JP7630893B2 JP2022001128A JP2022001128A JP7630893B2 JP 7630893 B2 JP7630893 B2 JP 7630893B2 JP 2022001128 A JP2022001128 A JP 2022001128A JP 2022001128 A JP2022001128 A JP 2022001128A JP 7630893 B2 JP7630893 B2 JP 7630893B2
Authority
JP
Japan
Prior art keywords
earthquake
resumption
trains
motion
observed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022001128A
Other languages
Japanese (ja)
Other versions
JP2023100442A (en
Inventor
美沙 森脇
直泰 岩田
俊太 野田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Technical Research Institute
Original Assignee
Railway Technical Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Technical Research Institute filed Critical Railway Technical Research Institute
Priority to JP2022001128A priority Critical patent/JP7630893B2/en
Publication of JP2023100442A publication Critical patent/JP2023100442A/en
Application granted granted Critical
Publication of JP7630893B2 publication Critical patent/JP7630893B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Description

この発明は、地震発生時に停止した移動体の停止位置からの運転再開の可否を判定する運転再開判定装置、及び地震発生時に停止した移動体の停止位置からの早期の運転再開を支援する運転再開支援システムに関する。 This invention relates to a driving resumption determination device that determines whether or not driving can be resumed from the stopping position of a moving body that has stopped when an earthquake occurs, and a driving resumption support system that supports the early resumption of driving from the stopping position of a moving body that has stopped when an earthquake occurs.

地震が発生した際に、運転停止条件を満たした場合には、走行中の列車は早期地震警報システムにより直ちに緊急停止させることとなっている。その後、鉄道事業者が沿線に一定間隔で設置している地震計による地震動観測値が、あらかじめ定められた基準値を超過していた場合、徐行や点検等の運転規制が行われる。従来の地震早期検知警報システムは、複数の検知点で地震動を検知するセンサと、各センサによって検知される地震動情報に基づいて被害域を推定して必要に応じて警報を発生する制御処理装置などを備えている(例えば、特許文献1参照)。この従来の地震早期検知警報システムでは、地震動情報に基づいて加害性の有無を判断し、加害性があると判断されたときには、列車への電力の供給を停止させて、列車の運行を停止させている。 When an earthquake occurs and the conditions for stopping operations are met, the earthquake early warning system immediately brings running trains to an emergency stop. After that, if the seismic motion measurements from seismometers installed at regular intervals along the line by the railway operator exceed a predetermined standard value, operational restrictions such as slowing down and inspections are implemented. A conventional earthquake early detection and warning system includes sensors that detect seismic motion at multiple detection points, and a control processing device that estimates the damage area based on the seismic motion information detected by each sensor and issues a warning as necessary (see, for example, Patent Document 1). This conventional earthquake early detection and warning system determines whether the earthquake is harmful based on the seismic motion information, and if it is determined that the earthquake is harmful, it stops the supply of power to the train and stops the train's operation.

列車の早期運転再開を支援する情報を提供することを目的として、鉄道地震被害推定情報配信システム(Damage Information System for Earthquake on Railway(DISER)(登録商標))が開発されており、地震発生後に面的地震動分布や、登録路線の詳細な沿線地震動の推定情報や、鉄道構造物の被害ランク推定情報が取得できる。この鉄道地震被害推定情報配信システムは、地震発生直後に公開される公的な地震情報と地盤データベースとを用いて、面的地震動分布を推定し、線路に沿った地震動やこの地震動に対する構造物の被害ランクを推定し、推定した情報を鉄道事業者に即時的に配信している(例えば、非特許文献1参照)。この鉄道地震被害推定情報配信システムでは、推定した情報に基づいて素早く列車の運転を再開している。 The Damage Information System for Earthquake on Railway (DISER) (registered trademark) has been developed with the aim of providing information to help trains resume operations as soon as possible, and can obtain area-wide seismic motion distribution after an earthquake occurs, detailed estimated information on seismic motion along registered lines, and estimated damage rank information for railway structures. This system uses public earthquake information released immediately after an earthquake occurs and a ground database to estimate area-wide seismic motion distribution, estimate seismic motion along the tracks and the damage rank of structures due to this seismic motion, and instantly distributes the estimated information to railway operators (for example, see Non-Patent Document 1). This system quickly resumes train operations based on the estimated information.

特開昭57-057273号公報Japanese Patent Publication No. 57-057273

岩田直泰,外4名,「鉄道地震被害推定情報配信システム(DISER)を利用して素早く運転を再開する」,RRR,公益財団法人鉄道総合技術研究所, 2020年,第77巻,第2号,p12-15Naoyasu Iwata and 4 others, "Quickly resume operation using the Railway Earthquake Damage Estimation Information Distribution System (DISER)", RRR, Railway Technical Research Institute, 2020, Vol. 77, No. 2, p12-15

鉄道沿線の地震計によって大きな地震を検知すると、地震動の観測値が予め定められた基準値を上回るときには、運行中の列車を直ちに緊急停止させたりする運転規制が行われている。その後に、沿線の構造物などの鉄道施設の状態を係員が目視で点検して、安全が確認されてから列車の運転を再開させている。しかし、人間の徒歩による点検であるため作業に長時間かかり、点検等が全て終了し安全が確認できるまで列車の運転を再開することができない。その結果、駅間停止列車の解消・旅客救済に長時間を要し、早期運転再開を困難にする要因の一つとなっている。 When a large earthquake is detected by seismometers along railway lines and the observed seismic motion exceeds a predetermined standard value, operational restrictions are put in place, such as immediately bringing trains in operation to an emergency stop. After that, staff visually inspect the condition of railway facilities such as structures along the line, and once safety is confirmed, train operations are resumed. However, since this inspection is carried out by humans on foot, it takes a long time, and train operations cannot be resumed until all inspections have been completed and safety has been confirmed. As a result, it takes a long time to stop trains between stations and rescue passengers, which is one of the factors that makes it difficult to resume operations quickly.

この発明の課題は、地震発生時に停止した移動体を停止位置から早期に運転再開することができる運転再開判定装置及び運転再開支援システムを提供することである。 The objective of this invention is to provide a resumption of operation determination device and a resumption of operation support system that can quickly resume operation of a moving object that has stopped during an earthquake from its stopped position.

この発明は、以下に記載するような解決手段により、前記課題を解決する。
なお、この発明の実施形態に対応する符号を付して説明するが、この実施形態に限定するものではない。
請求項1の発明は、図3、図4及び図6に示すように、地震発生時に停止した移動体(T1,T2,T4)の停止位置(P1,P2,P4)からの運転再開の可否を判定する運転再開判定装置であって、沿線の地震動(GD)が基準値(Th2)を下回る区間(S31,S32)内に前記移動体(T1,T2)が停止したときに、この区間内の他の停止位置(Pα)までこの移動体の運転再開を許可(S720)する運転再開許可部(8e)を備えることを特徴とする運転再開判定装置(8)である。
The present invention solves the above problems by the means described below.
In addition, although the present invention will be described with reference to corresponding reference numerals, the present invention is not limited to this embodiment.
The invention of claim 1 is an operation resumption judgment device (8) that judges whether or not operation can be resumed from the stopping position (P1, P2 , P4 ) of a moving body ( T1 , T2, T4 ) that stopped when an earthquake occurred, as shown in Figures 3 , 4 and 6, and is characterized in that when the moving body ( T1 , T2 ) stops within a section ( S31 , S32 ) where the seismic motion ( GD ) along the line is below a reference value ( Th2 ), it is equipped with an operation resumption permission unit (8e) that permits (S720) the resumption of operation of the moving body to another stopping position ( Pα) within this section.

請求項2の発明は、請求項1に記載の運転再開判定装置において、図3に示すように、前記運転再開許可部は、地震発生後に前記沿線の点検を実施する必要があるか否かの基準となる点検基準値(Th2)よりも、この沿線の地震動が下回る区間内の他の停止位置まで前記移動体の運転再開を許可することを特徴とする運転再開判定装置である。 The invention of claim 2 is a resumption of operation judgment device as described in claim 1, characterized in that, as shown in Figure 3, the resumption of operation permission unit permits the resumption of operation of the moving body to other stopping positions within the section where the seismic movement along the line is lower than the inspection standard value (Th 2 ), which is the criterion for whether or not inspection of the line needs to be carried out after the occurrence of an earthquake.

請求項3の発明は、請求項1又は請求項2に記載の運転再開判定装置において、図3に示すように、前記運転再開許可部は、前記沿線の地震動が基準値を下回る区間内の停車場(駅α)まで前記移動体の運転再開を許可することを特徴としている運転再開判定装置である。 The invention of claim 3 is the operation resumption determination device according to claim 1 or claim 2, characterized in that, as shown in FIG. 3, the operation resumption permission unit permits the resumption of operation of the moving body up to a station (station α) in a section where the seismic motion along the railway line is below a reference value.

請求項4の発明は、図3~図6に示すように、地震発生時に停止した移動体(T1,T2,T4)の停止位置(P1,P2,P4)からの早期の運転再開を支援する運転再開支援システムであって、請求項1から請求項3までのいずれか1項に記載の運転再開判定装置(8)を備え、前記運転再開判定装置は、前記沿線の地震動(GD)を評価(S500)する沿線地震動評価システム(5)が出力する沿線地震動情報と、前記移動体の運行を管理(S600)する運行管理システム(6)が出力するこの移動体の位置情報とに基づいて、前記沿線の地震動が基準値(Th2)を下回る区間内の他の停止位置(Pα)まで前記移動体(T1,T2)の運転再開を運転再開許可部(8e)が許可(S720)することを特徴とする運転再開支援システム(1)である。 The invention of claim 4 is an operation resumption support system that supports early resumption of operation of a moving body ( T1 , T2 , T4 ) that has stopped when an earthquake occurs from a stopping position ( P1 , P2 , P4 ) as shown in Figures 3 to 6, and is equipped with an operation resumption judgment device (8) described in any one of claims 1 to 3, and is characterized in that the operation resumption judgment device is an operation resumption support system (1) characterized in that an operation resumption permission unit ( 8e ) permits (S720) the resumption of operation of the moving body (T1, T2) to another stopping position (Pα) within a section where the seismic motion along the line is below a reference value ( Th2 ) based on lineside seismic motion information output by a lineside seismic motion evaluation system ( 5 ) that evaluates ( S500 ) the seismic motion ( GD ) along the line and position information of the moving body output by a traffic management system (6) that manages (S600) the operation of the moving body.

請求項5の発明は、請求項4に記載の運転再開支援システムにおいて、図1及び図2に示すように、前記沿線地震動評価システムは、沿線で連続的に観測される高密度の観測地震動情報に基づいて、前記沿線の地震動を評価することを特徴とする運転再開支援システムである。 The invention of claim 5 is the operation restart support system of claim 4, characterized in that, as shown in Figs. 1 and 2, the lineside earthquake motion evaluation system evaluates earthquake motion along the line based on high-density observed earthquake motion information that is continuously observed along the line.

請求項6の発明は、請求項4又は請求項5に記載の運転再開支援システムにおいて、図1及び図2に示すように、前記沿線地震動評価システムは、地震計によって観測される各観測点の地震動に関する観測地震動情報に基づいて、前記沿線の地震動を評価することを特徴とする運転再開支援システムである。 The invention of claim 6 is the operation restart support system of claim 4 or claim 5, characterized in that, as shown in Figs. 1 and 2, the railway line seismic motion evaluation system evaluates the seismic motion along the railway line based on observed seismic motion information related to seismic motion at each observation point observed by a seismometer.

請求項7の発明は、請求項4から請求項6までのいずれか1項に記載の運転再開支援システムにおいて、図4及び図5に示すように、前記移動体の運転再開を指令員に告知(S800)する運転再開告知装置(11)を備えることを特徴とする運転再開支援システムである。 The invention of claim 7 is a driving restart support system according to any one of claims 4 to 6, characterized in that it includes a driving restart notification device (11) that notifies a dispatcher (S800) of the restart of the moving body, as shown in Figs. 4 and 5.

この発明によると、地震発生時に停止した移動体を停止位置から早期に運転再開することができる。 This invention allows a moving vehicle that stops during an earthquake to quickly resume operation from its stopped position.

この発明の実施形態に係る運転再開支援システムの概念図であり、(A)は地震防災システムによる沿線地震動情報の概念図であり、(B)は高密度地震観測システムによる沿線地震動情報の概念図であり、(C)は沿線地震動評価システムによる沿線地震動情報の概念図である。1A is a conceptual diagram of a train operation resumption support system according to an embodiment of the present invention, in which (A) is a conceptual diagram of line-side seismic motion information obtained by an earthquake disaster prevention system, (B) is a conceptual diagram of line-side seismic motion information obtained by a high-density earthquake observation system, and (C) is a conceptual diagram of line-side seismic motion information obtained by a line-side seismic motion evaluation system. この発明の実施形態に係る運転再開支援システムを概略的に示す構成図である。1 is a schematic diagram illustrating a driving restart support system according to an embodiment of the present invention. この発明の実施形態に係る運転再開支援システムを模式的に示す概念図であり、(A)は地震発生後の列車の位置を模式的に示す概念図であり、(B)は沿線地震動と停止基準値及び点検基準値との関係を模式的に示す概念図であり、(C)は地震発生後の停止区間、点検区間及び移動可能区間を模式的に示す概念図である。1A is a conceptual diagram showing a schematic representation of a train operation restart support system according to an embodiment of the present invention; (A) is a conceptual diagram showing a schematic representation of the position of a train after an earthquake occurs; (B) is a conceptual diagram showing a schematic representation of the relationship between seismic motion along the line and stop and inspection standard values; and (C) is a conceptual diagram showing a schematic representation of stop sections, inspection sections, and movable sections after an earthquake occurs. この発明の実施形態に係る運転再開判定装置の構成図である。1 is a configuration diagram of an operation resumption determination device according to an embodiment of the present invention. この発明の実施形態に係る運転再開支援システムの動作を説明するためのフローチャートである。4 is a flowchart for explaining the operation of the driving restart support system according to the embodiment of the present invention. この発明の実施形態に係る運転再開判定装置の動作を説明するためのフローチャートである。4 is a flowchart for explaining the operation of the operation resumption determination device according to the embodiment of the present invention.

以下、図面を参照して、この発明の実施形態について詳しく説明する。
図2に示す線路Rは、列車T1~T4が走行する通路(軌道)である。線路Rは、二本の本線で構成された複線であり、起点から終点に向かって下り列車T1,T3が走行する下り線R1と、終点から起点に向かって上り列車T2,T3が走行する上り線R2とから構成されている。列車T1~T4は、線路Rに沿って移動する移動体である。列車T1~T4は、新幹線(登録商標)を走行する新幹線列車又は在来線を走行する在来線列車である。列車T1~T4は、例えば、電気車又は内燃車(内燃動車)などの鉄道車両であり、1両又は複数両の鉄道車両によって組成され編成されている。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
The track R shown in FIG. 2 is a passage (track) on which the trains T 1 to T 4 run. The track R is a double track consisting of two main lines, and is composed of a down line R 1 on which the down trains T 1 and T 3 run from the starting point to the end point, and an up line R 2 on which the up trains T 2 and T 3 run from the end point to the starting point. The trains T 1 to T 4 are moving bodies that move along the track R. The trains T 1 to T 4 are Shinkansen trains that run on the Shinkansen (registered trademark) or conventional trains that run on conventional lines. The trains T 1 to T 4 are, for example, railway vehicles such as electric cars or internal combustion cars (internal combustion railcars), and are made up and organized of one or more railway vehicles.

図1及び図2に示す運転再開支援システム1は、地震時に停止した列車T1,T2,T4の停止位置P1,P2,P4からの早期の運転再開を支援するシステムである。運転再開支援システム1は、地震直後に観測される観測地震動情報に基づいて、面的地震動分布及び列車T1~T4が走行する線路Rに沿った線的地震動分布を評価するとともに、地震時に停止した列車T1,T2,T4の停止位置P1,P2,P4と沿線地震動GDとに基づいて、列車T1,T2,T4の停止位置P1,P2,P4からの早期の運転再開の可否を判定する。運転再開支援システム1は、例えば、地震時における駅間停止列車を早期解消するために、地震後の駅間停止列車の運転再開を支援する駅間停止列車の早期解消支援システムである。運転再開支援システム1は、図1及び図2に示す地震防災システム2と、地震観測システム3と、高密度地震観測システム4と、沿線地震動評価システム5と、運行管理システム6と、図2に示す通信ネットワーク7と、図1及び図2に示す運転再開判定装置8と、図2に示す運行情報表示装置10と、運転再開告知装置11などを備えている。 The operation restart support system 1 shown in Fig. 1 and Fig. 2 is a system that supports early operation restart from the stop positions P1 , P2 , P4 of trains T1 , T2 , T4 that have stopped during an earthquake. The operation restart support system 1 evaluates the areal seismic motion distribution and the linear seismic motion distribution along the track R on which the trains T1 to T4 run, based on observed seismic motion information observed immediately after an earthquake, and determines whether or not early operation can be restarted from the stop positions P1 , P2 , P4 of the trains T1 , T2 , T4 that have stopped during an earthquake and the trackside seismic motion GD . The operation restart support system 1 is , for example, a system for supporting early resumption of operation of trains stopped between stations after an earthquake, in order to quickly resolve trains stopped between stations during an earthquake. The operation resumption support system 1 includes an earthquake disaster prevention system 2 shown in Figures 1 and 2, an earthquake observation system 3, a high-density earthquake observation system 4, a railway line seismic motion evaluation system 5, an operation control system 6, a communication network 7 shown in Figures 2, an operation resumption determination device 8 shown in Figures 1 and 2, an operation information display device 10 shown in Figure 2, and an operation resumption notification device 11.

図1及び図2に示す地震防災システム2は、各観測点の地震動を図3に示す地震計MA~MCによって観測するシステムである。ここで、地震動とは、地震における地面の揺れ動きである。地震時の列車運転規制に用いる地震動を表す指標は、警報用最大加速度、スペクトル強度(Spectral Intensity値(SI値))、計測震度、加速度記録の最大振幅値(絶対値)である最大加速度(Peak Ground Acceleration(PGA))、速度記録の最大振幅値(絶対値)である最大速度(Peak Ground Velocity(PGV))などである。地震防災システム2は、例えば、地震動の数秒間の初期微動データに基づいて、地震諸元を推定し運転規制を行う早期地震警報システムである。地震防災システム2は、各観測点に設置されて地震動を測定及び記録する早期警報用地震計と、各地震計間の地震動情報を中継するとともにこの地震動情報を伝送及び管理する中継サーバと、各地震計及び中継サーバを監視する監視端末などを備えている。地震防災システム2は、例えば、鉄道事業者が沿線に間隔をあけて配置した各観測点の自社の地震計によって比較的疎な地震動を観測する。地震防災システム2は、例えば、地震観測システム3が出力する観測地震動情報などを併用可能である。地震防災システム2は、図3(B)(C)に示すような各観測点の地震動を地震計MA~MCによって観測地震動GA~GCとして検出する。地震防災システム2は、各観測点の地震計MA~MCが観測した観測地震動GA~GCを観測地震動情報として沿線地震動評価システム5及び運転再開判定装置8に出力する。 The earthquake disaster prevention system 2 shown in Fig. 1 and Fig. 2 is a system that observes seismic motion at each observation point by seismometers M A to M C shown in Fig. 3. Here, seismic motion refers to the shaking of the ground during an earthquake. Indicators that represent seismic motion used for train operation restrictions during an earthquake include maximum acceleration for warning, spectral intensity (Spectral Intensity value (SI value)), measured seismic intensity, maximum acceleration (Peak Ground Acceleration (PGA)) which is the maximum amplitude value (absolute value) of an acceleration record, and maximum speed (Peak Ground Velocity (PGV)) which is the maximum amplitude value (absolute value) of a speed record. The earthquake disaster prevention system 2 is an early earthquake warning system that estimates earthquake specifications and performs operation restrictions based on initial microtremor data of seismic motion for several seconds, for example. The earthquake disaster prevention system 2 includes early warning seismometers installed at each observation point to measure and record seismic motion, a relay server that relays seismic motion information between each seismometer and transmits and manages the seismic motion information, and a monitoring terminal that monitors each seismometer and the relay server. The earthquake disaster prevention system 2, for example, observes relatively sparse earthquake motion using the railway operator's own seismometers at each observation point placed at intervals along the railway line. The earthquake disaster prevention system 2 can also use, for example, observed earthquake motion information output by the earthquake observation system 3. The earthquake disaster prevention system 2 detects earthquake motion at each observation point as observed earthquake motions G A to G C using seismometers M A to M C as shown in Figures 3(B) and (C). The earthquake disaster prevention system 2 outputs the observed earthquake motions G A to G C observed by the seismometers M A to M C at each observation point to the railway line earthquake motion evaluation system 5 and the operation resumption determination device 8 as observed earthquake motion information.

図1及び図2に示す地震防災システム2は、地震発生時に線路Rを走行する列車T1~T4の緊急停止の可否を判定する。地震防災システム2は、図3(A)(B)に示すように、観測地震動GA,GBが停止基準値Th1を上回る停止区間S1内を列車T1,T2,T4が走行しているときには、この停止区間S1内を走行する列車T1,T2,T4を緊急停止させる必要があると判定する。一方、地震防災システム2は、観測地震動GCが停止基準値Th1を下回る停止区間S1外を列車T3が走行しているときには、この停止区間S1外を走行する列車T3を緊急停止させる必要がないと判定する。ここで、図3(B)に示す停止基準値Th1は、地震発生後に列車T1~T4を停止させる必要があるか否かを判定するときに基準となる値である。図3(B)(C)に示す停止区間S1は、地震発生後に列車T1,T2,T4を停止させなければならない区間である。境界A-Bは、地震計MAが分担する受け持ち区間と地震計MBが分担する受け持ち区間との境界である。境界B-Cは、地震計MBが分担する受け持ち区間と地震計MCが分担する受け持ち区間との境界である。地震防災システム2は、地震発生時に列車T1~T4を緊急停止させる必要があるときには、列車T1~T4に供給する電力を自動的に停止させて列車T1~T4の非常ブレーキを動作させたり、列車無線によって列車T1~T4の運転士に緊急停止を指令したりする。 The earthquake disaster prevention system 2 shown in Fig. 1 and Fig. 2 judges whether or not the trains T 1 to T 4 traveling on the track R should be stopped in an emergency when an earthquake occurs. As shown in Fig. 3 (A) and (B), when the trains T 1 , T 2 , and T 4 are traveling in the stop section S 1 where the observed seismic motions G A and G B exceed the stop reference value Th 1 , the earthquake disaster prevention system 2 judges that the trains T 1 , T 2 , and T 4 traveling in this stop section S 1 should be stopped in an emergency. On the other hand, when the train T 3 is traveling outside the stop section S 1 where the observed seismic motion G C is below the stop reference value Th 1 , the earthquake disaster prevention system 2 judges that the train T 3 traveling outside the stop section S 1 should not be stopped in an emergency. Here, the stop reference value Th 1 shown in Fig. 3 (B) is a reference value when judging whether or not the trains T 1 to T 4 should be stopped after the occurrence of an earthquake. The stop section S1 shown in Figures 3(B) and (C) is a section where trains T1 , T2 , and T4 must be stopped after an earthquake occurs. Boundary A-B is the boundary between the section covered by seismometer M A and the section covered by seismometer M B. Boundary B-C is the boundary between the section covered by seismometer M B and the section covered by seismometer M C. When it is necessary to make an emergency stop of trains T1 to T4 in the event of an earthquake, earthquake disaster prevention system 2 automatically stops the power supplied to trains T1 to T4 to activate emergency brakes of trains T1 to T4 , or issues an emergency stop command to the drivers of trains T1 to T4 via train radio.

地震観測システム3は、地震防災システム2のような自社の地震計MA~MCによる地震動の観測とは異なり、気象庁又は国立研究開発法人防災科学技術研究所などの外部の公的機関が各観測点に設置する地震計によって地震動を観測する。地震観測システム3は、例えば、気象庁の各観測点の地震計による地震動情報(緊急地震速報)、又は国立研究開発法人防災科学技術研究所の強震観測網(Kyoshin Network(K-NET))による地震動情報(K-NET観測データ)などを使用する。地震観測システム3は、各観測点の地震計が観測した観測地震動を観測地震動情報(地震動情報)として沿線地震動評価システム5に出力する。 Unlike the earthquake disaster prevention system 2, which observes seismic motion using its own seismometers M A to M C , the earthquake observation system 3 observes seismic motion using seismometers installed at each observation point by an external public institution such as the Japan Meteorological Agency or the National Research Institute for Earth Science and Disaster Resilience. The earthquake observation system 3 uses, for example, seismic motion information (Earthquake Early Warning) from the seismometers at each observation point of the Japan Meteorological Agency, or seismic motion information (K-NET observation data) from the strong earthquake observation network (Kyoshin Network (K-NET)) of the National Research Institute for Earth Science and Disaster Resilience. The earthquake observation system 3 outputs the observed seismic motion observed by the seismometers at each observation point to the railway line seismic motion evaluation system 5 as observed seismic motion information (seismic motion information).

高密度地震観測システム4は、沿線の地震動を高密度に観測するシステムである。高密度地震観測システム4は、例えば、光ファイバーケーブルをセンサとして使用して、分散されたひずみの計測を行う分散型音響計測(Distributed Acoustic Sensing(DAS))によって、沿線の地震動を高密度に観測する。高密度地震観測システム4は、例えば、既存の通信用光ファイバーケーブルを利用可能であり、光ファイバーケーブル及び分散型音計測器により沿線の地震動を高密度で連続的に測定する。高密度地震観測システム4は、光信号をパルス化して光ファイバーケーブルの一端から連続して送信して、光ファイバーケーブル中のわずかな不純物から反射される反射信号(後方散乱波(レイリー散乱波))を受信する光信号送受信機と、この光信号送受信機が受信する反射信号を解析する解析部などを備えている。高密度地震観測システム4は、地震時に光ファイバーケーブルの長さが変化したときに受信される反射信号と、通常時に受信される反射信号とを比較し、光ファイバーケーブルのひずみ(変形)を検出することによって地震動を観測する。高密度地震観測システム4は、数十kmの光ファイバーケーブルを使用することによって、数m毎にひずみを計測することが可能であり、従来の地震計を用いた観測と比較して、非常に高密度な観測を低コストで実現可能である。高密度地震観測システム4は、沿線で観測した高密度の観測地震動を観測地震動情報として沿線地震動評価システム5に出力する。 The high-density earthquake observation system 4 is a system that observes seismic motion along railway lines at high density. The high-density earthquake observation system 4 observes seismic motion along railway lines at high density by distributed acoustic sensing (DAS), which uses, for example, optical fiber cables as sensors to measure distributed strain. The high-density earthquake observation system 4 can use, for example, existing optical fiber cables for communication, and continuously measures seismic motion along railway lines at high density using optical fiber cables and distributed sound meters. The high-density earthquake observation system 4 includes an optical signal transmitter/receiver that pulses an optical signal and transmits it continuously from one end of the optical fiber cable, and receives a reflected signal (backscattered wave (Rayleigh scattered wave)) reflected from a small amount of impurities in the optical fiber cable, and an analysis unit that analyzes the reflected signal received by the optical signal transmitter/receiver. The high-density earthquake observation system 4 compares the reflected signal received when the length of the optical fiber cable changes during an earthquake with the reflected signal received under normal circumstances, and observes seismic motion by detecting the strain (deformation) of the optical fiber cable. The high-density earthquake observation system 4 uses tens of kilometers of optical fiber cable to measure strain every few meters, and can achieve very high-density observations at low cost compared to observations using conventional seismometers. The high-density earthquake observation system 4 outputs the high-density observed seismic motion observed along the railway line to the railway line earthquake motion evaluation system 5 as observed seismic motion information.

図1及び図2に示す沿線地震動評価システム5は、沿線の地震動を評価するシステムである。沿線地震動評価システム5は、地震防災システム2及び地震観測システム3が出力する観測地震動情報に基づいて、沿線の地震動を評価する。沿線地震動評価システム5は、図1に示すように、地震観測システム3が出力する各観測点の観測地震動情報に基づいて、線路Rに沿った沿線の地震動を推定したり、地震防災システム2及び地震観測システム3が出力する各観測点の観測地震動情報に基づいて、線路Rに沿った沿線の地震動を推定したりする。沿線地震動評価システム5は、強い地震動が作用したときの地盤の特性変化を考慮して、地震直後の観測地震動情報と沿線の地盤情報とに基づいて面的地震動分布及び沿線の線的地震動分布を推定する。沿線地震動評価システム5は、各観測点の観測地震動情報に基づいて、地盤の増幅特性を考慮して基盤の入力地震動を推定し、推定後の基盤の入力地震動を用いて空間補間を行い、基盤における500mメッシュの面的地震動分布を演算する。ここで、空間補間とは、観測値などの既知のデータを用いて、周辺のデータを予測する際に用いる手法である。沿線地震動評価システム5は、各メッシュの地盤増幅特性を用いて地表の面的地震動分布及び沿線の線的地震動分布を演算する。沿線地震動評価システム5は、例えば、地震後の点検範囲の適正な判断を支援するために、地震直後に沿線の地震動や鉄道構造物の被害ランクを推定する鉄道地震被害推定情報配信システムである。 The lineside earthquake motion evaluation system 5 shown in Figures 1 and 2 is a system that evaluates earthquake motion along a line. The lineside earthquake motion evaluation system 5 evaluates earthquake motion along a line based on observed earthquake motion information output by the earthquake disaster prevention system 2 and the earthquake observation system 3. As shown in Figure 1, the lineside earthquake motion evaluation system 5 estimates earthquake motion along the track R based on observed earthquake motion information at each observation point output by the earthquake observation system 3, and estimates earthquake motion along the track R based on observed earthquake motion information at each observation point output by the earthquake disaster prevention system 2 and the earthquake observation system 3. The lineside earthquake motion evaluation system 5 estimates areal earthquake motion distribution and linear earthquake motion distribution along the line based on observed earthquake motion information immediately after an earthquake and ground information along the line, taking into account changes in the characteristics of the ground when a strong earthquake motion acts. The railway line earthquake motion evaluation system 5 estimates the input earthquake motion of the foundation taking into account the amplification characteristics of the ground based on the observed earthquake motion information from each observation point, performs spatial interpolation using the estimated input earthquake motion of the foundation, and calculates the areal earthquake motion distribution of 500m mesh on the foundation. Here, spatial interpolation is a method used to predict surrounding data using known data such as observed values. The railway line earthquake motion evaluation system 5 calculates the areal earthquake motion distribution of the ground surface and the linear earthquake motion distribution along the railway line using the ground amplification characteristics of each mesh. The railway line earthquake motion evaluation system 5 is a railway earthquake damage estimation information distribution system that estimates the earthquake motion along the railway line and the damage rank of railway structures immediately after an earthquake, for example, to support appropriate judgment of the inspection range after an earthquake.

沿線地震動評価システム5は、例えば、分散型音響計測によって観測される沿線の高密度の地震動に関する観測地震動情報に基づいて、沿線の地震動を評価する。沿線地震動評価システム5は、図1に示すように、高密度地震観測システム4が出力する観測地震動情報に基づいて、線路Rに沿った沿線の地震動を評価する。沿線地震動評価システム5は、地震観測システム3のみが出力する観測地震動情報や、地震防災システム2及び地震観測システム3が出力する観測地震動情報を空間補間して沿線の地震動分布を推定する手法とは異なり、高密度地震観測システム4が出力する観測地震動情報から沿線の地震動分布を生成する。 The lineside earthquake motion evaluation system 5 evaluates earthquake motion along the line based on observed earthquake motion information related to high-density earthquake motion along the line observed, for example, by distributed acoustic measurement. As shown in FIG. 1, the lineside earthquake motion evaluation system 5 evaluates earthquake motion along the line R based on observed earthquake motion information output by the high-density earthquake observation system 4. Unlike a method that estimates earthquake motion distribution along the line by spatially interpolating observed earthquake motion information output only by the earthquake observation system 3 or observed earthquake motion information output by the earthquake disaster prevention system 2 and the earthquake observation system 3, the lineside earthquake motion evaluation system 5 generates earthquake motion distribution along the line from observed earthquake motion information output by the high-density earthquake observation system 4.

沿線地震動評価システム5は、地震防災システム2及び/又は地震観測システム3が出力する観測地震動情報に基づいて推定した面的地震動分布及び線的地震動分布から沿線地震動GDを抽出し、図1(A)及び図3に示すような沿線地震動GDとキロ程とを対応させた沿線地震動情報を生成する。沿線地震動評価システム5は、高密度地震観測システム4が出力する観測地震動情報に基づいて沿線地震動GDを抽出し、図1(B)及び図3に示すような沿線地震動GDとキロ程とを対応させた沿線地震動情報を生成する。ここで、図1(A)(B)及び図3に示すキロ程とは、線路Rの起点からの線路延長(距離)であり、一般に起点から終点に向かって昇べきに設定される。沿線地震動評価システム5は、例えば、図3に示すように、地震観測システム3が観測した観測地震動に基づいて、下り線R1及び上り線R2に沿った沿線地震動GDを推定する。沿線地震動評価システム5は、図1(C)及び図3(B)に示すように、縦軸が地震動であり、横軸がキロ程であるときに、キロ程に応じた沿線地震動GDを表す波形を生成する。沿線地震動評価システム5は、沿線地震動GDとキロ程とを対応させた沿線地震動情報(推定地震動情報)を運転再開判定装置8に出力する。 The lineside earthquake motion evaluation system 5 extracts lineside earthquake motion GD from the planar earthquake motion distribution and the linear earthquake motion distribution estimated based on the observed earthquake motion information output by the earthquake disaster prevention system 2 and/or the earthquake observation system 3, and generates lineside earthquake motion information in which the lineside earthquake motion GD corresponds to the kilometer distance as shown in Fig. 1 (A) and Fig. 3. The lineside earthquake motion evaluation system 5 extracts lineside earthquake motion GD based on the observed earthquake motion information output by the high-density earthquake observation system 4, and generates lineside earthquake motion information in which the lineside earthquake motion GD corresponds to the kilometer distance as shown in Fig. 1 (B) and Fig. 3. Here, the kilometer distance shown in Fig. 1 (A) (B) and Fig. 3 is the track extension (distance) from the starting point of the track R, and is generally set to an ascending order from the starting point to the end point. For example, as shown in Fig. 3, the lineside earthquake motion evaluation system 5 estimates lineside earthquake motion GD along the down line R1 and the up line R2 based on the observed earthquake motion observed by the earthquake observation system 3. As shown in Fig. 1(C) and Fig. 3(B), the lineside earthquake motion evaluation system 5 generates a waveform representing the lineside earthquake motion GD corresponding to the kilometer distance when the vertical axis represents the earthquake motion and the horizontal axis represents the kilometer distance. The lineside earthquake motion evaluation system 5 outputs lineside earthquake motion information (estimated earthquake motion information) that corresponds the lineside earthquake motion GD to the kilometer distance to the service resumption determination device 8.

図1及び図2に示す運行管理システム6は、列車T1~T4の運行を管理するシステムである。運行管理システム6は、列車T1~T4の運行を円滑に進めるための業務を支援するシステムである。運行管理システム6は、例えば、鉄道の列車運行管理において列車ダイヤに基づいて、列車T1~T4を集中して管理及び制御する列車運行管理システム(Programed Traffic Control(PTC))である。運行管理システム6は、例えば、図3(A)に示すように、地震発生時に下り線R1で停止した列車T1の停止位置P1を検出するとともに、地震発生時に上り線R2で停止した列車T2,T4の停止位置P2,P4を検出する。運行管理システム6は、列車T1~T4の運行状況を常に把握しており、線路R上の列車T1~T4の走行位置P3及び停止位置P1,P2,P4を検出して、列車T1~T4の現在位置を位置情報(在線位置情報)として運転再開判定装置8及び運行情報表示装置10に出力する。 The traffic control system 6 shown in Fig. 1 and Fig. 2 is a system that manages the operation of trains T1 to T4 . The traffic control system 6 is a system that supports operations for smoothly advancing the operation of trains T1 to T4 . For example, the traffic control system 6 is a train traffic control system (Programmed Traffic Control (PTC)) that centrally manages and controls trains T1 to T4 based on a train diagram in railway train traffic control. For example, as shown in Fig. 3 (A), the traffic control system 6 detects the stop position P1 of train T1 that stopped on the down line R1 when an earthquake occurred, and detects the stop positions P2 , P4 of trains T2 , T4 that stopped on the up line R2 when an earthquake occurred. The traffic control system 6 constantly monitors the operating status of trains T1 to T4 , detects the running positions P3 and stopping positions P1 , P2 , and P4 of trains T1 to T4 on the track R, and outputs the current positions of trains T1 to T4 as position information (on-track position information) to the operation resumption determination device 8 and the operation information display device 10.

図2に示す通信ネットワーク7は、運転再開支援システム1に関する種々の情報を送受信するネットワークである。通信ネットワーク7は、地震防災システム2から沿線地震動評価システム5及び運転再開判定装置8に観測地震動情報を送信したり、地震観測システム3から沿線地震動評価システム5に観測地震動情報を送信したり、高密度地震観測システム4から沿線地震動評価システム5に観測地震動情報を送信したり、沿線地震動評価システム5から運転再開判定装置8に沿線地震動情報を送信したり、運行管理システム6から運転再開判定装置8及び運行情報表示装置10に位置情報を送信したり、運転再開判定装置8から運転再開告知装置11に運転再開情報を送信したりする。通信ネットワーク7は、地震防災システム2、地震観測システム3、高密度地震観測システム4、沿線地震動評価システム5、運行管理システム6、運転再開判定装置8、運行情報表示装置10及び運転再開告知装置11が相互に通信可能なようにこれらを接続する電話回線又はインターネット回線などの電気通信回線(通信装置)である。 The communication network 7 shown in FIG. 2 is a network for transmitting and receiving various information related to the operation resumption support system 1. The communication network 7 transmits observed seismic motion information from the earthquake disaster prevention system 2 to the lineside seismic motion evaluation system 5 and the operation resumption judgment device 8, transmits observed seismic motion information from the earthquake observation system 3 to the lineside seismic motion evaluation system 5, transmits observed seismic motion information from the high-density earthquake observation system 4 to the lineside seismic motion evaluation system 5, transmits lineside seismic motion information from the lineside seismic motion evaluation system 5 to the operation resumption judgment device 8, transmits position information from the operation management system 6 to the operation resumption judgment device 8 and the operation information display device 10, and transmits operation resumption information from the operation resumption judgment device 8 to the operation resumption notification device 11. The communication network 7 is an electric communication line (communication device) such as a telephone line or an Internet line that connects the earthquake disaster prevention system 2, the earthquake observation system 3, the high-density earthquake observation system 4, the lineside seismic motion evaluation system 5, the operation management system 6, the operation resumption judgment device 8, the operation information display device 10, and the operation resumption notification device 11 so that they can communicate with each other.

図1、図2及び図4に示す運転再開判定装置8は、地震発生時に停止した列車T1,T2,T4の停止位置P1,P2,P4からの運転再開の可否を判定する装置である。運転再開判定装置8は、列車T1,T2,T4の停止位置P1,P2,P4と、線路Rに沿った沿線地震動GDとに基づいて、地震時に停止した列車T1,T2,T4が停止位置P1,P2,P4から運転再開可能か否かを判定する。運転再開判定装置8は、地震時の停止列車の早期解消を図ることによって、列車内の乗客の早期救済を図る。運転再開判定装置8は、地震発生時に停止した列車T1,T2,T4の停止位置P1,P2,P4からの運転再開の可否を判定する運転再開判定プログラムに従って、所定の運転再開判定処理を実行する。運転再開判定装置8は、運転再開支援システム1を構成するネットワークコンピュータの一つであり、地震防災システム2、沿線地震動評価システム5及び運行管理システム6からの情報を受け取って処理結果を運転再開告知装置11に送信するサーバである。運転再開判定装置8は、図4に示すように、受信部8aと、観測地震動情報記憶部8bと、沿線地震動情報記憶部8cと、位置情報記憶部8dと、運転再開許可部8eと、運転再開判定プログラム記憶部8fと、送信部8gと、制御部8hなどを備えている。 The operation resumption determination device 8 shown in Fig. 1, Fig. 2 and Fig. 4 is a device that determines whether or not operation can be resumed from the stop positions P1 , P2 , P4 of the trains T1 , T2 , T4 that stopped when an earthquake occurred. The operation resumption determination device 8 determines whether or not the trains T1 , T2 , T4 that stopped when an earthquake occurred can resume operation from the stop positions P1 , P2 , P4 based on the stop positions P1 , P2 , P4 of the trains T1 , T2 , T4 and the trackside seismic motion GD along the track R. The operation resumption determination device 8 aims to quickly resolve trains that are stopped when an earthquake occurs, thereby quickly rescuing passengers on the trains. The operation resumption determination device 8 executes a predetermined operation resumption determination process according to an operation resumption determination program that determines whether or not operation can be resumed from the stop positions P1 , P2 , P4 of the trains T1 , T2 , T4 that stopped when an earthquake occurred. The operation resumption determination device 8 is one of the network computers constituting the operation resumption support system 1, and is a server that receives information from the earthquake disaster prevention system 2, the lineside earthquake motion evaluation system 5, and the traffic control system 6, and transmits the processing results to the operation resumption notification device 11. As shown in Fig. 4, the operation resumption determination device 8 includes a receiving unit 8a, an observed earthquake motion information storage unit 8b, a lineside earthquake motion information storage unit 8c, a position information storage unit 8d, an operation resumption permission unit 8e, an operation resumption determination program storage unit 8f, a transmitting unit 8g, and a control unit 8h.

図4に示す受信部8aは、地震防災システム2、沿線地震動評価システム5及び運行管理システム6から運転再開判定装置8に沿線地震動情報及び位置情報を受信する手段である。受信部8aは、地震防災システム2が送信する観測地震動情報、沿線地震動評価システム5が送信する沿線地震動情報及び運行管理システム6が送信する位置情報を受信する受信装置である。受信部8aは、地震防災システム2、沿線地震動評価システム5及び運行管理システム6から通信ネットワーク7を通じて受信した観測地震動情報、沿線地震動情報及び位置情報を制御部8hに出力する。 The receiving unit 8a shown in FIG. 4 is a means for receiving lineside seismic motion information and position information from the earthquake disaster prevention system 2, lineside seismic motion evaluation system 5, and traffic management system 6 to the operation resumption determination device 8. The receiving unit 8a is a receiving device that receives observed seismic motion information transmitted by the earthquake disaster prevention system 2, lineside seismic motion information transmitted by the lineside seismic motion evaluation system 5, and position information transmitted by the traffic management system 6. The receiving unit 8a outputs the observed seismic motion information, lineside seismic motion information, and position information received from the earthquake disaster prevention system 2, lineside seismic motion evaluation system 5, and traffic management system 6 via the communication network 7 to the control unit 8h.

観測地震動情報記憶部8bは、地震防災システム2が出力する観測地震動情報を記憶する手段である。観測地震動情報記憶部8bは、例えば、図1(A)及び図3(C)に示すように、地震防災システム2が観測した沿線の観測地震動GA~GCをキロ程と対応させて観測地震動情報として記憶する記憶装置である。観測地震動情報記憶部8bは、観測地震動GA~GCが停止基準値Th1を上回る停止区間S1をキロ程と対応させて記憶する。 The observed earthquake motion information storage unit 8b is a means for storing the observed earthquake motion information output by the earthquake disaster prevention system 2. For example, as shown in Fig. 1(A) and Fig. 3(C), the observed earthquake motion information storage unit 8b is a storage device that stores the observed earthquake motions G A to G C along the railway line observed by the earthquake disaster prevention system 2 as observed earthquake motion information in association with kilometres. The observed earthquake motion information storage unit 8b stores the stop section S 1 where the observed earthquake motions G A to G C exceed the stop reference value Th 1 in association with kilometres.

図4に示す沿線地震動情報記憶部8cは、沿線地震動評価システム5が出力する沿線地震動情報を記憶する手段である。沿線地震動情報記憶部8cは、例えば、図3(B)に示すように、沿線地震動評価システム5が評価した沿線地震動GDをキロ程と対応させて沿線地震動情報として記憶する記憶装置である。 The lineside earthquake motion information storage unit 8c shown in Fig. 4 is a means for storing lineside earthquake motion information output by the lineside earthquake motion evaluation system 5. The lineside earthquake motion information storage unit 8c is a storage device that stores, as lineside earthquake motion information, the lineside earthquake motion G D evaluated by the lineside earthquake motion evaluation system 5 in association with kilometres, as shown in Fig. 3(B), for example.

図4に示す位置情報記憶部8dは、運行管理システム6が出力する列車T1~T4の位置情報を記憶する手段である。位置情報記憶部8dは、例えば、図3(A)に示すように、運行管理システム6が管理する列車T1~T4の現在位置を位置情報として記憶する記憶装置である。位置情報記憶部8dは、各列車T1~T4の停止位置P1,P2,P4及び走行位置P3をキロ程と対応させて記憶する。位置情報記憶部8dは、例えば、線路R上の駅α,βなどの停車場、踏切、トンネル及び橋梁などの鉄道施設の種類及び位置を鉄道施設情報として位置情報とともに記憶する。位置情報記憶部8dは、例えば、下り線R1で停止する列車T1の停止位置P1と、上り線R2で停止する列車T2,T4の停止位置P2,P4と、下り線R1を走行する列車T3の走行位置P3とを、キロ程と対応させて随時更新して記憶する。 The position information storage unit 8d shown in Fig. 4 is a means for storing the position information of the trains T1 to T4 output by the traffic control system 6. The position information storage unit 8d is a storage device that stores the current positions of the trains T1 to T4 managed by the traffic control system 6 as position information, for example, as shown in Fig. 3(A). The position information storage unit 8d stores the stop positions P1 , P2 , P4 and the running position P3 of each of the trains T1 to T4 in association with the kilometre distance. The position information storage unit 8d stores, for example, the types and positions of railway facilities such as stations α, β, etc. on the track R, railroad crossings, tunnels and bridges, as railway facility information together with the position information. The position information storage unit 8d, for example, updates and stores the stopping position P1 of train T1 stopping on the down line R1 , the stopping positions P2 , P4 of trains T2 , T4 stopping on the up line R2 , and the running position P3 of train T3 running on the down line R1 in correspondence with the kilometres.

運転再開許可部8eは、沿線地震動GDが点検基準値Th2を下回る移動可能区間S31,S32内に列車T1,T2が停止したときに、この移動可能区間S31,S32内の他の停止位置Pαまで列車T1,T2の運転再開を許可する手段である。ここで、図3(B)に示す点検基準値Th2は、地震発生後に沿線の点検を実施する必要があるか否かを判定するときに基準となる値である。図3(B)(C)に示す点検区間S21は、地震発生後に沿線の点検を実施する必要がある区間(点検範囲)である。移動可能区間S31~S33は、地震発生後に沿線の点検を実施しなくても列車T1,T2,T4を移動させることが可能な区間(移動可能範囲)である。 The operation resumption permission unit 8e is a means for permitting the resumption of operation of the trains T1, T2 to another stop position in the movable sections S31 , S32 when the trains T1 , T2 stop in the movable sections S31 , S32 where the trackside earthquake motion GD is below the inspection reference value Th2 . Here, the inspection reference value Th2 shown in FIG. 3(B) is a reference value when determining whether or not it is necessary to carry out a trackside inspection after the occurrence of an earthquake. The inspection section S21 shown in FIG. 3(B) and (C) is a section (inspection range) where it is necessary to carry out a trackside inspection after the occurrence of an earthquake. The movable sections S31 to S33 are sections (movable ranges) where the trains T1 , T2 , T4 can be moved even if a trackside inspection is not carried out after the occurrence of an earthquake.

運転再開許可部8eは、地震防災システム2が出力する観測地震動情報と、運行管理システム6が出力する位置情報とに基づいて、列車T1~T4が停止区間S1内で停止しているか否かを判定する。運転再開許可部8eは、観測地震動情報記憶部8bが記憶する停止区間S1と、位置情報記憶部8dが記憶する列車T1~T4の現在位置とに基づいて、列車T1~T4が停止区間S1内で停止しているか否かを判定する。運転再開許可部8eは、例えば、図3に示すように、停止区間S1内で停止している列車T1,T2,T4を抽出する。 The operation restart permission unit 8e judges whether the trains T1 to T4 are stopped in the stop section S1 based on the observed seismic motion information output by the earthquake disaster prevention system 2 and the position information output by the traffic control system 6. The operation restart permission unit 8e judges whether the trains T1 to T4 are stopped in the stop section S1 based on the stop section S1 stored in the observed seismic motion information storage unit 8b and the current positions of the trains T1 to T4 stored in the position information storage unit 8d. The operation restart permission unit 8e extracts the trains T1 , T2 , and T4 stopped in the stop section S1 , for example, as shown in FIG.

運転再開許可部8eは、沿線地震動評価システム5が出力する沿線地震動情報と、運行管理システム6が出力する列車T1~T4の位置情報とに基づいて、沿線地震動GDが点検基準値Th2を下回る移動可能範囲S31,S32内の他の停止位置Pαまで列車T1,T2の運転再開を許可する。運転再開許可部8eは、例えば、図3(A)(B)に示すように、沿線地震動GDが点検基準値Th2を下回っている移動可能区間S31,S32内の列車T1,T2については、移動可能区間S31,S32内の停止位置P1,P2から停止位置Pαまで運転再開を許可する。一方、運転再開許可部8eは、点検基準値Th2よりも沿線地震動GDが上回る移動可能区間S33外の列車T4については、停止位置P4からの運転再開を許可しない。 The operation restart permission unit 8e permits the trains T1 , T2 to resume operation up to another stop position Pα within the movable range S31 , S32 where the lineside earthquake motion GD is below the inspection reference value Th2 , based on the lineside earthquake motion information output by the lineside earthquake motion evaluation system 5 and the position information of the trains T1 to T4 output by the traffic control system 6. For example, as shown in Figs. 3(A) and 3(B), the operation restart permission unit 8e permits the trains T1 , T2 within the movable section S31 , S32 where the lineside earthquake motion GD is below the inspection reference value Th2 to resume operation from the stop positions P1 , P2 within the movable section S31 , S32 to the stop position . On the other hand, the operation restart permission unit 8e does not permit the train T4 outside the movable section S33 where the lineside earthquake motion GD is greater than the inspection reference value Th2 to resume operation from the stop position P4 .

運転再開許可部8eは、沿線地震動GDが点検基準値Th2を下回る移動可能区間S31,S32内の駅αまで列車T1,T2の運転再開を許可する。運転再開許可部8eは、沿線地震動GDが点検基準値Th2を下回る移動可能区間S31内の停止位置P1に停止している列車T1については、移動可能区間S31内で最も近い駅αまで図中二点鎖線で示すように、列車T1の移動を許可する。運転再開許可部8eは、沿線地震動GDが点検基準値Th2を下回る移動可能区間S32内の停止位置P2に停止している列車T2については、移動可能区間S32内で最も近い駅αまで図中二点鎖線で示すように、列車T2の移動を許可する。運転再開許可部8eは、列車T1,T2,T4の運転再開の可否を運転再開情報として制御部8hに出力する。 The operation restart permission unit 8e permits the resumption of operation of the trains T1 , T2 to stations α in the movable sections S31 , S32 where the trackside earthquake motion GD is below the inspection standard value Th2 . For the train T1 stopped at a stop position P1 in the movable section S31 where the trackside earthquake motion GD is below the inspection standard value Th2 , the operation restart permission unit 8e permits the train T1 to move to the nearest station α in the movable section S31 as shown by the two-dot chain line in the figure. For the train T2 stopped at a stop position P2 in the movable section S32 where the trackside earthquake motion GD is below the inspection standard value Th2 , the operation restart permission unit 8e permits the train T2 to move to the nearest station α in the movable section S32 as shown by the two-dot chain line in the figure. The operation restart permission unit 8e outputs the permission or not of restarting the operation of the trains T 1 , T 2 , and T 4 to the control unit 8h as operation restart information.

図4に示す運転再開判定プログラム記憶部8fは、地震発生時に停止した列車T1,T2,T4の停止位置P1,P2,P4からの運転再開の可否を判定するための運転再開判定プログラムを記憶する手段である。運転再開判定プログラム記憶部8fは、情報記録媒体から読み取った運転再開判定プログラム又は電気通信回線を通じて取り込まれた運転再開判定プログラムを記憶する記憶装置などである。 The operation resumption judgment program storage unit 8f shown in Fig. 4 is a means for storing an operation resumption judgment program for judging whether or not operation can be resumed from the stopping positions P1 , P2 , P4 of trains T1 , T2 , T4 that stopped when an earthquake occurred. The operation resumption judgment program storage unit 8f is a storage device that stores the operation resumption judgment program read from an information recording medium or the operation resumption judgment program downloaded through an electric communication line.

送信部8gは、運転再開判定装置8から運転再開告知装置11に運転再開情報を送信する手段である。送信部8gは、運転再開許可部8eが出力する運転再開情報を運転再開判定装置8から通信ネットワーク7を通じて運転再開告知装置11に送信する送信装置である。 The transmission unit 8g is a means for transmitting driving resumption information from the driving resumption determination device 8 to the driving resumption notification device 11. The transmission unit 8g is a transmission device that transmits the driving resumption information output by the driving resumption permission unit 8e from the driving resumption determination device 8 to the driving resumption notification device 11 via the communication network 7.

制御部8hは、運転再開判定装置8の種々の動作を制御する中央処理部(CPU)である。制御部8hは、運転再開判定プログラムに従って運転再開判定処理を実行する。制御部8hは、例えば、受信部8aから受信した観測地震動情報、沿線地震動情報及び位置情報を観測地震動情報記憶部8b、沿線地震動情報記憶部8c及び位置情報記憶部8dに出力したり、観測地震動情報の記憶を観測地震動情報記憶部8bに指令したり、沿線地震動情報の記憶を沿線地震動情報記憶部8cに指令したり、位置情報の記憶を位置情報記憶部8dに指令したり、観測地震動情報記憶部8bから観測地震動情報を読み出してこの観測地震動情報を運転再開許可部8eに出力したり、沿線地震動情報記憶部8cから沿線地震動情報を読み出してこの沿線地震動情報を運転再開許可部8eに出力したり、位置情報記憶部8dから位置情報を読み出して運転再開許可部8eに出力したり、列車T1~T4が停止区間S1内で停止しているか否かの判定を運転再開許可部8eに指令したり、列車T1,T2の運転再開の許可を運転再開許可部8eに指令したり、運転再開許可部8eが出力する運転再開情報を送信部8gに出力したり、運転再開情報の送信を送信部8gに指令したりする。制御部8hは、受信部8a、観測地震動情報記憶部8b、沿線地震動情報記憶部8c、位置情報記憶部8d、運転再開許可部8e、運転再開判定プログラム記憶部8f及び送信部8gとの間に相互に通信可能に接続されている。 The control unit 8h is a central processing unit (CPU) that controls various operations of the operation resumption determination device 8. The control unit 8h executes operation resumption determination processing according to an operation resumption determination program. The control unit 8h outputs the observed seismic motion information, lineside seismic motion information, and position information received from the receiving unit 8a to the observed seismic motion information storage unit 8b, the lineside seismic motion information storage unit 8c, and the position information storage unit 8d, instructs the observed seismic motion information storage unit 8b to store the observed seismic motion information, instructs the lineside seismic motion information storage unit 8c to store the lineside seismic motion information, instructs the position information storage unit 8d to store the position information, reads out the observed seismic motion information from the observed seismic motion information storage unit 8b and outputs the observed seismic motion information to the operation restart permission unit 8e, reads out the lineside seismic motion information from the lineside seismic motion information storage unit 8c and outputs the lineside seismic motion information to the operation restart permission unit 8e, reads out the position information from the position information storage unit 8d and outputs it to the operation restart permission unit 8e, instructs the operation restart permission unit 8e to determine whether the trains T 1 to T 4 are stopped within the stop section S 1 , and The control unit 8h issues a command to the operation restart permission unit 8e to permit the restart of operation of 2 , outputs the operation restart information output by the operation restart permission unit 8e to the transmission unit 8g, and commands the transmission unit 8g to transmit the operation restart information. The control unit 8h is connected to the receiving unit 8a, the observed earthquake motion information storage unit 8b, the lineside earthquake motion information storage unit 8c, the position information storage unit 8d, the operation restart permission unit 8e, the operation restart judgment program storage unit 8f, and the transmission unit 8g so as to be able to communicate with each other.

図1、図2及び図4に示す運転指令所9は、列車T1~T4の乗務員に種々の指令をする機関である。運転指令所9は、この運転指令所9内で指令業務を行う指令員が従事する現業機関であり、沿線地震動評価システム5が評価する沿線地震動GDの監視や、運行管理システム6が管理する列車T1~T4の運行状況の監視などの業務が指令員によって行われる。運転指令所9は、例えば、停止位置P1,P2から次の駅αへ列車T1,T2を最徐行で運転再開するように、列車T1,T2の運転士に列車無線などによって、指令員が業務指示を行う。運転指令所9は、運行情報表示装置10と運転再開告知装置11などを備えている。 The operation control center 9 shown in Fig. 1, Fig. 2 and Fig. 4 is an organization that issues various commands to the crew members of the trains T1 to T4 . The operation control center 9 is an operational organization where a dispatcher who performs command duties in the operation control center 9 is employed, and the dispatcher performs duties such as monitoring the wayside earthquake motion GD evaluated by the wayside earthquake motion evaluation system 5 and monitoring the operation status of the trains T1 to T4 managed by the operation control system 6. For example, the dispatcher in the operation control center 9 issues instructions to the drivers of the trains T1 and T2 via train radio or the like to resume operation of the trains T1 and T2 from the stopping positions P1 and P2 to the next station α at the slowest speed. The operation control center 9 is equipped with an operation information display device 10, an operation resumption notification device 11, and the like.

図2及び図4に示す運行情報表示装置10は、列車T1~T4の運行状況を表示する装置である。運行情報表示装置10は、運行管理システム6が管理する列車T1~T4の現在位置(在線位置)、列車T1~T4の列車番号、行先及び遅れ時間などの運行情報を画面上に表示する。運行情報表示装置10は、図3(A)に示すように、列車T1,T2,T4の停止位置P1,P2,P4及び列車T3の走行位置P3を画面上に表示する。 The operation information display device 10 shown in Figures 2 and 4 is a device that displays the operation status of trains T1 to T4 . The operation information display device 10 displays on a screen operation information such as the current positions (on-track positions) of trains T1 to T4 , the train numbers, destinations, and delay times of trains T1 to T4 , which are managed by the operation management system 6. As shown in Figure 3(A), the operation information display device 10 displays on a screen the stop positions P1 , P2 , P4 of trains T1 , T2 , T4 and the running position P3 of train T3 .

図2及び図4に示す運転再開告知装置11は、列車T1,T2の運転再開を指令員に告知する装置である。運転再開告知装置11は、運転再開判定装置8の判定結果を指令員に告知する。運転再開告知装置11は、運転再開判定装置8が送信する運転再開情報を受信すると、運転指令所9内の指令員に視覚又は聴覚を通じて運転再開を告知させる。運転再開告知装置11は、例えば、図3(A)に示す運転再開を許可する列車T1,T2を表示装置の画面上に表示して運転指令所9内の指令員に告知したり、音声発生装置が発生する音声によって運転指令所9内の指令員に告知したりする。 The operation resumption notification device 11 shown in Fig. 2 and Fig. 4 is a device that notifies a dispatcher of the resumption of operation of the trains T1 and T2 . The operation resumption notification device 11 notifies the dispatcher of the judgment result of the operation resumption judgment device 8. When the operation resumption notification device 11 receives operation resumption information transmitted by the operation resumption judgment device 8, it notifies the dispatcher in the operation control center 9 visually or audibly. For example, the operation resumption notification device 11 notifies the dispatcher in the operation control center 9 of the resumption of operation by displaying the trains T1 and T2 that are permitted to be resumed as shown in Fig. 3 (A) on the screen of a display device, or notifies the dispatcher in the operation control center 9 by a voice generated by a voice generating device.

次に、この発明の実施形態に係る運転再開支援システムの動作を説明する。
図5に示すステップ(以下、Sという)100において、観測点の地震動を地震防災システム2が観測する。地震が発生すると、図3(B)(C)に示す地震計MA~MCが測定した各観測点の観測地震動GA~GCを、地震防災システム2が沿線地震動評価システム5及び運転再開判定装置8に送信する。また、公的機関の地震計が測定した各観測点の観測地震動を地震観測システム3が沿線地震動評価システム5に送信するとともに、沿線で連続的に測定された各観測点の高密度な観測地震動を高密度地震観測システム4が沿線地震動評価システム5に送信する。
Next, the operation of the driving restart support system according to the embodiment of the present invention will be described.
In step (hereinafter referred to as S) 100 shown in Fig. 5, the earthquake disaster prevention system 2 observes seismic motion at the observation points. When an earthquake occurs, the earthquake disaster prevention system 2 transmits the observed seismic motion G A to G C at each observation point measured by seismometers M A to M C shown in Fig. 3 (B) and (C) to the lineside seismic motion evaluation system 5 and the operation resumption determination device 8. In addition, the earthquake observation system 3 transmits the observed seismic motion at each observation point measured by seismometers of public institutions to the lineside seismic motion evaluation system 5, and the high-density earthquake observation system 4 transmits the high-density observed seismic motion at each observation point continuously measured along the line to the lineside seismic motion evaluation system 5.

S200において、観測地震動GA~GCが停止基準値Th1を上回るか否かを地震防災システム2が判断する。観測地震動GA~GCが停止基準値Th1を上回ると地震防災システム2が判断したときにはS300に進み、観測地震動GA~GCが停止基準値Th1を下回ると地震防災システム2が判断したときにはS400に進む。 In S200, the earthquake disaster prevention system 2 determines whether the observed seismic motions G A to G C exceed the stop reference value Th 1. When the earthquake disaster prevention system 2 determines that the observed seismic motions G A to G C exceed the stop reference value Th 1 , the process proceeds to S300, and when the earthquake disaster prevention system 2 determines that the observed seismic motions G A to G C fall below the stop reference value Th 1 , the process proceeds to S400.

S300において、地震防災システム2が列車T1,T2,T4を緊急停止させる。図3(B)に示すように、観測地震動GA,GBが停止基準値Th1を上回る停止区間S1内に列車T1,T2,T4が在線するときには、この停止区間S1内に在線する列車T1,T2,T4を地震防災システム2が緊急停止させる。 In S300, the earthquake disaster prevention system 2 brings the trains T1 , T2 , and T4 to an emergency stop. As shown in Fig. 3(B) , when the trains T1 , T2 , and T4 are located in a stop section S1 where the observed seismic motions G A and G B exceed a stop reference value Th1 , the earthquake disaster prevention system 2 brings the trains T1 , T2 , and T4 located in the stop section S1 to an emergency stop.

S400において、地震防災システム2が列車T3を緊急停止させない。図3(B)に示すように、観測地震動GCが停止基準値Th1を下回る停止区間S1外に列車T3が在線しているときには、この停止区間S1外に在線する列車T3を地震防災システム2が緊急停止させない。 In S400, the earthquake disaster prevention system 2 does not make an emergency stop of the train T3 . As shown in Fig. 3(B) , when the train T3 is located outside the stop section S1 where the observed seismic motion Gc is below the stop reference value Th1 , the earthquake disaster prevention system 2 does not make an emergency stop of the train T3 located outside the stop section S1 .

S500において、沿線地震動評価システム5が沿線の地震動を評価する。地震防災システム2又は地震観測システム3から沿線地震動評価システム5が観測地震動情報を受信すると、図1(C)及び図3(B)に示すように線路Rのキロ程に応じた沿線地震動GDを沿線地震動評価システム5が推定する。また、高密度地震観測システム4から沿線地震動評価システム5が観測地震動情報を受信すると、図1(C)及び図3(B)に示すように線路Rのキロ程に応じた沿線地震動GDを沿線地震動評価システム5が評価する。その結果、沿線地震動GDを沿線地震動情報として運転再開判定装置8に沿線地震動評価システム5が送信する。 In S500, the lineside earthquake motion evaluation system 5 evaluates the earthquake motion along the line. When the lineside earthquake motion evaluation system 5 receives observed earthquake motion information from the earthquake disaster prevention system 2 or the earthquake observation system 3, the lineside earthquake motion evaluation system 5 estimates the lineside earthquake motion G D corresponding to the kilometre of the track R as shown in Fig. 1 (C) and Fig. 3 (B). Also, when the lineside earthquake motion evaluation system 5 receives observed earthquake motion information from the high-density earthquake observation system 4, the lineside earthquake motion evaluation system 5 evaluates the lineside earthquake motion G D corresponding to the kilometre of the track R as shown in Fig. 1 (C) and Fig. 3 (B). As a result, the lineside earthquake motion evaluation system 5 transmits the lineside earthquake motion G D to the operation resumption determination device 8 as lineside earthquake motion information.

S600において、列車T1~T4の位置を運行管理システム6が検出する。例えば、図3(A)(B)に示すように、列車T1,T2,T4の停止位置P1,P2,P4を運行管理システム6が検出して、列車T1,T2,T4の位置情報を運行管理システム6が運転再開判定装置8に送信する。また、例えば、停止区間S1外に在線する列車T3の走行位置P3を運行管理システム6が検出して、列車T3の位置情報を運行管理システム6が運転再開判定装置8に送信する。 In S600, the traffic control system 6 detects the positions of the trains T1 to T4 . For example, as shown in Figures 3(A) and 3(B), the traffic control system 6 detects the stop positions P1 , P2 , and P4 of the trains T1 , T2 , and T4, and transmits the position information of the trains T1 , T2 , and T4 to the operation resumption determination device 8. Also, for example, the traffic control system 6 detects the running position P3 of the train T3 located outside the stop section S1 , and transmits the position information of the train T3 to the operation resumption determination device 8.

S700において、列車T1,T2,T4の運転再開の可否を判定する運転再開判定処理を運転再開判定装置8が実行する。先ず、沿線地震動GDが停止基準値Th1を上回る停止区間S1内に列車T1~T4が在線しているか否かを運転再開判定装置8が判定し、停止区間S1内で停止している列車T1,T2,T4を運転再開判定装置8が特定する。次に、図3(A)(B)に示すように、地震発生時に停止位置P1,P2,P4で停止した列車T1,T2,T4を、停止位置P1,P2,P4から運転再開するか否かを運転再開判定装置8が判定する。 In S700, the operation resumption determination device 8 executes an operation resumption determination process for determining whether or not operation of the trains T1 , T2 , and T4 can be resumed. First, the operation resumption determination device 8 determines whether or not the trains T1 to T4 are located in the stop section S1 where the trackside earthquake motion GD exceeds the stop reference value Th1 , and identifies the trains T1 , T2 , and T4 that are stopped in the stop section S1 . Next, as shown in Figures 3(A) and (B) , the operation resumption determination device 8 determines whether or not operation of the trains T1 , T2 , and T4 that stopped at the stop positions P1 , P2 , and P4 when the earthquake occurred should be resumed from the stop positions P1 , P2 , and P4 .

S800において、列車T1,T2の運転再開を運転再開告知装置11が指令員に告知する。運転指令所9内の指令員が列車T1,T2の運転士に列車無線などによって列車T1,T2の運転再開を指令すると、列車T1,T2の運転士が列車T1,T2を停止位置P1,P2から最徐行で運転再開する。その結果、移動可能区間S31,S32内の駅αまで列車T1,T2が移動して、列車T1,T2内の乗客が駅αで降車する。 In S800, the operation resumption notification device 11 notifies the dispatcher that the trains T1 and T2 have resumed operation. When the dispatcher in the operation control center 9 commands the drivers of the trains T1 and T2 to resume operation of the trains T1 and T2 by train radio or the like, the drivers of the trains T1 and T2 resume operation of the trains T1 and T2 at the slowest speed from the stopping positions P1 and P2 . As a result, the trains T1 and T2 move to stations α within the movable sections S31 and S32 , and the passengers on the trains T1 and T2 get off at station α.

次に、この発明の実施形態に係る運転再開判定装置の動作を説明する。
以下では、図4に示す運転再開許可部8eの動作を中心として説明する。
図6に示すS710において、沿線地震動GDが点検基準値Th2を下回るか否かを運転再開許可部8eが判断する。図3に示すように、沿線地震動GDが点検基準値Th2を下回る移動可能範囲S31~S33内に列車T1,T2,T4が停止しているか否かを運転再開許可部8eが判断する。沿線地震動GDが点検基準値Th2を下回ると運転再開許可部8eが判断したときにはS720に進み、沿線地震動GDが点検基準値Th2を上回ると運転再開許可部8eが判断したときにはS730に進む。
Next, the operation of the operation resumption determination device according to the embodiment of the present invention will be described.
The following description will be centered on the operation of the operation restart permission unit 8e shown in FIG.
In S710 shown in Fig. 6, the operation restart permission unit 8e judges whether the wayside earthquake motion GD falls below the inspection reference value Th2 . As shown in Fig. 3, the operation restart permission unit 8e judges whether the trains T1 , T2 , and T4 are stopped within the movable range S31 to S33 where the wayside earthquake motion GD falls below the inspection reference value Th2 . When the operation restart permission unit 8e judges that the wayside earthquake motion GD falls below the inspection reference value Th2 , the process proceeds to S720, and when the operation restart permission unit 8e judges that the wayside earthquake motion GD exceeds the inspection reference value Th2, the process proceeds to S730.

S720において、列車T1,T2の運転再開を運転再開許可部8eが許可する。従来の早期地震警報システムでは、図3(B)に示す境界A-Bと境界B-Cとの間を分担する地震計MBが観測する観測地震動GBがこれらの間で一定であると判断するため、観測地震動GBが点検基準値Th2を上回ると判断する。このため、従来の早期地震警報システムでは、境界A-Bと境界B-Cとの間の点検が終わるまで停止位置P1で停止している列車T1を移動させることができない。一方、この実施形態では、図3(B)に示すように、従来の早期地震警報システムに比べて、沿線地震動GDを線路R上の各位置で詳細に評価することができる。このため、この実施形態では、沿線地震動GDが点検基準値Th2を上回る区間については、停止位置P2から列車T2を移動不可能であるが、沿線地震動GDが点検基準値Th2を下回る区間については列車T2を移動可能である。例えば、図3(B)に示すように、停止位置P2から駅αまでの間では、沿線地震動GDが点検基準値Th2を連続して下回っているため、停止位置P2から駅αまで列車T2を移動可能である。このため、沿線地震動GDが点検基準値Th2を下回る移動可能範囲S31,S32内で停止している列車T1,T2については、移動可能範囲S31,S32内の列車T1,T2の運転再開を運転再開許可部8eが許可する。その結果、例えば、観測地震動GA,GBが停止基準値Th1を上回るために一旦停止させた列車T1,T2であっても、沿線地震動GDが点検基準値Th2を下回るときには、係員による安全確認をせずに列車T1,T2をα駅まで直ちに移動させることができる。 In S720, the operation restart permission unit 8e permits the restart of operation of the trains T 1 and T 2. In the conventional earthquake early warning system, the observed seismic motion G B observed by the seismometer M B , which is responsible for the area between the boundary A-B and the boundary B-C shown in FIG. 3B, is determined to be constant between these boundaries, and therefore the observed seismic motion G B is determined to exceed the inspection standard value Th 2. For this reason, in the conventional earthquake early warning system, the train T 1 stopped at the stop position P 1 cannot be moved until the inspection between the boundary A-B and the boundary B-C is completed. On the other hand, in this embodiment, as shown in FIG. 3B, the trackside seismic motion G D can be evaluated in detail at each position on the track R compared to the conventional earthquake early warning system. For this reason, in this embodiment, the train T 2 cannot be moved from the stop position P 2 in the section where the trackside seismic motion G D exceeds the inspection standard value Th 2 , but the train T 2 can be moved in the section where the trackside seismic motion G D is below the inspection standard value Th 2 . For example, as shown in Fig. 3B, the trackside earthquake motion GD is continuously below the inspection reference value Th2 between the stop position P2 and station α, so that the train T2 can be moved from the stop position P2 to station α. For this reason, for the trains T1 and T2 stopped within the movable ranges S31 and S32 where the trackside earthquake motion GD is below the inspection reference value Th2 , the operation restart permission unit 8e permits the trains T1 and T2 within the movable ranges S31 and S32 to resume operation. As a result, even if the trains T1 and T2 are temporarily stopped because the observed seismic motions GA and GB exceed the stop reference value Th1 , for example, when the trackside earthquake motion GD falls below the inspection reference value Th2 , the trains T1 and T2 can be immediately moved to station α without safety confirmation by a staff member.

S730において、列車T4の運転再開を運転再開許可部8eが許可しない。例えば、図3(B)に示すように、停止位置P4から駅βまでの間では、沿線地震動GDが点検基準値Th2を下回っている区間が一部あるが、沿線地震動GDが点検基準値Th2を上回っている区間もある。停止位置P4から駅βまでの間には、地震発生後に沿線の点検を実施しなくても列車T4を移動させることが可能な移動可能区間S33が存在するが、地震発生後に点検が必要な点検区間S21も存在し、停止位置P4から駅βまで列車T4を移動不可能である。このため、沿線地震動GDが点検基準値Th2を上回る移動可能範囲S33外で停止している列車T4については、列車T4の運転再開を運転再開許可部8eが許可しない。その結果、鉄道施設の安全が係員によって確認されるまで、停止位置P4で列車T4が停止した状態を維持する。 In S730, the operation restart permission unit 8e does not permit the train T4 to resume operation. For example, as shown in FIG. 3B, between the stop position P4 and station β, there are some sections where the trackside earthquake motion GD is below the inspection standard value Th2 , but there are also sections where the trackside earthquake motion GD exceeds the inspection standard value Th2 . Between the stop position P4 and station β, there is a movable section S33 where the train T4 can be moved without carrying out a trackside inspection after the occurrence of an earthquake, but there is also an inspection section S21 where inspection is required after the occurrence of an earthquake, and the train T4 cannot be moved from the stop position P4 to station β. For this reason, the operation restart permission unit 8e does not permit the train T4 to resume operation for the train T4 that is stopped outside the movable range S33 where the trackside earthquake motion GD exceeds the inspection standard value Th2 . As a result, the train T4 remains stopped at the stop position P4 until the safety of the railway facility is confirmed by the staff.

この発明の実施形態に係る運転再開判定装置及び運転再開支援システムには、以下に記載するような効果がある。
(1) この実施形態では、沿線地震動GDが点検基準値Th2を下回る移動可能区間S31,S32内に列車T1,T2が停止したときに、この移動可能区間S31,S32内の他の停止位置Pαまで列車T1,T2の運転再開を運転再開許可部8eが許可する。このため、列車T1,T2を停止位置P1,P2から他の停止位置Pαまで移動させることができる。その結果、地震発生時に停止した列車T1,T2を、停止位置P1,P2から早期に運転再開することができる。
The driving resumption determination device and driving resumption support system according to the embodiment of the present invention have the following effects.
(1) In this embodiment, when the trains T1 , T2 stop in the movable sections S31 , S32 where the trackside seismic motion GD is below the inspection standard value Th2 , the operation restart permission unit 8e permits the trains T1 , T2 to resume operation to another stop position within the movable sections S31 , S32 . Therefore, the trains T1 , T2 can be moved from the stop positions P1 , P2 to the other stop position . As a result, the trains T1 , T2 that stopped when the earthquake occurred can be quickly resumed operation from the stop positions P1 , P2 .

(2) この実施形態では、地震発生後に沿線の点検を実施する必要があるか否かの基準となる点検基準値Th2よりも、この沿線地震動GDが下回る移動可能区間S31,S32内の他の停止位置Pαまで列車T1,T2の運転再開を運転再開許可部8eが許可する。このため、地震時に停止している列車T1,T2を停止位置P1,P2から迅速に走行させることができる。その結果、地震時の停止列車を早期に運転再開することができる。 (2) In this embodiment, the operation restart permission unit 8e permits the trains T1, T2 to resume operation to another stop position within the movable sections S31 , S32 where the trackside seismic motion GD is lower than the inspection reference value Th2 , which is the criterion for whether or not a trackside inspection is necessary after the occurrence of an earthquake. This allows the trains T1 , T2 that are stopped during an earthquake to run quickly from the stop positions P1 , P2 . As a result, the trains stopped during an earthquake can resume operation early.

(3) この実施形態では、沿線地震動GDが点検基準値Th2を下回る移動可能区間S31,S32内の駅αまで列車T1,T2の運転再開を運転再開許可部8eが許可する。このため、例えば、地震時に駅間で停止している列車T1,T2を次の駅αまで最徐行で走行させることができ、列車T1,T2内から乗客を駅αで迅速に降車させることができる。その結果、地震時の駅間停止列車などを早期に運転再開することができるため、旅客を早期に救済することができる。 (3) In this embodiment, the operation restart permission unit 8e permits the trains T1 and T2 to resume operation up to station α in the movable sections S31 and S32 where the trackside earthquake motion GD is below the inspection standard value Th2 . For this reason, for example, the trains T1 and T2 stopped between stations during an earthquake can be made to travel at the slowest possible speed to the next station α, and passengers can be made to disembark from the trains T1 and T2 at station α quickly. As a result, trains stopped between stations during an earthquake can be quickly restarted, and passengers can be quickly rescued.

(4) この実施形態では、沿線地震動GDを評価する沿線地震動評価システム5が出力する沿線地震動情報と、列車T1~T4の運行を管理する運行管理システム6が出力する列車T1~T4の位置情報とに基づいて、沿線地震動GDが点検基準値Th2を下回る移動可能区間S31,S32内の他の停止位置Pαまで列車T1,T2の運転再開を運転再開許可部8eが許可する。このため、例えば、詳細な沿線地震動情報を参照して、列車T1,T2の停止位置P1,P2から次の駅αまでの間の地震動が点検の実施基準値に達していないことが確認できる場合には、列車T1,T2を最徐行で次の駅αまで走行させることができる。その結果、鉄道における地震後の運転再開を支援することができる。また、鉄道地震被害推定情報配信システム(DISER)を導入している鉄道事業者において、運転再開支援機能を付加することによって活用範囲をより一層広げることができる。さらに、地震発生後の沿線地震動情報を逐次更新して、停止位置P1,P2,P4からの列車T1,T2,T4の早期の運転再開を支援する情報を提供することができる。 (4) In this embodiment, the operation restart permission unit 8e permits the trains T 1 and T 2 to resume operation to another stop position P α in the movable sections S 31 and S 32 where the lineside earthquake motion G D is below the inspection standard value Th 2 based on the lineside earthquake motion information output by the lineside earthquake motion evaluation system 5 that evaluates the lineside earthquake motion G D and the position information of the trains T 1 to T 4 output by the traffic control system 6 that manages the operation of the trains T 1 to T 4. For this reason, for example, when it is confirmed by referring to detailed lineside earthquake motion information that the earthquake motion between the stop positions P 1 and P 2 of the trains T 1 and T 2 and the next station α does not reach the inspection implementation standard value, the trains T 1 and T 2 can be made to run at the slowest speed to the next station α. As a result, it is possible to support the resumption of operation after an earthquake in railways. In addition, the scope of use can be further expanded by adding an operation restart support function to railway operators who have introduced the Railway Earthquake Damage Estimation Information Distribution System (DISER). Furthermore, by successively updating trackside seismic motion information after an earthquake occurs, it is possible to provide information that supports early resumption of operation of trains T 1 , T 2 , T 4 from stopping positions P 1 , P 2 , P 4 .

(5) この実施形態では、沿線で連続的に観測される高密度の地震動に関する観測地震動情報に基づいて、沿線地震動評価システム5が沿線の地震動を評価する。このため、高密度地震観測システム4が出力する高密度の観測地震動情報に基づいて、沿線の地震動を高精度に観測し、沿線地震動情報を容易に把握することができる。 (5) In this embodiment, the railway line earthquake motion evaluation system 5 evaluates the earthquake motion along the railway line based on observed earthquake motion information related to high-density earthquake motion continuously observed along the railway line. Therefore, based on the high-density observed earthquake motion information output by the high-density earthquake observation system 4, it is possible to observe the earthquake motion along the railway line with high accuracy and easily grasp the railway line earthquake motion information.

(6) この実施形態では、地震計MA~MCによって観測される各観測点の地震動に関する観測地震動情報に基づいて、沿線地震動評価システム5が沿線の地震動を評価する。このため、外部の地震観測システム3が出力するK-NETなどの公的機関の地震計による観測地震動のみを使用して空間補間により面的地震動分布を推定した後に、沿線地震動GDを抽出して沿線地震動情報を生成することができる。また、自社の地震防災システム2が出力する観測地震動GA~GC及び外部の地震観測システム3が出力する観測地震動の双方を使用して空間補間により面的地震動分布を推定した後に、沿線地震動GDを抽出して沿線地震動情報を生成することができる。 (6) In this embodiment, the railway line earthquake motion evaluation system 5 evaluates the railway line earthquake motion based on the observed earthquake motion information on the earthquake motion at each observation point observed by the seismometers M A to M C. Therefore, it is possible to estimate the planar earthquake motion distribution by spatial interpolation using only the observed earthquake motion by the seismometers of public institutions such as K-NET output by the external earthquake observation system 3, and then extract the railway line earthquake motion G D to generate railway line earthquake motion information. In addition, it is possible to estimate the planar earthquake motion distribution by spatial interpolation using both the observed earthquake motions G A to G C output by the company's earthquake disaster prevention system 2 and the observed earthquake motion output by the external earthquake observation system 3, and then extract the railway line earthquake motion G D to generate railway line earthquake motion information.

(7) この実施形態では、列車T1,T2の運転再開を指令員に運転再開告知装置11が告知する。このため、列車T1,T2の運転士に指令員が運転再開を列車無線などによって連絡することができ、安全な停止位置Pαまで列車T1,T2を最徐行で移動させることができる。 (7) In this embodiment, the resumption of operation of the trains T1 and T2 is notified to the dispatcher by the operation resumption notification device 11. Therefore, the dispatcher can inform the drivers of the trains T1 and T2 of the resumption of operation by train radio or the like, and the trains T1 and T2 can be moved to a safe stopping position at the slowest possible speed.

この発明は、以上説明した実施形態に限定するものではなく、以下に記載するように種々の変形又は変更が可能であり、これらもこの発明の範囲内である。
(1) この実施形態では、列車T1~T4が新幹線又は在来線などの鉄道車両である場合を例に挙げて説明したが、磁気浮上式鉄道の鉄道車両、単軌式(モノレール)の車両、案内軌条式(新交通システム)の車両又は自動車などの他の移動体についても、この発明を適用することができる。また、この実施形態では、停車場として乗客の状況を行うために使用される駅α,βを例に挙げて説明したが、貨物の積卸しを行うために使用される貨物駅、列車の行き違い又は待合わせを行うために使用される信号場、車両の入替や列車の組成を行うために使用される操車場などの停車場についても、この発明を適用することができる。さらに、この実施形態では、駅間で停止している列車T1,T2を移動可能範囲S31,S32の他の停止位置Pαまで運転再開を許可する場合を例に挙げて説明したが、列車T1,T2を駅αに移動させる場合に、この発明を限定するものではない。例えば、踏切内、トンネル内又は橋梁上の移動可能範囲内で停止している列車を、この移動可能範囲内の踏切外、トンネル外又は橋梁外の他の停止位置まで移動させる場合についても、この発明を適用することができる。この場合には、例えば、踏切を跨ぐように列車が停止しているときに、踏切外の移動可能範囲内に列車を移動させることによって、踏切の遮断機を上げることができる。同様に、この実施形態では、停止位置P1,P2で停止している列車T1,T2を移動可能範囲S31,S32の最も近い駅αまで運転再開を許可する場合を例に挙げて説明したが、移動可能範囲であれば次の駅α以外の他の駅まで運転再開を許可する場合についても、この発明を適用することができる。
The present invention is not limited to the above-described embodiment, and various modifications and variations are possible as described below, which are also within the scope of the present invention.
(1) In this embodiment, the trains T 1 to T 4 are railroad vehicles such as bullet trains or conventional railroads, but the present invention can be applied to other moving bodies such as magnetic levitation railroad vehicles, monorail vehicles, guide rail vehicles (new transit systems), and automobiles. In addition, in this embodiment, the stations α and β used to check passenger status as stations are used as stations, but the present invention can be applied to stations such as freight stations used to load and unload cargo, signal stations used to allow trains to pass or wait, and shunting yards used to switch vehicles and form trains. Furthermore, in this embodiment, the trains T 1 and T 2 stopped between stations are allowed to resume operation up to another stop position P α in the movable ranges S 31 and S 32 , but the present invention is not limited to the case of moving the trains T 1 and T 2 to the station α. For example, the present invention can be applied to a case where a train stopped within a movable range in a railroad crossing, in a tunnel, or on a bridge is moved to another stop position outside the railroad crossing, outside the tunnel, or outside the bridge within the movable range. In this case, for example, when a train is stopped straddling a railroad crossing, the crossing gate can be raised by moving the train within the movable range outside the railroad crossing. Similarly, in this embodiment, an example has been described in which trains T1 and T2 stopped at stop positions P1 and P2 are permitted to resume operation up to the nearest station α within the movable ranges S31 and S32 , but the present invention can also be applied to a case in which trains are permitted to resume operation up to a station other than the next station α as long as it is within the movable range.

(2) この実施形態では、地震防災システム2、地震観測システム3及び高密度地震観測システム4が出力する観測地震動情報を使用する場合を例に挙げて説明したが、これらのいずれか1つ又は任意に組み合わせた観測地震動情報を使用する場合についても、この発明を適用することができる。また、この実施形態では、高密度地震観測システム4が分散型音響計測によって沿線の地震動を高密度に観測する場合を例に挙げて説明したが、分散型音響計測による観測にこの発明を限定するものではない。例えば、線路Rに多数の地震計を高密度に配置することによって、沿線の地震動を詳細に観測することもできる。さらに、この実施形態では、沿線に地震計MA~MCを3台設置する場合を例に挙げて説明したが、設置台数を3つに限定するものではなく、地震計を2台以下又は4台以上設置する場合についても、この発明を適用することができる。 (2) In this embodiment, the case where observed seismic motion information output by the earthquake disaster prevention system 2, the earthquake observation system 3, and the high-density earthquake observation system 4 is used has been described as an example, but the present invention can also be applied to a case where observed seismic motion information obtained by any one of these or any combination of these is used. In addition, in this embodiment, the case where the high-density earthquake observation system 4 observes seismic motion along the railway line at high density using distributed acoustic measurement has been described as an example, but the present invention is not limited to observation using distributed acoustic measurement. For example, by arranging many seismometers at high density on the railway line R, seismic motion along the railway line can be observed in detail. Furthermore, in this embodiment, the case where three seismometers M A to M C are installed along the railway line has been described as an example, but the number of seismometers installed is not limited to three, and the present invention can also be applied to a case where two or less or four or more seismometers are installed.

(3) この実施形態では、運転指令所9の指令員が列車T1,T2の運転士に運転再開を無線連絡する場合を例に挙げて説明したが、列車T1,T2の運転士が所持する携帯端末に運転再開を告知する場合についても、この発明を適用することができる。また、この実施形態では、運転指令所9の指令員から告知された列車T1,T2の運転士が停止位置P1,P2から運転再開する場合を例に挙げて説明したが、このような運転再開方法にこの発明を限定するものではない。例えば、列車T1~T4を自動的に運転する自動列車運転システム(Automatic Train Operation(ATO))によって列車T1,T2を停止位置P1,P2から自動的に運転再開する場合についても、この発明を適用することができる。 (3) In this embodiment, the case where the dispatcher of the operation control center 9 notifies the drivers of the trains T1 and T2 of the resumption of operation by radio has been described as an example, but the present invention can also be applied to a case where the drivers of the trains T1 and T2 are notified of the resumption of operation by a portable terminal carried by the driver of the trains T1 and T2. Also, in this embodiment, the case where the drivers of the trains T1 and T2 are notified by the dispatcher of the operation control center 9 and resume operation from the stop positions P1 and P2 has been described as an example, but the present invention is not limited to such a method of resuming operation. For example, the present invention can also be applied to a case where the trains T1 and T2 are automatically resumed from the stop positions P1 and P2 by an automatic train operation system (Automatic Train Operation (ATO)) that automatically operates the trains T1 to T4.

1 運転再開支援システム
2 地震防災システム
3 地震観測システム
4 高密度地震観測システム
5 沿線地震動評価システム
6 運行管理システム
7 通信ネットワーク
8 運転再開判定装置
8c 沿線地震動情報記憶部
8d 位置情報記憶部
8e 運転再開許可部
9 運転指令所
10 運行情報表示装置
11 運転再開告知装置
R 線路
1 下り線
2 上り線
1,T3 列車(下り列車(移動体))
2,T3 列車(上り列車(移動体))
1,P2.P4 停止位置
α 停止位置(他の停止位置)
3 走行位置
α,β 駅(停車場)
A~MC 地震計
A~GC 観測地震動
D 沿線地震動
A-B,B-C 境界
Th1 停止基準値
Th2 点検基準値(基準値)
1 停止区間
21 点検区間
31~S33 移動可能区間(区間)
REFERENCE SIGNS LIST 1 Operation resumption support system 2 Earthquake disaster prevention system 3 Earthquake observation system 4 High-density earthquake observation system 5 Railway-side earthquake motion evaluation system 6 Traffic control system 7 Communication network 8 Operation resumption determination device 8c Railway-side earthquake motion information storage unit 8d Position information storage unit 8e Operation resumption permission unit 9 Operation control center 10 Operation information display device 11 Operation resumption notification device R Railway track R1 Down line R2 Up line T1 , T3 Train (Down line train (moving body))
Trains T2 and T3 (Upbound trains (moving))
P 1 , P 2 . P 4 stop position P α stop position (other stop positions)
P 3 Traveling position α, β Station (stop)
M A - M C seismometers G A - G C observed earthquake motion G D earthquake motion along the railway line A-B, B-C boundary
Th 1 stop threshold
Th2 inspection standard value (standard value)
S1 Stop section S21 Inspection section S31 to S33 Moveable section (section)

Claims (7)

地震発生時に停止した移動体の停止位置からの運転再開の可否を判定する運転再開判定装置であって、
沿線の地震動が基準値を下回る区間内に前記移動体が停止したときに、この区間内の他の停止位置までこの移動体の運転再開を許可する運転再開許可部を備えること、
を特徴とする運転再開判定装置。
An operation resumption determination device that determines whether or not operation of a moving body that has stopped at the time of an earthquake can be resumed from a stopped position,
a resumption of operation permission unit that, when the moving object stops in a section where seismic motion along the railway line is below a reference value, permits the moving object to resume operation to another stopping position within the section;
An operation resumption determination device comprising:
請求項1に記載の運転再開判定装置において、
前記運転再開許可部は、地震発生後に前記沿線の点検を実施する必要があるか否かの基準となる点検基準値よりも、この沿線の地震動が下回る区間内の他の停止位置まで前記移動体の運転再開を許可すること、
を特徴とする運転再開判定装置。
In the operation resumption determination device according to claim 1,
the operation resumption permission unit permits the resumption of operation of the moving body to another stop position within a section along the railway line where the seismic motion is lower than an inspection reference value that is a criterion for whether or not an inspection along the railway line needs to be carried out after the occurrence of an earthquake;
An operation resumption determination device comprising:
請求項1又は請求項2に記載の運転再開判定装置において、
前記運転再開許可部は、前記沿線の地震動が基準値を下回る区間内の停車場まで前記移動体の運転再開を許可すること、
を特徴とする運転再開判定装置。
In the operation resumption determination device according to claim 1 or 2,
the operation resumption permission unit permits the resumption of operation of the moving body to a station within a section where the seismic motion along the railway line is below a reference value;
An operation resumption determination device comprising:
地震発生時に停止した移動体の停止位置からの早期の運転再開を支援する運転再開支援システムであって、
請求項1から請求項3までのいずれか1項に記載の運転再開判定装置を備え、
前記運転再開判定装置は、前記沿線の地震動を評価する沿線地震動評価システムが出力する沿線地震動情報と、前記移動体の運行を管理する運行管理システムが出力するこの移動体の位置情報とに基づいて、前記沿線の地震動が基準値を下回る区間内の他の停止位置まで前記移動体の運転再開を運転再開許可部が許可すること、
を特徴とする運転再開支援システム。
A driving restart support system that supports early restart of a moving body that has stopped at the time of an earthquake from a stopping position,
The device for determining whether to resume operation according to any one of claims 1 to 3 is provided,
the operation resumption determination device, based on lineside earthquake motion information output by a lineside earthquake motion evaluation system that evaluates earthquake motion along the line and position information of the moving body output by a traffic management system that manages the operation of the moving body, an operation resumption permission unit permits the resumption of operation of the moving body to another stopping position within a section where the earthquake motion along the line is below a reference value;
A driving restart support system that features:
請求項4に記載の運転再開支援システムにおいて、
前記沿線地震動評価システムは、沿線で連続的に観測される高密度の観測地震動情報に基づいて、前記沿線の地震動を評価すること、
を特徴とする運転再開支援システム。
In the driving restart support system according to claim 4,
the railway line earthquake motion evaluation system evaluates earthquake motion along the railway line based on high-density observed earthquake motion information continuously observed along the railway line;
A driving restart support system that features:
請求項4又は請求項5に記載の運転再開支援システムにおいて、
前記沿線地震動評価システムは、地震計によって観測される各観測点の地震動に関する観測地震動情報に基づいて、前記沿線の地震動を評価すること、
を特徴とする運転再開支援システム。
In the driving restart support system according to claim 4 or 5,
the railway line seismic motion evaluation system evaluates seismic motion along the railway line based on observed seismic motion information regarding seismic motion at each observation point observed by a seismometer;
A driving restart support system that features:
請求項4から請求項6までのいずれか1項に記載の運転再開支援システムにおいて、
前記移動体の運転再開を指令員に告知する運転再開告知装置を備えること、
を特徴とする運転再開支援システム。
In the driving restart support system according to any one of claims 4 to 6,
A device for notifying a dispatcher of the restart of the moving body is provided.
A driving restart support system that features:
JP2022001128A 2022-01-06 2022-01-06 Operation restart determination device and operation restart support system Active JP7630893B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022001128A JP7630893B2 (en) 2022-01-06 2022-01-06 Operation restart determination device and operation restart support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022001128A JP7630893B2 (en) 2022-01-06 2022-01-06 Operation restart determination device and operation restart support system

Publications (2)

Publication Number Publication Date
JP2023100442A JP2023100442A (en) 2023-07-19
JP7630893B2 true JP7630893B2 (en) 2025-02-18

Family

ID=87201634

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022001128A Active JP7630893B2 (en) 2022-01-06 2022-01-06 Operation restart determination device and operation restart support system

Country Status (1)

Country Link
JP (1) JP7630893B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011033448A (en) 2009-07-31 2011-02-17 Railway Technical Res Inst Early-stage operation resumption support system in earthquake using planar earthquake motion prediction
JP2011031711A (en) 2009-07-31 2011-02-17 Railway Technical Res Inst High train safety control system collecting information on vehicle
JP2014038010A (en) 2012-08-14 2014-02-27 Railway Technical Research Institute Railroad operation resumption support system using small portable seismograph and railroad operation resumption support method for the same
JP2018028224A (en) 2016-08-19 2018-02-22 東日本旅客鉄道株式会社 Traffic operation management method at earthquake and traffic operation management support system at earthquake
JP2018111430A (en) 2017-01-12 2018-07-19 株式会社日立製作所 Railroad maintenance work management system
US20190054937A1 (en) 2017-08-15 2019-02-21 Bnsf Railway Company Unmanned aerial vehicle system for inspecting railroad assets

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011033448A (en) 2009-07-31 2011-02-17 Railway Technical Res Inst Early-stage operation resumption support system in earthquake using planar earthquake motion prediction
JP2011031711A (en) 2009-07-31 2011-02-17 Railway Technical Res Inst High train safety control system collecting information on vehicle
JP2014038010A (en) 2012-08-14 2014-02-27 Railway Technical Research Institute Railroad operation resumption support system using small portable seismograph and railroad operation resumption support method for the same
JP2018028224A (en) 2016-08-19 2018-02-22 東日本旅客鉄道株式会社 Traffic operation management method at earthquake and traffic operation management support system at earthquake
JP2018111430A (en) 2017-01-12 2018-07-19 株式会社日立製作所 Railroad maintenance work management system
US20190054937A1 (en) 2017-08-15 2019-02-21 Bnsf Railway Company Unmanned aerial vehicle system for inspecting railroad assets
JP2020531349A (en) 2017-08-15 2020-11-05 ビーエヌエスエフ・レイルウェイ・カンパニーBnsf Railway Company Unmanned aerial vehicle system for inspecting railroad assets

Also Published As

Publication number Publication date
JP2023100442A (en) 2023-07-19

Similar Documents

Publication Publication Date Title
AU2019396832B2 (en) Transport and rail infrastructure monitoring system
US9607446B2 (en) System and method for identifying damaged sections of a route
AU2014323587B2 (en) System and method for identifying damaged sections of a route
US10308265B2 (en) Vehicle control system and method
US10569792B2 (en) Vehicle control system and method
US9908543B2 (en) System and method for inspecting a route during movement of a vehicle system over the route
AU2013266826B2 (en) System and method for inspecting a route during movement of a vehicle system over the route
ES2662877T3 (en) Railway systems using acoustic monitoring
US6216985B1 (en) Railway hazard acoustic sensing, locating, and alarm system
AU2016233624B2 (en) Vehicle control system and method
RU2618660C1 (en) Railway traffic interval regulation system based on radio channels
AU4131600A (en) Track monitoring equipment
CN106184235A (en) A kind of rail vehicle system
Aliev et al. Intelligent system of noise control of the technical condition of railroad tracks
JP7630893B2 (en) Operation restart determination device and operation restart support system
RU2671796C1 (en) System of distributed control of railway for high-speed movement
CA2242723C (en) Railway hazard acoustic sensing, locating, and alarm system
Sharma et al. Smart Maintenance of Railway Infrastructure Using Wireless Sensor Networks
CA3123323C (en) Transport and rail infrastructure monitoring system
Ozerov et al. Diagnostic Systems and Complexes for Railways
Lilley Train-generated sound within an underground light railway system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240328

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250127

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250204

R150 Certificate of patent or registration of utility model

Ref document number: 7630893

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150