process is then performed, and a second horizontal compression process is performed after the first horizontal compression process is stopped. By performing the first horizontal compression process on the multiple panel means, the multiple panel means are compressed and come into contact with the inner wall surface of the guide means, the gaps that existed between the multiple panel means and the guide means disappear, the multiple panel means do not tilt individually, and the multiple panel means maintain a straight line along the inner wall surface of the guide means. By performing the first vertical compression process after this first horizontal compression process, a compression force in the vertical movement direction is applied from the vertical compression means to the multiple panel means that maintain a straight line, so that they are efficiently compressed in the vertical direction and come into contact, thereby improving the watertightness between the multiple panel means. In this invention, since the multiple panel means move in the vertical movement direction by the first vertical compression process, the second horizontal compression process is performed after the first vertical compression process. The multiple panel means that are moved vertically by the second horizontal compression process are efficiently compressed and come into contact with the inner wall surface of the guide means, dramatically improving watertightness.
例えば、図2及び図4に示す制御では、時刻t10に第1水平圧迫処理を実行し、その後の時刻t14に第1垂直圧迫処理を実行し、時刻t13に第1水平圧迫処理を停止し、その後の時刻T18に第2水平圧迫処理を実行している。
図3に示す制御では、時刻t20に第1水平圧迫処理を実行し、その後の時刻t22に第1垂直圧迫処理を実行し、時刻t24に第1水平圧迫処理を停止し、その後の時刻T27に第2水平圧迫処理を実行している。
For example, in the control shown in Figures 2 and 4, a first horizontal compression process is executed at time t10, a first vertical compression process is executed at a subsequent time t14, the first horizontal compression process is stopped at time t13, and a second horizontal compression process is executed at a subsequent time t18.
In the control shown in FIG. 3, a first horizontal compression process is executed at time t20, a first vertical compression process is executed at the following time t22, the first horizontal compression process is stopped at time t24, and a second horizontal compression process is executed at the following time t27.
本発明の止水開閉体装置の制御装置の第2の特徴は、前記第1の特徴に記載の止水開閉体装置の制御装置において、前記第1水平圧迫処理を実行後に前記第1垂直圧迫処理を実行し、前記第1水平圧迫処理停止後に第2水平圧迫処理を実行し、前記第1垂直圧迫処理停止後に第2垂直圧迫処理を実行することにある。
これは、水平圧迫手段による第1水平圧迫処理を実行し、その後に垂直圧迫手段による第1垂直圧迫処理を実行するという動作と、水平圧迫手段による第1水平圧迫処理を停止した後に第2水平圧迫処理を実行するという動作と、垂直圧迫手段による第1垂直圧迫処理を停止した後に第2垂直圧迫処理を実行するという動作を、止水開閉体装置に行わせるようにしたものである。
A second feature of the control device for a watertight opening/closing body device of the present invention is that, in the control device for a watertight opening/closing body device described in the first feature, the first vertical compression process is executed after the first horizontal compression process is executed, the second horizontal compression process is executed after the first horizontal compression process is stopped, and the second vertical compression process is executed after the first vertical compression process is stopped.
This is configured to have the watertight opening/closing body device perform the following operations: execute a first horizontal compression process using the horizontal compression means, and then execute a first vertical compression process using the vertical compression means; execute a second horizontal compression process after stopping the first horizontal compression process using the horizontal compression means; and execute the second vertical compression process after stopping the first vertical compression process using the vertical compression means.
すなわち、水平圧迫手段による第1水平圧迫処理を実行し、その後に第1垂直圧迫処理を実行する。第1水平圧迫処理を停止する時刻と、第1垂直圧迫処理の実行を開始する時刻は任意である。第1水平圧迫処理を停止した後に第2水平圧迫処理を実行する。第2水平圧迫処理の実行を開始する時刻は任意である。第1垂直圧迫処理を停止した後に第2垂直圧迫処理を実行する。第1垂直圧迫処理を停止する時刻と、第2垂直圧迫処理の実行を開始する時刻は任意である。
図2及び図4に示すように、水平圧迫手段による第1水平圧迫処理を実行し、その後に第1垂直圧迫処理を実行するが、第1水平圧迫処理を停止後に第1垂直圧迫処理を実行する。また、第1水平圧迫処理を停止した後に第2水平圧迫処理を実行するが、第1垂直圧迫処理停止後、所定時間が経過した時点でに第2水平圧迫処理の実行を開始する。さらに、第1垂直圧迫処理を停止した後に第2垂直圧迫処理を実行するが、第2水平圧迫処理停止後に第2垂直圧迫処理の実行を開始する。
That is, a first horizontal compression process is executed by the horizontal compression means, and then a first vertical compression process is executed. The time at which the first horizontal compression process is stopped and the time at which the execution of the first vertical compression process is started are arbitrary. The second horizontal compression process is executed after the first horizontal compression process is stopped. The time at which the execution of the second horizontal compression process is started are arbitrary. The second vertical compression process is executed after the first vertical compression process is stopped. The time at which the first vertical compression process is stopped and the time at which the execution of the second vertical compression process is started are arbitrary.
2 and 4, a first horizontal compression process is performed by the horizontal compression means, and then a first vertical compression process is performed, but the first vertical compression process is performed after the first horizontal compression process is stopped. Also, a second horizontal compression process is performed after the first horizontal compression process is stopped, but the second horizontal compression process starts when a predetermined time has elapsed after the first vertical compression process is stopped. Furthermore, a second vertical compression process is performed after the first vertical compression process is stopped, but the second vertical compression process starts after the second horizontal compression process is stopped.
また、図3に示すように、水平圧迫手段による第1水平圧迫処理を実行し、その後に第1垂直圧迫処理を実行するが、パネル手段はガイド手段の内壁面に圧迫されて接触した時点で第1垂直圧迫処理を実行する。また、第1水平圧迫処理を停止した後に第2水平圧迫処理を実行するが、第1垂直圧迫処理停止後、所定時間が経過した時点で第2水平圧迫処理の実行を開始する。さらに、第1垂直圧迫処理を停止した後に第2垂直圧迫処理を実行するが、第2水平圧迫処理開始から所定時間が経過した時点又はフィードバック信号が所定値に達した時点で第2垂直圧迫処理の実行を開始する。
すなわち、第2の特徴に記載の止水開閉体手段の制御装置は、図2~び図4に示す制御及びその変形例を含むものである。
3, the first horizontal compression process is performed by the horizontal compression means, and then the first vertical compression process is performed, with the panel means performing the first vertical compression process when it is pressed against the inner wall surface of the guide means and comes into contact with the inner wall surface of the guide means. The second horizontal compression process is performed after the first horizontal compression process is stopped, with the second horizontal compression process starting when a predetermined time has elapsed after the first vertical compression process is stopped. The second vertical compression process is performed after the first vertical compression process is stopped, with the second vertical compression process starting when a predetermined time has elapsed after the start of the second horizontal compression process or when the feedback signal reaches a predetermined value.
That is, the control device for the watertight opening/closing body means described in the second feature includes the controls shown in Figs. 2 to 4 and their modified examples.
例えば、図2及び図4に示す制御では、時刻t10に第1水平圧迫処理を実行し、その後の時刻t14に第1垂直圧迫処理を実行し、時刻t13に第1水平圧迫処理を停止し、その後の時刻t18に第2水平圧迫処理を実行し、時刻t17に第1垂直圧迫処理を停止し、その後の時刻t1aに第2垂直圧迫処理を実行している。
図3に示す制御では、時刻t20に第1水平圧迫処理を実行し、その後の時刻t22に第1垂直圧迫処理を実行し、時刻t24に第1水平圧迫処理を停止し、その後の時刻T27に第2水平圧迫処理を実行し、時刻t26に第1垂直圧迫処理を停止し、その後の時刻t28に第2垂直圧迫処理を実行している。
For example, in the control shown in Figures 2 and 4, a first horizontal compression process is executed at time t10, a first vertical compression process is executed at a subsequent time t14, the first horizontal compression process is stopped at time t13, a second horizontal compression process is executed at a subsequent time t18, the first vertical compression process is stopped at time t17, and a second vertical compression process is executed at a subsequent time t1a.
In the control shown in FIG. 3 , a first horizontal compression process is executed at time t20, a first vertical compression process is executed at a subsequent time t22, the first horizontal compression process is stopped at time t24, a second horizontal compression process is executed at a subsequent time t27, the first vertical compression process is stopped at time t26, and a second vertical compression process is executed at a subsequent time t28.
本発明の止水開閉体装置の制御装置の第3の特徴は、前記第2の特徴に記載の止水開閉体装置の制御装置において、前記第1水平圧迫処理実行後の所定条件達成時に前記第1水平圧迫処理を停止し、前記第1水平圧迫処理実行後の所定条件達成時に前記第1垂直圧迫処理を実行し、前記第1垂直圧迫処理実行後の所定条件達成時に前記第1垂直圧迫処理を停止し、前記第1水平圧迫処理停止後の所定条件達成時に前記第2水平圧迫処理を実行し、前記第1垂直圧迫処理停止後の所定条件達成時に前記第2垂直圧迫処理を実行し、前記第2水平圧迫処理実行後の所定条件達成時に前記第2水平圧迫処理を停止し、前記第2垂直圧迫処理実行後の所定条件達成時に前記第2垂直圧迫処理を停止することにある。 The third feature of the control device for a watertight opening/closing device of the present invention is that, in the control device for a watertight opening/closing device described in the second feature, the first horizontal compression process is stopped when a predetermined condition is met after the first horizontal compression process is executed, the first vertical compression process is executed when a predetermined condition is met after the first horizontal compression process is executed, the first vertical compression process is stopped when a predetermined condition is met after the first vertical compression process is executed, the second horizontal compression process is executed when a predetermined condition is met after the first vertical compression process is stopped, the second vertical compression process is executed when a predetermined condition is met after the first vertical compression process is stopped, the second horizontal compression process is stopped when a predetermined condition is met after the second horizontal compression process is executed, and the second vertical compression process is stopped when a predetermined condition is met after the second vertical compression process is executed.
これは、各処理の実行開始時刻及び停止時刻をそれぞれの条件に応じて制御するようにしたものである。すなわち、第1水平圧迫処理は止水開閉手段によって開口部が閉鎖された後又はこの閉鎖後に止水開始ボタンが操作された後に実行を開始し、これ以降の各処理の開始及び停止は所定条件達成時点で実行される。 This allows the start and stop times of each process to be controlled according to the respective conditions. In other words, the first horizontal compression process starts to be executed after the opening is closed by the water stop opening/closing means or after the water stop start button is operated after this closure, and each process thereafter starts and stops when a predetermined condition is met.
図2又は図4に示すように、第1水平圧迫処理実行後の所定条件達成後(フィードバック信号H1,H2が第1所定値1.0〔A〕に達した時点で)に第1水平圧迫処理を停止し、第1水平圧迫処理実行後の所定条件達成後(第1水平圧迫処理停止後に所定時間(5秒)経過後)に第1垂直圧迫処理を実行し、第1垂直圧迫処理実行後の所定条件達成後(フィードバック信号V1~V4が第2所定値1.0〔A〕に達した時点で)に第1垂直圧迫処理を停止し、第1水平圧迫処理停止後の所定条件達成後(第1垂直圧迫処理停止後に所定時間(8秒)経過後)さらに第2水平圧迫処理を実行し、第1垂直圧迫処理停止後の所定条件達成後(第2水平圧迫処理停止後に所定時間(5秒)経過後)さらに第2垂直圧迫処理を実行し、第2水平圧迫処理実行後の所定条件達成後(図2ではフィードバック信号H1,H2が第3所定値4.0〔A〕に達した時点、図4ではフィードバック信号H1,H2が第4所定値3.0〔A〕に達した時刻から所定時間(約1秒)経過した時点)に第2水平圧迫処理を停止し、第2垂直圧迫処理実行後の所定条件達成後(図2ではフィードバック信号V1~V4が第5所定値4.0〔A〕に達した時点、図4ではフィードバック信号H1,H2が第6所定値3.0〔A〕に達した時刻から所定時間(約1秒)経過した時点)に第2垂直圧迫処理を停止する。 As shown in FIG. 2 or FIG. 4 , the first horizontal compression process is stopped after a predetermined condition is met after the first horizontal compression process is executed (when the feedback signals H1 and H2 reach a first predetermined value of 1.0 [A]), the first vertical compression process is executed after a predetermined condition is met after the first horizontal compression process is executed (when a predetermined time (5 seconds) has elapsed after the first horizontal compression process is stopped), the first vertical compression process is stopped after a predetermined condition is met after the first vertical compression process is executed (when the feedback signals V1 to V4 reach a second predetermined value of 1.0 [A]), the second horizontal compression process is further executed after a predetermined condition is met after the first horizontal compression process is stopped (when a predetermined time (8 seconds) has elapsed after the first vertical compression process is stopped), and the second horizontal compression process is executed after a predetermined condition is met after the first vertical compression process is stopped (when a predetermined time (8 seconds) has elapsed after the first vertical compression process is stopped). A second vertical compression process is further executed after a predetermined time (5 seconds) has elapsed after the horizontal compression process has been stopped, and the second horizontal compression process is stopped after a predetermined condition has been met after the second horizontal compression process has been executed (the point in time when the feedback signals H1 and H2 reach the third predetermined value of 4.0 [A] in FIG. 2, and the point in time when a predetermined time (about 1 second) has elapsed since the feedback signals H1 and H2 reach the fourth predetermined value of 3.0 [A] in FIG. 4 ). The second vertical compression process is stopped after a predetermined condition has been met after the second vertical compression process has been executed (the point in time when the feedback signals V1 to V4 reach the fifth predetermined value of 4.0 [A] in FIG. 2, and the point in time when a predetermined time (about 1 second) has elapsed since the feedback signals H1 and H2 reach the sixth predetermined value of 3.0 [A] in FIG. 4).
また、図3に示すように、第1水平圧迫処理実行後の所定条件達成後(フィードバック信号H1,H2が第1所定値1.0〔A〕に達した時点で)に第1水平圧迫処理を停止し、第1水平圧迫処理実行後の所定条件達成後(フィードバック信号H1,H2が所定値0.5〔A〕より大きくなった後)に第1垂直圧迫処理を実行し、第1垂直圧迫処理実行後の所定条件達成後(フィードバック信号V1~V4が第2所定値1.0〔A〕に達した時点で)に第1垂直圧迫処理を停止し、第1水平圧迫処理停止後の所定条件達成後(第1垂直圧迫処理停止後に所定時間(8秒)経過後)さらに第2水平圧迫処理を実行し、第1垂直圧迫処理停止後の所定条件達成後(フィードバック信号H1,H2が第1所定値1.0〔A〕に達した時点で)さらに第2垂直圧迫処理を実行し、第2水平圧迫処理実行後の所定条件達成後(フィードバック信号H1,H2が第3所定値4.0〔A〕に達した時点で)に第2水平圧迫処理を停止し、第2垂直圧迫処理実行後の所定条件達成後(フィードバック信号V1~V4が第5所定値4.0〔A〕に達した時点で)に第2垂直圧迫処理を停止する。なお、第2水平圧迫処理及び第2垂直圧迫処理の停止時点は、図4のようにフィードバック信号が第4及び第6所定値に達した時刻から所定時間経過後でもよい。 As shown in FIG. 3 , the first horizontal compression process is stopped after a predetermined condition is met (when the feedback signals H1 and H2 reach a first predetermined value of 1.0 [A]) after the first horizontal compression process is executed, the first vertical compression process is executed after a predetermined condition is met (after the feedback signals H1 and H2 become greater than a predetermined value of 0.5 [A]) after the first horizontal compression process is executed, the first vertical compression process is stopped after a predetermined condition is met (when the feedback signals V1 to V4 reach a second predetermined value of 1.0 [A]) after the first horizontal compression process is stopped, and the first vertical compression process is started after a predetermined condition is met (after the feedback signals V1 to V4 reach a second predetermined value of 1.0 [A]) after the first horizontal compression process is stopped. The second horizontal compression process is further executed after a predetermined time (8 seconds) has elapsed since the first vertical compression process was stopped, the second vertical compression process is further executed after a predetermined condition has been met since the first vertical compression process was stopped (when the feedback signals H1 and H2 reach a first predetermined value of 1.0 [A]), the second horizontal compression process is stopped after a predetermined condition has been met since the second horizontal compression process was executed (when the feedback signals H1 and H2 reach a third predetermined value of 4.0 [A]), and the second vertical compression process is stopped after a predetermined condition has been met since the second vertical compression process was executed (when the feedback signals V1 to V4 reach a fifth predetermined value of 4.0 [A]). Note that the second horizontal compression process and the second vertical compression process may be stopped after a predetermined time has elapsed since the feedback signals reach the fourth and sixth predetermined values as shown in FIG.
第3の特徴に記載の止水開閉体手段の制御装置は、図2~図4に示す制御を含むものである。例えば、図2及び図4に示す制御では、時刻t10に第1水平圧迫処理を実行し、その後の所定条件達成時t13に第1水平圧迫処理を停止し、第1水平圧迫処理実行後の所定条件達成時t14に第1垂直圧迫処理を実行し、第1垂直圧迫処理実行後の所定条件達成時t17に第1垂直圧迫処理を停止し、第1水平圧迫処理停止後の所定条件達成時t18に第2水平圧迫処理を実行し、第1垂直圧迫処理停止後の所定条件達成時t1aに第2垂直圧迫処理を実行し、第2水平圧迫処理実行後の所定条件達成時t19に第2水平圧迫処理を停止し、第2垂直圧迫処理実行後の所定条件達成時t1bに第2垂直圧迫処理を停止している。 The control device for the watertight opening/closing body means described in the third feature includes the control shown in Figs. 2 to 4. For example, in the control shown in Figs. 2 and 4, the first horizontal compression process is executed at time t10, the first horizontal compression process is stopped at time t13 when a predetermined condition is met thereafter, the first vertical compression process is executed at time t14 when a predetermined condition is met after the first horizontal compression process is executed, the first vertical compression process is stopped at time t17 when a predetermined condition is met after the first vertical compression process is executed, the second horizontal compression process is executed at time t18 when a predetermined condition is met after the first horizontal compression process is stopped, the second vertical compression process is executed at time t1a when a predetermined condition is met after the first vertical compression process is stopped, the second horizontal compression process is stopped at time t19 when a predetermined condition is met after the second horizontal compression process is executed, and the second vertical compression process is stopped at time t1b when a predetermined condition is met after the second vertical compression process is executed.
図3に示す制御では、時刻t20に第1水平圧迫処理を実行し、その後の所定条件達成時t24に第1水平圧迫処理を停止し、第1水平圧迫処理実行後の所定条件達成時t22に第1垂直圧迫処理を実行し、第1垂直圧迫処理実行後の所定条件達成時t26に第1垂直圧迫処理を停止し、第1水平圧迫処理停止後の所定条件達成時t27に第2水平圧迫処理を実行し、第1垂直圧迫処理停止後の所定条件達成時t28に第2垂直圧迫処理を実行し、第2水平圧迫処理実行後の所定条件達成時t29に第2水平圧迫処理を停止し、第2垂直圧迫処理実行後の所定条件達成時t2aに第2垂直圧迫処理を停止している。 In the control shown in FIG. 3, the first horizontal compression process is executed at time t20, the first horizontal compression process is stopped at t24 when a predetermined condition is met thereafter, the first vertical compression process is executed at t22 when a predetermined condition is met after the first horizontal compression process is executed, the first vertical compression process is stopped at t26 when a predetermined condition is met after the first vertical compression process is executed, the second horizontal compression process is executed at t27 when a predetermined condition is met after the first horizontal compression process is stopped, the second vertical compression process is executed at t28 when a predetermined condition is met after the first vertical compression process is stopped, the second horizontal compression process is stopped at t29 when a predetermined condition is met after the second horizontal compression process is executed, and the second vertical compression process is stopped at t2a when a predetermined condition is met after the second vertical compression process is executed.
なお、第3の特徴に記載の所定条件を種々変更することによってさまざまな制御の変形例に対応可能となる。この実施の形態では、所定条件として、所定時間が経過したか否か、フィードバック信号が所定値に達したか否か、又はフィードバック信号が所定値に達した後に所定時間が経過したか否かに基づいて判定しているが、止水開閉体装置の複数のパネル手段が水平圧迫処理及び垂直圧迫処理時に実際に水平方向及び垂直方向にどの程度移動するのかその移動量を測定しておき、その移動量に到達したか否かを制御時の所定条件としてもよい。 Note that various modifications of the control can be accommodated by modifying the predetermined condition described in the third feature in various ways. In this embodiment, the predetermined condition is determined based on whether a predetermined time has elapsed, whether the feedback signal has reached a predetermined value, or whether a predetermined time has elapsed after the feedback signal reached a predetermined value. However, the amount of movement of the multiple panel means of the watertight opening/closing device in the horizontal and vertical directions during the horizontal and vertical compression processes may be measured, and the predetermined condition during control may be determined based on whether the amount of movement has been reached.
本発明の止水開閉体装置の制御装置の第4の特徴は、前記第2又は第3の特徴に記載の止水開閉体装置の制御装置において、前記第1水平圧迫処理を実行後に、前記第1水平圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第1水平圧迫処理を停止し、前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第1垂直圧迫処理を実行し、前記第1垂直圧迫処理実行後に、前記第1垂直圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第1垂直圧迫処理を停止し、前記第1水平圧迫処理停止後に、前記第1垂直圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第2水平圧迫処理を実行し、前記第1垂直圧迫処理停止後に、前記第2水平圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第2垂直圧迫処理を実行し、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が所定値に達した時に、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が所定値に達してから所定時間が経過した時に、又は前記第2水平圧迫処理実行後に所定時間が経過した時に前記第2水平圧迫処理を停止し、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が所定値に達した時に、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が所定値に達してから所定時間が経過した時に、又は前記第2垂直圧迫処理実行後に所定時間が経過した時に前記第2垂直圧迫処理を停止することにある。 A fourth feature of the control device for a watertight opening/closing body device of the present invention is a control device for a watertight opening/closing body device according to the second or third feature, wherein after the first horizontal compression process is executed, the first horizontal compression process is stopped when a feedback signal of the first horizontal compression process reaches a predetermined value or when a predetermined time has elapsed, after the first horizontal compression process is executed, the first vertical compression process is executed when a feedback signal of the first horizontal compression process reaches a predetermined value or when a predetermined time has elapsed, after the first horizontal compression process is executed, the first vertical compression process is stopped when a feedback signal of the first vertical compression process reaches a predetermined value or when a predetermined time has elapsed, after the first horizontal compression process is stopped, the second horizontal compression process is executed when a feedback signal of the first vertical compression process reaches a predetermined value or when a predetermined time has elapsed, and the first vertical compression process is stopped. and stopping the second horizontal compression process when a feedback signal of the second horizontal compression process reaches a predetermined value after execution of the second horizontal compression process, when a predetermined time has elapsed since the feedback signal of the second horizontal compression process reaches a predetermined value after execution of the second horizontal compression process, or when a predetermined time has elapsed since the second horizontal compression process is executed, and stopping the second vertical compression process when a feedback signal of the second vertical compression process reaches a predetermined value after execution of the second vertical compression process , when a predetermined time has elapsed since the feedback signal of the second vertical compression process reaches a predetermined value after execution of the second vertical compression process, or when a predetermined time has elapsed since the second vertical compression process is executed.
これは、各処理の実行開始時刻及び停止時刻を所定時間経過したか又はフィードバック信号が所定値に達したかに応じて制御するようにしたものである。すなわち、第1水平圧迫処理は止水開閉手段によって開口部が閉鎖された後又はこの閉鎖後に止水開始ボタンが操作された後に実行を開始し、これ以降の各処理の開始及び停止は所定時間が経過したか否かの判定又はフィードバック信号が所定値に達したか否かの判断に応じてそれぞれ実行される。ここで、フィードバック信号が所定値に達した時の時間を予め記録しておくことによって、フィードバック信号が所定値に達したか否かを判定しなくても、記録しておいた時間に対応した時間が経過した時点で各処理の開始及び停止を行うようにすることができる。なお、全ての処理の実行開始時刻及び停止時刻を予め設定した時間で制御することも可能である。この場合は、予め止水開閉体装置の開閉動作及び圧迫動作を実行し、その時間を計測記録しておくことで対応可能である。また、第2水平圧迫処理及び第2垂直圧迫処理の停止時点については、図4のようにフィードバック信号が所定値に達した時刻から所定時間経過後とすることも可能である。 This is a system in which the start and stop times of each process are controlled according to whether a predetermined time has elapsed or the feedback signal has reached a predetermined value. That is, the first horizontal compression process is started after the opening is closed by the water stop opening/closing means or after the water stop start button is operated after this closure, and the start and stop of each subsequent process is executed according to whether a predetermined time has elapsed or whether the feedback signal has reached a predetermined value. Here, by recording the time when the feedback signal reaches a predetermined value in advance, each process can be started and stopped at the time when the time corresponding to the recorded time has elapsed without judging whether the feedback signal has reached a predetermined value. It is also possible to control the start and stop times of all processes with a preset time. In this case, it is possible to handle this by performing the opening/closing operation and compression operation of the water stop opening/closing body device in advance and measuring and recording the time. In addition, the stop time of the second horizontal compression process and the second vertical compression process can be set to a predetermined time after the feedback signal reaches a predetermined value as shown in FIG. 4.
本発明の止水開閉体装置の制御装置の第5の特徴は、前記第2、第3又は第4の特徴に記載の止水開閉体装置の制御装置において、前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が第1所定値に達した時に、又は前記第1水平圧迫処理のフィードバック信号が前記第1所定値に達する時間を経過した時に、前記第1水平圧迫処理を停止し、前記第1水平圧迫処理停止後の所定時間経過時に前記第1垂直圧迫処理を実行し、前記第1垂直圧迫処理実行後に、前記第1垂直圧迫処理のフィードバック信号が第2所定値に達した時に、又は前記第1垂直圧迫処理のフィードバック信号が前記第2所定値に達する時間を経過した時に、前記第1垂直圧迫処理を停止し、前記第1垂直圧迫処理停止後の所定時間経過時に前記第2水平圧迫処理を実行し、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が第3所定値に達した時に、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値よりも小さな第4所定値に達してから所定時間が経過した時に、又は前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値に達する時間を経過した時に前記第2水平圧迫処理を停止し、前記第2水平圧迫処理停止後の所定時間経過時に前記第2垂直圧迫処理を実行し、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が第5所定値に達した時に、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値よりも小さな第6所定値に達してから所定時間が経過した時に、又は前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値に達する時間を経過した時に前記第2垂直圧迫処理を停止することにある。
これは、図2又は図4の制御処理に対応したものである。
A fifth feature of the control device for a watertight opening/closing body device of the present invention is a control device for a watertight opening/closing body device according to the second, third or fourth feature, wherein, after execution of the first horizontal compression process, when a feedback signal of the first horizontal compression process reaches a first predetermined value or when a time has passed for the feedback signal of the first horizontal compression process to reach the first predetermined value, the first horizontal compression process is stopped, the first vertical compression process is executed when a predetermined time has passed after the first horizontal compression process is stopped, after execution of the first vertical compression process, when a feedback signal of the first vertical compression process reaches a second predetermined value or when a time has passed for the feedback signal of the first vertical compression process to reach the second predetermined value, the first vertical compression process is stopped when a feedback signal of the first vertical compression process reaches a second predetermined value or when a time has passed for the feedback signal of the first vertical compression process to reach the second predetermined value, the second horizontal compression process is executed when a predetermined time has passed after the first vertical compression process is stopped, the second horizontal compression process is stopped when the feedback signal of the second horizontal compression process reaches a predetermined value, when a predetermined time has elapsed since the feedback signal of the second horizontal compression process reaches a fourth predetermined value smaller than the third predetermined value after execution of the second horizontal compression process, or when a time has elapsed for the feedback signal of the second horizontal compression process to reach the third predetermined value after execution of the second horizontal compression process; the second vertical compression process is executed when a predetermined time has elapsed after the stop of the second horizontal compression process; and the second vertical compression process is stopped when the feedback signal of the second vertical compression process reaches a fifth predetermined value after execution of the second vertical compression process, when a predetermined time has elapsed since the feedback signal of the second vertical compression process reaches a sixth predetermined value smaller than the fifth predetermined value after execution of the second vertical compression process, or when a time has elapsed for the feedback signal of the second vertical compression process to reach the fifth predetermined value after execution of the second vertical compression process.
This corresponds to the control process shown in FIG.
本発明の止水開閉体装置の制御装置の第6の特徴は、前記第2、第3又は第4の特徴に記載の止水開閉体装置の制御装置において、前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が第1所定値に達した時に、又は前記第1水平圧迫処理のフィードバック信号が前記第1所定値に達する時間を経過した時に、前記第1水平圧迫処理を停止し、
前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が第7所定値に達した時に、又は前記第1水平圧迫処理のフィードバック信号が前記第7所定値に達する時間を経過した時に、前記第1垂直圧迫処理を実行し、
前記第1垂直圧迫処理実行後に、前記第1垂直圧迫処理のフィードバック信号が第2所定値に達した時に、又は前記第1垂直圧迫処理のフィードバック信号が第2所定値に達する時間を経過した時に、前記第1垂直圧迫処理を停止し、
前記第1垂直圧迫処理停止後に所定時間が経過した時に前記第2水平圧迫処理を実行し、
前記第2水平圧迫処理実行後に、前記第2水平圧迫処理のフィードバック信号が第1所定値に達した時に、又は前記第2水平圧迫処理のフィードバック信号が前記第1所定値に達する時間を経過した時に前記第2垂直圧迫処理を実行し、
前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が第3所定値に達した時に、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値よりも小さな第4所定値に達してから所定時間が経過した時に、又は前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値に達する時間を経過した時に前記第2水平圧迫処理を停止し、
前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が第5所定値に達した時に、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値よりも小さな第6所定値に達してから所定時間が経過した時に、又は前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値に達する時間を経過した時に前記第2垂直圧迫処理を停止することにある。
これは、図3の制御処理に対応したものである。なお、第2水平圧迫処理及び第2垂直圧迫処理の停止時点については、図4のようにフィードバック信号が第4及び第6所定値に達した時刻から所定時間経過後とすることも可能である。
A sixth feature of the control device for a watertight opening/closing body device of the present invention is a control device for a watertight opening/closing body device according to the second, third or fourth feature, wherein after the first horizontal compression process is executed, when a feedback signal of the first horizontal compression process reaches a first predetermined value, or when a time has passed during which the feedback signal of the first horizontal compression process reaches the first predetermined value, the first horizontal compression process is stopped;
After the first horizontal compression process is executed, when a feedback signal of the first horizontal compression process reaches a seventh predetermined value or when a time for the feedback signal of the first horizontal compression process to reach the seventh predetermined value has elapsed, the first vertical compression process is executed;
After the first vertical compression process is performed, when a feedback signal of the first vertical compression process reaches a second predetermined value, or when a time for the feedback signal of the first vertical compression process to reach the second predetermined value has elapsed, the first vertical compression process is stopped;
Executing the second horizontal compression process when a predetermined time has elapsed after the first vertical compression process has been stopped;
After the second horizontal compression process is executed, when a feedback signal of the second horizontal compression process reaches a first predetermined value or when a time for the feedback signal of the second horizontal compression process to reach the first predetermined value has elapsed, the second vertical compression process is executed;
stopping the second horizontal compression process when a feedback signal of the second horizontal compression process reaches a third predetermined value after execution of the second horizontal compression process, when a predetermined time has elapsed since the feedback signal of the second horizontal compression process reaches a fourth predetermined value smaller than the third predetermined value after execution of the second horizontal compression process, or when a time has elapsed since the feedback signal of the second horizontal compression process reaches the third predetermined value after execution of the second horizontal compression process;
The second vertical compression process is stopped when the feedback signal of the second vertical compression process reaches a fifth predetermined value after execution of the second vertical compression process, when a predetermined time has elapsed since the feedback signal of the second vertical compression process reaches a sixth predetermined value smaller than the fifth predetermined value after execution of the second vertical compression process, or when a time has elapsed since the feedback signal of the second vertical compression process reaches the fifth predetermined value after execution of the second vertical compression process.
This corresponds to the control process in Fig. 3. The second horizontal compression process and the second vertical compression process may be stopped after a predetermined time has elapsed from the time when the feedback signal reaches the fourth and sixth predetermined values as in Fig. 4.
本発明の止水開閉体装置の制御方法の第1の特徴は、開口部の周縁部から複数のパネル手段をガイド手段に沿って移動させることによって前記開口部を閉鎖し、閉鎖後に前記複数のパネル手段に対して水平移動方向及び垂直移動方向へ圧迫力を加えることによって前記複数のパネル手段を水平方向及び垂直方向に圧迫する第1水平圧迫処理及び第1垂直圧迫処理をそれぞれ実行し、前記複数のパネル手段と前記ガイド手段との間の水密性及び垂直方向でそれぞれ接触する前記複数のパネル手段間の水密性を高める止水開閉体装置の制御方法において、前記第1水平圧迫処理を実行後に前記第1垂直圧迫処理を実行し、前記第1水平圧迫処理停止後に第2水平圧迫処理を実行することにある。
これは、前記止水開閉体装置の制御装置の第1の特徴に対応した制御方法の発明である。
A first feature of the control method for a watertight opening/closing body device of the present invention is to close an opening by moving a plurality of panel means along a guide means from the peripheral portion of the opening, and after the opening is closed, a first horizontal compression process and a first vertical compression process are performed to compress the plurality of panel means horizontally and vertically by applying a compression force to the plurality of panel means in the horizontal movement direction and the vertical movement direction, respectively, thereby increasing the watertightness between the plurality of panel means and the guide means and the watertightness between the plurality of panel means that are in contact with each other in the vertical direction, in that the first vertical compression process is performed after the first horizontal compression process is performed, and the second horizontal compression process is performed after the first horizontal compression process is stopped.
This is an invention of a control method corresponding to the first feature of the control device for the watertight opening/closing body device.
本発明の止水開閉体装置の制御方法の第2の特徴は、前記第1の特徴に記載の止水開閉体装置の制御方法において、前記第1水平圧迫処理を実行後に前記第1垂直圧迫処理を実行し、前記第1水平圧迫処理停止後に第2水平圧迫処理を実行し、前記第1垂直圧迫処理停止後に第2垂直圧迫処理を実行することにある。
これは、前記止水開閉体装置の制御装置の第2の特徴に対応した制御方法の発明である。
A second feature of the control method for a watertight opening/closing device of the present invention is that, in the control method for a watertight opening/closing device described in the first feature, the first vertical compression process is executed after the first horizontal compression process is executed, the second horizontal compression process is executed after the first horizontal compression process is stopped, and the second vertical compression process is executed after the first vertical compression process is stopped.
This is an invention of a control method corresponding to the second feature of the control device for the watertight opening/closing body device.
本発明の止水開閉体装置の制御方法の第3の特徴は、前記第2の特徴に記載の止水開閉体装置の制御方法において、 前記第1水平圧迫処理実行後の所定条件達成時に前記第1水平圧迫処理を停止し、前記第1水平圧迫処理実行後の所定条件達成時に前記第1垂直圧迫処理を実行し、前記第1垂直圧迫処理実行後の所定条件達成時に前記第1垂直圧迫処理を停止し、前記第1水平圧迫処理停止後の所定条件達成時に前記第2水平圧迫処理を実行し、前記第1垂直圧迫処理停止後の所定条件達成時に前記第2垂直圧迫処理を実行し、前記第2水平圧迫処理実行後の所定条件達成時に前記第2水平圧迫処理を停止し、前記第2垂直圧迫処理実行後の所定条件達成時に前記第2垂直圧迫処理を停止することにある。
これは、前記止水開閉体装置の制御装置の第3の特徴に対応した制御方法の発明である。
A third feature of the control method for a watertight opening/closing device of the present invention is that, in the control method for a watertight opening/closing device described in the second feature, the first horizontal compression process is stopped when a predetermined condition is met after the first horizontal compression process is executed, the first vertical compression process is executed when a predetermined condition is met after the first horizontal compression process is executed, the first vertical compression process is stopped when a predetermined condition is met after the first vertical compression process is executed, the second horizontal compression process is executed when a predetermined condition is met after the first horizontal compression process is stopped, the second vertical compression process is executed when a predetermined condition is met after the first vertical compression process is stopped, the second horizontal compression process is stopped when a predetermined condition is met after the second horizontal compression process is executed, and the second vertical compression process is stopped when a predetermined condition is met after the second vertical compression process is executed.
This is an invention of a control method corresponding to the third feature of the control device for the watertight opening/closing body device.
本発明の止水開閉体装置の制御方法の第4の特徴は、前記第2又は第3の特徴に記載の止水開閉体装置の制御方法において、前記第1水平圧迫処理を実行後に、前記第1水平圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第1水平圧迫処理を停止し、前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第1垂直圧迫処理を実行し、前記第1垂直圧迫処理実行後に、前記第1垂直圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第1垂直圧迫処理を停止し、前記第1水平圧迫処理停止後に、前記第1垂直圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第2水平圧迫処理を実行し、前記第1垂直圧迫処理停止後に、前記第2水平圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第2垂直圧迫処理を実行し、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が所定値に達した時に、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が所定値に達してから所定時間が経過した時に、又は前記第2水平圧迫処理実行後に所定時間が経過した時に前記第2水平圧迫処理を停止し、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が所定値に達した時に、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が所定値に達してから所定時間が経過した時に、又は前記第2垂直圧迫処理実行後に所定時間が経過した時に前記第2垂直圧迫処理を停止することにある。
これは、前記止水開閉体装置の制御装置の第4の特徴に対応した制御方法の発明である。
A fourth feature of the control method for a watertight opening/closing device of the present invention is a control method for a watertight opening/closing device according to the second or third feature, further comprising the steps of: after executing the first horizontal compression process, stopping the first horizontal compression process when a feedback signal of the first horizontal compression process reaches a predetermined value or when a predetermined time has elapsed; after executing the first horizontal compression process, executing the first vertical compression process when a feedback signal of the first horizontal compression process reaches a predetermined value or when a predetermined time has elapsed; after executing the first vertical compression process, stopping the first vertical compression process when a feedback signal of the first vertical compression process reaches a predetermined value or when a predetermined time has elapsed; after stopping the first horizontal compression process, executing the second horizontal compression process when a feedback signal of the first vertical compression process reaches a predetermined value or when a predetermined time has elapsed; and stopping the second horizontal compression process when a feedback signal of the second horizontal compression process reaches a predetermined value after execution of the second horizontal compression process, when a predetermined time has elapsed since the feedback signal of the second horizontal compression process reaches a predetermined value after execution of the second horizontal compression process, or when a predetermined time has elapsed since the second horizontal compression process is executed, and stopping the second vertical compression process when a feedback signal of the second vertical compression process reaches a predetermined value after execution of the second vertical compression process, when a predetermined time has elapsed since the feedback signal of the second vertical compression process reaches a predetermined value after execution of the second vertical compression process, or when a predetermined time has elapsed since the second vertical compression process is executed.
This is an invention of a control method corresponding to the fourth feature of the control device for the watertight opening/closing body device.
本発明の止水開閉体装置の制御方法の第5の特徴は、前記第2、第3又は第4の特徴に記載の止水開閉体装置の制御方法において、前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が第1所定値に達した時に、又は前記第1水平圧迫処理のフィードバック信号が前記第1所定値に達する時間を経過した時に、前記第1水平圧迫処理を停止し、前記第1水平圧迫処理停止後の所定時間経過時に前記第1垂直圧迫処理を実行し、前記第1垂直圧迫処理実行後に、前記第1垂直圧迫処理のフィードバック信号が第2所定値に達した時に、又は前記第1垂直圧迫処理のフィードバック信号が前記第2所定値に達する時間を経過した時に、前記第1垂直圧迫処理を停止し、前記第1垂直圧迫処理停止後の所定時間経過時に前記第2水平圧迫処理を実行し、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が第3所定値に達した時に、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値よりも小さな第4所定値に達してから所定時間が経過した時に、又は前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値に達する時間を経過した時に前記第2水平圧迫処理を停止し、前記第2水平圧迫処理停止後の所定時間経過時に前記第2垂直圧迫処理を実行し、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が第5所定値に達した時に、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値よりも小さな第6所定値に達してから所定時間が経過した時に、又は前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第6所定値に達する時間を経過した時に前記第2垂直圧迫処理を停止することにある。
これは、前記止水開閉体装置の制御装置の第5の特徴に対応した制御方法の発明である。
A fifth feature of the control method for a watertight opening/closing device of the present invention is a control method for a watertight opening/closing device according to the second, third or fourth feature, further comprising the steps of: after execution of the first horizontal compression process, when a feedback signal of the first horizontal compression process reaches a first predetermined value or when a time has passed for the feedback signal of the first horizontal compression process to reach the first predetermined value, stopping the first horizontal compression process; executing the first vertical compression process when a predetermined time has passed after the first horizontal compression process has been stopped; after execution of the first vertical compression process, when a feedback signal of the first vertical compression process reaches a second predetermined value or when a time has passed for the feedback signal of the first vertical compression process to reach the second predetermined value, stopping the first vertical compression process; the second horizontal compression process is stopped when the feedback signal of the second horizontal compression process reaches a predetermined value, when a predetermined time has elapsed since the feedback signal of the second horizontal compression process reaches a fourth predetermined value smaller than the third predetermined value after execution of the second horizontal compression process, or when a time has elapsed for the feedback signal of the second horizontal compression process to reach the third predetermined value after execution of the second horizontal compression process; the second vertical compression process is executed when a predetermined time has elapsed after the stop of the second horizontal compression process; and the second vertical compression process is stopped when the feedback signal of the second vertical compression process reaches a fifth predetermined value after execution of the second vertical compression process, when a predetermined time has elapsed since the feedback signal of the second vertical compression process reaches a sixth predetermined value smaller than the fifth predetermined value after execution of the second vertical compression process, or when a time has elapsed for the feedback signal of the second vertical compression process to reach the sixth predetermined value after execution of the second vertical compression process.
This is an invention of a control method corresponding to the fifth feature of the control device for the watertight opening/closing body device.
本発明の止水開閉体装置の制御方法の第6の特徴は、前記第2、第3又は第4の特徴に記載の止水開閉体装置の制御方法において、前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が第1所定値に達した時に、又は前記第1水平圧迫処理のフィードバック信号が前記第1所定値に達する時間を経過した時に、前記第1水平圧迫処理を停止し、
前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が第7所定値に達した時に、又は前記第1水平圧迫処理のフィードバック信号が前記第7所定値に達する時間を経過した時に、前記第1垂直圧迫処理を実行し、
前記第1垂直圧迫処理実行後に、前記第1垂直圧迫処理のフィードバック信号が第2所定値に達した時に、又は前記第1垂直圧迫処理のフィードバック信号が第2所定値に達する時間を経過した時に、前記第1垂直圧迫処理を停止し、
前記第1垂直圧迫処理停止後に所定時間が経過した時に前記第2水平圧迫処理を実行し、
前記第2水平圧迫処理実行後に、前記第2水平圧迫処理のフィードバック信号が第1所定値に達した時に、又は前記第2水平圧迫処理のフィードバック信号が前記第1所定値に達する時間を経過した時に前記第2垂直圧迫処理を実行し、
前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が第3所定値に達した時に、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値よりも小さな第4所定値に達してから所定時間が経過した時に、又は前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値に達する時間を経過した時に前記第2水平圧迫処理を停止し、
前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が第5所定値に達した時に、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値よりも小さな第6所定値に達してから所定時間が経過した時に、又は前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値に達する時間を経過した時に前記第2垂直圧迫処理を停止することにある。
これは、前記止水開閉体装置の制御装置の第6の特徴に対応した制御方法の発明である。
A sixth feature of the control method for a watertight opening/closing device of the present invention is, in the control method for a watertight opening/closing device according to the second, third or fourth feature, the first horizontal compression process is stopped when a feedback signal of the first horizontal compression process reaches a first predetermined value after the first horizontal compression process is executed, or when a time for the feedback signal of the first horizontal compression process to reach the first predetermined value has elapsed;
After the first horizontal compression process is executed, when a feedback signal of the first horizontal compression process reaches a seventh predetermined value or when a time for the feedback signal of the first horizontal compression process to reach the seventh predetermined value has elapsed, the first vertical compression process is executed;
After the first vertical compression process is performed, when a feedback signal of the first vertical compression process reaches a second predetermined value, or when a time for the feedback signal of the first vertical compression process to reach the second predetermined value has elapsed, the first vertical compression process is stopped;
Executing the second horizontal compression process when a predetermined time has elapsed after the first vertical compression process has been stopped;
After the second horizontal compression process is executed, the second vertical compression process is executed when a feedback signal of the second horizontal compression process reaches a first predetermined value or when a time for the feedback signal of the second horizontal compression process to reach the first predetermined value has elapsed;
stopping the second horizontal compression process when a feedback signal of the second horizontal compression process reaches a third predetermined value after execution of the second horizontal compression process, when a predetermined time has elapsed since the feedback signal of the second horizontal compression process reaches a fourth predetermined value smaller than the third predetermined value after execution of the second horizontal compression process, or when a time has elapsed since the feedback signal of the second horizontal compression process reaches the third predetermined value after execution of the second horizontal compression process;
The second vertical compression process is stopped when the feedback signal of the second vertical compression process reaches a fifth predetermined value after execution of the second vertical compression process, when a predetermined time has elapsed since the feedback signal of the second vertical compression process reaches a sixth predetermined value smaller than the fifth predetermined value after execution of the second vertical compression process, or when a time has elapsed since the feedback signal of the second vertical compression process reaches the fifth predetermined value after execution of the second vertical compression process.
This is an invention of a control method corresponding to the sixth feature of the control device for the watertight opening/closing body device.
本発明の止水開閉体装置の制御装置及び制御方法によれば、複数の止水パネルを垂直方向及び水平方向に圧迫する際に、止水パネル同士及び止水パネルとガイドレールとの間の水密性を向上させることのできるという効果がある。 The control device and control method for a watertight opening/closing device of the present invention have the effect of improving the watertightness between the watertight panels and between the watertight panels and the guide rails when compressing multiple watertight panels vertically and horizontally.
以下、添付図面に従って、本発明に係る止水開閉体装置の制御装置及び制御方法の好ましい実施の形態について説明する。この実施の形態では、止水開閉体装置として、開口部の周縁部から複数の止水パネルをガイドレールに沿って順次移動させることによって開口部を閉鎖する従来から知られている止水開閉体装置を例に説明する。
図1は、本発明の一実施の形態による止水開閉体装置の概略構成を示す図である。図1において、止水開閉体装置10は、複数の止水パネルを開口部の上下に移動させることによって開口部を開閉すると共に水密性を飛躍的に向上させている。
A preferred embodiment of a control device and a control method for a watertight opening/closing device according to the present invention will be described below with reference to the attached drawings. In this embodiment, a conventionally known watertight opening/closing device that closes an opening by sequentially moving a plurality of watertight panels along a guide rail from the periphery of the opening will be described as an example of the watertight opening/closing device.
Fig. 1 is a diagram showing the schematic configuration of a watertight opening/closing device according to an embodiment of the present invention. In Fig. 1, a watertight opening/
止水開閉体装置10は、建物等の構造物などの開口部や、地下鉄の駅や地下街の出入口などの開口部に設けられている。止水開閉体装置10は、制御装置20、パネル収納部30、止水パネル21~24、ガイドレール31,32、水平圧迫装置41,42、垂直圧迫装置51~54を含んで構成されている。この止水開閉体装置10の基本的な構造及び動作は特許文献1などに記載されており公知なので説明は省略する。
The watertight opening/
水平圧迫装置41,42及び垂直圧迫装置51~54は、モータを動力源とする伸縮アクチュエータで構成される。伸縮アクチュエータはモータの回転駆動力を伸縮ロッドの伸縮力に変換するものである。止水開閉体装置10では、水平圧迫装置41,42を構成する伸縮アクチュエータの伸縮力を利用して、止水パネル21~24をガイドレール31,32の内壁面に圧迫させる水平圧迫機構を内蔵している。この水平圧迫機構は、水平圧迫装置41,42を構成する伸縮アクチュエータのロッドが垂直方向(下方向)に伸縮移動した場合に、その伸縮移動を利用して止水パネル21~24をガイドレール31,32の内壁面に向かう方向(水平方向)に移動させるように構成されている。この水平圧迫機構についても既に公知なので説明は省略する。なお、止水パネルまたはガイドレールの内壁面には、ゴム製の水密材(水密性ゴム)が設けられていて、止水パネルとガイドレールはこの水密材を介して接触する。
The
垂直圧迫装置51~54は、伸縮アクチュエータの伸縮力を利用して、止水パネル24の上端部を垂直方向(下方向)に圧迫させる垂直圧迫機構を内蔵している。この水平圧迫機構は、垂直圧迫装置51~54を構成する伸縮アクチュエータのロッドが伸縮移動した場合に、その伸縮移動を利用して止水パネル24を垂直方向(下方向)に移動させるように構成されている。この垂直圧迫機構についても既に公知なので説明は省略する。なお、止水パネルと止水パネルとの間、止水パネルと床との間にもそれぞれ水密材(水密性ゴム)が設けられている。
The vertical compression devices 51-54 incorporate a vertical compression mechanism that uses the expansion and contraction force of the expansion actuator to compress the upper end of the
この実施の形態に係る止水開閉体装置10は、4個の垂直圧迫装置51~54で構成されている。垂直圧迫装置51,52は止水パネル24の左側上端部に接触し、垂直圧迫装置51,52の圧迫力を接触部材61を介して止水パネル24に伝達し、止水パネル24を垂直方向(下方向)に圧迫するように構成されている。垂直圧迫装置53,54は、止水パネル24の右側上端部に接触し、垂直圧迫装置53,54の圧迫力を接触部材63を介して止水パネル24に伝達し、止水パネル24を垂直方向(下方向)に圧迫するように構成されている。この実施の形態において、垂直圧迫装置の個数は一例であり、右側左側中央のそれぞれ3個所に垂直圧迫装置を設けてもよいし、止水パネル24の横方向の長尺が短い場合には、1~2個の垂直圧迫装置を設けてもよい。逆に、止水パネル24の横方向の長尺が長い場合には、4個以上の垂直圧迫装置を設けてもよい。
The watertight opening/
なお、この実施の形態では、2個の垂直圧迫装置51,52で一つの接触部材61を圧迫し、2個の垂直圧迫装置53,54で一つの接触部材63を圧迫する場合を示しているが、3個以上の垂直圧迫装置で一つの接触部材を圧迫するように構成してもよいし、1個乃至複数個の垂直圧迫装置を組み合わせて、それぞれ一つの接触部材を圧迫するように構成してもよい。例えば、左側及び右側の接触部材は2個の垂直圧迫装置で圧迫し、中央の接触部材は1又は3個の垂直圧迫装置で圧迫してもよい。
In this embodiment, two
図2は、止水開閉体装置の制御時における水平圧迫装置及び垂直圧迫装置の内蔵モータから得られる電流フィードバック信号の波形を示す図である。図2の信号波形は、止水開閉体装置10の複数の止水パネル21~24によって開口部が閉鎖された後に、止水パネル21~24の水密性を向上させるために水平圧迫装置41,42及び垂直圧迫装置51~54の制御時に得られる電流フィードバック信号の波形の一例である。止水開閉体装置10は、図2の電流フィードバック信号に基づいて制御される。従って、この電流フィードバック信号を見ることによって止水開閉体装置10はどのように制御されているかを知ることができる。また、電流フィードバック信号は駆動トルク、圧迫時には圧迫力が反映される。
Figure 2 shows the waveforms of the current feedback signals obtained from the built-in motors of the horizontal compression device and vertical compression device when the watertight opening/closing device is being controlled. The signal waveforms in Figure 2 are an example of the waveforms of the current feedback signals obtained when the
上側の波形H1,H2が水平圧迫装置41,42の電流フィードバック信号を示し、下側の波形V1~V4が垂直圧迫装置51~54の電流フィードバック信号を示す。水平圧迫装置41,42及び垂直圧迫装置51~54の各モータから得られる電流フィードバック信号H1,H2,V1~V4は実際はそれぞれ異なっているが、ここでは説明の便宜上、水平圧迫装置41,42と垂直圧迫装置51~54からは同じものが得られるものとして説明とする。
The upper waveforms H1 and H2 show the current feedback signals of the
止水開閉体装置10の複数の止水パネル21~24によって開口部が閉鎖された後の止水開始(止水ON)ボタンが操作される。止水開始ボタンの操作によって時刻t10で止水ONとなる。この止水ONによって水平圧迫装置41,42の電流フィードバック信号H1,H2は図に示すように線形的に上昇する。これは、モータが駆動を開始し水平圧迫装置41,42によって止水パネル21~24が水平方向への移動を開始したことを示す。
After the opening is closed by the multiple water stop panels 21-24 of the water stop opening/
第1水平圧迫処理開始後の時刻t11で電流フィードバック信号H1,H2の値は0.5〔A〕となり、時刻t11から時刻t12までの間で0.5〔A〕の定常状態を示す。これは、モータが時刻t11から時刻t12までの間、定速度で回転していること、すなわち、水平圧迫装置41,42によって止水パネル21~24が定速度で水平方向に移動していることを示す。
At time t11 after the start of the first horizontal compression process, the values of the current feedback signals H1 and H2 become 0.5 A, and between time t11 and time t12, they show a steady state of 0.5 A. This indicates that the motor is rotating at a constant speed between time t11 and time t12, that is, the waterstop panels 21-24 are moving horizontally at a constant speed by the
時刻t12で電流フィードバック信号H1,H2の値は再び線形的に上昇する。これは、水平圧迫装置41,42によって水平方向に移動していた止水パネル21~24がガイドレール31,32の内壁面に接触し、止水パネル21~24の水平方向の移動がパネルとガイドレールとの間の圧縮性のある水密性ゴムへの圧接によって抑止されることによって、モータの電流値が線形的に上昇したことを示す。
At time t12, the values of the current feedback signals H1 and H2 rise linearly again. This indicates that the waterstop panels 21-24, which had been moving horizontally by the
電流フィードバック信号H1,H2の値が第1所定値1.0〔A〕となった時刻t13で水平圧迫装置41,42のモータへの電力供給を停止する。これによって、止水パネル21~24に対する水平圧迫装置41,42による水平方向への圧迫制御は一時的に停止する。これによって止水パネル21~24には電流値1.0〔A〕のトルクに応じた水平方向の圧迫力が印可された状態が維持されることになる。水平圧迫装置41,42が時刻t10から時刻t13までの間に止水パネル21~24に対して水平方向へ圧迫力を加える処理を第1水平圧迫処理とする。
At time t13 when the values of the current feedback signals H1, H2 reach the first predetermined value 1.0 [A], the power supply to the motors of the
水平圧迫装置41,42のモータへの電力供給を停止してから約5秒後の時刻t14で、垂直圧迫装置51~54への電力供給が開始する。これによって、電流フィードバック信号V1~V4は図に示すように線形的に上昇する。これは、モータが駆動を開始し垂直圧迫装置51~54によって止水パネル21~24が垂直方向への移動を開始したことを示す。
At time t14, approximately 5 seconds after the power supply to the motors of the
時刻t15で電流フィードバック信号V1~V4の値は0.5〔A〕となり、時刻t15から時刻t16までの間で0.5〔A〕の定常状態を示す。これは、モータが時刻t15から時刻t16までの間、定速度で回転していること、すなわち、垂直圧迫装置51~54によって止水パネル21~24が定速度で垂直方向に移動していることを示す。
At time t15, the values of the current feedback signals V1 to V4 become 0.5 A, and the signal remains steady at 0.5 A between time t15 and time t16. This indicates that the motor is rotating at a constant speed between time t15 and time t16, i.e., the
時刻t16で電流フィードバック信号V1~V4の値は再び線形的に上昇する。これは、垂直圧迫装置51~54によって垂直方向に移動していた止水パネル21~24の垂直方向の移動がパネル間の圧縮性のある水密性ゴムへの圧接によって抑止されることによって、モータの電流値が線形的に上昇したことを示す。
At time t16, the values of the current feedback signals V1 to V4 rise linearly again. This indicates that the vertical movement of the
電流フィードバック信号V1~V4の値が第2所定値1.0〔A〕となった時刻t17で垂直圧迫装置51~54のモータへの電力供給を停止する。これによって、止水パネル21~24に対する垂直圧迫装置51~54による垂直方向への圧迫制御は一時的に停止する。これによって伸縮アクチュエータのロッドの位置が保持されることで止水パネル21~24には電流値1.0〔A〕のトルクに応じた垂直方向の圧迫力が印可された状態が維持されることになる。すなわち、弾性の反発力を有する水密材の介在によって、この状態が維持されることを意味する。垂直圧迫装置51~54が時刻t14から時刻t17までの間に止水パネル21~24に対して垂直方向へ圧迫力を加える処理を第1垂直圧迫処理とする。
At time t17 when the value of the current feedback signal V1 to V4 becomes the second predetermined value 1.0 [A], the power supply to the motors of the
垂直圧迫装置51~54のモータへの電力供給を停止してから約8秒後の時刻t18で、再び水平圧迫装置41,42のモータへ電力供給を開始する。この時点で水平圧迫装置41,42は、水平方向の移動がパネルとガイドレールとの間の圧縮性のある水密性ゴムへの圧接によって抑止される状態にあるので、電流フィードバック信号H1,H2は時刻t12から時刻t13と同様に電流値のみが線形的に増加する。この電流値の増加と共に水平圧迫装置41,42の水平方向の圧迫力(トルク)も徐々に増加する。そして、電流フィードバック信号H1,H2が第3所定値4.0[A]に達した時刻t19で水平圧迫装置41,42のモータへの電力供給を停止する。これによって伸縮アクチュエータのロッドの位置が保持されることで止水パネル21~24には電流値4.0〔A〕のトルクに応じた水平方向の圧迫力が印可された状態が維持されることになる。水平圧迫装置41,42が時刻t18から時刻t19までの間に止水パネル21~24に対して水平方向へ圧迫力を加える処理を第2水平圧迫処理とする。
At time t18, about 8 seconds after the power supply to the motors of the vertical compression devices 51-54 is stopped, power supply to the motors of the
水平圧迫装置41,42のモータへの電力供給停止してから約5秒後の時刻t1aで、垂直圧迫装置51~54への電力供給が開始する。この時点で垂直圧迫装置51~54は、垂直方向の移動がパネル間の圧縮性のある水密性ゴムへの圧接によって抑止される状態にあるので、電流フィードバック信号V1~V4は電流値のみが線形的に増加する。この電流値の増加と共に垂直圧迫装置51~54の垂直方向の圧迫力(トルク)も徐々に増加する。そして、電流フィードバック信号V1~V4が第5所定値4.0[A]に達した時刻t1bで垂直圧迫装置51~54のモータへの電力供給を停止する。これによって止水パネル21~24には電流値4.0〔A〕のトルクに応じた垂直方向の圧迫力が印可された状態が維持されることになる。垂直圧迫装置51~54が時刻t1aから時刻t1bまでの間に止水パネル21~24に対して垂直方向へ圧迫力を加える処理を第2垂直圧迫処理とする。
At time t1a, about 5 seconds after the power supply to the motors of the
上述の一連の処理によって、止水開閉体装置10の複数の止水パネル21~24による水密性を向上させることが可能となる。なお、時刻t13から時刻t14までの時間(5秒)、時刻t17から時刻t18までの時間(8秒)及び時刻t19から時刻t1aまでの時間(5秒)は一例であり、開口部の大きさや止水パネルの枚数や大きさ等によって0~十数秒の範囲で適宜変更可能な値である。また、水平圧迫装置41,42、垂直圧迫装置51~54への電力供給を停止する際の電流フィードバック信号H1,H2,V1~V4の電流値0.5〔A〕,1.0〔A〕,4.0〔A〕も一例であり、開口部の大きさや止水パネルの枚数や大きさ、水密材のやわらかさ(弾力性)等によって0~数〔A〕の範囲で適宜変更可能な値である。
The above-mentioned series of processes makes it possible to improve the watertightness of the
また、図2の制御方法では、時刻t10から時刻t13までの第1水平圧迫処理と、時刻t14から時刻t17までの第1垂直圧迫処理をそれぞれ1回行う場合について説明したが、第1水平圧迫処理と第1垂直圧迫処理をそれぞれ複数回実行し、その後に時刻t18から時刻t19までの第1垂直圧迫処理、及び時刻t1aから時刻t1bまでの第2垂直圧迫処理を1又は複数回実行してもよい。 In addition, in the control method of FIG. 2, the first horizontal compression process from time t10 to time t13 and the first vertical compression process from time t14 to time t17 are each performed once. However, the first horizontal compression process and the first vertical compression process may each be performed multiple times, and then the first vertical compression process from time t18 to time t19 and the second vertical compression process from time t1a to time t1b may be performed once or multiple times.
図3は、止水開閉体装置の制御時における水平圧迫装置及び垂直圧迫装置の内蔵モータから得られる電流フィードバック信号の波形の別の一例を示す図である。図3の信号波形が図2のものと異なる点は、水平圧迫装置41,42の水平圧迫動作と垂直圧迫装置51~54の垂直圧迫動作とが重複するようにした点である。すなわち、図3では、水平圧迫装置41,42による水平圧迫動作と垂直圧迫装置51~54による垂直圧迫動作とが同時に実行される時間が存在する。以下、図3の波形に基づいて水平圧迫装置41,42と垂直圧迫装置51~54の制御方法を説明する。
Figure 3 shows another example of the waveform of the current feedback signal obtained from the built-in motor of the horizontal compression device and the vertical compression device when controlling the watertight opening and closing device. The signal waveform in Figure 3 differs from that in Figure 2 in that the horizontal compression action of the
止水開閉体装置10の複数の止水パネル21~24によって開口部が閉鎖された後に止水開始(止水ON)ボタン操作での止水ONによって時刻t20で水平圧迫装置41,42の電流フィードバック信号H1,H2は図に示すように線形的に上昇し、時刻t21から時刻t22まで0.5〔A〕の定常状態を示し、第1所定値1.0〔A〕となった時刻t24で水平圧迫装置41,42のモータへの電力供給が停止され、止水パネル21~24に電流値1.0〔A〕のトルクに応じた水平方向の圧迫力が印可された状態が維持される。水平圧迫装置41,42が時刻t20から時刻t24までの間に止水パネル21~24に対して水平方向へ圧迫力を加える処理を第1水平圧迫処理とする。
After the opening is closed by the multiple waterstop panels 21-24 of the waterstop opening/
一方、電流フィードバック信号H1,H2が0.5〔A〕の定常状態から時刻t22で再び線形的に上昇を開始する時刻t22で、垂直圧迫装置51~54への電力供給が開始する。これによって、電流フィードバック信号V1~V4は図2に示すように線形的に上昇し、時刻t23から時刻t25まで0.5〔A〕の定常状態を示し、第2所定値1.0〔A〕となった時刻t26で垂直圧迫装置51~54のモータへの電力供給が停止され、止水パネル21~24に電流値1.0〔A〕のトルクに応じた垂直方向の圧迫力が印可された状態が維持される。垂直圧迫装置51~54が時刻t22から時刻t26までの間に止水パネル21~24に対して垂直方向へ圧迫力を加える処理を第1垂直圧迫処理とする。 Meanwhile, at time t22 when the current feedback signals H1, H2 start to rise linearly again from the steady state of 0.5 [A], power supply to the vertical compression devices 51-54 begins. As a result, the current feedback signals V1-V4 rise linearly as shown in Fig. 2, exhibiting a steady state of 0.5 [A] from time t23 to time t25, and at time t26 when the current feedback signals V1-V4 reach the second predetermined value of 1.0 [A], power supply to the motors of the vertical compression devices 51-54 is stopped, and a state in which a vertical compression force corresponding to a torque of a current value of 1.0 [A] is applied to the waterstop panels 21-24 is maintained. The process in which the vertical compression devices 51-54 apply a compression force in the vertical direction to the waterstop panels 21-24 from time t22 to time t26 is referred to as a first vertical compression process.
垂直圧迫装置51~54のモータへの電力供給停止してから約8秒後の時刻t27で、再び水平圧迫装置41,42のモータへ電力供給を開始する。この時点で水平圧迫装置41,42は、水平方向の移動がパネルとガイドレールとの間の圧縮性のある水密性ゴムへの圧接によって抑止される状態にあるので、電流フィードバック信号H1,H2は時刻t22から時刻t24までと同様に電流値のみが線形的に増加する。そして、電流フィードバック信号H1,H2が第3所定値4.0[A]に達した時刻t29で水平圧迫装置41,42のモータへの電力供給を停止する。これによって止水パネル21~24には電流値4.0〔A〕のトルクに応じた水平方向の圧迫力が印可された状態が維持されることになる。水平圧迫装置41,42が時刻t27から時刻t29までの間に止水パネル21~24に対して水平方向へ圧迫力を加える処理を第2水平圧迫処理とする。
At time t27, about 8 seconds after the power supply to the motors of the vertical compression devices 51-54 is stopped, power supply to the motors of the
一方、水平圧迫装置41,42のモータへの電力供給停止してから時刻t28で、垂直圧迫装置51~54への電力供給が開始する。この時刻t28は、電流フィードバック信号H1,H2が第1所定値1.0[A]に達した時刻である。この時刻t28で垂直圧迫装置51~54は、垂直方向の移動がパネル間の圧縮性のある水密性ゴムへの圧接によって抑止される状態にあるので、電流フィードバック信号V1~V4は電流値のみが線形的に増加する。この電流値の増加と共に垂直圧迫装置51~54の垂直方向の圧迫力(トルク)も徐々に増加する。そして、電流フィードバック信号V1~V4が第5所定値4.0[A]に達した時刻t2aで垂直圧迫装置51~54のモータへの電力供給を停止する。これによって止水パネル21~24には電流値4.0〔A〕のトルクに応じた垂直方向の圧迫力が印可された状態が維持されることになる。垂直圧迫装置51~54が時刻t28から時刻t2aまでの間に止水パネル21~24に対して垂直方向へ圧迫力を加える処理を第2垂直圧迫処理とする。
On the other hand, at time t28 after the power supply to the motors of the
上述の一連の処理によって、止水開閉体装置10の複数の止水パネル21~24による水密性を向上させることが可能となる。なお、時刻t26から時刻t27までの時間(8秒)は一例であり、開口部の大きさや止水パネルの枚数や大きさ等によって0~十数秒の範囲で適宜変更可能な値である。また、水平圧迫装置41,42、垂直圧迫装置51~54への電力供給を停止する際の電流フィードバック信号H1,H2,V1~V4の電流値0.5〔A〕,1.0〔A〕,4.0〔A〕も一例であり、開口部の大きさや止水パネルの枚数や大きさ等によって0~数〔A〕の範囲で適宜変更可能な値である。
The above-mentioned series of processes makes it possible to improve the watertightness of the multiple waterstop panels 21-24 of the waterstop opening/
さらに、時刻t22は開口部の大きさや止水パネルの枚数や大きさ等に応じてだいたい特定の値となることが分かっているので、垂直圧迫装置51~54への電力供給の開始時刻を時刻t22よりも早い時刻に設定しても良い。例えば、時刻20経過後、時刻t22以内の所定の時間で垂直圧迫装置51~54への電力供給を開始しても良い。
時刻t27よりも時刻t28を遅らせる場合について説明したが、時刻t27と同じ時刻又は時刻t27よりも早い時刻に垂直圧迫装置51~54への電力供給を開始して良い。
Furthermore, since it is known that time t22 is approximately a specific value depending on the size of the opening and the number and size of the waterstop panels, the start time of the power supply to the vertical compression devices 51-54 may be set to a time earlier than time t22. For example, the power supply to the vertical compression devices 51-54 may be started at a predetermined time within time t22 after
Although the case where time t28 is delayed from time t27 has been described, power supply to the
図3の制御方法では、時刻t20から時刻t24までの第1水平圧迫処理と、時刻t22から時刻t26までの第1垂直圧迫処理をそれぞれ1回行う場合について説明したが、第1水平圧迫処理と第1垂直圧迫処理をそれぞれ複数回実行し、その後に時刻t27から時刻t29までの第2水平圧迫処理、及び時刻t28から時刻t2aまでの第2垂直圧迫処理を1又は複数回実行してもよい。 In the control method of FIG. 3, the first horizontal compression process from time t20 to time t24 and the first vertical compression process from time t22 to time t26 are each performed once. However, the first horizontal compression process and the first vertical compression process may each be performed multiple times, and then the second horizontal compression process from time t27 to time t29 and the second vertical compression process from time t28 to time t2a may be performed once or multiple times.
図4は、止水開閉体装置の制御時における水平圧迫装置及び垂直圧迫装置の内蔵モータから得られる電流フィードバック信号の波形のさらに別の一例を示す図である。図4の信号波形が図2のものと異なる点は、第2水平圧迫処理及び第2垂直圧迫処理における電流供給を停止するタイミングを、電流フィードバック信号が所定に達した時点から所定時間(遅延時間)経過後とした点である。
すなわち、図3では、水平圧迫装置41,42による第2水平圧迫動作の停止時点を電流フィードバック信号H1,H2が第4所定値3.0[A]に達した時刻t191から所定時間(遅延時間)約1秒経過後の時刻t19とし、垂直圧迫装置51~54による第2垂直圧迫動作の停止時点を電流フィードバック信号V1~V4が第6所定値3.0[A]に達した時刻t1b1から所定時間(遅延時間)約1秒経過後の時刻t1bとする。
Fig. 4 is a diagram showing yet another example of the waveforms of the current feedback signals obtained from the built-in motors of the horizontal compression device and the vertical compression device when controlling the watertight opening/closing device. The signal waveforms in Fig. 4 differ from those in Fig. 2 in that the timing for stopping the current supply in the second horizontal compression process and the second vertical compression process is set to a predetermined time (delay time) after the current feedback signal reaches a predetermined value.
3, the second horizontal compression action by the
このように第2水平圧迫処理及び第2垂直圧迫処理における電流供給を停止するタイミングをについて、電流フィードバック信号が所定値に達した時刻から所定時間(遅延時間)経過したことを条件にモータへの電力供給を停止するようにした。ここでの電流フィードバック信号の所定値は、所望の圧迫力(トルク)に達する時点から所定時間遡った時点での想定電流値(図3では3.0〔A〕)を設定する。これによって、電流フィードバック信号の所定値は低い値とすることができ、電流フィードバック信号の検出部の検出可能電流範囲のスペックが狭いものを使うことが可能となる。また、電流フィードバック信号の上昇の経過も実行のたびにばらつきがあるため、電流供給停止のタイミング判定に所定の遅延時間として時間の要素を含めることにより、圧迫装置のストロークのばらつきも低減し、好適な遅延時間を設けることで必要なストローク量と必要な圧迫力の両立を図ることができる。なお、図3の第2水平圧迫処理及び第2垂直圧迫処理においても図4と同様の処理を行ってよい。 In this way, the timing for stopping the current supply in the second horizontal compression process and the second vertical compression process is set so that the power supply to the motor is stopped on the condition that a predetermined time (delay time) has elapsed since the time when the current feedback signal reaches a predetermined value. The predetermined value of the current feedback signal here is set to an expected current value (3.0 [A] in FIG. 3) at a time point that is a predetermined time before the time when the desired compression force (torque) is reached. This allows the predetermined value of the current feedback signal to be a low value, making it possible to use a current feedback signal detection unit with a narrow specification for the detectable current range. In addition, since the progress of the rise of the current feedback signal also varies each time it is executed, the variation in the stroke of the compression device is reduced by including a time element as a predetermined delay time in the timing determination for stopping the current supply, and by setting a suitable delay time, it is possible to achieve both the required stroke amount and the required compression force. Note that the same processing as in FIG. 4 may be performed in the second horizontal compression process and the second vertical compression process in FIG. 3.
なお、図2~図4に示す制御では、第1水平圧迫処理停止後の所定時間経過後であって第1垂直圧迫処理停止後に所定時間(8秒)経過後に第2水平圧迫処理を実行する場合を示しているが、第1垂直圧迫処理のフィードバック信号が所定値に達した時点で(フィードバック信号V1~V4が所定値0.5〔A〕より大きくなった時点又はフィードバック信号V1~V4が所定値1.0〔A〕に達した時点(第1垂直圧迫処理の停止時点))で第2水平圧迫処理を実行するようにしてもよい。 Note that in the control shown in Figures 2 to 4, the second horizontal compression process is executed a predetermined time after the first horizontal compression process is stopped and a predetermined time (8 seconds) after the first vertical compression process is stopped. However, the second horizontal compression process may be executed when the feedback signal of the first vertical compression process reaches a predetermined value (when the feedback signals V1 to V4 become larger than a predetermined value of 0.5 [A] or when the feedback signals V1 to V4 reach a predetermined value of 1.0 [A] (when the first vertical compression process is stopped)).
水平圧迫装置41,42及び垂直圧迫装置51~54の各モータから得られる電流フィードバック信号H1,H2,V1~V4は実際はそれぞれモータ毎に異なっているので、所定条件達成時が水平圧迫装置41,42、及び垂直圧迫装置51~54でそれぞれ異なる場合には、達成時点の遅いもの又は早いものに合わせて制御してもよい。また、制御装置20は、個々の水平圧迫装置41,42及び垂直圧迫装置51~54のモータをそれぞれ制御するようにしてもよい。
The current feedback signals H1, H2, V1 to V4 obtained from the motors of the
以上説明した実施の形態では、上下昇降方式で繰り出される止水開閉体装置を例に説明したが、止水パネルなどの止水用の開閉体が横引き方式又は水平方式で繰り出されたりするものであっても、同様に適応することができる。また、垂直圧迫の圧迫方向を、開閉体の繰り出し方向に置き換えてもよい。 In the above embodiment, a watertight opening/closing body device that is deployed using a vertical lifting method has been described as an example, but the invention can be applied in the same way to a watertight opening/closing body such as a watertight panel that is deployed using a lateral pull method or horizontal method. In addition, the compression direction of the vertical compression may be replaced with the extension direction of the opening/closing body.
10…止水開閉体装置
20…止水開閉体装置の制御装置
21~24…止水パネル
30…シャッターケース
31,32…ガイドレール
41,42…水平圧迫装置
51~54…垂直圧迫装置
61,63…接触部材
10...Waterstop opening/
Claims (12)
前記第1水平圧迫処理を実行後に前記第1垂直圧迫処理を実行し、前記第1水平圧迫処理停止後に第2水平圧迫処理を実行する
ことを特徴とする止水開閉体装置の制御装置。 A control device for a waterstop opening/closing body device comprising: a waterstop opening / closing body device which opens and closes an opening by moving a plurality of waterstop panels along a guide rail from the periphery of the opening; a horizontal compression device which performs a first horizontal compression process to apply a compression force to the plurality of waterstop panels in a horizontal movement direction after the opening is closed by the waterstop opening/closing body device; and a vertical compression device which performs a first vertical compression process to apply a compression force to the plurality of waterstop panels in a vertical movement direction, the control device controlling the horizontal compression device and the vertical compression device so as to increase the watertightness between the plurality of waterstop panels and the guide rail and between the plurality of waterstop panels which are in contact with each other in the vertical direction,
A control device for a watertight opening/closing body device, characterized in that the first vertical compression process is executed after the first horizontal compression process is executed, and the second horizontal compression process is executed after the first horizontal compression process is stopped.
前記第1水平圧迫処理を実行後に前記第1垂直圧迫処理を実行し、
前記第1水平圧迫処理停止後に第2水平圧迫処理を実行し、
前記第1垂直圧迫処理停止後に第2垂直圧迫処理を実行する
ことを特徴とする止水開閉体装置の制御装置。 The control device for a watertight opening/closing device according to claim 1,
performing the first vertical compression process after performing the first horizontal compression process;
A second horizontal compression process is executed after the first horizontal compression process is stopped;
A control device for a watertight opening/closing body device, comprising: a control unit for executing a second vertical compression process after the first vertical compression process is stopped.
前記第1水平圧迫処理実行後の所定条件達成時に前記第1水平圧迫処理を停止し、
前記第1水平圧迫処理実行後の所定条件達成時に前記第1垂直圧迫処理を実行し、
前記第1垂直圧迫処理実行後の所定条件達成時に前記第1垂直圧迫処理を停止し、
前記第1水平圧迫処理停止後の所定条件達成時に前記第2水平圧迫処理を実行し、
前記第1垂直圧迫処理停止後の所定条件達成時に前記第2垂直圧迫処理を実行し、
前記第2水平圧迫処理実行後の所定条件達成時に前記第2水平圧迫処理を停止し、
前記第2垂直圧迫処理実行後の所定条件達成時に前記第2垂直圧迫処理を停止する
ことを特徴とする止水開閉体装置の制御装置。 The control device for a watertight opening/closing device according to claim 2,
Stopping the first horizontal compression process when a predetermined condition is met after the first horizontal compression process is executed;
execute the first vertical compression process when a predetermined condition is met after the execution of the first horizontal compression process;
Stopping the first vertical compression process when a predetermined condition is met after the first vertical compression process is executed;
Execute the second horizontal compression process when a predetermined condition is met after the first horizontal compression process is stopped;
Executing the second vertical compression process when a predetermined condition is met after the first vertical compression process is stopped;
Stopping the second horizontal compression process when a predetermined condition is met after the second horizontal compression process is executed;
A control device for a watertight opening/closing body device, characterized in that the second vertical compression process is stopped when a predetermined condition is achieved after the second vertical compression process is executed.
前記第1水平圧迫処理を実行後に、前記第1水平圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第1水平圧迫処理を停止し、
前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第1垂直圧迫処理を実行し、
前記第1垂直圧迫処理実行後に、前記第1垂直圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第1垂直圧迫処理を停止し、
前記第1水平圧迫処理停止後に、前記第1垂直圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第2水平圧迫処理を実行し、
前記第1垂直圧迫処理停止後に、前記第2水平圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第2垂直圧迫処理を実行し、
前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が所定値に達した時に、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が所定値に達してから所定時間が経過した時に、又は前記第2水平圧迫処理実行後に所定時間が経過した時に前記第2水平圧迫処理を停止し、
前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が所定値に達した時に、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が所定値に達してから所定時間が経過した時に、又は前記第2垂直圧迫処理実行後に所定時間が経過した時に前記第2垂直圧迫処理を停止する
ことを特徴とする止水開閉体装置の制御装置。 The control device for a watertight opening/closing device according to claim 2 or 3,
After performing the first horizontal compression process, when a feedback signal of the first horizontal compression process reaches a predetermined value or when a predetermined time has elapsed, the first horizontal compression process is stopped;
After the first horizontal compression process is executed, the first vertical compression process is executed when a feedback signal of the first horizontal compression process reaches a predetermined value or when a predetermined time has elapsed;
After the first vertical compression process is executed, when a feedback signal of the first vertical compression process reaches a predetermined value or when a predetermined time has elapsed, the first vertical compression process is stopped;
After the first horizontal compression process is stopped, the second horizontal compression process is executed when a feedback signal of the first vertical compression process reaches a predetermined value or when a predetermined time has elapsed;
After the first vertical compression process is stopped, the second vertical compression process is executed when a feedback signal of the second horizontal compression process reaches a predetermined value or when a predetermined time has elapsed;
stopping the second horizontal compression process when a feedback signal of the second horizontal compression process reaches a predetermined value after execution of the second horizontal compression process, when a predetermined time has elapsed since the feedback signal of the second horizontal compression process reached a predetermined value after execution of the second horizontal compression process, or when a predetermined time has elapsed since execution of the second horizontal compression process;
a control device for a watertight opening/closing body device, characterized in that the second vertical compression process is stopped when a feedback signal of the second vertical compression process reaches a predetermined value after execution of the second vertical compression process , when a predetermined time has elapsed since the feedback signal of the second vertical compression process reached a predetermined value after execution of the second vertical compression process, or when a predetermined time has elapsed after execution of the second vertical compression process.
前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が第1所定値に達した時に、又は前記第1水平圧迫処理のフィードバック信号が前記第1所定値に達する時間を経過した時に、前記第1水平圧迫処理を停止し、
前記第1水平圧迫処理停止後の所定時間経過時に前記第1垂直圧迫処理を実行し、
前記第1垂直圧迫処理実行後に、前記第1垂直圧迫処理のフィードバック信号が第2所定値に達した時に、又は前記第1垂直圧迫処理のフィードバック信号が前記第2所定値に達する時間を経過した時に、前記第1垂直圧迫処理を停止し、
前記第1垂直圧迫処理停止後の所定時間経過時に前記第2水平圧迫処理を実行し、
前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が第3所定値に達した時に、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値よりも小さな第4所定値に達してから所定時間が経過した時に、又は前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値に達する時間を経過した時に前記第2水平圧迫処理を停止し、
前記第2水平圧迫処理停止後の所定時間経過時に前記第2垂直圧迫処理を実行し、
前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が第5所定値に達した時に、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値よりも小さな第6所定値に達してから所定時間が経過した時に、又は前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第6所定値に達する時間を経過した時に前記第2垂直圧迫処理を停止する
ことを特徴とする止水開閉体装置の制御装置。 The control device for a watertight opening/closing device according to claim 2, 3 or 4,
After the first horizontal compression process is executed, when a feedback signal of the first horizontal compression process reaches a first predetermined value or when a time for the feedback signal of the first horizontal compression process to reach the first predetermined value has elapsed, the first horizontal compression process is stopped;
execute the first vertical compression process when a predetermined time has elapsed after the first horizontal compression process has been stopped;
After the first vertical compression process is executed, when a feedback signal of the first vertical compression process reaches a second predetermined value, or when a time for the feedback signal of the first vertical compression process to reach the second predetermined value has elapsed, the first vertical compression process is stopped;
execute the second horizontal compression process when a predetermined time has elapsed after the first vertical compression process has been stopped;
stopping the second horizontal compression process when a feedback signal of the second horizontal compression process reaches a third predetermined value after execution of the second horizontal compression process, when a predetermined time has elapsed since the feedback signal of the second horizontal compression process reaches a fourth predetermined value smaller than the third predetermined value after execution of the second horizontal compression process, or when a time has elapsed since the feedback signal of the second horizontal compression process reaches the third predetermined value after execution of the second horizontal compression process;
execute the second vertical compression process when a predetermined time has elapsed after the second horizontal compression process has been stopped;
a control device for a watertight opening/closing body device, characterized in that the second vertical compression process is stopped when a feedback signal of the second vertical compression process reaches a fifth predetermined value after execution of the second vertical compression process, when a predetermined time has elapsed since the feedback signal of the second vertical compression process reaches a sixth predetermined value smaller than the fifth predetermined value after execution of the second vertical compression process, or when a time has elapsed since the feedback signal of the second vertical compression process reaches the sixth predetermined value after execution of the second vertical compression process.
前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が第1所定値に達した時に、又は前記第1水平圧迫処理のフィードバック信号が前記第1所定値に達する時間を経過した時に、前記第1水平圧迫処理を停止し、
前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が第7所定値に達した時に、又は前記第1水平圧迫処理のフィードバック信号が前記第7所定値に達する時間を経過した時に、前記第1垂直圧迫処理を実行し、
前記第1垂直圧迫処理実行後に、前記第1垂直圧迫処理のフィードバック信号が第2所定値に達した時に、又は前記第1垂直圧迫処理のフィードバック信号が第2所定値に達する時間を経過した時に、前記第1垂直圧迫処理を停止し、
前記第1垂直圧迫処理停止後に所定時間が経過した時に前記第2水平圧迫処理を実行し、
前記第2水平圧迫処理実行後に、前記第2水平圧迫処理のフィードバック信号が第1所定値に達した時に、又は前記第2水平圧迫処理のフィードバック信号が前記第1所定値に達する時間を経過した時に前記第2垂直圧迫処理を実行し、
前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が第3所定値に達した時に、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値よりも小さな第4所定値に達してから所定時間が経過した時に、又は前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値に達する時間を経過した時に前記第2水平圧迫処理を停止し、
前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が第5所定値に達した時に、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値よりも小さな第6所定値に達してから所定時間が経過した時に、又は前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値に達する時間を経過した時に前記第2垂直圧迫処理を停止する
ことを特徴とする止水開閉体装置の制御装置。 The control device for a watertight opening/closing device according to claim 2, 3 or 4,
After the first horizontal compression process is executed, when a feedback signal of the first horizontal compression process reaches a first predetermined value or when a time for the feedback signal of the first horizontal compression process to reach the first predetermined value has elapsed, the first horizontal compression process is stopped;
After the first horizontal compression process is executed, when a feedback signal of the first horizontal compression process reaches a seventh predetermined value or when a time for the feedback signal of the first horizontal compression process to reach the seventh predetermined value has elapsed, the first vertical compression process is executed;
After the first vertical compression process is performed, when a feedback signal of the first vertical compression process reaches a second predetermined value, or when a time for the feedback signal of the first vertical compression process to reach the second predetermined value has elapsed, the first vertical compression process is stopped;
Executing the second horizontal compression process when a predetermined time has elapsed after the first vertical compression process has been stopped;
After the second horizontal compression process is executed, the second vertical compression process is executed when a feedback signal of the second horizontal compression process reaches a first predetermined value or when a time for the feedback signal of the second horizontal compression process to reach the first predetermined value has elapsed;
stopping the second horizontal compression process when a feedback signal of the second horizontal compression process reaches a third predetermined value after execution of the second horizontal compression process, when a predetermined time has elapsed since the feedback signal of the second horizontal compression process reaches a fourth predetermined value smaller than the third predetermined value after execution of the second horizontal compression process, or when a time has elapsed since the feedback signal of the second horizontal compression process reaches the third predetermined value after execution of the second horizontal compression process;
a control device for a watertight opening/closing body device, characterized in that the second vertical compression process is stopped when a feedback signal of the second vertical compression process reaches a fifth predetermined value after execution of the second vertical compression process, when a predetermined time has elapsed since the feedback signal of the second vertical compression process reaches a sixth predetermined value smaller than the fifth predetermined value after execution of the second vertical compression process, or when a time has elapsed since the feedback signal of the second vertical compression process reaches the fifth predetermined value after execution of the second vertical compression process.
前記第1水平圧迫処理を実行後に前記第1垂直圧迫処理を実行し、前記第1水平圧迫処理停止後に第2水平圧迫処理を実行することを特徴とする止水開閉体装置の制御方法。 A method for controlling a waterstop opening/closing body device includes: closing an opening by moving a plurality of waterstop panels along a guide rail from a peripheral portion of the opening; and after the opening is closed, a first horizontal compression process and a first vertical compression process are performed to compress the plurality of waterstop panels in the horizontal and vertical directions by applying compression forces to the plurality of waterstop panels in the horizontal and vertical movement directions, respectively, thereby improving watertightness between the plurality of waterstop panels and the guide rail and between the plurality of waterstop panels that are in contact with each other in the vertical direction,
A control method for a watertight opening/closing body device, characterized in that the first vertical compression process is executed after the first horizontal compression process is executed, and the second horizontal compression process is executed after the first horizontal compression process is stopped.
前記第1水平圧迫処理を実行後に前記第1垂直圧迫処理を実行し、
前記第1水平圧迫処理停止後に第2水平圧迫処理を実行し、
前記第1垂直圧迫処理停止後に第2垂直圧迫処理を実行する
ことを特徴とする止水開閉体装置の制御方法。 The method for controlling a watertight opening/closing device according to claim 7,
performing the first vertical compression process after performing the first horizontal compression process;
A second horizontal compression process is executed after the first horizontal compression process is stopped;
A control method for a watertight opening/closing body device, comprising: executing a second vertical compression process after the first vertical compression process is stopped.
前記第1水平圧迫処理実行後の所定条件達成時に前記第1水平圧迫処理を停止し、
前記第1水平圧迫処理実行後の所定条件達成時に前記第1垂直圧迫処理を実行し、
前記第1垂直圧迫処理実行後の所定条件達成時に前記第1垂直圧迫処理を停止し、
前記第1水平圧迫処理停止後の所定条件達成時に前記第2水平圧迫処理を実行し、
前記第1垂直圧迫処理停止後の所定条件達成時に前記第2垂直圧迫処理を実行し、
前記第2水平圧迫処理実行後の所定条件達成時に前記第2水平圧迫処理を停止し、
前記第2垂直圧迫処理実行後の所定条件達成時に前記第2垂直圧迫処理を停止する
ことを特徴とする止水開閉体装置の制御方法。 The method for controlling a watertight opening/closing device according to claim 8,
Stopping the first horizontal compression process when a predetermined condition is met after the first horizontal compression process is executed;
execute the first vertical compression process when a predetermined condition is met after the execution of the first horizontal compression process;
Stopping the first vertical compression process when a predetermined condition is met after the first vertical compression process is executed;
Execute the second horizontal compression process when a predetermined condition is met after the first horizontal compression process is stopped;
Executing the second vertical compression process when a predetermined condition is met after the first vertical compression process is stopped;
Stopping the second horizontal compression process when a predetermined condition is met after the second horizontal compression process is executed;
A method for controlling a watertight opening/closing body device, comprising: stopping the second vertical compression process when a predetermined condition is met after the second vertical compression process is performed.
前記第1水平圧迫処理を実行後に、前記第1水平圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第1水平圧迫処理を停止し、
前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第1垂直圧迫処理を実行し、
前記第1垂直圧迫処理実行後に、前記第1垂直圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第1垂直圧迫処理を停止し、
前記第1水平圧迫処理停止後に、前記第1垂直圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第2水平圧迫処理を実行し、
前記第1垂直圧迫処理停止後に、前記第2水平圧迫処理のフィードバック信号が所定値に達した時に、又は所定時間経過時に前記第2垂直圧迫処理を実行し、
前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が所定値に達した時に、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が所定値に達してから所定時間が経過した時に、又は前記第2水平圧迫処理実行後に所定時間が経過した時に前記第2水平圧迫処理を停止し、
前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が所定値に達した時に、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が所定値に達してから所定時間が経過した時に、又は前記第2垂直圧迫処理実行後に所定時間が経過した時に前記第2垂直圧迫処理を停止する
ことを特徴とする止水開閉体装置の制御方法。 The method for controlling a watertight opening/closing device according to claim 8 or 9,
After performing the first horizontal compression process, when a feedback signal of the first horizontal compression process reaches a predetermined value or when a predetermined time has elapsed, the first horizontal compression process is stopped;
After the first horizontal compression process is executed, the first vertical compression process is executed when a feedback signal of the first horizontal compression process reaches a predetermined value or when a predetermined time has elapsed;
After the first vertical compression process is executed, when a feedback signal of the first vertical compression process reaches a predetermined value or when a predetermined time has elapsed, the first vertical compression process is stopped;
After the first horizontal compression process is stopped, the second horizontal compression process is executed when a feedback signal of the first vertical compression process reaches a predetermined value or when a predetermined time has elapsed;
After the first vertical compression process is stopped, the second vertical compression process is executed when a feedback signal of the second horizontal compression process reaches a predetermined value or when a predetermined time has elapsed;
stopping the second horizontal compression process when a feedback signal of the second horizontal compression process reaches a predetermined value after execution of the second horizontal compression process, when a predetermined time has elapsed since the feedback signal of the second horizontal compression process reached a predetermined value after execution of the second horizontal compression process, or when a predetermined time has elapsed since execution of the second horizontal compression process;
A control method for a watertight opening/closing body device, characterized in that the second vertical compression process is stopped when a feedback signal of the second vertical compression process reaches a predetermined value after execution of the second vertical compression process, when a predetermined time has elapsed since the feedback signal of the second vertical compression process reached a predetermined value after execution of the second vertical compression process, or when a predetermined time has elapsed after execution of the second vertical compression process.
前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が第1所定値に達した時に、又は前記第1水平圧迫処理のフィードバック信号が前記第1所定値に達する時間を経過した時に、前記第1水平圧迫処理を停止し、
前記第1水平圧迫処理停止後の所定時間経過時に前記第1垂直圧迫処理を実行し、
前記第1垂直圧迫処理実行後に、前記第1垂直圧迫処理のフィードバック信号が第2所定値に達した時に、又は前記第1垂直圧迫処理のフィードバック信号が前記第2所定値に達する時間を経過した時に、前記第1垂直圧迫処理を停止し、
前記第1垂直圧迫処理停止後の所定時間経過時に前記第2水平圧迫処理を実行し、
前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が第3所定値に達した時に、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値よりも小さな第4所定値に達してから所定時間が経過した時に、又は前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値に達する時間を経過した時に前記第2水平圧迫処理を停止し、
前記第2水平圧迫処理停止後の所定時間経過時に前記第2垂直圧迫処理を実行し、
前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が第5所定値に達した時に、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値よりも小さな第6所定値に達してから所定時間が経過した時に、又は前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値に達する時間を経過した時に前記第2垂直圧迫処理を停止する
ことを特徴とする止水開閉体装置の制御方法。 The method for controlling a watertight opening/closing device according to claim 8, 9 or 10,
After the first horizontal compression process is executed, when a feedback signal of the first horizontal compression process reaches a first predetermined value or when a time for the feedback signal of the first horizontal compression process to reach the first predetermined value has elapsed, the first horizontal compression process is stopped;
execute the first vertical compression process when a predetermined time has elapsed after the first horizontal compression process has been stopped;
After the first vertical compression process is executed, when a feedback signal of the first vertical compression process reaches a second predetermined value, or when a time for the feedback signal of the first vertical compression process to reach the second predetermined value has elapsed, the first vertical compression process is stopped;
execute the second horizontal compression process when a predetermined time has elapsed after the first vertical compression process has been stopped;
stopping the second horizontal compression process when a feedback signal of the second horizontal compression process reaches a third predetermined value after execution of the second horizontal compression process, when a predetermined time has elapsed since the feedback signal of the second horizontal compression process reaches a fourth predetermined value smaller than the third predetermined value after execution of the second horizontal compression process, or when a time has elapsed since the feedback signal of the second horizontal compression process reaches the third predetermined value after execution of the second horizontal compression process;
execute the second vertical compression process when a predetermined time has elapsed after the second horizontal compression process has been stopped;
a control method for a watertight opening/closing body device, characterized in that the second vertical compression process is stopped when a feedback signal of the second vertical compression process reaches a fifth predetermined value after execution of the second vertical compression process, when a predetermined time has elapsed since the feedback signal of the second vertical compression process reaches a sixth predetermined value smaller than the fifth predetermined value after execution of the second vertical compression process, or when a time has elapsed since the feedback signal of the second vertical compression process reaches the fifth predetermined value after execution of the second vertical compression process.
前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が第1所定値に達した時に、又は前記第1水平圧迫処理のフィードバック信号が前記第1所定値に達する時間を経過した時に、前記第1水平圧迫処理を停止し、
前記第1水平圧迫処理実行後に、前記第1水平圧迫処理のフィードバック信号が第7所定値に達した時に、又は前記第1水平圧迫処理のフィードバック信号が前記第7所定値に達する時間を経過した時に、前記第1垂直圧迫処理を実行し、
前記第1垂直圧迫処理実行後に、前記第1垂直圧迫処理のフィードバック信号が第2所定値に達した時に、又は前記第1垂直圧迫処理のフィードバック信号が第2所定値に達する時間を経過した時に、前記第1垂直圧迫処理を停止し、
前記第1垂直圧迫処理停止後に所定時間が経過した時に前記第2水平圧迫処理を実行し、
前記第2水平圧迫処理実行後に、前記第2水平圧迫処理のフィードバック信号が第1所定値に達した時に、又は前記第2水平圧迫処理のフィードバック信号が前記第1所定値に達する時間を経過した時に前記第2垂直圧迫処理を実行し、
前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が第3所定値に達した時に、前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値よりも小さな第4所定値に達してから所定時間が経過した時に、又は前記第2水平圧迫処理実行後に前記第2水平圧迫処理のフィードバック信号が前記第3所定値に達する時間を経過した時に前記第2水平圧迫処理を停止し、
前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が第5所定値に達した時に、前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値よりも小さな第6所定値に達してから所定時間が経過した時に、又は前記第2垂直圧迫処理実行後に前記第2垂直圧迫処理のフィードバック信号が前記第5所定値に達する時間を経過した時に前記第2垂直圧迫処理を停止する
ことを特徴とする止水開閉体装置の制御方法。 The method for controlling a watertight opening/closing device according to claim 8, 9 or 10,
After the first horizontal compression process is executed, when a feedback signal of the first horizontal compression process reaches a first predetermined value or when a time for the feedback signal of the first horizontal compression process to reach the first predetermined value has elapsed, the first horizontal compression process is stopped;
After the first horizontal compression process is executed, when a feedback signal of the first horizontal compression process reaches a seventh predetermined value or when a time for the feedback signal of the first horizontal compression process to reach the seventh predetermined value has elapsed, the first vertical compression process is executed;
After the first vertical compression process is performed, when a feedback signal of the first vertical compression process reaches a second predetermined value, or when a time for the feedback signal of the first vertical compression process to reach the second predetermined value has elapsed, the first vertical compression process is stopped;
Executing the second horizontal compression process when a predetermined time has elapsed after the first vertical compression process has been stopped;
After the second horizontal compression process is executed, the second vertical compression process is executed when a feedback signal of the second horizontal compression process reaches a first predetermined value or when a time for the feedback signal of the second horizontal compression process to reach the first predetermined value has elapsed;
stopping the second horizontal compression process when a feedback signal of the second horizontal compression process reaches a third predetermined value after execution of the second horizontal compression process, when a predetermined time has elapsed since the feedback signal of the second horizontal compression process reaches a fourth predetermined value smaller than the third predetermined value after execution of the second horizontal compression process, or when a time has elapsed since the feedback signal of the second horizontal compression process reaches the third predetermined value after execution of the second horizontal compression process;
a control method for a watertight opening/closing body device, characterized in that the second vertical compression process is stopped when a feedback signal of the second vertical compression process reaches a fifth predetermined value after execution of the second vertical compression process, when a predetermined time has elapsed since the feedback signal of the second vertical compression process reaches a sixth predetermined value smaller than the fifth predetermined value after execution of the second vertical compression process, or when a time has elapsed since the feedback signal of the second vertical compression process reaches the fifth predetermined value after execution of the second vertical compression process.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021206224A JP7629843B2 (en) | 2021-12-20 | 2021-12-20 | Control device and control method for watertight opening and closing device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021206224A JP7629843B2 (en) | 2021-12-20 | 2021-12-20 | Control device and control method for watertight opening and closing device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023091464A JP2023091464A (en) | 2023-06-30 |
| JP7629843B2 true JP7629843B2 (en) | 2025-02-14 |
Family
ID=86940882
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021206224A Active JP7629843B2 (en) | 2021-12-20 | 2021-12-20 | Control device and control method for watertight opening and closing device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7629843B2 (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3185150U (en) | 2013-05-22 | 2013-08-01 | 紹博 洪 | Watertight structure of electric waterproof door |
| JP2015151749A (en) | 2014-02-14 | 2015-08-24 | 三和シヤッター工業株式会社 | waterproof door |
| JP2019120042A (en) | 2018-01-05 | 2019-07-22 | 三久建材工業股▲ふん▼有限公司 | Waterproof gate door crimping control device |
-
2021
- 2021-12-20 JP JP2021206224A patent/JP7629843B2/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3185150U (en) | 2013-05-22 | 2013-08-01 | 紹博 洪 | Watertight structure of electric waterproof door |
| JP2015151749A (en) | 2014-02-14 | 2015-08-24 | 三和シヤッター工業株式会社 | waterproof door |
| JP2019120042A (en) | 2018-01-05 | 2019-07-22 | 三久建材工業股▲ふん▼有限公司 | Waterproof gate door crimping control device |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2023091464A (en) | 2023-06-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7220295B2 (en) | Refrigerator drawer door control method and refrigerator | |
| JP7629843B2 (en) | Control device and control method for watertight opening and closing device | |
| FR2882845B1 (en) | ACTUATOR CONTROL METHOD | |
| US20110016793A1 (en) | Cable winding drum, window regulator and bodywork element | |
| CN210828892U (en) | Sliding door and window linkage device with positioning function | |
| CN104934863A (en) | Low-noise electrical cabinet capable of being hermetically closed | |
| JP4331510B2 (en) | A method to learn the running limit of roller blind actuator | |
| CN116876969B (en) | Assembled sound insulation door and window and control method thereof | |
| JP2017203338A (en) | Side block mechanism for moving partition device | |
| CN105649467A (en) | Method and system capable of realizing synchronization of double doors of safety gate | |
| CN111441684A (en) | Method for mounting a door drive and door drive | |
| CN104934865B (en) | An electrical switchgear with adjustable moving speed | |
| US10372099B2 (en) | Method for configuring an actuator for the operation of a moving element in a home-automation device, and actuator operating by this method | |
| JP7828847B2 (en) | Water-stopping opening/closing device and control method for the water-stopping opening/closing device | |
| CN117154564A (en) | Medium-voltage switch cabinet with cabinet door capable of being automatically closed and locked and application method thereof | |
| KR20120117149A (en) | Apparatus and method for controlling speed of power window | |
| KR20070121621A (en) | Door opener | |
| CN203050355U (en) | Electric door | |
| JP6992606B2 (en) | Performance evaluation method for active mass damper | |
| WO2017014076A1 (en) | Opening/closing control device | |
| CN117306985B (en) | A method and system for intelligent control of electric sliding doors | |
| CN220150902U (en) | Building outer wall supporting steel member | |
| JP7250619B2 (en) | shutter device | |
| KR100761689B1 (en) | Torque speed limit profile motor driving method and apparatus | |
| CN104934866A (en) | Electrical switch cabinet applying chain wheel transmission |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240315 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240925 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20241001 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20241021 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250107 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250203 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7629843 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |