JP7633891B2 - Method for constructing underground structure, underground structure, and precast concrete side or intermediate wall/column therefor - Google Patents
[go: Go Back, main page]

JP7633891B2 - Method for constructing underground structure, underground structure, and precast concrete side or intermediate wall/column therefor - Google Patents

Method for constructing underground structure, underground structure, and precast concrete side or intermediate wall/column therefor Download PDF

Info

Publication number
JP7633891B2
JP7633891B2 JP2021102551A JP2021102551A JP7633891B2 JP 7633891 B2 JP7633891 B2 JP 7633891B2 JP 2021102551 A JP2021102551 A JP 2021102551A JP 2021102551 A JP2021102551 A JP 2021102551A JP 7633891 B2 JP7633891 B2 JP 7633891B2
Authority
JP
Japan
Prior art keywords
precast concrete
side walls
concrete side
top plate
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021102551A
Other languages
Japanese (ja)
Other versions
JP2023001683A (en
Inventor
均 浅野
孝 田中
賢二 下坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP2021102551A priority Critical patent/JP7633891B2/en
Publication of JP2023001683A publication Critical patent/JP2023001683A/en
Application granted granted Critical
Publication of JP7633891B2 publication Critical patent/JP7633891B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

本発明は、半地下道路トンネル、地下駐車場、駐輪場、共同溝、地下鉄、地下道などの地下構造物の構築方法等に関する。 The present invention relates to methods for constructing underground structures such as semi-underground road tunnels, underground parking lots, bicycle parking lots, utility tunnels, subways, and underpasses.

出願人は、下記特許文献1にて、土被りが大きい地下構造物の構築方法等の提案を行った。具体的には、少なくとも両側壁部、頂版部及び底版部を有する地下構造物の構築方法であって、前記両側壁部の構築部位に、上端面より所定深さに亘ってインサート金具又は鋼材を埋設した埋設部が形成されるとともに、土水圧などの側方抵抗のために上方側に突出するように複数本の仮設鋼材が着脱可能に備えられた、本体構造となるプレキャストコンクリート側壁を地中に建込み、これらプレキャストコンクリート側壁間の頂版を構築する位置までの地盤を掘削除去した後、前記プレキャストコンクリート側壁間であって、前記インサート金具又は鋼材の埋設部を避けたその下部側にコンクリートを打設するとともに、前記プレキャストコンクリート側壁との結合及び一体化を図り、本体構造となる頂版部を先行的に完成させる第1工程と、前記プレキャストコンクリート側壁及び頂版部によって囲まれた頂版部以深の地盤を掘削し、最終的に底版部の構築深さまでの掘削を行う第2工程と、前記プレキャストコンクリート側壁間であって、底版部構築部位にコンクリートを打設するとともに、前記プレキャストコンクリート側壁との結合及び一体化を図り、本体構造となる底版部を構築する第3工程と、からなる地下構造物の構築方法である。 The applicant proposed a method for constructing an underground structure with a large soil cover in the following Patent Document 1. Specifically, the method for constructing an underground structure having at least both side walls, a top plate, and a bottom plate includes forming an embedded portion in which insert metal fittings or steel materials are embedded from the upper end surface to a predetermined depth in the construction portion of the both side walls, and erecting precast concrete side walls that form the main structure in the ground and that are provided with a plurality of temporary steel materials that are detachably attached so as to protrude upward to provide lateral resistance such as soil and water pressure, and then excavating and removing the ground up to the position where the top plate is to be constructed between the precast concrete side walls, and then excavating and removing the ground up to the position where the top plate is to be constructed, and then excavating and removing the ground between the precast concrete side walls, avoiding the embedded portions of the insert metal fittings or steel materials. This method of constructing an underground structure consists of a first step in which concrete is poured into the lower part of the precast concrete wall, and the top plate, which will be the main structure, is completed in advance by connecting and integrating it with the precast concrete side walls; a second step in which the ground is excavated below the top plate, which is surrounded by the precast concrete side walls and the precast concrete wall, and finally to the construction depth of the bottom plate; and a third step in which concrete is poured between the precast concrete side walls in the construction area of the bottom plate, and the bottom plate, which will be the main structure, is constructed by connecting and integrating it with the precast concrete side walls.

かかる地下構造物の構築方法によれば、土被りが大きい地下構造物において、側壁の建込み誤差が吸収できるとともに、工事に伴う地上占用規模及び期間が最小化でき、周辺環境への影響が必要最小限度に抑制でき、輸送及び現場作業が容易化でき、構造強度の確保が図れるなどの効果が発揮されるようになる。 This method of constructing underground structures has the following advantages: it is possible to absorb errors in the construction of side walls in underground structures with a large soil cover, it is possible to minimize the amount of ground occupied by the construction work and its duration, it is possible to keep the impact on the surrounding environment to a minimum, it is possible to facilitate transportation and on-site work, and it is possible to ensure the strength of the structure.

特開2011-122386号公報JP 2011-122386 A

大深度地下に地下構造物を構築する場合、プレキャストコンクリート側壁に大きな土水圧などを受けるため、プレキャストコンクリート側壁の部材厚を大きくする必要があり、これに伴い、プレキャストコンクリート側壁の製作や運搬などのコストが嵩むとともに、本構築方法の適用性が低下することが懸念されていた。 When constructing underground structures at great depths underground, the precast concrete side walls are subjected to large soil and water pressures, so the thickness of the precast concrete side walls must be increased. This increases the costs of manufacturing and transporting the precast concrete side walls, and there are concerns that the applicability of this construction method will decrease.

また、上記特許文献1記載の地下構造物の構築方法では、プレキャストコンクリート側壁の上端面に上方側に突出するように仮設鋼材が備えられているが、このプレキャストコンクリート側壁と仮設鋼材とは、図20に示されるように、プレキャストコンクリート側壁50の上端面より所定深さに亘って埋設されたインサート金具52に対して、仮設鋼材51の端部に備えられたベースプレート53を介してボルト定着するか、図21に示されるように、プレキャストコンクリート側壁50の上端面より所定深さに亘って埋設されるとともに埋設側先端部に支圧板54やスタッド(図示せず)が設けられた鋼材55に対して、仮設鋼材51を添接板56を介して添接接合することにより着脱可能に備えられている。 In the method for constructing an underground structure described in Patent Document 1, temporary steel materials are provided on the upper end surface of the precast concrete side wall so as to protrude upward. As shown in FIG. 20, the precast concrete side wall and the temporary steel materials are fixed by bolts via base plates 53 provided at the ends of the temporary steel materials 51 to insert metal fittings 52 embedded to a predetermined depth from the upper end surface of the precast concrete side wall 50, or as shown in FIG. 21, the temporary steel materials 51 are attached and detached by splicing them via splice plates 56 to steel materials 55 embedded to a predetermined depth from the upper end surface of the precast concrete side wall 50 and having bearing plates 54 and studs (not shown) at the embedded end.

しかし、プレキャストコンクリート側壁の上端面に上方側に突出する仮設鋼材をこのような方法で設けた場合には、土被りが大きくなるとプレキャストコンクリート側壁に対する仮設鋼材の固定部に過大な応力が集中し、プレキャストコンクリート側壁がひび割れなどの破損を生じるおそれがあった。 However, if temporary steel members protruding upward from the top end surface of the precast concrete sidewall are installed in this manner, when the soil cover becomes large, excessive stress is concentrated at the fixed part of the temporary steel member to the precast concrete sidewall, which may cause the precast concrete sidewall to crack or suffer other damage.

そこで本発明の主たる課題は、プレキャストコンクリート側壁の薄型化を図ることで、コスト縮減及び適用性の拡大を図るとともに、土被りが大きい場合でもプレキャストコンクリート側壁の破損を防止することにある。 The main objective of the present invention is to reduce costs and expand applicability by making the precast concrete side walls thinner, while also preventing damage to the precast concrete side walls even when there is a large soil covering.

上記課題を解決するために請求項1に係る本発明として、少なくとも両側壁部、頂版部及び底版部を有する地下構造物の構築方法であって、
前記両側壁部の構築部位に、地山側主筋の代わりに鋼材が芯材として配置されるとともに、前記鋼材としてT形鋼が用いられ、かつ前記T形鋼はフランジ部がプレキャストコンクリート側壁の外面側に対向し、ウェブ部が内側に向けて突出するように配置され、前記鋼材が上端面より上方側に延出して土水圧などの側方抵抗のための土留め壁用鋼材部を形成した、本体構造となるプレキャストコンクリート側壁を地中に建込み、これらプレキャストコンクリート側壁間の頂版を構築する位置までの地盤を掘削除去した後、前記プレキャストコンクリート側壁間に本体構造となる頂版部を構築し、埋め戻すことにより頂版部以浅部分を先行的に完成させる第1工程と、
前記プレキャストコンクリート側壁及び頂版部によって囲まれた頂版部以深の地盤を掘削し、最終的に底版部の構築深さまで掘削を行う第2工程と、
底版部構築部位において、底版部とプレキャストコンクリート側壁との結合に当たって、予めプレキャストコンクリート側壁の下部より底版部側に向けて側壁部主鉄筋を配筋するとともに、その先端部に機械式継手を設けておき、この機械式継手に対して底版部の配筋を行った後、型枠を配設し、コンクリートを打設して前記プレキャストコンクリート側壁との結合及び一体化を図りながら本体構造となる底版部を構築する第3工程と、からなることを特徴とする地下構造物の構築方法が提供される。
In order to solve the above problems, the present invention relates to a method for constructing an underground structure having at least two side walls, a top plate, and a bottom plate, comprising:
a first step of erecting precast concrete side walls that will form the main structure in the ground , the precast concrete side walls having a flange portion facing the outer surface of the precast concrete side walls and a web portion protruding inward, the precast concrete side walls extending upward from their upper end surfaces to form a retaining wall steel portion for lateral resistance to soil and water pressure, and excavating and removing the ground up to a position where a top plate will be constructed between the precast concrete side walls, and then constructing a top plate portion that will form the main structure between the precast concrete side walls and backfilling the ground to complete the portion shallower than the top plate in advance;
A second step of excavating the ground below the top plate surrounded by the precast concrete side walls and the top plate, and finally excavating the ground to a construction depth of the bottom plate;
The present invention provides a method for constructing an underground structure, which comprises the steps of: when joining the bottom slab and the precast concrete side wall at the bottom slab construction site, the side wall main reinforcing bars are arranged in advance from the lower part of the precast concrete side wall toward the bottom slab side, and a mechanical joint is provided at the tip of the reinforcing bars; after the bottom slab is reinforced relative to this mechanical joint, formwork is installed and concrete is poured to construct the bottom slab, which will become the main structure, while joining and integrating it with the precast concrete side wall.

上記請求項1記載の発明では、プレキャストコンクリート側壁について、地山側主筋の代わりに鋼材を芯材として配置した構造としているため、従来の異形棒鋼を主筋とした鉄筋コンクリート構造に比べて、鋼材の断面積量が増加し、プレキャストコンクリート全体としての曲げ耐力が増加する結果、プレキャストコンクリート部材の薄型化、軽量化が可能となり、コスト縮減が図れるとともに、大深度の地下構造物にも対応可能となり、本構築方法の適用性が拡大できる。 In the invention described in claim 1 above, the precast concrete side walls are constructed in such a way that steel material is placed as the core material instead of the main reinforcement on the ground side . This increases the cross-sectional area of the steel material compared to conventional reinforced concrete structures using deformed steel bars as the main reinforcement, and increases the bending strength of the precast concrete as a whole. As a result, it is possible to make the precast concrete members thinner and lighter, thereby reducing costs and making it possible to accommodate underground structures at great depths, thereby expanding the applicability of this construction method.

また、プレキャストコンクリート部材の芯材として用いられる前記鋼材が上端面より上方側に延出し、工事中の土留め壁として利用可能な土留め壁用鋼材部を形成するため、土被りが大きく、前記土留め壁用鋼材部に側方から大きな土水圧などが加わった場合でも、芯材から連続して延びる鋼材によって深度方向に対する連続的な抵抗力が確保でき、プレキャストコンクリート部材のひび割れなどの破損が防止できる。 In addition, the steel material used as the core material of the precast concrete member extends upward from the upper end surface to form a steel portion for the earth retaining wall that can be used as an earth retaining wall during construction. Therefore, even if there is a large amount of soil covering and a large soil and water pressure is applied to the steel portion for the earth retaining wall from the side, the steel material extending continuously from the core material ensures continuous resistance in the depth direction, preventing damage such as cracks in the precast concrete member.

前記プレキャストコンクリート側壁では、引張応力が卓越する地山側主筋の代わりの芯材としてT形綱からなる鋼材を用いることにより、プレキャストコンクリート側壁の曲げ耐力が増加し、プレキャスト部材の薄型化、軽量化がより確実に可能となる。 In the precast concrete side walls, by using steel material consisting of T-shaped steel bars as the core material instead of the main reinforcement on the ground side where tensile stress is dominant, the bending strength of the precast concrete side walls is increased, making it possible to more reliably make the precast members thinner and lighter.

記T形鋼は、フランジ部がプレキャストコンクリート側壁の外面側に対向し、ウェブ部が内側に向けて突出するように配置されているため、H形鋼を用いた場合に比べて鋼材の重心位置がプレキャストコンクリート側壁の外面側寄りとなるため、同一断面積の場合、有効高さが大きくなり、設計上有利となる。また、従来の異形鋼棒を用いた鉄筋コンクリート構造に比べて曲げ耐力が大きくなるため、内部掘削時の切梁による支保が簡略化できる。更に、プレキャストコンクリート側壁の製作において、現場打設コンクリートによって構築する底版部との接合部として、多数の機械式継手が設置されるが、その際、鋼材としてH形鋼を用いた場合に比べて、鋼材と機械式継手とが干渉することなく、所定のピッチで機械式継手を配置することが可能となり、コンクリートの充填性が良好となる。 The flange of the T -shaped steel faces the outer surface of the precast concrete side wall, and the web is arranged to protrude inward, so that the center of gravity of the steel material is closer to the outer surface of the precast concrete side wall than when H-shaped steel is used, and therefore the effective height is larger for the same cross-sectional area, which is advantageous in design. In addition, the bending strength is larger than that of conventional reinforced concrete structures using deformed steel bars, so that the support by struts during internal excavation can be simplified. Furthermore, in the production of precast concrete side walls, many mechanical joints are installed as joints with the bottom slab constructed by on-site poured concrete. In this case, compared to when H-shaped steel is used as the steel material, the mechanical joints can be arranged at a specified pitch without interference between the steel material and the mechanical joints, and the concrete filling property is improved.

請求項2に係る本発明として、両側壁部、両側壁間の中間壁又は中間柱、頂版部及び底版部を有する地下構造物の構築方法であって、
前記両側壁部、両側壁間の中間壁又は中間柱によって仕切られる各スパンを順に、側壁の構築部位には、地山側主筋の代わりに鋼材が芯材として配置されるとともに、前記鋼材としてT形鋼が用いられ、かつ前記T形鋼はフランジ部がプレキャストコンクリート側壁の外面側に対向し、ウェブ部が内側に向けて突出するように配置され、前記鋼材が上端面より上方側に延出して土水圧などの側方抵抗のための土留め壁用鋼材部を形成した、本体構造となるプレキャストコンクリート側壁を地中に建込むとともに、中間壁又は中間柱の構築部位には、主筋の代わりに鋼材が芯材として配置されるとともに、前記鋼材が上端面より上方側に延出して土水圧などの側方抵抗のための土留め壁用鋼材部を形成した、本体構造となるプレキャストコンクリート中間壁又は中間柱を地中に建込み、これらスパン間の頂版を構築する位置までの地盤を掘削除去した後、前記プレキャストコンクリート側壁間に本体構造となる頂版部を構築し、埋め戻すことにより頂版部以浅部分を先行的に完成させる第1工程と、
前記プレキャストコンクリート側壁及び頂版部によって囲まれた頂版部以深の地盤を掘削し、最終的に底版部の構築深さまでの掘削を行う第2工程と、
底版部構築部位において、底版部とプレキャストコンクリート側壁との結合に当たって、予めプレキャストコンクリート側壁の下部より底版部側に向けて側壁部主鉄筋を配筋するとともに、その先端部に機械式継手を設けておき、この機械式継手に対して底版部の配筋を行った後、型枠を配設し、コンクリートを打設して前記プレキャストコンクリート側壁及びプレキャストコンクリート中間壁又は中間柱との結合及び一体化を図りながら本体構造となる底版部を構築する第3工程と、からなることを特徴とする地下構造物の構築方法が提供される。
According to a second aspect of the present invention, there is provided a method for constructing an underground structure having both side walls, an intermediate wall or intermediate column between both side walls, a top plate portion, and a bottom plate portion, comprising the steps of:
a first step of erecting precast concrete side walls that will form a main structure in the ground for each span separated by the side wall portions and the intermediate wall or column between the side walls, in which steel material is placed as a core material in place of main reinforcement on the ground side of the construction portion of the side walls, T-shaped steel is used as the steel material, and the flange portion of the T-shaped steel is arranged so that it faces the outer surface of the precast concrete side wall and the web portion protrudes inward, and the steel material extends upward from the upper end surface to form a steel material portion for a retaining wall for lateral resistance such as soil and water pressure, and erecting precast concrete intermediate walls or intermediate columns that will form a main structure in the ground for each span separated by the side wall portions and the intermediate wall or column, in which steel material is placed as a core material in place of main reinforcement in place of main reinforcement and the steel material extends upward from the upper end surface to form a steel material portion for a retaining wall for lateral resistance such as soil and water pressure, excavating and removing the ground up to a position where a top plate will be constructed between the spans, constructing a top plate portion that will form the main structure between the precast concrete side walls, and backfilling the ground to complete the portion shallower than the top plate portion in advance;
A second step of excavating the ground below the top plate surrounded by the precast concrete side walls and the top plate, and finally excavating the ground to a construction depth of the bottom plate;
The present invention provides a method for constructing an underground structure, which comprises the steps of: when joining the bottom slab and the precast concrete side walls at the bottom slab construction site, first, arranging the main reinforcement bars of the side wall from the lower part of the precast concrete side wall toward the bottom slab, and providing a mechanical joint at the tip of the reinforcement bar; after arranging the reinforcement bars of the bottom slab relative to this mechanical joint, setting formwork and pouring concrete to construct the bottom slab, which will become the main structure, while joining and integrating the precast concrete side walls and the precast concrete intermediate walls or intermediate columns.

上記請求項2記載の発明は、側壁間に中間壁又は中間柱を有する地下構造物の場合の構築方法である。側壁間に中間壁又は中間柱を有する場合には、側壁間の頂版を構築する地盤をすべて掘削した後、頂版を構築することも可能であるが、この場合は、掘削規模が大きくなり、地上占用期間が長期化することになる。従って、両側壁部、両側壁間の中間壁又は中間柱によって仕切られる各スパンを順に、プレキャストコンクリート部材の建込み、頂版構築位置までの地盤の掘削、頂版の構築、埋戻しによる頂版部以浅部分の先行的完成の手順で施工することにより、地上占用期間を短縮化できるようになる。 The invention described in claim 2 above is a construction method for underground structures with intermediate walls or columns between side walls. When intermediate walls or columns are present between side walls, it is possible to excavate all of the ground in which the top plate between the side walls will be constructed, and then construct the top plate, but in this case, the scale of excavation will be large and the aboveground occupation period will be extended. Therefore, by constructing each span separated by both side walls and intermediate walls or columns between both side walls in the following order, erecting precast concrete members, excavating the ground up to the top plate construction position, constructing the top plate, and completing the shallower portion below the top plate by backfilling, it is possible to shorten the aboveground occupation period.

請求項に係る本発明として、前記プレキャストコンクリート側壁及び/又はプレキャストコンクリート中間壁又は中間柱は、鉛直支持力及び土水圧などの側方抵抗のために、下端面より下方側に突出するように複数本の鋼杭を備える請求項1、2いずれかに記載の地下構造物の構築方法が提供される。 As the present invention of claim 3 , there is provided a method for constructing an underground structure as described in either claim 1 or 2, wherein the precast concrete side walls and/or precast concrete intermediate walls or intermediate columns are provided with a plurality of steel piles protruding downward from their lower end surfaces for vertical bearing capacity and lateral resistance such as soil and water pressure.

上記請求項記載の発明においては、前記プレキャストコンクリート側壁及び/又はプレキャストコンクリート中間壁又は中間柱に対して、鉛直支持力及び土水圧などの側方抵抗のために、下端面より下方側に突出するように複数本の鋼杭を設けるようにしたものである。全根入れ長をプレキャストコンクリート部材とすることも可能であるが、この場合は建込み溝の掘削深さが深くなるばかりでなく、プレキャスト部材費が増し、工期の長期化と施工手間、工費が増す原因となる。従って、下端に複数本の鋼杭を設けることにより、建込み溝を浅くでき、かつこれら鋼杭によって十分な鉛直支持力及び土水圧などの側方抵抗力を確保することができる。 In the invention described in claim 3 , a plurality of steel piles are provided to protrude downward from the bottom end surface of the precast concrete side walls and/or precast concrete intermediate walls or intermediate columns in order to provide vertical bearing capacity and lateral resistance such as soil and water pressure. It is possible to use precast concrete members for the entire embedded length, but in this case, not only will the excavation depth of the building groove be deeper, but the cost of the precast members will increase, causing a longer construction period and increased construction labor and costs. Therefore, by providing a plurality of steel piles at the bottom end, the building groove can be made shallow, and these steel piles can ensure sufficient vertical bearing capacity and lateral resistance such as soil and water pressure.

請求項に係る本発明として、前記プレキャストコンクリート側壁及び/又はプレキャストコンクリート中間壁又は中間柱は、少なくとも内壁面側に対して、フィルムを貼設又は剥離剤を塗布してある請求項1~いずれかに記載の地下構造物の構築方法が提供される。 As a fourth aspect of the present invention, there is provided a method for constructing an underground structure according to any one of claims 1 to 3 , wherein the precast concrete side walls and/or precast concrete intermediate walls or intermediate columns have a film attached or a release agent applied to at least the inner wall surface side.

上記請求項記載の発明においては、プレキャストコンクリート側壁及び/又はプレキャストコンクリート中間壁又は中間柱の少なくとも内壁面側に対して、フィルムを貼設したり、或いは剥離剤を塗布しておくものである。施工時に前記プレキャストコンクリート部材の表面には、泥水やソイルセメントが付着し汚れるため、工事完成後に前記フィルムを剥がすことにより、或いは剥離剤を塗布しておき簡単に洗い流しできるようにしておくことにより、内壁面側を簡単に綺麗に仕上げできるようになる。 In the invention described in claim 4 , a film is applied or a release agent is applied to at least the inner wall surface of the precast concrete side walls and/or the precast concrete intermediate walls or intermediate columns. Since muddy water and soil cement adhere to the surface of the precast concrete members during construction and become dirty, the inner wall surface can be easily finished neatly by peeling off the film after the work is completed or by applying a release agent so that it can be easily washed away.

請求項に係る本発明として、地山側主筋の代わりに鋼材が芯材として配置されるとともに、前記鋼材としてT形鋼が用いられ、かつ前記T形鋼はフランジ部がプレキャストコンクリート側壁の外面側に対向し、ウェブ部が内側に向けて突出するように配置され、前記鋼材が上端面より上方側に延出して土水圧などの側方抵抗のための土留め壁用鋼材部を形成し、且つ鉛直支持力及び土水圧などの側方抵抗のために下端面より下方側に突出するように複数本の鋼杭が備えられたプレキャストコンクリート側壁と、プレキャストコンクリート側壁間の上部に設けられた頂版部と、プレキャストコンクリート側壁間の下部に設けられるとともに、現場打設コンクリートによって構築された底版部とからなることを特徴とする請求項1記載の構造物の構築方法によって構築された地下構造物が提供される。 According to a fifth aspect of the present invention, there is provided an underground structure constructed by the method for constructing a structure as described in the first aspect, characterized in that steel material is arranged as a core material instead of main reinforcement on the ground side, T-shaped steel is used as the steel material, the flange portion of the T-shaped steel is arranged so that it faces the outer surface of the precast concrete side wall and the web portion protrudes inward, the steel material extends upward from the upper end surface to form a steel part for a retaining wall for lateral resistance such as soil and water pressure, and a plurality of steel piles are provided so as to protrude downward from the lower end surface for vertical bearing force and lateral resistance such as soil and water pressure, a top plate portion provided at the upper part between the precast concrete side walls, and a bottom plate portion provided at the lower part between the precast concrete side walls and constructed of cast -in-place concrete.

請求項に係る本発明として、前記プレキャストコンクリート側壁間に、1又は複数のプレキャストコンクリート中間壁又は中間柱を有するとともに、該プレキャストコンクリート中間壁又は中間柱は、主筋の代わりに鋼材が芯材として配置されるとともに、前記鋼材が上端面より上方側に延出して土水圧などの側方抵抗のための土留め壁用鋼材部を形成し、且つ鉛直支持力及び土水圧などの側方抵抗のために下端面より下方側に突出するように複数本の鋼杭が備えられている請求項記載の地下構造物が提供される。 As the present invention of claim 6 , there is provided an underground structure as described in claim 5, which has one or more precast concrete intermediate walls or intermediate columns between the precast concrete side walls, and in which steel material is arranged as a core material instead of main reinforcement in the precast concrete intermediate walls or intermediate columns, and the steel material extends upward from the upper end surface to form a steel portion for a retaining wall for lateral resistance such as soil and water pressure, and a plurality of steel piles are provided to protrude downward from the lower end surface for vertical bearing force and lateral resistance such as soil and water pressure.

以上詳説のとおり本発明によれば、プレキャストコンクリート側壁の薄型化を図ることで、コスト縮減及び適用性の拡大が図れるとともに、土被りが大きい場合でもプレキャストコンクリート側壁の破損が防止できるようになる。 As explained above in detail, the present invention makes it possible to reduce costs and expand applicability by making the precast concrete side walls thinner, and also makes it possible to prevent damage to the precast concrete side walls even when they are covered with a large amount of soil.

本発明に係る地下構造物1Aを示す縦断面図である。A vertical cross-sectional view showing an underground structure 1A according to the present invention. 地下構造物1Aの構築手順(その1)である。This is the construction procedure (part 1) for underground structure 1A. プレキャストコンクリート側壁2を示す、(A)は側面側の縦断面図、(B)は正面側の縦断面図である。1 shows a precast concrete side wall 2, where (A) is a vertical cross-sectional view of the side surface and (B) is a vertical cross-sectional view of the front surface. 変形例に係るプレキャストコンクリート側壁2を示す、(A)は側面側の縦断面図、(B)は正面側の縦断面図である。1A and 1B show a precast concrete side wall 2 according to a modified example, in which (A) is a vertical cross-sectional view of the side surface, and (B) is a vertical cross-sectional view of the front surface. 図3及び図4のV-V線矢視図である。3 and 4 as seen from the line VV. ボックスカルバートの曲げモーメント図である。This is a bending moment diagram of a box culvert. 底版部接合部におけるプレキャストコンクリート側壁2の横断面図である。A cross-sectional view of the precast concrete side wall 2 at the bottom slab joint. プレキャストコンクリート側壁2、2同士の止水構造例を示す要部横断面図である。This is a cross-sectional view of a main portion showing an example of a waterproof structure between precast concrete side walls 2, 2. 地下構造物1Aの構築手順(その2)である。This is the construction procedure (part 2) for underground structure 1A. 地下構造物1Aの構築手順(その3)である。This is the construction procedure (part 3) for underground structure 1A. 地下構造物1Aの構築手順(その4)である。This is the construction procedure (part 4) for underground structure 1A. プレキャストコンクリート側壁2とプレキャストコンクリート頂版3との接合部を示す要部断面図である。2 is a cross-sectional view showing a main portion of the joint between a precast concrete side wall 2 and a precast concrete top slab 3. FIG. プレキャストコンクリート側壁2と頂版3との接合構造を示す要部断面図である。2 is a cross-sectional view showing a main portion of the joint structure between a precast concrete side wall 2 and a top plate 3. FIG. 地下構造物1Aの構築手順(その5)である。This is the construction procedure for underground structure 1A (part 5). 地下構造物1Aの構築手順(その6)である。This is the construction procedure (part 6) of underground structure 1A. 地下構造物1Aの構築手順(その7)である。This is the construction procedure (part 7) of underground structure 1A. 地下構造物1Aの構築手順(その8)である。This is the construction procedure for underground structure 1A (part 8). 底版部4との接合部を示す要部縦断面図である。A longitudinal cross-sectional view of the essential parts showing the joint with the bottom plate portion 4. 第2形態例に係る地下構造物1Bを示す縦断面図である。A vertical cross-sectional view showing an underground structure 1B relating to a second embodiment example. 従来の仮設鋼材51の固定構造を示す、(A)は側面側の縦断面図、(B)は正面側の縦断面図である。1A and 1B show a fixing structure of a conventional temporary steel material 51, in which (A) is a vertical cross-sectional view of the side surface and (B) is a vertical cross-sectional view of the front surface. 変形例に係る従来の仮設鋼材51の固定構造を示す、(A)は側面側の縦断面図、(B)は正面側の縦断面図である。1A and 1B show a fixing structure of a conventional temporary steel material 51 according to a modified example, in which (A) is a vertical cross-sectional view of the side surface, and (B) is a vertical cross-sectional view of the front surface.

以下、本発明の実施の形態について図面を参照しながら詳述する。 The following describes in detail the embodiments of the present invention with reference to the drawings.

〔第1形態例〕
図1~図3において、地下構造物1Aは、主筋の代わりに鋼材5、5…が芯材として配置されるとともに、前記鋼材5が上端面より上方側に延出して土水圧などの側方抵抗のための土留め壁用鋼材部5Bを形成し、且つ鉛直支持力及び土水圧などの側方抵抗のために下端面より下方側に突出するように複数本の鋼杭6、6…が備えられたプレキャストコンクリート側壁2と、前記プレキャストコンクリート側壁2、2間の上部に設けられた頂版部3と、プレキャストコンクリート側壁2、2間の下部に設けられるとともに、現場打設コンクリートによって構築された底版部4とからなるものである。
[First embodiment]
In Figures 1 to 3, underground structure 1A comprises precast concrete side walls 2 in which steel materials 5, 5... are arranged as core materials instead of main reinforcement, the steel materials 5 extending upward from the upper end surface to form a retaining wall steel material portion 5B for lateral resistance such as soil and water pressure, and a plurality of steel piles 6, 6... are provided so as to protrude downward from the lower end surface for vertical bearing force and lateral resistance such as soil and water pressure, a top plate portion 3 provided at the upper portion between the precast concrete side walls 2, 2, and a bottom plate portion 4 provided at the lower portion between the precast concrete side walls 2, 2 and constructed of cast-in-place concrete.

以下、具体的に前記地下構造物1Aについて施工順序に従いながら詳述する。 Below, the underground structure 1A will be described in detail in accordance with the construction sequence.

(第1工程)
第1工程は、プレキャストコンクリート側壁2、2間に本体構造となる頂版部3を構築し、埋め戻すことにより頂版部以浅部分を先行的に完成させる工程である。この第1工程について、図2~図14に基づき詳述する。
(First step)
The first step is to construct the top plate 3, which will be the main structure, between the precast concrete side walls 2, 2, and to complete the portion shallower than the top plate by backfilling. This first step will be described in detail with reference to Figs. 2 to 14.

先ず、図2に示されるように、側壁構築部位に、掘削重機を用いてプレキャストコンクリート側壁2の建込みのための掘削を行った後、プレキャストコンクリート側壁2を建て込む。 First, as shown in FIG. 2, excavation is performed at the side wall construction site using an excavator to construct the precast concrete side wall 2, and then the precast concrete side wall 2 is erected.

前記プレキャストコンクリート側壁2は、図3~図5に示されるように、主筋の代わりに鋼材5、5…が芯材として配置されるとともに、前記鋼材5が上端面より上方側に延出して配置され、頂版部3の構築までの間、土水圧などの側方抵抗のための土留め壁用鋼材部5Bとして機能し、且つ鉛直支持力及び土水圧などの側方抵抗のために、下端面より下方側に突出するように複数本の鋼杭6、6…が備えられたものを使用する。 As shown in Figures 3 to 5, the precast concrete side wall 2 is made of steel materials 5, 5... that are arranged as core materials instead of main reinforcement, and the steel materials 5 extend upward from the upper end surface. Until the top plate 3 is constructed, they function as the steel material section 5B for the retaining wall to provide lateral resistance such as soil and water pressure, and are equipped with multiple steel piles 6, 6... that protrude downward from the lower end surface to provide vertical support and lateral resistance such as soil and water pressure.

前記鋼材5は、プレキャストコンクリート側壁2に埋設された芯材用鋼材部5Aと、プレキャストコンクリート側壁2の上端面より上方側に延出した土留め壁用鋼材部5Bとが連続的に形成されたものである。 The steel material 5 is formed by continuously forming a core steel material section 5A embedded in the precast concrete side wall 2 and a retaining wall steel material section 5B extending upward from the upper end surface of the precast concrete side wall 2.

前記鋼材5は、図5に示されるように、プレキャストコンクリート側壁2の地山側及び構造物内側にそれぞれ配列された主筋のうち、地山側主筋の代わりに配置するのが好ましく、構造物内側は異形鋼棒を用いた鉄筋を配筋するのがよい。 As shown in Figure 5, the steel material 5 is preferably arranged in place of the main reinforcement bars arranged on the ground side of the precast concrete side wall 2 and on the inside of the structure, and reinforcing bars made of deformed steel bars are preferably arranged on the inside of the structure.

地山側主筋の代わりの芯材として前記鋼材5を配置することにより、本発明に係る地下構造物1Aのようなボックスカルバート構造において、図6に示されるように引張応力が卓越する側壁の強度を増加することができ、異形鋼棒を用いた鉄筋コンクリート構造に比べて、鋼材の断面積量が増加し、同一断面積の場合曲げ耐力が大きくなる。その結果、プレキャストコンクリート側壁2の薄型化及び軽量化が図れるとともに、大深度の地下構造物にも対応可能となり、本構築方法の適用性が拡大できる。 By placing the steel material 5 as a core material in place of the main reinforcement on the natural ground side, in a box culvert structure such as the underground structure 1A of the present invention, the strength of the side wall where tensile stress predominates can be increased as shown in Figure 6, and compared to a reinforced concrete structure using deformed steel bars, the cross-sectional area of the steel material increases, and the bending strength increases for the same cross-sectional area. As a result, the precast concrete side wall 2 can be made thinner and lighter, and it can also be used for underground structures at great depths, expanding the applicability of this construction method.

また、前記鋼材5をプレキャストコンクリート側壁2の上端面より上方側の地上まで到達する長さで延出させ、その地山側に鋼矢板などの板材を設置することにより、土留め壁として利用できるようにしている。前記鋼材5をプレキャストコンクリート側壁2の上端面より上方側に延出させるには、図3に示されるように、芯材用鋼材部5Aから分断することなく、連続する1本の鋼材としてもよいし、図4に示されるように、プレキャストコンクリート側壁2の上端面より上方側に突出した位置で、分断した鋼材の端部同士を添接板7により添接接合した構造としてもよい。 The steel material 5 is extended above the upper end surface of the precast concrete side wall 2 to a length that reaches the ground above, and a plate material such as a steel sheet pile is installed on the ground side, so that it can be used as an earth retaining wall. To extend the steel material 5 above the upper end surface of the precast concrete side wall 2, it may be a continuous piece of steel material without being separated from the core steel material portion 5A as shown in Figure 3, or it may be structured such that the ends of the separated steel material are spliced together with a splice plate 7 at a position protruding above the upper end surface of the precast concrete side wall 2 as shown in Figure 4.

このように、プレキャストコンクリート側壁2の芯材として用いられる鋼材5が、プレキャストコンクリート側壁2の上端面より上方側に延出し、工事中の土留め壁として利用可能な土留め壁用鋼材部5Bを形成するため、土被りが大きく、前記土留め壁用鋼材部5Bに側方から大きな土水圧などが加わった場合でも、芯材から連続して延びる鋼材5によって深度方向に対する連続的な抵抗力が確保でき、プレキャストコンクリート側壁2のひび割れなどの破損が防止できる。 In this way, the steel material 5 used as the core material of the precast concrete side wall 2 extends upward from the upper end surface of the precast concrete side wall 2 to form the retaining wall steel material section 5B that can be used as an earth retaining wall during construction. Therefore, even if there is a large amount of soil covering and a large soil and water pressure is applied to the retaining wall steel material section 5B from the side, the steel material 5 extending continuously from the core material ensures continuous resistance in the depth direction, preventing damage such as cracks in the precast concrete side wall 2.

前記鋼材5は、T形鋼、H形鋼、I形鋼、溝形鋼など、公知の形鋼材を使用することができるが、特にT形鋼を用いるのが望ましい。このT形鋼の配置は、図5に示されるように、フランジ部5fがプレキャストコンクリート側壁2の外面側(地山側)に対向し、ウェブ部5wが内側に向けて突出する向きで配置するのがよい。 The steel material 5 can be any known steel material, such as a T-shaped steel, an H-shaped steel, an I-shaped steel, or a channel steel, but it is particularly preferable to use a T-shaped steel. As shown in Figure 5, the T-shaped steel should be arranged so that the flange portion 5f faces the outer surface (ground surface) of the precast concrete side wall 2 and the web portion 5w protrudes inward.

T形鋼からなる鋼材5を上述のような向きで配置することにより、H形鋼をフランジ部がプレキャストコンクリート側壁2の外面側に対向するように配置した場合と比較して、鋼材の重心位置がプレキャストコンクリート側壁2の外面側寄りとなるため、同一断面積の場合、T形鋼とした方が、有効高さが大きくなり、設計上有利となる。 By arranging the steel material 5 made of T-shaped steel in the above-mentioned orientation, the center of gravity of the steel material is closer to the outer surface of the precast concrete side wall 2 compared to when the H-shaped steel is arranged so that the flange portion faces the outer surface of the precast concrete side wall 2, so for the same cross-sectional area, the effective height is greater in the case of T-shaped steel, which is advantageous in terms of design.

また、従来の異形鋼棒を用いた鉄筋コンクリート構造に比べて曲げ耐力が大きくなるため、内部掘削時の切梁による支保が簡略化できる。 In addition, since the bending strength is greater than that of conventional reinforced concrete structures using deformed steel bars, support using braces during internal excavation can be simplified.

更に、プレキャストコンクリート側壁2の製作において、現場打設コンクリートによって構築する底版部4や頂版部3との接合部として、図7に示されるように、主筋の配置位置に対応して機械式継手8、8…が設置されるが、その際、図7(A)に示されるように、鋼材としてH形鋼を用いた場合は、機械式継手8がH形鋼のフランジに干渉して主筋に対応する位置に配置できずに隣接する機械式継手8、8同士の間隔が過密化する場合があるのに対して、図7(B)に示されるように、鋼材5としてT形鋼を用いた場合は、鋼材5と機械式継手8とが干渉することなく、主筋に対応する位置にほぼ等間隔に配置することができ、コンクリートの充填性が良好となる。 Furthermore, in the production of the precast concrete side walls 2, mechanical joints 8, 8... are installed in correspondence with the positions of the main reinforcement as shown in Figure 7, at the joints with the bottom slab 4 and top slab 3 constructed with cast-in-place concrete. At that time, when H-shaped steel is used as the steel material, as shown in Figure 7( A ), the mechanical joints 8 may interfere with the flanges of the H-shaped steel and not be able to be positioned in positions corresponding to the main reinforcement, resulting in the spacing between adjacent mechanical joints 8, 8 becoming too close together. However, when T-shaped steel is used as the steel material 5, as shown in Figure 7( B ), the steel material 5 and the mechanical joints 8 do not interfere with each other, and they can be positioned at approximately equal intervals in positions corresponding to the main reinforcement, resulting in good concrete filling properties.

前記プレキャストコンクリート側壁2は、少なくとも内壁面側に対して、フィルムを貼設するか、剥離剤を塗布しておくことが望ましい。 It is desirable to apply a film or a release agent to at least the inner wall surface of the precast concrete side wall 2.

前記プレキャストコンクリート側壁2と鋼杭6とは、図3に示されるように、プレキャストコンクリート側壁2の下端面より所定深さに亘って埋設されたインサート金具9に対して、鋼杭6の端部に備えられたベースプレート6aを介してボルト定着するか、図示しないが、プレキャストコンクリート側壁2の下端面より所定深さに亘って埋設されるとともに埋設側先端部に支圧板やスタッドが設けられた鋼材に対して、鋼杭6を添接板を介した添接接合することにより着脱可能に備えられている。 As shown in FIG. 3, the precast concrete side wall 2 and the steel pile 6 are fixed by bolts via a base plate 6a provided at the end of the steel pile 6 to an insert metal fitting 9 buried to a specified depth from the bottom end surface of the precast concrete side wall 2, or, although not shown, the steel pile 6 is removably attached by splicing it via a splice plate to a steel material buried to a specified depth from the bottom end surface of the precast concrete side wall 2 and equipped with a bearing plate or stud at the tip of the buried side.

建込みに当たり、前記プレキャストコンクリート側壁2、2同士の接合面においては、所定の止水構造を設ける。この止水構造としては公知のものを制限なく用いることが可能であるが、特に、特開2011-122386号公報に開示された好適止水構造を用いるのが望ましい。同公報に開示されたプレキャストコンクリート側壁2の止水構造は、図8に示されるように、相隣接するプレキャストコンクリート側壁2A、2Bの対向側面において、一方のプレキャストコンクリート側壁2Aの側面に埋設された一方側接合金具10Aと、他方のプレキャストコンクリート側壁2Bの側面に埋設された他方側接合金具10Bとの係合によって周囲から締め切られた空間11が形成され、この締切り空間11内において、プレキャストコンクリート側壁2A、2Bに部材長手方向に沿って対向する凹状溝12が形成されるとともに、これら凹状溝12、12間に跨がって止水板13が挿入設置され、前記締切り空間11内にグラウト材14が充填されてなるものである。 When erecting the structure, a specified water-stopping structure is provided at the joint surface between the precast concrete side walls 2, 2. Any known water-stopping structure can be used without restriction, but it is particularly preferable to use the suitable water-stopping structure disclosed in JP 2011-122386 A. The water-stopping structure of the precast concrete side wall 2 disclosed in the publication is as shown in FIG. 8, in which a space 11 is formed on the opposing sides of adjacent precast concrete side walls 2A and 2B by the engagement of a first-side metal joint 10A embedded in the side of one precast concrete side wall 2A with a second-side metal joint 10B embedded in the side of the other precast concrete side wall 2B. In this closed space 11, opposing concave grooves 12 are formed in the precast concrete side walls 2A and 2B along the longitudinal direction of the members, and a water stop plate 13 is inserted and installed across these concave grooves 12, 12, and the closed space 11 is filled with grout material 14.

以上の工程までを終えたならば、図9に示されるように、プレキャストコンクリート側壁2の上方側に突出する土留め壁用鋼材部5B、5Bの間及びプレキャストコンクリート側壁2、2間の地盤を掘削除去する。地盤の掘削に当たっては、図10に示されるように、必要に応じて土留め壁用鋼材部5B、5B間に切梁20を架設する。掘削深さは、プレキャストコンクリート側壁2の頂部を露出させ、次工程の頂版部3を構築可能な程度とする。 Once the above steps have been completed, the ground between the retaining wall steel parts 5B, 5B that protrude above the precast concrete side wall 2 and between the precast concrete side walls 2, 2 is excavated and removed, as shown in Figure 9. When excavating the ground, struts 20 are erected between the retaining wall steel parts 5B, 5B as necessary, as shown in Figure 10. The excavation depth is set to a level that exposes the top of the precast concrete side wall 2 and allows the construction of the top plate part 3 in the next step.

掘削を終えたならば、図11に示されるように、プレキャストコンクリート側壁2、2間に頂版部3を構築する。前記頂版部3の構築は、プレキャストコンクリート頂版を架設するプレキャスト方式か、現場打設コンクリートによる現場打設方式を採用することができる。 Once excavation is complete, the top plate 3 is constructed between the precast concrete side walls 2, 2, as shown in Figure 11. The construction of the top plate 3 can be done using a precast method in which a precast concrete top plate is erected, or a cast-in-place method using cast-in-place concrete.

前記プレキャスト方式により前記頂版部3を構築する場合、プレキャストコンクリート側壁2との結合部は、例えば図12(A)に示されるように、プレキャストコンクリート側壁2の上部にアンカーロッド21を埋設しておくとともに、その上部にねじ式カップラー22を設けておき、前記プレキャストコンクリート頂版3を設置した後、前記ねじ式カップラー22の対応位置に予め埋設してあるスリーブ23を通してロッド24を挿入し、ねじ式カップラー22に連結した後、上部を締結するロッド結合方式や、図12(B)に示されるように、施工誤差を吸収するためにプレキャストコンクリート頂版3に埋設されたスリーブ25、25内に、プレキャストコンクリート側壁2の上面から突出させた鉄筋26、26を挿入した後、スリーブ25内にモルタルを注入し接合するスリーブ方式等を採用するのが望ましい。前記スリーブ25の内径は、前記鉄筋26の外形よりも若干大きく製作されており、頂版部3の施工誤差をこの部分で吸収することができる。 When constructing the top plate 3 by the precast method, it is desirable to adopt a rod connection method in which an anchor rod 21 is buried in the upper part of the precast concrete side wall 2 and a screw-type coupler 22 is provided on the upper part of the anchor rod 21, as shown in FIG. 12(A), and after the precast concrete top plate 3 is installed, a rod 24 is inserted through a sleeve 23 previously buried in the corresponding position of the screw-type coupler 22, and connected to the screw-type coupler 22, and then the upper part is fastened. Or, as shown in FIG. 12(B), a sleeve method is adopted in which reinforcing bars 26, 26 protruding from the upper surface of the precast concrete side wall 2 are inserted into sleeves 25, 25 buried in the precast concrete top plate 3 to absorb construction errors, and then mortar is injected into the sleeve 25 to join them. The inner diameter of the sleeve 25 is made slightly larger than the outer diameter of the reinforcing bar 26, and this part can absorb construction errors in the top plate 3.

また、前記現場打設方式により前記頂版部3を構築する方法は、例えば図13に示されるように、予めプレキャストコンクリート側壁2の上面又は側面上部に側壁部主鉄筋27、27…を配筋し、その先端部に機械式継手28を設けておき、この機械式継手28に対し頂版部主鉄筋29の先端部に取り付けた機械式継手30を接合して頂版部3の配筋を行った後、型枠を配設し、コンクリートを打設する。 In addition, the method of constructing the top plate 3 using the on-site casting method involves, for example, placing the side wall main reinforcing bars 27, 27... on the top surface or upper part of the side of the precast concrete side wall 2 in advance, providing mechanical joints 28 at their tips, joining mechanical joints 30 attached to the tips of the top plate main reinforcing bars 29 to the mechanical joints 28, reinforcing the top plate 3, setting up formwork, and pouring concrete, as shown in Figure 13.

ここで、前記頂版部3をプレキャストコンクリート側壁2の上面に配置し、プレキャストコンクリート側壁2の上端面より上方側に突出する土留め壁用鋼材部5Bを頂版部3に埋設することにより、プレキャストコンクリート側壁2と頂版部3との結合を強化するのが好ましい。例えば図12に示されるようにプレキャストコンクリート頂版3を架設する場合、プレキャストコンクリート頂版3に土留め壁用鋼材部5Bと嵌合可能な嵌合部31を上下方向に沿って設けておき、この嵌合部31に土留め壁用鋼材部5Bを嵌合させつつプレキャストコンクリート頂版3を設置した後、前記嵌合部31内の土留め壁用鋼材5Bとの隙間をモルタルで充填する。 Here, it is preferable to strengthen the bond between the precast concrete side wall 2 and the top plate 3 by placing the top plate 3 on the upper surface of the precast concrete side wall 2 and embedding the retaining wall steel part 5B, which protrudes upward from the upper end surface of the precast concrete side wall 2, in the top plate 3. For example, when erecting the precast concrete top plate 3 as shown in Figure 12, a fitting part 31 that can fit with the retaining wall steel part 5B is provided in the precast concrete top plate 3 along the vertical direction, and after installing the precast concrete top plate 3 while fitting the retaining wall steel part 5B into this fitting part 31, the gap between the retaining wall steel part 5B and the fitting part 31 is filled with mortar.

以上、頂版部3を設置したならば、図14に示されるように、頂版部3よりも上方に突出した土留め壁用鋼材部5B部分をガス切断等により撤去した後、埋戻しを行い、地上占用を開放する。 Once the top plate 3 has been installed as described above, as shown in Figure 14, the retaining wall steel section 5B that protrudes above the top plate 3 is removed by gas cutting or the like, and then backfilling is performed to release the aboveground area.

(第2工程)
上記第1工程により、頂版部3の以浅部分を先行的に完成させたならば、図15に示されるように、前記プレキャストコンクリート側壁2、2及び頂版部3によって囲まれた頂版部3以深の地盤を掘削し、最終的に底版部4の構築深さまでの掘削を行う。図16に示されるように、掘削は、必要に応じて切梁32、32によって支保を行い、掘削土砂の排出は、例えば頂版部3の一部を開口としておき、バケット(クレーン)により地上まで揚上し、ダンプトラック等により搬出するようにする。
(Second step)
Once the shallower portion of the top plate 3 has been completed in advance by the above-mentioned first step, the ground deeper than the top plate 3, surrounded by the precast concrete side walls 2, 2 and the top plate 3, is excavated as shown in Figure 15, and finally excavation is performed up to the construction depth of the bottom plate 4. As shown in Figure 16, the excavation is supported by struts 32, 32 as necessary, and the excavated soil is discharged, for example, by leaving part of the top plate 3 open, lifting it to the ground with a bucket (crane), and transporting it away by a dump truck or the like.

(第3工程)
所定深さ(底版部4の構築深さ)までの掘削を終えたならば、図17に示されるように、底版部構築部位にコンクリート33を打設するとともに、前記プレキャストコンクリート側壁2、2との結合及び一体化を図るようにする。底版部4とプレキャストコンクリート側壁2との結合は、例えば図18に示されるように、プレキャストコンクリート側壁2の下部より底版部4側に向けて側壁部主鉄筋33を配筋し、その先端部に機械式継手34を設けておき、この機械式継手34に対し底版部主鉄筋35の先端部に取り付けた機械式継手36を接合して底版部4の配筋を行った後、型枠を配設し、コンクリートを打設する。
(Third process)
Once excavation to a specified depth (construction depth of the bottom slab 4) is completed, concrete 33 is poured into the bottom slab construction area and the precast concrete side walls 2, 2 are joined and integrated together, as shown in Fig. 17. The bottom slab 4 and the precast concrete side walls 2 are joined, for example, as shown in Fig. 18, by arranging side wall main reinforcing bars 33 from the lower part of the precast concrete side wall 2 toward the bottom slab 4 side, providing mechanical joints 34 at their tips, and joining mechanical joints 36 attached to the tips of bottom slab main reinforcing bars 35 to the mechanical joints 34 to arrange the reinforcement of the bottom slab 4, followed by setting up formwork and pouring concrete.

後は、最終仕上げとして、前記プレキャストコンクリート側壁2の内壁面側に対して、予めフィルムを貼設している場合には、これを剥がして綺麗なコンクリート面を露出させる。また、剥離剤が塗布されている場合にはジェットウォーターの噴射やブラシ清掃により泥水やソイルセメント等の汚れを落とすようにする。 As a final finishing touch, if a film has been applied to the inner wall surface of the precast concrete side wall 2, this is removed to expose the clean concrete surface. If a stripping agent has been applied, muddy water, soil cement, and other contaminants are removed by spraying with jet water or cleaning with a brush.

〔第2形態例〕
上記形態例では、両側壁2、2間に頂版部3及び底版部4が架け渡される構造としたが、図19に示されるように、両側壁2、2間をプレキャストコンクリート中間壁又は中間柱15により仕切る地下構造物1Bとすることも可能である。構築手順は前述した第1形態例と基本的には同様であるが、施工ヤードがない場合などには、少なくとも一部の主筋の代わりに鋼材が芯材として配置されるとともに、前記鋼材が土水圧などの側方抵抗のために上端面より上方側に延出して配置された中間壁15を用いた上で、第1工程において左側の側壁2と中間壁15との間の左側スパン部分の頂版部3の構築を先行して行い、左側の側壁2の土留め壁用鋼材5Bのみを除去して埋戻しを行った後、中間壁15と右側の側壁2との間の右側スパン部分の掘削及び頂版部3の構築を行い、中間壁15及び右側の側壁2の土留め壁用鋼材5Bを除去して埋戻しを行う段階的な施工を行ってもよいし、施工ヤードがある場合などには、鋼材が上端面より上方側に延出しない通常の中間壁を配置した上で、左側スパン部分及び右側スパン部分を同時に施工してもよい。
[Second embodiment]
In the above example, the top plate portion 3 and the bottom plate portion 4 are bridged between the both side walls 2, 2. However, as shown in Figure 19, it is also possible to create an underground structure 1B in which the both side walls 2, 2 are separated by a precast concrete intermediate wall or intermediate column 15. The construction procedure is basically similar to that of the first embodiment described above. However, in cases where there is no construction yard, etc., a stepwise construction may be carried out in which a steel material is placed as a core material instead of at least a part of the main reinforcement, and an intermediate wall 15 in which the steel material extends upward from the upper end surface for lateral resistance such as soil-water pressure is used, and the top plate 3 of the left span portion between the left side wall 2 and the intermediate wall 15 is constructed in advance in the first step, and only the retaining wall steel material 5B of the left side wall 2 is removed and backfilled, and then the right span portion between the intermediate wall 15 and the right side wall 2 is excavated and the top plate 3 is constructed, and the retaining wall steel material 5B of the intermediate wall 15 and the right side wall 2 is removed and backfilled. Alternatively, in cases where there is a construction yard, etc., a normal intermediate wall in which the steel material does not extend upward from the upper end surface may be arranged, and the left span portion and the right span portion may be constructed simultaneously.

また、第3工程において、底版部4のコンクリート打設に当たって、プレキャストコンクリート中間壁又は中間柱15の下端面を底版部下面よりも上側位置としておき、打設したコンクリートがプレキャストコンクリート中間壁又は中間柱15部でとぎれることなく連続して配筋可能とするのが望ましい。 In addition, in the third step, when pouring concrete into the base slab 4, it is desirable to position the lower end surface of the precast concrete intermediate wall or intermediate column 15 above the lower surface of the base slab so that the poured concrete can be continuously reinforced without interruption in the precast concrete intermediate wall or intermediate column 15.

〔他の形態例〕
(1)上記形態例では、プレキャストコンクリート側壁2、2間の頂版を構築する位置までの地盤を掘削除去した後、頂版部3を構築するようにしたが、掘削部の開放が長期に亘る場合には、一端、覆工板を設置して掘削部を塞ぎ、この覆工板と順次交換しながら、頂版部3を構築するようにしてもよい。
[Other examples]
(1) In the above example, the ground is excavated and removed up to the position where the top plate between the precast concrete side walls 2, 2 is to be constructed, and then the top plate portion 3 is constructed. However, if the excavated portion will be left open for a long period of time, a covering plate may be installed to seal the excavated portion, and the top plate portion 3 may be constructed while successively replacing this covering plate.

(2)上記形態例においては、プレキャストコンクリート側壁2及びプレキャストコンクリート中間壁又は中間柱15共に、下端面より下方側に突出するように複数本の鋼杭6を備えるものを使用したが、前記鋼杭6を無くし、全根入れ長をプレキャストコンクリート部材としてもよい。 (2) In the above embodiment, both the precast concrete side walls 2 and the precast concrete intermediate walls or intermediate columns 15 are equipped with multiple steel piles 6 that protrude downward from their lower end faces, but the steel piles 6 may be eliminated and the entire embedded length may be made of precast concrete members.

(3)上記形態例では、図3及び図4に示されるように、プレキャストコンクリート側壁2に配置された全ての芯材(鋼材5)が上端面より上方側に延出して土水圧などの側方抵抗のための土留め壁用鋼材5Bを形成していたが、土水圧などに応じて、上端面より上方側に延出させる鋼材5を1つ置き又は2つ置き以上とし、それ以外の鋼材5を上方側に延出させないようにしてもよい。 (3) In the above embodiment, as shown in Figures 3 and 4, all of the core materials (steel materials 5) arranged in the precast concrete side wall 2 extend upward from the upper end surface to form the retaining wall steel materials 5B for lateral resistance to soil and water pressure, etc. However, depending on soil and water pressure, etc., every other steel material 5 may extend upward from the upper end surface by one or more, and the remaining steel materials 5 may not extend upward.

1A・1B…地下構造物、2…プレキャストコンクリート側壁、3…頂版部、4…底版部、5…鋼材、5A…芯材用鋼材部、5B…土留め壁用鋼材部、6…鋼杭 1A, 1B... Underground structure, 2... Precast concrete side wall, 3... Top plate, 4... Bottom plate, 5... Steel, 5A... Core steel, 5B... Retaining wall steel, 6... Steel pile

Claims (6)

少なくとも両側壁部、頂版部及び底版部を有する地下構造物の構築方法であって、
前記両側壁部の構築部位に、地山側主筋の代わりに鋼材が芯材として配置されるとともに、前記鋼材としてT形鋼が用いられ、かつ前記T形鋼はフランジ部がプレキャストコンクリート側壁の外面側に対向し、ウェブ部が内側に向けて突出するように配置され、前記鋼材が上端面より上方側に延出して土水圧などの側方抵抗のための土留め壁用鋼材部を形成した、本体構造となるプレキャストコンクリート側壁を地中に建込み、これらプレキャストコンクリート側壁間の頂版を構築する位置までの地盤を掘削除去した後、前記プレキャストコンクリート側壁間に本体構造となる頂版部を構築し、埋め戻すことにより頂版部以浅部分を先行的に完成させる第1工程と、
前記プレキャストコンクリート側壁及び頂版部によって囲まれた頂版部以深の地盤を掘削し、最終的に底版部の構築深さまで掘削を行う第2工程と、
底版部構築部位において、底版部とプレキャストコンクリート側壁との結合に当たって、予めプレキャストコンクリート側壁の下部より底版部側に向けて側壁部主鉄筋を配筋するとともに、その先端部に機械式継手を設けておき、この機械式継手に対して底版部の配筋を行った後、型枠を配設し、コンクリートを打設して前記プレキャストコンクリート側壁との結合及び一体化を図りながら本体構造となる底版部を構築する第3工程と、からなることを特徴とする地下構造物の構築方法。
A method for constructing an underground structure having at least two side walls, a top plate, and a bottom plate, comprising the steps of:
a first step of erecting precast concrete side walls that will form the main structure in the ground , the precast concrete side walls having a flange portion facing the outer surface of the precast concrete side walls and a web portion protruding inward, the precast concrete side walls extending upward from their upper end surfaces to form a retaining wall steel portion for lateral resistance to soil and water pressure, and excavating and removing the ground up to a position where a top plate will be constructed between the precast concrete side walls, and then constructing a top plate portion that will form the main structure between the precast concrete side walls and backfilling the ground to complete the portion shallower than the top plate in advance;
A second step of excavating the ground below the top plate surrounded by the precast concrete side walls and the top plate, and finally excavating the ground to a construction depth of the bottom plate;
A method for constructing an underground structure, characterized in that, when joining the bottom slab and the precast concrete side wall at the bottom slab construction site, the side wall main reinforcement bars are first arranged from the lower part of the precast concrete side wall toward the bottom slab and a mechanical joint is provided at the tip of the reinforcement bars, and after the bottom slab is reinforced relative to this mechanical joint, formwork is installed and concrete is poured to construct the bottom slab, which will become the main structure, while joining and integrating it with the precast concrete side wall.
両側壁部、両側壁間の中間壁又は中間柱、頂版部及び底版部を有する地下構造物の構築方法であって、
前記両側壁部、両側壁間の中間壁又は中間柱によって仕切られる各スパンを順に、側壁の構築部位には、地山側主筋の代わりに鋼材が芯材として配置されるとともに、前記鋼材としてT形鋼が用いられ、かつ前記T形鋼はフランジ部がプレキャストコンクリート側壁の外面側に対向し、ウェブ部が内側に向けて突出するように配置され、前記鋼材が上端面より上方側に延出して土水圧などの側方抵抗のための土留め壁用鋼材部を形成した、本体構造となるプレキャストコンクリート側壁を地中に建込むとともに、中間壁又は中間柱の構築部位には、主筋の代わりに鋼材が芯材として配置されるとともに、前記鋼材が上端面より上方側に延出して土水圧などの側方抵抗のための土留め壁用鋼材部を形成した、本体構造となるプレキャストコンクリート中間壁又は中間柱を地中に建込み、これらスパン間の頂版を構築する位置までの地盤を掘削除去した後、前記プレキャストコンクリート側壁間に本体構造となる頂版部を構築し、埋め戻すことにより頂版部以浅部分を先行的に完成させる第1工程と、
前記プレキャストコンクリート側壁及び頂版部によって囲まれた頂版部以深の地盤を掘削し、最終的に底版部の構築深さまでの掘削を行う第2工程と、
底版部構築部位において、底版部とプレキャストコンクリート側壁との結合に当たって、予めプレキャストコンクリート側壁の下部より底版部側に向けて側壁部主鉄筋を配筋するとともに、その先端部に機械式継手を設けておき、この機械式継手に対して底版部の配筋を行った後、型枠を配設し、コンクリートを打設して前記プレキャストコンクリート側壁及びプレキャストコンクリート中間壁又は中間柱との結合及び一体化を図りながら本体構造となる底版部を構築する第3工程と、からなることを特徴とする地下構造物の構築方法。
A method for constructing an underground structure having two side walls, an intermediate wall or intermediate column between the two side walls, a top plate and a bottom plate, comprising the steps of:
a first step of erecting precast concrete side walls that will form a main structure in the ground for each span separated by the side wall portions and the intermediate wall or column between the side walls, in which steel material is placed as a core material in place of main reinforcement on the ground side of the construction portion of the side walls, T-shaped steel is used as the steel material, and the flange portion of the T-shaped steel is arranged so that it faces the outer surface of the precast concrete side wall and the web portion protrudes inward, and the steel material extends upward from the upper end surface to form a steel material portion for a retaining wall for lateral resistance such as soil and water pressure, and erecting precast concrete intermediate walls or intermediate columns that will form a main structure in the ground for each span separated by the side wall portions and the intermediate wall or column, in which steel material is placed as a core material in place of main reinforcement in place of main reinforcement and the steel material extends upward from the upper end surface to form a steel material portion for a retaining wall for lateral resistance such as soil and water pressure, excavating and removing the ground up to a position where a top plate will be constructed between the spans, constructing a top plate portion that will form the main structure between the precast concrete side walls, and backfilling the ground to complete the portion shallower than the top plate portion in advance;
A second step of excavating the ground below the top plate surrounded by the precast concrete side walls and the top plate, and finally excavating the ground to a construction depth of the bottom plate;
A method for constructing an underground structure, characterized in that, in connecting the bottom slab and the precast concrete side walls at the bottom slab construction site, the side wall main reinforcement bars are arranged in advance from the lower part of the precast concrete side wall toward the bottom slab, and a mechanical joint is provided at the tip of the reinforcement bars, and after the bottom slab is reinforced relative to this mechanical joint, formwork is arranged and concrete is poured to construct the bottom slab, which will become the main structure, while connecting and integrating the precast concrete side walls and the precast concrete intermediate walls or intermediate columns.
前記プレキャストコンクリート側壁及び/又はプレキャストコンクリート中間壁又は中間柱は、鉛直支持力及び土水圧などの側方抵抗のために、下端面より下方側に突出するように複数本の鋼杭を備える請求項1、2いずれかに記載の地下構造物の構築方法。 A method for constructing an underground structure as described in claim 1 or 2, wherein the precast concrete side walls and/or precast concrete intermediate walls or intermediate columns are provided with a plurality of steel piles protruding downward from their lower end surfaces for vertical bearing capacity and lateral resistance such as soil and water pressure. 前記プレキャストコンクリート側壁及び/又はプレキャストコンクリート中間壁又は中間柱は、少なくとも内壁面側に対して、フィルムを貼設又は剥離剤を塗布してある請求項1~いずれかに記載の地下構造物の構築方法。 The method for constructing an underground structure according to any one of claims 1 to 3 , wherein the precast concrete side walls and/or the precast concrete intermediate walls or intermediate columns have a film attached or a release agent applied to at least the inner wall surface side. 地山側主筋の代わりに鋼材が芯材として配置されるとともに、前記鋼材としてT形鋼が用いられ、かつ前記T形鋼はフランジ部がプレキャストコンクリート側壁の外面側に対向し、ウェブ部が内側に向けて突出するように配置され、前記鋼材が上端面より上方側に延出して土水圧などの側方抵抗のための土留め壁用鋼材部を形成し、且つ鉛直支持力及び土水圧などの側方抵抗のために下端面より下方側に突出するように複数本の鋼杭が備えられたプレキャストコンクリート側壁と、プレキャストコンクリート側壁間の上部に設けられた頂版部と、プレキャストコンクリート側壁間の下部に設けられるとともに、現場打設コンクリートによって構築された底版部とからなることを特徴とする請求項1記載の構造物の構築方法によって構築された地下構造物。 2. An underground structure constructed by the method of constructing a structure as described in claim 1, characterized in that the precast concrete side walls are provided with a top plate portion provided at the upper part between the precast concrete side walls, and a bottom plate portion provided at the lower part between the precast concrete side walls and constructed of cast-in-place concrete, the top plate portion being provided at the upper part between the precast concrete side walls, and the bottom plate portion being provided at the lower part between the precast concrete side walls and constructed of cast -in-place concrete. 前記プレキャストコンクリート側壁間に、1又は複数のプレキャストコンクリート中間壁又は中間柱を有するとともに、該プレキャストコンクリート中間壁又は中間柱は、主筋の代わりに鋼材が芯材として配置されるとともに、前記鋼材が上端面より上方側に延出して土水圧などの側方抵抗のための土留め壁用鋼材部を形成し、且つ鉛直支持力及び土水圧などの側方抵抗のために下端面より下方側に突出するように複数本の鋼杭が備えられている請求項記載の地下構造物。 6. An underground structure as described in claim 5, having one or more precast concrete intermediate walls or intermediate columns between the precast concrete side walls, in which steel material is arranged as a core material instead of main reinforcement, the steel material extends upward from the upper end surface to form a steel portion for a retaining wall for lateral resistance such as soil and water pressure, and a plurality of steel piles are provided to protrude downward from the lower end surface for vertical bearing force and lateral resistance such as soil and water pressure.
JP2021102551A 2021-06-21 2021-06-21 Method for constructing underground structure, underground structure, and precast concrete side or intermediate wall/column therefor Active JP7633891B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021102551A JP7633891B2 (en) 2021-06-21 2021-06-21 Method for constructing underground structure, underground structure, and precast concrete side or intermediate wall/column therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021102551A JP7633891B2 (en) 2021-06-21 2021-06-21 Method for constructing underground structure, underground structure, and precast concrete side or intermediate wall/column therefor

Publications (2)

Publication Number Publication Date
JP2023001683A JP2023001683A (en) 2023-01-06
JP7633891B2 true JP7633891B2 (en) 2025-02-20

Family

ID=84688893

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021102551A Active JP7633891B2 (en) 2021-06-21 2021-06-21 Method for constructing underground structure, underground structure, and precast concrete side or intermediate wall/column therefor

Country Status (1)

Country Link
JP (1) JP7633891B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006132219A (en) 2004-11-08 2006-05-25 Toda Constr Co Ltd Construction method of underground structure and underground structure, and precast concrete side wall or intermediate wall / column for the same
JP2006336377A (en) 2005-06-03 2006-12-14 Tobishima Corp Precast concrete pile core and method for removing reinforced concrete structure using the same

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5275014A (en) * 1975-12-18 1977-06-23 Nippon Pressed Concrete Kk Land slide protection wall
JPH0476123A (en) * 1990-07-19 1992-03-10 Kumagai Gumi Co Ltd Constructing method for underground structure
JPH09268583A (en) * 1996-03-29 1997-10-14 Tokyu Koken Kk Structural steel embedded half precast concrete member and construction method of underground structure using the same member
KR20040050137A (en) * 2002-12-09 2004-06-16 주식회사 스마텍엔지니어링 Panel Assembly A Breast Wall to increase supporting power

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006132219A (en) 2004-11-08 2006-05-25 Toda Constr Co Ltd Construction method of underground structure and underground structure, and precast concrete side wall or intermediate wall / column for the same
JP2006336377A (en) 2005-06-03 2006-12-14 Tobishima Corp Precast concrete pile core and method for removing reinforced concrete structure using the same

Also Published As

Publication number Publication date
JP2023001683A (en) 2023-01-06

Similar Documents

Publication Publication Date Title
JP5513867B2 (en) Construction method of underground structure, underground structure, and precast concrete member therefor
KR100951097B1 (en) Slab and subgrade external wall structure and method for constructing underground slab and subgrade external wall, bracket
KR101148272B1 (en) Downward Construction Method of Basement applying SCFSliding Channel Form
JP4881555B2 (en) Construction method of underground structure
KR101167511B1 (en) Underpass using precast concrete pile and method for constructing the same
KR101051978B1 (en) Basement structure construction method using PC member
JP2004232328A (en) Structure of semi-precast arch culvert and its construction method
KR20210090101A (en) Integrated slurry wall construction structure and method using pouring blocking device and extension rebar, and construction device thereof
KR101296857B1 (en) Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same
KR100640244B1 (en) Construction Method of Slab-Outer Wall Simultaneous Placement Using Basement File Without Edge Beam
JP2004027609A (en) Construction method of underground structure and underground structure
JP5480744B2 (en) Foundation for structure and its construction method
JP7633891B2 (en) Method for constructing underground structure, underground structure, and precast concrete side or intermediate wall/column therefor
JPH11152762A (en) Structure and method of constructing the same
KR20070052109A (en) Simultaneous construction of slab and exterior wall and underground reverse casting using slim composite floor structure
KR20230108564A (en) Underground structure with precast concrete pile and composite diaphragm wall and the construction method thereof
KR101288602B1 (en) Underpass using precast concrete pile and method for constructing the same
JPH11350897A (en) Construction method of underground structure
KR100568904B1 (en) Synthetic connection structure, connection construction method and connecting device of fiber reinforced plastic sole and girder
KR100694762B1 (en) Simultaneous construction of slab-outer wall of basement level without edge beam
JP7788586B1 (en) Method for constructing underground structures
KR101884453B1 (en) Pre-climbing core construction method for top-down construction
JP3673508B2 (en) Intermediate shaft construction method and intermediate shaft
JP2001164559A (en) Construction method of continuous underground wall guide wall making use of l-type precast member
CN217998366U (en) Permanent and temporary combined basement structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240523

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20241114

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241119

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250109

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250203

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250207

R150 Certificate of patent or registration of utility model

Ref document number: 7633891

Country of ref document: JP