Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7633581B2 - Half-precast structure seawall and its construction method - Google Patents
[go: Go Back, main page]

JP7633581B2 - Half-precast structure seawall and its construction method - Google Patents

Half-precast structure seawall and its construction method Download PDF

Info

Publication number
JP7633581B2
JP7633581B2 JP2024060082A JP2024060082A JP7633581B2 JP 7633581 B2 JP7633581 B2 JP 7633581B2 JP 2024060082 A JP2024060082 A JP 2024060082A JP 2024060082 A JP2024060082 A JP 2024060082A JP 7633581 B2 JP7633581 B2 JP 7633581B2
Authority
JP
Japan
Prior art keywords
seawall
precast
foundation
piles
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2024060082A
Other languages
Japanese (ja)
Other versions
JP2024069723A5 (en
JP2024069723A (en
Inventor
正人 辻井
郁夫 中谷
哲憲 谷口
直人 小山
Original Assignee
ジオスター株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ジオスター株式会社 filed Critical ジオスター株式会社
Priority to JP2024060082A priority Critical patent/JP7633581B2/en
Publication of JP2024069723A publication Critical patent/JP2024069723A/en
Publication of JP2024069723A5 publication Critical patent/JP2024069723A5/en
Application granted granted Critical
Publication of JP7633581B2 publication Critical patent/JP7633581B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Foundations (AREA)
  • Revetment (AREA)
  • Piles And Underground Anchors (AREA)

Description

特許法第30条第2項適用 防潮堤建設工事 ハーフプレキャストの検討 旭化成(株)ハイポア日向工場殿向け 令和2年2月12日開催Patent Law Article 30, Paragraph 2 Application Seawall Construction Work Half Precast Consideration Asahi Kasei Corporation Hipore Hyuga Plant Held on February 12, 2020

本発明は、海岸線に沿って設置され、地震発生時の津波や台風の来襲時の高波に対する護岸や海水の陸地への浸水を抑制するハーフプレキャスト構造防潮堤に関する。 The present invention relates to a half-precast seawall that is installed along the coastline and serves as a revetment against tsunamis caused by earthquakes and high waves caused by typhoons, and prevents seawater from flooding onto land.

日本を含む地震大国と呼ばれる諸国において、大地震に伴う津波の被害を最小限に抑制することは喫緊の課題である。また、近年は地球温暖化に伴う台風の強大化が指摘されており、台風による高波被害も深刻さを増している。これら自然災害に対して海岸に沿って設置される防潮堤が、海岸の浸食や海水の内陸部への浸水を防ぐ手段として期待されている。 In earthquake-prone countries, including Japan, minimizing damage from tsunamis caused by major earthquakes is an urgent issue. In recent years, typhoons have been getting stronger due to global warming, and damage from high waves caused by typhoons is becoming more serious. Seawalls installed along the coast against these natural disasters are expected to be a means of preventing coastal erosion and seawater flooding inland.

従来の防潮堤として、例えば特許文献1、2には、プレキャスト部材(プレキャスト壁体)を用いることで、現場打ちコンクリートによる施工を少なくし、施工現場でのコンクリート使用量を低減させることで熟練工を必要とせず強固な堤体を構築する技術が開示されている。 For example, Patent Documents 1 and 2 disclose a technique for constructing a strong embankment using precast members (precast walls) to reduce the amount of cast-in-place concrete used and to reduce the amount of concrete used at the construction site, thereby making it possible to build a strong embankment without requiring skilled workers.

また、例えば特許文献3には、プレキャスト部材(プレキャスト堤体本体部)を用いることで、現場での施工量を少なくし、かつ、地盤条件が悪い場所への適用も可能な構造物を構築する技術が開示されている。 For example, Patent Document 3 discloses a technology for constructing a structure that uses precast members (precast dam body) to reduce the amount of on-site construction work and can be applied to locations with poor ground conditions.

特開2015-183453号公報JP 2015-183453 A 特開2015-196983号公報JP 2015-196983 A 特開2019-35259号公報JP 2019-35259 A

周囲を海洋に囲まれた日本の海岸線の延長距離は膨大であり、また、工事は天候にも左右されるため、防潮堤の設置や保全には大きなコストと工期が必要であり、工事の効率化が求められている。工事の効率化、工期の短縮化などのためには、予め工場などで製作された部材(いわゆるプレキャスト部材)を用いることが効果的であるが、一方で、プレキャスト部材を用いる場合、現場で施工する基礎部分(例えば鋼管杭や鋼管矢板杭など)に発生する施工誤差をプレキャスト部材の施工時に吸収し、所定の寸法、所定の配置構成で防潮堤を構築することが求められる。 Japan is surrounded by ocean and has an enormous coastline, and construction is also dependent on the weather, so the installation and maintenance of seawalls requires great costs and time, and there is a demand for more efficient construction. To improve construction efficiency and shorten construction times, it is effective to use components that are manufactured in advance in factories (so-called precast components). However, when using precast components, it is necessary to absorb construction errors that occur in the foundations (such as steel pipe piles and steel pipe sheet piles) constructed on site during construction of the precast components, and to build seawalls with specified dimensions and layout.

このような点に関し、上記特許文献1、2に記載の堤体は、工場で製作された基礎部(鋼・コンクリート複合フーチング)と、プレキャスト堅壁と、を用いる構成を採っており、実際の施工現場に杭施工された鋼管杭の施工誤差について何ら吸収手段を講じておらず、施工現場における施工誤差が十分に吸収されない恐れがある。 In this regard, the embankments described in Patent Documents 1 and 2 above are constructed using a foundation (composite steel/concrete footing) fabricated in a factory and a precast solid wall, and do not take any measures to absorb construction errors in the steel pipe piles installed at the actual construction site, so there is a risk that construction errors at the construction site will not be sufficiently absorbed.

また、上記特許文献3に記載の堤体においても、鋼管杭を除き、壁部やフーチング部などをいずれもプレキャスト部材としており、施工現場に直接施工される鋼管杭と、プレキャスト部材との間の施工誤差については言及されていない。 In addition, in the embankment described in Patent Document 3, all of the walls and footings, except for the steel pipe piles, are made of precast members, and there is no mention of construction errors between the steel pipe piles that are directly installed at the construction site and the precast members.

上記事情に鑑み、本発明の目的は、ハーフプレキャスト構造である防潮堤の構築時に、施工現場において基礎杭の施工時に生じる施工誤差を十分に吸収することで、高精度での施工が実現可能なハーフプレキャスト構造防潮堤を提供することにある。 In view of the above circumstances, the object of the present invention is to provide a half-precast seawall that can be constructed with high precision by fully absorbing construction errors that occur when constructing foundation piles at the construction site.

前記の目的を達成するため、本発明によれば、基礎部と、当該基礎部上に配列され壁体を構成する複数の防潮堤パネルと、からなるハーフプレキャスト構造防潮堤であって、前記基礎部は、その一部が地中に打ち込まれ、上端部が地表面上に突出した状態で設けられる基礎杭と、前記基礎杭を囲む所定範囲の地表面を均す均しコンクリートと、前記均しコンクリートの上方において、前記基礎杭の上端部を内包し、且つ、前記防潮堤パネルを支持するように設けられるフーチング部と、から構成され、前記基礎杭は、互いに平行に二列で構成され、前記防潮堤パネルは、プレキャストコンクリート部材であり、前記均しコンクリート上で前記基礎杭の二列配列中間位置に配列され、その下端部が前記フーチング部に挟まれるように支持され、一体化して構成され、前記フーチング部は、前記基礎杭の上端部に固着され上方に向けて突出する鉄筋群と、前記防潮堤パネルの下部から側方に突出する鉄筋群と、を含む鉄筋構造を内包する現場打ちコンクリートからなることを特徴とする、ハーフプレキャスト構造防潮堤が提供される。 In order to achieve the above object, according to the present invention, there is provided a half-precast seawall comprising a foundation and a plurality of seawall panels arranged on the foundation to form a wall, the foundation comprising foundation piles, parts of which are driven into the ground with their upper ends protruding above the ground surface, levelling concrete for levelling the ground surface within a prescribed range surrounding the foundation piles, and a footing disposed above the levelling concrete, which contains the upper ends of the foundation piles and supports the seawall panels, the foundation piles being The present invention provides a half-precast structure seawall, characterized in that the seawall panels are arranged in two rows parallel to each other, the seawall panels are precast concrete members arranged on the leveled concrete at the midpoint of the two rows of the foundation piles, and their lower ends are supported by being sandwiched between the footing portion and constructed as an integrated unit, and the footing portion is made of cast-in-place concrete containing a reinforcement structure including a group of reinforcement bars fixed to the upper ends of the foundation piles and protruding upwards, and a group of reinforcement bars protruding laterally from the lower part of the seawall panel.

本発明によれば、ハーフプレキャスト構造である防潮堤の構築時に、施工現場において基礎杭の施工時に生じる施工誤差を十分に吸収することで、高精度での施工が実現可能なハーフプレキャスト構造防潮堤が提供される。 The present invention provides a half-precast seawall that can be constructed with high precision by fully absorbing construction errors that occur when constructing foundation piles at the construction site.

本発明の第1の実施の形態に係るハーフプレキャスト構造防潮堤の概略説明図である。1 is a schematic explanatory diagram of a half-precast structure seawall according to a first embodiment of the present invention. FIG. 第1の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 1 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall according to a first embodiment. 第1の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 1 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall according to a first embodiment. 第1の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 1 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall according to a first embodiment. 第1の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 1 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall according to a first embodiment. 第1の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 1 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall according to a first embodiment. 第1の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 1 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall according to a first embodiment. 第1の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 1 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall according to a first embodiment. 本発明の第2の実施の形態に係るハーフプレキャスト構造防潮堤の概略説明図である。FIG. 11 is a schematic explanatory diagram of a half-precast structure seawall according to a second embodiment of the present invention. 第2の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall relating to the second embodiment. 第2の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with a second embodiment. 第2の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with a second embodiment. 第2の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with a second embodiment. 第2の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with a second embodiment. 第2の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with a second embodiment. 第2の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with a second embodiment. 第2の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with a second embodiment. 第2の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with a second embodiment. 本発明の第3の実施の形態に係るハーフプレキャスト構造防潮堤の概略説明図である。FIG. 11 is a schematic explanatory diagram of a half-precast structure seawall according to a third embodiment of the present invention. 第3の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall relating to the third embodiment. 第3の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall relating to the third embodiment. 第3の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall relating to the third embodiment. 第3の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall relating to the third embodiment. 第3の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall relating to the third embodiment. 第3の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall relating to the third embodiment. 第3の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 11 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall relating to the third embodiment. 本発明の第4の実施の形態に係るハーフプレキャスト構造防潮堤の概略説明図である。FIG. 13 is a schematic explanatory diagram of a half-precast structure seawall according to a fourth embodiment of the present invention. 第4の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 13 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with the fourth embodiment. 第4の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 13 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with the fourth embodiment. 第4の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 13 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with the fourth embodiment. 第4の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 13 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with the fourth embodiment. 第4の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 13 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with the fourth embodiment. 第4の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 13 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with the fourth embodiment. 第4の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 13 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with the fourth embodiment. 第4の実施の形態に係るハーフプレキャスト構造防潮堤の構築方法を示す概略説明図である。FIG. 13 is a schematic explanatory diagram showing a method for constructing a half-precast structure seawall in accordance with the fourth embodiment.

以下、本発明の実施の形態について図面を参照して説明する。なお、本明細書および図面において、実質的に同一の機能構成を有する構成要素については、同一の符号を付することにより重複説明を省略する場合がある。即ち、以下の本明細書において、各実施の形態において共通する構成要素については同一の符号を付して図示し、その説明は省略する場合がある。また、説明のため、地盤や地表面などは図示せず、地中に打ち込まれた状態の鋼管杭などを図示している。 The following describes an embodiment of the present invention with reference to the drawings. In this specification and the drawings, components that have substantially the same functional configuration may be given the same reference numerals to avoid repetitive explanation. In other words, in the following specification, components that are common to each embodiment may be illustrated with the same reference numerals, and their explanation may be omitted. For the sake of explanation, the ground and ground surface are not illustrated, and steel pipe piles driven into the ground are illustrated.

<第1の実施の形態>
(ハーフプレキャスト構造防潮堤1aの構成)
図1は、本発明の第1の実施の形態に係るハーフプレキャスト構造防潮堤1aの概略説明図である。図1に示すように、ハーフプレキャスト構造防潮堤1aは、海岸線に沿って設置される基礎部としての複数の鋼管杭2、均しコンクリート3、及び、均しコンクリート3の上方に設けられるフーチング部5と、を備えている。また、フーチング部5の上方には、複数配列される防潮堤パネル10が備えられている。なお、ここでの「海岸線」とは、海水が入り込む河川岸も含まれる。
First Embodiment
(Configuration of half-precast seawall 1a)
Fig. 1 is a schematic diagram of a half-precast seawall 1a according to a first embodiment of the present invention. As shown in Fig. 1, the half-precast seawall 1a comprises a plurality of steel pipe piles 2 as a foundation installed along the coastline, leveling concrete 3, and a footing 5 provided above the leveling concrete 3. In addition, a plurality of seawall panels 10 are arranged above the footing 5. Note that the "coastline" here also includes the river bank into which seawater enters.

ハーフプレキャスト構造防潮堤1aの基礎部20を構成するにあたり、基礎杭としての複数の鋼管が地中に打ち込まれることで複数の鋼管杭2として所定の間隔(例えば等間隔)で略直線状(略一列)に配置される。鋼管杭2の地中への打ち込み方法は特に限定されない。鋼管杭2は、その一部が地中に打ち込まれ、上端部が地表面上に突出した状態で設けられる。また、鋼管杭2の周辺においては、複数の鋼管杭2を囲む所定範囲の地表面を均すように均しコンクリート3が設けられている。均しコンクリート3は、ハーフプレキャスト構造防潮堤1aを構築する場所の地表面の凹凸などを均すために施工される。 When constructing the foundation 20 of the half-precast seawall 1a, multiple steel pipes as foundation piles are driven into the ground, and are arranged in a substantially straight line (substantially in a row) at a predetermined interval (for example, equal intervals) as multiple steel pipe piles 2. There are no particular limitations on the method of driving the steel pipe piles 2 into the ground. The steel pipe piles 2 are installed with a portion of them driven into the ground and their upper ends protruding above the ground surface. In addition, leveling concrete 3 is provided around the steel pipe piles 2 to level the ground surface in a predetermined area surrounding the multiple steel pipe piles 2. The leveling concrete 3 is applied to level out unevenness in the ground surface at the location where the half-precast seawall 1a is to be constructed.

均しコンクリート3の上方には、現場打ちコンクリートからなるフーチング部5が設けられている。フーチング部5の形状や構成は任意であるが、例えば、図示のように、所定の高さを有し、矩形断面である略直方体に構成されても良い。また、後述するように、フーチング部5の内部には、上記鋼管杭2の上端部や、配力筋としての複数の鉄筋(鉄筋群)が内包され、フーチング部の上面からは複数の鉄筋が上方に向かって突出している。 A footing 5 made of cast-in-place concrete is provided above the leveling concrete 3. The shape and configuration of the footing 5 are arbitrary, but it may be configured as a substantially rectangular parallelepiped with a predetermined height and a rectangular cross section, as shown in the figure. As described below, the interior of the footing 5 contains the upper end of the steel pipe pile 2 and multiple reinforcing bars (reinforcing bar group) as reinforcing bars, and multiple reinforcing bars protrude upward from the upper surface of the footing.

これら、鋼管杭2、均しコンクリート3、フーチング部5の施工により、ハーフプレキャスト構造防潮堤1aの基礎部20が構築される。これらの構造体は、いずれも現場施工によって構築される。 The foundation 20 of the half-precast seawall 1a is constructed by constructing the steel pipe piles 2, the leveling concrete 3, and the footing 5. All of these structures are constructed on-site.

また、フーチング部5の上部には、プレキャストコンクリート部材(以下、プレキャスト部材とも記載)である複数(図1では4つ)の防潮堤パネル10が支持され、配列されている。防潮堤パネル10の配列される位置は、上記鋼管杭2の直上であることが好ましい。また、防潮堤パネル10は略直方体形状を有しており、その下部の厚さd1が上部の厚さd2よりも厚く構成されている。本発明における防潮堤パネル10の厚さは特に限定されるものではなく、例えば均一であっても良いが、下部の厚さd1が上部の厚さd2よりも厚くなることにより、防潮堤パネル10の下部の剛性を上げることができ、耐波抵抗力を向上させることができる。また、後述するように、防潮堤パネル10の内部には、上記フーチング部5から上方に向かって突出した複数の鉄筋がスリーブ式継手などの接続手段を介して内包され、フーチング部5と防潮堤パネル10が連結する構成となっている。 In addition, a plurality of (four in FIG. 1) seawall panels 10, which are precast concrete members (hereinafter also referred to as precast members), are supported and arranged on the upper part of the footing part 5. The seawall panels 10 are preferably arranged directly above the steel pipe piles 2. The seawall panel 10 has a substantially rectangular parallelepiped shape, and the thickness d1 of the lower part is thicker than the thickness d2 of the upper part. The thickness of the seawall panel 10 in the present invention is not particularly limited and may be uniform, for example, but by making the thickness d1 of the lower part thicker than the thickness d2 of the upper part, the rigidity of the lower part of the seawall panel 10 can be increased and the wave resistance can be improved. In addition, as described later, a plurality of reinforcing bars protruding upward from the footing part 5 are contained inside the seawall panel 10 via a connecting means such as a sleeve joint, and the footing part 5 and the seawall panel 10 are connected to each other.

本発明の第1の実施の形態に係るハーフプレキャスト構造防潮堤1aは以上のように構成されている。このようなハーフプレキャスト構造防潮堤1aにおいて、基礎部20を構成する鋼管杭2、均しコンクリート3、フーチング部5はいずれも現場での施工によって構築される。一方で、防潮堤パネル10としては、予め工場などで製作されたプレキャスト部材を用いており、現場で組み立てのみを行う構成としている。これにより、鋼管杭2の打ち込み時などの現場施工時に生じる恐れのある施工誤差を、フーチング部5の構築時に吸収し、ハーフプレキャスト構造防潮堤1aを高精度で施工し構築することができる。 The half-precast seawall 1a according to the first embodiment of the present invention is constructed as described above. In this half-precast seawall 1a, the steel pipe piles 2, leveling concrete 3, and footing 5 that make up the foundation 20 are all constructed on-site. On the other hand, the seawall panel 10 uses precast members that have been manufactured in advance in a factory or the like, and is constructed so that only assembly is performed on-site. As a result, construction errors that may occur during on-site construction, such as when driving the steel pipe piles 2, can be absorbed when constructing the footing 5, and the half-precast seawall 1a can be constructed and built with high precision.

加えて、防潮堤パネル10としてプレキャスト部材を用いていることで、工事の効率化、工期の短縮化などが図られる。特に、防潮堤パネル10のような高さの高い部材においては、現場で製作する場合には施工足場を組んで施工することが求められ、足場の組み立てや解体といった種々の工程が必要となることから、防潮堤パネル10をプレキャスト部材とすることのメリットは大きい。 In addition, the use of precast materials for the seawall panel 10 improves the efficiency of construction and shortens the construction period. In particular, for tall materials such as the seawall panel 10, construction on-site requires the erection of scaffolding, which necessitates various processes such as assembling and dismantling the scaffolding. Therefore, there are great benefits to using precast materials for the seawall panel 10.

(ハーフプレキャスト構造防潮堤1aの構築方法)
本実施の形態に係るハーフプレキャスト構造防潮堤1aの構築方法は以下の通りである。以下で参照する図2~図8は、第1の実施の形態に係るハーフプレキャスト構造防潮堤1aの構築方法を示す概略説明図であり、以下ではこれら図2~図8を参照して構築方法について説明する。
(Method of constructing half-precast structure seawall 1a)
The construction method of the half-precast seawall 1a according to this embodiment is as follows: Figures 2 to 8, which will be referred to below, are schematic diagrams showing the construction method of the half-precast seawall 1a according to the first embodiment, and the construction method will be explained below with reference to Figures 2 to 8.

(基礎工事)
先ず、図2に示すように、ハーフプレキャスト構造防潮堤1aを設置する海岸の基礎工事として、所定の位置(例えば海岸線に沿った位置)に基礎杭としての複数の鋼管が地中に打ち込まれることで複数の鋼管杭2として略一列に等間隔で地中に配置される。この時の鋼管杭2の地中への打ち込み方法が特に限定されない。ここで打ち込まれた鋼管杭2の一部は地表面に突出した状態とされる。
(Foundation work)
First, as shown in Fig. 2, in the foundation work for the coast where a half-precast seawall 1a is to be installed, a plurality of steel pipes are driven into the ground as foundation piles at predetermined positions (for example, positions along the coastline) to form a plurality of steel pipe piles 2 arranged in a substantially line at equal intervals in the ground. There is no particular restriction on the method of driving the steel pipe piles 2 into the ground at this time. Parts of the driven steel pipe piles 2 are left protruding above the ground surface.

(均しコンクリート3の打設)
次に、図3に示すように、打ち込まれた複数の鋼管杭2の周辺の所定範囲に、地表面の凹凸を均すための均しコンクリート3が打設される。なお、均しコンクリート3打設後においても、複数の鋼管杭2は当該均しコンクリート3の表面から上方に突出した状態とされる。
(Pouring leveling concrete 3)
Next, as shown in Fig. 3, leveling concrete 3 is poured in a predetermined area around the driven steel pipe piles 2 to smooth out unevenness in the ground surface. Even after the leveling concrete 3 is poured, the steel pipe piles 2 are left protruding upward from the surface of the leveling concrete 3.

(フーチング部5の構築)
続いて、図4に示すように、均しコンクリート3の上面において複数の鋼管杭2を囲むように鉄筋群22が組み立てられる。鉄筋群22は、略一列に配列された複数の鋼管杭2を覆うように配筋される第1鉄筋群22aと、当該第1鉄筋群22aの上方に突出するように配筋される第2鉄筋群22bからなる。そして、鉄筋群22が組み立てられた状態で、図5に示すように、均しコンクリート3の上面において鉄筋群22の四方側面を囲むように型枠25が組み立てられる。そして、図6に示すように、型枠25で囲まれた空間内にコンクリートを打設することでフーチング部5が構築される。なお、図示のように、フーチング部5の構築にあたり第2鉄筋群22bの上端部は当該フーチング部5の上面から突出したままの状態とされる。
(Construction of footing portion 5)
Next, as shown in FIG. 4, a group of reinforcing bars 22 is assembled on the upper surface of the leveling concrete 3 so as to surround the plurality of steel pipe piles 2. The group of reinforcing bars 22 is composed of a first group of reinforcing bars 22a arranged so as to cover the plurality of steel pipe piles 2 arranged in a substantially straight line, and a second group of reinforcing bars 22b arranged so as to protrude above the first group of reinforcing bars 22a. Then, in a state in which the group of reinforcing bars 22 is assembled, as shown in FIG. 5, a formwork 25 is assembled on the upper surface of the leveling concrete 3 so as to surround the four side surfaces of the group of reinforcing bars 22. Then, as shown in FIG. 6, a footing portion 5 is constructed by pouring concrete into the space surrounded by the formwork 25. As shown in the figure, the upper end of the second group of reinforcing bars 22b is kept protruding from the upper surface of the footing portion 5 when the footing portion 5 is constructed.

上記のように施工された鋼管杭2、均しコンクリート3、及び、フーチング部5でもってハーフプレキャスト構造防潮堤1aの基礎部20は構成される。これら鋼管杭2、均しコンクリート3、及び、フーチング部5がいずれも現場施工により構築されるものである。 The foundation 20 of the half-precast seawall 1a is made up of the steel pipe piles 2, the leveling concrete 3, and the footing 5 constructed as described above. All of the steel pipe piles 2, the leveling concrete 3, and the footing 5 are constructed on-site.

(防潮堤パネル10の設置)
続いて、図7に示すように、型枠25が取り外され、フーチング部5の上部において複数の防潮堤パネル10が壁体を構成するように配列される。各防潮堤パネル10の下部には、例えばスリーブ式継手といった図示しない鉄筋受容部が複数設けられており、当該鉄筋受容部は、フーチング部5の上面から突出した状態の第2鉄筋群22bの上端部を受容可能に構成されている。この鉄筋受容部に第2鉄筋群22bの上端部を受容させた状態でモルタル等の経時性硬化材料を内部に充填させることでフーチング部5の上面の所定位置に防潮堤パネル10が据え付けられ固定される。このようにして最終的に図8に示すように壁体が構成され、ハーフプレキャスト構造防潮堤1aが構築される。
(Installation of seawall panel 10)
Next, as shown in Fig. 7, the formwork 25 is removed, and a plurality of seawall panels 10 are arranged on the upper part of the footing part 5 to form a wall. A plurality of reinforcing bar receiving parts (not shown), such as sleeve joints, are provided on the lower part of each seawall panel 10, and the reinforcing bar receiving parts are configured to receive the upper end of the second reinforcing bar group 22b protruding from the upper surface of the footing part 5. With the upper end of the second reinforcing bar group 22b received in the reinforcing bar receiving parts, a time-hardening material such as mortar is filled inside, and the seawall panel 10 is installed and fixed at a predetermined position on the upper surface of the footing part 5. In this way, the wall is finally formed as shown in Fig. 8, and the half-precast seawall 1a is constructed.

<第2の実施の形態>
(ハーフプレキャスト構造防潮堤1bの構成)
図9は、本発明の第2の実施の形態に係るハーフプレキャスト構造防潮堤1bの概略説明図である。図9に示すように、ハーフプレキャスト構造防潮堤1bは、海岸線に沿って設置される基礎部としての複数の鋼管杭2、均しコンクリート3、及び、均しコンクリート3の上方に設けられるフーチング部5と、を備えている。また、フーチング部5と一体化するように複数配列される防潮堤パネル10が備えられている。
Second Embodiment
(Configuration of half-precast structure seawall 1b)
Fig. 9 is a schematic explanatory diagram of a half-precast seawall 1b according to a second embodiment of the present invention. As shown in Fig. 9, the half-precast seawall 1b comprises a plurality of steel pipe piles 2 as a foundation installed along the coastline, leveling concrete 3, and a footing 5 provided above the leveling concrete 3. In addition, a plurality of seawall panels 10 are arranged so as to be integrated with the footing 5.

ハーフプレキャスト構造防潮堤1bの基礎部20を構成するにあたり、基礎杭である複数の鋼管杭2が互いに平行に略二列構成でもって打ち込まれている。鋼管杭2は、その一部が地中に打ち込まれ、上端部が地表面上に突出した状態で設けられる。また、鋼管杭2の周辺においては、複数の鋼管杭2を囲む所定範囲の地表面を均すように均しコンクリート3が設けられている。 To construct the foundation 20 of the half-precast seawall 1b, multiple steel pipe piles 2, which serve as foundation piles, are driven parallel to each other in approximately two rows. The steel pipe piles 2 are installed with a portion of them driven into the ground and their upper ends protruding above the ground surface. Additionally, leveling concrete 3 is provided around the steel pipe piles 2 to level the ground surface in a specified area surrounding the multiple steel pipe piles 2.

均しコンクリート3の上方には、現場打ちコンクリートからなるフーチング部5が設けられている。フーチング部5の形状や構成は任意であるが、例えば、所定の高さを有し、矩形断面である略直方体に構成され、後述する防潮堤パネル10の下端部を挟むように一体化させられるように構成されても良い。また、フーチング部5の内部には、上記鋼管杭2の上端部や、配力筋としての複数の鉄筋(鉄筋群)が内包されている。 A footing 5 made of cast-in-place concrete is provided above the leveling concrete 3. The footing 5 may have any shape or configuration, but may, for example, be configured as a substantially rectangular parallelepiped with a predetermined height and a rectangular cross section, and may be configured to be integrated with the lower end of the seawall panel 10 (described below) so as to sandwich it. The upper end of the steel pipe pile 2 and a number of reinforcing bars (reinforcing bar groups) serving as reinforcing bars are contained within the footing 5.

これら、鋼管杭2、均しコンクリート3、フーチング部5の施工により、ハーフプレキャスト構造防潮堤1bの基礎部20が構築される。これらの構造体は、いずれも現場施工によって構築される。 The foundation 20 of the half-precast seawall 1b is constructed by constructing the steel pipe piles 2, the leveling concrete 3, and the footing 5. All of these structures are constructed on-site.

また、本実施の形態では、平行に略二列構成で打ち込まれた鋼管杭2の二列配列中間位置にプレキャスト部材である複数(図9では5つ)の防潮堤パネル10が配列されている。これら防潮堤パネル10は、その下端部がフーチング部5に挟まれるように支持され、一体化して構成される。後述するように、フーチング部5の内部には、鋼管杭2の上端に固着された鉄筋群(後述する鉄筋群30)と、防潮堤パネル10の下部側方に突出した複数の鉄筋(後述する鉄筋群35)が内包され、鋼管杭2、フーチング部5、防潮堤パネル10が連結する構成となっている。 In this embodiment, multiple (five in FIG. 9) seawall panels 10, which are precast members, are arranged in the middle of the two rows of steel pipe piles 2 that are driven in parallel in approximately two rows. These seawall panels 10 are supported by having their lower ends sandwiched between the footing portion 5, and are constructed as an integrated unit. As will be described later, the footing portion 5 contains a group of reinforcing bars (reinforcing bar group 30, described later) fixed to the upper ends of the steel pipe piles 2 and multiple reinforcing bars (reinforcing bar group 35, described later) protruding to the lower side of the seawall panel 10, and the steel pipe piles 2, footing portion 5, and seawall panel 10 are connected together.

本発明の第2の実施の形態に係るハーフプレキャスト構造防潮堤1bは以上のように構成されている。このようなハーフプレキャスト構造防潮堤1bにおいて、基礎部20を構成する鋼管杭2、均しコンクリート3、フーチング部5はいずれも現場での施工によって構築される。一方で、防潮堤パネル10としては、予め工場などで製作されたプレキャスト部材を用いており、現場で組み立てのみを行う構成としている。これにより、鋼管杭2の打ち込み時などの現場施工時に生じる恐れのある施工誤差を、フーチング部5の構築時に吸収し、ハーフプレキャスト構造防潮堤1bを高精度で施工し構築することができる。また、上記第1の実施の形態と同様に、防潮堤パネル10としてプレキャスト部材を用いていることで、工事の効率化、工期の短縮化などが図られる。 The half-precast seawall 1b according to the second embodiment of the present invention is constructed as described above. In this half-precast seawall 1b, the steel pipe piles 2, the leveling concrete 3, and the footing 5 that constitute the foundation 20 are all constructed on-site. On the other hand, the seawall panel 10 uses precast members that have been manufactured in advance in a factory or the like, and is constructed so that only assembly is performed on-site. This allows construction errors that may occur during on-site construction, such as when driving the steel pipe piles 2, to be absorbed when constructing the footing 5, and the half-precast seawall 1b can be constructed and constructed with high precision. Also, as in the first embodiment, the use of precast members as the seawall panel 10 improves the efficiency of construction and shortens the construction period.

(ハーフプレキャスト構造防潮堤1bの構築方法)
本実施の形態に係るハーフプレキャスト構造防潮堤1bの構築方法は以下の通りである。以下で参照する図10~図18は、第2の実施の形態に係るハーフプレキャスト構造防潮堤1bの構築方法を示す概略説明図であり、以下ではこれら図10~図18を参照して構築方法について説明する。
(Method of constructing half-precast structure seawall 1b)
The method for constructing the half-precast seawall 1b according to this embodiment is as follows: Figures 10 to 18, which will be referred to below, are schematic diagrams showing the method for constructing the half-precast seawall 1b according to the second embodiment, and the construction method will be explained below with reference to Figures 10 to 18.

(基礎工事)
先ず、図10に示すように、ハーフプレキャスト構造防潮堤1bを設置する海岸の基礎工事として、所定の位置(例えば海岸線に沿った位置)に基礎杭としての複数の鋼管杭2が互いに平行に略二列構成となるように地中に打ち込む。この時の鋼管杭2の地中への打ち込み方法が特に限定されない。ここで打ち込まれた鋼管杭2の一部は地表面に突出した状態とされる。
(Foundation work)
First, as shown in Fig. 10, in the foundation work for the coast where a half-precast seawall 1b is to be installed, a plurality of steel pipe piles 2 as foundation piles are driven into the ground at predetermined positions (for example, positions along the coastline) so as to be parallel to each other and form approximately two rows. The method of driving the steel pipe piles 2 into the ground at this time is not particularly limited. Parts of the driven steel pipe piles 2 are left protruding above the ground surface.

(均しコンクリート3の打設)
次に、図11に示すように、打ち込まれた複数の鋼管杭2の周辺の所定範囲に、地表面の凹凸を均すための均しコンクリート3が打設される。なお、均しコンクリート3打設後においても、複数の鋼管杭2は当該均しコンクリート3の表面から上方に突出した状態とされる。
(Pouring leveling concrete 3)
Next, as shown in Fig. 11, leveling concrete 3 is poured in a predetermined area around the driven steel pipe piles 2 to smooth out unevenness in the ground surface. Even after the leveling concrete 3 is poured, the steel pipe piles 2 are left protruding upward from the surface of the leveling concrete 3.

(防潮堤パネル10の設置ならびにフーチング部5の構築)
続いて、図12に示すように、鋼管杭2の上端部において、上方に向けて突出する鉄筋群30を固着させる。鉄筋群30の固着は例えば溶接などの手段により行われる。なお、鉄筋群30は、現場において固着させても良く、あるいは、予め鋼管杭2の端部に固着させておいても良い。そして、図13に示すように、均しコンクリート3の上面において、平行な略二列構成で配置された鋼管杭2の二列配列中間位置に複数(図では5つ)の防潮堤パネル10が壁体を構成するように配列される。ここで、防潮堤パネル10には、その下部側方に突出する鉄筋群35が予め備えられており、防潮堤パネル10の配列時において上記鉄筋群30と鉄筋群35とは干渉しないように構成されている。
(Installation of seawall panel 10 and construction of footing 5)
Next, as shown in Fig. 12, a group of reinforcing bars 30 protruding upward is fixed to the upper end of the steel pipe pile 2. The group of reinforcing bars 30 is fixed by means of, for example, welding. The group of reinforcing bars 30 may be fixed on-site, or may be fixed to the end of the steel pipe pile 2 in advance. Then, as shown in Fig. 13, a plurality of (five in the figure) seawall panels 10 are arranged to form a wall at the midpoint of the two rows of steel pipe piles 2 arranged in approximately two parallel rows on the upper surface of the leveled concrete 3. Here, the seawall panel 10 is provided in advance with a group of reinforcing bars 35 protruding laterally from its lower portion, and is configured so that the group of reinforcing bars 30 and the group of reinforcing bars 35 do not interfere with each other when the seawall panels 10 are arranged.

続いて、図14、図15に示すように、防潮堤パネル10の表面に対して垂直方向に伸びる主鉄筋と、当該主鉄筋に対し水平方向に交差するように伸びる配力筋と、からなる鉄筋群40が均しコンクリート3の上面の所定位置に設置される。この鉄筋群40は、上記鉄筋群30と接続するように設置されても良い。このような各鉄筋群の設置により、図15に示すように、鉄筋群30、鉄筋群35、及び、鉄筋群40が均しコンクリート3の上面において一体的に配筋され、鉄筋構造42が構成される。 Next, as shown in Figures 14 and 15, a reinforcing bar group 40 consisting of main reinforcing bars extending vertically to the surface of the seawall panel 10 and distribution bars extending so as to cross horizontally to the main reinforcing bars is installed at a predetermined position on the upper surface of the leveled concrete 3. This reinforcing bar group 40 may be installed so as to connect to the reinforcing bar group 30. By installing each reinforcing bar group in this way, as shown in Figure 15, reinforcing bar group 30, reinforcing bar group 35, and reinforcing bar group 40 are integrally arranged on the upper surface of the leveled concrete 3, forming a reinforcing bar structure 42.

続いて、図16に示すように、均しコンクリート3の上面において鉄筋構造42の四方側面を囲むように型枠45が組み立てられる。そして、図17に示すように、型枠45で囲まれた空間内において、鉄筋構造42を埋設させるようにコンクリートを打設することでフーチング部5が構築される。そして、型枠45が外され、最終的に図18に示すように防潮堤パネル10とフーチング部5とが一体化されて壁体が構成され、ハーフプレキャスト構造防潮堤1bが構築される。
なお、本実施の形態では、基礎杭として複数の鋼管杭2が互いに平行に略二列構成に打ち込まれる場合を図示して説明したが、この鋼管杭2に代えて、複数の鋼管矢板が連続的に密着して配列された構成される鋼管矢板杭を基礎杭としても良い。
Next, as shown in Fig. 16, formwork 45 is assembled on top of the leveled concrete 3 so as to surround all four side surfaces of the reinforcing steel structure 42. Then, as shown in Fig. 17, concrete is poured into the space enclosed by the formwork 45 so as to bury the reinforcing steel structure 42, thereby constructing the footing 5. The formwork 45 is then removed, and finally, as shown in Fig. 18, the seawall panel 10 and the footing 5 are integrated to form a wall, and the half-precast seawall 1b is constructed.
In this embodiment, a case has been illustrated and described in which a plurality of steel pipe piles 2 are driven into the ground in approximately two rows parallel to each other as foundation piles. However, instead of these steel pipe piles 2, the foundation piles may also be steel pipe sheet piles consisting of a plurality of steel pipe sheet piles arranged in close contact with each other.

<第3の実施の形態>
(ハーフプレキャスト構造防潮堤1cの構成)
図19は、本発明の第3の実施の形態に係るハーフプレキャスト構造防潮堤1cの概略説明図である。図19に示すように、ハーフプレキャスト構造防潮堤1cは、海岸線に沿って設置される基礎部としての鋼管矢板杭2a、均しコンクリート3、及び、均しコンクリート3の上方に設けられるフーチング部5と、を備えている。また、フーチング部5の上方には、複数配列される防潮堤パネル10が備えられている。
Third Embodiment
(Configuration of half-precast structure seawall 1c)
Fig. 19 is a schematic explanatory diagram of a half-precast seawall 1c according to a third embodiment of the present invention. As shown in Fig. 19, the half-precast seawall 1c comprises steel pipe sheet piles 2a as foundations installed along the coastline, leveling concrete 3, and a footing 5 provided above the leveling concrete 3. In addition, a plurality of seawall panels 10 are arranged above the footing 5.

ハーフプレキャスト構造防潮堤1cの基礎部20を構成するにあたり、基礎杭としての複数の鋼管矢板が地中に打ち込まれることで鋼管矢板杭2aとして略直線状に配置される。鋼管矢板杭2aの地中への打ち込み方法は特に限定されない。鋼管矢板杭2aは複数の鋼管杭が連続的に密着して配列された構成であり、その形状や鋼管杭の本数は任意である。鋼管矢板杭2aは、その一部が地中に打ち込まれ、上端部が地表面上に突出した状態で設けられる。また、鋼管矢板杭2aの周辺においては、鋼管矢板杭2aを囲む所定範囲の地表面を均すように均しコンクリート3が設けられている。 When constructing the foundation 20 of the half-precast seawall 1c, multiple steel pipe sheet piles as foundation piles are driven into the ground and arranged in a substantially straight line as steel pipe sheet pile piles 2a. There are no particular limitations on the method of driving the steel pipe sheet pile piles 2a into the ground. The steel pipe sheet pile pile 2a is configured with multiple steel pipe piles arranged in close contact with each other, and the shape and number of steel pipe piles are optional. The steel pipe sheet pile pile 2a is installed with a portion driven into the ground and the upper end protruding above the ground surface. In addition, around the steel pipe sheet pile pile 2a, leveling concrete 3 is provided to level the ground surface in a predetermined area surrounding the steel pipe sheet pile pile 2a.

均しコンクリート3の上方には、現場打ちコンクリートからなるフーチング部5が設けられている。フーチング部5の形状や構成は任意であるが、例えば、図示のように、所定の高さを有し、矩形断面である略直方体に構成されても良い。これら、鋼管矢板杭2a、均しコンクリート3、フーチング部5の施工によりハーフプレキャスト構造防潮堤1cの基礎部20が構築される。これらの構造体は、いずれも現場施工によって構築される。 A footing 5 made of cast-in-place concrete is provided above the leveling concrete 3. The footing 5 may have any shape or configuration, but may, for example, be configured as a substantially rectangular parallelepiped with a predetermined height and a rectangular cross section, as shown in the figure. The foundation 20 of the half-precast seawall 1c is constructed by constructing the steel pipe sheet piles 2a, the leveling concrete 3, and the footing 5. All of these structures are constructed on-site.

また、フーチング部5の上部には、プレキャスト部材である複数(図19では4つ)の防潮堤パネル10が支持され、配列されている。上記第1の実施の形態と同様に、防潮堤パネル10の内部には、フーチング部5から上方に向かって突出した複数の鉄筋がスリーブ式継手などの接続手段を介して内包され、フーチング部5と防潮堤パネル10が連結する構成となっている。 In addition, multiple (four in FIG. 19) seawall panels 10, which are precast members, are supported and arranged on the top of the footing portion 5. As in the first embodiment, multiple reinforcing bars protruding upward from the footing portion 5 are contained inside the seawall panel 10 via connection means such as sleeve joints, connecting the footing portion 5 and the seawall panel 10.

本発明の第3の実施の形態に係るハーフプレキャスト構造防潮堤1cは以上のように構成されている。このようなハーフプレキャスト構造防潮堤1cにおいて、基礎部20を構成する鋼管矢板杭2a、均しコンクリート3、フーチング部5はいずれも現場での施工によって構築される。一方で、防潮堤パネル10としては、予め工場などで製作されたプレキャスト部材を用いており、現場で組み立てのみを行う構成としている。これにより、鋼管矢板杭2aの打ち込み時などの現場施工時に生じる恐れのある施工誤差を、フーチング部5の構築時に吸収し、ハーフプレキャスト構造防潮堤1cを高精度で施工し構築することができる。また、上記第1、第2の実施の形態と同様に、防潮堤パネル10としてプレキャスト部材を用いていることで、工事の効率化、工期の短縮化などが図られる。 The half-precast seawall 1c according to the third embodiment of the present invention is constructed as described above. In this half-precast seawall 1c, the steel pipe sheet piles 2a, the leveling concrete 3, and the footing 5 that constitute the foundation 20 are all constructed on-site. On the other hand, the seawall panel 10 uses precast members that have been manufactured in advance in a factory or the like, and is constructed so that only assembly is performed on-site. This allows the construction errors that may occur during on-site construction, such as when driving the steel pipe sheet piles 2a, to be absorbed when constructing the footing 5, and the half-precast seawall 1c can be constructed and constructed with high precision. Also, as in the first and second embodiments, the use of precast members as the seawall panel 10 improves the efficiency of construction and shortens the construction period.

(ハーフプレキャスト構造防潮堤1cの構築方法)
本実施の形態に係るハーフプレキャスト構造防潮堤1cの構築方法は概ね上記第1の実施の形態と同じ方法である。図20~図26は、第3の実施の形態に係るハーフプレキャスト構造防潮堤1cの構築方法を示す概略説明図である。図20~図26に示すように、本実施の形態に係るハーフプレキャスト構造防潮堤1cの構築方法は、鋼管杭2に代えて鋼管矢板杭2aを用いることを除き、上記第1の実施の形態と同じ方法であるため、詳細な説明については省略する。
(Method of constructing half-precast structure seawall 1c)
The construction method of the half-precast seawall 1c according to this embodiment is generally the same as that of the first embodiment. Figures 20 to 26 are schematic explanatory diagrams showing the construction method of the half-precast seawall 1c according to the third embodiment. As shown in Figures 20 to 26, the construction method of the half-precast seawall 1c according to this embodiment is the same as that of the first embodiment, except that steel pipe sheet piles 2a are used instead of the steel pipe piles 2, so detailed explanations will be omitted.

<第4の実施の形態>
(ハーフプレキャスト構造防潮堤1dの構成)
図27は、本発明の第4の実施の形態に係るハーフプレキャスト構造防潮堤1dの概略説明図である。図27に示すように、ハーフプレキャスト構造防潮堤1dは、海岸線に沿って設置される基礎部としての鋼管杭2、均しコンクリート3、及び、均しコンクリート3の上方に設けられるフーチング部5と、を備えている。また、フーチング部5の上方には、複数配列される防潮堤パネル10が備えられている。
<Fourth embodiment>
(Configuration of half-precast structure seawall 1d)
Fig. 27 is a schematic explanatory diagram of a half-precast seawall 1d according to a fourth embodiment of the present invention. As shown in Fig. 27, the half-precast seawall 1d comprises steel pipe piles 2 as a foundation installed along the coastline, leveling concrete 3, and a footing 5 provided above the leveling concrete 3. In addition, a plurality of seawall panels 10 are arranged above the footing 5.

ハーフプレキャスト構造防潮堤1dの基礎部20を構成するにあたり、基礎杭である複数の鋼管杭2が互いに平行に略二列構成でもって打ち込まれている。鋼管杭2は、その一部が地中に打ち込まれ、上端部が地表面上に突出した状態で設けられる。また、鋼管杭2の周辺においては、複数の鋼管杭2を囲む所定範囲の地表面を均すように均しコンクリート3が設けられている。 To construct the foundation 20 of the half-precast seawall 1d, multiple steel pipe piles 2, which serve as foundation piles, are driven parallel to one another in approximately two rows. The steel pipe piles 2 are installed with a portion of them driven into the ground and their upper ends protruding above the ground surface. Additionally, leveling concrete 3 is provided around the steel pipe piles 2 to level the ground surface in a specified area surrounding the multiple steel pipe piles 2.

均しコンクリート3の上方には、現場打ちコンクリートからなるフーチング部5が設けられている。フーチング部5の形状や構成は任意であるが、例えば、図示のように、所定の高さを有し、矩形断面である略直方体に構成されても良い。これら、鋼管矢板杭2a、均しコンクリート3、フーチング部5の施工によりハーフプレキャスト構造防潮堤1cの基礎部20が構築される。これらの構造体は、いずれも現場施工によって構築される。 A footing 5 made of cast-in-place concrete is provided above the leveling concrete 3. The footing 5 may have any shape or configuration, but may, for example, be configured as a substantially rectangular parallelepiped with a predetermined height and a rectangular cross section, as shown in the figure. The foundation 20 of the half-precast seawall 1c is constructed by constructing the steel pipe sheet piles 2a, the leveling concrete 3, and the footing 5. All of these structures are constructed on-site.

また、フーチング部5の上部には、プレキャスト部材である複数(図27では5つ)の防潮堤パネル10が支持され、配列されている。上記第1、第3の実施の形態と同様に、防潮堤パネル10の内部には、フーチング部5から上方に向かって突出した複数の鉄筋がスリーブ式継手などの接続手段を介して内包され、フーチング部5と防潮堤パネル10が連結する構成となっている。 In addition, a number of precast seawall panels 10 (five in FIG. 27) are supported and arranged on the top of the footing 5. As in the first and third embodiments, the interior of the seawall panel 10 contains a number of reinforcing bars protruding upward from the footing 5 via connecting means such as sleeve joints, connecting the footing 5 and the seawall panel 10.

本発明の第4の実施の形態に係るハーフプレキャスト構造防潮堤1dは以上のように構成されている。このようなハーフプレキャスト構造防潮堤1dにおいて、基礎部20を構成する鋼管杭2、均しコンクリート3、フーチング部5はいずれも現場での施工によって構築される。一方で、防潮堤パネル10としては、予め工場などで製作されたプレキャスト部材を用いており、現場で組み立てのみを行う構成としている。これにより、鋼管杭2の打ち込み時などの現場施工時に生じる恐れのある施工誤差を、フーチング部5の構築時に吸収し、ハーフプレキャスト構造防潮堤1dを高精度で施工し構築することができる。また、上記第1~第3の実施の形態と同様に、防潮堤パネル10としてプレキャスト部材を用いていることで、工事の効率化、工期の短縮化などが図られる。 The half-precast seawall 1d according to the fourth embodiment of the present invention is constructed as described above. In this half-precast seawall 1d, the steel pipe piles 2, the leveling concrete 3, and the footing 5 that constitute the foundation 20 are all constructed on-site. On the other hand, the seawall panel 10 uses precast members that have been manufactured in advance in a factory or the like, and is constructed so that only assembly is performed on-site. This allows construction errors that may occur during on-site construction, such as when driving the steel pipe piles 2, to be absorbed when constructing the footing 5, and the half-precast seawall 1d can be constructed and constructed with high precision. Also, as in the first to third embodiments, the use of precast members as the seawall panel 10 improves the efficiency of construction and shortens the construction period.

(ハーフプレキャスト構造防潮堤1dの構築方法)
本実施の形態に係るハーフプレキャスト構造防潮堤1dの構築方法は概ね上記第1の実施の形態と同じ方法である。図28~図35は、第4の実施の形態に係るハーフプレキャスト構造防潮堤1dの構築方法を示す概略説明図である。図28~図35に示すように、本実施の形態に係るハーフプレキャスト構造防潮堤1dの構築方法は、鋼管杭2の構成を互いに平行な略二列構成としていることを除き、上記第1の実施の形態と同じ方法であるため、詳細な説明については省略する。
なお、本実施の形態では、基礎杭として複数の鋼管杭2が互いに平行に略二列構成に打ち込まれる場合を図示して説明したが、この鋼管杭2に代えて、鋼管矢板が地中に打ち込まれる鋼管矢板杭を基礎杭としても良い。
(Method of constructing half-precast structure seawall 1d)
The construction method of the half-precast seawall 1d according to this embodiment is generally the same as that of the first embodiment. Figures 28 to 35 are schematic explanatory diagrams showing the construction method of the half-precast seawall 1d according to the fourth embodiment. As shown in Figures 28 to 35, the construction method of the half-precast seawall 1d according to this embodiment is the same as that of the first embodiment, except that the steel pipe piles 2 are arranged in approximately two rows parallel to each other, and therefore detailed explanations will be omitted.
In this embodiment, a case has been illustrated and described in which a plurality of steel pipe piles 2 are driven parallel to each other in approximately two rows as foundation piles, but instead of these steel pipe piles 2, steel pipe sheet piles in which steel pipe sheet piles are driven into the ground may also be used as foundation piles.

(作用効果)
以上説明したように構成されるハーフプレキャスト構造防潮堤1a~1dによれば、ハーフプレキャスト構造である防潮堤の構築時に、施工現場における基礎杭(鋼管杭2や鋼管矢板杭2a)の施工誤差を、フーチング部5構築時ならびに防潮堤パネル10配列時に十分に吸収することができる。これにより、ハーフプレキャスト構造防潮堤1a~1dの構築時に高精度での施工が実現される。
(Action and Effect)
According to the half-precast seawalls 1a to 1d configured as described above, when constructing a seawall with a half-precast structure, construction errors in the foundation piles (steel pipe piles 2 and steel pipe sheet piles 2a) at the construction site can be fully absorbed when constructing the footing 5 and when arranging the seawall panels 10. This enables high-precision construction when constructing the half-precast seawalls 1a to 1d.

また、ハーフプレキャスト構造防潮堤1a~1dの構築において、基礎部20を構成する基礎杭(鋼管杭2、鋼管矢板杭2a)、均しコンクリート3、フーチング部5は、現場での施工によって構築される。一方で、防潮堤パネル10は、予め工場などで製作されたプレキャスト部材を用いており、現場で組み立てのみを行う構成としている。即ち、現場打ちコンクリートといった現場での施工と、プレキャスト部材を併用することで、工事の効率化、工期の短縮化などが図られる。 In addition, in constructing the half-precast seawalls 1a-1d, the foundation piles (steel pipe piles 2, steel pipe sheet piles 2a), leveling concrete 3, and footing 5 that make up the foundation 20 are constructed on-site. On the other hand, the seawall panel 10 uses precast members that have been manufactured in advance in a factory or the like, and is constructed so that only assembly is performed on-site. In other words, by combining on-site construction such as cast-in-place concrete with precast members, construction efficiency can be improved and the construction period can be shortened.

以上、本発明の実施の形態の一例を説明したが、本発明は図示の形態に限定されない。当業者であれば、特許請求の範囲に記載された思想の範疇内において、各種の変形例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。 Although one embodiment of the present invention has been described above, the present invention is not limited to the illustrated embodiment. It is clear that a person skilled in the art can come up with various modified or revised examples within the scope of the ideas described in the claims, and it is understood that these also naturally fall within the technical scope of the present invention.

上記実施の形態では、基礎杭として鋼管杭2あるいは鋼管矢板杭2aを用いて基礎部20を構成する場合を挙げて図示・説明したが、本発明はこれに限られるものではない。例えば、基礎杭として、鋼矢板又はハット形鋼矢板などを用いても良い。 In the above embodiment, the foundation portion 20 is constructed using steel pipe piles 2 or steel pipe sheet piles 2a as foundation piles, but the present invention is not limited to this. For example, steel sheet piles or hat-shaped steel sheet piles may be used as foundation piles.

本発明は、海岸線に沿って設置され、地震発生時の津波や台風の来襲時の高波に対する護岸や海水の陸地への浸水を抑制するハーフプレキャスト構造防潮堤に適用できる。 The present invention can be applied to half-precast seawalls that are installed along coastlines and serve as revetments against tsunamis caused by earthquakes and high waves caused by typhoons, and to prevent seawater from flooding onto land.

1(1a~1d)…ハーフプレキャスト構造防潮堤
2…鋼管杭
2a…鋼管矢板杭
3…均しコンクリート
5…フーチング部
10…防潮堤パネル
20…基礎部
22…鉄筋群
25…型枠
30…(鋼管杭上端の)鉄筋群
35…(防潮堤パネルの下部側方の)鉄筋群
40…(主鉄筋と配力筋からなる)鉄筋群
42…鉄筋構造
45…型枠
Reference Signs List 1 (1a to 1d)...Half-precast structure seawall 2...Steel pipe pile 2a...Steel pipe sheet pile 3...Leveling concrete 5...Footing 10...Seawall panel 20...Foundation 22...Reinforcing bars 25...Formwork 30...Reinforcing bars (at the top end of the steel pipe pile) 35...Reinforcing bars (on the lower side of the seawall panel) 40...Reinforcing bars (consisting of main reinforcing bars and distribution bars) 42...Reinforcing bar structure 45...Formwork

Claims (4)

基礎部と、当該基礎部上に配列され壁体を構成する複数の防潮堤パネルと、からなるハーフプレキャスト構造防潮堤であって、
前記基礎部は、その一部が地中に打ち込まれ、上端部が地表面上に突出した状態で設けられる基礎杭と、
前記基礎杭を囲む所定範囲の地表面を均す均しコンクリートと、
前記均しコンクリートの上方において、前記基礎杭の上端部を内包し、且つ、前記防潮堤パネルを支持するように設けられるフーチング部と、から構成され、
前記基礎杭は、互いに平行に二列で構成され、
前記防潮堤パネルは、プレキャストコンクリート部材であり、前記均しコンクリート上で前記基礎杭の二列配列中間位置に配列され、その下端部が前記フーチング部に挟まれるように支持され、一体化して構成され、
前記フーチング部は、前記基礎杭の上端部に固着され上方に向けて突出する鉄筋群と、前記防潮堤パネルの下部から側方に突出する鉄筋群と、を含む鉄筋構造を内包する現場打ちコンクリートからなることを特徴とする、ハーフプレキャスト構造防潮堤。
A half-precast seawall structure comprising a foundation and a plurality of seawall panels arranged on the foundation to form a wall,
The foundation portion is a foundation pile that is installed with a part of the foundation pile driven into the ground and an upper end of the foundation pile protruding above the ground surface;
A leveling concrete for leveling the ground surface of a predetermined range surrounding the foundation pile;
a footing portion provided above the leveling concrete to contain the upper end of the foundation pile and to support the seawall panel;
The foundation piles are arranged in two rows parallel to each other,
The seawall panel is a precast concrete member, and is arranged at the center of the two rows of the foundation piles on the leveled concrete , and its lower end is supported so as to be sandwiched between the footing portion and is integrally formed,
This is a half-precast seawall structure, characterized in that the footing portion is made of cast-in-place concrete containing a reinforced concrete structure including a group of reinforcement bars fixed to the upper ends of the foundation piles and protruding upward, and a group of reinforcement bars protruding laterally from the lower part of the seawall panel.
前記基礎杭は、互いに平行に二列で構成され、複数の鋼管が地中に打ち込まれる鋼管杭、又は、複数の鋼管矢板が連続的に密着して地中に打ち込まれる鋼管矢板杭であることを特徴とする、請求項1に記載のハーフプレキャスト構造防潮堤。The half-precast seawall structure described in claim 1, characterized in that the foundation piles are steel pipe piles consisting of two rows parallel to each other and in which a plurality of steel pipes are driven into the ground, or steel pipe sheet piles consisting of a plurality of steel pipe sheet piles driven into the ground in continuous, close contact with each other. 前記フーチング部には、前記防潮堤パネルの表面に対して垂直方向に伸びる主鉄筋と、前記主鉄筋に交差するように伸びる配力筋とからなる鉄筋群が、前記基礎杭の上端部に固着され上方に向けて突出する鉄筋群と接続するように埋設されていることを特徴とする、請求項1又は2に記載のハーフプレキャスト構造防潮堤。3. A half-precast seawall structure as described in claim 1 or 2, characterized in that a group of reinforcing bars consisting of main reinforcing bars extending perpendicular to the surface of the seawall panel and distribution bars extending so as to intersect with the main reinforcing bars is embedded in the footing portion so as to connect to the group of reinforcing bars fixed to the upper ends of the foundation piles and protruding upward. 基礎部と、当該基礎部上に配列され壁体を構成する複数の防潮堤パネルと、からなるハーフプレキャスト構造防潮堤の構築方法であって、A method for constructing a half-precast structure seawall consisting of a foundation and a plurality of seawall panels arranged on the foundation to form a wall, comprising the steps of:
複数の基礎杭をその一部が地中に打ち込まれ、上端部が地表面上に突出した状態で前記ハーフプレキャスト構造防潮堤の延伸方向に、互いに平行に二列設け、A plurality of foundation piles are provided in two rows parallel to each other in the extension direction of the half-precast seawall, with a portion of each pile driven into the ground and an upper end portion protruding above the ground surface.
前記二列の基礎杭を囲む所定範囲の地表面を均す均しコンクリートを打設し、Pour leveling concrete over a predetermined area of the ground surface surrounding the two rows of foundation piles;
前記均しコンクリートの上方において、前記基礎杭の二列配列中間位置に前記複数の防潮堤パネルを、その下部から側方に鉄筋が突出した状態で配列し、Above the leveling concrete, the plurality of seawall panels are arranged at the center of the two rows of the foundation piles with reinforcing bars protruding laterally from the lower part of the panels;
前記主鉄筋、前記配力筋及び前記基礎杭上端部に固着する鉄筋を配設した後、全ての鉄筋をその内部に埋設し、また前記防潮堤パネルの下端部を挟んで支持し一体化するように現場打ちコンクリートを打設して前記フーチング部を完成させることを特徴とする、請求項3に記載のハーフプレキャスト構造防潮堤の構築方法。A method for constructing a half-precast structure seawall as described in claim 3, characterized in that after arranging the main reinforcing bars, the distribution bars, and the reinforcing bars fixed to the upper ends of the foundation piles, all of the reinforcing bars are buried inside, and in-situ concrete is poured to sandwich and support the lower ends of the seawall panels and integrate them, thereby completing the footing.
JP2024060082A 2020-04-02 2024-04-03 Half-precast structure seawall and its construction method Active JP7633581B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2024060082A JP7633581B2 (en) 2020-04-02 2024-04-03 Half-precast structure seawall and its construction method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020066871A JP7518341B2 (en) 2020-04-02 2020-04-02 Half-precast structure seawall and its construction method
JP2024060082A JP7633581B2 (en) 2020-04-02 2024-04-03 Half-precast structure seawall and its construction method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2020066871A Division JP7518341B2 (en) 2020-04-02 2020-04-02 Half-precast structure seawall and its construction method

Publications (3)

Publication Number Publication Date
JP2024069723A JP2024069723A (en) 2024-05-21
JP2024069723A5 JP2024069723A5 (en) 2024-08-21
JP7633581B2 true JP7633581B2 (en) 2025-02-20

Family

ID=78002885

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2020066871A Active JP7518341B2 (en) 2020-04-02 2020-04-02 Half-precast structure seawall and its construction method
JP2024060082A Active JP7633581B2 (en) 2020-04-02 2024-04-03 Half-precast structure seawall and its construction method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
JP2020066871A Active JP7518341B2 (en) 2020-04-02 2020-04-02 Half-precast structure seawall and its construction method

Country Status (1)

Country Link
JP (2) JP7518341B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7759271B2 (en) * 2022-01-31 2025-10-23 鹿島建設株式会社 Joining structure and joining method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002235375A (en) 2001-02-08 2002-08-23 Kajima Corp Construction method
JP2006207265A (en) 2005-01-28 2006-08-10 Toda Constr Co Ltd Pile-column connection method and its structure
JP2016003532A (en) 2014-06-19 2016-01-12 ジオスター株式会社 Footing of wall structure
JP2016148227A (en) 2015-02-13 2016-08-18 Jfeエンジニアリング株式会社 Water structure and construction method of water structure
JP2020033774A (en) 2018-08-30 2020-03-05 Jfeエンジニアリング株式会社 Dam body, and precast footing for dam body

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2591994B2 (en) * 1988-10-14 1997-03-19 新日本製鐵株式会社 How to Build a Dike

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002235375A (en) 2001-02-08 2002-08-23 Kajima Corp Construction method
JP2006207265A (en) 2005-01-28 2006-08-10 Toda Constr Co Ltd Pile-column connection method and its structure
JP2016003532A (en) 2014-06-19 2016-01-12 ジオスター株式会社 Footing of wall structure
JP2016148227A (en) 2015-02-13 2016-08-18 Jfeエンジニアリング株式会社 Water structure and construction method of water structure
JP2020033774A (en) 2018-08-30 2020-03-05 Jfeエンジニアリング株式会社 Dam body, and precast footing for dam body

Also Published As

Publication number Publication date
JP2024069723A (en) 2024-05-21
JP7518341B2 (en) 2024-07-18
JP2021161820A (en) 2021-10-11

Similar Documents

Publication Publication Date Title
CN110512647B (en) Structural design and construction method of a partially assembled subway station
US20160340855A1 (en) Modular construction mold apparatus and method for constructing concrete buildings and structures
CN107002376B (en) Floating gate or island and method for manufacturing same
JP6166550B2 (en) Embankment
WO2012096639A1 (en) Modular construction mold apparatus and method for constructing concrete buildings and structures
JP7633581B2 (en) Half-precast structure seawall and its construction method
JP4765965B2 (en) Revetment integrated ramen bridge and its construction method
JP2015183453A (en) Dam body
US20220325492A1 (en) Prefabricated, modular hydropower foundation system for soil conditions
CN217810967U (en) Supporting structure adopting prefabricated section steel concrete square pile as stand column
KR100778252B1 (en) Prefabricated slab bridge with H-girder installed on the connecting support member inserted on the lattice pile pillar and construction method
JP2022115624A (en) Quay wall structure, and construction method of the same
CN221398914U (en) Platform suitable for bearing platform drilling construction at dyke interface
JP6298688B2 (en) Embankment
JP2024069723A5 (en) Half-precast structure seawall and its construction method
CN118686206A (en) A PC combined construction method for pile cofferdam construction
JP2018178641A (en) Seawall panel, seawall and seawall construction method
CN119465858A (en) Bucket-type foundation breakwater with prefabricated walkway slab and wave-blocking wall and installation method thereof
CN118686125A (en) An assembled longitudinal water-passing earth-rock cofferdam structure and construction method thereof
RU2379424C1 (en) Method for erection of foundation slab of framed structure
JP6166547B2 (en) Embankment
KR200422840Y1 (en) Prefabricated slab bridge with H-girder mounted on connecting support member inserted on lattice pile pillar
JP6073716B2 (en) Wall structures such as seawalls
CN114892644A (en) A support structure using prefabricated steel concrete square piles as columns and construction method thereof
JP2024142636A (en) Underground water tank and method of construction

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240403

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240813

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250107

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250120

R150 Certificate of patent or registration of utility model

Ref document number: 7633581

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150